Loading...
WATER TREATMENT PLANT NO. 2 - CONTRACT 4 - REVERSE OSMOSIS PLANT SITE EXPANSION PROJECT - 10-0039-UT-D - ADMINISTRATIVE CHANGE ORDER #2 & FINALAdministrative Change Order 2 & Final Date: May 15, 2015 PROJECT: PROJECT NUMBER: 10- 0039 -UT (D) WTP 2 - Contract 4: Reverse Osmosis Plant Site Expansion PO REFERENCE: ST109476 COUNCIL AWARD: May 1, 2013 CONTRACTOR: Poole & Kent Company of Florida DATE OF CONTRACT: May 31, 2013 1781 NSW North River Drive Miami, Florida 33606 -1030 CODE: 0315- 96767 - 563600 -533- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order is to decrease for ODP, related Sales Tax Savings, & unused items and increase and add items according to conditions - see attached. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: Poole & Kent Co.of Fl ORIGINAL CONTRACT AMOUNT Admin Change Order 1 -CM - 9/13/2013 Admin Change Order 2 & Final -CM - NEW CONTRACT AMOUNT APPRQNED Smith, Mg7TR ,V ATTEST: $20,787,325.00 $0.00 By: ` (SEAL) ($5,911,028.86) Patrick H. Carr, President & CEO $14,876,296.14 Assistant Cit Date: Witnesses: Rosemarie Call, Date: ,29.2o/S Ty R.Parkiv Recommended By: City of Clearwater CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA �1 . William B. Horne, II Robert heyy PE, I Project Manager City Manager Michael D Quillen, PE, " City Engineer • Page 2 of 3 Administrative Change Order 2 & Final - WTP 2 - Contract 4: Reverse Osmosis Plant Site Expansion ITEM DESCRIPTION OUANTITY UNIT UNIT COST Decreases: 45B RO Cartridge Filters - Sale Tax Savings 46B RO HP Feed Pumps - Sale Tax Savings 47A Furnish & Deliver RO Skids - 0.006125452 LS ODP 47B Sale Tax Savings 1 50B Ozone Generators and System - 1 Sales Tax Savings 53B Transfer Pumps - Sale Tax Savings 1 1 LS $5,400.00 LS $32,261.00 $1,304,742.90 $65,928.00 $110,340.00 LS $9,991.00 LS $36,053.00 $178,000.00 $9,992.00 $1,200.00 $409,000.00 LS $24,315.00 LS $3,900.00 LS $9,738.00 55B Iron Treatment Filter Package - Sales Tax Savings 56 Backwash Pump Station 64B High Service Pumps — Sale Tax Savings 68B ATS — Sale Tax Savings 72A Furninsh & Deliver Emergency Generator — ODP 72B Emergency Generator — Sales Tax Savings 73B Fuel Storage Tank — Sale Tax Savings 97B Chemical Feed & Transfer Pumps - Sales Tax Savings 96 Owner's 2.5% Contingency Increases: 12 Stormwater Control Structure 36 Fencing — 7 ft. Tall Chain Link 43 Main Building 45C RO Cartridge Filters installation, testing, warranty 46A Furnish & Deliver RO HP Feed Pumps - ODP 47C RO Skids - Installation, Testing, Warranty 54 Transfer Pump Piping, Valves, and Appurtenances 63 Yard Piping, Valves, Fittings, and Appurtenances 73A Furninsh & Deliver Fuel Storage Tank — ODP 79 Pressure transmitters/ switches /gages /ultrasonic level sensors and transmitters 84C Ethernet Switches /Autodialer /Printers 91 Radios /antennas 94 Controls Console Unit(s) 1 1 LS LS 0.011235955 LS 1 LS 1 LS 0.00101467 LS 0.675175 400 0.065533305 1.773846 LS $489,325.00 Total (Decreases) to PO: EA LF LS LS 4,000.00 15.00 3,793,561.00 $10,000.00 0.085640138 LS $578,000.00 0.364843158 LS $38,000.00 0.0778515 LS $71,650.00 0.047703825 LS $1,757,288.00 0.013646154 LS $65,000.00 0.004046137 LS $422,000.00 0.03494582 LS 0.234147912 LS 0.053289478 LS 161,500.00 $182,000.00 $27,363.00 Total Increases: TOTAL COST ($5,400.00) ($32,261.00) ($7,992.14) ($65,928.00) ($110,340.00) ($9,991.00) ($36,053.00) ($2,000.00) ($9,992.00) ($1,200.00) ($415.00) ($24,315.00) ($3,900.00) ($9,738.00) ($489,325.00) ($808,850.14) $2,700.70 $6,000.00 $248,604.59 $17,738.46 $49,500.00 $13,864.04 $5,578.06 $83,829.36 $887.00 $1,707.47 $5,643.75 $42,614.92 $1,458.16 $480,126.51 Page 3 of 3 Administrative Change Order 2 - WTP 2 - Contract 4: Reverse Osmosis Plant Site Expansion ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Additions: 98 Crushed Rock Deep Injection Well 1 LS $10,457.74 $10,457.74 99 Flow Meters @PCU Interconnect 1 LS $9,147.89 $9,147.89 Total Additions: $19,605.63 Total Net (Decreases) /Increases /Additions to the PO: ($309,118.00) Decreases for Owner Direct Purchases (ODP): 45A Furnish & Deliver RO Cartridge 1 LS $92,024.00 ($92,024.00) Filters - ODP 46A Furnish & Deliver RO HP Feed 1 LS $627,500.00 ($627,500.00) Pumps - ODP 47A Furnish & Deliver RO Skids - 1 LS $1,290,878.86 ($1,290,878.86) ODP 50A Furnish & Deliver Ozone 1 LS $1,900,000.00 ($1,900,000.00) Generators and System - ODP 53A Furnish & Deliver Transfer Pumps . 1 LS $190,241.00 ($190,241.00) ODP Item 55A Furnish & Deliver Iron Treatment 1 LS $645,000.00 ($645,000.00) Filter Package - ODP 64A Furnish & Deliver High Service 1 LS $190,240.00 ($190,240.00) Pumps — ODP 68A Furnish & Deliver ATS — ODP 1 LS $25,555.00 ($25,555.00) 72A Furninsh & Deliver Emergency 1 LS $408,585.00 ($408,585.00) Generator — ODP 73A Furnish & Deliver Fuel Storage 1 LS $65,887.00 ($65,887.00) Tank — ODP 97A Furnish & Deliver Chemical Feed 1 LS $166,000.00 ($166,000.00) & Transfer Pumps - ODP Total (Decreases) for ODP: ($5,601,910.86) Total Net (Decreases)/Increases /Additions to the Contract: ($5,911,028.86)