REVERSE OSMOSIS PLANT NO 1 - PLANT EXPANSION - 09-0018-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 & Final
Date: May 5, 2014
PROJECT: PROJECT NUMBER 09- 0018 -UT
Reverse Osmosis Plant No. 1- Plant Expansion Phase I:
Concentrate and Backwash Pipelines PO REFERENCE: ST108621
CONTRACTOR:
SL Williams Consulting Corp.
242 Button Bush Lane
Wellington, FL 33414
AWARD DATE: July 19, 2012
CONTRACT DATE: August 7, 2012
CODE: 0315- 96764 - 563800 -533- 000 -0000
SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT
Decreases, increases and adds items according to field conditions - see attached
STATEMENT OF CONTRACT AMOUNG
ORIGINAL CONTRACT AMOUNT
Admin Change Order 1 & Final - CM
NEW CONTRACT AMOUNT
APPROVED AS TO )41(i1 MAI
Camilo Soto,
ATTEST:
Rosemarie Call,
Date:
si S t City Att
$ 1,542,238.53
!4. u\ �„
1c.�i�i ,; 1 )
$ 1,336,066.76
CITY OF CLEARWATER, IN
PINELLAS COUNTY, FLORIDA
B
William B. Horne, II,
City Manager
ACCEPTED BY`'''
SL Williams Consulting Corp.
By:
Carole Wilt artl�, I t sidtr t
Date:
Witnesses:
Recommended By:City of learwater
Lan-Anh Nguyen, P
Project Manager
1
Michael D. Quillen, /PE, City Engineer
• J
Page 2 of 2
Administrative Change Order 1 & Final - Reverse Osmosis Plant No. 1- Plant Expansion Phase I: Concentrate and Backwash Pipelines
ITEM DESCRIPTION UNIT QTY
Decreases:
3a F &I 3" CONDUIT - HDPE Pipe by Horizontal LF
Directional Drill
3b F &I 6" BW - PVC Pipe by Horizontal Directiona LF
3b F &I 8" CONC PVC Pipe by Horizontal LF
Directional Drill
5a F &I 6" Resilient Wedge Gate Valve & Valve Bo; EA
5b F &I 8" Resilient Wedge Gate Valve & Valve Bo: EA
6 Pull Boxes for 3" Conduit EA
7b F &I Combination Air Valve 8" CONC EA
8b F &I ARV Polyethylene Cover (Houses one EA
ARV)
9 Root Pruning LF
10 Tree Barricades LS
15 Sod Restoration as Directed by the Owner or the SY
16 Concrete Driveway Restoration as Directed by SY
the Owner or the Owner's Authorized Project
Representative
17 Concrete Sidewalk Restoration as Directed by the SY
18 Concrete Curb Restoration as Directed by the Om LF
19 Asphalt Paving Restoration as Directed by the 01 SY
20 Underdrain Restoration as Directed by the Owne LF
21 Excavation Below Normal Grade and Bedding RI CY
22 Contingency LS
Increases:
3d F &I 6" BW - HDPE Pipe by Horizontal Directior LF
3e F &I 8" CONC HDPE Pipe by Horizontal
Directional Drill LF
4a F &I 3" CONDUIT HDPE Pipe by Open Cut LF
4b F &I 6" BW PVC/DI Pipe by Open Cut LF
4c F &I 8" CONC PVC/DI Pipe by Open Cut LF
Additions:
23 12" stacker for communication box
24 Difference in traffic load bearing box
25 Various Claims
EA
EA
LS
385
1394
1538
2
2
11
2
2
1300
1
50
500
342.56
375
140.67
500
100
1
770
932
UNIT COST
$8.90
$20.99
$31.35
$1,397.00
$2,276.59
$1,240.05
$2,496.55
$620.50
$1.54
$3,900.00
$8.00
$30.00
$25.00
$12.00
$10.00
$22.00
$10.00
$140,203.50
Total (Decreases):
$19.65
$31.35
3 $10.50
3 $29.70
3 $40.93
Total Increases:
22 $385.87
1 $302.18
1 $36,545.71
Total Additions:
Total Net ( Decreases)/Increases/Additions:
TOTAL COST
($3,426.50)
($29,260.06)
($48,216.30)
($2,794.00)
($4,553.18)
($13,640.55)
($4,993.10)
($1,241.00)
($2,002.00)
($3,900.00)
($400.00)
($15,000.00)
($8,564.00)
($4,500.00)
($1,406.70)
($11,000.00)
($1,000.00)
($140,203.50)
($296,100.89)
$15,130.50
$29,218.20
$31.50
$89.10
$122.79
$44,592.09
$8,489.14
$302.18
$36,545.71
$45,337.03
$206,171.77