Loading...
TROPIC HILLS STORMWATER OUTFALL PROJECT - PHASE III - 11-0040-EN - ADMINISTRATIVE CHANGE ORDER 1 & FINALADMINISTRATIVE CHANGE ORDER 1 & FINAL Date: March 24. 2014 PROJECT: Tropic Hills Stormwater Putfall Project, Phase III CONTRACTOR: Steve's Excavating & Paving, Inc. PO Box 303 Dunedin, FL 34698 PROJECT NUMBER: 11- 0040 -EN PO REFERENCE: ST109427 AWARD DATE: April 18, 2013 CONTRACT DATE: Mav 09, 2013 CODE: 0315- 96179 - 563700- 539 - 000 -0000 (Al CODE: 0327- 96634 - 563800- 535 - 0,06 -M41 Y0) CODE: 0327- 96742 - 563800 - 533= Q(1(i- i00 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order decreases. increases and adds items according to field conditions. STATEMENT OF CONTRACT AMOUNT ORIGINAL CO ' RACT AMOUNT Administrativ C ange Order 1 & Final- CM NEW CON " • .' T A OUNT APPR 'ED AS T t ' !i RM: 51,449,371.28 (5183,579.34) 51,265,791.94 Camilo Soto, Assistant City A ATTEST: eg-t4 Rosemarie Call. Date CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Ar Will' m B. Horne. 11 City 9anager ACCEPT ! ' xcavatiltg &..P.aving, roc,. y Sarnago. President Date: Witnesses: 2 ,(SEAL) Recommended By: City of Clearwater -7 4t--L1L Tara L Kive Engineering ConstructioR Manager (r/Ajt Michael D. Quillen. PE. " City Engineer • Page 2 of 2 Administrative Change Order 1 &Final: Tropic Hills Stormwater Outfall Project Phase III ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Stormwater Code A: 0315- 96179 - 563700 -539- 000 -0000 Decreases: 2.3 Unsuitable Material Removal & Replacement CY 85 $ 53.00 ($4,505.00) (Pipe Culvert & Structure Bedding Only) 3.1 10' X 4' Box Culvert LF 25 $ 811.00 ($20,275.00) 3.2 30" RCP (Class III) LF 6 $ 132.00 ($792.00) 3.4 12" RCP (Class III) LF 4 $ 125.00 ($500.00) 3.14 30" Contech A2000 (Brentwood Drive Outfall) LF 14 $ 110.00 ($1,540.00) 4.1 Asphalt Pavement Restoration SY 797 $ 29.30 ($23,349.17) 4.2 Pavement Markings /Striping Restoration LS 1 $ 1,540.00 ($1,540.00) 4.3 Straight Curb Restoration LF 35 $ 25.00 ($875.00) 4.4 Valley Gutter Curb (Brentwood Drive Outfall) LF 5 $ 27.00 ($135.00) 4.7 Reconstruct Concrete Slab (Match Existing CY 23.5 $ 160.00 ($3,760.00) Thickness) 5.1 Tree Removal (If needed and City Approval EA 1 $ 1,450.00 ($1,450.00) Provided) 5.3 Tree Barricade (w /Cushioning Surface) LF 225 $ 19.25 ($4,331.25) 5.4 Root Pruning LF 100 $ 15.30 ($1,530.00) 6.0 10% Owner's Contingency - Stormwater LS 1 $ 126,735.53 ($126,735.53) Total (Decreases) Code A: ($191,317.95) Increases: 3.3 24" RCP (Class III) LF 2 $240.00 $ 480.00 5.6 Sodding SF 1500 $0.70 $1,050.00 Total Increases Code A: $ 1,530.00 Additions: 6.1 Sorm Conflict with 2" Waterline LS 1 $ 1,268.16 $ 1,268.16 6.2 Storm conflict with 1/2" Waterline LS 1 $ 1,252.64 $ 1,252.64 6.3 Repair Ponding in Existing Asphalt LS 1 $ 1,200.00 $ 1,200.00 6.4 Additional Base & Paving LS 1 $ 3,595.87 $ 3,595.87 6.5 Dick Norris Electrical for Light Poles LS 1 $ 7,259.89 $ 7,259.89 Total Additions Code A: $ 14,576.56 Total Net (Decreases)/Increases /Additions Code A: $ (175,211.39 Sewer Code B: 0327 - 96634 - 563800- 535- 000 -0000 Decreases: 7.4 8" PVC (SDR -35) Sanitary Sewer LF 5 $ 60.00 ($300.00) 7.5 Sanitary Lateral Relocation/Replacement (4" X 6 ") LF 25 $ 37.00 ($925.00) 7.6 10% Owner's Contingency - Sewer LS 1 $ 3,849.00 ($3,849.00) Total (Decreases) Code B: ($5,074.00) Additions: 7.13 Unknown 4" Sanitary LS 1 $ 799.25 $799.25 7.14 Notch Box Culvert LS 1 $ 1,483.50 $1,483.50 Total Additions Code B: $2,282.75 Total Net (Decreases) /Additions Code B: ('.2 791.25 Water Code C: 0327 - 96742 - 563800 - 533 -000 -0000 Decreases: 7.7 6" Ductile Iron Pipe Portable Water Main LF 70 $ 49.00 ($3,430.00) Relocation / Replacement (Restrain as- needed) 7.9 Ductile Iron Fittings TON 0.08 $ 11,550.00 ($970.20) 7.12 10% Owner's Contingency -Water LS 1 $ 1,176.50 ($1,176.50) Total (Decreases) Code C: ($5,576.70 Total Net (Decreases)/Increases /Additions to Contract: ($183,579.34