Loading...
REVERSE OSMOSIS PLANT NO 1 - PLANT EXPANSION - 09-0018-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 & Final Date: May 5, 2014 PROJECT: PROJECT NUMBER 09- 0018 -UT Reverse Osmosis Plant No. 1- Plant Expansion Phase I: Concentrate and Backwash Pipelines PO REFERENCE: ST108621 CONTRACTOR: SL Williams Consulting Corp. 242 Button Bush Lane Wellington, FL 33414 AWARD DATE: July 19, 2012 CONTRACT DATE: August 7, 2012 CODE: 0315- 96764 - 563800 -533- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT Decreases, increases and adds items according to field conditions - see attached STATEMENT OF CONTRACT AMOUNG ORIGINAL CONTRACT AMOUNT Admin Change Order 1 & Final - CM NEW CONTRACT AMOUNT APPROVED AS TO )41(i1 MAI Camilo Soto, ATTEST: Rosemarie Call, Date: si S t City Att $ 1,542,238.53 !4. u\ �„ 1c.�i�i ,; 1 ) $ 1,336,066.76 CITY OF CLEARWATER, IN PINELLAS COUNTY, FLORIDA B William B. Horne, II, City Manager ACCEPTED BY`''' SL Williams Consulting Corp. By: Carole Wilt artl�, I t sidtr t Date: Witnesses: Recommended By:City of learwater Lan-Anh Nguyen, P Project Manager 1 Michael D. Quillen, /PE, City Engineer • J Page 2 of 2 Administrative Change Order 1 & Final - Reverse Osmosis Plant No. 1- Plant Expansion Phase I: Concentrate and Backwash Pipelines ITEM DESCRIPTION UNIT QTY Decreases: 3a F &I 3" CONDUIT - HDPE Pipe by Horizontal LF Directional Drill 3b F &I 6" BW - PVC Pipe by Horizontal Directiona LF 3b F &I 8" CONC PVC Pipe by Horizontal LF Directional Drill 5a F &I 6" Resilient Wedge Gate Valve & Valve Bo; EA 5b F &I 8" Resilient Wedge Gate Valve & Valve Bo: EA 6 Pull Boxes for 3" Conduit EA 7b F &I Combination Air Valve 8" CONC EA 8b F &I ARV Polyethylene Cover (Houses one EA ARV) 9 Root Pruning LF 10 Tree Barricades LS 15 Sod Restoration as Directed by the Owner or the SY 16 Concrete Driveway Restoration as Directed by SY the Owner or the Owner's Authorized Project Representative 17 Concrete Sidewalk Restoration as Directed by the SY 18 Concrete Curb Restoration as Directed by the Om LF 19 Asphalt Paving Restoration as Directed by the 01 SY 20 Underdrain Restoration as Directed by the Owne LF 21 Excavation Below Normal Grade and Bedding RI CY 22 Contingency LS Increases: 3d F &I 6" BW - HDPE Pipe by Horizontal Directior LF 3e F &I 8" CONC HDPE Pipe by Horizontal Directional Drill LF 4a F &I 3" CONDUIT HDPE Pipe by Open Cut LF 4b F &I 6" BW PVC/DI Pipe by Open Cut LF 4c F &I 8" CONC PVC/DI Pipe by Open Cut LF Additions: 23 12" stacker for communication box 24 Difference in traffic load bearing box 25 Various Claims EA EA LS 385 1394 1538 2 2 11 2 2 1300 1 50 500 342.56 375 140.67 500 100 1 770 932 UNIT COST $8.90 $20.99 $31.35 $1,397.00 $2,276.59 $1,240.05 $2,496.55 $620.50 $1.54 $3,900.00 $8.00 $30.00 $25.00 $12.00 $10.00 $22.00 $10.00 $140,203.50 Total (Decreases): $19.65 $31.35 3 $10.50 3 $29.70 3 $40.93 Total Increases: 22 $385.87 1 $302.18 1 $36,545.71 Total Additions: Total Net ( Decreases)/Increases/Additions: TOTAL COST ($3,426.50) ($29,260.06) ($48,216.30) ($2,794.00) ($4,553.18) ($13,640.55) ($4,993.10) ($1,241.00) ($2,002.00) ($3,900.00) ($400.00) ($15,000.00) ($8,564.00) ($4,500.00) ($1,406.70) ($11,000.00) ($1,000.00) ($140,203.50) ($296,100.89) $15,130.50 $29,218.20 $31.50 $89.10 $122.79 $44,592.09 $8,489.14 $302.18 $36,545.71 $45,337.03 $206,171.77