Loading...
SMALLWOOD CIRCLE DRAINAGE IMPROVEMENTS - 11-0057-EN AND EDGEWOOD AVENUE SANITARY SEWER IMPROVEMENTS - 10-0027-UT - CHANGE ORDER #2Change Order 2 PROJECT Smallwood Circle Drainage Improvements and Edgewood Avenue Sanitary Sewer Improvements CONTRACTOR: Rowland, Inc. 6855 102nd Avenue, North Pinellas Park, FL 33782 Date: PROJECT NUMBER: PO REFERENCE NO.: April 24, 2015 11- 0057 -EN & 10- 0027 -UT ST110040 COUNCIL AWARD: November 7, 2013 DATE OF CONTRACT: December 4, 2013 CODE: 0315- 96178 - 563700 -539- 000 -0000 A CODE: 0327 - 96665 - 563800 -535- 000 -0000 B CODE: 0315- 96665 - 563800- 535- 000 -0000 C SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This Change Order decreases, increases and adds items according to field conditions and adds 165 days to the contract, see attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Change Order 1 - City Council 11/6/14 Change Order 2 - City Council 5 /7/15 NEW CONTRACT AMOUNT eoftencrAtk#05 $ 2,345,142.97 $ 148,718.00 $ 403,449.14 $ 2,897,310.11 George N. Cretekos Mayor ATTEST: Rosemarie Call Date: CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, II APPROVED A l)/(1 TO F Matthew S i4 i 11:2 City Manager Assistant City Attorney ACCEPTED BY: Rowland, Inc. By: /C 0 Kevin Rowland, Date: 5/S7/ S— Recommended By: City of Clearwater 74.-4,2L Tara Kivett Construction Manager Michael D. Quillen, PE, City Engineer • Page 2 of 3 Change Order 2: Smallwood Cir Drainage Improvements/Edgewood Avenue Sewer Improvements ITEM DESCRIPTION Stormwater Code A: 0315- 96178 - 563700 -539- 000 -0000 Decreases: 9 20" HDPE (including removal of existing 12" pipe) 48 Contingency UNIT Increases: 11 18" RCP (including removal of existing pipe) 13 Modify Existing Structures (ES -33, ES -42, ES -59) 17 Construct Type 10 Curb Inlet, Less than 10' (S -32, S -33, S -34, S -35, S- 36) 27 No. 57 Crushed Stone Bedding Material 29 8" Underdrain, including 2 cleanouts 32 Tree Removal 35 Sodding- Grassing 39 8" Roadway Base LBR 100 (Storm) 41 1 1/2" Asphaltic Concrete Structural Course Type S -1 42 2" Asphaltic Concrete Structural Course Type S -1 Additions: 51 ADS -15" 52 ADS -18" in lieu of item 9, 20" 53 Relay 24" RCP S -19 to S -22 , labor only 54 Remove 24" RCP S -19 to S -22 55 Reset S -22 56 36" RCP Removal and Extra Depth 57 UD connections & COs LF LS LF LF LF CY LF EA SF SY SY SY LF LF LF LS LS LS LS Qty UNIT COST 90 $ 185.00 0.612363 $ 117,577.32 Total (Decreases) Code A: 266 $ 1 $ 0.9 $ 98.00 975.00 1,525.00 514 $ 30.00 835 $ 37.00 1 23483 2120 794 1,000.00 0.47 13.60 8.45 3040 $ 20.35 34.5 90 102 Total Increases Code A: 115.00 118.00 102.50 $ 6,200.00 $ 1,295.00 $ 11,900.00 $ 5,200.00 Total Additions Code A: Total Net (Decreases)/Increases /Additions Code A: TOTAL COST ($16,650.00) ($72,000.00) ($88,650.00) $26,068.00 $975.00 $1,372.50 $15,420.00 $30,895.00 $1,000.00 $11,037.01 $28,832.00 $6,709.30 $61,864.00 $184,172.81 $3,967.50 $10,620.00 $10,455.00 $6,200.00 $1,295.00 $11,900.00 $5,200.00 $49,637.50 $145,160.31 Page 3 of 3 Change Order 2: Smallwood Cir Drainage Improvements/Edgewood Avenue Sewer Improvements ITEM DESCRIPTION UNIT Qty UNIT COST TOTAL COST Sewer Code C: 0315- 96665 - 563800 -535- 000 -0000 Decreases: 117 Furnish and Install Flowable Fill CY 16 $ 180.00 ($2,880.00) Total (Decreases) Code B: ($2,880.00) Increases: 103 Furnish and Install 8" PVC SDR -35 LF 5 $ 160.50 $802.50 Gravity Sewer Pipe 118 Remove and Replace Unsuitable CY 406 $ 17.50 $7,105.00 Material w/ Select Fill 119 Import of Crushed Stone CY 1153 $ 44.00 $50,732.00 121 Concrete Curb, Gutter, SW & DW CY 21 $ 460.00 $9,660.00 129 Contingency LS 0.05229168 $ 95,617.50 $5,000.00 Total Increases Code B: $73,299.50 Additions: 131 12" tie to MH -C LS 1 $ 1,299.75 $1,299.75 132 Retie 8" to exhisting MH -C LS 1 $ 2,922.10 $2,922.10 133 Adjust Raw Water Main LS 1 $ 14,682.18 $14,682.18 134 Sodding - Grassing SF 10990 $ 0.47 $5,165.30 135 Flowable Fill CY 1092 $ 150.00 $163,800.00 Total Additions Code B: $187,869.33 Total Net (Decreases)/Increases /Additions Code B: $258,288.83 Total Net (Decreases) /Increases /Additions to the Contract: $403,449.14