HILLCREST- BROOKHILL NEIGHBORHOOD TRAFFIC CALMING AND STORMWATER IMPROVEMENTS - 10-0002-EN & 10-0050-EN - ADMINISTRATIVE CHANGE ORDER #3 & FINAL
Administrative Change Order 3 & Final Date: January 26, 2015 PROJECT: PROJECT NUMBER: Hillcrest- Brookhill Neighborhood Traffic Calming & Stormwater Improvements PO REFERENCE: CONTRACTOR: David Nelson Construction Co., Inc. 3483 Alternate 19 Palm Harbor, Fl 34683 COUNCIL AWARD: DATE OF CONTRACT: CODE: 10- 0002 -EN& 10- 0050 -EN ST108969 October 17, 2012 November 27, 2012 0315- 92276 - 563700 -541- 000 -0000 (A) 0315- 96169 - 563700 -539- 000 -0000 (B) SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order decreases, increases and adds items according to field conditions - see attached. STATEMENT OF CONTRACT AMOUNT ACCE ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - CC - 2/20/2014 Admin Change Order 2 - CM - 6/10/2014 Admin Change Order 3 & Final - CM - NEW CONTRACT AMOUNT APPROV D AS $ 2,560,836.36 $ 618,029.02 By: $ - Jeff S (253,359.65) $ 2,925,505.73 Date: 1'e b D BY: David Nelson Constructibn'Ch.,-Ine. 0 (StAL0 �¢? Pres' k1ent \W nesses: M "t 'ew Smith, ATTEST: Assistant City Attorne Rosemarie Call, Date. ommended By: City of Clearwater CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA W.L,fr. u..cL(. William B. Horne, II City Manager Tara Kivett, •� Engineering Construction Manager Michael D Quillen City Engineer Page 2 of 3 Administrative Change Order 3 & Final - Hillcrest- Brookhill Neighborhood Traffic Calming & Stormwater Improve ITEM DESCRIPTION UNIT OTY UNIT COST TOTAL COST Traffic Calming Code A: 0315- 92276 - 563700 -541- 000 -0000 Decreases: 7 Concrete Brick Paver Removal SF 39 $9.00 16 Pavement Removal SY ($'oI.f�n) 102.9 $3.00 25 Topsoil Fill, Median CY ($ 500.0) 17 $30.00 (S510.00) 32 Asphalt Texture Print SF 5742 $9.00 33 Concrete Brick Pavers SF (Y> 1.b78.u0) 25 $10.00 ($250.00) 37 Detectable Warning Domes SF 59 $25.00 ($1.475.00) 42 Concrete Valley Gutter Curb, Special LF 107 $14.00 ($1.498 00 44 FDOT Valley Gutter LF 35 $25.00 45 Concrete Flume SF ($879 00 ) 22 $5.00 (; i 10.00) 47 6" Ductile Iron Pipe (Underdrain) LF 2 $40.00 ($80.u(,) 49 8" PVC LF 40 $25.00 50 18" RCP LF (S1.000.09) I 1 $40.00 52 18" MES (SD) EA 1 $600.00 t$600 .0 0.00 ) 0) 64 FDOT DBI Type D EA 1 $1,900.00 (51.900 00) 71 8" Ductile Iron Pipe (Protecto 401) LF 129 $50.00 ($6.450 00 78 Thermoplastic Pavement Markings, 6" LF 2087 $0.80 (S 1.669.6;)) 80 Thermoplastic Pavement Markings, 18 " -18" LF 372 $2.00 (S714.00) Skip, 12" 83 Thermoplastic Overlay Pattern "YBR" SF 456 $15.00 00.&1.00) 86 Retro - reflective Pavement Marker EA 132 $3.00 ($396.00) 87 Delineator EA 18 $50.00 ($900.00) 105 10% Contingency LS 1 $179,394.58 (5179.394.581 Increases: 14 Sanitary Pipe Removal LF 28 8" Crushed Concrete Base SY 35 Concrete Sidewalk, 4" SF 36 Concrete Sidewalk Ramp, 6" SF 38 Curb & Gutter, Type I LF 43 FDOT Curb & Gutter, Type RA LF 79 Thermoplastic Pavement Markings, 12" LF 81 Thermoplastic Pavement Markings, 18" LF 82 Thermoplastic Pavement Markings, 24" LF 90 Sod SF Total (Decreases) Code A: (S257.469.88) 440.5 1028.6113 150 180 840 36 241 32 3 12920 $200.00 $15.00 $2.50 $3.50 $13.50 $15.00 $2.00 $3.00 $4.00 $0.25 $88,100.00 $15,429.17 $375.00 $630.00 $11,340.00 $540.00 $482.00 $96.00 $12.00 $3,230.00 Total Increases Code A: $120,234.17 Additions: 166 Directional Drill 1 " Electrical Conduit LF 130 $18.90 $2,457.00 (single run) 167 Directional Drill 2" Irrigation Conduit LF 50 $24.15 $1,207.50 (double run) 168 Added Solar Panel Kits Mounted on LS 1 $7,361.64 $7,361.64 Concrete Posts 169 Re -feed Service Wire to New Pedestals I $2,520.00 forUp - lighting LS $2,520.00 170 Thermoplastic, Std, Yellow, 6' -10' Skip, 6" 1067 $2,240.70 LF $2.10 171 Thermoplastic, Std, White, Yield Line, 18" LF 96 $10.50 $1,008.00 Wx27 "HT Total Additions Code A: $16,794.84 Total Net (Decreases) /Increases /Additions Code A: (5120,440.87) • Page 3 of 3 Administrative Change Order 3 - Hillcrest- Brookhill Neighborhood Traffic Calming & Stormwater Improvements ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Stormwater Code B: 0315- 96169 - 563700 -539- 000 -0000 Decreases: 109 Root Pruning LF 560 $5.00 (5? 800.00) 117 Mill Asphalt Pavement, 2 Inch SY 323 $6.50 (52.000 50) 118 Mill Asphalt Pavement, 3.5 Inch SY 1840 $7.00 (S12.880.00) 122 Asphalt Driveway TN 3 $5.00 (515.00) 126 Detectable Warning Domes SF 18 $25.00 i$15(l.Ofl) 129 Underdrain, 6 inch LF 200 $20.00 (5- 3.000.00 ) 130 Underdrain, 8 inch LF 150 $25.00 ($3.750.00) 147 6" Ductile Iron Pipe (DIP) LF 226 $45.00 ($10.170.001 150 8" Ductile Iron Pipe (Protecto 401) LF 147.5 $75.00 (511.062.50) 154 Adjust Water Meter EA 3 $500.00 ($1.500.00) 156 10 %Contingency LS 1 $109,593.19 (5109.593.19) 200 Flowable Fill CY 5 $400.00 (52.000.00) 201 Tree removal EA 1 $1,200.00 ($1.200.00) 212 6" Pipe restraint (Megalug) EA 51 $75.00 ($3.825.00) 213 6" Line stop assembly EA 9 $4,500.00 (S40 5110 00) 215 Thermoplastic pavement marking, 24" LF 36 $4.00 (5144.00) Total (Decreases) Code B: (x205,989.19) Increases: 110 Asphalt Driveway Removal SF 637 $6.50 $4,140.50 112 Concrete Curb & Gutter Removal LF 46.525 $4.50 $209.36 114 Drainage Pipe Removal LF 74 $45.00 $3,330.00 121 2" Asphalt Pavement (Type SP) TN 152 $110.00 $16,720.00 123 Concrete Driveway SF 3102 $3.50 $10,857.00 124 Concrete Sidewalk, 4" SF 460 $2.50 $1,150.00 153 8" Line Stop Assembly EA 2 $5,200.00 $10,400.00 155 Sod SF 11003 $0.25 $2,750.75 202 Excavation, Roadway CY 629 $20.00 $12,580.00 Total Increases Code B: $62,137.61 Additions: 218 Replace Outfall Structure S -45 LS I $25,047.80 $25,047.80 219 Mill Asphalt Pavement, 2 Inch (Betty Ln - SY 1620 $4.00 $6,480.00 Woodlawn to Bellevue) 220 Credit for Deficient Curb LS 1 (20.595.00) ($20.595.00) Total Additions Code B: $10,932.80 Total Net (Decreases) /Increases /Additions Code B: (5132918.78) Total Net (Decreases) /Increases /Additions to Contract: 0253,359.65)