201403030758012793000 Gulf to Bay Boulevard, Suite 201
-� Clearwater, FL 33759
(727) 796 -1926
www.synergycivileng.com
Certificate of Authorization No. 27692
SYNERGY
Civil Engineering, Inc.
Pit
Prepared For:
Parking Lot
Approving Agencies:
Southwest Florida Water
Management District
-h >n �,r; 4
Revised:
ii � �
jj� 11 W I' I
FRIN PJAII, kl-i L, -
PREPARED FOR:
Mainstream Partners Vill LTD
101065 NW 191h Street
Miami, FL 33172-2529
SUBMITTED BY:
Synergy Civil Engineering, Inc.
3000 Gulf to Bay Boulevard, Suite 201
Clearwater, FL 33759
,\\\\\\\0\\\jI III I IIIIIII
NO� E L
MichaQ P,,lialrn4TViFp (Lip'. Ab13743)
0
el
Al. N ENGN
I I if I I I I
3000 Gulf to Bay Boulevard, Suite 201
SYNERGY Clearwater, Florida 33759
Civil Engineering, Inc
STORM WATER MANAGEMENT REPORT- PARCEL B: CLEARWATER, Fl.
4. NARRATIVE
A. Introduction
B. Historic & Existing Conditions
C. Proposed Conditions
D. Conclusion
11. EXHIBITS
A. Location Map
B. GIS Aerial Map — Historic Conditions
C. USGS Map
Ill. DRAINAGE CALCULATIONS
• Run off Coefficient Calculations
• Attenuation & Weir Calculation per City of Clearwater
• Stage/Storage and Treatment Calculation
• PONDS software draw down calculations
3000 Gulf to Bay Boulevard, Suite 201
SYNERGY Clearwater, Florida 33759 Pa g e3d 10'-�
Civil Engineering, Inc
STORM WATER MANAGEMENT REPORT- PARCEL B: CLEARWATER, FL
i f r; �
MAINSTREAM PARTNERS VIII LTD is proposing to construct a temporary parking lot located at
the northeast corner of Coronado Drive and 5th Street (vacant no address, Parcel ID SEE PLAN
COVER SHEET) which will include a storm water management system for treatment,
attenuation (dry pond), and landscaping on a 0.96 acre + /- parcel of land.
MAINSTREAM PARTNERS VIII LTD will be the Operation and Maintenance Entity and it will be
shown that the treatment and attenuation requirements will satisfy the criteria for both the
SWFWMD and the City of Clearwater.
B. HISTORIC & EXISTING CONDITIONS
The 0.93 acre site located at the northwest corner of Coronado Drive and 5th Street is currently
vacant.
There is no existing storm water management system in place for storm water treatment or
attenuation. Storm water runoff from the site is directed towards the property boundaries and
flows off site into the City of Clearwater's street right of way and storm water system. The site
does not contain existing wetlands or surface waters.
The site was previously (2009) occupied by (5) five buildings and was essentially 100 percent
impervious. The current owner demolished the (5) five existing buildings and is in the process of
permitting the site for a new hotel building. It is anticipated that construction of the new hotel
building will begin in 2016.
lellr r 6, r
MAINSTREAM PARTNERS VIII LTD is proposing to construct a parking lot at the northeast corner
of Coronado Drive and 5th Street (vacant no address, Parcel ID SEE PLAN COVER SHEET) and will
include a storm water treatment and attenuation system (dry pond), landscaping, walkways
and associated utilities on a 0.93 acre + /- parcel of land.
3000 Gulf to Bay Boulevard, Suite 201
SYNERGY Clearwater, Florida 33759
Civil Engineering, Inc
STORM WATER MANAGEMENT REPORT- PARCEL B:CLEARWATER, FL
Dry Pond:
SWFWMD:
• Treatment Volume =Y2" over the entire site (Discharging intoCitySystenm).
• Full treatment volume recovery within 72 hours — PONDS V3.2 software.
Note: S\0FVVKAD Criteria was confirmed bm District Engineer, Reference Appendix B.
City of Clearwater:
• Treatment Volume = Y2." over the entire site (Discharging into City System).
• Full treatment volume recovery within 24 hours — Modeled in PONDS V3.2.
• Existing Impervious "C" Value =Y2 /0.95\ =O.47S.
• Attenuation — control peak flow rate to Pre-Development flow rate due to direct discharge to
City System.
• Meet 6" Freeboard Requirement.
The sLornlVvater management systems have been designed tm meet the treatment
requirements ofthe SWFVVKU[} for a minor system and the treatment and attenuation
requirements of the City of Clearwater.
K����UK������� 3000 Gu|f to Bay 8ou|evard, Suite 2O1
��KU'WK_K���K Clearwater, Florida 33759
Civil Engineering, Inc
STORM WATER MANAGEMENT REPORT- PARCEL B: CLEARWATER, FL
A. LOCATION MAP
B. GIS AERIAL MAP
C. USGS MAP
3000 Gulf to Bay Boulevard, Suite 201
SYNERGY Clearwater, Florida 33759
Civil Engineering, Inc
3000 Gulf to Bay Boulevard, Suite 201
s »«m E Fl G Y C|earxxeter, F|orida 33759 'V Tbf
Civil Engineering, Inc
STORM WATER MANAGEMENT REPORT- PARCEL B: CLEARWATER, Fl.
B. AERIAL MAP - RECENT
3000 Gulf to Bay Boulevard, Suite 201
SYNER"GY Clearwater, Florida 33759 pq e
Civil Engineering, Inc
STORM WATER MANAGEMENT REPORT- PARCEL B: CLEARWATER, Fl.
3000 Gulf to Bay Boulevard, Suite 201
SYNERGY Clearwater, Florida 33759
Civil Engineering, Inc
STORM WATER MANAGEMENT REPORT- PARCEL B: CLEARWATER, FL
I
Civil Engineering, Inc
3000 Gulf to Bay Boulevard, Suite 201
Clearwater, Florida 33759
Page 0 of 10
IvXgC� `e
Elevation
Area
Volume
Cumulative Volume
(Ft.)
(Sq.Ft.)
(Cu.Ft.)
(CuSt.)
3.25
808
0
0
4.00
1721
948
948
4.38
2183
742
1690
4.50
2384
274
1964
4.70
13362
1575
3539
REQUIRED TREATMENT VOLUME= 1689
SITE AREA 1/2" RAINFALL VOLUME
40,544
REQUIRED ATTENUATION VOLUME= 3253
Treatment Elevation
Attenuation Elevation
s`
Q
;,.
Omi
Ln
u
c
u
c
u
C;
u
Obi
r;s
z
p
z
p
c
y
u
m
z
u
00
is
`
W
W
u
g
u
n
Y
r
u
m
°o
m
°o
LL
O
W
O
u
c
ci
u
o
u
m
�f
s
a
a
'S
m
LU
o
ci
_.
N
u
to
-1
M,
C5
o
}
Ln
z
u
C
C
V
CA
C
~Q
Vim,
W
W
W
W
kya
_`vZ
uZ
�J
nv
ui
C
cc
a
r.:
G
p
Zc
m
zO)
p
py
uj
ui
uj
°°
u
cc
Lb
u
a
ra
STORM WATER MANAGEMENT CALCULATIONS
PREPARED FOR
PARKING LOT B
Required Volume 25 Year 60 min Storm
V= (Cpost -Cpre) x A x I x 3600 sec.
PHASE N0: II
Q =CIA
Q PRE= 1.61 CFS
Q POST= 2.48 CFS
PRE - DEVELOPMENT "C= 0.48
POST - DEVELOPMENT "C"= 0.74
AREA (ACRES)= 0.93
INTENSITY (IN /HR.)= 3.60
VOLUME= 3,153
F
Required Stc
Volume
Duration = 120 min.
Q = POST
Q = PRE
Enter L & H in inches
C= 3.13
L= 32 inches
H= 3.6 inches
Q= 1.37 CFS
WEIR FLOW CALCULATIONS
PRE-DEVELOPMENT PEAK FLOW = 1.61 CFS
Permeability Calculations using Simplified Kv and Kh Approximations 02-Mar-14
Project Number : 90= 030 -82 . Design By. MO.
Project Name Parcel B'Patking ]L'4
oi.
Brief Description Simplified P6 ilffitCal6ulati6hs:,:% e
From Soils Report: Saturated K, = 47.2 in/hr
Proposed Value : Saturated Kv = 23.6 in/hr
Average Unsaturated Kv — 2/3 Saturated K,
Unsaturated K, = 0.6667 23.6 in/hr
15.73 in/hr
Unsaturated Kv = 31.47 ft/day
Average Saturated Kh — 1.5 Saturated K,
Saturated KI, = 1.5 23.6 in/hr
35.4 in/hr
Saturated Kh = 70.8 ft/day
Average Unsaturated K, 31.5 ft / day
Average Saturated Kh 1 70.8 ft / day
Project Data
Project Name:
Simulation Description:
Project Number:
Engineer :
Supervising Engineer:
Date:
Aquifer Data
PONDS Version 3.3.0229
Retention Pond Recovery - Refined Method
Copyright 2008
Devo Seereerarn, Ph.D., P.E.
Parcel B - Parking Lot
Treatment Volume Recovery
90-030-82
Michael J. Palmer
Michael J. Palmer, P.E.
02-27-2014
Base Of Aquifer Elevation, [B] (ft datum):
Water Table Elevation, [W1] (ft datum):
Horizontal Saturated Hydraulic Conductivity, [Kh] (ft/day):
Fillable Porosity, [n] (%):
Vertical infiltration was not considered.
Geometry Data
Equivalent Pond Length, [L] (ft): 155.0
Equivalent Pond Width, [W] (ft): 20.0
Ground water mound is expected to intersect the pond bottom
Stage vs Area Data
Stage
Area
(ft datum)
M
3.25
808.0
4.00
1721.0
4.38
2183.0
4.50
2384.0
4.70
13362.0
5.00
13973.0
Discharge Structures
Discharge Structure #1 is inactive
Discharge Structure #2 is inactive
Discharge Structure #3 is inactive
1.20
2.50
70.00
20.00
Parcel B - Parking Lot 03-02-2014 18:06:01 Page 1
PONDS Version 3.3.0229
Retention Pond Recovery - Refined Method
Copyright 2008
Devo Seereeram, Ph.D., P.E.
Scenario Input Data
Scenario I :: 1689 ft3 slug load
Hydrograph Type:
Slug Load
Modflow Routing:
Routed with infiltration
Treatment Volume (W) 1689
Initial ground water
level (ft datum) default, 2.50
Time After
Time After
Storm Event
Storm Event
(days)
(days)
0.100
2.000
0.250
2.500
0.500
3.000
1.000
3.500
1.500
4.000
Parcel B - Parking Lot 03-02-2014 18:06:02 Page 2
PONDS Version 3.3.0229
Retention Pond Recovery -Refined Method
Copyright 2008
Devo Swereemmmm" Ph.D., P.E.
Surnrna!y of Results :: Scenafid I :: 1689 fP slug load
Time Stage Rate Volume
(hours) datum)� (ft3/S)�� (ft3)��
Stage
Minimum
06.000 2.76
Maximum
0.002 4.38
Inflow
24.000
Rete - Moxhnum - Puodkm
0.002
Rate - Maximum -Negative
None
Oumu|atixeVp|ume - MeximumPooitixu
0.002
Cumulative Volume - Maximum Negative
None
Cumulative Volume ' End ofSimulation
96.000
Infiltration
Roba - Moxhnum - Poobive
0D02
Rate - Maximum ' Negative
None
Cumu|oUvaVo|uma - MaxmumPoedkve
24.000
Cumulative Volume - Maximum Negative
None
Cumulative Volume - End ofSimulation
98.000
Combined Discharge
Rate - Maximum -Positive
None
Rote - Nlaximum'NegoUue
Nona
Cumu|obveVo|ume - MoximumPooitima
None
Cumulative Volume ' Maximum Negative
None
Cumulative Volume - End ofSimulation
96.000
Discharge Structure 1 -inactive
Rote - Maxhnum - Poadke
disabled
Raba Maximum
disabled
CumubUveVoiumo - MaxmumPooitiva
disabled
Cumu|oUxeVo|ume - YNeximumNaub
disabled
Cumulative Volume - End ufSimulation
disabled
Discharge Structure 2 -inocbxe
Rote - YNaoimum - Pooitixe
disabled
Reto - [Nnximum'Negobve
disabled
Cumulative Volume 'Maximum Positive
disabled
Cumu|advaVo|uma - NYmximum Negative
disabled
Cumulative Volume - End ofSimulation
disabled
Discharge Structure 3 -inocUxa
Rate - Maximum -Positive
disabled
Rate ' Maximum -Negative
disabled
Cumulative Volume - Maximum Positive
disabled
Cumulative Volume - Maximum Negative
disabled
Cumulative Volume - End ofSimulation
disabled
Pollution Abatement:
disabled
38 Hour Stage and Infiltration Volume
36.000 3.00
72 Hour Stage and Infiltration Volume
72.000 2.82
281.5000
None
1689.0
None
1689.0
0.6905
None
1689.0
None
1689.0
None
None
None
None
0.0
disabled
disabled
disabled
disabled
disabled
disabled
disabled
disabled
disabled
disabled
disabled
disabled
disabled
disabled
disabled
1689.0
1689.0
PomeB'PorkingLot 03-02-2014 18:06:02 Page