Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2014 STREET RESURFACING PROJECT - 14-0025-EN - ADMINISTRATIVE CHANGE ORDER #2 & FINAL
Administrative Change Order 2 & Final PROJECT 2014 Street Resurfacing Project CONTRACTOR: Gator Grading & Paving, LLC 2704 105th Street East Palmetto, FL 34221 Date: PROJECT NUMBER: PO REFERENCE NO.: COUNCIL AWARD: DATE OF CONTRACT CODE: CODE: CODE: CODE: October 14, 2015 14- 0025 -EN ST110575 May 15, 2014 June 18, 2014 0315- 92277 - 563700 -541- 000 -0000 A 0315- 92652 - 563800 -541- 000 -0000 B 0315 - 94871 - 563800 -542- 000 -0000 C 0315- 94881 - 563800 -542- 000 -0000 D SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order decreases, increases and adds items according to field conditions to closeout the project, see details attached. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: Gator Grading & Paving, LLC ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - CM Admin Change Order 2 & Final - CM NEW CONTRACT AMOUNT Rosemarie Call Date: / 2 _2q lS $3,329,125.36 $101,591.96 ($175,602.89) $3,255,114.43 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA dkaaadtkar 441 Ar: Wi am B. Home, II APPRO D A TO FORM: Mat ew Smith, lerk City Manager Assistant City Attorney Sub day of in and State of By: / e ,„,7 C/ `. 4 -- (Seal) Mike Novak President Date: Wttn es: (two) Lu 11(n Recommended By: City of Clearwater affv/.. Tara Kivett Construction Manager Michael D. Quillen, PE, and sworn before me, this A , a Notary Public County, City Engineer rr•,,, BARBARA STONEBRAKER (Signature) NOTARY PUBLIC My Commission expires _ , MY COMMISSION # EE 192520 EXPIRES: August 25, 2016 Bonded Thru Notary Public Underwriters Page 2 of 3 Administrative Change Order 2 & Final - 2014 Street Resurfacing Project ITEM DESCRIPTION UNIT Qty UNIT COST TOTAL COST Street Resurfacing Code A: 0315- 92277 - 563700 -541- 000 -0000 Decreases: 2 Full Width Milling (2" to 4 ") TN 1000 $ 5.20 ($5,200.00) 3 SP 12.5 Asphalt Concrete Resurfacing TN 5424.62 $ 88.00 ($477,366.56) 5 Manhole Riser Installation EA 22 $ 115.00 ($2,530.00) 6 Pavement Marking - Crosswalks (Lane) EA 61 $ 43.50 ($2,653.50) 7 Pavement Marking -Stop Bars (Lane) EA 49 $ 19.45 ($953.05) 8 Pavement Marking- School Crossing/RR EA 2 $ 57.20 ($114.40) Pavement Marking -Turn, Straight, 9 Combo Arrows EA 19 $ 37.75 ($717.25) Pavement Marking- Dashed (White, 10 Yellow or Double Yellow) LF 11746 $ 0.20 ($2,349.20) 12 Pavement Marking -Solid Double Yellow LF 6122 $ 0.40 ($2,448.80) Temporary Pavement Marking - Turn, 14 Straight, Combo Arrows EA 83 $ 37.75 ($3,133.25) Temporary Pavement Marking - Dashed 16 (White, Yellow or Double Yellow) LF 6785 $ 0.20 ($1,357.00) Temporary Pavement Marking -Solid 17 White LF 6926 $ 0.25 ($1,731.50) Temporary Pavement Marking -Solid 18 Double Yellow LF 19446 $ 0.40 ($7,778.40) Temporary Pavement Marking Solid 19 Yellow LF 2765 $ 0.25 ($691.25) Remove and Replace Type 1 Curb (City 20 Index 101 - Sheet I of 2) LF 300 $ 49.00 ($14,700.00) Remove and Replace Valley Gutter Curb 21 (City Index 101 - Sheet 202) LF 600 $ 51.00 ($30,600.00) Construct 5 Foot Wide ADA Ramp (City 22 Index 109 - Sheet 2 of 3) EA 14 $ 1,100.00 ($15,400.00) 41 Contractor Retains Millings TN 100 $ (4.00) ($400.00) 40 Contingency LS 1 $ 273,061.95 ($273,061.95) Total (Decreases) A: ($843,186.11) Increases: 1 Full Width Milling (Up to 2 ") SY 16106 $ 1.90 $30,601.40 4 Asphaltic Concrete Resurfacing TN 6326.22 $ 94.00 $594,664.68 11 Pavement Marking Solid White LF 11678 $ 0.25 $2,919.50 13 Pavement Marking Solid Yellow LF 4469 $ 0.25 $1,117.25 Total Increases A: $629,302.83 Additions: 42 Drew Street Pipe LS 1 $ 56,391.48 $56,391.48 43 Traffic Loops EA 54 $ 1,300.00 $70,200.00 Total Additions A: $126,591.48 Total Net (Decreases)/Increases /Additions Code A: ($87,291.80) Page 3of 3 Administrative Change Order 2 & Final - 2014 Street Resurfacing Project Parking Code B: 0315-92652-563800-541-000-0000 Decreases: 24 Full Width Milling (Up to 2 ") SY 223 $ 2.50 ($557.50) 25 Asphalt Concrete Resurfacing Type S -III TN 243.09 $ 97.20 ($23,628.35) 26 Manhole Riser Installation EA 2 $ 135.00 ($270.00) 29 Pavement Marking - 6" Solid White LF 157 $ 0.35 ($54.95) 30 Pavement Marking - 6" Solid Yellow LF 9 $ 0.85 ($7.65) 32 Asphalt Concrete Resurfacing Type S -III TN 344.47 $ 97.20 ($33,482.48) 33 Manhole Riser Installation EA 4 $ 135.00 ($540.00) 34 Pavement Marking - Stop Bars EA 2 $ 19.45 ($38.90) 36 Pavement Marking - 6" Solid White LF 720 $ 0.35 ($252.00) 37 Pavement Marking - 6" Solid Blue LF 67 $ 0.85 ($56.95) 38 Pavement Marking - Solid Yellow LF 6 $ 0.25 ($1.50) Pavement Marking - Solid Double LF 50 39 Yellow $ 0.70 ($35.00) 40 Contingency LS 1 $ 29,585.81 ($29,585.81) Total (Decreases) B: ($88,511.09) Increases: Pavement Marking -Turn, Straight, 28 Combo Arrows, "Do Not Enter" EA 5 40.00 $200.00 Total Net (Decreases)/Increases Code B: ($88,311.09) Total (Decrease) to the Contract: ($175,602.89)