Loading...
GULF BLVD FORCE MAIN REPAIR - 07-0025-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 & Final PROJECT: Gulf Blvd Force Main Repair CONTRACTOR: Rowland Inc. 6855 102nd Ave North Pinellas Park, FL 33782 Date: PROJECT NUMBER: PO REFERENCE: March 6, 2014 07- 0025 -1 ST1097 COUNCIL AWARD: DATE OF CONTRACT: August 1, 201. August 1, 201. CODE: 0327 - 96665 - 563800- 535- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order decreases, increases and adds items according to field conditions and add 48 calendar days to the contract - see attached STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: Rowland Inc ORIGINAL CONTRACT AMOUNT CO 1 & Final - CM NEW CONTRACT AMOUNT ATTEST: $494,932.08 $18,474.07 By: $513,406.15 Kevin Rowland, :l si'cf nt 1 Rosemarie Call, Date: CIT PINELL in RIDA William APP City Manager OVED AS T Camilo Soto, Assistant City Attorney Date: Ap-i1 g, a,oi4 Witnesses: Recommended By: City of Clearwater K Ily 0' rien, r Michael D. Quillen, PE, City Enginee Project Manag( Page 2 of 2 Administrative Change Order I & Final: Gulf Blvd Force Main Replacement ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST Decreases: 7 C -905 PVC, 6' - 8' depth LF 37 155 ($5,735.00) 12 Restoration LF 139 30.6 ($4,253.40) 15 Initial, 0' - 6' depth EA 4 450 ($1,800.00) 16 Additional (Per Well Point), 0' -6' EA 70 56.5 ($3,955.00) 17 Iron Fittings & Joint Restraints LB 2497 5.1 ($12,734.70) 20 Main to Existing Force Main EA 12 565 ($6,780.00) 22 10 % Contingency LS 1 $44,993.83 ($44,993.83) Total (Decreases): ($80,251.93) Increases: 4 Hydro Barrier LF 348 60.00 $20,880.00 11 172 SR -36 Concrete Driveway SY 17 76.50 $1,300.50 Restoration 13 17 SR -3c By -pass Pumping Setup & EA/day 11 $1,570.00 $17,270.00 Operation, 15" - 21" diameter 14 Sodding SY 1220 5.6 $6,832.00 21 381 SR -74m Multi Lane (FDOT EA/day 33 $975.00 $32,175.00 Index No. 614) Total Increases: $78,457.50 Additions: 23 170 SR -34 Flowable Fill cyd. 46 $159.35 $7,330.10 24 34 SR -6 Sheeting sf. 286 $22.00 $6,292.00 25 SR -38 Concrete sidewalk syd. 124 $53.60 $6,646.40 restoration Total Additions: $20,268.50 Total Net (Decreases) /Increases /Additions to Contract: $18,474.07