Loading...
MARSHALL STREET SALSNES FILTER DESIGN - 06-0022-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 & Final PROJECT: Marshall St. Salsnes Filter Design CONTRACTOR: TLC Diversified 2179 17th Street East Tampa, FL 33610 Date: PROJECT NUMBER PO REFERENCE: AWARD DATE: CONTRACT DATE: CODE: April 24, 2014 06- 0022 -UT ST108624 July 19, 2012 August 7, 2012 )315- 96654 - 563800 -535- 000 -0000 (A) SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT Decreases, increases and adds items according to field conditions - see attached STATEMENT OF CONTRACT AMOUNT ORIGINAL C Administr NEW CO APPR CT AMOUNT rder 1 & Final - CM UNT Camilo Soto, ATTEST: Assistant City Attom $ 2,378,307.80 ($707,289.80) S 1,671,018.00 Rosemarie Call, Date: CITY OF CLEARWATER, IN PINELLAS COUNTY, FLORIDA 4 �V 1 / D Gths/r. 4C7Iiie For• V °am B. Home, II, City Manager ACCEPTED BY: TLC Diversified, Inc. Thurston Lamberson, President Date: ( Ll1 q Recommended By:City of Clearwater aArj„. thiu,4 ara L. y tt, Co ion Manager Michael D. Quill PE, City Engineer 1 Page 2 of 2 Administrative Change Order 1 & Final: Marshall St. Salsnes Filter Design ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Decreases: 5 Sludge Removal from Clarifiers CY 418 $ 11.00 $ (4,598.00) 6b Salsnes filters Sales Tax Savings EA 2 $ 20,931.00 $ (41,862.00) 7b Magnetic Flow Meters - Sales Tax Savings EA 4 $ 926.00 $ (3,704.00) 8 10% Contingency LS 1 $ 216,209.80 $ (216,209.80) Total (Decreases): $ (266,373.80) Additions: 9 Valve Changes LS 1 $ (4,261.00) $ (4,261.00) 10 Design Change Demolition LS 1 $ 13,772.00 $ 13,772.00 11 Locate Underground Piping LS 1 $ 2,731.00 $ 2,731.00 12 RAS Modification LS 1 $ 841.00 S 841.00 13 RAS Bypass LS 1 $ 2,066.00 $ 2,066.00 14 Labor for Valve Changes LS 1 $ 1,138.00 S 1,138.00 15 Relocate Stairs and Platform LS 1 $ 510.00 $ 510.00 16 Structural Crack Repair LS 1 $ 4,081.00 $ 4,081.00 17 30" Offset LS 1 $ 10,308.00 $ 10,308.00 18 Panel Rack modification LS 1 $ 4,841.00 $ 4,841.00 19 RAS Bypass Phase 3 LS 1 $ 5,369.00 $ 5,369.00 20 Doweling in Slab LS 1 $ 1,497.00 $ 1,497.00 21 30" Influent Line Repair LS 1 $ 57,495.00 S 57,495.00 22 6" Filter Drain Line LS 1 $ 10,538.00 $ 10,538.00 23 Filter Platform LS 1 $ 45,342.00 $ 45,342.00 24 Filter Influent pipe modification LS 1 $ 17,375.00 $ 17,375.00 25 Lower RAS Lie Tie In LS 1 $ 6,273.00 $ 6,273.00 26 Pipe Reroute LS 1 $ 22,375.00 $ 22,375.00 27 Cable to MCC9 LS 1 $ 788.00 $ 788.00 28 120v Power Feed to PLC LS 1 S 1,449.00 $ 1,449.00 29 Replace Reactor Panel Feeder LS 1 $ 5,392.00 S 5,392.00 30 Backup Floats, Influent Bldg LS 1 $ 3,143.00 $ 3,143.00 31 Relocate Analyzers LS 1 $ 3,544.00 $ 3,544.00 32 Sludge Tank Pump Out LS 1 $ 2,778.00 $ 2,778.00 33 Paving at Light LS 1 $ 2,205.00 $ 2,205.00 34 Milling and Overlay LS 1 $ 3,187.00 $ 3,187.00 35 Relocate Filter Feed Flow Meter Transmitter LS 1 $ 3,620.00 $ 3,620.00 36 Sludge Pump Drain and Water Supply LS 1 $ 2,075.00 $ 2,075.00 37 Temp Scaffold Rental Erectio LS 1 $ 6,872.00 $ 6,872.00 38 Wire From Infl Samplet to PLC in MCC9 LS 1 $ 303.00 $ 303.00 39 480v Feeder From MCC to Temp Sludge Pump LS 1 $ 1,061.00 $ 1,061.00 40 Filter Drain Tie In LS 1 $ 1,195.00 $ 1,195.00 41 Reroute Plant Water Line LS 1 $ 2,409.00 $ 2,409.00 42 Temp Sludge Pumping LS 1 $ 7,662.00 $ 7,662.00 43 16" Valve Handwheel Ext LS 1 $ 1,451.00 $ 1,451.00 44 Mudwell Discharge Splash Guard LS 1 $ 767.00 $ 767.00 45 Plant LS Discharge LS 1 $ 985.00 $ 985.00 46 Filter Effi Sample Prots LS 1 $ 5,078.00 $ 5,078.00 47 Repair Stucco to MCC9 LS 1 $ 1,861.00 $ 1,861.00 Decreases for Owner Direct Purchases (ODP): 6a Salsnes Filters Package (Equipment Only) - ODP EA 2 $ 322,016.00 (644,032.00) 7a Magnetic Flow Meters - ODP EA 4 $ 14,250.00 (57.000.00) Total (Decreases) ODP: (701,032.00) Total Additions: 260,116.00 Total Net (Decreases) /Additions to PO: (6,257.80) Total Net (Decreases) /Additions to Contract: (707,289.80)