Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2009-2010 SANITARY SEWER AND MANHOLE REHABILITATION PROJECT - 09-0047-UT - CHANGE ORDER #3
i CHANGE ORDER 3 PROJECT: 2009 -2010 Sanitary Sewer and Manhole Rehabilitation - Sanitary Sewer Emergency Repair CONTRACTOR: Rowland Incorporated 6855- 102nd Avenue North Pinellas Park, Fl 33782 DATE: 7/09/2014 PROJECT NUMBER: 09- 0047 -UT PO REFERENCE NO.: ST106418 -1 COUNCIL AWARD: Acorn 15, 2010 DATE OF CONTRACT: May 18, 2010 CODE: 0315- 96665 - 563800 -535- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order is to extend the contract for another funding year and increase the funding with all unit prices, terms and conditions remaining the same -see attached for details. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Change Order 1- City Council - 11/15/2012 Admin Change Order 2- City anager - 7/23/2014 Change Order 3 - City Co cil 8/20/21 4 NEW CONTRACT O Camilo Soto, George N Cretekos, Assistant City Attorney $ 600,000.00 $ 445,000.00 $ 74,894.91 $ 900,000.00 $ 2,019,894.91 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Lt) 146-w4, William B. Horne, II City Manager ACCEPTED BY: Rowland Incorporated By: Ken Rowland, • t? , Presiden .. '► " Date: Recommended By: City of Clearwater Project Manager Michael D Quille E, City Engineer Page 2 of 3: RE: Change Order 2 - 2009 -10 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Increases: 0315- 96665- 563800 -535- 000 -0000 C. SEWER PIPE, FORCE MAIN, AND MANHOLE EMERGENCY REPAIR 1. Mobilization LS 20 $ 200.00 $ 4,000.00 2. Traffic Control (per day) PD 40 $ 40.00 $ 1,600.00 3. Labor Hour $ Foreman - regular time PH 7950 $ 53.00 $ 421,350.00 Foreman - overtime PH 945 $ 63.00 $ 59,535.00 Operator - regular time PH 3100 $ 41.00 $ 127,100.00 Operator - overtime PH 6 $ 51.00 $ 306.00 Truck Driver - regular time PH 400 $ 33.00 $ 13,200.00 Truck Driver - overtime PH 10 $ 43.00 $ 430.00 Pipe Layer - reguar time PH 3000 $ 32.00 $ 96,000.00 Pipe Layer - overtime PH 10 $ 42.00 $ 420.00 Laborer - regular time PH 3000 $ 29.00 $ 87,000.00 Laborer - overtime PH 25 $ 39.00 $ 975.00 4. Equipment Foreman P/U with hand tools PH 1400 $ 18.00 $ 25,200.00 Job truck with tools PH 200 $ 26.00 $ 5,200.00 Tractor & Trailer (Transport) PH 225 $ 19.00 $ 4,275.00 Track Hole (to 100 HP) PH 225 $ 73.00 $ 16,425.00 Track Hole (101 HP to 170 HP) PH 70 $ 116.00 $ 8,120.00 Track Hole (171 HP and up) PH 90 $ 125.00 $ 11,250.00 Rubber Tired Backhoe PH 90 $ 50.00 $ 4,500.00 Wheel Loader (to 150 HP) PH 90 $ 53.00 $ 4,770.00 Wheel Loader (151 HP and up) PH 88 $ 60.00 $ 5,280.00 Track Type Tractors (to 100 HP) PH 2 $ 20.00 $ 40.00 Track Type Tractors (101 HP and up) PH 10 $ 25.00 $ 250.00 Dump Truck (Tandem Axle) PH 1 $ 60.00 $ 60.00 Plate Tamp PH 23 $ 5.00 $ 115.00 3" Trash Pump PH 22 $ 5.00 $ 110.00 4" Double Diaphragm P11 1 $ 8.00 $ 8.00 Air Compressor (125 CFM min) PH 1 $ 11.00 $ 11.00 Well Point Pump Per Day 1 $ 90.00 $ 90.00 Well Point LF 1 $ 20.00 $ 20.00 4" Jet Pump Per Day 1 $ 46.00 $ 46.00 Emergency Hauling up to 2500 galllons PH 1 $ 180.00 $ 180.00 Emergency Hauling over 2500 galllons PH 1 $ 180.00 $ 180.00 5. Materials Asphalt - 2" Overlay SY 2 $ 9.00 $ 18.00 3000 psi Concrete CY 1 $ 110.00 $ 110.00 Off Site Selected Fill CY 1 $ 3.00 $ 3.00 Limerock Base Material TN 1 $ 20.00 $ 20.00 #57 Washed Stone TN 1 $ 35.00 $ 35.00 Bahia Sod SF 1 $ 0.30 $ 0.30 City's standard manhole ring EA 1 $ 121.95 $ 121.95 City's standard manhole cover EA 1 $ 120.15 $ 120.15 Two -way Cleanouts EA 1 $ 50.00 $ 50.00 5A. Sewer Pipe Replacement per linear foot 8" Diameter PVC LF 1 $ 2.61 $ 2.61 10" Diameter PVC LF 1 $ 4.08 $ 4.08 12" Diameter PVC LF 1 $ 5.86 $ 5.86 15" Diameter PVC LF 1 $ 8.72 $ 8.72 18" Diameter PVC LF 1 $ 19.38 $ 19.38 20" Diameter PVC LF 1 $ 0.01 $ 0.01 21" Diameter PVC LF 1 $ 35.90 $ 35.90 24" Diameter PVC LF 1 $ 35.07 $ 35.07 30" Diameter PVC LF 101 $ 0.01 $ 1.01 36" Diameter PVC LF 101 $ 0.01 S 1.01 8" Diameter DI LF 1 $ 27.45 $ 27.45 10" Diameter DI LF 1 $ 33.75 $ 33.75 12" Diameter DI LF 1 $ 39.60 $ 39.60 15" Diameter DI LF 1 $ 0.01 $ 0.01 18" Diameter DI LF 1 $ 55.16 $ 55.16 Page 3 of 3: RE: Change Order 2 - 2009 -10 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT gIlf UNIT COST TOTAL COST 20" Diameter DI LF 1 $ 61.93 $ 61.93 21" Diameter DI LF 1 $ 0.01 $ 0.01 24" Diameter DI LF 1 $ 81.50 $ 81.50 30" Diameter DI LF 1 $ 91.15 $ 91.15 36" Diameter DI LF 1 $ 122.85 $ 122.85 5B Force Main Replacement per linear foot 8" Diameter PVC LF 1 $ 5.82 $ 5.82 10" Diameter PVC LF 1 $ 8.85 $ 8.85 12" Diameter PVC LF 1 $ 12.49 $ 12.49 15" Diameter PVC LF 1 $ 0.01 $ 0.01 18" Diameter PVC LF 1 $ 28.44 $ 28.44 20" Diameter PVC LF 1 $ 35.00 $ 35.00 21" Diameter PVC LF 1 $ 0.01 $ 0.01 24" Diameter PVC LF 1 $ 50.22 $ 50.22 30" Diameter PVC LF 1 $ 78.16 $ 78.16 36" Diameter PVC LF 1 $ 115.56 $ 115.56 8" Diameter DI LF 1 $ 27.45 $ 27.45 10" Diameter DI LF 1 $ 33.75 $ 33.75 12" Diameter DI LF 1 $ 39.60 $ 39.60 15" Diameter DI LF 59 $ 0.01 $ 0.59 18" Diameter DI LF 1 $ 55.16 $ 55.16 20" Diameter DI LF 1 $ 61.93 $ 61.93 21" Diameter DI LF 1 $ - 24" Diameter DI LF 1 $ 81.50 $ 81.50 30" Diameter DI LF 1 $ 91.15 $ 91.15 36" Diameter DI LF 1 $ 122.85 $ 122.85 Total increases Code A: $ 900,000.00