DRC - DRAFT ACTION AGENDA - 04/03/2014 (REV. 04/01/2014)jr�`J' OFIJ`i
CITY OF CLEARWATER
PLANNING & DEVELOPMENT DEPARTMENT
k Q POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748
MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756
TELEPHONE (727) 562 -4567 FAx (727) 562 -4576
DRAFT ACTION AGENDA
DEVELOPMENT REVIEW COMMITTEE
Thursday, April 03, 2014
8:30 - Staff Review
9:00 AM
Case number: FLD2014 -03009 -- 2871 GULF TO BAY BLVD
Owner(s): Stowell, A J Llc
2873 Thornton Rd
Clearwater, FL 33759 -4049
PHONE: No phone, Fax: No fax, Email: No email
Applicant: PHONE: No phone, Fax: No fax, Email: No email
Representative: Stephanie Tyrrell
3/31/2014
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Mcdonalds Usa, Llc
10150 Highland Manor Drive
Suite 470
Tampa, FL 33610
PHONE: (813) 630 -9634, Fax: No fax, Email: Stephanie.Tyrrell @us.Mcd.Com
Location:
1.28 acres located at the southeast corner of Gulf to Bay Boulevard and Cross
Circle.
Atlas Page:
300B
Zoning District:
Commercial
Request:
Flexible Development application to permit a 5,206 square foot restaurant with
drive -thru facilities in the Commercial (C) District with a lot area of 55,751 square
feet, a lot width of 150 feet along Gulf to Bay Boulevard, front (north) setback of
4.57 feet (to proposed pavement for bike rack pad) and 52.7 feet (to proposed
building), front (west) setback of 8.7 feet (to proposed pavement) and 74.4 feet (to
proposed building), side (south) setback of 55.5 feet (to proposed pavement) and
205.6 feet (to proposed building), side (east) setback of 3.2 feet (to pavement), 5
feet (to proposed pavement for dumpster pad) and 29.9 feet (to proposed building),
a building height of 15.58 (to top of flat roof), 19.34 feet (to top of parapet) and
20.25 feet (to top of roof cap element) and 47 off - street parking spaces as a
Comprehensive Infill Redevelopment Project pursuant to Community Development
Code (CDC) Section 2- 704.E; an increase in the height of a wall in the side (east)
and rear (south) setbacks from six to eight feet pursuant to CDC Section 3- 804.B.2;
and a reduction to a portion of the front (north) perimeter landscape buffer from 15
feet to 4.57 feet, a reduction to the front (west) perimeter landscape buffer from 15
feet to 8.7 feet, a reduction to a portion of the side (east) perimeter landscape
buffer from five feet to 3.2 feet, a reduction in the amount of interior landscape
island trees required from 19 to 16, a reduction to the foundation plantings along
the north and west building facades from five feet to zero feet and an increase in
the percentage of accent trees from 25 to 33.3 percent, as part of a
Comprehensive Landscape Program pursuant to CDC Section 3- 1202.G.
3/31/2014
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Proposed Use
Neighborhood
Association(s):
Presenter:
Workflow:
Restaurants
Clearwater Neighborhood Coalition
Glenn Ellen MHP Assoc
Matthew Jackson, Planner III
Review Name
Task Status
Status Date
Last Name
Determination of
Completeness
Complete
03/04/2014
Jackson
Fire Review
No Comments
03/13/2014
Keller
Traffic Eng Review
Comments
03/13/2014
Elbo
Parks and Rec Review
No Comments
03/20/2014
Reid
Land Resource Review
Comments
03/20/2014
Crandall
Environmental Review
Comments
03/20/2014
Josuns
Stormwater Review
Comments
03/24/2014
Spearman
Harbor Master Review
No Review Required
03/25/2014
Jackson
Solid Waste Review
Dumpster enclosure looks fine.
No Comments
03/26/2014
Pryor
Planning Review
Comments
03/26/2014
Jackson
Engineering Review
Comments
03/26/2014
Shannon
3/31/2014
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Summary of Comments on P: \12- 015 -MDC (McDonald's (9 -2528)
- 2871 Gulf to Bay Boulevard, Clearwater) \Drawings \McDonaIds
Restaurant - 2871 Gulf to Bay B
am
= Author: LMOREDA Subject: Text Box Date: 3/27/2014 2:35:24 PM
2871 Gull to IIEllay IIMrI1W.
, Author: RROWE Subject: Comments Date: 3/27/2014 2:21:02 PM
Per Debbie Reid, no issues - commercial project - with less sf building footprint.
am
Author: SJOSUNS Subject: Conditions Date: 3/20/20144:12:17 PM
ENV - General Notes:
1. DRC review is a prerequisite for Building Permit Review; additional comments may be forthcoming upon submittal of a Building Permit Application.
2. Offsite discharge of produced groundwater from dewatering shall comply with dewatering guidelines from Florida Department of Environmental Protection
(FDEP), F.A.C. 62- 621(2).
3. Additional permits from State agencies, such as the Southwest Florida Water Management District or Florida Department of Environmental Protection, may
be required. Approval does not relieve the applicant from the requirements to obtain all other required permits and authorizations.
Author: MJACKSON Subject: Conditions Date: 3/26/2014 10:58:27 AM
Prior to CDB. Please clarify how in the parking demand study a double drive -thru lane is expected to reduce the number of off - street parking spaces needed.
Author: MJACKSON Subject: Comments Date: 3/19/2014 9:26:08 AM
Prior to CDB - Revise to read "Setbacks" not "Building Setbacks" as setbacks are measured to all structures, notjust buildings.
Author: MJACKSON Subject: Comments Date: 3/19/2014 9:26:18 AM
Prior to CDB - Revise these numbers to include setbacks to structures, notjust building.
Author: JSHAN NON Subject: ENG -Condition Date: 3/21/2014 3:26:14 PM
Prior to Building Permit:
1. Please add the following demolition notes to the plans:
- -All utilities shall be cut and capped prior to demolition. The Wastewater Supervisor shall be notified.
-- Demolition shall not cause any service interruptions for other utility customers.
- -Water meters, double- detector checks and backflow preventers are owned by the City of Clearwater. The City shall remove and retain these items.
Author: SJOSUNS Subject: Conditions Date: 3/20/20144:12:17 PM
ENV - Prior to issuance of a building permit: An Asbestos Survey is usually required prior to conducting any demolition or renovations. Contact Pinellas County
Air Quality (727/464 -4422) for more information.
Author: ellen.crandall Subject: Conditions Date: 3/27/2014 1:00:34 PM
DRC review is a prerequisite for Building Permit Review, prior to issuance of a building permit any and all performance based erosion and sedimentation control measures must be approved by
Environmental and or Stormwater Engineering, be installed properly, and inspected.
Author: MJACKSON Subject: Conditions Date: 3/26/2014 9:53:21 AM
Prior to CDB. Add a note to the plan that all signs will be reviewed under separate application request.
Author: MJACKSON Subject: Comments Date: 3/25/2014 2:37:54 PM
Prior to CDB. Provide the distance from the property line to the north edge of the bicycle rack pad.
/Author: MJACKSON
Subject: Line
Date: 3/19/2014 9:56:01 AM
""Author: BELBO
/Author: BELBO
Subject: Oval
Subject: Line
Date: 3/14/2014 9:55:56 AM
Date: 3/14/2014 9:35:44 AM
""Author: BELBO
/Author: BELBO
Subject: Oval
Subject: Line
Date: 3/13/2014 5:04:07 PM
Date: 3/13/2014 5:04:07 PM
Author: BELBO
Subject: Conditions
Date: 3/27/2014 10:30:10 AM
Prior to CDB. Minimize vehicular conflict points by removing one of the two right turn only egress. If a full access driveway is desired along S.R. 60 (Gulf to Bay
Blvd.) then applicant shall acquire FDOT approval. Traffic Engineering recommends that the driveway operate as a right -in and right -out only.
Author: BELBO Subject: Conditions Date: 3/14/2014 1:34:43 PM
Prior to Building Permit. Provide hand railing to comply with 2012 Florida Accessibility Code For Building Construction.
Author: BELBO Subject: Conditions Date: 3/27/2014 10:35:27 AM
Prior o CDB:
1. The submitted traffic impact study is not acceptable at this time, please see Traffic Engineering for comments.
Prior to a Building Permit:
1. Obtain FDOT permit for driveway access or other work within the state road right -of -way.
General Note(s):
1. Applicant shall comply with the current Transportation Impact Fee Ordinance and fee schedule and paid prior to a Certificate of Occupancy (C.O.).
2. DRC review is a prerequisite for Building Permit Review; additional comments may be forthcoming upon submittal of a Building Permit Application.
Author: MJACKSON Subject: Conditions Date: 3/25/2014 2:38:04 PM
Prior to CDB. Revise the 3.2 foot dimension to reflect the distance from the east property line to the outside edge of the curb.
Author: BELBO Subject: Conditions Date: 3/21/2014 11:06:10 AM
Prior to CDB. Provide wheel stops where parking stalls abut a sidewalk to prevent a parked vehicle from over hanging onto the pedestrian walkway.
/Author: BELBO Subject: Line Date: 3/13/2014 5:04:07 PM
Author: MJACKSON Subject: Conditions Date: 3/25/2014 2:38:19 PM
Prior to CDB. Staff only requires a 12 foot wide travel lane on the east side of the drive -thru lane. As such, reduce the width of the drive -thru lane to provide the
required five foot landscape buffer along the east property line.
/Author: MJACKSON Subject: Line Date: 3/25/2014 2:32:29 PM
Author: JSHAN NON Subject: ENG -Condition Date: 3/21/2014 3:26:14 PM
Prior to Building Permit:
1. As per Community Development Code Section 3- 1701B, Sidewalks required, Plan considerations, if the remodeling of an existing structure will exceed by
50% of the assessed evaluation of the property where a sidewalk does not exist, an applicant shall provide for construction of a sidewalk in an easement or
right -of -way. If the property owner qualifies for an exception, the property owner shall pay a fee in lieu of constructing the sidewalk to be used to construct a
sidewalk at a future date. Please show sidewalk in the Cross Boulevard right of way.
2. As per Community Development Code Section 3- 1907B, Sidewalks /Bicycle paths and City Construction Standard Index No. 109 for Sidewalks, Applicant shall
bring all sub - standard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including A.D.A. standards (raised detectable tactile
surfaces or truncated domes per most recent FDOT Indexes #304 and 310).
3. If the proposed project necessitates infrastructure modifications to satisfy site - specific water capacity and pressure requirements and /or wastewater capacity
requirements, the modifications shall be completed by the applicant and at their expense. If underground water mains and hydrants are to be installed, the
Comments from page 7 continued on next page
installation shall be completed and in service prior to construction in accordance with Fire Department requirements.
4. As per Clearwater Code of Ordinances, Article IX., Reclaimed Water System, Section 32.376, Use of potable water for irrigation is prohibited, no person shall
use potable water for irrigation through a new or existing lawn meter on property where reclaimed water distribution facilities are available. If potable water is
currently used for irrigation, then a connection to the reclaimed water line in Cross Boulevard shall be established.
Author: MJACKSON Subject: Conditions Date: 3/25/2014 2:38:27 PM
Can two additional off - street parking spaces be placed in the location shown?
/Author: MJACKSON Subject: Line Date: 3/25/2014 2:38:27 PM
Author: JSHAN NON Subject: ENG -Condition Date: 3/21/2014 3:26:14 PM
Prior to C.O.
1. A right of way permit from FDOT for any work in Highway 60 /Gulf to Bay Blvd shall be provided.
Author: JSHAN NON Subject: ENG -Condition Date: 3/21/2014 3:26:14 PM
General Notes:
1. Only Sheets C4.1was reviewed for General Engineering criteria. The additional details provided in the plan set may have been necessary for
other departmental reviews to provide flexible development approval. Construction plans shall be reviewed in more detail prior to receipt of the
building permit.
2. Any work in the Cross Boulevard right of way will require a city right of way use permit which is permitted through the Engineering
Department. Right of way permits can be found online at http: // myclearwater. com /gov/ depts/ pwa /engin /FormsApplications.asp
3. DRC review is a prerequisite for Building Permit Review. Additional comments may be forthcoming upon submittal of a Building Permit
Application.
am
Author: BELBO Subject: Conditions Date: 3/14/2014 1:34:43 PM
Prior to Building. Provide slope of ADA ramp. ADA ramp shall comply with 2012 Florida Accessibility Code For Building Construction.
/Author: BELBO Subject: Line Date: 3/14/2014 9:59:30 AM
Author: BELBO Subject: Conditions Date: 3/14/2014 1:34:43 PM
Prior to a building permit. Install no left turn symbol (R3 -2) sign at the bottom of stop sign per current MUTCD standards.
/Author: BELBO Subject: Line Date: 3/13/2014 5:04:07 PM
am
Author: TSPEARMAN Subject: STR - Condition Date: 3/18/2014 2:46:50 PM
Author: TSPEARMAN Subject: Conditions Date: 3/25/2014 3:16:15 PM
Prior to Building Permit
1. Where are cross sections A -A and B -B located in plans?
2. Provide a copy of the approved SWFWMD permit
3. Prior to certificate of occupancy issuance, please submit a copy of the approved FDOT drainage connection permit.
4. Please use City's rational method to calculate the the required attenuation.
5. The site is required to provide not only water quality but also quantity for attenuation.
6. Please verify that there will be no adverse impacts to adjoining properties.
7. Show roof drain collection system and direct to pond for treatment and attenuation.
8. Finished work at the existing driveway and any areas within the City's r -o -w shall not result in ponding issues. Temporary flooding of the
restored area within the r -o -w may be needed for thorough inspection.
9. Show roof drain collection system and direct to pond for treatment and attenuation.
10. Flood Zone X - Design for 25 YR Storm event in drainage Calculations
Page: 13
Author: MJACKSON Subject: PLN - Condition Date: 3/19/2014 9:56:01 AM
Prior to CDB - Remove all detail sheets which do not require review until building permit.
Author: MJACKSON Subject: Conditions Date: 3/26/2014 11:17:40 AM
Prior to CDB. Clarify if the typical wall section is for the wall for the dumpster enclosure only or if also for the proposed eight foot tall wall.
Page: 15
Author: SJOSUNS Subject: Conditions Date: 3/20/20144:12:17 PM
ENV - Prior to Building Permit Review: Continue to provide erosion control measures on plan sheets and provide notes detailing erosion control methods for
Building Permit review.
Author: MJACKSON Subject: Conditions Date: 3/26/2014 9:35:13 AM
Prior to CDB, Pursuant to CDC Section 3- 1204.D, provide wheel stops for all off - street parking spaces adjacent to landscaped areas.
Author: ellen.crandall Subject: Conditions Date: 3/27/2014 1:12:02 PM
Consider the type and location of potential freestanding sig nag e in the front morht) landscape buffer. Magnolias are great shade trees, however a tree that natura lly is more limbed up (such as a high rise live oak) may offer better visibiI ity of sig nag e without
hacking the tree later. Acknowledge.
Author: ellen.crandall Subject: Conditions Date: 3/27/2014 1:02:15 PM
Some of the landscape islands do not appearto be 10 feet wide, yet they have shade trees proposed. Shade trees must be a minimum of 5 feet away from impervious. Clarify the dimension from back of curb to back of curb on the islands and revise the island or
the shade trees. Prior to building permit.
Author: MJACKSON Subject: Conditions Date: 3/26/2014 9:30:50 AM
Prior to CDB. Add each plant symbol to the plant schedule table.
Author: ellen.crandall Subject: Conditions Date: 3/27/2014 1:04:38 PM
There Is a 312 inch deficit proposed (which may change In response to comments and Is subject to a final landscape Inspection) and must be paid to the tree bank at a rate of $48 per Inch for a total of $14,976. Acknowledge.
Author: ECRANDALL Subject: Oval Date: 3/27/2014 1:13:01 PM
ECRANDALL Subject: Oval Date: 3/27/2014 1:13:01 PM
Author: ECRANDALL Subject: Oval Date: 3/27/2014 1:13:01 PM
Author: ellen.crandall Subject: Conditions Date: 3/27/2014 1:07:31 PM
Provide details of the perimeter wall that Is proposed. Specifically If tree #25 and #29 can be retained the wall may need to be pier and lintel.
Author: ellen.crandall Subject: Conditions Date: 3/27/2014 1:06:42 PM
Absolutely no trees are being retained. Understood It Is a tight site to design. Why are trees #29 and #25 being removed? It appears there may be as much as 10 feet between the trees and the top of the stormwater bank. Consider trying to shift the storm water
pond away from the trees.
Page: 23
Author: MJACKSON Subject: Conditions Date: 3/26/2014 10:00:59 AM
Prior to CDB. Pursuant to CDC Section 3- 1302.C.1, the heights of the lamps shall not exceed 35 feet, or one foot in height for each one foot the light fixture is
setback from the setback line.
Along the north property line the setback line is 15 feet and along the east and west property lines the setback line is five feet.
Author: BELBO Subject: Oval Date: 3/14/2014 1:49:01 PM
Author: BELBO Subject: Conditions Date: 3/14/2014 1:51:51 PM
Prior to CDB. Truck tracks impact the circled parking stalls. Is this restaurant a 24 hour, 7 days a week business? If so vehicle(s) parked in the impacted parking
stalls are unacceptable. Furthermore, the drive through operation will be impacted, if is a 24/7 a week operation.
/Author: BELBO Subject: Line Date: 3/14/2014 1:49:01 PM
/Author: BELBO Subject: Line Date: 3/14/2014 1:49:01 PM
""Author: BELBO Subject: Oval Date: 3/14/2014 1:49:01 PM
Author: MJACKSON Subject: Conditions Date: 3/26/2014 9:53:40 AM
Prior to CDB. Add a note to the plan that all signs will be reviewed under separate application request.
10:00 AM
Case number: FLD2014 -02002 -- 600 MANDALAY AVE 1
Owner(s): Xania Inc
1299 Main St Ste E
Dunedin, FL 34698 -5333
PHONE: No phone, Fax: No fax, Email: No email
Applicant: PHONE: No phone, Fax: No fax, Email: No email
Representative: Joseph Erwin
Presenter: Matthew Jackson, Planner III
3/31/2014
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
1121 Plaza Comercio
St Petersburg, FL 33702
PHONE: (727) 480 -5181, Fax: No fax, Email: Joseph herwinllc @tampabay.Rr.Com
Location:
.03 acres located at the northwest corner of Mandalay Avenue and Kendall Street.
Atlas Page:
258A
Zoning District:
Tourist
Request:
Flexible Development application to allow 562 square feet of Restaurant use in an
existing 1,298 square foot building in the Tourist(T) District with a lot area of 0.32
acres (1,374 square feet), a lot width of 60 feet (along Mandalay Avenue) and 22.9
feet (along Kendall Street), a front (east) setback of zero feet (to building), a front
(south) setback of zero feet (to building), a side (north) setback of zero feet (to
building), a side (west) setback of zero feet (to building), zero parking spaces and
a building height of 12 feet (to top of flat roof) as a Comprehensive Infill
Redevelopment Project pursuant to Community Development Code Section 2-
803.D as well as a reduction to the required foundation landscaping area width
from five feet to zero feet as a part of a Comprehensive Landscape Program
pursuant to Community Development Code section 3- 1202.G.
Proposed Use:
Restaurants
Neighborhood
Clearwater Beach Association
Association(s):
Clearwater Neighborhood Coalition
Presenter: Matthew Jackson, Planner III
3/31/2014
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Workflow:
Review Name
Task Status
Status Date
Last Name
Determination of
Completeness
Complete
03/12/2014
Jackson
Engineering Review
Comments
03/18/2014
Shannon
Traffic Eng Review
Comments
03/19/2014
Elbo
Environmental Review
Comments
03/20/2014
Josuns
Parks and Rec Review No Comments
No issues - commercial project less than 1 acre.
03/20/2014
Reid
Fire Review
Comments
03/24/2014
Keller
Stormwater Review
No Comments
03/24/2014
Spearman
Planning Review
Comments
03/25/2014
Jackson
Harbor Master Review
No Review Required
03/25/2014
Jackson
Land Resource Review
No Comments
03/26/2014
Anderson
Solid Waste Review Comments 03/31/2014 Pryor
Do to zero lot lines and past practice, we are approving the garbage service with residential Rear loading
collection.
3/31/2014
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
The DRC reviewed this application with the following comments:
Engineering Review Prior to Community Development Board:
1. It appears that the proposed outside seating is located in the Mandalay
Avenue right of way. Would a 44 -inch unobstructed portion of sidewalk be
maintained? Please show parking meters in relation to the picnic benches.
3/31/2014
Priorto Building Permit:
1. As per Community Development Code Section 3- 19078, Sidewalks /Bicycle
paths and City Construction Standard Index No. 109 for Sidewalks, Applicant
shall bring all sub - standard sidewalks and sidewalk ramps adjacent to or a
part of the project up to standard, including A.D.A. standards (raised
detectable tactile surfaces or truncated domes per most recent FDOT Indexes
#304 and 310).
2. If the proposed project necessitates infrastructure modifications to satisfy
site - specific water capacity and pressure requirements and /or wastewater
capacity requirements, the modifications shall be completed by the applicant
and at their expense. If underground water mains and hydrants are to be
installed, the installation shall be completed and in service prior to
construction in accordance with Fire Department requirements.
3. Grease traps are required on the sewer system for restaurants. Please
coordinate with Rob Powers in Utilities at 462 -6660 x 227 on the required
grease trap.
4. Potable water line and fire line shall be separate taps on the water main.
5. If any demolition is occuring, the following notes shall be provided on the
plans:
--All utilities shall be cut and capped prior to demolition. The Wastewater
Supervisor shall be notified.
--All existing utilities shall be protected during demolition.
-- Demolition shall not cause any service interruptions for other utility
customers.
- -Water meters, double- detector checks and backflow preventers are owned
by the City of Clearwater. The City shall remove and retain these items.
6. Please apply for a right of way use permit for any work in the Mandalay
Avenue right of way. The application can be found online at:
http: // myclearwater. com/ gov/ depts/ pwa /engin /FormsApplications.asp
General Notes:
1. Construction plans shall be reviewed in more detail prior to receipt of the
building permit.
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Environmental Review Priorto issuance of Building Permit:
1. An Asbestos Survey is usually required prior to conducting any demolition
or renovations. Contact Pinellas County Air Quality (727/464 -4422) for more
information.
2. Provide erosion control measures on plans sheet and provide notes
detailing erosion control methods.
General Note(s):
1. DRC review is a prerequisite for Building Permit Review; additional
comments may be forthcoming upon submittal of a Building Permit
Application.
2. Offsite discharge of produced groundwater from dewatering shall comply
with dewatering guidelines from Florida Department of Environmental
Protection (FDEP), F.A.C. 62- 621(2).
3. Additional permits from State agencies, such as the Southwest Florida
Water Management District or Florida Department of Environmental
Protection, may be required. Approval does not relieve the applicant from the
requirements to obtain all other required permits and authorizations.
Fire Review 1) To be addressed at building stage -must meet the requirements of NFPA
96 Standard for Ventilation Control and Fire Protection of
Commercial Cooking Operations 2008 Edition
Chapter 7 Exhaust Duct Systems
7.8* Termination of Exhaust System.
7.8.2 Rooftop Terminations.
7.8.2.1 Rooftop terminations shall be arranged with or provided with the
following:
(1) A minimum of 3 m (10 ft) of horizontal clearance from the outlet to adjacent
buildings, property lines, and air intakes
Please verify code criteria to be met as the structure to the North not shown
on plan
2) Separate plans for hood, fire suppression to be addressed at building stage
3) * Note: This is a D.R.C.approval only. Other issues may develop and will be
addressed at building permit stage
Planning Review All conditions are to be addressed prior to CDB.
Planning Review Clarify the site area square footage on page two of the Flexible Development
application as the site dimensions are 60 feet x 22.9 feet. Revise application
and drawings as applicable.
Planning Review Clarify all floor area amounts on page two of the Flexible Development
application as none are consistent with the survey provided or gross floor
areas of the three uses. For example, the gross floor area of the building
appears to be 1,357.48 sq ft [(60 *22.9)- 5.9 *(2.8)]. And when you add the three
gross floor areas of the uses (562 +639 +179) this equals 1,380 square feet
and the gross floor area listed is 1,298 square feet.
3/31/2014
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Planning Review
Once the correct gross floor area is ascertained, update the building coverage
amount listed on page two of the Flexible Development application as
applicable.
Planning Review
On page three of the Flexible Development application, remove all information
related to density as this is a commercial development and no dwelling or
overnight accommodation units are proposed.
Planning Review
On page three of the Flexible Development application, provide the number of
required off - street parking spaces. For 562 square feet of restaurant use,
between four to eight spaces are required.
Planning Review
For criterion number one on page six of the Flexible Development application,
while it is understood that no changes to the building are proposed, you still
need to address how the development will be in harmony with the scale, bulk,
coverage and character of adjacent properties. This is also important as the
building exterior has been painted prior to approval of this application.
Planning Review
For criterion number two on page six of the Flexible Development application,
correct existin to read existing.
Planning Review
For criterion number three on page six of the Flexible Development
application, provide how the proposed development will not adversely affect
the health or safety or persons residing or working in the neighborhood. The
response to the criterion simply restated the criterion.
Planning Review
For criterion number five on page six of the Flexible Development application,
explain how the new building facade design is consistent with the community
character as well as the Beach by Deign requirement that buildings be
designed with a tropical or coastal vernacular theme.
Planning Review
For criterion number six on page six of the Flexible Development application,
please clarify how the proposed hours of operation will minimize any adverse
effects, including visual, acoustic and olfactory.
Planning Review
For criterion number three on page seven of the Flexible Development
application, provide a response to the criterion addressing how the
redevelopment will not impede the normal and orderly development and
improvement of surrounding properties. The response provided does not
address the criterion.
Planning Review
For criterion number five on page seven of the Flexible Development
application, respond to how the proposed use complies with one of the
objectives a -f.
Planning Review
For criterion number six on page seven on the Flexible Development
application, provide complete response to design objectives a -e.
Planning Review
For the description of request on page one of the Comprehensive Landscape
application, provide the specific request of the removal of the required
foundation plantings. A complete sentence is preferred.
Planning Review
For page two of the Comprehensive Landscape Program application, correct
the spelling errors.
Planning Review
On page two of the Comprehensive Landscape Program criterion number 1.b,
remove the response.
Planning Review
For number three on the affidavit to authorize agent, please use a complete
sentence and correct the spelling.
Planning Review
Update the photograph of the building to show the existing conditions and to
show all building facades.
3/31/2014
7 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Planning Review Remove all mixed use references in the parking demand study. For a project
to be considered mixed use, a residential component is required.
Planning Review Prior to CDB. Acknowledge that the outdoor seating will be requested through
a separate Outdoor Cafe Permit application.
Traffic Eng Review Prior to CDB:
1. If tables and benches will be used on the public sidewalk, then provide a
minimum clear path of 44" wide to allow access for patrons /pedestrians on
wheelchairs.
2. Tables and chairs are not to be permanently secured onto the public
sidewalk.
3/31/2014
General Note(s):
1. Applicant shall comply with the current Transportation Impact Fee
Ordinance and fee schedule and paid prior to a Certificate of Occupancy
(C.O.). The TIF amount for the proposed project is: $3,607.33
2. DRC review is a prerequisite for Building Permit Review; additional
comments may be forthcoming upon submittal of a Building Permit
Application.
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
11:00 AM
Case number: FLD2014 -03007 -- 655 S GULFVIEW BLVD
Owner(s):
Clearwater Grande Dev Llc
20001 Gulf Blvd Ste 5
Indian Shores, FL 33785 -2417
PHONE: No phone, Fax: No fax, Email: No email
Applicant:
Clearwater Grande Dev Llc
20001 Gulf Blvd Ste 5
Indian Shores, FL 33785 -2417
PHONE: No phone, Fax: No fax, Email: No email
Representative:
Housh Ghovee
Northside Engineering
300 South Belcher Road
Clearwater, FL 33765
PHONE: (727) 709 -0943, Fax: No fax, Email: Housh@nortsideengineering.Net
Location:
located on the south side of South Gulfview approximately 894 feet west of Gulf
Boulevard.
Atlas Page:
285A
Zoning District:
Tourist
Request:
Flexible Development application to allow 181 -room overnight accommodation use
as well as a exit only driveway from the north side of the buildings parking garage
onto South Gulfview Boulevard as an amendment to a previously approved Site
Plan (FLD2013 -03011 / DVA2013 -03001 / HDA2014- 02001) in the Tourist (T)
District as a Comprehensive Infill Redevelopment Project under the provisions of
Community Development Code (CDC) Section 2- 704.E.
Proposed Use:
Overnight Accomodations
Neighborhood
Clearwater Beach Association
Association(s):
Clearwater Neighborhood Coalition
Presenter:
Kevin Nurnberger, Planner III
3/31/2014
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Workflow:
Review Name
Task Status
Status Date
Last Name
Determination of
Completeness
Complete
03/05/2014
Nurnberger
Planning Review
Comments
03/12/2014
Nurnberger
Engineering Review
See conditions.
Comments
03/17/2014
Shannon
Traffic Eng Review
Comments
03/19/2014
Elbo
Parks and Rec Review
See conditions.
Comments
03/20/2014
Reid
Environmental Review
Comments
03/20/2014
Josuns
Stormwater Review
Comments
03/24/2014
Spearman
Fire Review
Comments
03/25/2014
Keller
Land Resource Review
Comments
03/26/2014
Anderson
Solid Waste Review Comments
Solid Waste plans remain the same.
03/31/2014
Pryor
3/31/2014 10 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
The DRC reviewed this application with the following comments:
Engineering Review Priorto Building Permit:
1. Applicant shall bring all sub - standard sidewalks and sidewalk ramps
adjacent to or a part of the project up to standard, including A.D.A. standards
(raised detectable tactile surfaces or truncated domes per FDOT Index #304
and 310). As per FY2012/13 FDOT details, truncated domes are not required
for sidewalks intersecting driveways.
2. Please apply for a right -of -way permit for any work within Gulfview
Boulevard. The form can be found online at:
http: // myclearwater. com/ gov/ depts/ pwa /engin /FormsApplications.asp
3. Please provide information on the staging area and route for the
construction materials and equipment.
4. As per Clearwater Code of Ordinances, Article IX., Reclaimed Water
System, Section 32.376, Use of potable water for irrigation is prohibited, no
person shall use potable water for irrigation through a new or existing lawn
meter on property where reclaimed water distribution facilities are available.
Reclaimed water is available in the Gulfview Boulevard right -of -way. Please
show the proposed reclaimed water laterals and taps on both the the site civil
plans and landscape plans.
5. If the proposed project necessitates infrastructure modifications to satisfy
site - specific water capacity and pressure requirements and /or wastewater
capacity requirements, the modifications shall be completed by the applicant
and at their expense. If underground water mains and hydrants are to be
installed, the installation shall be completed and in service prior to
construction in accordance with Fire Department requirements.
General Note:
1. DRC review is a prerequisite for Building Permit Review. Additional
comments may be forthcoming upon submittal of a Building Permit
Application.
3/31/2014 11 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Environmental Review Priorto issuance of Building Permit:
1. Provide stormwater vault specifications showing the vault provides water
quality benefits and provide a vault maintenance schedule that has been
signed and accepted by the owner.
2. Provide erosion control measures on plans sheet and provide notes
detailing erosion control methods.
3. No light shall be visible or extend in areas identified as Sea Turtle Nesting
Areas during the nesting season (May 1 to October 31). Those areas where
security and public safety require lighting, alternative light management
approaches shall be applied. Provide evidence of sea turtle- friendly lighting in
accordance with City code and state laws.
General Note(s):
1. DRC review is a prerequisite for Building Permit Review; additional
comments may be forthcoming upon submittal of a Building Permit
Application.
2. Offsite discharge of produced groundwater from dewatering shall comply
with dewatering guidelines from Florida Department of Environmental
Protection (FDEP), F.A.C. 62- 621(2).
4. Additional permits from State agencies, such as the Southwest Florida
Water Management District or Florida Department of Environmental
Protection, may be required. Approval does not relieve the applicant from the
requirements to obtain all other required permits and authorizations.
3/31/2014 12 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Fire Review 1) Sheet C2.1 Shows the new Fire Department Connection, please show the
location of the existing Fire Department Connection to determine location of a
second Fire Hydrant Show location of fire hydrant for fire fighting use. Must be
within 300' of building as hose lays and on same side of street as building.
ACKNOWLEDGE PRIOR TO C.D.B.
2) This building is a High Rise and is required to have two (2) Fire Department
Connections please show the location of the second Fire Department
Connection ACKNOWLEDGE PRIOR TO C.D.B.
3) Whenever a proposed development will be required to install one or more
fire hydrants as a condition of approval and the proposed development will be
equipped with an internal fire protection system (fire sprinklers, standpipes, or
both) A fire hydrant shall be located within 25 -50 feet, as measured along a
normal access route, of the fire department connection for such internal
system. ACKNOWLEDGE PRIOR TO D.O.
4) Provide Fire Flow Calculations / Water Study by a FIRE PROTECTION
ENGINEER to assure an adequate water supply is available and to determine
if any upgrades are required by the developer due to the impact of this project.
Calculations / Water Study due ACKNOWLEDGE PRIOR TO D.O.
5) This building is determined to meet the criteria of a High Rise Building as
defined by the Florida Fire Prevention Code, 2010 Edition, therefore the
requirements of a High Rise structure must be met. These requirements
include, but are not limited to Fire Code items such as:
Fire Pump and generator if pump is electric, sprinkler system throughout with
control valve and water flow device on each floor, Class I Standpipe System,
Fire Alarm using voice /alarm communication, Central Fire Control Station,
firefighter phone system, Emergency lighting, and Standby Power as per
NFPA 70, Pressurized Stairwells, Stairwell marking and Elevator Lobbies.
Please ACKNOWLEDGE PRIOR TO CDB.
6) Fire Department Connections shall be identified by a sign that states No
Parking, Fire Department Connection the address that it supplies and shall be
designed in accordance with Florida Department of Transportation standards
for information signage and be maintained with a clearance of 7 1/2 feet in
front of and to the sides of appliance as per Florida Fire Prevention Code
2010 edition. ACKNOWLEDGE PRIOR TO CDB.
3/31/2014 13 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Fire Review 7) Must meet the requirements of NFPA -241 Standard for Safeguarding
Construction, Alteration, and Demolition Operations 2004 Edition
7.5.6 Stairs.
7.5.6.1 In all buildings over one story in height, at least one stairway shall be
provided that is in usable condition at all times and that meets the
requirements of NFPA 101, Life Safety Code.
7.5.6.2 This stairway shall be extended upward as each floor is installed in
new construction and maintained for each floor
still remaining during demolition.
7.5.6.3 The stairway shall be lighted.
7.5.6.4 During construction, the stairway shall be enclosed where the building
exterior walls are in place.
ACKNOWLEDGE PRIOR TO C.D.B.
8) Must meet the requirements of NFPA 1 Fire Code 2009 Edition
16.3.5 Standpipes. In all new buildings in which standpipes are required or
where standpipes exist in buildings being altered or demolished, such
standpipes shall be maintained in conformity with the progress of building
construction in such a manner that they are always ready for use. [241:7.6]
ACKNOWLEDGE PRIOR TO C.D.B.
9) Must Comply with Ordinance No. 47.053 Radio System Regulations for
buildings, install 911 Radio Repeater / Antenna Booster System
ACKNOWLEDGE PRIOR TO C.D.B.
10) Where underground water mains and hydrants are to be installed, they
shall be installed, completed, and in service prior to construction as per NFPA-
241.
All underground fire lines and hydrants must be installed by a contractor with a
class 1,11 or V license. ACKNOWLEDGE PRIOR TO C.D.B.
11) Must meet the requiements of NFPA -88A Standard for Parking Stuctures
2007 edition ACKNOWLEDGE PRIOR TO C.D.B.
12) Note: This is a D.R.C.approval only. Other issues may develop and will
be addressed at building permit stage.
Land Resource Review Land Resource Review:
1. The Palms on the site plan are not graded. Please add an inventory chart
that displays the number of Palms to be removed and the number of palms to
be installed. This will allow for your tree deficit to be determined. Please
include this on the demolition plan and the landscaping plan.
2. On the demolition plan, clearly mark all Palms to be removed with an "X" to
specify they will be removed.
3/31/2014 14 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Parks and Recreation Open space /recreation impact fees are due prior to issuance of building
Review permits or final plat (if applicable) whichever occurs first. These fees could be
substantial and it is recommended that you contact Debbie Reid at 727 -562-
4818 to calculate the assessment.
Planning Review Planning Review: Prior to Community Development Board
1. The landscape plan does not match the submitted architectural and site
plans. The landscape plan does not show the proposed garage exit from the
center of the Hampton Inn building to S. Gulfview Boulevard. Revise;
2. This being one of the primary changes to the building the driveway and new
exit should be shown correctly and how the new driveway affects the
landscape plan;
3. The Site Data Table on Sheet C1.1 of civil site plans states that there are
81 rooms in the Quality Inn Hotel where based on the Termination of
Nonconformity for Density it is 91 units. Revise;
4. In the same Table, the number of required parking spaces needs to reflect
the additional 10 units so it needs to be revised from 206 to 218;
5. The narrative states a 9.8 foot setback to decorative banding but the
decorative banding is not shown on Sheet C2.1. Clarify or revise;
6. General Applicability Criteria 1 states that 20 units from Quality Inn were to
be suites. Approved staff report had 16 units being converted to suites and
two standard rooms into storage. Clarify;
7. What flexibility to sight visibility triangle are you requesting on narrative
page 2. Page 6 of narrative discusses that it has been approved but the new
exit driveway has not been approved. Is it for the building in new driveway
triangle? Clarify;
8. Provide a statement that discusses the proposed benefits to parking
garage traffic circulation with introduction of new driveway on north side of
property;
9. General Applicability Criteria 3 discusses a shared access for both hotels;
removal of existing west access; but does not discuss the new exit driveway to
S. Gulfview and how that may impact safety for pedestrians. Clarify;
10. Show and provide a statement on how the parking garage design
complies with Sections E and F of the Beach by Design guidelines;
11. Encroachments into the sight visibility triangles were permitted because
Traffic Engineering staff found acceptable warning devises at the driveway
entrance as well as decorative colored pavers with a distinctive pattern to
provide a visual mark to pedestrians using the public right -of -way, clearly
identifying the entrance to reduce potential pedestrian - automobile conflict at
the driveway entrance. What safety measures are proposed for new driveway
entrance pedestrian conflict point on S. Gulfview?; and
12. That all Conditions of Approval as originally made by the CDB on May 21,
2013, will still be in effect and enforceable.
3/31/2014 15 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Stormwater Review Prior to to Building Permit:
1. Provide detail and cross section of proposed vault.
2. Show cross section of proposed swale around vault.
3. Show detail on plan to specify what will be done to roof collection system.
4. Storm system to north of site near Stair 1 is unclear, please specify clearly
on plans the pipes, inverts, connections.
5. Finished work at the existing driveway and any areas within the City's r -o -w
shall not result in ponding issues. Temporary flooding of the restored area
within the r -o -w may be needed for thorough inspection.
6. Please provide stormwater drainage calculations showing underground
vault has sufficient capacity. Please use rational method.
7. Recovery of vault shall be based on the double ring infiltrometer test
performed at the proposed depth of vault elevation. Please note, the entire
volume of vault shall draw down within 24 hours, not just the water quality
volume.
3/31/2014 16 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Traffic Eng Review Prior to Community Development Board :
1. Passenger loading area shall comply with the 2012 Florida Accessibility
Code For Building Construction, Section 503.
2. What is the vertical clear height of entry canopy relative from the
walk/speed table?
3. There shall be no objects in the sight triangle which does not meet the
City's acceptable vertical height criteria at a level between 30 inches above
grade and eight feet above grade. (City's Community Development Code,
Section 3 -904).
Priorto Building Permit:
1. The minimum clear height throughout the garage shall be seven feet zero
inches and shall be eight feet two inches for van - accessible parking spaces
including ingress and egress drive aisles to these spaces.
2. Structural supports located in parking garages shall not encroach into the
required area of a parking space. Structural supports shall be located in a
manner to provide maximum vehicular maneuverability and shall not obstruct
passenger ingress and egress.
3. Lighting levels in parking garages having public access shall meet or
exceed the current minimum Illuminating Engineering Society (IES) standards.
4. All electrical conduits, pipes, downspouts, columns or other features that
could be subject to impact from vehicular traffic shall be protected from impact
damage with pipe guards or similar measures. Measures used for protection
shall not encroach into any parking space.
5. Pedestrian - vehicular conflicts shall be avoided whenever possible. Where
unavoidable, active warning devices such as traffic signals or flashing warning
signs /devices and /or physical barriers such as vehicular actuated gates shall
be provided to warn the pedestrian and slow vehicular traffic. Too many
conflicts with pedestrians and vehicular traffic from the check -in parking
spaces to the lobby /elevators.
6. Provide typical angle in degrees for the angled parking stalls. Angled
parking stall dimensions shall be to the City's parking standards.
http: / /www. myclearwater.com /gov /depts /pwa /engin /publications /stddet/100-
Streets /pdf /12001.pdf
7. Please consider moving the building columns from the end of the parking
spces to 18- inches from the ends of the parking spaces.
General Notes:
1. Taxis and buses shall not stage on public right -of -way.
2. All resubmittals shall be accompanied with a response letter addressing
how each departmental condition has been met.
3. Applicant shall comply with the current Transportation Impact Fee
Ordinance and fee schedule and paid prior to receiving a Certificate of
Occupancy (C.O.).
4. DRC review is a prerequisite for Building Permit Review; additional
comments may be forthcoming upon submittal of a Building Permit
Application.
3/31/2014 17 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
1:00 PM
Case number: HDA2013 -08004 -- 325 S GULFVIEW BLVD
Owner(s): Mainstream Partners Viii Ltd
10165 N W 19th St
Miami, FL 33172 -2529
PHONE: (727) 224 -6650, Fax: No fax, Email: No email
Applicant: Mainstream Partners Viii
10165 N W 19th St
Miami, FL 33172 -2529
PHONE: (727) 224 -6650, Fax: No fax, Email: Mamerica @tampabay.Rr.Com
Representative: Istvan Peteranecz
Behar Peteranecz, Inc.
103 Rogers Street
Clearwater, FL 33704
PHONE: (850) 377 -1870, Fax: No fax, Email: Istvan@architecturebp.Com
Location:
Atlas Page:
Zoning District:
Request:
Proposed Use:
Neighborhood
Association(s):
Presenter:
3/31/2014
1.60 acres (including a 35 foot by 240 foot portion of the South Gulfview Boulevard
right -of -way) bound by South Gulfview Boulevard (west), Coronado Drive (east) at
the intersection of Coronado Drive and Brightwater Drive.
276A
Tourist
A Development Agreement between Mainstream Partners VIII, LTD. (the property
owner) and the City of Clearwater, providing for the allocation of 100 units from the
Hotel Density Reserve under Beach by Design. (HDA2013- 08004)
Overnight Accomodations
Clearwater Neighborhood Coalition
Clearwater Beach Association
Mark Parry, Planner III
18
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Workflow:
Review Name
Task Status
Status Date
Last Name
Determination of
Completeness
Complete
09/06/2013
Parry
Parks and Rec Review No Comments 09/12/2013 Reid
No issues on HDA. Open space /recreation impact fees will be due prior to issuance of building permits
or final plat (if applicable) whichever occurs first.
Engineering Review
Comments
09/17/2013
Shannon
Fire Review
No Comments
09/19/2013
Keller
Stormwater Review
Comments
09/23/2013
Spearman
Environmental Review
Comments
09/24/2013
Josuns
Traffic Engineering
Review
Comments
09/24/2013
Elbo
Land Resource Review
No Comments
09/25/2013
Anderson
Planning Review
Comments
09/25/2013
Parry
Harbor Master Review
No Comments
03/07/2014
Parry
3/31/2014 19 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
The DRC reviewed this application with the following comments:
Planning Review General Site Plan and Application Comments
1. There is no need to include General Applicability Criteria as provided in
Attachment C because this is not a Flexible Development request or
application at this point.
2. There is no need to include specific use Flexibility Criteria as provided in
Attachment D because this is not a Flexible Development request or
application at this point.
3. Take the responses from Attachment D number 6 with regard to Density and
Height and move them into Attachment E. Naturally Attachment E will be re-
numerated when you remove Attachments C and D.
4. Please include page three of the application with your resubmittal.
5. This may be splitting hairs but the application says there are 216 spaces
provided where I count 231.
6. Clarify what the hatched areas with the dashed red outline on Sheet A -204
for the north and south elevation massing studies are.
7. Please provide a transportation analysis as required on page three of four of
the application.
8. Clarify if the special warranty deeds submitted last year are still accurate
and reflect the subject property. I ask only because the legal description
provided in Exhibit A of the Development Agreements includes some lots
which were not originally included.
9. Clarify if the landscaping shown along the west side of the site in the right -of
-way will be installed and maintained by the property owner or the City.
3/31/2014 20 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Planning Review Development Agreement Comments
10. Section 6.1.10 is missing. Please add this required section. Be aware that
the City Council may deny the request if the submitted Development
Agreement is not consistent with the approved format unless otherwise
directed by Legal.
11. Section 6.2.4 is not worded as consistent with the approved format.
Please revise so that this section is worded exactly the same as the approved
Development Agreement format unless otherwise directed by Legal. In
addition, it is unclear as to why any portion of 5th Street needs to be vacated
with the proposal as this street is not adjacent to the subject site. I assume
you mean S. Gulfview Boulevard. Revise as appropriate, please.
12. Section 8.5 is not worded as consistent with the approved format. Please
revise so that this section is worded exactly the same as the approved
Development Agreement format unless otherwise directed by Legal.
13. Section 14.1.2 is not worded as consistent with the approved format.
Please revise so that this section is worded exactly the same as the approved
Development Agreement format unless otherwise directed by Legal.
14. The signature page is missing Leslie Dougall- Side's name under assistant
City attorney, leaves out the acknowledgement portion pertaining to the
Mayor's signature and adds a section as to City section for signing. Please
modify to be consistent with the approved format unless otherwise directed by
Legal.
15. Exhibit A provides that the area of the site is 2.00 acres more or less where
the application provides that the size of the site is 1.601 acres which is
decidedly on the less side of more or less. Please clarify and correct as
appropriate. In addition, the resubmitted legal description differs from the
legal description provided last year although a new survey was not submitted.
It looks like portions of some new lots have been added including Lots 8, 9, 12
and 13. Please clarify.
Planning Review Design Guideline Comments
16. With regard to Section C.2 it appears as though one building plane on the
south side is 102.5 feet. Clarify how this meets this Design Guideline
provision.
17. Please provide additional information that C.3 is being met on the north
and south facades.
18. With regard to D.3.a, it appears that the building stepsback at a height of
around 40 feet where the stepback needs to occur at a height of 25 feet.
Please clarify.
19. With regard to E.1.c, it is not clear how this is being met. Please provide
additional information how this section if satisfied. Specifically when you say
that the proposal follows some of the design parameters of the adjacent City
garage and Hyatt Hotel.
20. Section E.2 is applicable, actually, but it is really more of an operations
issue. I think that simple committing to meeting this will be sufficient.
21. The first part, at least of Section E.3 applies and needs to be addressed.
22. Please provide additional detail with regard to your response to Section F.
This will probably tie into the your response to Section E.1.c.
23. With regard to Section H, please add some details with regard to sidewalk
widths.
24. The response to Section K does not make sense. I think you are
responding to Section H. Revise and clarify.
3/31/2014 21 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Planning Review Disclaimer
25. Please be aware that additional comments may be generated at or
subsequent to the DRC meeting based upon applicant response to DRC
comments.
26. Please review the stated request closely. It is ultimately the responsibility
of the applicant to ensure that the request and submitted proposal are
accurate and consistent with each other.
Solid Waste Review Need to discuss solid waste service levels.
Stormwater Review 1. DRC review is a prerequisite for Building Permit Review; additional
comments may be forthcoming upon submittal of a Building Permit
Application.
3/31/2014 22 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
1:15 PM
Case number: FLD2014 -03008 -- 23 ROCKAWAY ST
Owner(s): Clearpark Llc
1001 E Atlantic Ave Ste 202
Delray Beach, FL 33483
PHONE: No phone, Fax: No fax, Email: No email
Applicant: Clearpark Llc
1001 E Atlantic Ave Ste 202
Delray Beach, FL 33483
PHONE: No phone, Fax: No fax, Email: No email
Representative: Katherine Cole, Esq.
Hill Ward Henderson
311 Park Place Boulevard
Suite 240
Clearwater, FL 33759 -4904
PHONE: (727) 259 -6791, Fax: No fax, Email: Katie. Cole @hwh law. Com
Location: south side of Rockaway Street approximately 100 feet west of Mandalay Avenue
Atlas Page: 258A
Zoning District: Tourist
Request: Flexible Development application for a Termination of Status of Nonconformity of a
14 -room Overnight Accommodation use with one accessory dwelling unit where the
otherwise maximum permitted density is 10 hotel units and one accessory dwelling;
a lot width of 60 feet and lot area of 10,440 where the otherwise required lot area
and width are 20,000 square feet and 100 feet, respectively, under the provisions
of CDC Section 6 -109
Proposed Use: Overnight Accomodations
Neighborhood Clearwater Neighborhood Coalition
Association(s): Clearwater Beach Association
Presenter: Mark Parry, Planner III
3/31/2014 23
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Workflow:
Review Name
Task Status
Status Date
Last Name
Planning Review
Comments
03/11/2014
Parry
Determination of
Completeness
Complete
03/11/2014
Parry
Harbor Master Review
No Comments
03/11/2014
Parry
Engineering Review
Comments
03/17/2014
Shannon
Traffic Eng Review
Comments
03/19/2014
Elbo
Parks and Rec Review No Comments 03/20/2014
No issues (no changes to existing hotel /motel buildings /units).
Reid
Stormwater Review
Comments
03/24/2014
Spearman
Fire Review
Comments
03/25/2014
Keller
Land Resource Review
No Comments
03/26/2014
Anderson
Solid Waste Review
No Comments
03/31/2014
Pryor
3/31/2014 24 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
The DRC reviewed this application with the following comments:
Engineering Review 1. The Engineering Department has no comments for the request for the
termination of nonconformity. Comments may occur if upon submittal of a
building permit.
Environmental Review General Note(s):
1. DRC review is a prerequisite for Building Permit Review; additional
comments may be forthcoming upon submittal of a Building Permit
Application.
Fire Review 1) * Note: This is a D.R.C.approval only. Other issues may develop and will
be addressed at building permit stage.
3/31/2014 25 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Planning Review General Site Plan and Application Comments
1. We need to clarify the current density. City records indicate a BTR for 14
hotel units where the application provides that there are 16 units on page two
and 15 units on page three. On page three of the application is stated that the
permitted number of hotel units is 12 but based on the square footage of the
site, 10,435 square feet, the maximum density is 11 units. I need to stick with
what the BTR is for. Exhibit A in one area provides that there are 15 units
where 11 units are permitted and in another that there are 14 units where 12
are permitted. It appears that the official unit count of 14 units per the BTR
has been consistent since 1997. The long and the short of it is this, we need
to get the numbers to be accurate and to match across all documents. I need
to know if there is an accessory dwelling which was brought up at one point. If
there is then the permitted density of the site is one accessory dwelling unit
with 10 hotel units where 14 hotel units exist. IF there is not accessory
dwelling then the permitted number of hotel units is 11 units where 14 exist.
Unless there is some forthcoming documentation which shows that there are
more units on site than that, that is what I intend to stick with.
2. Perimeter landscaping is not required however, the Code does require
foundation landscaping. A Comprehensive Landscape Program will need to
be submitted. Beach by Design does require a three foot landscape buffering
for parking. The lack of this buffer needs to be addressed.
3. Clarify the deal with the little building which seems to be attached to the
office on the west side of the site along Rockaway - Google Streetview has it
with a Pizza sign attached. I am guessing this actually on the adjacent
property to the west associated with the Sand Dune Motel and has nothing to
do with the subject site. Let me know if that is a correct assumption.
4. Clarify if the height of about 20 feet is from grade or BFE.
5. Please provide the phone number and email address of the property owners
on the application.
6. Please provide the areas of all four attached signs.
7. Clarify where mechanical equipment is located and how it is screened from
view from adjacent properties and rights -of -way. This includes equipment
such as air conditioning units.
8. Clarify the means by which solid waste is accommodated. Clarify where the
dumpster is located and how it is screened.
9. Clarify how parking works given a low, existing ratio.
10. Provide the timeframe with regard to redeveloping the property.
11. Since the building is required to be demolished by June clarify why we are
bothering rearranging the parking spaces.
12. Please provide a detailed analysis of the proposed improvements to the
site and building. You will want to include these details as you respond to the
Comp. Landscape Program criteria and the TOS criteria.
Planning Review General Applicability Criteria Comments
13. Criteria 1 through 4 - No comments.
14. Criterion 5 - Clarify the types of proposed improvements to the site and
building. Include as much detail as possible.
3/31/2014 26 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Planning Review
TOS Criteria Comments
15. Criterion 1 - While CDC Section 3- 1202.D does provide that perimeter
buffers are not required in the T District there is a caveat that provides an
exception to this rule in that the Old Florida District of Beach by Design does
have perimeter buffer requirement. Basically, landscape buffers are equal to
the required setback. The required front setback is 15 feet. The required side
setbacks are 10 feet. Therefore, the required buffers for front and side are 15
and 10 feet, respectively. This is all per Beach by Design which is the default
specified in the CDC.
16. Criterion 2 - I think that all you really need to do to address this one is
mention that interior landscaping is required of parking lots in excess of 4,000
and that the actual vehicular use area is 1,067 square feet.
17. Criterion 3 - Provide a discussion with regard to how the existing signs will
be brought into conformance with Code. Include details about the existing
signs such as area and dimensions.
18. Criterion 4 - A Comprehensive Landscape Program application is required
at this time because were essentially eliminating all landscape buffering.
19. Criterion 5 - No comments.
Planning Review
Comprehensive Landscape Plan Criteria Comments
20. This needs to be submitted.
Planning Review
Disclaimer
21. Please be aware that additional comments may be generated at or
subsequent to the DRC meeting based upon applicant response to DRC
comments.
22. Please review the stated request closely. It is ultimately the responsibility
of the applicant to ensure that the request and submitted proposal are
accurate and consistent with each other.
Solid Waste Review
How is solid waste service intended be serviced?
Stormwater Review
1. Stormwater has no comments for the request for the termination of
nonconformity. Comments may occur if upon submittal of a building permit.
Traffic Eng Review General Note(s):
1. DRC review is a prerequisite for Building Permit Review; additional
comments may be forthcoming upon submittal of a Building Permit
Application.
3/31/2014 27
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
1:35 PM
Case number: FLD2014 -03006 -- 22 BAY ESPLANADE
Owner(s):
Mathura Properties # 5 Llc
1901 South John Young Pkwy Ste 101
Kissimmee, FL 34741 -0601
PHONE: No phone, Fax: No fax, Email: No email
Applicant:
Mathura Properties # 5 LI
1901 South John Young Pkwy Ste 101
Kissimmee, FL 34741 -0601
PHONE: (321) 284 -4631, Fax: No fax, Email: Co math ura @hotmail.Com
Representative:
James Wilkerson
Wilkerson Architects, Llc
119 East Tallulah Drive
Greenville, SC 29605
PHONE: (864) 370 -2582, Fax: No fax, Email: Wilkpoe @charter.Net
Location:
The subject property is located at 22 Bay Esplanade and consists of 0.099acres
(4,350 SF). The parcel is located along the north side of Bay Esplanade
approximately 95 feet west of Mandalay Avenue and has 50 feet of frontage along
Bay Esplanade.
Atlas Page:
258A
Zoning District:
Tourist
Request:
Flexible Development application to permit a restaurant in the Tourist (T) District
with a lot area of 4,350 square feet, a lot width of 50 feet (along Bay Esplanade), a
front (south) setback of zero feet (to sidewalk) and 15 feet (to building), a side
(west) setback of 10 feet (to building), a side (east) setback of eight feet (to
building), a rear (north) setback of 16 feet (to building), a building height of 21.46
feet (to top of flat roof) and 28 feet (to top of parapet) and zero parking spaces as a
Comprehensive Infill Redevelopment Project, under the provisions of Community
Development Code Section 2 -803.0 and a reduction to the foundation landscape
requirement on the front (south) facade from five feet to zero feet as a
Comprehensive Landscape Program under the provisions of Community
Development Code Section 3- 1202.G
Proposed Use:
Restaurants
Neighborhood
Clearwater Beach Association
Association(s):
Clearwater Neighborhood Coalition
Presenter:
Melissa Hauck - Baker, Planner II
3/31/2014 28
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Workflow:
Review Name
Task Status
Status Date
Last Name
Environmental Review
Comments
03/20/2014
Josuns
Parks and Rec Review No Comments
No issues - commericial project less than 1 acre.
03/20/2014
Reid
Engineering Review
Comments
03/21/2014
Shannon
Traffic Eng Review
Comments
03/24/2014
Elbo
Stormwater Review
Comments
03/24/2014
Spearman
Planning Review
Comments
03/26/2014
Hauck -Baker
Land Resource Review
Comments
03/26/2014
Anderson
Fire Review
Comments
03/27/2014
Keller
Solid Waste Review Comments 03/31/2014 Pryor
We need to look at the possibilty of increasing the storage area to accomodate at least a 2 yard
Dumpster.
Determination of
Completeness
Complete
04/03/2014
Baker
3/31/2014 29 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
The DRC reviewed this application with the following comments:
Engineering Review Priorto issuance of Building Permit:
1. As per Community Development Code Section 3- 19078, Sidewalks /Bicycle
paths and City Construction Standard Index No. 109 for Sidewalks, Applicant
shall bring all sub - standard sidewalks and sidewalk ramps adjacent to or a
part of the project up to standard, including A.D.A. standards.
2. If the proposed project necessitates infrastructure modifications to satisfy
site - specific water capacity and pressure requirements and /or wastewater
capacity requirements, the modifications shall be completed by the applicant
and at their expense. If underground water mains and hydrants are to be
installed, the installation shall be completed and in service prior to
construction in accordance with Fire Department requirements.
3. As per Clearwater Code of Ordinances, Article IX., Reclaimed Water
System, Section 32.376, Use of potable water for irrigation is prohibited, no
person shall use potable water for irrigation through a new or existing lawn
meter on property where reclaimed water distribution facilities are available. If
potable water is currently used for irrigation, then a connection to the
reclaimed water line in Bay Esplanade shall be established.
4. Potable and fire lines shall be separate taps on the water main.
General Notes:
1. Only Sheets 3 -5 were reviewed for General Engineering criteria. The
additional details provided in the plan set may have been necessary for other
departmental reviews to provide flexible development approval. Construction
plans shall be reviewed in more detail prior to receipt of the building permit.
2. Any work in the Bay Esplanade right of way will require a city right of way
use permit which is permitted through the Engineering Department. Right of
way permits can be found online at
http: // myclearwater. com/ gov/ depts/ pwa /engin /FormsApplications.asp.
3/31/2014 30 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Environmental Review Priorto issuance of Building Permit:
1. Provide erosion control measures on plans sheet and provide notes
detailing erosion control methods.
2. The previous building permit complied with sea turtle lighting rules; continue
to comply. No light shall be visible or extend in areas identified as Sea Turtle
Nesting Areas during the nesting season (May 1 to October 31). Those areas
where security and public safety require lighting, alternative light management
approaches shall be applied. Provide evidence of sea turtle- friendly lighting in
accordance with City code and state laws.
General Note(s):
1. DRC review is a prerequisite for Building Permit Review; additional
comments may be forthcoming upon submittal of a Building Permit
Application.
2. Offsite discharge of produced groundwater from dewatering shall comply
with dewatering guidelines from Florida Department of Environmental
Protection (FDEP), F.A.C. 62- 621(2).
3. Additional permits from State agencies, such as the Southwest Florida
Water Management District or Florida Department of Environmental
Protection, may be required. Approval does not relieve the applicant from the
requirements to obtain all other required permits and authorizations.
Fire Review 1) All dumpsters, and any associated screening which consists of combustible
fencing around the dumpster pad shall have a minimum separation from the
nearest building or building overhang of ten feet (10') ACKNOWLEDGE
PRIOR TO CDB
2) Note: This is a D.R.C.approval only. Other issues may develop and will be
addressed at building permit stage. ACKNOWLEDGE PRIOR TO CDB
Land Resource Review Land Resource Review:
1. DRC review is a prerequisite for Building Permit Review, prior to issuance
of a building permit any and all performance based erosion and sedimentation
control measures must be approved by Environmental and or Stormwater
Engineering, be installed properly, and inspected.
3/31/2014 31 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Planning Review Planning Review
General Site Plan and Application Comments
1. Please provide the estimated total value of the proposed project.
2. The submitted Parking Demand Study was completed four years ago and
information needs to be provided regarding the current status of available
parking spaces within the adjacent areas. The study identified that within the
project primary impact area delineated with a 1,000 foot radius of the subject
property that 388 spaces were available through public parking spaces.
3. Please provide the proposed materials and color scheme for the exterior of
the building.
4. Please describe how the dumpster enclosure will be consistent with the
proposed building.
5. Please provide information regarding access of the site in accordance with
the requirements of Americans with Disabilities Act and clarify if an elevator is
included as part of the project.
6. Sheet 3 of the plan set provides conflicting information regarding
the proposed raised building being built on concrete and /or wood timber
pilings, please clarify the proposed construction method.
General Applicability Criteria
7. Criterion Four: Please provide specific information regarding the applicability
of the previously submitted Parking Demand Study as it relates to
accommodating and /or reducing the potential traffic congestion associated
with the use.
8. Criterion Five: Please describe how the proposed design of the use is
consistent with the community character.
9. Criterion Six: Describe the unique design of the site, specific hours of
operation and how the new landscaping will minimize adverse effects of the
proposed development.
Planning Review Planning Review
Flexibility Criteria, Comprehensive Infill Redevelopment
10. Criterion One, The application provides that the development is impractical
without deviations from the parameters set forth in the zoning district.
11. Criterion Five, Please provide specifics regarding anticipated number of
jobs created by proposed development.
12. Criterion Six, While commentary regarding the proposed design of the
building has been provided specifics regarding architectural elements being
incorporated has not been addressed.
Flexibility Criteria: Comprehensive Landscaping Application
13. Criterion One, Proposed landscaping theme to be demonstrably more
attractive than basic landscaping required, please elaborate on this issue.
14. Criterion Two, Lighting, The proposed lighting will be approved turtle
friendly and will be automatically controlled to ensure that lighting is off when
business is closed.
15. Criterion Three, Community Character, Please provide specifics regarding
how the proposed landscaping will enhance the community character.
16. Criterion Four, Property Values, Please provide specifics regarding the way
in which the proposed landscaping will increase the property values.
17. Criterion Five, Beach by Design for the Old Florida District requires a ten
(10) foot landscape buffer be required along the street frontage and the
property complies with this requirement.
3/31/2014 32 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Solid Waste Review We need to look at the possibilty of increasing the storage area to
accomodate at least a 2 yard Dumpster.
Stormwater Review Prior to Building Permit
1. As per Section 3 of the City of Clearwater Storm Drainage Design Criteria,
reinforced concrete pipe shall be used in all easements and right of ways.
The minimum allowable size is 15 -inch diameter.
2. Please resubmit revised drainage calculations.
3. Please inspect the storm structure on Bay Esplanade to ensure that
proposed storm pipe fits into the existing structure.
Traffic Eng Review Prior to CDB:
1. Please provide a letter stating the maximum number of DQ employees at
one time working at the facility. Mode of travel such as will they all travel
using single occupancy vehicles (SOV) or other modes of transportation.
General Note(s):
1. DRC review is a prerequisite for Building Permit Review; additional
comments may be forthcoming upon submittal of a Building Permit
Application.
3/31/2014 33 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
5:00 PM
Case number: ANX2014 -03007 -- 2017 N Betty LN
Owner(s): Cox, Dawn Michelle
1278 Palm St
Clearwater, FL 33755 -1129
PHONE: (727) 657 -8938, Fax: No fax, Email: No email
Applicant: PHONE: No phone, Fax: No fax, Email: No email
Location:
0.234 acres generally located south of Union Street, east of Douglas Avenue, north
of Sunset Point Road, and west of Kings Highway.
Atlas Page:
251 B
Zoning District:
Request:
Proposed annexation of two parcels totaling 0.234 acres into the City of
Clearwater, at the request of the property owners;
a. Petition to annex at the request of the property owners;
b. Future Land Use Map amendment from Residential Urban (RU) Category
(Pinellas County) to Residential Urban (RU) Category (City of Clearwater); and
c. Zoning Atlas amendment from R -4 One, Two, and Three Family Residential
District (Pinellas County), to Low Medium Density Residential (LMDR) District (City
of Clearwater).
Proposed Use:
Detached Dwelling
Neighborhood
Clearwater Neighborhood Coalition
Association(s):
No Other Homeowners Assocations
Presenter: Andrew Hayslip, Planner II
3/31/2014 34
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Workflow:
Review Name
Task Status
Status Date
Last Name
Determination of
Completeness
Complete
03/11/2014
Matzke
Engineering Review
See condition.
Comments
03/17/2014
Shannon
Traffic Eng Review
No Comments
03/17/2014
Elbo
Environmental Review
No Comments
03/20/2014
Josuns
Parks and Rec Review
No issues - annexation of sfr.
No Comments
03/20/2014
Reid
Fire Review
No Comments
03/24/2014
Keller
Stormwater Review
No Comments
03/25/2014
Johnson
Land Resource Review
No Comments
03/26/2014
Anderson
Solid Waste Review
No Comments
03/31/2014
Pryor
The DRC reviewed this application with the following comments:
Engineering Review 1. Annexation into the City of Clearwater will generate monthly stormwater
utility fees.
3/31/2014 35 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
5:00 PM
Case number: FLS2014 -03004 -- 345 CORONADO DR
Owner(s):
Mainstream Partners Viii Ltd
10165 N W 19th St
Miami, FL 33172 -2529
PHONE: No phone, Fax: No fax, Email: No email
Applicant:
Mainstream Partners Viii
10165 N W 19th St
Miami, FL 33172 -2529
PHONE: No phone, Fax: No fax, Email: No email
Representative:
Michael Palmer
Synergy Civil Engineering, Incorporated
3000 Gulf To Bay Boulevard
Suite 201
Clearwater, FL
PHONE: (727) 796 -1926, Fax: No fax, Email: Mpalmer @synergycivileng.Com
Location:
0.96 acres located on the northeast corner of Cornado Drive and Fifth Street.
Atlas Page:
276A
Zoning District:
Tourist
Request:
Flexible Standard Development approval to allow a parking lot in the Tourist (T)
District with a front (south) setback of 15 feet (to pavement), front (east) setback of
15 feet (to pavement), front (west) setback of 24.89 feet (to pavement), side (north)
setback of 10 feet (to pavement), an increase in the number of off - street parking
spaces in a row from 10 to 16, and 85 off - street parking spaces pursuant to
Community Development Code Section 2- 802.N., as well as a reduction to the
width of an interior landscape island from eight to five feet, a decrease in the area
required for interior landscape islands from 150 to 94 square feet and increase the
number of parking spaces in a row from 10 to 16, as a Comprehensive Landscape
Program pursuant to Section 3- 1402.G.
Proposed Use:
Vacant
Neighborhood
Clearwater Beach Association
Association(s):
Clearwater Neighborhood Coalition
Presenter:
Matthew Jackson, Planner III
3/31/2014 36
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Workflow:
Review Name
Task Status
Status Date
Last Name
Determination of
Completeness
Complete
03/11/2014
Jackson
Traffic Eng Review
Comments
03/17/2014
Elbo
Stormwater Review
Comments
03/18/2014
Spearman
Parks and Rec Review
No Comments
03/20/2014
Reid
Environmental Review
Comments
03/21/2014
Josuns
Land Resource Review
Comments
03/24/2014
Crandall
Fire Review
No Comments
03/24/2014
Keller
Planning Review
Comments
03/25/2014
Jackson
Engineering Review
Comments
03/26/2014
Shannon
Solid Waste Review
No Comments
03/26/2014
Pryor
3/31/2014 37 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Summary of Comments on
FLS2014- 03004_Comments172484.pdf
Page: 1
— Author: RROWE Subject: Text Box Date: 3/27/2014 3:38:14 PM
1F L.S20114 -0 004
45 ComIrnanndo Il lr'.
"v'1laallm AIrc aslnn IIPalrUIrnelr„! VII II, II_. IFIID IFlalr "c 11 113
Author: RROWE Subject: No Comments Date: 3/27/2014 3:40:56 PM
Solid Waste - No comments per Mark Beery for Mike Pryor. Mark can be reached at 727 - 5624930 xt 7112.
Author: RROWE Subject: No Comments Date: 3/27/2014 3:40:16 PM
Per Debbie Reid, no issues - new parking lot.
am
Author: SJOSUNS Subject: Conditions Date: 3/21/2014 10:18:38 AM
ENV - General Notes:
1. DRC review is a prerequisite for Building Permit Review; additional comments may be forthcoming upon submittal of a Building Permit Application.
2. Additional permits from State agencies, such as the Southwest Florida Water Management District or Florida Department of Environmental Protection,
maybe be required. Approval does not relieve the applicant from the requirements to obtain all other required permits and authorizations.
am
Author: SJOSUNS Subject: Conditions Date: 3/21/2014 10:18:38 AM
ENV - Prior to issuance of building permit: Continue to provide erosion control measures on plan sheet and provide notes detailing erosion control methods.
Author: ECRANDALL Subject: Conditions Date: 3/24/2014 10:34:23 AM
DRC review is a prerequisite for Building Permit Review, prior to issuance of a building permit any and all
performance based erosion and sedimentation control measures must be approved by Environmental and or
Stormwater Engineering, be installed properly, and inspected.
Author: BELBO Subject: Conditions Date: 3/17/2014 3:45:37 PM
General Note(s):
1. The proposed project will not incur any Transportation Impact Fee at this time.
2. DRC review is a prerequisite for Building Permit Review; additional comments may be forthcoming upon submittal of a Building Permit Application.
Author: MJACKSON Subject: Conditions Date: 3/25/2014 8:25:10 AM
Prior to Development Order. Pursuant to CDC3- 1202.E.1, only 15 off - street parking spaces are allowed in one row. As such, remove one parking space and
increase the width and area of the interior landscape island.
Author: JSHAN NON Subject: ENG -Condition Date: 3/21/2014 12:29:24 PM
Prior to Building Permit:
1. As per Community Development Code Section 3- 1907B, Sidewalks /Bicycle paths and City Construction Standard Index No. 109 for Sidewalks,
Applicant shall bring all sub - standard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including A.D.A.
standards (raised detectable tactile surfaces or truncated domes per most recent FDOT Indexes #304 and 310).
2. AS per Clearwater Cade of Ordinances, Article IX., Reclaimed Water Sysate rn, Section 32.376, Use of (eatable water for irrigation is
prohibited, no person shall use (eatable water for irrigation through a new or existing lawn meter on property where reclaimed water
distribution facilities are available. If (potable water is Currently used for irrigation, then a Connection to the reclaimed water line in
Coronado Drive shall be established.
Author: JSHAN NON Subject: ENG -Condition Date: 3/21/2014 12:29:24 PM
General Notes:
1. Only Sheet C -04 was reviewed for General Engineering criteria. The additional details provided in the plan set may have been necessary for
other departmental reviews to provide flexible development approval. Construction plans shall be reviewed in more detail prior to receipt of the
building permit.
2. Any work in the Coronado Drive right of way will require a city right of way use permit which is permitted through the Engineering
Department. Right of way permits can be found online at http: / /myclearwater.com /gov/ depts/ pwa /engin /FormsApplications.asp
3. DRC review is a prerequisite for Building Permit Review. Additional comments may be forthcoming upon submittal of a Building Permit
Application.
am
Author: TSPEARMAN Subject: Conditions Date: 3/25/2014 3:21:16 PM
Prior to Building Permit
1. The stormwater structure shall be designed to have a minimum of 6" vertical clearance between seasonal high water table and the chamber
bottom, the entire volume of the chamber shall draw down within 24 hours or less, and shall have at least 6" of freeboard for the 25 -year storm
event.
2. Any work done in City R -O -W shall not cause ponding after construction.
am
Author: ECRANDALL Subject: Conditions Date: 3/24/2014 10:31:21 AM
The tree proposed to be retained at the northeast is a norfolk island pine, which is not a desired species and should be removed. This will not contribute to the
deficit. The sabal palm in this area, however, should be retained. Revise prior to building permit.
Author: ECRANDALL Subject: Conditions Date: 3/24/2014 10:34:23 AM
Provide the tree inventory grading the trees and palms on site, or my apologies if it has been submitted, please clarify where in the documents it is.
Mayjust revise the Trees to be Removed table to include a rating, prior to building permit.
am
Author: MJACKSON Subject: Conditions Date: 3/25/2014 8:25:10 AM
Prior to Development Order. All sight visibility triangles need to be shown at the property line pursuant to CDC Section 3 -904.
Author: ECRANDALL Subject: Conditions Date: 3/24/2014 10:34:23 AM
Specimen palms are equal to a shade tree and would have a deficit of 2.5 inches if removed. Please revise table. Also accent trees have a deficit of 2 inches if
removed (unless the accent being referenced here is the norfolk island pine, then no deficit for it). Revise prior to building permit.
5:00 PM
Case number: FLS2014 -03005 -- 405 CORONADO DR
Owner(s): Mainstream Partners Viii Ltd
10165 N W 19th St
Miami, FL 33172 -2529
PHONE: No phone, Fax: No fax, Email: No email
Applicant: PHONE: No phone, Fax: No fax, Email: No email
Representative: Michael Palmer
Presenter: Matthew Jackson, Planner III
3/31/2014 38
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Synergy Civil Engineering, Incorporated
3000 Gulf To Bay Boulevard
Suite 201
Clearwater, FL 33759
PHONE: (727) 796 -1926, Fax: No fax, Email: Mpalmer @synergycivileng.Com
Location:
1.32 acres located at the southeast corner of Coronado Drive and Fifth Street.
Atlas Page:
276A
Zoning District:
Tourist
Request:
Flexible Standard Development approval to allow a parking lot in the Tourist (T)
District with a front (north) setback of 15 feet (to pavement), front (east) setback of
15 feet (to pavement), front (west) setback of 15 feet (to pavement), side (south)
setback of 10 feet (to pavement), an increase in the number of off - street parking
spaces in a row from 10 to 13, and 41 off - street parking spaces pursuant to
Community Development Code Section 2- 802.N., as well as a reduction to the
width of an interior landscape island from eight to 4.35 feet, a decrease in the area
required for interior landscape islands from 150 to 76 square feet and increase the
number of parking spaces in a row from 10 to 13, as a Comprehensive Landscape
Program pursuant to Section 3- 1402.G.
Proposed Use:
Parking Garages and Lots
Neighborhood
Clearwater Beach Association
Association(s):
Clearwater Neighborhood Coalition
Presenter: Matthew Jackson, Planner III
3/31/2014 38
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
DRC ActionAgenda
Workflow:
Review Name
Task Status
Status Date
Last Name
Determination of
Completeness
Complete
03/11/2014
Jackson
Fire Review
No Comments
03/13/2014
Keller
Traffic Eng Review
Comments
03/14/2014
Elbo
Parks and Rec Review
No Comments
03/20/2014
Reid
Environmental Review
Comments
03/21/2014
Josuns
Land Resource Review
Comments
03/24/2014
Crandall
Stormwater Review
Comments
03/24/2014
Spearman
Planning Review
Comments
03/26/2014
Jackson
Engineering Review
Comments
03/26/2014
Shannon
Solid Waste Review
No Comments
03/26/2014
Pryor
3/31/2014 39 DRC ActionAgenda
"EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER"
Summary of Comments on FLS2014-03005_Pre-
DRC_Comments172533.pdf
Page: 1
Author: RROWE Subject: No Comments Date: 3/28/2014 12:02:07 PM
Solid Waste - No comments per Mark Beery for Mike Pryor. Mark can be reached at 727 - 5624930 xt 7112.
Author: RROWE Subject: No Comments Date: 3/28/2014 12:01:00 PM
No issues, proposed parking lot, per Debbie Reid.
am
Author: SJOSUNS Subject: Conditions Date: 3/21/2014 10:31:40 AM
ENV - General Notes:
1. DRC is a prerequisite for Building Permit Review; additional comments may be forthcoming upon submittal of a Building Permit Application.
2. Additional permits from State agencies, such as the Southwest Florida Water Management District or Florida Department of Environmental Protection, may
be required. Approval does not relieve the applicant from the requirement to obtain all other required permits and authorizations.
am
Author: SJOSUNS Subject: Conditions Date: 3/21/2014 10:31:40 AM
ENV - Prior to issuance of building permit: Continue to provide erosion control measures on plan sheet and provide notes detailing erosion control methods.
Author: ECRANDALL Subject: Conditions Date: 3/24/2014 10:58:01 AM
DRC review is a prerequisite for Building Permit Review, prior to issuance of a building permit any and all
performance based erosion and sedimentation control measures must be approved by Environmental and or
Stormwater Engineering, be installed properly, and inspected.
Author: MJACKSON Subject: Conditions Date: 3/25/2014 8:45:04 AM
Prior to Development Order. As there is not a required number of off - street parking spaces for the development, remove one parking space so the interior
landscape island width and area is Code compliant.
Author: MJACKSON Subject: Conditions Date: 3/25/2014 8:45:16 AM
Prior to Development Order. Shift the parking spaces north to allow for a Code compliant interior landscape island width and area.
Author: MJACKSON Subject: Conditions Date: 3/25/2014 8:45:26 AM
Prior to Development Order. Shift the parking spaces south to allow for a Code compliant interior landscape island width and area.
Author: BELBO Subject: Conditions Date: 3/17/2014 3:51:00 PM
General Note(s):
1. The proposed project will not incur any Transportation Impact Fee at this time.
2. DRC review is a prerequisite for Building Permit Review; additional comments may be forthcoming upon submittal of a Building Permit Application.
Author: JSHAN NON Subject: ENG -Condition Date: 3/21/2014 1:35:20 PM
General Notes:
1. Only Sheets C -04 to C -05 were reviewed for General Engineering criteria. The additional details provided in the plan set may have been
necessary for other departmental reviews to provide flexible development approval. Construction plans shall be reviewed in more detail prior to
receipt of the building permit.
2. Any work in the Coronado Drive right of way will require a city right of way use permit which is permitted through the Engineering
Department. Right of way permits can be found online at http: // myclearwater. com /gov/ depts/ pwa /engin /FormsApplications.asp
3. DRC review is a prerequisite for Building Permit Review. Additional comments may be forthcoming upon submittal of a Building Permit
Application.
Author: JSHAN NON Subject: ENG -Condition Date: 3/21/2014 1:35:20 PM
Prior to Building Permit:
1. As per Community Development Code Section 3- 1907B, Sidewalks /Bicycle paths and City Construction Standard Index No. 109 for Sidewalks, Applicant shall
bring all sub - standard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including A.D.A. standards (raised detectable tactile
surfaces or truncated domes per most recent FDOT Indexes #304 and 310).
2. If the proposed project necessitates infrastructure modifications to satisfy site - specific water capacity and pressure requirements and /or wastewater capacity
requirements, the modifications shall be completed by the applicant and at their expense. If underground water mains and hydrants are to be installed, the
installation shall be completed and in service prior to construction in accordance with Fire Department requirements.
3. As per Clearwater Code of Ordinances, Article IX., Reclaimed Water System, Section 32.376, Use of potable water for irrigation is prohibited, no person shall
use potable water for irrigation through a new or existing lawn meter on property where reclaimed water distribution facilities are available. If potable water is
currently used for irrigation, then a connection to the reclaimed water line in Coronado Drive shall be established.
4. Please remove reference to City of Tampa on Sheet C -03.
am
Author: TSPEARMAN Subject: Conditions Date: 3/25/2014 3:04:25 PM
Prior to Building Permit
1. The stormwater structure shall be designed to have a minimum of 6" vertical clearance between seasonal high water table and the chamber
bottom, the entire volume of the chamber shall draw down within 24 hours or less, and shall have at least 6" of freeboard for the 25 -year storm
event.
2. A high volume of runoff seems to flow onto Hamden Dr. Please design trench drain at entrance and direct to pond for treatment and
attenuation.
3. Finished work at the existing driveway and any areas within the City's r -o -w shall not result in ponding issues. Temporary flooding of the
restored area within the r -o -w may be needed for thorough inspection.
am
Author: ECRANDALL Subject: Conditions Date: 3/24/2014 10:58:01 AM
The two palms just at the north of the proposed stormwater pond have already been removed. Submit an after - the -fact tree removal permit.
Author: ECRANDALL Subject: Conditions Date: 3/25/2014 10:16:10 AM
Provide a tree inventory or clarify how and where it has been submitted, or revise the tree to be removed table to include a rating. Please see attached Tree
Inventory Grading Sheet. Revise prior to BCP.
am
Author: MJACKSON Subject: Conditions Date: 3/25/2014 8:37:36 AM
Prior to Development Order. Show all sight visibility triangles at the property line pursuant to CDC Section 3 -904.