Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2009-2010 SANITARY SEWER AND MANHOLE REHABILITATION PROJECT - 09-0047-UT - ADMINISTRATIVE CHANGE ORDER #2
ADMINISTRATIVE CHANGE ORDER 2 PROJECT: 2009 -2010 Sanitary Sewer and Manhole Rehabilitation - Sanitary Sewer Emergency Repair CONTRACTOR: Rowland Incorporated 6855- 102nd Avenue North Pinellas Park, Fl 33782 DATE: PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: July 8, 2014 09- 0047 -UT ST106418 April 15, 2010 DATE OF CONTRACT: Mav 18, 2010 CODE: 0315- 96665 - 563800 -535- 000 -0000 A CODE: 0315- 96124 - 563700- 539 - 000 -0000 B SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order is to increase the funding for emergency sewer repair with all unit prices, terms and conditions remaining the same, and deduct Stormwater that was previously approved in CO #1 -see attached for details. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Change Order 1 - City Council - 11/15/2012 Admin Change Order 2 - NEW CONTRACT A APPROVED AS T $ 600,000.00 $ 445,000.00 $ 74,894.91 $ 1,119,894.91 Camilo Soto, George N Cr s, ATTEST: r ai Rosemarie Call, Date: O(Lit CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA L1.r Q A . L William B. Horne, II City Manager ACCEPTED BY: Rowland,I'Jjoratrd` By: K Rowland, Date: 7/0( Recommended By: City of Clearwater Lan -Anh Nguyen, PE, Project Manager Michael D Quillen, PE, City Engineer Page 2 of 5: RE: Administrative Change Order 2 - 2009 -10 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Increases Code A: 0315-96665-563800-535-000-0000 C. SEWER PIPE, FORCE MAIN, AND MANHOLE EMERGENCY REPAIR Quantity Unit price Total 1. Mobilization LS 6 $ 200.00 $ 1,200.00 2. Traffic Control (per day) PD 5 $ 40.00 $ 200.00 3. Labor Hour $ Foreman - regular time PH 196 $ 53.00 $ 10,388.00 Foreman - overtime PH 31 $ 63.00 $ 1,953.00 Operator - regular time PH 432 $ 41.00 $ 17,712.00 Operator - overtime PH 26 $ 51.00 $ 1,326.00 Truck Driver - regular time PH 100 $ 33.00 $ 3,300.00 Truck Driver - overtime PH 10 $ 43.00 $ 430.00 Pipe Layer - reguar time PH 399 $ 32.00 $ 12,768.00 Pipe Layer - overtime PH 31.5 $ 42.00 $ 1,323.00 Laborer - regular time PH 319.5 $ 29.00 $ 9,265.50 Laborer - overtime PH 26.5 $ 39.00 $ 1,033.50 4. Equipment Foreman P/U with hand tools PH 217 $ 18.00 $ 3,906.00 Job truck with tools PH 356 $ 26.00 $ 9,256.00 Tractor & Trailer (Transport) PH 26 $ 19.00 $ 494.00 Track Hole (to 100 HP) PH 108 $ 73.00 $ 7,884.00 Track Hole (101 HP to 170 HP) PH 71 $ 116.00 $ 8,236.00 Track Hole (171 HP and up) PH 4 $ 125.00 $ 500.00 Rubber Tired Backhoe PH 4 $ 50.00 $ 200.00 Wheel Loader (to 150 HP) PH 190.5 $ 53.00 $ 10,096.50 Wheel Loader (151 HP and up) PH 5 $ 60.00 $ 300.00 Track Type Tractors (to 100 HP) PH 5 $ 20.00 $ 100.00 Track Type Tractors (101 HP and up) PH 5 $ 25.00 $ 125.00 Dump Truck (Tandem Axle) PH 47.5 $ 60.00 $ 2,850.00 Plate Tamp PH 34 $ 5.00 $ 170.00 3" Trash Pump PH 25 $ 5.00 $ 125.00 4" Double Diaphragm PH 4 $ 8.00 $ 32.00 Air Compressor (125 CFM min) PH 3 $ 11.00 $ 33.00 Well Point Pump Per Day 10 $ 90.00 $ 900.00 Well Point LF 30 $ 20.00 $ 600.00 4" Jet Pump Per Day 3 $ 46.00 $ 138.00 Emergency Hauling up to 2500 galllons PH 4 $ 180.00 $ 720.00 Emergency Hauling over 2500 galllons PH 4 $ 180.00 $ 720.00 5. Materials Asphalt - 2" Overlay SY 15 $ 9.00 $ 135.00 3000 psi Concrete CY 16 $ 110.00 $ 1,760.00 Off Site Selected Fill CY 16 $ 3.00 $ 48.00 Limerock Base Material TN 25 $ 20.00 $ 500.00 #57 Washed Stone TN 35 $ 35.00 $ 1,225.00 Bahia Sod SF 5000 $ 0.30 $ 1,500.00 City's standard manhole ring EA 10 $ 121.95 $ 1,219.50 City's standard manhole cover EA 12 $ 120.15 $ 1,441.80 Two -way Cleanouts EA 12 $ 50.00 $ 600.00 5A. Sewer Pipe Replacement per linear foot 8" Diameter PVC LF 12 $ 2.61 $ 31.32 10" Diameter PVC LF 5 $ 4.08 $ 20.40 12" Diameter PVC LF 5 $ 5.86 $ 29.30 15" Diameter PVC LF 5 $ 8.72 $ 43.60 18" Diameter PVC LF 6 $ 19.38 $ 116.28 20" Diameter PVC LF 60 $ 0.01 $ 0.60 21" Diameter PVC LF 4 $ 35.90 $ 143.60 24" Diameter PVC LF 4 $ 35.07 $ 140.28 Page 3 of 5: RE: Administrative Change Order 2 - 2009 -10 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST 30" Diameter PVC LF 4 $ 0.01 $ 0.04 36" Diameter PVC LF 4 $ 0.01 $ 0.04 8" Diameter DI LF 6 $ 27.45 $ 164.70 10" Diameter DI LF 6 $ 33.75 $ 202.50 12" Diameter DI LF 6 $ 39.60 $ 237.60 15" Diameter DI LF 60 $ 0.01 $ 0.60 18" Diameter DI LF 6 $ 55.16 $ 330.96 20" Diameter DI LF 6 $ 61.93 $ 371.58 21" Diameter DI LF 35 $ 0.01 $ 0.35 24" Diameter DI LF 6 $ 81.50 $ 489.00 30" Diameter DI LF 6 $ 91.15 $ 546.90 36" Diameter DI LF 6 $ 122.85 $ 737.10 5B Force Main Replacement per linear foot 8" Diameter PVC LF 6 $ 5.82 $ 34.92 10" Diameter PVC LF 6 $ 8.85 $ 53.10 12" Diameter PVC LF 6 $ 12.49 $ 74.94 15" Diameter PVC LF 6 $ 0.01 $ 0.06 18" Diameter PVC LF 6 $ 28.44 $ 170.64 20" Diameter PVC LF 6 $ 35.00 $ 210.00 21" Diameter PVC LF 6 $ 0.01 $ 0.06 24" Diameter PVC LF 6 $ 50.22 $ 301.32 30" Diameter PVC LF 6 $ 78.16 $ 468.96 36" Diameter PVC LF 6 $ 115.56 $ 693.36 8" Diameter DI LF 5 $ 27.45 $ 137.25 10" Diameter DI LF 5 $ 33.75 $ 168.75 12" Diameter DI LF 5 $ 39.60 $ 198.00 15" Diameter DI LF 5 $ 0.01 $ 0.05 18" Diameter DI LF 5 $ 55.16 $ 275.80 20" Diameter DI LF 5 $ 61.93 $ 309.65 21" Diameter DI LF $ 24" Diameter DI LF 5 $ 81.50 $ 407.50 30" Diameter DI LF 5 $ 91.15 $ 455.75 36" Diameter DI LF 5 $ 122.85 $ 614.25 Total increases Code A: $ 124,894.91 Decreases Code B: 0315- 96124 - 563700- 539 - 000 -0000 1. Mobilization LS 2 $ 200.00 $ (400.00) 2. Traffic Control (per day) PD 5 $ 40.00 $ (200.00) 3. Labor Hour Foreman - regular time PH 80 $ 53.00 $ (4,240.00) Foreman - overtime PH 10 $ 63.00 $ (630.00) Operator - regular time PH 100 $ 41.00 $ (4,100.00) Operator - overtime PH 10 $ 51.00 $ (510.00) Truck Driver - regular time PH 100 $ 33.00 $ (3,300.00) Truck Driver - overtime PH 10 $ 43.00 $ (430.00) Pipe Layer - reguar time PH 100 $ 32.00 $ (3,200.00) Pipe Layer - overtime PH 10 $ 42.00 $ (420.00) Laborer - regular time PH 100 $ 29.00 $ (2,900.00) Laborer - overtime PH 10 $ 39.00 $ (390.00) 4. Equipment Foreman P/U with hand tools PH 100 $ 18.00 $ (1,800.00) Job truck with tools PH 50 $ 26.00 $ (1,300.00) Tractor & Trailer (Transport) PH 50 $ 19.00 $ (950.00) Track Hole (to 100 HP) PH 10 $ 73.00 $ (730.00) Track Hole (101 HP to 170 HP) PH 10 $ 116.00 $ (1,160.00) Track Hole (171 HP and up) PH 50 $ 125.00 $ (6,250.00) Page 4 of 5: RE: Administrative Change Order 2 - 2009 -10 ITEM Rubber Tired Backhoe Wheel Loader (to 150 HP) Wheel Loader (151 HP and up) Track Type Tractors (to 100 HP) Track Type Tractors (101 HP and up) Dump Truck (Tandem Axle) Plate Tamp 3" Trash Pump 4" Double Diaphragm Air Compressor (125 CFM min) Well Point Pump Well Point 4" Jet Pump Emergency Hauling up to 2500 galllons Emergency Hauling over 2500 galllons 5. Materials Asphalt - 2" Overlay 3000 psi Concrete Off Site Selected Fill Limerock Base Material #57 Washed Stone Bahia Sod City's standard manhole ring City's standard manhole cover Two -way Cleanouts 5A. Sewer Pipe Replacement per linear foot Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair DESCRIPTION 8" Diameter 10" Diameter 12" Diameter 15" Diameter 18" Diameter 20" Diameter 21" Diameter 24" Diameter 30" Diameter 36" Diameter 8" Diameter 10" Diameter 12" Diameter 15" Diameter 18" Diameter 20" Diameter 21" Diameter 24" Diameter 30" Diameter 36" Diameter PVC PVC PVC PVC PVC PVC PVC PVC PVC PVC DI DI DI DI DI DI DI DI DI DI 5B Force Main Replacement per linear foot 8" Diameter 10" Diameter 12" Diameter 15" Diameter 18" Diameter 20" Diameter 21" Diameter 24" Diameter 30" Diameter PVC PVC PVC PVC PVC PVC PVC PVC PVC UNIT OTY UNIT COST TOTAL COST PH 48 $ 50.00 $ (2,400.00) PH 1 $ 53.00 $ (53.00) PH 1 $ 60.00 $ (60.00) PH 1 $ 20.00 $ (20.00) PH 1 $ 25.00 $ (25.00) PH 10 $ 60.00 $ (600.00) PH 1 $ 5.00 $ (5.00) PH 1 $ 5.00 $ (5.00) PH 1 $ 8.00 $ (8.00) PH 1 $ 11.00 $ (1 1.00) Per Day 1 $ 90.00 $ (90.00) LF 1 $ 20.00 $ (20.00) Per Day 1 $ 46.00 $ (46.00) PH 1 $ 180.00 $ (180.00) PH 1 $ 180.00 $ (180.00) SY CY CY TN TN SF EA EA EA LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF 50 $ 9.00 101 $ 110.00 2 $ 3.00 1 $ 20.00 1 $ 35.00 1 $ 0.30 1 $ 121.95 1 $ 120.15 1 $ 50.00 1 $ 2.61 1 $ 4.08 1 $ 5.86 1 $ 8.72 1 $ 19.38 1 $ 0.01 1 $ 35.90 1 $ 35.07 59 $ 0.01 1 $ 0.01 1 1 1 1 1 1 1 1 1 1 $ 27.45 $ 33.75 $ 39.60 $ 0.01 $ 55.16 $ 61.93 $ 0.01 $ 81.50 $ 91.15 $ 122.85 5.82 8.85 12.49 0.01 28.44 35.00 0.01 50.22 78.16 (450.00) (1 1,1 10.00) (6.00) (20.00) (35.00) (0.30) (121.95) (120.15) (50.00) (2.61) (4.08) (5.86) (8.72) (19.38) (0.01) (35.90) (35.07) (0.59) (0.01) (27.45) (33.75) (39.60) (0.01) (55.16) (61.93) (0.01) (81.50) (91.15) (122.85) (5.82) (8.85) (12.49) (0.01) (28.44) (35.00) (0.01) (50.22) (78.16) Page 5 of 5: RE: Administrative Change Order 2 - 2009 -10 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST 36" Diameter PVC LF 1 $ 115.56 $ (115.56) 8" Diameter DI LF 1 $ 27.45 $ (27.45) 10" Diameter DI LF 1 $ 33.75 $ (33.75) 12" Diameter DI LF 1 $ 39.60 $ (39.60) 15" Diameter DI LF 1 $ 0.01 $ (0.01) 18" Diameter DI LF 1 $ 55.16 $ (55.16) 20" Diameter DI LF 1 $ 61.93 $ (61.93) 21" Diameter DI LF 1 $ - 24" Diameter DI LF 1 $ 81.50 $ (81.50) 30" Diameter DI LF 1 $ 91.15 $ (91.15) 36" Diameter DI LF 1 $ 122.85 $ (122.85) Total (Decreases) Code C: $ (50,000.00) Total (Decreases)/Increases: $ 74,894.91