COUNTRYSIDE MANHOLE REHABILITATION AND REPAIR - 13-0034-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 & Final Date: Au ust 17, 200 PROJECT NUMBER: .13-0034-UT PO REFERENCE: 401.1142,13 d CONTRACTOR: COUNCIL AWARD: F 9, 201 Kamminga & Roodvoets, Inc. DATE OF CONTRACT 2, 24)45 5219 Cone Road Tampa, 1133610 Code: 0327-96665-56380?-5i' 0Q0 -0 000 'e SCOPE OF CHARM THIS ORDER ACCEPTS REVISIONS TO THE CONTRACT V Dee easietem aed items. immeadst items aaerdisg to field - see I5 STATEMENT OF CONTRACT AMOUNT • ACCEPTED - • _ & Roodvo , Inca ORIGINAL CONTRACy AMO/UNT r r : ; $677,624.20 Bev: 1190a1) Admin Change Order l& Fi L Cr.., 'i alas /� Vice Presklent NEW CO b(TRA . Nte ,Is' +r•• 2• �' .2 6 - OL l � .$` (:%.2'1 it( � ./S „Date: U °�"- . Wim saes: (two) Rosemarie Call, r l City Effie - '_'/ Date: 7 9 .; Ct t 1) i ...< K'6 r CITY OF CLEARiVA.EIA.lo 5a r �� _ t, PINELLAS COUN'i ( O A 1 j t t` * nimended By: City of Clearwater t PROJECT Countryside Manhole Rehabilitation and Repair a- � ) Canto William B. Horne, II APPRO Smith, Project Manager S l sistant City Attorney Michael D. Quillen, PE, City Engineer Page 2 of 2 Administrative Change Order 1 &Final: Countryside Manhole Rehabilitation and Repair ITEM DESCRIPTION UNIT Qa UNIT COST Decreases: 5 Furnish & Install 8" PVC SDR- LF 61 $ 75.00 35 Gravity Sewer 6 Furnish & Install Flowable Fill CY 25 $ 240.00 ($6,000.00) 7 Remove & Replace Unsuitable CY 129 $ 35.00 (54,515.00) Material 9 Full Width Milling (Up To 2 ") SY 8526 $ 4.50 ($38,367.00) 10 Asphalt Concrete 2" Type S -1 TON 716.84 $ 70.00 ($50,178.80) 13 Rehabilitation Existing San EA 3 $ 7,000.00 (521.000.00) Sewer MH8 -12FT 14 CrushedConcreteBase SY 52.9 $ 35.00 ($1,851.50) 15 10% Contingency LS 1 $ 61,602.20 ($61,602.20) Total (Decreases): (5188,08930) Increases: 3 Furnish and Install Precast San I1 EA 5.00 $ 15,000.00 $75,000.00 4 Furnish & Install MH Ring & Co' EA 4.00 $ 1,450.00 55,800.00 8 Import of #57 Crushed Stone CY 23.75 $ 125.00 52,968.75 11 Rehabilitation Existing San EA 1.00 $ 5,700.00 $5,700.00 Sewer MH 0 - 4 FT 12 Rehabilitation Existing San EA 3.00 $ 6,550.00 $19,650.00 Sewer MH 4 - 8 FT Total Increases: 5109,118.75 Additions: 16 ModifyS12 LS 1.00 $ 1,392.24 $1,392.24 17 Modify S -22 LS 1.00 $ 455.50 5455.50 18 Modify S -13 LS 1.00 $ 360.90 $360.90 19 Modify S -29 LS 1.00 $ 704.10 5704.10 20 Modify S -2 LS 1.00 $ 599.45 5599.45 21 Modify S -14 LS 1.00 $ 707.16 5707.16 22 Modify S-40 IS 1.00 $ 1,161.98 $1,161.98 23 Remove & Replace Asphalt Ton 193.46 $ 23338 $45,149.69 24 Replace MH Ring & Cover EA 1.00 $ 1,150.00 $1,150.00 25 Remove & Replace Speed Table LS 1.00 $ 16,306.85 516,306.85 Total Increase Additions: 567,987.87 TOTAL COST ($4,575.00) Total Net ( Decreases)/Increases/Additions: ($10,982.88)