Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
SOUTH GULFVIEW BOULEVARD DRAINAGE IMPROVEMENTS - 11-0019-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINAL
ADMINISTRATIVE CHANGE ORDER 1 & FINAL Date: March 19, 2014 PROJECT: South Gulfview Blvd. Drainage Improvements CONTRACTOR: Steve's Excavating & Paving, Inc. PO Box 303 Dunedin, FL 34698 PROJECT NUMBER: 11- 0019 -EN PO REFERENCE: ST109588 AWARD DATE: .tune 19, 2013 CONTRACT DATE: July 17, 2013 CODE: 0315- 96183 - 563700 -539- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order decreases. increases and adds items according to field conditions. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Administrative C 1 1 NEW CONT C AMOUNT APPRO\ Camilo Soto, Assistant City Attorney ATTEST: 5388,273.75 (537,660.191 5350,613.56 Rosemarie Call, Date CIT\ OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne. 11 City Manager ACCEPTED eve's " cavating & Paving, Inc.' Ca arnago. President Witnesses: Recommended By: City of Clearwater 7a'7La< Tara L Kivett.Engineering Construction Manager Michael D. Quillen.. P r. City Engineer x .. Page 2 of 3 Administrative Change Order 1 & Final: South Gulfview Blvd. Drainage Improvements ITE M DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Stormwater Code A: 0315- 96170 - 563700 -539- 000 -0000 Decreases: 2.2 Unsuitable Material Removal & Replacement 100 CY $ 50.00 ($5,000.00) 3.1 18" RCP 4 LF $ 92.00 ($368.00) 3.2 18" Ductile Iron Pipe (Cement Lined Class 200) 26 LF $ 165.00 ($4,290.00) 3.3 24" Ductile Iron Pipe (Cement Lined Class 200) 4 LF $ 198.00 ($792.00) 3.4 30" RCP 0' - 6' Cut 2 LF $ 77.00 ($154.00) 3.6 36" PVC 6' - 8' Cut (Contech A -2000) 1 LF $ 239.00 ($239.00) 4.2 8" Compacted Crushed Concrete Base 8.5 SY $ 29.50 ($250.75) 4.3 Concrete Sidewalk 4" Thick 171 SY $ 4.80 ($820.80) 4.4 Concrete Driveway 6" Thick 360 SF $ 5.50 ($1,980.00) 4.5 FDOT Type F Curb 117 LF $ 20.00 ($2,340.00) 4.6 Valley Gutter Curb 26 LF $ 30.00 ($780.00) 4.9 Modified FDOT Type F Curb 10 LF $ 30.00 ($300.00) 5.1 1 -Inch Short Side Service 110 SF $ 2.25 ($247.50) 5.2 30" X 12" Tapping Sleeve and Valve 2 LF $ 26.00 ($52.00) 5.4 Stormwater Contingency 1 LS $ 46,200.95 ($46.200.95) Total (Decreases) Code A: ($63,815.00) Increases: 4.1 3" FDPT Type S Asphalt 79 SY $ 19.50 $ 1,540.50 Total Increases Code A: $ 1,540.50 Additions: 1.5 Brace Failure 1 LS $ 1,078.13 $ 1,078.13 1.6 Gas Line Conflict 1 LS $ 5,296.90 $ 5,296.90 2.3 Concrete Demo S -9 to S -8 1 LS $ 870.55 $ 870.55 3.16 12" DIP Offset 1 LS $ 1,265.00 $ 1,265.00 3.17 Conflict at S -11 1 LS $ 244.38 $ 244.38 3.18 S -8 Conflict 1 LS $ 3,196.31 $ 3,196.31 3.19 S -14 & 15 Conflict 1 LS $ 10,365.99 $ 10,365.99 3.20 Ring and Cover on S -13 1 LS $ 1,200.00 $ 1,200.00 5.5 Peanut Grass 1 LSW $ 16,142.55 $ 16,142.55 Total Additions Code A: $ 39,659.81 Total Net (Decreases)/Increases /Additions Code A: $ (22,614.69) Sewer Code B: 0327 - 96634 - 563800- 535 -000 -0000 Decreases: 7.1 8" Ductile Iron Pipe Sanitary w/Femco Couplings 40 LF $ 160.00 ($6,400.00) 7.2 8" PVC Sanitary w/Femoc Couplings 7 LF $ 112.00 ($784.00) 7.3 Sewer Contingency 1 LS $ 2,592.00 ($2,592.00) Total (Decreases) Code B: ($9,776.00) Water Code C: 0327 - 96742 - 563800 -533- 000 -0000 Decreases: 8.2 Water Contingency 1 LS $ 1,542.00 Total (Decreases) Code C: Reclaimed Code D: 0315- 96739 - 563800 - 533 -000 -0000 Decreases: 9.3 Reclaimed Water Contingency 1 LS $ 3,727.50 Total (Decreases) Code D: Total Net (Decreases)/Increases /Additions to Contract: ($1,542.00) ($1,542.00) ($3,727.50) ($3,727.50) ($37,660.19)