WOOD VALLEY TRAFFIC CALMING - 07-0039-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 & Final PROJECT Wood Valley Traffic Calming CONTRACTOR: Steve's Excavating & Paving, Inc. P.O. Box 303 Dunedin, FL 34697 Date: PROJECT NUMBER: PO REFERENCE: AWARD DATE: CONTRACT DATE: CODE: August 24, 2015 07- 0039 -EN ST110809 August 7, 2014 August 29, 2014 0315 - 92276 - 563700 -541- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT Decreases unused items, increases and adds items according to field conditions -se ached STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT $811,876.83 Admin Change Order 1 - CM - (553,124.05) Cath NEW CONTRACT AMOUNT 58,752.78 ACCEP : Y: Steve's cavating & Paving, Inc. S'6 Rosemarie Call, Date: CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Recommended y: City of Clearwater William B. Horne, II City Manager APPROV AS T � FO Matthew Smith, Page 2 of 3 sistant City Attorney Tara Kivett, Construction Manager Michael D. Quillen, PE, City Engineer Administrative Change Order 1 & Final: Wood Valley Traffic Calming Project ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Decreases: 8 Furnish & Install Mailbox EA 2 $ 210.00 $ (420.00) 14 Superpave Asphaltic Concrete TN 0.3 $ 147.00 $ (44.10) (Traffic A)(1") 17 Cement Conc. Pavt. With Fiber SY 1.67 $ 53.00 $ (88.51) Mesh Reinforcement, 6" 33 Straight Curb LF 1 $ 30.00 $ (i0.( �0) 34 Modified Straight Curb LF 20 $ 25.00 $ (500.00) 36 Concrete Traffic Separator - SY 31.78 $ 40.00 $ (1.271.20) (Type 1 - Option II - 4') 37 Concrete Traffic Separator - SY 0.11 $ 80.00 $ (8.80) (Type I - Option II) (Special 2' Width) 39 Concrete Sidewalk (6 ") SF 2 $ 5.50 $ (11.00) (Driveways) 58 Relocate Watermain, 8" EA 1 $ 5,235.00 $ (5.235.00) 63 Contingency LS 1 $ 105,896.98 $ (105.896.98) Total (Decreases): $ (1.13,_50539) Increases: 13 Milling 1" SY 141 $ 11.50 $ 1,621.50 15 Superpave Asphaltic Concrete TN 100.13 $ 147.00 $ 14,719.11 (Traffic A)(2 ") 16 Superpave Asphaltic Concrete TN 26.47 $ 195.00 $ 5,161.65 (Traffic A)(5 ")(Speed Table) 25 Conc. Pipe Culvert (Round) (18" LF 64 $ 87.00 $ 5,568.00 S /CD) 31 Concrete Curb & Gutter, FDOT LF 59 $ 29.00 $ 1,711.00 Type RA 38 Concrete Sidewalk (4 ") SF 1300 $ 4.85 $ 6,305.00 40 Concrete Sidewalk Curb Ramp & EA 2 $ 1,540.00 $ 3,080.00 Detectable Warning 41 Patterned Pavement SY 38.34 $ 80.00 $ 3,067.20 43 RIPRAP- Rubble, Ditch Lining TN 26.3 $ 68.00 $ 1,788.40 44 Bedding Stone TN 4.17 $ 31.00 $ 129.27 Total Increases: $ 43,151.13 Additions: 64 RR Insurance LS 1 $ 9,469.22 $ 9,469.22 65 Tree Removal in Rip Rap Area LS 1 $ 1,380.00 $ 1,380.00 66 Unsuitables CY 40 $ 35.00 $ 1,400.00 67 Joint Restraints LS 1 $ 891.25 $ 891.25 68 Conflict at S -5 LS 1 $ 592.83 $ 592.83 69 Overtime for Curbs at RR Tracks LS 1 $ 719.00 $ 719.00 70 Relocate Tree EA 1 $ 736.00 $ 736.00 71 Miscellaneous Added Work LS 1 $ 2,042.11 $ 2,042.11 Total Additions : $ 17,230.41 Total Net (Decreases) /Increases /Additions to Contract: $ (53,124.05)