WATER TREATMENT PLANT NO. 2 - CONTRACT 3: RAW WATER TRANSMISSION MAIN EXPANSION PROJECT - 10-0039-UT-C - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 & Final Date: December 8, 2014 PROJECT: PROJECT NUMBER: Water Treatment Plant No. 2 - Contract 3: Raw Water Transmission Main Expansion PO REFERENCE: CONTRACTOR: AWARD DATE: 10 -0039 -UT -(C) ST109511 Young Communication Co., Inc. CONTRACT DATE: 424 West Drive Melbourne, FL 32904 CODE: SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT Decreasing, increasing and adding items to the contract according to field conditions - see attached. May 16, 2013 June 14, 2013 0315- 96767 - 563800 - 533 -000 -0000 STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - CM NEW CONTRACT AMOUNT APPROVE ACCEPTED BY: $ 6,920,083.83 Young ion Co., Inc. ($538,512.08) $ 6,381,571.75 By: (SEAL) Steve Steve Yo President Matthe ATTEST: Rosemarie Call, Date: U L'L , 1 Q/ it /6 CITY OF CLEARWATER, IN PINELLAS COUNTY, FLORIDA C William B. Home, II, City Manager 11SHE0 Date: Witnesses: Recommended By: City of Clearwater Rob FaheyeE P jectManager Michael D. Quillen, E, City Engineer Page 2 of 3 Administrative Change Order 1 & Final - Water Treatment Plant No. 2 - Contract 3: Raw Water Transmission Main Expansion ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Decreases: 4 F &I 6 -inch PVC Raw Water Pipe by Horizontal LF $35.00 (515,435.00) Directional Drill 441 6b F &I 8 -inch PVC Raw Water Pipe by Horizontal LF 760 $52.50 ($39,900.00) Directional Drill (Mission Hills Conceptual 9 F &I 14 -inch HDPE Raw Water Pipe by LF 40 $79.00 ($3,160.00) Horizontal Directional Drill 10 F &I 16 -inch HDPE Raw Water Pipe by LF 30 $91.00 ($2,730.00) Horizontal Directional Drill 11 F &I 18 -inch HDPE Raw Water Pipe by LF 40 $105.00 (54,200.00) Horizontal Directional Drill 14 F &I 8 -inch HDPE Raw Water Pipe by Open Cut LF 15 $39.00 (5585.00) 15b F &18 -inch PVC Potable Water Pipe by Open LF 44 $99.50 (54,378.00) Cut 18 F &I 16 -inch HDPE Raw Water Pipe by Open LF 60 $95.00 ($5,700.00) 20 F &I 18 -inch HDPE Raw Water Pipe by Open LF 30 $113.00 ($3,390.00) 21 F &I 6 -inch Restrained Joints for PVC or HDPE EA 66 $61.00 ($4,026.00) Pipe 23 F &I 8 -inch Restrained Joints for PVC or HDPE EA 18 $94.00 (51,692.00) Pipe 25 F &1 10 -inch Restrained Joints for HDPE Pipe EA 8 $262.00 ($2,096.00) 27 F &1 12 -inch Restrained Joints for DI Pipe EA 86 $166.00 (514,276.00) 28 F &I 14 -inch Restrained Joints for HDPE Pipe EA 13 $642.00 (58,346.00) 30 F &I 16 -inch Restrained Joints for DI Pipe EA 57 $358.00 ($20,406.00) 31 F &I 18 -inch Restrained Joints for HDPE Pipe EA 4 $915.73 ($3,662.92) 32 F &I Compact DI Fittings LB 3391 $7.20 ($24,415.20) 38 Root Pruning LF 2642 $3.50 ($9,247.00) 40 Remove Trees EA 14 $450.00 ($6,300.00) 41 Sanitary Sewer Cleanouts EA 38 $428.00 ($16,264.00) 57 Wet tap Existing 8 -inch WM and reconnect LS 1 $4,886.00 ($4,886.00) Existing 8 -inch WM at Belleair Rd. and 58 Inspection, Pigging, Flushing, and Disinfection LF 271 $13.00 ($3,523.00) of Existing 16 -inch Water Main 59 Sod Restoration as Directed by the Owner or the SY 200 $4.54 ($908.00) Owner's Authorized Project Representative 60 Concrete Driveway Restoration as Directed by SY 129 $45.00 ($5,805.00) the Owner or the Owner's Authorized Project 61 Concrete Sidewalk Restoration as Directed by SY 146 $45.00 ($6,570.00) the Owner or the Owner's Authorized Project 62 Concrete Curb Restoration as Directed by the LF 162 $28.88 ($4,678.56) Owner or the Owner's Authorized Project 63 Underdrain Restoration as Directed by the LF 200 $16.50 ($3,300.00) Owner or the Owner's Authorized Project 64 Asphalt Paving Restoration as Directed by the SY 200 $27.00 ($5,400.00) Owner or the Owner's Authorized Project 67 Asphalt Overlay as Directed by the Owner or the SY 200 $17.00 ($3,400.00) Owner's Authorized Project Representative 69 Contingency LS 1 $629,098.53 ($629,098.53) Total (Decreases): ($857,778.21) Increases: 3 F &I 3 -inch Communication Conduit HDPE Pipe LF 2355 $14.00 $32,970.00 by Horizontal Directional Drill (RO #1 3" conduit for Law -Ann) 5 F &I 8 -inch HDPE Raw Water Pipe by LF 103 $47.00 $4,841.00 Horizontal Directional Drill 6a F &I 8 -inch PVC Raw Water Pipe by Horizontal LF 416 $52.50 $21,840.00 Directional Drill 6c F &I 8 -inch PVC Potable Water Pipe by LF 529 $75.00 $39,675.00 Horizontal Directional Drill 7 F &I 10 -inch HDPE Raw Water Pipe by LF 10 $53.00 $530.00 Horizontal Directional Drill 8 F &I 12 -inch PVC Raw Water Pipe by LF 137 $75.00 $10,275.00 Horizontal Directional Drill 12a F &I 6 -inch PVC Raw Water Pipe by Open Cut LF 210 $31.00 $6,510.00 12b F&1 6-inch PVC Potable Water Pipe by Open LF 2 $41.00 $82.00 Cut 13 F &I 6 -inch DI Potable Water Pipe by Open Cut LF 92 $43.00 $3,956.00 15a F &I 8 -inch PVC Raw Water Pipe by Open Cut LF 262 $62.00 $16,244.00 16 F &I 8 -inch DI Potable Water Pipe by Open Cut LF 7 $138.50 $969.50 17 F &I 12 -inch DI Raw Water Pipe by Open Cut LF 127 $177.00 $22,479.00 19 F &I 16 -inch DI Raw Water Pipe by Open Cut LF 15 $168.50 $2,527.50 22 F &I 6 -inch Restrained Joints for DI Pipe EA 63 $73.00 $4,599.00 24 F &I 8 -inch Restrained Joints for DI Pipe EA 29 $82.00 $2,378.00 33 F &I 6 -inch Resilient Wedge Gate Valve & Valve EA 2 $931.00 $1,862.00 Box 34 F &I 8 -inch Resilient Wedge Gate Valve & Valve EA 9 $1,221.00 $10,989.00 Box 36 F &I 16 -inch Resilient Wedge Gate Valve & EA 2 $4,169.00 $8,338.00 Valve Box 37 F &1 Combination Air Valve EA 2 $3,500.00 $7,000.00 65 Unsuitable Material Excavation Below Grade as CY 174 $18.00 $3,132.00 Directed by the Owner or the Owner's Authorized Project Representative 66 Select Backfill Below Grade as Directed by the CY 174 $25.00 $4,350.00 Owner or the Owner's Authorized Project Representative • • • Additions: 70 Additional 8 "x 1" services LS 1 $14,785.55 $14,785.55 71 Woodlawn St. & Washington Ave Sta 15 +26. 8" LS 1 $5,971.50 $5,971.50 Line Stop 72 Woodlawn St. & Washington Ave Sta 15 +26. LS 1 $9,188.02 $9,188.02 Activate new 8" potalbe line 73 Exploratory Digging on the 8" potable water LS 1 $4,506.77 $4,506.77 main at Sta 684 +71 74 Exploratory Digging on the 8" potable water LS 1 $4,506.77 $4,506.77 main at Sta 689+51 75 Exploratory Digging on Druid Rd. at Sta 186 +30 LS 1 $4,065.58 $4,065.58 76 Exploratory Digging on Drew St. & Calais Ln at LS 1 $5,464.68 $5,464.68 Sta 840 +20 to fmd 30" Effluent line 77 Martin Luther King Jr. north of Woodlawn St LS 1 $10,309.75 $10,309.75 Sta 513 +10. 16" x 8" Wet Tap 78 Hercules Ave existing asphalt in excess of 4" LS 1 $39,102.50 $39,102.50 thick from Sta# 81 +35 to 127 +80 79 Druid Rd. west of Home Depot entrance at Sta LS 1 $4,427.50 $4,427.50 198 +20. Cross existing 16" water main 80 16" repurposed line on Bellaire Rd from Beverly LS 1 $9,027.50 $9,027.50 Dr. to Highland Ave. 81 Drew Street at Best Buy during bridge hit at LS 1 $7,700.45 $7,700.45 SR60 82 16" Repurposed Raw line SR60 in front of LS 1 $6,965.10 $6,965.10 Home Depot Sta.261 +30 to 262 +20. Plan Sheet 83 6" Line stop on Missouri & Bellaire at Sta LS 1 $5,320.00 $5,320.00 #20 +18 84 16" Repurposed line from Bellaire/Missouri to LS 1 $6,445.75 $6,445.75 Martin Luther King S. tower. Attempted pipeline drain 85 16" Repurposed line from Bellaire to LS 1 $3,884.96 $3,884.96 Washington to Woodlawn to Martin Luther King S tower. Reconnect pipeline to restore services Total Increases: $205,547.00 87 Asphalt on Drew Street LS 1 (527,953.25) (527,953.25) Total Additions: $113,719.13 Total Net ( Decreases)/Increases/Additions: ($538,512.08