Loading...
12/01/2014Monday, December 1, 2014 1:00 PM City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 Council Chambers Council Work Session Special Work Session December 1, 2014Council Work Session Special Work Session 1. Call to Order 2. City Manager Approve preliminary funding in the amount of $500,000 for establishment of the ULI Report Implementation special program; and approve the transfer of $500,000 in General Fund reserves to the Special Programs Fund to fund the program. (consent) 2.1 3. Economic Development and Housing Annual Tourism Review - Adel Grobler, Imagine Global Consulting (WSO) 3.1 Designate 2506 Countryside Boulevard, formerly known as Countryside Executive Golf Course, as a Brownfield Area for the purpose of environmental rehabilitation and economic development and adopt Resolution 14-34. 3.2 4. Finance Authorize the negotiated sale of not to exceed $27,550,000 Water and Sewer Revenue Refunding Bond, Series 2014 and adopt Resolution 14-38 4.1 5. Gas System Approve a Contract with Corrpro Companies, Inc., in the amount of $313,424.62, for consulting and system maintenance services, and authorize the appropriate officials to execute same. (consent) 5.1 Approve and accept an Interlocal Agreement/Franchise with the City of Oldsmar in order to provide natural gas service to the citizens of Oldsmar and adopt Resolution 14-39. 5.2 6. Human Resources Approve a two-year renewal of the city paid life insurance benefit with the current carrier (Unum) at an increase of 74.8% ($103,927) over the current budgeted cost and authorize the appropriate officials to execute same. (consent) 6.1 Amend Chapter 2, Article V, Division 6, Section 2.506 of the City of Clearwater Code of Ordinance and Section 8.3 of the City of Clearwater Money Purchase Plan complying with the Internal Revenue Code and pass Ordinance 8650-14 on first reading. 6.2 7. Engineering Page 2 City of Clearwater Printed on 11/26/2014 December 1, 2014Council Work Session Special Work Session Approve an Engineer of Record (EOR) work order to URS Corporation in the amount of $170,352 for the Resident Initiated Reclaimed Water Project - Phase II (14-0038-UT) and the Raw Water Main Project (10-0039-UT), and authorize the appropriate officials to execute same. (consent) 7.1 Accept two Drainage Easements conveyed by owners of property at 20000 and 20162 US Highway 19, North to improve an existing drainage ditch. (consent) 7.2 Approve a Work Order to Engineer of Record King Engineering Associates, Inc. for Engineering Services for Clearwater Memorial Causeway Subaqueous Pipelines $336,746.00, and authorize the appropriate officials to execute same. (consent) 7.3 8. Planning Provide direction to staff regarding Council’s desire to participate in or opt out of the Pinellas County Temporary Emergency Housing Ordinance. 8.1 9. Marine & Aviation Approve Department of Environmental Protection (DEP) Agreement MV149 for CVA14-720, Clean Vessel Act Grant Program funding for the operation, maintenance and repair of the Clearwater Beach Marina pump out vessel and authorize the appropriate officials to execute same. (consent) 9.1 10. Public Utilities Approve a work order with Excergy Corporation of Denver Colorado, for a fee not to exceed $170,715.00 for phase one (of three) in determining the feasibility of implementing Advanced Metering Infrastructure, and authorize the appropriate officials to execute same. (consent) 10.1 11. Official Records and Legislative Services Appoint Eric D. Spaulding to the Marine Advisory Board as the Ex Officio member with term to expire December 31, 2018. 11.1 Schedule a special work session for January 21, 2015 to obtain public input on Urban Land Institute’s recommendations for downtown. (consent) 11.2 12. Legal Adopt Ordinance 8603-14 on second reading, amending the Zoning Atlas of the city by rezoning certain property whose post office address 12.1 Page 3 City of Clearwater Printed on 11/26/2014 December 1, 2014Council Work Session Special Work Session is 2854 Sunstream Lane, Clearwater, Florida 33759, from Low Density Residential (LDR) to Low Medium Density Residential (LMDR). Adopt Ordinance 8604-14 on second reading, annexing certain real property whose post office address is 1601 Long Street, Clearwater, Florida 33755, together with all abutting right-of-way of Long Street, into the corporate limits of the city and redefining the boundary lines of the city to include said addition. 12.2 Adopt Ordinance 8605-14 on second reading, amending the future land use plan element of the Comprehensive Plan of the city to designate certain real property whose post office address is 1601 Long Street, Clearwater, Florida 33755, together with all abutting right-of-way of Long Street, upon annexation into the City of Clearwater, as Residential Low (RL). 12.3 Adopt Ordinance 8606-14 on second reading, amending the Zoning Atlas of the city by zoning certain real property whose post office address is 1601 Long Street, Clearwater, Florida 33755, together with all abutting right-of-way of Long Street, upon annexation into the City of Clearwater, as Low Medium Density Residential (LMDR). 12.4 Adopt Ordinance 8608-14 on second reading, annexing certain real property whose post office addresses are 1244 Palm Street and 1301 Idlewild Drive, together with certain abutting Right-of-Way of Idlewild Drive, into the corporate limits of the city and redefining the boundary lines of the city to include said addition. 12.5 Adopt Ordinance 8609-14 on second reading, amending the future land use plan element of the Comprehensive Plan of the city to designate certain real property whose post office addresses are 1244 Palm Street and 1301 Idlewild Drive, together with certain abutting Right-of-Way of Idlewild Drive, upon annexation into the City of Clearwater, as Residential Urban (RU). 12.6 Adopt Ordinance 8610-14 on second reading, amending the Zoning Atlas of the city by zoning certain real property whose post office addresses are 1244 Palm Street and 1301 Idlewild Drive, together with certain abutting Right-of-Way of Idlewild Drive, upon annexation into the City of Clearwater, as Low Medium Density Residential (LMDR). 12.7 Adopt Ordinance 8613-14 on second reading, annexing certain real property whose post office address is 815 Woodruff Avenue, Clearwater, Florida 33756, together with all abutting right-of-way of Woodruff Avenue, into the corporate limits of the city and redefining the boundary lines of the city to include said addition. 12.8 Adopt Ordinance 8614-14 on second reading, amending the future land use plan element of the Comprehensive Plan of the city to designate certain real property whose post office address is 815 Woodruff Avenue, 12.9 Page 4 City of Clearwater Printed on 11/26/2014 December 1, 2014Council Work Session Special Work Session Clearwater, Florida 33756, together with all abutting right-of-way of Woodruff Avenue, upon annexation into the City of Clearwater, as Residential Low (RL). Adopt Ordinance 8615-14 on second reading, amending the Zoning Atlas of the city by zoning certain real property whose post office address is 815 Woodruff Avenue, Clearwater, Florida 33756, together with all abutting right-of-way of Woodruff Avenue, upon annexation into the City of Clearwater, as Low Medium Density Residential (LMDR). 12.10 Adopt Ordinance 8616-14 on second reading, annexing certain real property whose post office address is 2107 Bell Cheer Drive, Clearwater, Florida 33764, into the corporate limits of the city and redefining the boundary lines of the city to include said addition. 12.11 Adopt Ordinance 8617-14 on second reading, amending the future land use plan element of the Comprehensive Plan of the city to designate certain real property whose post office address is 2107 Bell Cheer Drive, Clearwater, Florida 33764, upon annexation into the City of Clearwater, as Residential Low (RL). 12.12 Adopt Ordinance 8618-14 on second reading, amending the Zoning Atlas of the city by zoning certain real property whose post office address is 2107 Bell Cheer Drive, Clearwater, Florida 33764, upon annexation into the City of Clearwater, as Low Medium Density Residential (LMDR). 12.13 Adopt Ordinance 8620-14 on second reading, amending Ordinances 3674-84 and 6915-01 regarding Reserve Requirements for future Water and Sewer revenue bonds. 12.14 13. City Manager Verbal Reports Capitol Theatre Proposed Amendment13.1 14. City Attorney Verbal Reports 15. Council Discussion Item Streetsense Recommendations - Councilmember Jonson15.1 Centennial Parade Route - Councilmember Jonson15.2 Urban Land Institute Unified Visioning Process - Councilmember Jonson15.3 16. New Business (items not on the agenda may be brought up asking they be scheduled for subsequent meetings or work sessions in accordance with Rule 1, Paragraph 2). Page 5 City of Clearwater Printed on 11/26/2014 December 1, 2014Council Work Session Special Work Session 17. Closing Comments by Mayor 18. Adjourn 19. Presentation(s) for Council Meeting Annual Utilities We Care Fund Appeal - Cynthia Boyd, Utility Customer Service 19.1 Clearwater for Youth - Amy Connors, Vice Chair19.2 Clearwater Jr. Tornadoes - Tatishka Musgrove, President Clearwater Jr. Tornadoes 19.3 FDOT Presentation of Gateway Express Projects - Eyra Cash, Consultant Project Manager 19.4 Greenwood Panthers - Joe Marshall, Greenwood Panthers President19.5 Parks and Recreation Advisory Board Annual Report19.6 Turkey Trot - Skip Rogers, West Florida Y Runners Club, Race Director19.7 Page 6 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-734 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: City Manager's Office Agenda Number: 2.1 SUBJECT/RECOMMENDATION: Approve preliminary funding in the amount of $500,000 for establishment of the ULI Report Implementation special program; and approve the transfer of $500,000 in General Fund reserves to the Special Programs Fund to fund the program. (consent) SUMMARY: This request is to establish a designated program and initial seed money appropriation to underwrite implementation of the ULI Advisory Services Panel Report, as reflected in the ULI Implementation Matrix with Priority (P) items designated for initial implementation. It would be intended that this program would be supplemented periodically as circumstances warrant, as costs for implementation of specific items are further defined, and as items in the Implementation Matrix are added to the Priority (P) list. APPROPRIATION CODE AND AMOUNT: Funding for this item will be provided by a first quarter budget amendment allocating General Fund reserves in the amount of $500,000 to establish special program 181-99888, ULI Report Implementation. The balance in General Fund reserves is approximately $17.3 million, or 14.8% of the 2014/15 General Fund operating budget. A total of $1,651,214 of General Fund reserves has been used to date to fund expenditures in the 2014/15 operating budget. Page 1 City of Clearwater Printed on 11/26/2014 ULI REPORT IMPLEMENTATION MATRIX (P): Staff recommended initiatives to begin within 1st 90 days; reflects Council discussion deferring Bluff/Waterfront Master Plan until after CMA and Greenlight clarifications. *Timeframe begins once Council or City Manager provide direction/approval Month/years represent time to completion from commencement Staff Recommendation Timeframe*Work Program Impacts Cost 1)Create a Comprehensive Boating Plan (P) M&A ED&H, P&R, Library Support: Consultant needed; Report to include market analysis, survey; description of desired activities; locations for ferry service, etc.180 days M&A: Minimal, consultant needed $35k 1a) Provide recreational boating experiences at downtown marina M&A Legal Support: Recommendations for activities that need referendum approval will be part of the Comprehensive Boating Plan (above). Referendum: March 2016 Legal: Once activities and locations are identified, Legal can define charter changes needed to reflect desired activities. TBD 2) Ensure environmental Integrity of Clearwater Harbor M&A Engineering Support: 1) Marina to investigate benefit of upgrading its certification from "Clean Marina" to "Clean and Resilient Marina" designation; 2) Engineering will continue to implement stormwater and mitigation activities; (3) Ongoing implementation of Stevenson Creek Watershed Management Plan and future update of Plan. (1) TBD; (2) Ongoing; (3) Begin in 2015, 18 months (1) M&A would need work program modification; (2) and (3) Part of work programs (1) TBD; (2) n/a; (3) $400k 3)Ensure future connections to the waterfront P&D P&R, Legal, Engineering Support: (1) Current connections include maintaining 14 access points; (2) Future connections (path along water) is a long-term implementation item to be considered as part of Bluff Master Plan and Comprehensive Boating Plan process; 3) goals and objectives to be included in the revision to the Downtown Redevelopment Plan and N. Marina Master Plan (1) Ongoing; (2) long-term and TBD, per 1.2; 3) long-term , per 1.2 TBD TBD STRATEGY 1.1: Waterfront District--Promote and grow the boating culture; instill activity along the waterfront. ACTIONS Lead Department FOCUS AREA 1: STRATEGY Planning, Development and Design Strategies Page 1 4)Create a water taxi or ferry service M&A Legal Support alternative transporation modes and encourage as public-private partnership. (1) For water taxi service, regulatory framework needs to be created to allow the taxis, define locations for stops, rules, etc. (2) For ferry service, public subsidy is needed to run on a schedule. Council to determine how much public subsidy, if any, to allocate; RFP can be prepared and contractor selected. (1) 6 months for water taxi regulations; (2) 6 months for contractor selection; additional 8-9 months for dock permits Legal: Significant work on the regulations; M&A: Signficant staff time to prepare RFP; design needed by Engineering; and time for dock permitting and construction (2) TBD (subsidy needed for contractor plus est. $50k for beach landing/floating dock) 5) Create comprehensive North Marina Master Plan (Small Area Plan) (P)P&D M&A Support: Priority to provide framework for pending decisions on facility siting and development applications. 1 year (including consultant selection) Consultant needed for Master Plan; Minimal staff impact if US 19 Plan is largely completed; regulatory changes to be done by staff, if needed, after Plan is completed. $75k+/- (subject to change based on final scope) 6)Attract waterfront restaurants ED&H CRA Support: Activity is subject to referendum and part of Bluff Master Plan TBD, per 1.2 TBD TBD 7) Capitalize and grow Old Clearwater Bay housing stock ED&H P&D Support: (1) ED&H--Research grant or low-interest loan rehabilitation programs not associated with affordable housing and determine if program is feasible; (2) P&D--Research policy and regulatory incentives to encourage housing improvements 1 year ED&H--could be incorporated as part of FY14-15 work program with a consultant TBD--Incentives needed for Rehab program funding; $15k for consultant 8) Master Plan the Bluff/Waterfront: -Appoint Steering Committee -Engage Development Consultant -RFP for Master Plan Consultant (Public Engagement) P&D ED&H ACM Support: Commencement subject to Council authorization vis-à-vis clarification of CMA Downtown Project . The Plan could include addressing market analysis and development strategy/financial feasibility; access and parking; park design (what activities could be accommodated and where and how they might occur and be designed); and public engagement. Consultant selection: 4 months; Plan completion 12- 15 months TBD: Substantial multi-department work program impacts $200-300k (depends on scope) 8a) Define Referendum process after Bluff Master Plan (added for timeline purposes) ACM, Legal Clerk, PC Support:Charter review begins January 2015. Ballot language is needed 3 months prior to election.The next regular election is March 1, 2016. If we miss that date, then a special election will have to be called ($100k+). Next election is November 8, 2016. Historically, 9-12 months (following completion of Bluff/Waterfront Master Plan)Significant time from Clerk, Legal, PC TBD: Election schedule chosen will be major determinant of cost STRATEGY 1.2: Bluff/Waterfront Page 2 8b) Following Master Plan process, conduct RFP process for "horizontal or master" developer (to develop opportunity sites along the Bluff) ACM ED&H Support: to be implemented after Bluff Master Plan 4 months for selection Work Program addition for ED&H n/a 8c)Expand Coachman Park P&R Support: to be implemented after Bluff Master Plan TBD, per 1.2 TBD TBD 8d)Identify opportunity sites along the Bluff ACM Support as part of Bluff Master Plan TBD, per 1.2 TBD TBD 8e)Attract and promote a large draw on City Hall site ACM Support as part of Bluff Master Plan TBD, per 1.2 TBD TBD 8f) Make attractive locations across the Bluff and to the water (Cleveland street connection) P&R Engineering Support as part of Bluff Master Plan and Expand Coachman Park process TBD, per 1.2 TBD TBD 9)Boost the Library (P) Library P&R ED&H Support: Some charter restrictions limit recommendations: (1) Research partnership opportunities to develop the Main Library as an Arts & Culture destination space. (2) Engage STEM organizations in the downtown area to identify educational and creative opportunities. (3) Determine space, buildout/materials, and resources needed. Research: 3 months; Planning 3 months; Implmentation: TBD Major impact: the most efficient and effective way is to increase one PT position to FT (cost about $17,000 a year). Also will need to add hours to increase access. $17,000 to upgrade PT to FT; $50,000 for evening hours, $50,000 for Fri & Sat morning, general fund next budget. $30,000 to reconfigure space for partnerships. 10)Use Bridge as Gateway (P) P&R Legal Engineering Support as public art project: (1) Engineering to research FDOT requirment; (2) Legal to research Pierce 100 issues; (3) P&R to Manage Public Art Process/Call for Artists (1) and (2) DOT and Legal --6 months; (3) 6-9 month public art process Work program: Engineering: research. Legal: Research Restrictions P&R: Public Art Process after above. $350-400k (based on Tampa's project--Could be opportunity for corporate sponsorship) 11)Make downtown more navigable Engineering CRA Support changes to Wayfinding signs after Community Branding project and facility siting is completed (i.e. garage, City Hall, Intermodal hub, CMA, etc.); In short-term: Research flexible sign faces, and identify funding sources.TBD Could be incorporated into Engineering and CRA work programs after branding & facilities determined. TBD, based upon system selected 12) Reconsider design guidelines and signage regulations (P)P&D Support Depends on Council direction/ prioritiesP&D: Changes to sign code can be done in-house n/a STRATEGY 1.3: Central Business District: Make downtown more attractive; bring people to the streets; make downtown more navigable Page 3 13) Consider application of Form-based Code (in the Downtown Redevelopment Plan area) P&D Legal Support Depends on Council direction/ priorities P&D: Depending upon the extent of these changes, this may be doable in-house or if more extensive, require outside assistance.Est. $75-100k 14) Create a Streetscape Toolkit (for secondary/arterial streets) Engineering ED&H Support: (1) As part of current strategy, streetscape improvements are encouraged as part of private redevelopment. (2) Streetscape elements are already incorporated into Downtown Redevelopment Plan: Cleveland Streetscape Phase 2 design palette/spec sheets are used as general guide for "side" streets. (3) Support Cleveland Streetscape Phase 3. (1) Ongoing (2)Completed (3)FY 17-20 Part of existing work programs (3) $6m in Penny 3 allocated for Cleveland Streetscape Phase 3 15)Attract an Incubator (P)ED&H CRA Support as part of private sector (and not solely publicly-funded) initiative: (1) model already underway focusing on tech entrepreneurship; staff exploring CRA financial participation; (2) Explore feasibility of a "Resource Center" or "One Stop" concept with other partners (1) 3 months (2) 12-18 months Part of ED&H/CRA work program (1) TBD--Potential CRA financial participation; (2) TBD 16)Consider City Hall with Intermodal Hub CM/ACM Engineering Support: Preliminary siting analysis is underway; Final decision depends on CMA and Greenlight referendum results. TBD Significant staff impacts after CMA & Greenlight resolved. TBD ($7.5m for City Hall only as part of the CMA proposal); $5.5M in Penny 2017 for Intermodal Center/City Hall 17) Create a secondary service-based retail environment along Fort Harrison CRA Support as part of private redevelopment opportunities. Given that majority of property ownership is Church of Scientology and Pinellas County, there is little likelihood of added retail space.Long-term TBD TBD 18) Attract additional retail/restaurants (i.e. Find the next Starbucks)CRA Support as private sector initiative: Church of Scientology and downtown property owners working on identifying market demand and matching potential businesses with appropriate locations. Once impediments are defined, City will work with this group to explore potential programs and solutions.TBD Can be incorporated as part of existing work program TBD Page 4 19) Attract another cultural or entertainment venue to the area (i.e. Find the next Capitol Theatre)ACM Support as part of Bluff Master Plan process TBD, per 1.2 TBD TBD 20) Enhance Gateways (to include: five points intersection; Cleveland and Myrtle, lntermodal hub, Pinellas Trail; Fort Harrison & Court) (P)Engineering ED&H, CRA Support: Five points intersection is completed. Other locations need ROW and feasibility investigation and funding identification (some after facility siting)TBD Minimal staff impacts for ROW identification of other locations. Need to identify design and construction costs if able to proceed.TBD 21) Promote downtown brand through signage, public art, architectural elements, and green space P&D, P&R PC, CRA, Engineering Support: 1) Community Branding Project underway; 2) Identify opportunities after Community Branding project is completed TBD TBD TBD 22)Build a garage near or adjacent to intermodal hub ACM Engineering Support: Needs feasibility investigation and funding identification after the Greenlight referendum 3-5 years for south location, 4-6 years for north location. Appears to assume 2 downtown garages, one south & one north. Significant staff impacts on each. $7 M - $8 M per garage; Source of Funds TBD 23) Create bike/walk loop to connect Downtown with North Greenwood and East Gateway Engineering P&R CRA Support:1) Major portions complete; 2) North Connector location unresolved; 3) Needs ROW, feasibility and funding identification.5+ years Moderate staff time to coordinate w/CSX RR for northern loop.est. $500k 24)Connect Jolley Trolley to East Gateway ED&H CRA Support: Part of East Gateway Vision Plan. However, feasibility is dependent on available funding and market demand from riders 5+ years Part of existing work programs TBD 25) Evaluate highest and best use of the existing golf course and enhance Glen Oaks Park P&R Do not support: (1) Clearwater Golf Course: Long- term lease agreement would need to be terminated with a significant financial impact to the city; (2) Glen Oaks Park: Currently at maximum use with stormwater and parks facility combined n/a n/a n/a 26) Connect Glen Oaks to East Gateway via a Stevenson Creek Trail CRA Engineering P&R Support as part of East Gateway Vision Plan 5+ years Preliminary layout complete. Ready to contact property owners for possible easements. Minimal staff impacts. Est. $400k not including land acquisition 27)Commmunity Market (P)CRA ED&H Support: (1) Feasibility of Festival Core part of East Gateway Vision Plan; (2) Investigation of "Mercado" as it needs a fixed location and feasibility and cost analysis (1) 3 years (2) TBD (1) Part of ED&H/CRA/Engineering work program (2) Significant impact to work program if conducted in FY14-15 (1) TBD (2) TBD 28)Promote Healthy Food CRA ED&H P&R Support: Farmers Market part of East Gateway Vision Plan; underway with feasbility TBD Part of ED&H/CRA work program TBD STRATEGY 1.4: Community Gateways and Connections Page 5 Staff Recommendation Timeframe*Work Program Impacts Cost 29)Conduct community branding effort (P)PC Support: Contract awarded and work underway-- North Star hired 12 months Part of existing work program $100k 30) Communicate the real estate market and potential for expansion of real estate activity (P) ED&H PC Support: Prepare a marketing piece that highlights housing, retail, and office demand for web-based and social media distribution 4 months To be completed in house with existing staff $5k 31) Create a forum for the discussion of issues with the city, development partners, and community stakeholders (P)ACM Support: Create Communications Stakeholder Group (CSG); Define goals Subject to Council Concurrence n/a n/a Staff Recommendation Timeframe*Work Program Impacts Cost 32)Identify Lead Responsibility CM Support: ACM appointed; ULI Implimentation Team (aka "Brain Trust") appointed Completed No impact n/a 33)Revise Downtown Redevelopment Plan P&D CRA Support: Begin after TIF extension is approved by Pinellas County; Bluff/Waterfront Master Plan and North Marina Special Area Plan will be addressed once completed. 12-18 months from County Commission direction on TIF extension; TBD to make changes from Bluff and N. Marina Master Plans TBD: Multi-phase effort depending on recommendations of Bluff Master Plan and N. Marina Master Plan, Form-based code analysis, etc. TBD if consultant is needed 34) Investigate the use of TIF bonds to leverage redevelopment (P) ACM Finance Support: Needs cost/benefit analysis; Opinion letter from Financial Advisor has been requested 4 months Incorporated as part of existing work program TBD FOCUS AREA 3: ORGANIZATIONAL CAPACITY AND IMPLEMENTATION ITEM 3.1: Implementation FOCUS AREA 2: COMMUNICATION/PARTNERSHIPS Item 2.1: Clearwater must begin to actively tell its story Item 2.2: ACTIONS Lead Department ACTIONS Lead Department Page 6 35) Add Clean and Safe Program to Downtown Redevelopment Plan CRA Police Support: Needs further investigation and definition TBD, part of DT plan above TBD TBD 36)Support Special Events CRA, DDB P&R Support events (Blast Friday and Star Spectacular, etc.) that are better integrated into redevelopment activities, engaging public and creating awareness for Downtown activities Underway & Ongoing Part of existing work program Recommend FY14-15 CRA funding: $75k Blast Friday and $15k Star Spec; DDB is funding $17.5k for Blast Friday and $20k for Star Spec 37)Create framework for engaging partners CM/ACM Support: Create specific plan/deliverables for affected Departments Underway & Ongoing Part of existing work program n/a 38)Pinellas County CM/ACM Engineering ED&H Support: Work together on funding opportunities, CRA TIF extension, and PSTA and MPO/transportation/parking needs Underway & Ongoing Part of existing work program n/a 39)Business Leadership ED&H Support: Attend meetings with umbrella organization Underway & Ongoing Can be incorporated as part of existing work program n/a 40)Church of Scientology ACM, ED&H PC, P&D Others? Support: Establish and maintain regular communication with Church, determine long-term plan for properties; etc. Underway & Ongoing Can be incorporated as part of existing work program n/a 41)Community Leaders ACM Support: Create Communication Stakeholder Group (CSG) (see Item 2.2) 3 months: Subject to Council Concurence with Direction TBD n/a ITEM 3.2: Engage Partners Page 7 ULI REPORT IMPLEMENTATION MATRIX (P): Staff recommended initiatives to begin within 1st 90 days; reflects Council discussion Priority Items Only deferring Bluff/Waterfront Master Plan until after CMA and Greenlight clarifications. *Timeframe begins once Council or City Manager provide direction/approval Month/years represent time to completion from commencement Staff Recommendation Timeframe*Work Program Impacts Cost 1)Create a Comprehensive Boating Plan (P) M&A ED&H, P&R, Library Support: Consultant needed; Report to include market analysis, survey; description of desired activities; locations for ferry service, etc.180 days M&A: Minimal, consultant needed $35k 5) Create comprehensive North Marina Master Plan (Small Area Plan) (P) P&D M&A Support: Priority to provide framework for pending decisions on facility siting and development applications. 1 year (including consultant selection) Consultant needed for Master Plan; Minimal staff impact if US 19 Plan is largely completed; regulatory changes to be done by staff, if needed, after Plan is completed. $75k+/- (subject to change based on final scope) 9)Boost the Library (P) Library P&R ED&H Support: Some charter restrictions limit recommendations: (1) Research partnership opportunities to develop the Main Library as an Arts & Culture destination space. (2) Engage STEM organizations in the downtown area to identify educational and creative opportunities. (3) Determine space, buildout/materials, and resources needed. Research: 3 months; Planning 3 months; Implmentation: TBD Major impact: the most efficient and effective way is to increase one PT position to FT (cost about $17,000 a year). Also will need to add hours to increase access. $17,000 to upgrade PT to FT; $50,000 for evening hours, $50,000 for Fri & Sat morning, general fund next budget. $30,000 to reconfigure space for partnerships. 10)Use Bridge as Gateway (P) P&R Legal Engineering Support as public art project: (1) Engineering to research FDOT requirment; (2) Legal to research Pierce 100 issues; (3) P&R to Manage Public Art Process/Call for Artists (1) and (2) DOT and Legal --6 months; (3) 6-9 month public art process Work program: Engineering: research. Legal: Research Restrictions P&R: Public Art Process after above. $350-400k (based on Tampa's project--Could be opportunity for corporate sponsorship) 12) Reconsider design guidelines and signage regulations (P)P&D Support Depends on Council direction/ prioritiesP&D: Changes to sign code can be done in-house n/a STRATEGY 1.1: Waterfront District--Promote and grow the boating culture; instill activity along the waterfront. ACTIONS Lead Department FOCUS AREA 1: STRATEGY Planning, Development and Design Strategies STRATEGY 1.2: Bluff/Waterfront STRATEGY 1.3: Central Business District: Make downtown more attractive; bring people to the streets; make downtown more navigable Page 1 15)Attract an Incubator (P)ED&H CRA Support as part of private sector (and not solely publicly-funded) initiative: (1) model already underway focusing on tech entrepreneurship; staff exploring CRA financial participation; (2) Explore feasibility of a "Resource Center" or "One Stop" concept with other partners (1) 3 months (2) 12-18 months Part of ED&H/CRA work program (1) TBD--Potential CRA financial participation; (2) TBD 20) Enhance Gateways (to include: five points intersection; Cleveland and Myrtle, lntermodal hub, Pinellas Trail; Fort Harrison & Court) (P)Engineering ED&H, CRA Support: Five points intersection is completed. Other locations need ROW and feasibility investigation and funding identification (some after facility siting)TBD Minimal staff impacts for ROW identification of other locations. Need to identify design and construction costs if able to proceed.TBD 27)Commmunity Market (P) CRA ED&H Support: (1) Feasibility of Festival Core part of East Gateway Vision Plan; (2) Investigation of "Mercado" as it needs a fixed location and feasibility and cost analysis (1) 3 years (2) TBD (1) Part of ED&H/CRA/Engineering work program (2) Significant impact to work program if conducted in FY14-15 (1) TBD (2) TBD 29)Conduct community branding effort (P)PC Support: Contract awarded and work underway-- North Star hired 12 months Part of existing work program $100k 30) Communicate the real estate market and potential for expansion of real estate activity (P)ED&H PC Support: Prepare a marketing piece that highlights housing, retail, and office demand for web-based and social media distribution 4 months To be completed in house with existing staff $5k 31) Create a forum for the discussion of issues with the city, development partners, and community stakeholders (P)ACM Support: Create Communications Stakeholder Group (CSG); Define goals Subject to Council Concurrence n/a n/a 34) Investigate the use of TIF bonds to leverage redevelopment (P) ACM Finance Support: Needs cost/benefit analysis; Opinion letter from Financial Advisor has been requested 4 months Incorporated as part of existing work program TBD STRATEGY 1.4: Community Gateways and Connections FOCUS AREA 3: ORGANIZATIONAL CAPACITY AND IMPLEMENTATION ITEM 3.1: Implementation FOCUS AREA 2: COMMUNICATION/PARTNERSHIPS Item 2.1: Clearwater must begin to actively tell its story Item 2.2: Page 2 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-705 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: PresentationIn Control: Economic Development & Housing Agenda Number: 3.1 SUBJECT/RECOMMENDATION: Annual Tourism Review - Adel Grobler, Imagine Global Consulting (WSO) SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Year-End Review Tourism Marketing and PR Activities December 1, 2014 Clearwater Visitor Statistics: Year Over Year Comparison 2013 and 2014 8.3% in Visitor Numbers 581,100 Visitors 6.29% in Expenditure $516,286.700 6.29% in Economic Impact $1,028,236,600 Fall & Winter Statistics Achievements OfferpopTwitter Promotion and Give-away In Partnership With Shephard’sBeach Resort Generated 63% Growth in Followers in 3 Months Reached More Than 580,000 Twitter Users National Campaign Received 276,660 Unique Visitors to the Website in 2013/14 Growth of 2013/14 Individual Month with Exceptional Growth –Sept ’14 Grew 61% over Sept ’13 Website Developed Mobile Website for Smartphones and Tablets Site Has Received More Than 107,000 Visits on Mobile Devices Since Launching Mobile App Technology @MyClearwater 149% Follower Increase in 2014 More than 6,500 current Twitter followers KloutScore of 53 Social Media: Twitter Insider Perspective Unique, Interesting, and Engaging Content Relevant for Search Engine Optimization Clearwater Blog Media Outreach 13 Press Releases Distributed, Reaching an Average of 4,700 Media Each 318 Targeted Media Pitches 2Releases via Newswire Mailings 4 Major Broadcast Shows 135 Articles Advertising Value: More Than $5 Million Focus on Quality National Coverage With Special Attention to Broadcast Coverage Coverage Generated TV Coverage of Clearwater and the Pier 60 Sugar Sand Festival on the Today Show TODAY Show Weather Channel Featured the Pier 60 Sugar Sand Festival Extensively with Nine Segments Weather Channel The Travel Channel Featured Clearwater Beach in an Episode of Bikinis & Boardwalks Travel Channel NY 1’s Valarie D’EliaAttended the Pier 60 Sugar Sand Festival and Featured the Event, plus Dolphin Tale 2 in a Segment NY1 Travel with Val Coverage Coverage Clearwater Beach Uncorked February 2014 USA Today Miami Herald Glamour.com Daily Meal, Just Luxe Gold Coast Mag, Boca Life Mag, Fort Lauderdale, Palm Beacher and more Press Trips: Group SevenIndividual Media Visits Including: Forbes.com Weather Channel Insider Magazine NY1/Travel with Val PetPalsTV The Trading Travelers Travel Weekly Press Trips: Individual Media Photoshootfor Destination 235 New High Resolution Images Available on Flickr for Download and Use Hosted by Sheraton Sand Key Photography Update Arranged New York Media Mission for City of Clearwater in September 2014 Capitalized on Dolphin Tale 2 Release Arranged Meetings with Nine Media including Travel + Leisure, Family Circle, Budget Travel, Martha Stewart Weddings, Brides Magazine and More Media Mission Hosted an Ice Cream Social for 68 Journalists Focus on Dolphin Tale 2 Release Event was Hosted at Off The Wall Frozen Yogurt in Midtown Created Interactive Social Media Opportunity: Photo Booth for Journalists to Capture their Picture in Clearwater Media Mission: Event Media Mission: Event Media Mission: Event Sugar Sand Festival Clearwater Jazz Holiday Outback Bowl Beach Day Sea-Blues Festival Clearwater Beach Restaurant Week Clearwater’s Dolphins Bright House Clearwater Super Boat Nat’l Championship & Seafood Festival Press Trips in Collaboration With CVB Local Collaboration Current Trends Media Trends Reduced Print Space Growth of Online Publications New Generation of Editors Integration of Various Platforms for Publications Content Trends User Generated Content Native Content Visual Content –Video and Images Travel Trends Millennials Hispanic Market Multi-generational Travel Imagine Communications Strategic Objectives Increase Visibility and Awareness of the Destination to Grow Visitation Generate High-Profile National Media Coverage Emphasis on Earned Placements Increase Online Content and Coverage Support In-House Marketing and PR Activities Promote Elite Events Promote 100 Year Anniversary Strategic Objectives Proactive High-Quality Media Outreach Consumer Social Media Marketing Campaign Event Marketing Video Development Capitalize on Current Technology Review and Adopt City Branding Update as Needed Focus for Upcoming Year Year-End Review Tourism Marketing and PR Activities December 1, 2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-649 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Economic Development & Housing Agenda Number: 3.2 SUBJECT/RECOMMENDATION: Designate 2506 Countryside Boulevard, formerly known as Countryside Executive Golf Course, as a Brownfield Area for the purpose of environmental rehabilitation and economic development and adopt Resolution 14-34. SUMMARY: The owner, 25 Countryside West, LLC, (Applicant) purchased the subject property on December 27, 2013, as recorded in O.R. Book 18306 Page 2595 Pinellas County, Florida. The aforementioned 44.277 MOL acre site was formerly the location of the Countryside Executive Golf Course which closed in 2005. The site has been vacant and unused since that time. The Applicant requests that the City of Clearwater exercise its authority for designation of a Brownfield area proposed by a person other than the local government entity as set forth in Chapter 376.80(2)(c) Florida Statutes and designate the above parcel a Brownfield Area under the Florida Brownfield Redevelopment Program. Upon designation by the City, the Owner, hereinafter the Person Responsible for Brownfield Site Rehabilitation (PRFBSR), will enter into a Brownfield Site Rehabilitation Agreement (BSRA) with the Florida Department of Environmental Protection (FDEP) and notify the City Brownfield Coordinator when such an agreement has been reached. The PRFBSR will 1) conduct the remediation under the direction of FDEP and 2) complete the redevelopment and reuse of the existing zoning, Medium Density Residential (MDR), and future land use planned classification, Residential Urban (RU), to accommodate urban multi-family residential. The rehabilitation and redevelopment of the proposed Brownfield site will result in economic productivity of the area, along with the creation of at least 5 new permanent jobs at the Brownfield site that are full-time equivalent positions not associated with the implementation of the BSRA and that are not associated with redevelopment project demolition or construction activities pursuant to the redevelopment of the proposed Brownfield site or area. This designation shall not, however, render the City of Clearwater liable for the cost of site rehabilitation or source removal, as those terms are defined in Sections 376.70 (17) and (18), Florida Statutes, for other costs in excess of those attributable to the City as administrator of a Brownfields Program; or as a property owner, if the City hereafter acquires any realty within the designated Brownfield Area. The requirements of the aforementioned statute have been satisfied by the applicant and, based upon the information presented; staff recommends adoption of Resolution 14-34. APPROPRIATION CODE AND AMOUNT: N/A Page 1 City of Clearwater Printed on 11/26/2014 File Number: ID#14-649 USE OF RESERVE FUNDS: N/A Page 2 City of Clearwater Printed on 11/26/2014 2506 MDR US-19 N BELCHER RD SR 580 ENTERPRISE RD C O U N TRYSID E BLV D LAURELWOOD DR W U S - 1 9 F R O N T A G E R D BAY BERRY DR E US-19 FRONTAGE RD O AKLEAFLN MOOREHAVENDRW MOORE HAVEN DR EGREENBRIAR B L V D S E Q U OIA DR TIMBERCRESTCIRW HAZELWOOD LN WARWICK DR BIRCHBARK TRL OAK NECK RD SUMATRAN WAY TULIP TREE LN COVINGTON DR OAKLEAFDR ROYALPINE S CIR H A W T H ORNE DR TIMBERCRESTCIRE WHITE OAK C IR MILLWOODLN NETHERLANDS DR HERDA DR SYCAMORE DR TAHITIAN LN SCOTLAND DR PALMWOOD DR FIR LANE CT BAY BERRY LN OAKNECKDR BUTTONWOOD CT SR 580 EXHIBIT A ²Prepared by:Engineering DepartmentGeographic Technology Division100 S. Myrtle Ave, Clearwater, FL 33756Ph: (727)562-4750, Fax: (727)526-4755www.MyClearwater.com JAB N.T.S.221A & 232A10/17/2014Map Gen By:Grid #:Date:Scale: 2506 Countryside Boulevard / Parcel Number: 30-28-16-18367-000-0001 44.30Acreage: Document Path: V:\GIS\Engineering\Location Maps\2506 Countryside Blvd.mxd LEGAL DESCRIPTION:LOTS 1, THROUGH 240, INCLUSIVE AND TRACT A, COSTA VERDE, ACCORDING TO THE MAP OR PLAT THEREOF, AS RECORDED IN PLAT BOOK 132, PAGES 38 THROUGH 55, INCLUSIVE, PUBLIC RECORDS OF PINELLAS COUNTY, FLORIDA. [GM14-9216B-002/158324/1] RESOLUTION NO. 14-34 A RESOLUTION OF THE CITY OF CLEARWATER, FLORIDA, MAKING FINDINGS; DESIGNATING PROPERTY FORMERLY KNOWN ASCOUNTRYSIDE EXECUTIVE GOLF COURSE LOCATED AT 2506 COUNTRYSIDE BOULEVARD, CLEARWATER, FLORIDA 33763, AS A BROWNFIELDAREA FOR THE PURPOSE OF ENVIRONMENTAL REHABILITATION AND ECONOMIC DEVELOPMENTPURSUANT TO SECTIONS 376.77-376.86,FLORIDA STATUTES;PROVIDING AN EFFECTIVE DATE. WHEREAS,the State of Florida has provided, in Florida Statutes Sections376.77 – 376.86,for the designation by resolution of certain contiguous areas consisting of one or more Brownfields sites as “Brownfields Areas”, and for the corresponding provision of environmental remediation and economic development for such areas; and WHEREAS, morespecifically, Florida Statutes Section 376.80(2)(c) provides for Brownfield designation by persons other than a governmental entity; and WHEREAS, the City of Clearwater is required to notify the Florida Department of Environmental Protection of its decision to designate a Brownfield Area within its jurisdiction if said persons establishcertain criteria as set forth in Florida Statutes Section 376.80(2)(c); and WHEREAS, 25 Countryside West, LLC (hereinafter, the“Owner”) owns 44.277 MOL acres of propertylocated at 2506 Countryside Boulevard, Clearwater, Florida33763, the legal description and a depiction of which are attached hereto as EXHIBIT A, both of which are incorporated herein by this reference (the “Subject Property”); and WHEREAS, the Owner submitted an application to the City of Clearwater Economic Development and Housing Department on October 7, 2014, requesting the City of Clearwater designate by resolution theSubject Property a Brownfield Area as authorized under the Florida Brownfield Redevelopment Act, Section 376.77-376.86Florida Statutes; and WHEREAS,the Owner,upon designation by the City,will enter into a Brownfield Site Rehabilitation Agreement with the Florida Department of Environmental Protection (FDEP) and will conduct the remediation under the direction of FDEP and complete the redevelopment and reuse with the existing zoning medium density residential (MDR) and future land use planned classification residential urban (RU); and WHEREAS,theCity has complied with the procedures and has given proper notice and opportunity for the public to be heard, as required by Sections376.80and 166.041, Florida Statutes;and now therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: [GM14-9216B-002/158324/1] Section 1. The City Council finds: that the person making application for the designation of a brownfield site owns or controls the site, is requesting the designation, and has agreed to rehabilitate and redevelop the potential brownfield site; the rehabilitation andredevelopment of the proposed brownfield site will result in economic productivity of the area, along with the creation of at least 5 new permanent jobs at the brownfield site that are full-time equivalent positions not associated with the implementation of the brownfield site rehabilitation agreement and that are not associated with redevelopment project demolition or construction activities pursuant to the redevelopment of the proposed brownfield site or area; the redevelopment of the proposed brownfieldsite is consistent with the local comprehensive plan and is a permittable use under the applicable local land development regulations; notice of the proposed rehabilitation of the brownfield area has been provided to neighbors and nearby residents of the proposed area to be designated, and the person proposing the area for designation has afforded to those receiving notice the opportunity for comments and suggestions about rehabilitation; the person proposing the area for designation has provided reasonable assurance that he or she has sufficient financial resources to implement and complete the rehabilitation agreement and redevelopment of the brownfield site. Section 2. For the purpose of the Florida Brownfield Redevelopment Act, Sections 376.77 -376.86,Florida Statutes, (hereinafter the “Act”), the Subject Property is hereby designated a Brownfield area. For purposes of Clearwater’s Brownfields Program, this area shall be called the 2506 Countryside Boulevard Brownfield Area.This designation shall not, however, render the City of Clearwater liable for the cost of site rehabilitation or source removal, as those termsare defined in Section 376.79 (17) and (18), Florida Statutes; for other costsin excess of those attributable to the City as administratorof a Brownfields Program, or as a property owner, if the City hereafter acquires any realty with the designated Brownfield Area. Section 3. The Owner will negotiate a Brownfield Site Rehabilitation agreement, if needed, addressing such rehabilitation, and notify the City Brownfield Coordinator when such an agreement has been reached. Section 4. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this __________ day of ______________________2014. CITY OF CLEARWATER, FLORIDA By: ____________________________ George N. Cretekos Mayor Approved as to form:Attest: ______________________________________________________ Laura Mahony Rosemarie Call City Attorney City Clerk Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 14-38 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: ResolutionIn Control: Finance Agenda Number: 4.1 SUBJECT/RECOMMENDATION: Authorize the negotiated sale of not to exceed $27,550,000 Water and Sewer Revenue Refunding Bond, Series 2014 and adopt Resolution 14-38 SUMMARY: Currently there is outstanding $26,430,000 par value of Water and Sewer Revenue Bonds, Series 2006, with maturities in years 2019 - 2032 and interest rates ranging from 4.25% to 4.625% that are callable on December 1, 2015. Current bond-market conditions present an opportunity to advance refund these bonds to achieve a present value savings of approximately $2,242,720 (8.49%). The City’s debt management policy states, “As a general rule, the present value savings of a particular refunding should exceed 5%.” In anticipation of the refunding, the City through its Financial Advisor, Stifel, Nicolaus and Company, Inc., issued a Request for Proposals (RFP) soliciting proposals from qualified investment companies to provide a bank loan. This resolution authorizes the negotiated sale of not to exceed $27,550,000 par value at a fixed interest rate of 3.18% of Revenue Refunding Bonds, Series 2014, to TD Bank, N.A., the firm submitting the most favorable response to the RFP. APPROPRIATION CODE AND AMOUNT: N/A Page 1 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-708 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Gas System Agenda Number: 5.1 SUBJECT/RECOMMENDATION: Approve a Contract with Corrpro Companies, Inc., in the amount of $313,424.62, for consulting and system maintenance services, and authorize the appropriate officials to execute same. (consent) SUMMARY: Clearwater Gas System distribution system is comprised of steel, cast iron and plastic gas mains/service lines. All steel gas lines must be Cathodically Protected (CP) from external corrosion. This is accomplished by applying a low voltage to the steel which prevents corrosion/oxidation of the pipe. In July 2014, the Florida Public Service Commission (FPSC) conducted their annual evaluation of CGS’s distribution system. Their evaluation found several items that need to be modified in order to be compliant. The FPSC recommended we hire an outside company to assist us in correcting the deficiencies cited in their 2014 audit. CGS issued Request for Proposals 36-14 and selected Corrpro as the best candidate for this project. As part of the evaluation, Corrpro will provide a comprehensive report and list action items to correct all deficiencies within our CP system. In addition, Corrpro will provide all necessary field labor to correct each deficiency. This project is expected to last 6-12 months, depending on the extent of their findings. APPROPRIATION CODE AND AMOUNT: A first quarter budget amendment will increase expenditure code 0423-02179-530100-532-000-000 (Other Gas Regulatory) by $313,424.62 for this contract, which is offset by existing Gas Fund revenues. USE OF RESERVE FUNDS: N/A Page 1 City of Clearwater Printed on 11/26/2014 REQUEST FOR PROPOSALS CITY OF CLEARWATER, FLORIDA RFP NO. 36-14 Notice is hereby given that the City of Clearwater will be receiving sealed proposals at the City’s Purchasing Division, 100 South Myrtle Avenue, Clearwater, FL 33756 for: Consulting and Maintenance Services for Operating a Cathodic Protection System in a Natural Gas Distribution System PROPOSAL DUE DATE: MONDAY, SEPTEMBER 15, 2014, 10:00 AM EDT The City is seeking experienced and qualified firms that demonstrate the highest level of ability, professionalism and expertise. Six (6) copies and one (1) electronic copy of each proposal shall be submitted in a sealed envelope and plainly marked: “RFP No. 36-14, Consulting and Maintenance Services for Operating a Cathodic Protection System in a Natural Gas Distribution System” Issued at Clearwater, Florida, this 22nd day of August, 2014. Prepared By: Brian Langille, PE, CEM Operations Manager Clearwater Gas System 400 N Myrtle Ave Clearwater, FL 33755 TABLE OF CONTENTS INTRODUCTION ____________________________________________________________________ 1 OBJECTIVES _______________________________________________________________________ 3 PROJECT BACKGROUND _____________________________________________________________ 3 PROJECT APPROACH ________________________________________________________________ 3 PROJECT MANAGEMENT ____________________________________________________________ 4 SUMMARY OF SERVICES _____________________________________________________________ 4 PROPOSAL SUBMITTAL ______________________________________________________________ 7 SELECTION COMMITTEE _____________________________________________________________ 8 TENTATIVE SCHEDULE ______________________________________________________________ 8 FAMILIARITY WITH LAWS ____________________________________________________________ 9 RFP INQUIRIES AND ADDENDA _______________________________________________________ 9 APPROPRIATIONS CLAUSE ___________________________________________________________ 9 PUBLIC ENTITIES CRIME STATEMENT ___________________________________________________ 9 BID SECURITY ____________________________________________________________________ 10 DRUG-FREE WORKPLACE REQUIREMENTS _____________________________________________ 10 OPERATOR QUALIFICATION _________________________________________________________ 11 BID PROTEST PROCEDURE __________________________________________________________ 11 NO CORRECTIONS CLAUSE __________________________________________________________ 12 RETENTION/DISPOSAL OF RFPS CLAUSE _______________________________________________ 12 LEGAL NAME CLAUSE ______________________________________________________________ 12 OPENNESS OF PROCUREMENT CLAUSE ________________________________________________ 12 NO COLLUSION CLAUSE ____________________________________________________________ 12 QUALIFICATIONS OF VENDORS ______________________________________________________ 13 EXECUTION OF CONTRACT __________________________________________________________ 13 TIME OF COMPLETION _____________________________________________________________ 14 INSURANCE REQUIREMENTS ________________________________________________________ 14 INFORMALITY WAIVING/BID REJECTIONS CLAUSE _______________________________________ 16 PROPOSAL SUBMITTAL CERTIFICATION ________________________________________________ 17 INTRODUCTION The City of Clearwater (“City” or “Owner”), d/b/a Clearwater Gas System (“CGS”), owns and operates a natural gas distribution system (“System”) within portions of Pinellas and Pasco County, Florida. CGS has approximately 850 miles of distribution gas mains that operates between 8 – 60 PSI and serves approximately 18,500 natural gas customers over a 330 square mile service territory. Proposals are now sought from qualified companies (“Consultant”) to provide consulting and maintenance services for operating a cathodic protection (CP) system within a natural gas distribution system. CGS generally serves natural gas to north Pinellas County (i.e., north of Ulmerton Rd) and Southwest Pasco County (Pinellas/Pasco county line to State Rd 52 and Ehren Cutoff Rd). In addition, CGS serves the beach communities from Clearwater down to Redington Beach. CGS only has metallic distribution gas mains and service lines in Pinellas County. Below is a general breakdown of our distribution gas mains & service lines, taken from the Pipeline and Hazardous Materials Safety Administration (PHMSA) annual distribution report. Additional information, such as GIS shapefiles, depicting the exact location of our main & service lines can be made available upon request. 1 2013 PHMSA 7100-1.1 Annual Report 2 OBJECTIVES CGS’s main objective is to receive zero (0) violations from the Florida Public Service Commission inspector for the 2015 annual audit. The Consultant should work directly with our CP employees to provide the guidance and applicable training to achieve this goal in the upcoming and future years. PROJECT BACKGROUND In July 2014, the Florida Public Service Commission (FPSC) conducted their annual evaluation of CGS’s cathodic protection system. Part of the cathodic protection system was surveyed and results indicated portions of it were not electrically continuous (i.e., electrical short) or had depleted anodes that did not meet the National Association of Corrosion Engineers (NACE) negative 0.85V criteria. In addition, their evaluation found several record keeping/documentation items that need to be modified in order to be compliant with the FPSC. PROJECT APPROACH The project team will be composed of the Consultant and employees of the CGS’s Cathodic Protection section. The Consultant will field test the entire Cathodic Protection system and evaluate the current conditions. This will include:  Test and verify for the presence of current protection in the system that have monitoring stations, o Recommend the addition of monitoring stations, where required. o Remove, or reclassify, monitoring stations not necessary o Evaluate all steel casings in CGS’s distribution system and determine the vitality of monitoring stations  Testing of insulating joints to ensure that they are functioning as intended and are not shorted o Recommend additional insulating joints where needed to allow the system to be more manageable and troubleshooting friendly  Determine if the system is electrically isolated from other metallic structures, as originally designed  Compare the results of field tests to NACE criteria for appropriate cathodic protection  Indicate if any repairs are necessary prior to final corrective action measures  Cost evaluation shall be provided for all corrective action measures (i.e., transitional & final repair work)  CGS will determine the amount of corrective action work be performed by the Contractor vs. internal CGS crews  Consultant should provide a methodology for long-term documentation of cathodic protection records 3 PROJECT MANAGEMENT Consultant will provide Project Management services during the system evaluation portion of the project. Specific tasks may include:  Consultant Project Management  A Project Kickoff Meeting  Monthly Progress Meetings  Monthly Reports Completed  Quality Assurance/Quality Control Implementation  Maintenance of a Decision Log Consultant will ensure continuous responsibility of the project in terms of staffing, budget, schedule and scope; promote communication within the project team and document key decisions. SUMMARY OF SERVICES In general, this section outlines the types of services expected of the Consultant to support the cathodic protection needs of CGS. The Consultant services provided may include, but are not limited to, the following:  Conduct a full audit of CGS’s CP system for mains and service lines o Inspect all CGS compliance records/documentation, related to corrosion control, for proper compliance as required by the Code of Federal Regulations, Title 49, Part 192 and the FL Administrative Code chapter 25-12  Evaluate all test station locations (conduct both field inspections & office reviews)  Determine solutions to correct low voltage readings at test stations (i.e., locations that don’t meet the minimum voltage requirements of -0.850 V)  Evaluate the quantity, operational ability & locations of our existing rectifier stations  Provide a written report that outlines all corrective actions measures needed in order to comply with Federal and State regulations  Provide a cost estimate for a Consultant to perform all corrective action measures, to include labor & materials  Make recommendations to enhance operational efficiency of existing CP system o Evaluate the need for electronic records vs. paper based report o Training/Coaching of CGS’s Cathodic Protection employees  Provide an Executive Summary of the Evaluation report 4 In addition, the proposal shall contain the following sections: A. Project overview B. Detailed project approach C. Related Projects & References D. Consultant team E. Project schedule F. Conflicts of interest G. Propriety information H. Staff estimate I. Solicitation of Sub-consultants, Subcontractors, other service providers and suppliers J. Employment Practices K. Cost information L. Contract Documents A. PROJECT OVERVIEW (15 points) Provide a narrative description of the project based on the scope of work and proposed schedule presented in this Request for Proposal (RFP). CGS will assess participating Consultants’ understanding of the project based on the overview. B. DETAILED PROJECT APPROACH (15 points) Provide a detailed description of the proposed approach to the project as described herein. The description shall include details to implement the tasks described in the Summary of Services and any recommended revisions to the list of tasks. The approach should recognize, address and provide for resolution of all aspects of the project. C. PROJECT COST (20 points) Consultants shall provide an hourly rate schedule for consultant personnel to be billed to the project and identify all other costs to be billed to the project. Include any adjustments that are predicted to occur during the life of the project. D. RELATED PROJECTS & REFERENCES (20 points) Provide a minimum of three (3) similar projects the firm and the proposed team have completed. The description of each project should include the year(s) during which the work was performed and a description of process design components. The firm's role in the project should also be 5 described (pre-design, design construction management, etc., and prime Consultant, Subconsultant, etc.). For references, include the name, title, and phone number of the primary contact person for each project listed. E. CONSULTANT TEAM (20 points) The proposed Consultant team shall be identified including project manager, project engineer, and other key personnel. The percentage of time devoted to this project for all personnel shall be stated. A Consultant team organization diagram shall be included. A resume of each team member shall be included in the appendix. Each resume should include a description of relevant projects. Any proposed Subcontractors shall be identified; tasks assigned and experience included similarly to the firm’s own project personnel. F. PROJECT SCHEDULE (10 points) A project schedule for completion of the project shall be submitted with the proposal. All major outputs and meetings shall be included on the schedule, including time allocations. Time shall be allocated for CGS review. G. CONFLICTS OF INTEREST Firms submitting proposals in response to this RFP must disclose to CGS any actual, apparent, direct or indirect, or potential conflicts of interest that may exist with respect to the firm, management, or employees of the firm or other persons relative to the services to be provided under the Agreement for services to be awarded pursuant to this RFP. If a firm has no conflicts of interest, a statement to that effect shall be included in the Proposal. H. PROPRIETARY INFORMATION Firms submitting proposals to this RFP must provide a statement that nothing contained in the submitted proposal will be proprietary. I. STAFF ESTIMATE Provide a City staff estimate of time for each task to permit CGS the opportunity to determine the level of detail and the number of management, engineering, technical, drafting and support personnel hours envisioned for each task. Estimates of hours for each staff classification shall be provided for each task. 6 J. SOLICITATION OF SUBCONSULTANTS, SUBCONTRACTORS, OTHER SERVICE PROVIDERS AND SUPPLIERS If the prime Consultant intends to solicit sub-proposals and/or quotes for certain tasks on this project from qualified Sub-consultants, Subcontractors, other service providers and suppliers, CGS expects the prime Consultant to solicit qualified firms in the local business community for such services and supplies. The solicitation conducted should be as broad as possible to reasonably provide opportunities for and encourage relationship building with qualified minority and women-owned firms, and small and local business in Pinellas County. The Consultant shall not illegally discriminate in the solicitation process. Substitution of any Sub-consultants, Subcontractors, other service providers and suppliers identified in the agreement shall not be made without the written consent of CGS. K. EMPLOYMENT PRACTICES Consultants shall provide a summary of their firm’s employment policies and procedures, including any equal employment opportunity and affirmative action policies. Also, include a brief summary outlining the present composition of your work force. L. CONTRACT DOCUMENTS Consultant will provide a draft agreement for CGS to review. Agreement should include all services as described in this RFP. PROPOSAL SUBMITTAL Six (6) copies of the proposal and one (1) electronic copy shall be submitted to: If submitted by mail: Alyce Benge, CPPO Purchasing Manager Purchasing Division of the City of Clearwater P.O. Box 4748 Clearwater, Florida 33758 If submitted in person: Alyce Benge, CPPO Purchasing Manager Purchasing Division of the City of Clearwater 100 South Myrtle Avenue Clearwater, FL 33756 Note: All copies must be submitted and received by the Purchasing Division no later than 10:00 AM EDT on Monday, September 15, 2014. 7 SELECTION COMMITTEE The Selection Committee will consist of a minimum of five (5) employees from certain departments within the City of Clearwater. The Committee will choose the top two (2) or three (3) proposers, based on initial evaluation scoring of the RFP submittals, for a scheduled presentation in Clearwater. RFP submittals and presentations will be scored based on the criteria below: Proposal Evaluation Criteria 1. Project Overview 2. Detailed Project Approach 3. Project Cost 4. Related Projects & References 5. Consultant Team 6. Project Schedule Maximum Points 15 15 20 20 20 10 Total 100 The Consultant will be selected in accordance with the Proposal Evaluation Criteria identified above. A final recommendation will be made by the selection panel, based on the technical review and evaluation of the proposal and presentation. Negotiations will occur with the responsible Consultant who provides the best overall response to the requirements of this RFP. The selection of the Consultant and the negotiated Contract will be presented to our City Council for approval. Written notification of the outcome of the selection process will be mailed to all Consultants who submitted a proposal. Proposers shall not be entitled to payment for any expenses incurred in the preparation of its proposal. TENTATIVE SCHEDULE The following is a proposed schedule for this project. If participating Consultants find that the schedule needs to be modified, indicate such in your proposal. Milestone Dates Request for Proposal (issued)…Aug 22 Proposals Due…………………Sept 15 Proposal Review & Evaluation..Sept 16 – 26 Presentations …………………..Sept 29 – Oct 3 Consultant Selected……………Oct 6 Contract Negotiation…………. Oct 6 – Oct 17 City Council Approval………...Nov 6 Provide work schedule………...Nov 10 Issue Report, including cost estimate for corrective action measures – February 2015 8 FAMILIARITY WITH LAWS Each consultant shall be responsible for full and complete compliance with, and by submitting a proposal certifies that it is familiar with, all federal, state and local laws, ordinances, rules and regulations. RFP INQUIRIES AND ADDENDA Each proposer shall examine all RFP documents and shall judge all matters relating to the adequacy of such documents. Any inquiries, suggestions or requests concerning interpretation, clarification, or additional information pertaining to the RFP shall be made in writing a minimum of five (5) working days prior to the due date specified herein to City’s Purchasing Manager, Alyce Benge, CPPO, at P.O. Box 4748, Clearwater, FL 33758-4748; or Fax (727) 562-4635. Facsimiles must have a cover sheet which shall include, at a minimum, the proposer’s name, address, RFP Number, number of pages transmitted, phone number, and facsimile number. Inquiries may also be emailed to Alyce.Benge@MyClearwater.com. Neither City nor CGS shall be responsible for oral interpretations given by any City or CGS employee, representative, or others. The issuance of a written addendum is the only official method whereby interpretation, clarification, or additional information may be given. If any addenda are issued to this RFP, City/CGS will attempt to notify all proposers who have secured the same. It shall be the responsibility of each proposer, however, to contact City’s Purchasing Manager at (727) 562-4633 to determine if any addenda were issued and to make such addenda a part of the proposal prior to the submission of a proposal. APPROPRIATIONS CLAUSE City, as a governmental entity, is subject to the appropriation of funds by its legislative body in an amount sufficient to allow the continuation of its performance in accordance with the terms and conditions of the Agreement for each and every fiscal year following the fiscal year in which this contract is executed and entered into and for which the Agreement shall remain in effect. Upon receipt of notice that sufficient funds are not available to continue its full and faithful performance of the Agreement, City/CGS shall provide prompt written notice of such event. Effective thirty (30) days after giving such notice or upon the expiration of the period of time for which the funds were appropriated, whichever occurs first, City/CGS shall thereafter be released of all further obligations in any way related to the Agreement. PUBLIC ENTITIES CRIME STATEMENT Pursuant to Florida Statute 287-132-133, effective July 1, 1989, the City of Clearwater, as a public entity, may not accept any proposal from, award any contract to, or transact any business in excess of the threshold amount provided in Section 287.017, F.S., for Category Two (currently $35,000) with any person or affiliate on the convicted vendor list for a period of 36 months from 9 the date that person or affiliate was placed on the convicted vendor list unless that person of affiliate has been removed from the list pursuant to Section 287.133 (3)(f), F.S. If you submit a proposal in response to this request, you are certifying that Florida Statute 287.132 and 287.133 does not restrict your submission. BID SECURITY Each proposer/bidder must deposit a bid bond in the amount of ten percent (10%) of the total annual cost referenced in the Proposal, made payable to the City of Clearwater, which sum will serve as bid security and will be forfeited to the City of Clearwater as liquidated damages in the event an award is made and the contract and bonds are not promptly and properly executed as required. All proposals may be held for a period of 60 days after receipt. All certified checks, except those accompanying the two (2) or three (3) lowest bids, will be returned by certified mail to the unsuccessful bidders within fourteen (14) days after the date of the bid opening. (If the signing of the contract be deferred for a period exceeding two (2) weeks, and the second low bidder desires to substitute a bid bond for his certified check and the bid bond fully guarantees his bid, he shall be permitted to do so). The certified checks accompanying the proposals selected for presentations will be returned within three (3) days after the Owner and the successful bidder have executed the contract. In the event no contract award is made within the time limit specified, each certified check or bid bond will be returned upon the demand of the proposer. DRUG-FREE WORKPLACE REQUIREMENTS In order to comply with Florida Statutes, all proposers will be required to complete a Drug Free Workplace form (F.S. 287.087). Preference will be given to businesses with drug-free workplace programs. Whenever two or more proposals that are equal with respect to price, quality and service are received by the City for the procurement of commodities or contractual services, a proposal received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie proposals will be followed if none of the tied proposers have a drug-free workplace program. In addition, the Contractor agrees that it has in place, or will implement a Drug and Alcohol Training and Testing Program for their employees that comply with the requirements of the United States Department of Transportation, Title 49, Pipeline Safety Regulations, Part 199. The contractor will also furnish quarterly statistical reports to CGS to show active compliance during term of contract. The Contractor further agrees to allow access to its property and records by the Human Resources Director, or appointed designee, of the City of Clearwater. The Contractor will permit representatives of state or federal agencies who monitor the compliance of Drug and Alcohol rules/regulations access to its property and records. The contractor shall furnish quarterly statistical reports to the Operations Coordinator during term of contract. 10 Said program shall provide pre-employment, random, for cause and post accident drug training and testing (alcohol for cause testing) for all of its employees as required by Federal regulations and who are assigned to perform services for Clearwater Gas System. The contractor shall attest in writing, the following: 1. That the contracting firm has an agreement with a drug testing laboratory certified by HHS/NIDA and an alcohol testing facility; 2. The name and address of the Medical Review Officer retained by the contractor for the drug and alcohol testing program; 3. That all employees of the contractor have been drug tested pre-employment; and 4. That all employees covered by the US Department of Transportation Regulation 199 receive random, for cause and post accident drug testing and alcohol testing for cause pursuant to such regulation. Prior to doing any work for CGS, the vendor will submit a copy of their current Drug and Alcohol Testing Policy. This policy should be included in their Proposal. OPERATOR QUALIFICATION Contractor employees and their subcontractors must meet the requirements and intent of the Code of Federal Regulations (CFR) 49 Part 192.801, 192.803, 192.805, 192.807 and 192.809 relating to “Operator Qualification” with mandatory knowledge, skill and abilities, training to be completed by November 30, 2014. The contractor must state in writing that their Operator Qualification plan is in conformance with the intent of Federal Operator Qualification Regulations and is at least equal to and applicable to Clearwater Gas System’s ASME B31Q Operator Qualification Plan. OQ and all Training Documentation shall be furnished upon request. The Contractor’s Operator Qualification Plan must also explain how their employees have the ability to identify and react to natural gas related Abnormal Operating Conditions that may be encountered while working on the gas pipeline facility. Contractor Employee Operator Qualification, Knowledge, Skill and Ability records will be kept for a 5 year period. BID PROTEST PROCEDURE Any actual or prospective proposer who is aggrieved in connection with the solicitation or award of a contract may seek resolution of his/her complaints by contacting the Purchasing Manager. 11 NO CORRECTIONS CLAUSE Once a proposal is submitted, the City/CGS shall not accept any request by any proposer to correct errors or omissions in any proposal submitted. RETENTION/DISPOSAL OF RFP’S CLAUSE City/CGS reserve the right to retain all proposals submitted for official record purposes and to use any ideas in a proposal regardless of whether that proposal is selected. Submission of a proposal indicates acceptance by the proposer of the conditions contained in this RFP and all attached exhibits, unless clearly and specifically noted in the Agreement between City/CGS and the selected proposer. City/CGS also reserves the right to securely dispose of any or all copies of proposals. No copies of proposals will be returned to the proposer. LEGAL NAME CLAUSE Proposals shall clearly indicate the legal name, address and telephone number of the proposer (company, firm, partnership, individual). Proposals shall be signed above the typed or printed name and the title of the signer shall be indicated. To constitute a valid proposal, the signer must have authority to bind the proposer to the submitted proposal. OPENNESS OF PROCUREMENT CLAUSE Written proposals, other submissions, correspondence, and all records made thereof, as well as negotiations conducted pursuant to the RFP, shall be handled in compliance with Chapters 119 and 286 of Florida Statutes. Neither the City nor CGS shall give any assurance as to the confidentiality of any portion of any proposal once submitted. NO COLLUSION CLAUSE By offering a submission to the RFP, the proposer certifies that the proposer has not divulged to, discussed or compared his/her competitive proposal with other proposers and has not colluded with any other proposers or parties to this competitive proposal whatsoever. Also, the proposer certifies, and in case of joint competitive proposal each party thereto certifies as to its own organization, that in connection with the competitive proposal: a) any prices and/or cost data submitted have been arrived at independently, without consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices and/or cost data, with any other proposer or with any competitor; 12 b) any price and/or cost data quoted for this competitive proposal have not been knowingly disclosed by the proposer, directly or indirectly to any other proposer or competitor, prior to the scheduled award of the contract; c) no attempt has been made or will be made by the proposer to induce any other person or firm to submit or not to submit a competitive proposal for the purpose of restricting competition; d) the only person or persons interested in this competitive proposal, principal or principals is/are named therein and no person, other than those named therein, has any interest in this competitive proposal or in the Agreement to be entered into; and e) no person or agency has been employed or retained to solicit or secure the Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or established commercial agencies maintained by the proposer for the purpose of doing business. QUALIFICATIONS OF VENDORS The Owner may make such investigations as necessary to determine the ability of the vendor to perform the work, and the vendor shall furnish to the Owner any additional information and financial data for this purpose as the Owner may require. If such an investigation fails to satisfy the Owner that the vendor is properly qualified to complete the work described in the “Specific Requirements” section of the RFP, the proposal may be rejected. In the event the vendor fails, refuses, or neglects to submit the requested additional information within ten (10) days of the date of any request for submission, the vendor’s proposal guarantee (Bid Security) shall be forfeited to the use of the Owner, not as a penalty, but as liquidated damages. In addition to qualifications previously set forth, no proposal will be considered unless the bidder, whether resident or non-resident of Florida, is properly qualified to submit a proposal in accordance with all applicable laws of the City, Pinellas County, and the State of Florida. EXECUTION OF CONTRACT The vendor to whom the contract is awarded must, within ten (10) calendar days following Notice of Award, substitute the bid security for a surety performance and payment bond in the amount of thirty per centum (30%) of the annual contract price of the work, conditioned that the vendor will faithfully perform all work of this contract and promptly pay for all materials furnished and labor supplied or performed in the execution of all work. All bonds and insurance shall be issued by companies authorized to transact business in the State of Florida. 13 If the bidder to whom the contract is awarded fails to give bonds or execute the contract within the time specified, the amount of the proposal guarantee shall be forfeited to the Owner, not as a penalty but as liquidated damages. TIME OF COMPLETION The successful vendor shall commence work under contract on a date to be specified in a written contract from the Owner or his authorized representative. The time of completion for this contract will be twelve (12) months from contract execution. The Contractor shall have at least two (2) weeks notice of this commencement date and shall fully complete the work described in the Contract and specifications listed in vendor’s proposal, prior to the completion date. If the Contractor fails to commence work within two (2) weeks of the announcement of the official starting date, this shall be just cause for the annulment of the contract. INSURANCE REQUIREMENTS The Vendor shall, at its own cost and expense, acquire and maintain (and cause any Contractors and Subcontractors to acquire and maintain) during the term with the City, sufficient insurance to adequately protect the respective interest of the parties. Coverage shall be obtained with a carrier having an AM Best Rating of A-VII or better and licensed or eligible to do business in the State of Florida. Specifically the Vendor must carry the following minimum types and amounts of insurance on an occurrence basis or in the case of coverage that cannot be obtained on an occurrence basis, then coverage can be obtained on a claims-made basis with a minimum three (3) year tail following the termination or expiration of this Agreement: 1. Commercial General Liability Insurance including but not limited to, premises operations, products/completed operations, products liability, contractual liability, independent Vendors, personal injury and advertising injury, in the minimum amount of $1,000,000 per occurrence and $2,000,000 general aggregate, and $2,000,000 products/completed operation aggregate. 2. Commercial Automobile Liability Insurance for any owned, non-owned, hired or borrowed automobile is required in the minimum amount of $1,000,000 combined single limit. 14 3. Statutory Workers’ Compensation Insurance in accordance with the laws of the State of Florida, and Employer’s Liability Insurance in the minimum amount of $100,000 each employee each accident, $100,000 each employee by disease and $500,000 aggregate by disease with benefits afforded under the laws of the State of Florida. Coverage should include Voluntary Compensation and U.S. Longshoremen’s and Harbor Worker’s Act coverage where applicable. Coverage must be applicable to employees, Contractors, and Subcontractors, if any. 4. Professional Liability/Malpractice/Errors or Omissions Insurance coverage appropriate for the type of business engaged in by the Vendor with minimum limits of $1,000,000 per occurrence. If a claims made form of coverage is provided, the retroactive date of coverage shall be no later than the inception date of claims made coverage, unless prior policy was extended indefinitely to cover prior acts. Coverage shall be extended beyond the policy year either by a supplemental extended reporting period (ERP) of as great a duration as available, and with no less coverage and with reinstated aggregate limits, or by requiring that any new policy provide a retroactive date no later than the inception date of claims made coverage. 5. If the Vendor is using its own property or the property of City in connection with the performance of its obligations under this Agreement, then Property Insurance on an “All Risks” basis with replacement cost coverage for property and equipment in the care, custody and control of others is required. The above insurance limits may be achieved by a combination of primary and umbrella/excess liability policies. Other Insurance Provisions: 1. The City must be specifically included as an “Additional insured” on the Commercial Liability Insurance, Commercial Auto Liability Insurance, and Professional Liability policies listed above, and as a “Loss Payee” on Vendor’s Property Insurance policy, if applicable to the project per the above. 2. Prior to the execution of this Agreement, and then annually upon the anniversary date(s) of the insurance policy’s renewal date(s), the Vendor will furnish the City with a Certificate of Insurance evidencing the coverage’s set forth above and naming 15 the City as an “Additional Insured” with endorsement on the Vendor’s Commercial General Liability Insurance, Commercial Auto Liability Insurance, and Professional Liability Insurance policies listed above, and as a “Loss Payee” on the Vendor’s Property Insurance policy, if applicable to the project per the above. In addition when requested in writing from the City, Vendor will provide the City with certified copies of all applicable policies. The addresses where such certificates and certified policies shall be sent or delivered is as follows: City of Clearwater Attn: Clearwater Gas Services P.O. Box 4748 Clearwater, FL 33758-4748 3. Vendor shall provide thirty (30) days written notice of any cancellation, non-renewal, termination, material change or reduction in coverage. 4. Vendor’s insurance as outlined above shall be primary and non-contributory coverage for Vendor’s negligence. 5. Vendor shall defend, indemnify, save and hold the City harmless from any and all claims, suits, judgments and liability for death, personal injury, bodily injury, or property damage arising directly or indirectly including legal fees, court costs, or other legal expenses. The stipulated limits of coverage above shall not be construed as a limitation of any potential liability to the City and/or State of Florida, and failure to request evidence of this insurance shall not be construed as a waiver of Vendor’s obligation to provide the insurance coverage specified. INFORMALITY WAIVING/BID REJECTIONS CLAUSE City/CGS may reject a proposal if: a) The proposer misstates or conceals any material facts in the proposal; or b) The proposal does not strictly conform to the law or requirements of the RFP. The City of Clearwater reserves the right to waive any informalities or to accept or reject any or all proposals in part or in total and award the contract in the best interest of the City. 16 PROPOSAL SUBMITTAL CERTIFICATION TO: City of Clearwater (d/b/a Clearwater Gas System) The following proposal is submitted in accordance with RFP #36-14, inviting proposals to be received until Monday, September 15, 2014, for the “Consulting and Maintenance Services for Operating a Cathodic Protection System Within a Natural Gas Distribution System”. Having carefully examined the RFP document and being familiar with the various conditions of the work, the undersigned herein agrees to furnish all materials required and to perform all labor necessary to satisfactorily complete such work. Accompanying this proposal is a Certified or Cashier's Check or Bid Bond in the amount of ten percent (10%) of the proposal cost total drawn upon the ________________________________ BANK and made payable to the City of Clearwater, to serve as bid security. The undersigned hereby certifies that this proposal is genuine and not sham or collusive, or made in the interest or in behalf of any person, firm, or corporation not herein named and that the undersigned has not directly or indirectly induced or solicited any other bidder to submit a sham bid, or any other person, firm or corporation to refrain from bidding, and that the undersigned has not in any manner sought by collusion to secure for himself an advantage over any other bidder. ATTEST: __________________________________ Bidder's Business Name ______________________________ By: ______________________________ Corporate Secretary Officer (or Principal) __________________________________ Title AFFIX CORPORATE SEAL, if a corporation Business Address: ____________________________ Business City/State/Zip Code _________________________ Business Telephone Number   [GM14‐2064‐053/158246/1]    CONTRACT   This contract (“contract”) between CORRPRO Companies, Inc. (“CORRPRO”), and Clearwater Gas System (“Client”), dated this ______ day of December, 2014. Whereas, Client desires to engage CORRPRO to provide certain support services and/or material as described herein (the “Work”); and   Whereas, CORRPRO has agreed to furnish the Work in accordance with the terms and conditions set forth in this Contract; and Now therefore, in consideration of the mutual covenants set forth herein, and other good and valuable consideration, the receipt of which are hereby acknowledged, the Parties agree as follows:   1. SCOPE OF WORK. CORRPRO hereby engages Client, and CORRPRO hereby agrees to perform the Work described on Exhibit B, (attached hereto and incorporated herein) in accordance with, and reasonably inferable from, specifications, drawings and all Contract Documents.   2. COMPENSATION, COMMENCEMENT AND COMPLETION OF THE WORK. Compensation to CORRPRO for the proper performance of the Work shall be according to Exhibit B hereto. Amounts paid to CORRPRO hereunder shall constitute the sole and complete compensation for the performance of the Work. CORRPRO shall complete performance of the Work within the agreed schedule set forth on Exhibit B unless the period for performance has been modified in a writing signed by authorized representatives of CORRPRO and Client.   2.1 The Contract amount includes and Client shall pay, except as provided for below, all local, state, and federal taxes, license fees, assessments and permit charges based upon or measured by the work to be done hereunder, labor performed by Clients’ employees, materials furnished, and services rendered by its employees, including, but not limited to, business license taxes, sales, use, occupation, gross receipts and like taxes, arising out of the ownership, acquisition, furnishing, installation, inspections or use of materials, equipment, or other personal property, or Clients’ furnishing labor or services in respect to the Work. Where any such tax is to be separately stated or charged, the total of all items involved in the Work to be done hereunder, and the added tax so separately stated or charged, shall not exceed the Contract price. Client shall in no instance be responsible for CORRPRO’s corporate or employment taxes or any other taxes imposed or resulting from the CORRPRO conducting its business. CORRPRO agrees that persons employed by CORRPRO for purposes related to the performance of the Work hereunder are not employees of the Client for any purpose whatsoever, including, but not limited to, unemployment tax, social security contributions, income tax withholding or workers compensation, whether local, state or federal. CORRPRO shall be solely liable to pay all such applicable taxes and professional license fees which qualify its employees to perform as required hereunder.   3. TERMS AND CONDITIONS. The performance of the Work by CORRPRO to Client for the ultimate benefit of the Client shall be pursuant to all Contract Documents, including the Prime Contract, the Terms and Conditions attached hereto and incorporated herein as Exhibit A, all documents identified and referred to as part of Exhibit B, and Insurance Requirements attached hererto and incorporated herein as Exhibit C. All of the foregoing documents are referred to and fully incorporated herein as Contract Documents.     [GM14‐2064‐053/158246/1]  In witness whereof, the parties hereto have caused this Contract to be executed by their duly authorized representatives as of the date first written above.   Corrpro Companies, Inc.       By: Name: Title:               Countersigned:       CITY OF CLEARWATER, FLORIDA       ___________________________  By: __________________________  George N. Cretekos     William B. Horne II   Mayor        City Manager            Approved as to form:     Attest:       ___________________________  ________________________________  Laura Mahony     Rosemarie Call   Assistant City Attorney    City Clerk                   Rev 03/2011 Exhibit A 1April 2005   [GM14‐2064‐053/158246/1]      Corrpro Companies, Inc. STANDARD TERMS AND CONDITIONS   The performance of services and delivery of materials by Corrpro Companies, Inc. or its subsidiary (“Corrpro”) is subject to the following Terms and Conditions:   1.0 Description of Professional Services. Corrpro will provide corrosion control engineering, coatings, consulting, inspection, installation, or technical services, along with products and materials associated with the services, as more fully described in the Services Agreement, Letter to Commence Work and/or other Exhibits (collectively, the “Agreement”).   2.0 Client Responsibilities. 2.1 Site information,permits, and approvals. Client shall obtain or arrange required access rights, site and surface information, approvals, permits, and licenses for the engagement, other than professional and business licenses required of Corrpro in the ordinary course of business. If design/engineering services are included, Client shall furnish complete and accurate relevant criteria, to assist in such design/engineering as it has available in the course of its business. 2.3 Safety, waste,pollutants. (a) Client shall provide a safe work environment for those activities performed by Corrpro at work sites other than Corrpro’s facilities. Other than as may be required or applicable to CORRPRO employees in the course of their employment, Corrpro shall have no obligation with respect to the means and methods of others or any health or safety precautions required of others by regulatory agencies. (b) Client shall be responsible for ownership, releases, transportation, clean up and disposal of waste materials or pollutants.   3.0 Warranty. Client and Corrpro agree that the warranties provided in the Warranty Certificate attached as Exhibit C are the sole and exclusive warranties applicable to the services, products and materials covered by the Agreement. The Warranty Certificate provisions shall take precedence and govern over any additional or inconsistent term contained in any Exhibit or other document, unless such additional or inconsistent term is in writing signed by an authorized representative of Corrpro and specifically states that such term is intended to add to or modify the provisions of the Warranty Certificate. In the event Client provides design services, Corrpro shall not be liable for losses resulting from design services.   4.0 Indemnification. 4.1 Corrpro. As to claims other than warranty claims subject to paragraph 3.0, Corrpro agrees to indemnify Client for Client’s losses to the extent caused by the negligence of Corrpro and its employees or authorized agents performing within the scope of their employment or agency. 4.2 Client. Subject the limits of Section 768.28, Florida Statutes, Client agrees to indemnify Corrpro for Corrpro’s losses to the extent caused by the negligence of Client and its employees performing within the scope of their employment. Notwithstanding anything contained herein to the contrary, this indemnification provision shall not be construed as a waiver of any immunity to which City is entitled or the extent of any limitation of liability pursuant to § 768.28, Florida Statutes. Furthermore, this provision is not intended to nor shall be interpreted as limiting or in any way affecting any defense City may have under § 768.28, Florida Statutes or as consent to be sued by third parties.   5.0 Insurance Corrpro shall maintain general liability, professional liability, and automotive liability insurance, and property insurance covering Corrpro’s machinery and equipment, in commercially reasonable amounts, and workers compensation insurance coverage required by law. Such insurance shall be subject to the coverage provisions, limitations of liability, and other terms and conditions contained in the applicable policies. Upon request Corrpro will provide a certificate evidencing such insurance.   6.0 Confidentiality and Ownership Rights 6.1 Confidential Information. Subject to applicable law, including but not limited to Chapter 119, Florida Statutes, (Florida Public Records law) Client and Corrpro shall each maintain the confidentiality of information specifically designated as confidential by the party providing the information, except as required by law. 6.2 Ownership Rights. External reports/deliverables contemplated hereunder prepared for Client’s use shall belong to Client. Ownership of all rights, including copyrights, in internal reports, specifications, drawings and other documents, including those in electronic form, prepared by Corrpro shall belong to Corrpro. Ownership in intellectual property rights, including patentable and unpatentable inventions, methods, Exhibit A 2April 2005   [GM14‐2064‐053/158246/1]  processes, copyrightable software or works, developed by or with Corrpro in connection with the engagement shall belong to Corrpro.   7.0 Remedies 7.1 Opportunity to Cure. If any alleged breach, error, omission or other circumstance giving rise to a claim or dispute arises, the injured party shall provide written notice to the other party providing reasonable details of the facts and providing for a reasonable opportunity (up to 30 days) for the other party to remedy the problem. 7.2 Term and Termination of Agreement. The Agreement commences as of the date of execution of the Services Agreement or the Letter to Commence Work by authorized representatives of both Corrpro and Client and continues through the completion of the services and the final and complete payment by Client to Corrpro for the services and associated products or materials. If a claim or dispute arises during the term of the Agreement and is not timely remedied as provided in paragraph 7.1, the injured party may terminate the Agreement upon written notice, provided that Client shall remain responsible for paying Compensation accrued to Corrpro through the date of termination. If Client terminates the Agreement without cause, Corrpro may recover the full amount of Compensation contemplated in the Services Agreement or Letter to Commence Work. If Client terminates the Agreement for cause, Corrpro shall be entitlited to all monies earned to the date of the termination. 7.3 Dispute Resolution. Corrpro's claims solely for past due Compensation are, at Corrpro's sole option, not subject to the mediation and arbitration provisions below except and unless, prior to Corrpro's commencing a collection action, Client has provided written notice to Corrpro of an alleged breach of the Agreement as provided in paragraph 7.1 above. The parties shall engage in reasonable efforts (including a meeting of high ranking management of the Client and Corrpro facilities involved) to resolve any other claim or dispute not resolved timely under paragraph 7.1 above, or other matters in question arising out of or related to the Agreement. If not resolved, such claim, dispute, or matter shall be submitted to non- binding mediation under (unless the parties agree otherwise) either the Construction Industry or Commercial Mediation Rules of the American Arbitration Association. If the mediation does not result in a settlement within 60 days after service of a written demand for mediation, any unresolved controversy or claim shall be settled by binding arbitration, except that at Corrpro's option, Corrpro may sue for past due Compensation. The arbitration shall be under (unless the parties agree otherwise) either the Construction Industry or Commercial Arbitration Rules then 7.4 In effect of the American Arbitration Association. Judgment on the award may be entered in any court having jurisdiction thereof. Mutual Limitation of Liability for Damages. In addition to the limitations of liability set forth on the Warranty Certificate and except as stated in this section 7.0, neither party to the Agreement shall be responsible to the other party for incidental, consequential, indirect, punitive, or exemplary damages with respect to any claims, disputes, or other matters in question arising out of or relating to the Agreement or its termination, and Client and Corrpro shall waive such damages. 8.0 OtherProvisions (a) Compliance with laws. Client and Corrpro shall comply with all applicable laws and regulations, including environmental and safety laws applicable to the respective operations of each, the Fair Labor Standards Act and other laws concerning wages, hours, and equal employment opportunity. (b) Governing Laws. The Agreement shall be governed by and construed in accordance with the laws of the State of Florida excluding any conflict of laws provision which would refer to the law of another jurisdiction. (c) Force Majeure. Neither party shall be liable for its failure or delay in performance, other than the duty to pay the Compensation earned, if due to circumstances beyond its reasonable control including governmental action, fire, flood, weather conditions, natural catastrophes, war, labor troubles, or strikes. (d) Assignment. The Agreement may not be assigned without consent of the parties. Corrpro may utilize its authorized representatives and subcontractors in performing the Agreement. The Agreement shall be binding upon and inure to the benefit of the parties' successors and permitted assigns. (e) Entire Agreement/Amendments. The Agreement, the Warranty Certificate and the Exhibits constitute the complete and entire understanding and agreement between the parties with respect to the subject matter of the Agreement. No prior or contemporaneous statement, agreement, representation or warranty, oral or written, with respect to the subject matter hereof, shall vary or modify the written terms of the Agreement. The Agreement may be amended only by a written document signed by both parties. (f) Headings. The headings in the Agreement and any Exhibit are for ease of reference only and in no way define, limit, construe or describe the scope or extent of such section. (g) In addition to all other contract requirements as provided by law, the contractor executing this agreement agrees to comply with public records law specifically to: Exhibit A 3April 2005   [GM14‐2064‐053/158246/1]  (h) Keep and maintain public records that ordinarily and necessarily would be required by the public agency in order to perform the service being provided by the contractor hereunder. (i) Provide the public with access to public records on the same terms and conditions that the public agency would provide the records and at a cost that does not exceed the cost provided for in Chapter 119, Florida Statutes, as may be amended from time to time, or as otherwise provided by law. (j) Ensure that the public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law. (k) Meet all requirements for retaining public records and transfer, at no cost, to the public agency all public records in possession of the contractor upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the public agency in a format that is compatible with the information technology systems of the public agency. (l) The contractor hereby acknowledges and agrees that if the contractor does not comply with a public records request, the public agency shall enforce the contract provisions in accordance with the contract.     END of Exhibit A Contract Exhibit B Exhibit B – Page 1 Rev 03/2011   [GM14‐2064‐053/158246/1]    . Contract Documents – Expanded Description of Services Schedule of Work – Payment Terms – Notices   [√ If applicable]   Contract Documents: The attached document(s), with the following titles (latest date or revision unless otherwise indicated) are Contract Documents: Request for proposals City of Clearwater, Florida - RFP NO. 36-14 August 22, 2014   Expanded Description of Services: Detailed description of Work to be performed by Subcontractor:   The following outlines Corrpro’s proposed scope of work associated with the evaluation process being performed as part of Clearwater Gas System (CGS) cathodic protection project.   Methodology:   Corrpro intends to assign Michael Dammer as the primary engineer for the account. As the lead engineer, Michael will provide the field services required to maintain effective corrosion control for the gas distribution system. The effort will require close interface with gas system personnel from a scheduling perspective, as well as working together to troubleshoot and repair problems in the system.   The system maintenance will be carried out in a partnership arrangement with gas company personnel. Proper operating ranges for each system will be established by Corrpro. When systems are found outside of the proper range, Corrpro will work with CGS personnel to determine the cause(s) and if corrective action is needed.   Maintenance of the cathodic protection systems also includes annual surveys for evaluation to NACE criteria. This includes consideration for voltage drops other than those across the structure to soil interface. In short, the surveys will be completed with the rectifiers interrupted using GPS synchronized current interrupters. Annual survey results will be documented in table form and provided along with a letter format report describing the conclusions and recommendations for continued corrosion control.   During the annual surveys, small repairs will typically be handled while the engineer is still in the area. Repairs like fuse and stack replacements will often be handled and mentioned in the reports. Clearing electrical shorts on the line found during the surveys will be coordinated with gas company field crews. Contract Exhibit B Exhibit B – Page 2 Rev 03/2011   [GM14‐2064‐053/158246/1]        One key area where support may be needed is in locating and resolving DC interference on the gas system. The interference may be caused by other gas systems, but may also be caused by underground storage tank systems operating at local service stations. Recently there has been extensive testing in other regions to resolve such conflicts.   Corrpro will support CGS to develop policies, testing procedures, protocols and remedial documentation process required for compliance with Subpart I of 49 C.F.R. Part 192. This will include (but not limited to):   - Developing procedures for the design, inspection, operation, and maintenance of corrosion control systems to be executed under the direction of the person in charge of the Corrosion Control Section or other as designated who is qualified by education, training and experience in natural gas pipeline facilities corrosion control methods, i.e. (192.453) (192.605 (b)(2)).   - Developing procedures for all cathodically protected pipelines are periodically surveyed or monitored as required. Prompt remedial action is initiated (shop work request) by the Corrosion Control Section to correct any deficiencies indicated by the monitoring. Repair work progress and completion status is tracked by the Corrosion Control Section and reports are generated and distributed to each repair section supervision listing outstanding work to be completed and duration of time since the work was requested, i.e. (192.465 (d)).   - Developing procedures to confirm all Corrosion Control Records are maintained for as long as the pipeline remains in service. Corrosion Control components and protected piping are recorded within Detail Main Maps and Corrosion Control Maps. Other records systems that contain test, survey, and inspection data to demonstrate that adequacy of corrosion control measures include; Corrosion Test Station Record Cards, Corrosion Job Files, Rectifier Inspection Record Cards, Short Main (lengths 100’ or less) Potential Record Cards, and various computer data base records, i.e. (192.491). - Developing procedures for maps and records for Corrosion Control are maintained by the Corrosion Control Section and Drafting for all Distribution Operations main and services, and those associated with Gas pipeline, i.e. (192.491). Contract Exhibit B Exhibit B – Page 3 Rev 03/2011   [GM14‐2064‐053/158246/1]        - Maps, drawings and/or records of inspection and maintenance for components in the distribution system that could be affected by corrosion are maintained by CGS personnel, i.e. (193.2625). The data would be incorporated into GIS system.   - Developing cathodic protection system design and operation manuals, i.e. (192.453).   A comprehensive field testing and data analysis would be executed to provide detailed recommendation to CGS for complying with C.F.R. 192 requirements. Corrpro will physically inspect and test all sections of the distribution piping system in an effort to clearly define system integrity, program effectiveness and recommend remedial action and/or procedural changes. Once these areas are addressed, an overall evaluation of Clearwater Gas Company’s 2012 and 2013 cathodic protection data set will be conducted. An engineered approach will then be developed to determine if it is necessary to conduct additional field testing. Corrpro will develop a detailed procedure for Pipeline Integrity Evaluation Strategy. As part of Evaluation Strategy, Corrpro will assist CGS to establish a comprehensive protocol to categorize the piping systems based on potential polarization and leak history. The categorization of the pipeline systems will facilitate CGS to evaluate and assess cathodic protection (CP) systems and ensure an effective CP program. In particular, first emphasis will be placed on the following areas:    All pipe sections with sub-criteria potential, > -0.85v, and a corrosion leak history (Category A)  All pipe sections with sub-criteria potential and no leak history (Category B)  All pipe sections with marginal potential, -0.85v to -0.90v, and a corrosion leak history (Category C)  All pipe sections with < -0.90v and a corrosion leak history of 3 or more leaks (Category D)   To determine the existing condition of the pipeline system, a wide array of assessment tools, field test equipment and methodologies will be required to meet the established goals and objectives. During the field assessments, weekly progress reports and monthly field test reports will be submitted to CGS. Location sheets of planned activities for the each week will be provided to the Company prior to the start of each work week. Contract Exhibit B Exhibit B – Page 4 Rev 03/2011   [GM14‐2064‐053/158246/1]        Periodic meetings will be scheduled with key Clearwater Gas System personnel to ensure close communication, proper compilation of data, engineering analysis of the data and preparation of graphs and charts. A subsequent meeting with the Commission will be scheduled and Corrpro’s Principal Engineer and Project Manager will be made available as deemed appropriate by Clearwater Gas System.   Using sound engineering judgment, Corrpro will choose the appropriate tasks/tools from the list below that are considered necessary to determine the health of the system and make recommendations on each system evaluated and assessed.   1) Potential Mapping – Whereas close interval surveys are likely not cost effective or practical for the distribution piping systems being evaluated, potential mapping is a viable assessment tool. The field engineers will typically collect electrical potential measurements between the available test stations at intervals not to exceed 100 feet between readings (unless a valid, documented explanation is provided). Problem areas, direct connected galvanic anodes, additional system appurtenances which are commonly found between test points will also be mapped. The data collected will assist in verifying the previously reviewed test data. Furthermore, the potential mapping will serve as a valuable tool to identify sub-criterion measurements as well as verify protected pipe sections, i.e. (C.F.R. 192.465 (e)(2)).   2) Identify the Adequacy of Test Points – The applicable state and federal regulations indicate that an “adequate” number of test stations are required to demonstrate the effectiveness of cathodic protection system. This broad requirement will be considered in terms of test station frequency determination. The potential mapping will be valuable in making this determination and recommending, where necessary additional test points are needed, i.e. (C.F.R. 192.469).   3) Current Requirement Measurements – Current requirement testing will be conducted with the use of temporary ground-beds and a portable current source. The data will be used to determine the actual current required to achieve accepted levels of cathodic protection. This information will be valuable, particularly on the pipe sections of sub-criterion protection as it will help in determining the coating quality. Ultimately, this information will be used to decide whether a system should be replaced or whether it can be economically cathodically protected, i.e. (C.F.R. 192.483) Contract Exhibit B Exhibit B – Page 5 Rev 03/2011   [GM14‐2064‐053/158246/1]        4) Electrical Continuity Measurements – Continuity measurements will be obtained on suspected “shorted” piping and used as a verification tool. Typically, if a cathodically protected system is electrically shorted to adjacent or foreign metallic structures, the cathodic protection system is probably not meeting accepted levels of corrosion control. Additionally, dielectric fittings such as unions may be defective, which can negatively impact the system integrity, i.e. (C.F.R. 192.471).   5) Resistivity Testing - In-situ soil resistivity measurements using the Wenner four- electrode surface technique as described in ASTM G57 will be obtained based upon a review of the cathodic protection data. Resistivity data is useful in determining the corrosivity of an area which can significantly impact the functionality of galvanic anodes, i.e. (C.F.R. 192.465 (e)(3)).   6) Anode Current Output – In practical and accessible areas, magnesium anode current outputs will be obtained at test station locations. The values will be used to determine the functionality of the anodes and to estimate their remaining service life, i.e. (C.F.R. 192.465).   7) Identify Practicality of Achieving Protection by Means of Galvanic Anodes- Based on the data analysis, associated soil resistivity measurements and current requirement measurements, the effectiveness of using galvanic anodes will be determined. This is especially useful in determining the practicality of using a galvanic versus an impressed current system to protect the pipe in question, i.e. (C.F.R. 192.487 & 192.489).   8) Verification and Collection of Pipe-to-Soil Data at Test Points – This method will be utilized to verify the validity of all of the CP data as well as determine the validity of the testing procedures. Test station data will also be taken remotely at intervals of sufficient spacing and number to validate procedures and annual CP survey data, i.e. (C.F.R. 192.465)   9) Electrical Isolation Testing – For systems requiring such action, above grade flanges, dressers, couplings and insulated unions will be tested to determine the integrity and effectiveness of their electrical isolation quality utilizing a Gas Electronics #601. This device is capable of locating shorted bolts and can evaluate partially shorted insulators. Underground insulators requiring such action will be tested using, the Gas Electronics #701. The results of this testing will be extremely valuable for troubleshooting pipe sections, i.e. (C.F.R. 192.467). Contract Exhibit B Exhibit B – Page 6 Rev 03/2011   [GM14‐2064‐053/158246/1]        10) Verification of Annual CP Data – Many of the test methods listed above will be utilized to determine and verify the validity of the previously collected potential measurements. City of Clearwater Corrosion technicians will be observed to verify proper use of equipment, including data loggers, half cells, multi-meters, and other equipment used in the course of their respective cathodic protection duties. Verification of proper use of equipment will also include calibration and data collection procedures, i.e. (C.F.R. 192.491).   The following are the defined deliverables for the Corrosion Program Evaluation:   a) Data Collection and Analysis   1) Produce weekly location sheets for Corrpro field activities prior to commencement of the activities. 2) Produce weekly progress and monthly field test reports that reference the work conducted and recommended remediation by segment. 3) Schedule periodic conference call/meeting at two week intervals to discuss findings and ensure close communication. 4) Produce a comprehensive report and detailed spreadsheet with data compilation, graphs, and engineering analysis of each section of pipe assessed. 5) Provide detailed recommendations for possible remediation associated with each pipe sections. 6) Subsequent presentation to the Public Service Commission of the State of Florida if requested. 7) Provide Operation and Maintenance (O&M) Manual for Clearwater Gas System CP System. 8) Develop Evaluation Strategy protocol that will satisfy the “Public Service Commission Requirements”. b) Post Corrective Action After City of Clearwater has completed any recommended remediation and/or corrective action, Corrpro’s Project Manager will conduct verification of the cathodic protection system effectiveness and the results of the corrective action. This condition assessment will provide the assurance that the integrity of the cathodic protection is sound and that effective corrosion control measures are currently in place. Contract Exhibit B Exhibit B – Page 7 Rev 03/2011   [GM14‐2064‐053/158246/1]        Although the evaluation scope is stated per the aforementioned, variances in field conditions should allow latitude in terms of considering other assessment techniques when necessary as approved by Clearwater Gas System. This engineered approach and potential changes in assessment decisions will be specific to the actual Clearwater Gas System conditions. At this juncture we do not envision such changes in scope but experience has indicated that we should approach the project with open-mindedness, allowing for technical adjustments should we encounter different scenarios. Contract Exhibit B Exhibit B – Page 8 Rev 03/2011   [GM14‐2064‐053/158246/1]          Schedule of Work: Work will be performed in accordance with the schedule below:   Milestone Dates Request for Proposal (issued)…Aug 22 Proposals Due…………………Sept 15 Proposal Review & Evaluation..Sept 16 – 26 Presentations …………………..Sept 29 – Oct 3 Consultant Selected……………Oct 6 Contract Negotiation…………. City Council Approval………...Nov 20 Provide work schedule………...Nov 24   Schedule will be coordinated between CORRPRO and Client.         be: Payment Terms: The amount and method of payment to Subcontractor for the proper performance of Work shall   A. Labor   Classification Rate Overtime Principal Engineer (Walt Young) $120 /hr n/a Project Manager (Michael Dammer) $95 / hr n/a API Engineer P.E. $110 /hr n/a Sr. Engineer (Michael Dammer) $95 /hr n/a Field Engineer (Jim Bradford) $ 80 /hr n/a Technician $ 62 /hr $ 93.00 /hr Construction Superintendent $ 70 /hr n/a Foreman $ 58 /hr $ 87.00 /hr Operator $ 48 /hr $ 72.00 /hr Laborer $ 35 /hr $ 52.50 /hr Draftsman $ 50 /hr n/a Data/Word Processing $ 35 /hr n/a Coating Inspector $ 85 /hr $ 127.50 /hr Inspector API 653/570/510 $ 95 /hr $ 142.50 /hr   CIS CREW / DCVG Crew (2-man) $ 2,100 / day n/a CIS CREW / DCVG Crew (3-man) $ 3,150 / day n/a   B. Expenses   Meals 30/day/man Room cost + 15% Air Transportation cost + 15% Equipment Rental cost + 15% Subcontractor cost + 15% Contract Exhibit B Exhibit B – Page 9 Rev 03/2011   [GM14‐2064‐053/158246/1]          C. Equipment   Auto  $0.505 cent/mile Pickup  $0.505 cent/mile Utility Truck w/ tools $48/day + .505 cent/mile Auger Truck w/ drill stem $60/day + .505 cent/mile Backhoe w/trailer $225 / day Trencher $200 / day Directional Drill Rig $1000 / day Jack Hammer (Electric) $75.00/day Concrete Saw $125.00/day Cut off Saw $65.00/day Other equipment quoted as needed   D. Instruments PCM Equipment $100 / day GPS (sub-meter) $100 / day CIS Equipment $150 / day         Notices:   Corrpro Companies, Inc.      Phone: Fax: Attention: Subcontractor:      Phone: Fax: Attention: Pro p o s e d R a t e s 10/20/2014 Ba s e O H P r o f i t B a s e B a s e Pe r i o d R a t e Rat e Rat e Pe r i o d R a t e Per i o d R a t e Pri o r R e p o r t R e v i e w Su r v e y Re p o r t i n g ( c o n c u r r e n t w i t h s u r v e y ) Tro u b l e s h o o t i n g Re p o r t i n g Re p a i r - E s t i m a t e d 5 % T S R e p a i r Repair - ESTIMATED Cla s s i f i c a t i o n Un b u r d e n e d 28 % 2 9 % W/O H W / O H & P D o c u m e n t R e v i e w P o t e n t i a l M a p p i n g - E l e c t r i c a l I s o l a t i o n T e s t i n g I d e n t i f y i n g D e f i c i e n c i e s - D e v e l o p i n g S u r v e y P l a n C u r re n t R e q u i r e m e n t , E l e c t r i c a l C o n t i n u i t y , R e s i s t i v i t y T e s t i n g C o n s t r u c t F i n a l R e p o r t P l a n w i t h C G S B a s i c T S / R e c t i f i e r R e p a i r C o n s t r uction - Excavation - Anode InstallationHoursCost Estimate PR O G R A M M A N A G E R ( P R I N C I P A L ) $ 1 2 0 . 0 0 20 20$2,400.00 PR O J E C T M A N A G E R / S R E N G I N E E R $ 9 5 . 0 0 120 2 4 0 2 4 0 1 6 0 1 6 0 4 0 4 0 1 0 0 0 $ 9 5 , 0 0 0 . 0 0 FIE L D E N G I N E E R $ 8 0 . 0 0 480 32 0 80 8 0 9 6 0 $ 7 6 , 8 0 0 . 0 0 CO N S T R U C T I O N S U P E R I N T E N D E N T $ 6 5 . 0 0 $ 8 3 . 2 0 $ 1 0 7 . 3 3 8080$8,586.24 FO R E M A N $7 6 . 0 0 $ 9 7 . 2 8 $ 1 2 5 . 4 9 160160$12,160.00 OP E R A T O R $ 8 5 . 0 0 $ 1 0 8 . 8 0 $ 1 4 0 . 3 5 160160$22,456.32 LA B O R E R $ 5 2 . 0 0 $ 6 6 . 5 6 $ 8 5 . 8 6 160160$13,737.98 0$0.00 EX P E N S E S ( E S T I M A T E D ) C o s t + 1 5 % 75 0 0 45 0 0 25 0 0 1 8 0 0 0 3 2 5 0 0 $ 3 7 , 3 7 5 . 0 0 VE H I C L E S $ 0 . 0 1 70 0 0 70 0 0 35 0 0 1 4 0 0 0 3 1 5 0 0 $ 1 5 9 . 0 8 BA C K H O E $ 2 2 5 . 0 0 2020$4,500.00 MA T E R I A L S ( E S T I M A T E D ) C o s t + 1 5 % 50 0 0 3 0 0 0 0 3 5 0 0 0 $ 4 0 , 2 5 0 . 0 0 TOTAL$313,424.62Total Ta s k Cle a r w a t e r G a s T i m e C o s t S c h e d u l e Fo r O f f i c i a l U s e O n l y 1 &Y I J C J U  #    1 B H F    Contract Exhibit C   [GM14‐2064‐053/158246/1]      INSURANCE   CORRPRO shall, at its sole expense, secure and maintain in force while the contract is in effect, policies of insurance of the following types:       1. Commercial General Liability Insurance including but not limited to, premises operations, products/completed operations, products liability, contractual liability, independent Vendors, personal injury and advertising injury, in the minimum amount of $1,000,000 per occurrence and $2,000,000 general aggregate, and $2,000,000 products/completed operation aggregate. 2. Commercial Automobile Liability Insurance for any owned, non-owned, hired or borrowed automobile is required in the minimum amount of $1,000,000 combined single limit. 3. Statutory Workers’ Compensation Insurance in accordance with the laws of the State of Florida, and Employer’s Liability Insurance in the minimum amount of $100,000 each employee each accident, $100,000 each employee by disease and $500,000 aggregate by disease with benefits afforded under the laws of the State of Florida. Coverage should include Voluntary Compensation and U.S. Longshoremen’s and Harbor Worker’s Act coverage where applicable. Coverage must be applicable to employees, Contractors, and Subcontractors, if any. 4. Professional Liability/ Errors or Omissions Insurance coverage appropriate for the type of business engaged in by the Vendor with minimum limits of $1,000,000 per occurrence. If a claims made form of coverage is provided, the retroactive date of coverage shall be no later than the inception date of claims made coverage, unless prior policy was extended indefinitely to cover prior acts. Coverage shall be extended beyond the policy year either by a supplemental extended reporting period (ERP) of as great a duration as available, and with no less coverage and with reinstated aggregate limits, or by requiring that any new policy provide a retroactive date no later than the inception date of claims made coverage. Contract Exhibit C   [GM14‐2064‐053/158246/1]  5. If the Vendor is using its own property or the property of City in connection with the performance of its obligations under this Agreement, then Property Insurance on an “All Risks” basis with replacement cost coverage for property and equipment in the care, custody and control of others is required. The above insurance limits may be achieved by a combination of primary and umbrella/excess liability policies. Other Insurance Provisions: 1. The City must be specifically included as an “Additional insured” on the Commercial Liability Insurance and Commercial Auto Liability Insurance listed above, and as a “Loss Payee” on Vendor’s Property Insurance policy, if applicable to the project per the above. 2. Prior to the execution of this Agreement, and then annually upon the anniversary date(s) of the insurance policy’s renewal date(s), the Vendor will furnish the City with a Certificate of Insurance evidencing the coverage’s set forth above and naming the City as an “Additional Insured” on the Vendor’s Commercial General Liability Insurance Commercial Auto Liability Insurance, policies listed above, and as a “Loss Payee” on the Vendor’s Property Insurance policy, if applicable to the project per the above. In addition when requested in writing from the City, Vendor will provide the City with certified copies of all applicable policies. The addresses where such certificates and certified policies shall be sent or delivered is as follows: City of Clearwater Attn: Clearwater Gas Services P.O. Box 4748 Clearwater, FL 33758-4748 3. Vendor shall provide thirty (30) days written notice of any cancellation, non-renewal, termination, material change or reduction in coverage. 4. Vendor’s insurance as outlined above shall be primary and non-contributory coverage for Vendor’s negligence. Contract Exhibit C   [GM14‐2064‐053/158246/1]  5. Vendor shall defend, indemnify, save and hold the City harmless from any and all claims, suits, judgments and liability for death, personal injury, bodily injury, or property damage arising directly or indirectly including legal fees, court costs, or other legal expenses. The stipulated limits of coverage above shall not be construed as a limitation of any potential liability to the City and/or State of Florida, and failure to request evidence of this insurance shall not be construed as a waiver of Vendor’s obligation to provide the insurance coverage specified.                                          Rev 03/2011 Exhibit C – Page 1 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-709 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Gas System Agenda Number: 5.2 SUBJECT/RECOMMENDATION: Approve and accept an Interlocal Agreement/Franchise with the City of Oldsmar in order to provide natural gas service to the citizens of Oldsmar and adopt Resolution 14-39. SUMMARY: On November 18, 2014, the City of Oldsmar Commission approved the Interlocal Agreement with the City of Clearwater, which provides a franchise for the Clearwater Gas System to provide natural gas service in Oldsmar. The Clearwater Gas System has provided service within the City of Oldsmar for the past 30 years under a prior franchise agreement. The Interlocal Agreement provides the City of Clearwater an additional 20-year right to continue to construct, operate and maintain all facilities necessary to supply natural gas to the City of Oldsmar. The Interlocal Agreement provides for a 5% franchise fee to be paid by the consumers of natural gas within the City of Oldsmar. The prior franchise fee was 4.5%. APPROPRIATION CODE AND AMOUNT: N/A USE OF RESERVE FUNDS: N/A Page 1 City of Clearwater Printed on 11/26/2014 Resolution No. 14-39 RESOLUTION NO. 14-39 A RESOLUTION OF THE CITY OF CLEARWATER, FLORIDA, ACCEPTING THE FRANCHISE, PRIVILEGE AND CONCESSION OF THE CITY OF OLDSMAR, FLORIDA, FOR THE PURPOSE OF FURNISHING GAS WITHIN THE CITY OF OLDSMAR AND TO ITS INHABITANTS; PROVIDING AN EFFECTIVE DATE. WHEREAS, renewal of a gas system franchise has been approved by the adopting of Ordinance No. 2014-11of the City of Oldsmaron November18,2014, a copy of which is attached hereto and incorporated herein as Exhibit “A”; and WHEREAS, the terms and conditions of the gas system franchise are acceptable; now, therefore, BE IT RESOLVED BY THE CITY COUNCILOF THE CITY OF CLEARWATER, FLORIDA: Section 1. The terms and conditions of the gas system franchise, privilege and concession granted by the City of Oldsmar, Florida, by the adoption of Ordinance No. 2014-11ofthe City of Oldsmar, are hereby accepted, and the City Councilof the City of Clearwater does hereby agree to comply with the terms and conditions of the franchise and with all reasonable ordinances adopted by the City Council of the City of Oldsmar not inconsistent with the franchise. Section 2. This resolution shall take effect immediately upon adoption. Upon adoption of this resolution, the City Clerk shall deliver a certified copy to the City Clerk of the City of Oldsmar. PASSED AND ADOPTED this _____day of December,2014. ____________________________ George N. Cretekos Mayor Approved as to form: Attest: _______________________________________________________ Laura Mahony Rosemarie Call Assistant City Attorney City Clerk Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-684 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Human Resources Agenda Number: 6.1 SUBJECT/RECOMMENDATION: Approve a two-year renewal of the city paid life insurance benefit with the current carrier (Unum) at an increase of 74.8% ($103,927) over the current budgeted cost and authorize the appropriate officials to execute same. (consent) SUMMARY: The City currently provides life insurance coverage to employees: The coverage limits are: CWA: One and one-half times annual salary up to a maximum of $50,000. FOP and IAFF: $2500. SAMP: $2500 plus one time annual salary (Voluntary benefit that is employee paid up to 5 time’s annual salary). The loss ratio on the basic life coverage was 215% with 12 claims for active employees and 41 retiree claims. A breakdown by insurance class is: Base life Paid Premium - $309,177 Paid Claims - $678,485 (11 claims) Incurred Claims - $734,307 (Includes waiver clms and reserves) Average claim - $61,680 Voluntary Life Paid Premium - $163,371 Paid Claims - $150,000 (1 claim) Incurred Claims - $249,037 (Includes waiver claims and reserves) Average claim - $150,000 Retiree Life Paid Premium - $47,753 Paid Claims - $41,036 The City Benefit consultant went to market to 15+ carriers and received only one response (Voya) insurance. The current carrier matched the Voya bid. USE OF RESERVE FUNDS: Funding for this contract will be provided by a 1st quarter budget amendment allocating Central Insurance Fund reserves in the amount of $103,927. The Central Insurance currently has an estimated $8.3 million in available reserves. Page 1 City of Clearwater Printed on 11/26/2014 File Number: ID#14-684 Page 2 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8650-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Human Resources Agenda Number: 6.2 SUBJECT/RECOMMENDATION: Amend Chapter 2, Article V, Division 6, Section 2.506 of the City of Clearwater Code of Ordinance and Section 8.3 of the City of Clearwater Money Purchase Plan complying with the Internal Revenue Code and pass Ordinance 8650-14 on first reading. SUMMARY: The ordinance amends Section 8.3, Lump Sum Payments, requiring the Plan Administrator to make a lump sum payment for contributions exceeding $1000 to an individual retirement plan of a designated trustee if the distributee has failed to make an election after termination of employment. Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8650-14 ORDINANCE NO.8650-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA,AMENDING CHAPTER 2, ARTICLE V, DIVISION 6, SUBDIVISION VII, SECTION 2.506 OF THE CITY OF CLEARWATER CODE OF ORDINANCES; AMENDING SECTION 8.3OF THE CITY OF CLEARWATER MONEY PURCAHSE PLAN DOCUMENT TO COMPLY WITH THE INTERNAL REVENUE CODE; PROVIDING AN EFFECTIVE DATE. WHEREAS, the City is authorized and empowered to amend the Plan to comply with changes to Internal Revenue code, NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA; Section 1.Chapter 2, Article V., Division 6, Subdivision VII, Section 2.506, Clearwater Code of Ordinancesis hereby amended to readas follows: Sec. 2.506 Lump Sum Payment. Notwithstanding anything contained in this Plan to the contrary, any benefit payable under the Plan, which is not more than $1,000, including such Participant’s Rollover Contributions Account, shall be paid in a lump sum as soon as practicable following the Participant’s termination of employment. Should the actuarial lump sum value of such a payment be greater than $1,000.00, and if the distributee has not elected to have such distribution paid directly to a specified eligible retirement plan, the plan administrator shall make such paymentto an individual retirement plan of a designated trustee or issuer and shall notify the distributee in writing (either separately or as part of the notice under section 402(f)of theCode) that the distribution may be transferred to another individual retirement plan. Section 2.The City of Clearwater hereby adopts the amended Money Purchase Pension Plan effective October 15, 2014, in the form attached hereto as Exhibit A and made a part hereof. Section 3. This ordinance shall take effect retroactive to October 15, 2014. PASSED ON FIRST READING __________________________ PASSED ON SECOND AND FINAL __________________________ READING AND ADOPTED __________________________ George N. Cretekos Mayor 2 Ordinance No. 8650-14 Approved as to form:Attest: _______________________________________________________ Matthew Smith Rosemarie Call Assistant City Attorney City Clerk Exhibit A CITY OF CLEARWATER MONEY PURCHASE PENSION PLAN SECOND RESTATEMENT \388024\2 -# 507616 v4 i CITY OF CLEARWATER MONEY PURCHASE PENSION PLAN ARTICLE I Definitions...............................................................................................................2 1.1 "Account" or "Accounts"..........................................................................................2 1.2 "Administrator"..........................................................................................................2 1.3 "Anniversary Date"....................................................................................................2 1.4 "Annual Additions"....................................................................................................2 1.5 "Code"........................................................................................................................2 1.6 "Compensation"........................................................................................................2 1.7 ”Directed Investment Fund".....................................................................................3 1.8 "Effective Date".........................................................................................................3 1.9 "Employee"................................................................................................................3 1.10 "Employer".................................................................................................................3 1.11 "Employer Contribution Account" and “Employee Contribution Account”..........3 1.12 [This section intentionally left blank.]......................................................................3 1.13 "Limitation Year".......................................................................................................3 1.14 "Normal Retirement Date".........................................................................................3 1.15 "Participant"...............................................................................................................3 1.16 "Plan".........................................................................................................................3 1.17 "Plan Administrator".................................................................................................3 1.18 "Plan Year".................................................................................................................4 1.19 "Pooled Investment Fund"........................................................................................4 1.20 "Rollover Contribution Account" ...........................................................................4 1.21 "Section 415 Compensation"....................................................................................4 1.22 "Segregated Investment Fund"................................................................................4 1.23 "Trust"........................................................................................................................4 1.24 "Trust Agreement".....................................................................................................4 \388024\2 -# 507616 v4 ii 1.25 "Trustee"....................................................................................................................4 1.26 "Trust Fund"..............................................................................................................4 1.27 "Valuation Date"........................................................................................................4 1.28 "Valuation Period".....................................................................................................4 ARTICLE II Establishment and Name of the Plan...................................................................5 2.1 Name of Plan. ...........................................................................................................5 2.2 Exclusive Benefit. ....................................................................................................5 2.3 Mistake of Fact...........................................................................................................5 2.4 Participants' Rights. ................................................................................................5 2.5 Qualified Plan. ..........................................................................................................5 ARTICLE III Plan Administrator................................................................................................6 3.1 Administration of the Plan........................................................................................6 3.2 Powers and Duties.....................................................................................................6 3.3 Direction of Trustee...................................................................................................7 3.4 Conflict in Terms.......................................................................................................7 3.5 Final Authority...........................................................................................................7 3.6 Appointment of Advisors and Delegation of Duties................................................7 ARTICLE IV Eligibility and Participation..................................................................................8 4.1 Eligibility and Participation.......................................................................................8 4.2 Former Employees....................................................................................................8 4.3 Change of Eligibility Status......................................................................................8 4.4 Military Service..........................................................................................................8 ARTICLE V Contributions to the Trust....................................................................................9 5.1 Employer Contributions............................................................................................9 5.2 Form and Timing of Contributions...........................................................................9 5.3 Rollover Contributions..............................................................................................9 5.4 No Duty to Inquire......................................................................................................9 \388024\2 -# 507616 v4 iii ARTICLE VI Participants' Accounts and Allocation of Contributions.................................10 6.1 Common Fund.........................................................................................................10 6.2 Establishment of Accounts.....................................................................................10 6.3 Interests of Participants..........................................................................................10 6.4 Adjustments to Accounts.......................................................................................10 6.5 Limitation on Allocation of Contributions..............................................................11 ARTICLE VII Benefits Under The Plan...................................................................................13 7.1 Retirement Benefit...................................................................................................13 7.2 Termination of Employment Benefit.......................................................................13 7.3 Death Benefit...........................................................................................................13 ARTICLE VIII Form And Payment Of Benefits.......................................................................15 8.1 Timing and Form.....................................................................................................15 8.2 Manner of Payment..................................................................................................20 8.3 Lump Sum Payment................................................................................................21 8.4 Periodic Adjustments..............................................................................................21 8.5 Location of Participant or Beneficiary Unknown...................................................21 8.6 Transfer to Other Qualified Plans...........................................................................21 8.7 Direct Rollovers.......................................................................................................22 8.8 Withdrawals from Rollover Contribution Accounts..............................................23 8.9 Withdrawals from Employer and Employee Mandatory Contribution Accounts.23 ARTICLE IX Trust Fund And Expenses Of Administration..................................................24 9.1 Name of Trustee......................................................................................................24 9.2 Expenses of Administration...................................................................................24 ARTICLE X Amendment And Termination............................................................................25 10.1 Restrictions on Amendment and Termination of Plan..........................................25 10.2 Amendment of Plan.................................................................................................25 10.3 Termination of Plan.................................................................................................25 \388024\2 -# 507616 v4 iv 10.4 Termination Procedure...........................................................................................25 ARTICLE XI Participant Direction Of Account Investment...................................................26 11.1 Participant Directed Investments...........................................................................26 11.2 Election Procedures................................................................................................26 11.3 Failure to Designate................................................................................................26 11.4 Charges and Credits................................................................................................26 11.5 Procedures...............................................................................................................27 ARTICLE XII Miscellaneous....................................................................................................28 12.1 Alienation.................................................................................................................28 12.2 Governing Law.........................................................................................................28 12.3 Gender......................................................................................................................28 12.4 Forfeiture of Benefits for Specified Offenses........................................................28 12.5 Claims Procedures..................................................................................................29 ARTICLE XIII Loans To Participants......................................................................................31 13.1 Availability of Loans................................................................................................31 13.2 Time and Manner of Repayment.............................................................................32 13.3 Default......................................................................................................................32 1 \388024\2 -# 507616 v4 CITY OF CLEARWATER MONEY PURCHASE PENSION PLAN THE CITY OF CLEARWATER, FLORIDA (the "Employer") hereby restates this money purchase pension plan, a tax-qualified defined contribution plan this _____ day of ___________, 2008, to provide supplementary retirement and other benefits for certain eligible employees. WITNESSETH: WHEREAS, the Employer desires to provide for the retirement of certain Employees employed by the Employer by establishing a money purchase pension plan for those Employees who now or may hereafter qualify for participation therein; WHEREAS, the Employer desiresto amend the Plan to comply with legislative changes; and WHEREAS, the Plan may be amended by the Employer pursuant to Section 9.02 thereof. NOW, THEREFORE, in consideration of the premises, it is agreed as follows: 2 \388024\2 -# 507616 v4 ARTICLE I DEFINITIONS 1.1 "Account" or "Accounts"shall mean a Participant's Employer Contribution Account, Rollover Account and/or such other accounts as may be established by the Plan Administrator. 1.2 "Administrator" shall mean the Plan Administrator. 1.3 "Anniversary Date" shall mean December 31 of each Plan Year. 1.4 "Annual Additions"shall mean, for any Limitation Year, the sum of: (a)the amount of Employer contributions allocated to the Participant during any Limitation Year under any qualified defined contribution plan maintained by the Employer; (b)the amount ofthe Employee's contributions (other than rollover contributions, if any) to any qualified defined contribution plan maintained by the Employer; (c)any forfeitures allocated to the Participant under any qualified defined contribution plan maintained by the Employer; or (d)amounts allocated to an individual medical account, as defined in Section 415(l)(2) of the Code that is part of a pension or annuity plan maintained by the Employer, and amounts derived from contributions that are attributable to medical benefits under a welfare benefit plan (as defined in Section 419(e) of the Code) maintained by the Employer; provided, however, the percentage limitation set forth in Section 415(c)(1)(B) of the Code shall not apply to: (A) any contribution for medical benefits (within the meaning of Section 419A(f)(2) of the Code) after separation from service which is otherwise treated as an "Annual Addition," or (2) any amount otherwise treated as an "Annual Addition" under Section 415(l)(1) of the Code. 1.5 "Code" shall mean the Internal Revenue Code of 1986, as amended, or any successor statute. Reference to a specific section of the Code shall include a reference to any successor provision. 1.6 "Compensation" (a)"Compensation" shall mean the regular salaries and wages, bonuses, overtime pay, holiday time, accrued vacation, sick pay, and severance pay paid by the Employer during the Plan Year reportable as W-2 wages for Federal income tax withholding purposes, Employee contributions designated as employer contributions under Section 414(h) of the Code, and elective contributions made during the Plan Year on behalf of a Participant to a Plan described in Section 125 or 457 of the Code, but shall not include any other type 3 \388024\2 -# 507616 v4 of cash or non-cash remuneration, including, but not limited to disability payments, amounts paid by the Employer to a Plan described in Section 125, 132(f)(4), 402(e)(3) or 457(b) of the Code, credits or benefits under this Plan, any amount contributed to any pension, employee welfare, life insurance or health insurance plan or arrangement, or any other fringe benefits, welfare benefits, or deferred compensation. (b)No Compensation in excess of the limit under Section 401(a)(17) of the Code (adjusted under such regulations as may be issued by the Secretary of the Treasury) shall be taken into account for any Employee. If a Plan Year consists of fewer than 12 months, the Compensation limit will be multiplied by a fraction, the numerator of which is the number of months in the Plan Year, and the denominator of which is 12. 1.7 ”Directed Investment Fund" shall mean an investment fund established pursuant to Article XI for purposes of investing Participants' Accounts. 1.8 "Effective Date" of this Plan shall mean January 1, 2008, except as may otherwise be noted herein. 1.9 "Employee" shall mean any person actively employed by the Employer in the position of City Manager, City Attorney, Assistant City Attorney and all management contract employees, who are not participants in the City of Clearwater Employees' Pension Fund, a defined benefit pension plan, excluding temporary employees. 1.10 "Employer" shall mean the City of Clearwater, Florida. 1.11 "Employer Contribution Account" and “Employee Contribution Account” shall mean an account established pursuant to Section 6.2 with respect to Employer contributions and Employee contributions made pursuant to Article V. 1.12 [This section intentionally left blank.] 1.13 "Limitation Year" shall mean the Plan Year. 1.14 "Normal Retirement Date" shall mean the date on which a Participant has reached the age of 55. 1.15 "Participant" shall mean any eligible Employee of the Employer who has become a Participant under the Plan. Participant shall include any former employee of the Employer who became a Participant under the Plan and who still has a balance in an Account under the Plan. 1.16 "Plan" shall mean the City of Clearwater Money Purchase Pension Plan, a tax-qualified defined contribution plan, as herein set forth, as it may be amended from time to time. 1.17 "Plan Administrator" shall mean the Employer or the person or persons appointed by the Employer pursuant to Article III hereof. 4 \388024\2 -# 507616 v4 1.18 "Plan Year" shall mean the period beginning June 23, 1997 and ending December 31, 1997; thereafter, the 12-month period beginning on January 1 and ending on the following December 31 of each year. 1.19 "Pooled Investment Fund" shall mean a Directed Investment Fund established under ArticleXI, the combined assets of which shall consist of the common investments of all Participants selecting the Directed Investment Fund. 1.20 "Rollover Contribution Account" shall mean an account established pursuant to Section 6.2 with respect to rollover contributions made pursuant to Article V. 1.21 "Section 415 Compensation" shall mean all compensation as described in Section 1.415-2(d)(2) and Section 1.415-2(d)(3) of the Income Tax Regulations. 1.22 "Segregated Investment Fund" shall mean a Directed Investment Fund established under Article XI, in which the assets of each Participant selecting the Directed Investment Fund shall be separately invested, and for which the earnings attributable to such assets shall be separately accounted. 1.23 "Trust" shall mean the trust established by the Trust Agreement. 1.24 "Trust Agreement" shall mean the agreement providing for the Trust Fund, as it may be amended from time to time. 1.25 "Trustee" shall mean the individual, individuals or corporation designated as trustee under the Trust Agreement. 1.26 "Trust Fund"shall mean the trust fund established under the Trust Agreement from which the benefits provided for by the Plan are to be paid or funded. 1.27 "Valuation Date"shall mean December 31 of each year and each day securities are traded on a national stock exchange, except regularly scheduled holidays of the Employer or the Trustee, or such other date as may be selected by the Plan Administrator. 1.28 "Valuation Period" shall mean the period beginning with the first day after a Valuation Date and ending with the next Valuation Date; provided, however, that the first Valuation Period shall begin on the Effective Date of the Plan. 5 \388024\2 -# 507616 v4 ARTICLE II ESTABLISHMENT AND NAME OF THE PLAN 2.1 Name ofPlan. A tax-qualified defined contribution plan is hereby established in accordance with the terms hereof and shall be known as the "CITY OF CLEARWATER MONEY PURCHASE PENSION PLAN." 2.2 Exclusive Benefit. This Plan is created for the sole purpose of providing benefits to the Participants. Except as otherwise permitted by law, in no event shall any part of the principal or income of the Trust be paid to or reinvested in the Employer or be used for or diverted to any purpose whatsoever other than for the exclusive benefit of the Participants and their beneficiaries. 2.3 Mistake of Fact. Notwithstanding the foregoing provisions of Section 2.2, any contribution made by the Employer to this Plan by a mistake of fact may be returned to the Employer within one year after the payment of the contribution. 2.4 Participants' Rights. The establishment of this Plan shall not be considered as giving any Employee, or any other person, any legal or equitable right against the Employer, the Trustee or the principal or the income of the Trust, except to the extent otherwise provided by law. The establishment of this Plan shall not be considered as giving any Employee, or any other person, the right to be retained in the employ of the Employer. 2.5 Qualified Plan. This Plan and the Trust are intended to qualify under the Code as a tax-qualified employees' plan and trust, and the provisions of this Plan and the Trust are to be interpreted accordingly. 6 \388024\2 -# 507616 v4 ARTICLE III PLAN ADMINISTRATOR 3.1 Administration of the Plan. (a)The Plan Administrator shall controland manage the operation and administration of the Plan, except with respect to investments. The Plan Administrator shall have no duty with respect to the investments to be made of the funds in the Trust except as may be expressly assigned to it by the terms of the Trust Agreement and except to the extent that the Plan Administrator determines the investment funds which will be made available under the Plan in accordance with Article XI hereof. (b)(1)The Employer may appoint a committee to assist in the administration of the Plan, which shall serve at the pleasure of the Employer. All usual and reasonable expenses of the committee may be paid in whole or part by the Employer, and any expenses not paid by the Employer shall be paid from the Trust Fund. Any members of the committee who are employees of the City shall not receive compensation with respect to their services for the committee. (2)The committee must act at a publicly noticed meeting. The committee may elect one of its members as chairman, appoint a secretary, who may or may not be a committee member, and advise the Trustee of its actions in writing. The secretary shall keep a record of all meetings and forward necessary communications to the Employer or the Trustee. The committee may adopt such by-laws and regulations as it deems desirable for the conduct of its affairs. All decisions of the committee shall be made by a vote of the majority, including actions taken in writing without a meeting. (3)The committee and the individual members thereof shall be indemnified by the Employer (and not from the Trust Fund) against any and all liabilities arising by reason of any act or failure to act made in good faith pursuant to the provisions of the Plan, including expenses reasonably incurred in the defense of any claim relating thereto. 3.2 Powers and Duties. (a)The Plan Administrator shall have complete control over the administration of the Plan herein embodied, with all powers necessary to enable it to carry out its duties in that respect. Not in limitation, but in amplification of the foregoing, the Plan Administrator shall have the power and discretion to interpret or construe this Plan and to determine all questions that may arise as to the status and rights of the Participants and others hereunder. 7 \388024\2 -# 507616 v4 (b)The Plan Administrator may promulgate such policies and make such rules and regulations for the proper administration of the Plan as it deems necessary. 3.3 Direction of Trustee. It shall be the duty of the Plan Administrator to direct the Trustee with regardto the distribution of benefits to the Participants and others hereunder. 3.4 Conflict in Terms. The Plan Administrator shall notify each Employee, in writing, as to the existence of the Plan and Trust and the basic provisions thereof. In the event of any conflict between the terms of this Plan and the Trust Agreement and as set forth in any explanatory booklet, this Plan and the Trust Agreement shall control. 3.5 Final Authority. Except to the extent otherwise required by law, the decision of the Plan Administrator in matters within its jurisdiction shall be final, binding and conclusive upon each Employee and beneficiary and every other interested or concerned person or party. 3.6 Appointment of Advisors and Delegation of Duties. (a)The Plan Administrator may appoint such accountants, counsel, specialists and other persons that it deems necessary and desirable in connection with the administration of this Plan. (b)The Plan Administrator may designate one or more of its employees to perform the duties required of the Plan Administrator hereunder. 8 \388024\2 -# 507616 v4 ARTICLE IV ELIGIBILITY AND PARTICIPATION 4.1 Eligibility and Participation. Any Employee employed by the Employer in the position of City Manager or City Attorney shall become a Participant in the Plan on the Effective Date. Each other eligible Employee shall enter the Plan as a Participant on his date of employment. 4.2 Former Employees. An Employee who ceases to be a Participant, terminates employment and is reemployed by the Employer shall be eligible again to become a Participant on thedate of his reemployment. 4.3 Change of Eligibility Status. In the event a change of job classification results in a Participant no longer qualifying as an eligible Employee, such Employee shall cease to be an active Participant as of the effective date of such change of job classification but the Employee shall not be deemed to have terminated employment with the Employer for purposes of this Plan. 4.4 Military Service. Notwithstanding any provision of this Plan to the contrary, contributions, benefits and service credit with respect to qualified military service will be provided in accordance with Section 414(u) of the Code. 9 \388024\2 -# 507616 v4 ARTICLE V CONTRIBUTIONS TO THETRUST 5.1 Employer Contributions. (a)Employer Contributions. For each Plan Year, the Employer shall contribute to the Trust on behalf of each Participant employed by the Employer an amount equal to: 15% of Compensation on behalf of the City Manager and the City Attorney; 14% of Compensation on behalf of the Chief of Police; and 8% of Compensation on behalf of management contract employees (excluding the Chief of Police) and Assistant City Attorneys. The Employer will make bi-weekly contributions to the Trust throughout the Plan Year to meet its funding obligations under the Plan. (b)Employee Mandatory Contributions. For eachPlan Year, the City Manager and the City Attorney shall contribute an amount equal to 2% of Compensation and the Chief of Police shall contribute an amount equal to 6% of Compensation bi-weekly to the Trust. The mandatory contributions made by employees under the Plan shall be designated as employer contributions pursuant to Section 414(h) of the Code. Such designation is contingent upon the contributions being excluded from the Employees’ gross income for federal income tax purposes. For all other purposes of the Plan, such contributions shall be considered employee contributions. (c)Vesting. All Participants shall be immediately 100% vested in all contributions made pursuant to this Section. 5.2 Form and Timing of Contributions. Payments on account of the contributions due from the Employer for any Plan Year shall be made in cash. Such payments may be made by the Employer at any time. 5.3 Rollover Contributions. With the consent of the Plan Administrator and in such manner as prescribed by the Plan Administrator, the Trustee may accept a rollover contribution (as defined in the applicable sections of the Code, except that for this purpose "rollover contribution" shall be deemed to include both a direct payment from an Employee and a direct transfer from a trustee of another qualified plan in which an Employee is or was a participant). Rollover amounts shall be allocated to the Employee's Rollover Contribution Account and invested in accordance with the provisions of Article XI. The Trustee shall not accepta rollover contribution that is subject to the requirements of Sections 401(a)(11) and 417 of the Code. 5.4 No Duty to Inquire. The Trustee shall have no right or duty to inquire into the amount of any contribution made by the Employer or the method used in determining the amount of any such contribution, or to collect the same, but the Trustee shall be accountable only for funds actually received by it. 10 \388024\2 -# 507616 v4 ARTICLE VI PARTICIPANTS' ACCOUNTS AND ALLOCATION OFCONTRIBUTIONS 6.1 Common Fund. The assets of the Trust shall constitute a common fund in which each Participant shall have an undivided interest. 6.2 Establishment of Accounts. The Plan Administrator shall establish and maintain with respect to each Participant such accounts as necessary to reflect the Participant's interest in the Trust Fund with respect to contributions made by the Employer, the Employee and a Rollover Contribution Account to reflect the Participant's interest in the Trust Fund with respect to employer, employee and rollover contributions. The Plan Administrator may establish such additional accounts as are necessary to reflect a Participant's interest in the Trust Fund. 6.3 Interests of Participants. The interest of a Participant in the Trust Fund shall be the balance remaining from time to time in his Account after making the adjustments required in Section 6.4. 6.4 Adjustments to Accounts. Subject to the provisions of Section 6.5, a Participant's Account shall be adjusted from time to time as follows: (a)As of each Valuation Date, each of a Participant's Accounts shall be credited or charged, as the case may be, with a share of the earnings of the Trust Fund for the Valuation Period ending with such current Valuation Date as follows: (1)As of each Valuation Date, any portion of the Participant's Accounts that is invested in a Pooled Investment Fund established under ArticleXIshall be credited or charged, as the case may be, with a share of the earnings of such Pooled Investment Fund for the Valuation Period ending with such current Valuation Date. Each Participant's share of the earnings of a Pooled Investment Fund for any Valuation Period shall be determined by the Plan Administrator on a weighted average basis, so that each Participant with a balance in such Pooled Investment Fund shall receive a pro- rata share of the earnings of such Pooled Investment Fund, taking into account the period of time that each dollar invested in such Pooled Investment Fund has been so invested. (2)As of each Valuation Date, the portion of the Participant's Accounts that is invested in each Segregated Investment Fund established under Article XI shall be credited or charged, as the case may be, with the earnings attributable to the Participant's investment in such Segregated 11 \388024\2 -# 507616 v4 Investment Fund for the Valuation Period ending with such current Valuation Date. (b)Each Participant's Accounts shall be credited with contributions made during the Plan Year, as follows: (1)As of each Valuation Date that is the last day of the Plan Year, or at such other times as determined by the Employer, the Employer Contribution Account of a Participant shall be credited with his share of the contribution made by the Employer with respect to the Plan Year ending with such ValuationDate. A Participant's share of the amount of the contribution for the Plan Year shall be determined pursuant to the provisions of Article V. (2)As of each Valuation Date, the Rollover Contribution Account of a Participant shall be credited with the Rollover Contributions, if any, made by the Participant pursuant to Article V. (c)As of each Valuation Date, each Account of a Participant shall be charged with the amount of any distribution made to the Participant or his beneficiary from such Account during the Valuation Period ending with such Valuation Date. (d)For purposes of all computations required by this Article VI, the cash method of accounting shall be used, and the Trust Fund and the assets thereof shall be valued at their fair market value as of each Valuation Date. The Plan Administrator may adopt such additional accounting procedures as are necessary to accurately reflect each Participant's interest in the Trust Fund, which procedures shall be effective upon approval by the Employer. All such procedures shall be applied in a consistent, nondiscriminatory manner. 6.5 Limitation on Allocation of Contributions. (a)Notwithstanding anything contained in this Plan to the contrary, the aggregate Annual Additions to a Participant's Accounts under this Plan and under anyother defined contribution plans maintained by the Employer for any Limitation Year shall not exceed the lesser of: the limitation under Code Section 415(c), $40,000, as adjusted for increases in the cost-of-living under Code Section 415(d) of the Code, or 100% of the Participant's Code Section 415(c)(3) compensation for such Limitation Year. (b)In the event that the Annual Additions, under the normal administration of the Plan, would otherwise exceed the limits set forth above for any Participant, or in theevent that any Participant participates in both a defined benefit plan and a defined contribution plan maintained by the Employer and the aggregate annual additions to and projected benefits under all of such plans, 12 \388024\2 -# 507616 v4 under the normal administration of suchplans, would otherwise exceed the limits provided by law, then the Plan Administrator shall take such actions, applied in a uniform and nondiscriminatory manner, as will keep the annual additions and projected benefits for such Participant from exceeding the applicable limits provided by law. Adjustments shall be made to other plans, if necessary to comply with such limits, before any adjustments may be made to this Plan. 13 \388024\2 -# 507616 v4 ARTICLE VII BENEFITS UNDER THE PLAN 7.1 Retirement Benefit. (a)A Participant shall be entitled to a normal retirement benefit upon such Participant's Normal Retirement Date. (b)Except as provided in Sections 8.8 and 8.9 of this Plan, until a Participant actually terminates from the employ of the Employer, he shall not receive a distribution and he shall continue to be treated in all respects as a Participant. (c)Upon the retirement of a Participant as provided in 7.1(a) and subject to adjustment as provided in Section 8.4, such Participant shall be entitled to receive, at the time and in the manner described in Article VIII, a retirement benefit in an amount equal to 100% of the balance in his Accounts as of the Valuation Date concurring with or preceding the date of his retirement, plus the amount of any contributions allocated subsequent to such Valuation Date. 7.2 Termination of Employment Benefit. In the event a Participant's employment with his Employer is terminated for reasons other than retirement, and subject to adjustment as provided in Section 8.4, such Participant shall be entitled to receive, at the time and in the manner described in Article VIII, a termination of employment benefit in an amount equal to the balance in his Account as of the Valuation Date concurring with or preceding the date of the distribution, plus the amount of any contributions allocated subsequent to such Valuation Date. 7.3 Death Benefit (a)In the event of the death of a Participant and subject to adjustment as provided in Section 8.4, his beneficiary shall be entitled to receive, at the time and in the manner described in Article VIII,a death Benefit in an amount equal to 100% of the balance in his Account as of the Valuation Date concurring with or preceding the date of his death, plus the amount of any contributions allocated subsequent to such Valuation Date. (b)At any time and from time to time, each Participant shall have the unrestricted right to designate a beneficiary to receive his death benefit and to revoke any such designation. Each designation or revocation shall be evidenced by written instrument filed with the Plan Administrator, signed by the Participant and bearing the signature of a witness to his signature. In the event that a Participant has not designated a beneficiary or beneficiaries, or if for any reason such designation shall be legally ineffective, or if such beneficiary or beneficiaries shall predecease the Participant, then the personal representative of the estate of such Participant shall be deemed to be the beneficiary designated to receive such death benefit, or if no personal representative is appointed forthe estate of 14 \388024\2 -# 507616 v4 such Participant, then his next of kin under the statute of descent and distribution of the state in which such Participant's domicile at the date of his death shall be deemed to be the beneficiary or beneficiaries to receive such death benefit. 15 \388024\2 -# 507616 v4 ARTICLE VIII FORM AND PAYMENT OF BENEFITS 8.1 Timing and Form. (a)(1)Except as otherwise provided in this Article VIII, the amount of the retirement or death benefit to which a Participant is entitled under Sections 7.1 and 7.3 shall be paid to him or, in the case of a death benefit, shall be paid to said Participant's beneficiary or beneficiaries as soon as practicable following the Participant's actual retirement following his Normal Retirement Date or death, as the case may be. (2)The amount of the termination of employment benefit to which a Participant is entitled under Section 7.2 shall be paid to him as soon as practicable following his termination of employment. (3)Notwithstanding paragraphs (a)(1) and (a)(2), above, a Participant may elect to defer thedistribution of his benefit until any subsequent date elected by the Participant in writing pursuant to such procedures as the Plan Administrator may adopt, but in no event later than the date described in 8.1(b). (b)(1)Effective January 1, 2003, all distributions from the Plan will be determined and made in accordance with the Treasury Regulations under Section 401(a)(9) of the Code and shall take precedence over any inconsistent provisions of the Plan. Any distribution paid to a Participant (or, in the case of a death benefit, to his beneficiary or beneficiaries) shall commence not later than: (i)April 1 of the year following the calendar year in which the Participant retires on or after his Normal Retirement Date; or (ii)April 1 of the year immediately following the calendar year in which the Participant reaches age 70½. (2)Time and Manner of Distribution. (A)Death of Participant Before Distributions Begin. If the Participant dies before distributions begin, the Participant's entire interest will be distributed, or begin to be distributed, no later than as follows: (i)If the Participant's surviving spouse is the Participant's sole designated Beneficiary, then,except as provided in Section 8.1(b)(2)(A)(v), distributions to the surviving spouse will begin by December 31 of the calendar 16 \388024\2 -# 507616 v4 year immediately following the calendar year in which the Participant died, or by December 31 of the calendar year in which the Participant would have attained age 70½, if later. (ii)If the Participant's surviving spouse is not the Participant's sole designated Beneficiary, then, except as provided in Section 8.1(b)(2)(A)(v), distributions to the designated Beneficiary will begin by December 31 of the calendar year immediately following the calendar year in which the Participant died. (iii)If there is no designated Beneficiary as of September 30 of the year following the year of the Participant's death, the Participant's entire interest willbe distributed by December 31 of the calendar year containing the fifth anniversary of the Participant's death. (iv)If the Participant's surviving spouse is the Participant's sole designated Beneficiary and the surviving spouse dies after the Participant but before distributions to the surviving spouse begin, Section 8.1(b)(2)(A), other than Section 8.1(b)(2)(A)(i), will apply as if the surviving spouse were the Participant. (v)Participants or Beneficiaries may elect on an individual basis whether the 5-year ruleor the life expectancy rule in this Section 8.1(b)(2)(A) and Section 8.1(b)(4) applies to distributions after the death of a Participant who has a designated Beneficiary. The election must be made no later than the earlier of September 30 of the calendar year in which distribution would be required to begin under this Section 8.1(b)(2)(A), or by September 30 of the calendar year which contains the fifth anniversary of the Participant's (or, if applicable, surviving spouse's) death. If neither the Participant nor Beneficiary makes an election under this paragraph, distributions will be made in accordance with this Section 8.1(b)(2)(A) and Section 8.1(b) (4) below. For purposes of this Section 8.1(b)(2)(A) and Section 8.1(b)(4), unless 8.1(b)(2)(A)(iv) applies, distributions are considered to begin on the Participant's required beginning date. If Section 8.1(b)(2)(A)(iv) above applies, distributions are considered to begin on the date distributions are required to begin to the surviving spouse under Section 8.1(b)(2)(A)(i) above. If distributions under an annuity purchased from an insurance company irrevocably commence to the Participant before the Participant's required beginning date (or to the Participant's surviving spouse before the date distributions are required to begin to the surviving spouse under 17 \388024\2 -# 507616 v4 Section 8.1(b)(2)(A)(i), the date distributions are considered to begin is the date distributions actually commence. (B)Forms of Distribution.Unless the Participant's interest is distributed in the form of an annuity purchased from an insurance company or in a single sum on or before the required beginning date, as of the first distribution calendar year distributions will be made in accordance with Sections 8.1(b)(3) and 8.1(b)(4). If the Participant's interest is distributed in the form of an annuity purchased from an insurance company, distributions thereunder will be made in accordance with the requirements of Section 401(a)(9) of the Code and the Treasury Regulations thereunder. (3)Required Minimum Distributions During Participant's Lifetime. (A)Amount of Required Minimum Distribution For Each Distribution Calendar Year. During the Participant's lifetime, the minimum amount that will be distributed for each distribution calendar year is the lesser of: (i)the quotient obtained by dividing the Participant's account balance by the distribution period in the Uniform Lifetime Table set forth in Treasury Regulations Section 1.401(a)(9)-9, using the Participant's age as of the Participant's birthday in the distribution calendar year; or (ii)if the Participant's sole designated Beneficiary for the distribution calendar year is the Participant's spouse, the quotient obtained by dividing the Participant's account balance by the number in the Joint and Last Survivor Table set forthin Treasury Regulations Section 1.401(a)(9)-9, using the Participant's and spouse's attained ages as of the Participant's and spouse's birthdays in the distribution calendar year. (B)Lifetime Required Minimum Distributions Continue Through Year of Participant's Death. Required minimum distributions will be determined under this Section 8.1(b)(3) beginning with the first distribution calendar year and up to and including the distribution calendar year that includes the Participant's date of death. (4)Required Minimum Distributions After Participant's Death. (A)Death On or After Date Distributions Begin. 18 \388024\2 -# 507616 v4 (i)Participant Survived by Designated Beneficiary. If the Participant dies on or after the date distributions begin and there is a designated Beneficiary, the minimum amount that will be distributed for each distribution calendar year after the year of the Participant's death is the quotient obtained by dividing the Participant's account balance by the longer of the remaining life expectancy of the Participant or the remaining life expectancy of the Participant's designated Beneficiary, determined as follows: (1)The Participant's remaining life expectancy is calculated using the age of the Participant in the year of death, reduced by one for each subsequent year. (2)If the Participant's surviving spouse is the Participant's sole designated Beneficiary, the remaining life expectancy of the surviving spouse is calculated for each distribution calendar year after the year of the Participant's death using the surviving spouse's age as of the spouse's birthday in that year. For distribution calendar years after the year of the surviving spouse's death, the remaining life expectancy of the surviving spouse is calculated using the age of the surviving spouse as of the spouse's birthday in the calendar year of the spouse's death, reduced by one for each subsequent calendar year. (3)If the Participant's surviving spouse is not the Participant's sole designated Beneficiary, the designated Beneficiary's remaining life expectancy is calculated using the age of the Beneficiary in the year following the year of the Participant's death, reduced by one for each subsequent year. (ii)No Designated Beneficiary. If the Participant dies on or after the date distributions begin and there is no designated Beneficiary as of September 30 of the year after the year of the Participant's death, the minimum amount that will be distributed for each distribution calendar year after the year of the Participant's death is the quotient obtained by dividing the Participant's account balance by the Participant's remaining life expectancy calculated using the age of the Participant in the year of death, reduced by one for each subsequent year. (B)Death Before Date Distributions Begin. 19 \388024\2 -# 507616 v4 (i)Participant Survived by Designated Beneficiary. Except as provided in Section 8.1(b)(2)(A)(v) above, if the Participant dies before the date distributions begin and there is a designated Beneficiary, the minimum amount that will be distributed for each distribution calendar year after the year of the Participant's death is the quotient obtained by dividing the Participant's account balance by the remaining life expectancy of the Participant's designated Beneficiary, determined as provided in Section 8.1(b)(4)(A) above. (ii)No Designated Beneficiary. If theParticipant dies before the date distributions begin and there is no designated Beneficiary as of September 30 of the year following the year of the Participant's death, distribution of the Participant's entire interest will be completed by December 31 ofthe calendar year containing the fifth anniversary of the Participant's death. (iii)Death of Surviving Spouse Before Distributions to Surviving Spouse Are Required to Begin. If the Participant dies before the date distributions begin, the Participant's surviving spouse is the Participant's sole designated Beneficiary, and the surviving spouse dies before distributions are required to begin to the surviving spouse under Section 8.1(b)(2)(A)(i) above, this Section 4 will apply as if the surviving spouse were the Participant. (5)Definitions. (A)Designated Beneficiary.The individual who is designated as the Beneficiary under the Plan and is the designated Beneficiary under Code Section 401(a)(9) and Treasury Regulations Section 1.401(a)(9)-1, Q&A-4 of the Code. (B)Distribution calendar year. A calendar year for which a minimum distribution is required. For distributions beginning before the Participant's death, the first distribution calendar year is the calendar year immediately proceeding the calendar year which contains the Participant's required beginning date. For distributions beginning after the Participant's death, the first distribution calendar year is the calendar year in which distributions are required to begin under Section 8.1(b) 2 above. The requiredminimum distribution for the Participant's first distribution calendar year will be made on or before the Participant's required beginning date. The required minimum distribution for other distribution calendar years, including the required minimum distribution for the distribution calendar year 20 \388024\2 -# 507616 v4 in which the Participant's required beginning date occurs, will be made on or before December 31 of that distribution calendar year. (C)Life expectancy. Life expectancy as computed by use of the Single Life Table in Treasury Regulations Section 1.401(a)(9)-9 of the Code. (D)Participant's Account balance. The Account balance as of the last valuation date in the calendar year immediately preceding the distribution calendar year (valuation calendar year) increased by the amount of any contributions made and allocated or forfeitures allocated to the account balance as of dates in the valuation calendar year after the valuation date and decreased by distributions made in the valuation calendar year after the valuation date. The account balance for the valuation calendar year includes any amounts rolled over or transferred to the Plan either in the valuation calendar year or in the distribution calendar year if distributed or transferred in the valuation calendar year. (c)With respect to distributions under the Plan made for the 2002 calendar year, the Plan will apply the minimum distribution requirements of Section 401(a)(9) of the Code in accordance with the regulations under Section 401(a)(9) that were proposed on January 17, 2001, notwithstanding any provision of the Plan to the contrary. 8.2 Manner of Payment. (a)A Participant's retirement, death or termination of employment benefit may be paid in one of the following optional forms as elected by the Participant, or in the case ofa death benefit, by the Participant's beneficiary or beneficiaries. The optional forms are as follows: (1)A lump sum payment. (2)Monthly, quarterly or annual installments over a fixed period of time, not exceeding the life of the Participant or the joint life and last survivor expectancy of the Participant and his designated beneficiary. (b)A Participant or his beneficiary may elect to receive the payment of any part or all of the unpaid installments under paragraph 8.2(a)(2) above in a lump sum, in accordance with rules and regulations promulgated by the Plan Administrator (and in accordance with the Code). (c)Each Participant shall have the right to designate a beneficiary for purposes of the optional form of benefit payment described in paragraph 8.2(a)(2) above and to revoke any such designation. Each designation or revocation shall be evidenced by written instrument filed with the Employer and shall be effective upon filing with the Employer. 21 \388024\2 -# 507616 v4 (d)In the case of a retirement or termination of employment benefit, in noevent shall payment extend beyond the life or life expectancy of the Participant or the joint lives or life expectancies of the Participant and his designated beneficiary. If the Participant dies before receiving the entire amount payable to him, the balance shall be distributed to his designated beneficiary at least as rapidly as under the method being used prior to the Participant's death. (e)In the case of a death benefit, payment (1)to the designated beneficiary shall begin within one year following the Participant's death (unless the designated beneficiary is the Participant's spouse, in which case such benefit shall begin no later than the date the Participant would have reached 70½) and shall not, in any event, extend beyond the life or life expectancy of the designated beneficiary; or (2)to any other beneficiary shall be totally distributed within five years from the date of the Participant's death. 8.3 Lump Sum Payment. Notwithstanding anything contained in this Plan to the contrary, any benefit payable underthe Plan, which is not more than $1,000, including such Participant’s Rollover Contributions Account, shall be paid in a lump sum as soon as practicable following the Participant's termination of employment.Should the actuarial lump sum value of such payment be greater than $1000.00, and if the distributee has not elected to have such distribution paid directly to a specified eligible retirement plan of a designated trustee or issuer and shall notify the distributee in writing (either separately or as part of a notice under section 402(f) of the code) that the distribution may be transferred to another individual retirement plan. 8.4 Periodic Adjustments. To the extent the balance of a Participant's Accounts has not been distributed and remains in the Plan, and notwithstanding anything contained in the Plan to the contrary, the value of such remaining balance shall share in allocations of the income (or loss) of the Trust Fund pursuant to the provisions of Article VI. 8.5 Location of Participant or Beneficiary Unknown. In the event that all, or any portion of the distribution payable to a Participant or his beneficiary, hereunder shall remain unpaid after five (5) Plan Years solely by reason of the inability of the Plan Administrator, after sending a registered letter, return receipt requested, to the last known address, and after further diligent effort, to ascertain the whereabouts of such Participant or his beneficiary, the amount so distributable shall be treated as a forfeiture. In the event a Participant or beneficiary of such Participant is located subsequent to his benefit being reallocated, such benefit shall be restored by an additional contribution by the Employer. 8.6 Transfer to Other Qualified Plans. The Trustee, upon written direction by the Plan Administrator, shall transfer some or all of the assets held under the Trust to another plan or trust meeting the requirements of the Code relating to qualified plans and 22 \388024\2 -# 507616 v4 trust, whether such transfer is made pursuant to a merger or consolidation of this Plan with such other plan or trust or for any other allowable purpose. 8.7 Direct Rollovers. (a)Notwithstanding any provisions of the Plan to the contrary that would otherwise limit a distributee's (as defined below) election under this paragraph, a distributee may elect, at the time and in the manner prescribed by the Plan Administrator, to have any portion of an eligible rollover distribution (as defined below) paid directly to an eligible retirement plan (as defined below) specified by the distributee in a direct rollover (as defined below). (b)For purposes of this paragraph, the following terms shall have the following meanings: (1)An "eligible rollover distribution" is any distribution of all or any portion of the balance to the credit of the distributee, except that an eligible rollover distribution does not include: any distribution that is one of a series of substantially equal periodic payments (not less frequently than annually) made for the life (or life expectancy) of the distributee or the joint lives (or joint life expectancies) of the distributee and the distributee's designated beneficiary, or for a specified period of ten years or more; any distribution to the extent such distribution is required under Section 401(a)(9) of the Code, and the portion of any distribution that is not included in gross income (determined without regard to the exclusion for net unrealized appreciation with respect to employer securities). (2)An "eligible retirement plan" is an individual retirement account described in Section 408(a) of the Code, an individual retirement annuity described in Section 408(b) of the Code, an annuity plan described in Section 403(a) or 403(b) of the Code, a deferred compensation plan under Section 457 (b) of the Code or a qualified trust described in Section 401(a) of the Code, that accepts the distributee's eligible rollover distribution. However, in the case of an eligible rollover distribution to the surviving spouse, an eligible retirement plan is an individual retirement account or individual retirement annuity. (3)A "distributee" includes an Employee or former Employee. In addition, the Employee's or former Employee's surviving spouse and the Employee's or former Employee's spouse, 23 \388024\2 -# 507616 v4 as defined in Section 414(p) of the Code, are distributees with regard to the interest of the spouse or former spouse. (4)A "direct rollover" is a payment by the Plan to the eligible retirement plan specified by the distributee. 8.8 Withdrawals from Rollover Contribution Accounts. A Participant, while still employed, may request a withdrawal of all or a portion of his Rollover Contributions Account at any time. 8.9 Withdrawals from Employer and Employee Mandatory Contribution Accounts. A Participant who has reached age 59½ may request a withdrawal of all or a portion of his Employer Contributions Account and/or his Employee Mandatory Contributions Accounts at any time. 24 \388024\2 -# 507616 v4 ARTICLE IX TRUST FUND AND EXPENSES OF ADMINISTRATION 9.1 Name of Trustee. The Trust Fund shall be held by the Trustee, or by a successor trustee or trustees, for use in accordance with the Plan under the Trust Agreement. The Trust Agreement may from time to time be amended in the manner therein provided. Similarly, the Trustee may be changed from time to time in the manner provided in the Trust Agreement. 9.2 Expenses of Administration. (a)(1)The assets of the Trust Fund may be used to pay all expenses of the administration of the Plan and the Trust Fund, including the Trustee's compensation, the compensation of any investment manager, the expense incurred by the Plan Administrator in discharging its duties, all income or other taxes of any kind whatsoever that may be levied or assessed under existing or future laws upon or in respect of the Trust Fund, and any interest that may be payable on money borrowed by the Trustee forthe purpose of the Trust. (2)The Employer may pay the expenses of the Plan and the Trust Fund. Any such payment by the Employer shall not be deemed a contribution to this Plan. (b)Notwithstanding anything contained herein to the contrary, no excise tax or other liability imposed upon the Trustee, the Plan Administrator or any other person for failure to comply with the provisions of any federal law shall be subject to payment or reimbursement from the assets of the Trust. (c)For its services, any corporate Trustee shall be entitled to receive reasonable compensation in accordance with its rate schedule in effect from time to time for the handling of a Trust. Any individual Trustee shall be entitled to such compensation as shall be arranged between the Employer and the Trustee by separate instrument; provided, however, that no person who is already receiving full-time pay from the Employer shall receive compensation from the Trust Fund (except for the reimbursement of expenses properly and actually incurred). 25 \388024\2 -# 507616 v4 ARTICLE X AMENDMENT AND TERMINATION 10.1 Restrictions on Amendment and Termination of Plan. It is the present intention of the Employer to maintain the Plan set forth herein indefinitely. Nevertheless, the Employer specifically reserves to itself the right at any time,and from time to time, to amend or terminate this Plan in whole or in part; provided, however, that no such amendment: (a)shall have the effect of vesting in the Employer, directly or indirectly, any interest, ownership or control in any of the present or subsequent funds held subject to the terms of the Trust Agreement; (b)shall cause or permit any property held subject to the terms of the Trust Agreement to be diverted to purposes other than the exclusive benefit of the Participants and their beneficiaries or for the administrative expenses of the Plan Administrator and the Trust; (c)shall reduce the then vested interest of a Participant; (d)shall reduce the Account of any Participant; or (e)shall increase the duties or liabilities of the Trustee without its written consent. 10.2 Amendment of Plan. Subject to the limitations stated in Section 10.1, the Employer shall have the power to amend this Plan in any manner that it deems desirable, and, not in limitation but in amplification of the foregoing, it shall have the right to change or modify the method of allocation of contributions hereunder, to change any provision relating to the administration of this Plan and to change any provision relating to the distribution or payment, or both, of any of the assets of the Trust. 10.3 Termination of Plan. The Employer, in its sole and absolute discretion, may terminate this Plan and the Trust, completely or partially, at any time without any liability whatsoever for such complete or partial termination. In any of such events, the affected Participants, notwithstanding any other provisions of this Plan, shall have fully vested interests in the amounts credited to their respective Accounts at the time of such complete or partial termination of this Plan and the Trust. All such vested interests shall be nonforfeitable. 10.4 Termination Procedure. In the event the Employer decides to terminate this Plan and the Trust, after payment of all expenses and proportional adjustments of individual Accounts to reflect such expenses and other changes in the value of the Trust Fund as of the date of termination, each affected Participant (or the beneficiary of any such Participant) shall then be entitled to receive any amount then credited to his Account in accordance with the form of payment prescribed by Article VIII. 26 \388024\2 -# 507616 v4 ARTICLE XI PARTICIPANT DIRECTION OF ACCOUNT INVESTMENT 11.1 Participant Directed Investments. On the commencement of his participation in the Plan, each Participant shall direct the Trustee to invest his Accounts in one or more Directed Investment Funds made available by the Plan Administrator from time to time. The Plan Administrator may provide each of the Directed Investment Funds made available to Participants through shares of one or more investment companies or mutual funds, segregated accounts invested in one or more of savings or notice accounts, deposits in or certificates issued by a bank, insurance, annuity or other investment contracts, or other appropriate investment vehicles. 11.2 Election Procedures. Except as may be otherwise provided by the Trust Agreement or by any contract enteredinto by the Trustee or the Plan Administrator with an investment manager appointed to manage all or any portion of the assets of the Plan, each Participant's directed investment elections shall be made in writing upon his commencement of participation in the Plan. (a)A Participant shall designate the percentage of the balances of his Accounts and future contributions to his Accounts tobe allocated to any Directed Investment Fund. (b)Subject to Section 11.2(c), a Participant may revise his election effective as of the first day of each Valuation Period. The Participant's revised election shall be effective for contributions made to the Plan after the effective date of such revision, and may be effective for the investmentof balances previously allocated and remaining credited to a Participant's Accounts. Any revised election with respect to future contributions shall be subject to the percentage limitations established by the Plan Administrator pursuant to Section 11.2(a). If required by the Plan Administrator, any revised election with respect to existing Account balances shall specify the specific percentage, or dollar amount, of each Account to be transferred between Directed Investment Funds. (c)The Trustee shall make requested investments on behalf of each Participant within a reasonable period after the receipt of directions from the Plan Administrator or the Participant. 11.3 Failure to Designate. If a Participant does not specifically designate the initial investments for all of his Accounts at the time he becomes a Participant in the Plan, his Accounts shall be invested in a stable value fund offered as one of the Directed Investment Funds available to Participants until such time as he makes his initial designation regarding his investments. 11.4 Charges and Credits. A Participant's Accounts shall be divided into sub-accounts to properly account for the Directed Investment Funds in which such Accounts are invested. Each sub-account shall be adjusted as of each Valuation Date in accordance with Article VI for purposes of (a) crediting dividends, interest, and other 27 \388024\2 -# 507616 v4 income on the investments in a particular Directed Investment Fund, as well as all realized and unrealized gains credited to that fund, and (b) charging individually allocable expenses in connection with the investments in a particular Directed Investment Fund, as well as all realized and unrealized losses charged to that fund. Other charges or fees separately incurred and not charged to a Directed Investment Fund, and incurred as a result of an election made by a Participant associated with the investment of his Accounts, shall be charged against his Accounts in accordance with ArticleVI. 11.5 Procedures. The Plan Administrator shall establish procedures regarding Participant investment direction as are necessary, which procedures shall be communicated to all Participants and applied in a uniform, nondiscriminatory manner. 28 \388024\2 -# 507616 v4 ARTICLE XII MISCELLANEOUS 12.1 Alienation. No Participant or beneficiary of a Participant shall have any right to assign, transfer, appropriate, encumber, commute, anticipate or otherwise alienate his interest in this Plan or the Trust or any payments to be made thereunder; no benefits, payments, rights or interests of a Participant or beneficiary of a Participant of any kind or nature shall be in any way subject to legal process to levy upon, garnish or attach the same for payment of any claim against the Participant or beneficiary of a Participant; and no Participant or beneficiary of a Participant shall have any right of any kind whatsoever with respect to the Trust, or any estate or interest therein, or with respect to any other property or right, other than the right to receive such distributions as are lawfully made out of the Trust, as and when the same respectively are due and payable under the terms of this Plan and the Trust. 12.2 Governing Law. This Plan shall be administered, construed and enforced according to the laws of the State of Florida, except to the extent such laws have been expressly preempted byfederal law. 12.3 Gender. Throughout this Plan, and whenever appropriate, the masculine gender shall be deemed to include the feminine and neuter; the singular, the plural; and vice versa. 12.4 Forfeiture of Benefits for Specified Offenses. (a)Notwithstanding anything to the contrary, any Participant who is convicted of the following offenses committed prior to retirement, or whose employment is terminated by reason of his admitted commission, aid or abetment of the following specified offenses, shall forfeit all rights and benefits under this Plan, except for the return of his Rollover Contribution Account as of the date of termination. Specified offenses are as follows: (1)The committing, aiding or abetting of an embezzlement of public funds; (2)The committing, aiding or abetting of any theft from the Employer; (3)Bribery in connection with the employment of a public officer or employee; (4)Any felony specified in Chapter 838, Florida Statutes (except §838.15 and §838.16); (5)The committing of an impeachable offense; (6)The committing of any felony by a public officer or employee who willfully and with intent to defraud the public or the public agency, for which he acts or in which he is employed, of the right to receive 29 \388024\2 -# 507616 v4 the faithful performance of his duty as a public officer or employee, realizes or obtains or attempts to obtain a profit, gain, or advantage for himself or for some other person through the use or attempted use of the power, rights, privileges, duties or position of his public office or employment position. (7)Conviction shall be defined as an adjudication of guilt by a court of competent jurisdiction; a plea of guilty or a nolo contendere; a jury verdict of guilty when adjudication of guilt is withheld and the accused is placed on probation; or a conviction by the Senate of an impeachable offense. Court shall be defined as any state or federal court of competent jurisdiction which is exercising its jurisdiction to consider a proceeding involving the alleged commission of a specified offense. (b)Prior to forfeiture, the Plan Administrator shall hold a hearing on which notice shall be given to the Participant whose benefits are being considered for forfeiture. Said Participant shall be afforded the right to have an attorney present. No formal rules of evidence shall apply, but the Participant shall be afforded a full opportunity to present his case against forfeiture. (c)Amounts forfeited from a Participant's Account under this Section 12.4 shall be used to reduce future Employer contributions. 12.5 Claims Procedures. (a)Claims for benefits under the Plan may be made by a Participant or a beneficiary of a Participant on forms supplied by the Plan Administrator. Written notice of the disposition of a claim shall be furnished to the claimant by the Plan Administrator within ninety (90) days after the application is filed with the Plan Administrator, unless special circumstances require an extension of time for processing, in which event action shall be taken as soon as possible, but not later than one hundred eighty (180) days after the application is filed with the Plan Administrator; and, in the event that no action has been taken within such ninety (90) or one hundred eighty (180) day period, the claim shall be deemed to be denied for the purposes of Section 12.5(b). In the event that the claim is denied, the denial shall be written in a manner calculated to be understood by the claimant and shall include the specific reasons for the denial, specific references to pertinent Plan provisions on which the denial is based,a description of the material information, if any, necessary for the claimant to perfect the claim, an explanation of why such material information is necessary and an explanation of the claim review procedure. (b)If a claim is denied (either in the form of a written denial or by the failure of the Plan Administrator, within the required time period, to notify the claimant of the action taken), a claimant or his duly authorized representative shall have sixty (60) days after the receipt of such denial to petition the Plan Administrator in writing for a full and fair review of the denial, during which time 30 \388024\2 -# 507616 v4 the claimant or his duly authorized representative shall have the right to review pertinent documents and to submit issues and comments in writing. The Plan Administrator shall promptly review the claim and shall make a decision not later than sixty (60) days after receipt of the request for review, unless special circumstances require an extension of time for processing, in which event a decision shall be rendered as soon as possible, but not later than one hundred twenty (120) days after the receipt of the request for review. If such an extension is required because of special circumstances, written notice of the extension shall be furnished to the claimant prior to the commencement of the extension. The decision of the review shall be in writing and shall include specific reasons for the decision, written in a manner calculated to be understood by the claimant, with specific references to the Plan provisions on which the decision is based. 31 \388024\2 -# 507616 v4 ARTICLE XIII LOANS TO PARTICIPANTS 13.1 Availability of Loans. (a)The Plan Administrator, in accordance with its uniform nondiscriminatory policy, may direct the Trustee, upon application of a Participant who is actively employed by the Employer, to make a loan to such Participant out of his vested Accounts upon application of the Participant based upon the Participant’s immediate and heavy financial need (which shall be limited to the criteria set forth in paragraph (e) below). Any such loan to a Participant shall be considered a Participant directed investment under Article XI and without limitation shall be subject to the provisions of Article XI. (b)All loans must be requested in writing on an application approved by the Plan Administrator and signed by the Participant. The Employer must review and approve the application. (c)The amount advanced, when added to the outstanding balance of all other loans to the Participant from this Plan or any other qualified retirement plan adopted by the Employer, may not exceed the lesser of: (1)$50,000, reduced by the excess, if any, of: (A)the highest outstanding balance of all loans made from the Plan to that applicant during the one year period ending on the day before the date on which the loan is made, reduced by (B)the outstanding balance of all loans from the Plan to that applicant on the date on which the loan is made, or (2)50% of the vested balance of the Participant’s Accounts. (d)The minimum amount that may be borrowed by the Participant shall be$1,000.00. (e)A loan will be authorized only in the event of an immediate and heavy financial need. An immediate and heavy financial need shall be deemed to include: (1)expenses of medical care (as defined in Section 213(d) of the Code) incurred by the Participant or his spouse or other dependents (as defined in Section 152 of the Code) or necessary for such persons to obtain such medical care, (2)payments (other than mortgage payments) directly related to the purchase of the Participant’s principal residence, 32 \388024\2 -# 507616 v4 (3)payment of tuition and related educational fees for the next 12 months of post-secondary education for the Participant or his spouse, children or other dependents, (4)payments necessary to prevent the eviction of the Participant from his principal residence or the foreclosure on the mortgage of such residence, or (5)such other events as may be prescribed by the Commissioner of the Internal Revenue Service in revenue rulings, notices and other documents of general applicability. (f)Only one loan may be outstanding at any time. After a loan has beenfully repaid, a new loan may not be made to the borrower for at least 30 days after the final payment has been made with respect to the prior loan. (g)Notwithstanding the foregoing, no Participant shall be entitled to borrow an amount that the Plan Administrator determines could not be adequately secured by the portion of such Participant’s Accounts that is permitted to be held as security pursuant to applicable Department of Labor Regulations. (h)Any out-of-pocket legal and administrative costs incurred by the Trustee as a result of a loan, or application for a loan, shall be paid by the Participant who received or applied for such loan. 13.2 Time and Manner of Repayment. Any loan made under this Article XIII shall be repayable to the Trust at such times and in such manner as may be provided by the Plan Administrator, subject to the following limitations: (a)Each loan shall be secured by 50% of the vested balance of the Participant in his Accounts. The Plan Administrator shall not accept any other form of security. Each Participant shall agree to have each required loan payment deducted from his pay and remitted to the Trustee. (b)Each loan shall bear interest at a reasonable rate and shall provide for substantially level amortization of principal and interest no less frequently than quarterly. The interest rate charged shall be comparable to the rate charged by commercial lending institutions in the region in which the Employer is located for comparable loans as determined by the Plan Administrator at the time the loan is approved. (c)Each loan shall be repaid within a specified period of time. Such period shall not be less than twelve (12) months, nor shall such period exceed five (5) years, unless the loan is used to acquire the principal residence of the Participant. 13.3 Default. In the event of default, the Trustee, at the direction of the Plan Administrator, may proceed to collect said loan with any legal remedy available, including 33 \388024\2 -# 507616 v4 reducing the amount of any distribution permitted under Article VIII by the amount of any such loan that may be due and owing as of the date of distribution or any other action that may be permitted by law. “Events of Default” shall include any failure to make a payment of principal or interest attributable to the loan when due; failure to perform or to comply with any obligations imposed by any agreement executed by the Borrower securing his loan obligation; and any other conditions or requirements set forth within a promissory note or security agreement that may be required in order to ensure that the terms of the loan are consistent with Commercially reasonable practices. IN WITNESS WHEREOF, this Plan has been executed this ____ day of _________________, 2008 .CITY OF CLEARWATER By: _________________________________ "EMPLOYER" Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-557 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Engineering Department Agenda Number: 7.1 SUBJECT/RECOMMENDATION: Approve an Engineer of Record (EOR) work order to URS Corporation in the amount of $170,352 for the Resident Initiated Reclaimed Water Project - Phase II (14-0038-UT) and the Raw Water Main Project (10-0039-UT), and authorize the appropriate officials to execute same. (consent) SUMMARY: This Agenda Item provides for engineering and design services for the construction of new reclaimed water transmission and distribution mains in the Imperial Park Subdivision . This is a resident initiated project and more than 50 percent of the property owners in the project area have requested this service be extended to their neighborhood. Additionally due to the similar nature of the work, the design and permitting of a raw water main of a CSX crossing and SR 590 will be included for the brackish raw water transmission system. The goal of this and all other reclaimed water projects is to reduce the amount of potable water and groundwater being used for irrigation and other non -potable uses. In addition, expansion of the Reclaimed Water Distribution System in accordance with Reclaimed Water Master Plan brings the City of Clearwater closer to achieving zero-discharge of effluent to Tampa Bay and adjacent surface waters. The work order provides for the design and bidding services of reclaimed water distribution systems and their associated extensions of the reclaimed water transmission system to 242 residential properties in Imperial Park Subdivision. The work order also provides for the design and permitting of a raw water main of a CSX crossing in Kapok Park and SR 590 between Virginia Lane and Mission Hills Boulevard. These two locations are parts of the components which will transport the raw water to the WTP under the RO No. 2 Plant Permitting and Development Project (10-0039-UT). The adjacent constructed segments were designed by URS under a separate work order. The design phase for Reclaimed Water Project - Phase II is anticipated to be complete by June 2015, with the construction phase scheduled for beginning by September 2015. URS Corporation is one of the City’s Engineers-of-record, and this work order was negotiated in accordance with the Consultants Competitive Negotiations Act. APPROPRIATION CODE AND AMOUNT: 0315-96739-561300-533-000-0000 $151,084 0327-96741-561300-533-000-0000 $ 19,268 Funding is available in Capital Improvement Program project 0315-96739, Reclaimed Water Distribution System, in the amount of $151,084 and Utility Renewal and Replacement project 0315-96741, System R&R - Capitalized, in the amount of $19,268 for total funding in the amount of $170,352. Page 1 City of Clearwater Printed on 11/26/2014 File Number: ID#14-557 Page 2 City of Clearwater Printed on 11/26/2014   WO Initiation Form.docx 1 of 16 8/1/2014      URS CORPORATION SOUTHERN  WORK ORDER INITIATION FORM  for the CITY OF CLEARWATER  Date: October 22, 2014  Project Number: ___________  City Project Number: 14‐0038‐UT  Plan Set Number: ___________    1. PROJECT TITLE:  Resident Initiated Reclaimed Water Project ‐ Phase II  2. SCOPE OF SERVICES:  The project provides for the design and bidding services for the Imperial Way subdivision  reclaimed water distribution system and design and permitting of a CSX crossing in Kapok  Park via jack‐and‐bore of an 8‐inch raw water main and design and permitting of a section  of the same 8‐inch raw water main along SR 590 between Virginia Lane and Mission Hills  Blvd. This work order is based upon the understanding that approximately 12,600 feet of  reclaimed water distribution mains (4‐ and 6‐inch) will be designed and constructed as a  part of this project.  This work order provides for: data collection, the development of the  60 percent plans and technical specifications, the development of the 90 percent plans and  technical specifications, the development of the 100 percent plans and technical  specifications, the development of final plans and technical specifications, one (1) public  involvement meeting (including preparation), bidding assistance and the development of  addenda required.  The design plans shall be compiled using the City of Clearwater CAD  standards, as attached.                 WO Initiation Form.docx 2 of 16 8/1/2014   I ‐ PRE‐DESIGN PHASE      Task 1‐ Kick Off Meeting     URS will convene a Kick Off Meeting with the CITY within one (1) week after the  Notice to Proceed.  URS will develop the agenda for the Kick Off Meeting with input  from the CITY.  The Kick Off Meeting will discuss and document the points of  contacts within the CITY and URS, communication protocol, data requirements, the  scope of work, project schedule, milestones and submittals, and other  miscellaneous issues.     URS will prepare minutes of the Kick Off Meeting and will distribute them to the  meeting attendees.      Task 2‐ Data Collection     URS will work with the CITY of collect existing data that will benefit the project.   Examples of data required are water and sewer atlases, record drawings of existing  reclaimed water facilities associated with the design of the project.          II ‐ DESIGN PHASE      Task 1‐ Survey    URS will perform the survey work required to develop the base information and  the horizontal/vertical control for the design and construction plans.  The  approach involves field surveying of the full right‐of‐way.     A. Topographic, Tree, Utility & Jurisdiction Survey     1. Topographic Survey (12,600 L.F.)   a) Prepared in accordance with the minimum technical  standards as set forth in Chapter 5j‐17 Florida  Administrative Code.   b) Elevations within jurisdictional areas (if any) are not  included.   c) Spot elevations over the entire site on a 100‐foot grid  (approx) and in FDOT/County section 50 foot grid.   d) Mapping to extend full right‐of‐way.   e) Vertical datum will be NAVD 1988.   f) Right‐of‐way lines depicted as per tax maps, existing plats  and property corners as found in the field.   g) No title reports will be reviewed.     WO Initiation Form.docx 3 of 16 8/1/2014  h) Right‐of‐way takings not shown on tax maps will need to  be supplied by the client.   2. Tree Survey   a) Trees 4 inches in diameter breast high and larger will be  located showing common name and diameter.   b) The location of trees smaller than 4 inches or species not  protected (including ornamentals) is not included.   c) The location of trees within jurisdictional areas (if any) is  not included.   d) Tree canopies will be located.     3. Utility Survey     a. Locate surface evidence of utilities i.e. water valves,  manholes, storm structures, etc.     b. Inverts, pipe sizes and pipe material of accessible  structures will be obtained.     c. Utility provider atlases (if available) will be obtained and  utilized to depict the approximate location of underground  utility services.     d. This utility location methodology meets the requirements  of a quality level C as defined by the federal highway  administration. Utilizing this method it is not unusual to  find that 15 to 30 percent of the underground utilities are  either omitted or are plotted two feet or more in error.       Task 2‐ Geotechnical    The purpose of the geotechnical services is to provide subsurface soil conditions  and relevant geotechnical engineering properties as well as to provide  geotechnical recommendations to guide project design and construction. The  objective of the geotechnical study will be to obtain information concerning  subsurface conditions at within the project area in order to obtain data to base  engineering estimates and recommendations in each of the following areas:  Suitability of materials on‐site for use as backfill. Recommendations for  placement and compaction of approved fill materials.  General location and description of potentially deleterious materials discovered  in the borings, which may interfere with construction progress including existing    WO Initiation Form.docx 4 of 16 8/1/2014  fills or surficial organics. Identification of groundwater levels and estimation of  Seasonal High Groundwater Table (SHGWT) levels.  URS will review published soils and topographic information. This published  information will be obtained from the appropriate Florida Quadrangle Map  published by the United States Geological Survey (USGS), and the Soil Survey for  Pinellas County, published by the United States Department of Agriculture  (USDA) Natural Resources Conservation Service (NRCS).  URS will execute a program of subsurface exploration consisting of borings,  subsurface sampling and field testing. We plan to perform up to eighteen (18)  Standard Penetration Test (SPT) borings to a depth of 10 feet below existing  grade along the proposed pipeline alignments. The borings will be completed at  an average spacing of one boring per 500 to 1,000 linear feet of pipeline. In each  SPT boring, samples will be collected and SPT resistances will be measured  virtually continuously to the boring termination depth. In areas where access is  limited or utilities are present that limit the use of mechanized equipment, auger  borings may need to be substituted for the SPT borings.  URS will visually classify the samples in the laboratory using the American  Association of State Highway and Transportation Officials (AASHTO) soil  classification system. Identify soil conditions at each boring location  URS will prepare a formal engineering report in accordance with this proposal,  which summarizes the course of study pursued, the field data generated,  subsurface conditions encountered and our engineering recommendations in  each of the pertinent topic areas.      Task 3‐ Subsurface Utility Engineering    The location of potential utility conflicts is not known at this time. It is assumed  that up to twelve (12) utility conflicts will be encountered which will require  field verification by subsurface utility evaluation.      Task 4‐ Hydraulic Modelling     In order to properly size the RCW distribution piping and confirm that all RCW  connections will have adequate pressures, URS will prepare a hydraulic model for  the Imperial Way subdivision. CITY will provide the connecting pressures in the  existing 8” PVC RCW main running along Lakeview Rd. results from the hydraulic  modeling will be summarized in a Technical Memorandum.          WO Initiation Form.docx 5 of 16 8/1/2014    Task 5‐ Development of 60 Percent Plans and Technical Specifications     URS will develop the 60 percent completion level plans and technical specifications.   The plans will be plan view with detail bubbles for identified areas of potential  conflict or full profiles in areas that will require additional profile information (e.g.  Pinellas County ROW and/or FDOT ROW).  The 60 percent plans will contain: a  cover sheet, general notes and index, survey data sheet, geotechnical information  and typical details.  The 60 percent technical specifications will include those  specialty sections required for the project that are not within the CITY’s standard  specification sections.  Also the 60 percent submittal will include a preliminary bid  form, measurement and payment section, and opinion of probable construction  cost.      URS will submit ten (10) sets of the 60 percent plans, technical specification  sections and opinion of probable construction cost to the CITY for review and  comment.  URS will convene a 60 percent review meeting with the CITY to receive  review comments approximately two (2) weeks after the submission of the 60  percent documents to the CITY.  URS will prepare and distribute minutes  (comments and responses) of the 60 percent review meeting to the attendees.      Task 6‐ Development of 90 Percent Plans and Technical Specifications      From the review of the 60 percent plans, technical specifications and opinion of  probable construction cost, URS will develop the 90 percent completion level plans  and technical specifications.  The plans will be plan view with profile details for  identified areas of potential conflict or in areas that will require additional profile  information (e.g. Pinellas County ROW and/or FDOT ROW).  The 90 percent plans  will contain: a cover sheet, general notes and index, survey data sheet,  geotechnical information and typical details.  The 90 percent technical  specifications will include those specialty sections required for the project that are  not within the CITY’s standard specification sections.  Also the 90 percent submittal  will include the bid form, measurement and payment section, and opinion of  probable construction cost.     URS will submit ten (10) sets of the 90 percent plans, technical specification  sections and opinion of probable construction cost to the CITY for review and  comment.  URS will convene a 90 percent review meeting with the CITY to receive  review comments approximately two (2) weeks after the submission of the 90  percent documents to the CITY.  URS will prepare and distribute minutes  (comments and responses) of the 90 percent review meeting to the attendees.            WO Initiation Form.docx 6 of 16 8/1/2014   III ‐ FINAL DESIGN PHASE      Task 1‐ Development of 100 Percent Plans and Technical Specifications     From the review of the 90 percent plans, technical specifications and opinion of  probable construction cost, URS will develop the 100 percent completion level  plans and technical specifications.  The plans will be plan view with profile details  for identified areas of potential conflict or in areas that will require additional  profile information (e.g. Pinellas County ROW and/or FDOT ROW).  The 100 percent  plans will contain: a cover sheet, general notes and index, survey data sheet,  geotechnical information and typical details.  The 100 percent technical  specifications will include those specialty sections required for the project that are  not within the CITY’s standard specification sections.  Also the 100 percent  submittal will include the bid form, measurement and payment section, and  opinion of probable construction cost.    The 100 percent submittal will be used as supporting information for Pinellas  County permit applications.       URS will submit ten (10) sets of the 100 percent plans, technical specification  sections and opinion of probable construction cost to the CITY for review and  comment.  URS will convene a 100 percent review meeting with the CITY to receive  review comments approximately two (2) weeks after the submission of the 100  percent documents to the CITY.  URS will prepare and distribute minutes  (comments and responses) of the 100 percent review meeting to the attendees.      Task 2‐ Development of Final Plans and Technical Specifications     From the review of the 100 percent plans, technical specifications and opinion of  probable construction cost, URS will develop the final plans and technical  specifications.  The plans will be plan view with profile details for identified areas of  potential conflict or in areas that will require additional profile information (e.g.  Pinellas County ROW and/or FDOT ROW).  The final plans and technical  specifications will be ready for advertisement by the CITY for bidding by general  utility contractors.       URS will submit two (2) sets of the final plans, and specifications and opinion of  probable construction cost to the CITY for review and comment.   URS will also  submit the final plans and specifications in electronic form (AutoCAD for the final  plans and Word for the final specifications) and one signed and sealed original set  of plans.  It is anticipated that the final plans and specifications will be used by the  CITY for bidding and construction of the project.         WO Initiation Form.docx 7 of 16 8/1/2014   IV ‐ BIDDING PHASE        Task 1‐ Attendance at Pre‐Bid Conference    URS will attend the pre‐bid conference.  The purpose of URS attendance is to  answer technical questions with respect to the design.  URS will not be responsible  for questions or providing information involving the contract between the CITY and  the contractor.       Task 2‐ Preparation of Addenda    URS will prepare up to two (2) addenda during the bid phase to formally answer  bidder’s technical questions, clarify issues or adjust the bid documents prior to the  bid opening.       Task 3‐ Preparation of Addenda  From the final issued for bid plans and technical specifications, URS will prepare a  Conformed Set of plans and technical specifications.      Task 4‐ Recommendation of Award    Following bid advertisement by the CITY, URS will review the bids submitted by the  contractors and provide an award recommendation to the CITY.    V – PUBLIC INVOLVEMENT     It is anticipated that one (1) public involvement meeting will be convened during  the design of the project.  URS will attend the meeting if required and will prepare  a MS PowerPoint presentation for each meeting.  It is anticipated that the URS  presentation will include project design and configuration information, anticipated  schedule of design and construction activities, and other pertinent information for  the public.     It is also anticipated that the CITY will conduct reclaimed water user interest  surveys within the reclaimed water distribution areas to gauge potential customer  connections.  URS will assist the CITY with the surveys as required.    VI – MISSION HILLS RAW WATER MAIN    This task includes design and permitting of a CSX crossing in Kapok Park via jack‐and‐ bore of an 8‐inch raw water main and design and permitting of a section of the same  8‐inch raw water main along SR 590 between Virginia Lane and Mission Hills Blvd.  This task provides for: the development of the 90 percent plans and technical    WO Initiation Form.docx 8 of 16 8/1/2014  specifications, the development of final plans and technical specifications, bidding  assistance and the development of addenda required. The plans will be plan view  with profile. Survey will be provided by the CITY.  URS will execute a program of subsurface exploration following the same scope of  services as outlined in Task II above. URS will perform up to three (3) Standard  Penetration Test (SPT) borings; one SPT boring to a depth of 10 feet below existing  grade along the proposed pipeline alignment and two SPT borings to a depth of 30  feet below existing grade at the CSX crossing.   The location of potential utility conflicts is not known at this time. It is assumed that  up to two (2) utility conflicts will be encountered which will require field verification  by subsurface utility evaluation.   The 90 percent submittal will be used as supporting information for CSX and FDOT  permit applications.  City will prepare the FDEP construction permit for the raw water  main. FDEP final clearance application will be a part of a separate work order.  URS will attend the pre‐bid conference.  The purpose of URS attendance is to answer  technical questions with respect to the design.  URS will not be responsible for  questions or providing information involving the contract between the CITY and the  contractor.   URS will prepare up to two (2) addenda during the bid phase to formally answer  bidder’s technical questions, clarify issues or adjust the bid documents prior to the  bid opening.   From the final issued for bid plans and technical specifications, URS will prepare a  Conformed Set of plans and technical specifications.  Following bid advertisement by the CITY, URS will review the bids submitted by the  contractors and provide an award recommendation to the CITY.  3. PROJECT GOALS:   The project goals are to design and construct new reclaimed water distribution systems for  the CITY to continue to expand its reclaimed water customer base and to increase the  amount of reclaimed water used to offset potable water demand for nonpotable uses.   Additionally the increased use of reclaimed water within the CITY will also help to reduce  the amount of treated effluent that is discharge to surface waters for disposal. In addition,  the project goal is to design and construct the remaining portions of the Mission Hills 8‐ inch raw water main.   The work products developed will include the 60‐, 90‐, 100‐percent plans and technical  specifications, a final bidding set of plans and specifications, opinions of probable  construction cost, survey electronic files, geotechnical report, regulatory permit    WO Initiation Form.docx 9 of 16 8/1/2014  applications.  The plans will be drafted in AutoCAD and the text documents will be MS  Word documents.  Any public information presentations will be in MS PowerPoint.    4. BUDGET:  Attachment “B” provides the fee estimate detail. This price includes all labor and  expenses anticipated to be incurred by URS Corporation Southern for the completion of  these tasks in accordance with Professional Services Method “A” – Cost Times Multiplier  Basis, for a fee not to exceed One Hundred and Seventy Thousand Three Hundred and  Fifty Two Dollars ($170,352.00).     Permit application fees will be paid by the CITY.   5. SCHEDULE:  The design portion of the project is to be completed 180 days from issuance of notice‐to‐ proceed for the Imperial Way RCW System and 90 days for the Mission Hills Raw Water  Main.  The schedule is based upon the assumption of the CITY reviews of the project work  products will be completed in two (2) weeks from the date of submission.  The project  deliverables are to be phased as follows:    Imperial Way RCW System  60% Plans and Technical Specifications  90 calendar days  90% Plans and Technical Specifications  120 calendar days  100% Plans and Technical Specifications  150 calendar days  Final Construction Documents  180 calendar days  Bidding Assistance  TBD    Mission Hills Raw Water Main  90% Plans and Technical Specifications  60 calendar days  Final Construction Documents  90 calendar days  Bidding Assistance  TBD      WO Initiation Form.docx 10 of 16 8/1/2014  6. STAFF ASSIGNMENT (Consultant):     Officer‐in‐Charge:  Dana K. Tallman, P.E.   Project Manager:  Bozhidar Handjiev, P.E.   Engineer III:   Laurel Rowse, E.I.   Senior Designer:  Terry Sonnenberg   Admin Assistant:  Lisa Woodard    7. CORRESPONDENCE/REPORTING PROCEDURES:  ENGINEER’s project correspondence shall be directed to Bozhidar Handjiev, P.E.  All City  project correspondence shall be directed to Khang Nguyen, E.I. with copies to others as  may be appropriate.    8. INVOICING/FUNDING PROCEDURES:  Invoices for work performed shall be submitted monthly to the City of Clearwater,  Engineering Department, Attn.: Veronica Josef, Senior Staff Assistant, PO Box 4748,  Clearwater, Florida 33758‐4748.   Imperial Way RCW 0315‐96739‐561300‐533‐000‐0000 $151,084  Mission Hills RWM 0327‐96741‐561300‐533‐000‐0000  $19,268    Invoice will clearly indicate what project is being billed.    9. INVOICING PROCEDURES  At a minimum, in addition to the invoice amount(s) the following information shall be provided  on all invoices submitted on the Work Order:  A. Purchase Order Number and Contract Amount.  B. The time period (begin and end date) covered by the invoice.  C. A short narrative summary of activities completed in the time period  D. Contract billing method – Lump Sum or Cost Times Multiplier  E. If Lump Sum, the percent completion, amount due, previous amount earned and total  earned to date for all tasks (direct costs, if any, shall be included in lump sum amount).  F. If Cost Times Multiplier, hours, hourly rates, names of individuals being billed, amount due,  previous amount earned, total earned to date for each task and other direct costs (receipts    WO Initiation Form.docx 11 of 16 8/1/2014  will be required for any single item with a cost of $50 or greater or cumulative monthly  expenses greater than $100).  G. If the Work Order is funded by multiple funding codes, an itemization of tasks and invoice  amounts by funding code.       10. SPECIAL CONSIDERATIONS:  The consultant named above is required to comply with Section 119.0701, Florida Statutes  (2013) where applicable.      PREPARED BY: APPROVED BY:  ________________________ ________________________  Dana K. Tallman, PE, BCEE Michael D. Quillen, PE  Vice President City Engineer  URS Corporation Southern City of Clearwater  ___________________ ___________________  Date Date    WO Initiation Form.docx 12 of 16 8/1/2014  Attachment “A” WORK ORDER INITIATION FORM CITY OF CLEARWATER DELIVERABLES STANDARDS FORMAT: The design plans shall be compiled utilizing one of the following standards:  City of Clearwater CAD standards or Consultant’s CAD standards (please provide all supporting  documents when utilizing Consultant’s Standards).  DATUM: Horizontal and Vertical datum shall be referenced to North American Vertical Datum of 1988 (vertical)  and North American Datum of 1983/90 (horizontal). The unit of measurement shall be the United States  Foot. Any deviation from this datum will not be accepted unless reviewed by City of Clearwater  Engineering/Geographic Technology Division.  DELIVERABLES: A minimum of two (2) signed and sealed Plans and Contract Documents (specifications book) labeled  “ISSUED FOR BID” shall be provided at the onset of the bid phase, as well as electronic copies. Electronic  plan copies in PDF and CAD and electronic contract documents in PDF and MS Word.   The design plans shall be produced on bond material, 24" x 36" at a scale of 1" = 20’ unless approved  otherwise. The consultant shall also deliver all digital files in CAD drawing format and PDF format  together with all project data in AutoCAD Civil 3D file format. All references, such as other drawings  attached, images and graphic files, custom fonts and shapes shall be included in hard copy and  electronic copy.    Prior to the City Council award date, a minimum of two (2) copies of signed and sealed plans and  contract documents (specifications book) labeled “CONFORMED” shall be provided. All revisions made  during the bid phase shall be included in the plan sets and noted in the revision block or as a footnote.  Copies of each Addendum shall be included at the front of the contract and all revisions made during the  bid phase shall be incorporated into the Contract Documents.  Electronic copies of “CONFORMED” plans (PDF and CAD) and contract documents (PDF and MS Word)  shall be provided prior to the City Council award date.  NOTES:  If approved deviation from using Clearwater CAD standards, the consultant shall include all  necessary information to aid in manipulating and printing/plotting the drawings. Please address  any questions regarding file format to Mr. Tom Mahony, Geographic Technology Manager, at  (727) 562‐4762 or email address: tom.mahony@myclearwater.com.       WO Initiation Form.docx 13 of 16 8/1/2014  Attachment “B”  IMPERIAL WAY RECLAIMED WATER PROJECT (XXX) URS CORPORATION SOUTHERN WORK ORDER INITIATION FORM PROJECT BUDGET Task Description Subconsultant Labor Total Services  1 Pre‐Design  1.1 Kick‐Off Meeting  $1,716  $1,716  1.2 Data Collection  $1,573  $1,573    $3,289  2 Design  2.1 Survey $48,200 $1,650  $49,850  2.2 Geotechnical $10,000 $1,650  $11,650  2.3 Subsurface Utility Engineering $8,450 $1,650  $10,100  2.4 Hydraulic Modelling  $2,662  $2,662  2.5 Development of 60 Percent Plans & Specs  $24,497  $24,497  2.6 Development of 90 Percent Plans & Specs  $16,742  $16,742    $115,501  3 Final Design Plans and Specifications  3.1 Development of 100 Percent Plans & Specs  $10,714  $10,714  3.2 Development of Final Plans & Specs  $7,524  $7,524    $18,238  4 Bidding   4.1 Pre‐Bid Conference  $506  $506  4.2 Preparation of Addenda  $2,893  $2,893  4.3 Recommendation of Award  $506  $506    WO Initiation Form.docx 14 of 16 8/1/2014    $3,905  5 Public Involvement  5.1 Public Involvement  $8,151  $8,151         $8,151  6 Mission Hills Raw Water Main  6.1 Geotechnical $4,650 $0  $4,650  6.2 Subsurface Utility Engineering  $1,500 $0 $1,500 6.3 Development of 90 Percent Plans & Specs  $6,529  $6,529  6.4 Development of Final Plans & Specs  $2,184  $2,184  6.5 Bidding Services  $3,905  $3,905    $18,768  Subtotal, Labor and Subcontractors $167,852  Other Direct Costs (prints, photocopies, postage, etc.)  $2,500             (Not applicable to lump sum Work Orders)      Grand Total $170,352   Attachment “C”   WO Initiation Form.docx 15 of 16 8/1/2014  REVIEW PERIOD SUBMITTAL REQUIREMENTS   This list is intended as a guideline of the items to be completed at various levels of project completion.  The specific list for each project shall be finalized in the work order.     30% Construction Plans Requirements for the 30% submittal shall include the following:   Cover Sheet,  Legend and Abbreviations per City standards,  Key Sheet,  Demolition Plans indicating existing improvements, utilities, and topography, and identification of  trees to be removed,  Preliminary layout of the proposed improvements, existing right‐of‐way and easements,  subdivision, block, and lot number, and plat book and page for adjacent parcels,  Engineer’s/Architect’s preliminary opinion of probable construction cost, based on the 30 %  submittal.      60% Construction Plans In addition to the items in the 30% submittal, requirements for the 60% submittal shall include the  following:     General Construction Notes related to best management practices, utilities, and other conditions  relevant to the project,  Typical pavement sections shall indicate typical cross sectional slopes, median improvements,  pavement requirements, right‐of‐way lines, sidewalks, curbs, gutters, and landscaped areas,  Grading, Paving, and Drainage detail sheets, including standard and nonstandard stormwater  management structures, retaining walls, and related notes,  Erosion control and tree protection details, including best management practices applied to the  project,  Existing private utilities, as available, such as gas, electrical, telephone, fiber optic, and cable TV,  Detailed Cross Sections,  Wetland Planting Plans and Details,  Utility Plan including utility relocation/adjustment details indicating utility conflicts, relocation  design, proposed utility structures, and conflict manholes, design details, and specific profiles, if  required,  Permit Applications,  Estimated construction quantities,   Engineer’s/Architect’s updated opinion of probable construction cost and duration based on the  60% design submittal, and  Engineer/Architect will review City’s standard technical specifications and modify or supplement as  necessary for the project.     Attachment “C”   WO Initiation Form.docx 16 of 16 8/1/2014  90% Construction Plans The 90% construction plans shall include the design items required for the construction of the  project, including the special provisions and technical specifications.  In addition to the items in the  60% submittal, requirements for the 90% submittal shall include the following:  a. Maintenance of Traffic Plan,   b. Structural plans, details, and calculations, including design and details of shallow  foundations, pedestrian bridge abutments, retaining walls, structural reinforcing, tiebacks,  and stability analyses for slopes and retaining walls,   c. Detailed construction quantities based upon 90% design,  d. Engineer’s/Architect’s updated opinion of probable construction cost and duration based  on the 90% design submittal, and  e. Technical specifications and Special Provisions.    Final (100%) Construction Documents The 100% submittal shall address the City’s final review comments.    Engineering Projects prepared and/or submitted shall be reviewed and checked by a civil engineer  registered in the state of Florida as the Engineer of Record.  The Engineer of Record shall sign, seal  and date the design calculations, technical specifications and contract drawings as required by  Florida law.    See Attachment “A” – Deliverables – for specific labeling requirements.      PROJECTLOCATION KEENE RD BELLEAIR RD NURSERY RD HERCULES AVE LAKEVIEW RD VIEWTOP DR STANCEL DR FAIRFIELD DR HUNT LN HIGHFIELD DR EASTFIELD DR BUGLE LN BRENTWOOD DR WEBER DR HAMLIN DR OAK LN SEVER DR DEXTER DR HUNTER LN WOODCREST AVE BEVERLY DR MAGNOLIA DR SANDRA DR BURNICE DR MORROW DR DOROTHY DR BROOKSIDE RD WHITACRE DR IRVING AVE PENNY LN DOUGLAS DR BEVERLY CIR KENDALL DR REBECCA DR JEFFORDS ST WELLINGTON DR FAULDS RD OAKADIA DR FOX CIR MEADOW LN REDCOAT LN RIPON DROAK LAKE DR NORTHWOOD DR WOODLEY RD LEES CT ERNEST RD NORMANDY RD SOUTHWOOD LN YULEE DR GREAT OAK DR UNIVERSITY DR PRICE CIR BELLEAIR LN EMERALD DR BEL-KEENE DR OAKADIA LN GRACELYN DR BELL CHEER DR VIOLA DR REGENT AVE WINDING WAY MEADOW DALE DR WOODRUFF AVE P O I N CIA N A D R ALEMANDA DR BROOKSIDE DR RESERVE BLVD OAK GROVE DR B E L L D R CANTERBURY RD BELLEAIR CT MARTHA LN WINFIELD CIR JEFFORDS ST RIPON DR FAULDS RD WOODCREST AVE DEXTER DR MAGNOLIA DR CANTERBURY RD EMBASSY DR AMBASSADOR DR CORONET LN DIPLOMAT DR IMPERIAL WAY KURT LN ENVOY CT ATTACHE CT COLLEGE DR UNIVERSITY CT DRUM ST CATALINA DR BARCELONA DR PLEASANT PKWY GATEWAY DR GATEWAY DR OXFORD DR SEVARD AVE WILLOWBRANCH AVE WINFIELD RD WINFIELD RD LAKEVIEW RD CANTERBURY RD REBECCA DR SAND R A D R JEFFORDS ST EMERALD DR LOCATION MAP ²Prepared by:Engineering DepartmentGeographic Technology Division100 S. Myrtle Ave, Clearwater, FL 33756Ph: (727)562-4750, Fax: (727)526-4755www.MyClearwater.com CRM K_N N.T.S.308/316B 24-29s-15e08/18/2014Map Gen By:Reviewed By:S-T-R:Grid #:Date:Scale: 14-0038-UT Reclaimed Water 2015Imperial Park Document Path: V:\GIS\Engineering\Location Maps\14-0038-UT Reclaimed Water 2015 Imperial Park.mxd PROJECTSITEPROJECTSITE MISSIO N HILLS CO NDO ASSN. SR 590 McMULLEN-BOOTH RD ST. CROIX DR ST. JOHN DR CATHERINE DR EDENWOOD ST VIRGINIA LN MOSS AVE FAIRWOOD AVE PARK TRAIL LN GROVE DR BAYVIEW AVE MERRILL AVE LAWRENCE DR CALAMONDIN LN EL TRINDAD DR SUE DRSARAH DR GLEN OAK AVE GRAND VIEW AVE GRAPEFRUIT CIR LORI DR GRANTWOOD AVE JADEWOOD AVE LAKE VISTA DR KAPOK CIR HOLLYWOOD AVE BRIGADOON DR KAPOK KOVE DR THOMAS RD ST. ANTHONY DR KAPOK KOVE CIR SAN MATEO ST LEONARD DR COUNTRY LN TERRACE VIEW LN DOVEWOOD ST APPLEWOOD DR ABBEY CT CANDLEWOOD ST SAN BERNADINO ST SPRING LAKE DR HOMEWOOD ST TERRACE DR RUTH ECKERD HALL DR LAKE CIR SARAH DR MISSION HILLS BLVD MISSION DR MI S S I O N D R FLINT DR FLINT DR MISSION CIR MISSION CIR FEATHER DR FEATHER DR MELONWOOD AVE ARROWHEAD CIR NUTWOOD S T KINGSWOOD DR LEMONWOOD ST ABBEY CRESCENT LN NAVEL DR CLEARWATER-SAFETY HARBOR DR AVOCADO DR KUMQUAT DR BRIGADOON CIR SHADDOCK DR SAN JOSE ST SAN PEDRO ST KAPOK KOVE CT BAYVIEW AVE LOCATION MAP ²Prepared by:Engineering DepartmentGeographic Technology Division100 S. Myrtle Ave, Clearwater, FL 33756Ph: (727)562-4750, Fax: (727)526-4755www.MyClearwater.com CRM KN N.T.S.273B 08-29s-16e11/13/2014Map Gen By:Reviewed By:S-T-R:Grid #:Date:Scale: WATER TREATMENT PLANT #2RAW WATER TRANSMISSION MAIN EXTENTION Document Path: V:\GIS\Engineering\Location Maps\water treatment plant #2 permit Khang.mxd Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-698 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Engineering Department Agenda Number: 7.2 SUBJECT/RECOMMENDATION: Accept two Drainage Easements conveyed by owners of property at 20000 and 20162 US Highway 19, North to improve an existing drainage ditch. (consent) SUMMARY: The City is planning improvements to a drainage ditch along the boundary of two adjacent properties. Property at 20000 US Highway 19 North is owned by A. and S. Kulach, Inc. and is the current location of Quality Inn Central Clearwater. Property at 20000 US Highway 19 North is owned and occupied by South Gate Home Owners, Inc. Both property owners have agreed to donate a drainage easement to the City to improve the drainage feature. Page 1 City of Clearwater Printed on 11/26/2014 Proposed Drainage Easements US-19 N DRUID RD GULF-TO-BAY BLVD BYPASS DR SEVILLE BLVD BURNICE DR ALTIRA DR TROPIC HILLS DR CARACAS AVE FRUITLAND AVE DRIFTWOOD AVE EVERGLADES AVE LOCATION MAP ²Prepared by:Engineering DepartmentGeographic Technology Division100 S. Myrtle Ave, Clearwater, FL 33756Ph: (727)562-4750, Fax: (727)526-4755www.MyClearwater.com JB CL N.T.S.299B 18-29s-16e11/14/2014Map Gen By:Reviewed By:S-T-R:Grid #:Date:Scale: Proposed Drainage Easement20000 & 20162 US Highway 19 N Document Path: V:\GIS\_Staff\Jim_B\Projects\Chuck Lane\20000_20162 US 19 D.Easement.mxd Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-699 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Engineering Department Agenda Number: 7.3 SUBJECT/RECOMMENDATION: Approve a Work Order to Engineer of Record King Engineering Associates, Inc. for Engineering Services for Clearwater Memorial Causeway Subaqueous Pipelines $336,746.00, and authorize the appropriate officials to execute same. (consent) SUMMARY: The requested $336,746.00 authorization under this Work Order is for professional engineering services for the, Design, Permitting, and Bidding of the Clearwater Memorial Causeway Subaqueous Pipelines. This project includes two separate pipelines: A replacement 20-inch sanitary sewer force main across Clearwater Harbor from Bayway Blvd. to State Road 60 (approximately 2,500 feet), and a new 20-inch pipeline across the Intracoastal Waterway from the Memorial Causeway to Drew Street for future use as either a sanitary sewer force main, water main, or reclaimed water main (approximately 2,700 feet). Due to the critical nature of subaqueous pipelines, staff has been preparing contingency plans to address a potential pipeline failure, which would cause utility service disruption to Clearwater Beach, Island Estates and Sand Key. It has been determined that replacement of the Bayway sewer main is advised and that we should install a back -up subaqueous pipeline from the mainland to the causeway allowing staff the flexibility to quickly restore potable water, sanitary sewer or reclaimed water service to the beach communities. The replacement 20-inch force main will replace an existing sanitary sewer force main in the same general location that is nearing the end of its useful life. The new 20-inch pipeline will provide operational reliability and assurance in the event of a pipeline failure or third party damage incident. This pipeline will allow for restoration of utility service to Island Estates, Clearwater Beach and Sand Key in days rather than weeks in the event of an emergency. The scope of services includes the survey, design, environmental /ecological assessment, Sovereign Submerged Land Easement, Public Information Meetings and bidding assistance. King Engineering Associates, Inc. is an Engineer-of-Record for the City of Clearwater. APPROPRIATION CODE AND AMOUNT: 0327-96665-561300-535-000-0000 Funding is available in Utility Renewal and Replacement project 0327-96665, Sanitary Sewer R and R. Page 1 City of Clearwater Printed on 11/26/2014 C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 1 of 15 11/12/2014 King Engineering Associates, Inc. WORK ORDER INITIATION FORM for the CITY OF CLEARWATER Date:November 12, 2014 Project Number:2110-214-000 City Project Number:14-0041-UT Plan Set Number:2014053 1.PROJECT TITLE: Clearwater Memorial Causeway Subaqueous Pipelines Project 2.SCOPE OF SERVICES: The City of Clearwater (City) has requested King Engineering Associates, Inc. (King) to design, permit, and prepare construction plans for the installation of the following: A replacement force main across Clearwater Harbor from Bayway Blvd. to State Road (S.R.) 60 (approximately 2,500 LF); A new 20-inch pipeline across the Intracoastal Waterway from the Memorial Causeway to Drew Street; for future use as either a force main, water main, or reclaimed water main (approximately 2,700 LF). The existing force main across Clearwater Harbor from Bayway Blvd. to S.R. 60 is a 20-inch force main. The original utilities that paralleled the Causeway included the following: 16-inch Molox Joint Water Main (1958) 20-inch Ball Joint Water Main (1991) 16-inch Cast Iron Water Main (1961) 20-inch Force Main (unknown age) C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 2of 15 11/12/2014 In 1999, as part of the “Island Estates Reclaimed Water Main Project”, the City installed a new 16-inch ductile iron reclaimed watermain along the Causeway, connected it to the existing 16- inch Molox Joint water main and converted the 16-inch Molox joint watermainto reclaimed water service. In 2003, the City installed several new pipelines parallel with the Causeway to Drew Street via horizontal directional drill as follows: 20-inch HDPE Force Main (installed in 2003) 18-inch HDPE Water Main (installed in 2003) 18-inch HDPE Reclaimed WaterMain (installed in 2003) 6-inch HDPE Gas Main (installed in 2003) As part of the work that was completed in 2003, the existing 16-inch Cast Iron Water Main (1961)and the 20-inch Ball Joint Water Main (1991) were abandonedand the 20-inch force main (unknown age)that is located on the south of the side the Causeway was grouted and abandoned. Therefore, the only utilities that are in-servicealong the Causeway are as follows: 20-inch HDPE Force Main (installed in 2003) 18-inch HDPE Water Main (installed in 2003) 18-inch HDPE Reclaimed WaterMain (installed in 2003) 6-inch HDPE Gas Main (installed in 2003) ThisWork Order authorizes King to provide planning, design, permitting and other services related topreparing Contract Documents for advertisement for public bid. The design plans will be compiled using the City of Clearwater DeliverablesStandards, as referenced in Attachment “A”. I.PRE-DESIGN PHASE Task 1.1 -Project Coordination King will provide the following services throughout the Pre-Design and Final Design Phases: A.Prepare a project specific Project Management Plan (PMP) establishing team members and responsibilities, lines of communication, project delivery schedules and project budgets. B.Coordinate the activities of the King’s staff and subconsultants with those of the City and administer communications among the project team members and with the City’s staff. C.Prepare for and attend status meetings during the30%, 60%, and 90% design phasesof the work. C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 3of 15 11/12/2014 D.Maintain and update monthly project schedules and status reports. E.Administer a quality assurance program covering the technical work of the project team. Task 1.2–Geotechnical Services A geotechnical exploration program will be conducted within the project area. Specifically, the geotechnical program scope includes: A.Five (5) Standard Penetration Test (SPT) borings will be conducted in waterto a depth of ±50 feet below the mudline surface as follows: Three (3)SPT boringslocated in the water between Bayway Blvd. and State Road (S.R.) 60 Two (2) SPT borings located in the water between S.R. 60 and Drew Street Four(4)SPT borings to a depth of 50 feet on the landward side of the project areaas follows: One (1) SPT boring located at the vacant lot on Bayway Blvd. One(1)SPT boring located on the south side of S.R. 60and one (1) SBT boring on the North side of S.R. 60 on the West side of the Intracoastal Waterway. One (1) SPT boring adjacent to Drew Street Laboratory classification tests will be performed on representative samples including grainsize analyses, Atterberg limits and organic content tests. Corrosivity testing will not be required. B.The results of the field and laboratory studies will be included in a signed and sealed geotechnical report. The report will also include recommendations for dewatering, an evaluation of the suitabilityof existing soils forHDD,backfill purposes and recommendations for compaction requirements. Task 1.3–Surveying Topographic survey services will perform in the areas listed below using the following surveying methods: The vacant lot on Bayway Blvd.: Conventional Ground Survey. S.R. 60 tie-in: Conventional Ground Survey. C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 4of 15 11/12/2014 Drew Street tie-in: Conventional Ground Survey. The water bottom between Bayway Blvd. and S.R. 60: Bathymetry, 2,100 feet long and 200 feet wide. The North side of S.R. 60 West of the Intracoastal Waterway tie-in Conventional Ground Survey. The water bottom between Drew Street and the Causeway: Bathymetry, 1,500 feet long and 200 feet wide. A.The topographic survey will be referenced to the North American Vertical Datum of 1988 (vertical) and North American Datum of 1983/90 (horizontal) and made in accordance with the Minimum Technical Standards set forth in Chapter 5J-17 of the Florida Administrative Code. The survey will include the following: Invert elevations and pipe sizes on manholes, storm drains and other structures that are accessible according to the requirements of OSHA regulations. Location of existing above ground utilities and above ground evidence of underground utilities. Above ground features within the proposed corridor, grade breaks, fences, walls, driveways, trees 5” diameter and above (including tree canopies) and outline bushes or shrubs. If a tree is beyond the right-of-way, but its canopy extends into the right-of-way it will be located. Establish temporary bench marks along the portion of the route, by conventional methods utilizinglocal permanent bench marks as published by National Geodetic Survey and the City of Clearwater. Location of the right-of-way monumentation along the route. Cross-sectioning the Intracoastal Waterway bottom at approximately 50 foot intervals. Establish the Mean High Water (MHW) Line Elevation at the Causeway, Bayway Blvd. site and Drew St. site. Development of a specific purpose jurisdictional survey for the wetland/surface water and MHW lines. C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 5of 15 11/12/2014 Development of a sketch and legal description for use in obtaining an easement for the pipelines across the Intracoastal Waterway. Development of a sketch and legal description for use in obtaining a temporary construction easement at vacant lot on Bayway Blvd. Locating land-based geotechnical test borings. Task 1.4–Subsurface Utility Engineering and Utility Coordination A.Subsurface Utility Engineering Subsurface Utility Engineering (SUE) services will be provided to locate, confirm depth and sizeofexisting utilities unable to be located by conventional surveying and in potential conflict with the proposed pipeline alignment. A total of 20vacuum excavated holes are included in the fees along with surveying in the hole locations. B.Utility Coordination Plans of the proposed pipeline alignments will be sent to utility companiesknown to be in the project areaat 30, 60, 90 and 100 percent submittals. Utilities will be requested to locate and draw their facilities on these plansor note “no conflicts” and return one copy to King. This information will be combined with above ground visible data and SUE data to estimate the location of existing utilities. Three (3) meetings have been included to review the alignment with various utility ownersalong the pipeline alignment. Task 1.5–Environmental Services A.Preliminary Listed Species Assessment King Environmental Scientists will conduct a preliminary ecological assessment of the proposed project area, the purpose of which is to identify sensitive ecological features, marine resources or potential listed species involvements as it relates to potential permitting constraints forthe project. A brief memorandum of findings will be prepared summarizing the results of the field reconnaissance and GIS or literature database searchesalong with a preliminary determination of effect on implicated species. In the event that initial or follow-up wildlife surveys detect the presence of listed species within the project area, such that proposed project activities may affect such species, it will be necessary to coordinate with the FWC, USFWS and/or other regulatory agencies to determineif anyadditional surveys are required. Because the extent of these subsequent surveys cannot be predicted at this time, they are not included in the proposed fees. C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 6of 15 11/12/2014 B.Jurisdictional Wetland/Surface Water Determination King’sEnvironmental Scientists will locate and determine the approximate extent of regulatory wetland/surface water jurisdiction within the project limits. Since the proposed project is situated adjacent to (and under) the Intracoastal Waterway and across portions of Clearwater Harbor, the extent of regulatory wetland/surface water jurisdiction will minimally be established using the Mean High Water (MHW) elevation in the vicinity of the project area. If preliminary field review reveals the presence of wetlandsabove the established MHW elevational contour as shown on the plans, the Kingwill delineate and GPS/survey locate such wetland areas inestablishingthe more landward limits of regulatory jurisdiction as applicable based on local, state and federal agency criteria. Task 1.6–Preliminary Design Plans and Memorandum A.Preliminary Design Plans Preliminary Design Plans will be prepared. It is anticipated that these drawings will include only plan views and will show pertinent survey data, jurisdictional lines, apparent right-of-way lines, existing utility data, a proposed pipeline route, proposed easements, interconnection points, and preliminary maintenance of traffic techniques. The Preliminary Design Plans will serveas the 30% Design and will be submitted for City review along with a PreliminaryDesign Memorandum discussed below. B.King will develop a Preliminary Design Memorandum forthe proposed pipelines, which will include and address the following: Confirmation of existing pipeline configurations Proposed alignments and alternatives considered Materials of construction Methods of construction (open cut, directional drill, etc.)and Horizontal Directional Drill calculations Construction staging/Construction phasing Maintaining service during construction Available rights-of-way and easements required Summary of coordination with other utility owners C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 7of 15 11/12/2014 Environmental impacts/considerations Permitting requirements Estimated construction costsand construction duration The Preliminary Design Plans and Memorandum will be presented to the Cityand the FDOT at a preliminary design briefing attended by King’s Project Manager, Environmental Scientist and Project Engineer. Comments received will be incorporated into the Preliminary Design Memorandum and the memorandum will be finalized. Comments on the Preliminary Design Planswill be incorporated into the 60% Design Documents. II.FINAL DESIGN PHASE Task 2.1–Design Document Development King will develop biddable drawings and specifications for construction of the proposed pipelines. A.Final Design Plans, Technical Specifications andConstructionCost Estimate Cover Index and Notes Stormwater Pollution Prevention Plan Pipeline Key Sheet Force Main1”=20’ Plan and Profiles (5sheets) StandbyMain 1”=20’ Plan and Profiles(6sheets) Interconnection Plans and Sections Force Main System Details StandbyMain System Details Miscellaneous Details Restoration Plans Maintenance of Traffic and Pedestrian Control Plans Documents will be submitted to the City at the 60% and 90% complete levels along with estimates of probable construction costs. Front end technical specifications will be developed using the City’s standard documents. King will meet with the City after each submittal to review and respond to the City’s comments. C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 8of 15 11/12/2014 Task 2.2–Permitting King willprovide permitting services, which will includes attending pre-application meetings, submitting permit application packages and responding to Requestsfor Additional Information (RAI)to obtain the following permits: A.Attend one (1)pre-application meetingswith FDEP, FDOT and the U.S. Army Corps of Engineers B.FDEP Application for a Specific Permit to ConstructPWS Components C.FDEP Notification/Application For Constructing A Domestic Wastewater Collection/Transmission System D.FDOT Utility Permit E.FDEP StateWide Environmental Resource Permit (SWERP) F.FDEP Sovereign Submerged Land Easement Activities located on sovereignty submerged lands (as defined in subsection 18-21.003, F.A.C.,) typically require a proprietary authorization from the Board of Trustees of the Internal Improvement Trust Fund (Board of Trustees) to use such lands under Chapter 253, F.S., and Chapter 18-21, F.A.C., and, if located in an aquatic preserve, Chapter 258, F.S., and Chapter 18-18 or 18-20, F.A.C. When noticing is required under Section 253.115, F.S., for activities requiring a lease or easement in, on, or over state-owned submerged lands, the FDEP in representing the Board of Trustees of the Internal Improvement Trust Fund requires noticing of all property owners within a 500-foot radius of the easement limits. Based on preliminary record searches in the GIS databases that revealed no existing easements present and the projects location within the Pinellas County Aquatic Preserve, it is assumed that an FDEP Sovereign Submerged Land (SSL) Easement will be required concurrent with the SWERP process. In support of obtaining the easement King will perform the following: Additional records search and coordination with FDEP SSL Division regarding a determination of the extent of SSL involvement and the resulting proprietary authorization required if any. Prepare an aquatic resource assessment of the effected shoreline(s) and the approximate extent of submerged aquatic vegetation (SAV) or other sensitive marine resources present in the project corridor based on available agency mapping products only(e.g. no in-water assessmentor mapping by King). C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 9of 15 11/12/2014 Prepare a brief narrative within the SWERP application package to address the required public interest criteria associated with obtaining authorization to use SSL within an Aquatic Preserve. Provide a list of names and addresses from the latest county tax assessment roll in mailing label format to FDEP to facilitate their notification of all property owners within a 500-foot radius of the proposed lease or easement boundary. G.U.S. Army Corps of Engineers Nationwide Dredgeand Fill Permit Because the proposed subaqueous crossing north of the Memorial Causeway Bridge will traverse the Gulf Intracoastal Waterway (GICWW) a federally maintained channel,the project falls under both the regulatory and proprietary jurisdiction of the U.S. Army Corps of Engineers (USACE). As a result, the Consultant will prepare an U.S. Army Corps of Engineers (USACE) Nationwide Permit (NW 12) as appropriate in accordance with current Corps regulatory guidelines and respond to up to two rounds ofagency questions necessary to obtain approval for the permit. This task also includes coordination with the USACE Jacksonville Office real estate and operations divisions related to design criteria associated with GICWW easement requirements and hydrographic survey data. This scope includes the preparation and submittal of the permit application, Corps Preliminary JD Form and supporting narratives along with 8½” x 11" exhibits. In addition, the Consultant will prepare an easement legal description and assist the City in executing the required USACE Consent to Easement to use the Corpsof Engineers Right- of-Way. H.The following permit application fees have been included: FDEP Notification/Application For Constructing A Domestic Wastewater Collection/Transmission System: $500.00 FDEP Application for a Specific Permit to Construct PWS Components: $650.00 FDEP State Wide Environmental Resource Permit (SWERP): $1,500.00 In accordance with Section 166-248 of the Pinellas County Land Development Code, since the proposed project will employ horizontal directional drill methods to facilitate a subaqueous crossing of Waters of the Pinellas County such utility projects are considered exempt from requirement to obtain a Dredge and Fill Permit from the Pinellas County Water & Navigation Control Authority. It is further assumed that the project will not involve any C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 10of 15 11/12/2014 activities having an impact to the water column or substrate within County, State or Federal waters. Building permits and dewatering permitswill be obtained by the contractor. Task 2.3–Public Relations Assistance King will assist the Clearwater Public Communications Department by providing the following services: A.Attending two(2) Public Relations/Information meetings; B.Assistance with developing handouts or flyers to be distributed by the City; C.Preparing maps, exhibits and/or PowerPoint presentations for use at the above meetings. III.BIDDING PHASE Task 3.1 -Bid Documents and Bidding and Award Assistance King will assistthe City with advertisement, bidding and award of the project including: A.Submitting final Bid Documents including: Two (2)signed and sealed copies of the project drawings and technical specifications; One (1) unbound reproducible set of the technical specifications; One (1) CD-ROM containing the project drawings in AutoCAD format and the technical specifications in Word format; One (1) CD-ROM containing the Bid Documents in PDF format; The final Engineer’s Opinion of Probable Construction Costand construction duration. B.Attending the pre-bid meeting and site visit; C.Preparing up to two (2) Addenda/answer questions; D.Reviewing the bids, evaluating the apparent low bidder and providing recommendation of contract award. C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 11of 15 11/12/2014 Task 3.2 –Prepare Conformed Contract Documents A.Prepare and submit four (4) signed and sealed sets of conformed contract documents 3.PROJECT GOALS: Project deliverables will include the followingand those referenced in Attachment A: 1.Three (3) copies ofthe Preliminary Listed Species Assessment; 2.Three (3) copies of the Geotechnical Report; 3.Five (5) 24”x36” copies and two (2) 11”x17” copy of the 30% drawings;Five (5) copies of the Preliminary Design Memorandum;One (1) CDROM containing the Plansand Preliminary Design Memorandumin PDF format. 4.Five (5) 24”x36” copies and two (2) 11”x17” copy of the 60% drawings; Five (5) copies of the 60% Technical Specifications; One (1) CDROM containing the Plans and Technical Specifications in PDF format. 5.Five (5) 24”x36” copies and two (2) 11”x17” copy of the 90% drawings;Five (5) copies of the 90% Technical Specifications; One (1) CDROM containing the Plans and Technical Specifications in PDF format. 6.One (1) full copy of all permit application packages and RAI responses; 7.Bid Documents as described above. 8.Meeting minutes in PDF format by email. 4.BUDGET: This price includes all labor and expenses anticipated to be incurred by King Engineering Associates, Inc. for the completion of these tasks in accordance with Professional Services Method “A” –Cost Times Multiplier Basis, for a fee not to exceedThreeHundredThirty-Six Thousand Seven Hundred Forty-SixDollarsand Zero Cents($336,746). 5.SCHEDULE: The project is to be completed 395days from issuance of notice-to-proceed. The project deliverables are to be phased as follows: 30% construction plans 120calendar days 60% construction plans and permit applications 180calendar days 90% construction plans 365calendar days Final construction documents 395calendar days C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 12of 15 11/12/2014 6.STAFF ASSIGNMENT (Consultant): Principal:Christopher F. Kuzler, P.E. Project Manager:Loc P. Truong, P.E. Project Engineers:Christopher High E.I., Timothy Palmer, E.I. Designers:Mark Gladbach, Frank Paul, Chanta Sengaroun Clerical:Paula Eldon 7.CORRESPONDENCE/REPORTING PROCEDURES: Engineer’s/Architect’sproject correspondence shall be directed to:Loc P. Truong, P.E. All City project correspondence shall be directed to: Kelly J. O'Brienwith copies to others as may be appropriate. 8.INVOICING/FUNDING PROCEDURES: Invoices for work performed shall be submitted monthly to the City of Clearwater, Engineering Department, Attn.:Veronica Josef, Senior Staff Assistant,PO Box 4748, Clearwater, Florida 33758-4748.Contingency services will be billed as incurred only after written authorization is provided by the City to proceed with those services. City Invoicing Code: 0327-96665-561300-535-000-0000 9.INVOICING PROCEDURES At a minimum, in addition to the invoice amount(s) the following information shall be provided on all invoices submitted on the Work Order: A.Purchase Order Number and Contract Amount. B.The time period (begin and end date) covered by the invoice. C.A short narrative summary of activities completed in the time period. D.Contract billing method –Lump Sum or Cost Times Multiplier. E.If Lump Sum, the percent completion, amount due, previous amount earned and total earned to date for all tasks (direct costs, if any, shall be included in lump sum amount). F.If Cost Times Multiplier, hours, hourly rates, names of individuals being billed, amount due, previous amount earned, total earned to date for each task and other direct costs (receipts will be required for any single item with a cost of $50 or greater or cumulative monthly expenses greater than $100). G.If the Work Order is funded by multiple funding codes, an itemization of tasks and invoice amounts by funding code. 10.SPECIAL CONSIDERATIONS: The consultant named above is required to comply with Section 119.0701, Florida Statutes (2013) where applicable. C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 13of 15 11/12/2014 PREPARED BY:APPROVED BY: __________________________________________________________ Christopher F. Kuzler, P.E.Michael D. Quillen, PE Sr. Vice President City Engineer King Engineering Associates, Inc.City of Clearwater ______________________________________ Date Date Attachment “A” C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 14of 15 11/12/2014 WORK ORDER INITIATION FORM CITY OF CLEARWATER DELIVERABLES STANDARDS FORMAT: The design plans shall be compiled utilizing one of the following standards: City of Clearwater CAD standards or Consultant’s CAD standards (please provide all supporting documents when utilizing Consultant’s Standards). DATUM: Horizontal and Vertical datum shall be referenced to North American Vertical Datum of 1988 (vertical) and North American Datum of 1983/90 (horizontal). The unit of measurement shall be the United States Foot. Any deviation from this datum will not be accepted unless reviewed by City of Clearwater Engineering/Geographic Technology Division. DELIVERABLES: A minimum of two (2) signed and sealed Plans and Contract Documents (specifications book) labeled “ISSUED FOR BID” shall be provided at the onset of the bid phase, as well as electronic copies. Electronic plan copies in PDF and CAD and electroniccontract documents in PDF and MS Word. The design plans shall be produced on bond material, 24" x 36" at a scale of 1" = 20’ unless approved otherwise.The consultant shall also deliver all digital files in CAD drawing format and PDF format together with all project data in AutoCAD Civil 3D file format. All references, such as other drawings attached, images and graphic files, custom fonts and shapes shall be included in hard copy and electronic copy. Prior to the City Council award date, a minimum of two (2) copies of signed and sealed plans and contract documents (specifications book) labeled “CONFORMED” shall be provided. All revisions made during the bid phase shall be included in the plan sets and noted in the revision block or as a footnote. Copies of each Addendum shall be included at the front of the contract and all revisions made during the bid phase shall be incorporated into the Contract Documents. Electronic copies of “CONFORMED” plans (PDF and CAD) and contract documents (PDF and MS Word) shall be provided prior to the City Council award date. NOTES: If approved deviation from usingClearwater CAD standards, theconsultant shall include all necessary information to aid in manipulating and printing/plotting the drawings. Please address any questions regarding file format to Mr. Tom Mahony, Geographic Technology Manager, at (727) 562-4762 or email address:tom.mahony@myclearwater.com. Attachment “C” C:\Users\GRANIC~1\AppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@14062D33\@BCL@14062D33.docx 15of 15 11/12/2014 Clearwater Memorial Causeway Subaqueous Force Main Project King Engineering Associates, Inc. WORK ORDER INITIATIONFORM PROJECT BUDGET Task Description Subconsultant Services Labor Total I.Pre-Design 1.1 Project Coordination $20,509 $20,509 1.2 Geotechnical Services $36,800 $ 1,067 $37,867 1.3 Surveying Services $12,534 $48,090 $60,624 1.4 SUE and Utility Coordination $ 8,625 $ 9,165 $17,790 1.5 Environmental Services $11,493 $11,493 1.6 Preliminary Design Plans and Memorandum $26,791 $26,791 $175,074 II.Final Design Phase 2.1 Design Document Development $66,759 2.2 Permitting $ 46,427 2.3 Public Relations Assistance $ 5,093 $118,279 III.Bidding Phase 3.1 Bid & Award Services $ 10,116 $10,116 3.2 Conform Plans and Technical Specifications $ 2,664 $2,664 $12,780 Subtotal, Labor and Subcontractors $306,133 Contingency (10%)$30,613 Grand Total $336,746 RePLACEMENT 20"SANITARY SEWERFORCE MAIN NEW 20"PIPELINE MEMORIAL CSWY MIDWAY IS GULF BLVD ISLAND WAY WI NDWARD I S LEEWARD ISWINDWARD PSGE DREW ST OAK AVE PIERCE ST TURNER ST OSCEOLA AVE LARBOARD WAY BAYWAY BLVD BAY AVE BAYSIDE DR GULF VIEW BLVD ROGERS ST COURT ST CLEVELAND ST CHESTNUT ST SEMINOLE ST DO RY PSGE PALM AVE DO LP HI N PT MARINA WAY OSCEOLA AVE JONES ST S KI F F P T LAURA ST ORANGE AVE ELDRIDGE ST GEORGIA ST SOUTH SHORE BLVD BRIGHTWATER DR DEVON DR LIME ST CEDAR ST LOCATION MAP ²Prepared by:Engineering DepartmentGeographic Technology Division100 S. Myrtle Ave, Clearwater, FL 33756Ph: (727)562-4750, Fax: (727)526-4755www.MyClearwater.com CRM K_O N.T.S.285B/286A xx-xx-xx11/14/2014Map Gen By:Reviewed By:S-T-R:Grid #:Date:Scale: CLEARWATER MEMORIAL CAUSEWAYSUBAQUEOUS PIPELINES14-0041-UT Document Path: V:\GIS\Engineering\Location Maps\20 SS subaqueous pipeline 14_0041_UT.mxd Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-702 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Planning & Development Agenda Number: 8.1 SUBJECT/RECOMMENDATION: Provide direction to staff regarding Council’s desire to participate in or opt out of the Pinellas County Temporary Emergency Housing Ordinance. SUMMARY: On November 18, 2014, Pinellas County adopted an ordinance establishing countywide regulations for temporary emergency housing following a disaster declaration. This ordinance is the result of a lengthy collaborative effort between the County, local municipalities, the Pinellas Planning Council and the Federal Emergency Management Agency. The ordinance would go into effect upon a declaration of a State of Housing Emergency by the Board of County Commissioners and could, depending on the scale and nature of the disaster, apply to all or any part of the incorporated and/or unincorporated areas of Pinellas County. Municipalities may opt out of the County ordinance if they have an ordinance addressing local housing emergencies within their jurisdictions. The City of Clearwater currently permits temporary emergency housing as a temporary use pursuant to Community Development Code Section 3-2103.N. These regulations allow relocation tents or mobile homes for displaced persons upon determination by City Council that a particular area constitutes a disaster area. Temporary housing is allowed provided it is connected to city utilities and provisions for solid waste exist unless either of these services are not reasonably available. The ordinance provides a significant amount of flexibility and allows temporary housing in all zoning districts for a maximum of 18 months unless authorized by City Council for a greater period of time. The Pinellas County temporary emergency housing ordinance is more comprehensive than the Clearwater ordinance in that it provides regulations for different zoning districts and community sites and addresses permitting issues. The main provisions of the countywide ordinance are outlined below. ·Provides for three types of temporary housing: manufactured homes, recreational vehicles and modular dwellings; ·Requires a permit for a temporary housing unit; ·Requires licensed contractors or owner-buildings, if applicable, to obtain permits for all mechanical, plumbing and electrical work; ·Requires water service and wastewater service to be properly connected to functioning water service and sanitary sewer or septic system. If functioning service is not feasible, other temporary water/wastewater services may be approved by the Pinellas County Health Department; ·Allows one temporary housing unit (or two in the case of a two-family dwelling) on single-family/two family property if dwelling is declared uninhabitable; waives setback Page 1 City of Clearwater Printed on 11/26/2014 File Number: ID#14-702 requirements for temporary unit; precludes temporary unit from extending into conservation/drainage easements, floodways or preservation areas; allows in right-of-way if jurisdiction permits it; and allows unit to extend onto adjacent property with authorization from the adjacent property owner; and limits temporary housing to be in place for 12 months or until certificate of occupancy is issued following the repair or replacement of damaged residence; ·Allows two temporary housing units on parcels zoned for multi-family or non-residential purposes; prohibits such units on parcels designated Preservation or other similar zoning designations or on environmental lands owned/managed by the County, or in the Special Flood Hazard Areas/coastal storm area; waives setback requirements; allows such units in right-of-way if jurisdiction permits it; adjacent property owner can allow units to extend onto their property with appropriate authorization; and limits temporary housing unit permit for 12 months, unless an appropriate extension is granted; and ·Allows community sites (those which accommodate more than 2 temporary housing units) in any zoning district except Preservation and areas outside of special flood hazards areas/coastal storm area (the suitability of such sites will be prioritized based on criteria to be established by the County in conjunction with the municipalities); discourages the location of community sites on properties supporting industrial/employment generating uses due to the importance of getting businesses operational; requires authorization from the City Manager to establish a community site; requires a concept plan to be submitted and approved for community sites housing more than 10 temporary housing units; requires compliance with minimum setback requirements of the respective zoning district, unless otherwise approved by the municipality; and limits temporary housing unit permit for 12 months, unless an appropriate extension is granted. In order to provide a consistent post-disaster regulatory framework to assist FEMA with relief efforts, the Planning and Development Department and the Division Chief of Emergency Management recommend the City be subject to the countywide temporary emergency housing ordinance. Staff further recommends that Community Development Code Section 3-2103.N be revised to reference the County ordinance so it is clear to residents and future staff that the City operates under the countywide ordinance. If City Council desires to opt out of the countywide ordinance the Planning and Development Department recommends that Section 3-2103.N be revised and customized for Clearwater but modeled after the countywide ordinance to make countywide relief easier and more efficient. APPROPRIATION CODE AND AMOUNT: N/A USE OF RESERVE FUNDS: N/A Page 2 City of Clearwater Printed on 11/26/2014 1 ORDINANCE NO. ____ AN ORDINANCE OF THE COUNTY OF PINELLAS,PROVIDING THAT THE PINELLAS COUNTY CODE BE AMENDED BY ADDING NEW DIVISION 2 TO CHAPTER 34 ARTICLE II; PROVIDING FOR THE PLACEMENT OF MOBILE HOMES, RECREATIONAL VEHICLES,AND OTHER APPROPRIATE SHELTER IN RESIDENTIAL AREAS AND COMMERCIAL AREAS AS TEMPORARY ALTERNATIVE HOUSING; PROVIDING FOR A HOUSING EMERGENCY DECLARATION; PROVIDING FOR REGULATORY PROVISIONS; PROVIDING LOCAL COMPREHENSIVE PLAN AND COUNTYWIDE RULE AMENDMENTS WHERE NECESSARY FOR IMPLEMENTATION; PROVIDING FOR AREAS EMBRACED; PROVIDING FOR FILING OF THE ORDINANCE AND AN EFFECTIVE DATE; PROVIDING FOR SEVERABILITY; PROVIDING FOR INCLUSIONIN THE CODE;AND PROVIDING FOR ANY MODIFICATION THAT MAYARISE FROM CONSIDERATION OF THE ORDINANCE AT PUBLIC HEARING. WHEREAS, the Pinellas County Charter, Section 2.04(k), states that the County shall haveall special and necessary power to furnish within the various municipalities the services and regulatory authority directly concerned with the development and implementation of civil preparedness programs; and WHEREAS, when directly related to the furnishing of the services and regulatory authority associated with the development and implementation of civil preparedness programs,county ordinances shall prevail over municipal ordinances, when in conflict; WHEREAS, because of the existing and continuing possibility of the occurrence of natural or manmade disasters or emergency and destruction of housing stock resulting therefrom, and in order to ensure the readiness of both the incorporated and unincorporated areas of Pinellas County to adequately deal with the loss of housing stock, it is desirable that Pinellas County implement a program to augment impaired housing stock by allowing, on a temporary basis, supplemental housing in zoning categories and land use categories that do not allow such housing alternatives and under conditions that are not otherwise permitted under the existing land development code; and WHEREAS, the coordination of implementation of this ordinance will be facilitated by amendment of local comprehensive plans and the Countywide Plan to allow alternative housing on a temporaryand supplemental basis. NOW,THEREFORE,IN REGULAR SESSION DULY ASSEMBLED ON THIS (DATE)DAY OF (MONTH),2014,BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF PINELLAS COUNTY,FLORIDA. Section 1.Chapter 34, Article II, Division 2, Sections 34-36through 34-39of the Pinellas County Code areherebyadded to read as follows: 2 Division 2: EMERGENCY HOUSING Section 34-36HOUSING EMERGENCY DECLARATION (a)Purpose:The purpose of this Division is to provide reasonable flexibility in land developmentregulations to afford temporary housing optionsto otherwise displaced residents during the aftermath of a disaster that rendered existing housing stock uninhabitable. (b)Activation:Upon declaration of a state of emergency pursuant to Article II, Division 1 of this Chapter 34, and during the pendency thereof, the Board of County Commissioners, as a part of the original declaration or at any time during the duration of a declared state of emergency, may declare a state of housing emergency for all or any part of the incorporated and/or unincorporated areas of Pinellas County. (c)Areas Embraced: (1)A Housing Emergency Declaration must define the boundaries of all areas subject to the provisionsof this Section 34-36 and Section 34-37. The areas embraced may include the entire unincorporated and incorporated areas of Pinellas County or any part thereof. (2)On its own initiative or upon petition by the governing body of a municipality, and based on findings regarding the status of housing stock in the areas being considered, the Board of County Commissioners or an official authority may amend the Housing Emergency Declaration resolution to expand or contract the areas embraced. (d)Termination: (1)A Housing Emergency Declaration survives the termination of the Article II, Division 1 emergency declaration and may only terminate, in whole or in part,by formal action of the Board of County Commissioners or an official authorityto amend or terminate the areas embraced by the Housing Emergency Declaration. (2)The status of the Housing EmergencyDeclarationshall be evaluated 90 days after its declaration and every 90 days thereafter as long as the Housing Emergency Declaration is in effect to determine if formal action by the Boardof County Commissionersor an official authorityis warranted to amend or terminate the Declaration. (e)Effect of a Housing Emergency Declaration:Upon the activation of a Housing EmergencyDeclaration, the provisions of Section 34-37, below,become 3 applicable in all the areas embraced by theHousing Emergency Declaration.If there isaDisasterHousing Plan adopted as a partof the County’s Comprehensive Emergency Management Plan, the Disaster Housing Plan shall be compatible with Section 34-37, below. Section 34-37:REGULATORY PROVISIONS (a)Definitions: (1)Community Sites: Sites where three or more temporary housing units are provided. These sites can include, but are not limited to,existing mobile home parks and mobile home subdivisions,andareas where extensive construction and building of an entire communityis involved, which may includesuch things as building roads; laying water, sewer, electrical, and telecommunications lines; and arranging for public transportation, police, fire, and emergency medical services. (2)Essential Services: Services necessary to a basic standard of living and the general welfare of society.Services may include, but are not limited to,the following: electricalservices, gas services, and water and wastewater treatment services. (3)Manufactured Home: A structure, transportable in one or more sections, which in the traveling mode is 8 body feet or more in width or 40 body feet or more in length, or, when erected on site, is 320 square feet or more, and which is built on a permanent chassis and designed to be used as a dwelling with or without a permanent foundation when connected to the required utilities, and includes plumbing, heating, air conditioning and electrical systems contained therein; except that such term shall include any structure that meets all the requirementsof this paragraph except the size requirements and with respect to which the manufacturer voluntarily files acertification required by the secretary (U.S. Department of Housing and Urban Development) and complies with the standards established under this title. For mobile homes built prior to June 15, 1976, a label certifying compliance to the Standards for Mobile Homes, National Fire Protection Association (NFPA)501, is required.For the purposes of these provisions, a mobile home shall be considered a manufactured home. (4)Modular Dwelling Unit: Any residential unit, constructed to the standards promulgated by the Florida Building Commission, away from the installation site, and which bears a Department of Economic Opportunityinsignia. (5)Non-residential: On applicable future land use maps and zoning maps, future land use designations and zoning categories where residential uses are normally not permitted. (6)Owner-Builder: Owners of property when acting as their own contractor and providing direct, onsite supervision themselves when building or improving single-family or two-family residences on such property for the occupancy or use of such owners and not offered for sale or lease. 4 (7)Recreational Vehicle:A vehicle built on a single chassis, 400 square feet or less, designed to be self-propelled or permanently towable by a light duty truck, and designed as temporary living quarters for recreational, camping, travel, or seasonal use. (8)Temporary Housing:Temporary accommodations for individuals or families whose homes are made uninhabitable by an emergency or a major disaster that meets the physical accessibility needs of the household and includes essential utilities, access to areas for food preparation, and bath facilities in a context that allows a family to live together with a reasonable amount of privacy for a period generally from 12 to 18 months. (9)Temporary Housing Unit: Manufactured home, recreational vehicle,or modulardwellingunit. (10)Wrap-Around Services: The delivery of infrastructure and additional essential services to address disaster-related needs of affected residents living in community sites.These services go beyond the physical need for housing and typically include basic social services and access to utilities, transportation, grocery stores, medical facilities,and employment opportunities. (b)Single-Family or Two-Family Residential Parcels.Upon the activation of a Housing Emergency Declarationand subject to the conditions contained in this Subsection, temporaryhousing may be provided by placing temporary housing unitson parcels of land where the existing primary residence is declared uninhabitable due to damage from a disaster. The damaged primary residence must be located on a parceldesignated by the applicable future land use map and/orby the applicable zoning map for use as a detached, single-family residenceor a two-family (duplex) residence. (1)A permit for a temporaryhousing unitmust be obtained through the Pinellas County Planning and Development Services Departmentor the applicable municipal departmentor official. (2)The permit for a temporaryhousing unitshall beissued forno more thantwelve (12)months.A temporary housing unit shall be removed no later than twelve (12) months after the date of the issuance of the temporary housing building permit,or the temporary housing unit shall be removed upon the issuance of the Certificate of Occupancy following the repair or replacement of the damaged on-site residence, whichever occurs first,unless an appropriate extensionof the temporary housing permit has been granted by the applicable departmentor official, providedthat repairorreplacementofthedamagedprimaryresidencehas commencedwithinthevalidityperiodofthetemporaryhousing permitandcontinuesingoodfaith. 5 (3)A maximum of one (1) temporaryhousing unit(or two (2) in the case of a two-family residence)will be allowed ona parcel containingan existing home site provided: i.The home located on the parcel has been declared uninhabitable by the Pinellas County Planning and Development Services Department or designee or the applicable municipal departmentor official. ii.The water service and wastewaterservicemust be properly connected toafunctioning water service and sanitary sewer systemor septic systemin accordance with codes in effect at the time.However, if connection toa functioningservice is not feasible, other temporary water and wastewater services may be utilized subject to Pinellas County Health Department approval. iii.Setback requirements willbewaived during the duration that the temporaryhousing unit is permitted.However,the temporaryhousing unitcannot extend into any public right-of- way,conservation/drainage easement, floodway, preservation area, or onto any adjacent propertythat is not owned by the household who will be residing in the temporary housing unit unless an applicable permit is obtained from the appropriate jurisdiction allowing the temporary housing unit to extend into the public right-of-way orthere is written authorization from the adjacent property owner allowing the temporary housing unit to extend into the adjacent property. iv.An adequate, functional electrical service with proper connection for temporary housing units shall be utilized, if feasible, and approved by the Pinellas County Planning and Development ServicesDepartmentor applicable municipal department or official. v.Only a stateor locally licensed contractoror an owner-builder will be allowed to apply for a permit and perform any work related to the connection of plumbing, electrical and mechanical service systems atthe site. Contractors must be registered with the Pinellas County Construction Licensing Board. (4)In the case where a manufactured housing unit or a modular dwelling unit is permitted by the applicable zoning district or future land use designation as a permanent housing structure, and if said structure is intended to become permanent, all applicable setback and other land development regulations shall be met at the time when the housing unit becomes permanent. (c)Multi-Family Residential Parcelsand Non-Residential Parcels.Upon the activation of a Housing Emergency Declaration, up to two temporaryhousing unitsmay be used as temporaryhousingon a parcelin any zoning district that 6 permits multi-family residential use or non-residential use, with the exception of parcels designated as Preservation, Conservation,or comparable designation for environmentally sensitive landson the applicable future land use map and parcels covered under Subsection 34-37 (b), subject to the following conditions: (1)Temporary housing units shall not be permitted in the Preservation, Conservation, Preservation-Resource Management and similar applicable zoning districts that designate environmentally-sensitive land.Temporary housingunits shall not be permitted on environmental lands that are owned or managed by Pinellas County, in Special Flood Hazard Areas(velocity zone or 100-year floodplain),in the coastal high hazard area as defined in the local government comprehensive plan (or coastal storm area, if adopted by the local government), or in any area in the federal, state, county, or municipal resource-based park or open space system that is determined by that agency to be of critical environmental significance. (2)To furthereconomic development policies and strategies supportingjob creation and retention, which would be particularly imperative in post-disaster situations, properties that have an industrialor employment zoning and/or future land usedesignation on a jurisdiction’s respective zoning or future land use map shall not be considered appropriate locations for temporary emergency housing unless other suitable locations are not available. Properties having an industrial or employment designationshall be consideredproperties of last resort for locatingtemporary emergency housing. (3)A permit for a temporaryhousing unitmust be obtained through the Pinellas County Planning and Development Services Departmentor the applicable municipaldepartmentor official. (4)The permit for a temporaryhousing unitshall be issued for no more than twelve (12) months.A temporary housing unit shall be removed no later than twelve (12) months after the date of the issuance of the temporary housing building permit, unless an appropriate extensionof the temporary housing permit has been granted by the applicabledepartmentor official. (5)Functioning public water and wastewater services shall be utilized if feasible.However, if connection tofunctioning public services is not feasible, other water and wastewater services may be utilized subject to Pinellas County Health Department approval. (6)An adequate, functional electrical service with proper connection for temporary housing units shall be utilized, if feasible, and approvedby the Pinellas County Planning and Development Services Department or applicablemunicipaldepartmentor official. 7 (7)Only a state or locally licensed contractor will be allowed to apply for a permit and perform any work related to the connection of plumbing, electrical and mechanical service systems at the site. Contractors must be registered with the Pinellas County Construction Licensing Board. (8)Setback requirements will be waived during the duration that the temporary housing unit is permitted. However, the temporary housing unit cannot extend into any public right-of-way, conservation/drainage easement, floodway, preservation area, or onto any adjacent property that is not owned by the household who will be residing in the temporary housing unit unless an applicable permit is obtained from the appropriate jurisdiction allowing the temporary housing unit to extend into the public right-of-way or there is written authorization from the adjacent property owner allowing the temporary housing unit to extend into the adjacent property. (9)In the case where a manufactured housing unit or a modular dwelling unit is permittedby the applicable zoning district or future land use designation as a permanent housing structure, and if said structure is intended to become permanent, all applicable setback and other land development regulations shall applyat the time when the housing unit becomes permanent. (d)Community Sites.Upon the activation of a Housing Emergency Declaration, temporary housing unitsmay be used as temporaryhousing in a community siteregardless of the property’s applicable zoning and/or future land use map designation, with the exception of parcels designated as Preservation, Conservation, or comparable designation for environmentally sensitive landson the applicable future land use map,subject to the following conditions: (1)Any zoning district except Preservation, Conservation, Preservation-Resource Management and similar applicablezoning districts that designate environmentally-sensitive lands may be considered for a community site. A community site shall not be permitted on environmental lands that are owned or managed by Pinellas County, in Special Flood Hazard Areas (velocity zoneor 100-year floodplain), in the coastal high hazard area as defined in the local government comprehensive plan (or coastal storm area, if adopted by the local government), or in any area in the federal, state, county, or municipal resource-based park or open space system that is determined by that agency to be of critical environmental significance. (2)The suitability of properties for community sites will be prioritized based on criteria to be established by Pinellas County in cooperation with the municipalities. 8 (3)To further economic development policies and strategies supporting job creation and retention, which would be particularly imperative in post-disaster situations, properties that have an industrial or employment zoning and/or future land usedesignation shall not be considered appropriate locations for temporary emergency housing unless other suitable locations are not available.Properties having an industrial or employment designation shall be considered properties of last resort for locating temporary emergency housing. (4)Authorization from the Pinellas County Administrator (for unincorporated areasor County-owned property) or from the respective chief administrative official of a municipality of Pinellas County, or their designee,must be provided before arranging for theestablishment of a community site. (5)A Concept Plan for acommunity site of more than ten (10) temporary housing units shall be approved by the Pinellas County Planning and Development Services Department or the applicable municipaldepartmentor officialprior to the issuance of permits for locating temporary housing units on the community site. (6)Permits must be obtained for the temporaryhousing unitsthrough the Pinellas County Planning and Development Services Department or the applicable municipal departmentor official. (7)The permit for a temporaryhousing unitshall be issued for no more thantwelve (12) months.Permit extensions may be granted by the applicabledepartmentor officialasappropriate. (8)Functioning public water and wastewater services shall be utilized if feasible.If connection to functioning public services is not feasible, other water and wastewater services may be utilized subject to Pinellas County Health Department approval. (9)An adequate, functional electrical service with proper connection for temporary housing units shall be utilized, if feasible, and approved by the Pinellas County Planning and Development ServicesDepartmentor applicable municipaldepartmentor official. (10)Only a state or locally licensed contractor will be allowed to apply for a permit and perform any work related to the connection of plumbing, electrical and mechanical service systems at the site. Contractors must be registered with the Pinellas County Construction Licensing Board. (11)Minimum setbacks shall be in compliance with the host parcel’s zoning designation, unless otherwise approved by the respective municipality. (12)In the case where a manufactured housing unit or a modular dwelling unitis permitted, by the applicable zoning district or future land use designation as a permanent housing structure, and if said structure is intended to become permanent, all applicable 9 setback and other land development regulations shall apply at the time when the housing unit becomes permanent. Section 34-38:IMPLEMENTATION THROUGH COMPREHENSIVE PLAN AND COUNTYWIDE PLAN RULE AMENDMENT The Pinellas County Comprehensive Plan, municipal comprehensive plans,and theCountywideRulesshall be reviewed and amended as necessary to facilitate the implementation of the requirements of Sections34-36and 34-37. Section 34-39:AREAS EMBRACED Pursuant to Section 2.04(k) of the Pinellas County Charter and Chapter 252, Florida Statutes, thisordinance shall be effective in the incorporated as well as unincorporated areas of the County. Section 2:FILING OF ORDINANCE;EFFECTIVE DATE Pursuant to Section 125.66, Fla. Stat., a certified copy of this Ordinance shall be filed with the Department of State by the Clerk of the Board of County Commissioners within ten (10) days after enactment by the Board of County Commissioners. This Ordinance shall become effective upon filing of the ordinance with the Department of State. SECTION 3:SEVERABILITY If any Section, Subsection, sentence, clause, phrase, or provision of this Ordinance is for any reason held invalid or unconstitutional by any Court of competent jurisdiction, such holding shall not be construed to render the remaining provisions of this Ordinance invalid or unconstitutional. SECTION 4:INCLUSION IN CODE It is the intention of the Board of County Commissioners that the provisions of this Ordinance shall become and be made a part of the Pinellas County Code; and that the sections of this Ordinance may be renumbered or relettered and the word “ordinance” or “section” may be changed to section, article or such other appropriate word or phrase in order to accomplish such intentions. Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-687 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Marine & Aviation Agenda Number: 9.1 SUBJECT/RECOMMENDATION: Approve Department of Environmental Protection (DEP) Agreement MV149 for CVA14-720, Clean Vessel Act Grant Program funding for the operation, maintenance and repair of the Clearwater Beach Marina pump out vessel and authorize the appropriate officials to execute same. (consent) SUMMARY: The DEP, under the Florida’s Clean Vessel Act Grant Program, makes provision for reimbursement for the operation, maintenance and repair of the pump out vessel. Grant funding has been approved in the amount of $12,015.66 (75% of project costs) through December 17, 2015. The city match of $4,005.22 (25% of project costs) will be accounted for in hourly wages and parts cost. The City is required to conduct operation of the pump out vessel under a Pump out Station Operational Plan that specifies hours of operation, maintenance principles, methods in determining volume of material pumped including the use of flow meters as may be necessary, information/educational materials on pump out operation and assurances that the pump out vessel will be used solely for the collection of recreational boat sewage. A pump out log is required each calendar quarter. APPROPRIATION CODE AND AMOUNT: N/A USE OF RESERVE FUNDS: N/A Page 1 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-695 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Public Utilities Agenda Number: 10.1 SUBJECT/RECOMMENDATION: Approve a work order with Excergy Corporation of Denver Colorado, for a fee not to exceed $170,715.00 for phase one (of three) in determining the feasibility of implementing Advanced Metering Infrastructure, and authorize the appropriate officials to execute same. (consent) SUMMARY: The City of Clearwater Public Utilities department is seeking to determine the feasibility of implementing Advanced Metering Infrastructure (AMI) for potable, irrigation and reclaimed water accounts, under City Project 14-0050-UT. AMI is an integrated system of smart meters, communications networks, and data management systems that enable two-way communication between the smart meter and a utility company. The goal of an AMI is to provide utility companies with real-time data about water consumption, which, in turn, allows utility companies to provide a higher level of service to the customer. AMI would eliminate the need for manual, monthly meter reading. In order to refine the direction of the city’s AMI initiative, this Work Order with Excergy Corporation addresses the initial phase only (first of 3), and includes: -Evaluation and summary of the feasibility of alternative Automated Metering Infrastructure (AMI) solutions; -Business case development; -Strategic assessment; and -Summary of all related technology and associated financial packages available. Based upon the City’s evaluation of the results achieved from Excergy, the completion of Phase I will be the basis for direction whether to proceed to a subsequent phase. Only if, in the opinion of the City, it is determined to be in the City’s continued best interest to pursue AMI implementation, will Excergy be directed to proceed to the next phase through another work order. Later, Excergy will be able to provide projected costs for Phases II and III. The cost of equipment, hardware or software to implement AMI will be identified in a future phase. Qualifications: Public Utilities, through the Purchasing department, published a Request for Qualifications (RFQ 33-14) in June 2014. Eight companies responded. Using a formal rating process, a review committee composed of representatives from Public Utilities, Utility Customer Service, Information Technology, Engineering, and Finance departments. The submittals were narrowed down to the top three, who were invited to return to make a formal presentation to the review committee. Excergy Corporation was selected as the highest rated presentation. Page 1 City of Clearwater Printed on 11/26/2014 File Number: ID#14-695 APPROPRIATION CODE AND AMOUNT: Funds are available in Fiscal Year 2015 Capital Improvement Program project 0315-96774, Automated Meter Reading, for the amount of $170,715 to fund this work order. USE OF RESERVE FUNDS: N/A Page 2 City of Clearwater Printed on 11/26/2014 Excergy Corporation WORK ORDER INITIATION FORM for the CITY OF CLEARWATER Date:December 5,2014 Project Number: City Project Number:14-0050-UT Plan Set Number: 1.PROJECT TITLE: Advanced Metering Infrastructure –Phase I (Feasibility/Business Case/Strategic Assessment) 2.SCOPE OF SERVICES: Project Summary: Excergy will provide Advanced Metering Infrastructure (AMI) support and services through a series of phases.This work order initiation is for Phase I only. The phases are: PHASE I Stage 1 -Evaluate and summarize the feasibility of alternative AMI solutions. Stage 2 -Business Case Development. Stage 3 -Strategic assessment;Summarize all related technology and associated financial packages to refine direction of City’s AMI initiative. PHASE II (Not included in this work order) Stage 4 -Develop a Request for Proposal (RFP)for AMI system acquisition and installation; Assist the City during the evaluation and scoring of Proposals submitted as result of the RFP. Stage 5 -Assist the City in contract negotiations with selected AMI vendor. PHASE III (Not included in this work order) Stage 6 -Strategy Formulation;Implementation Plans. Stage 7 -Assist the City during installation and activation of the AMI system. Stage 8 -Assist the City with IT interfaces. 2 PhasesI–IIIandStages1–8aboveingeneral,outlinetheExcergyservicestobeprovidedto theCitysuchthattheCitycanprogressfrominitialfeasibilityanalysistofinalAMItechnology implementation.This work order addresses Phase I only.ItisunderstoodthatCityevaluation ofresultsachievedfromeachExcergycompletedStagewillbethebasisfordirectionto proceedtothesubsequentphase;only,ifintheopinionoftheCity,itisdeterminedtobein theCity’scontinuedbestintereststopursueAMIimplementation,willExcergybedirectedto proceedtothenextphase.Thedesignplansshallbecompiledusing theapplicableCityof ClearwaterDeliverablesStandards. Detailed TasksandDeliverables (Phase I, Stages 1-3): Task1: ProjectManagement Followingthenoticetoproceed,ExcergywillholdanorganizationalKickoffSessionwithCityof Clearwater’sprojectteamtoreviewprojectscope,requirements,deliverables,timetable, reportingrelationships,andprojectmanagementtools;establishadetailedProjectPlanand Schedule;anddeveloptheCommunicationsPlan.Wewilldiscusssensitivities,issues,and concernsuniqueto CityofClearwaterthatwillneedtobeaddressedduringtheproject.Wewill establishasetofprojectmanagementandreportingprotocols. Priortothissession,Excergywillprovidearequestforbackgroundinformation,tobeusedas inputfortheprocessanalysesandbusinesscasedevelopment,including: Currentmeterreadingtechnologiesandcustomerinteractionprocessesandpolicies Workloadandperformancestatistics Meterpopulationsandmetermanagement RelevantcharacteristicsofCityofClearwater’sbillingsystem,ratestructuresforeach district,theassetmanagement/workordersystems,andCityofClearwater’sIT environment Conservation,nonrevenuewaterprograms,andwaterresourcemanagement Other relevantbackgroundinformation DuringtheKickoffSession,ExcergywillreviewthedatarequestwithCityofClearwater’steam tounderstandwhatinformationisreadilyavailableandwhatinformationneedstobecompiled, identifywhowillcompileit, andestablishatimetable,beingmindfulofthelimitationsonCityof Clearwaterstafftime.And,workingwithCityofClearwater’steam,wewillidentifyCityof Clearwaterstafftobeinterviewed(seeTask3)tohelpunderstandCityofClearwater’sdataand issues,andestablishaninterviewschedule.Excergy will provide a preliminary discussion of typical costs associated with a water AMI project to help validate Clearwater planning assumptions. The thorough costs and benefits analysis will be performed in Task 10. FollowingtheKickoffSession,theExcergyProjectManagerwillprovideaKickoffSession SummaryforCityofClearwaterandExcergy,aswellastheProjectPlanandScheduleand CommunicationsPlan. 3 Throughouttheproject,theExcergyProjectManagerwillmanagetheweeklyprojectstatus cycleforCityofClearwater.Thiswillincludemeasurementofprojectprogress,performance status,riskmanagement,itemsofconcern,andopenactionitems.Theseitemswillbemanaged regularly,consistently tracked,andcommunicatedtotheCity’sprojectmanager. Oncethebaselineisidentified,establishedanddocumentedattheProjectKickoffMeeting,any changestotheprojectbaselinewillbemanagedthroughachangecontrolprocessthatusesa ChangeControlBoard(CCB)tomanageanyunavoidablechange.TheCCBwilloverseechanges thatarebeyondthescopeofthecontractualrequirementsforsoftware,documentation, environment,andinterfaces,aswellaschangestotheStatementofWork(SOW)andcontract milestones.TheCityofClearwaterorExcergyProjectManagerwillbringissuesrequiring attentionanddirectiontotheCCB, includingscopeissuesarisingfromchangerequestsorissues thataffectcontractmilestonesandrequirements. Task1Meetings ►Asrequired Task1Deliverables ►DetailedProjectPlanandSchedule ►BackgroundInformationRequest ►KickoffSessionSummary ►Weekly Status Reports Task2: CommunicationsPlan AMIbusinesscasestudiestendtobehighprofilesincesystemcostisnottrivialandAMIcan significantlyimpactmanyoperations.CityofClearwateremployeesmaybeexposedtoa significantamountofinformation(fromvendors,forexample), someofwhichcanbeconfusing. Informationvoidsareoftenfilledbymisinformation.Therefore,managingproject communicationswellisessential.Itisimportantthatallpersonswhoarepotentiallyaffectedby theprojectbeinformedandhaveanopportunityforinput.WithCityofClearwater’sproject team,wewillestablishguidelines,pointsofcontact,andthemethodstobeusedfor communications.TheCommunicationsPlanshouldcoverdatagathering,proceduresfor documentingmeetingsandworkshops,draftdocuments,andreviewtracking,andbalance formality withcosteffectivenessandtimeliness. Task2Meetings ►N/A 4 Task2Deliverables ►CommunicationsPlan Task3: Information AnalysisandStaffInterviews Uponreceivingtherequestedbackgroundinformation,Excergywillreviewthedata. Approximatelyoneweekafterreviewingbackgroundinformationprovidedby City of Clearwater,Excergystaffwillconductupto12individualhour-longinterviewswithmanagersor representativesofthefunctionalareaslikelytobeimpactedbyanAMIsystemasdeterminedby theClearwaterProjectManager.TwoExcergystaffwillconductone-on-oneonsiteinterviews withCityofClearwaterstaffattherateoftwointerviewsperhourconductedoverthecourseof oneday. TheseinterviewswillhelptoclarifythebackgroundinformationprovidedbyCityofClearwater andidentifyindividualissuesandneeds,organizationalrequirementsand sensitivities,and futurevisionsforleveragingAMIcapabilities.Thebackgroundinformationandinterviewswill helpinassessingwhereAMIcouldgenerateeconomicandnon-economicbenefitsandcosts. Onthedayimmediatelyfollowingtheinterviews,inaone-dayworkshopwiththeprojectteam, Excergywillpresenttheconsolidatedobservationsfromtheinterviewstomakesurewehave capturedandunderstandallimportantissuesandneeds.WewillreviewCityofClearwater’s corporatestrategies;customerinteractions,operations,andwaterresourcemanagementvision andgoals;regulatoryenvironment;existingissuesandconstraints(suchasworkforceand capitalbudgetrequirements);andotherfactorsthatmightaffectanAMIproject. Task3Meetings ►Upto12individualhour-longinterviewswithmanagersorrepresentativesofthe functionalareaslikelytobeimpactedby anAMIsystem ►One-day workshoptopresentconsolidatedobservationsfrom interviews Task3Deliverables ►Summary offindings,includingconsolidatedissues andneeds Task4: SituationAnalysisandAMI-MDMS Technology Review Aspartofaone-dayworkshoponsitewiththeCityofClearwater,Excergywillreviewcurrent andemergingAMItechnologiesandbestpractices,andtheirrelativeadvantagesand disadvantagesforCityofClearwater.Wearefamiliarwitheveryavailabletechnologyandwill suggestthosethatappeartobemostalignedwithCityofClearwater’sobjectivesandoperating environment.Additionalworkshoptopicstobeconsideredincludethefollowing: ►ThecurrentAMImarketplaceandtrends,andrelatedissuessuchasstandardsand obsolescence 5 ►Communicationsanddatabackhaulsystems ►Interoperability oftheCityofClearwater’smetersandmajorAMIvendorofferings ►CustomerinteractionandoperationalapplicationsenabledbyAMI, andtheirinformation requirements,aswellascharacteristicsofAMIdata(frequency,resolution,latency,success rate,etc.) ►MeterdatamanagementandintegrationissuesbetweenanAMIsystemandCityof Clearwater’sSAPbilling,newcustomerinterfaces,andhowAMI–Meter Data Management System (MDMS)fitsintotheutility’sITarchitecture andplanning ►Advancesinwatermeteringtechnologies,includingelectromagneticandultrasonic meters,andtheirimplicationsforbusinesscasesandforprocurementstrategies ►Availableacousticleakdetection(ALD)technologiesandtheirinteroperabilitywithAMI systems ►Otheremergingtechnologies,suchasAMI-ormeter-basedsensors(e.g.,forwater pressure)andactuators(e.g.,remotecontrolshut-offvalves),andtheirimplicationsforbusiness cases ►Possibilitiesforcollaborationwithotherutilities(e.g.,gasandelectricutilities),including economiesofscaleandinstitutionalconsiderations ►Variousimplementationanddeploymentstrategies Followingthisworkshop,ExcergywillprovideadraftwhitepaperdiscussingAMItechnologyand relatedconsiderationsforCityofClearwater.BasedoncommentsfromCityofClearwater,we willrevisethisforincorporationintothebusinesscaseassessmentreport. Task4Meetings ►CurrentandemergingAMI&MDMStechnologiesworkshop Task4Deliverables ►AMI/MDMSTechnology whitepaper(draft) Task5: AMICustomerInteraction ProcessAnalysis AsafoundationfortheAMIrequirementsdefinitionandeconomicandfinancialanalyses, ExcergywillleadCityofClearwaterstaffintwohalf-dayworkshopstomodelkeymeteringand customerinteractionprocessesandpolicies,quantifypotentialbenefits,andidentifyother benefits.Areastoexaminemayincludeon-cyclemeterreading,highbillinvestigations,move- insandmove-outs,andcollections.Themodeling will focusondatarequirementsandkeypaths ofinformationandworkflow. BasedonAMIcapabilitiesandtheprojectteam’svisionoffuturecustomerinteraction,wewill leadCityofClearwaterstaffinmodelingredesignedbusinessprocessesandestimatingthe 6 extenttowhichAMIcanstreamlineoperationsandenhanceservice.Theworkshopswillalso exploreenhancedservicesfacilitatedbyAMI,suchas“watchdog”services.These understandingsareessentialtobuildingacomprehensivebusinesscase. Wewillprovideabriefanalysisofthedatarequiredtosupportspecificcustomerinteraction, operations,conservation,andNon-revenuewater(NRW)managementfunctionsintermsofthe frequencyofmetersampling,datatransmission,latency,synchronization,resolutionand reliability recommendedfortheapplicationfunction. Task5Meetings ►Twohalf-day Customerinteractionprocessmodelingandredesignworkshops Task5Deliverables ►CustomerinteractionWorkshopSummary Memorandum Task6: Distribution OperationsAnalysis Excergystaffwillconductahalf-dayworkshop with CityofClearwaterdistribution system managerstoreviewthepotentialcosts,savingsandotherbenefitsofimplementingAMI-based distributionsystemmonitoring.Excergywilldocumenttheworkshop,providingabrief assessmentofthepotentialcontributiontothebusinesscaseviaamemorandum. Task6Meetings ►Half-day AMI-baseddistributionsystem monitoringworkshop Task6Deliverables ►AMI-baseddistributionsystem monitoringworkshopsummarymemorandum Task7: Conservation and Demand Management Analysis Excergystaffwillconductahalf-dayworkshopwithappropriateCityofClearwaterconservation anddemandmanagementstafftoreviewthepotentialcosts,savingsandotherbenefitsof implementingAMI-basedconservationanddemandmanagementprocesses.Excergywill documenttheworkshop,providingabriefassessmentofthepotentialcontribution to the businesscaseviaamemorandum. Task7Meetings ►ConservationandDemandManagementAnalysishalf day workshop Task7Deliverables ►ConservationandDemandManagementSummary Memorandum 7 Task8: Current SoftwareApplications, Integration, and Information Technology Assessment ExcergywillreviewCityofClearwater’sexistinginformationsystemsandassociatedbusiness processes,toidentifyareasofexistingsoftwarethatmustbemodifiedforeffectiveintegration toachievethebenefitsofAMI.With CityofClearwaterstaff,wewillcreateaprovisional applicationdevelopmentroadmapandanAMIintegrationscheme.Thiseffortisnotmeantto specifyCityofClearwater’sITarchitecture;rathertosuggestdirections,futureneeds,andlevel ofeffort. Duringaone-dayworksessionwithCityofClearwaterstaff,wewilldiscusssystemintegration challengesandopportunities,andthedecisionsthathavetobemade.WewillalsodiscussAMI deploymentinterfaceplanning,emphasizingprojectcontrolbestpracticesandtools.Wewill helpCityofClearwaterobjectivelyassessthereadinessofitssystemsandprocessestosupport AMIdeploymentandcost-effectively manageAMIoperationandmaintenance. Excergywilldrafttechnicalmemorandacoveringdatarequirements,suggestedintegration requirements,andaprovisionalapplicationdevelopmentroadmapforreviewbyCityof Clearwaterstaffandincorporationintothebusinesscaseassessment. Task8Meetings ►Data andITintegrationworkshopforanalysisof“Asis”,“Tobe”and“Inthefuture” Task8Deliverables ►TechnicalmemorandaonfunctionaldatarequirementsandAMIinformationintegration ►Provisionalapplicationdevelopmentroadmap Task9: AMI/MDMS StrategicAlternatives Basedon CityofClearwater’sorganizationaland strategicneeds,theprocessanalysisand redesignexercises,andthesoftwareandITneedsdefinedinprevioustasks,Excergy willdevelop asetofprovisionalAMIandMDMSstrategicalternatives.Strategicconsiderationsof AMI/MDMSimplementationwillincludethefollowing: ►Choiceoftechnology ►CustomerTypes:TowhatextentshouldstrategiesadoptedinoneofCityofClearwater’s customertypes(commercial/residential)bedifferentfromothers? ►SpeedofAMIdeploymentandTiming ofMDMSimplementation ►Projectmanagement:ShouldCityofClearwaterseekavendorturnkeysolution,engagea projectmanagementfirm,orassumetheroleofgeneral contractor? ►Collaborativeopportunities:Arethereopportunitiestocollaboratewithneighboring municipalutilitiesorenergy utilities? 8 ►Organizationalresources:WhatotherITprojects,strategicinitiatives,organizationaland staffingchanges,etc.,mightimpactthetimingandextentofanAMIandMDMS implementation? WorkingwithCityofClearwater’steam,Excergywilldevelopassessmentsoftheseandother areas.Wewilldiscusstheseinaone-dayRequirements/Strategiesworkshop,atwhichwewill presentpreliminary recommendations. Basedontheworkshop,wewillrevisetherequirementsandpreliminarystrategy recommendations.Thesewillform thebasisfordevelopingthebenefit/costmodels. Task9Meetings ►One-day Requirements/StrategiesWorkshop Task9Deliverables ►AMI/MDMSrequirementsandstrategy recommendationsreport Task10:EconomicandFinancialAnalysis BasedontheanalysisandreviewofCityofClearwater’sdata,aswellasrecentAMIandMDMS systemcostdata,wewilldevelopahighlevelbenefit/costmodelofthemajorscenarios identifiedinTask9.The modelwillincorporate thefollowing: ►Capitalcoststoincludenewmetersorregisters,salvageonoldmeters,MeterInterface Units(MIUs),collectorsandrepeaters,controlhardwareandsoftware,themeterdata managementsystem,integrationwithexistingsystems,installationandprojectmanagement, core applicationdevelopment,andincidentalcosts. ►Operationsandmaintenance(O&M) costs toincludeData Concentrator Unit(DCU)power, backhaulcommunications,softwarelicensing,applicationmanagement,systemoperatorcosts, fieldservicetorepairfailedcomponents,periodicfieldinspections,andstaffingfortamperand theftfollow-up.Atypicallistofbusinesscaseelementsisshownbelow.Wemayincorporate additionalcontributors toeconomicbenefitsandcostsidentifiedwithCity ofClearwaterstaff. ►ExcergywillreviewCityofClearwater’smeterpopulation,metertesting,andreplacement schedulesinconstructingthebusinesscasetofactorineconomiesofscaleandother applicablecostefficientstrategiesforAMIdeployment. ►DirectsavingsfromAMI,suchasothersavingsandcostsrelatedtomorecosteffective conservationprograms,distributionsystemleakmanagement,revisionofcapitalconstruction programs,orahostofotherareas. 9 TypicalElementsofAMIEconomic/FinancialAnalysis Meterstobechangedorretrofitted Vehicleandothersavings MeterandMIUcosts Reductionsin billing adjustments Installationcosts,includinglidreplacement Under-registrationrecovery from meters Salvageonoldmeters Distributionleakdetectionnetsavings MetermaintenanceavoidedduringinstallationFinancingsavingsfrom CIP deferrals Meterreadingcollectionequipment Environmentalsavings(Greenhouse Gases (GHG),etc.) Meterdatamanagementsystem Waterconservationsavings Integrationcosts Multi-yearparameters Projectmanagement Costandsavingsimpact(%)overtime AnnualO&Mcosts,licensefees Cashflow Personnel Depreciation/residualvalues Netpresentvalue/IRR Legalandconsultingcosts Trainingcosts Financingcosts Communicationsandpublicity costs Discountedcashflowwithfinancing Themodelwillcalculatecashflowineachyearoftheplanningperiod,netpresentvalue,and otherfinancialmeasuresusedtocomparealternatives. ExcergywillreviewthebusinesscaseanalyseswithCityofClearwaterinaone-dayworkshop andrevisethemodelanalyseswhereappropriatebasedontheteam’scomments.Theanalyses andaccompanyingnarrativewillform thecore oftheBusinessCaseReport.Excergy will endeavor to complete the analysis as soon as practical to give the City insight to projected financials before the end of Phase I. Task10Meetings ►One-day BusinessCaseAnalysesReviewWorkshop Task10Deliverables ►Highlevelmulti-periodeconomicandfinancialmodel ►Businesscasenarrative Task11:MeterTechnologiesManagement Excergywillincorporate ananalysisofCity ofClearwater’sexistingmeter populationandits performanceintothebenefit/costanalysisof Task 10, anddevelopa set ofrecommendationsfor meterprocurement,AMImeterconfiguration (readingresolution, frequencyoftransmissionand sampling),meterretrofit,andreplacement. 10 Task11Meetings ►CollectionofinformationanddiscussionwiththeCityofClearwater’smetershop Task11Deliverables ►AMI-basedmetertechnologiesmanagementrecommendationsreport Task12:NoneconomicBenefits/Costs Whileeconomic/financialmodelsdealwellwithonlyhard,directcostsandbenefits;abusiness casemustalsoconsidersoftandindirectcostsandbenefits,suchasenhancedcustomer satisfactionandconfidence,andreducedenvironmentalimpact.Aspartofthebusinesscase, wewillincludeahighlevelreviewofthenon-economicfactors,includingTripleBottomLine objectives,andidentifymajorindicatorsforeachcomponent(social,environmental,customer service,employeedevelopment,etc.). ExcergywillthenprovideCityofClearwaterawhitepapermemorandumonnoneconomic benefitsandcosts. Task12Meetings ►N/A Task12Deliverables ►Whitepapermemorandum onnoneconomicbenefitsandcosts Task13:DeploymentRecommendations BasedontheeconomicandfinancialanalysesofthekeystrategiesdevelopedinTask9,wewill developdraftrecommendationsregarding: ►Newtechnologies,ifany,thatareappropriateforthevariousdistrictsoroperatingunits ►The rate(s) of deployment, and in particular, acceleration over normal meter replacement ►Projectmanagementandimplementationsupport ►Prerequisitesinsuchareasasinformationtechnology,CityofClearwater’sorganization, customer-interactionpractices,etc. We willpresentthesedraftrecommendationsina memorandum.Basedonfeedbackand discussionswithCityofClearwaterstaff,wewill revisetherecommendationsmemorandum. 11 Task13Meetings ►Reviewanddiscussionwith CityofClearwaterProjectManagerpriortoreleaseof Memorandum onAMIdeploymentrecommendations Task13Deliverables ►Memorandum onAMIdeploymentrecommendations Task14:Implementation Considerations Basedontherecommendedstrategiesandbusinesscase,ExcergywillhelpCityofClearwater’s teamprepareadraftimplementationplan.Wewillalsohelpprepareaprojectscheduleinthe formofaGanttchartthatshowsthekeytasksandmilestonesforprojectprocurementand deployment.Thiswillhelpidentifythepointsatwhichmonetaryandstaffingcommitmentsare required. Aspartofimplementationplanning,Excergywillprepareasuggestedprojectschedule,from startofprocurementthroughdeployment.Ateachstage,wewillrecommendthefunctions requiredforprojectmanagement(forexample,vendorselection,fieldinspections, programming,acceptancetesting,etc.)andwhichfunctionscouldbeoutsourcedorprovidedby thevendor,orshouldbehandledby CityofClearwaterstaff.These recommendations will be incorporated and consistent with the economic analysis of Task 10. ExcergywillprepareadraftImplementationPlanningReport,whichwillincludeaproject procurementprocessanddeploymentscheduleandsuggestedstaffing.Wewillreviewthedraft withCityofClearwaterstaffinaone-dayworkshop,andreviseitasnecessary.(Note:afinal implementationplanisgenerally createdatthetimeoftechnology andvendorselection.) Task14Meetings ►Implementationconsiderationsworkshop Task14Deliverables ►Draftimplementationplanningwhitepaper Task15:RiskAssessment SinceanAMIprojectrequiressignificantcapitalinvestment,deliversmission-critical information,andhasalongservicelife;riskassessmentandmanagementshouldbepartofa comprehensiveAMIbusinesscaseanalysis,addressingtechnologicalrisksandbusinessrisks. Aspartoftheimplementationconsiderations,wewilldevelopariskanalysisofrecommended technologiesanddeploymentstrategies,identifyingpotentialrisksateachstageintheproject, theirlikelihood,impact,andsuggestedmanagementstrategies(mitigation,prevention,or acceptance). Task15Meetings ►N/A 12 Task15Deliverables ►Riskassessmentmemorandum Task16:Consolidated Report ExcergywillcompilethecomponentsdevelopedintheprevioustasksintoaDraftAMIFeasibility Studyreport.MostoftheelementsofthisreportwillhavealreadybeenreviewedbyCityof Clearwater’scoreteaminpriortasks.Thereportwillconsolidatethisworktocomprisea companywideanddistrict-by-districtanalysisofallcostsandbenefitsofinstallingAMI.Aftera finalreviewwithCity ofClearwater’score team,wewillfinalizethereport. Task16Meetings ►ReviewanddiscussionwithCityofClearwaterProjectManagerontheDraftAMI FeasibilityStudy Reporttoobtain&incorporatefeedbackpriortoreleaseofFinalAMIFeasibility Report Task16Deliverables ►DraftAMIFeasibility Study Report ►FinalAMIFeasibility Report 3.PROJECTGOALS: Task1:ProjectManagementsupport.DetailedProjectPlanandSchedule,Background InformationRequest,KickoffSessionSummary,Weekly Status Reports Task2:CommunicationsPlan Task3:Summary offindings,includingconsolidatedissuesandneeds Task4:AMITechnology whitepaper(draft),MDMSTechnology whitepaper(draft) Task5:CustomerinteractionWorkshopSummary Memorandum Task6: AMI-baseddistributionsystem monitoringworkshopsummarymemorandum Task7: ConservationandDemandManagementSummary Memorandum Task8: Technicalmemorandaonfunctionaldatarequirements andAMIinformationintegration, Provisionalapplicationdevelopmentroadmap Task9: AMI/MDMSrequirementsandstrategy recommendationsreport 13 Task10:Highlevelmulti-periodeconomicandfinancialmodel,Businesscasenarrative Task11:AMIbasedmetermanagementrecommendationsreport Task12:Whitepapermemorandum onnoneconomicbenefitsandcosts Task13:Memorandum onAMIdeploymentrecommendations Task14:Draftimplementationplanningwhitepaper Task15:Riskassessmentmemorandum Task16:DraftAMIfeasibilitystudy report,FinalAMIfeasibility report 4.BUDGET: ThispriceincludesalllaborandtravelexpensesanticipatedtobeincurredbyExcergy CorporationforthecompletionofthesetasksinaccordancewithProfessionalServicesMethod “A”–CostTimesMultiplierBasis,forafeenottoexceed onehundredseventythousandseven hundredfifteendollars($170,715.00).Labor is estimated to be $152,715 and travel expenses at $18,000. Excergy will minimize travel costs through local resources, government rates, and remote work sessions wherever possible and agreed to by the Cityof Clearwater. Milestone Description Due Amount Task 1 Project Management Monthly Based on Actual Time and Expenses $21,075.00 Task 2 Kickoff Session, Data Request, Information Gathering, Communications Plan Monthly Based on Actual Time and Expenses $18,000.00 Task 3 Information Analysis andStaff Interviews Monthly Based on Actual Time and Expenses $21,720.00 Task 4 Situation Analysis and AMI –MDMS Technology Review Monthly Based on Actual Time and Expenses $11,595.00 Task 5 AMI Customer Interaction Process Analysis Monthly Based on Actual Time and Expenses $10,770.00 Task 6 Distribution Operation Analysis Monthly Based on Actual Time and Expenses $7,500.00 14 Task 7 Conservation and Demand Management Analysis Monthly Based on Actual Time and Expenses $3,600.00 Task 8 Current Software Applications, Integration and Information Technology Assessment Monthly Based on Actual Time and Expenses $18,610.00 Task 9 AMI-MDMS Strategic Alternatives Monthly Based on Actual Time and Expenses $6,825.00 Task 10 Economic and Financial Analysis Monthly Based on Actual Time and Expenses $13,700.00 Task 11 Meter Technologies Management Monthly Based on Actual Time and Expenses $5,850.00 Task 12 Noneconomic Benefits/Costs Monthly Based on Actual Time and Expenses $3,050.00 Task 13 Deployment Recommendations Monthly Based on Actual Time and Expenses $3,600.00 Task 14 Implementation Considerations Monthly Based on Actual Time and Expenses $3,640.00 Task 15 Risk Assessment Monthly Based on Actual Time and Expenses $4,300.00 Task 16 Consolidated Report Monthly Based on Actual Time and Expenses $16,880.00 15 Professional HourlyRate Administrative $50.00 Tom Gallegos $225.00 Mark Johnson $225.00 John Sullivan $ 225.00 Gareth Thompson $225.00 Priscila Zardo $225.00 Lynn Adams $235.00 James Ketchledge $260.00 Don Schlenger $300.00 BillingandPaymentTerms Excergy willinvoicetheCitymonthly forlaborandtravelexpenses.Paymenttermsarenetthirty (30)days.Excergy reservestherighttochargeone andone-half(1.5%)percentpermonthor themaximumratepermittedby law,whicheverisgreater,onany balanceremaining unpaid afterthirty (30)days. 5.SCHEDULE: The projectisanticipatedtostartonDecember 8,2014,andbecompletedby May 1,2015.A detailedprojectscheduleisshowninAppendixA. 6.STAFFASSIGNMENT (Consultant): Excergy staff assignments: James Ketchledge, CEO: Principal in Charge/Quality Assurance Priscila Zardo: Project Manager (Phases 1 & 2), Technical Lead for Phase 3 Lynn Adams, Executive Consultant: Business Process/ Organization Mark Johnson, Principal Consultant: Economic Analysis Gareth Thompson, Solution Architect: IT/ System Integration Dr. Don Schlenger, Ph.D., Sr. Vice President –Water: AMI SME Tom Gallegos, Principle Consultant: Meter Technologies Management 16 John Sullivan, PMP: Project Manager (Phase 3) City assignments: Glenn Daniel: Project Manager CORRESPONDENCE/REPORTING PROCEDURES: Engineer’s/Architect’s project correspondence shall be directed to: Priscila Zardo, pzardo@excergy.com,720-316-7006 x713 All City project correspondence shall be directed to: GlennDaniel, glenn.daniel@myclearwater.com, 727-562-4960x7249, with copies to others as may be appropriate. 7.INVOICING/FUNDING PROCEDURES: InvoicesforworkperformedshallbesubmittedmonthlytotheCityofClearwater,Public UtilitiesDepartment,Attn:GlennDaniel,WaterManager,1650 N Arcturas Ave.,Bldg C, Clearwater,Florida33765-1945.Contingencyserviceswillbebilledasincurredonlyafter writtenauthorizationisprovidedby theCitytoproceedwiththoseservices. CityInvoicingCode:0315-96774-561300-533-000-0000 8.INVOICINGPROCEDURES Ataminimum,inadditiontotheinvoiceamount(s)thefollowinginformationshallbeprovided onall invoicessubmittedontheWorkOrder: A.PurchaseOrderNumberandContractAmount. B.The timeperiod(beginandenddate)coveredby theinvoice. C.A shortnarrativesummary ofactivitiescompletedinthetimeperiod. D.Contractbilling method–LumpSum orCostTimesMultiplier. E.If LumpSum,thepercentcompletion,amountdue,previousamountearnedandtotal earnedtodateforall tasks(directcosts,ifany,shall beincludedinlumpsum amount). F.IfCostTimesMultiplier,hours,hourlyrates,namesofindividualsbeingbilled,amountdue, previousamountearned,totalearnedtodateforeachtaskandotherdirectcosts(receipts willberequiredforanysingleitemwithacostof$50orgreaterorcumulativemonthly expensesgreaterthan$100). G.IftheWorkOrderisfundedbymultiplefundingcodes,anitemizationoftasksandinvoice amountsby fundingcode. 9.SPECIALCONSIDERATIONS: TheconsultantnamedaboveisrequiredtocomplywithSection119.0701,FloridaStatutes (2013) whereapplicable. 17 PREPARED BY:APPROVED BY: JamesKetchledge Tracy Mercer President/CEO PublicUtilitiesDirector ExcergyCorporation City of Clearwater October30, 2014 Date Date 18 WORKORDERINITIATIONFORM AppendixA:ProjectSchedule 19 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-710 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: AppointmentIn Control: Official Records & Legislative Services Agenda Number: 11.1 SUBJECT/RECOMMENDATION: Appoint Eric D. Spaulding to the Marine Advisory Board as the Ex Officio member with term to expire December 31, 2018. SUMMARY: APPOINTMENT WORKSHEET BOARD: Marine Advisory Board TERM: 4 years APPOINTED BY: City Council FINANCIAL DISCLOSURE: Not Required RESIDENCY REQUIREMENT: City of Clearwater SPECIAL QUALIFICATIONS: None MEMBERS: 7 CHAIRPERSON: Paul J. Kelley MEETING DATES: 2nd Wed., 8 am (Quarterly) PLACE: Chambers APPTS. NEEDED: 1 APPOINT ERIC D. SPAULDING AS THE EX OFFICIO CAPACITY MEMBER: 1. Eric D. Spaulding - 612 Gardenia St., Belleair, FL 33756 - Fishing (was serving 2nd term to expire 3/31/17) - Original Appointment 3/19/09 Zip codes of current members on board: 3 at 33761 1 at 33764 3 at 33767 Note - Section 2.197 of the Clearwater Code of Ordinances allows individuals to be appointed in ex officio capacity in order to obtain technical expertise unavailable locally. During his tenure on the Board, Mr. Spaulding has provided great insight on local navigational issues, shoaling problems, and, at the request of the Army Corps of Engineers, he joined the Corps in the dredging of the Clearwater Pass area. Page 1 City of Clearwater Printed on 11/26/2014 File Number: ID#14-710 Page 2 City of Clearwater Printed on 11/26/2014 11/11/14 U—dbAM FAX 121 44i TiVI U earwater Marine Ent Name: Home Address: 2— 6- Telephone: Cell Phone: CITY OF CLEARWATER - APPLICATION FOR ADVISORY BOARDS must be Clearwater resident) 6.11 How long a resident of Clearwater? Occupation: Field of Education: I3000 002 Office Address: cCo-4A- 54. Telephone: E-mail Address: If retired, former occupation: Community Activities: Employer: CPA Other Work Experience: RECEIVED NOV 17 2814 OFFICIAL RECORDS AND Other Interests: Board Service (current and past): cAv 00, pe.s Board Preference: , 0 Additional Comments: Signature: Date: See attached list for boards that require financial disclosure at time of appointment. Please return this application and board questionnaire to the Official Records & Legislative Services Department, P. 0. Box 4748, Clearwater, FL 33758-4748, or drop off your application at City Hall, 2nd Floor, 112 S. Osceola Avenue. Note: For boards requiring Clearwater residency,this application must be accompanied by a copy of one of the following: Current voter registration within city limits Valid current Florida Drivers' License issued to an address within city limits Declaration of Domicile filed with the city clerk affirming residency within city limits 11/,..,v14 ;. HUI 1- A (2( 44 ( '2(;)•1 Clearwater Marine Ent BOARD QUESTIONNAIRE 1. What is your understanding of the board's duties and responsibilities? E 0002 / 0002 2. Have you ever observed a board meeting either in person or on C-View, the City's TV station? 3. What background and/or qualifications do you have that you feel would qualify you to serve on this Board? 4. Why do you want to serve on this Board? fti 601 1 e-e-ls k Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-724 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Official Records & Legislative Services Agenda Number: 11.2 SUBJECT/RECOMMENDATION: Schedule a special work session for January 21, 2015 to obtain public input on Urban Land Institute’s recommendations for downtown. (consent) SUMMARY: During the November 12, 2014 work session, Council directed staff to schedule a special work session after the New Year to obtain public input. APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: REZ2014-08003 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 2 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.1 SUBJECT/RECOMMENDATION: Adopt Ordinance 8603-14 on second reading, amending the Zoning Atlas of the city by rezoning certain property whose post office address is 2854 Sunstream Lane, Clearwater, Florida 33759, from Low Density Residential (LDR) to Low Medium Density Residential (LMDR). SUMMARY: APPROPRIATION CODE AND AMOUNT: N/A USE OF RESERVE FUNDS: N/A Page 1 City of Clearwater Printed on 11/26/2014 F.1. COMMUNITY DEVELOPMENT BOARD PLANNING AND DEVELOPMENT DEPARTMENT STAFF REPORT MEETING DATE: 10-21-2014 AGENDA ITEM: F.1. CASE: REZ2014-08003 REQUEST: To amend the Zoning Atlas designation from Low Density Residential (LDR) to Low Medium Density Residential (LMDR). GENERAL DATA: Agent……………………… Larry Mills Applicant / Owner.............. Sunstream Lane Development, LLC Location……..................... 2854 Sunstream Lane, located approximately 160 feet west of Parkstream Avenue, south of Saber Drive, and north of Lake Chautauqua Park. Property Size…................. 11.462 acres, more or less ANALYSIS: Site Location and Existing Conditions: This case involves an 11.462-acre, more or less, property located on the south side of Sunstream Lane, approximately 160 feet west of Parkstream Avenue. The parcel, addressed as 2854 Sunstream Lane, is owned by Sunstream Lane Development, LLC and is currently vacant. Request: The request is to change the property’s Zoning Atlas designation of Low Density Residential (LDR) to Low Medium Density Residential (LMDR). Both the current district (Low Density Residential) and the proposed district (Low Medium Density Residential) are consistent with the underlying future land use map classifcation of Residential Low (RL); therefore, no future land use map amendment is required. The applicant has submitted a Preliminary Plat for a 28-lot subdivision to be processed if this rezoning is approved. The applicant understands all necessary approvals and permits must be obtained before development of the subject site occurs. Community Development Board – October 21, 2014 REZ2014-08003- Page 2 of 7 Level III Zoning Atlas Amendment Application Review PLANNING & DEVELOPMENT LONG RANGE DIVISION Vicinity Characteristics: The property is surrounded by single family homes to the north and to the east. To the south is Lake Chautauqua Park, and to the west are Lake Chautauqua and a single family home. Approximately 1330 linear feet, or 33 percent of the perimeter property boundary, abuts properties with a Zoning Atlas designation of Open Space/Recreation. The remainder abuts properties zoned Low Medium Density Residential (LMDR), Low Density Residential (LDR), Preservation (P) and Agricultural Estate Residential (A-E) (Pinellas County) (see Figure 1 below). Figure 1 A complete listing of the surrounding land uses, Future Land Use Map designations and Zoning Atlas designations are shown in Table 1 below. 33% 17%16% 8% 26% Abutting Zoning Atlas Designations Open Space/Recreation OS/R Low Medium Density Residential (LMDR) Low Density Residential (LDR) Preservation (P) Agricultural Estate Residential (A-E) (Pinellas County) Community Development Board – October 21, 2014 REZ2014-08003- Page 3 of 7 Level III Zoning Atlas Amendment Application Review PLANNING & DEVELOPMENT LONG RANGE DIVISION Table 1. Surrounding Future Land Use and Zoning Designations Direction Existing Conditions Existing Use(s) FLUM Designation Zoning Atlas Designation North: Single Family Residential Residential Low (RL) Low Density Residential (LDR) East: Single Family Residential Residential Low (RL) Low Medium Density Residential (LMDR) South: City Park Recreation/Open Space (R/OS) Open Space/Recreation (OS/R) West: Lake Chautauqua, Single Family Residential Preservation (P), Water, Residential Low (RL) Preservation (P), Agricultural Estate Residential (A-E) (Pinellas County) REVIEW CRITERIA: No amendment to the Zoning Atlas shall be recommended for approval or receive a final action of approval unless it complies with the standards contained in Section 4-602.F, Community Development Code. Table 2 below depicts the consistency of the proposed amendment with the standards as per Section 4-602.F: Table 2. Consistency with Community Development Code Standards CDC Section 4-602 Standard Consistent Inconsistent F.1 The proposed amendment is consistent with and features the goals, policies and objectives of the Comprehensive Plan and furthers the purposes of this Development Code and other city ordinances and actions designed to implement the plan. X F.2 The available uses to which the property may be put are appropriate to the property which is subject to the proposed amendment and compatible with existing and planned uses in the area. X F.3 The amendment does not conflict with the needs and character of the neighborhood and the city. X F.4 The amendment will not adversely or unreasonably affect the use of other property in the area. X F.5 The amendment will not adversely burden public facilities, including the traffic-carrying capacities of streets, in an unreasonably or disproportionate manner. X F.6 The district boundaries are appropriately drawn with due regard to locations and classifications of streets, ownership lines, existing improvements and the natural environment. X Community Development Board – October 21, 2014 REZ2014-08003- Page 4 of 7 Level III Zoning Atlas Amendment Application Review PLANNING & DEVELOPMENT LONG RANGE DIVISION RECOMMENDED FINDINGS OF FACT AND CONCLUSIONS OF LAW: Consistency of Development with the Clearwater Comprehensive Plan and Community Development Code and Regulations [Sections 4-602.F.1] Recommended Findings of Fact: Applicable goals, objectives and policies of the Clearwater Comprehensive Plan which support the proposed amendment include: Goal A.1.1.3 Environmentally sensitive wetlands subject to Department of Environmental Protection (DEP) jurisdiction and the jurisdictional wetlands of the Southwest Florida Water Management District (SWFWMD) shall be designated by “Preservation” (P) zoning and prevented from being built upon except as permitted by the Preservation Zoning District. Goal A.2 A sufficient variety and amount of Future Land Use categories shall be provided to accommodate public demand and promote infill development. Goal A.2.2.2 Residential land uses shall be sited on well-drained soils, in proximity to parks, school, mass transit and other neighborhood-serving land uses. Goal A.4 The City shall not permit development to occur unless an adequate level of service is available to accommodate the impacts of development. Areas in which the impact of existing development exceeds the desired levels of service will be upgraded consistent with the target dates for infrastructure improvements included in the applicable functional plan element. Policy A.6.2.1 On a continuing basis, the Community Development Code and the site plan approval process shall be utilized in promoting infill development and/or planned developments that are compatible. Recommended Conclusions of Law: The request does not conflict with the goals, objectives and policies of the Clearwater Comprehensive Plan and furthers said plan as indicated in the following. The proposed Low Medium Density Residential (LMDR) District is compatible with the single family residential uses. The subject site borders Lake Chautauqua Park, and is also in close proximity to Westfield Countryside Mall (1 mile), McMullen Booth Middle School (0.85 miles), as well as other neighborhood-serving uses (i.e. grocery stores and restaurants to the northwest, west, and southwest). In addition, the proposal does not degrade the level of service for public facilities below the adopted standards (a detailed public facilities analysis follows in this report). The portion of the property that is zoned Preservation (P) will remain as such, and will see no development. Compatibility with Surrounding Property/Character of the City & Neighborhood [Section 4-602.F.2, 4-602.F.3 and Section 4-602.F.4] Recommended Findings of Fact: Existing surrounding uses consist of single family homes, a city park, and a lake. The Zoning Atlas designations of surrounding properties include Low Density Residential (LDR), Low Medium Density Residential (LMDR), A-E, Agricultural Estate Residential (Pinellas County), Preservation (P), and Open Space/Recreation (OS/R). Community Development Board – October 21, 2014 REZ2014-08003- Page 5 of 7 Level III Zoning Atlas Amendment Application Review PLANNING & DEVELOPMENT LONG RANGE DIVISION The proposed Low Medium Density Residential (LMDR) District primarily permits residential uses. The intent of the Low Medium Density Residential (LMDR) District is to protect and preserve the integrity and value of existing, stable residential neighborhoods of low to medium density while at the same time, allowing a careful and deliberate redevelopment and revitalization of existing neighborhoods in need of revitalization or neighborhoods with unique amenities which create unique opportunities to increase property values and the overall attractiveness of the City. The proposed Zoning Atlas designation will allow infill development of the subject property to take place. A low medium density residential use will serve as an appropriate transition from the lower density residential areas to the north and east and to the open space use to the south, adding to the appeal of the neighborhood and overall attractiveness of the City. Recommended Conclusions of Law: The proposed Zoning Atlas designation is in character with the overall Zoning Atlas designations in the area. Further, the proposal is compatible and consistent with the uses and character of the surrounding properties and neighborhood in the vicinity of the subject property. Sufficiency of Public Facilities [Section 4-602.F.5] Recommended Findings of Fact: To assess the sufficiency of public facilities needed to support potential development on the property, the maximum development potential of the property under the present Future Land Use Map designation and the present and requested Zoning designation were analyzed. Even though this is a Zoning Atlas amendment application, maximum development potential is based on the underlying future land use, so for purposes of this analysis, sufficiency of public facilities is based on the Future Land Use Map designation. In this instance there is no change to the Future Land Use Map, and both the current Low Density Residential (LDR) District and the proposed Low Medium Density Residential (LMDR) District primarily permit residential uses. Since there is no change to the Future Land Use Map designation nor a change of use, there is no change to the development potential (i.e., dwelling units per acre or floor area ratio) as shown in Table 3. Community Development Board – October 21, 2014 REZ2014-08003- Page 6 of 7 Level III Zoning Atlas Amendment Application Review PLANNING & DEVELOPMENT LONG RANGE DIVISION Table 3. Public Facilities Level of Service Analysis Maximum Potential Impact to Public Facilities/Services Net Change Capacity Available? Public Facility/Service Current Low Density Residential (LDR) District (5 units per acre) Requested Low Medium Density Residential (LMDR) District (5 units per acre) Streets 573 Trips1 573 Trips1 0 Yes Potable Water2 14,842 GPD3 14,842 GPD3 0 Yes Wastewater2 13,358 GPD3 13,358 GPD3 0 Yes Solid Waste2 144.5 Tons/Year 144.5 Tons/Year 0 Yes Parkland2 0 Acres4 0 Acres4 0 Yes Notes: 1. Based on average daily trips per acreage figure, Pinellas County Countywide Plan Rules.  Residential Low (RL) – 50 vehicle trips per day per acre. 2. Analysis based on utilization rates of 260.4 GPD/unit for potable water and 234.36 GPD/unit for wastewater; 5,069.44 lbs/year/unit for solid waste. 3. GPD – Gallons per day. 4. Based on 4.0 acres of parkland per 1,000 persons and 2.2 persons per unit. The Trip Generation Comparison by Zoning Atlas Designation in Table 4 below indicates the estimated trip generation for specific uses allowed in the current and proposed zoning districts based on the Institute of Transportation Engineer’s (ITE) Trip Generation 9th Edition. There is no change in the maximum number of units that could be built since the Future Land Use is not being amended. However, because the property is currently vacant, there would be an increase of up to 545 average daily trips and an increase of 58 PM peak trips if the parcel were built to its maximum development potential. Table 4. Trip Generation Comparison by Zoning Atlas Designation Land Use Development Potential Avg. Daily Trips Net Change Avg Daily Trips PM Peak Trips Avg Rate PM Peak Trips Net Change PM Peak Trips Existing Designation: Low Density Residential (LDR) District Vacant 0 units 0 N/A 0.00 0 N/A Single Family Residential1 (9.57 trips/unit) 57 units2 545 N/A 1.01 58 N/A Proposed Designation: Low Medium Density Residential (LMDR) District Single Family Residential1 (9.57 trips/unit) 57 units2 545 545 1.01 58 58 Abbreviations and Notes: N/A = Not Applicable. SF = Square Feet GFA = Gross Floor Area 1. Institute of Transportation Engineer’s Trip Generation 9th Edition Land Use 210. 2. Total dwelling units permitted by the underlying RL Future Land Use Map category is 5 units per acre. Community Development Board – October 21, 2014 REZ2014-08003- Page 7 of 7 Level III Zoning Atlas Amendment Application Review PLANNING & DEVELOPMENT LONG RANGE DIVISION Recommended Conclusions of Law: Based upon the findings of fact, it is determined that the additional traffic generated by the proposed amendment will not result in the degradation of the existing level of service on Enterprise Road. This segment of Enterprise Road is currently operating at a Level of Service C, which is above the adopted roadway level of service standard. There will be an increase in demand for potable water and generation of wastewater and solid waste, but there is adequate capacity to accommodate the maximum demand generated by the proposed amendment. Furthermore, parkland and recreation facilities will not be affected by the proposed amendment. Location of District Boundaries [Section 4-602.F.6] Recommended Findings of Fact: The location of the proposed Low Medium Density Residential (LMDR) District boundaries is consistent with the boundaries of the subject property. The proposed Low Medium Density Residential (LMDR) District is compatible with the single family residences to the north and east, and to the park to the south. Recommended Conclusions of Law: The district boundaries are appropriately drawn in regard to location and classifications of streets, ownership line, existing improvements, and the natural environment. REVIEW PROCEDURE: Approval of the Zoning Atlas amendment does not guarantee the right to develop the subject property. The property owner must comply with all laws and ordinances in effect at the time development permits are requested, including transportation concurrency provisions of the Concurrency Management System in Division 9, Community Development Code. RECOMMENDATION: Based on the foregoing, the Planning and Development Department recommends the following action: Recommend APPROVAL of the request for Zoning Atlas amendment from the Low Density Residential (LDR) classification to the Low Medium Density Residential (LMDR) classification. Prepared by Planning and Development Department Staff: Kyle Brotherton Planner II ATTACHMENTS: Resume Photographs of Site and Vicinity Ordinance No. 8603-14 ORDINANCE NO. 8603-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING THE ZONING ATLAS OF THE CITY BY REZONING CERTAIN PROPERTY LOCATED APPROXIMATELY 160 FEET WEST OF PARKSTREAM AVENUE, SOUTH OF SABER DRIVE, AND NORTH OF LAKE CHAUTAUQUA PARK, CONSISTING OF METES & BOUNDS TRACT 13/01 IN SECTION 32, TOWNSHIP 28 S, RANGE 16 E, WHOSE POST OFFICE ADDRESS IS 2854 SUNSTREAM LANE, CLEARWATER, FLORIDA 33759; FROM LOW DENSITY RESIDENTIAL (LDR) TO LOW MEDIUM DENSITY RESIDENTIAL (LMDR); PROVIDING AN EFFECTIVE DATE. WHEREAS, the amendment to the zoning atlas of the City as set forth in this ordinance is found to be reasonable, proper and appropriate, and is consistent with the City's Comprehensive Plan; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The following described property in Clearwater, Florida, is hereby rezoned, and the zoning atlas of the City is amended as follows: Property Zoning District See attached Exhibit A for legal description From: Low Density Residential (LDR) (REZ2014-08003) To: Low Medium Density Residential (LMDR) The map attached as Exhibit B is hereby incorporated by reference. Section 2. The City Engineer is directed to revise the zoning atlas of the City in accordance with the foregoing amendment. Section 3. This ordinance shall take effect immediately by the Pinellas County Board of County Commissioners, and subject to a determination by the State of Florida, as appropriate, of compliance with the applicable requirements of the Local Government Comprehensive Planning and Land Development Regulation Act, pursuant to §163.3189, Florida Statutes. 2 Ordinance No. 8603-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk REZ2014-08003 EXHIBIT A LEGAL DESCRIPTION: The North 1/2 of the Southwest 1/4 of the Northeast 1/4 of Section 32, Township 28 South, Range 16 East, Pinellas County, Florida. LESS that part described as follows: Commence at the Northwest corner of the Southwest 1/4 of the Northeast 1/4 of said Section 32 for a Point of Beginning; thence go South 360 feet; thence East 700 feet; thence North 360 feet; thence West to the Point of Beginning. LESS A portion of the North 1/2 of the Southwest 1/4 of the Northeast 1/4 of Section 32, Township 28 South, Range 16 East, Pinellas County, Florida, being described as follows: Commence at the Northwest corner of the Southwest 1/4 of the Northeast 1/4 of said Section 32; thence S00°02'36"W for 360.00 feet; thence S89°43'28"E for 154.67 feet to the POINT OF BEGINNING; thence continue S89°43'28"E for 236.65 feet; thence S64°29'01"W for 91.32 feet; thence S75°42'43"W for 104.03 feet; thence N82°46'40"W for 33.42 feet; thence N43°54'59"W for 29.50 feet; thence N00°16'32"E for 40.70 feet to the POINT OF BEGINNING. LEGAL DESCRIPTION (continued): (PLAT LEGAL) Said parcel being further described as follows: A portion of the North 1/2 of the Southwest 1/4 of the Northeast 1/4 of Section 32, Township 28 South, Range 16 East, Pinellas County, Florida being described as follows: BEGIN at the Southeast corner of the Northwest 1/4 of the Northeast 1/4 of said Section 32; thence S00°01'04"W along the West boundary of the East 1/2 of the Northeast 1/4 of said Section 32 for 679.24 feet; thence leaving said West boundary N89°39'11"W for 1328.96 feet; thence N00°00'01"E for 318.62 feet; thence S89°40'51"E for 154.67 feet; thence S00°19'09"W for 40.70 feet; thence S43°52'22"E for 29.50 feet; thence S82°44'03"E for 33.42 feet; thence N75°45'20"E for 104.03 feet; thence N64°31'38"E for 91.32 feet; thence S89°40'51"E for 308.60 feet; thence N00°00'43"E for 360.00 feet; thence S89°40'45"E for 629.17 feet to the POINT OF BEGINNING. Contains 640,230 Square Feet or 14.698 Acres, more or less. REZ2014-08003 LEGAL DESCRIPTION (continued): LESS that portion lying waterward of the jurisdictional wetland line being further described as follows: A portion of the North 1/2 of the Southwest 1/4 of the Northeast 1/4 of Section 32, Township 28 South, Range 16 East, Pinellas County, Florida being described as follows: COMMENCE at the Southeast corner of the Northwest 1/4 of the Northeast 1/4 of said Section 32; thence S00°01'04"W along the West boundary of the East 1/2 of the Northeast 1/4 of said Section 32 for 679.24 feet; thence leaving said West boundary N89°39'11"W for 1110.56 feet to the POINT OF BEGINNING; thence continue N89°39'11"W for 218.41 feet; thence N00°00'01"E for 318.62 feet; thence S89°40'51"E for 154.67 feet; thence S00°19'09"W for 40.70 feet; thence S43°52'22"E for 29.50 feet; thence S82°44'03"E for 33.42 feet; thence N75°45'20"E for 104.03 feet; thence N64°31'38"E for 91.32 feet; thence S89°40'51"E for 95.71 feet; thence S24°21'07"E for 65.45 feet; thence S09°13'01"W for 43.93 feet; thence S04°16'54"W for 75.01 feet; thence S31°02'39"W for 52.24 feet; thence S46°39'28"W for 65.44 feet; thence S63°50'01"W for 23.88 feet; thence S29°36'41"W for 32.06 feet; thence S87°48'09"W for 42.64 feet; thence S84°26'15"W for 45.04 feet; thence S89°10'13"W for 44.84 feet; thence S83°05'08"W for 39.18 feet to the POINT OF BEGINNING. Contains 140,945 square feet or 3.236 Acres, more or less. Exhibit B ZONING MAP Owner(s): Sunstream Lane Development, LLC Case: REZ2014-08003 Site: Approximately 160 feet west of Parkstream Avenue, south of Saber Drive, and north of Lake Chautauqua Park Property Size(Acres): ±11.462 Land Use Zoning PIN: 32-28-16-00000-130-0100 From : To: RL LDR RL LMDR Atlas Page: 233B MDR P SABER DR PA R K S T R E A M A V E AN T H O N Y A V E ENTERPRISE RD E SUNSTREAM LN P H EAS ANT RUN SUNDANCER DR SABER CT LDR P OS/R LMDR MDR P LMDR OS/R 2863 2857285128452839 28 3 3 28 2 7 2 8 6 4 2 8 5 8 27 6 9 27 6 7 27 7 3 27 7 5 27 7 7 27 7 9 27 6 5 27 8 1 27 8 5 27 8 3 27 5 7 27 8 7 27 9 1 27 5 9 27 3 7 2427 2420 2832 2423 2429 2862 2856 2849 283728312825 2819 2811 2416 2422 2440 2428 2434 2 8 4 62 8 4 0 2 8 5 2 2449 2431 2437 2425 2443 2455 2381 2387 2369 2375 2393 2372 2378 2384 23902392 2925 2919 2913 2366 2417 2435 2429 2423 2447 2453 2441 2459 2411 2448 2460 2436 2454 2442 2452 2458 2410 2924 2930 2918 2741 2745 2745 2741 2739 2771 2763 2761 2714 2823 2817 2811 2426 2826 2436 2430 2424 2873 2867 2861 2855 2843 28 1 6 282 2 282 8 28 3 4 2419 2 4 6 1 2399 2396 2350 2356 2374 2362 2368 2386 2398 2931 2 2 2 2 2405 2406 2418 2430 2412 2424 2 2 2 2 2 2 2 2908 2422 2416 2428 2434 2446 2440 2854 2912 2850 2739 2741 27452745 2789 2745 2745 -N o t t o S c a l e - -N o t a S u r v e y - LMDR P S:\Planning Department\C D B\Zoning Atlas Amendments\Active Cases\Sunstream Lane 2854 REZ2014-08003 - Sunstream Lane Development\Maps_NEW\Word\LocREZ2014-08003.docx LOCATION MAP Owner(s): Sunstream Lane Development, LLC Case: REZ2014-08003 Site: 2854 Sunstream Lane Property Size(Acres): ±11.462 Land Use Zoning PIN: 32-28-16-00000-130-0100 From : To: RL LDR RL LMDR Atlas Page: 233B ^ PROJECT SITE ENTERPRISE RD ENTERPRISE RD E SABER DR LANDMARK DR PARKSTREAM AVE AN T H O N Y A V E HI L L C R E E K C I R E SUNDANCER DR STEVEN ST HILLCREEK CIR S GL ORIA CT BOND AVE SHADE TREE LN TERENCE CT FOXHEAD WAY -N o t t o S c a l e - -N o t a S u r v e y - LAKE CH A U TAU Q U A S:\Planning Department\C D B\Zoning Atlas Amendments\Active Cases\Sunstream Lane 2854 REZ2014-08003 - Sunstream Lane Development\Maps_NEW\Word\AerREZ2014-08003.docx AERIAL PHOTOGRAPH Owner(s): Sunstream Lane Development, LLC Case: REZ2014-08003 Site: 2854 Sunstream Lane Property Size(Acres): ±11.462 Land Use Zoning PIN: 32-28-16-00000-130-0100 From : To: RL LDR RL LMDR Atlas Page: 233B SABER DR SABER DR PA R K S T R E A M A V E PA R K S T R E A M A V E AN T H O N Y A V E AN T H O N Y A V E ENTERPR ISE R D EENTERPRISE RD E SUNSTREAM LNSUNSTREAM LN P H EA SANT RUN PHE A SA N T R U N SUNDANCER DR SUNDANCER DR SABER CT SABER CT -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Zoning Atlas Amendments\Active Cases\Sunstream Lane 2854 REZ2014-08003 - Sunstream Lane Development\Maps_NEW\Word\FLUREZ2014-08003.docx MDR P SABER DR PA R K S T R E A M A V E AN T H O N Y A V E ENTERPRISE RD E SUNSTREAM LN P H EAS ANT RUN SUNDANCER DR SABER CT RL R/OS RM RL P WATER RL RL RL RL RU P R/OS PR/OSWATER RURM 2863 2857285128452839 28 3 3 28 2 7 2 8 6 4 2 8 5 8 27 6 9 27 6 7 27 7 3 27 7 5 27 7 7 27 7 9 27 6 5 27 8 1 27 8 5 27 8 3 27 6 1 27 5 7 27 8 7 27 9 1 27 5 9 27 3 7 28 2 3 2427 2420 283228262423 2429 2862 2856 28 4 9 28 3 728 3 128 2 5 28 1 9 28 1 1 2416 2422 2440 2428 2434 2 8 4 62 8 4 0 2 8 5 2 2449 2431 2437 2425 2443 2455 2387 2369 2375 2393 2399 2378 2384 2390 2396 2392 2398 29 2 5 29 1 3 2366 2417 2423 2447 2453 2441 2459 2411 2448 2460 2436 2454 2442 2452 2458 2410 2924 2930 2918 2741 2745 27892745 2741 2739 RL P 27 7 1 27 6 3 27 1 4 28 1 7 28 1 1 2426 2436 2430 2424 28 7 3 28 6 7 28 6 1 28 5 5 28 4 3 28 1 6 282 2 282 8 283 4 2419 2 4 6 1 2381 2372 2350 2356 2374 2362 2368 2386 29 3 1 29 1 9 2 2 2 2 2435 2429 2405 2406 2418 2430 2412 2424 2 2 2 2 2 2 2 2908 2422 2416 2428 2434 2446 2440 28 5 4 2912 28 5 0 2739 2741 274527452745 2745 -N o t t o S c a l e - -N o t a S u r v e y - RL FUTURE LAND USE MAP Owner(s): Sunstream Lane Development, LLC Case: REZ2014-08003 Site: 2854 Sunstream Lane Property Size(Acres): ±11.462 Land Use Zoning PIN: 32-28-16-00000-130-0100 From : To: RL LDR RL LMDR Atlas Page: 233B P S:\Planning Department\C D B\Zoning Atlas Amendments\Active Cases\Sunstream Lane 2854 REZ2014-08003 - Sunstream Lane Development\Maps_NEW\Word\ZonREZ2014-08003.docx ZONING MAP Owner(s): Sunstream Lane Development, LLC Case: REZ2014-08003 Site: 2854 Sunstream Lane Property Size(Acres): ±11.462 Land Use Zoning PIN: 32-28-16-00000-130-0100 From : To: RL LDR RL LMDR Atlas Page: 233B MDR P SABER DR PA R K S T R E A M A V E AN T H O N Y A V E ENTERPRISE RD E SUNSTREAM LN P H EAS ANT RUN SUNDANCER DR SABER CT LDR P OS/R LMDR MDR P LMDR OS/R 2863 2857285128452839 28 3 3 28 2 7 2 8 6 4 2 8 5 8 27 6 9 27 6 7 27 7 3 27 7 5 27 7 7 27 7 9 27 6 5 27 8 1 27 8 5 27 8 3 27 5 7 27 8 7 27 9 1 27 5 9 27 3 7 2427 2420 2832 2423 2429 2862 2856 2849 283728312825 2819 2811 2416 2422 2440 2428 2434 2 8 4 62 8 4 0 2 8 5 2 2449 2431 2437 2425 2443 2455 2381 2387 2369 2375 2393 2372 2378 2384 23902392 2925 2919 2913 2366 2417 2435 2429 2423 2447 2453 2441 2459 2411 2448 2460 2436 2454 2442 2452 2458 2410 2924 2930 2918 2741 2745 2745 2741 2739 2771 2763 2761 2714 2823 2817 2811 2426 2826 2436 2430 2424 2873 2867 2861 2855 2843 28 1 6 282 2 282 8 28 3 4 2419 2 4 6 1 2399 2396 2350 2356 2374 2362 2368 2386 2398 2931 2 2 2 2 2405 2406 2418 2430 2412 2424 2 2 2 2 2 2 2 2908 2422 2416 2428 2434 2446 2440 2854 2912 2850 2739 2741 27452745 2789 2745 2745 -N o t t o S c a l e - -N o t a S u r v e y - LMDR P S:\Planning Department\C D B\Zoning Atlas Amendments\Active Cases\Sunstream Lane 2854 REZ2014-08003 - Sunstream Lane Development\Maps_NEW\Word\ExistREZ2014-08003.docx 60 1 2 313233 LAKE CHAUTAUQUA 60 60 100 60 60 60 60 60 60 60 60 6060 60 61628 61629 A B E F H 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 1 2 3 4 5 6 789 10 11 12 13 14 52 3435 51 50 36 37 38 39 40 41 42 43 44 4546 4748 49 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2 3 1 2 3 4 5 6 789 10 39 40 41 42 43 44 16171819 1 2 3 4 5 1 1 2 30 29 28 2726 25 2324 22 4 5 13/04 5.80 13/01 14.73 13/03 41.1 24/01 48.16 13/0213/0213/02 33 AC(C) AC(C) AC AC 3 SABER DR PA R K S T R E A M A V E AN T H O N Y A V E ENT ERPRISE RD E SUNDANCER DR 2863 2857285128452839 28 3 3 28 2 7 2 8 6 4 2 8 5 8 27 7 1 27 6 9 27 6 7 27 7 3 27 7 5 27 7 7 27 7 9 27 6 3 27 6 5 27 8 1 27 8 5 27 8 3 27 6 1 27 5 7 27 8 7 27 9 1 27 5 9 27 3 7 28 1 1 24272426 2420283228262423 2856 2436 2430 2424 28 3 1 28 2 5 28 1 9 28 1 1 2416 2440 2434 2 8 16 2449 2431 2425 2443 2455 2372 2396 2392 29 1 9 29 1 3 2366 2908 2741 2745 2789 27 1 4 28 2 3 28 1 7 2429 2862 28 4 9 28 7 3 28 6 7 28 6 1 28 5 5 28 3 7 28 4 3 2422 2428 2 8 4 62 8 4 0 2 82 2 28 2 8 2 83 4 2 8 5 2 2437 2419 2 4 6 1 2381 2387 2369 2375 2393 2399 2378 2384 2390 2350 2356 2374 2362 2368 2386 2398 29 3 1 29 2 5 2 2 2 2 2417 2435 2429 2423 2447 2453 2441 2405 2459 2411 2406 2448 2460 2418 2436 2430 2412 2454 2424 2442 2 2 2 2 2 2 2 2452 2458 2410 2422 2416 2428 2434 2446 2440 28 5 4 2912 2924 2930 2918 28 5 0 2741 2739 274527452745 2745 2745 2741 2739 -N o t t o S c a l e - -N o t a S u r v e y - EXISTING SURROUNDING USE MAP Owner(s): Sunstream Lane Development, LLC Case: REZ2014-08003 Site: 2854 Sunstream Lane Property Size(Acres): ±11.462 Land Use Zoning PIN: 32-28-16-00000-130-0100 From : To: RL LDR RL LMDR Atlas Page: 233B Park Single Family Residential Single Family Residential Water Multi-Family Residential View looking west at the subject property, 2854 SunstreamLane.View looking north of the subject property. View looking south of the subject property.Adjacent property to the southeast of the subject property along ParkstreamAvenue. REZ2014-08003 SunstreamLane Development, LLC 2854 SunstreamLane Adjacent property to the northeast of the subject property along ParkstreamAvenue. View looking easterly along SunstreamLane. Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8604-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.2 SUBJECT/RECOMMENDATION: Adopt Ordinance 8604-14 on second reading, annexing certain real property whose post office address is 1601 Long Street, Clearwater, Florida 33755, together with all abutting right-of-way of Long Street, into the corporate limits of the city and redefining the boundary lines of the city to include said addition. SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8604-14 ORDINANCE NO. 8604-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, ANNEXING CERTAIN REAL PROPERTY LOCATED ON THE SOUTH SIDE OF LONG STREET, APPROXIMATELY 300 FEET WEST OF RIDGE AVENUE, CONSISTING OF LOT 1, BLOCK 6, FIRST ADDITION TO HIGHLAND PINES SUBDIVISION, WHOSE POST OFFICE ADDRESS IS 1601 LONG STREET, CLEARWATER, FLORIDA 33755, TOGETHER WITH ALL ABUTTING RIGHT- OF-WAY OF LONG STREET, INTO THE CORPORATE LIMITS OF THE CITY, AND REDEFINING THE BOUNDARY LINES OF THE CITY TO INCLUDE SAID ADDITION; PROVIDING AN EFFECTIVE DATE. WHEREAS, the owner of the real property described herein and depicted on the map attached hereto as Exhibit A has petitioned the City of Clearwater to annex the property into the City pursuant to Section 171.044, Florida Statutes, and the City has complied with all applicable requirements of Florida law in connection with this ordinance; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The following-described property is hereby annexed into the City of Clearwater and the boundary lines of the City are redefined accordingly: Lot 1, Block 6, FIRST ADDITION TO HIGHLAND PINES SUBDIVISION, according to the map or plat thereof, as recorded in the Plat Book 30, Page 100, Public Records of Pinellas County, Florida (ANX2014-09015) The map attached as Exhibit A is hereby incorporated by reference. Section 2. The provisions of this ordinance are found and determined to be consistent with the City of Clearwater Comprehensive Plan. The City Council hereby accepts the dedication of all easements, parks, rights-of-way and other dedications to the public, which have heretofore been made by plat, deed or user within the annexed property. The City Engineer, the City Clerk and the Planning and Development Director are directed to include and show the property described herein upon the official maps and records of the City. Section 3. This ordinance shall take effect immediately upon adoption. The City Clerk shall file certified copies of this ordinance, including the map attached hereto, with the Clerk of the Circuit Court and with the County Administrator of Pinellas County, Florida, within 7 days after adoption, and shall file a certified copy with the Florida Department of State within 30 days after adoption. 2 Ordinance No. 8604-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A PROPOSED ANNEXATION MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST 1305 1301 1229 1221 1225 1624 1201 12051616 1220 1216 1300 1304 16 2 5 1212 1200 15 8 5 16 0 1 16 1 1 16 0 5 16 1 3 160 0 160 0 161 4 16 0 8 160 4 16 00 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 15 6 7 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 15 72 15 7 0 16 04 16 10 161 2 1211 15 5 3 1226 15 5 1 15 5 5 1290 1300 15 6 1 15 6 0 15 5 4 15 6 1 15 6 3 15 66 15 7 2 16 04 161 0 16 14 156 0 156 4 15 6 8 15 5 0 15 60 1209 11 1117 15 7 6 131611 16 0 1 15 5 5 1305 1301 1304 15 6 5 -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\locANX2014- 09015.docx LOCATION MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B ^ PROJECT SITE LONG ST PALMETTO ST RIDGE AVE SCOTT ST FLAGLER DR WOOD AVE N HIGHLAND AVE SHERWOOD ST LYNN AVE GENTRY ST WALNUT ST CLARK ST BONAIR ST LEVERN ST CASLER AVE NELSON AVE MURRAY AVE ELMWOOD ST CARROLL ST CROWN ST WEBB DR CARLOS AVE LOGAN ST CHANDLER AVE MACRAE AVE PALM TERRACE DR RICHARDS AVE -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\aerANX2014- 09015.docx AERIAL PHOTOGRAPH Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 16 0 1 16 0 1 LONG ST LONG ST RIDGE AVE RIDGE AVE GENTRY ST GENTRY ST WO O D A V E WO O D A V E CLARK ST CLARK ST CARROLL ST CARROLL ST -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\proANX2014- 09015.docx PROPOSED ANNEXATION MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST 1305 1301 1229 1221 1225 1624 1201 12051616 1220 1216 1300 1304 16 2 5 1212 1200 15 8 5 16 0 1 16 1 1 16 0 5 16 1 3 160 0 160 0 161 4 16 0 8 160 4 16 00 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 15 6 7 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 15 72 15 7 0 16 04 16 10 161 2 1211 15 5 3 1226 15 5 1 15 5 5 1290 1300 15 6 1 15 6 0 15 5 4 15 6 1 15 6 3 15 66 15 7 2 16 04 161 0 16 14 156 0 156 4 15 6 8 15 5 0 15 60 1209 11 1117 15 7 6 131611 16 0 1 15 5 5 1305 1301 1304 15 6 5 -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\fluANX2014- 09015.docx FUTURE LAND USE MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 RU RU RL RL RL RU RL RL RU RU RU RU RL RU RURL RL RURLRU LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST 1305 1301 1229 1221 1225 1624 1117 1201 120515 7 6 161 6 1220 1216 1300 1304 16 2 5 1212 120015 8 5 16 0 1 16 1 1 16 0 5 16 1 3 16 0 0 16 0 0 16 1 4 16 08 16 0 4 16 0 0 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 15 6 7 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 157 2 15 7 0 16 0 4 161 0 16 1 2 1226 15 5 5 15 5 1 15 5 5 1290 1305 13011300 1304 15 6 1 15 6 0 15 5 4 15 6 1 15 6 3 15 6 5 15 6 6 15 7 2 16 1 0 161 4 15 6 0 15 6 4 15 6 8 15 5 0 15 6 0 1113161111 16 0 1 1211 15 5 3 160 4 1209 -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\zonANX2014- 09015.docx ZONING MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST LMDR 1305 1301 1229 1221 1225 1624 1201 12051616 1220 1216 1300 1304 16 2 5 1212 1200 15 8 5 16 0 1 16 1 1 16 0 5 16 1 3 160 0 160 0 161 4 16 0 8 160 4 16 00 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 15 72 15 7 0 16 04 16 10 161 2 1211 15 5 3 1226 15 5 1 15 5 5 1290 1300 15 6 0 15 5 4 15 6 1 15 6 3 15 66 15 7 2 16 04 161 0 16 14 156 0 156 4 15 6 8 15 5 0 15 60 1209 LMDR 11 1117 15 7 6 131611 16 0 1 15 6 7 15 5 5 1305 1301 1304 15 6 1 15 6 5 -N o t t o S c a l e - -N o t a S u r v e y - LMDR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\exiANX2014- 09015.docx EXISTING SURROUNDING USES MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST 1305 1301 1229 1221 1225 1624 1201 12051616 1220 1216 1300 1304 16 2 5 1212 1200 15 8 5 16 0 1 16 1 1 16 0 5 16 1 3 160 0 160 0 161 4 16 0 8 160 4 16 00 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 15 6 7 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 15 72 15 7 0 16 04 16 10 161 2 1211 15 5 3 1226 15 5 1 15 5 5 1290 1300 15 6 1 15 6 0 15 5 4 15 6 1 15 6 3 15 66 15 7 2 16 04 161 0 16 14 156 0 156 4 15 6 8 15 5 0 15 60 1209 11 1117 15 7 6 131611 16 0 1 15 5 5 1305 1301 1304 15 6 5 -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Single Family Residential View looking south at the subject property, 1601 Long StreetEast of the subject property West of the subject propertyAcross the street, to the north of the subject property ANX2014-09015 Stephan and WiebkeKoenig 1601 Long Street View looking easterly along Long StreetView looking westerly along Long Street Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8605-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.3 SUBJECT/RECOMMENDATION: Adopt Ordinance 8605-14 on second reading, amending the future land use plan element of the Comprehensive Plan of the city to designate certain real property whose post office address is 1601 Long Street, Clearwater, Florida 33755, together with all abutting right-of-way of Long Street, upon annexation into the City of Clearwater, as Residential Low (RL). SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8605-15 ORDINANCE NO. 8605-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING THE FUTURE LAND USE PLAN ELEMENT OF THE COMPREHENSIVE PLAN OF THE CITY, TO DESIGNATE THE LAND USE FOR CERTAIN REAL PROPERTY LOCATED ON THE SOUTH SIDE OF LONG STREET, APPROXIMATELY 300 FEET WEST OF RIDGE AVENUE, CONSISTING OF LOT 1, BLOCK 6, FIRST ADDITION TO HIGHLAND PINES SUBDIVISION, WHOSE POST OFFICE ADDRESS IS 1601 LONG STREET, CLEARWATER, FLORIDA 33755, TOGETHER WITH ALL ABUTTING RIGHT-OF-WAY OF LONG STREET, UPON ANNEXATION INTO THE CITY OF CLEARWATER, AS RESIDENTIAL LOW (RL); PROVIDING AN EFFECTIVE DATE. WHEREAS, the amendment to the future land use plan element of the comprehensive plan of the City as set forth in this ordinance is found to be reasonable, proper and appropriate, and is consistent with the City's comprehensive plan; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The future land use plan element of the comprehensive plan of the City of Clearwater is amended by designating the land use category for the hereinafter described property, upon annexation into the City of Clearwater, as follows: Property Land Use Category Lot 1, Block 6, FIRST ADDITION TO HIGHLAND PINES SUBDIVISION, according to the map or plat thereof, as recorded in the Plat Book 30, Page 100, Public Records of Pinellas County, Florida; Residential Low (RL) (ANX2014-09015) The map attached as Exhibit A is hereby incorporated by reference. Section 2. The City Council does hereby certify that this ordinance is consistent with the City’s comprehensive plan. Section 3. This ordinance shall take effect immediately upon adoption, contingent upon and subject to the adoption of Ordinance No. 8604-14. 2 Ordinance No. 8605-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A FUTURE LAND USE MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 RU RU RL RL RL RU RL RL RU RU RU RU RL RU RURL RL RURLRU LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST 1305 1301 1229 1221 1225 1624 1117 1201 120515 7 6 161 6 1220 1216 1300 1304 16 2 5 1212 120015 8 5 16 0 1 16 1 1 16 0 5 16 1 3 16 0 0 16 0 0 16 1 4 16 08 16 0 4 16 0 0 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 15 6 7 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 157 2 15 7 0 16 0 4 161 0 16 1 2 1226 15 5 5 15 5 1 15 5 5 1290 1305 13011300 1304 15 6 1 15 6 0 15 5 4 15 6 1 15 6 3 15 6 5 15 6 6 15 7 2 16 1 0 161 4 15 6 0 15 6 4 15 6 8 15 5 0 15 6 0 1113161111 16 0 1 1211 15 5 3 160 4 1209 -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\locANX2014- 09015.docx LOCATION MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B ^ PROJECT SITE LONG ST PALMETTO ST RIDGE AVE SCOTT ST FLAGLER DR WOOD AVE N HIGHLAND AVE SHERWOOD ST LYNN AVE GENTRY ST WALNUT ST CLARK ST BONAIR ST LEVERN ST CASLER AVE NELSON AVE MURRAY AVE ELMWOOD ST CARROLL ST CROWN ST WEBB DR CARLOS AVE LOGAN ST CHANDLER AVE MACRAE AVE PALM TERRACE DR RICHARDS AVE -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\aerANX2014- 09015.docx AERIAL PHOTOGRAPH Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 16 0 1 16 0 1 LONG ST LONG ST RIDGE AVE RIDGE AVE GENTRY ST GENTRY ST WO O D A V E WO O D A V E CLARK ST CLARK ST CARROLL ST CARROLL ST -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\proANX2014- 09015.docx PROPOSED ANNEXATION MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST 1305 1301 1229 1221 1225 1624 1201 12051616 1220 1216 1300 1304 16 2 5 1212 1200 15 8 5 16 0 1 16 1 1 16 0 5 16 1 3 160 0 160 0 161 4 16 0 8 160 4 16 00 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 15 6 7 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 15 72 15 7 0 16 04 16 10 161 2 1211 15 5 3 1226 15 5 1 15 5 5 1290 1300 15 6 1 15 6 0 15 5 4 15 6 1 15 6 3 15 66 15 7 2 16 04 161 0 16 14 156 0 156 4 15 6 8 15 5 0 15 60 1209 11 1117 15 7 6 131611 16 0 1 15 5 5 1305 1301 1304 15 6 5 -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\fluANX2014- 09015.docx FUTURE LAND USE MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 RU RU RL RL RL RU RL RL RU RU RU RU RL RU RURL RL RURLRU LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST 1305 1301 1229 1221 1225 1624 1117 1201 120515 7 6 161 6 1220 1216 1300 1304 16 2 5 1212 120015 8 5 16 0 1 16 1 1 16 0 5 16 1 3 16 0 0 16 0 0 16 1 4 16 08 16 0 4 16 0 0 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 15 6 7 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 157 2 15 7 0 16 0 4 161 0 16 1 2 1226 15 5 5 15 5 1 15 5 5 1290 1305 13011300 1304 15 6 1 15 6 0 15 5 4 15 6 1 15 6 3 15 6 5 15 6 6 15 7 2 16 1 0 161 4 15 6 0 15 6 4 15 6 8 15 5 0 15 6 0 1113161111 16 0 1 1211 15 5 3 160 4 1209 -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\zonANX2014- 09015.docx ZONING MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST LMDR 1305 1301 1229 1221 1225 1624 1201 12051616 1220 1216 1300 1304 16 2 5 1212 1200 15 8 5 16 0 1 16 1 1 16 0 5 16 1 3 160 0 160 0 161 4 16 0 8 160 4 16 00 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 15 72 15 7 0 16 04 16 10 161 2 1211 15 5 3 1226 15 5 1 15 5 5 1290 1300 15 6 0 15 5 4 15 6 1 15 6 3 15 66 15 7 2 16 04 161 0 16 14 156 0 156 4 15 6 8 15 5 0 15 60 1209 LMDR 11 1117 15 7 6 131611 16 0 1 15 6 7 15 5 5 1305 1301 1304 15 6 1 15 6 5 -N o t t o S c a l e - -N o t a S u r v e y - LMDR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\exiANX2014- 09015.docx EXISTING SURROUNDING USES MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST 1305 1301 1229 1221 1225 1624 1201 12051616 1220 1216 1300 1304 16 2 5 1212 1200 15 8 5 16 0 1 16 1 1 16 0 5 16 1 3 160 0 160 0 161 4 16 0 8 160 4 16 00 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 15 6 7 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 15 72 15 7 0 16 04 16 10 161 2 1211 15 5 3 1226 15 5 1 15 5 5 1290 1300 15 6 1 15 6 0 15 5 4 15 6 1 15 6 3 15 66 15 7 2 16 04 161 0 16 14 156 0 156 4 15 6 8 15 5 0 15 60 1209 11 1117 15 7 6 131611 16 0 1 15 5 5 1305 1301 1304 15 6 5 -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Single Family Residential View looking south at the subject property, 1601 Long StreetEast of the subject property West of the subject propertyAcross the street, to the north of the subject property ANX2014-09015 Stephan and WiebkeKoenig 1601 Long Street View looking easterly along Long StreetView looking westerly along Long Street Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8606-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.4 SUBJECT/RECOMMENDATION: Adopt Ordinance 8606-14 on second reading, amending the Zoning Atlas of the city by zoning certain real property whose post office address is 1601 Long Street, Clearwater, Florida 33755, together with all abutting right-of-way of Long Street, upon annexation into the City of Clearwater, as Low Medium Density Residential (LMDR). SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8606-14 ORDINANCE NO. 8606 -14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING THE ZONING ATLAS OF THE CITY BY ZONING CERTAIN REAL PROPERTY LOCATED ON THE SOUTH SIDE OF LONG STREET, APPROXIMATELY 300 FEET WEST OF RIDGE AVENUE, CONSISTING OF LOT 1, BLOCK 6, FIRST ADDITION TO HIGHLAND PINES SUBDIVISION, WHOSE POST OFFICE ADDRESS IS 1601 LONG STREET, CLEARWATER, FLORIDA 33755, TOGETHER WITH ALL ABUTTING RIGHT-OF-WAY OF LONG STREET, UPON ANNEXATION INTO THE CITY OF CLEARWATER, AS LOW MEDIUM DENSITY RESIDENTIAL (LMDR); PROVIDING AN EFFECTIVE DATE. WHEREAS, the assignment of a zoning district classification as set forth in this ordinance is found to be reasonable, proper and appropriate, and is consistent with the City's comprehensive plan; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The following described property located in Pinellas County, Florida, is hereby zoned as indicated upon annexation into the City of Clearwater, and the zoning atlas of the City is amended, as follows: The map attached as Exhibit A is hereby incorporated by reference. Section 2. The City Engineer is directed to revise the zoning atlas of the City in accordance with the foregoing amendment. Section 3. This ordinance shall take effect immediately upon adoption, contingent upon and subject to the adoption of Ordinance No. 8604-14. Property Zoning District Lot 1, Block 6, FIRST ADDITION TO HIGHLAND PINES SUBDIVISION, according to the map or plat thereof, as recorded in the Plat Book 30, Page 100, Public Records of Pinellas County, Florida Low Medium Density Residential (LMDR) (ANX2014-09015) 2 Ordinance No. 8606-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A ZONING MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST LMDR 1305 1301 1229 1221 1225 1624 1201 12051616 1220 1216 1300 1304 16 2 5 1212 1200 15 8 5 16 0 1 16 1 1 16 0 5 16 1 3 160 0 160 0 161 4 16 0 8 160 4 16 00 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 15 72 15 7 0 16 04 16 10 161 2 1211 15 5 3 1226 15 5 1 15 5 5 1290 1300 15 6 0 15 5 4 15 6 1 15 6 3 15 66 15 7 2 16 04 161 0 16 14 156 0 156 4 15 6 8 15 5 0 15 60 1209 LMDR 11 1117 15 7 6 131611 16 0 1 15 6 7 15 5 5 1305 1301 1304 15 6 1 15 6 5 -N o t t o S c a l e - -N o t a S u r v e y - LMDR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\locANX2014- 09015.docx LOCATION MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B ^ PROJECT SITE LONG ST PALMETTO ST RIDGE AVE SCOTT ST FLAGLER DR WOOD AVE N HIGHLAND AVE SHERWOOD ST LYNN AVE GENTRY ST WALNUT ST CLARK ST BONAIR ST LEVERN ST CASLER AVE NELSON AVE MURRAY AVE ELMWOOD ST CARROLL ST CROWN ST WEBB DR CARLOS AVE LOGAN ST CHANDLER AVE MACRAE AVE PALM TERRACE DR RICHARDS AVE -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\aerANX2014- 09015.docx AERIAL PHOTOGRAPH Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 16 0 1 16 0 1 LONG ST LONG ST RIDGE AVE RIDGE AVE GENTRY ST GENTRY ST WO O D A V E WO O D A V E CLARK ST CLARK ST CARROLL ST CARROLL ST -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\proANX2014- 09015.docx PROPOSED ANNEXATION MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST 1305 1301 1229 1221 1225 1624 1201 12051616 1220 1216 1300 1304 16 2 5 1212 1200 15 8 5 16 0 1 16 1 1 16 0 5 16 1 3 160 0 160 0 161 4 16 0 8 160 4 16 00 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 15 6 7 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 15 72 15 7 0 16 04 16 10 161 2 1211 15 5 3 1226 15 5 1 15 5 5 1290 1300 15 6 1 15 6 0 15 5 4 15 6 1 15 6 3 15 66 15 7 2 16 04 161 0 16 14 156 0 156 4 15 6 8 15 5 0 15 60 1209 11 1117 15 7 6 131611 16 0 1 15 5 5 1305 1301 1304 15 6 5 -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\fluANX2014- 09015.docx FUTURE LAND USE MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 RU RU RL RL RL RU RL RL RU RU RU RU RL RU RURL RL RURLRU LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST 1305 1301 1229 1221 1225 1624 1117 1201 120515 7 6 161 6 1220 1216 1300 1304 16 2 5 1212 120015 8 5 16 0 1 16 1 1 16 0 5 16 1 3 16 0 0 16 0 0 16 1 4 16 08 16 0 4 16 0 0 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 15 6 7 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 157 2 15 7 0 16 0 4 161 0 16 1 2 1226 15 5 5 15 5 1 15 5 5 1290 1305 13011300 1304 15 6 1 15 6 0 15 5 4 15 6 1 15 6 3 15 6 5 15 6 6 15 7 2 16 1 0 161 4 15 6 0 15 6 4 15 6 8 15 5 0 15 6 0 1113161111 16 0 1 1211 15 5 3 160 4 1209 -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\zonANX2014- 09015.docx ZONING MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST LMDR 1305 1301 1229 1221 1225 1624 1201 12051616 1220 1216 1300 1304 16 2 5 1212 1200 15 8 5 16 0 1 16 1 1 16 0 5 16 1 3 160 0 160 0 161 4 16 0 8 160 4 16 00 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 15 72 15 7 0 16 04 16 10 161 2 1211 15 5 3 1226 15 5 1 15 5 5 1290 1300 15 6 0 15 5 4 15 6 1 15 6 3 15 66 15 7 2 16 04 161 0 16 14 156 0 156 4 15 6 8 15 5 0 15 60 1209 LMDR 11 1117 15 7 6 131611 16 0 1 15 6 7 15 5 5 1305 1301 1304 15 6 1 15 6 5 -N o t t o S c a l e - -N o t a S u r v e y - LMDR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Long Street 1601 ANX2014-09015 - Koenig\Maps\exiANX2014- 09015.docx EXISTING SURROUNDING USES MAP Owner(s): Stephan and Wiebke Koenig Case: ANX2014-09015 Site: 1601 Long Street Property Size(Acres): ROW Acres 0.167 0.096 Land Use Zoning PIN: 11-29-15-39078-006-0010 From : To: RL R-3 RL LMDR Atlas Page: 270B 60 60 38962 39078 3 4 6 7 8 10 11 12 8 12 12 12 3 5 678 9 14 15 16 17 18 21 2223 12 3 4 123 4 5 1 2 3 45 1 2 3 4 1 2 3 4 5 678910 1 2 3 45 678910 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 14 1112131415 1617181920 24/0124/03 24/0224/0424/0524/06 LONG ST RIDGE AVE GENTRY ST WOOD AVE CLARK ST CARROLL ST 1305 1301 1229 1221 1225 1624 1201 12051616 1220 1216 1300 1304 16 2 5 1212 1200 15 8 5 16 0 1 16 1 1 16 0 5 16 1 3 160 0 160 0 161 4 16 0 8 160 4 16 00 15 6 5 15 7 1 16 0 5 16 0 9 16 1 5 15 7 3 15 6 7 16 0 5 16 0 9 16 0 1 16 1 5 1275 15 7 3 16 1 3 15 6 9 16 0 1 15 6 1 16 0 9 15 6 5 16 0 5 15 72 15 7 0 16 04 16 10 161 2 1211 15 5 3 1226 15 5 1 15 5 5 1290 1300 15 6 1 15 6 0 15 5 4 15 6 1 15 6 3 15 66 15 7 2 16 04 161 0 16 14 156 0 156 4 15 6 8 15 5 0 15 60 1209 11 1117 15 7 6 131611 16 0 1 15 5 5 1305 1301 1304 15 6 5 -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Single Family Residential View looking south at the subject property, 1601 Long StreetEast of the subject property West of the subject propertyAcross the street, to the north of the subject property ANX2014-09015 Stephan and WiebkeKoenig 1601 Long Street View looking easterly along Long StreetView looking westerly along Long Street Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8608-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.5 SUBJECT/RECOMMENDATION: Adopt Ordinance 8608-14 on second reading, annexing certain real property whose post office addresses are 1244 Palm Street and 1301 Idlewild Drive, together with certain abutting Right-of-Way of Idlewild Drive, into the corporate limits of the city and redefining the boundary lines of the city to include said addition. SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8608-14 ORDINANCE NO. 8608-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, ANNEXING CERTAIN REAL PROPERTIES LOCATED GENERALLY SOUTH OF UNION STREET, EAST OF DOUGLAS AVENUE, NORTH OF SUNSET POINT ROAD (STATE ROAD 576), AND WEST OF KINGS HIGHWAY, CONSISTING OF PORTIONS OF SECTION 03, TOWNSHIP 29 NORTH, RANGE 15 EAST, WHOSE POST OFFICE ADDRESSES ARE 1215 UNION STREET, 1244 PALM STREET AND 1301 IDLEWILD DRIVE, TOGETHER WITH CERTAIN ABUTTING RIGHT-OF-WAY OF IDLEWILD DRIVE AND UNION STREET, INTO THE CORPORATE LIMITS OF THE CITY, AND REDEFINING THE BOUNDARY LINES OF THE CITY TO INCLUDE SAID ADDITIONS; PROVIDING AN EFFECTIVE DATE. WHEREAS, the owners of the real properties described herein and depicted on the map attached hereto as Exhibit B have petitioned the City of Clearwater to annex the properties into the City pursuant to Section 171.044, Florida Statutes, and the City has complied with all applicable requirements of Florida law in connection with this ordinance; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The following-described properties are hereby annexed into the City of Clearwater and the boundary lines of the City are redefined accordingly: See attached Exhibit A for Legal Descriptions (ANX2014-09016) The map attached as Exhibit B is hereby incorporated by reference. Section 2. The provisions of this ordinance are found and determined to be consistent with the City of Clearwater Comprehensive Plan. The City Council hereby accepts the dedication of all easements, parks, rights-of-way and other dedications to the public, which have heretofore been made by plat, deed or user within the annexed property. The City Engineer, the City Clerk and the Planning and Development Director are directed to include and show the property described herein upon the official maps and records of the City. Section 3. This ordinance shall take effect immediately upon adoption. The City Clerk shall file certified copies of this ordinance, including the map attached hereto, with the Clerk of the Circuit Court and with the County Administrator of Pinellas County, Florida, within 7 days after adoption, and shall file a certified copy with the Florida Department of State within 30 days after adoption. 2 Ordinance No. 8608-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A LEGAL DESCRIPTIONS ANX2014‐09016 ========================================================================================= No. Parcel ID Legal Description Address 1. 03-29-15-15840-001-0100 Lot 10, Block A 1215 Union Street 2. 03-29-15-15840-001-0280 Lot 28, Block A 1244 Palm Street together with: - South half of 60 foot Right-of-Way of Union Street abutting Lot 10, Block A. The above in CLEARDUN subdivision, as recorded in PLAT BOOK 13, PAGE 47, of the Public Records of Pinellas County, Florida. ========================================================================================= No. Parcel ID Legal Description Address 3. 03-29-15-12060-011-0010 Lot 1, Block K 1301 Idlewild Drive together with: - all abutting Right-of-Way of Idlewild Drive. The above in BROOKLAWN subdivision, as recorded in PLAT BOOK 13, PAGE 59, of the Public Records of Pinellas County, Florida. Exhibit B PROPOSED ANNEXATION MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER 12 6 3 2081 2040 2052 1212 2020 2031 2087 200011 8 7 1186 2022 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 5 7 12 4 5 12 4 3 12 9 0 12 8 4 12 8 0 12 7 2 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 1 1 12 0 9 12 8 2 12 0 6 2077 12 8 3 12 0 7 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 1980 11 8 5 2030 2024 2020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\locANX2014- 09016.docx LOCATION MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B ^ ^^-N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\aerANX2014- 09016.docx AERIAL PHOTOGRAPH Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 12 1 5 12 4 4 13 0 1 UNION ST UNION ST BE T T Y L N BE T T Y L N PALM ST PALM ST IDLEWILD DR IDLEWILD DR DOUGLAS AVE DOUGLAS AVE BERMUDA ST BERMUDA ST SEDEEVA CIR NSEDEEVA CIR N WOODLAWN TER WOODLAWN TER OAKDALE WAY OAKDALE WAY PINECREST WAY PINECREST WAY -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\proANX2014- 09016.docx PROPOSED ANNEXATION MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER 12 6 3 2081 2040 2052 1212 2020 2031 2087 200011 8 7 1186 2022 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 5 7 12 4 5 12 4 3 12 9 0 12 8 4 12 8 0 12 7 2 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 1 1 12 0 9 12 8 2 12 0 6 2077 12 8 3 12 0 7 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 1980 11 8 5 2030 2024 2020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\fluANX2014- 09016.docx FUTURE LAND USE MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 RU RU RU RU RU RU RU RU RU RU RU RU RU RU UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER 12 6 3 2081 2040 1212 2020 1186 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 4 3 12 9 0 12 8 4 12 8 0 12 7 2 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 0 9 12 8 2 12 0 6 12 8 3 12 0 7 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2052 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2031 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 2087 1980 200011 8 7 11 8 5 2030 2024 20222020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 5 7 12 4 5 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 1 1 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2077 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - RU RU RU S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\zonANX2014- 09016.docx ZONING MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER LMDR 12 6 3 2081 2040 2052 1212 2020 2031 2087 200011 8 7 1186 2022 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 5 7 12 4 5 12 4 3 12 9 0 12 8 4 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 1 1 12 0 9 12 8 2 12 0 6 2077 12 8 3 12 0 7 MDR LMD 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 1980 11 8 5 2030 2024 2020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 8 0 12 7 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - LMDR LM D R LM D R S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\existANX2014- 09016.docx EXISTING SURROUNDING USES MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER 12 6 3 2081 2040 2052 1212 2020 2031 2087 200011 8 7 1186 2022 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 5 7 12 4 5 12 4 3 12 9 0 12 8 4 12 8 0 12 7 2 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 1 1 12 0 9 12 8 2 12 0 6 2077 12 8 3 12 0 7 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 1980 11 8 5 2030 2024 2020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Multi Family Residential View looking south at the subject property, 1215 Union StreetEast of the subject property West of the subject propertyAcross the street, to the north of the subject property ANX2014-09016 Joseph Zeller 1215 Union Street View looking easterly along Union StreetView looking westerly along Union Street View looking north at the subject property, 1244 Palm StreetWest of the subject property East of the subject propertyAcross the street, to the south of the subject property ANX2014-09016 Enrique Venegas 1244 Palm Street View looking easterly along Palm StreetView looking westerly along Palm Street View looking south at the subject property, 1301 IdlewildDriveEast of the subject property West of the subject propertyAcross the street, to the north of the subject property ANX2014-09016 Barbara Green 1301 IdlewildDrive View looking easterly along IdlewildDriveView looking westerly along IdlewildDrive Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8609-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.6 SUBJECT/RECOMMENDATION: Adopt Ordinance 8609-14 on second reading, amending the future land use plan element of the Comprehensive Plan of the city to designate certain real property whose post office addresses are 1244 Palm Street and 1301 Idlewild Drive, together with certain abutting Right-of-Way of Idlewild Drive, upon annexation into the City of Clearwater, as Residential Urban (RU). SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8609-14 ORDINANCE NO. 8609-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING THE FUTURE LAND USE PLAN ELEMENT OF THE COMPREHENSIVE PLAN OF THE CITY, TO DESIGNATE THE LAND USE FOR CERTAIN REAL PROPERTIES LOCATED GENERALLY SOUTH OF UNION STREET, EAST OF DOUGLAS AVENUE, NORTH OF SUNSET POINT ROAD (STATE ROAD 576), AND WEST OF KINGS HIGHWAY, CONSISTING OF PORTIONS OF SECTION 03, TOWNSHIP 29 NORTH, RANGE 15 EAST, WHOSE POST OFFICE ADDRESSES ARE 1215 UNION STREET, 1244 PALM STREET AND 1301 IDLEWILD DRIVE, TOGETHER WITH CERTAIN ABUTTING RIGHT- OF-WAY OF IDLEWILD DRIVE AND UNION STREET, UPON ANNEXATION INTO THE CITY OF CLEARWATER, AS RESIDENTIAL URBAN (RU); PROVIDING AN EFFECTIVE DATE. WHEREAS, the amendment to the future land use plan element of the comprehensive plan of the City as set forth in this ordinance is found to be reasonable, proper and appropriate, and is consistent with the City's comprehensive plan; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The future land use plan element of the comprehensive plan of the City of Clearwater is amended by designating the land use category for the hereinafter described properties, upon annexation into the City of Clearwater, as follows: Property Land Use Category See attached Exhibit A for legal descriptions Residential Urban (RU) (ANX2014-09016) The map attached as Exhibit B is hereby incorporated by reference. Section 2. The City Council does hereby certify that this ordinance is consistent with the City’s comprehensive plan. Section 3. This ordinance shall take effect immediately upon adoption, contingent upon and subject to the adoption of Ordinance No. 8608-14. 2 Ordinance No. 8609-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A LEGAL DESCRIPTIONS ANX2014‐09016 ========================================================================================= No. Parcel ID Legal Description Address 1. 03-29-15-15840-001-0100 Lot 10, Block A 1215 Union Street 2. 03-29-15-15840-001-0280 Lot 28, Block A 1244 Palm Street together with: - South half of 60 foot Right-of-Way of Union Street abutting Lot 10, Block A. The above in CLEARDUN subdivision, as recorded in PLAT BOOK 13, PAGE 47, of the Public Records of Pinellas County, Florida. ========================================================================================= No. Parcel ID Legal Description Address 3. 03-29-15-12060-011-0010 Lot 1, Block K 1301 Idlewild Drive together with: - all abutting Right-of-Way of Idlewild Drive. The above in BROOKLAWN subdivision, as recorded in PLAT BOOK 13, PAGE 59, of the Public Records of Pinellas County, Florida. Exhibit B FUTURE LAND USE MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 RU RU RU RU RU RU RU RU RU RU RU RU RU RU UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER 12 6 3 2081 2040 1212 2020 1186 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 4 3 12 9 0 12 8 4 12 8 0 12 7 2 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 0 9 12 8 2 12 0 6 12 8 3 12 0 7 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2052 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2031 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 2087 1980 200011 8 7 11 8 5 2030 2024 20222020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 5 7 12 4 5 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 1 1 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2077 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - RU RU RU S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\locANX2014- 09016.docx LOCATION MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B ^ ^^-N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\aerANX2014- 09016.docx AERIAL PHOTOGRAPH Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 12 1 5 12 4 4 13 0 1 UNION ST UNION ST BE T T Y L N BE T T Y L N PALM ST PALM ST IDLEWILD DR IDLEWILD DR DOUGLAS AVE DOUGLAS AVE BERMUDA ST BERMUDA ST SEDEEVA CIR NSEDEEVA CIR N WOODLAWN TER WOODLAWN TER OAKDALE WAY OAKDALE WAY PINECREST WAY PINECREST WAY -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\proANX2014- 09016.docx PROPOSED ANNEXATION MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER 12 6 3 2081 2040 2052 1212 2020 2031 2087 200011 8 7 1186 2022 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 5 7 12 4 5 12 4 3 12 9 0 12 8 4 12 8 0 12 7 2 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 1 1 12 0 9 12 8 2 12 0 6 2077 12 8 3 12 0 7 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 1980 11 8 5 2030 2024 2020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\fluANX2014- 09016.docx FUTURE LAND USE MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 RU RU RU RU RU RU RU RU RU RU RU RU RU RU UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER 12 6 3 2081 2040 1212 2020 1186 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 4 3 12 9 0 12 8 4 12 8 0 12 7 2 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 0 9 12 8 2 12 0 6 12 8 3 12 0 7 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2052 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2031 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 2087 1980 200011 8 7 11 8 5 2030 2024 20222020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 5 7 12 4 5 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 1 1 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2077 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - RU RU RU S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\zonANX2014- 09016.docx ZONING MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER LMDR 12 6 3 2081 2040 2052 1212 2020 2031 2087 200011 8 7 1186 2022 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 5 7 12 4 5 12 4 3 12 9 0 12 8 4 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 1 1 12 0 9 12 8 2 12 0 6 2077 12 8 3 12 0 7 MDR LMD 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 1980 11 8 5 2030 2024 2020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 8 0 12 7 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - LMDR LM D R LM D R S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\existANX2014- 09016.docx EXISTING SURROUNDING USES MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER 12 6 3 2081 2040 2052 1212 2020 2031 2087 200011 8 7 1186 2022 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 5 7 12 4 5 12 4 3 12 9 0 12 8 4 12 8 0 12 7 2 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 1 1 12 0 9 12 8 2 12 0 6 2077 12 8 3 12 0 7 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 1980 11 8 5 2030 2024 2020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Multi Family Residential View looking south at the subject property, 1215 Union StreetEast of the subject property West of the subject propertyAcross the street, to the north of the subject property ANX2014-09016 Joseph Zeller 1215 Union Street View looking easterly along Union StreetView looking westerly along Union Street View looking north at the subject property, 1244 Palm StreetWest of the subject property East of the subject propertyAcross the street, to the south of the subject property ANX2014-09016 Enrique Venegas 1244 Palm Street View looking easterly along Palm StreetView looking westerly along Palm Street View looking south at the subject property, 1301 IdlewildDriveEast of the subject property West of the subject propertyAcross the street, to the north of the subject property ANX2014-09016 Barbara Green 1301 IdlewildDrive View looking easterly along IdlewildDriveView looking westerly along IdlewildDrive Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8610-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.7 SUBJECT/RECOMMENDATION: Adopt Ordinance 8610-14 on second reading, amending the Zoning Atlas of the city by zoning certain real property whose post office addresses are 1244 Palm Street and 1301 Idlewild Drive, together with certain abutting Right-of-Way of Idlewild Drive, upon annexation into the City of Clearwater, as Low Medium Density Residential (LMDR). SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8610-14 ORDINANCE NO. 8610-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING THE ZONING ATLAS OF THE CITY BY ZONING CERTAIN REAL PROPERTIES LOCATED GENERALLY SOUTH OF UNION STREET, EAST OF DOUGLAS AVENUE, NORTH OF SUNSET POINT ROAD (STATE ROAD 576), AND WEST OF KINGS HIGHWAY, CONSISTING OF PORTIONS OF SECTION 03, TOWNSHIP 29 NORTH, RANGE 15 EAST, WHOSE POST OFFICE ADDRESSES ARE 1215 UNION STREET, 1244 PALM STREET AND 1301 IDLEWILD DRIVE, TOGETHER WITH CERTAIN ABUTTING RIGHT-OF-WAY OF IDLEWILD DRIVE AND UNION STREET, UPON ANNEXATION INTO THE CITY OF CLEARWATER, AS LOW MEDIUM DENSITY RESIDENTIAL (LMDR); PROVIDING AN EFFECTIVE DATE. WHEREAS, the assignment of a zoning district classification as set forth in this ordinance is found to be reasonable, proper and appropriate, and is consistent with the City's comprehensive plan; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The following described properties located in Pinellas County, Florida, are hereby zoned as indicated upon annexation into the City of Clearwater, and the zoning atlas of the City is amended, as follows: The map attached as Exhibit B is hereby incorporated by reference. Section 2. The City Engineer is directed to revise the zoning atlas of the City in accordance with the foregoing amendment. Section 3. This ordinance shall take effect immediately upon adoption, contingent upon and subject to the adoption of Ordinance No. 8608-14. Property Zoning District See attached Exhibit A for legal descriptions Low Medium Density Residential (ANX2014-09016) 2 Ordinance No. 8610-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A LEGAL DESCRIPTIONS ANX2014‐09016 ========================================================================================= No. Parcel ID Legal Description Address 1. 03-29-15-15840-001-0100 Lot 10, Block A 1215 Union Street 2. 03-29-15-15840-001-0280 Lot 28, Block A 1244 Palm Street together with: - South half of 60 foot Right-of-Way of Union Street abutting Lot 10, Block A. The above in CLEARDUN subdivision, as recorded in PLAT BOOK 13, PAGE 47, of the Public Records of Pinellas County, Florida. ========================================================================================= No. Parcel ID Legal Description Address 3. 03-29-15-12060-011-0010 Lot 1, Block K 1301 Idlewild Drive together with: - all abutting Right-of-Way of Idlewild Drive. The above in BROOKLAWN subdivision, as recorded in PLAT BOOK 13, PAGE 59, of the Public Records of Pinellas County, Florida. Exhibit B ZONING MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER LMDR 12 6 3 2081 2040 2052 1212 2020 2031 2087 200011 8 7 1186 2022 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 5 7 12 4 5 12 4 3 12 9 0 12 8 4 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 1 1 12 0 9 12 8 2 12 0 6 2077 12 8 3 12 0 7 MDR LMD 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 1980 11 8 5 2030 2024 2020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 8 0 12 7 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - LMDR LM D R LM D R S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\locANX2014- 09016.docx LOCATION MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B ^ ^^-N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\aerANX2014- 09016.docx AERIAL PHOTOGRAPH Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 12 1 5 12 4 4 13 0 1 UNION ST UNION ST BE T T Y L N BE T T Y L N PALM ST PALM ST IDLEWILD DR IDLEWILD DR DOUGLAS AVE DOUGLAS AVE BERMUDA ST BERMUDA ST SEDEEVA CIR NSEDEEVA CIR N WOODLAWN TER WOODLAWN TER OAKDALE WAY OAKDALE WAY PINECREST WAY PINECREST WAY -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\proANX2014- 09016.docx PROPOSED ANNEXATION MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER 12 6 3 2081 2040 2052 1212 2020 2031 2087 200011 8 7 1186 2022 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 5 7 12 4 5 12 4 3 12 9 0 12 8 4 12 8 0 12 7 2 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 1 1 12 0 9 12 8 2 12 0 6 2077 12 8 3 12 0 7 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 1980 11 8 5 2030 2024 2020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\fluANX2014- 09016.docx FUTURE LAND USE MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 RU RU RU RU RU RU RU RU RU RU RU RU RU RU UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER 12 6 3 2081 2040 1212 2020 1186 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 4 3 12 9 0 12 8 4 12 8 0 12 7 2 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 0 9 12 8 2 12 0 6 12 8 3 12 0 7 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2052 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2031 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 2087 1980 200011 8 7 11 8 5 2030 2024 20222020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 5 7 12 4 5 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 1 1 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2077 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - RU RU RU S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\zonANX2014- 09016.docx ZONING MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER LMDR 12 6 3 2081 2040 2052 1212 2020 2031 2087 200011 8 7 1186 2022 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 5 7 12 4 5 12 4 3 12 9 0 12 8 4 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 1 1 12 0 9 12 8 2 12 0 6 2077 12 8 3 12 0 7 MDR LMD 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 1980 11 8 5 2030 2024 2020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 8 0 12 7 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - LMDR LM D R LM D R S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Union Street 1215 ANX2014-09016 - Zeller\Maps\existANX2014- 09016.docx EXISTING SURROUNDING USES MAP Owner(s): Idlewild Area - Multiple Owners Case: ANX2014-09016 Site: Generally south of Union Street, east of Douglas Avenue, north of Sunset Point Road (State Route 576), and west of Kings Highway. Property Size(Acres): ROW (Acres): 0.397 0.18 Land Use Zoning PIN: 03-29-15-15840-001-0100 03-29-15-15840-001-0280 03-29-15-23060-011-0010 From : To: RU R-4 RU LMDR Atlas Page: 251B 50 50 60 60 60 60 66 60 60 60 06060 60 60 60 60 60 60 60 60 60 60 15840 46998 80388 47 4 3 0 A F K O A B C G A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 10 11 12 13 14 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324252627282930313233343536 1 2 3 4 5 678 9 10 11 12 13 141516 17 123456789101112139123456789101112 1 2 3 4 5 6 7 8 9101112 13 14 15 16 17 18 19 20 21222324 25 26 27 28 29 30 2 4 6 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617181920 2122 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 5 6 78 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 60 63 30 36 1 1 1 1 1 1 1 UNION ST BE T T Y L N PALM ST IDL EW ILD DR DOUGLAS AVE BERMUDA ST SEDEEVA CIR N WOODLAWN TER 12 6 3 2081 2040 2052 1212 2020 2031 2087 200011 8 7 1186 2022 2016 12 4 4 2080 13 0 0 1244 1240 1236 1234 1230 1222 1200 12 9 5 12 8 7 12 8 3 12 7 7 12 7 3 12 7 1 12 6 7 12 6 5 12 6 1 12 4 1 12 3 5 12 3 1 12 2 5 12 1 3 12 9 1 12 9 6 12 6 0 12 5 6 12 5 2 12 4 6 12 6 5 12 6 1 12 5 7 12 4 5 12 4 3 12 9 0 12 8 4 12 8 0 12 7 2 12 2 6 12 2 2 12 2 0 12 2 5 12 0 1 12 1 1 12 0 9 12 8 2 12 0 6 2077 12 8 3 12 0 7 13 0 1 2026 12 6 5 12 6 7 12 5 5 12 5 9 2073 2071 2079 2083 2038 2048 2058 2029 2021 1995 2022 20 1 7 12 3 4 2027 2020 2021 2 0 1 5 2 0 2 4 2061 2066 20702074 12 7 4 12 7 8 1980 11 8 5 2030 2024 2020 20142012 2067 20252021 12 5 9 12 7 1 12 6 3 13 0 9 13 1 0 2063 2065 2069 13 0 0 1278 1276 1274 1272 1270 1268 1266 1264 1260 1258 1256 1212 1206 2001 12 9 1 12 5 3 12 4 9 12 4 5 12 0 9 2022 2024 2028 2030 12 8 6 2022 12 6 6 12 6 2 12 3 2 12 3 5 12 2 3 2021 12 0 7 12 9 2 12 6 6 12 6 0 12 5 4 12 5 0 12 4 6 12 4 2 12 1 0 12 3 1 204412 9 3 12 7 9 12 7 7 12 7 1 12 6 7 12 6 5 12 5 9 12 5 5 12 5 1 12 4 7 12 4 5 12 3 9 12 3 5 12 2 1 12 1 7 12 1 1 12 7 6 12 6 8 12 6 4 12 6 2 12 5 6 12 5 0 12 4 2 12 3 4 12 3 2 12 2 8 12 2 0 12 1 6 12 1 2 12 0 6 2049 2060 2064206612 8 3 12 7 9 12 7 5 12 6 7 12 5 5 12 5 7 12 5 1 12 4 5 12 3 9 12 3 5 12 3 3 12 3 1 12 2 1 12 1 5 12 7 0 12 6 6 12 6 2 12 6 0 12 5 6 12 5 0 12 4 6 12 4 4 12 3 8 12 3 4 12 3 0 12 2 4 12 2 2 12 2 0 12 1 2 12 5 3 2063 12 7 5 12 7 3 12 7 1 12 4 7 12 4 5 12 4 1 12 3 7 12 3 5 12 2 7 12 2 3 12 1 9 12 1 5 12 1 1 1999 1997 1996 2017 2031 1186A 024½ 12 4 4 ½ -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Multi Family Residential View looking south at the subject property, 1215 Union StreetEast of the subject property West of the subject propertyAcross the street, to the north of the subject property ANX2014-09016 Joseph Zeller 1215 Union Street View looking easterly along Union StreetView looking westerly along Union Street View looking north at the subject property, 1244 Palm StreetWest of the subject property East of the subject propertyAcross the street, to the south of the subject property ANX2014-09016 Enrique Venegas 1244 Palm Street View looking easterly along Palm StreetView looking westerly along Palm Street View looking south at the subject property, 1301 IdlewildDriveEast of the subject property West of the subject propertyAcross the street, to the north of the subject property ANX2014-09016 Barbara Green 1301 IdlewildDrive View looking easterly along IdlewildDriveView looking westerly along IdlewildDrive Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8613-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.8 SUBJECT/RECOMMENDATION: Adopt Ordinance 8613-14 on second reading, annexing certain real property whose post office address is 815 Woodruff Avenue, Clearwater, Florida 33756, together with all abutting right-of-way of Woodruff Avenue, into the corporate limits of the city and redefining the boundary lines of the city to include said addition. SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8613-14 ORDINANCE NO. 8613-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, ANNEXING CERTAIN REAL PROPERTY LOCATED ON THE EAST SIDE OF WOODRUFF AVENUE, APPROXIMATELY 300 FEET SOUTH OF DRUID ROAD, CONSISTING OF LOT 11, BLOCK A, OAK ACRES SUBDIVISION, WHOSE POST OFFICE ADDRESS IS 815 WOODRUFF AVENUE, CLEARWATER, FLORIDA 33756, TOGETHER WITH ALL ABUTTING RIGHT-OF-WAY OF WOODRUFF AVENUE, INTO THE CORPORATE LIMITS OF THE CITY, AND REDEFINING THE BOUNDARY LINES OF THE CITY TO INCLUDE SAID ADDITION; PROVIDING AN EFFECTIVE DATE. WHEREAS, the owner of the real property described herein and depicted on the map attached hereto as Exhibit A has petitioned the City of Clearwater to annex the property into the City pursuant to Section 171.044, Florida Statutes, and the City has complied with all applicable requirements of Florida law in connection with this ordinance; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The following-described property is hereby annexed into the City of Clearwater and the boundary lines of the City are redefined accordingly: Lot 11, Block A, OAK ACRES SUBDIVISION, according to the map or plat thereof, as recorded in the Plat Book 27, Page 11, Public Records of Pinellas County, Florida (ANX2014-09018) The map attached as Exhibit A is hereby incorporated by reference. Section 2. The provisions of this ordinance are found and determined to be consistent with the City of Clearwater Comprehensive Plan. The City Council hereby accepts the dedication of all easements, parks, rights-of-way and other dedications to the public, which have heretofore been made by plat, deed or user within the annexed property. The City Engineer, the City Clerk and the Planning and Development Director are directed to include and show the property described herein upon the official maps and records of the City. Section 3. This ordinance shall take effect immediately upon adoption. The City Clerk shall file certified copies of this ordinance, including the map attached hereto, with the Clerk of the Circuit Court and with the County Administrator of Pinellas County, Florida, within 7 days after adoption, and shall file a certified copy with the Florida Department of State within 30 days after adoption. 2 Ordinance No. 8613-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A PROPOSED ANNEXATION MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 60 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 2 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 819 809 809 805 821 805 815 811 809 805 1768 1764 1750 1766 1756 1750 17 4 9 1003 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 17 42 180 0 173 6 710 815 715 711 17 84 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\locANX2014- 09018.docx LOCATION MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B ^ PROJECT SITE DRUID RD S KEENE RD LAKEVIEW RD S D U N C A N A V E BRENTWOOD DR WOODCREST AVE REGENT AVE WOODSIDE AVE WOODRUFF AVE SPENCER AVE KENDALL DR MEADOW LN BEVERLY CIR N BROOKSIDE RD JEFFORDS ST WILLOWBRANCH AVE OAK LAKE DR MAGNOLIA DR ESTELLE DR WOODSIDE AVE JEFFORDS ST -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\aerANX2014- 09018.docx AERIAL PHOTOGRAPH Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 815815 DRUID RD DRUID RD S KEENE RD S KEENE RD MAGNOLIA DR MAGNOLIA DR WO O D R U F F A V E WO O D R U F F A V E WOO D C RE S T A VE WO O D CR E S T AV E MAGNOLIA DR MAGNOLIA DR -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\proANX2014- 09018.docx PROPOSED ANNEXATION MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 60 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 2 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 819 809 809 805 821 805 815 811 809 805 1768 1764 1750 1766 1756 1750 17 4 9 1003 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 17 42 180 0 173 6 710 815 715 711 17 84 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\fluANX2014- 09018.docx FUTURE LAND USE MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 RL RL RU RU RL RL RU RL RL RU RU RU RL RU RU DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 809 809 821 815 811 809 805 1768 1750 1766 1756 1750 17 4 9 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 17 42 180 0 173 6 710 819 815 805 715 711 805 17 64 17 84 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\zonANX2014- 09018.docx ZONING MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E LMDR MDR LDR 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 819 809 809 805 821 805 815 811 809 805 1768 1764 1750 1766 1756 1750 17 4 9 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 180 0 710 815 715 711 17 84 17 42 173 6 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - LDMR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\exiANX2014- 09018.docx EXISITING SURROUNDING USES MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 60 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 2 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 819 809 809 805 821 805 815 811 809 805 1768 1764 1750 1766 1756 1750 17 4 9 1003 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 17 42 180 0 173 6 710 815 715 711 17 84 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Single Family Residential Single Family Residential View looking east at the subject property, 815 Woodruff AvenueNorth of the subject property South of the subject propertyAcross the street, to the west of the subject property ANX2014-09018 Matthew J. Larsen 815 Woodruff Avenue View looking northerly along Woodruff AvenueView looking southerly along Woodruff Avenue Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8614-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.9 SUBJECT/RECOMMENDATION: Adopt Ordinance 8614-14 on second reading, amending the future land use plan element of the Comprehensive Plan of the city to designate certain real property whose post office address is 815 Woodruff Avenue, Clearwater, Florida 33756, together with all abutting right-of-way of Woodruff Avenue, upon annexation into the City of Clearwater, as Residential Low (RL). SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8614-14 ORDINANCE NO. 8614-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING THE FUTURE LAND USE PLAN ELEMENT OF THE COMPREHENSIVE PLAN OF THE CITY, TO DESIGNATE THE LAND USE FOR CERTAIN REAL PROPERTY LOCATED ON THE EAST SIDE OF WOODRUFF AVENUE, APPROXIMATELY 300 FEET SOUTH OF DRUID ROAD, CONSISTING OF LOT 11, BLOCK A, OAK ACRES SUBDIVISION, WHOSE POST OFFICE ADDRESS IS 815 WOODRUFF AVENUE, CLEARWATER, FLORIDA 33756, TOGETHER WITH ALL ABUTTING RIGHT-OF-WAY OF WOODRUFF AVENUE, UPON ANNEXATION INTO THE CITY OF CLEARWATER, AS RESIDENTIAL LOW (RL); PROVIDING AN EFFECTIVE DATE. WHEREAS, the amendment to the future land use plan element of the comprehensive plan of the City as set forth in this ordinance is found to be reasonable, proper and appropriate, and is consistent with the City's comprehensive plan; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The future land use plan element of the comprehensive plan of the City of Clearwater is amended by designating the land use category for the hereinafter described property, upon annexation into the City of Clearwater, as follows: Property Land Use Category Lot 11, Block A, OAK ACRES SUBDIVISION, according to the map or plat thereof, as recorded in the Plat Book 27, Page 11, Public Records of Pinellas County, Florida; Together with all abutting Right-of- Way of WOODRUFF AVENUE. Residential Low (RL) (ANX2014-09018) The map attached as Exhibit A is hereby incorporated by reference. Section 2. The City Council does hereby certify that this ordinance is consistent with the City’s comprehensive plan. 2 Ordinance No. 8614-14 Section 3. This ordinance shall take effect immediately upon adoption, contingent upon and subject to the adoption of Ordinance No. 8613-14. PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A FUTURE LAND USE MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 RL RL RU RU RL RL RU RL RL RU RU RU RL RU RU DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 809 809 821 815 811 809 805 1768 1750 1766 1756 1750 17 4 9 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 17 42 180 0 173 6 710 819 815 805 715 711 805 17 64 17 84 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\locANX2014- 09018.docx LOCATION MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B ^ PROJECT SITE DRUID RD S KEENE RD LAKEVIEW RD S D U N C A N A V E BRENTWOOD DR WOODCREST AVE REGENT AVE WOODSIDE AVE WOODRUFF AVE SPENCER AVE KENDALL DR MEADOW LN BEVERLY CIR N BROOKSIDE RD JEFFORDS ST WILLOWBRANCH AVE OAK LAKE DR MAGNOLIA DR ESTELLE DR WOODSIDE AVE JEFFORDS ST -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\aerANX2014- 09018.docx AERIAL PHOTOGRAPH Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 815815 DRUID RD DRUID RD S KEENE RD S KEENE RD MAGNOLIA DR MAGNOLIA DR WO O D R U F F A V E WO O D R U F F A V E WOO D C RE S T A VE WO O D CR E S T AV E MAGNOLIA DR MAGNOLIA DR -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\proANX2014- 09018.docx PROPOSED ANNEXATION MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 60 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 2 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 819 809 809 805 821 805 815 811 809 805 1768 1764 1750 1766 1756 1750 17 4 9 1003 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 17 42 180 0 173 6 710 815 715 711 17 84 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\fluANX2014- 09018.docx FUTURE LAND USE MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 RL RL RU RU RL RL RU RL RL RU RU RU RL RU RU DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 809 809 821 815 811 809 805 1768 1750 1766 1756 1750 17 4 9 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 17 42 180 0 173 6 710 819 815 805 715 711 805 17 64 17 84 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\zonANX2014- 09018.docx ZONING MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E LMDR MDR LDR 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 819 809 809 805 821 805 815 811 809 805 1768 1764 1750 1766 1756 1750 17 4 9 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 180 0 710 815 715 711 17 84 17 42 173 6 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - LDMR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\exiANX2014- 09018.docx EXISITING SURROUNDING USES MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 60 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 2 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 819 809 809 805 821 805 815 811 809 805 1768 1764 1750 1766 1756 1750 17 4 9 1003 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 17 42 180 0 173 6 710 815 715 711 17 84 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Single Family Residential Single Family Residential View looking east at the subject property, 815 Woodruff AvenueNorth of the subject property South of the subject propertyAcross the street, to the west of the subject property ANX2014-09018 Matthew J. Larsen 815 Woodruff Avenue View looking northerly along Woodruff AvenueView looking southerly along Woodruff Avenue Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8615-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.10 SUBJECT/RECOMMENDATION: Adopt Ordinance 8615-14 on second reading, amending the Zoning Atlas of the city by zoning certain real property whose post office address is 815 Woodruff Avenue, Clearwater, Florida 33756, together with all abutting right-of-way of Woodruff Avenue, upon annexation into the City of Clearwater, as Low Medium Density Residential (LMDR). SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8615-14 ORDINANCE NO. 8615-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING THE ZONING ATLAS OF THE CITY BY ZONING CERTAIN REAL PROPERTY LOCATED ON THE EAST SIDE OF WOODRUFF AVENUE, APPROXIMATELY 300 FEET SOUTH OF DRUID ROAD, CONSISTING OF LOT 11, BLOCK A, OAK ACRES SUBDIVISION, WHOSE POST OFFICE ADDRESS IS 815 WOODRUFF AVENUE, CLEARWATER, FLORIDA 33756, TOGETHER WITH ALL ABUTTING RIGHT-OF-WAY OF WOODRUFF AVENUE, UPON ANNEXATION INTO THE CITY OF CLEARWATER, AS LOW MEDIUM DENSITY RESIDENTIAL (LMDR); PROVIDING AN EFFECTIVE DATE. WHEREAS, the assignment of a zoning district classification as set forth in this ordinance is found to be reasonable, proper and appropriate, and is consistent with the City's comprehensive plan; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The following described property located in Pinellas County, Florida, is hereby zoned as indicated upon annexation into the City of Clearwater, and the zoning atlas of the City is amended, as follows: The map attached as Exhibit A is hereby incorporated by reference. Section 2. The City Engineer is directed to revise the zoning atlas of the City in accordance with the foregoing amendment. Section 3. This ordinance shall take effect immediately upon adoption, contingent upon and subject to the adoption of Ordinance No. 8613-14. Property Zoning District Lot 11, Block A, OAK ACRES SUBDIVISION, according to the map or plat thereof, as recorded in the Plat Book 27, Page 11, Public Records of Pinellas County, Florida; Together with all abutting Right-of-Way of WOODRUFF AVENUE. Low Medium Density Residential (LMDR) (ANX2014-09018) 2 Ordinance No. 8615-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A ZONING MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E LMDR MDR LDR 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 819 809 809 805 821 805 815 811 809 805 1768 1764 1750 1766 1756 1750 17 4 9 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 180 0 710 815 715 711 17 84 17 42 173 6 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - LDMR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\locANX2014- 09018.docx LOCATION MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B ^ PROJECT SITE DRUID RD S KEENE RD LAKEVIEW RD S D U N C A N A V E BRENTWOOD DR WOODCREST AVE REGENT AVE WOODSIDE AVE WOODRUFF AVE SPENCER AVE KENDALL DR MEADOW LN BEVERLY CIR N BROOKSIDE RD JEFFORDS ST WILLOWBRANCH AVE OAK LAKE DR MAGNOLIA DR ESTELLE DR WOODSIDE AVE JEFFORDS ST -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\aerANX2014- 09018.docx AERIAL PHOTOGRAPH Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 815815 DRUID RD DRUID RD S KEENE RD S KEENE RD MAGNOLIA DR MAGNOLIA DR WO O D R U F F A V E WO O D R U F F A V E WOO D C RE S T A VE WO O D CR E S T AV E MAGNOLIA DR MAGNOLIA DR -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\proANX2014- 09018.docx PROPOSED ANNEXATION MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 60 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 2 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 819 809 809 805 821 805 815 811 809 805 1768 1764 1750 1766 1756 1750 17 4 9 1003 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 17 42 180 0 173 6 710 815 715 711 17 84 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\fluANX2014- 09018.docx FUTURE LAND USE MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 RL RL RU RU RL RL RU RL RL RU RU RU RL RU RU DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 809 809 821 815 811 809 805 1768 1750 1766 1756 1750 17 4 9 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 17 42 180 0 173 6 710 819 815 805 715 711 805 17 64 17 84 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\zonANX2014- 09018.docx ZONING MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E LMDR MDR LDR 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 819 809 809 805 821 805 815 811 809 805 1768 1764 1750 1766 1756 1750 17 4 9 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 180 0 710 815 715 711 17 84 17 42 173 6 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - LDMR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Woodruff 815 ANX2014-09018 - Larsen\Maps\exiANX2014- 09018.docx EXISITING SURROUNDING USES MAP Owner(s): Matthew J. Larsen Case: ANX2014-09018 Site: 815 Woodruff Avenue Property Size(Acres): ROW Acres 0.323 0.138 Land Use Zoning PIN: 14-29-15-61848-001-0110 From : To: RL R-2 RL LMDR Atlas Page: 297B 60 40 50 83 33 63 40 22 1 33/02 33/01 33/03 33/04 33/05 33/06 1.1733 40 50 83 60 6060 60 66 83 61848 61956 AB 2 1 9 8 6 7 8 2 1 1 20 21 2 7 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 4 5 6 7 8 1 3 1 A 1 21 DRUID RD S KEENE RD MAGNOLIA DR WO O D R U F F A V E WO O D CR E S T A V E 818 800 804 814 810 801 814 810 800 804 818 815814 808 818 804 801 821 819 809 809 805 821 805 815 811 809 805 1768 1764 1750 1766 1756 1750 17 4 9 1003 17 6 5 17 5 7 17 4 9 1004 17 3 7 17 40 17 3 7 18 0 9 17 6 7 1005 17 6 0 18 00 17 42 180 0 173 6 710 815 715 711 17 84 179 8 Tr a f -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Single Family Residential Single Family Residential View looking east at the subject property, 815 Woodruff AvenueNorth of the subject property South of the subject propertyAcross the street, to the west of the subject property ANX2014-09018 Matthew J. Larsen 815 Woodruff Avenue View looking northerly along Woodruff AvenueView looking southerly along Woodruff Avenue Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8616-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.11 SUBJECT/RECOMMENDATION: Adopt Ordinance 8616-14 on second reading, annexing certain real property whose post office address is 2107 Bell Cheer Drive, Clearwater, Florida 33764, into the corporate limits of the city and redefining the boundary lines of the city to include said addition. SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8616-14 ORDINANCE NO. 8616-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, ANNEXING CERTAIN REAL PROPERTY LOCATED ON THE SOUTH SIDE OF BELL CHEER DRIVE, APPROXIMATELY 1,200 FEET WEST OF SOUTH BELCHER ROAD, CONSISTING OF LOT 1 AND 2, PLEASANT RIDGE ESTATES, IN SECTION 24, TOWNSHIP 29 S, RANGE 15 E, WHOSE POST OFFICE ADDRESS IS 2107 BELL CHEER DRIVE, CLEARWATER, FLORIDA 33764, INTO THE CORPORATE LIMITS OF THE CITY, AND REDEFINING THE BOUNDARY LINES OF THE CITY TO INCLUDE SAID ADDITION; PROVIDING AN EFFECTIVE DATE. WHEREAS, the owner of the real property described herein and depicted on the map attached hereto as Exhibit A has petitioned the City of Clearwater to annex the property into the City pursuant to Section 171.044, Florida Statutes, and the City has complied with all applicable requirements of Florida law in connection with this ordinance; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The following-described property is hereby annexed into the City of Clearwater and the boundary lines of the City are redefined accordingly: Lot 1 & 2, PLEASANT RIDGE ESTATES, according to the map or plat thereof, as recorded in the Plat Book 53, Page 71, Public Records of Pinellas County, Florida; (ANX2014-09017) The map attached as Exhibit A is hereby incorporated by reference. Section 2. The provisions of this ordinance are found and determined to be consistent with the City of Clearwater Comprehensive Plan. The City Council hereby accepts the dedication of all easements, parks, rights-of-way and other dedications to the public, which have heretofore been made by plat, deed or user within the annexed property. The City Engineer, the City Clerk and the Planning and Development Director are directed to include and show the property described herein upon the official maps and records of the City. Section 3. This ordinance shall take effect immediately upon adoption. The City Clerk shall file certified copies of this ordinance, including the map attached hereto, with the Clerk of the Circuit Court and with the County Administrator of Pinellas County, Florida, within 7 days after adoption, and shall file a certified copy with the Florida Department of State within 30 days after adoption. 2 Ordinance No. 8616-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A PROPOSED ANNEXATION MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR 7 86 234 5 1320 1282 1220 2172 2130 2149 1300 2119 2125 2131 2165 2173 2149 2187 2195 2099 2147 2179 2185 2109 2117 2101 2117 2109 2155 2161 2147 2167 2173 2178 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2073 2091 1250L 1290Traf 99 181 9587 12002148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Bell Cheer 2107 ANX2014-09017 - Mann\Maps\Location Map ANX2014-09017.docx LOCATION MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B ^ PROJECT SITE -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Bell Cheer 2107 ANX2014-09017 - Mann\Maps\Aerial ANX2014-09017.docx Aerial Photograph Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B BURNICE DR BURNICE DR LAKEVIEW RD LAKEVIEW RD S B E L C H E R R D S B E L C H E R R D VIOLA DR VIOLA DR BELL CHEER DR BELL CHEER DR DORADO PL DORADO PL YULEE DR YULEE DR PLEASANT PKWY PLEASANT PKWY B E L L D R B E L L D R -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Bell Cheer 2107 ANX2014-09017 - Mann\Maps\Proposed Annexation ANX2014-09017.docx PROPOSED ANNEXATION MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR 7 86 234 5 1320 1282 1220 2172 2130 2149 1300 2119 2125 2131 2165 2173 2149 2187 2195 2099 2147 2179 2185 2109 2117 2101 2117 2109 2155 2161 2147 2167 2173 2178 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2073 2091 1250L 1290Traf 99 181 9587 12002148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\2107 Bell Cheer\Maps\FLU Map ANX2014-09017.docx FUTURE LAND USE MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 RL P RL RL RU R/OS RU RU RU R/OS I RL RU R/OG WATER RU BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR 7 86 234 5 1282 1220 2172 2130 2149 2119 2125 2131 2165 2173 2149 2187 2195 2099 2147 2179 2185 2109 2117 2101 2117 2109 2155 2161 2147 2167 2173 2178 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2091 1250L 1290Traf RU WATER RU RU RU WATER RU RU RU RU 1320 99 181 9587 12002148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1300 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2073 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\2107 Bell Cheer\Maps\Zoning Map ANX2014-09017.docx ZONING MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR P LMDR OS/R LMDR I O P P 7 86 234 5 1320 1282 1220 21 3 0 21 4 9 1300 21 1 9 21 2 5 21 3 1 21 6 5 21 7 3 21 4 9 21 8 7 21 9 5 20 9 9 2147 21 7 9 21 8 5 21 0 9 21 1 7 21 0 1 21 1 7 21 0 9 21 5 5 21 6 1 21 4 7 21 6 7 21 7 3 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2073 2091 1250L 1290Traf LMDR LMDR LMDR OS/R OS/R 99 181 9587 1200 2172 2148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2178 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - LMDR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\2107 Bell Cheer\Maps\Existing ANX2014-09017.docx EXISTING SURROUNDING USES MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR 7 86 234 5 1320 1282 1220 2172 2130 2149 1300 2119 2125 2131 2165 2173 2149 2187 2195 2099 2147 2179 2185 2109 2117 2101 2117 2109 2155 2161 2147 2167 2173 2178 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2073 2091 1250L 1290Traf 99 181 9587 12002148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Single Family Residential Vacant Single Family Residential View looking south at the subject property, 2107 Bell Cheer Drive Across Bell Cheer Drive, north of the subject property West of the subject propertyAcross Pleasant Parkway east of the subject property Looking westerly along Bell Cheer DriveLooking easterly along Bell Cheer Drivegyggyg ANX2014-09017 Roger and Carolyn Mann 2107 Bell Cheer Drive Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8617-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.12 SUBJECT/RECOMMENDATION: Adopt Ordinance 8617-14 on second reading, amending the future land use plan element of the Comprehensive Plan of the city to designate certain real property whose post office address is 2107 Bell Cheer Drive, Clearwater, Florida 33764, upon annexation into the City of Clearwater, as Residential Low (RL). SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8617-14 ORDINANCE NO. 8617-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING THE FUTURE LAND USE PLAN ELEMENT OF THE COMPREHENSIVE PLAN OF THE CITY, TO DESIGNATE THE LAND USE FOR CERTAIN REAL PROPERTY LOCATED ON THE SOUTH SIDE OF BELL CHEER DRIVE, APPROXIMATELY 1,200 FEET WEST OF SOUTH BELCHER ROAD, CONSISTING OF LOT 1 AND 2, PLEASANT RIDGE ESTATES, IN SECTION 24, TOWNSHIP 29 S, RANGE 15 E, WHOSE POST OFFICE ADDRESS IS 2107 BELL CHEER DRIVE, CLEARWATER, FLORIDA 33764, UPON ANNEXATION INTO THE CITY OF CLEARWATER, AS RESIDENTIAL LOW (RL); PROVIDING AN EFFECTIVE DATE. WHEREAS, the amendment to the future land use plan element of the comprehensive plan of the City as set forth in this ordinance is found to be reasonable, proper and appropriate, and is consistent with the City's comprehensive plan; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The future land use plan element of the comprehensive plan of the City of Clearwater is amended by designating the land use category for the hereinafter described property, upon annexation into the City of Clearwater, as follows: Property Land Use Category Lot 1 & 2, PLEASANT RIDGE ESTATES, according to the map or plat thereof, as recorded in the Plat Book 53, Page 71, Public Records of Pinellas County, Florida; Residential Low (RL) (ANX2014-09017) The map attached as Exhibit A is hereby incorporated by reference. Section 2. The City Council does hereby certify that this ordinance is consistent with the City’s comprehensive plan. Section 3. This ordinance shall take effect immediately upon adoption, contingent upon and subject to the adoption of Ordinance No. 8616-14. 2 Ordinance No. 8617-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A FUTURE LAND USE MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 RL P RL RL RU R/OS RU RU RU R/OS I RL RU R/OG WATER RU BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR 7 86 234 5 1282 1220 2172 2130 2149 2119 2125 2131 2165 2173 2149 2187 2195 2099 2147 2179 2185 2109 2117 2101 2117 2109 2155 2161 2147 2167 2173 2178 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2091 1250L 1290Traf RU WATER RU RU RU WATER RU RU RU RU 1320 99 181 9587 12002148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1300 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2073 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Bell Cheer 2107 ANX2014-09017 - Mann\Maps\Location Map ANX2014-09017.docx LOCATION MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B ^ PROJECT SITE -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Bell Cheer 2107 ANX2014-09017 - Mann\Maps\Aerial ANX2014-09017.docx Aerial Photograph Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B BURNICE DR BURNICE DR LAKEVIEW RD LAKEVIEW RD S B E L C H E R R D S B E L C H E R R D VIOLA DR VIOLA DR BELL CHEER DR BELL CHEER DR DORADO PL DORADO PL YULEE DR YULEE DR PLEASANT PKWY PLEASANT PKWY B E L L D R B E L L D R -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Bell Cheer 2107 ANX2014-09017 - Mann\Maps\Proposed Annexation ANX2014-09017.docx PROPOSED ANNEXATION MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR 7 86 234 5 1320 1282 1220 2172 2130 2149 1300 2119 2125 2131 2165 2173 2149 2187 2195 2099 2147 2179 2185 2109 2117 2101 2117 2109 2155 2161 2147 2167 2173 2178 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2073 2091 1250L 1290Traf 99 181 9587 12002148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\2107 Bell Cheer\Maps\FLU Map ANX2014-09017.docx FUTURE LAND USE MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 RL P RL RL RU R/OS RU RU RU R/OS I RL RU R/OG WATER RU BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR 7 86 234 5 1282 1220 2172 2130 2149 2119 2125 2131 2165 2173 2149 2187 2195 2099 2147 2179 2185 2109 2117 2101 2117 2109 2155 2161 2147 2167 2173 2178 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2091 1250L 1290Traf RU WATER RU RU RU WATER RU RU RU RU 1320 99 181 9587 12002148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1300 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2073 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\2107 Bell Cheer\Maps\Zoning Map ANX2014-09017.docx ZONING MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR P LMDR OS/R LMDR I O P P 7 86 234 5 1320 1282 1220 21 3 0 21 4 9 1300 21 1 9 21 2 5 21 3 1 21 6 5 21 7 3 21 4 9 21 8 7 21 9 5 20 9 9 2147 21 7 9 21 8 5 21 0 9 21 1 7 21 0 1 21 1 7 21 0 9 21 5 5 21 6 1 21 4 7 21 6 7 21 7 3 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2073 2091 1250L 1290Traf LMDR LMDR LMDR OS/R OS/R 99 181 9587 1200 2172 2148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2178 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - LMDR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\2107 Bell Cheer\Maps\Existing ANX2014-09017.docx EXISTING SURROUNDING USES MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR 7 86 234 5 1320 1282 1220 2172 2130 2149 1300 2119 2125 2131 2165 2173 2149 2187 2195 2099 2147 2179 2185 2109 2117 2101 2117 2109 2155 2161 2147 2167 2173 2178 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2073 2091 1250L 1290Traf 99 181 9587 12002148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Single Family Residential Vacant Single Family Residential View looking south at the subject property, 2107 Bell Cheer Drive Across Bell Cheer Drive, north of the subject property West of the subject propertyAcross Pleasant Parkway east of the subject property Looking westerly along Bell Cheer DriveLooking easterly along Bell Cheer Drivegyggyg ANX2014-09017 Roger and Carolyn Mann 2107 Bell Cheer Drive Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8618-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.13 SUBJECT/RECOMMENDATION: Adopt Ordinance 8618-14 on second reading, amending the Zoning Atlas of the city by zoning certain real property whose post office address is 2107 Bell Cheer Drive, Clearwater, Florida 33764, upon annexation into the City of Clearwater, as Low Medium Density Residential (LMDR). SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8618-14 ORDINANCE NO. 8618-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING THE ZONING ATLAS OF THE CITY BY ZONING CERTAIN REAL PROPERTY LOCATEDON THE SOUTH SIDE OF BELL CHEER DRIVE, APPROXIMATELY 1,200 FEET WEST OF SOUTH BELCHER ROAD, CONSISTING OF LOT 1 AND 2, PLEASANT RIDGE ESTATES, IN SECTION 24, TOWNSHIP 29 S, RANGE 15 E, WHOSE POST OFFICE ADDRESS IS 2107 BELL CHEER DRIVE, CLEARWATER, FLORIDA 33764, UPON ANNEXATION INTO THE CITY OF CLEARWATER, AS LOW MEDIUM DENSITY RESIDENTIAL (LMDR); PROVIDING AN EFFECTIVE DATE. WHEREAS, the assignment of a zoning district classification as set forth in this ordinance is found to be reasonable, proper and appropriate, and is consistent with the City's comprehensive plan; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The following described property located in Pinellas County, Florida, is hereby zoned as indicated upon annexation into the City of Clearwater, and the zoning atlas of the City is amended, as follows: The map attached as Exhibit A is hereby incorporated by reference. Section 2. The City Engineer is directed to revise the zoning atlas of the City in accordance with the foregoing amendment. Section 3. This ordinance shall take effect immediately upon adoption, contingent upon and subject to the adoption of Ordinance No.8616-14. Property Zoning District Lot 1 & 2, PLEASANT RIDGE ESTATES, according to the map or plat thereof, as recorded in the Plat Book 53, Page 71, Public Records of Pinellas County, Florida; Low Medium Density Residential (LMDR) (ANX2014-09017) 2 Ordinance No. 8618-14 PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED George N. Cretekos Mayor Approved as to form: Camilo A. Soto Assistant City Attorney Attest: Rosemarie Call City Clerk Exhibit A ZONING MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR P LMDR OS/R LMDR I O P P 7 86 234 5 1320 1282 1220 21 3 0 21 4 9 1300 21 1 9 21 2 5 21 3 1 21 6 5 21 7 3 21 4 9 21 8 7 21 9 5 20 9 9 2147 21 7 9 21 8 5 21 0 9 21 1 7 21 0 1 21 1 7 21 0 9 21 5 5 21 6 1 21 4 7 21 6 7 21 7 3 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2073 2091 1250L 1290Traf LMDR LMDR LMDR OS/R OS/R 99 181 9587 1200 2172 2148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2178 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - LMDR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Bell Cheer 2107 ANX2014-09017 - Mann\Maps\Location Map ANX2014-09017.docx LOCATION MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B ^ PROJECT SITE -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Bell Cheer 2107 ANX2014-09017 - Mann\Maps\Aerial ANX2014-09017.docx Aerial Photograph Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B BURNICE DR BURNICE DR LAKEVIEW RD LAKEVIEW RD S B E L C H E R R D S B E L C H E R R D VIOLA DR VIOLA DR BELL CHEER DR BELL CHEER DR DORADO PL DORADO PL YULEE DR YULEE DR PLEASANT PKWY PLEASANT PKWY B E L L D R B E L L D R -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\Bell Cheer 2107 ANX2014-09017 - Mann\Maps\Proposed Annexation ANX2014-09017.docx PROPOSED ANNEXATION MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR 7 86 234 5 1320 1282 1220 2172 2130 2149 1300 2119 2125 2131 2165 2173 2149 2187 2195 2099 2147 2179 2185 2109 2117 2101 2117 2109 2155 2161 2147 2167 2173 2178 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2073 2091 1250L 1290Traf 99 181 9587 12002148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - S:\Planning Department\C D B\Annexations (ANX)\Active Cases\2107 Bell Cheer\Maps\FLU Map ANX2014-09017.docx FUTURE LAND USE MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 RL P RL RL RU R/OS RU RU RU R/OS I RL RU R/OG WATER RU BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR 7 86 234 5 1282 1220 2172 2130 2149 2119 2125 2131 2165 2173 2149 2187 2195 2099 2147 2179 2185 2109 2117 2101 2117 2109 2155 2161 2147 2167 2173 2178 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2091 1250L 1290Traf RU WATER RU RU RU WATER RU RU RU RU 1320 99 181 9587 12002148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1300 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2073 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - RL S:\Planning Department\C D B\Annexations (ANX)\Active Cases\2107 Bell Cheer\Maps\Zoning Map ANX2014-09017.docx ZONING MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR P LMDR OS/R LMDR I O P P 7 86 234 5 1320 1282 1220 21 3 0 21 4 9 1300 21 1 9 21 2 5 21 3 1 21 6 5 21 7 3 21 4 9 21 8 7 21 9 5 20 9 9 2147 21 7 9 21 8 5 21 0 9 21 1 7 21 0 1 21 1 7 21 0 9 21 5 5 21 6 1 21 4 7 21 6 7 21 7 3 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2073 2091 1250L 1290Traf LMDR LMDR LMDR OS/R OS/R 99 181 9587 1200 2172 2148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2178 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - LMDR S:\Planning Department\C D B\Annexations (ANX)\Active Cases\2107 Bell Cheer\Maps\Existing ANX2014-09017.docx EXISTING SURROUNDING USES MAP Owner: Roger D. & Carolyn A. Mann Case: ANX2014-09017 Site: 2107 Bell Cheer Drive Property Size (Acres): 0.454 acres Land Use Zoning PIN: 24-29-15-72144-000-0010 From : To: RL R-3 RL LMDR Atlas Page: 308B 60 60 50696 125 124 123 122 121120119118 117 116115114113 112111 50 50 80 10 0 50 50 50 100 40 40 60 60 60 50 60 60 60 60 60 60 6 0 50 8 0 6 0 62406 62408 72144 064080642606444 31050 13158 22824 5 4 10 9 8 6 543 2 1 10 9 876 5 4 3 2 1 (62)11 40 41 42 43 3 4 5 6 7 9 10 11 12 13141516 1112 1314 15 18 19 20 21 1 2 3321987 6 5 4 3 2 1 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 1716 15 14 131211 10 9 8 7 654 3 2 1787 1234 5 9 10 11 1213 14 15 16 17 1 2 6 7 8 8 7 14 15 16 17 131211 16 13/01 5.9 12/03 8.93 11/01 5.11 11/04 4.76 11/0911/0811/0511/03 11/02 11/06 11/07 11/10 AC(C) AC(C) AC AC 1 BURNICE DR LAKEVIEW RD S B E L C H E R R D VIOLA DR BELL CHEER DR DORADO PL YULEE DR 7 86 234 5 1320 1282 1220 2172 2130 2149 1300 2119 2125 2131 2165 2173 2149 2187 2195 2099 2147 2179 2185 2109 2117 2101 2117 2109 2155 2161 2147 2167 2173 2178 1276 1332 2100 1341 2176 2160 2198 2197 2191 2185 2173 2167 2157 2155 2149 2143 2139 2125 2188 2174 2160 2142 2124 2106 2106 2111 2115 2 1 1 9 2135 2143 1222 1228 1234 2073 2091 1250L 1290Traf 99 181 9587 12002148 2140 2148 2154 2161 2155 2137 2143 2167 1331 175 167 159 151 143 125 137 131 1 2 1 6 2141 2157 2191 219911081109 08 2206 2173 2107 2191 2131 2143 2125 2135 2152 2134 2130 2122 2116 2100 2125 2133 2181 2184 2190 2166 2160 13302194 1342 2186 2180 2168 2152 2144 2138 2132 2126 2192 2166 2138 2130 2118 2112 2100 2123 2127 2124 2110 2118 2070 2076 2085 2079 2112 1 1 1 1 1 1 1107 1111 1 2210Elec 1 -N o t t o S c a l e - -N o t a S u r v e y - Single Family Residential Single Family Residential Single Family Residential Vacant Single Family Residential View looking south at the subject property, 2107 Bell Cheer Drive Across Bell Cheer Drive, north of the subject property West of the subject propertyAcross Pleasant Parkway east of the subject property Looking westerly along Bell Cheer DriveLooking easterly along Bell Cheer Drivegyggyg ANX2014-09017 Roger and Carolyn Mann 2107 Bell Cheer Drive Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: 8620-14 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 2 File Type: OrdinanceIn Control: Legal Department Agenda Number: 12.14 SUBJECT/RECOMMENDATION: Adopt Ordinance 8620-14 on second reading, amending Ordinances 3674-84 and 6915-01 regarding Reserve Requirements for future Water and Sewer revenue bonds. SUMMARY: APPROPRIATION CODE AND AMOUNT: Page 1 City of Clearwater Printed on 11/26/2014 Ordinance No. 8620-14 1 ORDINANCE NO. 8620-14 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING ORDINANCE NO. 3674-84, AND ORDINANCE NO. 6915-01; PROVIDING CERTAIN OTHER MATTERS IN CONNECTION THEREWITH; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: SECTION 1. AUTHORITY FOR THIS ORDINANCE. This Ordinance is enacted pursuant to Chapter 166, Part II, Florida Statutes, and other applicable provisions of law and pursuant to Section 21 of Ordinance No. 3674-84 (the “1984 Ordinance”) and is supplemental to and amending of the Original Ordinance, as amended by Ordinance No. 6915-01 (the “2001 Ordinance”). SECTION 2. DEFINITIONS. All capitalized undefined terms shall have the same meaning as set forth in the Original Ordinance (as herein defined). SECTION 3. FINDINGS. It is hereby ascertained, determined and declared that: A. The Issuer now owns, operates and maintains the System and is empowered to maintain, operate, improve and extend such system and regulate and fix reasonable rates and charges for the services furnished thereby. B. The Issuer derives Gross Revenues from rates, fees and charges made and collected for the services and facilities of the System supplying water and sanitary sewerage services and the Gross Revenues are not pledged or encumbered in any manner, except for payment of the Parity Bonds. C. Any Series of Bonds and the project to be funded with the proceeds of such Series of Bonds, shall be issued under the authority of the 1984 Ordinance as amended by the 2001 Ordinance (collectively as amended, the “Original Ordinance”) and such projects shall be undertaken upon approval by subsequent resolution of the Issuer as provided by law. The proceeds of any Series of Bonds shall be applied as provided in a supplemental ordinance or resolution. D. Since enactment of the Original Ordinance, the requirements of the capital markets for the structure of debt instruments, specifically whether a debt service reserve is required to market bonds, the increased activity of banking and other similar financial institutions in the capital markets, and the enactment of various bond subsidy programs, the Original Ordinance needs to be amended to adjust to these changed market conditions. E. Section 21 of the 2001 Ordinance provides for the material amendment of the 1984 Ordinance with the consent of the insurer under any bond insurance policy for a Series of Bonds then outstanding plus the consent of the Registered Owners of two-thirds in principal amount of the Bonds then outstanding (the “Required Consents”), and Section 20 of the 2001 Ordinance provides for the material amendment of the 2001 Ordinance with the consent of the Registered Owners or fifty-one percent or more in the principal amount of Bonds of each Series so affected and outstanding. Ordinance No. 8620-14 2 F. The amendments to the Original Ordinance contained in this Ordinance shall become effective upon the receipt of the consent of the Registered Owners of two-thirds in principal amount of the Bonds then outstanding together with the consent of any insurer under any bond insurance policy for a Series of Bonds then outstanding. G. Each Series of Bonds authorized and issued pursuant to subsequent resolutions adopted on and after the date of enactment of this Ordinance shall be issued with the express understanding that the Registered Owners of such Series of Bonds consent to the amendments set forth in this Ordinance, and upon the receipt of the required consent for these amendments, each such Series of Bonds shall be subject to this Ordinance as if this Ordinance was fully in effect on the date of issuance of such Series of Bonds. SECTION 4. AMENDMENTS TO ORIGINAL ORDINANCE. A. Subject to the receipt of the Required Consents, Section 2 of the 1984 Ordinance, as amended in Section 2 of the 2001 Ordinance shall be amended to add the following new defined terms to read as follows: "Balloon Bonds" means Bonds of a Series designated as such by Supplemental Resolution adopted in connection with the issuance thereof, for which either (1) no serial maturities or Sinking Fund Installments prior to the maturity thereof have been established, or (2) the aggregate of such serial maturities and Sinking Fund Installments that have been established is less than the amount necessary to amortize such Bonds on a substantially level debt service basis. "Qualified Agreement" means, to the extent from time to time permitted pursuant to law, any contract or contracts entered into in connection with Bonds under which payments are, in whole or in part, based on interest rate, cash flow, or other basis desired by the Issuer, including, without limitation, contracts commonly known as current or forward interest rate swap or swaption agreements and interest rate floors or caps. Notwithstanding anything herein to the contrary, "Qualified Agreement" shall not include goods and service supply contracts. "Variable Rate Bonds" shall mean obligations issued with a variable, adjustable, convertible or other similar rate which is not fixed in percentage at the date of issue for the entire term thereof as shall be determined by Supplemental Resolution of the Issuer. B. Subject to the receipt of the Required Consents, the following defined terms contained in Section 2 of the 1984 Ordinance, as amended in Section 2 of the 2001 Ordinance shall be amended to read as follows (deletions are indicated by a strikethrough and additions are indicated by underlining): "Bond Service Requirement" for any Fiscal Year, as applied to the Bonds of any series, shall mean the sum of: (1) the amount required to pay the interest becoming due on the Bonds of such series during the Fiscal Year, except to the extent that such interest shall Ordinance No. 8620-14 3 have been provided by payments into the Sinking Fund out of bond proceeds for a specific period of time or by payments of investment income into the Sinking Fund from the Bond Service Account or any subaccounts therein. Whenever such income is applied in calculating a Bond Service Requirement for any purpose, such income shall also be excluded in the computation of Gross Revenues for such purpose. (2) the amount required to pay the principal of Serial Bonds of such series maturing in such Fiscal Year. (3) the Amortization Installments for Term Bonds of such series for such Fiscal Year. (4) in the event the Issuer has purchased or entered into an agreement to purchase Federal Securities or Authorized Investments from moneys in the Bond Service Account, then the income received or to be received on such Federal Securities or Authorized Investments from the date of acquisition thereof to the date of maturity thereof, or when the Issuer issues a Series of Bonds pursuant to a subsidy program offered by another governmental unit which provides for a subsidy payment to the Issuer to pay all or any portion of interest or principal due on such Series of Bonds, unless otherwise designated for other purposes, such income or subsidy payment shall be taken into consideration in calculating the payments which will be required to be made into the Sinking Fund and the Bond Service Account therein. Whenever such income or subsidy payment is applied in calculating a Bond Service Requirement for any purpose, such income or subsidy payment shall also be excluded in the computation of Gross Revenues for such purpose. (5) with respect to Balloon Bonds, the unamortized principal coming due on the final maturity date thereof shall be ignored and in lieu thereof there shall be added to the Annual Debt Service for the applicable period of time in which such final maturity occurs and to each year thereafter through the 30th anniversary of the issuance of such Bonds (the "Reamortization Period") the amount of substantially level principal and interest payments (assuming for such purposes such interest rate as a financial advisor selected by the Issuer and having experience in the pricing of municipal bonds shall determine is a reasonable estimate of the rate that such Balloon Bonds would bear based upon such Reamortization Period and the characteristics of such Balloon Bonds) that if paid in each year during the Reamortization Period would be sufficient to pay in full the unamortized portion of such Balloon Bonds by such anniversary. (6) with respect to Variable Rate Bonds which are not subject to a Qualified Agreement, if any, the interest rate used to calculate the Bond Service Requirement shall be the higher of (i) the actual rate on the date of calculation, or if the indebtedness is not yet outstanding, the initial rate (if established and binding), (ii) if the indebtedness has been outstanding for at least twelve months, the average rate over the twelve months immediately preceding the date of calculation, and (iii) if the indebtedness has been outstanding for twelve months or less, (1) if interest on the indebtedness is excludable from gross income under the applicable provisions of the Internal Revenue Code, the most recently published Bond Buyer 25 Bond Revenue Index (or comparable index if no longer Ordinance No. 8620-14 4 published) plus fifty (50) basis points, or (2) if interest is not so excludable, the interest rate on direct U.S. Treasury Obligations with comparable maturities plus fifty (50) basis points; provided, however, that for purposes of any rate covenant measuring actual debt service coverage during a test period, Variable Rate Bonds which are not subject to a Qualified Agreement shall be deemed to bear interest at the actual rate per annum applicable during the test period. "Reserve Requirement" shall be such amount as determined by subsequent Resolution of the Issuer relating to a specific Series of Bonds adopted prior to the issuance of such Bonds, which may not exceed the lesser of (i) the Maximum Bond Service Requirement, (ii) 125% of the average annual Bond Service Requirement or (iii) the largest amount as shall not adversely affect the exclusion of interest on the Bonds from gross income for Federal income tax purposes. The Issuer shall determine by subsequent Resolution relating to a specific Series of Bonds adopted prior to the issuance of such Bonds whether such Series of Bonds will be secured by the Reserve Account, and if such Series of Bonds will be secured by a Reserve Account or a Reserve Subaccount, whether such Series of Bonds will be secured by a separate Series specific Reserve Subaccount or on a parity with other Series of Bonds in the Reserve Account or a Reserve Subaccount, and if secured with other Series of Bonds on a parity basis, which Series of Bonds will be so secured. C. Subject to the receipt of the Required Consents, Section 16B of the 1984 Ordinance, as amended, modified and restated in Section 17D of the 2001 Ordinance shall be amended to read as follows (deletions are indicated by a strikethrough and additions are indicated by underlining): D. DISPOSITION OF REVENUES. All funds at any time remaining on deposit in the Revenue Fund shall be disposed of on or before the twentieth day of each month, commencing in the month immediately following the delivery of the 2001 Bonds, for so long as any Bonds remain Outstanding, only in the fol- lowing manner and in the following order of priority: (1) Funds shall first be used for deposit into the Operation and Maintenance Fund, which was established by the Original Ordinance, of such sums as are necessary for the Cost of Operation and Maintenance, for the next ensuing month. (2) A sum as shall be determined by supplemental resolution of the Issuer shall be deposited into the Construction Fund and used for the purpose of paying Project Costs. (3) From the moneys remaining in the Revenue Fund, the Issuer shall next deposit into the Sinking Fund created by the Original Ordinance, such sums as will be sufficient to pay (a) one-sixth (1/6) of all interest becoming due on the Bonds on the next semi-annual interest payment date; (b) commencing in the first month which is twelve (12) months or six (6) months prior to the first annual or semi-annual maturity date, respectively, of any Serial Bonds, one-twelfth (1/12) or one-sixth (1/6), respectively, of the amount of Serial Bonds which will become due and payable on the next annual or semiannual principal maturity Ordinance No. 8620-14 5 date, respectively, and (c) one-twelfth (1/12) of the Amortization Installment required to be made on the next annual payment date or one-sixth (1/6) of the Amortization Installment required to be made on the next semi-annual payment date into a "Bond Amortization Account", created and established in the Sinking Fund by the Original Ordinance. Such payments shall be credited to a separate special account for each series of Term Bonds outstanding, and if there shall be more than one stated maturity for Term Bonds of a series, then into a separate special account in the Sinking Fund for each such separate maturity of Term Bonds. The funds and investments in each such separate account shall be pledged solely to the payment of principal of the Term Bonds of the series or maturity within a series for which it is established and shall not be available for payment, purchase or redemption of Term Bonds of any other series or within a series, or for transfer to the Sinking Fund to make up any deficiencies in required payments therein. The Amortization Installments may be due either annually or semiannually, but in any event, the required payments as set forth above shall be made monthly commencing in the first month which is six (6) months or twelve (12) months, as the case may be, prior to the date on which the Amortization Installment is required to be made pursuant to (c) above. Upon the sale of any series of Term Bonds, the Issuer shall by resolution, establish the amounts and maturities of such Amortization Installments for each series, and if there shall be more than one maturity of Term Bonds within a series, the Amortization Installments for the Term Bonds of each maturity. In the event the moneys deposited for retirement of a maturity of Term Bonds are required to be invested, in the manner provided below, the Amortization Installments may be stated in terms of either the principal amount of the invest- ments to be purchased on, or the cumulative amounts of the principal amount of investments required to have been purchased by, the payment date of such Amortization Installment. Moneys on deposit in each of the separate special accounts in the Bond Amortization Account shall be used for the open market purchase or the redemption of Term Bonds of the series or maturity of Term Bonds within a series for which such separate special account is established or may remain in said separate special account and be invested until the stated date of maturity of the Term Bonds. The resolution establishing the Amortization Installments for any series or maturity of Term Bonds may limit the use of moneys to any one or more of the uses set forth in the preceding sentence and may specify the type or types of investments permitted hereunder to be purchased. (4) Moneys remaining in the Revenue Fund shall next be applied by the Issuer to maintain a either the Reserve Account or a separate Reserve Subaccount, which Reserve Account was created and established by the Original Ordinance and which each Reserve Subaccount is created by subsequent Resolution relating to a specific Series of Bonds adopted prior to the issuance of such Bonds, in a sum equal to the Reserve Requirement for each applicable Series of Bonds, all or a portion of which sum may be initially provided from the proceeds of the sale of the respective Series of Bonds and/or other moneys of the Issuer. The Issuer shall thereafter deposit into said Reserve Account or Reserve Subaccount, as applicable, an amount equal to one-twelfth (1/12) of twenty per cent (20%) of the difference between the amount, if any, so deposited Ordinance No. 8620-14 6 upon the delivery of the Bonds and the amount of the Reserve Requirement on all outstanding for the applicable Series of Bonds. No further payments shall be required to be made into such Reserve Account or Reserve Subaccount, as applicable, when there has been deposited therein and as long as there shall remain on deposit therein a sum equal to the Maximum Bond Service Reserve Requirement on all applicable Series of outstanding Bonds becoming due in any ensuing Fiscal Year. Any withdrawals from the Reserve Account or a Reserve Subaccount shall be subsequently restored from the first moneys available in the Revenue Fund after all required current payments into the Sinking Fund and into the Reserve Account and each Reserve Subaccount, as applicable, including all deficiencies for prior payments into the Sinking Fund, have been made in full. Moneys in the Reserve Account or a Reserve Subaccount, as applicable, shall be used only for the purpose of the payment of maturing principal (including Amortization Installments) of or interest on the Series of Bonds secured by such Reserve Account or Reserve Subaccount, as applicable, when the moneys in the Sinking Fund and allocated to such Series of Bonds are insufficient therefor, and for no other purpose. Upon the issuance by the Issuer of any Additional Bonds under the terms, limitations and conditions provided in this Ordinance and the Original Ordinance, the payments into the Reserve Account or Reserve Subaccount, as applicable, shall be increased so that the amount on deposit therein shall be equal to the Maximum Bond Service Requirement on all Bonds outstanding and to be outstanding Reserve Requirement established for such Series of Additional Bonds in accordance with the subsequent Resolution authorizing such Series of Additional Bonds. Whenever the amount on deposit in the Reserve Account or any Reserve Subaccount exceeds the Reserve Requirement on all Bonds then outstanding applicable to such Reserve Account or Reserve Subaccount, the excess may be withdrawn and deposited into the Sinking Fund to pay debt service on the respective Series of Bonds. The Issuer shall not be required to make any further payments into the Sinking Fund or into the Reserve Account or any Reserve Subaccount when the aggregate amount of moneys in the Sinking Fund and the Reserve Account are or any Reserve Subaccount, as applicable, is at least equal to the aggregate principal amount of Bonds then outstanding and secured by the Sinking Fund and the respective Reserve Account or Reserve Subaccount, plus the amount of interest then due or thereafter to become due on the respective Series of Bonds then outstanding. Notwithstanding the foregoing provisions, in lieu of the required deposits of Revenues into the Reserve Account, the Issuer may cause to be deposited into the Reserve Account or a Reserve Subaccount a surety bond or an insurance policy issued by a reputable and recognized insurer for the benefit of the Bondholders of the Series of Bonds to be secured by such Reserve Account or Reserve Subaccount, in an amount equal to the difference between the Maximum Bond Service Reserve Requirement for such Series of Bonds and the sums then on deposit in the applicable Reserve Account or Reserve Subaccount, Ordinance No. 8620-14 7 if any, which surety bond or insurance policy shall be payable (upon the giving of notice as required thereunder) on any interest payment date on which a deficiency exists which cannot be cured by funds in any other account held pur- suant to this Ordinance and the Original Ordinance and available for such purpose. The insurer providing such surety bond or insurance policy shall be an insurer whose municipal bond insurance policies insuring the payment, when due, of the principal of and interest on municipal bond issues results in such issues being rated in one of the three highest rating category categories by Standard & Poor's Corporation or Moody's Investors Service, Inc., or their successors. If a disbursement is made from a surety bond or an insurance policy provided pursuant to this paragraph, the Issuer shall be obligated to either rein- state the maximum limits of such surety bond or insurance policy immediately following such disbursement or to deposit into the Reserve Account or Reserve Subaccount, as applicable, as herein provided in this paragraph for restoration of withdrawals from the Reserve Account or a Reserve Subaccount, as applicable, funds in the amount of the disbursement made under such policy, or a combination of such alternatives. (5) The Issuer shall next apply and deposit the moneys in the Revenue Fund into the Renewal and Replacement Fund created by the Original Ordinance. The Issuer shall deposit into such Renewal and Replacement Fund an amount equal to one-twelfth (1/12) of five per centum (5%) of the Gross Revenues of the System for the previous Fiscal Year, or such other amount as is certified as necessary for the purposes of the Renewal and Replacement Fund by the Consulting Engineer and as approved by the City Commission. The moneys in said Renewal and Replacement Fund shall be used only for the purpose of paying the cost of extensions, enlargements or additions to or the replacement of capital assets of the System and emergency repairs thereto. Such moneys on deposit in such Fund shall also be used to supplement the Reserve Account if necessary in order to prevent a default in the payment of the principal of and interest on the Bonds. (6) To the extent junior lien bonds are issued and outstanding (which subordinated bonds the Issuer reserves the right to issue), the Issuer shall next apply moneys in the Revenue Fund to the payment of principal of, redemption premium, if any, and interest on such subordinated debt of the Issuer. (7) The balance of any moneys remaining in the Revenue Fund after the above required payments have been made may either be deposited into either the Renewal and Replacement Fund or the Sinking Fund, or may be used for the purchase or redemption of Bonds, or may be used by the Issuer for any lawful purpose of the Issuer. D. Subject to the receipt of the Required Consents, Section 16C of the 1984 Ordinance, as amended, modified and restated in Section 17E of the 2001 Ordinance shall be amended to read as follows (deletions are indicated by a strikethrough and additions are indicated by underlining): E. INVESTMENT OF FUNDS. The Operation and Maintenance Fund, the Sinking Fund, the Reserve Account (and any Reserve Subaccounts therein), the Renewal and Replacement Fund, the Revenue Fund, the Construction Fund, Ordinance No. 8620-14 8 and any other special funds herein and in the Original Ordinance established and created shall constitute trust funds for the purposes provided herein for such funds. All such funds shall be continuously secured in the same manner as state and municipal deposits are required to be secured by the laws of the State of Florida. Moneys on deposit in any of such funds and accounts may be invested and reinvested in Authorized Investments. Investments made with moneys in the Construction Fund, the Revenue Fund, the Operation and Maintenance Fund, and the Sinking Fund (except the Bond Amortization Account therein), must mature not later than the date that such moneys will be needed. Investments made with moneys in the accounts in the Bond Amortization Account, in the Reserve Account (and any Reserve Subaccounts therein) and in the Renewal and Replacement Fund must mature, in the case of the accounts in the Bond Amortization Account not later than the stated date of maturity of each respective Amortization Installment of the Term Bonds to be retired from the sub-accounts in the Bond Amortization Account from which the investment is made, in the case of the Reserve Account (and any Reserve Subaccounts therein) not later than the final maturity of any the applicable Series of Bonds then outstanding, and in the case of the Renewal and Replacement Fund, not later than such date as shall be determined by the Issuer. Any and all income received by the Issuer from all such investments shall be deposited into the Revenue Fund, except however, that investment income earned in the Bond Amortization Account may be retained therein or deposited into the Sinking Fund and used to pay maturing principal of and interest on the Bonds, at the option of the Issuer. The cash required to be accounted for in each of the foregoing funds and accounts established herein may be deposited in a single bank account, and funds allocated to the various accounts established herein may be invested in a common investment pool, provided that adequate accounting records are maintained to reflect and control the restricted allocation of the cash on deposit therein and such investments for the various purposes of such funds and accounts as herein provided. The designation and establishment of the various funds in and by this Ordinance shall not be construed to require the establishment of any completely independent, self-balancing funds as such term is commonly defined and used in governmental accounting, but rather is intended solely to constitute an earmarking of certain revenues and assets of the System for certain purposes and to establish certain priorities for application of such revenues and assets as herein provided. SECTION 5. SEVERABILITY OF INVALID PROVISIONS. If any one or more of the covenants, agreements or provisions herein contained shall be held contrary to any express provisions of law or contrary to the policy of express law, though not expressly prohibited, or against public policy, or shall for any reason whatsoever be held invalid, then such covenants, agreements or provisions shall be null and void and shall be deemed separable from the remaining covenants, agreements or provisions and shall in no way affect the validity of any of the other provisions hereof or of the Bonds issued hereunder. Ordinance No. 8620-14 9 SECTION 6. REPEALING CLAUSE. All ordinances or resolutions or parts thereof of the Issuer in conflict with the provisions herein contained are, to the extent of such conflict, hereby superseded and repealed. SECTION 7. EFFECTIVE DATE. This Ordinance shall take effect immediately upon its passage. SECTION 8. PUBLIC NOTICE. Notice of the proposed enactment of this Ordinance has been properly advertised in a newspaper of general circulation in accordance with Chapter 166.041, Florida Statutes. PASSED ON FIRST READING ________________________ PASSED ON SECOND READING AND FINAL READING AND ADOPTED ________________________ ___________________________ George N. Cretekos Mayor Approved as to form: Attest: ____________________________ ____________________________ Pamela K. Akin Rosemarie Call City Attorney City Clerk Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-737 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: City Manager Verbal Report In Control: Council Work Session Agenda Number: 13.1 SUBJECT/RECOMMENDATION: Capitol Theatre Proposed Amendment SUMMARY: N/A APPROPRIATION CODE AND AMOUNT: N/A USE OF RESERVE FUNDS: N/A Page 1 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-725 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Council Discussion Item In Control: Council Work Session Agenda Number: 15.1 SUBJECT/RECOMMENDATION: Streetsense Recommendations - Councilmember Jonson SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Page 1 To:Rod Irwin, Assistant City Manager From:Gina L. Clayton, Assistant Planning and Development Director Date:October 10, 2014 RE:Response to Streetsense’s 2010 Letter Regarding Sign Regulations Sent Via E-Mail Per your request please find the Planning and Development Department’s responsesto the questions/concerns raised by Streetsense about the City’s sign ordinance and Downtown Design Guidelines. 1.Prohibited Signs –Section 3-1803 –Sandwich Board Signs. Streetsense thought there was lack of clarity as to whether or not sandwich board signs were allowed but suggested that well designed and maintained sandwich board signs could enhance the overall retail experience. At the time the memo was prepared sidewalk signs were allowed in the Downtown. In 2012 the City Council amended the sign ordinance to permit sidewalksigns for retail and restaurant usesthroughout the City. The revised ordinance provides for specific location requirements (5’ from the building wallin Downtown) as well as design criteria. In developing the provisions with the Chamber of Commerce it was evident that most businesses prefer to buy stock sidewalk signsso design criteria was developed to ensure a certain level of qualityfor these signs. The provisions also allow for flexibility with regard to the design criteria “inorder to achieve a creatively designed sign using a particular symbol or logo indicative of the type of business and services being advertised.” To date, no business has requested flexibility to do a creative designthat would contribute to the overall retail experience. No special process or fee is associated with requesting this flexibility. 2.Section 3-1804.5 General Standards –The light which illuminates a sign shall be shaded, shielded, or directed so that no structure,including sign supports or awningsare illuminated by such lighting. Streetsense recommended that lighting may be directedso that signage on awningsmay be illuminated, but care must also be taken to avoid lighting awnings support structures. The Planning and Development Department would agree that awnings that are front-lit are appropriate. Back-lit awning would be inappropriate and would require the entire awning to be counted as signage pursuant to thedefinition of sign structure. Page 2 3.Section 3-1805 –Attached Menu Signs of no more than 4 square feet of sign face located at the entrance or service window of a restaurant. Streetsense questionedwhether menu boards and accompanying signs counttoward thetotal allowed sign area. A menu board is allowed without a permit and does not count toward the total allowed sign area for a particular storefront. 4.Section 3-1805 –Signs permitted without a permit. In the Downtown District, one sandwich board signfor each business, but no more than two per lot. Streetsense thought these were not permitted based on Section 3-1803.I and questioned why there was a limit on the number of signs. It also indicated that every retailer should be entitled to a sandwich board sign provided the sign is designed to match the retailer’s storefront aesthetic. Generic sandwich board signs should not be permitted. As indicated in the response to #1 above, the Chamber of Commercedesired an ordinance that supported the use of generic sandwich board signs. A flexibility provision was included in the ordinance to allow for creativity but no business has exercised that provisionto date. 5.Section 3-1806.3 –Permitted signs requiring development review –the following signs shall be permitted in all non-residential districts: a. Oneattached sign per business establishment. Streetsensedidn’t review the definition of “attached”and thought the provision was restrictive. Itwanted to know if multiple signswerepermitted for a storefront if they vary in type. For example is a retailer permitted to have a wall- mounted sign, a projectingor blade sign and a menu board provided the maximum allowable signage area for the retaileris not exceeded? Are corner tenants allowed signage on both storefronts? Streetsense indicated that retailers should be encouragedto design their signage as an integral part of their storefront and should be encouragedto include multiple signage types. The total area of these signs should be less thanor equal to an area permitted for all types of signage for a given storefront. Corner tenants should be allowed some signage on their secondary frontage, but not as much as allowed on the primary storefront. The sign code permits a business to have one attached sign which could be either a wall sign, projecting/blade sign, hanging sign, or awning sign(corner properties are allow one sign on each façade abutting a street). Additionally,a business could erect the following: o Window signage up to 25% ofthe total window area fronting a right-of-way provided all window signs donot exceed 50 square feet on any façade facing a street; o A 16 square foot sign in the vicinity of a rear entrance ifthebusiness has a rear façade facing a parking lot with a rearentrance; Page 3 o A graphic element could be incorporated on an awning in addition to the allowable attached signage provided the awning is not back-lit and the graphic does not exceed 25% of the awning area or 16 square feet, whichever is less. This provision is intended to allow businesses flexibility to provide an attractive and interesting element to their building; o 4 square foot menu sign for a restaurant;and o Sidewalk sign for retail and restaurant uses42 inches in height and24 inches in width. Increases in the number of signs and sign area may be requested through the Comprehensive Sign Program which is a design-based program focused on creativity and quality. 6.3-1806.3 -Permittedsigns requiring development review. The following signs shall be permitted in all non-residential districts: a. oneattached sign per business establishment. The area of an attached sign face shall not exceed: i. One square foot per 100 square feet of building façade facing the street frontage to which the sign is to be attached. Streetsense asked if the calculation is based on the entire building or just the area of the storefront. It recommended that the City consider revising the calculation to be linked to the tenant’s linear frontage. For example, consider allowing two square feet of signage for each linear foot of storefront. In 2012 the Planning and Development Department worked with the Chamber of Commerce and Business Task Force in developing amendments to the sign ordinance that replaced the formula outlined above which essentially limited sign area to a minimum of 20 feet to a maximum of 24 square feet. The new minimum sign standards allow 24 square feet by right for any type of sign through a building permit or sign area equal to 3% of the building(or tenant)façade area up to 36 square feet if a higher quality of signage is proposed such as channel letters mounted directly on the building, illuminated capsule signs, contour cabinet signs, etc. This additional sign area is allowed though a sign permit and does not require review and approval through the Comprehensive Sign Program application. The 3% option focuses on quality and creativity. Additional sign area or number of signs can be requested through the Comprehensive Sign Programif this is deemed insufficient by the business owner. Several Downtown businesses have used this process to erect additional signage such as Starbucksand Dunkin Donuts among others. 7.Section 3-1806.3.b. –Attached signs –Signs shall be designed according to a common theme including similar style, color, materials or other characteristics to provide a sense of uniformity. Streetsense questioned why signage in a building with multiple tenants be designed to a common theme as signage is an integral part of a retailer’s storefront and should be a visible expression of that retailer’s identity.Requiring conformity to a particular style or aesthetic as one would expect in a typical strip shopping center is counter-productive to the goal of creating a dynamic and vibrant retail district. Streetsense recommended that tenants should be guided toward quality materials and quality design rather than a storefront that looks like their neighbors. Page 4 The Planning and Development Department agrees with Streetsense’s recommendation that quality materials and quality design should be emphasized. The Department recognizes that retailers want to distinguish themselves and does not require the use of the same exact colors, fonts, etc. in properties with multiple tenants. These typeof properties have thevisual impact of a single entityso Staff works with them to achieve points of agreement such as the same type of sign e.g. flush mounted channel letters, etc. but does not requires the fonts and colors to be the same, etc. These points of agreement can achieve the intent of the code while allowing the retailer to express their identity. 8.3-1806.3.c. –Projecting signs may be used as a type of attached sign in the Downtown and Tourist District. Streetsense questioned if a projecting sign is permitted in conjunction with other types of signs, and if so is such a combination of signs bound by the 20 sf –24 sf range. This sign provision allows a projecting sign to be used as a permitted attached sign. As the Code allows one attached sign through a building(sign)permit, the projecting signwould be allowed in lieu of another type of attachedsign. Streetsense recommended that retailers be encouraged to include multiple sign types. This can be achieved in Downtown and the rest of Clearwater through a Comprehensive Sign Program application which requires design review to ensure the use of quality design and materials as advocated by Streetsense. 9.3-1807.C.1.a and b –Comprehensive Sign Program Flexibility Criteria –The signs proposed in a comprehensive sign program shall be designed as part of the architectural themeof the principal building proposed or developed on the parcel proposed for development and shall be constructed of materials and colors which reflect integrated architectural vocabulary for the parcel proposed for development; or b. The design, character, location and/or materials of all freestanding and attached signs proposed in a comprehensive sign program shall be demonstrably more attractive than signs otherwise permitted on the parcel proposed for development under the minimum signs standards. All signs must be architecturally integrated into/with the design of the building and/or site using similar and coordinated design features, materials and colors, etc. Streetsense believes this section unnecessarily limits a retail tenant’s opportunity for creative expression in their storefront and signage package. An emphasis on quality design and materials should take precedence over uniformity if one hopes to createa dynamic and unique shopping district. Itsrecommendation was that an emphasis be placed on guiding each tenant to quality materials and quality design. Storefronts which are too similar in character should, in fact, be discouraged. National tenantsshould be encouraged to go above and beyond their standard design and details in a special retail district. It is the level of quality and variety of storefronts that makes for a unique pedestrian experience. The focus of the Comprehensive Sign Program is on quality design and materials. The goal is not to make every tenant sign look alike but to incentivize creative, attractive and quality signage. Rarely does the Department receive an application that proposes creative signage. Page 5 National retailers resist changes to their standard sign sizes and designs. Small businesses typically rely on the sign contractor/manufacturer to design the sign for theminstead of a graphic designer. Without a creative/interesting logo, a sign’s appearance is apt to be mundane. 10.Downtown Design Guidelines –Streetsense felt there are fewer questionable clauses in the Downtown Design Guidelines than with the sign code, but thought there seems to be an overall predisposition toward a homogenous retail expression. Some ofthe issues that stood out to Streetsense were as follows: Bulkheads below windows –why are they necessary at every storefront? Vibrant colors –why should these be prohibited,especially in storefronts? Metal canopies and awnings –why are these prohibited? Sandwich Board Signs –why are these prohibited? Storefronts in historic structures –if the overall architectural integrity of the historic building is maintained, why must the storefront be of a historic nature as well? Streetsense suggested that the first three items above limitthe creative expression of a retailer in their storefront design. Furthermore it indicated that if quality materials are used in a thoughtful manner, any of these can help a storefront stand out from its neighbors and contribute to the overall streetscape. A modern storefront in a historic structure can be –if done well –quite striking and an overall positive for the pedestrian experience. The Design Guidelines specify that bulkheads below display windows are appropriate based on the architectural style of the building; therefore they are not requiredon every building. There is no provision in the Design Guidelines that prohibitsvibrant colors. Garish, gaudy, loud, excessive colors are considered inappropriate as well as using the deepest tones of the color wheel for the main body of the building. Awningand canopies are not prohibited; however,awnings made of high-gloss or fabrics which appear to be plastic are inappropriate. As discussed above sidewalk signs arenow permitted. If a building is designated as a historic structure by City Council action, renovations must comply with the Secretary of the Interior Standards for Rehabilitation. These standardsrequirethe historic character of the building to be retainedand preserved. Any change to a storefront would need to be reviewed for compliance with the Standards. Since the Downtown Plan was adopted in 2003 I thought it would be helpful to know that the Design Guidelines weredeveloped in conjunction with asteering committee comprised of representatives from the Main Street Program Committee, Downtown Development Board, Chamber of Commerce, affected neighborhood associations, business owners, local architects and contractorsover a 7 month period. A totalof 11 committee meetingswere held and prior to the adoption process staff presented draft guidelines to the City Council on four occasions and once to the entire Main Street Committee, the Downtown Development Board, and the Community Development Code. Page 6 As indicated above, the Clearwater sign ordinance and the Downtown Design Guidelines focus on quality design, quality materials, creativity, as well as recognize there are multiple design solutions for any particular project.The issue seems to be there is a disconnect with the implementationof each.Our experience is that quality requirements are typically seen as obstacles and not objectives. It has also been our experience no renovation proposal has been made that mirrors the creativity and quality that Streetsense advocates. If you need any additional information please let me know. 1| Page To:Sandy Harriger From:Gina L. Clayton, Assistant Planning and Development Director Date:November 13, 2014 RE:Summary Recommendations of the Downtown Subcommittee Sent Via E-Mail Changes to the Clearwater sign ordinance and Downtown Design Guidelines to implement recommendations of the Downtown Subcommittee can be included inthe Downtown Design Guidelines/sign code updates project identified as a priority project of the ULI report. While the Planning and Development Department believes the sign code and design guidelines fully support and require qualitydesignand materialsas recommended by the draft Streetsense ClevelandStreet District Storefront and Signage Design Guidelines, it also recognizes that perceptions may not be consistent with that. The Planning and Development Department offers the following to address the subcommittee’s recommendations. Page 1 #2 Awning Lighting:An amendmentto the sign regulations (Section 3-1805.C.5)can be prepared to allow for the exterior illumination of awnings as advocated by Streetsense. The revisions would be drafted in way that clarifies lighting installed under the awning (back-lit) is not permitted. #4Sandwich Board Signs: An amendment can be made to the Downtown Design Guidelines to encourage unique sidewalk signs. It should be noted that the sidewalk sign provisionsof the Community Development Codealready allows flexibility to the design criteria to achieve creatively designed signsbut this can be reinforced through the Design Guidelines. It should be noted that the actual design guidelines in the draft Streetsense report does not mention anything about creativity. In fact they just state that sidewalk signage shall be made of certain material, that they cannot be illuminated, cannot exceed six square feet and must be taken in at the close of business. The language does not state anything about requiring creativite, unique or interesting signs. The photographs used in the section are either chalkboard signs or creative/unique sidewalk signs. To ensure only the use of creative/unique sidewalk signsas shown in the Streetsense draftreport, an amendment to the sidewalk sign regulationsin the Codewould need to be prepared to 2| Page preclude the use of the wind signs and plastic sign frames which the Code currently allows. Also amendments to the Design Guidelines could include photographs of interesting sidewalk signs. A total of nine sidewalk signs permits have been issued for properties in the Community Redevelopment District. Five are the maximum size permitted and four are slightly smaller. #5 Attached Signs Definition of Maximum Sq. Footage Allowance: It is challenging to accomplish the recommendation based on the organization of the sign regulations. The Planning and Development Department created a Sign Guide for Downtown Businesses several months ago to assist business owners in understanding what signs they could erect. That brochure could be updated and include the menu sign information and the awning graphic provision. Additionally the Downtown Design Guidelines could be revised to specify the use of multiple permitted signs is appropriate. If the subcommittee’s recommendation is broader that what is understood above, multiple signs are allowed through the Comprehensive Sign Program(CSP). Community Development Code Section 3-1808.A.1 states that “The intent of the comprehensive sign programis to provide private property owners and businesses with flexibility to develop innovative, creative and effective signage . . .” Section 3-1808.B.1 states that signage proposed in the CSP “may deviate from the minimum sign standards in terms of number of signs per business or parcel of land, maximum area of a sign face . . .” The draftStreetsense report specifies that the height of capital letters shall be at least 10” in height but not more than 30’ tall. This recommendation would create a new regulation just for capital letters withina small geographic area of the City. If City Council desires to add this new regulation, the Planning and Development Department would recommend addingthis to the Downtown Design Guidelines where there is alreadya provision which states that “Lettersize, letter and wording spacing, font and style and other design elements of a sign that create an overall high quality aesthetic appearance” is appropriate. #7Attached Signs –Recommends No Common Sign Themefor Multiple Tenants in One Building: While the Department believesa common theme can be achieved through a variety of means without sacrificing diversity, creativityand uniqueness, the Department understands some may not be comfortable relying on the“or other characteristics” provision of Section 3- 1807.B.c.3 when determining if a common theme exists. It should pointed out that the second bullet of the signs section of the Downtown Design Guidelines finds signs to be appropriate if their design, colors, materials, size shape and methods of illumination reinforce the overall design of the façade. This is consistent with the Streetsense idea that signage be designed as an integral part of the retailer’s storefront. If the verbiage in the Streetsense draft report is clearer than the language in the Design Guidelines, then the Guidelines can certainly be revised accordingly. #8 Recommends Designs Using Multiple Signage Types: It is unclear if this is the same recommendation as in #5. If it is notand the recommendation is to allow multiple signs without design review, Staff is concerned about the ability to create and maintain a quality and vibrant environment compared to one of visual clutter/unattractive signage competing for attention. The 3| Page Planning and Development Department believes the subcommittee’s recommendation could be achieved by through a no-fee CSP for properties located in the CRA. This process could also potentially allow for additional sign area if appropriate. The Department’s recommendation could be accomplished through an amendment to the fee schedulein Appendix A of the Community Development Code. #9Recommends Comprehensive Sign Program Shift to Encourage Diversity with Quality: As indicated in #5 above, the CSP is a design based program that supports and incentivizes flexibilityand creativity, as well as requires the use of quality materials and sign design. The Planning and Development Department believes that the recommendations of the draft Streetsense report can be achieved through the use of the existing program with some additional appropriate statements added to the Downtown Design Guidelines. #10 –We would be happy to meet to discuss any aspect of the draft Streetsense Cleveland Street District Storefront and Design Guidelines. Upon reviewingthe sign provisions of the draft Streetsensereportand the Downtown Design Guidelines, there are similarities in the concepts contained in both. The Guidelinessupport signage that is designed to reinforce the overall design of the façade and the Streetsense draft report states that successful storefront signs should be carefully integrated into the overall storefront design. Both documents support quality design and materials. While there are similarities in the concepts of each document, the graphics in the draft Streetsense document convey a very vibrant and interesting environmentthat is more effective than some of the local examples used in the Downtown Plan. TheDepartment plans to incorporate some of those photographs into the Plan as part of the ULI implementation project. t 4% I Streetsense April 7, 2010 Downtown Recommendations - Status and Recommendations 1 Streetsense Recommendation Allow Sandwich Board Signs: Action taken: Sign code was modified to allow sandwich board signs city wide in 2012. 2 Streetsense Recommendation: AIIow illumination of storefront awnings Action to be taken: Correct existing oversight in code as recommended. And additionally modify the Downtown Guidelines to allow permitted signage on the surface of awnings not just on the valance of the awning. 3 Streetsense Recommendation: Allow menu boards to be excluded from a tenant's overall signage allowance. Action taken: Current code allows menu signs at the entrance or service window of a restaurant. In 2012 the size of such signs was increased to six square feet in addition to tenant's overall signage allowance. 4 Streetsense Recommendation: Every Retailer should be allowed a sandwich board sign provided such sign is designed to match that retailer's storefront aesthetic. Generic sandwich board signs should not be permitted. Action taken: Code allows retail and restaurants to have a sandwich board sign (2012 amendment). Council Decision: Should the code in Downtown Design Guidelines be modified to PROHIBIT generic sandwich board signs? 5 Streetsense Recommendation: Corner tenants should be allowed some signage on their secondary frontage, but not as much as allowed on the primary storefront. Action taken: Sign code was modified in 2012 to allow corner tenants to have the same allowable signage on both street frontages. 2014 -11 -25 Streetsense Recommendations docx.docx 1 Printed 12/1/2014 11:22 AM 6 Streetsense Recommendation: Consider going to the tenant's linear frontage rather than one square foot per 100 square feet of building facade. Action taken: Sign code was modified in 2012 to increase the signage by right to 24 square feet, or 3% of the frontage area up to a maximum of 36 square feet. Note that these allowances are in addition to window signage (25% up to a total of 50 sq. ft.), menu signs (up to six sq. ft.), and sidewalk signs square footage allowances. 7 Streetsense Recommendation: Emphasis should be placed on guiding each tenant toward quality materials and a quality design rather than a storefront that looks like their neighbor's. Action to be taken: Revise Downtown Guidelines to more clearly emphasize quality and individual design looks for each storefront. 8 Streetsense Recommendation: Retailers should be encouraged to design their signage as an integral part of their storefront, and should be encouraged to include multiple signage types. The total area of these signs should be less than or equal to an area permitted for all types of signage for a given storefront. Action Suggested: Modify code for downtown to no longer be restricted to one attached sign, but to allow multiple attached signs within the total signage allowance as recommended by streetsense. This will allow attached signs, awning signs, projecting signs and /or hanging signs at the same time. 9 Streetsense Recommendation: Comprehensive sign program should discourage storefronts that are too similar in character to create a unique pedestrian shopping experience. Action to be taken: Revise Downtown Guidelines to more clearly emphasize quality and individual design looks for each storefront. 10 Streetsense Questioned the following in the Downtown Design Guidelines: a. Why are bulkheads below windows necessary at every storefront? Ans: Current design guidelines don't require for every storefront. b. Why should vibrant colors be prohibited? Council Decision Sought: Consider incorporating the streetsense color design samples in the Downtown Design Guidelines. c. Why prohibit metal canopies and awnings? Ans: These are not currently prohibited. d. Why are sandwich board signs prohibited? Ans: As indicated in #1 sandwich board signs were allowed in the 2012 code modification. e. If the overall architectural integrity of the historic building is maintained, why must the storefront be of a historic nature as well? Ans: This is not required such as the design of the Dunkin Donuts storefront in the Peninsular Telephone Building. 2014 -11 -25 Streetsense Recommendations docx.docx 2 Printed 12/1/2014 11:22 AM April'7, 2010 Mr. Rod Irwin City of Clearwater Clearwater City Hall, 3rd Floor 112 S. Osceola Ave. , _Or'' r 1 Clearwater, FL 33756 AAlee "fW vDearMr. Irwin, fa jiji°P „ .14 Streetsense has reviewed both the DoWnt6wn e i G d Atm i Ala eLl[ad dA4.m.en 2716,124-44- Ciket,t Gt./IOU/Gale' cF444ette AtrAhet;ab t9444 * frtd/ PeA -14144/4" Guide!' es and Article , Fie= f3 of the Community Development Code for the City of Clearwater. In general, we agree that these regulations are consistent with those found in vibrant downtown retail districts throughout the country. However, there are several line items in both the code and guidelines that seem either unclear or especially restrictive to us. The specific regulations in question from the sign ordinance are listed below and a brief discussion of the Downtown Design Guidelines follows. Clearwater, Florida, Community Development Code» PART I - COMMUNITY DEVELOPMENT CODE» ARTICLE 3. - DEVELOPMENT STANDARDS» DIVISION 18. - SIGNS Section 3 -1803. - Prohibited signs. I. Sandwich board signs, except as provided in Section 3- 1805.Y. This is unclear. Section 3- 1805.Y. discusses sandwich board signs as temporary signs during construction projects, but no mention is made of Section3- 1805.U. which seems to allow sandwich board signs for businesses. Streetsense recommendation lld siarae 406;0,_firttau edksandwivich : :board_signs,can add'anothere lay'.eRoff?.treetfurniture: :and enhahceahe overall: retall;experies pe. Section 3 -1804. - General standards. 5.The light which illuminates a sign shall be shaded, shielded, or directed so that no structure, including sign supports or awnings, are illuminated by such lighting. Signage can often be integrated into an awning. This implies that such signage may not be illuminated. What is the logic for disallowing the illumination of awnings? --( 4i-1^^ 444 , i 1 0` „j1a Streetsense recommendation: tL :.; tlr Jh. rig,m y2be;direc ed §Q:thatsignage on<awnitgs may be illuminated, butcare must-.be'taken'.`To avoid lighting thatVa ning's support structures . c'sifrf‘"C Section 3 -1805. - Signs permitted without a permit. J. Attached menu signs ofno more than four square feet of sign face area located at the entrance or service window of a restaurant. One freestanding drive - through sign no more than 16 square feet in area and six feet in height located in the rear ofthe principal building. Do menu boards and accompanying signage count toward the total allowed signage area associated with a particular storefront? 4600 East West Highway, Suite 800 Bethesda, Maryland 20814 • phone 301.652.9020 • fax 301.652.9166 Ljti n- Streetsense recommendation: As the sign ordinance is currently written rpemlogards sh01:110e exciudedr:from a tenant's overall ,signage: all.owanceJ j f:ttfere Is a.doalreto iric.0dethwslgnage ;Inthe ttotal; `the'°ordinance should be ire- written to increase th'e allowable signage are for-each storefront7 Section 3 -1805. - Signs permitted without a permit. U. In the Downtown District, one sandwich board sign for each licensed business, but no more than two per lot. According to Section3-1803.I sandwich board signs seem to be prohibited. If they are permitted, why are they limited to two per lot? If a lot contains a building with three retailers, why is each retailer not permitted a sandwich board sign should they so choose? And in that case, who determines which retailers are entitled to have sandwich board signs? Streetsense recommendation: Well designed and maintained sandwich board signs can add another oplayerofstreetfurnitureandenhancetheoverallretailexperience. C e :fi *retain if 0u.J_q0be .ntItletito =ap r At o1"" VrirYi 6oai`cl+ Ign Coyf led such sign is desigJ edrto match that ,retajler's storefront aest etic F G hePV alldaw ch:board slgns.should, not b0, Mliit0,0 ;,, 41--42 not Al o0 Section 3 -1806. - Permitted signs requiring development review. 3.Attachedsigns. The following signs shall be permitted in all non - residential districts: a. One attached sign per business establishment. Without the definition of "attached sign" this seems restrictive. Are multiple signs permitted for a storefront if they vary in type? For example, is a retailer permitted a . rng4 • 111.4.144111gInand a rim94,1wA for one storefront provided they do not exceed the maximum allowable ec signage are for one retailer? Are corner tenants allowed signage on both of their storefronts? CCayA ?t ,; Streetsense recommendation: Retailers should be encouraged to design their signage as an integral part of their storefront, and .14isM, gnpgtarag ;to,.jticl ae rrjt ltjbleNgnageiy1p;l a he total area of p ` these signs should be less than or equal to an area permitted for all types of signage for a given CO,.t,, storefront. Corner tenants should be allowed some signage on their secondary frontage, but not as much as allowed on the primary storefront. Section 3 -1806. - Permitted signs requiring development review. 3. Attached signs. The following signs shall be permitted de, in all non - residential districts: a. One attached sign per business establishment. The area of an attached sign face shall not exceed: i. One square foot per 100 square feet of building facade facing the street frontage to which the sign is to be attached Pt this calculation based on the entire building or just the area of the storefront? 20 S1 Streetsense recommendation: 'oi sider'r• ttlsin`g +thlelcaIoalatioNto be llnke sto a.te aot's,lirear.4 / r't fr rgintgd0`4 For example, consider allowing 1 o tj ialeFteet `of-sigi age for•: each :.linear foot,of:atorefront. € '°`1„:".71(A., Section 3 -1806. - Permitted signs requiring development review. 3. Attached signs. The following signs shall be permitted in all non - residential districts: b. Where individual business establishments with exterior entrances are located in a single building, multi- tenant buildings, or as part of a business/office complex or shopping center, attached signs shall be designed according to a common theme including similar style, color, materials or other characteristics to provide a sense of uniformity. Changes to individual tenant signage shall be reviewed for compliance with the established or projected theme of the development site. vhykmirsighegeirra-:DujI ling wlthyrnultiple tenants:be designed to. a, common'. theme. ipignage is an integral part of a retailer's storefront, and should be a visible expression of that retailer's identity. Requiring conformity to a particular style or aesthetic as one would expect in a typical strip shoppingcenteriscounter - productive to the goal of creating a dynamic and vibrant retail district. iraplim Streetsense recommendation l ttlaNkSl ild`be;:placed.on RuidipTeac,Ittenant toward ualitydtngtgoials,0 a,quality desigp rather than a storefront that looks.ilke their neighbor'sf Storefronts whicharetoosimilarincharactershould, in fact, be discouraged. National tenants should be encouraged to go above and beyond their standard design and details in a special retail district. It is the level of quality and variety of storefronts that makes for a unique pedestrian shopping experience. Section 3 -1806. - Permitted signs requiring development review. 3. Attached signs. The following signs shall be permittedinallnon - residential districts: c. Projecting signs may be used as a type of attached sign in the Downtown (D) and Tourist (T) Districts, unless otherwise permitted by the community development coordinator. They shall be installed with a minimum eight -foot clearance from the bottom ofthe sign to grade or the sidewalk. Projecting signs shall comply with encroachmentintosetbackandrights -of -way Section 3 -908. Are projecting signs permitted in conjunction with other types of signs, and if so is such a combination of signs bound by the 20sf -24sf range stipulated in Section 3- 1806.3.a.ii.? Streetsense recommendation: Retailers should be encouraged to design their signage as an integral part of their storefront, and should be encouraged to include multiple signage types. The total area of these signs should be less than or equal to an area permitted for all types of signage for a given storefront. Section 3 -1807. - Comprehensive sign program. C. Flexibility criteria. 1. Architectural theme. a. The signs proposed in a comprehensive sign program shall be designed as a part of the architectural theme ofthe principal buildings proposed or developed on the parcel proposed for development and shall be constructed of materials and colors which reflect an integrated architectural vocabulary for the parcel proposed for development; or b. The design, character, location and/or materials ofall freestanding and attached signs proposed in a comprehensive sign program shall be demonstrably more attractive than signs otherwise permitted on the parcel proposed for development under the minimum signs standards. All signs must be architecturally integrated into /with the design ofthe building and /or site using similar and coordinated design features, materials and colors, etc. rgt tiit l Lire fb nlageftaa tnittaAtal, tenanM wQINtWcr'eat ve,expresslpn,jn neidItfiNiTiliege15"1 14 9,14 ., jMAu , tyMgn and matenalsshould take precedence] rlif tniitTitittne.hope$ tA, create a dYna ar, u ?Iqu shopping district: I Streetsense recommendation: Emphasis should be placed on guiding each tenant toward quality materials and a quality design rather than a storefront that looks like their neighbor's. Storefronts which are too similar in character should, in fact, be discouraged. National tenants should be encouraged to go above and beyond their standard design and details in a special retail district. It is the level of quality and variety of storefronts that makes for a unique pedestrian shopping experience. There are fewer questionable clauses in the Downtown Design Guidelines, except that ISSItg:MObefOrhdy:Or41kbidiibbSitid,r09.wprcl; '-homogenous-rptail--expres$ion$ Some of the issues with the Downtown Design Guidelines that stand out are: IiiiigitiWitteleklacigkg- :R^e401.9m.s.Ram.Wvpritglprgirpoqi vioggitiogize - vargagatimike.,KoNtel especially in storefronts? Ifiag.1..M.SZINAlitrattggi- WRaelgiesoaqtiliteja s4f10.14*:Weitgingt VglOtatittIgte100114404,t, V-00f,0131011()ASVIUOtittfOr01- IfelhAVAYAriarPOlteOtgr.,01:ttegrity Ofthe historic building is, ngintaitiOd;,:why40.10 the (storefront be ot,.s,,historicpature:-st\well? Streetsense recommendations: ltraitifiliaaTifead:;liritiftrdiaeitiiiire*e-sicisAfitrMteriirVittie(t twomfxdritAtesight Provided quality materials are used in a thoughtful manner, any of these can help a storefront stand out from its neighbors and contribute to the overall streetscape. Sandwich board signs were discussed with the sign ordinance. A modern storefront in a historic structure can be - if done well quite striking and an overall positive for the pedestrian experience. L e t) W41. 111 AT: -33.ffiragraftallg • traVLIMMINT,40 Oftnffalls should be placed through the storefront and signage design guidelines on the 9,v :it:twAte11:CSPATOMMDA4The form and SclitattaWfreariffeligIRMINVreirgrIt1010ttitidgif VIRIZMPIPAVATtraraNattlaMO,M 732MtIMMECIY:P10.109.RPOYOnne-gr, r• We look forward to working with you further on these issues. Sincerely, Bruce Leonard Streetsense storefront & signage c esign guidelines The total allowable storefront signage is the maximum amount of signage any one shop can display. Having a limit on the amount of signage is not meant to hinder any retailer's expression, but to ensure that the sidewalk and storefronts are not visually cluttered, protecting all retailer investments. Each retailer within the Cleveland Street District is granted two square feet of signage for each linear foot of primary frontage. For retailers that are located on a corner with more than one frontage, the second frontage will be granted one square foot of signage for each linear foot of secondary frontage. Signage areas from each frontage may not be combined and must be applied to that same frontage to which the signage area was given. Once the total allowable storefront signage area is calculated, signage area may be divided up among the various sign types outlined on page 35. CLEARWATER OR 2 SQUARE FEET (SF) OF SIGNAGE WILL BE GRANTED FOR EACH LINEAR FOOT OF PRIMARY FRONTAGE 36 Street Attached signage Storefront width 20 30 40 50 60 70 80 90 100 Storefront height 15 15 15 15 15 15 15 15 15 Calculated sq footage 300 450 600 750 900 1050 1200 1350 1500 3% allowance 3% 3% 3% 3% 3% 3% 3% 3% 3% Calculated sign sq ft 9 13.5 18 22.5 27 31.5 36 40.5 45 Minimum allowed for each store Max allowed for each store 24 24 24 24 24 24 24 36 36 36 Add ons: Window 25% or 50 40 50 50 50 50 50 50 50 50 Menu 6 ft 6 6 6 6 6 6 6 6 6 Sandwich board 7 7 7 7 7 7 7 7 7 Total Clw 77 87 87 87 S7 87 99 99 99 streetsense allowance 2 ft each frontage 40 60 80 100 120 140 160 180 200 Note 1995 Clw sign Code allowed 1.5 sq ft for each frontage to max of 150 30 45 60 75 90 105 120 135 150 18 store -ront & signage design guidelines Usingpainted and colored materials is an easy way to create a cohesive storefront, highlighting key architectural elements and details that contribute to the overall personality ofthe store. When viewed in context, even the brightest ofcolors should harmoniously blend with neighboring storefronts and should not clash. Color should be chosen with a store's brand identity in mind. Although colors chosen for the ground level storefront should coordinate with upper floors in the same building, choices should not be limited to such palettes. Buildings that have been deemed historic in nature (please see page 6 for a map of historic structures) have restricted color palettes that they must use. Please refer to the Downtown Design Guidelines for further instruction on designing and choosing a color for a storefront in a historic structure. Harmonious color palettes (see color palette examples on page 20) can be created several different ways through several different approaches: Monochromatic scheme: Use variations in lightness and saturation of a single color. Analogous Color Scheme: Use colors that are adjacent to each other on the color wheel. Complementary Color Scheme: Use two colors that are opposite each other on the color wheel. Appropriate The color scheme should match the store's personality and "speak to" the target audience. Palettes should be limited to three colors. Color should help unify all parts of the storefront's design. Color should be chosen with context in mind; a storefront's color should not clash with adjacent buildings and should harmonize with the building's upper floors. The storefront design coordinator should approve all color palettes. Inappropriate More than three colors on any storefront. Colors chosen without purpose. Colors that obscure architectural details. Colors that clash with palettes on upper stories or with adjacent stores. Color schemes that are not coordinated with the overall street experience. store-ront & signage c esign guidelines Diagram of Storefront Color. 19 w 1- PERMADIZEDARCHITECTURALFINISHES 20 COLOR SCHEME EXAMPLES storefront & signage design guidelines Arctic Blue Classic Copper Mediterranean Mist Terra Cotta Metallic Black Burgundy Metallic Champagne Dark Bronze Gold Hartford Mist Platinum Ice Tropical Jade Sapphire Ice Champagne Rose Medium Bronze Light Sequin Sterling Gray MONOCHROMATICANALOGOUSCOMPLEMENTARY t r- "" (yip f*°, 1,e, 4'4 , 4.4 Am. storefront & signage design guidelines 21 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-727 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Council Discussion Item In Control: Council Work Session Agenda Number: 15.2 SUBJECT/RECOMMENDATION: Centennial Parade Route - Councilmember Jonson SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-755 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Council Discussion Item In Control: Council Work Session Agenda Number: 15.3 SUBJECT/RECOMMENDATION: Urban Land Institute Unified Visioning Process - Councilmember Jonson SUMMARY: N/A APPROPRIATION CODE AND AMOUNT: N/A USE OF RESERVE FUNDS: N/A Page 1 City of Clearwater Printed on 11/26/2014 14:3 Selected Quotes from the Clearwater ULI Report 1. "This dynamic represents a particular threat to Clearwater, because in the panel's experience it seems to be a profoundly divided city, it is geographically divided between the mainland and the beach, but it is also internally divided, with deep and enduring tensions between various sparring factions. "' 2. "Clearwater must find one unified vision. " 2 3. "This vision must include each of the different constituencies that form Clearwater, and they must buy into that vision. Everyone must feel invited and everyone must be invested in the outcome, because the city simply cannot afford to leave assets or talents on the table. "3 4. "If everyone could just figure out how to work together, Clearwater's constituencies might actually be able to get what they want. " 4 5. "widespread suspicion and distrust that ran rampant in the panel's conversations. Most people felt frustrated, stymied and blocked from contributing to a better Clearwater. The panel cannot stress enough how universal this sentiment was. There were no exceptions.5 6. "The panel does not deny the difficulty of building trust in a situation where it is sorely lacking, but this work must be done, or everything else is pointless. " 6 7. "Absent true collaboration and a compelling overarching vision, the future of Clearwater will remain uncertain. "' 1 ULI Report Page 9 2 Page 9 3 Page 9 Page 11 5 Page 11 6 Page 11 Page 35 3` v'le 9A, ULI Downtown Vision Statements ULI Report: Clearwater must find one unified vision' Existing Vision Statements: 1. Clearwater City Vision a. Facilitate Development of the Economy: i. Diversify the Economic Base 1. Develop downtown and US 19N 2. Clearwater Downtown Redevelopment Plan — February 3, 2004 a. Purpose of this plan: This Plan reflects Clearwater's desire to reclaim its traditional downtown and make it the center and heart of the City. i. Every city should have a unique place that fosters community interaction and fun. Downtown should and can be that place for Clearwater residents and tourists alike. ii. Downtown Clearwater is a reflection of how our forefathers lived, worked and shopped. Clearwater's past can be seen in its historic buildings in and around Downtown and historic Coachman Park. We cannot envision and plan for the future unless we are mindful of our past learning from our successes and failures. iii. Clearwater is the Pinellas County seat and should present a welcoming air to all the Pinellas County residents as they transact business with their government. iv. Finally, Clearwater's Downtown is still a major player in the City's economic life and has a grand opportunity to increase its economic impact through redevelopment. 3. Clearwater Downtown Development Board (Adopted June 2014) a. Goal of the DDB: A flourishing and prospering downtown, with rising property values, a successful, attractive and interesting mix of cultural, restaurant, retail, residential and office tenants that attracts and serves visitors from the local and surrounding area as well as travelers from around the world. b. Primary Goal: To promote, facilitate and support activities that sustain, promote and advance downtown revitalization and to attract businesses and residents to relocate and stay in the downtown area. (per the DDB /CRA Interlocal Agreement) 4. Clearwater Economic Development Strategic Plan — a blueprint for sustained economic growth adopted November 2011). Three guiding principles set the foundation for economic vitality: a. Attracting and retaining a younger mix of professionals b. Facilitating projects that expand the City's tax base c. Diversifying the tax base with industry clusters well- suited for Clearwater. 1 ULI Report page 9 2014 -11 -25 ULI Downtown Vision Statements.docx 1 Printed 12/1/2014 12:09 PM Proposed Vision Statements 5. Clearwater Downtown Partnership: Vision Statement — Create a Cultural District for Downtown Clearwater (Draft — November 23, 2014) a. A leading, dynamic cultural epicenter that embraces the diversity of art, spirit, ethnicity, creativity, and innovation expressed through shared experiences and enhanced by the environment in which they are brought together. b. This environment is reflected by each unique businesses, experiences, people, and events that bond our community and serve as examples to other communities. c. The human experience of the City will be invigorated through an active waterfront, connectivity between the business, residential, tourism, events and through iconic imagery that showcases our leadership to the world. 6. ULI Report Downtown Vision a. STRATEGY (Downtown) must become a vibrant and successful place in its own right, serving its own citizens [page 10]. Below from the exit presentation: i. Authentic sense of place ii. Serves local needs iii. Provides housing for its own population iv. The Tourists will want to participate in a Great Downtown b. Rebuilding the kind of downtown that once existed, with activities that people want to do. c. The city must reach out to the downtown waterfront, and into the bay itself, to create activities in and on the water. d. The panel does not believe that any tourism - related destination (even the aquarium) can on its own, serve as a game- changing silver bullet for downtown. e. The entire story of Clearwater is in its name — the panel urges the city to take advantage of its beautiful and evocative name, which gives it a unique advantage over cities such as Tampa, St. Petersburg, and Sarasota. 2014 -11 -25 ULI Downtown Vision Statements.docx 2 Printed 12/1/2014 12:09 PM Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-713 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Presentation(s) for Council Meeting In Control: Council Work Session Agenda Number: 19.1 SUBJECT/RECOMMENDATION: Annual Utilities We Care Fund Appeal - Cynthia Boyd, Utility Customer Service SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-714 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Presentation(s) for Council Meeting In Control: Council Work Session Agenda Number: 19.2 SUBJECT/RECOMMENDATION: Clearwater for Youth - Amy Connors, Vice Chair SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-715 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Presentation(s) for Council Meeting In Control: Council Work Session Agenda Number: 19.3 SUBJECT/RECOMMENDATION: Clearwater Jr. Tornadoes - Tatishka Musgrove, President Clearwater Jr. Tornadoes SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-716 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Presentation(s) for Council Meeting In Control: Council Work Session Agenda Number: 19.4 SUBJECT/RECOMMENDATION: FDOT Presentation of Gateway Express Projects - Eyra Cash, Consultant Project Manager SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-717 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Presentation(s) for Council Meeting In Control: Council Work Session Agenda Number: 19.5 SUBJECT/RECOMMENDATION: Greenwood Panthers - Joe Marshall, Greenwood Panthers President SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-718 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Presentation(s) for Council Meeting In Control: Council Work Session Agenda Number: 19.6 SUBJECT/RECOMMENDATION: Parks and Recreation Advisory Board Annual Report SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#14-719 Agenda Date: 12/1/2014 Status: Agenda ReadyVersion: 1 File Type: Presentation(s) for Council Meeting In Control: Council Work Session Agenda Number: 19.7 SUBJECT/RECOMMENDATION: Turkey Trot - Skip Rogers, West Florida Y Runners Club, Race Director SUMMARY: APPROPRIATION CODE AND AMOUNT: USE OF RESERVE FUNDS: Page 1 City of Clearwater Printed on 11/26/2014