SMALLWOOD CIRCLE DRAINAGE IMPROVEMENTS - 11-0057-EN AND EDGEWOOD AVENUE SANITARY SEWER IMPROVEMENTS - 10-0027-UT - CHANGE ORDER #2Change Order 2
PROJECT
Smallwood Circle Drainage Improvements and
Edgewood Avenue Sanitary Sewer Improvements
CONTRACTOR:
Rowland, Inc.
6855 102nd Avenue, North
Pinellas Park, FL 33782
Date:
PROJECT NUMBER:
PO REFERENCE NO.:
April 24, 2015
11- 0057 -EN & 10- 0027 -UT
ST110040
COUNCIL AWARD: November 7, 2013
DATE OF CONTRACT: December 4, 2013
CODE: 0315- 96178 - 563700 -539- 000 -0000 A
CODE: 0327 - 96665 - 563800 -535- 000 -0000 B
CODE: 0315- 96665 - 563800- 535- 000 -0000 C
SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT
This Change Order decreases, increases and adds items according to field conditions and adds 165 days to the contract, see
attached.
STATEMENT OF CONTRACT AMOUNT
ORIGINAL CONTRACT AMOUNT
Change Order 1 - City Council 11/6/14
Change Order 2 - City Council 5 /7/15
NEW CONTRACT AMOUNT
eoftencrAtk#05
$ 2,345,142.97
$ 148,718.00
$ 403,449.14
$ 2,897,310.11
George N. Cretekos Mayor
ATTEST:
Rosemarie Call
Date:
CITY OF CLEARWATER, in
PINELLAS COUNTY, FLORIDA
William B. Horne, II
APPROVED A l)/(1
TO F
Matthew S i4
i
11:2
City Manager
Assistant City Attorney
ACCEPTED BY: Rowland, Inc.
By: /C 0
Kevin Rowland,
Date: 5/S7/ S—
Recommended By: City of Clearwater
74.-4,2L
Tara Kivett
Construction Manager
Michael D. Quillen, PE,
City Engineer
•
Page 2 of 3
Change Order 2: Smallwood Cir Drainage Improvements/Edgewood Avenue Sewer Improvements
ITEM DESCRIPTION
Stormwater Code A: 0315- 96178 - 563700 -539- 000 -0000
Decreases:
9 20" HDPE (including removal of
existing 12" pipe)
48 Contingency
UNIT
Increases:
11 18" RCP (including removal of
existing pipe)
13 Modify Existing Structures (ES -33,
ES -42, ES -59)
17 Construct Type 10 Curb Inlet, Less
than 10' (S -32, S -33, S -34, S -35, S-
36)
27 No. 57 Crushed Stone Bedding
Material
29 8" Underdrain, including 2 cleanouts
32 Tree Removal
35 Sodding- Grassing
39 8" Roadway Base LBR 100 (Storm)
41 1 1/2" Asphaltic Concrete Structural
Course Type S -1
42 2" Asphaltic Concrete Structural
Course Type S -1
Additions:
51 ADS -15"
52 ADS -18" in lieu of item 9, 20"
53 Relay 24" RCP S -19 to S -22 , labor
only
54 Remove 24" RCP S -19 to S -22
55 Reset S -22
56 36" RCP Removal and Extra Depth
57 UD connections & COs
LF
LS
LF
LF
LF
CY
LF
EA
SF
SY
SY
SY
LF
LF
LF
LS
LS
LS
LS
Qty
UNIT COST
90 $ 185.00
0.612363 $ 117,577.32
Total (Decreases) Code A:
266 $
1 $
0.9 $
98.00
975.00
1,525.00
514 $ 30.00
835 $ 37.00
1
23483
2120
794
1,000.00
0.47
13.60
8.45
3040 $ 20.35
34.5
90
102
Total Increases Code A:
115.00
118.00
102.50
$ 6,200.00
$ 1,295.00
$ 11,900.00
$ 5,200.00
Total Additions Code A:
Total Net (Decreases)/Increases /Additions Code A:
TOTAL COST
($16,650.00)
($72,000.00)
($88,650.00)
$26,068.00
$975.00
$1,372.50
$15,420.00
$30,895.00
$1,000.00
$11,037.01
$28,832.00
$6,709.30
$61,864.00
$184,172.81
$3,967.50
$10,620.00
$10,455.00
$6,200.00
$1,295.00
$11,900.00
$5,200.00
$49,637.50
$145,160.31
Page 3 of 3
Change Order 2: Smallwood Cir Drainage Improvements/Edgewood Avenue Sewer Improvements
ITEM DESCRIPTION UNIT Qty UNIT COST TOTAL COST
Sewer Code C: 0315- 96665 - 563800 -535- 000 -0000
Decreases:
117 Furnish and Install Flowable Fill CY 16 $ 180.00 ($2,880.00)
Total (Decreases) Code B: ($2,880.00)
Increases:
103 Furnish and Install 8" PVC SDR -35 LF 5 $ 160.50 $802.50
Gravity Sewer Pipe
118 Remove and Replace Unsuitable CY 406 $ 17.50 $7,105.00
Material w/ Select Fill
119 Import of Crushed Stone CY 1153 $ 44.00 $50,732.00
121 Concrete Curb, Gutter, SW & DW CY 21 $ 460.00 $9,660.00
129 Contingency LS 0.05229168 $ 95,617.50 $5,000.00
Total Increases Code B: $73,299.50
Additions:
131 12" tie to MH -C LS 1 $ 1,299.75 $1,299.75
132 Retie 8" to exhisting MH -C LS 1 $ 2,922.10 $2,922.10
133 Adjust Raw Water Main LS 1 $ 14,682.18 $14,682.18
134 Sodding - Grassing SF 10990 $ 0.47 $5,165.30
135 Flowable Fill CY 1092 $ 150.00 $163,800.00
Total Additions Code B: $187,869.33
Total Net (Decreases)/Increases /Additions Code B: $258,288.83
Total Net (Decreases) /Increases /Additions to the Contract: $403,449.14