Loading...
FLD2003-09053 r' ... r'1 ,^,rn\lprSheet I , " Jl1!tJ't FLD2003-09053 2575 ENTERPRISE RD Date Received: 09/26/2003 ZONING DISTRICT: 0 LAND USE: 1</o&- . ATLAS PAGE: 221A ,. URS e --'''01.,;. e r;.[C~~VED NOV 0 6 2003 ~ November 6, 2003 Po, ~"~ .~,,.., nc~/I.-. I'''::I''T ",' .Il., \ ~ll" r -. .' c:= t::,:,", :^J ..:..l Mr. Mike Reynolds, AICP Senior Planner, City of Clearwater Development Services Department 100 South Myrtle Avenue, Suite 210 Clearwater, FL 33756 ORIGINAL Re: Tampa Bay Water Administrative Office Building Case: FLD2003-09053 - 2575 Enterprise Road Construction Plan Resubmittal Dear Mr. Reynolds, Per our DRC meeting on Thursday, October 30,2003, URS is resubmitting the revised construction plans for City of Clearwater approval. We are resubmitting on behalf of Tampa Bay Water. In accordance with our resubmittal, please find enclosed the following: · Set of the revised construction plans, signed and sealed · Flexible Development Application · Previously approved Site Plan · Revised Survey Plan as prepared by PBS&J, signed and sealed · Location Map . Revised reduced Site Plan · Certified arborist review letter · SWFWMD ERP original submittal cover letter · Reduced Landscape Plan . Building elevation graphics · Photograph of the existing on-site sign · Traffic Analysis · Stormwater Management Report (5 copies only) · Additional geotechnical information as prepared by Tierra, Inc. · Pond Calcs for "Dry Pond", signed and sealed Please find below our responses to your comments: Stormwater: a) Proposed stormwater pond must meet 24-hour recovery per City of Clearwater Drainage Criteria. Please provide drawdown calculations demonstrating that the water quality volume will be available in 24-hours. This must be addressed prior to CDB. As discussed with the City's Brian Barker, the proposed pond will function more efficiently as a "dry" pond. The proposed pond was previously submitted as a "wet" pond. URS recently requested additional geotechnical work to be completed by Tierra, Inc. to obtain a better understanding of the soil condition at the proposed pond bottom. URS Corporation 7650 West Courtney Campbell Causeway Tampa, FL 33607-1462 Tel: 813.286.1711 Fax: 813.287.8591 C:\PfClj\"'cl$'docs\Tnmpa Bay \\'alerICity Resub doc ,. URS e e As shown in the enclosed geotechnical report prepared by Tierra (dated November 3, 2003), the average permeability rate of the soil at the pond bottom is 27.4 feet/day. This would allow the pond to drawdown to the bottom elevation (EL = 70.0) from the control elevation in the weir walls (El = 71.60) in 19.6 hrs - meeting City requirements for a "dry" pond design. Please refer to the enclosed Pond Calculations for "Dry Pond." As discussed with Mr. Barker, in lieu of revising and resubmitting the Stormwater Management Report previously submitted for a "wet" pond, URS was requested to submit additional drawdown calculations for a proposed "dry" pond, which are enclosed. The weir inverts remained consistent from what was originally submitted, so the AdICPR modeling information would not change. The proposed conditions drainage basins also remain consistent, as well as the basin-node schematic and the configuration of the pond. The water quality treatment volume requirements are less for dry pond designs (first Yz inch of runoff for dry ponds and 1 inch of runoff for wet ponds). URS provided calculations showing that the proposed pond can even drawdown the WQTV required for a wet pond since we propose to keep the control elevations in the weir walls the same as previously submitted. b) Provide copy of approved SWFWMD permit prior to building permit. Comment noted. General En2ineerin2: a) Need to confirm location of existing 8-inch diameter water main under proposed building prior to CDB. Per City request in the 10/30/03 DRC meeting, the construction plans have been revised to show the existing 8" water main to be removed under the building and properly abandoned directly outside the building. Please refer to sheets C-04 and C-07 for clarification. Plannin2: a) Site data table: state the required number of parking spaces. The construction plans have been revised to include the required number of parking spaces within the Site Data table (Note #7). Please refer to sheet C-05 for clarification. b) All signage proposed will need to meet the City of Clearwater sign code. See Sections 3- 1801 through 3-1807. Comment noted. 2 C\projects\docs\Tampa Bay Water\City Resub.doc URS e e c) Any wall signage should consist of channel letters. Comment noted. d) Any proposed signage needs to be architecturally integrated to the design of the building and site. Comment noted. e) Provide a plan note on the site plan which provides explanative information about the irrigation/training area, including the number of anticipated training/touring events per year. Note included on Sheet C-05 that states "Irrigation training/education area to consist of irrigation/landscape test plots, passive observations by practitioners and anticipate two to three field classes per year." f) Provide color elevations for all sides of the proposed building. Color elevations will be provided under separate cover prior to the CDB Meeting. Solid Waste: a) Dumpster location needed, built to City spec and shown on all drawings and shown on detail sheet. Dumpster location needs to be angled (modify proposed location on site plan). Contact Tom Glenn, Solid Waste Program Coordinator, Telephone No. (727) 562-4930, ext. 7105 to confirm location. The construction plans have been revised to include the dumpster location as per City specifications. Please refer to sheet C-05 for plan view with labeling and sheet C-08 for clarification. The service drive was designed to allow a front-loaded dump truck to drive straight to the dumpster, empty the trash, reverse back, and drive out to the left. This service access was designed as a one-way drive to accommodate this truck movement. During our 10/30/03 DRC meeting, this issue was discussed and the current configuration of the proposed dumpster was approved by City staff. Land Resources: a) State why the pond is to be rehydrated. Comment omitted by City of Clearwater staff during 10/30/03 DRC meeting. 3 C.'projects\docs\Tampa Bay Water\City Resub.doc URS e e b) Tree survey is inaccurate, most of the pine trees were larger than stated, revise data prior to building permit. The on-site trees were resurveyed and input into the revised construction plans. Please refer to sheet C-03 for clarification. c) Show all trees and their canopies on all plans. All trees and their canopies are shown on all plans. d) The trees proposed to be preserved in the median island are average to below average trees and may not tolerate construction. Trees have been shown to be root pruned and protected with tree barricades. Please refer to sheet C-04 for clarification. e) Re-route storm line away from the existing trees on the east property line prior to D.O. The construction plans have been revised to show the proposed storm line along the eastern property line relocated away from the existing trees. Please refer to sheet C-06 for clarification. f) Parking lot should be concrete "on grade" with a WANE aeration system at all trees with canopies impacted by pavement. Submit prior to building permit. A 'WANE' or equivalent type of aeration system will be used at all trees with canopies impacted by pavement. As per City request, the construction plans have been revised to show concrete "at grade" or slightly above grade in the area where the pine trees are to be preserved at the northwest corner of the parking lot. Please refer to sheet C-06 for clarification. g) Re-route water line to avoid tree impacts prior to D.O. The construction plans have been revised to show the proposed water lines reconfigured away from the existing trees. Please refer to sheet C-07 for clarification. h) Revise irrigation plan to avoid tree impacts prior to building permit. Irrigation plan revised to avoid impacting existing trees. i) Revise Tree Preservation Plan to reflect modification prior to building permit. Plan has been revised to reflect modifications. clarification. Please refer to sheet C-04 for 4 C:\projects\docs\Tampa llay Water\City Resub_doc URS e e Environmental: a) In lieu of a 25-foot wetland buffer, removal of all exotic vegetation from the site will be required. Notes addressing removal of all exotic vegetation from the site have been provided on Sheet C-04. Landscapinl!: a) Show the actual canopies of all existing trees on, and including trees within 25' of adjoining properties. Actual canopies of all trees have been shown on the plans. Please refer to sheet L-Ol for clarification. b) Proposed trees should not impact the existing trees indicated on the plan. Proposed trees have been moved so that they will not impact any of the existing trees indicated on the plan. Please refer to sheet L-Ol for clarification. c) There is a weeping yaupon holly in the center of the circle drive located in the midst of the three-sabal palms. Is this intentional? It does not appear on the color renderings submitted. Adjust plans accordingly. Placement of the weeping yaupon is intentional. Color renderings will be adjusted accordingly. d) Plan does not meet the requirements of perimeter plantings in Code Section 3-l202.D. Plan has been revised to comply with requirements of perimeter plantings in Code Section 3-1202.D. Please refer to sheet L-Ol for clarification. e) Screen the overhead doors from view. Trees have been added to screen overhead doors from view. Please refer to sheet L-Ol for clarification. We appreciate your review of the revised Tampa Bay Water Administrative Office Building construction plans. Please call me at 813-675-6859 if you have any questions. sincel~ J~a S. Bradley Project Engineer, Development and Planning Services cc: Paula Dye, Tampa Bay Water 5 C:\projects\docs\Tampa Bay W:lter\Cily Resuh_doc , . . TAMPA BAY WATER ADMINISTRATION OFFICE BUILDING FLEXIBLE DEVELOPMENT APPLICATION Prepared for: TANlPA BAY~ ,^,ATER .....~.. vr 111'........ ....i_ Prepared by: URS Corporation Southern 7650 W. Courtney Campbell Causeway Tampa, Florida 33607-1462 ...... 1"-' C -. · 'Jr- D t i_ :~-, I. ~ ~ \ J;... '- I .... September 24,2003 NOV 0 6 2003 ...., ,\''\'~'''"'rrl"')'''''' '''':~'T r i."" . _,J.. I 'I! ( ,'i I C'F {)_=A~,.. ,l":j~ ~ ~ .' rwater -~ o~ e Q SUBMIT ORIGiNAl SIGNED AND NOTARIZED APPLICATION Q SUBMIT 12 COPIES OF THE ORIGINAl APPlICATION indu<flllg 1) collated, 2) stapled and 3) folded sets of site pIaos Q SUBMIT APPLICATION FEE $ CASE #: DATE RECENED: RECEIVED BY (staff initials): ATlAS PAGE II: ZONING DISTRICT: lAND USE ClASSIFICATION: SURROUNDING USES OF ADJACENT ,. PliOPERTIES: NORTH: . SOUTH:" ." j -\ WEST: . EAST: Planning Department 100 South Myrtle Aveooe Clearwater, Florida 33756 Te~hone:727~2~567 Fax: 727-562~865 - * NOTE: 13 TOTAl SETS OF INFORMATION REQUIRED (APPLICATIONS PlUS SITE PLAN SETS) FLEXIBLE DEVELOPMENT APPIJCATION (Revised 11/(5102) I' r' I" I ) , -PLEASE TYPE OR PRINT- A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Code Section 4-202.A). APPLICANT NAME: Tampa Bay Water, . Jerry'L. Maxwell, General Manager MAILING ADDRESS: 2535' Landmark Drive, Sf211 , Clearwater, Fl 3'3761 727-791-2317 727-791-2388 PHONE NUMBER: FAX NUMBER: , PROPERTY O~ER(S): ABR Plymouth Plaza, lTD. . , (Must indude AlL owners) . . AGENT NAME: Steye Luce, URS Corporation 7650 Courtney Campbell Causeway, W., Tampa, Fl' 33607 MAILING ADDRESS: PHONE NUMBER: 813-636-2418 FAX NUMBER: 813-636-2499 813-767-5763 steve_luc~urscorp.com CEll NUMBER: E-MAIL ADDRESS: . .--.. . . . ..:. B. PROPOSED DEVELOPMENT INFORMATION: (Code Section 4-202.A) STREET ADDRESS: Eastside of Enterprise Roan LEGAl DESCRIPTION: See.Pur<;hase & Sale Agreement - Exhibit A PARCEL NUMBER: 302816000003400110 '. PARCEL SIZE: 3.8 acres + (acres, ,uare feel) ft+ of office space 7 000 sq. PROPQSED USE(S) AND SIZE(S): ' (number of dwelling units, hotel rooms or square footage 0( nooresidenlialuse) , , .. DESCRIPTION OF REQUEST(S): Inc::rease.. maximum .hd~ht. to _ ~5 . feet (62 feet at peak of. roof. 48 [Include an requested code deviations; ~.g. reductiOO"in required number 0( parldniJ spaces, specific use, etc.) at eaves). Reduce side yard (adjacent to parking garage) to 1 0 feet. -. eet Page 1 of 6 - Flexible Development Application - City of Clearwater J e e DOES THIS APPLICATION INVOLVE THE TRANSFER OF DEVELOPMENT RIGHTS (T'3f), A PREVIOUSLY APPROVED PLANNED UNIT DEVELOPMENT, OR A PREVIOUSLY APPROVED (CERTIFIED) SITE PlAN? YES _ NO _ (if yes, attach a copy of the applicable documents) Previousl roved site hm. See attached C. PROOF OF OWNERSHIP: (Code Section 4-202.A.5) o SUBMIT A COpy OF THE TITLEJNSURANCE POLICY, DEED OR AFFIDAVIT ATTESTING TO THE OWNERSHIP OF THE PROPERTY D. WRmEN SUBMITTAL REQUIREMENTS: (Code Section 3-913.A) o Provide complete responses to the six (6) GENERAl APPlICABILITY CRITERIA - Explain how each criteria is achieved, In detaH: 1. The proposed development of the land wi. be In harmony with the scale, bulk. coverage, density and character of aajacent properties In which it islocaled. SEE ATTACHED 2. The proposed development wiI not hinder or discourage the appropriate development and use of aajaCeflt land and buildings or significantly impair the value thereof. SEE ATTACHED 3. The proposed development win not adversely affect the health or safety or persons residing or worldng in ~ neighborhood of the proposed use. SEE ATTACHED 4. The proposed development is designed 10 minimize traffic congestion. SEE ATTACHED 5. The proposed development is consistent with the community character of the immecflClte vicinity of the parcel proposed for development. SEE ATTACHED 6. The design of the proposed development minimizes adverse effects, incIuOlIl9 visual, acoustic and olfactory and hours of operation mpacts, on adjacent properties. SE.E ATTACHEI) " o Address the applicable fleXIbility aitelja for the specific land use as listed in each Zoning District to which the waiver is requested (use separate sheets as necessary) - Explain how aiteria is achieved, in detail: SEE ATTACHED Page 2 of 6 - Aexible Development Appficalion - City of Clearwater e e D. WRITTEN SUBMITTAL REQUIREMENTS: (Code Section 3-913.A) Provide complete responses to the six (6) General Applicability Criteria - Explain how each criteria is achieved, in detail: 1. The proposed development of the land will be in harmony with the scale, bulk coverage, density and character of adjacent properties in which it is located. The subject site is a vacant office lot in the Plymouth Plaza Office Park. A five story approximately 60,000 square foot building was previously approved on this site by the City of Clearwater. The proposed use is a 37,000 square foot, 3 story office building. The subject land use is consistent with the Future Land Use Plan, zoning and compatible with the adjacent, industrial, office, retail and open space land uses. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. The proposed office use is el1tirely consistent with the adjacent land uses. As stated above, the subject site is a vacant office lot within an office park. It has been envisioned for approximately 20+ years, land planning and engineering completed and infrastructure developed in anticipation of an office use being located on the subject site. 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. The proposed use is an office building for professional office/administrative activities. This land use will not adversely affect the health or safety or persons residing or working in the neighborhood. 4. The proposed development js, designed to minimize traffic congestion. Primary access is via Enterprise Road: The segment of Enterprise Road located adjacent to the proposed office use will operate at Level-of-Service A with project traffic. Access to the subject site is also possible via US 19 and Countryside Boulevard. Internal office park circulation roads allow for the minimization of project traffic impacts. 5. The proposed development is consistent with the community character of .the immediate vicinity of the parcel proposed for development. The community character in the area is comprised of office, big box retail, golf course and industrial land uses. The subject land use is compatible with the character of the surrounding community. e e 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts on adjacent properties. Office land uses are one of the least intrusive uses within a community. The subject project is less intense than the office use previously approved on the subject site. The proposed site design and architecture will enhance the quality of the existing community. Address the applicable flexibility criteria for the specific land use as listed in each Zoning District to which the waiver is requested (use separate sheets as necessary to explain how criteria is achieved, in detail: Office zoning district maximum height is 30 feet. The subject request is to increase this height to 55 feet (62 feet at the roof peak/48 feet at eaves). Rather than a typical flat roof an attractive pitched roof is proposed. The office building is proposed at three stories. The proposed 3 stories vs. 2 or 1 stories, allows for the ability to set aside more open space, in particular protection/preservation of a cluster of a few remnant cypress trees that are located on the western po~ipn of the Ipt, \ypich are distressed and most likely will not be claimed as jurisdictional by. the Southwest; Florida Water Management District. The site design, as proposed, will protect this area and the storm water management system developed for the site will allow for re-hydration of this distressed area. The increase in building height contributes to the opportunity to accomplish this environmentally sensitive site design approach. In addition, this site design will allow for Tampa Bay Water staff to create an educational/training area on-site for best irrigation practices. A public services that is intended to convey water conservation ideas and practices to the entire Tampa Bay community. The office zoning district side yard setback is 20 feet. The subject request is to reduce this setback to 10 feet. Justification for this setback reduction in part is to bring the office building and surface parking <;loser to the adjacent parking garage. The adjacent parking garage was designed and built to accommodate parking for the subject office site. The setback reduction is for the parking lot only, not the office building. The subject site is located within the Plymouth Plaza Office Park. This is a campus style office park. The proposed 37,000 square foot office buildi~g and parking lot are intended to integrate into this office park - establishing significant separations between office and parking uses within this office park is contrary to the intent of this office park design. In addition, it should be noted the subject site design incorporates a pedestrian/covered walkway connecting the proposed 37,000 ft. office building with the adjacent parking garage - consistent with the intent of the overall office park/campus design approach of bringing together and linking office buildings with parking garages. Landscaping will be provided within this side yard setback. . In addition, the covered walkway connecting the office building with the parking garage will include complimentary landscaping materials further linking the adjacent property together as a unified office park development. e E. SUPPLEMENTAL SUBMITTAL REQUIREMENTS: (Code Section 4-202.A) a a SIGNED AND SEAlED SURVEY Qnduding legal descr1>tion ofproperty}- One original and 12 copies; TREE SURVEY Qncluding existing trees on site and within 25' of the aOj3Cent site, by species, size (DBH 4" Of greater), and location, induding drip lines and indicating trees to be removed}; a LOCATION MAP OF THE PROPERTY; PARKING DEMAND STUDY in coojunction with a request \0 make deviations to the parking standards [Ie. RedJce nU'1lber of spaces). PriQr to the submittal of this apprJCation, the methodology of such study sh31 be approved by the Community Development CoortflllatOf and shall be in accordance with accepled traffIC engineering principles. The find'1I1QS. of the study wiD be used in delennlning whether Of not deviations \0 the parldng standards are approved; a a a a GRADING P~, as applicable; PRELIMINARY PLAT, as required (Note: Building permits Will not be Issued 0011 evidence o! recoofIng a final plat is provided); COPY OF RECORDED PlAT, as apPlicable; (not required).. F. SITE PLAN SUBMITTAL REQUIREMENTS: (Code Section 4-202.A) a SITE PlAN with the following information (not to ex~ AD dimensions; ~ North arrow; Engineering bar scale (minimum scale one inch equals 50 feet). and date prepared; location map; Index sheet referencing in<ividuaI sheets indJded in pact.age; Footprint and size of al EXISTING buiIOlOgS and sbucIures; Footprint and size of al PROPOSED buildings and sInJcttres; AI required setbacks; AI existing and proposed points of access; AI required sight triangles; Identification of environmentaly unique areas, such as watercourses, wetlands, tree masses. and specimen trees, Including descripIioi1 and location of ooderstocy, ground cover vegetation and wildli{e habitats, etc;. location of all pub/ic and private easements; location of all street ~y within and aOj3CeIlt to. the site; Location of existing public and private utilities, indOOlll9 fire hydrants, stonn and sanilafy sewer lines, manholes and ill stations, gas and water ires; AI parking spaces, driveways,loading areas and vehicular use areas; Depiction by sha<f1l1Q Of crosshatching of aft reqlired pat1dng 101 interior landscaped areas; location of an solid waste containers, recycling Of trash handrll1Q areas and outslde mechanical equipment and all required screening (per Section 3-201(D)(i} and Index #J01}; location of all landscape material; location of an onsiIe and olfsite storm-water management. faclities; location of all outdoor lighting fixtures; and location of an existing and proposed sidewalks. a SITE DATA TABlE for existing, reqlired, and proposed development. In writtenllabular form: land area in square feet and acres; Number of EXISTING dwelling units; Number of PROPOSED dwelling units; Gross floor- area devoted to each use; Parking spaces: total number, presented in tabular form with the number of required spaces; Total paved area, induding al paved partdng spaces and driveways, expressed in square feet and percentage or the paved vehicular area; Size and species or all landscape material; Orftcial records book and page 0lJl00ers or al existing utility easement; Blilding and structure heights; Impenneable surface ratio (I.S.R.); and Floor area ratio (FAR.) for all nonresidential uses. a REOucED SITE PlAN to scale (8 %X 11) and color rendering if possible; a FOR DEVELOPMENTS OVER ONE ACRE. provide the following addilional infonnalion on site plan: One-foot contours Of spot elevations on site; Off site elevations if required \0 evaluate the proposed stonnwater management for the parcel; All open space areas; location or all earth Of water retaining walls and earth berms; lot lines and building lines (dimensioned); Streets and drives (dimensioned); Building and structural setbacks (dimensioned); Structural overhangs; Tree Inventory; prepared by a "certified arborist", or aU trees 8" DBH or greater, rellecling size, canopy (drip lines) and coodition of such trees. Page 3 or 6 - Flexible Development Application - City or Clearwater e e G. STORMWATER PLAN SUBMITTAL REQUIREMENTS: (City of Clearwater Design Criteria Manual and 4-202.A.21) o STORMWATER PlAN including the following requirements: Existing topography extending 50 feet beyond all property lines; Proposed grading including finished floor elevations of an slruclures; AD adjacent streets and municipal storm systems; Propo~ stOl)1)Water delentionfretention area including lop of bank, toe of slow, and outlet control slru!:;lure; Stormwater calculations for attenuation and water quality; Signature of Florida registered Professional Engineer on aU plans and calculations o COPY OF PERMIT INQUIRY lETTER OR SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT (SWFWMD) PERMIT SUBMITTAL (SWFWMD approval Is required prior to Issuance of City Building Pennit), if app6cable o COpy OF STATE AND COUNTY STORMWATER SYSTEM TIE-IN PERMIT APPLICATIONS, if applicable "I..e'- -UND$CAPINCfPLAN-SUBMITTAL REQUIREMENTS: (Section 4-1102A) a lANDSCAPE PlAN: AI existing and proposed structures; Names of abutting streets; Drainage and retention areas including swales, side slopes and bottom e1eva6ons; Derlfleation and dimensions of an required perimeter landscape buffers; Sight visibility triangles; Delineation and dimeosloos of aa parking areas induding landscaping Islands and curbing; Proposed and required partdng spaces; Existing trees on-site and Immediately aajacent to the site, by species, size and locations, including dripine; location, size, description, specifications and quantities of aa existing and proposed landscape materials, inckJding botanical and common names; , I Typical planting details for trees, palms, shrubs and ground cover plants including lnstrucIions, soil mixes, backfiling, mUlching and protective measures; Interior landscaping areas hatched and/or shaded and labeled and interior landscape coverage, expressing in both square feet and percentage covered; , Conditions of a previous development approval (e..g.. con<frtions inposed by the Community Development Boaro~ Irrigation notes. o REDUCED lANDSCAPE PlAN to scale (8 14 X 11) (color rendering if possible); '. o IRRIGATION PlAN (required for level two and three approval); a COMPREHENSIVE lANDSCAPE PROGRAM app6calion, as app6cable. I. BUILDING ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A.23) Required in the event the application indudes a development where design standards are in Issue (e.g.. Tourist and Downtown DIstricts) or as part of a Comprehensive InliD Redevelopment Project or a Residenliallnlill Project. a BUilDING ELEVATION DRAWINGS - all sides of aU buildings including height dimensions, colors and materials; a REDUCED BUILDING ELEVATIONS - four sides of buikfll19 with colors and materials to scale (814 X 11) (black and while and color rendering, if possible) as required. J. SIGNAGE: (Division 19. SIGNS I Section 3-1806) a AD EXISTING freestanding and attached signs; Provide photographs and dimensions (area, height, etc.), Indicate whether.they will be . removed or to remain.. a All PROPOSED freestanding and attached signs; Provide details induding location, size, height, colors, materials and drawing a Comprehensive Sign Program application, as applicable (separate application and fee required). o Reduced signage proposal (8 14 X 11) (color), if submitting Comprehensive Sign Program appHcalion. Page 4 of 6 - Flexible Development Application - City of Clearwater e e K. TRAFFIC IMPACT STUDY: (Section 4-801.C) Q Indude as required if proposed development win degrade the acceptable level of service for any roadway as adopted in the Comprehensive Plan. Trip generation shall be based on the most recent edition of the Institute of Transportation Engineer's Trip General Manual. Refer to Section 4-801 C of the Community Development Code for exceptions to this requirement L. SIGNATURE: I, the uodersigned, acknowledge that an representations made in this apprlC3tion are true and accurate to the best of my knowledge and authorize City representatives to visit and photograph the property described in this apprlC3tion. 51 ATE OF FLORIDA, COUNTY OF PINElLAS Sworn to and subscribed before me this _ day of AD. 20_ to me and/or by , who is personany known has produced as identification. ,.'-'-' ,,~" Signature of property owner or representative Notary pubrlC, My commission expires: Page 5 of 6 - Flexible Development App6calion - City of Clearwater M. AFFIDAVIT TO AUTHORIZE AGENT: I ABR PL YMOUTH.PLAZA :'---L TD. - - (Names of an property owners) 1. That (I amlwe are) the owner(s) and record title hoIder(s) of the following described property (address or general location): East side of Enterprise Road, south of Main St, North of Countryside Boulevard. " 2. That Ihls property ~tutes the property for which a request for a: (desaibe request) 37,000 square foot office building. .... .- - - . ~.,;; . . -.. .-..- Steve Luce, URS Corporation I 3. That the undersigned (haslhave) appointed and (doesIdo) appoint as (hlsIlheIr) agent(s) to execute any petitions or other documents ne<:essaly to affect such petition; . 4. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 5. That site visits to the property are necessary by City representatives in order to process this application an4 the owner authorizes City representatives to visit and photograph the property described in this application; - 6. That (I/we), the undersigned auIhority, hereby certify that the foregoing is true and COITecl Property Owner Property Owner STATE OF FLORIDA, COUNTY OF PINELlAS Before me the undersigned, an officer duly commissioned by the laws of the Stale of Florida, on this day of , personally appeared who having been first duly sworn _ Deposes and says that he/she fully understands the contents of the affidavit that he/she signed. Notary Public My Commission Expires: ;:':'Mannmg uepa lion r-omJSooevetopment re s men( 8pptlCauon "-IAILQOC e e Page 6 of 6 - Flexible Development Application _ City of Clearwater .. . ., , 1" . CITY OF CLEARWATER loNG RANGE PLANNING DEVELOPMENT REvIEW PLANNING DEPARTMENT POST OFFICE Box 4748, CLFARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 December 19, 2003 Mr. Keith Greminger URS Corporation 7650 West Courtney Campbell Causeway Tampa, Florida 33607-1462 RE: Development Order - Case FLD2003-09053- 2575 Enterprise Road Dear Mr. Greminger: This letter constitutes a Development Order pursuant to Section 4-206D.6 of the Community Development Code. On December 16, 2003, the Community Development Board reviewed your Flexible Development application to permit an office building with an increase of building height from 30 feet to 55 feet and a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F. Based on the application and the staff recommendation, the Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria per Section 2-1004.F. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. Conditions of Approval: 1. That a SWFWMD permit needs to be provided prior to issuance of any building permits; 2. That all signage meet Code, consist of channel letters for any wall signs, and be architecturally integrated to the design of the building and site; 3. That prior to building permit, provide a revised tree survey, accurately indicating the size of the pine trees; 4. That the irrigation plan be revised to avoid tree impacts, prior to building permit; and 5. That the Tree Preservation Plan be revised to reflect modifications, prior to building permit. Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (by December 16, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do BRIAN J AUNGST, MAYOR-COMMISSIONER HoYT HAMILTON, VICE MAYOR-COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BILL]ONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" ........ ~ .~ ., .... /.. December 19, 2003 Greminger, Page 2 not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. The issuance of this Development. Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4-502.B by the applicant or by any person granted party status within 14 days of the date of this Development Order. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on January 2,2004. If you have any questions, please do not hesitate to call Michael H. Reynolds, AICP, Senior Planner, at 727-562-4836. You can access zoning information for parcels within the City through our website: www.myc1earwater.com. Sincerely, ~~ Cynthia H. Tarapani, AICP Planning Director cc: Paula Dye, AICP, Chief Environmental Planner, Tampa Bay Water S:\Planning Department\C D B\FLEX\lnactive or Finished Applications\Enterprise 2575 Tampa Bay Water (0) - ApprovecMnterprise 2575 Development Order December 19, 2003.doc e e PROJECT :SITE LOCATION MAP SEC. 30 TWNSHP. 28 RANGE 16 NTS - ~ . "'_., ,-r"",\ I. \_l,;L-i.. -- NOV 0 6 LUU] i'r \ '\.. r . I f ,- I . \ . { ~ ~s:.J'.,1 H'~J.II..(;I :s~] "O"'10i~1 >- ZUl w>- ~~ffi ~g~ owu >0 :gO N\fld 311S iiivM ~AV9 VdWV.l 01009 J..31QVlj9 .S VnHsor :3l'fQ Z~~~~~f:1~~ SIlO UJl'I1ltllOS tIOliRI()dJO' sun 0\:"'.1 DNIOllns 381:J:JO 3^11\fl:HSINII"JO\f S 11 0 1 S 1:'1 3 ~ ")lVJS UO!PI1JISuCJ 'Cj JON - SSCiIJDo/c! Ul UOld r1 l ' ....... *~ ~ ~ u '" a. < 0: " A. r ' '" ' \\0/1 >/ ( ) '1."'(' \.. \\.. ,- i- \ r~>~~ ,\ ~~s;!3 '-~\~~~~ '\\'~\\.. ,/ ~ ,,-~':(~/ , ~~S~.,... I ~~~~~; r"""O o ~ "" ~;o~ :.1.;0~.> ij t' H \ i\ ~ \\. :<. " ' ~ " '''\~\./) ,\,~........ C~ \~.\, ',,, '~~\ ,...., "\ \, '\ \~, \"\ \\ " " '\ \~, \Z 0 III 0 ...~...;:\ "- ~ S :n~;g ~3S '\ -- ~~-:r~tj~ zo~~~ \\ ~;~~~~~ ~~~~~ / ~~~fg~85 ~~~~~ ! ~u ~~~~~ 8~~~~ / /1 ~8~~~:~ /- ,: I 1/ I, J ~\~ ~~}) U/1 / ;' rl~,/ I, '/ ~ '{;~ ~ - ;//Q:-~ ..,;: ,;/ \Q'Z^-- ,,//~ ///' / '\ \ ,I I , I Q.tJ: ' I /1 \. 0 \ / /I~I :- I, ,\.~ ~ 1/ /A..0/ t 'I . ~ ? ~~, /I /1 o~:=?) o o E\ r\ r (-......... ,_ /"', ~S \0; \0; .0 1,0\ \':" r/...~--~/-.'- I I I i : I I \:. I I (~W\, if) I '- / \ II I <.:l 'rc;;,,,,.~=~-1~~;;?~" / =::-=~~';:~:_- ~.= ~ - ~:. ~ ==: __~~~~o'- ~ ~.~:co. -~~~";,~;>l~~ II ~'~=-..- .--~~;/ ~~t ; --- -~:::::::> --' ~ , / <I :j ;1 :1 'I " il ="....1 H ~5.; l'~ ~~ g;~ ~~. ~'~; ". 1~~ ;/ O. ~:~ ~~D. I \\ \~\ I i/ !i I ., II ~ I ~ I ( ), 11 l I , I.! 1,1 ; . I,! l" ; :::. =-~'=.:::::-::~ -:....--:_-_::7_~..;..-_-:-~ -?~ /~:::: :::: =: :: :::::;; ~\--- ~\. ,/ ~ 0 g --I ~ ~ " . O' ~~ ~L ,I i ., . i~ . ~, ; ~~g"~~~K ,. .' i ~ ~ " h. - .'. -" , ~~ ~ eMee~e~ " B~ ~. ~ i. "~ tli:lIi:lIllIllIi:lIi:lI:;.; . i~ !: ~ g! ~~: ~ ~~ I gE ! ~ ~~ ~I i i~;5~~~~ ~~ -" .g 0 ,: ~~ ~. ,~; Ul o' o. o' ~ ~ i~ 1~ , g~ ~: i~ ~. g~ ~ 0' .. :~~ :i ~: . a~ !..d .~ ~ ~ ~~ ~ ~. , >;: w , , , ,. ~ ~ a~ .. l' ~ ii ." ~ ~ ." ~~ al 0 !J. ~... ". Z " i . << A; .~ H 5'.; ~ " ny' ~< .^ !g^ . . ~ :;~ ~- ,~ rl'5a i~ 'I. ~ ~d 8 ,~ ~.":,":J ~~ , ~ s' ~" '0 ;. ! i~B~~ h ~ ,~. ." ~~ ~" ;~ ~~ . ~~ I l l i ! ~l . I .1 .1 III I~! I~I ~i i:~ ~~i !~i t~ L ~ ~LC> ::; c:r ~ <...J I- ,..., "'" .. , :z " I 1 ...J <( I- W o ...J ...J <l: l- (/) 0' w [J. [J. <l: U o z ~ ~ ...J ::{ I- W o z ~ (/) 0' w [J. [J. <l: U o Z <l: I e e -j' September 23, 2003 ~~~aw 3224 Price Avenue · Tampa Florida, 33611-3721 (813) 831-2334 · Fax: (813) 837-0364 URS Corporation Steven K. Luce. AICP 7650 W. Courtney Campbell Cswy. Tamp~ FL 33607-1462 (813) 636-2418 Fax (813) 636-2499 RE: Tampa Bay Water Clearwater Office Site Dear Mr. Luce. This letter is to infonn you that on 9/23/03 I. Tim Therrien, perfonned a tree inspection at the proposed site for the Tampa Bay Water Clearwater Office. This inspections was to detennine that the size, species, and general locations of the trees on this site were accmate according to the Topographic and Tree Survey that was prepared by Post, Buckley, Shuh & Jernigan (PBS&J), Inc., on 8/15/03, sheet 2 of2. My findings during this inspection is that the previous noted survey is accurate in the size, species, and locations of the trees on this site. If you have any questions concerning this inspection, please feel free to call my office. Sincerely, , ~~/~ Tim Therrien Owner/Speedy Tree Care l.S.A. Certified ArOOrist #FL-0792 - - ... II''' ;.~' -.. , _I J NOV 0 6 2003 r c'd l "I \ t-9EO-U::8-E 18 ~UJUIP I ~~T.~~ __ _~ J__ !" Iloard 01 Ulrectors KOberl :>tewart, ~rank rarker, KiCk tlaker, "amy Laslor, Ann Hildebrand, Pam Iorio Susan Latvala, Ted Schrader, Ronda Storms General Manager Jerry L ~ax~ General Counsel Donald D. Conn e " TAMPA BAY. WATER 2535 landmark Drive, Suite 211, Clearwater, FL 33761-3930 Phone: 727.796.2355/ Fax: 727.791.2388 / SunCom: 513.7010 www.tampabaywater.org Supplying Water Io The Region September 23, 2003 Ms. Michelle Hopkins, P .E. Southwest Florida Water Management District 7601 Highway 301 North Tampa, FL 33637-6759 Re: Tampa Bay Water Administrative Office Building Environmental Resource Permit Application - General Permit Pine lIas County, Florida Section 30, Township 28 S, Range 16 E Dear Ms. Hopkins: Attached is the Environmental Resource Permit (ERP) - General Permit Application forTampa BayWater'sAdiiiliiistrative OfficeBUililing:-URS-Corporation nas .~_compiled.the application.on.behalLof Tampa Bay. Water. In.accordance_with.ollr submittal, please find enclosed the following: . Four (4) sets of construction plans, signed and sealed; . Four (4) copies of the Environmental Resources Permit Application, including information requested in Section C; . Four (4) copies of the Stormwater Management Report for the Tampa Bay Water Office Development; . Two (2) copies of the existing Site Survey; . Two (2) copies of the SWFWMD aerial; . Two (2) copies of the REDI Aerial Map and Adas; . One (1) copy of the SWFWMD pre-application meeting notes; . One (1) copy of the City of Clearwater Storm Sewer Atlas for the project area; . One (1) copy of the Environmental Report; . One (1) copy of the Deed and Contract to Purchase; and . A check in the amount of $800.00 made payable to the Southwest Florida Water Management District In summary, the Tampa Bay Water Administrative Office development pr~jerct ar~a... ".- r " totals :t 3.80 acres and includes utilizing an isolated relict cypress are~ ,fC{r. ili~ >I __ NOV 0 6 L003 T "' , .- Ms. Michelle Hopkins, P.E. September 43, 2003 It Page 2 e treatment and attenuation servmg the proposed office buildings along with associated parking. We appreciate your review of this submitted information. If you have any questions or comments, please call me at 727-796-2355, or the project engineer, Mr. Josh Bradley, at 813-286-1711. Sincerely, t:~ ~~ Chief Environmental Planner xc (without enclosure): Joshua S. Bradle~, P.E., Project Engi!!eer, URS Comoration T:\Eng...Proj\ Vecellio\New Office Building\Letter to S\VF\VMD.doc e ......,....................... !Zoo NV1d 3dVOSCNV1 1I3.lYM z~ffi !I :3.1VO c; .AY& S2o.~ ~ 19t~-L09tt l:I'~.l san. OlD::> ~ .....-.,-..0 ElNI01lna 3::>1.:1;::10 ~~g ~~09lI.L ,(K'-.I YdWV.l ~WIl~wn 3^1.Lvw.SINI~aV 00 SNOISI^3~ :31Y.)S UO!pnJlCUO:) JOj lON - sSilJ60Jd UI UOld ~ . I +~. ~ U 00 C""") = = C"-l ~ ec a: " . . " i1 II ~"' 5' t~ ~ ~~ i ~~~ ~ ~I~~ t. ~ ~~~~ i' II II II II II II I, II II II II II 'I II )oIl II ill !! <:.0 o ::> c::> z ~ no eJ;!;~ ~i~ - ~g~ <l .; /' in , ,., ~ ' , u... 0 ,,""........ 8........ 0 I ,~ ~ I 0 0 < ~ ~ ~ /, , I ,!. !i:\\~I'/ I N ~ \V t<~ .., z ',', '\ ~p; \\\ :II!:: \ \,."", cr~ '\ 'I, ~ti \ \~'\ /' e'~ ~~ , ~~ ~ ( 1311! ~" , ,;j , g'f '-, <( e ~ e I o g; eJ '-'~~ Z eJ 2 ~ ~ ~ a::: !l1 ~ ~ ~ <l o ~ o <l .; .. <l .., .; <l <l ~ ; .; <l N 0 ; 0 . <l ~ ; <l <l c.! .; .; .; <l c.! 0 i ; ; 0 .. ~ a . ~ ~" ~~ z ~~ ~ I ~ 0 ~ f1 ~i~U z 2 w ~ i i ~ ~ ~ ~ ~ hr ~ '-' ; i ~ ~ " " ~UH ",0 w ~ 0 ~ ~ ~ z~ ---l ~ ~ ~ ~ ~, 3 1:l 1:l1:l1:l1:l1:l "on I .. -oo~o08t8J ':'. :ll , ~ ."000 ,/ e e NOV 0 6 2003 r'" URS e e l November 13, 2003 Mr. Mike Reynolds, AICP Senior Planner, City of Clearwater Development Services Department 100 South Myrtle Avenue, Suite 210 Clearwater, FL 33756 NOV 1 3 2003 Re: Tampa Bay Water Administrative Office Building Case: FLD2003-09053 - 2575 Enterprise Road Construction Plan Resubmittal- Additional Information Dear Mr. Reynolds, As discussed in our 11/1 0/03 telephone conversation, per the City's request please find enclosed fifteen (15) color copies of the elevations for the proposed building and fifteen (15) color copies of the reduced landscape plan. We appreciate your review of the revised Tampa Bay Water Administrative Office Building construction plans and this additional information. Please call me at 813-675- 6859 if you have any questions. Sincerely, Jtd)~ Joshua S. Bradley Project Engineer, Development and Planning Services CC: Paula Dye, Tampa Bay Water URS Corporation 7650 West Courtney Campbell Causeway Tampa, FL 33607-1462 Tel: 813.286.1711 Fax: 813.287.8591 \\c I nIO_'''ci\'il'\Projects\ TB _ Walcr\Docs\CITY\City Resub2.doc SNOlSIA3l;1 rO/90/ II N'fld 3d'o'osa iilvM ~AV9 VdWV.l ~~ ~~ffi (j)~~ ~~g :gO .....-- <:::> ~ :3J.'f'(] :31't'JS E:lNI01lnS 3:)1:l 3^I.l~.lSINIV'la'o' ,or-.I UO!pnJ1SUO:l JO..:l 10N - SUJI)OJ:::l Uj UOld +~. ~ u. '" u 5l ~ '" " tOOZ t l ADN I <( 0 I- ~ <( ~ ~ o 5 U1 !3 0 : ~ ~ ~ VI ~ll.i1 !;? ~ ~ !Z ~~o ;J ~~~ VI " - ~~~ ~ I ! ~~ O~8 ~~ ti ~~ <I(~ 0 ~ ~ ~~ ~ " " " " " " " ,,', ogll u .; ",,"" in ~f"'<i/: I O<~ [j~ 10 ...J ~ '" I o)~ ~"I',,-~/ I N ~ ,,, I( ", ..\ ',\ \~ z ,,\ Q" Sl"~~ ~f5 \\,..\ ~lt '\ ~h "S \ ~ \ , G)~ o'~~\','/ ',/ ....~ ;-- ~~ , h ( i:i~ , , '-, C) Z ~ Cl:: <( 0.... ,.....---- ..--.- ".'- - o .p..-;...--- 'jr:' I: 0 II I: I: ~ I: ~ ': o' ::dJ u .; ~ u .., .; u u ~ ~ .; U N .; Z " .; ~ u ~ ~ u ~ ~ u ~ u u .; .., .; ~ .; 0 u .; oi " .., .; " ~ ~ .; ~ VI ~ g l ~ ~ ~ i i ~ ~ "' ill .., .; ~ VI '" :r ~ i ~ 9 z ~ ~ ~ ~ 0 ~ ~ 0 z 8 ~ ~ B ~ w Ii' 8 ~ '" 3 ~ ~ 9 ~ ~~ '" c: ll. 0 " Iil Iil "0 ..,'" VI Z o l(' ~ " ~ o o ~ ~ ~ . ~ ~~ ~ (,)1'1 ..\ ~o o z w C) W .-J ~ ~ ~ ~ 2 8 OA. t:t.... w UJ V) ~ ~ S l:~~~~ ~ ~ ~ ~ ~ ~ ~ ~ ~~h~ ;( 0 ~ ! 8 ~ ~ ~o ~_ ~~~~~ ~ ~ g ~ ~ 3 ~ = 1:; UUE ~~~..~~~*HOOO .V) ~ ~~ ~ on " ~ URS e e November 25, 2003 Mr. Mike Reynolds, AICP Senior Planner, City of Clearwater Development Services Department 100 South Myrtle Avenue, Suite 210 Clearwater, FL 33756 Re: Tampa Bay Water Administrative Office Building Case: FLD2003-09053 - 2575 Enterprise Road Construction Plan Resubmittal- Additional Information Dear Mr. Reynolds, As discussed, per the City's request please find enclosed fifteen (15) color copies of the revised elevations for the proposed building. We appreciate your review of the revised Tampa Bay Water Administrative Office Building construction plans and this additional information. Please call me at 813-675- 6859 if you have any questions. Sincerely, Joshua S. Bradley Project Engineer, Development and Planning Services CC: Paula Dye, Tampa Bay Water URS Corporation 7650 West Courtney Campbell Causeway Tampa. FL 33607-1462 Tel: 813.286.1711 Fax: 813.287.8591 S:\Projects\TB_ \Valt'1 l>\.lc~{'rTY.(,ity ReSllb3.doc -- URS Corporation " 7650 West Courtney Campbell Causeway Tampa, Florida 33607 (813) 286-1711 Fax (813) 636-2499 Date September 25,2003 Clearwater, Florida Attn: Mr. Mike Reynolds FileNo. 12003801.00001 Project: Tampa Bay Water Subject: TO: City of Clearwater 100 South Myrtle We are sending you the following items: X attached VIa o Hand Carry USPS x Federal Express Overnight Plans Specifications Reports Prints Calculations Test Results Proposal Request Estimate Copy of Letter/Transmittal Agreement Item Copies Date Description 2 13 13 09-25-03 09-25-03 Color Co Co ies of Architectural Elevations i' ! , t- ,!' <._, ,. t '''Cii-YOF(:U~:~f~i:\i;:;~ . '.r.) THESE ARE TRANSMITTED as checked below; 7'"'7 S- 7"' J For your approval For your review & comments For your Information For your signature For your use For your quotation Approval/Comments as noted As requested Returned Executed Response Requested Please Return ASAP (Call For Pick Up) x Remarks: With questions call Joshua Bradley, PE (813) 675-6858 By: James A. Bradley CC: Title Intern URS e 7650 West Courtney Campbell Causeway Tampa, FL 33607-1462 Phone (813) 286-1711 - LETTER OF TRANSMITTAL Fax (813) 636-2499 Date: October 8, 2003 Addressed To: Subject: City of Clearwater Tampa Bay Water Building Plan Review Committee 100 S. Myrtle Avenue, Suite 210 Clearwater, FL 33756 Attention: Project Number: Mr. Mike Reynolds 12003801.00001 ~ Hand Delivery D Regular Mail Weare sendmg you the following items: D Attached D Separately Via ~ Plans D Specifications D Reports D Prints D Calculations/Data D_ D FedEx DupS ~ Courier D - D Test Results D Proposal Request D Estimate D Copy of Letter/Memo/Transmittal D Task Work Order No. _ D_ Item Copies Date Description 1 3 Tampa Bay Water Revised Plans 2 1 Architectural Renderings 3 4 5 D For your approval D For you review D For your comments D For your signature ~ For your use D For your quotation D_ D Approval/Comments as noted D As Requested D Returned D Executed D Response Requested D Please Return D_ Remarks: Enclosed are copies of the above-referenced documents for the Tampa Bav Water proiect. Ifvou have any Questions. please call (813) 636-2418. By: Steve Luce Title: Proiect Mana2er cc: file TAMPA BAY~ WATER Supplying Water To The Region Boord of Directors Robert Stewart, FIr. Porker, Rick Boker, Kathy Costar, Ann Hildebrand, Pam lorio, Susan l , Ted Schroder, Rondo Storms Generol Monoger Jerry L. Maxwell Generol Counsel Donald D. Conn e 2535 landmark Drive, Suite 211, Clearwater, Fl 33761-3930 Phone: 727.796.2355/ Fax: 727.791.2388 / SunCom: 513.7010 www.tampabaywater.org September 23, 2003 Mr. Mike Reynolds City of Clearwater Development Services Department 100 S. Myrtle Avenue, Suite 210 Clearwater, FL 33756 Re: Submittal of Flexible Development Application - Tampa Bay Water Administrative Office Building Dear Mr. Reynolds: Tampa Bay Water proposes to develop an office building on an approximately 3.8 acre vacant office site within the Plymouth Plaza Office Park. This office park is located north of Countryside Boulevard, west of US 19 and east of Enterprise Road. The lot upon which the new Tampa Bay Water office headquarters is to be developed fronts Enterprise Road. Enclosed is a Flexible Development Application requesting site plan approval of a 37,000 square foot office building on the site described above. The specific request under this application process is to: 1) gain a 10-foot reduction of a side yard setback; and 2) allow for an office building height of 55 feet (62 feet at the peak/48 feet at the eaves). It should be noted that a site plan was previously approved for an office building on this same parcel by the City of Clearwater (approval granted in 1993). This prior approval had an approved building height of 65 feet. As a public not-for-profit government agency, it is requested that the application fee associated with this submittal be waived. The Florida Statutes (F.S. 373.1963) establishes the enabling legislation for Tampa Bay Water as a governmental agency. An Interlocal Agreement has been adopted which fully establishes the specific mission and not-for-profit status of Tampa Bay Water. Per prior discussions with City of Clearwater staff, it was determined that this fee could be waived as Tampa Bay Water is a public agency. T:\Eng...Proj\ Vecellio\New Office Building\Letter to City of Clearwater.doc Mr. Mike Reynolds September 23, 2003 Page 2 - - Please call me at 727-796-2355, or Mr. Steve Luce of the URS Corporation at 813- 286-1711, if you have any questions regarding this submittal. s~ Vl~ Paula Dye, AICP f/ 7 ~ Chief Environmental Planner T: \En~Proj\ Vecellio \New Office Builcling\Lctter to City of Clearwater.doc 1 e e TABLE OF CONTENTS SHEET 1 FLEXIBLE DEVELOPMENT APPLICATION SHEET 2 PREVIOUSLY APPROVED SITE PLAN SHEET 3 SURVEY SHEET 4 LOCATION MAP SHEET 5 REDUCED SITE PLAN SHEET 6 CERTIFIED ARBORIST REVIEW LETTER SHEET 7 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT - ERP SUBMITTAL COVER LETTER SHEET 8 REDUCED LANDSCAPE PLAN SHEET 9 BUILDING ELEVATION GRAPHICS SHEET 10 PHOTOGRAPH OF EXISTING ON-SITE SIGN SHEET 11 TRAFFIC ANALYSIS (one copy) SHEET 12 STORMWATER ANALYSIS (one copy) e . SHEET 1 FLEXIBLE DEVELOPMENT APPLICATION TAMPA BAY WATER ADMINISTRATION OFFICE BUILDING FLEXIBLE DEVELOPMENT APPLICATION Prepared for: rnl ' ~ r~ r~ fl W ~ r-'l".\J ')", .......-...."--....--.. ,--~ ill" ' I ), ~; 1 UI SEP 2 4 2003 Ii iJ ,__ .-____.1 PLf\l'~NING& DEVElOFi\;f~;~! SvC~ CITY OF CLEAhWAI EH TANlPA BAY~ \NATER _~...v_- It.-............i.. Prepared by: URS Corporation Southern 7650 W. Courtney Campbell Causeway Tampa, Florida 33607-1462 September 24, 2003 e e TABLE OF CONTENTS SHEET 1 FLEXIBLE DEVELOPMENT APPLICATION SHEET 2 PREVIOUSLY APPROVED SITE PLAN SHEET 3 SURVEY SHEET 4 LOCATION MAP SHEET 5 REDUCED SITE PLAN SHEET 6 CERTIFIED ARBORIST REVIEW LETTER SHEET 7 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT- ERP SUBMITTAL COVER LETTER SHEET 8 REDUCED LANDSCAPE PLAN SHEET 9 BUILDING ELEVATION GRAPHICS SHEET 10 PHOTOGRAPH OF EXISTING ON-SITE SIGN SHEET 11 TRAFFIC ANALYSIS (one copy) SHEET 12 STORMWATER ANALYSIS (one copy) tit e SHEET 1 FLEXIBLE DEVELOPMENT APPLICATION ~ e e' CASE #: DATE RECEIVED: RECEIVED BY (staff initials): AllAS PAGE #: ZONING DISTRICT: lAND USE ClASSIFICATION: SURROUNDING USES OF ADJACENT ,. P@PERTIES: NORTH: . SOUTH: WEST: EAST: o SUBMIT ORIGiNAl SIGNED AND NOTARIZED APPlICATION o SUBMIT 12 COPIES OF THE ORIGINAl APPlICATION induding 1) collated, 2) stapled and 3) folded sets of site pIaos o SUBMIT APPlICATION FEE $ , . - * NOTE: 13 TOTAl SETS OF INFORMATION REQUIRED (APPLICATIONS PlUS SITE PLAN SETS) FLEXIBLE DEVELOPMENT APPLICATION (Revised II/OSJ02) -PLEASE lYPE OR PRINT- A. APPLICANT, PROPERTY OWNER AND AGENT IN FORMA TION: (Code Section 4-202.A) . APPlICANT NAME: Tampa Bay Water, JerryL. Maxwel.I, General Manager 2S3S' Landmark Drive, S1211, Clearwater, FL 3'3761 . . MAJUNG ADDRESS: 727-791-2317 727-791-2388 PHONE NUMBER: FAX NUMBER: , PROPERTY ~R(S): ABR Plymouth Plaza, LTD. . (Must include ALL owners) . . AGENT NAME: Steve Luce, URS Corporation 7650 Courtney Campbell Causeway, W., Tampa, FL' 33607 MAlUNG ADDRESS: PHONE NUMBER: 813-636-2418 FAX NUMBER: 813-636-2499 813-767-5763 steve luc~urscorp.com CEll NUMBER: E-MAIl ADDRESS: . . ~-.. - . . ...:.. B. PROPOSED DEVELOPMENT IN FORMA nON: (Code Section 4-202.A) STREET ADDRESS: Eastside of Enterprise Road lEGAl DESCRIPTION: See. Purchase & Sale Agreement - Exhibit A PARCEL NUMBER: 302816000003400110 . PARCel SIZE: 3.8 acres + .--" (acres. ~O'O(J) S . ft+ of office space PROPQSED USE(S) AND SIZE{S): ' q (runber of dwelling ooIts, hotel rooms or square footage 0( nonresidential use) .. - I ncrease, maximum hei~ht to 55 feet (62 feet Cit peak of. roof 48 ~. DESCRIPTION OF REQUEST(S): - . " . (include al requested code deviations; e.g. reduction in required number 0( par1dng spaces, specific use, etc.) at eaves). Reduce side yard (adjacent to parking garage) to 1 0 feet. -. eet Page 1 or 6 - Flexible Development Application - City of Clearwater , . e e . DOES THIS APPLICATION INVOlVE THE TRANSFER OF DEVELOPMENT RIGHTS (T9f), A PREVIOUSLY APPROVED PlANNED UNIT DEVELOPMENT, OR A PREVIOUSLY APPROVED (CERTIFIED) SITE PlAN? YES _ NO _ (if yes, attach a copy of the applicable documents) Previously a roved site Jan. See attached C. PROOF OF OWNERSHIP: (Code Section 4-202.A.5) o SUBMIT A copy OF THE TITlEJNSURANCE POlICy, DEED OR AFFIDAVIT ATTESTING TO THE OWNERSHIP OF THE PROPERTY D. WRITTEN SUBMITTAL REQUIREMENTS: (Code Section 3-913.A) o Provide complete responses to the six (6) GENERAl APPlICABIlITY CRITERIA - ExpJain how each aileria is achieved, In defat: 1. The proposed development of the land wi be in harmony with the scale, buIt, coverage, density and character of adjacent properties in which it islocaJed. SEE ATTACHED 2. The proposed development wiI not hinder or discot.rage the appropriate development and use of adjacenlland and buildings or significantly Impair the value thereof. SEE ATTACHED 3. The proposed development wiI not adversely affect the health or safety or persons residing or working In ute neighborhood of the proposed use. SEE ATTACHED 4. The proposed development is designed 10 minimize traffic congestion. SEE ATTACHED 5. The proposed development is consistent with the community character of the immediate vicinity of the parcet proposed for development. SEE ATTACHED 6. The design of the proposed development minimizes adverse effects, incJuding visual, acoustic and olfactory and hours of operation Impacts, on adjacent properties. SE:E ATTACHEI) .' o Address the applicable flexibility aiterja for the specilic land use as listed In each Zoning District to which the waiver is requested (use separate sheets as necessary) - Explain how aiteria is achieved, In detail: SEE ATTACHED Page 2 of 6 - Flexible Development Application - City of Clearwater e e D. WRITTEN SUBMITTAL REQUIREMENTS: (Code Section 3-913.A) Provide complete responses to the six (6) General Applicability Criteria - Explain how each criteria is achieved, in detail: 1. The proposed development of the land will be in harmony with the scale, bulk coverage, density and character of adjacent properties in which it is located. The subject site is a vacant office lot in the Plymouth Plaza Office Park. A five story- approximately 60,000 square foot building was previously approved on this site by the City of Clearwater. The proposed use is a 37,000 square foot, 3 story office building. The subject land use is consistent with the Future Land Use Plan, zoning and compatible with the adjacent, industrial, office, retail and open space land uses. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. The proposed office use is elltirely consistent with the adjacent land uses. As stated above, the subject site is a vacant office lot within an office park. It has been envisioned for approximately 20+ years, land planning and engineering completed and infrastructure developed in anticipation of an office use being located on the subject site. 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. The proposed use is an office building for professional office/administrative activities. This land use will not adversely affect the health or safety or persons residing or working in the neighborhood. 4. The proposed development j~, designed to minimize traffic congestion. Primary access is via Enterprise Road: The segment of Enterprise Road located adjacent to the proposed office use will operate at Level-of-Service A with project traffic. Access to the subject site is also possible via US 19 and Countryside Boulevard. Internal office park circulation roads allow for the minimization of project traffic impacts. 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. The community character in the area is comprised of office, big box retail, golf course and industrial land uses. The subject land use is compatible with the character of the surrounding community. e e 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts on adjacent properties. Office land uses are one of the least intrusive uses within a community. The subject project is less intense than the office use previously approved on the subject site. The proposed site design and architecture will enhance the quality of the existing community. Address the applicable flexibility criteria for the specific land use as listed in each Zoning District to which the waiver is requested (use separate sheets as necessary to explain how criteria is achieved, in detail: Office zoning district maximum height is 30 feet. The subject request is to increase this height to 55 feet (62 feet at the roofpeak/48 feet at eaves). Rather than a typical flat roof an attractive pitched roof is proposed. The office building is proposed at three stories. The proposed 3 stories vs. 2 or I stories, allows for the ability to set aside more open space, in particular protection/preservation of a cluster of a few remnant cypress trees that are located on the western pot1;ion of the lpt, which are distressed and most likely will not be claimed as jurisdictional by ,~p.e Southwest, Florida Water Management District. The site design, as proposed, will protect this area and the stormwater management system developed for the site will allow for re-hydration of this distressed area. The increase in building height contributes to the opportunity to accomplish this environmentally sensitive site design approach. In addition, this site design will allow for Tampa Bay Water staff to create an educational/training area on-site for best irrigation practices. A public services that is intended to convey water conservation ideas and practices to the entire Tampa Bay community. The office zoning district side yard setback is 20 feet. The subject request is to reduce this setback to 10 feet. Justification for this setback reduction in part is to bring the office building and surface parking closer to the adjacent parking garage. The adjacent parking garage was designed and built to accommodate parking for the subject office site. The setback reduction is for the parking lot only, not the office building. The subject site is located within the Plymouth Plaza Office Park. This is a campus style office park. The proposed 37,000 square foot office building and parking lot are intended to integrate into this office park - establishing significant separations between office and parking uses within this office park is contrary to the intent of this office park design. In addition, it should be noted the subject site design incorporates a pedestrian/covered walkway connecting the proposed 37,000 ft. office building with the adjacent parking garage - consistent with the intent of the overall office park/campus design approach of bringing together and linking office buildings with parking garages. Landscaping will be provided within this side yard setback. In addition, the covered walkway connecting the office building with the parking garage will include complimentary landscaping materials further linking the adjacent property together as a unified office park development. e E. SUPPLEMENTAL SUBMITTAL REQUIREMENTS: (Code Section 4-202.A) if if SIGNED AND SEALED SURVEY Qnduding legal description of property} - One original and 12 copies; TREE SURVEY Qncluding existing trees on site and within 25' of the aOj3CeIlt site, by species, size (DBH 4' or greater), and location, induding drip lines and ildicaling trees to be removed}; ~ LOCATION MAP OF THE PROPERTY; PARKING DEMAND STUDY in conjunction with a request to make deviaIions to the parking standards [Ie. Reduce nll'llber of spaces}. PriQr to the submittal of this application, the methodology of such study sh3I be approved by the Comnulity 0eIIeI0pment Coordinator and shalbe in accordance with accepted traffic engineering principles. The fincflll9S ,of the study wi be used in determining whether or not deviations to the parking standards are approved; GRADING P~, as appIcab/e; PRELIMINARY PlAT, as required (Note: BuikIng permits will not be Issued unti evkIence_O!recording a final plat is provided); Q r/ Q Q COPY OF RECORDED PlAT, as aPPlicable; (not requ ired). F. SITE PLAN SUBMmAL REQUIREMENTS: (Code Section 4-202.A) Q SITE PlAN with the following information (not to ex~ L AI dimensions; ~ J North arrow; :z: Engineering bar scale (minimum scale one inch equals 50 feet), and date prepared; :./ Location map; ~ Index sheet referencing In<ividuaI sheets included in package; ...:L Footprint and size of aI EXISTING buildings and sbucIures; Footprint and size of aI PROPOSED buikIngs and strucb.res; AI required setbacks; AI existing and proposed poDs 0( access; AI required sight triangles; Identification of environmenlaIy unique areas, such as watercotnes, weIIands, tree masses, and specimen trees,lncIuding desc:riptioi1 and location of understory, ground COYer wgeCation and wiIdife habitats, etc;' location of all public: and private easements; location of all street rights-of-way within and adjacent to'the site; location of existing pubic and private utilities, induding fire hydrants, storm and sanitary sewer illes, manholes and 1ft stations, gas and water ines; AI parking spaces, ~,Ioading areas and vehicular use areas; Depiction by shacflll9 or c:rosshatchIng of aI required palidng lot interior landscaped areas; location of al so&d waste containers, recycing or trash handling areas and ouIsIde mechanical equipment and aI required screening {per Section 3-201(D)(i} and Index 1701}; Location of aRlandscape maleriaI; Location of aft onsite and olrsite storm-water management faclities; location of an outdoor /ighIing fixtues; and location of aR existing and proposed sidewalks. ~ ;/ 7 ...:L ' ./ ,7 ../ / ~ -L !L... .L L Q SITE DATA TABlE for existing, requi'ed, and proposed development. In writtenIlabuIar form: JL land area h square feet and acres; WJj Number of EXISTING dwe5ng units; ~ Number of PROPOSED dweIing units; L Gross floor area devoted to each use; ~ Parking spaces: toeal number, presented h tabular fonn with the number of required ~; -Ii Total paved area, incIucing aI paved parldng spaces and driveways, expressed h square feet and percentage 0( the paved vehicular area; -L Size and species of a.1andscape material; L Official records book and page numbers of a. existing utility easement; ..>L.. Building and structure heights; ~ IlJllermeable suface ratio (I.SR); and , 4 Floor area ratio (FAR.) for aI nonresldentiaI uses. ~ REbucED SITE PlAN to scale (8 ~ X 11) and color rendering if possible; Q FOR DEVELOPMENTS OVER ONE ACRE, provide the following additional information on site plan: .JL. One-foot contours or spot elevations on site; ~ Offsite elevations if required to evaluate f1e proposed stormwater management for the parcel; ..LL. All open space areas; L location of al/ earth or water retaining walls and earth berms; --Y:: lot fines and building lines (dimensioned); ....L Streets and drives (dimensioned); ..L Building and structural setbacks (dimensioned); ./ Structural overhangs; "7. Tree Inventory; prepared by a "certified arborist', of an trees 8' DBH or greater, rellecting size, canopy (drip ines) and condition of such trees. Page 3 of 6 - Flexible Development Application - City of Clearwater e e 'G. STORMWA TER PLAN SUBMITTAL REQUIREMENTS: (City of Clearwater Design Criteria Manual and 4-202.A.21) r/ -1 2- ~ ~ ~ STORMWATER PlAN including the following requirements: Existing topography extending 50 feet beyond all property lines; Proposed grading including finished ftoor elevations of al structures; All adjacent streets and municipal storm systems; Propo~ stOl)'l1.Nater detentionfretention area induding top of bank, toe of slopjl.and outlet conbul strugure; Stormwater calculations for attenuation and water qua6ty; Signature of Florida registered Professional Engineer on al plans and calculations COPY OF PERMIT INQUIRY lETTER OR SOUTHWEST FlORIDA WATER MANAGEMENT DISTRICT (SWFWMD) PERMIT SUBMITTAl (SWFWMD approval is required prior to issuance of City Building Permit), if applicable copy OF STATE AND COUNTY STORMWATER SYSTEM TIE-IN PERMIT APPLICATIONS, if appIcabIe o ..lC- r/ ~ ~ -i .../ .J>L --Ii -L ~ ~ ~ -L ~ cI DI'l/A "LANDSCAPINGPLAN-SUBMmAL REQUIREMENTS: (Section 4-1102A)"-'- .-...,.. .. LANDSCAPE PlAN: AI existing and proposed structures; Names of abutting streets; Drainage and retention areas IncJuding swales, side slopes and bottom elevations; Delineation and dimensions of al required perimeter landscape buffers; Sight visN"1ty 1riangIes; Delineation and dimensions of al parking areas induc:Ing landscaping Islands and cubing; Proposed and required pat1dng spaces; Existing trees on-site and immecIately adjacent to the site, by species, size and locations, induding dripIne; Location, size, description, specifications and quantities of al existing and proposed landscape materials, inckJding botanical and common names; . I Typical planting deIaiis for trees, palms, shrubs and ground cover plants incIu<fl19lnstrudions, soil mixes, baddilling. mUlching and protective meast.res; Interior landscaping areas hatched and/or shaded and labeled and interior landscape covemge, expressing in both square feet and percentage covered; . Conditions of a previous development approval (e.g. conditions imposed by the ComIOOOly Development Board); Irrigation notes. REDUCED l:ANDSCAPE PlAN to scale (8 % X 11) (color rendering if posslbIe); IRRIGATION PlAN (required for level two and three approval); COMPREHENSIVE lANDSCAPE PROGRAM app&catioo, as applicable. I. 1iI o BUILDING ELEVATION PLAN SUBMmAL REQUIREMENTS: (Section 4-202.A.23) Required in the event the application indudes a development where design standards are in issue (e.g. Tourist and Downtown Disbicts) or as part of a Comprehensive Iofil Redevelopment Project or a Residentia/lnfill Project. BUILDING ELEVATION DRAWINGS - al sides of al buildings including height cimensions, colors and materials; REDUCED BUILDING ELEV A nONS - four sides of buikflll9 with colors and materlais to scale (8 % X 11) (black and white and color rendering, if possib/e) as required. J. r/ o o o SIGNAGE: (Division 19. SIGNS I Section 3-1806) All EXISTING freestanding and attached signs; Provide phoIographs and dimensions (area, height, etc.), indicate whether they will be ' removed or to remain. AU PROPOSED freestanding and attached signs; Provide details including location, size, height, colors, rnateriais and drawing Comprehensive Sign Program application, as apprlC8ble (separate app6cation and fee required). Reduced signage proposal (8 Yz X 11) (color), if submitting Comprehensive Sign Program application. Page 4 of 6 - Flexible Development Application - City of Clearwater e e K. TRAFFIC IMPACT STUDY: (Section 4-801.C) Q Indude as required if proposed development will degrade the acceptable level of service for any roadway as adopted in the Comprehensive Plan. Trip generation shall be based on the most recent edition of the Institute of Transportation Engineer's Trip General Manual. Refer to Section 4-801 C of the Community Development Code for exceptions to this requirement X L SIGNATURE: ~--- _ STATE OFFLORIDA, COUNTY OF PIfUU...cO ((CC- {' J .s~~1Tl to . .~n .subscribed before. me this ~ day of \".:.R ~ ' AD. 20C):J to me and/or by (1 ('\IIl( d c-t. ./1.( crl ft ,who is personally known has produced as identification. ,\"'VI~'"" /~l:>r:..~~~ '"'*. ".'"' k~ k~ ..~~..;".*l ',RtI~ LEO J. SALVATORI MY COMMISSION # CC 967892 EXPIRES: November 28, 2004 Bonded ThllJ Notary Public Underwriters I, the undersigned, acknowledge that all representations made in this application are true and accurate to the best of my knowledge and authorize City representatives to visit and photograph the property described in this apprlC8tion. . ::7 Signature of property owner or representative Page 5 of 6 - Flexible Development App6cation - City of Clearwater e e M. AFFIDAVIT TO AUTHORIZE AGENT: . ABR PLYMOUTH.PLAZA>-L TD. (Names of all property owners) 1. That (I amlwe are) the owner{s) and record title holder(s) of the following described property (address or general location): East side of Enterprise Road~ south of Main St, North of Countryside Boulevard. 2. That this property CO!lstitutes the property fOf which a request for a: (describe request) 37,000 square foot office building. 3. That the undersigned (haslhave) appointed and (does/do) appoint Steve Luce, URS Corporation as (hlsllhelr) agent(s) to execute any petitions or other documents necessary to affect such petition; 4. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the abo.:.e described property; 5. That site visits to the property are necessary by City representatives in order to process this application anq the owner authorizes City representatives to visit and photograph the property described in this apPliCiiOO~; ~ 6. n.ot (1Iwe),lhe"""""",""" -, -by ""'"' """" ~ bue and. 1. ~ ~ Property , Property Owner STATE OF FLORIDA, / COUNTY OF-7If1CL:!=AG CoU (<e /' My Commission Expires: eve nt re .:. .. ..,~~u;P4:~~ liJ:&.... "i"~ "*" ".'- ~~. }~j ~1,~f'.;".~.. ,P,lU~ . LEO J. SAlVATORI MY COMMISSION # CC 967892 EXPIRES: November 28, 2004 Bond.d Thru Notary Public Underwriters .~9iu;"ap~ii '!Iqnd ''"ION ru41 papuoB VOO~ '8~ J9qW9^ON :S3tlldX3 ~68L96 :X) # NOISSlrlrlO:> ArI . Itl01V^1VST031 ,~'$P.I~:;':~~~ ~:{ }.~ ~'~d ..JIit.i ",111111" Page 6 of 6 - Aexible Development Application - City of Clearwater ..... Sep, 17, 2003 -11: 23AM 'TAMPA BAY WATER 727.791.2340 e ~N 0 ' 339788 p. 2.1:34 e This infitrument prepared by II'ld after reoordln;. return tD~ L.eo J. "Ivaron. eaq. auarlee & BrlIII~ 4501 Tlm1lml"rmll North Suite 300 Naples. Florldll34' D3 ReCTlVE S W TV DEED THIS CORRECTIVE SPECIAL WAARANTY, made thJsq~ day n1A.,.LJ~JJ?003, between ABR PLYMOUTH PL.AZA" LTD" a Florida limited partnerl5hrp:-w"'os;~~ addreea is 5130 Main Street, ., New Port Richey, FL 34652. rGrantor-), and DECADE COMPANIES INCOME PROPI,RTISS, A UMITBD PARTN!ItSHIP, a Wisconsin limIted partnership, whose post office address Is N19 W24130 Rlverwood Drive, Suite 100. Waukesha. WI 53188, (uGrantee"). WITNESSEni that Granter. for and in consideration of th. sum of Ten Dollars ($10.00), and other good and valuable con5id.ra~on to Grantor in hand paid by Grantee, the receipt whereof Is herehy acknowiedged, have granted. bargained and sold to Grantee, and Grantee's heirs and assIgns forever, the following described land. sltual$, lying and being in Pinellls County, Plorida, to-wit:' See ~ibit A attached her.fa and incorporated herein by virtue of this reference: Subject to those items set forth on Exhibit B attached hereto and incorporated herein by virtue of this reference. and Grantor does hereby covenant with Grantee that except as ncted above, titl. to the land is free trom all encumbrances made by Grantor and that Grantor Will fully warrant the tI~e to said land, and will defend the same against thQ lawful elaims of all persons claIming by or through Grantor, but against nane other. . . This correcUve dOClJrnent is given for the express purpose of correcting a clerical error In the legal description of the original instrument which was recorded In Official Re~rds Book 12211, Page 1464, of the Public Records of Plnellas County, Florida. IN WIT WHEREOF, Grantor has hereunto set Grantor's hand and seal the day and . Ittsn. AIR PLYMOUTH PlAZA, LTD., a Florida limited partnership By: itneSI No.2 gnalurl 11-b,-a. f<. ~ / a (! I< WL C1... Witness No.2 Printed Name QSNAP\401eQO.1 Sep. 17. 2003 11: 23AM 'TAMPA BAY WATER 727.791.2340 e e . ~aa ~i Y'~I. !I Ii ~E~i II e~1 ; ~ "I-"!~ ..: I: I" .,.;!;_ t! I~! !fl!!tl~~i!;i: il~1 ~~~~~I~' !II~~!I t~~a~I"~~ E!iill;;e~11 ~. till II~S Ifili~1 ~;~ I;J!i!13!i:~~!ti s2 11..11. ~ 1::'i15 lit 8'1" II ~ii~ I !i;!~i;:li~!iI;~; ,i;!~II~!~!~S .'1, "~!:III;~'. i ~ aa!1 ,. !.!! I~ .I~~'~IR~ C -II R~II_. 2 ~ I I ;'~II:~~I III~ I 15 2- ~.~ "f =!~I'!~I~~ictli. ;=f IfiwtSI:I: 5) T :i~t.: _! .... :cl IJW .. . I!~e~ ~ ! ,1!1=~I.i!!I~I.~e~i ~111~al~;iI5~~. . ,~I;~~iiB,i!.!I~i~f ~~!Q~I~I! ~!~~ ~~liJ!!5R~;lii.I:!il ~a!I~:: llillt~ ill };p=~tf"~<1 ip t:!i11 ""~e ;G!! ~ ii;!!=i!;- ;11!3: ils. 5~~iiilliii! ',i~;:1i ~~il!:~lSlm iiie!fI1il:lz ~d Ire ~~Fi'li!l!~w eo i~!* .~'a I!& g.I~~ &~K~ 311li~' ,,1i.il"~il~I'h~ '.:I!.c'3ii~2;~I~!=I;i1 ~1!c~!:!.I'!:~e ! .... a I 1;::1 ~ ~ '&::..., ~~ :J ~ ~!i"S;~~!I,:lt~II~; E!lla~e~I~W!~I! ; u~ l"'U I! c.l~i, ~I tpol .L1".Pii~ili~II'" ! ~i 8rsl~!IIMII~5~ i~! ig: -=!IIII'::= ; i:~i'!.)..}f w8a:!wcElo ~~~I!s!-lIllaIIJie z ii~;glciC~;8il!i~I!I~ I~;i~il~ ii~!;3~ i =~p21 :I=;I~ ~4-I...~.':2 ~ .I..~ Bl*sll I < 1~1;lllz~!~ili~=i' ; 1~I;i=i!1 '1~11'~ i!e~;iIJ!15.~Ji~ll g I'lii;!; li~l~ ~ g!;i!~~il=B;llf!i~l ~ ;;~;:i~~'I~=:!!! I -1_1,~~iJ,tl~J~~I~il I ~1'~lilll! cll-; · l'I~~I;~~il !tll i i 8 r- ~~ -I II! I~: ,!i~IU~jid;~~ialI5!11 il!nl~iiiei~si ~ ~~~.~~i~511.i.~i! ~~ ~ i ~EOJII_~ ~~!I ~ ;~I!lilill iiiis:I!: ; ~~I!lili;!ls;ll~ i 8No.33978S p. 3,05 !XH1BIT A " , . - e Project Name: Administrative Office Parcel No: 001.01 PURCHASE AND SALE AGREEMENT THIS PURCHASE AND SALE AGREEMENT (the "Agreement") is made and entered into by and between TAMP ABA Y WATER, A Regional Water Supply AuthorIty ("Buyer") and ABR PLYMOUTH PLAZA, LTD., a Florida limited partnership ("Seller") and AMERICAN ACQUISITION TITLE, INC. (hereinafter "Escrow Agent" or "Title Company') WITNESSETH: WHEREAS, Seller has legal title to and possession of that certain property located and being in Section 30, Township 28 South, Range 16 East in Pinellas County, Florida, identified by parcel identification number 302816000003400110 as illustrated on Exhibit "A" attached hereto and incorporated herein, by reference (the "Real Property"); and WHEREAS, Seller desires to sell and Buyer desires to purchase the Real Property; . NOW, THEREFORE,for and in consideration ofthe mutual covenants and promises, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: 1. PURCHASE PRICE. Seller shall sell to Buyer and Buyer shall purchase from Seller the Real Property for a total purchase price of One Million Three Hundred Thousand Dollars ($1,300,000.00) (hereinafter the "Purchase Price"), payable at Closing by' cashier's check, bank draft, or cert!fied funds pursuant to the provisions and conditions outlined herein. 2. DEPOSIT. Buyer shall deposit the sum of Fifty Thousand Dollars ($50,000.00) cash as a deposit ("Deposit") to apply to the Purchase Price of the Real Property at the time of Closing as provided in paragraph 3 below ("Closing'} Deposit shall be postmarked to Escrow Agent within ten t/dMe (10) working days of the Effective Date (as defined below) ofthis Agreement. 3. CLOSING. The sale of the Real Property shall be closed on or before ninety (90) days from the Effective Date (as defined below) of this. Agreement, or such other time as the parties hereto may mutually agree. The exact date for the Closing on the Real Property shall be set by the Buyer, with at least ten (10) days prior notice to the Seller. This sale shall be closed at the offices of Escrow Agent or at such other location mutually acceptable to the parties hereto. Closing is subject to Buyer obtaining appropriate affidavits and documents as needed in order to enable Buyer to construct Buyer's desired office facilities on the Real Property. Page 1 of 12 -- e 4. COSTS. The Buyer shall pay all expenses incidental to transfer of the Real Property including, but notlimited to, recording fees and similar expenses. Seller shall pay the cost of recording any corrective instruments required to perfect title and taxes for the year of Closing. As required pursuant to Florida Ad~inistrative Code Section 12B-4.002(3)(a), Seller shall pay for documentary stamps. 5. CONVEYANCE. Upon payment of the Purchase Price, Seller shall convey the Real Property illustrated in Exhibit "A" to Buyer by Warranty Deed. Said conveyance shall be free and clear of all liens and encumbrances except taxes and assessments for the year of Closing and subsequent years and zoning ordinances and land development regulations (the o "Permitted Exceptions"). In addition, the following shall also apply to the conveyance: (a) The Seller shall provide a legal description and survey sketch of the Real Property, acceptable to the Buyer, which has been recorded in the Public Records of Pine lIas County, Florida prior to Closing. (b) The City of Clearwater requires a set back of20 feet from the existing parking garage structure located immediately east of the Real Property. In the event that it is found that the existing parking garage does not comport with the set back requirement, said conveyance is to be free and clear of any east property line dispute as recognized by the City of Clearwater and the then current fee owner(s) of the parcel located to the east of the Real Property. (c) Seller shall also assign to Buyer all its right, title and interest in a Cross-Easement Agreement, recorded at Official Records Book 12271, Page 1500 of the Public Records of Pinellas County, Florida. Such assignment shall take place after said Cross-Easement Agreement has been amended and recorded to reflec( a corrected legal description of the Real Property 0 (d) Seller shall also assign to Buyer all its right, title and interest ina Parking Easement Agreement, recorded at Official Records Book 12271, Page 1480 of the Public Records of PineIlas County, Florida. Such assignment shall take place after said Parking Easement Agreement has been amended and recorded to reflect a corrected legal description of the Real Property. 6. REMEDIES UPON DEFAULT. If Buyer fails to perform this Agreement within the time specified, the Deposit paid by Buyer may be retained by or for the account of Seller as liquidated dam~ges, consideration for the execution of this Agreement, and in full settlement of any claims; whereupon, Buyer and Seller shall be relieved of all obligations under this Agreement. If, for any reason other than failure of Seller to make Seller's title marketable after diligent effort, Seller fails, Page 2 of 12 e e neglects, or refuses to perform this Agreement, or breaches any of its warranties herein, Buyer may seek specific performance or elect to receive the return of Buyer's deposit without thereby waiving any action for damages resulting from Seller's breach. 7. TITLE INSURANCE. Buyer, at Buyer's option, may obtain, prior to the Closing of the Real Property, a Marketability Title Insurance Policy (ALTA Form "B" Owner's) ("Policy") unqualified, on the Real Property in the amount of the Purchase Price; such Policy to be issued by Title Company. The Commitment shall name Buyer as proposed insured, and shall disclose that . Seller has good and marketable title in and to the Real Property, and shall be subject only to the Permitted Exceptions, with all standard printed exceptions, including those for survey (if Buyer elects to obtain a Survey), mechanic's liens, and parties in possession, deleted. In the event the Commitment for such a Policy shows any exceptions to title other than the Permitted Exceptions, Buyer shall notify Seller, in writing, within fifteen (15) days of receipt of the Commitment specifying the defects which exist with respect to the title. Seller agrees to proceed immediately and diligently to cure any defects in title for which it has received notice hereunder. Seller shall have a period of sixty (60) days after receipt of such written notice within which to cure any such defects in title to the satisfaction of the Title Company and Buyer's attorneys. Subject to the other terms and provisions of this Agreement, the Sale of the Real Property shall be closed within . ten (10) days after written proof of the successful completion of such cure being provided to Buyer; provided, however, no such Closing shall be earlier than the date of Closing as hereinabove provided. If Seller fails to cure the defect~ within the time provided, Buyer may, at its option, either (a) request return of the Deposit and terminate this Agreement, whereupon all rights and liabilities arising hereunder shall terminate, or (b) waive all conditions ofthis paragraph and, subj ect to all the other terms and provisions of this Agreement, close this transaction in the same manner as if no such defects in title existed. 8. SURVEY. The Buyer may, at Buyer's option and at its own expense, obtain a survey ofthe Real Property, certified ina manner sufficient for issuance of a Policy deleting the survey exception, said certification to include Buyer, Seller, and Title Company. If the survey shows any encroach- ments or that improvements intended to be located on the Real Property in fact encroach on setback lines, easements, or lands owned by other persons, or violate any restrictions, agreements, covenants, or applicable governmental regulations, the same shall be treated as a title defect. 9. ADDITIONAL DOCUMENTS TO BE DELIVERED AT CLOSING: At Closing, Seller shall execute and acknowledge where necessary, and deliver to Buyer, in addition to the documents mentioned elsewhere here, the following: " (a) An Affidavit establishing that there are no liens or lien rights for services, labor, or materials furnished to or for the improvement of the Real Property; that there are no Page 3 of 12 e e unrecorded possessory or other interests in or agreements affecting the Real Property of any kind; that Seller is in sole possession of the Real Property; and that no person or entity other than Seller has access to or has the right of access to or occupancy of the Real Property described in Exhibit "A" attached. hereto, or any portion thereof, nor does any person or entity other than Seller own buildings, structures, improvements, fixtures, or personal property located on said Real Property. (b) An Affidavit acknowledging that the sale of the Real Property includes any and all improvements located thereon. (c) An Affidavit showing an exemption from the withholding requirements of Section 1445 of the Internal Revenue Code of 1954, as amended. (d) All other instruments and documents required by the Title Company affecting title to or possession of the Real Property and necessary to transfer or assign the same to Buyer, as required by this Agreement. (e) If Seller is a corporation or partnership, Seller shall deliver such affidavits and instruments as may reasonably be required by Buyer or the Title Company evidencing that Seller is in good standing in the state of it~ organization and evidencing the authority of the person(s) executing the various documents on behalfofSeller in connection with the Closing of th~s transaction. Such instruments may include, without limitation, certificates of good standing and corporate or partnership resolutions and authorizations appropriate as to the status of the Seller~ 10. PUBLIC DISCLOSURE. If the Seller is a corporation, partnership, limited partnership, trust, or enters into this Agreement in any form of representative capacity whatsoever for others, then, ten days prior to Closing, Seller shall furnish to Buyer an Affidavit. 11. ATTORNEYS' FEES AND COSTS. In connection with any litigation arising under this Agreement, the prevailing party shall be entitled to recover its expenses therefore, including reasonable attorney's and legal assistants' fees and costs prior to trial, at trial, and on appeal, in bankruptcy proceedings; and in connection with enforcing or collecting upon any judgment. 12. SURVIVAL. Any provision of this Agreement which by its nature and effect is required to be observed, kept, or performed after Closing shall survive the Closing and shall not be merged therein but shall remain binding upon and for the benefit of the parties hereto and their respective successors and assigns until fully observed, kept or performed. The warrantees of Seller herein shall survive Closing. Page 4 of 12 e e 13. ESCROW. Escrow Agent agrees to hold, keep, and deliver said Deposit and all other documents and sums delivered to it pursuant hereto in accordance with the terms and provisions of this Agreement. Escrow Agent shall not be entitled to any fees or compensation for its services hereunder. . Escrow Agent shall be liable only to hold the Deposit and all other documents and sums delivered to its care and to deliver the same to the parties named herein in accordance with the provisions of this Agreement, it being expressly understood that by acceptance of this Agreement Escrow Agent is acting in the capacity of a depository only and shall not be liable or responsible to anyone for any damage, losses, or expenses unless same shall have been caused by the gross negligence or willful malfeasance of Escrow Agent. In the event of any disagreement among the parties to this Agreement, or among them or any of them and any other party resulting in any adverse claims and d~mands being made in connection with or for the monies involved herein or affected hereby; Escrow Agent shall be entitled to refuse to comply with any such claims or demands so long as such disagreement continues; and, in so refusing, Escrow Agent shall make no delivery or other disposition of any of the monies then held by it under the terms of this Agreement, and in so doing, Escrow Agent shall not become liable to anyone for such refusal; and Escrow Agent shall be entitled to continue to refrain from action until the rights of the adverse claimants shall have been finally settled or adjudicated in a court of appropriate jurisdiction, or all differences shall have been adjusted by agreement between or among the parties and Escrow Agent shall have been notified in writing of such agreement signed by the parties hereto. Further, Escrow Agent shall have the right at all times to deliver the Deposit or document or pay all sums held by it (a) to the appropriate party under the terms hereof, or (b) into any court of competent jurisdiction after a dispute between or among the parties hereto has arisen, whereupon Escrow Agent's obligations hereunder shall terminate. Seller and Buyer jointly and severally agree to defend, indemnify, and hold harmless said Escrow Agent from any and all costs, damages, and expenses, including reasonable attorneys' fees, that Escrow Agent may incur in its compliance of and in good faith with the terms of this Agreement: However, nothing herein shall be deemed a waiver of Buyer's or Seller's sovereign . . immunity, or any defense that Buyer or Seller may have arising from said sovereign immunity. 14. ENVIRONMENTAL: The Real Property has not in the past and is not presently being used for handling, storage, transportation, or disposal of hazardous or toxic materials, and no notice or advice has been received by the Seller of any condition or state of facts that would contribute to a claim of pollution or other damage to the environment by reason of the conduct of any business on the Real Property or any other use of the Real Property. 15. ACCESS. The Buyer shall have access to the Real Property illustrated in Exhibit "A" attached hereto, from the Effective Date to the date this Agreement is terminated or default occurs, for the purpose of soil testing, engineering studies, surveys, and other similar due diligence activities. At Seller's request, Buyer shall at its own expense correct any damages to the Real Property occasioned by Buyer's activities in the event that the parties will not proceed to Closing. Page 5 of 12 e e l6~ TESTING RESULTS. In the event the results of tests performed on the Real Property illustrated in Exhibit "A" attached hereto, in accordance with paragraph 15 above, is found by Buyer in its sole discretion to be below the standards necessary for Buyer's intended use, this Agreement shall, at Buyer's option, be null and void and of no further force and effect, in which event the Deposit shall be returned to the Buyer, and the parties to this Agreement shall have no further obligations hereunder. 17. EFFECTIVE DATE. This Agreement shall be effective when approved by the Board of Directors of Tampa Bay Water and when signed by both Buyer and Seller (herein "Effective Date"). Page 6 of 12 e e 18. MISCELLANEOUS: (a) This Agreement constitutes the entire agreement of the parties hereto and supersedes any prior understandings or written or oral agreements between the parties respecting the terms of this Agreement. No rights or duties, unless incorporated in this Agreement, shall be binding upon the parties hereto. (b) This Agreement and the interpretation and enforcement of the same shall be governed by and construed in accordance with the laws of the State of Florida. . (c) . This Agreement shall be binding upon and its benefits and advantages shall inure to . the successors and assigns of the parties hereto, (d) No amendment, modification, or alteration of the terms of this Agreement or waiver of any breach hereof shall be binding unless such amendment, modification, alteration, or waiver is in writing, dated subsequen(to the date hereof, and duly executed by the parties hereto. No waiver of any breach or term hereof shall imply a waiver of any other term or breach hereof. 19. EXECUTION. By execution of this Agreement, Seller is deemed to be extending to Buyer an irrevocable offer to sell the Real Property on the terms set forth herein. If, within ninety (90) days from the date of execution by Seller, this Agreement is not fully executed by Buyer, the rights and obligations of Seller under this. Agreement shall be deemed null and void. TillS SPACE LEFT BLANK INTENTIONALLY Page 7 of 12 e e IN WITNESS WHEREOF, the parties have caused this Agreement to be executed the date and year written below. WITNESSES: SELLER: ABR PLYMOUTH PLAZA, LTD., a Florida limited partnership By: (Corporate Seal) REEDDEVELOPMENTCONWANY A Florida corporation, as Gerieral Partner .\.,J__.-=1L Print Name: \ c) ~G7f; M ~~ Date: ~~/o~ By: Notary Pu lie, State of Flori Print Name: Page 8 of 12 """~':~"" LEO J. SALVATORI /J~'~ ~f.\ MY COMMISSION fCC 967892 ~~. EXPIRES: November 28, 2004 <1.i;iif. Bonded ThN Nolary Public Underwriters e e Commission No.: My Commission Expires: Page 9 of 12 e e ATTEST: BUYER: TAMPA. BAY WATER, A Regional Water Supply Authority 3~~ . obert ~ S~wart As: Chairman Approved as to form: Date: :J \A..\'; ~ \) ~C3 By: &fuQ.k--u~/ ' Office of General Counsel STATE OF. FLORIDA COUNTY OF 7\~e \\Cd The foregoing instrument was acknowledged before me this 611 S'- day of ~ \ ~ ' 2003, by %(0 'ou\- ~. S-\e\...)cr-\-. . ,as Chairman of Tampa Bay ater, on behalf of Tampa Bav Water~ He~ is personally known to me or has produced as identification. . By: Notary Public, State Florida at Large Print Name: .~...... .. ; . ~~<,.....v.~ Regina A Kavanagh CommISSIOn No.: . ~"":'A~':+~ MYCOMMI.SSION# 00189301 EXPIRES M C .. E' ~~ ...~ May 3, 2007 Y ommISSIOn xprres: ".t,tO;.'~'$" BONOEOTHRUTROYFAlNIHSU.""'" INC "ftlt'" 1\I"'IlI"'-'il Page 10 of 12 e WITNESSES: . Page 11 of 12 e TITLE COMPANY AND ESCROW AGENT: L /- .\;V 4- . T As: . ..1 I /~ fV\A;J!tj eX-. Date: /19 J led / I e e EXHIBIT A ILLUSTRATION OF REAL PROPERTY TO COME Page 12 of 12 .~ fj III ~:! "'=., ~ ~~ / :::; ,..,0 . WgjW ~~ 'Cn~~ ~ . N4..a.. ~ W.. k~iri. z .~~io~~g a !!~~~;'f',lz w ~... ~~6~J f:: g .!J~~ug:j :5 ll. Z :J <( o .. CE :3>- i.J... ~.~ ~~ 8:J V) VJ <( -' G:J<::( ~ a....1-- ~O <( w=2: to w.-.J ~.""'C i ~()'. ~lJJ ~-.J :::J Sl'!..L. ~O ~:c ~() ~I-- ~Lu 6~", r<) z (f); g o :g~ F= "'N U '" W VJ e . r- .1. ' I'f 11 ;:::::: X/Jip l 11 C330 HL~ON - -I. ~ '- C '" 3' ""0 (lJ r'J '" ~(~ . n;..~P ~i~i~ ~ ~g:~~,~ : !'J~ugj wN ~g~ ....00 ,..,~ "'Ill,., fO:~ _ZNN 3'... . ~e b~~~~ owiON ajll);orlz ~~6~J "~I 0: ....a:qom Q .... N ;., N... . ..,.., f;;NN lo~~~~~ . "",...,:enNNN ';1010'2:.11I ~~6~~~ ,'1 era:: "'00,\ " S"~ ""0 N '" 3' bO oO! o ..... ""0 o o z '0 <.> <~ 6. ~~ 0. N 0 .., ;., N ;" ... ..... ~ 0 cO W <D l= '" <( -' ll. .z :J )" 0 n 0 in .0 l" <D '" N aJ Vl W :., in '" en aJ Vl M, .It, to.oo ,oo'.n w , n -t Vl ::g~ u .0 ....<( a: . <~.q- .......... O' or'J I() ~~ Vl >- ' ~~ z ::> o <.> 294.56' t ~ VI -"g~ ... 0 u~<( a:r'JO <lD<O lD ' Q;.tf)l"") 'lD ~ "1 ,~O'l91 3 .Lt,to.oo N o 'Q,..- 00> . oa:i~ ~ g ~.~ n '0_.0 z ::;.....inZII C'4N""'~" U II 0 a: ...JO:::<JUlD , '" 10 oCn~ - ..... en at _ 8-:..-ttio e>>uif'tUz :ti ~~8 ~ ~ II II H cr _HI:: <I U II) ~/5'/ IJ ~ 1 Jflj t . f r s:::: i~ljlijJJ I I ~ Hib:llmfrldlI ~ ;~~~7ii ~ nkjIJ] JfJIUll ~ W 11llJJ,tlJIi.!l! :s... 1""'11"1"'11111 ~ :~~.~333.~ ~ ~ u ~., :s~ 0);:1) .~~ g:Q Clgs t; ~' (j ~; !l::Q' ~~, a~: ~Qi ~ ' ~ ! ~ - .~ [ li~ ti~~ e g~~5a~ wi. ::i~oa";~ ~~t;~iOot 3.~~r:!": ~~~~~S ~1IC"';o1":'" ~~i~~~-< !~~~~e !::I. ~~~~~:!.. ~." :~g~gi'- ~iO~~d~~ ~~i~g~a ~ > 5:~!~~t : a>-~ 1Itj!:~1E~ d e~~~~~~!a a ~o ;~ ~~ <~~~t ~ p~ ~'<=5~O~ ~~~~6 < n< w ~~~ ~~o~oo~~ ~ ~;~~ .~e~~~o~:~~!~ ~ z~~i~~~~:w~~~~~~Q ~ W~O~Z~N~W~NO_~~ffiw~ '~I~NF~~~~O~u~g~~~ ~ WQ<~~ e~o~o~o~_~~' ~ ~~e~U~~%~8~~~w~.g~ C,,? cia-V! .2tj~-Z~U')I",.O~5~Q:C!g .~ ~~8~ffi~lffi:~~~~~~:~ m.~o~~~~w~~~<~~~~~~ ~ ~~~u~o~.~un~ ~~z~~ ~~~~~~~~~5~g~~5F~ . ~ ~<-<wz~ -~~%rZ<UN~~ ~ ~~~~~< ~5~w~wo~ ~~ g J:t...~'IO..~6<~~I.L..~I-:J~~ I.L.. ~9~~~~~N~~a~aE~~:~~ ~ ~~~U~~~~~~o8o~~~~~ z ~UNa-~O~~~<N<~~IO~O g ~~8~~:~f~z:5:~~~~~ Zen - . iL 0-. N'" W 0 "'- 0 a::: 0 g'j ..w .~ ~_~~O~w~~~~d :u~~~~5 d ww~~~~~~~~~~~~~~~< g FF~~S~~~~~w~w~~~g~ ~ ~~~~~~~w6J~~~~g~~~ ~ ~<~~~~~~oo~~g~~~-w < oo~o~~w~~oZoo~~i~ ~ ~~OJ~U~~~G~~~ZW_~w ~ :::: .-;;-<<~~"::~ii:)-C2>-Ct~-."~ w ~~->-~~I~ oJ<~Z~ ~~ d g~~~o~~~6<~~~~o~gg ~ .~~~~nIOZ~~ ~W~~O ~ ~ ~~o~~~z~r~~m~~~~ ~ ~~~~o~~~~~~~~~~~~e -~ ~~i~<N~~~~5U~~:_~~ w w.~o~g~~"""L\.WZ<ZU .~iE- ~ "'~fg:~",IIl?~~~~~<~o._~ ~ N~~~~2~~~~~~~~a~~< rlwW~~5~O ~~~<O~~W ~ g~~~"""<<jP~o ~~~~ZO~ a ~B)-_N<~~~~N~~~~~Oz U) wii:~NOC)W.:i D:: f;: ._L&..~d~< ~ ~~1~2~~~~~~~~~~~N~ N ~~~< <WZ~<<~N~~-w~5 ~ OIW~Z~WW~W~FL&..C~"""< ~ o:~~~~~~~~~O~O~~wI i n~~O~D::~~Nzo~z~5<nd o e~cZza......~~wz~w~~~;~ : ~o~*~~~~~~~~~~~~~~ ~ ~5uo~",~oo~ougu<~~~ Z d~5~~~N~~~~~ ~~L&..~~ o <...~~O ~...~~~ ~ ~o~o G ~~<<~~e~N~<~~~~~j~ :~ ~~~~~<w~~~~ba~~3~g ~~ ~-~U~~N~~OU~U~~~<~ ~u..~~~~~ ~~~t~~~~~~"'~ ~~~Q ~~~~~~wGD::~~gg~~ z~~u~~a~3~~~~a~u~~~~g OO~~~~~O<~~~~<O~OZ~~~ ~~~~wl W~~~~OC w wBo W ~~~~~~~~~~w ~~G~G~~W~ ~~~:g~~~~~ffit3~~~~s~~~ ~~~~dQ~~<m;;~ ~~~~~~F~ J~5~2~~g~~~g~~g~g~~~~ <~______~n. _ ~_~_~_ _ N LL o I- W w I (f) e e SHEET 2 PREVIOUSLY APPROVED SITE PLAN e e SHEET 3 SURVEY e e SHEET 4 LOCATION MAP e . PROJECT SITE - =l J ~ 1.I ~ LJ ") LJ ~ ') ~ ~ 1.I , ') 1.I , " ~ :J ~ ~ ~ J > J .) I ~ ~ 'I ~ LOCA liON MAP :J ~ =l ~ SEC. 30 TWNSHP. 28 RANGE 16 lJ .> ::S ~ I 'I ~ II .> J lJ """) ) ~ ~ NTS e SHEET 5 REDUCED SITE PLAN e 1roJ''''''OOi!I'f90r l>>5,,""l>l'Q SYOC'QO\dY N\f1d 3115 '9LU:"'OU:!Ol;j'M31"'M~"'3l:J 3/IllKl).~...~aNVlStSZ ~3.1VMAVBVd'tftl.1 =~""""".'-"'"'san lLlI"9ill(.'HJ .:WI:,"P!JCI,'Bdw.j 'W'OJIIOQ<l.....JMUU'"'>J MO.9l """Il'"OSOO'IBJO<lJCJSMn LC:) c::> <.::> DNIGllna 3:11.:1.:10 3^I.1V~.1SINIVlIaV ~3.1VM Ava Vd'tftl.1 o II! 1.1, !; +~ ~ j Ul U ;: 0. <: '" " imm o I ,1 : I <" h \, ~1'5 \ ,:tn \ \"".......... / o o o o ~, \,\ \~,'\,~/ " \\~ /) ;..' '~. /'1" \.... >y~m7 it ':,-:"'",,~,,"I.."l.,, ,,I / 8g~~~ ,\,' / i~i~~ / ; ,>,\ // 5::'~~/ ,.\ " . //f/~ ~i'~.' II / ,; /0"; /',/{i!' o / ~';'</5/ 'If ,//...t(/ . >"m_ / tfl / I~/ /' I' t(/ ';, I /'\ o ~>~ ~s~ ~\ Q~g~ ~~~~ "''''0 ",r w - ... o o o r..~'~'- / . , ./ Or <<0 ~I~ ./ c:lvi i~~ ~;~ Jd 'il;;!:i~ " I " \111 ift Ii I cL / / --' <( l- I w 0 , --' --' j, <( l- I! (/) II 0' w CL , CL I <( ~ 0 Z <( ~ I '. / - - '''- -. - :-- _. -, -'- --- " i , ~~I ~ > ~~ ~~ " ~ g[i~i~~~ ..~ III ~~ ~~ 0< .. ~ ~~ ~~ ~ .5\'i 0" "' ~ ~ ~g ~~~~~\lI~~ n i~ ; ~> 0 i~;~3~~~ :~ -, 8 ~~ ~I ~5 ~~ ~~ I 8: ~~ u Q ., W &' ... 5~ w . g:~ .. .< ~ ~~ ,. 0 ! i; c ~- ~~ ~~ z ~ " i~ ~~ .5 ~~ . i~ ~'" OW ~U ~~ 8 ., U .~ io " ~~ ~~~ ~:i ~... ~, ~~ [ !i! i.. ~ i ~ i Hi ai ~~ --' ~ W o Z ~ (/) o~ i ~ u is z <( I e e SHEET 6 CERTIFIED ARBORIST REVIEW LETTER e e ~ ~ ~cue 3224 Price Avenue · Tampa Florida, 33611-3721 (813) 831-2334 · Fax: (813) 837-0364 September 23, 2003 URS Corporation Steven K. Luce, AICP 7650 W. Courtney Campbell Cswy. Tampa, FL 33607-1462 (813) 636-2418 Fax (813) 636-2499 RE: Tampa Bay Water Clearwater Office Site Dear Mr. Luce, This letter is to inform you that on 9/23/03 I, Tim Therrien, performed a tree inspection at the proposed site for the Tampa Bay Water Clearwater Office. This inspections was to determine that the size, species, and general locations of the trees on this site were accurate according to the Topographic and Tree Survey that was prepared by Post, Buckley, Shuh & Jernigan (pBS&J), Inc., on 8/15/03, sheet 2 of2. My findings during this inspection is that the previous noted survey is accurate in the size, species, and locations of the trees on this site. If you have any questions concerning this inspection, please feel free to call my office. Sincerely, \ ~~/~ Tim Therrien Owner/Speedy Tree Care I.S.A. Certified Arborist #FL-0792 2-d v9EO-L.E8-E18 j::: UIUlI=> I ~~T.~~ -- -- ~-- e e SHEET 7 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ERP SUBMITTAL COVER LETTER ., Board of Directars Robert Stewert, LAPerker, Rick Boker, Kathy Costar, Ann Hildebrand, Pam lorio, Susan l", Ted Schroder, Rondo Storms General Manager Jerry l. Maxwell General Counsel Donald D. Conn e TAMPA BAVe: WATER 2535 landmark Drive, Suite 211, Clearwater, Fl33761-3930 Phone: 727.796.2355 / Fax: 727.791.2388 / SunCom: 513.7010 www.tampabaywater.org COpy Supplying Water To The Region September 23, 2003 Ms. Michelle Hopkins, P.E. Southwest Florida Water Management District 7601 Highway 301 North Tampa, FL 33637-6759 Re: Tampa Bay Water Administrative Office Building Environmental Resource Permit Application - General Permit Pinellas County, Florida Section 30, Township 28 S, Range 16 E Dear Ms. Hopkins: Attached is the Environmental Resource Permit (ERP) - General Permit Application for Tampa Bay Water's Administrative Office Building. URS Corporation has compiled the application on behalf of Tampa Bay Water. In accordance with our submittal, please find enclosed the following: . Four (4) sets of construction plans, signed and sealed; . Four (4) copies of the Environmental Resources Permit Application, including information requested in Section C; . Four (4) copies of the Stormwater Management Report for the Tampa Bay Water Office Development; . Two (2) copies of the existing Site Survey; . Two (2) copies of the SWFWMD aerial; . Two (2) copies of the REDI Aerial Map and Atlas; . One (1) copy of the SWFWMD pre-application meeting notes; . One (1) copy of the City of Clearwater Storm Sewer Atlas for the project area; . One (1) copy of the Environmental Report; . One (1) copy of the Deed and Contract to Purchase; and . A check in the amount of $800.00 made payable to the Southwest Florida Water Management District In summary, the Tampa Bay Water Administrative Office development project area totals ::!:: 3.80 acres and includes utilizing an isolated relict cypress area for the .. Ms. Michelle Hopkins, e September 23, 2003 Page 2 e ;" treatment and attenuation servmg the proposed office buildings along with associated parking. We appreciate your review of this submitted information. If you have any questions or comments, please call me at 727-796-2355, or the project engineer, Mr. Josh Bradley, at 813-286-1711. Sincerely, r:~ ~~ Chief Environmental Planner xc (without enclosure): Joshua S. Bradley, P.E., Project Engineer, URS Corporation / T:\Eng...Proj\ VeceJlio\New Office BuiIding\Letter to SWFWMQ.doc e SHEET 8 REDUCED LANDSCAPE PLAN e SNOI$I/\3\1 ~w ._~IlO' toM.'IIII;;1IVO - ~- lW:~ 1MI'1M1O' N'if1e:lSON'if1 I9Ltt VO~OH \lllVM~j 3A~a)MfWONVl ~l ~31'cfM A'cf8 'cfdVf"l """""'~--san !ICI.llOKt_......j, 1IIUIIftI':)IMMOSOU ......-... .......- c::::> . ---I SNIOllna 3::>I:HO 3^11Vl:flSIN1WOlf B31\lM AVa VdHV'l +~ ~ z ~~o ~51~ e~~ ~ 5;):2 - ~~~ ~ <l: ~ ~:~ f- ~ ~ ~:i <l: " w ~ ~\I 0 '" "' ~'! '5 w ~ ~ w " c..? "' in Z ~ 'i y: ~ t:t: 'i <l: ;; ~ CL ~ f? 0 ~III II, ffi ~ z 0 ~ ~ w::! Z => i ~H~ ~ ,:;,:; "' ~ ~ ~~ ffi o O~~3 ~ ~ ~ ~i<( ): ~ l? ooQ~ lI.. ~ ~ ~~~~ ~ ~ I 1111 I IQ co...Ocn N .... ... I"'lNN... n... ::! => ~ => '" 5 /;:.o-:::.~ !b '':-v 110 0\ ! O~,.,....i Ii \ l,,'~\"~:,:, .-r ~!'~, ~~\ >.. \"\::)~i \'~>~> (~'q.,:~ >/ \ .,V/<,~ ,., ~ . 05: i :I: I zl' 0' I ~: I ". S! " 1,-/ " '/ ./ /:' 1/ II 'i f ,/,;,1 /; /1 /':' /;/ ./1 -,,;~I , l/ , ' /1 ,,I <J 0 il 0 / ~ / ~ / ~/' ~~~~--" - I ~ Ii! 8 ~ ~ 5 ! "' ~ ~ ~ 0 is z 0 ~ ~ ~ In '" \1 <'l " 0 z i "' w ~ ijl 8 'z 9 z ~ "' z ~ ~ ~ => 9 w ~ ~ 8 '" '" ~ 9 0 w z i!! ~ 8 '" g => ::! '" ;<; 0: 0 0 " in in 1111.~;.lllr ~::~. ..' /' / . o z w c..? W ---.l 0 ! 0 f? " ~ ~ "' '" ~ w \1 ~ '" w ~ Z ~ <'l ~ 0 z ~ w '" w S ~ w > '" ::; " ::! z " ~ o ~ ::J i= w ~ w w w'" '" ~ tj.... WW e:~~~~ ~r~;~ Q.U:JOll. "'uuu~ zzzzz tititititi xxxxx wwwww o~.@e_ *"000 ~"'_Il-t'CIOI.tf""s ___"_f'lOlI""""'_"""~'I~""W.\~.'''\'S_....-.a ~CSNOlSIA3l:l ~w .18 "ON ~.". _~w - *- *- -- ~I.J.~~-~ --..o.....;llIa_-.L~". -~=...... NYld 3d'if:>SONYl Wtt~~~~~ l:l3J.VMAVSVdlW.L DNI011na 3:)1~~O 3A1J.Vl:lJ.~;Nlwav l:l3.LVM AVa VdlWJ. +~ ffi ~~g ~J ~~~ .- ~~~ .~ ~ B <! ~ o ~.. <.?~~ ~ e j;1 ~ Q,.:i2 0::: ; ~ <! i ~ 0... .. i" t ~II mIl" ~ 0 ~ ~i,'. 9 8 i!i ",II.. ~ i: 011 !!;II ::'11: II II '" ~ ~~ ~ 9 ~,J~ !" ~ 2<g1l~ ~ H~~~ ~ ~ H~~U ~ ~~!. I I I ~ .- I'1N2~ ~ :! '" ~ ~ ~ ~~ o~ ~~ i~ 1l~ ~ ~'"t~ '" ~~ It~ ~ o ~~~~ ~ , ::l ~I';'/ \,,/(/ ,( , \,\ " ' " " o ~ '" u ci ill o ~ ~ // ~i '" "j ~~. ---.-/ " ' ..,---1 '" l'! ~I' ~~:_:;;:;.:____L_. _.. - ~~ ~~; - .. ~,:,,~~~' /' ____~~ " ::'~!'~' /',f' ,-~~~~ - "",";/' / /-, ~~,~~...~,~~_._"j- - // j';:/' ----- /~~"":.,::/ "":' _~__ ______--------- ,. 4-""'/;/ I" ,:::~~~7~"...").~7:c;:; lJr// Ii ~N " ~ '" ! s ~ e; ~ ~ ~ ~ "' 8 ill ~ o z w <.? w -l ~ ~ ~ ~ I ~~Ii~; !~ 5 ~ ~ e -0 r<2\ " ~ v~808g< ~ l? ~ ~ tl~~ ~~U~ hB~ U~U "'''' 1:i1:i 1:i 'HI 00'" .,...,........,..,-_w.. __ _II-_W.._""'.... -- -- ~ o ;= < u G: ~ '" " => " Z :i ci W _ I~ ~-;;~~ ;;c:;~~~~ ~~[~J~~ g:. Vl:;) I/).;r:: ~ m~m ~ .c! ~ ~ '"'l U I ./,u.ub78.7 <..Jl<')N~..,mN -.~~ur;~ f2~~~~iog f- (f) ..--Jw " f-:2 Z~ <~ ..--J>,- CLg ) ~~ 0 u '" iillitl gl.l~~~ ~ 8'<==<!~~~ > LoJ 8 g " 0 Z ~ ~~~~w z :~g~~ ~~ ~ tIlzo:::l;~a.< ~ ~~~~~;~~ u .... 0 CI ~ u...J VI lL.. g 1Xl~-CI'>lC1~C(I D - ~- -- .LSIl.LNYld ON" S3.LON 3d":>SONYl ~ G' ;;.;;.~ uuuuuu uu o 0 c:i ci ci ci ci ci ci ~~-~ g~~~~~ ~~ ==:~:~..:~;;~~~:: ....lL..Ol.L..L.l...u...L.l...lL..L.l...OOOlL..lL.. . - . . . -.. . -. a::C::D::::IOD::: a:: a:: a:: D::D::1O VNa:::a:: Il..a.a...,a. a. a. a.. a.a.,,",N+a.a. VlUlV'J Vl VlVl VI VlVl 1Il1ll '+~':o;;'~lOlO ....;;:;;~~.. "'IN'" -"''''-NN...J...J...J-'''I XXXl.i...XXXXXXL.l...lL..lL..XX t- ~.: I- I- ...: 1-- ...: I- I- r:r::r::rJ:::r::r:J:J:J:J::r::r:IJ: - . - . - .. - "" ~g~NlJJ~~g~~NN~~~ ~~5~5~~5~55~5~~ ..,,.,,,_1"1......"'..,..,,.,___,.,,, II ~ a3 ;S l) t j1 .EU'. i ~ .~ 5E E- ~ ~'" Cl~ ~.: ~OE~ ~] 0 .,O~;g~~] ~~:l~!~q~;~H~ t3~~~~~~~~~:S~j~~5. ~ ~ g ~ ~:"e.g'~ ~ {~~ R~'~ o::~8~~~:S~~a:~~.g;S$~ '-' ~ > g 8 ffi ~ ~:::l; z 0 ffi 8:: 0 ~~3E 5 ~ ~~~ z ~~g; ~~g ~6V1W~ tJ ~~~ Vl~ffi~5I~~~8o~~~_V1w ~$f5ffi:~~:l;e~ugo~~~ ~~~~~~~i~~;~~~i8 ~~O~~~~:gg~~~~~~ ~QlU~::1 ~3.LYMW31:) 3MllJ'lIWWlJW19E51Z l:l3..LVMAVSVdMf.1 t>NlO1lnS 3:)1.:1.:10 ~Il.W.1SlNlwavl:l3J.VMAVSVdWY.1 (f) W f- a z ci ~~~ u~ it:5ag ~~~5 ~~~~ ~-< ~~jf~ ~2~~ <w)g:5 ~~-~~ ~E~~ ;~~~~ I---....lza.~ 5~6~~ ~~~~~ Vi~8~~ ~~~~~ Z....lVlI---Z o....lZZO ~<Q<Vi :5L.1...!<':~:5 ~~~~~ ~~~~tj ~~~d~ ~;~~~ 1---0 < L.I... ~8ffiVi~ ~~~i~ g~~w5 ~1---~-2:2 8~ea:~ ~f~j~: ~~~~~ oWVlL.l...ffi ~g~:4~ ~~~~; U....l~WI--- 'l<:::;io~>- ~~:;~ wc:::zoz F~~Z~ ~~~;j ...:2:80i~ w CL <l: U (f) o z <l: ..--J ~~ ~~ ~~ fu~ ~~ g~ ~8 :;i~ z" "'" OZ ~" ~~ ,," ~~ 5~ ~g ~g ~z ~8 ~w ~F ~~ u" w~ F~ fu'f "" ~~ <w "'~ w~ ~~ ::J~ 1~ ~::l' "]0 ~w ~~ ,,~ ~~ ~~ ::l3 :~ ~l:> : ~tjf@~8 ~[~~~ ~~t:~o ~~~~~ ~~;~~ w~g>~ ~w~:=OI I---lDW~L.I... ~::JFL.l...O < "w ....l:r:oz~ <!Vll---D:F ~~j~~ ~~~~~ ~~ffi~8 via.I :r: gl:>~:~ C:::wt2-z E~~~~ ~wU:::J~ 8F~tii~ ~<~~g ~Cl\:! w Gj~~~~ ~~VlO~ WZL.l...ZVl W::Jo<t,;I ~~<8~ I<C~QZ VI I....lI:5 ~~~:~ <CL.I...<(CD . ~~~~@ : ~~~~ci ~ ....l:;io~~ ~ ~~:~~ ~:~Fg~ ~~t2c30~ j'o;t~~&S~ ~N(;Iza~ :.xf5~~(3 ~~5fr~~ 8~~~ci~ VI ~~~~~ ~~~~~~ ~ ~~ ~~ ~~ ~~ :8 ~8 Q~ Sill g:g: ~':J Ow e:::~ ~: ;~ 'l<::1---L.I... e:::~ :5~~ V1~ ~....lVl Zz ~~~ ~~w- (;Ie:::O -- ~6~ 85 ~g~ all. :8~ ~~ ~ Cl ~.<i! e.::J :5~ ~~~ a~ ~\:iF ll.~ ~Cl~ ~~ ~~::J 8~ ~o~ s~ wl---a CDL.I... j5~ ~o ~cr vi~t3 V111..JI---OZ wtii156d::; ~~~~~~ ~~~~~; ~~~~~~ ~~~~g~ ~::~~~ ~~6QF~ ~~~~~~ o V10=:' e,~~~~~ ~5j~~~ !<lri(j5o~ " ~w R:~<( ~I~ ~~w Zz ~17:~ o:Ww 0;!:~ ~g~ > 0 ~~~ ::JFZ ~~E <tii~ ~~z c5l::j"": z~z oL.l...Qvi < ~z ~~~5 5i~gg ~:~~ ~~~~ :s~e::J ~85~ WClFQ ~~~g J:ClI---O t:~~1--- ~ClOZ o~UQ ~~)-ti zcr:Z:::J a~~~ ~~:58 j:.-[i;) 2~ow ~~S~ ....l~ICl ~~~< ~ll.r~ cr:8gVl ~~!~ ~~g~ ~~~~ ~" ~ .~~~ <"I<Vl2 " t : 'l<::ll.~ 5 ~~ti ~" ~~E ~~~ 8 ;~~ ~ ~~~ g: WIU ~~; ,,~~ 1---~8 ~~~ ~f5~ ~~< ~~~ o:r;B z~~ ~g8 I WZo oo~ ~u~ *~g ~f5~ ""0 ~~U -<o'J:! Cl~1--- ~~e ~~~ ~ ~~8~ ~ ':Jw~~ ~ ~F~g w ~~~8 w wU ~ ~ ~~:~ w g~g~ ~ ~F~~ ~ ~fua~ ~ UOU15 .." ~~~~ ~ ~,,~ ~ Z "';~fu8 ..: 'i ~ ~ ~ i'; ~ o Z o :)j ~ Z 1>' '" g ~ o Ii' ~ ~ " ~ " ~ o u ~ > Z < ~ o W > ~ ~ ~. ~~ ~~ /;:~ ~~ Z ~~ ~ VI~ ....l ~ ~~ g~ ~~ ~> ZZ 0< U" WZ :1 ,,; ~ Z o Z '" ~ ~ ~ o ~ W ~ ~ < " < W '" o Z < ~ ::J ~ W I ~ Z W ~ " i'! 'i1 ~ ~ ~. 5g ~5 ~~ ~~ ~z ~~ W .I "'~ z o I ! 8 ~ ~ " I 8 " E ~ Vi ~ ! ~ " < Z I < "' ~ " < :;: ffi ~ " < " 'i1 ~ i " W ~ < ~ ~ ~ ~ e~ ~ ~g ~ <: i~ ~ ~ 3~ ... ~Y' ~ ~ ;i~ ~ ~ 3i~ ~ " - Z < W Z ~ 0 i ~~ ~ ~fu ~w ~ ~u Z zZ 0 ~ ~~ ~- I ~~ ~ ...... ....lL.l... G: <~ lei ~~ !Xi ~ ~~~ Vl5J: g~~ ":ll::<C~ ~ZI ~~~ 5~~ ~~* ;~~ ww~ ~~~ .,,< ~8~ ~~~ ~~~ ~~:z ~~~ ~~@ o~~ ~~~ fuE:i~ wc:::~ :~~ OVl':J ~ ~ l.L.I:5~ Fti~ <~~ . ~8~~ ~~.~~ ~~~~ ~~e~ ~8~~ ~e:::<Ct3 ~9~~ ~~~~ ~J:~w ~~~~ ~~~~ "~,, lei8~~ g ~~ ~~ z~ ~~ ~; w~ Zz :~ f5ti ~~ "" ~Q ZI <'" ;:;~ ~" ow "'to ,,> ZZ << ~~ "5 ~fu ~~ ~~ i;j~ ;i~ IW ~~ ~w ZI W~ ~~ o~ w" "0 ~; ~~ ~~ jt::l :~ -.--san H.l.I_(t~e) .I.OIl:t__l ~~~-- --- ~ < I ~ ~ o ~ 8 I o W j ~ ~ ~ ~ Z W WW u~z ~--'o ~~~ o ~ ~~~ :4 z~5 ~ ~~~ g <C~~ ~!e- EFll. ... ~~~ t wWw ~ ~~~ ; Vl:J~ ~ Q~::J ~ ~~~ ~ ~j~ : ~a.lIJ U ~~~ I ~<:ll. ~ ~~~ l.L.I -j::. ~ ~~~ ~ ~~~ g ;~~ cr: <c[Sc::: ~ F~~ e; ~l:>~ I ~~~ ~ ~~g ~ i;jii'~ ~ ~~~ <C ~~~~ ~ ~~~~ ~ <:~~U w ituu~ ~ ~~:~ ! ~8g~ ~ ~~g,~ ~8::J 2 ~8~~ c-.... c:::> ~ JI ~ ~~ ~"'''II'''-_''''' ___..n__....._~_~_..... ~ o Z o i ~ '" ~ ~ ~ ~ ~ Z ~ " W U Z ~ ~ '" ~ o ~ > ~ " '" " 'i1 W ~ " ~ i 8 .,; < u ~ ZI ~~ ~~ ~2i '" Zw ~ ~g: ~ ~g ~ << Z EI--- F ~~ ~ wo t" W <. I 5~ J: 5~ ~ ::JQ. ~ ~~ ~ ~~ '::;: ~~ f5~ ;; 8~ u ~~ 5 ~~ ~ ~Si ~" I 58 ~ g,~ " ~~ W ~w Q <co. ~ E~ ~ ~: <: ~~ ~ ~~ ~ ~<C m g!;( " ~> ~ .~~ ~ ~. ~" < ~~ oi 28 Z o " Z < " ~ Z ~ ~~~ ~o~ :=:~t ~~!!l ;~~ ~ I" ~~~ ~~~ IL;!~ 8~5 Ow~ ,<w" F-~U uu ~~O O>~ ~~~ Zu "w" U~Z ~~~ 3i311. ~~" ~WZ <~ ~~~ ~~~ ~ ~~ ZO< ::5~e::: ~"" ~~; ~~~ L.I...~1ii 38~ ~~~ ~cr:1-- ~W~ Z"" 5"" 1l.8::1 ;j~ ~~ ~8 ~~ ~~ !:'~ eJ~ ~i ~~ 0" ~~ g~ G'~ ~l:> ~z ~~ CD~ ~< <" ~gs ~~ i~-, :~~ _u -~. ~- ~ m~ < ~8 "'0 OW m> ",0 :cg: ~~ ';'''' ,"0 IO Ccw ~~~ ~~~ l1i~~ ~~~ '"I~ ~~~ ~~! ~~.~ f:;:~ l!j' l, ~Il!'cf, l O"'5'~" ~, W~ ~ < x ~. N ~E ~~ ~g ~~ i3~ ~~ 00 ~w uu <0 mw SlIV.L3C 3dV:>SCNVl llllEE 't'CftIOl:l 'H3.LYMW3l:J ~~W1~ H3J.YMAVO VdWVl ONlOllna :r.:>I.~.::IO 3AI.1W1SINIWOVH31VM AVDVdMfl x '> m lr J,g 8:J:~~ Ol-~~ ~~~~ ~ ~~c.:i E ~~~ w ~~:s ~ ~~~ ~ ~^t z ~~~ ~ ~E~ ~ ~ 1"") Gi 0 ~ <0 ~ ...J ~ o t:l ~~ >-~ zz :5 0- W W '" >- ~ ~o <;~ "'z ~o m~ :;; u z :;; i3 o z < I ~ o ~ ~Z <<; ~Wa. ~~5 ~~ ~j:~ d~~ o m '" W U ~ < ~ Z W ~ '~ ~~ ...J ~ ~ ~ "'~ ~W uj 0 '" ,,~ t:l 0 ~~ ...J Z ~W ti~ :;;: F 818 ~~ ~ z~ 0 :5~ ~j: <", 0- ~@ >- rn ~Q ::> u;:; o~ ::> ~I;; 8j ~z '" I ~~ <n WW rn "'i!' ~~ ::> 0 ~" '" W ..~ I '"'- Vl ~<;j ~~ ~~ ~::i "'~ t5~ ~W 0< ~8 '" '" W~ ~~ ~ ~ <3> 0 :s~ ,,~ :;; " :;; 0::'" ~ ~ ~'" I W " ~g; ~ 0 ~ :Oiil z ~ Z " " ...J ~ o t:l ~~ zz :5 0- ::; ...J <( 0- C'? c:> ~ JI ~ "11 ---"'......,-_...... ----_......._-~-- ~~ _~w - *- -- N'lfld NOI.L '9'9IHHI UW:E't"InIO'" 'llUYMW31::l 3M:IQloftM'IONY1~ '1:131VMAVSVdNVJ. 1DDDDlllIlI......--~san Hn_(c~e) tOltt__l ~~~_lllII.I. --- ~ c:::> c:r. CNIOllna 301::1:10 3AUW.LSININlV'I:I31VMAVB 'lfdW'tJ. o z w <.? w -l t1 0: ~ ~ 20 ~ ~ ~ ~ ~:::J 0 !5 0 in ~ ~ ili ~ ~m ~"'.. U I;; >'~ 0 ! u ffi< ~ ~:z: a u ~ ~~ e ..Ii '" "'I ~ "" ... 8,,~ b < II)~ S: - VI io .... ~o-~ "'g = ~ ii ~ ~ ;Ii !l!~" ;:l~... ~~ J.. G 9 ~1! oj ~ ::l z~ ~ ~ ~8 ~ ~ ~ " 8'" 1i10 ~i 15 Ii1 ~~ ~ ~ ~~ SQx !z ~ ~~:i J:fl' i~ ~~ ~ i Iff ~ ... Q I ~@] 0 II II II II ~ .. ~ I o Z <C ~ w o ~ W f- (f) ~ C1 ; 6 ~ f- <C ~ <.? i (t: ~ 0::: R JI ~ 'Ii +~. ~ u '" !II ~ ~ " ~ ~ , ~~","'''/"",,;' I (~ 10 ~/ , , , , , , .-, ~ ~ ~. ':x' .....") \ ,/' ~ ~~ ' ~, ~, \~~ '\ '\, ~~ "-,\ '\:\ ", 1\ ~~V":i ue l\'~~' '\<\~"1'; " ~II)~ \\ '\~ .-" II /.? ,~ 0 ill \, \~1;:J' I if ,(\ i ~ ~~~;; ~};t.'1.:..>.'.... r..[)/ 0' //1' //~ll o J~t </ ~~{~' l</~~? i~ t \ (~;'~'Ij~,</ Ii m.'~.'.0.,~mi~~0:>::1~~;:,;;~~"j;~~~5' '>~ /;;:!$~~/~~/~I I: m '~~ ( Ii .... Ii, I; I I !I (-~~~-;, ~~~ ' _,' :,:" 'K~;-~ " ~I /~/l~/,ll:l/~;/ II ; :,'~; o..~. / -~rr;~'r- ~o '~_ / '1/ j/ / / J~~r 0 ~;:/"~>\~ yc'!+,/,{;? / l f' :f~ I IN<,"i~~:0.''''~( ,r//~/ ~ :~~ ' I! :/ r~J?,~~~~ . xli f:~:;/" \[; "'Ir'b"'fi: (~ Iii ~ ~:t?/~j~j~/ tfI", m ~i~y ~-;/.-;;' /' /.;/:/ If ::'< .. , ". .....-;-;-;;;> /' ~;:~/ l:~-'" , "'.4~'/ // ~,,-;'/ ~~~--:;;::;.:______ ___ .... .....~: ~jF//>~~;~ -------- -----------:~;'.::-,. /' h~"',.'l" -.:;-.:;-;'- --,- /~~.:....", ==~-~~~~--~~~~~:::~~::;-~~;-:;;~:;/ ===-,---------l~ l 7===--- \', o h o ~ I'~' \\~/',/ ,,, '<' ',\'\ "\ ',', \, ,\,.~ , ' \, t\ / , ',>..,/'/ '~ .. ..~ 0 00 '-~ % ( , , ...., __""......1___.. -__"H-_'MI"_~_~_"" < ~g 2~ .~ . ~~~ <~< ~~~ (f) g~; ~ jog; o ~~~ Z ~~a. ~ ~~~ Z ~a.C) ~ a.5~ rr: ~~~ ~ U~ 0.. ~~~ 6 f2~~ ~ ~Q;~ <.? ~~t5 n:: :r6~ ~ Vlo::<.:l ---l ~~~ ri ~~~ w ~~0 ~ VJ:::ew '-' ~g!.l ~",-, gi~ 8~~ ~~~ -' a::: o::~ ~Cl~~ eJ~:iU~ ~lD~~~ zwtJ<V) i:;jUll......J5 ~~~~b 8~~~~ ~5i~~~ ~~~~01i aG:.o(~15~ ~~~~~~ ~..JO .L5':r! ..JFa::t5...J1- ~~~~~~ e:5w~e:~ ~~~~~~ ~~~~~~ ~8~~~: ~*~~~iE ~~o::~~g Io~15o..Z ~~iJ~~g ~d~~.:~ ~~~~o~ ~~~~~~ ~~!zSo..~ g:t58~j: jFffiffiC(ilj ~~~<g~ V1~=,::liw:::!, ~:~~~~ ~~~~~~ I-QU..Ii:::::ti!Z 8~~~~~ w::::E ....Ie..=> IOL...<{loJO FUO:::!'o::w ~ " _ou -~. ~- l1YJ.30 aNY S3J.ON NOIJ. YDI~~I ~ ~~ ~~ ~~ ~5 zo w~ <In. "'0 "z 8< ~ w ~~ a~ ~~ 0>- "m ti~ E;~ en ~~~ ~ c(1-~ ~ ~g8 ~ ~~~ ~ ~~o :JVJ...J ~ ~~~ ~ z' is ~~& ~ ~8~ ... Q;~;i ~ ~~~ ~ WOUl l- n. z 0 ~~Q ~ ~R UI ~ ..; '5 ~ ~ u~ ~~ ~ ~u~ lii~~ : ~~ g~~ &llll :5 M~ e: ~ ~~ ~ ;>:'i '"' 8~g I:~ ~'" : ~~ ~~~ ~~ ~~ ~ ~~ ~ ..; j ~!. o 8 eee ~ ~ < o 6 it i'! n. ii ~ i'! '-' z I z W I " .. o ~~ Ww z~ :JEl ~~ ~~ S.,; ~N ~~ < I ~ ~~ w ~~ mw ~m ~~ 0<1. ffii7i >,-, 8~ ?j~ ,,~ Z :i~ :~ >- ~~ o~ ~o oI ~~ mO w" moo ~~ I" ~< '-'0 i; ~~ :Jm :~ '-' ~~ ~w ~~ ~<.:l ~8 gi7j g:~ ~~ ~~ '-'w zm ~~ n.~ ~~ 00 w" '-'" ~~ z" ~< mO m~ :~ 00 ?j: I~ ~..:( ~ :~~ ~o i e ~~~ ~ W::!i~ < :=J::l<: N I :::l!' ~~~ ~ ~ ~ VI::io ::i ~ '" t3<~ ~ is VI ~~~ z i 5 ~~~ ~ ~ <i!~f? ~ F ~ '" .,; Z ~ o~ ~ ~ ~ i 97 Szl: ~ ~ J.~ d 50r~o ~~ e ~ ~ s ~ ~~ ~o ~ ~5 ~-z~ ~ 2~ ~g ~ ~ ~ ~ i~: ~~ ~~ ~ ~ ~ ~: ~ ~I~ ~ : ~i ~ ;~ ~ ~ :bj'g~ ~~ f~:~~ ~ ~ ~ ~~ 5 ~i~ ~ ~ ~~ ; ~; ~ ~ ~ ~9 '$ I !i'" ~ZO ~ J: 0 VI VlZ VI VI~l.l VI lII: Z". ~ a:C VI 0 l~~;'1;~9;i~~~t~ g ~ ~cl~ ~~lL~ ~ ~';j-~ ~~~ ~ ~ N 088e eeeee@@ @@~@@@@@-l o tk: I- Z o U Z o I- (3 ~ tk: W X ~12 ~ ~~ ~ ~~ ~- a.. ((j~ ..... ~ ~~ 0!2 ~~ ~ = ~~ ; g I~~ : ~ o~[j ~ t3 ~~~ ~<"j 5 ~Vi~ z a..~t- ~ ~~8 ~ ~~~ 0:: VlUt- o ~~~ ~ ~o ~ o i= !;;( o ~R 8 ~ ..... ~ " o:i tk: W -l -l o tk: I- Z o U Ow o::~ CDo >-" :r:~ N ~tLtEYCII:I01:l'lilll'f'~ 3MM]lftNW(lN'f'19tSZ ~31VMAY8VdNVl DNICJ11nS 301::1::10 3I\llvtllSINI~~31VMAVSVd"""1 o z < < i'! w o z < " ~ ~ 8 ~ fi' wz ffiQ ~~ n.~ ~~ ~~ WZ mo ~~ I~ ~'" ~~ ~f2 ~~ ~w z'-' OZ u::? w6 Fg5 ~a:@ ~ ~~ ~ ~~:~ ~9 ~~j ~~~7t;;~~ ~~~g: ~m t,) m:a' ~,Z_I ~6 g~ 0 i~: ~ _:Jw~ z 0ee 06 ~ ~ W I ~ g I " o ~ " :i i'! ~ ~ <( 8 1i 0 ~ ~ ~ ~ ~ ~ i ~ ! ; ~ t g 6~ ~~ ~ ~g ~<g ~~ '" !3:~ ~ ~< 0 ~~ ~:> ~;i ~~ 8 ~~ l5 ~~ g 8~ ~ ~~ aO ~~ ~w gjfJ ~~ ~~ mz ~5j OI ~~ ~w W", ~~ <1.0 IO ~~ ti~ ~8 ow ~~ iE~ ~~ 15ffi ~~ ~>- ~~ fu~ i;!z ~~ ~~ Io ~3 ~o oz ~: ~j 8~ ZZ g8 ~~ :~ I~ ~~ .,; ;:i ~ ~~ 5 ~ ~g ~ ~~ ~ ~~ e ~~ ~ 0:=J :J ~~ 5 zz ~~ ~ <0 < ::::i"lD Oi ~~ ~ ~~ ~ 12~ ~ :0" g~ ~ ~~ ~ ~~ ~< i=~ ....... "A' iEVI Z ~w < ~~ ~~ ~~ ~~ ~<i! ~ii' <!il ~ o ~~ ~~ 00 ~g ffi~ ~o :;>" '-" z~ ~~ wo ~5~ ~f?~ ~ ~ a::wO Cl~2E ~~~ ;tc~ 000 ~~I- g6~ ..J~:ci! tQ ~olli ~ a:~~ ~ 58~ i= ~~::l ~ a::===~ Cl :~; ~. ~~a: ~~ ~ ~~ lL~ g:~~ ~8 ~ ~~ iE " o 5 ~ w m o ~ " ..; '" o z < o W ~~ 0" w< ::i" ~w ~m z~ ;:;<1 ~~ ~~ ~: .,; ~ ~ ~ ~ I ~ 0 itL ~ ! 8 ~ . ~~g~ ~~~lli ~;~~ ~~~~ ~~~o 2 r 1Il~~~ ~~~~ S:~~~ J~lIl~ ~~ ~~~ o z < ~ 8 a: ~ 0 o 0 ~~- ~ZO ~~~ ~~N ~8t '-'~" zoo> 3:'u...~ ~~~ ~t< 50F ~o:i ~~!;( ~~5 0ii5u... g~~ gcg ~Io a..t:: Ow o,:~g:~ f2~~~ ~~:~ ii50-< ~;~~ ~::l~~ ~~~: ~ ZO :ci!~~~ ~~~~ ~o z 12 vi~ ~ Sw ~ a..F 8 5~ ~ 88 5 3~ ~ o~ ~ ~a.. .,; C'i c= r:r. ~ ..,-.-....1-_""_ ___u__""__.........__~_"- < 5 o~ ~ I-~ ~ n. ~~ ~~~ :Z~ 8 ~Qg f?!;;(..J ~ ~~~ o,:~> ffi f2ti6 a1 ~8~ ~ ~g:8 t3 ~~~ ~ ~ o 12g~ ~ ~~2 ~ ~ ~ ~~ ~ oma..a.. ~ ~~~~ lnZ:::::!::::::!: N ~ ~ ~~ ~ ~OVlVl V1g;5~ ~ ~ffi~; 12 Vl ~8 t3 ~ ~g w ~ ~~ ll': 1= ~~ o 5 V1~ ~ 0 < ~ ~ ~~ < ~ ~~ " ai w Z ::::; CL tk: 0 W CL <( U 1Il~ O~ z~ <(0 -lz l/1 w > -l <( > <..? Z ::::; CL ::::J 0 U I w :><: ~ u~ 51? ~~ o~ -.;t e:: 0 1Il Z w 1Il Z <( ~ tk: 0 r<1 e SHEET 9 BUILDING ELEVATION GRAPHICS - " - . CITY OF CLEARWATER loNG RANGE PLANNING DEVELOPMENT REviEW PlANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 December 19, 2003 Mr. Keith Greminger URS Corporation 7650 West Courtney Campbell Causeway Tampa, Florida 33607-1462 RE: Development Order - Case FLD2003-09053- 2575 Enterprise Road Dear Mr. Greminger: This letter constitutes a Development Order pursuant to Section 4-206D.6 of the Community Development Code. On December 16, 2003, the Community Development Board reviewed your Flexible Development application to permit an office building with an increase of building height from 30 feet to 55 feet and a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F. Based on the application and the staff recommendation, the Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria per Section 2-1004.F. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. Conditions of Approval: 1. That a SWFWMD permit needs to be provided prior to issuance of any building permits; 2. That all signage meet Code, consist of channel letters for any wall signs, and be architecturally integrated to the design of the building and site; 3. That prior to building permit, provide a revised tree survey, accurately indicating the size of the pine trees; 4. That the irrigation plan be revised to avoid tree impacts, prior to building permit; and 5. That the Tree Preservation Plan be revised to reflect modifications, prior to building permit. Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (by December 16,2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do BRIAN J. AUNGST, MAYOR-COMMISSIONER HoYT HAMILTON, VICE MAYOR-COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BILL]ONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" ~ e . . " December 19, 2003 Greminger, Page 2 not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. The issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4-502.B by the applicant or by any person granted party status within 14 days of the date of this Development Order. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on January 2,2004. If you have any questions, please do not hesitate to call Michael H. Reynolds, AICP, Senior Planner, at 727-562-4836. You can access zoning information for parcels within the City through our website: www.myc1earwater.com. Sincerely, ~~ Cynthia H. Tarapani, AICP Planning Director cc: Paula Dye, AICP, Chief Environmental Planner, Tampa Bay Water S:\Planning Departmenf\C D lAFLEX\lnactive or Finished Applications\Enterprise 2575 Tampa Bay Water (0) - Approved\Enterprise 2575 Development Order December 19, 2003.doc r. ' · 1 e e LL o rwater >- I- u FAX COVER MEMO CITY OF CLEARW A TER PLANNING DEPARTMENT . 100 S. MYRTLE AVE., 2nd Floor CLEARWATER, FL 33756 (727) 562-4567 FAX: (727) 562-4865 TO: ,IJ a-u / L ,tJ Y ..e- FAX: 7 ?/- ~:JlT 0 Phone: FROM: /11; !(..e /(.ey/{A I tlJ' , J"-J 2 - V' PJ'~ Phone: DATE: /2~2-2-- oJ ( SUBJECT: rL-f) ~ 0..3 - ~ <7 () S- .3 MESSAGE: c/R~ eotfzt dJ2../ NUMBER OF PAGES(INCLUDING THIS PAGE) v r. 'l It e ( CITY OF CLEARWATER loNG RANGE PIANNING DEVELOPMENT REvIEW PlANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 December 19, 2003 Mr. Keith Greminger URS Corporation 7650 West Courtney Campbell Causeway Tampa, Florida 33607-1462 RE: Development Order - Case FLD2003-09053- 2575 Enterprise Road Dear Mr. Greminger: This letter constitutes a Development Order pursuant to Section 4-206D.6 of the Community Development Code. On December 16, 2003, the Community Development Board reviewed your Flexible Development application to permit an office building with an increase of building height from 30 feet to 55 feet and a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F. Based on the application and the staff recommendation, the Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria per Section 2-1004.F. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. Conditions of Approval: 1. That a SWFWMD permit needs to be provided prior to issuance of any building permits; 2. That all signage meet Code, consist of channel letters for any wall signs, and be architecturally integrated to the design of the building and site; 3. That prior to building permit, provide a revised tree survey, accurately indicating the size of the pine trees; 4. That the irrigation plan be revised to avoid tree impacts, prior to building permit; and 5. That the Tree Preservation Plan be revised to reflect modifications, prior to building permit. Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (by December 16, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do BRIAN J. AUNGST, MAYOR-COMMISSIONER HoYT HAMILTON, VICE MAYOR-COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BILL]ONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" r. e e December 19, 2003 Greminger, Page 2 not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. The issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4-502.B by the applicant or by any person granted party status within 14 days of the date of this Development Order. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on January 2, 2004. If you have any questions, please do not hesitate to call Michael H. Reynolds, AICP, Senior Planner, at 727-562-4836. You can access zoning information for parcels within the City through our website: www.myc1earwater.com. Sincerely, Cynthia H. Tarapani, AICP Planning Director cc: Paula Dye, AICP, Chief Environmental Planner, Tampa Bay Water S:\Planning Departmenf\C D B\FLEJNnactive or Finished Applications\Enterprise 2575 Tampa Bay Water (0) - ApprovedlEnterprise 2575 Development Order December 19, 2003.doc r ~NSMISSION VERIFICATION REPORT ~ TIME 12/22/2003 15:53 t'~AME PLAN FAX 7275524575 TEL 7275524557 DATE, TIME FAX NO./NAME DURA TI ON PAGE(S) RESULT MODE 12/22 16:51 97912340 00:01:34 03 OK STANDARD ECM .. . I j '.1 . . e e I- LL o u FAX .COVER MEMO CITY OF CLEARWATER PLANNING DEPARTMENT 100 S. MYRTLE AVE., 2nd Floor CLEARWATER, FL 33756 (727) 562-4567 FAX: (727) 562-4865 TO: /'t~ (.:J4t 6--J' ~ ""/}7 -er tP /7- tJ~ -ZV?'f - ~ /l V ~//.1 o,rcAJ 0--1 , FAX: Phone: FROM: /if/ilL /e.ey/t.<J IN , 7<-7/i Phone: U-6 2 - $/tP?b I DATE: /2,-1--2- OJ . SUBJECT: ~ 2063 - () f 0 S- J I MESSAGE: ~"- ~. NUMBER OF PAGES(INCLUDING THIS PAGE) J e . CITY OF CLEARWATER loNG RANGE PlANNING DEVELOPMENT REviEW PLANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRnE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 December 19, 2003 Mr. Keith Greminger URS Corporation 7650 West Courtney Campbell Causeway Tampa, Florida 33607-1462 RE: Development Order - Case FLD2003-09053- 2575 Enterprise Road Dear Mr. Greminger: This letter constitutes a Development Order pursuant to Section 4-206D.6 of the Community Development Code. On December 16, 2003, the Community Development Board reviewed your Flexible Development application to permit an office building with an increase of building height from 30 feet to 55 feet and a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F. Based on the application and the staff recommendation, the Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria per Section 2-1004.F. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. Conditions of Approval: 1. That a SWFWMD permit needs to be provided prior to issuance of any building permits; 2. That all signage meet Code, consist of channel letters for any wall signs, and be architecturally integrated to the design of the building and site; 3. That prior to building permit, provide a revised tree survey, accurately indicating the size of the pine trees; 4. That the irrigation plan be revised to avoid tree impacts, prior to building permit; and 5. That the Tree Preservation Plan be revised to reflect modifications, prior to building permit. Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (by December 16, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do BRIAN J. AUNGST, MAYOR-COMMISSIONER HoYT HAMILTON, VICE MAYOR-COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BILL]ONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" e e December 19, 2003 Greminger, Page 2 not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. The issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4-502.B by the applicant or by any person granted party status within 14 days of the date of this Development Order. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on January 2,2004. If you have any questions, please do not hesitate to call Michael H. Reynolds, AICP, Senior Planner, at 727-562-4836. You can access zoning information for parcels within the City through our website: www.myc1earwater.com. Sincerely, ~~ Cynthia H. Tarapani, AICP Planning Director cc: Paula Dye, AICP, Chief Environmental Planner, Tampa Bay Water S:\Planning Departmenf\C D B\FLEJNnactive or Finished Applications\Enterprise 2575 Tampa Bay Water (0) - ApprovedlEnterprise 2575 Development Order December 19, 2003.doc ~NSMISSION VERIFICATION REPORT ~ TIME 12/22/2003 15:57 NAME PLAt'-l FAX 7275524575 TEL 7275524557 DATE, nlvlE FAX NO./NAME DURAn O~~ PAGE(S) RESULT MODE 12/22 15: 5Eo '381353524'39 00:01:34 03 OK STANDARD ECM e e LL rwater o >- t- u TO: FAX .COVER MEMO CITY OF CLEARWATER PLANNING DEPARTMENT 100 S. MYRTLE AVE., 2nd Floor CLEARWATER, FL 33756 (727) 562-4567 FAX: (727) 562-4865 fJ ~I "- t1v .0/ / 7 91- ~:;yo FAX: Phone: FROM: /It/ ICe I'::~ ,.-L.cj Ie/if Phone: rt 2 - $I' tfl] ~ DATE: /2.... / / - 0 ;J SUBJECT: T~r ct.-- (}7 4.1 if-...Pt/" c.0'r4- ~/~ MESSAGE: JJl.~ ~ J"k// ~~c::./r TOV /7-/'-0:7 C~~ h1~_ NUMBER OF PAGES(INCLUDING THIS PAGE) r: CDB Meeting Date: Case Number: Agenda Item: Applicant: Representative: Address: e e December 16. 2003 FLD2003-09053 E9 Tampa Bay Water. Mr. Jerry L. Maxwell. General Managero'l"J Mr. Keith Greminger. URS Corporation rrZ,.r'\Z 2575 Enterprise Road 0, /tI4 CITY OF CLEARWATER l PLANNING DEPARTMENT STAFF REPORT GENERAL INFORMATION: REQUEST: EXISTING ZONINGI LAND USE: PROPERTY SIZE: PROPERTY USE: ADJACENT ZONINGI LAND USES: Flexible Development approval to permit an office building with an increase of building height from 30 feet to 55 feet and a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F. Office District (0); Residential/Office General (RlOG) 3.8 acres Current Use: Vacant lot Proposed Use: Office building with walkway to existing parking garage North: Commercial District (C); Retail West: Open Space Recreation District (OSIR); Golf course; East: Office District (0); Retail South: Office District (0); Medical Offices; ANALYSIS: This 3.8-acre site is located on the north side of Enterprise Road, approximately 750 feet north of Countryside Boulevard. The predominant character of the immediate vicinity is office and retail. The proposal is to construct a 37,000 square foot three-story office building to serve as the headquarters for Tampa Bay Water. The proposed building will have a light in color brick finish and a pitched roof. A covered walkway is proposed to connect the building to an existing parking garage located immediately east of the site. The site plan proposes 220 parking spaces, with 52 spaces located onsite and the remainder within the adjacent parking garage. The applicant is seeking flexible approval for two deviations from the Community Development Code: (1) an increase of building height from 30 feet to 55 feet and (2) a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F. Staff Report - Community Development Board - December 16, 2003 - Case FLD2003-09053 - Page 1 e e The maximum building height reduction is sought to accommodate the building design, which includes a pitched roof. The height of the building allows for greater vegetative space on the site. The proposal exceeds the typical green space submittal by including an Irrigation TraininglEducation Area to consist of irrigation/landscape test plots, passive observations by practitioners and anticipated two to three field classes per year. CODE ENFORCEMENT ANALYSIS: There are no outstanding enforcement issues associated with this site. STANDARDS AND CRITERIA: (Sections 2-1001.1 and 2-1004): STANDARD PROPOSED CONSISTENT INCONSISTENT MAXIMUM FLOOR 0.22 X AREA RATIO (FAR) (0.40 IMPERVIOUS 0.44 X SURFACE RATIO (ISR) (0.75) LOT AREA 3.8 acres X (minimum) (10,000 sq. ft.) LOT WIDTH 500 feet X (minimum) (100 ft.) FRONT SETBACK 45 feet (to pavement and building) X (25 feet) REAR SETBACK (20 20 feet to building X feet) SIDE SETBACK (10 East setback: 10 feet to pavement X* feet) HEIGHT (maximum) 55 feet to midpoint of the roof X* (30 feet) PARKING SPACES 220 spaces, including 5 handicap X (111 spaces, plus 5 spaces handicap spaces required) *See analysis section. FLEXIBILITY CRITERIA (Section 2-1004.F): Consistent Inconsistent 1. Height: a. The increased height results in an improved site plan, landscaping areas in excess of the minimum required or improved design and appearance; b. The increased height will not reduce the vertical component of the view from any adjacent residential property. Sign. No sign of any kind is designed or located so that any portion of the sign is more than six feet above the finished grade of the front lot line of the parcel proposed for development unless such signage is part [X] [ ] 2. [X] [ ] Staff Report - Community Development Board - December 16, 2003 - Case FLD2003-09053 - Page 2 e e 3. of an approved comprehensive sign program. Off-street parking: The physical characteristics of a proposed building are such that the likely uses of the property will require fewer parking spaces per floor area than otherwise required or that the use of significant portions of the building will be used for storage or other non-parking demand-generating purposes. 4. Front setback: The reduction in front setback results in an improved site plan or improved design and appearance. GENERAL STANDARDS (Section 3-913): 1. Development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties. 2. Development will not hinder or discourage development and use of adjacent land and buildings or significantly impair the value thereof. 3. Development will not adversely affect the health or safety of persons residing or working in the neighborhood. 4. Development is designed to minimize traffic congestion. 5. Development is consistent with the community character of the immediate vicinity. 6. Design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts on adjacent properties. [Xl [ ] [X] [ ] Consistent Inconsistent [X] [ ] [Xl [ ] [X] [ ] [Xl [ ] [X] [ ] [X] [ ] SUMMARY AND RECOMMENDATION: The Development Review Committee reviewed the application and supporting materials on October 30, 2003. The Planning Department recommends APPROVAL of the application for Flexible Development approval to permit an office building with an increase of building height from 30 feet to 55 feet and a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F., with the following bases and conditions. Bases for Approval: 1. The proposal complies with the Flexible Development criteria per Section 2-1004.F. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. Conditions of Approval: 1. That a SWFWMD permit needs to be provided prior to issuance of any building permits; 2. That all signage meet Code, consist of channel letters for any wall signs, and be architecturally integrated to the design of the building and site; 3. That prior to building permit, provide a revised tree survey, accurately indicating the size of the pine trees; Staff Report - Community Development Board - December 16, 2003 - Case FLD2003-09053 - Page 3 e e 4. That the irrigation plan be revised to avoid tree impacts, prior to building permit; and 5. That the Tree Preservation Plan be revised to reflect modifications, prior to building permit. Prepared by: Planning Department Staff: /I11'~ ". ~ Michael H. Reynolds, AICP, Senior Planner ATIACHMENTS: Aerial Photograph of Site and Vicinity Location Map Future Land Use Map Zoning Atlas Map Application S:\Planning Departmenf\C D H\FLEX\Pending cases\Up for the next CDBlEnterprise 2575 Tampa Bay Water (O!\Enterprise 2575 Staff Report. doc Staff Report - Community Development Board - December 16, 2003 - Case FLD2003-09053 - Page 4 4I'ANSMISSION VERIFICATION REPORT ~ TIME 12/11/2003 15:22 NAME PLAN FAX 7275524575 TEL 7275524557 DATE,TIME FAX NO./NAME DURATION PAGE(S) RESULT MODE 12/11 15: 19 97912340 00:02:29 05 OK STANDARB ECM ,dO p.m. e II-t'u..-CJ ]' e Case: FLD2003-09053 - 2575 Enterprise Road Owner: ABR Plymouth Plaza, LTD. Applicant: Tampa Bay Water, Mr. Jerry L. Maxwell, General Manager Representative: Mr. Steve Luce, URS Corporation (7650 W. Courtney Campbell Causeway, Tampa, FL 33607; phone: 813-636-2418). Location: 3.8 acres on the north side of Enterprise Road, approximately 750 feet north of Countryside Boulevard. Atlas Page: 221A. Zoning: 0, Office District. Request: Flexible Development approval to increase building the height from 30 feet to 55 feet and to reduce the side setback (east) from 20 feet to 10 feet to pavement, under the provisions of Section 2- 1004.F. Proposed Use: 37,000 square foot three-story office building. Neighborhood Association: None. Presenter: Michael H. Reynolds, AICP, Senior Planner. Attendees included: City Staff: Frank Gerlock, Bryan Berry, Duanne Anderson, Rick Albee, Tom Glenn and Scott Rice. Applicant/Representative: Steve Luce, Paula Dye, Paul Kurtz, and Josh Bradley The DRC reviewed this application with the following comments: . 1. Parks and Recreation: a) No Comments Stormwater: a) Proposed stormwater pond must meet 24hr recovery per City of Clearwater Drainage Criteria. Please provide drawdown calculations demonstrating that the water quality volume will be available in 24 hrs. This must be addressed prior to CDB. b) Provide copy of approved SWFWMD permit prior to building permit. Traffic Ene:ineerine:: a) No comments. General Ene:ineerine:: a) Need to confirm location of existing 8-inch diameter water main under proposed building prior to CDB. lannin : a) Site data table: state the required number of parking spaces. b) All signage proposed will need to meet the City of Clearwater sign code. See Sections 3-1801 through 3-1807. c) Any wall signage should consist of channel letters. d) Any proposed signage needs to be architecturally integrated to the design of the building and site. e) Provide a plan note on the site plan, which provides explanative information about the irrigation/training area, including the number of anticipated training/touring events per year. rff)Provide color elevations for all sides of the proposed building. '-S';;lid Waste: . a) Dumpster location needed, built to city spec and shown on all drawings and shown on detail sheet. Dumpster location needs to be angled (modify proposed location on site plan). Contact Tom Glenn, Solid Waste Program Coordinator, Tel. # 727-562-4930, ext. 7105 to confirm location. Land Resources: a) Tree survey is inaccurate, most of the pine trees were larger than stated, revise data prior to building permit. b) Show all trees and their canopies on all plans. c) The trees proposed to be preserved in the median island are average to below average trees and may not tolerate construction. d) Re-route storm line away from the existing trees on the east property line prior to CDB. e) Parking lot should be concrete "on grade" with a WANE aeration system at all trees with canopies impacted by pavement. Submit prior to CDB. f) Re-route water line to avoid tree impacts prior to CDB. g) Revise irrigation plan to avoid tree impacts prior to building permit. h) Revise Tree Preservation Plan to reflect modification prior to building permit. Fire: I'"~W I~/~ ~/~~ k~ ,,(,.. ~6. 2. 3. 4. 5. 7. 8. Page 1 of2 . u. f- - u FAX COVER MEMO CITY OF CLEARWATER PLANNING DEPARTMENT 100 S. MYRTLE AVE. CLEARW A TER, FL 33756 (727) 562-4567 FAX: (727) 562-4865 TO: ~~L \~\J c....Q.. FAX: .CO.\ s - (g 3 ~ - 2--4-.<7 7 Phone: ~ \ ":1 - \0 3 \g. LA. \ ~ FROM: Wo-> ~ Wl'-\~. Phone: S lo Z--c t S1:l+ . DA TE:~ lO ~ \)3> RE: fL D Uo '3 - 0 , ().:S" '3 'Z-~ '7"S" ~~rl"'~CL t.-\. MESSAGE: t=\N.-\ l)LC tav-~~ NUMBER OF PAGES(INCLUDING THIS PAGE) '3 RANSMISSION VERIFICATION REPORT TIME 10/31/2003 17:02 NAME PLAN FAX 7275524575 TEL 7275524557 DATE,TIME FAX NO./NAME DURATION PAGE(S) RESULT MODE 10131 17:01 98135352499 00:01:22 03 OK STANDARD ECM . . 2:10 p.m. Case: FLD2003-09053 - 2575 Enterprise Road Owner: ABR Plymouth Plaza, L TD. Applicant: Tampa Bay Water, Mr. Jerry L. Maxwell, General Manager Representative: Mr. Steve Luce, URS Corporation (7650 W. Courtney Campbell Causeway, Tampa, FL 33607; phone: 813-636-2418). Location: 3.8 acres on the north side of Enterprise Road, approximately 750 feet north of Countryside Boulevard. Atlas Page: 221A. Zoning: 0, Office District. Request: Flexible Development approval to increase building the height from 30 feet to 55 feet and to reduce the side setback (east) from 20 feet to 10 feet to pavement, under the provisions of Section 2- 1004.F. Proposed Use: 37,000 square foot three-story office building. Neighborhood Association: None. Presenter: Michael H. Reynolds, AICP, Senior Planner. Attendees included: City Staff: Frank Gerlock, Bryan Berry, Duanne Anderson, Rick Albee, Tom Glenn and Scott Rice. Applicant/Representative: Steve Luce, Paula Dye, Paul Kurtz, and Josh Bradley The DRC reviewed this application with the following comments: 1. Parks and Recreation: a) No Comments 2. Stormwater: a) Proposed stormwater pond must meet 24hr recovery per City of Clearwater Drainage Criteria. Please provide drawdown calculations demonstrating that the water quality volume will be available in 24 hrs. This must be addressed prior to CDB. b) Provide copy of approved SWFWMD permit prior to building permit. 3. Traffic Enl!ineerinl!: a) No comments. 4. General Enl!ineerinl!: a) Need to confIrm location of existing 8-inch diameter water main under proposed building prior to CDB. 5. Planninl!: a) Site data table: state the required number of parking spaces. b) All signage proposed will need to meet the City of Clearwater sign code. See Sections 3-1801 through 3-1807. c) Any wall signage should consist of channel letters. d) Any proposed signage needs to be architecturally integrated to the design of the building and site. e) Provide a plan note on the site plan, which provides explanative information about the irrigation/training area, including the number of anticipated training/touring events per year. f) Provide color elevations for all sides of the proposed building. 6. Solid Waste: a) Dumpster location needed, built to city spec and shown on all drawings and shown on detail sheet. Dumpster location needs to be angled (modify proposed location on site plan). Contact Tom Glenn, Solid Waste Program Coordinator, Tel. # 727-562-4930, ext. 7105 to confIrm location. 7. Land Resources: a) Tree survey is inaccurate, most of the pine trees were larger than stated, revise data prior to building permit. b) Show all trees and their canopies on all plans. c) The trees proposed to be preserved in the median island are average to below average trees and may not tolerate construction. d) Re-route storm line away from the existing trees on the east property line prior to CDB. e) Parking lot should be concrete "on grade" with a WANE aeration system at all trees with canopies impacted by pavement. Submit prior to CDB. f) Re-route water line to avoid tree impacts prior to CDB. g) Revise irrigation plan to avoid tree impacts prior to building permit. h) Revise Tree Preservation Plan to reflect modifIcation prior to building permit. 8. Fire: Page 1 of2 a) No CO~s . 9. Environmental: a) In lieu of a 25-foot wetland buffer, removal of all exotic vegetation from the site will be required. 10. Communitv Response: a) 11. Landscapinl!: a) Show the actual canopies of all existing trees on, and including trees within 25' of adjoining properties. b) Proposed trees should not impact the existing trees indicated on the plan. c) There is a weeping yaup on holly in the center of the circle drive located in the midst of the three-sabal palms. Is this intentional? It does not appear on the color renderings submitted. Adjust plans accordingly. d) Plan does not meet the requirements of perimeter plantings in Code Section 3-1202.D. e) Screen the overhead doors from view. NOTES: Resubmit 15 collated copies of the revised plans and application material addressing all above departments' comments by Thursday, November 6, 2003, no later than noon. I IMS5clPDSIPlanning DepartmentlC D BIFLEXlPending cases I Up for the next DRCIEnterprise 2575 Tampa Bay WaterIFinal DRC Comments JO. 30. 03. doc Page 2 of2 T It . CITY OF CLEARWATER PLANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 loNG RANGE PlANNING DEVELOPMENT REvIEW October 6, 2003 Mr. Steven K. Luce, AICP URS Corporation 7650 West Courtney Campbell Causeway Tampa, Florida 33607 RE: Application for Flexible Development approval to increase building height from 30 feet to 55 feet (62 feet at peak of roof and 48 feet at eaves), and to reduce the side setback (east) from 20 feet to 10 feet to pavement (Case number: FLD2003- 09053,2575 Enterprise Road) Dear Mr. Luce: The Planning Staff has reviewed your application as referenced above. After a preliminary review of the submitted documents, staff has determined that the application is complete, but with the following submissions or revisions necessary: 1. Site data table: state the required number of parking spaces. The Development Review Committee will review the application for sufficiency on October 30, 2003, in the Planning Department conference room - Room 216 - on the second floor of the municipal service building, 100 South Myrtle Avenue in Clearwater. You or your client must be present to answer any questions that the Committee may have regarding your application. Any responses to the above comment may be helpful at the DRC meeting, but additional staff comments will be provided at the meeting. Both the above stated comments and DRC meeting comments must be addressed and submitted to the Planning Department by November 6, 2003, no later than 12 noon (provide 15 copies of all submittals). If you have any questions, please do not hesitate to call me at 727-562-4836. Sincerely, Mr~h~ Michael H. Reynolds, AICP Senior Planner S:\Planning Department\C D B\FLEX\Pending cases\Up for the next DRC\Enterprise 2575 Tampa Bay WateflEnterprise 2575 Completeness Letter. doc BRIAN J. AUNGST, MAYOR-COMMISSIONER HoYT HAMILTON, VICE MAYOR-COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BILL]ONSON, COMMISSIONER "EQUAL EMPLOYMENT ~"D AFFIRMATNE ACTION EMPLOYER" "" '" CDB Meeting Date: Case Number: Agenda Item: Applicant: Representative: Address: ~ . December 16,2003 FLD2003-09053 E9 Tampa Bay Water, Mr. Jerry L. Maxwell, General Managet:" /'} Mr. Keith Greminger, URS Corporation V ~ / ""Z 2575 Enterprise Road 10, i1I4l CITY OF CLEARWATER PLANNING DEPARTMENT STAFF REPORT GENERAL INFORMATION: REQUEST: EXISTING ZONING! LAND USE: PROPERTY SIZE: PROPERTY USE: ADJACENT ZONING! LAND USES: Flexible Development approval to permit an office building with an increase of building height from 30 feet to 55 feet and a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F. Office District (0); Residential/Office General (RIO G) 3.8 acres Current Use: Vacant lot Proposed Use: Office building with walkway to existing parking garage North: Commercial District (C); Retail West: Open Space Recreation District (OSIR); Golf course; East: Office District (0); Retail South: Office District (0); Medical Offices; ANALYSIS: This 3.8-acre site is located on the north side of Enterprise Road, approximately 750 feet north of Countryside Boulevard. The predominant character of the immediate vicinity is office and retail. The proposal is to construct a 37,000 square foot three-story office building to serve as the headquarters for Tampa Bay Water. The proposed building will have a light in color brick finish and a pitched roof. A covered walkway is proposed to connect the building to an existing parking garage located immediately east of the site. The site plan proposes 220 parking spaces, with 52 spaces located onsite and the remainder within the adjacent parking garage. The applicant is seeking flexible approval for two deviations from the Community Development Code: (1) an increase of building height from 30 feet to 55 feet and (2) a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F. Staff Report - Community Development Board - December 16, 2003 - Case FLD2003-09053 - Page 1 . e The maximum building height reduction is sought to accommodate the building design, which includes a pitched roof. The height of the building allows for greater vegetative space on the site. The proposal exceeds the typical green space submittal by including an Irrigation TraininglEducation Area to consist of irrigation/landscape test plots, passive observations by practitioners and anticipated two to three field classes per year. CODE ENFORCEMENT ANALYSIS: There are no outstanding enforcement issues associated with this site. STANDARDS AND CRITERIA: (Sections 2-1001.1 and 2-1004): STANDARD PROPOSED CONSISTENT INCONSISTENT MAXIMUM FLOOR 0.22 X AREA RATIO (FAR) (0.40 IMPERVIOUS 0.44 X SURFACE RATIO (ISR) (0.75) LOT AREA 3.8 acres X (minimum) (10,000 sq. ft.) LOT WIDTH 500 feet X (minimum) (100 ft.) FRONT SETBACK 45 feet (to pavement and building) X (25 feet) REAR SETBACK (20 20 feet to building X feet) SIDE SETBACK (10 East setback: 10 feet to pavement X* feet) HEIGHT (maximum) 55 feet to midpoint of the roof X* (30 feet) PARKING SPACES 220 spaces, including 5 handicap X (111 spaces, plus 5 spaces handicap spaces required) *See analysis section. FLEXIBILITY CRITERIA (Section 2-1004.F): Consistent Inconsistent 1. Height: a. The increased height results in an improved site plan, landscaping areas in excess of the minimum required or improved design and appearance; b. The increased height will not reduce the vertical component of the view from any adjacent residential property. Sign. No sign of any kind is designed or located so that any portion of the sign is more than six feet above the finished grade of the front lot line of the parcel proposed for development unless such signage is part [X] [ ] 2. [X] [ ] Staff Report - Community Development Board - December 16, 2003 - Case FLD2003-09053 - Page 2 . e 3. of an approved comprehensive sign program. Off-street parking: The physical characteristics of a proposed building are such that the likely uses of the property will require fewer parking spaces per floor area than otherwise required or that the use of significant portions of the building will be used for storage or other non-parking demand-generating purposes. 4. Front setback: The reduction in front setback results in an improved site plan or improved design and appearance. GENERAL STANDARDS (Section 3-913): 1. Development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties. 2. Development will not hinder or discourage development and use of adjacent land and buildings or significantly impair the value thereof. 3. Development will not adversely affect the health or safety of persons residing or working in the neighborhood. 4. Development is designed to minimize traffic congestion. 5. Development is consistent with the community character of the immediate vicinity. 6. Design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts on adjacent properties. [X] [ ] [X] [ ] Consistent Inconsistent [X] [ ] [X] [ ] [X] [ ] [X] [ ] [X] [ ] [X] [ ] SUMMARY AND RECOMMENDATION: The Development Review Committee reviewed the application and supporting materials on October 30, 2003. The Planning Department recommends APPROVAL of the application for Flexible Development approval to permit an office building with an increase of building height from 30 feet to 55 feet and a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F., with the following bases and conditions. Bases for Approval: 1. The proposal complies with the Flexible Development criteria per Section 2-1004.F. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. Conditions of Approval: 1. That a SWFWMD permit needs to be provided prior to issuance of any building permits; 2. That all signage meet Code, consist of channel letters for any wall signs, and be architecturally integrated to the design of the building and site; 3. That prior to building permit, provide a revised tree survey, accurately indicating the size of the pine trees; Staff Report - Community Development Board - December 16, 2003 - Case FLD2003-09053 - Page 3 . . ~ . " . e , 4, That the irrigation plan be revised to avoid tree impacts, prior to building permit; and 5. That the Tree Preservation Plan be revised to reflect modifications, prior to building permit. Prepared by: Planning Department Staff: /It/.~ ". ~ Michael H. Reynolds, AICP, Senior Planner ATTACHMENTS: Aerial Photograph of Site and Vicinity Location Map Future Land Use Map Zoning Atlas Map Application S:\Planning DepartmenflC D B\FLEX\Pending cases\Up for the next CDB\Enterprise 2575 Tampa Bay Water (O}\Enterprise 2575 Staff Report,doc Staff Report - Community Development Board - December 16, 2003 - Case FLD2003-09053 - Page 4 e . L EVANS ~ ~ ~ w w ~ ~ w z ~ ENTERPRISE ~ PINEHURST 2N AVE S 2575 Enterprise Road Location Map I Case: Property Size(Acres) : FLD2003-09053 Owner: I ABR Plymouth Plaza, LTD. Site: 3.8 acres PIN: 30/28/16/00000/340/0110 Atlas Page: 221A i - -I 1 : ,________'--7642 , -. t-'--'-- ;~~ ,: ,- - - ~ , , - - - - - . - - . - - - -. , , ------------- , ~ - - - - - - ~ OS/R " ,"", , . ~....~ifDR\ , , ' .., ,..... ----------~ , , : 2538 : 1- - - -, , '-", '" to> ,., , e e 26998 o 0:: LIJ ~ R: 0:: ~ ~ 26990 -' c .S.27 601 j---------------, - . " , , -, :.." ", ~", ').~,1"O, -- \.....' '''- - - - - - - -.. - - - - - --- Zoning Map I Case: Property Size(Acres) : Owner: I ABR Plymouth Plaza, LTD. Site: 2575 Enterprise Road FLD2003-09053 3.8 acres PIN: 30/28/16/00000/340/0110 I Atlas Page: 221A 2~~1...2.:'''\ ;26810 \ , , , , , , \ '. c. en ..Joo. CD -- " . e j---------------. ;- -1_. , Parking L/ ,\ 1 -. " 1,_____------______1 " , , , '"..... 26990 ---Retail , '------.. , , , , " " , 611:P \., 'J "...,1 ,",.............. , ' ..... t .. :,......~~9'.9..., ............... ............ ,,' '..'....' ~---~\ , , , ' " , 1~ ...' ...... 'v"' .. '0 \t. \"\ ....JI \ \ .......... ~ '- 'e ", ,,' , \..... ""0 ;-........\ -,' , ,__________. Z '-\.:) '. I I m ~ " : 2538 : en ~ '~\ ,---1:1---------. 0 \ \ :: '$ ,~, '. I I ,...... , , , ", -: ~: " , Golf Course , , , , , ,,...... , " , ' t.... <.3'""............ " ' " , .....,' " " "'... ,......\, ,,',-,-' ,,-;. ( , " ,..' ,\..", Existing Land Use Map Owner: ABR Plymouth Plaza, LTD. Case: FLD2003-09053 Site: 2575 Enterprise Road Property Size(Acres): 3.8 acres PIN: 30/28/16/00000/340/0110 Atlas Page: 221A e e Aerial Map Owner: I ABR Plymouth Plaza, LTD. Case: FLD2003-Q9053 Site: 2575 Enterprise Road Property Size(Acres) : 3.8 acres PIN: 30/28/16/00000/340/0110 I Atlas Page: 221A e "O~ t:: v cd Vl ~.- V I-< ~ :> 0... cd 0 I-< ~.D V Vl cd 1:: ~'-"'~ 00 v a t:: 00 :.QE!O~ o cd tl::: ~ 0001;)0 - 00 cd- Vlt::V~ ~ ..;::: ..s:: '-'" v.~ t v .- ~ O."!::: > v t:: Vl - ("fj 0 Q) ("fj 0 r:n tr) N .~ 0 " 1.0 ~ 0\ N ~ 0 I ~ ("fj Q) t.r) 0 .D Q) 0 S t"- ~ N Q) t.r) Q ;:> ~ ~ 0 N ~ Z e - Q) en 'C t;; e- Q) Q) ~ 1:: '€~ O"'c::l s::: """ ooro s::: ~ ..... 0 ~..... o Q) o .t::: - en ~ E ..... 0 :>ct:: Q) ..... .;;; t,...; 0 """ ro Q) """ ~ t1 ("f) ro 0 Q) Cl) 0 ..s::: ("f) N t -en Irl 0 .~ 0 <- \0 s::: ~ 0'1 N 00 ~ 0 s::: I ~ :.g ("f) (1) l./") 0 ..0 0 Cl) 0 S .9 r--.... E N (1) ~ l./") Q ::> Q) ~ ~ 0 :> N ~ Z ~ z ~ b.1 ... 2 ~ ~"i' ~ !il l5:h _ q l:: ~~i ~ J;:. ~ i'61 ~i>" &;~~l:~ ~Ie~ e~:5~~~ u 8 S!:!~i~~ ~ ~i Il: i5~: l ~ o ~ ffi! >- :::1 ~~":":- t: ... ~ g .d~ u ... -f< .;!ii~ ~t; ~ i ~lb.:s:g15 ~ ~ _o~O'.!!:~ .;: ~:~rr~:u. r~ o ~og.~to'O'2 U e 5E~1...~€~'6 ~~ .~~'bo.sol 10 :~i'Oilil~ l:~ J:l.s!iI(.E~"'~ oS'" 11,,&'5- 9 a: -1/l~ c:~=:5 .C5;o:.~.:: ~(jl~ ~!a:~:~~~ ~{;:5 2........= ..,,2!i -I .. It 0 ~~cb:~!Io,;! .!']1i 2e.!''' ..:..~::ii3 fIO"S.S. ~i~]~i~~~: [~ g~"'~ic';';c.~ "D ii:/l~"~"~p ~j ~:~I ~~~iro .!!] t :d"l: i~",a ~~ ! u~;lii:~4J~l oS Il~1~i~~5i: ~ e,. o ~ zEe 0 o N o ~ - ~ ~ :J >- >- .... 0:.... ~ ~u X >- 00: ... .... 0:... Z 0: Z Q..... Z ... 0 ~ < Q. ~ ... I 0 < '- f5 z 0: 0 0: 15 VI ::; < < .... Q. ~ m VI ...... .... 0 in '" ... VI 0:-' i ... w < ::> 0: .... <u z 0 z 0 ~ w Z U 0 0'" '" Cl ::; II> - " ::; wO W 0 0 u < oin ... z ... Z 0 0 >- <.... 0: >- Z z -' .... Die: Cl .... 0 0 W m -' 0 < 0 N N <.:> =: w @ ..,. [;3 -1 CO) ... . ~ ~ U~ ::s \- ..01 001 w........ Ill.. 5~ w........ o::S' <( (1)"'- <(N ....IN I- <( Zw o c t~ Zl>!1 Z lLlIl O Oll) .,.N N~I 3:0 Ill!') o ~ ~I ~ ~-~--- ~ N ~U " I r1 Lj t- ~ ~ ....) '.- i! I ~r'l =L.~ i t'" V) I ~ ~ ~ ~ C'J fB-'~ In I In i i ~ i r..n.......n.~ ~nn..__.__.nj !;>d'll6JaW-g-u!5ua '~lIaJ:)~ '~d ZO:9\7:ZO WIEIIlO '6Mp""Ill\S\fll\1\O\fOOl.n\l\NmN3\:S fl fl fl - fl fl fl fl e fl 0 0 0 0 0 0 0 0 > > > > ~ ~ ~ ~ 0 0 .... 0 0 ..... 0 0 0 n ..... ..... ~ ..... t ~ ~ .j:>. 00 -..l i;~ Ul 0- 0 00 0 Ul Ul 0 0 'Tj <: :;00 s:: ~ 0 ~ ot"" ::gO tr:1 ~ CD CD CD .... 9 :E ~ :l CD ;:J. n Il' ~ CD - -g (JCl Il' en CD - ~ & s -<' p.. _. CD Il' ~ 5' :l (J CI:I s:: .... :l 3 Il' .... CD n >-3 (JCl ;:a e; 0 >-3 CD CD tr:1 CD el. ...., 0 ;:J. .... e:. < :l ~>~ Il' (J CD 8: (J ?; - :l :l S 8- '< 0 en (JCl (JCl Il' n n :;0 0 3 ~ e:. ~ :;0 z:lCll - CD ..... ~ CD '"0 :::: Il' n C < ::Ill::: 3 r;> n - 0' 5' n < o' '"0 - p.. ft (JCl ::r o' o' CD :E Il' :l '"C p.. :E n :l CD - en a 5' en '"0 ~ ~ \0 ~ \0 ~ \0 \0 ~ \0 -- -- -- t:3 t:3 N N N g:: g:: ~ g:: ~ g:: g:: ~ ~ ~ N N N N N g g g g g g g g g g ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ..... Q ~ t:3 g ~ ::r:: :E o z o :l CD z o :l CD z o :l CD z o :l CD z o :l CD ::r:: :E o ::r:: :E o z o :l CD '"0 ~ n o o ~ ::r:: o t"" o o ...., w I~ ~ ~ <~ CI:IS ~ \0 .....t:3 <:g:: CI:I!3 ~ ~ <~ CI:Ig ~ Q :;ON t""Q ON o o '>l ~ <~ CI:Is ~ ..... o :;Ow I> t:3 S ~ ~ .....N <:~ CI:Ig ~ ~ <~ CI:Ig ~ ~ <~ CI:IS ~ ~ I'D ;l> .., "'. :S. ~ ~ s z g.::g ... 0- g-o _. n 0:;0 S'So ~3 go n 6" n l" ::to o :l o ...., go n n ~. '" ::to ;:l (JQ ~ ~ ft ... a l" S' - Q ttJ..... I ~ tr:1N o o '>l \ - Q ..... ~ -- N o o '>l z o :l CD n('1 ~ ~ tD l:/) ~ ~ ~> ~~ ~ :;. N .... =- =t..od 'ft"'l = .... I.C l:/) =~ UI = ~(J'Q o o ~ ttJ 1tr:1 ..... <: CI:I ~ <~ CI:Ig ~ "C J'il G tv o ...., w \0 ...... .....N <~ Cf.l8 w n e; " )> n <:t" ::" .;e ~ fl o > o ...... o ~ "g. (;" !:? 0" ::l ;:a (") (1) <" (1) p. ~ ~ 8 w z o ::l (1) ..... < Cf.l ~ N .....~ <N Cf.l8 w ~ o o ...... 0'1 n :;0 >-3 :;0 (1) <: G" ~ ~ ~ N 8 w z o ::l (1) ~ .....~ <N Cf.l8 w ~ ~ o o ~ a:: (1) (1) ... :i" (JQ ~ ~ N 8 w z o ::l (1) ~ N .....~ <N Cf.l8 w ~- > ...... ""'" o Cf.l ~. < f!i: ... \0 N ~ N 8 w z o ::l (1) ...... >-33 .....N 08 w E;-;? ~ 3 Jg'~ oo <t ~ : 0..(') ~~ o o' :;: ::l ;:l ;:l o G ;:l 8- ~$. [g- oo :=.:: ::r'" ~ 8" ... (') ~" oo '0 G (') ~ 0.. oo ::r o :;: ;:l o ;:l E.. fl o ~ ""'" o Cf.l g. Q.: ~ po '" ... (1) :;0 (1) <: G' ~ \0 ...... N ~ 8 w z o ::l (1) :I: o b ~ o~ ~~ o '>.l fl o ~ w o fl o o o N o e ~ ...... o 'i:l ~ P:o :;0 ~ :;0 (1) <: G" ~ 'I:I ::;" (1) :;0 (1) <: G" ~ \0 ...... N ~ 8 w \0 ...... N ~ 8 w ~ Q ...... 0'1 N o o '>.l ...... Q 00 ...... N 8 w z o ::l (1) z o ::l (1) o o @ o o @ o ~ o I> ...... o~ I> N 8 w ...... tl:lQ >~ tl:l8 w Z o ~ :;c (') o ~ G a S' (') G 0- (') ~ G 0.. 5" G ;..: G .g ... oe tv 0.. 0 tv '0 O"::r- (') ./::0.3""," 000 (') :> Ef 0 S' ;c 5. s ~ S;:' ~ (') ~ ;:l ~ 5.' 3 ~ S' :>~c::: ~~ 3 "C.""'J'il Z ~"(')s:: ",S'-G (') ;:l ::l. ~ ~ G :;c >-<:Z OClo3 GOOG ...., S'- ::l. G G ~ '0 'Ti ~PG ~og. ;a s.~~ -~(') tIi G G./::o. S' Eo Eo Z :;:~~ ::r2:Cii rJJ ~~ g ~~g- tB 2~~ ...:;:= (') s:: -" G ::r ~ (') ...., E.. go ~ tn" Ef ~ o ~.=r~ ~ ~d Z <:~"'" 5.~~ (;j 8.~D. ~~.'g g; s~; =:g5. 10 G ...., 2' ;;;. ~= c::: ~"~ (') ~ 0" = _ =nn c.a..~ :;c O"s::~ oos:a. gj gg:~ :;:;: = <0..... ~S'-'g ~ ~~~ ~G;:l o ~ :;:'gF- Z" ~5. s' ~ G P Cf.l ~ ~ !:? ~ :;0 (1) <: G" ~ ~ ~ N 8 w z o ::l (1) :I: o b ~ I~ ~ o o '>.l fl o o o UI o t""' ~ p. :;0 (1) '" o s:: .... (") (1) :;0 (1) <: G' ~ \0 ...... N ~ N 8 w ~ ...... ~ o o '>.l z o ::l (1) :I: o t""' o 1:;0 > rJJ G G (') o ;:l 0.. ... 0" ;:l ~ ~ <~ Cf.l8 w -I n I;~ ~>~ :z= n:::-:: (j N~ enrll .....~ en:;!:: ~~ ~b :::tIN "'tl= :::tI= Cii~ mf6 :::tI= c~ C1 ~ rIl ~ > ~ """ .... -< .... ~ t""4 .... rIl """ .... := (JCl N ...... N Q 0'1 N o ~ ~ ~ a:: 8 - 8 -4 fl ~ !;~ e tj ~ - tj .j:>. 0 tv ;g trJ t""' ::s ~ ::r: < c.. i' en ~~~ a- n ~ Q 5' -:lCII z ~ (1) {Jq ?:IIl:: :a ~ ~ a en ..... :;0 ;S, ~ (1) (1) :;0 < ~ (1) 0' < ~ 0' ~ \0 ~ N tv ~ ~ ~ tv ~ g g tv W g W - W ~ !2 -...) - -- ;S tv g 8 w ,., z o ~ '"t:I cffl (> w o ..... w ~ <~ CI:Ig w ~ ~ n a, ~. ':" ~ ... tv 2l 3 cre,8'-"(> -, '-" ... c: 5' ~ ~'2.. 3 ::;' 0- _. ~ 0 8. c: ~ 3 ~"Sl :?, ....... -. -. ~ gg:?"Qtv =-"'agVl 2lg..-08' B ~ g O;a. :?, ~ g. ~ :E 5' < :=. ~O-(> ~ EO (> ~ 0- s..~' g g- -3' ::s o' :;s ~::s ~ 'Oc:~ . ~ :::..: a ..... [;je:3 ~ Jg s:- a '0(> g s-~. 8-...... ..., ft (> . o' 3 ::s 12. ~ '-" (> g z o ~ ::r: 12 tj g ~ - g;S 8 ,., - !2 )>:::::! bg w 5'-::: c: (> ::s ~ 0- _. ~. @, g(JQ , a O-~ 0'0 ::s ... o (> ..... ~ ... ..... (> ... a (> o (> 3 tIJ 3 ~, (> - ::s - O-::s ~ ;a. ::s tIJ ~~ 0- _, ::;." -< 5' (> ::s 8' ~... :E 0' (> ::s .....(JQ '0'0 o (> ::s ... 0- o' e~ ..... 0 it..... z o ::s (1) ::r: o t""' tj )> b tIJ (> (> a o ::s ~ o ::s tIJ r":ln N ~ ~ UI ~ CI.l ...., =It n> UI.. > m ~ r') Z _ _ -l l. .... m S :l. ::0 -= _ "tJ-=<-< ::0 CH ~ en b .... m I.e ~ ::0 -= .... C Ul = CH(JC:l tv N 0\ o w ""C ~ - o N w N o o w ~nditions Associated With FLD2003-09053 2575 ENTERPRISE RD e 10/07/2003 landscape 10/07/2003 10/07/2003 10/07/2003 Arden Dittmer 562-4604 Plan does not meet the requirements of perimeter plantings in Code Section 3-1202.0. Not Met Arden Dittmer 562-4604 Show the actual canopies of all existing trees on, and including trees within 25' of adjoining properties. Proposed trees should not impact the existing trees indicated on the plan. Not Met Not Met There is a weeping yaupon holly in the center of the circle drive located in the midst of the three sabal palms.. is this intentional? It does not appear on the color renderings submitted. Adjust plans accordingly. Not Met 10/20/2003 land Resource Condition Rick Albee 562-4741 10/20/2003 10/20/2003 10/20/2003 10/20/2003 10/20/2003 10/20/2003 10/20/2003 Tree survey is inaccurate, must of the pine trees were larger than stated, revise data prior to Not Met building permit. Show all trees and there canopies on all plans. Not Met The trees proposed to be preserved in the median island are average to below average trees and Not Met may not tolerate construction. Re-route storm line away from the existing trees on the east property line prior to D.O. Not Met Parking lot should be concrete "on grade" with a WANE aeration system at all trees with canopies Not Met impacted by pavement. Submit prior to building permit. Re-route water line to avoid tree impacts prior to D.O. Not Met Revise irrigation plan to avoid tree impacts prior to building permit. Not Met Revise Tree Preservation Plan to reflect modification prior to building permit. Not Met CaseConditons 1 of 1 'TJ<: (1) (1) ~ >; ~ ~ >; I" S () S '0 I" $:;. tEl o > o - VI :::00 (1) >; () I" 0.. 5' I" (Jq (1) (') I" n s:: ~ o' ;::l \0 ...... tv 0\ ...... tv o o ~ \0 ...... tv g; tv o o ~ tEl o > o - 0\ - ~ o 'TJ r-' o > 'TJ ~e o - 00 o 9 ~ 1=. (D 0.. o S \0 N 0\ ...... tv o o ~ 'TJ r-' o > tv .j:> .j:> tEl o > tv ~ o r-' ~ (p >; o -, (') o .g (D (p ;::l (1) '" '" Or-' :E ~ ;::l (p ~ ~ o > 0'" g 5' (Jq '"tl >; o '0 \0 ...... tv 0\ ...... tv o o ~ 'TJ r-' o > tv ~ VI '"tlo '"tlo ji;"() ;::l s:: a (1) g '" !:;. ...... I" () ::r (1) 0.. 5' \0 ...... tv 0\ ...... tv o o ~ 'TJ r-' o > tv .j:> VI . o 00 o 'TJ r-' o o o -.I o ~ >; I" S () tT1 ;::l (Jq :::0 (1) -< (D' :E \0 ...... tv 0\ N o o ~ 'TJ r-' o > o o 00 :::0> (1) a hl (1) _. ;::l -< 0.. (1) a 0..(1) g ....;' ;;~ ~~~ z::lCl <>;:::: - 0 ~ ...... - ~ ~ ...... tv N 0 0 0 0 ~ ,., ::r: ::r: z ::r: z z z z z Z :E :E 0 :E 0 0 0 0 0 0 ~ 0 0 ;::l 0 ;::l ;::l ;::l ;::l ;::l ;::l n (1) (1) (1) (1) (1) (1) (1) ~ I\) rIl = C1I ~ r:IJ. 0 ::r: 0 ..... ("D C1I ~ 0 0 0 m > @ r-' @ '"0 0 z~ ~ ~ -t~ - .... ('D m~ -< :::IJ~ .... 0 - ...... "tIQ <--< Vol ~Q cn~ ~ m' .... Q r:IJ. :::IJ~ - CQ -. 1:::0 ~ to Ul = tT1 1 ~ (JQ > r-' tT1 \0 \0 \0 - \0 \0 \0 \0 ~ ~ N N N 0 ...... ...... ...... ...... ~ 0 tv tv tv tv ...... ....... ....... ....... 1:::0 ...... ....... ....... ....... ....... F: tv to - ....... 0\ g; 0\ ~ 0\ g; 0\ g; <: N <: <: N N <: ...... <: <: N <: 0 1 ~ <: tv tv tv tv N ...... en 0 en 0 en 0 > 0 en 0 en 0 en 0 en 0 Q tT1 tv en 0 0 0 0 0 0 0 0 0 0 ~ ~ ~ ~ ~ ~ ~ ~ 0 0 ,., ,., CTZ E:~ 9-:0- ::l 8 (Jq .- () 0 ::l ::tl .... a So ('D 0' () ~ o' ::l 0 ...... So ('D ('D ~. :c S' (Jq 00 :E ~ ("l n- O> >; 00 - '" a ~ 0 " ;l> 8. ...... ::; tv tv ~: ::l <::> - ~ ...... ~ ~ tv ::l ~ 0 ~ 0- 0 ('D .... ~ ~ I" '0 (') >; (1) I" (p 0.. \0 ...... tv 0\ N o o ~ ~ >; (]) (1) en s:: >; -< (]) '-<: :::0 (1) () 0.. \0 ...... tv g; tv o o ~ \0 ...... tv 0\ ...... tv o o ~ tT1 ;::l (Jq 5' (]) (]) >; 5' (Jq :::0 (1) -< (D' :E \0 ...... tv 0\ ...... tv o o ~ - fl "Tj fl ~e fl fl "Tj it fl fl r r ;.- 0 0 0 0 0 0 0 0 !l -t > 0 > 0 0 0 0 0 3: 0 0 0 0 0 0 0 0 0 - i;~ - - ~ ~ ~ l;.) N - Ul 0\ ~ 0 0\ 0 0 0 0 0 0 0 0 > () 0 I:/) I:/) 'i:l "Tj I:/) r r '1:l :::0 :::0 ~ 2- I ~ ::;. 0 po ('D '=' "2- >-3 () 0: I:>;"' ('D ..., ::I (Jq <: :::0 S 0- e:. ~,' (So :::0 ~ ~ I Rei :::0 " ~ f2?: ('D ::E :::0 ,., ('D < ('D .., 00 < ('D - po :::0 (CO po '" ('D >6;, ~:r>~ (CO ~ '" ('D ~ 0 < C'; ::I ::E 50 ~ 0 ::E ..., c:: (CO 0 ..., .~ :::0 ..., ::E = i= ('D (Jq :::0 0 0 ('D ('D ('D n ('D < < < :::0 ";:::: :;:- (CO (Co, (CO ('D ('D ::E ::E ::E < 0- (C. ::E \0 \0 \0 \0 \0 \0 \0 \0 \0 ...... ...... ...... ...... ...... ...... ...... ...... N N N N N N N N N ~h 0\ 0\ ~ 0\ 0\ 0\ 0\ 0\ 0\ ...... N ...... ...... ...... ...... ...... ...... N N N N N N N N '- 0 0 0 0 0 0 0 0 0 ~h 0 0 0 0 0 0 0 0 0 .... l;.) l;.) l;.) l;.) l;.) l;.) l;.) l;.) l;.) *;.1 '~j 0 m ...... 10. - ~ ~" ...... N 0 0 r., \0 0 - ...... 0 N :::: ...... 0\ 0\ 00 N ...... ...... N 0 N 0 0 0 0 0 l;.) r., l;.) Z Z Z Z Z Z Z Z Z 0 0 0 0 0 0 0 0 0 (1 ::I ::I ::I ::I ::I ::I ::I ::I ::I n ('D ('D ('D ('D ('D ('D ('D ('D ('D ~ N CIl ~ tn t'tl l"I.l ::r:: 0 0 ::r:: ::r:: ...... t'D 0 0 0 0 0 tn :*!= r ffi ffi r r m ~ > ""I:l 0 0 0 Z ~ '" -I t""l - lIG ('D m -. tv ::0 0 < N -. 0 ""C - ...., ::0 = t..('J w = en ~ ~ m' _. = l"I.l ::0 \,C - 0= -. ..... 0 0 1:::0 = <: ~ 01 (JQ I ~ I:/) :::0 > > \0 \0 \0 \0 - 0 - 0 ...... ...... ...... ...... 0 0 0 N N N N 0 :::: ...... ..... ..... ..... ..... >-3:::J 0 ...... t:l:l ...... :::0 - ~ 0\ 0\ 0\ 00 N ..... <: <: ...... <: ...... <: ...... ..... ...... ~ 0\ I ...... > ...... 1 ~ <: N N N N a~ ...... N N ...... I:/) 0 I:/) 0 I:/) 0 I:/) 0 :::0 N > 0 t:l:l 0 > N I:/) 0 0 0 0 0 0 0 0 0 l;.) l;.) l;.) l;.) l;.) O' l;.) l;.) 0 t., r., 0.0 Z O.e~ftO!'-l'g g'S:-' en iil c:: 0 ('D :E a 8 :> ::r a ~. ci' 5. 8' :E 0 ('D "tl ""1 O::s . ell ~ (j _. '"0 R? ::I '" ~ ~ r ~ ~ 5. ? ~ 50 0 lIG - ::tl 0 '" ('D ~ ::; ('D a "tl'''' '" '" .., n g: ~g 0 ::tl ~.(jc:: (;"s-~ 00 a (j m O~. ~ '" ('D ::tl '" a -<:Z lIGoa "''''('D 0 '" - r ::r _. ('D -l s- ~o ('D g ~ '"0 o 0 :E 0 g :!J S?P~ ~~g ::I 0 '" ::tl s-:s!tv i;)oo o ~ 50 m ('D ('D -I>- _. eo. po o 0. n _ ~~~ ::S:r= ('D 0.('D 0 Z po ('D.., ::r ciQ' : ('D 0. en - '"0 ('D O::r ::r - . n "tl ~ a 8 :E:E ('D ~g- ~ en ::.: ('D ~ .g:s. ~ 8- ~ n: 0-- 0. ::J eo. ft..::! r;;' ~ :ci ('D 0 i:r ('D 0;="0.'"0 'g('D@ -- 8, ('D Z ~@~ ::s~~ '< >< I('D r;; o:E(j 0.",'"0 '" a c g- ~. ~o g. g '"0 ~ ::tl ('D a:Eo =00: n '" m ('D 0...., 2' _. - ~ @ I:) :E n (j '" '" !"' c:: _. '" _ ~ cr : 0. := n 0 c. ~ ~ '" ~ crc::~ oOsp' () ::r ('Di;) 0:E: 0 ~ :E 0 ~ :=. ~ ~...... "'0 00 - '" 0 c:: <O(i CI:l:r"o ~ 0 > ~. ::s..., ~ ('tl ::s ...... 0. 0 "tl i;) '" :E 'g p.. N N S: = 0 0 - ~ SP.5. ...... .;; ~ Z -.J N ~ 0 ~ 5' 0 l;.) it fl -t fl tI ~;~ tI tI 0 0 - e tI -I:. -I:. 0 tv \0 l' 0 m po =:l =:l ::r: :::, 0.. [/J ~~~ a. .... (') 0 .g =:l 0 ~ S' -::::la .... z ~ Qq n ^ =:l ..... :;0 po e:.. [/J (D ..... :;0 <: (I) .... (I) (=D' :;0 <: :E (I) (=D' <: :E (=D' :E \0 \0 N ....... \0 tv 0\ 0\ ....... ....... tv tv N 0 0\ 0 0 ....... tv 0 W 0 W 0 W - 0 0 ....... :::J - N 0 ....... 0 tv 0 0 W 0 ,., z z 0 z 0 =:l =:l (I) 0 (I) =:l (I) ::r: ::r: 0 ~ b tI "tI I>:> 0<< (l> W o ....., w \0 ....... tv ......0\ <....... C/)~ o w n '" ~ p. 3i: ~ ~ c:r e, "0 -!:3 @ 8 '-' ::l, _, I>:> =:l' !!J ~ Si =:l ~: 0. gag NI>:><tjO ~ 8, eo. 0 ....., o ::l 0 I>:> [Sia D: @&; 8' I>:> !!J ~ g ~~ g. ~ :E -, ~ (l> ::l (i [ Co ~~ 0... !!J ~, s c:r 0.. (JQ::t. (:: Ef-=-g ~ "O[~ ~ ~:=;o :;; f;i&.S i3 ::l ~ O<<::l" (') ~~, ~ Q (D ~ ,. o' ~ i;l ,go - @ 8" @ .g ~. 0. ::r: "Ii ~ S2 ::r:S2 "Ii tv o o ,., - o >:::J b~ o w -, - ::l,-, S ~ 0. _. a ~. _. ::l go<< , () 0.,<: 0"0 ::l .... o ~ ~'" ~ ~ o (l> ~ i (l> _ ::l - o.=:l ~ : I>:> ~ 0..... 0.. ;s . e: ~ g 8' eo..... :E 2) (l> ::l ~o<< "0"0 o (l> 5. g, ~o. o en &0 (l> ....., > b '" (l> (l> () o ~ o' ::l '" n = CIl ~ > m _ n z '~J ~ -I t""l .... m 0 :;l. ]J N ~ "tIQ~ ]J Q ~ en ~ .... m I CIl Q ~ ]J ~ .... C Q = Ul(JQ ~ 00 ~ tv o ~ - S2 tv - ....... tv o o w tit e Conditions Associated With FLD2003-09053 2575 ENTERPRISE RD 10/07/2003 Arden Dittmer 562-4604 Plan does not meet the requirements of perimeter plantings in Code Section 3-1202.0. Not Met landscape 1 0/07/2003 Arden Dittmer 562-4604 10/07/2003 Show the actual canopies of all existing trees on, and including trees within 25' of adjoining properties. Proposed trees should not impact the existing trees indicated on the plan. Not Met Not Met 10/07/2003 There is a weeping yaupon holly in the center of the circle drive located in the midst of the three sabal palms.. is this intentional? It does not appear on the color renderings submitted. Adjust plans accordingly. Not Met land Resource Condition Rick Albee 562-4741 10/20/2003 Tree survey is inaccurate, must of the pine trees were larger than stated, revise data prior to Not Met building permit. 10/20/2003 Show all trees and there canopies on all plans. Not Met 10/20/2003 The trees proposed to be preserved in the median island are average to below average trees and Not Met may not tolerate construction. 10/20/2003 Re-route storm line away from the existing trees on the east property line prior to D.O. Not Met 10/20/2003 Parking lot should be concrete "on grade" with a WANE aeration system at all trees with canopies Not Met impacted by pavement. Submit prior to building permit. 10/20/2003 Re-route water line to avoid tree impacts prior to D.O. Not Met 10/20/2003 Revise irrigation plan to avoid tree impacts prior to building permit. Not Met 10/20/2003- Revise Tree Preservation Plan to reflect modification prior to building permit. Not Met Print Date: 10/21/2003 CaseConditons Page 1 of 1 <') ~ e e ~ 0 :;. 0 C"l \0 "S -- ...... ".0 <') u ...... ...... <: -- <;?1 ~ 0 "' ...... r- u <') ("'"l <') <') <') <') <') <') <') <') <') 8 0 8e1) 8 8 8 8e1) 8<: 8e1) 8 8e1) 0 eI) eI) C:! ~I eI) eI) eI) C"l > 53> 53 > 53 > C"l > C:!> C:! I 53> 53 > C:!> \0 ...... ~~ ...... ...... \0 ...... \0...... <')P:: ...... \0...... ~ S C"l...... C"l C:! ~ ~ 25 C"l...... C"l ~ 0; -- -- 0; 0\ 0\ ...... 0\ eI) ~I ~I OJ) > == f'r) c ...... ~ .- In ... = 0::: rI'J 0'\ W .- = ~ I U) f'r) D:: .... C = ...... = D.. 0 .- N 0::: ~ :9 w <l.) .- I- ~ ... ~ ~ CJ ~ Z p... -< w :it 0 0 Cl,) It) Cl Cl """ rI'J ~ It) ~ ~ N U ~ Cl) Cl) Cl) Cl) Cl) Cl) Cl) 0 Cl) 0 0 U i:::l i:::l i:::l i:::l i:::l i:::l i:::l ~ i:::l ~ ~ 0 0 0 0 0 0 0 0 z z z z z z Z :I: Z :I: :I: <') C"l <') 0 8 0 8 C"l C"l -- C:! \0 <') <') ...... C"l 25 25 -- 0\ ..... ...... <') <') <') <') <') <') <') <') <') <') 8 8 8 8 8 8 8 8 8 8 C"l 53 C"l C"l C"l 53 C"l C"l 53 C"l \0 \0 \0 \0 \0 \0 \0 C"l ~ ~ ~ C"l ~ C"l ~ C:! C"l 0; 0; 0; 0\ 0; i:::l C. 0 .S 8 tI.l ...... tI.l ..... ~ Cl) i:::l ~ "0 p.. i:::l u .~ ~ 0 CIl Cl) Cl) OIl * ...... S- o.. Cl) 'S: ..c: .S ..... "0 ~ :::.:: 'S: u ~ ~ Cl) CIl ..... 0.. ::3 "3 ...... u Cl) ..... 0 ~~I P:: P:: t:l ::3 8 P:: u u ..... OIl CIl ~ 0 ] >. "0 -a <+:: c OIl .S tI.l U Cl) Cl) U ...... Cl) i:::l = ..... CIl 8"0 ~ ..... 0 """ ...... > CIl Cl) ..... Cl) CIl ~ ~ E-< "0 ~ Cl) 8 i:::l E-< 0 ~ OIl U Cl) ..... ~ ..... eI) U CIl ..c i:::l ...... <+:: i:::l .S "0 Cl) Cl) '5b ::3 CIl .s i:::l Cl) 0 Cl) ~ """ ..... '5 ~ 8 ~ CIl g/5: ..... ~ ..... Cl) CIl U ..... i:::l jo j 0 ..... ~ ..... Cl) >~ <:P:: E-< ~ Clp.. E-< ClP:: 00 0 0 Ir) Ir) 0 ~ 00 0 \0 Ir) -0 0 r- oo """ <') <') ...... <') ...... ...... u ~ 0 0 ~ ~ ~ ~ ~ ...... 0 0 ~ Cl Cl <: <: <: Cl ~ ~ Cl Cl Cl Cl Cl Cl Cl Cl ri ri ri ri ri ri ri ri ri ------------ ~ ::E o i=l-. g \0 ..... - ~ - - 25 ~, _ r- ~~ o~ lI'l C ..... = D:: o~ ~ W ~ I tn ~~ ~gc.. 0;;: M D:: ~ ~ ~ ~ ~ Z < w ~ =It: II) l:I:l ~ "'" = "-l ~ U~ \ a '_~ z "8~ ., -o8..~ ~ 0 o.,ro !:>cg'a ~ 8...s ~ t;j.9 ~ CI = ~o ~]!., ~ 000 ~;:::l.o p::: ~ <l';:: ~ .g ~ =.og u:~>,...., _ro .~ <E '- ~.; CY "00= o~e g;j 8 .3 .~ .g .g ..e ~ o.ro"O u~o 00 ~ 0 ~ ro > Z ~ <l 8.. g,.a.~ ~ ~ ~ .~ c.g t;l u o ro ..c:: .,._;:::l =~.... ~~~ Ee .s~"~ ~ a~ r/l 00 .::::,..c:: ~., ~ ~ ~ ::.~ .E ~., ~ o~_ ;::!i~.s p::: 1:00. .... .... ~ ooo~ "'ro ..... ro ~ ., .~ .s E- 0..,., 8!:>0I) z>- ~~~ ~":::o ~u ~.s"~ sU'~ ;:~ ~ .,~ ~ .~ ~ 8 "8 ~ 0 en u ~ o ~ g "8 ~ .~ 8 .E ~ ~ .....;..8.8 8..NO.g;::!i"a'O ~ S .;: .", u <<: 1;! " u t;l o o o ~ o ..c:: 00 "0 a ~ 0. 00 e .g o .... .s l:l ......c:: - 00 ]] if~ "0 0 ., 0 g 0 o ~ o 0 .~ -Iii 0"0 ~ a B ~ ~.s \8 ~ 8.a ~ 80 C:!...... t:::E-< o - ~ 8m ~~ ~ ~ 8m ~~ ~ ~ ~ <X:1 000 25 - ~ 8m C'l ~~ C:! 0\ ~ 8m C'l ~:> C'l...... 0; ~ 8m ~~ ~ ~ 8m ~~ ~ ~ 8m ~:> C'l...... 0; ~ ~~ C'li=Q 25 - <X:1 o m :> ...... 5 o ::r: ~ o o M '- o C'l ., ~ D-. o ....:l o ::r: (1) Q o Z (1) Q o Z (1) Q o Z (1) Q o Z (1) Q o Z (1) Q o Z (1) Q ~ (1) Q o Z (1) Q o Z (1) Q o Z ~ 8 C:! 00 25 - ~ 8 C'l ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 8 8 8 8 8 8 8 8 8 C'l C'l C'l ~ ~ C'l ~ ~ ~ ~ ~ ~ ~ C'l ~ ~ ~ ~ C'l ~ ~ ~ ..... ..... 0\ 0\ ~ (1) "0 ';; ~ ~ ~ (1) (1) (1) (1) (1) > ::.::: P::: .;; ';; .;; '0 u (1) (1) (1) (1) u ~~I ~ ~ P::: P::: P::: 01) (1) .S ~ .... (1) ;:::l t ~ ~ B Q ';; 0 (1) ....... (1) "c;j CJl (1) .;; .9 (1) [/J ';; P::: <<l ....... (1) P::: (1) ~ ~ 'c;; ::E (1) "c;j P::: (1) ~ > P::: ~ P::: .S:l ;;; "0 (1) ~ :'S! ~ E-< l 01) Q (1) (1) <<l .... '0 ....... P::: ....:l ....:l m u:; i=l-. m r;) 0 U 0 0 0 0 0 0 0 0 \0 0 -0 \0 lrl - C'l ~ "'" "'" "'" - - u 8 0 0 0 0 0 - ~ 0 ~ I- 0 0 0 0 0 <X: 0 0 0 0 0 0 0 0 0 0 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ --------------- ~ ~ -.. - ('<) - - 25 r:?# _ t'- ~~ .... In C ..... = 0::: .~ ~ w ~ I UJ ~D:: .0 g 11. .;;: M 0::: .... ~ W ..... ~ I- CJ ~ Z -<..:.: w ~ _ It) rI.l ~ """ = ~ ~ Uu '" e:: .g :.a e:: o u ll) ll) '" C+-; ll) 0';: ~ 0 .9 .; !3 e:: 0.0 000. e:: "0 ..9 ~ c8~ ~ "g "t :.a ;:::l11 '" e:: (5 '" e::-o e:: .~ 8 '" a ~ 0 -= g '" .... f(j '0 .... e:: 0.0 ~"9 ooe:: .S .~ t;l (;j .~ "8 :='"~ l""l o o 25EE - s e e ~ i- "s: "., u -< ~ " u ('<) 8CZl N ~~ ~ 0\ ('<) 8 ~ 01 t'-<t: 25 - .9 '""' '5 a 2"13 "00 ..:g ll) 0. ;s OIl a'S o "'t:l ~ <l::'3~ e:: .0 0. .2";;' .5 .... OIl $:1.- "8 l1J ~ td 2f "'0 -= ~ .S ~ .~ ~ '0 (5g~!a'" ~.9~.g~ N .... c+-; 6 '5 ..;: "g .:: "S 0 o;o~~~ j ~ .- .= a"8.~ g. ~ '" - ~ ~Z"E ~ ll) 1il '" e:: .g :.a e:: o u ~ ..... ~ C+-; ;:::l .0 -0 j ~ ~~ ('<) 8CZl ~> N""" -.. 0\ 01 <t: EE ("T\ c+-; o ("T\ ll) ~ c. <<> c:: o Z ('<) l""l 8 0 0 N 25 -.. 23 - 25 - - ('<) ('<) ('<) ('<) 8 8 8 8 N N ~ ~ ~ ~ N ~ ~ ~ 0\ ~ ~ ~ <<> <<> <<> "> '> '> <<> <<> :=.::: <<> ~ ~ u ~ ~ c; ~ ~~I <<> "> Oll - - c:: c:: '" <<> <<> '" ~ .~ ~ ::;E Oll u 0 ... c:: C/O ... 0 'S "1:l "> ~ c:: 0 '" c:: N ....l ~ ::r: N "<t N 0 -0 - - "<t 0\ u 0 0 0 0 I- 0 0 0 0 0 0 0 0 ~ ~ ~ ~ -------------- o ....l o ::r: 9 o ::r: <<> c:: o Z <<> c:: o Z <<> c:: o Z Inditions Associated With e FLD2003-09053 2575 ENTERPRISE RD 10/07/2003 Landscape 10/07/2003 10/07/2003 10/07/2003 Arden Dittmer 562-4604 Plan does not meet the requirements of perimeter plantings in Code Section 3-1202.D. Arden Dittmer 562-4604 Show the actual canopies of all existing trees on, and including trees within 25' of adjoining properties. Proposed trees should not impact the existing trees indicated on the plan. There is a weeping yaupon holly in the center of the circle drive located in the midst of the three sabal palms.. is this intentional? It does not appear on the color renderings submitted. Adjust plans accordingly. Print Date: 10/13/2003 1 of 1 Not Met Not Met Not Met Not Met CaseConditons Pinellas County Property Appraiser Information: 3028 16000003400110 e _ Page 4 of 4 ;08 :bRISE 22D {\l o li) IY) r- ill r::c .00 C-/ \,0-'-' 284,15 284 4.;./011 0J iJ) co ['..1 PL'l ,\ /-\C " iOQ) --:,'\- /\ " , \, /6' \.0 '\ \, \ 2555 r-fHfERPRr I ,-.. r> FJf) I Pinellas County Property Appraiser Parcel Information B,.l(;.k:..tQ...S~.gr(;h.pgg.~. An_t0-P@Il~tion_Qf thi~gLe~n http://pao.co.pinellas.fl.us/htbin/cgi-scr3?0=1&a=1 &b= l&c= 1 &r=.16&s=4&u=0&p=30+2... 9/26/2003 Pinellas County Property APpraise.formation: 30 28 16 00000 340 0110 e Page 1 of 4 AppraiS~lLinfQJIJlaliQl1 BlJildinginfQnnatiOl1 Map. 0.16 mile radius Same area. cartographic information Sam~ar~a,Lal1dJ]s~,Pmp~rtylls~_<::od_e~~lG, Sa1Jl~J![~a. Sales Info Mass Appraisal is the systematic appraisal of groups of properties as of a given date using standardized procedures and statistical testing. Its purpose is to provide an equitable and efficient appraisal of all property in a jurisdiction for ad-valorem tax purposes. We recognize that there is a reasonable range of values within which a property can sell. Our Mass Appraisal Market Value tends toward the lower end of the range. Recent upgrades or remodeling efforts completed by a seller in order to prepare a property for sale, especially those on the interior of a building, are often not reflected in our Comparable Sales Value. Finally, our values are historical and are developed using arms length sales from the three years prior to January 1. For this reason, our values are generally lower than what a seller will ask for a property in today's appreciating market. Appraisal Information http://pao.co.pinellas.fl. us/htbin/cgi -scr3 ?o= 1 &a= 1 &b= 1 &c= 1 &r=.16&s=4&u=0&p=30+ 2... 9/26/2003 Pinellas County Property Appraiser Information: 30 28 16 00000 340 0110. e . Page 2 of 4 30 / 28 / 16 / 00000 / 340 / 0110 Z6-Sep-Z003 JiM SMith, CFA Pinellas County Property Appraiser 09:Z1:19 Ownership InforMation Uacant Property Use and Sales A B R PLYMOUTH PLAZA LTD 5130 MAIN ST STE 6 NEW PORT RICHEY FL 3465Z-Zi 05 COMparable sales value as Prop Addr: 0 of Jan 1, 2003, based on Census Trac t : .00 sales frOM 2001 - 2002: 0 Sale Date OR BoOk/Page Price (Qual/UnQ) Vac/IMp Plat InforMation 0 /0 01 0 0 ( ) 0000: Book Pgs - 0 /0 01 0 0 ( ) 0000: Book Pgs - 0 /0 01 0 0 ( ) 0000 : Book Pgs - 0 /0 01 0 0 ( ) 2003 Value EXEMPTIONS Jus t / Marke t: 943.100 HOMestead: 0 Ownership % .000 Historic : 0 Use %: .000 Assessed/Cap: 943.100 Tax ExeMpt %: .000 Other ExeMp t : 0 Taxable: 943.100 Agricultural: 0 2003 Tax InforMation Land InforMation District: CW Seawall: Frontage: Clearwater View: 03 Millage: Z3.0851 Land Size Unit Land Land Land Front x Depth Price Units Meth 02 Taxes: ZI.965.84 1) 0 x 0 6.50 170.698.7 S Special Tax .00 2) 0 x 0 .00 .00 3) 0 x 0 . 00 .00 Without the Save-Our-HoMes 4) 0 x 0 .00 .00 cap, 2003 taxes will be : 5) 0 x 0 .00 .00 ZI. 771. 56 6) 0 x 0 .00 .00 Without any exeMptions, Total Land Value: LI09.54Z 2003 taxes will be : ZL 771. 56 Short Legal FROM PNT ON S R/W OF SR 580 & E R/W OF ENTERPRISE Description RD TH S 1150FT (S) FOR POB TH E ZZOFT TH S 135FT TH E L Building Information http://pao.co.pinellas.fl.uslhtbin/cgi -scr3 ?o= 1 &a= 1 &b= 1 &c= 1 &r=.16&s=4&u=0&p=30+ 2... 9/26/2003 Pinellas County Property Appraiser Information: 3028 16000003400110. e . 30 / 28 / 16 / 00000 / 340 / 0110 Page 3 of 4 Z6-Sep-Z003 JiM sMith, CFA Pinellas COunty Property Appraiser Vacant Parcel Property Use: 000 Land Use: 10 09:Z1:Z0 Vacant Extra Features Description DiMensions Price Units Value RCD Year 1) .00 0 0 0 0 2) .00 0 0 0 0 3) .00 0 0 0 0 4) .00 0 0 0 0 5) .00 0 0 0 0 6) .00 0 0 0 0 TOTAL RECORD VALUE: 0 Map With Property Address (non-vacant) ~~[t][f]~~ http://pao.co.pinellas.fl. uslhtbinlcgi -scr3 ?o= 1 &a= 1 &b= 1 &c= 1 &r=.16&s=4&u=0&p=30+ 2... 9/26/2003 8. Case: FLD2003.45 -700 S. Gulfview Boulevard . Ownerl Applicant: Mr. Elias Anastasopoulas. Representative: Mr. Alex Plisko, Plisko Architecture, P A (800 Drew Street, Clearwater, FL 33755; phone: 727-442-7200; fax: 727-447-6914; email: archp@verizon.net). Location: 0.51 acre located on the north side of Gulfview Boulevard at the intersection with Parkway Drive. Atlas Page: 285A. Zoning: T, Tourist District. Request: Flexible Development approval to permit retail sales and services with a reduction of the front (south) setback from 15 feet to four feet (to pavement), reductions of the front (west) setback from 15 feet to two feet (to building) and from 15 feet to zero feet (to sidewalk), reductions of the side (north) setback from 10 feet to zero feet (to ramp), from 10 feet to one foot (to building) and from 10 feet to five feet (to rubber matting), reductions of the side (east) setback from 10 feet to zero feet (to pavement) and from 10 feet to three feet (to rubber matting), a reduction of required parking from five spaces per 1,000 square feet (38 spaces) to 3.19 spaces per 1,000 square feet (23 spaces) and a reduction in the width of the required foundation landscaping adjacent to the building from five feet to two feet, as part of a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-803.C. Proposed Use: A 7,610 square-foot retail sales and services building. Neighborhood Association: Clearwater Beach Association (Pres. Mr. David MacNamee, 827 Mandalay Ave., Clearwater, FL 33767; phone: 727-446-5801; e- mail: dmacnav@att.net). Presenter: Wayne M. Wells, AICP, Senior Planner. 9. Case: FLD2003-09053 - 2575 Enterprise Road Owner: ABR Plymouth Plaza, LTD. Applicant: Tampa Bay Water, Mr. Jerry L. Maxwell, General Manager Representative: Mr. Steve Luce, URS Corporation (7650 W. Courtney Campbell Causeway, Tampa, FL 33607; phone: 813-636-2418). Location: 3.8 acres on the north side of Enterprise Road, approximately 750 feet north of Countryside Boulevard. Atlas Page: 221A. Zoning: 0, Office District. Request: Flexible Development approval to permit an office building with an increase of building height from 30 feet to 55 feet and a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F. Proposed Use: 37,000 square foot three-story office building. Neighborhood Association: None. Presenter: Michael H. Reynolds, AICP, Senior Planner. Community Development Board Agenda - December 16, 2003 - Page 6 .. Case: FLD2003-09053 - 257_terprise Road Owner: ABR Plymouth Plaza_D. 'I Applicant: Tampa Bay Water, Mr. Jerry L. Maxwell, General Manager Representative: Mr. Steve Luce, URS Corporation (7650 W. Courtney Campbell Causeway, Tampa, FL 33607; phone: 813-636-2418). Location: 3.8 acres on the north side of Enterprise Road, approximately 750 feet north of Countryside Boulevard. Atlas Page: 221A. Zoning: 0, Office District. Request: Flexible Development approval to increase building the height from 30 feet to 55 feet and to reduce the side setback (east) from 20 feet to 10 feet to pavement, under the provisions of Section 2- 1004.F. Proposed Use: 37,000 square foot three-story office building. Neighborhood Association: None. Presenter: Michael H. Reynolds, AICP, Senior Planner. . 2:10 p.rn. Attendees included: City Staff: Frank Gerlock, Bryan Berry, Duanne Anderson, Rick Albee, Tom Glenn and Scott Rice. ApplicantJRepresentative: Steve Luce, Paula Dye, Paul Kurtz, and Josh Bradley The DRC reviewed this application with the following conunents: 1. Parks and Recreation: a) No Comments 2. Stormwater: a) Proposed stormwater pond must meet 24hr recovery per City of Clearwater Drainage Criteria. Please provide drawdown calculations demonstrating that the water quality volume will be available in 24 hrs. This must be addressed prior to CDB. b) Provide copy of approved SWFWMD permit prior to building permit. 3. Traffic Ene:ineerine:: a) No comments. 4. General Ene:ineerine:: a) Need to confirm location of existing 8-inch diameter water main under proposed building prior to CDB. 5. Plannine:: a) Site data table: state the required number of parking spaces. b) All signage proposed will need to meet the City of Clearwater sign code. See Sections 3-1801 through 3-1807. c) Any wall signage should consist of channel letters. d) Any proposed signage needs to be architecturally integrated to the design of the building and site. e) Provide a plan note on the site plan, which provides explanative information about the irrigation/training area, including the number of anticipated training/touring events per year. t) Provide color elevations for all sides of the proposed building. 6. Solid Waste: a) Dumpster location needed, built to city spec and shown on all drawings and shown on detail sheet. Dumpster location needs to be angled (modify proposed location on site plan). Contact Tom Glenn, Solid Waste Program Coordinator, Tel. # 727-562-4930, ext. 7105 to confirm location. 7. Land Resources: a) Tree survey is inaccurate, most of the pine trees were larger than stated, revise data prior to building permit. b) Show all trees and their canopies on all plans. c) The trees proposed to be preserved in the median island are average to below average trees and may not tolerate construction. d) Re-route storm line away from the existing trees on the east property line prior to CDB. e) Parking lot should be concrete "on grade" with a WANE aeration system at all trees with canopies impacted by pavement. Submit prior to CDB. Development Review Committee Action Agenda -Thursday, October 30, 2003 - Page 21 t 8. . 9. 10. f) Re-route water.o avoid tree impacts prior to CDB. a g) Revise irrigatio n to avoid tree impacts prior to building perm' h) Revise Tree Preservation Plan to reflect modification prior to building permit. Fire: a) No Comments Environmental: a) In lieu of a 25-foot wetland buffer, removal of all exotic vegetation from the site will be required. Community Response: a) Landscapine: a) Show the actual canopies of all existing trees on, and including trees within 25' of adjoining properties. b) Proposed trees should not impact the existing trees indicated on the plan. c) There is a weeping yaupon holly in the center of the circle drive located in the midst of the three-sabal palms. Is this intentional? It does not appear on the color renderings submitted. Adjust plans accordingly. d) Plan does not meet the requirements of perimeter plantings in Code Section 3-1202.D. e) Screen the overhead doors from view. 11. NOTES: Resubmit 15 collated copies of the revised plans and application material addressing all above departments' comments by Thursday, November 6, 2003, no later than noon. Development Review Committee Action Agenda -Thursday, October 30, 2003 - Page 22 ,..--- - . ~ FlU - - CLEARWATER fI1-rr]lr1!r~~ ~~~.\tl~.LoF rh'tJ~ ~~~ ~ ~~,0, ~ 10 ~C":) ~" .;:e ~ lIir::~ --=-- ~~ ~~\-=::-- :S:lt ~~~---- .,;~" "":o:/~'~;W~P ~~'t' ~~ATE~~.j~ -1r-TJI'n'.'f CITY OF PlANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUIlDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 loNG RANGE PlANNING DEVELOPMENT REviEW October 17,2003 Mr. Frederick L. Busack, Esq. Pennington, Moore, Wilkinson, Bell & Dunbar, P.A. 2701 North Rocky Point Drive, Suite 930 Tampa, FL 33607 Re: Proposed Tampa Bay Water office site, 2575 Enterprise Road, Case FLD2003-09053 Dear Mr. Busack: Thank you for your letter of explanation regarding the proposed Tampa Bay Water office site at 2575 Enterprise Road, including the attachments. Based on the information contained in your letter, I agree that a Minor Lot Adjustment is unnecessary. Should you have any additional questions regarding this site and the Flexible Development proposal, please contact Michael Reynolds, AICP, Senior Planner, at 727-562-4836. Sincerely, IJrMf~f1. W~ Way6.e M. Wells, AICP Senior Planner \\MS5c\PDS\Planning Department\C 0 B\FLEX\Pending cases\Up for the next DRC\Enterprise 2575 Tampa Bay Water\Enterprise 2575 Lot Line Letter 10,\ 7.03.doc BRIAN J. AUNGST, MAYOR-COMMISSIONER HoYT HAMILTON, VICE MAYOR-COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BII.I.JONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATNE ACTION EMPLOYER" ~. ennlngton Moore Wilkinson Bell~ Dunbar P.A. ATTORNEYS AT LAW \V \V \V P l' 11 11 i Il g t () 11 1.1 W . co III tit . Frederick L. Busack Attorney at Law (813) 639-9599 fred(al,penningtonlaw. com October 2, 2003 Wayne Wells Senior Planner 100 South Myrtle Avenue Clearwater, FL 33756 Re: Proposed Tampa Bay Water Office Site Dear Mr. Wells, Thank you for getting back in touch with me on Tuesday. Pursuant to your request, this letter reiterates the discussion we had on the telephone last Tuesday regarding the parcel upon which Tampa Bay Water wishes to construct its headquarters. As we discussed on the telephone, it appears that implementation of the Minor Lot Adjustment process outlined in your email to Paula Dye dated September 26, 2003 would be inappropriate due to the specific facts surrounding the transaction by which the parties originally attempted to split the parent parcel into two separate lots. In July 2002, ABR Plymouth Plaza, Ltd. (hereinafter "Plymouth") attempted to grant Decade Companies Income Properties, a limited partnership (hereinafter "Decade") the eastern portion of the parent tract via a special warranty deed recorded at Official Records Book 12271, Page 1464 of the Public Records of Pinellas County, Florida. A copy of this recorded deed is attached for your easy reference as Exhibit A. Also attached as Exhibit B for your easy reference is a drawing prepared by Northside Engineering Services, Inc. in July 2002. This drawing seems to indicate the lot configuration that the parties had hoped to create by the conveyance. The legal description in the deed attached hereto as Exhibit A attempted to create two lots out of the parent tract by first describing the entire parent tract (referenced in the legal description as Parcel 1) then lessing out the western lot (referenced in the legal description as Parcel 2). If done properly, this would have resulted in a conveyance of the eastern lot to Decade. Unfortunately, a careful review of the "less out" portion (Parcel 2) of the legal description reveals that it is missing two calls and distances as noted in Exhibit A. Without these two calls, the legal description cannot close and is therefore deficient to describe the intended conveyance. As a result, the deed attached as Exhibit A failed to convey the property to Decade and the parent parcel remained intact. As I indicated to you on the telephone and discussed with Mr. Dye, it is unclear to us how the drawing was produced in the Property Appraiser's map with the defective 2701 North Rocky Point Drive, Suite 930 . Tampa, FL 33607 . (813) 639-9599 . (813) 639-1488 fax CLEARWATER TALLAHASSEE TAMPA ~- e e Page Two October 2, 2003 W ayne Wells legal description as it would be impossible to locate the east line of the western parcel from the legal description included in the deed. I understand that your maps are based upon the Property Appraiser's maps and would therefore also contain the erroneous east boundary line depiction. We discovered this title defect and brought it to the attention of Plymouth's attorney. Plymouth and Decade agreed to file a corrective deed that properly described the parcels conveyed. This Corrective Special Warranty Deed is recorded at Official Records Book 13066, Page 1214 of the Public Records of Pinellas County, Florida, a copy of which is attached hereto as Exhibit C for your easy reference. You indicated to me that you had reviewed the survey prepared by Orris Clark Sartor last August which properly illustrates the location of the east boundary of the western lot based upon the corrected legal description. You also indicated that you recognized that the survey illustrates that the eastern boundary of the western lot lies more than 20 feet from the parking garage located on the eastern lot. Consequently, there appears to be no basis for implementing the Minor Lot Adjustment process as the required setback already exists and can now be properly illustrated in a survey because the complete legal description is now part of the public record thanks to the recording of the corrective special warranty deed. We hope that this letter meets your needs, and pursuant to our discussion on the telephone, we understand that Tampa Bay Water need not engage in the Minor Lot Adjustment process. If this is not the case, or if you have any additional questions, please contact me at our Tampa office. Thank you for your assistance in this matter. s~/~ Frederick L. Busack, Esq. Pennington, Moore, Wilkinson, Bell & Dunbar, P.A. Enclosure cc: Paula Dye Linda Roberson Barrie Buenaventura Steve Luce Charles Dye . < .e e EXHIBIT "A" e e r0. k'MlEN F. ][ J!Jl(ER, ClERK If :' PINELLAS COONTY, FLORIDA URT . f 02-376868 OCT- 8-2002 4 : 22PN FINEllAS CO 8K 12271 PG 1464 111111I111111111I1111I11111111I111111 JIIII 1111 III' This instrument prepar ~y and after recording, return to: \/ b Leo J. Salvatori, Esq. Quarles & Brady 4501 Tamiami Trail North Suite 300 Naples, Florida 34103 ------------------- 6C2'i5594 10-09-2002 16~23:30 DAT 51 . OED-DECADE CDlWANlES INCOME 038535 1":02376969 Bf{:1.'l2'71 SPG:W4 Effi:l468 RECORDING 005 PAGES 1 $24. 00 DOC 3TAIi' - DR2l9 3 $25,625.00 $23,649.00 $23,649.00 $.00 SPECIAL WARRANTY DEED :\';- THIS SPECIAL WARRANTY, made this "70 day of July, 2002, between ABR PLYMOUTH PLAZA, LTD., a Florida limited partnership, whose post office address is 6620 Rowan Road, New Port Richey, Florida 34653, ("Grantor"). and DECADE COMPANIES INCOME PROPERTIES, A LIMITED PARTNERSHIP, a Wisconsin limited partnership, whose post office address is N 19 W24130 Riverwood Drive, Suite 100, Waukesha, Wisconsin 53188, ("Grantee"). WITNESSETH that Grantor, for and in consideration of the sum of Ten Dollars ($10.00). and other good and valuable consideration to Grantor in hand paid by Grantee. the receipt whereof is hereby acknowledged, have granted, bargained and sold to Grantee, and Grantee's heirs and assigns forever, the following described land, situate, lying and !:" being in Pinellas County, Florida, to-wit: F::.'~'.:'; ._~__ ;'.?~:~~ BUq:> CD See Exhibit A attached hereto and incorporated herein by virtue of this O:<;':>~316.05. . reference; I";'..'!" Subject to those items set forth on Exhibit B attached hereto and incorporated herein by virtue of this reference. F~~:.::'" ~-: r..~ . t-:'.t; ",-., .. and Grantor does hereby Covenant with Grantee that except as noted above, title to the l.~ "i~li:lnd is free from all encumbrances made by Grantor and that Grantor will fully warrant the -lfjJJ;r ~.. .:'..title to said land, and will defend the same against the lawful claims of all persons claiming . :;:' '>.,:;.$'i by or through Grantor, but against none other. -:; i.~' .,'.. . IN WITNESS WHEREOF. Grantor has hereunto set Grantor's hand and seal the day and year first a ve written. ,/ By: (Corporate Seal) REED DEVELOPMENT COMPANY, a Florida corporation, as General ,----Partner. . __ """--.. "\(\ '. --.......... \. -"-... - , ".' ~ By: -..\. c. '- -~-:::':'~'::'d Robert M. Reed, II, as President ABA PLYMOUTH PLAZA. LTD., a Florida limited partnership .~/'.'~'/;. . ". .~. .i / ( I i.:'.; I , 'i / ../ j '..; Witness No.2 Printed Name QBNAPIJ5913C!.J ~ .,' .... "lit }'J' .-il). i i 1 i I I .. I ~ i f . f I i i ! .;.....i;.:;. __:i escription: Pinellas,FL Document-Book.Paae 12271.14~4 Paa~' 7 ~F ~ :.i J ..j :)1 .. .-.....;,: .': .....:.:.,...>.....;- :{~. \. -- e FINELLAS COUNTY rLA. Orr,REC.8K 12271 FG 1465 The foregoing instrument was acknowledged betor by Robert M. Reed II, as President of Reed Develo e C as General Partner and on behalf of ABR PLY 0 L partnership, who is personally known to e. V e,this'3Q: day ot July, 2002 any, a Florida corporation; Z LTD., a Florida limited :.;i QBNAP\359130.3 ..:;.Jr ,jJt .. ,~k)}t TYPED, PRINTED OR STAMPED NAME OF NOTARY PUBLIC My Commission Expires: ~~~/i;;} LEOJ. SAlVATORI Wi ';.\ MY COMMISSION t CC 967892, . . " EXPIRES: Noven'ber 28, 2004 , 10 hndI4Thn1""'"PubIc~,. - 2 - ..~ ", j r ! I: " I .. .. .. )escriotion: Pin~I2aL<;.FT, T1f"'l,...nm,QMr_~r\.r-\z.,. O:t,....,.~ i"??77 iJ!J:;.d. 'C=It"'I"~. .,......f: r:: rI 'j ",/i .:' STATE OF flORIDA COUNTY OF COLLIER I !i< .jid ; jr .:!:i i i ;' e '_ ~ ::;[~ ~;t~ ~ ~~ 0;;11'1 iii::' }j~ie .13 a::' ~:-~ ~~~~2~g ~~~=~ ~~: e~~:~~~~S:2~~ ~C~~w~~~~~tt :~6~~ 1-'i~iNLo.~ ..~t'~\nllil::,a.~e ~'i~~~~':,t;oo ':XI..I,:o(.z~ ~g~8~~i~~~!3~~~~~ ~ ~~ N~W~~~~UY~'-a~ ~~~~~~p~<<~ ~_~O~ ~ ~- .1J~c'u~O~:ia~~.:..~"'~~ 5~~Ur.!ilJwU~e wu~~~ ~~;~~5~!~~&g~~~~:~ ~g~~~mc~~S;!u~f.~o~ eg~~~~c~~~~~i~:e~~ i-~~~~~5~~ue9;~~:~ ~~~~5U~.!~31~ge!:~~ ~~~~~~~&e~t~~igGO~ ~~~ ~~~a~o~Oe~%~~~ ~;n~~~~~~~~~~~W~~~ ~~~9Z~f~tta .at~~~Z~~ u:5~~~~~~Bow~ge~~" Sz:~~~~ja~~l~:~3~~ ~~u~ e. tW-~3 u~mlJ ~~Q:~~~.~~uu~~a~~~ ~ca~~~~a~:~~~~U~~_ u~~~~ ~~mo~~z,~~uZc~ :z-~a ~vi!a~.! .:l~U..ct:....c ~~~~~~~f~~u~~oa~3~: Df~a~'~!~~~~w~o~c~:~ ~~~~;~l~~~t~E~~E=;~ ~~i~e~~~:;'t~~~~:ie: ~ :>.. ';"':-l .t"t'i! .( l'!~'" '" ~~Sl.i" c~e~~~~~~b~~~~~~~~g ~~O~;~~~.::l~~~ah~~~ a~~~~~:~~~~PE:a~f.~~ o~~~:~e~:=:~~:;~~~! ~~~a~~!!~~~~r~~~~l~ ~l~~=~~~~~~:~t~~~~~ ~~~~~~~~~~~G~~()~UO~ ~~~~Z~;:f~.:~;:~~~~~ ;~;U4~~~P~:!3(~~au: :W~~o~~~~~Ji~~~~~~~k ~~~~~~~~~~~:~J~~~~~ ~!!~~~~~~~:~~~::~~~ ~:~~~:~~-~l~~~~~~~t ~e~~~~~~~~~~t~~:;:~ ~~~~:~~~~~~~~~~~u~e z~~> ~~ o~ 0 ~.&~~ ~~%~~~O~U~X()U~~~ o. ~~~a~~:~~~u~::~:Ui~~ ~~~aU~~!l~~U~~w~~oo ~~r~a~~~..~.~~<<~tw~~ :~~a~~~~~~a~~el~l~~ ~laA~~:~~~b:~~~~2:~ ~ l~!:~~~~~~~~~~~~~~l s j~d:~;~~~g~=8g8~~..~ ~ ~O~~~U~llU?~~~ci~~~: ~,,_ ~~~.~-~~~.-~~~C>~~;~~~'.i ... ~~ri~~~~j~a~~~eC~Ol e ~~~~~5i~~On~~aW.~~M ~ vll'lw OUU;:::&U2w:!_:."uwVl ",15 - :;: b ~ ~ ~ : if - l~ : 6 -' ,.... ~ ~ J ~ tJ ~~~~~~w~~Yw~~~~~1~~~ 0 ~U~;~4~~~~~uz_~O~~tz ~ :~~'~t2~~~Ot~-'-~~~Ea ~ 2j~~~~~~f9~~b~:~a~~~ u =~~&~~:~:~:A~~~l~~~5 ~ 3~~~~~~rl~~~~g~~~~~~i ~ 5~~~~~~~:~~~~~~~~~~~ ~ ~g~~~=~~~~~~~~~~~~~l j ~...B~8~~~~~~~~~~~l~h2 ~ n " o;;~~ ttiS u~ ~ g:gt:, e~w~~ ;;. ~;';;~J .In.~~: w; ~~ ~"" .~... ~o~g~e l:'uu""'J!?;;~. ~~~I- _ ~ i 2 1. ~ n~. ~ 35 :i j r. Ielo~~u:t:~-ci~~~ . i!~lg~wr...5c~o~VI ~ a .. \,oJ 0( 0(. U 0 u :z ~- 11'1 t' (, ~ w;; )0. ~~: 5' <( ~~.... l 'j,."2G;t ;i!~ll~"Uo.ol f! ~ ~ ~ ~~~~ af:1~t~I...<. ~ g ~ '" ~ j! '" tf : ~ '" 5 ~ ~ ..\ Sg5~~~~~o~ow~~ I ~-..!~~t:~~~:':5~b ~~Q"~~~5~oUl~::: o~:~~::;~~~~~~ , ~~~~5 ~ta~U~~:" ""'". j~u~:::~::~~t~~~ ~~g:~:~~i~~5:!~ ~~:ii''!~z'^~~~r~: ::. ~ i't;-;;!;; t1'~ ~I -~~::: 1ft ~~l~~~c~~~f:o(f.~' ~ .~WaAj!;o~,..sou~ ~'t~~~'i~~:''Z L::g~ };~~t::::~t'~~~t:t:o(;' ~!~-t::~g:!~clr.::~~ :_:1; a~~~~dg ~ ~.ri~ ~ ~ ~ ii '~""'. Z a- ; ~ t ... ~ ..--~ c~",:5~~'~",~.J~...r.,: .i~ ~jffmm~mi :. t; t ~ ~: t. i: ::~ ~ ~?' r:= ~'~ ~6.: ~b~;J ~ f: ~l~:.i~ 4;.:, J "" r...., II ~ "I'" ~.. ;t:'3f.~~::;::1~" j "~',,:, u3'tc'I'~:'ai'1,"r;~g::.: ..-Co_ 'j ~ 100' It (, n'" 0" Q' "rIel ::::~::' ~ ~I:.:'; ~~~t::: '!!p ~ ~~it-".~l}~~~~.~; t;~?:~::.~~JJ~:lJ~:;: : E & ~?J ~ ~:: H? ~ ~~ c.': _ G i u '" '"'t ~ \It U .) 0.:,' :; c.~~~~ul;j'~~n:;..djg ~:i~~~~rd::~~::'!! CI ~ lJ () U ~ 1. 0" ~ u ~ :~ ~! ~ : ~ t .:- ~: 'I. u ~:. ~i J,~~ !!~~t=;''E'::~J~''I''.oo( 1 S d" ..- . . ~ 8 ~ ~ ~ J u" 8 ~ ~ ~r: ~~!:::;;:'!~: ~':=~'J ~ ~ ~ :: ~ I:' ~ ~ ~ ~ ~ ~.~ :: :; 69-'- ~....:;:", ..w....(>"'" """,.I r::" 0 . ~: ,-. ! '(,.0 - ~o N~a !e~:;~~:~ 8~9~i tJ!. ~...; ~ ~ ~ g ~ ~ ~ ~ 3 ~E1 : ~ [ ~ .~ :c' '2 :: .t t> ~ ~ :l~' 5~ .. ~ u h ~ ~ S ... ~'i ~ ~~ ~ ~ ~:~ ~'it~~~<( ~t:t~~~v.~& ~~... ~ __..., ~,.)o hl-....~ ~Q,. g~: ~ ~ ~ ~ 1 ~-~:;;{)~;:~r D~~5;~1~~~~~~~~~ ~~ l: ~.: ~' ~ ~~~ ~~~~:;, ~... ul8::dii ~:,). 'i7;:!...'t' e PINELLAS OFr .REC.8K COUNTY 'LR. ~ 12271 PI3 1466 I EXHIBIT A "'''-i,~_ '., c;) ,"",-t "'...... ......_.!! ...:;) C't \.. ~ (rD :1 <: d \' \, V' c J-.- '- J" €J 0 (r- '0 pc,: V') Q) Q) <:J ~.) C ~ Q) ~ ~ ~ .~ :'N"'~.~-- )escription: Pinellas,FL Document-Book.Page 12271.1464 Page: 3 of 5 "'l_~.....__ "f'\"'l!:"Ann~ ~_____.L.. I J. }" e e PINELLAS COUNTY rLA Orr.REC.8K 12271 PO 1487 Exhibit B Permitted Encumbrances 1. Easement in favor of Florida Power Corporation recorded in Official Record Book 6090. Page 835, of the Public Records of Pinellas County, Florida. 2. Easement contained in that certain instrument recorded January 30, 1973, in Official Record Book 3986, Page 85, of the Public Records of Pinellas County, Florida. 3. Easements in favor of the City of Clearwater recorded in Official Record Book 4223. Page 1502; Official Record Book 4442. Page 1147; Official Record Book 4595, Page 56; and Official Record Book 9524, Page 266, all of the Public Records of Pinellas County. Florida. 4. Reciprocal easement agreement recorded in Official Record Book 4245, Page 1654; and in Official Record Book 4282. Page 1150. of the Public Records of Pinellas County, Florida. 5. Reciprocal easement and parking agreement recorded in Official Record Book 4416, Page 98, of the Public Records of Pinellas County, Florida. 6. Restrictions contained in those certain deeds recorded in Official Record Book 4415, Page 1151; and in Official Record Book 4434, Page 842, of the Public Records of Pinellas County, Florida. 7. The rights of those tenants in possession as a result of those leases set forth on the Assignment of Leases and Security Deposit and Assumption Agreement between Grantor and Grantee of even date herewith. 8. Assumption Agreement and Consolidation, Renewal and Restatement of Mortgages and Security Agreements and Assignments of Leases and Rents and Spreader Agreement and Notice of Future Advance recorded July 29, 1997 in Official Record Book 9788, Page 838 of the Public Records of Pinellas County, Florida. 9. Assignment of Rents, leases, Profits and Contracts, from ABR Plymouth Plaza. ltd.. in favor of The Chase Manhattan Bank. N.A.. recorded December 3, 1992, in Official Record Book 8108. Page 2202; said Assignment was assigned to Teachers Insurance and Annuity Association of America by instrument recorded in Official Record Book 9788. Page 831; said Assignment was modified and restated by document recorded in Official Record Book 9788, Page 928; all of the Public Records of Pinellas County, Florida. 10. UCC-l Financing Statement from ABR Plymouth Plaza, Ltd., in favor of The Chase Manhattan Bank. N.A., recorded in Official Record Book 8108, Page 2214; said Financing Statement was assigned to Teachers Insurance and Annuity Association of America by instrument recorded in Official Record Book 9788, Page 837; said 7:- ~..i 1 ~ .1' ~f;;-r ;/ ..,:/~~ .r I ~ Description: Pinellas,FL Document-Book.Page 12271.1464 Page: 4 of 5 ~_~___ An~~AOO~ ~_____~ . ' ;., rf. 1; -~~:.. ! i i i I I I I I ~1fP ./ -.r.: , .il e e PINELLAS COUNTY FLA. OFF.REC.8K 12271 PG 1488 Assignment was modified and restated by document recorded in Official Record Book 9788, Page 944; all of the Public Records of Pinellas County, Florida. 11. Parking Easement Agreement between Grantor and Grantee of even date herewith. 12. Signage Easement Agreement between Grantor and Grantee of even date herewith. 13. Cross-Easement Agreement between Grantor and Grantee of even date herewith. 14. Ad valorem real estate taxes for the year 2002 and all subsequent year, bearing Tax Identification Number 30-28-16-00000-340-0100. 2 . ::..~ ": ~ i i I I I I' ! i l ! , i ; I I I i i ! , in I I I I I I f I I , I .~r Description: Pinellas,FL Document-Book.Page 12271.1464 Page: 5 of 5 n_A~_~ An'~AOO~ ~~__~~~m e e EXHIBIT "C" r--- - . . This instrument prepared by and after recording, retum to: y Leo J. Salvatori, Esq. Quarfes & Brady 4501 Tamiami Trail North Suite 300 Naples. Florida 34103 03-391939 SPT-12-2003 5:0~ PINELLAS CO BK 13066 PG 1214 ,.......... CORRECTIVE SPECIAL WARRANTY DEED THIS CORRECTIVE SPECIAL WARRANrY, made this~ day of ~"JIJAJl2003, between ABRZ-" PLYMOUTH PLAZA, LTD., a Florida limited partnership, whose ~ffice address is 5130 Main Street, ##6, New Port Richey, FL 34652, rGrantor"), and DECADE COMPANIES INCOME PROPERTIES. A UMITED PARTNERSHIP, a Wisconsin Hmited partnership, whose post office address is N19W24130 Riverwood Drive, Suite 100, Waukesha, WI 53188, ("Grantee"). WITNESSETH that Grantor, for and in consideration of the sum of Ten Dollars ($10.00), and other good and valuable consideration to Grantor in hand paid by Grantee, the receipt s- whereof is hereby acknowledged, have granted, bargained and sold to Grantee, and Grantee's ;,i Ra:ORD~irs and assigns forever, the following described land, situate, lying and being in Pinellas :: iC:;N County, Florida, to-wit: '..s . I I 1 I - ~nd Grantor does hereby covenant with Grantee that except as noted above, title to the land is i 11rl~,la't free from all encumbrances made by Grantor and that Grantor will fully warrant the tiUe to said I t 1"'4/ land, and wiD defend the same against the lawful claims of all persons claiming by or through I Grantor. but against none other. I .\:T , ,".1":; .r! ~ ".(" See Exhibit A attached hereto and incorporated herein by virtue of this reference: Subject to those items set forth on Exhibit B attached hereto and incorporated herein by virtue of this reference. Kf.\~ This corrective document is given for the express purpose of correcting a clerical error in the legal description of the original instrument which was recorded in Official Records Bool< 12271, Page 1464, of the Public Records of Pinellas County, Ronda. WHEREOF, Grantor has hereunto set Granto(s hand and seal the day and e Yjlitten. ABR PLYMOUTH PLAZA. L TO., a Florida limited partnership By: QBNAP\401600.1 L ~ T~ L . \ . . ,. ..-{." - ~ .::".' . :-.. .. ..,.... :.->; .....;:.......;.. PINELLRS COUNTY rLR. Orr.REC.BK 13066 PG 1215 I STATE OF FLORIDA COUNTY OF COLLIER The foregoing instrument was acknowledged before me this qth day ".4nl..J1I2003 by ROBERT M. REED, II, as President of REED DEVELOPMENT COM~ Florida corporation. as General Partner and on behalf of ABR PL VMOUTH PLAZA. L TO.. a Florida limited partnership, who is personally known to r~ . , ~ t1 ~ t ~/!J(;~J"1f Notary Pti) D*aK...... . . .., C4I'nIlIiIeIan DOO5Z784 ~ ~ ~__20.2005 - - TYPED. PRINlED OR STNoFED NAME OF NOTARY P\JSUC My Commission Expires: QaNAP\401600.1 -2- i." I i ~ I: i 1 I ; ~ l'BIS DOC1JIIENT OF 'IBIS ~ A PORTIOH QUALITY AHD IIA IS OF POOR . Y BE ILLEGIBLE. L ~ ~ ~~ -~~ ~ -~ Z~M =~ ~~~S ~o ?~ o ? ...oozol5o o,iZ ~... FtI~ ,,!CWC"fUC .0...:- ~'c~ ...~~j!;a.8 ~~o<~ .... 0 .,.-._ It- tD ~o~~~e~~~~~-~~!~: ~1~!~~f~~~~M~~~~~ ~g~A~~~5~8x!w3<%~ ~O~I ~~l5j!;~~:~3~J!~~ 6~ I.P~fi~ j!;o~a~ ~~~ 10~ozzls~~ z~ ~ ;E~!~;3~1~~i~I:;!; e~~lsioJie.!108~:b~ 1-,ui5 IYI<I!g~...;X l~i;.~~JI!I&~ii~~i ~~S ...egcw.~bw~5-oU I~_OO~. >t~ j!;~z~~~ si!li:i!~a~~i~:~; :;;~~3;!~:I~~~;I~i 5!JiJ!=~JI~~~;I~ j~ ;!~~i~;~~;!3~~fill: g>ii~~.~aj!;zl!w! wH- _<I~"~~L~~~ ~~a<~~: o~~i"'~z 0 0 ~ ow. ~&,~=o!:~ ~~~8<~~~~ ~~i 5~ ~~u~~~gls~-~~ D~~~...t~=L~~!:"'IES5- ~~~~~~E~~~;~~!~~~~: ~ <,..,,0"'0' 0"6:to w" - at'", t~ I~.~~F~~&~~~".:O ~~! ~e=ft~~~<J~a~w~g 8~< .055~~I~a~~~~~~ . .~;~~b":~=~tlt;-~~~J!Z!: ~~~J!!~~~~d3!~~~u~~e Of 1~.t_~5~~~ot~~U~~ ~~EiK~~5~~~~~~J!~A:~ ~<..oljzzori1'I!'O::'" M ,-~2i", ~~_;:<tltltI;~~~~~S~~lj3 ~,. l5~_u~~ws~nd ~ ~ ~~~~~~~~~~~"~<<~ . 8~u~ ~H~;-~~"~~~ ~dj<t;"~~z~z_~~~~ ~ !;~b~~Ei~~~~~3~gi=~ ~~~~~=~8-~J!~ .~o,i~~~2i I~~~~~~d= ~~,::~ ~:3 ~_~~= 5~~~~=~~r~a.o ~il~~i~~:il~~~Dil~;1 ~.ftls~c!~aa lj ~.~~~= itl~~~<~~~c~. -tlof~o .3wiu~5i~~aoiI3i~~~ i~;~~~ft~l!b~~~~~J!~2 ,:: 14 ~11~~~~~~li~=~~~ : J!li!~~i~~a~5~~!:=;S ~ goc b~. wo. z_~o.& =.:p~~ez~~~3t1~D"P~ ~!~t"~~~~;a~i~~~;Si g _~ ~~~ 00 ~~c~~ _.~!f;~E~'1~9!~~~~d; I~~f~t~!:i~)~~ii~~~~ &~A~~~~~~co~~~ z~~~z z- O~~O~~ 30 w~ c -I!'~ o~~~~~~c~~~~~~~tlaZzw ~~Fi.u~~~. i~&5iotltl. 11s~~~~~~Pi~&;....~~l5~~ l~tI~_~El53~~~8o~e~~~z ~~t~;~~~tlw;e&~~~ug=~ - ~~A C~F- u~ ~.."cz~w = a ~a_a~3~c~5~~~c~-~ ~ ~< FU=.w~~o~z~-_wx- 0 lk Z c.....:t!:~e ~ ... ~o o~o3 ~ 0 '" ~c.!:... ~~ ~~ ~ i=:Wao ..z CCi .., uw<u 3C2~~< - =~cc ' F:;:~"': ~~~c ~<oo<3~' a=oo"'o~O~K'OO ..... liiz~~~':~Kx~3~ ~D~~a:tl;!<1 ~o...Pg Fil2:o:Z: ~3<.%~0 lo"'~~~~"'~o~ :c- 0......-= :sliClll ZiK~-ti iI;i~ai...~S~~a2~~ ~~~~liio'" ut!1Ol .~ !l8~"'iS~t!~.~..:!~e= eg~~ie21~:;~li~E 1;'!'~~t!~Iii~ft~~I20 oi.!!: az:li!~<::I_d 1:!~~~.~~Ji!iS:: ~~:igfii1,~u~ii~~ uCI~I~j~~u~J!;~ ~~~~> tI~::i~~ii~ :t$ts :::z.Lil2~;tP 5i5i5:i~~titiJ~ef~S . ::Ej!;~~p'~ !ior:~.X,.: o..s:-;t~'" o~...c a~ ~_.~ ~fiuti~~J!i" .!(~~~ii~~e~~~...e tl'i~=8t~:i5E;: %~~co. S6~:i5Z ~ori2~efi::O"~~-'Il:~ _.a 2: Za n~Fw 5j..~o,io~Io::'~O:i~ ~~8!l:: <~G~~!l"'.otf ,:w to. !j!....D Z ~=~ is!j!1'fii Z "ZgFP ~ ...UF"'~'" Xii! 5-<"~P '5!""'~ ~f.!: X ;i;:ii>..~Ez~';ti-o zj_WGl:nz::",w-z ~u!!~~.:t2zgj!;~;t~~ ~w,...o~... w .. 0<:1-- ~~~~:;::~j!!:~~~~"'~~ &O~~o......~:::J...~~~:!w .:~!iE<1~~~..!(O~=~~. ~::i",~li~Ct!~;!!~&"'~ ~~::Ju.~~ ~~uO~!'i~ <.....~o..."'::,~~li.......5 ...~oe:z~"'.--..c:-= o...a.. dg~a~~:::l~..a~5~'" ~dj<ti.-ficz...z~g~ ~",,>~~:z:fj~o~o<czJ! wa:~o .~30~2:~EU .e ,...ft,",,:. _w ittl~.. 0 _ ~Cdor~~>w Z M w~o~~~_~!CE.~W '" ~~,!.~=;~~::.a~~w~z ~ ~~~~~~~::ti~~~~~: ~ ~8:d~~~.iS...a 15-" ~ ~";;~~dtllj!;:~~i~e ~ _gw~uii5~~~a9~~~ = "~~&~~~~~w'u:-a ~ ~ 0< <o::E ~8~ ~... t~~~t~E8Ials~i~tI.~ o~2ti,-U... .;;lj~,o;E~i5 :. ",:glll:!S;~~~~::'2~~;!j!!: ~ ~=~:~ :~~~~~~Ec ... i g"2~~o~~;SiL.e ~ g!~_~:~~~~e~~:S a "t:... ';I;~~_)..N:::JZ e-. III J o:Jt:s:C'lI...- ,...-- · ... ~3~~wz~i>~~5~i~~~ ~ ~a~~" <0: ...:: I Z <iSDeJ .. &~~'~::i!::tz~~~::i~~~ 8 _... ~Pl!'~ tI,!.l5ZI!' 6~ ~ ~tJi~e:!i5I~;~~SS ~ 5~~<<~~o~~>ft"'c!~~ ~ c~~~.E!~~~e=l=&~~ ~ O~~a;"2:~~~~~~~~~ ~ ::i!~-E~~,!....~!j!.8i~~ 0 8 ~w6_cx~ IF!: ",Q.. Z j<o~u~a~o~~~~&d~ s C't zz.~t..~ ~ t1 ~ & e . c u - I a z J: o ~ ~ EXHIBIT A PIHELLRS COUHTV fLR. or~ .REC.8K 13068 PG 1218 r r~'- L PINELLAS COUNTY FLA OFF.REC.8K lSOSS PG 1217 Exhibit B Permitted Encumbrances 1. Easement in favor of ROOda Power Corporation recorded in Official Record Book 6090, Page 835, of the Public Records of Pinellas County, Florida. 2. Easement contained in that certain instrument recorded January 30, 1973, in Official Record Book 3986, Page 85, of the Public Records of Pinellas County, Florida. Easements in favor of the City of Clearwater recorded in Official Record Book 4223, Page 1502; Official Record Book 4442, Page 1147; Official Record Book 4595, Page 56; and Official Record Book 9524, Page 266, all of the Public Records of Pinellas County, Florida. 4. Reciprocal easement agreement recorded in Official Record Book 4245. Page 1654; and in Official Record Book 4282, Page 1150, of the Public Records of Pinellas County, Florida. 3. 5. Reciprocal easement and parking agreement recorded in Official Record Book 4416, Page 98, of the Public Records of Pinellas County, Florida. 6. Restrictions contained in those certain deeds recorded in Official Record Book 4415, Page 1151; and in Official Record Book 4434, Page 842, of the Public Records of Pinellas County, Florida. 7. The rights of those tenants in possession as a result of those leases set forth on the Assignment of Leases and Security Deposit and Assumption Agreement between Grantor and Grantee of even date herewith. 8. Assumption Agreement and Consolidation. Renewal and Restatement of Mortgages and Security Agreements and Assignments of Leases and Rents and Spreader Agreement and Notice of Future Advance recorded July 29, 1997 in Official Record Book 9788, Page 838 of the Public Records of Pinellas County, Florida. 9. Assignment of Rents, Leases, Profits and Contracts, from ABR Plymouth Plaza, Ltd., in favor of The Chase Manhattan Bank, NA. recorded December 3, 1992. in Official Record Book 8108, Page 2202; said Assignment was assigned to Teachers Insurance and Annuity Association of America by instrument recorded in Official Record Book 9788. Page 831; said Assignment was modified, and restated by document recorded in Official Record Book 9788. Page 928; all of the Public Records of Pinellas County, Florida. 10. UCC.1 Financing Statement fromABR Plymouth Plaza, Ltd., in favor of The Chase Manhattan Bank, N.A., recorded in Official Record Book 8108, Page 2214; said Financing Statement was assigned to Teachers Insurance and Annuity Association of America by instrument recorded in Official Record Book 9788, Page 837; said Assignment was modified and restated by document recorded in Official Record Book 9788, Page 944; all of the Public Records of Pinellas County, Florida. ~ " I L .;. ,,' .~.~_:~:.~":::";.';-":~;!':':~:""'. ~'. :.,';'i::_.,.:-J/J.:,<;'4.::!'..'l"~~.:.:~:~~.:<i;"';::':'':''~''''' ._~;~..<.:.:,..:,.' .:,-:" .,-,,-' '". -.' I PIMELLR5 COUHTY rLA. orr.REC.BK 13066 PG 1218 11. Parking Easement Agreement between Grantor and Grantee of even date herewith. 12. Signage Easement Agreement between Grantor and Grantee of even date herewith. 13. cross-Easement Agreement between Grantor and Grantee of even date herewith. 14. Ad valorem real estate taxes for the year 2002 and all subsequent year. bearing Tax Identification Number 30-28-16-00000-340-0100. ;'.. ~;. , . ~e f I:. " ~. !. , . I 2 ~~~~~ ::Si Ima1q5~ ~~ ~::5 ~~ ~. ~~ ~~ ~e CQi I~ ~~ SQ ;:;:;~ !B~ ..... dS tf.) .. & -~ ,.. !i: tl;S ~~ -~~I~~ ~ ~~ 888 8~ ~~-o !::ii! I : Id~ .- ...-.---" ~ FedEx I Ship Manager I Label ii) 2008 8552 - Page 1 of 1 From: Dorothy Deluca (813;639-9599 Pennington law Firm 2701 N ROCKY POINT DR Suite 930 Tampa, Fl,33607 REVENUE BARCODE 1111111I11111111111 ~, To: Wayne Wells, Sr. Planner (727)562-4504 Pinellas County 100 South Mrytle Street Clearwater, FL, 33756 Ref: 14403 18205 SHIP DATE: 020CT03 WEIGHT: 1 LBS 33756-FL-US II I PRIORITY OVERNIGHT TPA 34 CLWA FRI A2 TRK # 7910 2008 8552 o~'If1 Deliver by: 030CT03 Shipping Label: Your shipment is complete Cancel shipment Edltshipmoot inforrrtlttion Pm<eMliInothm Snipl'HMt Repeat faSt &hiptnf!flt ' 1. Use the 'Print' feature from your browser to send this page to your laser or inkjet printer. 2. Fold the printed page along the horizontal line. 3. Place label in shipping pouch and affix it to your shipment so that the barcode portion of the label can be read and scanned. Warning: Use only the printed original label for shipping. Using a photocopy of this label for shipping purposes is fraudulent and could result in additional billing charges, along with the cancellation of your Fed Ex account number. Use of this system constitutes your agreement to the service conditions in the current FedEx Service Guide, available on fedex.com. FedEx will not be responsible for any claim in excess of $1 00 per package, whether the result of loss, damage, delay, non-delivery, misdelivery, or misinformation, unless you declare a higher value, pay an additional charge, document your actual loss and file a timely claim. Limitations found in the current FedEx Service Guide apply. Your right to recover from Fed Ex for any loss, including intrinsic value of the package, loss of sales, income interest, profit, attorney's fees, costs, and other forms of damage whether direct, incidental, consequential, or special is limited to the greater of $1 00 or the authorized declared value. Recovery cannot exceed actual documented loss. Maximum for items of extraordinary value is $500, e.g. jewelry, precious metals, negotiable instruments and other items listed in our Service Guide. Written claims must be filed within strict time limits, see current FedEx Service Guide. https://www.fedex.com/cgi-bin/ship _it/unity/6J gXs8BiVy9Bg W sOEcZu4CeTs8GeUu2Hg... 101212003 e e Wells, Wayne From: Sent: To: Cc: Subject: Wells, Wayne Friday, September 26, 2003 2:24 PM 'Paula Dye' Reynolds. Mike RE: FLD2003-09053;2575 Enterprise Road; Tampa Bay Water Proposed 37, 000 square foot building site plan Paula - It is my understanding that the property with the office building and parking garage at 26750 US 19 was previously divided into two lots: Lot A (eastern lot) - Parcel 30/28/16/00000/340/0100, with the office and parking garage; and Lot B (western lot) - Parcel 30/28/16/00000/340/0110, the vacant parcel Tampa Bay Water is purchasing. This parcel division occurred when a deed was recorded selling the eastern Lot A in October 2002. This sale created a 2.5-foot side setback to the parking garage, in violation of our Code setback provisions. It is my further understanding that this setback violation is being/will be corrected, providing for a minimum 20-foot side setback from the amended common lot line to the existing parking garage. This parcel division is NOT deemed to be a subdivision, where a subdivision plat would be required to be filed and recorded, as the division into two lots does not meet our Code definition of a subdivision. The moving of the lot line that was created in October 2002 DOES require the City approval of a Minor Lot Adjustment in accordance with our Code provisions. To submit a Minor Lot Adjustment, please direct a letter to me with the following information or documentation: 1. The owner's name (per deed) of both Lot A and Lot B. Include a copy of the deed that was recorded in October 2002. Note: Tampa Bay Water does not have to be the current owner of Lot B to process the Minor Lot Adjustment. 2. The legal description of both Lot A and Lot B as it was upon the recording of the deed in October 2002. 3. The legal description of both Lot A and Lot B as it will be amended (by shifting the lot line over so that the parking garage meets the required 20-foot side setback) . 4. Three signed and sealed surveys of Lot B, which shows the 20-foot side setback being met from the amended common lot line to the existing parking garage. 5. The application fee is $150. I understand that you will be asking for a fee waiver as part of your submission. If a deed has already been recorded to amend the lot line so that the parking garage meets the 20-foot side setback, please also submit a copy of this recorded deed. I will prepare an Affidavit for recording in the public records of pinellas County, including one of the surveys that you will be submitting. Once prepared, you will be asked to record the Affidavit and survey. Once recorded, please submit a copy of the recorded document to me for our files. I will submit to the Pinellas County Property Appraiser a copy of this recorded document for their information and cross checking to recorded deeds. If a deed has not yet been recorded to amend the lot line according to the legal description for Lot B as will be in the Minor Lot Adjustment Affidavit, we request a deed be recorded and a copy of the deed be submitted to me for our files. With this accomplished, you will be done with the Minor Lot Adjustment process. This is an administrative process and does not go to any board. Since you have submitted for a Flexible Development case, which must be approved by the Community Development Board, I would suggest submitting the Minor Lot Adjustment request as soon as you can (next week is fine). Should you have any questions regarding any of the above, feel free to contact me at 727- 562-4504. Wayne Wells, AICP Senior Planner PS: Did Jerry Maxwell previously work for Alachua County or Manatee County. I believe 1 that we worked there at the stlt time. e -----Original Message----- From: paula"Dye [mailto:Dye@TAMPABAYWATER.org] Sent: Friday, September 26, 2003 1:17 PM To: Reynolds, Mike; Wells, Wayne Cc: Gerlock, Frank; Schodtler, John; steve_Iuce@urscorp.com Subject: RE: FLD2003-09053;2575 Enterprise Road; Tampa Bay Water Proposed 37, 000 square foot building site plan Thanks for letting us know this. When do you need this letter by? Do you need it today? Or, can it be sent to you next week? -----Original Message----- From: Reynolds, Mike [mailto:MReynold@clearwater-fl.com] Sent: Friday, September 26, 2003 11:28 AM To: 'steve_Iuce@urscorp.com'; Paula Dye Cc: Gerlock, Frank; Wells, Wayne; Schodtler, John Subject: FLD2003-09053;2575 Enterprise Road; Tampa Bay Water Proposed 37, 000 square foot building site plan To: Steve Luce, AICP URS Corporation Paula Dye, AICP Tampa Bay Water Paula and Steve, Please provide a letter requesting a minor lot adjustment. In your letter, address the fee waiver just as you did for the FLD application cover letter. This minor lot adjustment is needed as we are in receipt of the boundary survey prepared by PBS & J dated August 2003. This minor lot line adjustment is administrative and its processing will be concurrent with the FLD application. The processing of the minor lot adjustment will not cause a change in the review and consideration schedule of the FLD application. Please contact Wayne Wells, AICP, Senior Planner for further information regarding the minor lot adjustment review. Wayne can be reached at tel. # 727-562-4504. Thank you. Mike Reynolds, AICP Senior Planner City of Clearwater Planning Department Tampa Bay Water scans all email for viruses, worms, and inappropriate material and blocks email deemed harmful or inappropriate. Email service is provided to Tampa Bay Water users for business purposes and is subject to public records laws. 2 r Plnellas County Property APpral Information: 3028 160000034001' Page 2 of5 30 / 28 / 16 / 00000 / 340 / 0110 21i-Sep-2003 JiM SMith, CFA Pinellas County Property Appraiser 13:40:13 Ownership InforMation Uacant Property Use and Sales A B R PLYMOUTH PLAZA LTO 5130 MAIN ST STE Ii NEW PORT RICHEV FL 34li52-2105 COMparable sales value as Prop Addr: 0 of Jan 1, 2003, based on Census Trac t : .00 sales frOM 2001 - 2002: 0 Sale Date OR Book/Page Price (Qual/UnQ) Vac/ IMP Plat InforMation 0 /0 01 0 0 ( ) 0000: Book Pgs - 0 /0 01 0 0 ( ) 0000: Book Pgs - ' 0 /0 01 0 0 ( ) 0000: Book Pgs - 0 /0 01 0 0 ( ) 2003 Value EXEMPTIONS Just/Market: 943.100 HOMestead: 0 Ownership % .000 Historic : 0 Use %: .000 Assessed/Cap: 943.100 Tax ExeMpt %: .000 Other ExeMp t : 0 Taxable: 943.100 Agricultural: 0 2003 Tax InforMation Land InforMation District: CW Seawall: Frontage: Clearlllater View: 03 Millage: 23.0851 Land Size Unit Land Land Land Front x Depth Price Units Meth 02 Taxes: 21. 9li5. 84 1) 0 x 0 1i.50 110.li98.1 S Special Tax .00 2) 0 x 0 .00 .00 3) 0 x 0 .00 .00 Without the Save-Our-HoMes 4) 0 x 0 .00 .00 cap, 2003 taxes will be : 5) 0 x 0 .00 .00 21. 111. 51i 6) 0 x 0 .00 .00 Without any exeMptions, Total Land Value: 1.109.542 2003 taxes will be : 21. 111. 51i Short Legal FROM PNT ON S R/W OF SR 580 3: E R/W OF ENTERPRISE Description RO TH S f150FT(S) FOR POB TH E 220FT TH S 135FT TH E L Building Information http://pao.co.pinellas.fl.uslhtbinlcgi-c1ick?o=l&a=l&b= 1 &c= 1 &r=.16&s=4&t= 1 &u=O&p... 9/26/2003 J1inellas County Property APprai Information: 30 28 16 00000 340 0 Ii Page 3 of5 30 / 28 / 16 / 00000 / 340 / 0110 Z6-Sep-Z003 JiM sMith, CFA Pinellas COunty Property Appraiser Vacant Parcel Property Use: 000 Land Use: 10 13:40:13 Vacant Extra Features Description DiMensions Price Units Value RCD Year 1) .00 0 0 0 0 2) .00 0 0 0 0 3) .00 0 0 0 0 4) .00 0 0 0 0 5) .00 0 0 0 0 6) .00 0 0 0 0 TOTAL RECORD VALUE: 0 Map With Property Address (non-vacant) ~~[t][f]~g] http://pao.co.pinellas.f1. us/htbinlcgi-c1ick?o= 1 &a= 1 &b= 1 &c= 1 &r=.16&s=4&t= 1 &u=O&p... 9/2612003 , Pinellas County Property APpra. Information: 3028 160000034001' Page 4 of5 i08 :bR1SE 220 {\J o ['- m 11) (r" 2B4.15 284 ~/Oll (\J PL'l (.0 co c'U " ~ '8 )!:J,,(:: / /~ "./? ,.",\ // CO'?' /J~..r " ':Jo '.... " ./,/'/' f') ~.~~ /,/ \..~ " // EtHE~~ c0 ~, 0 --^)'O ",/'\ \\ \ ... \'....0:.- \ () ", \ \ '. \\ 2555 ~t'l'ff"RPR ~ I ;}-.. r-. flf) I 1/8 Mile Aerial Photograph http://paooco.pinellas.f1.us/htbin/cgi -c1ick?o= 1 &a= 1 &b= 1 &c= 1 &r= . 16&s=4&t= 1 &u=O&p... 9/26/2003 . . Pinellas County Property APpra. Information: 3028 1600000340011 Page 5 of5 Pinellas County Property Appraiser Parcel Information http://pao.co.pinellas.f1. us/htbin/cgi-c1ick?o= 1 &a= 1 &b= 1 &c= 1 &r= . 16&s=4&t= 1 &u=O&p... 9/2612003 .t>inellas County Property APpra. Information: 30 28 16 00000 340 01 Oif Page 2 of6 30 / 28 / 16 / 00000 / 340 / 0100 ZIi-Sep-Z003 JiM SMith, CFA Pine lIas Coun ty Property Appraiser 13:Z5:01 Ownership InforMation Non-Residential Property Address. Use. and Sales DECADE COHPANIES INCOHE PROPERTIES STE 100 NI9 WZ4130 RIUERWOOD DR WAUKESHA WI 53188-1131 COMparable sales value as Prop Addr: Zli750 US HIGHWAY 19 N of Jan 1, 2003, based on Census Trac t : Z1i9.01i sales froM 2001 - 2002: 0 Sale Date OR Book/Page Price (Qual/UnQ) Vac/IMp Plat InforMation 10/Z.00Z lZ. Z71/1. 464 3.375.000 (Q) I 0000: Book Pgs - IZ/1.99Z 8.108/Z.178 3.6Z0.000 (U) I 0000: Book Pgs - 4 /1.984 5.739/1.885 I. 450.000 (H) U 0000: Book Pgs - 10/1.981 5.Z55/ 40 550.000 (U) U 2003 Value EXEMP TIONS Just/Market: 3.400.000 HOMestead: 0 Ownership % .000 Historic : 0 Use %: .000 Assessed/Cap: 3.400.000 Tax ExeMpt %: .000 Other ExeMpt: 0 Taxable: 3.400.000 Agricultural: 0 2003 Tax InforMation Land InforMation District: CW Seawall: Frontage: Clearlllate r View: 03 Millage: Z3.0851 Land Size Unit Land Land Land Front x Depth Price Units Meth 02 Taxes: 95.493.51 1) 0 x 0 6.50 144.671. 9 S Special Tax .00 2) 0 x 0 .00 .00 3) 0 x 0 .00 .00 Without the Save-Our-HoMes 4) 0 x 0 .00 .00 cap, 2003 taxes will be : 5) 0 x 0 .00 .00 78.489.34 6) 0 x 0 .00 .00 Without any exeMptions, Total Land Value: 940.368 2003 taxes will be : 78.489.34 Short Legal BET AT HOST N'LY COR OF COUNTRYSIDE TWO CONDO TH Description S54DW ZOI.65FT TH N36DW 160FT TH S54DW 31.1i9FT TH L Building Information - Building 1 -Sllilding2 http://pao.co.pinellas.fl.us/htbinlcgi-scr3?0=1&a=1&b=1 &c= 1 &r=.16&s=4&t= 1 &u=O&p... 9/26/2003 ,Ilinellas County Property APpral Information: 3028 16000003400111 Page 3 of6 Building #1 30 / 28 / 16 / 00000 / 340 / 0100 :01 Z6-Sep-Z003 JiM SMith, CFA Pinellas County Property Appraiser 13:Z5:01 COMMercial Card 01 of Z IMproveMent Type: Offices Property Address: Z6150 US HIGHWAV 19 N Prop Use: 33Z Land Use: 18 Structural Elements Foundation Floor SysteM Exterior Wall Height Factor Party Wall Structural FraMe Roo f FraMe Roof Cover Cabinet & Mill Floor Finish Interior Finish Partition Factor Special Footing St ructu ral Slab Cone Block/Stucco o None Fire Proof St Steel Bar Joist/Rigid FraM Built Up/Metal/Gyps Ave rage Carpet COMbination Drywall o Heating & Air Heating&Cooling Pckg Fixtures 50 Bath Tile Electric Shape Factor Quality Year Built Effective Age Other Depreciation Function Depreciation EconoMic Depreciation Floor and Ave rage Rectangle Average Wall 1. 981 10 o o o Sub Areas Description Factor Area Description Factor Area 1) Base Area 1. 00 58.560 ?) .00 0 2) .00 0 8) .00 0 3) .00 0 9) .00 0 4) .00 0 10) .00 0 5) .00 0 11) .00 0 6) .00 0 12) .00 0 Commercial Extra Features Description DiMensions Price Units Value RCD Year 1) EL EU PASS 30.000.00 Z 0 34.800 1. 981 2) ASPHALT 1. 00 9.Z00 0 9.Z00 999 3) ELEU STOP 3.500.00 ZO 0 40.600 1. 981 4) ELEU PASS 30.000.00 Z 0 34.800 1. 981 5) ELEU STOP 3.500.00 ZO 0 40.600 1. 981 6) .00 0 0 0 0 TOTAL RECORD VALUE: 160.000 Building #2 http://pao.co.pinellas.fl.uslhtbinlcgi -scr3 ?o= 1 &a= 1 &b= 1 &c= 1 &r= . 16&s=4&t= 1 &u=O&p... 9/26/2003 IPinellas County Property APpral Information: 30 28 16 00000 340 01 oit Page 4 of6 30 / 28 / 16 / 00000 / 340 / 0100 :02 26-Sep-2003 JiM SMith, CFA Pinellas County Property Appraiser 13:25:04 COMMercial Card 02 of 2 IMproveMent Type: Parking Garage Property Address: 26150 US HIGHWAY 19 N Prop Use: 332 Land Use: 18 Structural Elements Foundation Floor SysteM Exterior Wall Height Factor Party Wall Structural FraMe Roof FraMe Roof Cover Cabinet & Mill Floor Finish Interior Finish Partition Factor Spread/Mono Footing Slab on Grade Concrete Block o None Concrete Reinforced Prestress Concrete Built Up/Composition Hone Concrete Finish Hone o Heating & Air Hone Fixtures Bath Tile Electric Shape Factor Quality Year Built Effective Age Other Depreciation Function Depreciation EconoMic Depreciation o Hone Average Rectangle Ave rage 1. 981 10 o o o Sub Areas Description 1) Base Area 2) 3) 4) 5) 6) Factor Area 1.00129.160 7) .00 0 8) .00 0 9) .00 0 10) .00 0 11) .00 0 12) Description Factor .00 .00 .00 .00 .00 .00 Area o o o o o o Commercial Extra Features Description DiMensions Price Units Value RCD Year 1) .00 0 0 0 0 2) .00 0 0 0 0 3) .00 0 0 0 0 4) .00 0 0 0 0 5) .00 0 0 0 0 6) .00 0 0 0 0 TOTAL RECORD VALUE: 0 Map With Property Address (non-vacant) ~~[t][fJ~g] http://pao.eo.pinellas.fl.uslhtbin/egi -ser3 ?o= 1 &a= 1 &b= 1 &e= 1 &r= . 16&s=4&t= 1 &u=O&p... 9/26/2003 IPinellas County Property APpral Information: 3028 160000034001' 4,15 ()J I co co cq ,..r<J A' '() ~J"V ".,/"/' \\, '\ "'\, ~ \'>,-"'6'1 \-() \., ~? '\, \\ "''',0 I?-I '"' I .....:::: ,;:J I 31/05 26812 HIGNA'iJ 28.4.53 PL YMOUT 1e6-mDAZ A HIGHWA Y 3;;:1--01 -::;J >,-) . Ac ,- <">-,,,.if "\.~~ /'~...> (( 0:::> ;,,- /' '(,V ;'\ :;J/<S)'~ >...'..., (1;-'" /' 2555 r-t:!\rf-~Rt5E1 ~ /' ."../,/" _.--"-,,.t/ ./"'...,.t.j~""\, \ .--\ ..-,:::> \ ~ ',)' \ ev . \,~:;~.~, ~ Page 5 of6 "" 1/8 Mile Aerial Photograph ,.../ ~/...r (11?1 // () (.' /' \-' 2536 COLNl'~'SI~E BLVD 4 A" , l_ http://pao.co.pinellas.tlus/htbin/cgi-scr3?0=I&a=l&b=1&c= 1 &r= . 16&s=4&t= 1 &u=O&p... 9/26/2003 ,Pinellas County Property APpra. Information: 30 28 16 00000 340 01_ Page 6 of6 Pinellas County Property Appraiser Parcel Information Back..JQSs:arch_P_<!g~ An eXI!lanation of this screen http://pao.co.pinellas.fl. us/htbinlcgi-scr3 ?o= 1 &a= 1 &b= 1 &c= 1 &r= . 16&s=4&t= 1 &u=O&p... 9/26/2003 Pennington Moore Wilkinson Bell ('}g Dunbar PA ATTORNEYS AT LAW e e Frederick L. Busack Attorney at Law (813) 639-9599 fred@penningtonlaw.com \ ]I j "\.' October 2, 2003 Wayne Wells Senior Planner 100 South Myrtle Avenue Clearwater, FL 33756 r; ;-,~ (r! I fc Ii rVj rc::--' ,; I . ; \ '-, 11 I \ f, (j \ L','.; --------. --... --'---';' ii,' 1\ ',' I ' i U1 !; Iii OCT 0 6 2003 ; i 'jl ' L~ I~ . ______.__,J f'Lf\IIiNING& DEVELOP'v':-:"l ~.~C~ CITY OF CLEf:.iTN,.\ IlH Re: Proposed Tampa Bay Water Office Site Dear Mr. Wells, Thank you for getting back in touch with me on Tuesday. Pursuant to your request, this letter reiterates the discussion we had on the telephone last Tuesday regarding the parcel upon which Tampa Bay Water wishes to construct its headquarters. As we discussed on the telephone, it appears that implementation of the Minor Lot Adjustment process outlined in your email to Paula Dye dated September 26, 2003 would be inappropriate due to the specific facts surrounding the transaction by which the parties originally attempted to split the parent parcel into two separate lots. In July 2002, ABR Plymouth Plaza, Ltd. (hereinafter "Plymouth") attempted to grant Decade Companies Income Properties, a limited partnership (hereinafter "Decade") the eastern portion of the parent tract via a special warranty deed recorded at Official Records Book 12271, Page 1464 of the Public Records of Pinellas County, Florida. A copy of this recorded deed is attached for your easy reference as Exhibit A. Also attached as Exhibit B for your easy reference is a drawing prepared by Northside Engineering Services, Inc. in July 2002. This drawing seems to indicate the lot configuration that the parties had hoped to create by the conveyance. The legal description in the deed attached hereto as Exhibit A attempted to create two lots out of the parent tract by first describing the entire parent tract (referenced in the legal description as Parcell) then lessing out the western lot (referenced in the legal description as Parcel 2). If done properly, this would have resulted in a conveyance of the eastern lot to Decade. Unfortunately, a careful review of the "less out" portion (Parcel 2) of the legal description reveals that it is missing two calls and distances as noted in Exhibit A. Without these two calls, the legal description cannot close and is therefore deficient to describe the intended conveyance. As a result, the deed attached as Exhibit A failed to convey the property to Decade and the parent parcel remained intact. As I indicated to you on the telephone and discussed with Mr. Dye, it is unclear to us how the drawing was produced in the Property Appraiser's map with the defective 2701 North Rocky Point Drive, Suite 930 ~ Tampa, FL 33607 " (813) 639-9599 " (813) 639-1488 fax .__ ~. _ ...._. _.__ __~,_,,_'___~_"___'__" ._______n_.___ ___.__"~__.___________,_._..__~_._.____.._._'__.___.___ -- - ---------- . ___..______.__._____...__._.___._._._____.__u.______ .._,.____.___..___,_.__.".____.~.__._._____... TALLAHASSEE TAMPA CLEARWATER It e Page Two October 2, 2003 Wayne Wells legal description as it would be impossible to locate the east line of the western parcel from the legal description included in the deed. I understand that your maps are based upon the Property Appraiser's maps and would therefore also contain the erroneous east boundary line depiction. We discovered this title defect and brought it to the attention of Plymouth's attorney. Plymouth and Decade agreed to file a corrective deed that properly described the parcels conveyed. This Corrective Special Warranty Deed is recorded at Official Records Book 13066, Page 1214 of the Public Records of Pinellas County, Florida, a copy of which is attached hereto as Exhibit C for your easy reference. You indicated to me that you had reviewed the survey prepared by Orris Clark Sartor last August which properly illustrates the location of the east boundary of the western lot based upon the corrected legal description. You also indicated that you recognized that the survey illustrates that the eastern boundary of the western lot lies more than 20 feet from the parking garage located on the eastern lot. Consequently, there appears to be no basis for implementing the Minor Lot Adjustment process as the required setback already exists and can now be properly illustrated in a survey because the complete legal description is now part of the public record thanks to the recording of the corrective special warranty deed. We hope that this letter meets your needs, and pursuant to our discussion on the telephone, we understand that Tampa Bay Water need not engage in the Minor Lot Adjustment process. If this is not the case, or if you have any additional questions, please contact me at our Tampa office. Thank you for your assistance in this matter. S~~ct2-L- Frederick L. Busack, Esq. Pennington, Moore, Wilkinson, Bell & Dunbar, P.A. Enclosure cc: Paula Dye Linda Roberson Barrie Buenaventura Steve Luce Charles Dye e e EXHIBIT" A" " e e ~, 02-378968 OCT- 9-2002 4: 22PN PINELLAS CO 8K 12271 PG 1464 I 111m 11111 1111I 11m 11111111I1111111111111111111 Th" ''''trumMI p"pac ~y ,nd ,'''' recording, return to: ,; b Leo J. Salvatori, Esq. Quarles & Brady 4501 Tamiami Trail North Suite 300 Naples, Florida 34103 KfiillN F, DE U[R, ClERK If ~ PIHELLAS crony, FLORIDA XJRT ., 6C2%5~ 10-09-2002 16:23:30 DIlT 51 . DED-DECADE COHPANlES INCOME 038535 1":02376969 BK:12271 SPG:14f.4 Effi:l468 RECORD IHG 005 PAGES 1 $24. 00 DOC STAJi' - DR2l9 j $23,625,00 $23,649.00 $23,649.00 $.00 SPECIAL W ARRAN1Y DEED THIS SPECIAL WARRANTY, made this "7()1'':-day of July, 2002, between ABR PLYMOUTH PLAZA, LTD., a Florida limited partnership, whose post office address is 6620 Rowan Road, New Port Richey, Florida 34653, ("Grantor"). and DECADE COMPANIES INCOME PROPERTIES, A LIMITED PARTNERSHIP, a Wisconsin limited partnership, whose post office address. is N 1 9 W24130 Riverwood Drive, Suite 100, Waukesha, Wisconsin 53188, ("Grantee"). WITNESSETH that Grantor, for and in consideration of the sum of Ten Dollars ($10.00). and other good and valuable consideration to Grantor in hand paid by Grantee, the receipt whereof is hereby acknowledged, have granted, bargained and sold to Grantee, and Grantee's heirs and assigns forever, the following described land, situate, lying and . !::". being in Pinellas County, Florida, to-wit: r::.':-;.:'; ._~-_ ;'.~?,~ au~ WSee Exhibit A attached hereto and incorporated herein by virtue of this D:-i~2~t 6.05. . reference; j';.,"t" Subject to those items set forth on Exhibit B attached hereto and incorporated herein by virtue of this reference. F~:;''' ~~. ...~u._... i'-.':';- _. ....._ e'.;.""; r-~:.".: .. and Grantor does hereby covenant with Grantee that except as noted above, title to the J ;~;i:Oland is free from all encumbrances made by Grantor and that Grantor will fully warrant the -l~I~t::~..title to said land, and will defend the same against the lawful claims of all persons claiming :."~;.:.: ':."': ~ by or through Grantor, but against none other. ", ". . " /' ABR PLYMOUTH PLAZA, LTD., a Florida limited partnership , I I 1 i ! 1'- , , ~ ~ f , I 1 I I I IN WITNESS WHEREOF, Grantor has hereunto set Grantor's hand and seal the day and year first a ve written. .~/'_: ./ ;. .' " .,' J: / ( By: (Corporate Seal) REED DEVELOPMENT COMPANY, a Florida corporation, as General . _--pany,er. . _ .""--..__. \r,.'. ~''', ~ By: ...:~.. (~.... _ )s::::.~;.,.d Robert M. Reed, II, as President ;/ ....:. .~: . . ", /~. QBNi\PIJ5913ll.3 " .;:; .:.:)l }! ../-:/ j,:Y ..~:i' ....1 ~ ascriotion: Pinellas,FL Document-Book.Paae 12271.1464 PaaA' 7 nr ~ " . rr- j ....1 ....i ..\\ :J~ ,:' .i' '..'. e STATE OF FLORIDA COUNTY OF COLLIER e PINELLAS COUNTY rLA. orr ,REC.8K 12271 PO 1465 The foregoing instrument was acknowledged befor by Robert M. Reed 11, as President of Reed Develo e C as General Partner and on behalf of ABR PLY 0 L partnership, who is personally known to e. V e,this']Q: day of July, 2002 any, a Florida corporation; Z LTD., a Florida limited y. :,'! QBNAP\359130.3 TYPED. PRINTED OR STAMPED NAME OF NOTARY PUBLIC My Commission Expires: W~.~.~~ I-!' F~ . .. LEO J. SALVATORI MY COMMISSION t CC 967892 EXPIRES: Ncmmber 2S. 2004 ___"NIIc~" . .~~; " .'.. ,,~., : ',.:.f[' ,..:.j ,. ..'=~t .':,~;~~ .,~~>;t.. - 2 - ~ . .. j' I ,',. I. )~.q~rintion: Pin~IlaR.ii'T, n".-nmjQrtt--J:l""".....J.o. D::lI"T~ ,.,.,71 7i1t::.d. 'O:lf"P,o", ., ....~ r:: I { .,;;1 .. ; ~l .~~" i ., .....:.r' ;' ;~. e l. ~ ~~ ~~! ~ ~~ ~;;;-'^ 1riL'"' ~:;ji8 .13 at' ~:~ ~~~~g~~ ~3~~~ ~~~ g~~~~~~-~~~~~ ~a~u~a~'~~I~~-~~~~a ~'i'?i~e~ ..:i~~'Vi:l~a.~e ~i~f:'1"$':,:;;'OO .~....."'.;-c.xw XS~8~~ij~~~~~~~~~ ~ d~ N~U~~~~U!~'-a~ a?~:~~~t~;~~~..2~ ~ .... -r.: j.....u"l Z Of5,_....., eoo e~:~r.!.Z!~~~~~~Y~~~ ~~~~_~~~~ag6t w"~~ ~g~~~~c~~i;~~~r.~~~ ~g~o;EC~~o~~i~~~~~ i-~~~~~~~~uugtt~~W~ ~~6~GU~~~lJ~~e!~l~ W~~c..lIJ<("':x (1 0(0.... Ir- w ~f~l~~~~U~%~~~~~~~ ~?"~~~=~~~~~~~w~t... ~~u02~Naa ~~~~~z ~ ~Eg~~~~~~~~~tg2~~... ;~~~~~~~~~~l~~~~~a aW~~CG~ww.a""~~~m~~ ~~~~2~~aa~o~ac~~~~ g=~~~a~~~ ~~~~u~~... U~~~~~~....~~~~~~U t~ ~-~~_u~~a~c~>~aU~~~3 ~:~w~c~~~~ua~ ~a~u oI~!~.~!~~~~~~g~~!:~ ~~~=:~l~~~t~E~~8~:~ e~~~e~~~:~~~~~~:~e: ~~._~~ ~~~a~~~~~~~~~. c~e~;~~~~~~~~~~:~~g t. ~ 0 l p:;::' ~) .: C a .. u ~ a 0.'" ~ CD z~~~-~~'~~..go~~~~l~- ~~~]~~~~~~~::~~:~~:~ 2-WU~) ~~~W~ ~~w ~ ~~=~~~~!.~~~~r~~~~t~ ~t~~.~!~E:~l~~t~~X~~ a ~ & ~ ~ ~!; ~ ~~ ~:;'. III ~~ ~ u ~ U u:t ~~~~X~;:f~.:~::::~~~~ ;~;~4~~pE~~~~~~~a~E !~~~V~i~~~~C~;~~=n~ ~8ra:~~t:;~~~~~~~~~: ~~;:~:~~=~r2g5~~2E~ w<<~o. u u~l ~~~O :~!~~~~~;~~~t~~:;:! ~~~~:~~~~~~~~~~:v~e z~~> ~Z o~~ 0 fl..~~. :~3~~~~~U2X~U~~~~o! -.-b ii U l.k~ J-~~-t:-~- U' ~ ': ,':vi 'Z l ~ ~q~~u.~!~~~U~~~~~UO ~~r~~~~='~~~.~<<~Cw~~ :~w~~~~~~~a~~ei~~~~ roI:!i!CL~~"'~~~~"'~~ .~~:w .:.: q oo(o%lI'Iz-'~ ~_::.",,~~.~'_ ~~ :i ~~~2%~!w~~O~~~~~.~~l ~ j~d~~~:.~~~~=~g8~~~~ ~ eo:;~'''U''i!.~~UI?'';U 7d""~. .... ~ de .~~Q~ wg~~~u-~~;~ ~ ~~::~~~~~~~o~~e~;g. - ao..ci"51t',..~ u~~!t .<co~l e", ~:::co~~ -; .con'i r;.1o.I ....o\1t U""IJ ouo~.c u2w:r_~~UuwV'l ~ -~~~3~:~-~:a-' .~~~~~~ ~ ~~,~~:g~g~ru~~~~~7'~~ 0 ~u~~~~~~~7~8 ~~o~~~z ~ =~!t~tu~~~u~~-~Z~~et ~ 2J~~b~g~fg~~b~:~~~~~ ~ ~~~~:~:~E~:~~~~r~~~~ e !:~...~_ ~-' .V'\U...J"!""...~ "":lW ~a:.-9~~~~~lg~~~~~~~ ~ ~"'~;~~~~~~~on8~~u~~~ ~ ~~~~::t~~~l~~~~~~~S~ ~ ~:8~B~~~~l~~~~:~l~o2 ~ 5..~bg 6 ~ tD 7"l." p~ ua~2 -:: g::;gt; "010.1..0 .... ~~; ~J ?~~~~~ zW:; ~2...." .'" ~o~o~e ~ u U 1.01 4? ;t ~ - ~ ~ ~'- . ~ ~ ;rl.~;, .~:r.5::;:~f- 1...~~UOtA:::'tjuoCoa.~ . i! ~19~:::a~ %b~V1 %'~.... ~oO( ~~~u~,'.;lrilj 3 .~~~~~~~ "aa'~)l~, 6::' Ucr t: -:.-lla~aw"'~~ .... t:' ~ Q t:' 2 ~ ~ ~ ~ l 't .. '~" -: 0 :: j. ': 't ::' w .... ,... VI \.. :J :.:. ..... C~ ~ ~ b ~ I...~ ~ ~ ~~o~t' ~~.!u68~a~~:i'z'~t1 'B ~ :r. ~ If'.... e i5? ~ ~ :I,::::;: ~.._~\J?::;~o(~J!~c~~~ )oo! gi!:~:&.s<<"~uu~;ro !' c: '" ~ e ~~~u~~w: ~ 5'f'~.........,3a...ia~utf-~:.., ~ ~g; ~:~~i ~ ~a~~ ~~:~~:;z"'~~~~~:; ~ v ~~:;;i"'t1~~..CO"'1O't ~wW:'..::C! .~j:a.l... o';i!'!~~i!ZO"Z;.. .. ~U:~6~:; .8::~~~':i' !; ~:~!Etit!"" w~~S m... . u....... loo.ZO OUt' VI ~~ ~~=:i;g!:cli::~,: ....5: ~ I~ ~~:::u~: ~ ......nl ~ ~~ii~"'.Z;~ ~ t~~<c'~ ~~'"' ;;::..~... e~ ....-p; ~'-::i~ ~"~ e~~ !;1.4..:i:~ ~/.~~{. ~~~~'~~~~h;~h~~ ;~G ;~~ 1 ~~" ~ 1~ r~ d~ ~ ~~ "t ~ !! ~ :. t: 't 'i':; p ~ ~ :~:~ ~ ::S-~:::~1.:J ~~~, ~.~~:~ ~g i ~~'('...:..: ~~IlA r~ ~ .ot.~n':~~t'~)~ltJrl~~~ ::.:, ~"" ,r 10 ,. I .. ~IJI"'';'" ;t:'3~~~~;t~ <c il <C~.i.:; u8'tUt"~:'D i 'i... ~~g::: ... C.I ~ ... I.' . c, n .. 0 <II Ill" '7..... ::::~::' ~ t.:.:, ~ tJS~~: ... [I ~ '-';;. ~ ,':. n ':' ~ ... ~.7 ~ ~~Hg~s!~~:~~~ CI.G ~ GO: :;"'~.~ a ~o.;.; lq_..;~U.l'~~~n:;.,djg 6Vl~~~~H~ .u~~"I.o~ ....\j ;r:J~c.l~~~...t:='~ =~l~i':/....~..,a~:"... i ~. Cj ~ ~ f. ~ ~:;: /. ~ ;: ~~ ~~ <c - ~ l.~g: ~:~ <C.;S";7 l, b 0- '-". - II ~ 0 ~ ., .I' uo:"'" ,. r- ~:::!:~;:!~: g.::S'1 ~ ~ ~ :- ~ ~ 1. e ~ ~ '1. ~,~ : ; g ~ ~ ~:: : "'. .. 't ~ :! ~ ! :: N~-~~O~~==:'t.:.:.~t::~~ .J'" b ~ '" ~L_ .:":; ~ ~t:'~~r~ 1:1! . : ~ ~ 0 ~ ~ ~ J "' "':3 ~t1 ~~[~Pt~:~~~:~~8: .. ~ u b ;' l! ~ ~ ;j .! .::!.1~ ~ ~ l..H.) B~t~!~:~~~~5~~~t ~~~~=t~i:~r~::~~~ ~~~r.. .t'~~~'l:':;'t..~~n.'. ;~~~g:;~:~~~z~~~ ~~~t~!~~~r~~5~~~ -e PINELLAS OFF,Re:C.8K COUNTY rLR. ~ 12271 PG 1466 I l, EXHIBIT A ""i.~,_ , ('1) ~~,~ l, "- "-.....;r ) ...~:- c\.\ C"''t; '..... I.- "'. " .~~:t ~ Lib :s \~\ c ..s, \'- \'\ V':. :s--- '"' (, J'. \..,,-, €:> If\ 0 (r~ 'U r.' Vl V' . ) Q) QJ d tJ C ~ <;l) ();, --s;: -t: -l---. ''\- '/;M'~~'. )escription: Pinellas,FL Document-Book.Page 12271.1464 Page: 3 of 5 "'\_~..-._" A""IL'Ant')~ "'-----.. I ", :,. i~: e e PINELLAS COUNTY rLA. Orr .REC.8K 12271 PO 1467 Exhibit B Permitted Encumbrances 1. Easement in favor of Florida Power Corporation recorded in Official Record Book 6090, Page 835, of the Public Records of Pinellas County, Florida, 2. Easement contained in that certain instrument recorded January 30, 1973. in Official Record Book 3986, Page 85. of the Public Records of Pine lias County. Florida. 3. Easements in favor of the City of Clearwater recorded in Official Record Book 4223. Page 1502: OffiCial Record Book 4442. Page 1147: OffiCial Record Book 4595. Page 56; and OffiCial Record Book 9524, Page 266. all of the Public Records of Pinellas County, Florida. 4. Reciprocal easement agreement recorded in Official Record Book 4245, Page 1654; and in Official Record Book 4282. Page 1150. of the Public Records of Pinellas County, Florida. . 5. ReCiprocal easement and parking agreement recorded in Official Record Book 4416. Page 98. of the Public Records of Pinellas County, Florida. 6. Restrictions contained in those certain deeds recorded in Official Record Book 4415. Page 1151: and in Official Record Book 4434, Page 842. of the Public Records of Pinellas County, Florida. 7. The rights of those tenants in possession as a result of those leases set forth on the Assignment of Leases and Security Deposit and Assumption Agreement between Grantor and Grantee of even date herewith. 8. Assumption Agreement and Consolidation. Renewal and Restatement of Mortgages and Security Agreements and Assignments of Leases and Rents and Spreader Agreement and Notice of Future Advance recorded July 29. 1997 in Official Record Book 9788. Page 838 of the Public Records 01 Pinellas County, Florida. 9. Assignment of Rents. Leases, Profits and Contracts. from ABR Plymouth Plaza. Ltd., in favor of The Chase Manhattan Bank. N.A.. recorded December 3, 1992. in Official Record Book 8108. Page 2202; said Assignment was assigned to Teachers Insurance and Annuity Association of America by instrument recorded in Official Record Book 9788. Page 831; said Assignment was modified and restated by document recorded in Official Record Book 9788. Page 928; all of the Public Records of Pinellas County. Florida. 10. UCC-1 Financing Statement from ABR Plymouth Plaza. Ltd., in favor of The Chase Manhattan Bank, N.A.. recorded in Official Record Book 8108, Page 2214; said Financing Statement was assigned to Teachers Insurance and Annuity Association of America by instrument recorded in Official Record Book 9788, Page 837; said I < ....~ i _I' ....l,i } ;. .r Description: Pine11as,FL Document-Book.Page 12271.1464 Page: 4 or 5 n_~~_. An~~AOO~ ~------ ~ 1\. I ! i \ i I "'i. )r e e PIN~LLAS COUNTY FLA. OFF.R~C.8K 12271 PG 1488 Assignment was modified and restated by document recorded in Official Record Book 9788. Page 944; all of the Public Records of Pinellas County, Florida. 11. Parking Easement Agreement between Grantor and Grantee of even date herewith. 12. Signage Easement Agreement between Grantor and Grantee of even date herewith. 13. Cross-Easement Agreement between Grantor and Grantee of even date herewith. 14. Ad valorem real estate taxes for the year 2002 and all subsequent year, bearing Tax Identification Number 30-28-16-00000-340-0100. 2 ~ i I I I I' , 1 i ! ! I , I i i \ -- ! 1 , i ,. I . -~- ..,::J .~?;} :i$ .' .;:1" . ~~ y . 1'~ .:.j! Description: Pinellas,FL Document-Book.Page 12271.1464 Page: 5 of 5 ~_~~_. An,CAOOC ~---~-~. "': e e EXHIBIT "C" . -~----- I-~ I . . This inslnlment prepared by and after recording, retum to: y Leo J. Salvatori, Esq. Quarles & Brady 4501 Tamiami Trail North Suite 300 Naples. Florida 34103 03-391B39 SPT-12-2003 S:O~ PINELLAS CO BK 13066 PG 1214 ,.......111 CORRECTIVE SPECIAL WARRANTY DEED THISCORRECTIVE SPECIAL WAAFWITY, made this~ day of ~~J,uiA2003. between ABR-- PLYMOUTH PLAZA. LTD.. a Florida limited partnership. whose ~ffice address is 5130 Main Street. #6. New Port Richey. FL 34652. rGrantor"), and DECADE COMPANIES INCOME PROPERTIES. A UNITED PARTNERSHIP. a Wisconsin limited partnership. whose post office address is N19W24130Riverwood Drive. Suite 100. Waukesha. WI 53188. rGrantee-). WIiNESSE"TH that Grantor. for and in consideration of the sum of Ten Dollars ($10.00), and other good and valuable consideration to Grantor in hand paid by Grantee, the receipt '5" whereof is hereby acknowledged. have granted. bargained and sold to Grantee, and Grantee's hi RECORDmwirs and a~ns f~ver, the following described land. situate. lying and being in Pinellas :: iC ~ County. Flonda, to-Wlt: ".9S See Exhibit A attached hereto and incorporated herein by virtue of this reference; ,"T , :-oF.::' o tHo Subject to those items set forth on Exhibit B attached hereto and incorporated herein by virtue of this reference. o I I 1 I _ o4Ind Grantor does hereby covenant with Grantee that except as noted above. tiUe to the land is I ~o!~ -Po ~,l ~ from all encumbrances made by Grantor and that Grantor will fully warrant the title to said I t I"V land. and will defend the same against the lawful claims of all persons claiming by or through ! Grantor. but against none other. - ! ~".C KE~' This corrective document is given for the express purpose of correcting a clerical error in the legal description of the original instrument which was recorded in Official Records Book 12271. Page 1464, of the Public Records of Pinellas County, Rorida. WHEREOF. Grantor has hereunto set Grantor's hand and seal the day and 'tten. ABR PLYMOUTH PLAZA. L TO.. a Rorida limited partnership By: Robert M. Reed. II. as President QBNAP\401600.1 I r I 1 I I \ ; i . ~ '--(0. ~ ",':;_"1 . '.~ :;. "'~ ..': ~.:.' ,-..:.,......:... PINE~~RS COUNTY ~~R. O~~.REC.BK 1~06S PG 1215 STATE OF FLORIDA COUNTY OF COLLIER The foregoing instrument was acknowledged before me this qth day ...4nl..J1/2003 by ROBERT M. REED. II. as President of REED DEVELOPMENT COM~ Florida corporation. as General Partner and on behalf of ABR PLYMOUTH PLAZA. L TO., a Florida rllllited partnersl1ip, who Is personallY known ~ ' ~ /l. t ~1lI1)Il/f Notary Pti) DlllaK......... . . lit CcInINIlIIllIIIJOO6Z784 ~ ':I E:qIINa AuguIl2e. 2llCI5 TYPED. PRINTED OR STAMPED NAME OF NOTARY PUBUC My Commission Expires: QsNAP\401600.1 -2- -.--...--. ..--- L -.J I :.- r~ r , i I I ,i . mlS DOCUMEMT . 0' mIS ~ A POllTIOR QUALITY ARD !IA IS Of POOR. :r BE ILLEGIBLE. , I 10 ~-~ ~= -~~ ~ -~ Z~M -~ ~~~a ~ ~~ ow2 ~~o~~~o w~ o~ ~~~ ~.a~~u~ ~~~:: =Fc ~-c_5~~-~ :Cd ~o:~~f~~~=C-~~8~: ~tJ~~~~~~~~M:~~~~ ~~C~".~~~8~=W~C% - 1"~G;~~~a~~-~a3l~~~ ~.~~~~ ti~~~u c~e~ ~~Ui5D~~z;~.~E~~i:!~~ ~~~9~IZ3io!l!ei~~~~ iC8"...,=I>>- ltl= w;;.t: ag~~foJ~e- ~o~F50z i5i~II~+~I:Bi!e~~' ~~.X=~~il~!I~~F~~~ ~~9 ~egEwC~~w~5-oQ ~~_I ~.>~e~~~~z~~~ 5ED~itigga~a~~~~Z~~ a.~ &~5~<~ ~~ o~~ ez~~~~..~~~~~O~e~~~ :~I ~.~ 0 ..FaM~!~Z Ka ,i~.~~~~~I~-i~ :~.Ji~;~<;~~=FI15~ z-~l F_~i w~3~'t~z~. :i,~a~~~~I:!~~a:I!: ~&.t~u~ ~~~w;8<~F.~ c%i ~~ e~~~F~g~H~=: D.i!~.~~~L >>-5Wftw~~5d ~;il~.!E~~~~1!~=~~: ~w~ e~~~e~;2~~!~~~~ ~IZ! ~eE~C~F<~~a~:{g 8 ~z~05E~~~~F;'FF~5 "'WD'.O z~. DO. . _ -F% ..=~~t;-=~9~ZZ a!;~!i~f~di~~~2u~ie -l .W.<~~KZF-OEW~U~~ O~~e~P.O~-.~ F ~WO ~~E~o~~2~~~e~'~~U-~ ~::l_5~~ZM!~~~C.. .-~fi~ ~~_~u<~~~~z~~~~s~~~~ ~ .~O 5Z.~~~w~~nd ~ OC~~F~r _~~FCn~<~~ Slllil ~ F:lM5~ _.~~n...~~ '~d3<~~~~Z~Z_~W~~OC ...~ W.~w- W~CO w e ~ C~..~~-8F%OZ~;~~~ ~1~~~!~8.~e;~i~~~~~ u~~~~~:s~~~~;~~::l3~~ ~~F>-_5-~ <.~~-~ =e C~!~,,~~USUOU_~~~.e .J:~G,.t .~ I:I01lO5~O"U~ 01} F~~~:K!fC~~fi ;.C~F= i~~~9<~:~C!C t:.~OO _i~iu~~;~~aollit;~9~ ft F~~~~.!~ ~~ F~FU~ L e< ~~~ C~ O~_-~~W ~ l~c~i~5~...;~ii~i~t;~~ ~ eliti~~~~~ai~~i8~~~~ e go.fiO"~WOC.CZ~~~~< ~ =~:~~~e~~~~i~~~~!; ~ aq,S' b.t~>>-~a~i~t:'C~O~ L g~w-bu~~~ O~w~tct:'b ~:.~~~~:~;!i~~:'i~i~ ~o~~~~F~~iF~~~~ix~c~ &~A,~~O~.EO"'~~ z~~~Z ~!'i!I~~~!~i~!~~!~~1 ti,~E~~~~.!~L~.'F~~~~ ~~~F.~~5:~~~8.~6~F~~ ~~~~~~~Fwwgo~~~~u~.~ .. C!!,:S C.'E- ..UUFf"o"'l.......CZ--: .. a a~a.a~Q~C~5~~~C~~~ ~ ~<UFU~_w~~O~z:~..W%- 0 '" x <..Vi:~~~e ~ L ...AI ... ...0 ~ O_O~ a 0 0 5~~'" 5~ ~~ ~ F'WOO ~z: iC- :; u~<u ~2~~~ - =",ce . F..e...- ",FCC ~<O ~~,.}i 1=0 wo' o~O 0...... z z~F~fi~wriOzwz~:' _~ ..... >:1: 5" !l!O~~o:;~C1U~SCLP8 .F:i:l:OZ ~;rc<"""'o io~~;lS~o~o~o:c.,; o~wc ~ZiN z-=~..w i!~Fa~~l=ti~:a~~~ ~~i!eli.,:;~~S)~;~ ~8, ~~l! .c...~ :J~ Ifu~~~~es~~:;~~~E ;,!.~~~~~::t;;;~~~o o~ !C cZ5i!~c:J_d ~e~li~~~2F!F~:: ~~!ififl"il~ii!~e as:i~tI!)i>~u~~!iti ~~~~t:J:;:3i~!i5ia ..tlts~...~Z:..~~~Ks: 5lii5~..~tii~,;eG :!' :lr=~F~~tF'oll:F~~~ o_s.-~~" lIOfO-rc ~ ~_~~ ~eut;~~l:!I.. .?c~~~i;~~~.~ti~e o~~z=i:\ 3.0 ~ ~ ~~,~~..~FI'!"'I .tI., ~'i:"'eo. S;i5F-iSz ~Mg~~fi::6... ~....:I:;S~ _.... :I::Z: .. F ~::3...~wufi~fi~~fi:c ~~e!~<'":S"':~~..otI t~8Ft;if~~tj~~~~ ~i!..5~ !"o~~5!" ... al!!<z.,;;;ifi~~~z~t~ 3.....wo;:nz... .zw SU!!F~_:;2~8~~8~~ .....wJ-o-;c:..w... doO -z ~F ~ ~==~F~~'" ~..~~ ~ Lol\~O"we:J ~~ :!w ':3%C1fi~F...~~c1=z"" ~~u!5fir=fi~~;!5~ii:i;:~ ~~,u<ow"'~~uo~"'~ ~d:::~~o~~:;: · e!!l!l)..~o ~ ex .....;--<<& o~.. 8!l!a~~::"~ua<fiPw ":d:::l4OI:;C-ticz i~8~ ~..>...~:z:fi.~~~cczo wl!i~o_~.~...x~ti.. ~ .... .w....""...w w':l~~ _ ...ecio~...~>w~.::r: wi ~wo~..~.~5ec.~~ .. z~,!.~~~~.~a~~w~= ~ ~"ia~~e~\j~~bF~: ~ _gC r=~" is.... ~ ... w ~~;~~~~I~~i~~~e ~ :;:5~2~~t ._~~~~!~~ i LF ~~~ Mc...A~L-a < i~~l!~~~~i;~~:~~.~ e5gti.-S.!~g~..;Et"3 ~ F'.~~ti~.I=<G~~~~ ~ i;~i~;~i~iiiS;E ~ ~~wfi~~~~!l!~l!~~~ a ~~~5...~~~~~~t;;a-: : ~;~i~~:~~~~~~I;~ ~ L~~'~~~~z~~!~~~~ 2 _~ ~r~~ tl'zo~ 6. - ~i~i~~~~~i~;~~~E ~ fi~~~~~O~ ~~...<!;. ~ COtl~ uit!~~~o::i~..~tl ~ a~~&;n:l:~~~~~~~~iS ~ ~~~_E~~~~~~.8l~r= 0 o~2w~ :I:"'~!""o 2: ~~8~8=a25~~~~~~~ 5 n eft :z z:l~...E ~ e . i: u = o o i ~ ... i - EXHIBIT A PIHE~~R5 COUHTV FLR. OFF .REC.BK 13066 PG \216 r r~- PINELLAS COUNTY FLA OFF.REC.BK 13088 PG 1217 exhibit B Permitted Encumbrances 1. Easement in favor of Florida Power Corporation recorded in Official Record Book 6090. Page 835, of the Public Records of Pinellas County. Florida. 2. Easement contained in that certain instrument recorded January 30. 1973. in Official Record Book 3986. Page 85. of the Public Records of Pinellas County. Florida. 3. Easements in favor of the City of Clearwater recorded in Official Record Book 4223, Page 1502; Official Record Book 4442. Page 1147; Official Record Book 4595. Page 56; and Official Record Book 9524. Page 266, all of the Public Records of Pinellas County. Florida. 4. Reciprocal easement agreement recorded in Official Record Book 4245. Page 1654; and in Official Record Book 4282. Page 1150. of the Public Records of Pinellas County. Florida. 5. Reciprocal easement and parking agreement recorded in Official Record Book 4416. Page 98. of the Public Records of Pinellas County, Florida. 6. Restrictions contained in those certain deeds recorded in Official Record Book 4415. Page 1151; and in Official Record Book 4434. Page 842. of the Public Records of Pinellas County. Florida. 7. The rights of those tenants in possession as a result of those leases set forth on the Assignment of leases and Security Deposit and Assumption Agreement between Grantor and Grantee of even date herewith. 8. Assumption Agreement and Consolidation. Renewal and Restatement of Mortgages and Security Agreements and Assignments of leases and Rents and Spreader Agreement and Notice of Future Advance recorded July 29. 1997 in Official Record Book 9788. Page 838 of the Public Records of Pinellas County. Florida. 9. Assignment of Rents. leases. Profits and Contracts. from ABR Plymouth Plaza, ltd.. in favor of The Chase Manhattan Bank. NA. recorded December 3. 1992. In Official Record Book 8108. Page 2202; said Assignment was assigned to TeacherS Insurance and Annuity Association of America by instrument recorded in Official Record Book 9788. Page 831; said Assignment was modified. and restated by document recorded in Official Record Book 9788. Page 928; all of the Public Records of Pinellas County. Florida. 10. UCC-1 Financing Statement fromABR Plymouth Plaza. ltd.. in favor of The Chase Manhattan Bank. N.A.. recorded in Official Record Book 8108. Page 2214; said Financing Statement was assigned to Teachers Insurance and Annuity Association of America by instrument recorded in Official Record Book 9788, Page 837; said Assignment was modified and restated by document recorded in Official Record Book 9788. Page 944; all of the Public Records of Pinellas County. Florida. L ~ ~ , I L ~ .' ~. ',:c'~"_: :;..L. .... <,'i...:..!:."...><:,.../:.:",;>;J":''-:'-~'~'''''':'''''',...,,-,....>:.. ". ..... ." I 1 \ I I I Pl~E~~R5 COUHiY rLA. Orr.REC.8~ 13066 PG 1218 11. Parking Easement Agreement between Grantor and Grantee of even date herewith. 12. Signage Easement Agreement between Grantor and Grantee of even date herewith. 13. cross-Easement Agreement between Grantor and Grantee of even date herewith. 14. Ad valorem real estate taXes for the year 2002 and all subsequent year. bearing Tax Identification Number 3o-26-16-O()OOO-340-01OO. \ \ ~' ~', . f li. ,.' ~. 2 II~:I II ifig -=P ..,., ~w i$ ~~ ~~ I~ ~i _~ m~ ~e ~ ....~ .....~ ~ ;~ ~~ _~~\~~ i~ 8~8 ~~ ~ ~~ \ ~ \ : Id~ ti .. .. .. .- ..--.---.- ~ From: Sent: To: Subject: To all: Wells, Wayne Tuesday, November 18, 2003 2:34 PM Planning Lightning protection system Kathy Yang with URS has contacted me, as suggested by the Development Services Department, about a new lightning protection system that is being considered for the new Tampa Bay Water building at 2575 Enterprise Road. You may see more about the proposed system, called a Prevectron 4 with a hinged base mast, at www.theprotectionsource.com.Ms. Yang has told me that the proposed mast height is 16 feet with the Prevectron 4 on top (approximately 16.5 feet tall), which would be mounted to the top of the building. Under Case No. FLD2003-09053, going to the COB on December 16,2003, the applicant is requesting a height increase from 30 feet to 55 feet. This increase height under this case does not include this lightning protection system. The question that has been posed is how we deal with it from a Code standpoint. Following are the options I have determined: 1. Under the definition of "height, building or structure," linear radio and television antenna are permitted to project 10 feet higher than the maximum height otherwise allowed in the Office District. Under this option, the proposal exceeds the maximum height allowed, and to provide for such would require the FLD case to include such additional increase in height to provide for this lightning protection system (not presently included in the FLD request). 2. Under the definition of "height, building or structure," flagpoles located on top of buildings are permitted to project 10 feet higher than the maximum height otherwise allowed in the Office District. Under this option, the proposal exceeds the maximum height allowed, and to provide for such would require the FLD case to include such additional increase in height to provide for this lightning protection system (not presently included in the FLD request). 3. Under Section 2-2001.C (telecommunication towers and antennas), antennas are an accessory use allowable in all zoning districts and may be installed on buildings provided the installation does not add more than 20 feet to the height of the structure and that the antenna and supporting electrical and mechanical equipment are neutral in color and identical to, or closely compatible with the color of the supporting structure so as to make the antennas and related equipment as visually unobtrusive as possible. Under this option, the FLD case would not need to be amended to include this lightning protection system as part of a height increase. It is my opinion that Option 3 is the best fit for this proposal, due to its design (see the website), its height and processing (do we really want to process a FLS or FLD case potentially solely for a lightning protection system?). Do you think my determination is correct? Are there other options not outlined above that should be considered? Please let me know ASAP. Thanks. Wayne . e Reynolds, Mike To: Cc: Subject: steve_luce@ urscorp.com; pdye@tampabaywater.org Gerlock, Frank; Wells, Wayne; Schodtler, John FLD2003-09053;2575 Enterprise Road; Tampa Bay Water Proposed 37,000 square foot building site plan To: Steve Luce, AICP URS Corporation Paula Dye, AICP Tampa Bay Water Paula and Steve, Please provide a letter requesting a minor lot adjustment. In your letter, address the fee waiver just as you did for the FLD application cover letter. This minor lot adjustment is needed as we are in receipt of the boundary survey prepared by PBS & J dated August 2003. This minor lot line adjustment is administrative and its processing will be concurrent with the FLD application. The processing of the minor lot adjustment will not cause a change in the review and consideration schedule of the FLD application. Please contact Wayne Wells, AICP, Senior Planner for further information regarding the minor lot adjustment review. Wayne can be reached at tel. # 727-562-4504. Thank you. Mike Reynolds, AICP Senior Planner City of Clearwater Planning Department 1 e - Reynolds, Mike To: Cc: Subject: steve_luce@ urscorp.com; pdye@tampabaywater.org Gerlock, Frank; Wells, Wayne; Schodtler, John Tampa Bay Water Proposed 37,000 square foot building site plan; FLD2003-09053 FL.-Q ...~ ~rc.... , To: Steve Luce, AICP URS Corporation Paula Dye, AICP Tampa Bay Water Paula and Steve, .,.,.." ~r Please provide a letter requesting an Mffiil.istl Miv8 ~or Lot I.iM Adjustment. In your letter, address the fee waiver just as you did for the FLD application cover letter. Thisfc;;'..adjUstment is needed as we are in receipt of the boundary survey prepared by PBS & J dated August 2003. This minor lot line adjustment is administrative and its processing will be concurrent with the FLD application. Thank you. "',~ ..;J ~I (r...jl I,.A 5 v JY" S,(/ l"V A' ~.vl b) - t'J.Q ~ '~J ~"<i.} ~ r-e.. \'\) --k. ) br \~ -.L (Ov- ~ ~AU. W ~ ".&.of" J - ~~ ) ~ " \ ~ ~ {<..H f1-\""'" ~... b. \-1.... ,"\~ W~ ~"'''~~~~ 'oj t)l~';~) ~u't\ r-U-~ \~..\ ~Uc:..,,( H~ t. \..-\'\-. ) ~ --~:~ ~~l~. .;!Il1~~- ~ ~,L\ . " l.J~~~~~=.~}~~.e-n;.:'-='-:-.~~ ... '<\JJt~ ~..,....J? \..-- ,'\l \...) - \';r T.- .-IQ.~ /~d"- S~~) (j~l'~~\1."~j ,1/ -k /-8' <3e.~>>...t..\~ b J~ - I'J.L-cl cr-w~~"""f> Cbu~) ~ Mike Reynolds, AICP Senior Planner City of Clearwater Planning Department 1 r , CITY OF CLEARWATER loNG RANGE PLANNING DEVELOPMENT REvIEW PLANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTIE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 December 19, 2003 Mr. Keith Greminger URS Corporation 7650 West Courtney Campbell Causeway Tampa, Florida 33607-1462 RE: Development Order - Case FLD2003-09053- 2575 Enterprise Road Dear Mr. Greminger: This letter constitutes a Development Order pursuant to Section 4-206D.6 of the Community Development Code. On December 16,2003, the Community Development Board reviewed your Flexible Development application to permit an office building with an increase of building height from 30 feet to 55 feet and a reduction of the side (east) setback from 20 feet to 10 feet (to pavement), under the provisions of Section 2-1004.F. Based on the application and the staff recommendation, the Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria per Section 2-1004.F. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. Conditions of Approval: 1. That a SWFWMD permit needs to be provided prior to issuance of any building permits; 2. That all sign age meet Code, consist of channel letters for any wall signs, and be architecturally integrated to the design of the building and site; 3. That prior to building permit, provide a revised tree survey, accurately indicating the size of the pine trees; 4. That the irrigation plan be revised to avoid tree impacts, prior to building permit; and 5. That the Tree Preservation Plan be revised to reflect modifications, prior to building permit. Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (by December 16, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do BRIAN J. AUNGST, MAYOR-COMMISSIONER HoYT HAMILTON, VICE MAYOR-COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BILL]ONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" , " December 19, 2003 Greminger, Page 2 not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. The issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4-502.B by the applicant or by any person granted party status within 14 days of the date of this Development Order. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on January 2,2004. If you have any questions, please do not hesitate to call Michael H. Reynolds, AICP, Senior Planner, at 727-562-4836. You can access zoning information for parcels within the City through our website: www.myc1earwater.com. Sincerely, Cynthia H. Tarapani, AICP Planning Director cc: Paula Dye, AICP, Chief Environmental Planner, Tampa Bay Water S:\Planning Departmenf\C D B\FLEX\Inactive or Finished Applications\Enterprise 2575 Tampa Bay Water (0) - Approved\Enterprise 2575 Development Order December 19, 2003.doc ! ,~ SHEET 11 TRAFFIC ANAL YSIS ;P""7"'j~~ " ! ),) ~ r~,nJt!['fE_,n~" I~_,:' i SEP 2 4 2003 t: I J II'; " , I~J ;,' [:1' l..' :'~'~'~S:.;-='0:."77:~:..,.t i !, '~"i~'{O'';: c'" "'~l ",:--.1 ::'vCtl L__" ,,1 I' ,U:/,ri~VA1EF/ .1 ; '\ I , T Traffic Study for Tampa Bay Water Office Building Pinellas County, Florida Prepared for Tampa Bay Water Prepared by URS Corporation , ~ J. INTRODUCTION The purpose of this study is to evaluate opening year (2003) traffic conditions for the proposed Tampa Bay Water office building located on Enterprise Road between Main Street and Countryside Blvd in Pinellas County. II. PROJECT TRIP GENERATION Project traffic for the proposed Tampa Bay Water 37,000 square foot office building was developed the Institute of Traffic Engineers (ITE) Trip Generation, 6th Edition, rates and methods. Table 1 shows daily, and AM and PM peak hour traffic generation. III PROJECT TRIP DISTRIBUTION The site is located in an existing office park that is similar in land use to the proposed project. Because of the similarity between the existing land use and the proposed project, traffic distribution from the project site is based on turning movement counts taken at the site driveway. IV BACKGROUND TRAFFIC Background traffic is the traffic that would travel the roadway regardless of whether the proposed project was built. Background traffic is based on traffic counts taken at the site drive and on Enterprise Road. The traffic counts are shown in Appendix A. V ROADWAY GEOMETRY Enterprise Road is a two-lane undivided facility connecting office and commercial land uses with Main Street on north, and Countryside Boulevard on the south. The driveway serving the proposed project is a two-lane undivided road. VI TRAFFIC OPERATIONS ANALYSIS In order to evaluate the current traffic conditions, capacity and level of service analyses were conducted using the Highway Capacity Manual and the FDOT Quality/Level of Service Manual. Level of service (LOS) is a quantitative measure describing traffic conditions on a traffic stream. There are six levels of service "A" through "F", with LOS A representing the best operations and LOS F representing the worst conditions. Figure I shows the PM peak hour background and project traffic. The project driveway at Enterprise Road is currently stop sign controlled. With the proposed project traffic and the current level of background traffic, the intersection is expected operate at LOS B. No improvements are required. The Highway Capacity Software (HCS) analyses are shown in Appendix B. 2 ... . 1 Enterprise Road was evaluated using Table 4-7 Generalized Peak Hour Directional Volumes for Florida's Urbanized Areas (See Appendix C). Based on the Non-State Roadways-Other Signalized Roadways table, Enterprise Road is expected to operate at LOS B or better with the combined background and project traffic. No improvements are required. 3 J. . . , FIGURES , , U li:: Ctl t= u "li:: c: Ctl 5'= .... - OlU ~ Gl ~ "e I1lt:L ::; :; o 0 II ~~ Cll Cll Gl Gl "Ct:Lt:L C~~ Q)t:Lt:L Cl ~ Q)XX -.JX~ ~ ~ < <\\r- Main St t C'l E ~ I-~ r- LLN" ~ 1O ~ <(~ ! ~ N ll::-E C'l ~ oi CfJ NTS "0 c::: a> en 'C 0.. L- a> ..... c W \ro'::,\ \ 'I~" V 1 <:2'::,\ \' \\ ~ 6> </ <;- ~ I I I I I I / / I I I I I <o\~o 'oe ~~~ ~~~ cP >, CfJ "0 (l) ~ E U5 ~ 1'5 ~ ~ :; E o u Iij:: ~m~ .gl Il. ..... u.~2 ~~ o >, o C1l NCO ..... C1l C1l Cl. ~ E ~ >- Ctl =: Gl (/) ::J Ctl u E~~ ~-2.~ "5~r-:. c7lug c: >- C'l oGlC'l :.;::: C l'tl ~532 ~8 .Q o LL U ~ oi iQ ~ E ::>~~ TABLES TABLE 1: TAMPA BAY WATER ITE TRIP GENERATION AM Peak Hour PM Peak Hour ---------------~ APPENDIX A >- CIl :: a> :> .... o <'"l (])O)o .f:!~~ 0.0 - ....00) (])o~ coco Woo..- (]) ~, CD E-o'l;lo CIlOOZ ZO-e(]) (])CDroCl ff~Ci5~ >- :?; Ul o =1"- CDO c.o<o o 0. '" ~E'" ~roro ~O :g ... >- 0 O<ll- OcU- (/)tro ~50. :JoE ~~ o \!) <0 r- >- CIl 3 II) > ~ '0 c ro '0 tt:: II) Ul .~ ffi(/) 2 OCltt::'Oc O:JoW I ." 0 ,. o ~t') 5 " "'0 t..::;:; 22~lil cc.....Ul 55~2 OO~E I-i- ,I- l-E ~- ! f~! ~~I~ ~ ~ \ 2 Wl~ m\!)N '<t<OtO <.> !E ('[l ..... I- <i: rooo .:::: <Il ....J ci.1ii a..... ~ I "0 Q) ..... C 'C a. lI) Co :J >, -g e ctl :J (95:0 Q).o >- C ~ S ci.1ii a..... {:. 2 .s:::. I- .:::: <Il ....J ~ci. ~ I "0 ..... C .s:::. . Q):J .2' ~.8L~ :2-:5 I ::l ~. h m <'"l \!) ~ IQ) :J I'" . M ..- N '" rc 0 :.s:::. ! IW'~ o~o ~ , E ,0 ~ ~ ~ CIl I 1.- ~ a.. a.. a.. 0 I I- ,CIl U') 0 U') L1 Il i"i~i ~L~J IX) 0 I"-N l"-\!)tO\!) 0000 0000 0000 0000 '<t~Nr--. "''''''',.... ,....000 ",,....Nr--. "''''''',.... 0000 mN<O'<t \!) N '<t '" 0000 '<tON,.... \!)r--.o>~ '" ,.... N '" 0000 U')r--.m,.... "'..-N'" 0000 ~~~~CIl a.. a.. a.. a.. 0 o \!) 0 \!) O..-"''<t LriLriLriLri 0000 IX) IX) '<t o 0 o 000 00 o~~ 00 000 06 l"- N N <<)\!)<O C-?....: O>\!)O> ..- . . N<O'<t O>'<t 000 66 m 0 '" cx:i \!) ,.... ,.... N..itO <0 oC!C! 00 '<to>O> ,.... . . I()N <') N N N 000 00 mtOO> Ncx:i..t m'<t "''<t<O "":6 ~cf!~ O.s:::.- I-~$ -00.0 c a. I- ~<( CD 1ii o I- c ci.ro ~J ~"O :c Q) C 0> Q) :J I .- ..... 0 . 0:: .0 O Ci5 ::l <tl ... W ~ .:::: <Il ....J \!) cO '<t ci.1ii 0.- , {:.I :c OJ ii ::J ... ..c I- .:= <Il ....J ci.1ii 0.0 I- >,"0 <tl C 5: g Q)-O >- _ lI) ..... Q) :s: - .s:::. OJ ii ::l ... .s:::. I- -:::: CD ...J \!) to '<t .:= <Il ....J I"- IX) U') r- N '<t N IX) 6 o 0 000 6 O~O o o~o o ,.... N ,.... N":...... m",,,, ~ . '" ~ffi 000 6 o 0> N "'O\!) ...... . LO <0 000 6 r-o'<t to <') <0 ,.... ,.... ~ a.. o o Lri '<t C<) '<t '" '<to "'0> to o ~ '" <') ~ a.. 0 o o to o m<o LO I() o \!) o ~ a..'<t o o LO o \!) '" \!)m "'N IX) 6 o~o 0 o <001() ...... . '" ,....0 o ~ \!) '" 2 a.. 0 \!) '<t ~ o <Il Ec:<Il'E<Il6~<Il6 'I I I-'~ ~o,g E <Il E 13 E E 13 ()B~2C1l.s:::.2C1l I l-e ...<Il0<llOu.OJOu. I CIl 5 ~>a..>'><:I>'><: I (/)- .2 oro ro c: 0 <Il <Il - "a.. a.. ~__i 2 2 <l: >- rn :; '0) > (5 C") 0) 0 0 .~o 0 L- 0 N e-o <0 .s8!:: Co OJ Woo~ 0) Q) Q) Euiijo rooOZ ZO-eQ) ~:m.l!l g lLOO 00 0.. ;>. 3: II) o =....... <1>0 C.J:l<D o Q.C") +:EC"> ~ ro t1l 8. 0 :g 5 ~.Q oelL oot:::<1i O:::~Q. :JoE ~~ o LO <D I'- i?;- C :J OJoo 0 ~ cr:: ;>.0 O::lEgJ . .. :J - o~oo~ i..:ulriO:: 2S~ .. ssroa> ooQ):5 oo~o .\i;T1o co l() N M '0 MC"'JMvlO f- ~ E 'nil hooop ~! I" I ci a. " Q) c: Q) :J .8 oUi III W ,,'" c: Q) :J Vl 0 1~~If1 '- t! I iQ) 0'2 . i""" CO N l() ~Zt= ~ T-T- , . 'iiBPOOOP ~I I I , ! i i u. IE ro. L- I- <( -g 'E &: Vl a. ~ I ,,~ ~c: ~ :J CIl.8 ~Ui .... (I) 2 ' ;: MO.... .. o ci i , I "0 'i:,pooo Jy -g ~r i ,(I) :J Vl 0 \e-~~--~._~ ; i1!l O:J 12 E ~ '" 0> I'- 0 Ie :Cr,' i""'............1'- WWr' : I I "; I : I I I I i ~* 0> M v :::!::::: <(<(<(0 lOOlO ~Mv .. r:..: r:..:,:.: 000 lOl'-NlOkJ> MvvcoFo i""" OOO<r- .... I'- 0> I'- i NNNMj;! N~_V~ ~~::::Ill <(<(<(<(0 OlOOlO o~(t)...t ti:iti:icoco 0000 N '<t' C') o C> o 000 cici 000 cici 000 cici 0> .... .... co v I'- --~.q: M"'.... o ' . r-~g 000 cici CO C") N NOCO LOci N 000 cici COOOCl lCi"'; I'- U) N 000 cici V"'OCl 0Cl . . T""~~ ~"<t.... C") . . "<to> .... ~~~ O.c- .....el9 -g 2:~ ~<( C> ~'~ 01 ,I rsi rll '0 (I) c: Q) :J .... 0 .c o ~ 2 W 0Cl -.i C") 0> N '" >,'0 III C ~ :J (1).8 >.... c III ;: ----I 0> lO co co .... I'- N I'- ci o 0 ci a. 000 ci 000 ci ~ 000 <( II> 0 ci 0 .0 v <0 .. N N .... co 0 '" NM .... ci ci a. U)....N N '" cO 2 ....C>C> 0> LO"';<r- .... 0> 000 ~o ci l() v ti:i 0 M M M 0 lO N ci ....M.... M C") 000 ci o N....N to '" ~N lO v ti:i o v N .... .... <0 vlO .... ci ~ 000 ci o vO>l'- ..~('l"') ~O> I'- M .~ <(o....v 0"00 o 'ti:i 00 ~v lO v co o cu CI1)-Q)L.. 'Q)L.. 5 .QE~E~EE~ ,- "0 ~ ~ ~ <<J ~ .2 co Ql 0 (I) Ou. 0I0U. Ee!>a..>-"!J:>-"! 2-E '!:1m m :; - co a.. a.. o 0 .. ., Weather: Good Counted By: JAMAR Location: Enterprise Rd N of Countryside BI Start PEAK Time Southbound Northbound Total Hourly Daily HOUR 8/19/2003 2 1 3 12:15 AM 0 0 0 12:30 AM 0 0 0 12:45 AM 1 2 3 6 1 :00 AM 1 0 1 1 :15 AM 0 0 0 1 :30 AM 0 4 4 1:45AM 2 0 2 7 2:00 AM 0 0 0 2:15 AM 0 0 0 2:30 AM 0 0 0 2:45 AM 0 0 0 0 3:00 AM 1 2 3 3:15 AM 2 0 2 3:30 AM 0 0 0 3:45 AM 1 3 4 9 4:00 AM 1 0 1 4:15 AM 2 1 3 4:30 AM 1 2 3 4:45 AM 0 2 2 9 5:00 AM 0 4 4 5:15 AM 7 2 9 5:30 AM 7 12 19 5:45 AM 9 10 19 51 6:00 AM 6 7 13 6:15 AM 9 7 16 6:30 AM 16 10 26 6:45AM 13 18 31 86 6 - 7 AM 86 7:00 AM 13 17 30 103 7:15 AM 27 9 36 123 7:30 AM 14 20 34 131 7:45AM 30 12 42 142 7 - 8 AM 142 8:00 AM 26 17 43 155 8:15 AM 24 19 43 162 8:30 AM 21 22 43 171 8:45 AM 26 26 52 181 8 - 9 AM 181 9:00 AM 23 23 46 184 9:15 AM 20 28 48 189 9:30 AM 24 24 48 194 9:45 AM 19 27 46 188 9 - 10 AM 188 10:00 AM 22 29 51 10:15 AM 26 31 57 10:30 AM 28 34 62 10:45 AM 37 35 72 242 11 :00 AM 35 24 59 11: 15 AM 31 37 68 11:30AM 32 33 65 11 :45 AM 25 22 47 239 12:00 PM 25 22 47 12:15 PM 23 38 61 12:30 PM 18 23 41 12:45 PM 35 36 71 220 1 :00 PM 32 26 58 1: 15 PM 31 25 56 1 :30 PM 31 27 58 1 :45 PM 30 30 60 232 2:00 PM 26 31 57 2:15 PM 32 30 62 2:30 PM 25 28 53 2:45 PM 28 21 49 221 3:00 PM 31 34 65 3:15 PM 19 27 46 3:30 PM 31 26 57 3:45 PM 38 26 64 232 3 - 4 PM 232 4:00 PM 40 32 72 239 4:15 PM 20 29 49 242 4:30 PM 32 32 64 249 4:45 PM 30 15 45 230 4 - 5 PM 230 5:00 PM 20 28 48 206 5:15 PM 16 18 34 191 5:30 PM 14 20 34 161 5:45 PM 11 33 44 160 5 - 6 PM 160 6:00 PM 18 36 54 166 6: 15 PM 17 25 42 174 6:30 PM 16 17 33 173 6:45 PM 15 24 39 168 6 - 7 PM 168 7:00 PM 19 19 38 7:15 PM 17 18 35 7:30 PM 6 15 21 7:45 PM 10 8 18 112 8:00 PM 4 4 8 8:15 PM 3 12 15 8:30 PM 4 3 7 8:45 PM 2 6 8 38 9:00 PM 4 6 10 9:15 PM 4 4 8 9:30 PM 1 4 5 9:45 PM 1 5 6 29 10:00 PM 1 4 5 10:15 PM 6 3 9 10:30 PM 1 1 2 10:45 PM 0 1 1 17 11:00 PM 0 1 1 11:15PM 2 5 7 11:30 PM 1 2 3 11 :45 PM 0 0 0 11 2830 1374 1456 Weather: Good Counted By: JAMAR Location: Enterprise Rd N of Countryside BI Start Time Southbound Northbound Total Hourly Daily 8/20/2003 0 0 0 12:15 AM 1 3 4 12:30 AM 0 0 0 12:45 AM 3 3 6 10 1 :00 AM 1 1 2 1 : 1 5 AM 1 0 1 1 :30 AM 0 0 0 1 :45 AM 0 0 0 3 2:00 AM 0 2 2 2:15 AM 0 1 1 2:30 AM 0 0 0 2:45 AM 1 0 1 4 3:00 AM 0 0 0 3:15AM 3 1 4 3:30 AM 1 2 3 3:45 AM 1 0 1 8 4:00 AM 0 3 3 4:15 AM 0 1 1 4:30 AM 1 5 6 4:45 AM 1 2 3 13 5:00 AM 1 4 5 5:15 AM 7 7 14 5:30 AM 9 9 18 5:45AM 10 7 17 54 6:00 AM 10 11 21 6:15 AM 14 8 22 6:30 AM 13 7 20 6:45 AM 23 13 36 99 6 - 7 AM 99 7:00 AM 13 15 28 106 7:15 AM 29 9 38 122 7:30 AM 17 14 31 133 7:45 AM 31 12 43 140 7 - 8 AM 140 8:00 AM 13 18 31 143 8:15 AM 24 17 41 146 8:30 AM 26 19 45 160 8:45 AM 25 29 54 171 8-9AM 171 9:00 AM 19 18 37 177 9:15 AM 19 26 45 181 9:30 AM 26 30 56 192 9:45 AM 33 30 63 201 9 - 1 0 AM 201 10:00 AM 37 26 63 10:15 AM 35 22 57 10:30 AM 29 33 62 10:45 AM 32 24 56 238 11 :00 AM 37 37 74 11 : 15 AM 25 26 51 11:30AM 26 30 56 11 :45 AM 35 26 61 242 12:00 PM 28 34 62 12:15 PM 27 25 52 12:30 PM 25 36 61 12:45 PM 28 40 68 243 1 :00 PM 30 29 59 1: 15 PM 28 19 47 1 :30 PM 32 34 66 1:45 PM 31 25 56 228 2:00 PM 27 26 53 2:15 PM 40 39 79 2:30 PM 35 25 60 2:45 PM 39 23 62 254 3:00 PM 28 32 60 3:15PM 29 24 53 3:30 PM 42 25 67 3:45 PM 33 25 58 238 3 - 4 PM 238 4:00 PM 33 29 62 240 4:15 PM 22 20 42 229 4:30 PM 22 28 50 212 4:45 PM 18 21 39 193 4 - 5 PM 193 5:00 PM 24 23 47 178 5:15PM 16 21 37 173 5:30 PM 22 15 37 160 5:45 PM 12 22 34 155 5 - 6 PM 155 6:00 PM 15 22 37 145 6:15 PM 12 23 35 143 6:30 PM 20 25 45 151 6:45 PM 8 19 27 144 6 - 7 PM 144 7:00 PM 9 13 22 7:15 PM 11 18 29 7:30 PM 11 13 24 7:45 PM 6 6 12 87 8:00 PM 5 15 20 8:15PM 3 10 13 8:30 PM 2 11 13 8:45 PM 2 7 9 55 9:00 PM 1 2 3 9:15PM 1 8 9 9:30 PM 2 3 5 9:45 PM 0 3 3 20 10:00 PM 2 3 5 10:15 PM 3 0 3 10:30 PM 1 2 3 10:45 PM 1 7 8 19 11:00 PM 0 1 1 11: 15 PM 3 6 9 11 :30 PM 1 2 3 11 :45 PM 1 0 1 14 2833 1423 1410 Weather: Good Counted By: JAMAR Location: Enterprise Rd N of Countryside BI Start Time Southbound Northbound Total Hourly Daily 8/21/2003 0 1 3 12:15 AM 1 2 2 12:30 AM 1 1 6 12:45 AM 3 3 0 11 1 :00 AM 0 0 0 1 :15 AM 0 0 1 1 :30 AM 0 1 0 1 :45 AM 0 0 0 2:00 AM 0 0 2 2:15 AM 0 2 0 2:30 AM 0 0 1 2:45 AM 0 1 2 5 3:00 AM 0 2 2 3:15 AM 2 0 1 3:30 AM 1 0 4 3:45 AM 1 3 2 9 4:00 AM 2 0 1 4:15 AM 1 0 3 4:30 AM 0 3 2 4:45 AM 0 2 7 13 5:00 AM 4 3 9 5:15 AM 2 7 16 5:30 AM 5 11 24 5:45 AM 15 9 16 65 6:00 AM 9 7 12 6:15 AM 8 4 22 6:30 AM 15 7 31 6:45 AM 12 19 28 93 6 - 7 AM 93 7:00 AM 16 12 39 120 7:15 AM 23 16 45 143 7:30 AM 24 21 38 150 7:45 AM 22 16 44 166 7 - 8 AM 166 8:00 AM 22 22 41 168 8:15 AM 18 23 48 171 8:30 AM 21 27 46 179 8:45 AM 21 25 56 191 8-9AM 191 9:00 AM 36 20 45 195 9:15 AM 25 20 47 194 9:30 AM 27 20 45 193 9:45 AM 21 24 70 207 9 - 1 0 AM 207 10:00 AM 29 41 53 10:15 AM 27 26 47 10:30 AM 24 23 70 10:45 AM 36 34 61 231 11 :00 AM 28 33 68 11 : 15 AM 32 36 74 11 :30 AM 38 36 66 11 :45 AM 29 37 50 258 12:00 PM 25 25 57 12:15 PM 25 32 70 12:30 PM 26 44 67 12:45 PM 37 30 59 253 1 :00 PM 28 31 43 1:15PM 22 21 52 1 :30 PM 27 25 58 1 :45 PM 35 23 50 203 2:00 PM 27 23 54 2:15 PM 24 30 62 2:30 PM 33 29 81 2:45 PM 37 44 63 260 3:00 PM 42 21 49 3:15 PM 25 24 43 3:30 PM 23 20 43 3:45 PM 21 22 56 191 3 - 4 PM 191 4:00 PM 30 26 49 191 4: 15 PM 26 23 47 195 4:30 PM 27 20 47 199 4:45 PM 19 28 30 173 4 - 5 PM 173 5:00 PM 13 17 32 156 5:15 PM 14 18 38 147 5:30 PM 20 18 49 149 5:45 PM 25 24 48 167 5 - 6 PM 167 6:00 PM 18 30 27 162 6:15 PM 12 15 25 149 6:30 PM 8 17 33 133 6:45 PM 17 16 28 113 6 - 7 PM 113 7:00 PM 11 17 31 7:15 PM 13 18 25 7:30 PM 12 13 15 7:45 PM 4 11 15 86 8:00 PM 10 5 9 8:15 PM 2 7 10 8:30 PM 5 5 13 8:45 PM 4 9 11 43 9:00 PM 4 7 8 9:15 PM 4 4 9 9:30 PM 2 7 8 9:45 PM 3 5 4 29 10:00 PM 2 2 5 10:15 PM 3 2 2 10:30 PM 0 2 0 10:45 PM 0 0 8 15 11:00 PM 1 7 2 11:15 PM 1 1 1 11:30 PM 0 1 4 11 :45 PM 0 4 2791 2798 5581 1368 1423 Weather: Good Counted By: JAMAR Location: Enterprise Rd S of Main St Start PEAK Time Northbound Southbound Total Hourly Daily HOUR 8/19/2003 7 1 8 12:15 AM 2 0 2 12:30 AM 3 0 3 12:45 AM 1 2 3 16 1 :00 AM 1 0 1 1 :15 AM 0 0 0 1 :30 AM 2 1 3 1 :45 AM 0 1 1 5 2:00 AM 0 0 0 2:15 AM 0 0 0 2:30 AM 0 2 2 2:45 AM 0 0 0 2 3:00 AM 0 0 0 3:15 AM 0 0 0 3:30 AM 0 0 0 3:45 AM 0 0 0 0 4:00 AM 0 2 2 4:15 AM 0 2 2 4:30 AM 1 1 2 4:45AM 1 1 2 8 5:00 AM 1 2 3 5:15 AM 0 4 4 5:30 AM 1 1 2 5:45 AM 1 2 3 12 6:00 AM 1 9 10 6:15 AM 5 8 13 6:30 AM 4 17 21 6:45 AM 4 9 13 57 6 - 7 AM 57 7:00 AM 6 10 16 63 7:15 AM 4 21 25 75 7:30 AM 14 25 39 93 7:45 AM 14 19 33 113 7 - 8 AM 113 8:00 AM 7 28 35 132 8:15 AM 10 19 29 136 8:30 AM 12 28 40 137 8:45 AM 14 26 40 144 8 - 9 AM 144 9:00 AM 13 17 30 139 9:15 AM 12 12 24 134 9:30 AM 10 15 25 119 9:45 AM 13 15 28 107 9 - 10 AM 107 10:00 AM 12 18 30 10:15 AM 15 13 28 10:30 AM 16 16 32 10:45 AM 18 17 35 125 11 :00 AM 20 19 39 11: 15 AM 20 22 42 11:30AM 32 30 62 11 :45 AM 29 26 55 198 , 12:00 PM 33 29 62 12:15 PM 30 18 48 12:30 PM 25 19 44 12:45 PM 24 26 50 204 1 :00 PM 27 21 48 1: 15 PM 19 23 42 1 :30 PM 21 26 47 1 :45 PM 17 24 41 178 2:00 PM 21 25 46 2:15 PM 30 14 44 2:30 PM 22 15 37 2:45 PM 17 21 38 165 3:00 PM 22 18 40 3:15 PM 18 20 38 3:30 PM 20 15 35 3:45 PM 27 10 37 150 3 - 4 PM 150 4:00 PM 21 19 40 150 4:15 PM 20 23 43 155 4:30 PM 22 15 37 157 4:45 PM 36 19 55 175 4 - 5 PM 175 5:00 PM 30 15 45 180 5:15 PM 35 17 52 189 5:30 PM 22 19 41 193 5:45 PM 17 14 31 169 5 - 6 PM 169 6:00 PM 18 14 32 156 6:15 PM 19 11 30 134 6:30 PM 15 6 21 114 6:45 PM 25 5 30 113 6 - 7 PM 113 7:00 PM 17 13 30 7:15 PM 20 10 30 7:30 PM 14 6 20 7:45 PM 17 9 26 106 8:00 PM 13 8 21 8: 15 PM 5 5 10 8:30 PM 13 5 18 8:45 PM 10 2 12 61 9:00 PM 13 4 17 9:15 PM 3 0 3 9:30 PM 3 3 6 9:45 PM 10 3 13 39 10:00 PM 6 3 9 10:15 PM 1 0 1 10:30 PM 5 1 6 10:45 PM 5 1 6 22 11:00 PM 3 4 7 11:15PM 2 2 4 11:30 PM 1 0 1 11:45 PM 0 0 0 12 2181 1140 1041 Weather: Good Counted By: JAMAR Location: Enterprise Rd S of Main St Start Time Northbound Southbound Total Hourly Daily 8/20/2003 5 2 7 12:15 AM 2 1 3 12:30 AM 1 0 1 12:45 AM 0 0 0 11 1 :00 AM 1 0 1 1 :15 AM 2 1 3 1 :30 AM 1 3 4 1 :45 AM 4 1 5 13 2:00 AM 0 0 0 2:15 AM 0 1 1 2:30 AM 0 0 0 2:45 AM 0 0 0 1 3:00 AM 3 0 3 3:15 AM 0 0 0 3:30 AM 0 1 1 3:45AM 0 0 0 4 4:00 AM 0 1 1 4:15 AM 0 2 2 4:30 AM 0 1 1 4:45 AM 2 0 2 6 5:00 AM 1 1 2 5:15 AM 0 2 2 5:30 AM 2 5 7 5:45 AM 1 4 5 16 6:00 AM 3 7 10 6:15 AM 3 11 14 6:30 AM 8 14 22 6:45 AM 6 13 19 65 6 - 7 AM 65 7:00 AM 5 18 23 78 7:15 AM 9 21 30 94 7:30 AM 6 28 34 106 7:45 AM 6 23 29 116 7 - 8 AM 116 8:00 AM 5 19 24 117 8:15 AM 6 30 36 123 8:30 AM 6 24 30 119 8:45 AM 11 20 31 121 8 - 9 AM 121 9:00 AM 9 26 35 132 9:15 AM 13 15 28 124 9:30 AM 17 19 36 130 9:45 AM 13 19 32 131 9 - 10 AM 131 10:00 AM 20 19 39 10:15 AM 16 26 42 10:30 AM 34 25 59 10:45 AM 20 23 43 183 11 :00 AM 16 19 35 11 : 15 AM 28 25 53 11:30AM 25 18 43 11 :45 AM 34 29 63 194 12:00 PM 30 21 51 12:15 PM 23 15 38 12:30 PM 17 31 48 12:45 PM 22 17 39 176 1 :00 PM 22 21 43 1:15 PM 21 23 44 1 :30 PM 27 18 45 1 :45 PM 26 23 49 181 2:00 PM 10 18 28 2:15 PM 25 14 39 2:30 PM 24 20 44 2:45 PM 12 22 34 145 3:00 PM 38 31 69 3:15PM 20 17 37 3:30 PM 25 27 52 3:45 PM 27 24 51 209 3 - 4 PM 209 4:00 PM 23 16 39 179 4:15PM 25 26 51 193 4:30 PM 23 23 46 187 4:45 PM 41 31 72 208 4 - 5 PM 208 5:00 PM 26 15 41 210 5:15PM 27 20 47 206 5:30 PM 30 14 44 204 5:45 PM 24 21 45 177 5 - 6 PM 177 6:00 PM 27 14 41 177 6:15PM 13 18 31 161 6:30 PM 17 9 26 143 6:45 PM 20 15 35 133 6 - 7 PM 133 7:00 PM 14 3 17 7:15PM 26 10 36 7:30 PM 19 12 31 7:45 PM 12 9 21 105 8:00 PM 20 10 30 8:15PM 10 3 13 8:30 PM 7 3 10 8:45 PM 10 3 13 66 9:00 PM 16 1 17 9:15PM 13 1 14 9:30 PM 6 1 7 9:45 PM 4 0 4 42 10:00 PM 8 0 8 10:15 PM 4 2 6 10:30 PM 3 0 3 10:45 PM 4 2 6 23 11 :00 PM 0 3 3 11:15 PM 2 0 2 11 :30 PM 4 2 6 11:45 PM 4 3 7 18 2344 1195 1149 Weather: Good Counted By: JAMAR Location: Enterprise Rd S of Main St Start Time Northbound Southbound Total Hourly Daily 8/21/2003 5 2 7 12:15 AM 5 2 1 12:30 AM 0 1 1 12:45 AM 1 0 2 11 1 :00 AM 1 1 3 1 : 15 AM 2 1 3 1 :30 AM 0 3 3 1 :45 AM 3 0 0 9 2:00 AM 0 0 1 2:15 AM 1 0 0 2:30 AM 0 0 0 2:45AM 0 0 2 3 3:00 AM 2 0 3 3:15 AM 3 0 0 3:30 AM 0 0 0 3:45 AM 0 0 2 5 4:00 AM 0 2 1 4:15 AM 0 1 1 4:30 AM 0 1 1 4:45 AM 1 0 2 5 5:00 AM 0 2 3 5:15 AM 1 2 1 5:30 AM 0 1 6 5:45AM 0 6 5 15 6:00 AM 1 4 15 6:15 AM 9 6 22 6:30 AM 8 14 15 6:45 AM 1 14 13 65 6 - 7 AM 65 7:00 AM 4 9 27 77 7:15 AM 9 18 27 82 7:30 AM 4 23 23 90 7:45 AM 5 18 38 115 7 - 8 AM 115 8:00 AM 12 26 24 112 8:15 AM 12 12 39 124 8:30 AM 8 31 45 146 8:45 AM 23 22 21 129 8 - 9 AM 129 9:00 AM 10 11 45 150 9:15 AM 24 21 44 155 9:30 AM 20 24 39 149 9:45 AM 19 20 41 169 9 - 10 AM 169 10:00 AM 22 19 22 10:15 AM 9 13 37 10:30 AM 16 21 49 10:45 AM 28 21 26 134 11 :00 AM 9 17 45 11 : 15 AM 26 19 51 11 :30 AM 29 22 46 11 :45 AM 27 19 53 195 12:00 PM 27 26 52 12:15 PM 30 22 66 12:30 PM 33 33 51 12:45 PM 29 22 41 210 1 :00 PM 15 26 46 1:15PM 28 18 36 1 :30 PM 20 16 39 1 :45 PM 25 14 38 159 2:00 PM 22 16 31 2:15 PM 19 12 29 2:30 PM 11 18 40 2:45 PM 14 26 46 146 3:00 PM 29 17 52 3:15 PM 28 24 44 3:30 PM 18 26 47 3:45 PM 28 19 42 185 3 - 4 PM 185 4:00 PM 25 17 28 161 4:15 PM 15 13 40 157 4:30 PM 27 13 41 151 4:45 PM 26 15 47 156 4 - 5 PM 156 5:00 PM 34 13 46 174 5: 15 PM 25 21 45 179 5:30 PM 29 16 36 174 5:45PM 20 16 21 148 5 - 6 PM 148 6:00 PM 16 5 19 121 6:15 PM 12 7 48 124 6:30 PM 28 20 34 122 6:45 PM 19 15 15 116 6 - 7 PM 116 7:00 PM 9 6 20 7:15 PM 15 5 24 7:30 PM 12 12 25 7:45 PM 22 3 12 81 8:00 PM 7 5 20 8:15 PM 14 6 14 8:30 PM 11 3 13 8:45 PM 9 4 10 57 9:00 PM 8 2 4 9: 15 PM 2 2 9 9:30 PM 5 4 16 9:45 PM 12 4 8 37 10:00 PM 4 4 12 10:15 PM 9 3 5 10:30 PM 4 1 8 10:45 PM 4 4 5 30 11 :00 PM 2 3 1 11:15PM 1 0 1 11:30 PM 1 0 5 11:45 PM 3 2 2194 2201 4381 1166 1028 APPENDIX B I DrivewayPM.txt HCS2000: unsignalized Intersections Release 4.1c TWO-WAY STOP CONTROL SUMMARY Analyst: Agency/co. : Date Performed: Analysis Time period: Intersection: Jurisdiction: units: u. s. Customary Analysis Year: 2003 project 10: Tampa Bay water East/west Street: project Driveway North/south Street: Enterprise Road Intersection Orientation: NS URS Corporation 09/18/2003 PM peak Hour Driveway Study period (hrs): 0.25 vehicle volumes and Adjustments Major Street: Approach Northbound Movement 1 2 3 L T R volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR percent Heavy Vehicles Median Type undivided RT Channelized? Lanes configuration upstream signal? Minor Street: Approach Movement 119 0.92 129 16 0.92 17 southbound 4 5 6 L T R 8 116 0.92 0.92 8 126 2 0 1 LT No Eastbound 10 11 12 L T R 1 0 TR No volume Peak Hour Factor, PHF Hourly Flow Rate, HFR percent Heavy vehicles Percent Grade (%) Median Storage Flared Approach: Exists? Storage Westbound 7 8 9 L T R 42 0 78 0.92 1.00 0.92 45 0 84 2 0 2 0 No o RT Channelized? Lanes Configuration 010 LTR Delay, Queue Length, and Level of Service NB SB Westbound Eastbound 1 4 7 8 9 10 11 12 LT LTR Approach Movement Lane config v (vph) c(m) (vph) v/c 95% queue length Control Delay LOS Approach Delay Approach LOS 8 1436 0.01 0.02 7.5 A 129 827 0.16 0.55 10.2 B 10.2 B HCS2000: unsignalized Intersections Release 4.1c phone: E-Mail : Fax: TWO-WAY STOP CONTROL(TWSC) ANALYSIS Analyst: Agency/co. : Date performed: URS corporation 09/18/2003 page 1 ~ Analysis Time period: PM Peak Hour Intersection: Driveway Jurisdiction: units: u. s. Customary Analysis Year: 2003 project ID: Tampa Bay water East/west Street: project Driveway North/South Street: Enterprise Road Intersection orientation: NS DrivewayPM.txt Study period (hrs): 0.25 vehicle volumes and Adjustments Major Street Movements 1 2 3 4 5 6 L T R L T R volume Peak-Hour Factor, PHF peak-IS Minute volume Hourly Flow Rate, HFR percent Heavy vehicles Median Type undivided RT Channelized? Lanes configuration upstream Signal? Minor Street Movements 119 0.92 32 129 1 0 TR No 8 9 T R 0 78 1.00 0.92 0 21 0 84 0 2 0 No 7 L volume Peak Hour Factor, PHF Peak-IS Minute Volume Hourly Flow Rate, HFR percent Heavy vehicles percent Grade (%) Median Storage Flared Approach: Exists? Storage 42 0.92 11 45 2 RT Channelized? Lanes configuration o 1 0 LTR 16 0.92 4 17 8 0.92 2 8 2 116 0.92 32 126 o LT 1 NO 10 L 11 T 12 R o pedestrian volumes and Adjustments Movements 13 14 15 16 Flow (ped/h r) 0 0 0 0 Lane Width (ft) 12.0 12.0 12.0 12.0 walking speed (ft/sec) 4.0 4.0 4.0 4.0 Percent Blockage 0 0 0 0 upstream signal Data Arrival Green Type Time sec Prog. Flow vph Sat Flow vph cycle Length sec prog. speed mph Distance to signal feet s2 Left-Turn Through S5 Left-Turn Through worksheet 3-Data for computing Effect of Delay to Major Street vehicles Movement 2 Movement 5 Shared ln volume, major th vehicles: Shared ln volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: 126 o 1700 1700 1 worksheet 4-Critical Gap and Follow-up Time Calculation Cri ti cal Gap calculation Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(c,base) 4.1 7.1 6.5 6.2 t(c,hv) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 p(hv) 2 2 0 2 page 2 DrivewayPM.txt t(c,g) 0.20 0.20 0.10 0.20 0.20 0.10 Grade/lOa 0.00 0.00 0.00 0.00 0.00 0.00 to,lt) 0.00 0.70 0.00 0.00 t(C,T): I-stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2-stage 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 t(c) I-stage 4.1 6.4 6.5 6.2 2-stage Follow-up Time calculations Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(f,base) 2.20 3.50 4.00 3.30 t(f,HV) 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 P(HV) 2 2 0 2 t(f) 2.2 3.5 4.0 3.3 worksheet s-Effect of upstream signals computation I-Queue clearance Time at Upstream signal Movement 2 Movement 5 Vet) v(l,prot) Vet) v(l,prot) v prog Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (see) cycle Length, C (see) Rp (from Exhibit 16-11) proportion vehicles arriving on green P g (q1) g(q2) g(q) computation 2-proportion of TWSC Intersection Time blocked Movement 2 Movement 5 Vet) v(l,prot) Vet) v(l,prot) alpha beta Travel time, tea) (see) smoothing Factor, F proportion of conflicting flow, f Max platooned flow, v(c,max) Min platooned flow, v(c,min) Duration of blocked period, t(p) proportion time blocked, p Computation 3-platoon Event periods 0.000 0.000 Result p(2) peS) p(dom) p(subo) Constrained or unconstrained? 0.000 0.000 proportion unblocked for minor movements, p(x) (1) single-stage Process (2) (3) Two-Stage process stage I stage II p(l) p(4) p(7) p(8) p(9) p (10) p(l1) p (12) computation 4 and 5 single-Stage Process Movement 1 L 4 L 7 L 8 T 9 R 10 L 11 T 12 R v c,x s px V c,u,x 146 138 280 280 C r,x Page 3 --- -------------------------------~ DrivewayPM.txt c plat,x Two-Stage process 7 Stage1 Stage2 8 Stage1 Stage2 10 Stage1 Stage2 11 Stage1 Stage2 v(c,x) s p(x) v(c,u,x) 1700 1700 c(r, x) C(plat,x) worksheet 6-Impedance and capacity Equations step 1: RT from Minor St. conflicting Flows potential capacity pedestrian Impedance Factor Movement capacity probability of Queue free St. Step 2: LT from Major St. Conflicting Flows potential capacity pedestrian Impedance Factor Movement capacity probability of Queue free St. Maj L-Shared prob Q free St. step 3: TH from Minor St. Conflicting Flows Potential capacity pedestrian Impedance Factor cap. Adj. factor due to Impeding mvmnt Movement capacity probability of Queue free St. step 4: LT from Minor St. conflicting Flows Potential capacity pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. cap. Adj. factor due to Impeding mvmnt Movement capacity 9 12 138 910 1.00 910 0.91 4 1.00 1.00 1 146 1436 1.00 1436 0.99 0.99 8 1.00 1.00 11 280 632 1.00 0.99 628 1.00 7 1.00 0.99 1.00 10 280 710 1.00 1.00 0.99 1.00 0.90 0.99 706 worksheet 7-computation of the Effect of Two-stage Gap Acceptance Step 3: TH from Minor St. part 1 - First Stage conflicting Flows potential capacity pedestrian Impedance Factor cap. Adj. factor due to Impeding mvmnt Movement capacity probability of Queue free St. Part 2 - Second stage conflicting Flows Potential capacity pedestrian Impedance Factor cap. Adj. factor due to Impeding mvmnt Movement capacity part 3 - single Stage conflicting Flows potential Capacity pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Result for 2 stage process: a 8 11 280 632 1.00 0.99 628 1.00 0.99 page 4 .. y C t probability of Queue free St. Step 4: LT from Minor St. Part 1 - First Stage conflicting Flows Potential Capacity Pedestrian Impedance Factor cap. Adj. factor due to Impeding mvmnt Movement Capacity part 2 - Second stage conflicting Flows potential capacity pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement capacity part 3 - single stage conflicting Flows Potential capacity pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. cap. Adj. factor due to Impeding mvmnt Movement capacity Results for Two-stage process: a y C t DrivewayPM.txt 628 1.00 7 1.00 10 280 710 1.00 1.00 0.99 1.00 0.90 0.99 706 worksheet 8-Shared Lane Calculations 706 Movement 7 L 12 R 8 T 9 R 10 L 11 T volume (vph) Movement capacity (vph) Shared Lane capacity (vph) 45 706 o 628 827 84 910 Movement 7 L worksheet 9-computation of Effect of Flared Minor Street Approaches 12 R 8 T 9 R 10 L 11 T C sep volume Delay Q sep Q sep +1 round (Qsep +1) 706 45 628 o 910 84 n max C sh SUM c sep n C act 827 worksheet 10-Delay, Queue Length, and Level of Se rvi ce Movement 1 4 7 8 9 10 11 12 Lane config LT LTR v (vph) 8 129 c(m) (vph) 1436 827 vlc 0.01 0.16 95% queue length 0.02 0.55 Control Delay 7.5 10.2 LOS A B Approach Delay 10.2 Approach LOS B worksheet II-Shared Major LT Impedance and Delay Movement 2 Movement 5 Page 5 p(oj) v(il), volume for stream 2 or 5 v(i2), volume for stream 3 or 6 s(il), Saturation flow rate for stream 2 or 5 s(i2), Saturation flow rate for stream 3 or 6 P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through lanes d(rank,l) Delay for stream 2 or 5 DrivewayPM.txt 1.00 page 6 0.99 126 o 1700 1700 0.99 7.5 1 0.0 .. APPENDIX C ., TABLE 4 - 7 GENERALIZED PEAK HOUR DIRECTIONAL VOLUMES FOR FLORIDA'S URBANIZED AREAS. UNINTERRUPTED FLOW HIGHWAYS Level of Service ABC D 100 340 670 950 1,060 1,720 2,500 3,230 1,600 2,590 3,740 4,840 STATE TWO-WAY ARTERIALS Class I (>0.00 to 1.99 signalized intersections per mile) Level of Service B C 220 720 1,530 1,810 2,330 2,720 3,030 3,460 Lanes Divided I Undivided 2 Divided 3 Divided Lanes Divided I Undivided 2 Divided 3 Divided 4 Divided A D 860 1,860 2,790 3,540 ** 250 380 490 Class II (2.00 to 4.50 signalized intersections per mile) Level of Service B C 100 590 220 1,360 340 2,110 440 2,790 Lanes Divided ] Undivided 2 Divided 3 Divided 4 Divided A D 810 1,710 2,570 3,330 ** ** ** ** Class III (more than 4.5 signalized intersections per mile and not within primary city central business district of an urbanized area over 750,000) FREEWAYS E 1,300 3,670 5,500 Interchange spacing :0> 2 mi. apart Level of Service B C 2,110 2,940 3,260 4,550 4,410 6,150 5,560 7,760 6,710 9,360 D E 3,580 3,980 5,530 6,150 7,480 8,320 9,440 10,480 1],390 12,650 D E 3,440 3,910 5,410 6,150 7,380 8,380 9,340 10,620 11,310 12,850 Lanes 2 3 4 5 6 A 1,270 1,970 2,660 3,360 4,050 E 890 *** *** Interchange spacing < 2 mi. apart Level of Service C 2,660 4,180 5,700 7,220 8,740 Lanes 2 3 4 5 6 A ],130 1,780 2,340 3,080 3,730 B 1,840 2,890 3,940 4,990 6,040 *** E 850 1,800 2,710 3,500 BICYCLE MODE (Note: Level of service for the bicycle mode in this table is based on roadway geometries at 40 mph posted speed and traffic conditions, not number of bicyclists using the facility.) (Multiply motorized vehicle volumes shown below by number of directional roadway lanes to determine maximum service volumes.) Paved Shoulder/ Level of Service Level of Service Bicycle Lane Lanes Divided A B C D E Coverage A B C D E I Undivided ** ** 280 660 810 0-49% ** ** 170 720 >720 2 Divided ** ** 650 1,510 1,720 50-84% ** 130 210 >210 *** 3 Divided ** ** 1,020 2,330 2,580 85-100% 160 380 >380 *** *** 4 Divided ** ** 1,350 3,070 3,330 Class IV (more than 4.5 signalized intersections per mile and within primary city central business district of an urbanized area over 750,000) Level of Service Lanes Divided A B C I Undivided ** ** 270 2 Divided ** ** 650 3 Divided ** ** 1,000 4 Divided ** ** 1,350 PEDESTRIAN MODE (Note: Level of service for the pedestrian mode in this table is based on roadway geometries at 40 mph posted speed and traffic conditions, not the number of pedestrians using the facility.) (Multiply motorized vehicle volumes shown below by number of directional roadway lanes to determine maximum service volumes.) D E 720 780 Level of Service 1,580 1,660 Sidewalk Coverage A B C D E 2,390 2,490 0-49% ** ** ** 330 810 3,130 3,250 50-84% ** ** ** 520 990 85-100% ** 120 590 >590 *** NON-STATE ROADWAYS Major City/County Roadways BUS MODE (Scheduled Fixed Route) Level of Service (Buses per hour) Lanes Divided A B C D E Level of Service I Undivided ** ** 480 760 810 Sidewalk Coverage A B C D E 2 Divided ** ** 1,120 1,620 1,720 0-84% ** >5 :0>4 :0>3 :0>2 3 Divided ** ** 1,740 2,450 2,580 85-100% >6 >4 :0>3 :0>2 :0>1 Lanes Divided I Undivided 2 Divided Other Signalized Roadways (signalized intersection analysis) Level of Service B C ** 250 ** 580 D 530 1,140 A ** ** Source: Florida Department of Transportation Systems Planning Office 605 Suwannee Street, MS 19 Tallahassee, FL 32399-0450 http://wwwll.myflorida.com/planning/systems/smllos/default.htm 02/22/02 ARTERIAL/NON-STATE ROADWAY ADJUSTMENTS DIVIDED/UNDIVIDED (alter corresponding volumes by the indicated percent) E 660 1,320 Lanes Median Left Turns Lanes Adjustment Factors I Divided Yes +5% I Undivided No -20% Multi Undivided Yes -5% Multi Undivided No -25% ONE WAY FACILITIES Increase corresponding volume 20% "'This table does not con:o;litute a standard and should be used only for general planning applications. The computer models from which this table is derived should be used for more specific planning applications. The table anu deriving computer models should not be used for corridor or intersection design, where more refined techniques exist. Values shown are hourly directional volumes for levels of service and are for the .llllomobileltruck modes unless specifically stated. Level of service letter grade thresholds are probably not comparable across modes and, therefore, cross modal comparisons should be made with caution. Furthermore, combining levels of service of different modes into one overall roadway level of service is not recommended. To convert to annual average daily traffic volumes, these. volumes must be di\ided by appropriate D and K factors. The table's input value defaults and level of service criteria appear on the following page. Calculations are based on planning applications or the Highway Capacity tvlanual, Bicycle LOS Model, Pedestrian LOS Model and Transit Capacity and Quality of Service Manual, respectively for the automobile/truck, bicycle, pedestrian and bus modes. ....Cannot be achieved using table input value defaults. *....Not applicable for that level of service letter grade. For automobile/truck modes, volumes greater than level of service D become F because intersection capacities have been reached. For bicycle and pedestrian modes. the level of service letter grade (including F) is not achievable, because there is no maximum vehicle volume thresholu using table input value defaults. 97 I I I I I I I I I I I I I I I I I I I TIERRA November 3, 2003 URS Corporation 7650 West Courtney Campbell Causeway Tampa, Florida 33607 Phone(813) 286-1711 Fax (813)287-8591 Attn: Mr. Dennis Syrja, P.E. RE: Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No.: 6511-03-205 Mr. Syrja: Per your authorization, Tierra, Inc. has completed the geotechnical engineering study for the above referenced project. The results of the study are provided herein. Should there be any questions regarding the report, please do not hesitate to contact our office at (813) 989-1354. Tierra would be pleased to continue providing geotechnical services throughout the implementation ofthe project, and we look forward to working with you and your organization on this and future projects. Respectfully submitted, TIERRA, INC. /~ Erick M. Frederick, E.1. Geotechnical Engineer ~ - /h ~ Henri V. Jean, P.E. Principal Geotechnical Engineer Florida Registration No.: 55420 NOV 0 6 2003 7805 Professional Place. Tampa, Florida 33637 (813) 989-1354. FAX (813) 989-1355 I I I I I I I I I I I I I I I I I I I TABLE OF CONTENTS PROJECT DESCRiPTION........ ............. .................. ................................. ............. ......... 1 Project Information....................................................................................................... 1 Proposed Development............................................................................................... 1 Scope of Services........................................................................................................ 1 SITE AND SUBSURFACE CONDITIONS ...................................................................... 2 General Site Information.............................................................................................. 2 Subsurface Conditions................................................................................................. 3 Pinellas County Soil Survey......................................................................................... 3 Groundwater Information ................. ...................... ........... ...... ... ..................... .............4 Laboratory Testing....................................................................................................... 4 Field Permeability Tests.............................................................................................. 5 EVALUATION AND RECOMMENDATIONS .................................................................. 5 General....................................................................................................................... . 5 Site Preparation........................................................................................................... 5 Foundation Recommendations.................................................................................... 6 Settlement.................................................................................................................... 6 Floor Slab.................................................................................................................... 7 Pavement Construction Considerations....................................................................... 7 On Site Soil Suitability................................................................................................. 9 CONSTRUCTION CONSIDERATIONS ..........................................................................9 General....................................................................................................................... . 9 Fill Placement and Subgrade Preparation ................................................................... 9 Drainage and Groundwater Concerns....................................................................... 11 Structural Fill.............................................................................................................. 11 Excavations............................................................................................................... 12 REPORT LIM ITA TIONS....... ........... ........ ................. ............................. ......... ............... 12 APPENDIX Boring Location Plan Soil Profiles Results of Laboratory Testing Results of Field Permeability Testing Sheet 1 Sheet 2 Sheet 3 Sheet 4 I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 1 of 13 PROJECT DESCRIPTION Project Information The project is located East of Enterprise Road and North of Countryside Boulevard in Pinellas County, Florida. After minimal Clearing the site was accessible to our standard geotechnical equipment. Proposed Development The project, as we understand it, consists of performing a subsurface investigation in order to provide information to the design team for the proposed development. It is our understanding that the developer proposes to construct a 3-story structure approximately 15,000 square feet in plan view. It is anticipated that the structure will be supported using a shallow spread foundation system with a slab-on-grade. In addition, access drives, parking and stormwater treatment facilities are anticipated to support the development. Scope of Services The objective of our study was to obtain information concerning subsurface conditions at the site in order to obtain data from which to base engineering estimates and recommendations in each of the following areas: 1. Feasibility of utilizing shallow spread foundation systems for support of the structures. Suitability of slab-on-grade. 2. Design parameters required for the foundation system, including allowable bearing pressures, foundation sizes, foundation levels and soil subgrade treatments. 3. Suitability of materials on-site for use as structural fill, pavement subgrade and general backfill. Recommendations for placement and compaction of approved fill materials. 4. General location and description of potentially deleterious materials discovered in the borings, which may interfere with construction progress, and structure performance, including existing fills or surficial organics. 5. General pavement section construction considerations. 6. Identification of groundwater levels and estimation of Seasonal High Groundwater Table (SHGWT). 7. Estimation of shallow soil infiltration rates. I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 2 of 13 We provided the following services in order to achieve the preceding objectives: 1. Reviewed readily available published soils and topographic information. This published information was obtained from the appropriate Florida Quadrangle Map published by the United States Geological Survey (USGS) and the Soil Survey of Pinellas County, Florida published by the United States Department of Agriculture (USDA) Soil Conservation Service (SCS). 2. Executed a program of subsurface exploration consisting of borings, subsurface sampling and field-testing. We performed six (6) Standard Penetration Test (SPT) borings to depths ranging from 45 to 50 feet within the proposed building area. In each boring, samples were collected and SPT resistances were measured virtually continuously for the top 10 feet and on intervals of 5 feet thereafter. In addition we performed seventeen (17) auger borings to depths ranging from 4 to 15 feet below the existing ground surface within the proposed pavement and pond areas. 3. Visually classified the samples in the laboratory using the Unified Soil Classification System (USCS). Conducted limited laboratory testing. Identified soil conditions at each boring location and formed an opinion of the site soil stratigraphy. 4. Performed five (5) field permeability tests within the proposed pond area. 5. Collected groundwater level measurements and estimated SHGWT. 6. Prepared a formal engineering report, which summarizes the course of study pursued, the field and laboratory data generated, subsurface conditions encountered and our engineering recommendations in each of the pertinent topic areas. SITE AND SUBSURFACE CONDITIONS General Site Information Based on the Oldsmar, Florida, United States Geological Survey (USGS), topographic map, the ground surface elevation at the property is approximately +75 feet National Geodetic Vertical Datum (NGVD) of 1927. At the time of our field services two (2) noted depressions were observed at the project site. Both depressions were noted within the limits of the proposed pond system. Based on information from URS, the depressions were determined to be historic wetlands that have been impacted by an adjacent ditch. I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 3 of 13 Subsurface Conditions The subsurface conditions were explored using six (6) SPT borings performed to depths ranging from 45 to 50 feet below the existing ground surface within the proposed building footprint. In addition, seventeen (17) auger borings were performed within the proposed pavement and pond areas to depths ranging from 4 to 15 feet below the existing ground surface. The borings were located in the field by a Geotechnical Engineering Technician, measuring distances from existing site features. The approximate boring locations are presented on Sheet 1 of the appendix. The soil strata encountered in the borings performed at the proposed development are summarized in the following table: 1 Gray Fine SAND with Organics SP 2 Gray to Brown Fine SAND to Fine SAND SP/SP-SM With Silt 3 Greenish Gray SAND With Clay to SP-SC/SC Clayey SAND 4 Blue-Green Silty CLAY CL 5 Weathered Limestone * --- *Note - u___u USCS does not have a classification symbol for limestone. The subsurface soil stratification is of a generalized nature to highlight the major subsurface stratification features and material characteristics. The soil profiles included on Sheet 2 of the appendix should be reviewed for specific information at individual boring locations. These profiles include soil description, stratifications and penetration resistances. The stratifications shown on the boring profiles represent the conditions only at the actual boring location. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the actual transition may be gradual. Pinellas County Soil Survey The Soil Survey of Pinellas County, Florida published by the USDA, SCS was reviewed for general near surface soil information. This information indicates there are two (2) primary I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 4 of 13 mapping units at the project location. The map unit data is summarized in the following paragraphs and table. (Au) Astor Soils - These are nearly level, very poorly drained sandy soils in swamps. Water covers these soils 2 to 9 months most years and 9 months or more during wet years. (My) Myakka Fine Sand - This is a nearly level, poorly drained soil on broad flats between sloughs and swamps. In places it is gently sloping. The water table is normally at a depth of 10 to 30 inches. It rises to the surface for a short time during wet periods and falls below 30 inches during extended dry periods. Au 0-26 SP-SM A-2 6.3-20 5.6-6.5 <10 6 or more 26-80 SP A-3 6.3-20 6.1-7.8 0-16 SP, SP-SM A-3 6.3-20 4.5-6.5 My 16-25 SP-SM, SM A-3 0.63-2.0 4.5-6.5 <10 1 to 4 25-84 SP-SM, SP A-3 6.3-20 4.5-6.5 Groundwater Information The groundwater levels were encountered at approximate depths of 2% to 5% feet below the existing site grade. It should be noted that groundwater levels tend to fluctuate during periods of prolonged drought and extended rainfall and may be affected by man-made influences. In addition, a seasonal effect will also occur in which higher groundwater levels are normally recorded in rainy seasons. In this regard, it is estimated that the seasonal high groundwater table (SHGWT) will be encountered at a depth of 1 to 1 % feet below existing grades at the subject site (current ground surface) or at the predevelopment site grades in the proposed pavement and building areas. It should be noted also, that the historic SHGWT is estimated to be above the existing ground surface in the proposed pond area. If the SHGWT in this area becomes critical to design then a registered biologist should be retained to estimate the above grade SHGWT based on biological indicators such as vegetation staining. Laboratory Testing Based on the soils encountered within the noted depression, limited laboratory testing was conducted to determine the nature of the soils encountered. Specifically, Tierra performed organic content testing to determine the percent organics encountered in samples obtained from the borings performed below or near the proposed building footprint. The results I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 5 of 13 indicated organic contents ranging from 10 to 11 percent. These soils are detrimental to the proposed construction and should be over excavated and replaced with clean engineered fill. Field Permeability Tests Five (5) field permeability tests were performed within the proposed pond area to estimate shallow soil vertical and horizontal permeability rates. The tests were performed at depths ranging from 1 % to 4% feet below existing grades in order to penetrate the dense, non- permeable organic sand layer encountered. The results of the tests performed are presented in the Appendix. It should be noted that the dense organic sand layer encountered does not extend throughout the entire proposed pond site however, an average of the permeability results should be used for pond design. EVALUATION AND RECOMMENDATIONS General Based on the results of the field exploration, it appears that the soils encountered in the borings will provide adequate support for the proposed development after proper site preparation. The following report sections provide our recommendations for site preparation and construction considerations. Site Preparation Based on the information obtained from the boring logs, deleterious organic material was encountered below the building footprint. The approximate horizontal limits are indicated on Sheet 1 of the Appendix. This material will adversely affect foundation performance. As a result, the organic material located within the proposed building footprint plus an additional 5 feet should be over excavated and replaced with clean engineered fill. A representative of Tierra should be onsite during excavation to oversee the removal of the organic material and verify foundation trenches for proper compaction. Prior to construction, the location of any existing underground utilities within the construction area should be established. Provisions should then be made to relocate any interfering utility lines within the construction area to appropriate locations and backfilling the excavation with compacted structural fill. In this regard, it should be noted that if abandoned underground pipes are not properly removed or plugged, they might serve as conduits for subsurface erosion, which subsequently may result in excessive settlement. As a minimum, it is recommended that the clearing operations extend to the depth needed to remove surface vegetation and associated root materials and other material considered deleterious at least 5 feet beyond the proposed development area. Fill placement and subgrade preparation recommendations are presented in the "Construction Considerations" Section of this report. I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 6 of 13 Foundation Recommendations The borings performed in the proposed building areas generally encountered loose to medium dense fine sand to fine sand with silt within the foundation influence zone. The soils encountered are considered suitable for site development utilizing shallow foundation systems, provided the recommendations presented herein are utilized. At the time of this report, foundation loading was not available. Based on our experience with similar projects we have assumed column loads to be on the order of 120 kips per square foot (ksf) with perimeter walls loads on the order of 8 kips or less. If the actual loads differ significantly from the assumed loads, Tierra should be allowed the opportunity to reevaluate our recommendations based on the new loads. Based on the anticipated construction, shallow foundations should be designed for a net maximum allowable bearing pressure not to exceed 2,500 pounds per square foot (psf). The foundation and floor slab should bear on properly placed and compacted cohesion less (sand) native soil or structural fill. The existing near surface sandy soils should be improved by compaction after clearing operations to improve foundation support and reduce total and differential settlement. Compaction criteria are presented under the "Construction Considerations" section of this report. All footings should be embedded so that the bottom of the foundations is a minimum of 18 inches below adjacent compacted grades on all sides and should be a minimum of 36 inches wide for strip footings and 72 inches square for column pads. The minimum footing sizes should be used regardless of whether or not the foundation loads and allowable bearing pressures dictate a smaller size. These minimum footing sizes tend to provide adequate bearing area to develop bearing capacity and account for minor variations in the bearing materials. All footings should be constructed in a "dry" fashion. All footing excavations should be covered during rain events. Uncovered excavations may become oversaturated and difficult to compact during rain events. Surface run-off water should be drained away from the excavations and not allowed to pond. It is important that the structural elements be centered on the footings such that the load is transferred evenly unless the footings are proportioned for eccentric loads. Tierra should be notified to inspect all foundation excavations for proper compaction. Settlement The settlement of shallow foundations supported on the compacted sand fill and natural sandy soils should occur rapidly after loading. Thus, the expected settlement should occur during construction as dead loads are imposed. Minor settlements associated with the deeper loose sands may occur over time but should not structurally affect the building. Provided the recommended site preparation operations are properly performed and the recommendations previously stated are utilized, the total settlement of the walls should not exceed approximately * inch. Differential settlement is estimated to be on the order of % of the total settlement. Differential settlement of this magnitude is usually considered I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 7 of 13 tolerable for the anticipated construction. However, the Structural Engineer should compare the anticipated settlement to the allowable settlement of the structure to ensure that it is acceptable. Floor Slab The floor slab may be safely supported as a slab-on-grade provided any undesirable materials encountered during removal of the building and foundations are removed and replaced with controlled structural fill. It is also recommended that the floor slab bearing soils be covered by a lapped polyethylene sheeting in order to minimize the potential for floor dampness which can affect the performance of glued tile and/or carpet flooring. If used, this membrane should consist of a minimum six (6) mil single layer of non-corroding, non-deteriorating sheeting material placed to minimize seams and to cover all of the soil below the building floor. This membrane should be cut in a cross shape for pipes or other penetrations; the membrane should extend to within one-half inch of all pipes or other penetrations. All seams of the membrane should be lapped at least 12 inches. Punctures or tears in the membrane should be repaired with the same or compatible material. Pavement Construction Considerations In general, following the completion of the recommended clearing and grading operations, the compacted fill or natural shallow sandy soils should be acceptable for construction and support of a flexible (Iimerock, crushed concrete, or shell base) or semi-flexible (soil cement base) type pavement section. Any fill utilized to elevate the cleared pavement areas to subgrade elevation should consist of reasonably clean (maximum 12% passing #200 sieve sizes) fine sands uniformly compacted to a minimum density of 98% of the modified Proctor maximum dry density. The choice of pavement base type will depend on final pavement grades. If a minimum separation of 18 inches between the bottom of the base and the seasonal high groundwater level is obtained, then a limerock, shell, or crushed concrete base can be utilized. A soil cement base should be utilized if the separation between final grade and the seasonal high groundwater is a minimum of 12 inches. However, the pavement bases should not be placed within 12 inches of the seasonal high groundwater level unless an under-drain system is provided to maintain minimum grade separation. Roadway base materials are not to be designed to exist in the saturated form. Limerock and shell base material should meet Florida Department of Transportation (FOOT) requirements including compaction to a minimum density of 98% of the modified Proctor maximum dry density and a minimum Limerock Bearing Ratio (LBR) of 100%. Crushed concrete should have an LBR value of 100% and be graded in accordance with FOOT Standard Specification Section 204. Due to the expected subgrade I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 8 of 13 soil conditions, we recommend Type B stabilized subgrade (LBR = 40%) as specified by the FOOT Standard Specifications for Road and Bridge Construction. A soil cement base should be designed according to FOOT or PCA modified short cut design procedures. A strength of 300 psi should be achieved on laboratory cured compressive strength specimens molded from samples taken from the base material as it is placed. A stabilized subgrade need not be incorporated with a soil cement base. As a guideline for pavement design, we recommend that the base course be a minimum of 8 inches thick in heavily traveled drives. The subgrade should be compacted to a minimum depth of 12 inches to a minimum density of 98% of the modified Proctor maximum dry density, and should be firm and true to line and grade prior to paving. Traffic should not be allowed on the subgrade as the base is placed to avoid rutting. Before paving, the base should be checked for soundness. The asphaltic concrete structural course should consist of at least one and one-half (1-JS) inches of Type S asphaltic concrete material. The asphaltic concrete should meet standard FOOT material requirements and placement procedures as outlined in the current FOOT Standard Specifications for Road and Bridge Construction. The asphaltic concrete should be compacted to a minimum of 96% of the Marshall maximum laboratory unit weight. As an alternate to the above referenced flexible pavement design, a rigid (concrete) pavement design could be used. The concrete should have a minimum compressive strength of 4,000 psi at 28 days when tested in accordance with ASTM C-39. Based on our experience, a minimal thickness of five (5) inches should be utilized for standard duty applications and a minimal thickness of six (6) inches should be utilized for heavy-duty applications. The project civil engineer should design the steel reinforcement within the concrete pavement. The subgrade should be prepared to achieve a minimum LBR of 20% as mixed and pulverized to a depth of 12 inches below the pavement base elevation. The subgrade soils should be compacted to a minimum density of98% of the modified Proctor maximum dry density. Actual pavement section thickness should be provided by the design civil engineer based on traffic loads, volume, and the owners design life requirements. The above sections represent minimum thicknesses representative of typical load and construction practices and as such periodic maintenance should be anticipated. All pavement materials and construction procedures should conform to the FOOT or appropriate city or county requirements. I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 9 of 13 On Site Soil Suitability Based on the results of the boring performed, the soil in Stratum 2 encountered in the borings may be used as pavement subgrade and general backfill as long as it is free of debris, clay material and organics. CONSTRUCTION CONSIDERATIONS General It is recommended that a qualified and certified material engineering firm be retained to provide observation and testing of construction activities involved in the foundation earthwork, and related activities of this project. Tierra cannot accept any responsibility for any conditions, which deviate from those, described in this report, if not engaged to provide construction observation and testing for this project. Fill Placement and Subgrade Preparation The following are our recommendations for overall site preparation and mechanical densification work for the construction of the proposed development based on the anticipated construction and our boring results. These recommendations should be used as a guideline for the project general specifications prepared by the design engineer. The site should be cleared; this primarily includes removing debris and any deleterious materials encountered, including the previously mentioned organic soils encountered below the building footprint area. It is recommended that any undesirable material be removed to the satisfaction of Tierra prior to beginning construction at the site. Any cavities formed should be replaced with compacted structural fill. As a minimum, it is recommended that the clearing operations extend at least five (5) feet beyond the development perimeters. Following the clearing operations, the exposed existing subgrade should be evaluated and proofrolled as directed by representatives of Tierra to confirm that all unsuitable materials have been removed. The proofrolling should consist of compaction with a large diameter, heavy vibratory drum roller. The vibratory drum roller should have a static drum weight on the order of eight (8) to ten (10) tons and should be capable of exerting a minimum impact force of 36,000 pounds (DYNAPAC CA-250 or equivalent is expected to provide acceptable results). The vibratory roller should not be used within 50 feet of any existing structures. These areas should be compacted using a fully loaded 2 cubic yard capacity front-end loader or equivalent. Careful observations should be made during proofrolling to help identify any areas of soft yielding soils that may require overexcavation and replacement. Prior to any field operations, we recommend that a survey be performed (including pictures and/or video) of the existing structures (including utilities) located adjacent to the proposed construction. I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 10 of 13 Documentation should be made of any foundation problems or cracking noted by the owners and the survey crews. It is also recommended that a follow-up photographic survey be performed after the construction activities. The proofrolling equipment should make a minimum of eight (8) overlapping passes over the structure and pavement areas with the successive passes aligned perpendicular. It is recommended that within the building area, the natural ground, to a minimum depth of one (1) foot below stripped grade, be compacted to a dry density of at least 95% of the modified Proctor maximum dry density. Following satisfactory completion of the initial compaction, the structure and pavement areas may be brought up to finished subgrade levels, if needed, using structural fill. Imported fill should consist offine sand with less than 12% passing the No. 200 sieve, free of rubble, organics, clay, debris and other unsuitable material. Fill should be tested and approved prior to acquisition. Approved sand fill should be placed in loose lifts not exceeding 12 inches in thickness and should be compacted to a minimum density of 95% of the modified Proctor maximum dry density. Density tests to confirm compaction should be performed in each fill lift before the next lift is placed. Prior to beginning compaction, soil moisture contents may need to be controlled in order to facilitate proper compaction. If additional moisture is necessary to achieve compaction objectives, then water should be applied in such a way that it will not cause erosion or removal of the subgrade soils. A moisture content within the percentage range needed to achieve compaction is recommended prior to compaction of the natural ground and fill. After compaction and proofrolling, the building foundation excavations can begin. All foundation excavations should be observed by the geotechnical engineer or a representative to explore the extent of any loose, soft, or otherwise undesirable materials. If the foundation excavations appear suitable as load bearing materials, the bottom of the foundation excavations should be compacted to a minimum density of95% of the modified Proctor maximum dry density for a minimum depth of one (1) foot below the bottom of the footing depth, as determined by field density compaction tests. Backfill soils placed adjacent to footings or walls should be carefully compacted with a light rubber-tired roller or vibratory plate compactor to avoid damaging the footings or walls. Approved sand fills to provide foundation embedment constraint should be placed in loose lifts not exceeding 6 inches and should be compacted to a minimum density of 95% of the modified Proctor maximum dry density. If soft pockets are encountered in the footing excavations, the unsuitable materials should be removed and the proposed footing elevation may be re-established by backfilling after the undesirable material has been removed. This backfilling may be done with a very lean concrete or with a well-compacted, suitable fill such as clean sand, gravel, or crushed I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 11 of 13 FOOT No. 57 or FOOT No. 67 stone. Sand backfill should be compacted to a minimum density of 95% of the modified Proctor maximum dry density. Immediately prior to reinforcing steel placement, it is suggested that the bearing surfaces of all footing and floor slab areas be compacted using hand operated mechanical tampers. In this manner, any localized areas, which have been loosened by excavation operations, should be adequately recompacted. A representative from our firm should be retained to provide on-site observation of earthwork and ground modification activities. Density tests should be performed in the top one (1) foot of compacted existing ground, each fill lift, and the bottom of foundation excavations. It is important that Tierra be retained to observe that the subsurface conditions are as we have discussed herein, and that foundation construction ground modification and fill placement is in accordance with our recommendations. Drainage and Groundwater Concerns The groundwater levels presented in this report are the levels that were measured at the time of our field activities. Fluctuation should be anticipated. We recommend that the Contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact on this construction procedure. Care should be given to open excavations and site grading to minimize ponding of surface water. If needed, groundwater can normally be controlled in shallow excavations or rim ditches with a sump pump. During subgrade soil preparation, any plastic soils below design grade could become disturbed by construction activities. If this becomes the case, the contractor may be directed by the owner's representative to remove the disturbed or pumping soils to a depth of 12 to 18 inches below design grade and backfill the area with structural fill. Water should not be allowed to collect in the foundation excavation, on the floor slab areas, or on prepared subgrades of the construction either during or after construction. Undercut or excavated areas should be sloped toward one corner to facilitate removal of any collected rainwater, groundwater, or surface runoff. Positive site drainage should be provided to reduce infiltration of surface water around the perimeter of the building and beneath the floor slabs. The grades should be sloped away from the building and surface drainage should be collected and discharged such that water is not permitted to infiltrate the backfill and floor slab areas of the building. Structural Fill All materials to be used for structural fill or backfill should be evaluated and, if necessary, tested by Tierra, Inc. prior to placement to determine if they are suitable for the intended use. Suitable fill materials should consist of fine to medium sand with less than 12% passing the No. 200 sieve, free of rubble, organics, clay, debris and other unsuitable material. I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 12 of 13 Excavations In Federal Register, Volume 54, No. 209 (October 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, Part 1926, Subpart P". This document was issued to better insure the safety of workmen entering trenches or excavations. It is mandated by this federal regulation that excavations, whether they be utility trenches, basement excavations or footing excavations, be constructed in accordance with the new OSHA guidelines. It is our understanding that these regulations are being strictly enforced and if they are not closely followed, the owner and the contractor could be liable for substantial penalties. The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractors "responsible persons", as defined in 29 CFT Part 1926, should evaluate the soil exposed in the excavations as part ofthe contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in all local, state, and federal safety regulations. We are providing this information solely as a service to our client. Tierra does not assume responsibility for construction site safety or the contractor's or other party's compliance with local, state, and federal safety or other regulations. REPORT LIMITATIONS The Geotechnical Engineer warrants that the findings, recommendations, specifications, or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. The scope of the exploration was intended to evaluate shallow soil conditions. The recommendations submitted are based on the available subsurface information obtained by Tierra and design details furnished by URS Corporation for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, Tierra should be notified immediately to determine if changes in the foundation recommendations are required. If Tierra is not retained to perform these functions, Tierra will not be responsible for the impact of those conditions or the geotechnical recommendations for the project. After the plans and specifications are more complete, the Geotechnical Engineer should be retained and provided the opportunity to review the final design plans and specifications to I I I I I I I I I I I I I I I I I I I Report of Geotechnical Engineering Services Enterprise Road Development Proposed Tampa Bay Water Site Pinellas County, Florida Tierra Project No. 6511-03-205 Page 13 of 13 check that our engineering recommendations have been properly incorporated into the design documents. At this time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use of URS Corporation, and its consultant(s) for the specific application to the proposed Tampa Bay Water development on Enterprise Road in Pinellas County, Florida. - - - - - - - - - - - - - - ljl ~ ~ .... o ~ i:I ~ ~ ., II' .... ~ i:I '" o .... .... II' 0- ~ "0 po p .. o ..., p; ::1 0- o > C 1 I I 1 1 1 1 1 I 1 1 1 I 1 I 1 1 1 I 1 o ~ 8 10 ..., o ftr <It <It C'l t:>" o g" <It a:: ~ ftr ftr !': a:: '" ::l '" ~ ,.... 8 13 o ftr E- <II <It "'1 <It I:: o :1l '" t:>" oS' a:: z'" O"og. (t-<_ I=l"'''' 10 e::::1 o-o-?- <II <It '" 1ts:: Sll> "'. is:: C'l?- '" ::1 "'1 <It .,.,- c..o.. I !': I 1 1 I 1 ~ ..., <It 0.. o o 10 '" .... E- O" <It 10 C'l t:>" <It Ul o t:>" ~ o .... ~ 1: >.... ....0 ..., 1: >>>.... (I) ...,....... to I ("') OJ"" I I I Eo I I I to I I I of 1 1 1 I I I I I I I " I , ", I I 1 I I I I I I 1 I 1 1 I I I I 1 1 I " I 1 I 1 I I 1 1 1 1 I ;' I ci1 1;;:1 <It 10 '" ::r I'T1 c.. I 1 I I I 1 I 1 I I I I 1 1 I o ..., 1 I I 1 I I I 1 1 I I I I o 3 1 1 I I 1 1 1 I 1 1 I 1 ~ '< I I I I I I 1 I 1 1 1 ~ ::> I 1 1 1 1 I 1 I 1 1 I ("') ::r I I 1 I 1 1 I 1 I I 1 .,., ::r I I I 1 I I 1 I 1 1 o " I 1 I 1 I I I I I 3' I I 1 1 I I I 1 I I "1J ll> 1 I 1 1 I I I I 1 ("') o I I I 1 1 I z o ::1 <It 1 I I 1 1 I I 1 I I 1 I I 1 I 1 1 I I 1 I 1 1 I o w::1 01-6 !ts. ~ <:;1 ..... " I>J o '... ci) f':> ..., '" .... o ..., --t S- o W::1 01-6 g.so ~C11 'c+ o I>J o '< <It '" til .... o ..., --t .... o trj -< <It ~ '< <It ~ .... o ..., 0> .... o .... I>J 13 o ::1 f 1 I o Wt' 01-6 ~S' ~C11 '.... o ~ o '< <It '" til .... o ..., --t .... o trj < <It ..., '< ~ e; o Wt' og g-S' ~C11 '.... o ~ o ~ 10 til z o t' <It I I I 1 I 1 I I 1 1 I 1 1 I I I I I 1 I 1 I I I trj < <It ..., '< ~ '" ..., .... o ..., .... .... o 0> 8 o J:l .... It I I I o WJ:l og ~S' ~C11 '.... o I>J o ~ '" til .... o ..., --t .... o <: 10 ..., ;' '" :::! :;: t:>" .... 5: <It I I 1 1 1 1 1 I 1 I I 1 I 1 I trj ~ ~ ..., .... o ..., .... .... o 0> 8 o ::l .... It I I I 1 o WJ:l og o..~' ",J:l ~C11 '.... o ~ o '< <It ~ trj trj 8~8~ :;; '<l :;; '< ~'< ~'< <It <It e; e; ZZZ 0'00 J:lJ:lJ:l <It <It <It I I I I I I I 1 1 1 I 1 I 1 1 I I 1 1 1 I I 1 1 I I I I 1 I 1 1 1 1 I I 1 I I I .... o ..., .... .... o 0> 8 o J:l .... It : I 1 0- ..., 0> 8 o J:l .... It o ..., .... o ..., 0> 8 o J:l f o ..., .... o ..., ~ .... o .... o ..., ~ .... o "'1 ..., ....0 ~S 8>1>0 00 J:l.... :;'0 !"O> o 5' C'l t:>" <II '" .... o ..., 0> .... o si 0.... ~W ~J:l .... o S' C'l ::r <It '" .... o ..., .... o ..., ~ ~ 8gj 8.... ~g- ~J:l - o S' '" ::r <It Ul .... o ..., 8i 0.... J:l::r ....", frJ:l .... o S' C'l t:>" <It '" .... o ..., 0> .... o .... ~ si @:;. ""10 frJ:l .... o S' C'l t:>" <It '" .... o ..., .... c+ o II>- 8~ 0'" ~; ~~ .... o S' C'l t:>" <It fA .... o ..., 0> c+ o .... ~ ~ 13m @; ....", ~J:l .... o S' C'l t:>" <It '" 0- ..., .... o ..., ~ 8i 0.... ~W ~J:l .... o S' C'l t:>" <It fA .... :;; 0> .... o .... ~ 8~ 0'" J:lC+ ....W ~::1 - o S' C'l t:>" <It fA .... o ..., .... o ..., ~ 8i 0.... ~W ~::l - o S' C'l t:>" IJl <: ~ ~. ~. .... t:>" .... 5: <It 1 I 1 1 I I I 1 1 I 1 1 I I I ~ <II 812 0.... J:lt:>" ~~ .... C11 s' C'l [ ~ 8~ 0.... J:lt:>" ....'" ~t' .... o 5' C'l [ .... :;; .... :;; ~ 8i8i 0....0.... ~W~W It J:l It::l 0-0 .... ""0""0 8 S'8 S' 0C'l0C'l ~ [~[ .... .... o 0 ..., ..., 0> 0> ~a::a:: ....000 ~ 8 ,;; ;; 8>1>0""; ~st~ It 0> OtHlO , 000 """'.~. ~'t:l t' J:lC'lC'l C'lt:>"t:>" [lBfB o-~~ ""'--''< o>i <It t, ~ I 1 1 1 1 I .... o ..., ~ .... o 0> .... o ..., ~ .... o 0> - o ..., I>J 'T' 00 o - 'T''T' 00_ 00> >I>oW >I>o>l>o'T' bJ..w ';'n >1>0 >1>0 ? 00 o ~ 'T''T' C11~ C110> >1>0.... tqo'T' ~J,.._ ~II>-OO ~.... 1"'T''T' OO~.... >I>oC11o> C11W 'T''T''T' OOC11W 000> ~- fi'T' ~~- ow.... w ~ 'f' 'T''T' 0> w~ ~ 000> >1>0 W b r~ o -0 C<>w ,...., 1"'T'? ...... o>c<>c<> ~C110 ,....,~ "':;'T'? OO~ 00> 'T''T'? 000000 000 W 10 ::l ?- Ul ::r p I I I I , , I , , "'1"'1 S'S' <II'" "'en 1>'10 ::l ::l 0..0.. 1 1 1 I I I I I I , , , , , I I , , "'1"'1"'1 5'5'5' co <It co "''''en 101010 ::1::1l:l 0..0..0.. '< I I _, I o I I 10 1 1 ::l' 1 - I I , , I I I I , , , , , , I 1 I , I , , , , 1 "0 a:: ~~ ....C'l I:>;' 1 I 1 1 1 1 1 1 I 1 1 I 1 I I I I I I I , 1 I 1 1 I 1 1 , I , , I I 1 1 "'1"'1~ .....-.0 l:ll:l1O <It <It 8 ~~'< l:ll:ltj> 0.. 0.. J:l 1 '<<It I- IOcr. 1 \0 '" : 8 8. 1 I 1 I I I I 1 1 , 1 I 1 1 1 , 1 , I I 1 1 1 I :::!3I31 l:l ::ll:l <It co <It ~g;g; ::lJ:ll:l 0..0..0.. I I I I I I I I I I I I 1 I I 1 I I , I I 1 1 , I 1 , I "'1"'1"'1 S.S'S' <It(llCO "''''''' 10"'10 l:lJ:ll:l 0..0..0.. 1 I I I I I I I I I I I 1 1 I 1 I I I 1 I 1 1 I I 1 I 1 1 I 1 , I , , I , I 1 , I 1 9ff1S' 10 c+ 10 ';<'<8 : a~ 1 1O::t> 1'<::1 I co I '" I '" , ::l I 0.. : 1 1 I I 1 I I , I 1 I 1 I 1 , w "'1"'1 ~ -.""'. co ::t> l:l l:l I::::l co <It I (t) ('/.l tI.I : ~ ~ ~ : l:l 0.. 0.. 1 0..'< 1 I . ....' I 0 I 1 10 I : 13 : I I : g: : :3 : I '< I I I I 1 w "'1"'1 =r _._. <It tj>l:ll:l 1::J:l<ltCO ... ('tl en rn "'",10'" 1O",::ll:l ::l ::l 0.. 0.. 0.. 0..'< I I, I : 01 I I>' I : p: 1 1 : g: : 8: I '< I I 1 1 1 W"'1"'1 "'1 ~ S'S' S' o..<It <It co ... CIl to en ~~~ ~ ~~F' ?- : ....' 1 0 I I '" I : 8: 1 I 1 I I 1 1 I I I 1 I I 1 I 1 , 1 I I I 1 1 1 "'1 5' <It '" 10 ::1 0.. I I I 1 1 1 1 I I I I I I I ~~~ s'S'S' <It a> a> "''''''' 10"'''' l:ll:ll:l 0..0..0.. I I I I I I I I I I I I I I I 1 1 I I 1 1 1 I I I 1 1 1 I I I I I 1 1 I I I I 1 I 1 ~~~ 5'S'S' a> (Il, a> "''''''' 10"'''' l:ll:l J:l 0..0..0.. I I I I I I I "I I I I 1 1 I I I 1 1 1 I I I I I I 1 I I I I I I I I 1 I I I I I I '" t:>" ~ I 1 I I I I , I I , I , I 1 - - - - - > 0.. 10 g -< S a> w ~ J:l ~'" 8,13 c+<It "'''' 'S8. [~ 'tl 'tl S' aq ~ 00 ~ Ul c:l ~ ~ ..q o r 6i C'l '" c+ 0' J:l ~ t:rj to' t.zJ ~ ~ ~ ~ go. ~' ~ '" o ~ a>', 0; ;:: ~ ~;~ '" ~' 8 ~ ~ 3, g ~ > c.. I 1 I I 1 I I I I I o ~J:l o..g ~ S' f"~ o c+ o C11 o ~ ~ 0- ..., ~ c+ o ~ 0' o 0.. t:>" '" to e: 0.. m sf 0.... ~t .... o S' C'l t:>" fB 0- ... - 5l ~ t1 <It "0 c+ t:>" c+ o '" s-~ 0"0 _J:l CD' ~ e: ,aq ',t:>" =a '" ~ %J 0.. '" ~:;-~ ;-O'tl as.... a> t:>" ~ S' a> '" '" J:l 0.. I I 1 I I I 1 I 1 1 I I I I 51 t1 > 1 W ww tJJww "O"t1 www www www oow '" ww '" ww '" WW I W www www w .'" ~~ ~~'" ........ ~ ~.'" "'0'" "O~"O .~r~ S:;'i:l S::'i:l 09'" I ~ ..'" '" Z "'''''i:l .'i:l 0 . tn 'i:l ~ _'i:l I I r f I I ~ ww IW www W ooW W I W W W '" ~~ ~~~ .a::.s:: Z ?s:: .s:: w w w w a:: I .s:: ~ s:: .a::, 1 'i:l .=.i:I:l s:; .0 'i:l .0 '" 1 5i 6i w I i W ~ ~ wW wws:: w ww w W 1 W W s:: OS:: 'i:la:: a:: s:: 0 0 I 'i:l '" GO 1 0' I , i I 1 I > >> ~~~ I I ~~~ ~~~ ~~~ ~~~ ~ ~~ > ~~ ~~~~ I > ~~~ >>> > 0 I I I , II 1 I ~ I I I I I I > 0 .w ww ~C<>~ I I ww~ C<>I~ w.w C<> .9'.0> ~ w IC<> ~w C<> I~ C<> I C<> ~~~ ~~~ C<> ~ l:l I 1 1 1 0 .... ~ 0> I I ~ >~ 1 ..., S' I I ~~ 1 ~ = ~ .... I I ~ I 0 ~ I I 1 I I , ~ I I I _. Q.~'~:::'O ~ ....= ... SD .....,., ~ Sg.~~8O t11 9' 1" '-' a> i.8 t:>"~ ~ ~ C11 ~ ..,~ S- f I ~ 00 000 00 000 000 000 000 .... 00 .... 00 .... 00 0 000 000 0 = 1il'a>aq <:l' 0 0 0 ~ a> - I 1 W I 1 ~ >1>0 II>- 8,....,Z 9' I ~ % I ~ 8 ~? <D -- --.... ............ ............ ............ ............ ........ ........ ........ '-' .... ............ ............ .... .;.n 00 888 888 8g8 8g8 888 0 88 0 8g 0 gg 0 000 goo g ':"'~II>- '" 00 0 000 00 ~ C'l >1>0 W C<> ~ 8.......Z ~ ? ~ ~ t ~ .... <D -.... -....- ........- ............ ........- ............ ........ ........ ........ ...... .... .......tooo'''''''' ............ .... 8 ~? J: .... 00 8g8 ggg gg8 g88 000 t11 gg gg 0 00 0 ggg ggg g , 0.... (Il 00 000 00 0 ...... 0 "0 I ~ - <O<D <O<D? 1 ??? ??? ??? <D<D<D w <D? C<> <0<0 w <D<D ~ ~?? 00<0<0 <0 ~.......Z C11 'T''T' 'T'? 1 1"?? ~ ~ %% ~ %% 1" 1"?? 1" S' I , %<D ~ QQ' <D <D<D <D<O<D I ............ <0, <D<O ............... <0<0<0 '-' co <0<0<0 co coco .... , ilo.;'" aq 0 <D<D <D<O<O 1 gg8 <0<0<0 8gg <0 co <0 coco <0<0 C11 <D<C\ 00 <0 co <0 co co co 0 ~, I 0 ......~o 1 a> I 1 < 1 1 ~.......Z i I>J I I .... 11>->1>0 .... .... .... .... <:l" C11 ?1"1f I I 1f1"1f If 1"1" 1f9'1f ~~! .... I~ .... I~ .... Ifi ~ If 9'lfl" If........ 00 I I I I I I I I ...... I I f . ~~ <:.71 -- c"t-:l<:.71 1 I o~o C11 C<> .... o~o C11 C11 C11 C<>C11 - ....C11.... ....C11C11 .... I>J~ <:l.o I I C11~ C11 ~ C11 C11 0 ~ ~ ~ ~ ~ ......II>-g I I 0 0 0 0 pp 0 0 ~ 0 ~ ~y~ ~~ ~~~ ~~~ ~~~ ~ '~ ~ ~~ ~ '0> ~~ 00> ~~ Ql' ~ f?f ~~ I~I C<>~% f~f ^~f f f f~ ~ ff 3ff ~~, lr ~ V VV ~~~ ~~ ~, ~ p, ~ ~ ~~ ~ ~~ ~ ~~ V V ~~ VVV V, 0' ,p o 0 0 p ~ 0 ~~ 5: ~ 1>Jl:V ow' , 0' , Ow ' w' o~o 0' 0' 0' ~ ~ ~~~ ~ 0 00 0 00 o 0 0 0 0 0>0 0 0 0 0 0 0 0 0 00 000 0 .... '< p pp p p s:> s:>s:>p p s:> p ~ ~=a~ - _0 - .... .... 1-'1-'0' .... .... .... ~ ^ NT' 06^ VV ^6^' ^6V ^6^ ~~~ ^ ~~ ^ ~~ ^ 'T' ^ ^ 3^V ^^^ ^" i",~ ? ?? ~, ? s:>? S:>, ? ?, s:> ? ? P pp P P pp ppp o~ 0"" p, s:> ;;:~Cf 0 0_ -....0 ~~ 0....0 o....~ 0....0 ............ 0 ....0 0 ....0 0 -0 0 0 O~ 000 ' a '< - <:l. C:.n~1 ~CO~ C11C11C11 C11C110 C11C11C11 C11C110 C11 C11C11 C11 C11C11 C11 C11C11 C11 C11 C110 C11C11t11 ~f:l (Il 1 ~ ~~ ~~~ $1'$1' ~~~ I l:d ~l"~ ~~~ $1'~~ ~ l"$1' ~ l"$1' ~ ~$1' I $1' l"$1' ~~~ ~ I ~ >1>0 C11<:l" i~l" 9"T' ~~~ ............ 1"9'1" i1" 1" If ........ If ........ .... 9'9' I 9' ~....~ ~~~ C11~ I I I ~~~ I I I I I I '-' I It:l: a \Xl $-n~, \Xl, $1' \Xl \Xl $1'$1'$1' ~$1'$1' \Xl ~~ \Xl ~~ ~ ~~ I po ~ $1' I 0 >1>0 <:l1C11 >I>oC11C11 11>-11>- C11C11C11 000000 C11C11C11 0C11C11 II>- oow >1>0 00C<> 00 c<>oo I II>- 00C11 000 C11 = I ~ ~~ ~~~ == ~~~ ~~~ ~~~ ==~ ~ ~~ ~ ~~ S' S'~ S' ~ ~~S' S'~~ S' w 0 00 000 aq'cJq" 000 000 000 """,...,0 0 00 0 00 li ~ ~ ~ ~ ~ ~ ::rt:>" ~~:1 ~~~ ~:1~ aqaq:1l ~ ~~ ~ ~~ ~ ~~ ~ ~ ~,~ ~ ~~~ ~ ...... po po, "', , 0" Ii' ~d. ;'=a -~ ... i-:I I e>> r r g ~ ~ ~ ~ ;! ~ ~' ~ ~ ~ ~ S. <It ~ 8 ~ 10 0.. ~ ~ 00- lod ~ ~ c .1 s ~ ~ ~ co I I I I I I I I I I I I I I I I I I I 7ii III - ... c ... :s .l!! -~ ~ :s - ~ - m c 0 N N III '0 0 -C") C") z :iE u - u~ '2 - 0 "'": III C 0 C1.l!! ..... ... C ..... ..... o 0 U l< III "C .5 >- - 'u ; m III 0:: m - 'E - ::i 'E CI ::i ... U III ; .c m ... III ~ 0:: <C m - :; It) - m 'E III Q ~ N ::i - c M m Q "C ~ <C I ':; .... 0 .... C" ~~ It) ::i 0 w C?, - In 0 III ... Q2 z 0 .c c.. - CI U III ~ Gl C ...J W e U; '0 I- m Z c.. III Q '<;f' ~w l! c.. Q M N - N cO III ... C ,., ..... E III III E i= u ... :s III In c.. 0- I- 0 J:.c co co In E I I ~~ <( <( E ... III :s .c - E III ... :s - In Z g C! 0 .c N M - C. III C I I III C. C! C! E III 0 ..... In ... III .c E m :s It) Z I I CI CO <( C I ';: 0 al C") Q) Q) ..r:::. C/) I I I I I I I I I I I I I I I I I I I Results of Field Permeability Testing Tampa Bay Water Enterprise Road Development Pinellas County, Florida Tierra Project No.: 6511-03-205 PERM-1 PERM-2 PERM-3 PERM-4 PERM-5 2.5 3 2.5 1.5 4.5 29 25 20 31 32 29 25 20 31 32 Sheet 4 I I I I I I I I I I I I I I I I I I I STORMWATER MANAGEMENT REPORT FOR TAMPA BAY WATER ADMINISTRATIVE OFFICE BUILDING PINEL LAS COUNTY, FLORIDA Prepared for: TAMPA BAY WATER 2535 Landmark Drive Clearwater, FL 33761 Prepared bv: URS Corporation 7650 West Courtney Campbell Causeway - Suite 700 Tampa, FL 33607 DATE: SEPTEMBER 2003 (JSB) Note: This stormwater management report is prepared for the Southwest Florida Water Management District, and the City of Clearwater. NOV 0 6 LUO] I I I I I ,I I I I I I I I I I I I I I STORMW ATER MANAGEMENT REPORT I I I I FOR TAMPA BAY WATER ADMINISTRATIVE OFFICE BUILDING PINEL LAS COUNTY, FLORIDA Prepared for: TAMPA BAY WATER 2535 Landmark Drive Clearwater, FL 33761 Prepared by: URS Corporation 7650 West Courtney Campbell Causeway - Suite 700 Tampa, FL 33607 DATE: SEPTEMBER 2003 (JSB) Note: This stormwater management report is prepared lor the Sonthwes~ter' , Management District, and the City of Clearwater. . ~ -- n :J " SIGNATURE , .\v ~', . JOSHUA S. BRADLEY .REGISTERED PROFESSIONAL 11/'(tf1, ,: I DATe_ 60020 FL REG. NO. I I I I I I I I I I I I I I I I I I I TABLE OF CONTENTS Page 1.0 INTRODUCTION ............ ........ ....... ............... ....... .............. ....... ...................... ................................3 2.0 EXISTING CONDITIONS ......... ............ ........... ... ......... .... ...... ............................. ........................... 3 2.1 Existing Conditions Summary. .... ................................. ....... ................ ............................................. 3 2.2 Existing Conditions Hydrologic and Geotechnical Data ..................................................................4 2.3 Existing Conditions Stormwater Analysis ................. ......... ...... ....... .................... ............................. 4 3.0 PROPOSED CONDITIONS............................................................... .............................................5 3 .1 Water Quality Treatment....................................................................... .................. ................... ......6 3.2 Stormwater Attenuation........................................................ ............................................................7 3.3 Floodplain Considerations......................................................................................... ......... ..............8 4.0 OPERATION AND MAINTENANCE GUIDELINES ................................................................... 8 4. 1 Operation......................................................................................................... ........................ .........8 4.2 Maintenance.............................................................................................................................. .......8 TABLES 2.3.1 Existing Conditions Peak Runoff (25-year, 24-hour storm event) 3.1.1 Proposed Conditions Water Quality Treatment 3.2.1 Existing vs. Proposed Conditions APPENDICES 1 Site Plan 2 SCS Soils Survey Map 3 SCS Soil Survey Description Tables 4 Existing Conditions Drainage Map 5 Existing Conditions, Hydrologic and Hydraulic Input Calculations 6 Existing Conditions, Basin-Node Schematic 7 Existing Conditions, AdICPR Analysis 8 Proposed Conditions, Drainage Map 9 Proposed Conditions, Hydrologic and Hydraulic Input Calculations 10 Proposed Conditions, Basin-Node Schematic 11 Proposed Conditions, AdICPR Analysis 12 FEMA Floodplain Map 13 Geotechnical Report Page 2 I I I I I I I I I I I I I I I I I I I 1.0 INTRODUCTION The proposed Tampa Bay Water Office Development project site contains approximately 3.80 acres in total land area and is located immediately northeast of Enterprise Road, west of US 19 and north of Countryside Boulevard, in Pinellas County, Florida. The project site is located within Section 30, Township 28, Range 16 in the jurisdictional boundaries of the City of Clearwater. The proposed improvements consist of utilizing an existing cypress area to serve as the stormwater management system supporting the development of office buildings (future and currently proposed) including associated parking. 2.0 EXISTING CONDITIONS 2.1 Existin2 Conditions Summary Currently on-site, there is an existing stormwater pond with a contiguous ditch on the north side and a separate existing flow-through ditch on the west side of the project area. The existing on- site stormwater pond currently receives both on-site and off-site runoff which is conveyed through the existing contiguous ditch before collecting within the pond. This existing pond has a control structure which outfalls into the existing ditch system on the east side of Enterprise Drive. The separate on-site flow-through ditch to the west is a component of the existing Enterprise Road ditch system. The existing on-site stormwater conveyance system was permitted through D.E.R. in the early 1980s. Due to its location, the existing ditch that is contiguous to the existing on-site pond will be relocated to the north in the proposed condition. Neither the on-site pond itself nor the separate on-site ditch to the west will be reconfigured, redesigned, or directly impacted. Therefore, their function should remain consistent from the existing condition to the post-construction condition. Rainfall directly into the on-site pond/contiguous ditch and separate on-site ditch to the west was not included or evaluated within the existing conditions stormwater analysis. In the existing condition, there are three distinct on-site basins that were evaluated. A small Page 3 I I I I I I I I I I I I I I I I I I I I 2.3 portion in the northeast comer ofthe site drains off-site to the north. This area was not included or evaluated within the existing stormwater analysis. Basin EX-IOO is 0.98 acres in size and flows into an existing ditch which outfalls directly into the existing on-site stormwater pond. Basin EX- 200 is 0.81 acres in size and discharges southwest into the ditch system along the east of Enterprise Road. Basin EX-DEPR is 0.77 acres in size and holds runoff within an existing cypress dome before flowing over an earthen weir into the existing on-site stormwater pond. 2.2 Existine Conditions Hvdroloeic and Geotechnical Data Per the SCS Soils Map of Pinellas County, Florida, the on-site soils evident are astor and myakka. Historically, these soils do not drain well and they hold seasonal high elevations within 1 foot of the surface. As explained in section 3.0 (below), these soils have been unnaturally drained for over 20 years due to an existing on-site stormwater pond/ditch system which positively outfalls off-site. Considering this situation, we evaluated the existing conditions showing the on-site soils characterized as hydrologic soil group B. Refer to Appendices 2 and 3. Upon site inspection, the project soils within basins EX-IOO and EX-200 can be characterized as 'Open Space, Good Condition' and basin EX-DEPR can be characterized as 'Open Space, Poor Condition' in the determination of curve numbers for the existing conditions. The TR-55 method was utilized to estimate curve numbers based upon the hydrologic soil groups. Refer to Appendix 5 for the hydrologic and hydraulic input calculations for the existing conditions. Existine Conditions Stormwater Analvsis The on-site area was analyzed utilizing SWFWMD criteria to determine the allowable on-site peak discharge in the post-development condition. The computerized stormwater model 'Advanced Interconnected Channel & Pond Routing' (AdICPR), Version 2.2, was utilized to examine the hydrologic and hydraulic features of both the existing and proposed conditions. Please refer to Appendix 7, Existing Conditions AdICPR Analysis, for clarification. For all existing basins an analysis of a 25-year, 24-hour storm event was completed to determine allowable discharges, in accordance with SWFWMD criteria. A summary of the peak runoff in the existing conditions during the 25-year, 24-hour storm event is presented in Table 2.3.1. Page 4 I I I I I I I I I I I I I I I I I I I Table 2.3.1 Existing Conditions Peak Runoff (SWFWMD 25-yr storm event) PEAK DISCHARGE (cfs) TOTAL RUNOFF INTO POND TOTAL RUNOFF INTO DITCH 3.48 2.49 * Refer to Appendix 6, Existing Conditions AdICPR Analysis for clarification. 3.0 PROPOSED CONDITIONS In the existing condition, located within Basin EX-DEPR, there is a low area containing a group of cypress trees. Although this low cypress area will temporarily hold rain falling directly within it, the adjacent existing ditch/pond system seems to de-water it. The existing outfall structure within the existing stormwater pond has a control elevation set at EL=67.90. Upon a field visit in the middle of this past August (the height of this year's rainfall) the water elevation was holding right at elevation 67.90 with stain lines up 6" above the control elevation (elevation 67.90). With the low contour elevation in the cypress area at EL=70.00, and no hydrology found within 24" below grade in this area, it is evident that the existing ditch/pond system pulls the standing water from existing basin EX- DEPR. As explained in section 2.1 (above), the existing ditch/pond system was permitted through D.E.R. in the early 1980s. Since it was determined that this existing low cypress area has been unnaturally dewatered for over 20 years, the decision was made to re-hydrate this area. By improving the surrounding berm, setting it at a constant elevation, and pre-treating via skimmer (pre-treatment not required by SWFWMD) before discharging into the cypress area, we propose to utilize this area for proposed stormwater treatment and attenuation. This proposed stormwater pond will serve the entire office project, including the future office building (total area = 2.21 acres). Page 5 I I I I I I I I I I I I I I I I I I I 3.1 In the proposed condition, there is only one proposed basin. Basin PR-lOO is 2.21 acres in size and encompasses the proposed office buildings (currently proposed and future) and proposed parking. Basin PR-lOO will be routed through a proposed wet detention pond (as detailed above) before outfalling into both the existing on-site pond and the existing on-site ditch. Using the existing control elevation information (as shown above), it was determined that the seasonal high water elevation within the proposed stormwater pond should be set at EL=67.90. The tailwater information for the existing ditch system and the existing stormwater pond was input as a time/stage node. As stated above, a field visit was performed in August 2003 (the height of this year's rainfall). Approximately 1 foot of water was witnessed inside the existing on-site ditch (bottom elevation = 66.00~) with no apparent stain lines or biological indicators within 18" of the water elevation. Conservatively, the initial stage at time 0 was set at elevation 67.9. This is consistent with the initial stage set for the existing pond. Remaining conservative, we assumed that the ditch would stage up to a maximum 2 feet and the pond would stage up to a maximum 1 foot above the initial stage from time 12 hours to time 18 hours before staging back to the initial stage at time 30 hours. Water Qualitv Treatment The stormwater treatment volume is based upon a "wet detention" system for the proposed drainage basin. The treatment volume is determined by computing the volume of runoff from the contributing drainage basin based upon one inch of runoff, pursuant to SWFWMD requirements. The water quality treatment volume was calculated between the normal water level (NWL) and design low water level (DLW). Refer to A.ppendix 9, Proposed Conditions Hydrologic and Hydraulic Input Calculations. Table 3.1.1 summarizes the proposed conditions basin area, as well as required and provided water quality treatment volume. Page 6 I I I I I I I I I I I I I I I I I I I Table 3.1.1 Proposed Conditions Water Quality Treatment PROPOSED BASIN BASIN AREA (Ae) REQUIRED WQT VOLUME (AF) PROVIDED WQT VOLUME (AF) 3.2 Stormwater Attenuation The on-site stormwater runoff for the proposed improved pond system meets the attenuation criteria regulated by both SWFWMD and Hillsborough County. As indicated in the existing conditions analysis (Section 2.3), the maximum post-development peak discharge exiting the site (25-year, 24- hour storm event) must be no greater than the peak discharge in the existing condition (25-year, 24- hour storm event). Refer to Appendices 9 and 10 for the proposed conditions hydrologic and hydraulic calculations and basin-node schematic. Table 3.2.1 presents the existing versus proposed conditions peak discharges for the proposed basin. Table 3.2.1 Existing vs. Proposed Conditions BASIN # EXISTING CONDITION PEAK DISCHARGE (cfs)- 25 YRl24 HR STORM EVENT PROPOSED CONDITION PEAK DISCHARGE (cfs)- 25 YRl24 HR STORM EVENT Page 7 I I I I I I I I I I I I I I I I I I I 4.2 The peak discharges for the post-development condition was less than the allowable discharge. Refer to Appendix .11, Proposed Conditions AdICPR Analysis for clarification. 3.3 Floodplain Considerations In existing conditions, the proposed site area has been found to be in Flood Zone X; refer to Appendix 12. As a result, no floodplain impacts or compensation would be required for the proposed improvements. 4.0 OPERATION AND MAINTENANCE GUIDELINES Tampa Bay Water will own and maintain the entire proposed stormwater system. The adjacent property owner to the east holds a drainage easement over the existing on-site stormwater system. In addition to the proposed stormwater system, Tampa Bay Water will own and maintain the existing on- site stormwater system. 4.1 Operation The project's stormwater management system is a gravity operated system and requires no operator action. Maintenance 1. Inlet grates: Inlet grates will be checked periodically for damage or blockage. Any damaged grates will be replaced or repaired. Any debris blocking full flow through the grate will be removed. 2. Pipes and Inlets: Pipes and inlets will be inspected periodically for damage or blockage. Any damaged pipes or inlets will be repaired or replaced. Any trash, debris, or sand deposits will be removed. 3. Stormwater Pond: All side slopes and maintenance berms will be periodically mowed and cleaned. During the mowing operation, the pond will be inspected for bare spots, damage, and erosion. Any bare spots greater than one square foot in area will be seeded or sodded to Page 8 I I I I I I I I I I I I I I I I I I I replace the grass cover. In case of erosion or damage where underlying soil is missing, the missing soil shall be replaced and the area brought to grade, with seeding or sodding as required. In addition, cattails, bulrushes, and other vegetation will be cut back from inlet and/or outfall structures. All inflow and outflow structures shall be maintained by the procedures outlined for pipes, inlets, and grates except outflow control structures shall be inspected for blockage after any rainfall event that produces significant runoff. Page 9 l I I I I I I I I I I I I I I I I I I I APPENDIX 1 SITE PLAN - - - - - - - - - - - - - - - - - - - Ofoow;"'il Nom.: S:\P,ojull\TB_Wat.r\DWC\TBWTFLSASt.dwQ LOft Modified: S.p 23. 2000 - 10:5&nI PIott,d on; S'P 23. 2003 - 11,04i!"" by tbrya"t -.~ J~m !~m ~:! -IO;~ -IO;~ I I(lIO; =a: ;;;11< ~;;l "''' " " " " 56 " " c\ ~~ ~ ~;;I ~~i 0> ~ ~ ~ z 8~ ~ ~ ,., '" " ". ", ~ ,.. " .- )> ~LQ~ 9~~ ~; _f 0 ~o 0 0 .~ '" III :lI Sf oc f ~ ~ ~ ~ ~gF " ~~ S "t> ,.~ a~cn~lJ)~~~~ CD ~ ~ :;: III '1~ ~ g .J ~g "," ~c ~ c x x ;;l z I ~ I g ~~ "t> 08 ."i'1 ~ '" ~:::O-tiii~Fr=;i;r;l r in in :l ~ ;v 0-< "'~ .",.. 85 o~ ~ 8' ~ ~~~ ;ij 0" r- " ~~ r-~:~~~~,,~ 0 :l :l " 0-< ~o .", :,.'" n ~ ~ t5 Z > ~ 0 01> i:!~ ~~ >~ "" ~ >'" ~~ ;:I~ ~~ "'~ o~ ~~ Z ~ z> .. ~Vll:i:;;tc>(;)~~ " 8 ~~ !Ii " ~ "?i'i > "'''' ,.. ~o ~'" 0 Z 2,,> 0;;1 '" ~ 5~ ..., ~~,,>>........ ~ ~ > () V> 0 > !!' a 52'" ~ ~~;;o;;o ~~> ~ "t> ] i'1 ~ V> 'i! 6> V> f ~ rri"'~ > ~s;:< >>~ z 6 '" ~ c '" c . :i~ "t> Q~ " g > ~ )> .. aJ CD ~ " Ilili " ".. > ~ > '" 'i'~ c V> ..~~ ~jg 8 ~ y"" ~~ > " :l 0 '" ~ " R R > 0 ." 't V>> '" ~ -a '" ~ " ~ ~ 0 F~ ~g > g ~2 ~~ ~~~ 0 ",'" iliz 8 ~ ~ ~~ ~ (fJ -a ~~ -< f;;" o"t> 0 ;;1~ '" iii 0 g II! ~ ::; OCD mU'l"'tl "t> 8 >" J::Z "t> " m ..~ "t>~ ~~ '" ~ Z ~ -< ~",,,, "t> .,,'" "t> "t> :ll "t> .. ili ~~ ~ '" " '" ~ 0 ~ m ~~~ ~ ::ill '" '" ~!ij ~ ~ :\ > ~~> 0 :l 0 Il ~~ ili ~~ ~ " ~ ~ '" 0 :\ 0 ~o ~~ "0 p~ ~~ ~ti:~ ,,'OJ 0 g ~~c:;....-uU:~~ " ~ :l- V> ~~I'I ~8 ~a >V> ~ a CD> ~ ",:: > 01'1 f;;1= ~!;m ~r- " a ~ --i (f) .6 >,0 +0 ~~ :0 ~o > z,.. "'v> ~mt~~~~~ '" :I- ~ '" "Ill ~:lI 6 9~ ;;1z> ;;1 V> f' " ~~~ ;:Iili ;:15 f +;0 .;;o~; >~ .. g 0 0 "'0 ~ "'~ z> G') ~~ :~ ~ "t> l'~ -<V> ~ ~(.,jVJ OZ >J IIll(!IIll(!IIllll!(i!(i ~> ~~ >J ;go III ,,~~ ~'" ~~ ~!Ii t~ ,.~ ;0"'> ~ 2S~-t 1S~ 'i! Z ~o -< '- " ~~~ ~~ -=Ui'-o9oo~ .g-,l: ,-< 0 0 > > ~;?i ~o ~ .. '" "'" > "'0 > 122 8!J'~~:...!>>~t: 1O;~~ia: "'~ '" Z > " 5i ili !:ja! "'=' ~ C;)%~ '8'" g: ii ;:10 0 '" '" ~~ Oz .!!~~E~~~~ ~ 0 ~~>~~ ~~ '" "t>~ 0 V> > >0 ~~ ~~ V> ~~o g~ !il > H!i "'aJ '" ~ '" '" m ?o~ ~ Il> ~ > ~z ~~~ ",a .~ ;:. "E~~": ~~ ~ :l ~ > >:R i!; 0 ;;1 -2> 0 -I ~~g..~ R > '" ~;,,~ ~ ::< R ~ J:: ~a > '" ~ )> ~< 16 !t" ~ c > > ~~~~,., ~~ :<U ~ i!i ;;1 ~ ~ r S~1(l ;;l ~~ ~~' '" III ~;~~ "~ ;;1 ~~~'" ;~ ~h ~ >~ I .. .... ...J....:::!t..... 1=0 "t> )> >. ~ Z :\ 0 "-0. J:: () ~.~ > '" I ~ )> ~ fA il C , a -a [.m \<_~I , -a d i ~ m ~ Z 0 .~~U H J:: VI ~ (f) i:; -I ill :l )> !!C f' J r / r d / 0 ~ ~...~ , m . I -I 'I )> I ~ r ::1::; 'I ': t r J _I II II I ~ -- ...;::'~..:::.-.. - - --- - .-- ./ ~"'....",.....-- ...--- .." .--' ---..- :-=..=--=-:...::::..=- -::: .= = :::. -:::..:-- -., ...- ::.:: .=~ =-=-=-=-='::::'::'::::':":" ...."..-..... .' .,.....-- - -- --..;::-..:;-' ;:::..:::=..::::=-==..:=:..;:::. ;;:. ::::. :::::. ."...... -...::-...::-'::";'--- ./....... ",;:",..::..;::,,;:~ ~-- --.- --.--.--.-- '-'.~.. -- ---- .-/ /.:'~/ - - - -----------.- -._-~= -'iiIIr" -_.-- - '-. -. -'- /',:/..... "'------ - - -. //,..--- ..---- - -- ,....// ....- -- "'."'./ " 1.. /'Tl /;:-::/ // ." o~ --. .....-;--;-::-. /' .... "'" 'I: ~~ I /~ Q y~/ .1 --~" -- -- - .... .... , \. / i \ -::.~-'" -- -- --1-1 -..-...--.---. 11 d 1 II II 1:1 /........ 't!i ................1 IiI, \\ I' i\ '" .\ \\ I' I I I I I I I 1 ! I <J 1 1 \\ \\ '\\ / / '/1.:/ / N>>~ >I"i= ,," >~"tI. ~!:a~ ~~~ ('Jla ~N!a ~::. g ~'r~ lil~ !< ~V>~ ~~~ !Ii> 'i!~ 'I"' <, Ul .,,~~ O;::Ul Z:E::! o,.z -H) r'l :0 1 I. i :; // . I / I II ;' I I;" / / .1/ I,' // 'I 1/ / / 1/ // C" ',' 1/ ,;, / 1;1 II /i "I " II /; 1/ II "I ;/ Ii '/ II II /;' II II '/ I // I 1/1 / /' I ;/ I /'/ ,,I II I I ,,/ I ,I III / i. II /.~ I 1;1 'i / ~l / / /1 / / 1/ I / I' I I ;'/ / 1/ ;,/11/ all ;' I / ;,/ ;' ~ / J II~ / 'I I , I I I / / ~/\ I I I / . / iJ,I/ \~.\ (\ 1 II '\\ \ / II v' \ / II '.. \ 1 (_ _. \\ \ I.. Ii::::,., <:, II ~ ..... ,Ii 't.\ ":" . , " '-""" '., /~~>.::.. '~2\"::. ',-<\ ',' ~"~ \\ r. ."'.;;,,~."',....~:.\\\ [\ .-7 .. ~~ '~ " '. "\ ", '. ~' "- '. " '''.,\. '1 b !il~ ~.,\\ l ; ~~ ~J)i' j N - G') ( 8 ~ ~ Z '\ 0 c' OJ I -- Z >, iJ //~\ 03! /' ~:::/ / , / -' - - o - - o o o o I / I // /1 , , / ' , ; // o ~;o." ~pl;O ClR~ "'>0 ~ ::jjq ~2~ =< n :z: o '-.... - r>1 -i;U :>>Cl;U;U ;uc:>>Ci r>1()Z:>> :>>~z:::j oG"l~ z 10 \. o 1 o 1 I**~c:;:' ,;/ 1( ! (?~:o I ,I" /...>...... ^ . ",,','''', ". /"" " \ \ ' '~ ~~~~ \~-" 5~~~ \ ZZ z , C)~ C) \ \ . :,>), ;,> ", "",,"" /',~ \,\, ,. /' .I , )' / , \ '.j o "tI -=- C1 "'0 I'TI ::tlOl>>x QVol;o;o(i) .::::;; )> "-I oV)C)zz 8~1'TIC1c) ~() r'l Ul C)"tIr"'I-IV)"O ~~~05~ :>^~>~." gzzg)>~ C)C)~~a 1 : - I I I I I I I i I Ii q ::tl ~ :Ii n Ul () > &:; .; ,~~ / ./ :+~ i I 0 r'l II ~o. (1 I I () 0 i I ^ i I II II II Ii II II 0 , I I II I I II II I - - 00 o ;I~> 5 OJ III TAMPA BAY WATER 2535 LANDMARK DRIVE CLEARWATER, FLORIDA 33761 SITE PLAN ORWN: CAB DOON' JSB CHKO: PK APVO. DWS CATE: 08119103 Joe':12003801.00001 NO. BY DATE REVISIONS DESCRIPTION c-:> . c::> c..n URS URSCorporation Southern 7650 W. Courtney Campbell Cswy. Tampa, Florida 33607 (813) 286-1711 Engineering Business No. 00000002 TAMPA BAY WATER ADMINISTRATIVE OFFICE BUILDING FOR I I I I I I I I I I I I I I I I I I I APPENDIX 2 SCS SOILS SURVEY MAP , " ,-\ ~, ~ Mci. t.,.i!: "':_ (; ~ t. . "\. t ,-4 , '1:,' " " ;, \~, iLi!, i ~ " " " ~ oj. ~,,' ""11,' .1,_, I' .; ~'J ';:'1 4' M. ~ ! '~'N1Yl:~'~" , ~ "( "'l.:.. :t. ~:~. .:. \. ..-~~... ,~~ ~ ~:.' ...;":'~ ~>~""""'~i'(: .. - \. .... ' . '.,." 'A-~ . ....' \ J".. ' ',..~" 1..,.. ~ ..., . ..... I I I I I I I I I I APPENDIX 3 I SCS SOIL SURVEY DESCRIPTION TABLES I I I I I I I I '.~r"_ - - - - ~ ~ s:: ~~g': ~'" 8~ . ~...~,. 0 t:l ....... ....r:>'!6"'mp,.~~ o>oo~ t:l) .: 0>...0' ~~...~: ,~~t:l'" ___~ C> D1 ,.,' p,.g S t;.I...o", ....00..."'l 5"z8g, O>~r:>'t:l) p,.o ~" J;t.1~ g,t:l e. ::1:0 ;..-,. ... "" ~ '-' .?' .:: s:: Z ~ ~ Z= 00~p,. ~t:l e-::I:D1.. ~& c?g.' ~ 0 oo~' Zt:l ~o l;l:jo -oq::l 'J-O.... ~o ., 00.... z~ ~O> l;l:j '" -oq "" ~;- ~g, D1 Z (D ~ l;l:j> ? ~ ~~ ~p,. D1 t:l !-3~ ~; ~oo ~Z 0", ~""o oo::l . ~1-3::1: -1 p,. '" r:>' rt.l .. ~ 6:>s g . <..... .... l;l:j~;' g . = CD It ~(D ~ : e:z", .... t:l 0 0 t'D t:J;:t...... &~.?'~ ~ b:lZ~ S' r:>'::al';' ... r:>',," (D li' 0 c,j""4 e'l;l:j~ o~o ::lz~ ~l;l:j~ ~~~ 5'~ e. 8~;' o O>::l p,.~ 0 e.1-3 ... '-'~; 00 00.... .: <:n ~~ .r:>' > C> Q: 8 lO ... S' (D D1 '" ::l po > C> Q: 8 ~ S' (D D1 ~ po ............ 00'""0> <:n<:n~ ....oco ........ "".... <:n~.... 'r?t o>~.... <:noo,"" ~~f <:n"".... ~<:no> ~.... tf ~w ~~ ............ 000 ....~o .... .... ocoo '""000 ........ ........ ~"" l ............ '""<:n<:n ............ ~'""O> ........ W<:n - "".l ~S: ~~S'" . r:>'~.t:l) ..... 00;' t:l ~~t:l~ ~~J~ ~~ ---"'r:>'p,. S::Z(D ~ oo~'t:l p,. ::I: ... g ~r:>'op,. ~ .... (D Z.....p,. l;l:jS" 'J-O C> ""... oo~. l".lg ~o Z.... l;l:joo ~~ ",... . (D (D ?~ ....0 ~oo~ 1-30> '00 WO> 0", oot:l .; p,. tot o '" 8 "'l 8 lO ::I. t:l (D '" (D p,. er (D t:l ft 00 ... "'10'" CD::l'" e:p,.~ 8"'&' (D ~ p,. ~p,. ?'~ 8 _lO 0::1. s~ "'l '" '" t:l p,. - ~ 8 ~~8 - "'t:: g~;-(D ... (D r:>'--- ~ ~ 10 b:lo ... t:l ...", ~, 5' p,. g, t:l 0> S e. &l ?? o o~ = p,.t:loot:l e.0l;l:j'" '-'O'J-O"'l 10 ...,~ ~ Zo .., ::a '" ~.~ p,. t:lw"" ;-::a~ ~~'" =",t:l "'(Dp,. (Dc> ~~~ p,.~ 8 0-1-3t:: .... (D ~'wt:l ~oo ... 00'" (D. ... ...~ r:>' ~.~o t:l. ..., 00 "'~ ~p,. ~.,< 80 (D<: t:l(D &j~ .. 0 '" 8 '< 8 lO ::I. t:l (D '""'"" ~w "".... er'f W"" ""<:n ........ ....0 wO> ........ W~ - ~ ---~Q" 1-3~08 e:l';'=t:: ~~ ~ (D ~ z"'l::l ~l;l:j~o o~o; t:l 00 10 CJ'l l;l:jp,.o b:l~"""" ..... 00 J4:1......... ; ::a~co S Sl~t.:lg. ~..~~o' 0(D8t:l e,? =':0 ~~.... ~ t:l 00 1-30~ . ;I.... wr:>'(D 0(D!x:l ~~o ~ o~ ~:O> . '" co ....S.~ O>~~ ~~p,. 00 "'~ ~p,. ~.,< 80 (D<: ~~ "'- . 0 lO 8 '< 8 ~ S' (D ~~~ w....O ~.... f'rer' ~"".... ""~w ............ ....0.0 ~w,"" ............ ""<:no> - l;l:j ~~ ~g,ep,. . E: t:l) ....~(D t:l Q) S' (D (D l;l:j(D~g; . =...t:l ---~op,. a:: ..., .. o ~Q p,.~o e.l';'= '-'~ t:l z4' ::a~ ~o 00'" l;l:jp,. ~~ 00<:n ::a~ ~p,. 1€w ?S t:: ....(D :-'''' 1-3t:l . 0 w;l.. or:>' (D ~~ ~ ... .... l;l:jC> ~ . g a "*"~ _. a::...[ 0'< o.:::fg ~t:l= ",(D... ...~ r:>' ~Zo "'ll;l:j.... ~~~ e.ZlO O'l;l:j~ ~~!x:l ...Zo' o t:<.l'" ~~p,. 1O",<:n ;-(Doo ...?"" ... "" ~ g.~~ p,. E!-3~ ""a '""~' 00;' .; :ll ~~ . ... ....0 0>.... - - - 00 t:<.l ~ Z t:<.l ~ ~ t:<.l::o 8 . 0.... 8~;: ~ <:n~. '" oolll So... ~ 0 ~Z"" =::aQ ~~g ~.oot:l t:ll;l:j4' Q~~ l:1'ZO o ::a'" ::I,,," p,. N ..,'"" g1€~o ;?~ '" ""8 t:l~t:: ~. (D t:l !-3::l a ",,0 000;1. p,.00l:1' ~.; g, ~oo . ... ....'" <:n;- - - - w~ co 00 "" 'rf w"" ~O> ........ ....0 ~"" ........ w<:n 00 1€g p,.p,. ~.,< 80 (D<: ::l(D &j'" '0' lO 8 "'l a ~ s' CD 0>0> , 0> <:n ~~~ o><:n~ ~ ""oa ..~.~ == 1-3 a (D . CD'" w::lo o ~ 000r:>' .; ....0 ~~.... . (D 0 ...."'10 0>0t:l CDp,. ~~'< ~8~ o~e. "'(D(D ~''1 <: S'::C: e: CJ'l p,. -.m" t:ll;l:j~ Q~a l:1'zt:: o J?j CD e.~~ o z= .e.l".l~ ~(D rn~ (D'" 00 . .... '""~ rn8~ (D .... e. ?~'" """'t:l) ~O>::l ::l 1-30(D . ::I: rn ""r:>'''' '"""'t:l oo~,p. .: ~o ~....... . 000 ....Q<:n <:n~ t:<.l~~ . '" 0 ---I;l (D S::o ~ OlOrn' p,.p,.- ~~i .a" ~ ..r.o >- o Q: 8 ~. t:l CD '" g po '""'"" "".... .... ~er' "".... '""'"" ........ 00 '""<:n > ....p,. ~ '" 't:l 00~~8 3::a. o~ e~~CD'= ~Zb::~;' ~~. t:l) -oqCJ'l ::l t:l ~~Sl (D '" '" ... rn (0 '< r:>'~ ?....Op,. co .... .. t.:l~ 00 ..~~~ 1-3~;- , ~.~ ""-0 oollllO oot:lp,. .; o~ .....;1.0 ... r:>'~ . CD.... ....~~ <:nO 8 tJ:jMt=: . t::1 IE ---= :ll s::~~ &.e:... "'t:lO ""~ .... 00 g ::l '" 8 (D '" t:l p,. 0' o '" ... o' t:l ~ ?'f w.... <:n,"" <:n"" 'itf oo~"" ~<:n~ > C> Q: 8 ~ S' (D rn lO t:l po >- o Q: 8 lO ... S' CD rn lO t:l po > o Q: 8 ~ S' (D rz t:l po > o Q: 8 '" ::I. I:l (D rn ~ po ? ::l ... El '" ... g. !!. ........ ....0 ""<:n ............ 000 ~<:n<:n t.:l.... OCO t.:l "".... t.:lt.:l "".... t:l.., "".l =(Dt::1 ~"gO ~;l.1-3 ........ ~<:n O)w ?er' 0(0) ""0 '"".... ?f 00'"" ~o .... ~ ~cr' w.... 00,"" t::1 (D 't:l ... l:1' ........ 00 ww ........ 00 W~ ~ ~ ........'l::l 00' oo~ p,. a:: CDp,.~' !il....~. ~."'l 13 4' = a ~ 080 Oo't:l ::l/;i'~ ......8 ~f;= "'(DEl --- ~Z 00 8 . ~ ............ ............ ........ ........ ........ ............ ........ ............ ........ ........ ........ ........ to (D 000 88 000 00 00 00 00 ... 000 888 00 00 00 0 000 00 00 00 000 000 00 00 00 00 ~ --- ... '" 0 CJ'l ~Z (D ""0 'C 8 . ~. .... coco coco coco co CO CO coco co CO CO coco coco coco coco ~~ o coco co CO CO ::l o coco 000000 '""'"" co 00 '""'"" 000000 <:n,"" ,""00,",, coco ,",,0) coco coco ....., CJ'l --- rn 0 ~. oZ '""0 i ~. a"" s:: a8 (D t.:l.... .... .... .... t.:l 0 ....~'"" <:noow w'"" CO"" w~ ww.... W"" t.:l~W ~t.:l ....t.:l 0),"" 00 co .:..- l:1' '" t:l 0 :;. 0 !!. <:n '" 8 t:l ~~ .... .... .... t.:l ~ 10 ....~O) <:n,",,~ 00"" ; t.:l~ t.:l~.... ~t.:l ...."""" ~t.:l ....t.:l <:nO) '""00 ~ - ~ ~ s' 0 .. 0 0 t.:l ~ a ~ w;.:..... ........ .... .... .... t.:l ~<:n ~ ~ ....~<:n co~ 0>.... ....w ........0 "".... 0........ ~.... ....t.:l 0),"" lJl 0 El g ~ ~' <:n ... .... .... .... s r ........ .... ~ ....t.:l~ t.:l~0 <:nw <:no 0.... ....00 co .... 000 ........ 00 ""t.:l <:n<:n i 0 8 t.:l ........ .... .... .... 8 o""~ ........0 ~"" <:no coo 000 000 000 ....0 00 ........ ~~ ~ ...~ =~ s,c zzz ZZZ ""z zz zzz t.:lZ zzz ZZ zz zz zZ' :;: S. t.:l"" p,. ~~~ ~~~ """" w~ ~~ ~~~ co~ ~~~ ~~ ~~ ~~ ~~ ~ s'i ... ~~ zzz zzz z zz zzz ....z zzz zz zz zz zz ~ s. ~~~ ~~"tl 00'"" O)~ ~~ ~~~ ~~ ~~~ ~~ ~~ ~~ ~~ 4' t:r:r :r:r:r :r:r :r:r :r:r :r:r:r :r:r :r:r:r :r:r >> :r:r :r:r w~ > w~~ ~~~ ~~ lf~ t.:l~ ""~~ t.:l~ ~~~ ~w w~ ~~ > '088 0'88 ,J.,8 I r-.___ ( --- r-.r-.r-. ___r-. ------ 88 88 Q ~o ~oo 0>0 000 00 00 00 [ .....,.....,....., "'-''-''-' 0'0 r-. ....., .-.,"-' r-. .....,....., ~,....., .....,.....,...., .....,...., .....,....., .....,...., ,,-,...., b:: 8 0 8 0 ....,....., ....., ....., 0 s; f,l ... 000000 oor::nr::n 0000 0000 0000 000000 0000 000000 0000 0000 0000 0000 .... 0 ~~~ ~"tl~ Q<jJ s::~ s::~ s::~~ Q~ ~~~ ~~ ~~ ~~ ~~ ~ ::l tn tntn 00 tn e. .. s:: s::s:: s:: s::s:: s::s:: t:l) Q [ - - e,.., ~ ~ gj 'C f (D p,. 0- "'l "".l 0' ::I. e- t::1 CD 't:l ~ 8 (D t:l ... o .... 8 t=l UJ c:l ::l:l ;3 ..q a:: o to. ... f; CD p,. CD IJl ~ ~ !il ~ s- ... o' l:l I;j ~ t::1 ~ o ~ .j ~ s' .... ~ ~ a <:l ~ l g ~ ~ ~. l:1' "=:l --. . (Jl .... .". ~ '" t:l p,. ~ 10 ... (! p,. 't:l ... 0 0 CD p,. = ... CD rn 0 ..., ... l:1' (D > s (D ::I. 0 '" t:l ~ 0 S. lO ~ 0 t:l g, 00 Itf ... ~ 10 ... CD b:: ~ aq' l:1' ~ 9 ~ 0 .~ Bl 0 ;. /;i S --- ~ 00 S b:: .9 ~ --- ~ ...... e,.., O'c I I I I I I I I I I I I I I I I I I I APPENDIX 4 EXISTING CONDITIONS DRAINAGE MAP I I I I I I I I I I I I I I I I I I I APPENDIX 5 EXISTING CONDITIONS, HYDROLOGIC AND HYDRAULIC INPUT CALCULATIONS I I I I I I I I I I I I I I I I I I I JOB NAME: SUBJECT: DATE: BY: Tampa Bay Water Office Development Existing Conditions Stormwater Calculations 8/29/2003 JSB/KMW BASIN: EX-I00 ITOTAL AREA (AC): 0.98 POND AREA (AC) = *EXIST. PAVEMENT AREA (AC) = OPEN SPACE - GOOD CONDo (SOIL TYPE 'B') = 0.00 0.10 0.88 CN= CN= CN= 100 98 61 WEIGHTED CN = 64.8 TIME OF CONCENTRATION = 10 min - Conservative Assumption * Can only utilize half of the existing pavement - City of Clearwater requirement. BASIN: EX-200 ITOTAL AREA (AC): 0.81 OPEN SPACE - GOOD CONDo (SOIL TYPE 'B') = 0.81 CN= 61 TIME OF CONCENTRATION == 10 min - Conservative Assumption BASIN: EX-DEPR TTOTAL AREA (AC): 0.77 OPEN SPACE - POOR CONDo (SOIL TYPE 'B') = 0.77 CN= 79 TIME OF CONCENTRATION = 10 min - Conservative Assumption EX-DITCH will be kept in its existing condition. I I I I I I I 1\ I I I I I I I I I I I APPENDIX 6 EXISTING CONDITIONS, BASIN-NODE SCHEMATIC I TAMPA BAY WATER OFFICE DEVELOPMENT I I EXISTING STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) I Nodes A Stage/Area V Stage/Volume T Time/Stage M Manhole I ;,:C - POND I Basins o Overland Flow U SCS Unit Hydro S Santa Barbara /f'-. I I Links P Pipe W Weir C Channel D Drop Structure B Bridge R Rating Curve H Breach W:EARTHEN WEIR I I /"-.. I -- I A:DEPRESSION I U:EX-DEPR I I I I I I Interconnected Channel and Pond Routing Model (ICPR) <Q2002 Streamline Technologies, Inc. I I I I I I I I I, I I I I I I I I 'I I I APPENDIX 7 EXISTING CONDITIONS, AdICPR ANALYSIS I ...... <4i:'J>-3 I a oo><~ (tl lIlH .... '00'tl n i::l~ 0 0 ~ t<:1 ZlIl 'tl Gl~ ::<l >< I n i:'J en 00 - (tl 00 i:'J>-3::;: 0- 00 Z 'tlO~ i H PJ >-3~>-3 0 :3 t<:1 t<:1 Z (1) ~~::<l i:'J>-30 I ::<It<:1''l ::<l"l N H '" Oi:'J<1 =::l 0<:t<:1 0- w~ ""0 ~I:"'O C::i:'J 0 G) ~t;J I 8- III Ii ~ 0 HI:"' ?::i en >= 00 i:'J '0 Z'tl 0 3: s:: . t<:1 g, . Z . >-3 I (JQ . ~ . en . 1-" 0 . B 0- . . I--' g. . llJ ---- . ('t ...... . 1-" I (') . 0 ""0 . ::l C! 3: @ PJ X N ..... en I 0 00 ('t>-3 0 po llJ 1-'- N 0"1 Ii LQ :3 ~ rn (1) (1) en ~ (tl ~ -..I I N en S' ('t 0 llJ 3: (tl 0"1 HlLQ llJ ..., -..I ('t(1)X (tl n I [ ::;: -..I llJ 0' w 00 Ii ('t::l (JQ 0 PJ 1-" G' 0 HlLQ ::l ~CIl 0 ('t(1)LQ I S' 3: llJ 0 I X N 000 ..... ('t(1) 0 llJl--' 0 HlLQ ('t 0 ('t(1)llJ il 3: llJ X ..... 0"1 ~oo -..I HlIi>= I 00 ('t(1)1i \D NllJHI 3: I>> HX ..... ,::l N HI >-3 I po I--' 1-'- 0 Ii 0 :3 00 rn :€ (1) H I w ::l HI ~ 111--'3: ~ HlOllJ 0 rn :€ X 3: OllJ I >= X ..... ('t 00 HI >-3 po I--' 1-" 0"1 Ii 0 :3 ~ rn :€ (1) I 0 >= 0 ('t HI ..... 01--'3: N HlOllJ ~ rn :€ X I ""0 '" (JQ (tl 0 ...., I I I I I I I I I I I I I I I I I I I I TAMPA BAY WATER OFFICE DEVELOPMENT EXISTING STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) Basin Name: EX-100 Group Name: BASE Simulation: EX 25-YR, 24-HR Node Name: 10 Basin Type: SCS Unit Hydrograph Unit Hydrograph: Uh256 Peaking Fator: 256.0 Spec Time Ine (min): 1.33 Comp Time Ine (min): 1.33 Rainfall File: Flmod Rainfall Amount (in): 9.200 Storm Duration (hrs): 24.00 Status: Onsite Time of Cone (min): 10.00 Time Shift (hrs): 0.00 Area (ae): 0.980 Vol of Unit Hyd (in): 1.000 Curve Number: 64.800 DCIA (%): 0.000 Time Max (hrs): 12.04 Flow Max (efs): 3.357 Runoff Volume (in): 4.858 Runoff Volume (ft3): 17282.607 Basin Name: EX-200 Group Name: BASE Simulation: EX 25-YR, 24-HR Node Name: 20 Basin Type: SCS unit Hydrograph Unit Hydrograph: Uh256 Peaking Fator: 256.0 Spec Time Ine (min): 1.33 Comp Time Ine (min): 1.33 Rainfall File: Flmod Rainfall Amount (in): 9.200 Storm Duration (hrs): 24.00 Status: Onsite Time of Cone (min): 10.00 Time Shift (hrs): 0.00 Area (ae): 0.810 Vol of Unit Hyd (in): 1.000 Curve Number: 61.000 DCIA (%): 0.000 Time Max (hrs): 12.04 Flow Max (efs): 2.486 Runoff Volume (in): 4.382 Runoff Volume (ft3): 12884.096 Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc. Page 1 of2 I I I I I I, I I I I I I I I I I I I I TAMPA BAY WATER OFFICE DEVELOPMENT EXISTING STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) --------------------------------------------------- Basin Name: EX-DEPR Group Name: BASE Simulation: EX 25-YR, 24-HR Node Name: DEPRESSION Basin Type: SCS Unit Hydrograph Unit Hydrograph: Uh256 Peaking Fator: 256.0 Spec Time Inc (min): 1.33 Comp Time Inc (min): 1.33 Rainfall File: Flmod Rainfall Amount (in): 9.200 Storm Duration (hrs): 24.00 Status: Onsite Time of Cone (min): 10.00 Time Shift (hrs): 0.00 Area (ac): 0.770 Vol of Unit Hyd (in): 1.000 Curve Number: 79.000 DCIA (%): 0.000 Time Max (hrs): 12.04 Flow Max (cfs): 3.555 Runoff Volume (in): 6.632 Runoff Volume (ft3): 18536.374 Interconnected Channel and Pond Routing Model (ICPR) <eJ2002 Streamline Technologies, Inc. Page 2 of2 I I I I I I I I I I I I I I I I I I I TAMPA BAY WATER OFFICE DEVELOPMENT EXISTING STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) ====================================================================================== ==== Basins ========================================================================== ====================================================================================== Name: EX-100 Group: BASE Node: 10 Type: SCS unit Hydrograph Status: onsite Unit Hydrograph: Uh256 Rainfall File: Flmod Rainfall Amount (in) : 9.200 Area (ac) : 0.980 Curve Number: 64.80 DCIA(%): 0.00 Peaking Factor: 256.0 Storm Duration (hrs) : 24.00 Time of Conc(min): 10.00 Time Shift (hrs) : 0.00 Max Allowable Q(cfs): 999999.000 Name: EX-200 Group: BASE Node: 20 Type: SCS Unit Hydrograph Status: Onsite Unit Hydrograph: Uh256 Rainfall File: Flmod Rainfall Amount (in) : 9.200 Area (ac) : 0.810 Curve Number: 61.00 DCIA(%): 0.00 Peaking Factor: 256.0 Storm Duration (hrs) : 24.00 Time of Conc(min): 10.00 Time Shift (hrs) : 0.00 Max Allowable Q(cfs): 999999.000 Name: EX-DEPR Group: BASE Node: DEPRESSION Type: SCS Unit Hydrograph Status: Onsite Unit Hydrograph: Uh256 Rainfall File: Flmod Rainfall Amount (in) : 9.200 Area(ac): 0.770 Curve Number: 79.00 DC IA ( %): O. 00 Peaking Factor: 256.0 Storm Duration (hrs) : 24.00 Time of Conc(min): 10.00 Time Shift (hrs) : 0.00 Max Allowable Q(cfs): 999999.000 -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- ==== Nodes =========================================================================== Name: DEPRESSION Group: BASE Type: Stage/Area Base Flow(cfs): 0.000 Init Stage(ft): 67.900 Warn Stage (ft) : 73.000 Stage (ft) Area (ac) 70.000 0.0200 Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. Page 1 of5 I I TAMPA BAY WATER OFFICE DEVELOPMENT EXISTING STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) I 71. 000 72.000 0.1400 0.3700 I Name: EX-POND Group: BASE Type: Time/Stage Base Flow(cfs) : 0.000 Init Stage(ft) Warn Stage (ft) : 0.000 0.000 I I Time (hrs) Stage(ft) I 0.00 8.00 12.00 18.00 24.00 30.00 67.900 68.400 68.900 68.900 68.400 67.900 I ====================================================================================== ==== Cross Sections ================================================================== ====================================================================================== I Name: EARTHEN Encroachment: No Group: BASE I Station(ft) Elevation(ft) Manning I S N I 0.000 7.000 50.000 73.000 72 .150 72.720 0.010000 0.010000 0.010000 I -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- ==== Operating Tables ================================================================ -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- I -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- ==== Pipes =========================================================================== I I Name: From Node: Length (ft) : 0.00 Group: BASE To Node: Count: 1 Friction Equation: Average C UPSTREAM DOWNSTREAM Solution Algorithm: Automatic Geometry: Circular Circular Flow: Both Span (in) 0.00 0.00 Entrance Loss Coef: 0.00 Rise(in) : 0.00 0.00 Exit Loss Coef: 0.00 Invert (ft) : 0.000 0.000 Bend Loss Coef: 0.00 Manning's N: 0.000000 0.000000 Outlet Ctrl Spec: Use dc or Top Clip (in) 0.000 0.000 Inlet Ctrl Spec: Use dn Bot Clip (in) : 0.000 0.000 Stabilizer Option: None I I I Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc. Page 2 of5 I I I TAMPA BAY WATER OFFICE DEVELOPMENT EXISTING STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) I Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge wi headwall I Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge wi headwall 'I ====================================================================================== ==== Channels ======================================================================== I ====================================================================================== I Name: Group: BASE I UPSTREAM Geometry: Trapezoidal Invert (ft) : 0.000 TClplnitZ(ft): 9999.000 Manning's N: 0.000000 Top Clip(ft): 0.000 Bot Clip(ft): 0.000 Main XSec: AuxElev1 (ft) : Aux XSec1: AuxElev2 (ft) : Aux XSec2: Top Width (ft) : Depth (ft) : Bot Width(ft): 0.000 LtSdSlp(h/v): 0.00 RtSdSlp(h/v): 0.00 I I I I From Node: To Node: Length (ft) : 0.00 Count: 1 DOWNSTREAM Trapezoidal 0.000 9999.000 0.000000 0.000 0.000 Friction Equation: Average Solution Algorithm: Automati Flow: Both Contraction Coef: 0.000 Expansion Coef: 0.000 Entrance Loss Coef: 0.000 Exit Loss Coef: 0.000 Outlet Ctrl Spec: Use dc 0 Inlet Ctrl Spec: Use dn Stabilizer Option: None 0.000 0.00 0.00 -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- I ==== Drop Strcutures ================================================================= I Name: Group: BASE I UPSTREAM Geometry: Circular Span(in): 0.00 Rise(in): 0.00 Invert (ft) : 0.000 Manning's N: 0.000000 Top Clip(in): 0.000 Bot Clip (in) : 0.000 I From Node: To Node: Length(ft): 0.00 Count: 1 DOWNSTREAM Circular 0.00 0.00 0.000 0.000000 0.000 0.000 Friction Equation: Average C Solution Algorithm: Automatic Flow: Both Entrance Loss Coef: 0.000 Exit Loss Coef: 0.000 Outlet Ctrl spec: Use dc or Inlet Ctrl Spec: Use dn Solution Incs: 10 I Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge wi headwall Downstream FHWA Inlet Edge Description: I Page 3 of5 Interconnected Channel and Pond Routing Model (ICPR) t92002 Streamline Technologies, Inc. I I I TAMPA BAY WATER OFFICE DEVELOPMENT EXISTING STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) II Circular Concrete: Square edge wi headwall I ====================================================================================== ==== Weirs =========================================================================== I ====================================================================================== I Name: Group: Flow: Type: EARTHEN WEIR BASE Both Vertical: Mavis From Node: To Node: Count: Geometry: DEPRESSION EX-POND 1 Irregular I XSec: Invert (ft) Control Elevation (ft) Struct Opening Dim(ft) EARTHEN 72.000 72.000 9999.00 I TABLE I Bottom Clip(ft): Top Clip (ft) : Weir Discharge Coef: Orifice Discharge Coef: 0.000 0.000 3.200 0.600 I -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- ==== Bridges ------------------------------------------------------------------------- ------------------------------------------------------------------------- -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- I -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- ==== Breaches I -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- I ==== Rating Curves ------------------------------------------------------------------- ------------------------------------------------------------------- -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- I ==== Hydrology Simulations I Name: ************** Filename: S:\Projects\TB_Water\ICPR\EX 25-YR, 24-HR.R32 Override Defaults: No I Time (hrs) Print Inc(min) 30.000 5.00 I -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- ==== Routing Simulations ------------------------------------------------------------- ------------------------------------------------------------- I Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. Page 4 of 5 I I I TAMPA BAY WATER OFFICE DEVELOPMENT EXISTING STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) I ====================================================================================== I Name: ************** Hydrology Sim: ************** Filename: S:\Projects\TB_Water\ICPR\EX 25-YR, 24-HR.I32 I Execute: Yes Alternative: No Restart: No Patch: No I Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time (sec) : Boundary Stages: 0.10 10.000 0.000 0.5000 Delta Z Factor: 0.10000 End Time (hrs) : 30.00 Max Calc Time (sec) : 60.0000 Boundary Flows: I Time (hrs) Print Inc(min) I 11.000 16.000 30.000 30.000 5.000 30.000 I Group Run BASE Yes I I I I I I I I I Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc. Page 5 of5 I I I I I I I I I I I I I I I I I I I I APPENDIX 8 PROPOSED CONDITIONS, DRAINAGE MAP I I I I I I I I I I I I I I I I I I I APPENDIX 9 PROPOSED CONDITIONS, HYDROLOGIC AND HYDRAULIC INPUT CALCULATIONS I I I I I I I I I I I I I I I I I I I JOB NAME: SUBJECT: DATE: BY: IBASIN : PR-100 Tampa Bay Water Office Development Proposed Conditions Stormwater Calculations 8/29/2003 JSB TOTAL AREA (AC): 2.21 POND AREA (AC) = P A VEMENTIBLDG{PH I & II) AREA (AC) = OPEN SPACE - GOOD CONDITION = WEIGHTED CN = 95.9 0.39 1.52 0.30 CN= CN= CN= TIME OF CONCENTRATION = 10 min - Conservative Assumption WQTV [FIRST 1 INCH OF RUNOFF] (AC-FT) = 0.18 IpOND: 100 DESC. BOT TOB DLW= 71.56 ELEV. 70 71 72 73.5 AREA (AC) 0.02 0.10 0.34 0.39 100 98 80 VOLUME (AC-FT) o 0.06 0.28 0.65 I I I I I I I I I I I I I I I I I I I APPENDIX 10 PROPOSED CONDITIONS, BASIN-NODE SCHEMATIC I TAMPA BAY WATER OFFICE DEVELOPMENT II PROPOSED STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) II I Nodes A Stage/Area V Stage/Volume T Time/Stage M Manhole II Basins o Overland Flow U SCS Uni t Hydro S Santa Barbara I I Links P Pipe W Weir C Channel D Drop Structure B Bridge R Rating Curve H Breach I II II I II I I I I I I, T: EX-POND / 1"'- W: WEIRl / '" ._--_._----------~---~- T:EX-DITCH / W: WEIR2 / A: PR-1O '" " U: PR-1OO Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc. I ~ I I I I I I I I I I I I I I I I I I I APPENDIX 11 PROPOSED CONDITIONS ADICPR ANALYSIS I I ....... ~ ~ .... o o ~ o ...... ~ 0- o ::r g g. ~ 0- "0 o i:l 0- ~ g ~. s;:: o 0- g. ---. n "0 ~ @ N o o N C/.l q ~ [ S. ~ >-:l ~ o g- O 0" ()Q o. .en ....... i:l o 10\0'\10\0'\ tv-....]-....]N-..J""'] t-I\D\DI-1\D\D 000000 000000 000000 I I:%] I:%] I:%]X I:%]X x' X I tt1 10 "U I t:1 :<1'OH:<1'OH '0>-310>-3 .....zo.....zo otl:r:otl:r: I I tlltlltlltlltlltll ~~~~~~ 000000000000 1:%]1:%]1:%]1:%]1:%]1:%] '0'0'0 '0'0'0:<1:<1:<1 :<1:<1:<1' I , I I I .....,............,. NNt\JOOO 111U1U1000 '<'<'<'<'<'< 111111111111 I I tvNNNNN "'""'""'""'""'""'" P' P' P' P' ;:n:" 111111111111 I .............................. tvl\JtvNNN ~oo~oo UloaNeD I ....J O\O'\...J 0'\0'\ WCX>\OWCO\O O\O\OW\D\O ooo~oo .....JoO...JOO I -J -J ~oo~oo 000000 000000 000000 I I ..... ..... 0\ 0\ '" -J -J 0\ WOO...,JOO I I .............1--1........1-11-1 NNtvtvtvtv o.p.~o~~ OUlU1otvN ..... ..... I--\WNUl.c:::.W I co.e:..~O'\....JW NU1~O....JOO wOCO~~Q) I ..... ..... weaNOO ~OO.J::l.OO UlOONOO I 01000000 CDOOt-lOO \0000'\00 00001-100 I "0 ~ ()Q ~ o ...., I :;: ~ X 00 rt>-3 P' ~ fJ. I1lOS OJ (1) (1) 00 rt ~ :;: HllO ~ rt(1)X :;: ~ 0011 rt;:! ~ fJ. HllO ;:! rt(1)lO :;: ~ X CIltl rt(1) ~ f-' HllO rt rt(1)~ :;: ~ X ~CIl HlI1J:: rt(1)11 "'~HI :;: ~ HX ;:! HI >-3 P' f-' fJ. 11 0 S OJ .;; (1) H ;:! HI ()f-':;: HlO~ OJ .;; X :;: o~ J:: X rt HI >-3 P' f-' fJ- 11 0 S OJ .;; (1) o J:: rt HI ()f-':;: HlO~ OJ .;; X z ~ S (1) c.,'O>-3 CIl:<1~ tIlo:;: '-.'0'0 Gg~ ~l:%]tIl tl~ >< 0000 1:%]>-3:;: 'Oo~ >-3~>-3 I:%] I:%] ~~:<1 1:%]>-30 :<11:%]"J :<1"J '" H 01:%]0 0<:1:%] w~ -t'tl ~~ >-31:%] Ht' 00 Z'O :;: I:%] Z >-3 Q 11 o J:: '0 00 ...- e f-' ~ rt .... o ;:! I I I I I I I I I I I I I I I I I I I TAMPA BAY WATER OFFICE DEVELOPMENT PROPOSED STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) Basin Name: PR-100 Group Name: BASE Simulation: PR-100yr, 24hr Node Name: PR-10 Basin Type: SCS Unit Hydrograph Unit Hydrograph: Uh256 Peaking Fator: 256.0 Spec Time Ine (min): 1.33 Comp Time Ine (min): 1.33 Rainfall File: Flmod Rainfall Amount (in): 12.100 Storm Duration (hrs): 24.00 Status: Onsite Time of Cone (min): 10.00 Time Shift (hrs): 0.00 Area (ae): 2.210 Vol of Unit Hyd (in): 1.000 Curve Number: 95.900 DCIA (%): 0.000 Time Max (hrs): 12.04 Flow Max (efs): 15.988 Runoff Volume (in): 11.598 Runoff Volume (ft3): 93040.617 Basin Name: PR-100 Group Name: BASE Simulation: PR-25yr, 24hr Node Name: PR-10 Basin Type: SCS Unit Hydrograph Unit Hydrograph: Uh256 Peaking Fator: 256.0 Spec Time Ine (min): 1.33 Comp Time Ine (min): 1.33 Rainfall File: Flmod Rainfall Amount (in): 9.200 Storm Duration (hrs): 24.00 Status: Onsite Time of Cone (min): 10.00 Time Shift (hrs): 0.00 Area (ae): 2.210 Vol of Unit Hyd (in): 1.000 Curve Number: 95.900 DCIA (%): 0.000 Time Max (hrs): 12.04 Flow Max (efs): 12.116 Runoff Volume (in): 8.703 Runoff Volume (ft3): 69819.583 Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc. Page I of 1 I I TAMPA BAY WATER OFFICE DEVELOPMENT PROPOSED STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) I ==== Basins ========================================================================== I -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- Name: PR-100 Group: BASE Node: PR-10 Type: SCS Unit Hydrograph Status: Onsite I Unit Hydrograph: Uh256 Rainfall File: Flmod Rainfall Amount (in) : 9.200 Area (ac) : 2.210 Curve Number: 95.90 DCIA(%): 0.00 Peaking Factor: 256.0 Storm Duration (hrs) : 24.00 Time of Conc(min): 10.00 Time Shift (hrs) : 0.00 Max Allowable Q(cfs): 999999.000 I I I ==== Nodes =========================================================================== I Name: EX-DITCH Group: BASE Type: Time/Stage Base'Flow(cfs): 0.000 Init Stage (ft) : 0.000 Warn Stage (ft) : 0.000 I Time (hrs) Stage(ft) I 0.00 8.00 12.00 18.00 24.00 30.00 67.900 68.900 69.900 69.900 68.900 67.900 I I Name: EX-POND Group: BASE Type: Time/Stage Base Flow(cfs): 0.000 Init Stage (ft) : 0.000 Warn Stage (ft) : 0.000 I Time (hrs) Stage (ft) I 0.00 8.00 12.00 18.00 24.00 30.00 67.900 68.400 68.900 68.900 68.400 67.900 I I Name: PR-10 Group: BASE Type: Stage/Area Base Flow(cfs): 0.000 Init Stage (ft) : 67.900 Warn Stage (ft) : 74.000 I Interconnected Channel and Pond Routing Model (ICPR) ([;)2002 Streamline Technologies, Inc. Page 1 of 5 I I I TAMPA BAY WATER OFFICE DEVELOPMENT PROPOSED STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) I I Stage(ft) Area (ac) I 70.000 71.000 72.000 73.500 0.0200 0.1000 0.3400 0.3900 ====================================================================================== I ==== Cross Sections ================================================================== I ====================================================================================== ==== Operating Tables ================================================================ ====================================================================================== I ====================================================================================== ==== Pipes =========================================================================== I ====================================================================================== ====================================================================================== I ==== Channels ======================================================================== ====================================================================================== I ====================================================================================== ==== Drop Strcutures ================================================================= ====================================================================================== I ====================================================================================== ==== Weirs =========================================================================== I ====================================================================================== I Name: WEIRl Group: BASE Flow: Both Type: -Vertical: Mavis From Node: To Node: Count: Geometry: PR-10 EX-POND 1 Rectangular I Span (in) Rise (in) Invert (ft) Control Elevation (ft) 7.75 999.00 71. 600 71.600 TABLE I Bottom Clip (in) : Top Clip (in) : Weir Discharge Coef: Orifice Discharge Coef: 0.000 0.000 3.200 0.600 I I Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc. Page 2 of 5 I I I TAMPA BAY WATER OFFICE DEVELOPMENT PROPOSED STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) I I Name: Group: Flow: Type: WEIR2 BASE Both Vertical: Mavis From Node: To Node: Count: Geometry: PR-10 EX-DITCH 1 Rectangular I Span (in) Rise(in) Invert (ft) Control Elevation (ft) 5.50 999.00 71.600 71.600 I TABLE I Bottom Clip(in): Top Clip (in) : Weir Discharge Coef: Orifice Discharge Coef: 0.000 0.000 3.200 0.600 II ==== Bridges ========================================================================= ====================================================================================== I ====================================================================================== ==== Breaches ======================================================================== ====================================================================================== I ====================================================================================== I ==== Rating Curves =================================================================== ====================================================================================== I ====================================================================================== ==== Hydrology Simulations ----------------------------------------------------------- ----------------------------------------------------------- ====================================================================================== I Name: Filename: PR-100yr, 24hr S:\Projects\TB_Water\ICPR\PR-100yr, 24hr. R32 I Override Defaults: Storm Duration (hrs) : Rainfall File: Rainfall Amount (in) : Yes 24.00 Flmod 12.10 I Time (hrs) Print Inc(min) 30.000 5.00 I -------------------------------------------------------------------------------------- Name: Filename: PR-25yr, 24hr S:\Projects\TB_Water\ICPR\PR-2Syr, 24hr.R32 I Override Defaults: No Time (hrs) Print Inc(min) I Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc. Page 3 of5 I I I TAMPA BAY WATER OFFICE DEVELOPMENT PROPOSED STORMWATER EVALUATION JSB/KMW (SEPTEMBER 2003) I 30.000 5.00 I ==== Routing Simulations ============================================================= -------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------- I Name: PR-100yr, 24hr Hydrology Sim: PR-100yr, 24hr Filename: S:\Projects\TB_Water\ICPR\PR-100yr, 24hr.I32 I Execute: Yes Alternative: No Restart: No Patch: No I Max Delta Z(ft): Time Step Optimizer: Start Time (hrs) : Min Calc Time(sec) : Boundary Stages: 0.10 10.000 0.000 0.5000 Delta Z Factor: 0.10000 End Time (hrs) : 30.00 Max Calc Time (sec) : 60.0000 Boundary Flows: I Time (hrs) Print Inc(min) I 11.000 16.000 30.000 30.000 5.000 30.000 I Group Run BASE Yes I I Name: PR-25yr, 24hr Hydrology Sim: PR-25yr, 24hr Filename: S:\Projects\TB_Water\ICPR\PR-25yr, 24hr.I32 Execute: Yes Alternative: No Restart: No Patch: No I Max Delta Z(ft): 0.10 Time Step Optimizer: 10.000 Start Time (hrs) : 0.000 Min Calc Time (sec) : 0.5000 Boundary Stages: Delta Z Factor: 0.10000 I End Time (hrs) : 30.00 Max Calc Time (sec) : 60.0000 Boundary Flows: I Time (hrs) Print Inc(min) I 11.000 16.000 30.000 30.000 5.000 30.000 I Group Run BASE Yes I Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc. Page 4 of5 I I I I I I I I I I I I I I I I I I I I APPENDIX 12 FEMA FLOODPLAIN MAP == c:z: cc: CD I Q cc: Q. L&.I c.:J ::z: I c:z: cc: = en :z: - I = Q = ..... L&.. ..... I c:z: :z: = ~ :z: _I I I I I I I I I I I I I I 0 ~ ~ ~I sH a::: ~ .. C"') u w "''''''' LI.I co LI.I C) Cl c::r: t-- ::J~:C ~C) Cl.l en Z .,..:> = co bIl :E < a: .0 .. :EC) -< ~ 0.. :gffi~ =C) cac-..l ~I 18118 :>co ~ .. ... ..... t-- ~~ 0 :z:~ LI.I C"') Cl !;;: 0 ~ g g ..:;)- 2: a::: Cl.l .... z :r;z1l ~S= ~ ~ Cr- ~~.g ~LI.I = 0 III II DZ~ c::c c-..I bIl E-4 ...J 1S!l!1 roOct1 ~:;)a. ==- LI.I= e:s ~ w w..== ..... Z z '" '" ,-.- "t.;i o~g ; c:..:>> f-l ~ ~S:!~ .n ~ ._. ~~B w.. LI.I :::> ~ . - 1... LI.I t- ~ Z _J ~ 0 a:U c: Q.. c:z: 0 a:: ~~S L&.I ~ = U 0 ~ 0 ~ eur ~-.5 V) ~ lL o~ Z" = =>> CO? fc Cl.l (S ~o ~ ~.,O en CZ) < u. "E.., ~ < 0 L&.. 0 eO ~ 0., Z Q 0 .. cu :e 0 u ~ ~u.~ ., 0.:> ~ - ~ z oOz &.(1) E ~h ~ ~ ClC) cC~5 Q ..... ClC) 0.. ~ ~r~ . ~ ~ <( u; z ~uo oa:.~ ~ (:) 0 0 ..... ~ z ::> ~z'" 1...:) o~,g~ "" = Z L&.I ~ :2: ~oS - 0." 5 Cl.l - ~ ~ :z: w UJ-' r.t "c.,E "l:l ..... ~ ~ c:z: UJ :2: zw .g., 1; E Cl.l ..... A.. ~ Q. ~ 0 0 ds~ ~i.g 8 ~ u u x "-/ v t; w ~ ~ 0 ~J-4 ~< ::;j~ 0<1)0\ U~("() fI.) ;....1"""'4 olA ~ fr~ ....-4 1"""'4 4) 0 z ~ U <l .~ = ~ ~ .~ E I I I I I I I I I I I I I I I I I I I APPENDIX 13 GEOTECHNICAL REPORT 0'1-21-03 11:53 From-CUSHMAN WAKEFIELD 813-221-9166 T-144 P.03/14 F-518 Central Florida Testi~g laboratories, Inc. :J~t1n9 fj::)E.fJ~.lopmLnf. and d?e~ruJ;, 12m -40TH 8TREEr NORTH. CLEARWATER. FL ~.37C1Z I I I I I I I I I I I I I I I I I I I TAMPA BAY AReA [72'7) 512-8791 FLORIDA (BOO) 248.cFT~ FAX (727) 218-0023 July 15~ 1999 RECEIVED Mr. Mark Jonnatti Spencer & JonuatU, Arcbitects 1661 Bast Bay Drive. Largo~ FL 33771 JUL. 16 1999 SPENCE:R & JONNArn ARCHITECTS. INC, Re; Geotechnical Investigation of Plaza n Building Project, located at Enterpriso Road and Countryside Blvd., Clearwater, Fla. Our Lab No. 12S961 Dear Mr .Jonnclttis As authorized and in accordance with oUr proposal No. 9906-030, our office has conducted a subsurface soils investigation on the above referenced property. This investigation consisted of five standar4.penetration test (SPT) bor~ drilloo at the approximate locatioDB shown on the site schematic provided our office. We have also included an area map showing the site location. with respect to the surrounding geographical area. The purpose of the borings is to provide general engineering properties of the. soils and to allow us to make recamm~datioDs as to fotJ,lldation types .and their compatibility with the existing soils for your proposed new three story office building. Test Methods . The borings were done using samplfug' intervals in excess of those required by ASTM Specifications, D-1586, describing the Standard Penetration Test or ~ I , "split-spoc;>o" method of sampling. Four samples were taken in the upper ten feet to provide greater defInition within this zone. The penetration resistance testing and .s;unple taking was accomplisbed with the use of a 2" D.D. sampler seated six inches into tbe bottom of the bore hole III1d advanced an additional one foot under ~he effort of a 140 pound hammer fallfng freely thirty inches. The number. of blows required of the hammer to advance the sampler one foot into ttndisturbed material was noted as the blow count (N) of that particular stratum. Portions of ~h Boil sample so taken~ were classified, sealed. in moisture-proof containers and returned to our laboratori.es tor verification offield classiiicatiun. z.a1 oeee i3~~3SH' dH ~HSZ:lt eooa IZ Inr ot-Zl-03 11:53 I From-CUSHMAN WAKEFIELD 813-ZZl-9166 T-144 P.04/14 F-518 I I" I I. I I I I I I I I I I I I I I I g.d Spencer & lonnatti - Plaza Two Project, Clearwllter, Fla. July 15, 1999 page 2 The borings were advanced using ~. rotary drill rig, utilizing a recirculating bentonite drill fluid to maintain the bore hole in noncohesive soils and to remove cutting5 oreated by the drill bit Upon completi.on the bore holes were sealed ill. accordance with SWFWMD regulations. BOridg Resulb The soil profile identified by all five. of the borings is generally similar with rcgMd to deep IiOit characteristics but: does differ in near surface soil properties. Borings B-1, B-3 and B..5 define sandy'soils that exhibit medium dense to dense penetration t1:sistances to depths ot at least 20 feet and are foUowed by &lightly looser Sa.nWI and then soft to very bani' ~lays that. COJJ1pose the confining layt;!' of impervious soils that underlie the site. Clays began at depths of app,roxirnatel y 30 feet below the suTface in all borings. Botings B-2 and B-4 differed in that both. . borings encountered a loose zone of ~andy soils in the 3 to 5 foot depth range. Soils below this depth again mirrored' ~e other 3 borings and reflected medium. dense to dcnse~ noncoheisve sandy soils. to approxima.tely 30 feet. The groundwater table at test location5-. was meMun:d between 5 and 6 feet bt:low surface at the time of testing. RecommeD~tions 'The soil profile defined by these boring~-is acceptable for supporting the proposed 3 story office building utilizing shallow spread footer foundatioDS designeel for allowable soil pressures of 2,500 pounds per square foot after densification by proof-rolling of near surface loose SO~. Densification procedures should be performed after stripping of surface ve~etation and topsoils and comply with the following g(meral specification.c The building pad area plus a. ten fo~t pe:rm.1.eter buffer strip be proof.rolle:d to increase the density of loose, near surface sandy floils. Proof~rolliIlg should include a minimum of five passes in each of two perpendicular directions by a drum type vibratory compactor capable of exerting' at least 35.000 ft.-lbs. of dynamic force to the soils. While we did - not find allY unsuitable Boils within the depth and at the loo~tion of our S borings, we do recommend that after completion of ptoof-roll~ and prior to placement of any fill soils, if need~ the site shOuld be inspected by the geotechnical engineer 10 locate any soft or yielding areas identified .by the .proof-rolling. Thes~ arcu ~ouId be removed by-' exca.vation and replaced with clean,.' noncohesive sandy soils similar to those found on site by our borings. Both over excavated areas, if qesigI;lated, and any-fill ploced within the pad area should c;onform to the following general fill ~eci:fication: ... ,'~ Central Florida Testing Laboratories, Inc. . 12825-4O'TH STREET NORTH, CU!ARWATat. FL33182 08Ee l3C~3S~1 dH WHS2:tl EDna ta lnr I I I I, I I I I I I I I I I I I I I I 07-Z1-03 yOd 11 :54 From-CUSHMAN WAKEFIELD 813-Z21-9166 T-144 P.05/14 F-518 Spencer &, J onnatti - Plaza Two Project, ClearWater, Fla. Iuly 1S,. 1999 page J . . All fill placed within the buildjng pad and perimeter buffer area, should consist of ~1ean. noncohesive sandy soils. Fill should be placed in lifts nCll exceeding one foot in depth and compacted to ~ minimum density of at lea:!:t ninety-five percent (95%) of tl1e soils maximum dry density as establi5hed by the Modified Proctor Test, ASTM 0-1557, Each: lift should achieve satisfactory density results prior to placement and compaction of subsequent lifts to elimina.te the possibility; 'of dense soil bridging over loose in5Ufficiently compacted soils, Natural ground should achieve these same conlpaction results for a depth of 12 inches or I foot below bottom ()f proposed foundations, whicheve:r is greater. Generally, to meet this requirement cOmpaction equipment such as self prop(~l1ed drum roltera capable of exerting 10 tons or more to the soil "will. be needed. Sm.all sled type compactors cannot provit1e adequate coropactive effort. The determination of either static rolling or vibratory rolling can be made in the fi~ld and depends OD fin~s and moisture conUlIlt of the fill 5oils. Upon WCce85ful completion of this. densifica~"n process an allowable soil pressure of 2,500 pounds per square fQQt may be used for design purposes. These recommendations apply to fill soils placed prior to foundation constrUction as well as those placed in&ide ste.rnwallfj. Due.to the uoncohesive nature of the 81Uldy soils, we recommend that foundationS "be constructed with their tops at least 12 inches below finished grade. Our office is ava.ilabl~ to provide any comtruction testing ~ces needed to show compliance with these recommendatiqns or with your forthcomi118 Construl~tion Specifications dealitig with soils, concrete or asphalt paving. ). .... ~ .1 .. . Limitations ' This investigation and report deals orily with the soil zones and strata loc;ated within the area ;represented from the ground surface to the termination depth of the boring. I,; It is not intended to predict or accept'responsibility for sinkhole develQpment. Other means of subsurface investigatio118 includi~ but not limited to) deep structural borings, rock coring, geophysieiSl 6tudies, ground penetrating radar or rcsi~ti vity surveys Me used for sinkhole potential determinations and are o'ut of the scope of this investigation. Generally aCCyPted soil mechanics and foundation engineering practices were utilized in the preparation of this report; and no other w8ITanty, either exprl:ssed or implied is made a.s to the reoonuncndauoQ6 provided. I,. . II Central ~Qrida Testing Laboratories, Inc. . '~62S. 40TH S~ NoIlTH, C~tM"rEIl. FL33102 o~ee L3~~3S~' dH ~~S2~~1 EOOZ 12 l"r I I I I I I I I I I I I I I I I I I I 07-21-03 S.d 11 :54 From-CUSHMAN WAKEFIELD 813-ZZl-9166 T-144 P,06/14 F-518 Spencer & Jonnatti - Plaza Two Projec~ Clearwater1 Fla. July 15t 1999 j' page 4!' ' ", This rq)Ort i. for ~ l:]l;clusi-vc use of our client and may not contain sufficient information for other USCSJ such as: quantity ta'ke-offs, or for interpretation by othet partie$ for bidcti.l1g purposes. In the event conclusions omd/or recommendations based on our data are made: by others, such conclusions and/or recQmmendations are not our resppnsibility unless we have been giv~n an opportunity to revi.ew and concur with them. If borings were not staked by a regis~ered land surveyor but were located by our drill crews, the following method was used: Distances are generally: measured using a 200 foot tape measure with right angle approximation used to turn corners. Scaling from prinU: or surveys with reference points shown on the plan or geographical references will produce a deg~e of accuracy that is typically :t. 5% for l~gth and :t 10 degrees for an&les. Soil strata delineations are estima:t~d in the field by color cbangesy lexture differcmCCB and pmctration ~e valuC$. These may be mo:re gradual transitions than those shown on the boring log representations of strata delineations. ", The ground water depth dct~qn shown on the left side of the ,boring log was measured in the bore hole at the time of drilling, unless noted otherwise. This depth does not reflect seasonal high water levels and would fluctuate as expected with variations in. rainfall or other .factors not present at the time of our soils investigation. The boring data represents only that'data obtained during !big investigation at the approximate locations shown on the site schematic or plan. Should significant variations of soil or subsurface 'conditions exist between boring locations and be encountered by future exploratory work or site prepara.tion efforts~ our office should be notified 80 that 5upplementul borings~ Of data gathering detexminations can be llUlCie to update our report and recommendations at a minimal expense to our client. ", ,h.. ....1\1. " It is the reaponsibility of our client to iufonn our office of these variations if possible modifications of the report i& ~arranted. This report is gen~ra1 in nature. unless. apecific geotechnical data or recommendations were asked lobe addressed. However, we would be pleased to answer any questions concerning comments or recoIr1lnendatioDs made in this report. I .Central Florida Testing Laboratories, Inc. 12625 - 40TH ~rrr NORTH, CLeAAWATIOR, FL 33752 oeEE i3r~3S~, d~ W8S2:tl sooa 12 rn~ 07~21-03 11 :54 From-CUSHMAN WAKEFIELD 813-221-9166 T-144 P.07/14 F-518 I I I I I I I I I I I I, I I I I I I I . '" Spencer & Jonnattl - Plaza Two Project, CIe~ater, FIa. July 15, 1999 page 5 , " We appreciate the opportunity to have, been of servico. If any further ev-.luatioIl of the site or testing services are needed, either prior to or dming construction, please do not hesitate to contact our office. . . " Sincerely, G LAB ORATORIES; INC. I' I:" i.... GCS/cb attachments .1 ~:l ' I': '," I': < , ,;1:;" '11'1: " , I' 'f~ . -<j I . ~ . , ~ .1'\ ." ,; . ,.' " I:', .. 1 :'~~ Central Florida Testing Laboratories, Inc. . . 126~ -40tH S'1'RiET NomH. Cl.EAAWAl'tI\, FL 33762 " : 'r! god O€€E: .l3(,~3S\;;l1 dH ,.1 ' ,: I" I W\;;lOE:ll EOO~ 12 l~(, :\' 11 :, I I I I I, I I I ~~ I I I I I I I I I I I 07-21-03 11 :55 From-CUSHMAN WAKEFIELD BI3-221-9166 1-144 P.OB/14 F-51B Ii \lllUlWI '*- Ii I E$~ ~~ \ ,'.', P:-- Iii'. .-....~...;._ ; l~:" lrQ., ...... J I' I """" _ I i." .~ I"" '.1 . + . j" ~ , -, PltP I" ~ ~ 1 ~ Il~ ~ ~.~ ,~ ,~,. ~I~ )t ; ... , I_..~ . ~1Wol' . I I .. ~ ~~=~" .;V~ w ~.-P~,*n~ .' ~(I ~~~ S~~~. ... ;.. _\ '. . " ~.:,;,. ;~~= ~~.~ "ttyli . ~~~n1 '" ~~~;....",,",. ""'"-' - D, ~"'" \ ., ~ _~Il ~ "'''VilWiIili<r . I!:IIIlI~qJ'i ~~;;t..'~ ~', . i ~ . t:""',"j~,.. (~// ..... ......L :.,.... ~~ - I ,.~ ~~MIlI~ . ~".... u+".., '. n"dlll'l.... ' . . I J\~~~U .. I.,,~ - ! I .~-=f 1===1-r L"fY...'!! I .. (l .l " ,E-U"" 1f''t.,I'~ U' d ~"": .~_ ~_I.~~LJ.7+ ........... '." ltlI ~I$ tmI' =- . i.t~~~i'dl~ ~ '1JI ....... ~~h......,.".. 'Ill' ~ -~..rtrm~~T{~~~fI\l\I1lWl. . ~1 . I1fS Ull ...._omJiJl~~~I~~. T l...d 1.,....~MIlII~lI'" l!i1 ., 1-1;> < ,;. ~..... . ,-" ~1_2 ~t1 ~ ~\".L $ 'Jlf\:ftWlIfllJJ)(j" I I .~;:~.iffit' ~- IrU I :_n ~;~' ~~!::~fit o ev, .~ ;~~~. ~~. L- · I 1 ~ -1fJ .... - ~~~Y '~ lJ , ~'. lIMi .(.<'1'. 1t11.~". !~;f~ ~t.-1l! ~~ " h1t -~- ~I I III r :) rJ ~.In t~~l-I/Ilf _f'" fIi~tl/lmJlj ""lII_ J."'" ~ 1$Im1.1liIlP.. n~ =11 I Cli;l . I ~~~ ": jl , .... oIUII;. "- "' ~ l.."d OEEe ~3~~3S~1 dH W~O€;lt E002 12 tn~ I 07-21-03 11 :55 From-CUSHMAN WAKEFIELD 813-221-9166 T-144 P.09/14 F-518 I Boring Locations Plaza Two Clearwater, Florida I lab No. :125961 " : I I I I ~. North. I I I \'I I ., I I ~ I l~ " .' I I I I I Socl O&&E: .l3L~3SU-' dH loli::lle;tT 8002 ta Il'lC" 07:'21-03 11:56 From-CUSHMAN WAKEFIELD 813-221-9166 T-144 P.l0/14 F-518 I I I I I I I I I I I I I I I I I I I ~F~ Al"~~ Oient: Spencer and Jonatti Architects, Inc. Project: Plaza Two Location: Enterpri~ Road &, Countryside Blvd. Clearwater, Flonda' 'lAg of.Borebole: B-1 '. Report No: 125961 Date Drilled: 7-2-99 .! I! f !8 i z Stmldard p~ TBfIt !AI ~ Anlb ~ 1,0 ~ ~ ~c 5p ~ ~o ~ .~ 190 GlaUf\d Surf8ce o :.:.:.:,: Sand . . . .. dIMtl orav, fine m'llned wfttl JUClIbt / medIUm C1.,.8 .. .. - .... SIIIJd 5 ::::: \.t..Il ~ fine 1I1'8ined ::::::::: 8.nd ...... -.' nil". 'fInD aminec:l ~ :::::;::: ..... Sand 10 :':':':': lbawn. finearained Sud "'t brown. fine araIned sand kB.rk reddlah brown fine lIn1lned . . ~.. ~ .. . .' ~::~:: SMd :::.:.::: f1nearelnad .. .. .- 20- ~:.:-: Sand :::: :h: taht brown. fine araInecI ~ ;;(.':':' Sand :;k'( : \ffIuIc bruwn fine tll'8lned I ~- .....L. \:SlU'Id / -.... d' , . ~ lI......tUITI en&e :~.:: rkbrown IN oralned wlthtr. cia v . .:.:~. $MId . :~~: l;trt brt1Nn, ClayeywJth oheIl 3[)- .~-.; ~ Cr.-y . , .......... ..ndY wfth shell ~ :!5-~ ChJy ~ .tDhl gl8)' wItI'lllrnerCOk tragmmta ~~ - medium d..". 7-10-10 20 6-1G-15 25 , ctense 7-14-18 32 \..---- ..........v:::I ~"" !, very dense ~70 very dense ,1..xT-30 57 ::::: ::::. .~-:.:<.. - . . . . . 15- ......... very del\$4l 25-21-35 a'2 . I V V7 . I medium d~ 9-11-10 21 ./ )..." 3-11.1~ ~ t ,'J / ,oft. 3-4--D 4 :i"":' " .. ", ~': : aoft 3--2-2 4 ................ ........ ~ .co-~ Clay l..ttJIII"'" ~ lmM'n "---- :-......... very ~rd 3-4+C5Cl ~ ""'e . End or 80ring 416- - Nota: no loss of c11''CulatlCD Water T4ble: _5.2' Ekvation: Existin: GnJUn~ Drilled by: 15//0 Compiled by: CG Shed l,of Drill Method: Rotary SampJioa Method; SpJitspoon ASTM D-1586 S.d oeeE 13C~3SH' dH ~Hl€:tl e002 lZ Tnt I I I I I I I I I I I I I I I I I I I 07-21-03 11 :56 From-CUSHMAN WAKEFIELD 813-221-9166 T-144 P.11/14 F-518 . ~~ . I&PII Oient: Spencer and J~nnatti Architects~ Inc. ~ ~to : ~FTL Projed: Plaza Two Loeation: Enterprise. Road & Countryside Blvd. Clearwater. Florida. Lox of Borehole: B,,2 ~~TilJ11HQ Date Drill~d: 7-2-99 Report No: 125961' I f, 6Canderd PenetnlUort Test La j} Js 1 bklwaIft AnlIIl~ 1 9 10 :.p ~ 4.CI ~ Ep 7,0 ep sp1qo z D GrOUI'ld SUIfDce : " ".. . . . SImd ...... . 80ft, 7-A-7 is :, .. . . . . ,.-lark ara". fine DIlIined with 1'OC)t5 I d' .... .. I ~ :~:)~: Umerock YCItJ IDoIie 1-1-1 2 ( 5- Iba. rIw'liN1al " .. . . .. . veryloc:leo 1..j}..1 1 ~ .. ..... SIIRd I' :1 ::::: ::.:: \dark Dray. nne Ql'llned J mlldll.lnl den88 4-7-10 17 ~ ., - :;:::::: : s."" . . 10- ~~j~~( \derk brown. fine g,u,ed lnIldiwn d,,"U 7-11-13 24 ~ I, . SDnd. '...or ..... f'1rtIJ oralned , . \r - .. ...... S.nd . 15- .1'..."'.' .. \ ...... fI- \ / ~. 15-23--26 48 -;. ,.. ..It..... t.. brown fiM g~IMd ."....- '. / .. . . . Send ,.. .. 1 , .. .. .. ::::: :::: HarK brawn. ftne GnlIneCI ,/ 20- z:- - . ./ .. .,.... a1lshtly !coR 4-3-4 7 1 i #0 ::::~: S.ml ~..." brown, fine gnMned with ir. clIy , . . .,.".t ':- " -'.;,; 1'1.. , 25- ;r:.' . . % ,[' 1'.. " Sand medi\n dlill'lH &5.0 .1,0 .. . - light gray, cta'81 wiIh rnne~ : . .. ":;/' fragmente / I "...... . ,. . , 3Q-~ : ti 80ft 2.1-1 2 ..... r"'., ~ CIify "- .. ~ Ight green, ..ndywith ehell , r--.... ,,~ ~.~- ! 'Vel)' ~~ +12-50 e:z , ..... ~ I I I '" 40 \L!.~ / very hard 5tW" fOOT ... \Umerodc I Ery:l Gf Bor1ng I I 45- Notes: no loss of CIrculation Water Table: -5.0' borehole was plugged and grouted Elevation: Esistbag Gtouilc " Drilled by: 15/JO Drill Metbod: Rotary Compiled by: CG SllJllplinR Method: SPlitsPOOll ASTM D-1S86 Sheet i of Ol"d oeee .l.3C'~3s':n dt-t W~te;lt &002 12 l~~ CUmt: Spencer and l~nnani Architect~ Inc. Pt'oJect: Plaza Two Loeation: Enterprise.R.oad &:. Countryside Blvd. Clearwater. Florida Log of BoreboJca B-3 Report Nos 125961 Date D.illed: 7-2-99 I I I I I I I I I I I I I I I I I I I 07-21-03 11 :58 From-CUSHMAN WAKEFIELD 813-221-9186 eF;()) ~ ~mm_~ r ! II 48 GRlutd ~ o :.:.:.:.: $and 'I... . / :i;:: :.:: .. fine al'lillned wlllu'Qots ......t. e--J / ....'t.... e.,.1U S ..-, fin.a~ ;(.;'... Blind : ': ':1: \;;; bi'oM1 line anllned wit"'/". root. / ;(.:=:~: $and 10 : .:.:. .' : bnMYl. TIne arelMd wiIh fr. lOliIlf $and :.:.:.:.: brGWn.~ansined Iftedlum.d.... 5-8-12 20 ~ __ 24-32-38 70 medium d~ 12-7-8 15 medlum ClSmI 6-11-13 24 / dlJr188 &-15-23 3e 115 ...,. ... ... -.. ",-. ,.. ., . : :::::;:: VIIJY &,r,&eI. 24-36-41 77 $4IIJf1 IghL brown.lIne gnliJ\ed 20- X::::: .; 0: :.:(. . Sand ~: ~!; ~ bI1Mrl, fir10 gJJdhed wlllHI'. clay :- :- ;;(. : 25.1 ::'~1 30-~ ~ ~ .~ C/lfY ~ 35- ~ 11"*1, ..ndy with rocJaJ <<l- ~ ~r '" m.dlumdCMe 8-7-5 12 wry ~ 3-1-0 1 frrm: 2~:z.3 s otiIf +7-7 ,14 wry hafl;t 17-32-41 73 End of EIorIrg . ~- "NOtes: no loss of cm:ulation Drill Method: Rotary SnmuJiDI!! Method; 5olippoom ASTM D-1586 T-144 P.12/14 F-518 I; ., I, '''', ~ z Se.ndwd P...endim Test LA!: bIow8Ift Anal-{ 9 1.0 2D 3D 4\0 ~ 60 7D ~ ~19D ,'-:" U"...... __ r'. """:--. --p~ ~.-, , \. ..~ '" " ,.....~ (: .~, I ~:"I ""'..../ ~ ~ / .,,j., ;1.1\' . \ ~., ,II'. 1\ I....r--.... /'1 r " "". I' .::' Water Table: -5.7' ., -- Elevatio~: En-tin: C..ou'nd DriDed by: BNIMBM CompUed by: CG " . Sheet 1 of: ." tt.c1 '. ' OEEE i3L~3S~' dH ~~TE:lI e002 lZ I~r I I I I I I I I I I I I I I I I I I' I 07-21-03 11 :57 From-CUSHMAN WAKEFIELD 813-221-9166 T-144 P.13/14 F-518 ~~o · .I..,. ~ ~~I) ~~ Client; Spencer and Jonnatn Architects~ Inc. proJeet: Plaza two Location: Enterprise.Road & Countryside Blvd. Clearwater, Florida Log of Borehole: B-4 Report No: 125961 ' Date Drilled: 7-2-99 i' ~ 8' j~ ~ ~ j! o GJ1:lLn:! S~1ICle ::::: Sand : ::: :: ::: \;;~i.h black. fine arelncd wi1h root. I 5 ~:~:~)I\S8rx1 fioaaralned I .:.:.:.::\ Sand ~ ~ ~ ~ > ~: \d.rk brown. flrm llfIIW,ed medJum dense 5-6-8 14 modIum denM 9-17-12 29 slightly IoC!SB 6-5-4 9 very IoQICt 1 ~1-1 2 J 1a~ .... . . ., .. . . . , - . , .. ..".'.... Ssnd brown, fine _"ad medIUm den_ 4-7.7 14 . '5~ ~ : : : : . . ... wrydens8 18-28-34 62 -..... . ,.. . ,'.,' -.... 20~ r~[W ~::'~ co.~ .....".... ::::::~: : ~-:.~.:.: 25- ......... ;;(. '.' " :;:):;: Sand Z. . :.: . arav. fll18 graNd with tr. clay . 30~ ~. ~ 35-~ Clay ~ ~. undy INith ItlCka .~ .~ 410 ~ Clay I\.lIaht ar_n End of RQring d.nae' 19-22~18-40 mecllum csenM 4-7-e 'Iii 111m '. 3-1-6 6 lIrm 1~'" 8 very MrCl 17w~ 100 / 45- Notes: PO Joss of cuculation Drill Method: Rotary SamDliDlr Method; SDJiUDoon ASTM 0-1586 ~ 'j z S1IInd8rd p......lI'TOIl ' L" bIoWIIft An8I) 0 "Q 2p ~ 4f> ~ ~ 7p eo ao19O r ." .... [) ) ~ l'!'--... "'i'... . "II J '. 7 I I) 1I . . o. f . ' - l .,. ~. , J . 41'- t-. ................ r....... t---. -. Water l'able: -5.9' ' . Elevation: ExistiD& GroUl1( Drilled by: BNIMEM Compiled bye CG Sheet i. or '"'I 21 "d oeee ~3r~3S~' dH W~~E.1t e002 fa lQr " 07-21-03 11 :57 From-CUSHMAN WAKEFIELD 813-221-9166 T-144 P.14/14 F-518 I I I I I I I I I I I I I I I I I I I ~".II · AJlPIlno~ ~ ~O ~!!~ Client; Spencer and.Jonnatti Architects, Inc. PI'Ojed: Plaza Two Location; Eotmprise'Road &. Countryside Blvd. Clearwater, Fb-ida Log of Bore bole: B-S Report No; 125961 Date )).iUed: 1.z...99.... .' . .- i. ~ Ii f. !s ~ "i z 6ba1t1d_ PenelnltK., T_ bl~ C? 1.0 ~ JQ ~ s,o " 7p 80 9,0190 '. Lat ~ G/'DQnlt SUTfIIC:1I o "..,. -.. ,- Sand . . :. : . : ' : - \dark arav _ ~ unlined with rOClla :;(.~:::: \ Sand 5 _ .:#. m- arained . . . . . . _ _ ,. 811f1d ~ ~ ~ ~ ~? fine ~nad "*" tr. ~,..v ."... Stwkl 10- .;.:-:':. "'--fi .__'_J . . . . . . . . . DI'OI/\/n. nv ..raln.-;l :Sand derk brown. fll18 grained J ........, 15 :':';':': . .:-:-:-:- :-:-:<': Sand : ::::: ::: light reddl8h brown, fino 9"*"" VIIry~ 100+ l......, .......i'-. ........ ........ r . ~ r :!1 ',j' ,',,' : ,. '.~J : ,'1. , ~[.I 'F , " '. . .~, "'I' if ~1~~ .,~t ", , " ,\~ , ~t .( :~I'I , .' . I~I: .1:' ':. ,. .I~'; I ;"11' . / medium dens& 7-B.1~ 22 I nllIdlum <<!enM 9-9-10 19 I meclium denSe 5--5-5 1Q 11III')' de.~ 11$-30 !iT I derwe' 13-27-22 4Q II J '-- . -1--__ 7 . verydenlfe 25-33-28 81 J \ /~ /' /V 20- :;..:-:-: '-:.:..' . :- ;. :,;(. : :Z:<.: ~.,. 25- :.:.:?:: Sand )?::: ;:: sreen, ftne grmed WItt! tr. clay . :.:.?,( 30';~ ~ Clay - ~ ....". Andy lI\IIh tr- aMlI ~ 35 ;.._~ ~~ ~ Chty ~ light green. ~ <<l-~ CI.y . ~... PINtOft Sand rbIr1c 18ddi&h bWlNn, tinCt grained with Ir. dav aIlghtIy loose 4-4-6 9 ~ tnsIIum ctenae 4-4-7 11 \ \ , hard 1-6-20 34 hard' 6--11:1-24 39 End of 6Grlrg IJ. '" . 45- Notes: no loss of arculation Water Table: -5.7' ~,,:: Elevation: histing Gro ' tel ",' DriUc:d by: BN/MEM )~~. Compiled by; CG .'<. Sheet 1 :t)f : ~.~~. Drill Method: Rotary Samplia~ Method~ Solit_ooon ASTM I)..1586 Et .~ o~eE ~3~~3S~' dH i~ -, W~2~:tl e002 t2 lryr ". '. '* . JOB NAME: SUBJECT: DATE: BY: Tampa Bay Water Office Development Proposed Conditions Stormwater Calculations 8/29/2003 Revised 11/05/03 JSB POND CALCS FOR "DRY POND" IBASIN: PR-I00 TOTAL AREA (AC): 2.21 POND AREA (AC) = PAVEMENT/BLDG(PH I & II) AREA (AC) = OPEN SPACE - GOOD CONDITION = 0.39 1.52 0.30 100 98 80 CN= CN= CN= WEIGHTED CN = 95.9 TIME OF CONCENTRATION = 10 min - Conservative Assumption WQTV [FIRST 1/2 INCH OF RUNOFF] (AC-FT) = 0.09 IpOND: 100 AREA VOLUME DESC. ELEV. (AC) (AC-FT) BOT 70 0.02 0 71 0.10 0.06 72 0.34 0.28 TOB 73.5 0.39 0.65 DLW= 71.15 DRAWDOWN CALCS FOR "DRY POND" AREA AT POND BOTTOM (EL = 70.0) [SF] = 871.20 * AVERAGE PERMEABILITY RATE OF SOIL AT POND BOTTOM [FT/DAY] = 27.4 [FT/HR] = 1.14 EXIST. VOLUMETRIC PERMEABILITY RATE [CF/HR]= 1.14 FT/HR * 871.2 SF = 994.62 PROPOSED WATER QUALITY TREATMENT VOLUME (SHOWN ABOVE) [CF] = 4011.2 VOLUME BETWEEN WEIR INVERT (EL=71.60) AND POND BOT (EL=70.0) [CF] = 9757.44 FS = FACTOR OF SAFETY = 2 DRAWDOWN RECOVERY TIME [HOURS] = 2 (FS) * (9757.44 CF 1 994.62 CF/HR) = 19.62 * REFER TO GEOTECHNICAL REPORT AS PREPARED BY TIERRA, DATED NOVEMBER 3,2003 NOV 0 6 2003 ~ . Traffic Study for Tampa Bay Water Office Building Pinellas County, Florida Prepared for Tampa Bay Water Prepared by URS Corporation . NOV 0 6 2003 e e I. INTRODUCTION The purpose of this study is to evaluate opening year (2003) traffic conditions for the proposed Tampa Bay Water office building located on Enterprise Road between Main Street and Countryside Blvd in Pinellas County. II. PROJECT TRIP GENERATION Project traffic for the proposed Tampa Bay Water 37,000 square foot office building was developed the Institute of Traffic Engineers (ITE) Trip Generation, 6th Edition, rates and methods. Table I shows daily, and AM and PM peak hour traffic generation. III PROJECT TRIP DISTRIBUTION The site is located in an existing office park that is similar in land use to the proposed project. Because of the similarity between the existing land use and the proposed project, traffic distribution from the project site is based on turning movement counts taken at the site driveway. IV BACKGROUND TRAFFIC Background traffic is the traffic that would travel the roadway regardless of whether the proposed project was built. Background traffic is based on traffic counts taken at the site drive and on Enterprise Road. The traffic counts are shown in Appendix A. V ROADWAY GEOMETRY Enterprise Road is a two-lane undivided facility connecting office and commercial land uses with Main Street on north, and Countryside Boulevard on the south. The driveway serving the proposed project is a two-lane undivided road. VI TRAFFIC OPERATIONS ANALYSIS In order to evaluate the current traffic conditions, capacity and level of service analyses were conducted using the Highway Capacity Manual and the FDOT QualitylLevel of Service Manual. Level of service (LOS) is a quantitative measure describing traffic conditions on a traffic stream. There are six levels of service "A" through "F", with LOS A representing the best operations and LOS F representing the worst conditions. Figure I shows the PM peak hour background and project traffic. The project driveway at Enterprise Road is currently stop sign controlled. With the proposed project traffic and the current level of background traffic, the intersection is expected operate at LOS B. No improvements are required. The Highway Capacity Software (HCS) analyses are shown in Appendix B. 2 e e Entetprise Road was evaluated using Table 4-7 Generalized Peak Hour Directional Volumes for Florida's Urbanized Areas (See Appendix C). Based on the Non-State Roadways-Other Signalized Roadways table, Entetprise Road is expected to operate at LOS B or better with the combined background and project traffic. No improvements are required. 3 e e FIGURES o If: III .=c.i -0 If: c ~ et 0>0 ..><: QJ o .~ III e 000.. L L ::> ::> 00 II ..><: ..><: III III CD QJ -00..0.. c:::2::2 C1)0..0.. Cl ~ C1)xX ..Jx?:5. e e Main St '" I-~ E t ~ LLN" r-- <(~ ..... iO o:::~ ..... ! ~ of N '" ..... CJ) NTS "0 rr= Q) en 'C e- >. Q) en "U ...... :J C CD .- W E en :J U ~ ('0 a. L- E :J 0 u I IE CD ~ ~ .... ('0 :J CD I- .2> a. .... LL~ CD a. ~ C') >. 0 ('0 0 m N L- ('0 ('0 a. !j? E ~ I I I I I I I I I I I I I >. III ;: CD Ul ::> III () c'ijiN Cii .00. ~ .s:; ..... -E' ::>11lr-- ~()g c >.'" oil>'" :.;:::;C(tI 1111::-0 L... ~'C 000 e- () u: 85;ai CJ) 0 0. c:::LOE ::d~ ~ e e TABLES e e TABLE 1: TAMPA BAY WATER ITE TRIP GENERATION AM Peak Hour PM Peak Hour e APPENDIX A e >- ro 3 Q) .::: o C") Q)O)O .~:g ~ 0. 0 -- ....00) lDo.... co03 Woo...... ID CD cI) Euiijo rooOZ ZU~CD IDCDIIlOl ff~(j)~ >- ::: Ul U =r- c1)O c.o<o o 0.C") ~EC') e tll tll oou a. >- 1:: oG).Q Ocu.. U)tro ergo. :JuE ?;~ o 10 co r- >- t\l ~ > 5 "0 C III "0 n: CD Vl '0:: 0. ~(/) ~ lOn:UC o:Jow . ..0.. n ~C> g .. "'C t..: ;: a; CD CD 0 ~_.r::.Q) CC.....Ul :::J ::J tll .... 001D2l UU?;E ~ I a. 15 1-' -0 E Q) C tJ) Q)::J .- L- o,er .01 0(;) co w o.s 0.0 I- o !E (0, L- I 1-1 ~ I -0 Q) .... C "C 0- th a. :J >. -0 O(tlc c93:5 Q).o >.... C ~ 5: o.tii 0.- {? NCON o.tii 0.- ~ -0 C Q) ::J th 0 ;::.0 a...c: L.. ...... I (J) ::J ~c 0 . (/) ~ :::J '- .r; I- 't3 ....J I cI) ~ ' E 0 I I ~ ~ l11J ~~~1Il 0.0.0.0 10010 ....C').;;t ".;,f~.;,f 000 COOr-N I"-\!')(DIO 0000 0000 0000 0000 .;;t....Nto-. C')C')C').... .....000 10 to-. m..... (1').-N(1') 0000 ~~~~1Il 0.0...0.0.0 010010 0....(1').;;t LijLiju;Lij 0000 00 00 v o ~ o 000 00 000 00 000 00 to-. N N en I/) <0 M""': ml/)m C;:;tO'<i O).;;t 000 00 m 0 (1') c:O 10 .... .... N " " vI/) co 000 cia .;;tmm ..... " . ION (1') N N N 000 00 0) <0 m C;:;c:O'<i m.;;t (1')v<o "":0 J9*cf! o.r;- l-eJ9 -00.0 C 0.1- e<( o ~-g Q) :J .... 0 .0 .... o f/) co W It) to v >>"0 a:l C 3: 5 Q).o >.... _ th ..... Q) ~ It) &ri v ~. c I -I ci.ro 0.- {?\ E Ol a: :J .... L: I- ;::: 0> ....J I"- 10 N o 000 o O~o o o~o o co r- .;;t N co o o ~ a. o o Lij ..,. i? ci.tii o.~ I :E OJ a: 2 .c:: I- ;::: 0> ....J ci.<ii 0.- o I- 1: OJ a: ::J .... .c:: I- ;::: Q> ....J citii 0.'0 0 I- ..... N ..... N":..... ..... 0)(1')C") ..... "(1') .....IX) 0) 000 c:i o 0) N C')01O ..... . 10 <0 000 c:i to-.Ov ari (1') co ..... .... 000 0 c:i v (1') ..,.0 (1')0) IX) c:i .- (1') (1') ~ 0.0 o o Lij o 0) CO 10 10 o 10 o ~ Cl....,. o o to o 10 (1') 100> (1')N IX) c:i <0010 10 :::c:iC') C") o ~ ~ ~ 0.000 Cl..o ~ 0 ~ ..~ .;,f o 0 Q> ECQ>'E(I)o...;Q>o I' I E ~""'2 E 0> E '0 E E u , .j:: o~e.:!tll.r;.:!t\l I It ...Q>O(l)Ou-OJOU- L'L 12 g~>o.~~I>~ U) C 00> Q> , - .no. a. m 0 a. 2 '<( "" ro ~ Q) > ~ I M Q) 00 o~oo e.8 ~ Q)ow .....o::c coO) Woo...-- Q)Q)Q) E'Oiijo tlI00Z Z()-eCD ~~2 ~ u.(J)(J)Q.. >- ~ Ul o = I"- CDO c..a<D o a.M :P E (") ~(O(O O()'O e- >- ;:: OCD.Q Ocu. CJ)tai o:::ga. :JoE ~~ o 10 co I'- ~ c 0) ::J ~ ~ >-8 0::::>~:3 . .. :J - o~(J)~ i..:'Oi..:o:: .!S~.. cc"'''' ::J ::J ro Q) ooQ)5 003:0 f~~~~@ ~e~~ E '0 Q)C Q) ::3 .8 oUi 111 W '0 C 4l ::J ~.8 o..c - ~ ai2 ilizt: o. IE ro, '=1 <( ~ C "C n. U) a. ::J e CJ >.'0 roC ;: ::3 4l.8 ~;; ... 4l ~ : :.3 I ~epOOOp FII I i 000.... ..-t-e>t-i NNNMI:! O><'?v N('l')~<ct ~~~11I <(<(<(0 10010 "-<'?v 00;":';":' ;..:. 000 ~~~~ <(0<(0<(<( 010010 O"-<'?V co';;';;';; 0000 N '<1" M o 0 o ~ I!; I ; 1 ! I 1 0> ex) ..- It) <0 t- N t- O .. o o o ci. a. 000 000 00 '0 0 Q) C 4l ::J ... 0 .a 000 oUi 000 aI 00 W 0 ~ 000 0<( 000 '" 0 c:io c:i 0 U; v cO C> CO .. N ..- ..- ex) ..- .,; 0 CO N NM ..- t- M 0 COVt- It)..-N N ,....tri~ cO ..- M(O..- ,... (]) 0) 0) o 0 0 U')~T- ..- ..-~g 0> 000 000 ~O 00 0 10 V cO 0 CO M M M MO N It) N 0 NO CD ... M ... .00 '0'" M N >.C; M ~ ::J 4l.8 >- oqq C ~ 000 0 00 ~ 0 roo a) Nt-N ~N aO~ cO It) t- (D V ,;; 0 It) Ol V ~ ..- (0 ~ c-.i N vu) CO ..- t- O 000 00 Qli~~ ..-:g~ "-v"- Mo, 'to> ..- s~~ O.c - I-OlU '0 a. 1-0 Co. ~<( (!) 000 o vO>t- ..- OM ..-0; ,~ ~ <(~,":V o<(V o a) 10 o V -',;; ,;; 00 0 Q) CCD-CO..... "0)"- ~ .QE~E-fl:EE-fl ..1) ..2 f:! ~ to.J:: .2 CO Q)OQlOU.OlOU. Ef?>n.>~J:>~ e~ ~ gJ ~ ,,- ,;;n. n. o 0 .. 41 e o t- M e e Weather: Good Counted By: JAMAR Location: Enterprise Rd N of Countryside BI Start PEAK Time Southbound Northbound Total Hourly Daily HOUR 8/19/2003 2 1 3 12:15 AM 0 0 0 12:30 AM 0 0 0 12:45 AM 1 2 3 6 1 :00 AM 1 0 1 1:15 AM 0 0 0 1 :30 AM 0 4 4 1 :45 AM 2 0 2 7 2:00 AM 0 0 0 2:15 AM 0 0 0 2:30 AM 0 0 0 2:45 AM 0 0 0 0 3:00 AM 1 2 3 3:15 AM 2 0 2 3:30 AM 0 0 0 3:45 AM 1 3 4 9 4:00 AM 1 0 1 4:15 AM 2 1 3 4:30 AM 1 2 3 4:45 AM 0 2 2 9 5:00 AM 0 4 4 5:15 AM 7 2 9 5:30 AM 7 12 19 5:45 AM 9 10 19 51 6:00 AM 6 7 13 6:15 AM 9 7 16 6:30 AM 16 10 26 6:45AM 13 18 31 86 6-7AM 86 7:00 AM 13 17 30 103 7:15 AM 27 9 36 123 7:30 AM 14 20 34 131 7:45 AM 30 12 42 142 7 - 8 AM 142 8:00 AM 26 17 43 155 8:15 AM 24 19 43 162 8:30 AM 21 22 43 171 8:45 AM 26 26 52 181 8-9AM 181 9:00 AM 23 23 46 184 9:15AM 20 28 48 189 9:30 AM 24 24 48 194 9:45 AM 19 27 46 188 9 - 10 AM 188 10:00 AM 22 29 51 10:15 AM 26 31 57 10:30 AM 28 34 62 10:45 AM 37 35 72 242 11:00AM 35 24 59 11:15AM 31 37 68 11:30AM 32 33 65 11 :45 AM 25 22 47 239 e e 12:00 PM 25 22 47 12:15 PM 23 38 61 12:30 PM 18 23 41 12:45 PM 35 36 71 220 1 :00 PM 32 26 58 1 :15 PM 31 25 56 1 :30 PM 31 27 58 1 :45 PM 30 30 60 232 2:00 PM 26 31 57 2:15 PM 32 30 62 2:30 PM 25 28 53 2:45 PM 28 21 49 221 3:00 PM 31 34 65 3:15 PM 19 27 46 3:30 PM 31 26 57 3:45 PM 38 26 64 232 3 - 4 PM 232 4:00 PM 40 32 72 239 4:15 PM 20 29 49 242 4:30 PM 32 32 64 249 4:45 PM 30 15 45 230 4 - 5 PM 230 5:00 PM 20 28 48 206 5:15 PM 16 18 34 191 5:30 PM 14 20 34 161 5:45 PM 11 33 44 160 5 - 6 PM 160 6:00 PM 18 36 54 166 6:15 PM 17 25 42 174 6:30 PM 16 17 33 173 6:45 PM 15 24 39 168 6-7PM 168 7:00 PM 19 19 38 7:15 PM 17 18 35 7:30 PM 6 15 21 7:45 PM 10 8 18 112 8:00 PM 4 4 8 8:15 PM 3 12 15 8:30 PM 4 3 7 8:45 PM 2 6 8 38 9:00 PM 4 6 10 9:15 PM 4 4 8 9:30 PM 1 4 5 9:45 PM 1 5 6 29 10:00 PM 1 4 5 10:15 PM 6 3 9 10:30 PM 1 1 2 10:45 PM 0 1 1 17 11:00 PM 0 1 1 11:15 PM 2 5 7 11 :30 PM 1 2 3 11:45 PM 0 0 0 11 2830 1374 1456 e e Weather: Good Counted By: JAMAR Location: Enterprise Rd N of Countryside BI Start Time Southbound Northbound Total Hourly Daily 8/20/2003 0 0 0 12:15 AM 1 3 4 12:30 AM 0 0 0 12:45 AM 3 3 6 10 1 :00 AM 1 1 2 1:15AM 1 0 1 1 :30 AM 0 0 0 1 :45 AM 0 0 0 3 2:00 AM 0 2 2 2:15 AM 0 1 1 2:30 AM 0 0 0 2:45 AM 1 0 1 4 3:00 AM 0 0 0 3:15 AM 3 1 4 3:30 AM 1 2 3 3:45 AM 1 0 1 8 4:00 AM 0 3 3 4:15 AM 0 1 1 4:30 AM 1 5 6 4:45 AM 1 2 3 13 5:00 AM 1 4 5 5:15 AM 7 7 14 5:30 AM 9 9 18 5:45 AM 10 7 17 54 6:00 AM 10 11 21 6:15 AM 14 8 22 6:30 AM 13 7 20 6:45 AM 23 13 36 99 6-7AM 99 7:00 AM 13 15 28 106 7:15 AM 29 9 38 122 7:30 AM 17 14 31 133 7:45 AM 31 12 43 140 7-8AM 140 8:00 AM 13 18 31 143 8:15AM 24 17 41 146 8:30 AM 26 19 45 160 8:45 AM 25 29 54 171 8-9AM 171 9:00 AM 19 18 37 177 9:15 AM 19 26 45 181 9:30 AM 26 30 56 192 9:45 AM 33 30 63 201 9 - 10 AM 201 10:00 AM 37 26 63 10:15 AM 35 22 57 10:30 AM 29 33 62 10:45 AM 32 24 56 238 11 :00 AM 37 37 74 11:15AM 25 26 51 11:30 AM 26 30 56 11 :45 AM 35 26 61 242 e e 12:00 PM 28 34 62 12:15 PM 27 25 52 12:30 PM 25 36 61 12:45 PM 28 40 68 243 1 :00 PM 30 29 59 1 :15 PM 28 19 47 1 :30 PM 32 34 66 1 :45 PM 31 25 56 228 2:00 PM 27 26 53 2:15 PM 40 39 79 2:30 PM 35 25 60 2:45 PM 39 23 62 254 3:00 PM 28 32 60 3:15 PM 29 24 53 3:30 PM 42 25 67 3:45 PM 33 25 58 238 3 - 4 PM 238 4:00 PM 33 29 62 240 4:15 PM 22 20 42 229 4:30 PM 22 28 50 212 4:45 PM 18 21 39 193 4 - 5 PM 193 5:00 PM 24 23 47 178 5:15 PM 16 21 37 173 5:30 PM 22 15 37 160 5:45 PM 12 22 34 155 5 - 6 PM 155 6:00 PM 15 22 37 145 6:15 PM 12 23 35 143 6:30 PM 20 25 45 151 6:45 PM 8 19 27 144 6 - 7 PM 144 7:00 PM 9 13 22 7:15 PM 11 18 29 7:30 PM 11 13 24 7:45 PM 6 6 12 87 8:00 PM 5 15 20 8:15 PM 3 10 13 8:30 PM 2 11 13 8:45 PM 2 7 9 55 9:00 PM 1 2 3 9:15 PM 1 8 9 9:30 PM 2 3 5 9:45 PM 0 3 3 20 10:00 PM 2 3 5 10:15 PM 3 0 3 10:30 PM 1 2 3 10:45 PM 1 7 8 19 11 :00 PM 0 1 1 11:15 PM 3 6 9 11 :30 PM 1 2 3 11:45 PM 1 0 1 14 2833 1423 1410 e e Weather: Good Counted By: JAMAR Location: Enterprise Rd N of Countryside BI Start Time Southbound Northbound Total Hourly Daily 8/21/2003 0 1 3 12:15 AM 1 2 2 12:30 AM 1 1 6 12:45 AM 3 3 0 11 1 :00 AM 0 0 0 1:15 AM 0 0 1 1 :30 AM 0 1 0 1 :45 AM 0 0 0 1 2:00 AM 0 0 2 2:15 AM 0 2 0 2:30 AM 0 0 1 2:45 AM 0 1 2 5 3:00 AM 0 2 2 3:15 AM 2 0 1 3:30 AM 1 0 4 3:45 AM 1 3 2 9 4:00 AM 2 0 1 4:15 AM 1 0 3 4:30 AM 0 3 2 4:45 AM 0 2 7 13 5:00 AM 4 3 9 5:15 AM 2 7 16 5:30 AM 5 11 24 5:45 AM 15 9 16 65 6:00 AM 9 7 12 6:15 AM 8 4 22 6:30 AM 15 7 31 6:45 AM 12 19 28 93 6-7AM 93 7:00 AM 16 12 39 120 7:15AM 23 16 45 143 7:30 AM 24 21 38 150 7:45 AM 22 16 44 166 7-8AM 166 8:00 AM 22 22 41 168 8:15 AM 18 23 48 171 8:30 AM 21 27 46 179 8:45 AM 21 25 56 191 8 - 9 AM 191 9:00 AM 36 20 45 195 9:15 AM 25 20 47 194 9:30 AM 27 20 45 193 9:45 AM 21 24 70 207 9 - 10 AM 207 10:00 AM 29 41 53 10:15AM 27 26 47 10:30 AM 24 23 70 10:45 AM 36 34 61 231 11 :00 AM 28 33 68 11: 15 AM 32 36 74 11 :30 AM 38 36 66 11:45 AM 29 37 50 258 e e 12:00 PM 25 25 57 12:15 PM 25 32 70 12:30 PM 26 44 67 12:45 PM 37 30 59 253 1 :00 PM 28 31 43 1 :15 PM 22 21 52 1:30 PM 27 25 58 1 :45 PM 35 23 50 203 2:00 PM 27 23 54 2: 15 PM 24 30 62 2:30 PM 33 29 81 2:45 PM 37 44 63 260 3:00 PM 42 21 49 3:15 PM 25 24 43 3:30 PM 23 20 43 3:45 PM 21 22 56 191 3 - 4 PM 191 4:00 PM 30 26 49 191 4:15 PM 26 23 47 195 4:30 PM 27 20 47 199 4:45 PM 19 28 30 173 4-5PM 173 5:00 PM 13 17 32 156 5:15 PM 14 18 38 147 5:30 PM 20 18 49 149 5:45 PM 25 24 48 167 5 - 6 PM 167 6:00 PM 18 30 27 162 6: 15 PM 12 15 25 149 6:30 PM 8 17 33 133 6:45 PM 17 16 28 113 6 - 7 PM 113 7:00 PM 11 17 31 7:15 PM 13 18 25 7:30 PM 12 13 15 7:45 PM 4 11 15 86 8:00 PM 10 5 9 8:15 PM 2 7 10 8:30 PM 5 5 13 8:45 PM 4 9 11 43 9:00 PM 4 7 8 9:15 PM 4 4 9 9:30 PM 2 7 8 9:45 PM 3 5 4 29 10:00 PM 2 2 5 10:15 PM 3 2 2 10:30 PM 0 2 0 10:45 PM 0 0 8 15 11:00 PM 1 7 2 11:15 PM 1 1 1 11:30 PM 0 1 4 11:45 PM 0 4 2791 2798 5581 1368 1423 e tit Weather: Good Counted By: JAMAR Location: Enterprise Rd S of Main St Start PEAK Time Northbound Southbound Total Hourly Daily HOUR 8/19/2003 7 1 8 12:15 AM 2 0 2 12;30 AM 3 0 3 12:45 AM 1 2 3 16 1 :00 AM 1 0 1 1:15 AM 0 0 0 1 :30 AM 2 1 3 1 :45 AM 0 1 1 5 2:00 AM 0 0 0 2: 15 AM 0 0 0 2:30 AM 0 2 2 2:45 AM 0 0 0 2 3:00 AM 0 0 0 3;15 AM 0 0 0 3;30 AM 0 0 0 3;45 AM 0 0 0 0 4:00 AM 0 2 2 4:15 AM 0 2 2 4:30 AM 1 1 2 4;45 AM 1 1 2 8 5:00 AM 1 2 3 5:15 AM 0 4 4 5:30 AM 1 1 2 5:45 AM 1 2 3 12 6:00 AM 1 9 10 6:15 AM 5 8 13 6:30 AM 4 17 21 6:45 AM 4 9 13 57 6-7AM 57 7:00 AM 6 10 16 63 7:15 AM 4 21 25 75 7;30 AM 14 25 39 93 7:45 AM 14 19 33 113 7-8AM 113 8:00 AM 7 28 35 132 8:15 AM 10 19 29 136 8;30 AM 12 28 40 137 8;45 AM 14 26 40 144 8-9AM 144 9:00 AM 13 17 30 139 9;15 AM 12 12 24 134 9:30 AM 10 15 25 119 9:45 AM 13 15 28 107 9 - 10 AM 107 10:00 AM 12 18 30 10;15 AM 15 13 28 10:30 AM 16 16 32 10:45 AM 18 17 35 125 11:00AM 20 19 39 11:15AM 20 22 42 11 :30 AM 32 30 62 11 :45 AM 29 26 55 198 e e 12:00 PM 33 29 62 12:15 PM 30 18 48 12:30 PM 25 19 44 12:45 PM 24 26 50 204 1 :00 PM 27 21 48 1 :15 PM 19 23 42 1 :30 PM 21 26 47 1 :45 PM 17 24 41 178 2:00 PM 21 25 46 2:15 PM 30 14 44 2:30 PM 22 15 37 2:45 PM 17 21 38 165 3:00 PM 22 18 40 3: 15 PM 18 20 38 3:30 PM 20 15 35 3:45 PM 27 10 37 150 3-4PM 150 4:00 PM 21 19 40 150 4:15 PM 20 23 43 155 4:30 PM 22 15 37 157 4:45 PM 36 19 55 175 4-5PM 175 5:00 PM 30 15 45 180 5:15 PM 35 17 52 189 5:30 PM 22 19 41 193 5:45 PM 17 14 31 169 5-6 PM 169 6:00 PM 18 14 32 156 6:15 PM 19 11 30 134 6:30 PM 15 6 21 114 6:45 PM 25 5 30 113 6-7 PM 113 7:00 PM 17 13 30 7:15 PM 20 10 30 7:30 PM 14 6 20 7:45 PM 17 9 26 106 8:00 PM 13 8 21 8:15 PM 5 5 10 8:30 PM 13 5 18 8:45 PM 10 2 12 61 9:00 PM 13 4 17 9:15 PM 3 0 3 9:30 PM 3 3 6 9:45 PM 10 3 13 39 10:00 PM 6 3 9 10:15 PM 1 0 1 10:30 PM 5 1 6 10:45 PM 5 1 6 22 11:00 PM 3 4 7 11:15 PM 2 2 4 11:30 PM 1 0 1 11:45 PM 0 0 0 12 2181 1140 1041 e e Weather: Good Counted By: JAMAR Location: Enterprise Rd S of Main St Start Time Northbound Southbound Total Hourly Daily 8/20/2003 5 2 7 12:15 AM 2 1 3 12:30 AM 1 0 1 12:45 AM 0 0 0 11 1 :00 AM 1 0 1 1 :15 AM 2 1 3 1 :30 AM 1 3 4 1:45 AM 4 1 5 13 2:00 AM 0 0 0 2:15 AM 0 1 1 2:30 AM 0 0 0 2:45 AM 0 0 0 1 3:00 AM 3 0 3 3:15AM 0 0 0 3:30 AM 0 1 1 3:45 AM 0 0 0 4 4:00 AM 0 1 1 4:15 AM 0 2 2 4:30 AM 0 1 1 4:45 AM 2 0 2 6 5:00 AM 1 1 2 5:15 AM 0 2 2 5:30 AM 2 5 7 5:45 AM 1 4 5 16 6:00 AM 3 7 10 6:15 AM 3 11 14 6:30 AM 8 14 22 6:45 AM 6 13 19 65 6-7AM 65 7:00 AM 5 18 23 78 7:15 AM 9 21 30 94 7:30 AM 6 28 34 106 7:45 AM 6 23 29 116 7-8AM 116 8:00 AM 5 19 24 117 8:15 AM 6 30 36 123 8:30 AM 6 24 30 119 8:45AM 11 20 31 121 8-9AM 121 9:00 AM 9 26 35 132 9:15 AM 13 15 28 124 9:30 AM 17 19 36 130 9:45 AM 13 19 32 131 9 - 10 AM 131 10:00 AM 20 19 39 10:15 AM 16 26 42 10:30 AM 34 25 59 10:45 AM 20 23 43 183 11 :00 AM 16 19 35 11:15 AM 28 25 53 11:30 AM 25 18 43 11 :45 AM 34 29 63 194 e e 12:00 PM 30 21 51 12:15 PM 23 15 38 12:30 PM 17 31 48 12:45 PM 22 17 39 176 1 :00 PM 22 21 43 1 : 15 PM 21 23 44 1 :30 PM 27 18 45 1 :45 PM 26 23 49 181 2:00 PM 10 18 28 2:15 PM 25 14 39 2:30 PM 24 20 44 2:45 PM 12 22 34 145 3:00 PM 38 31 69 3:15 PM 20 17 37 3:30 PM 25 27 52 3:45 PM 27 24 51 209 3 - 4 PM 209 4:00 PM 23 16 39 179 4:15 PM 25 26 51 193 4:30 PM 23 23 46 187 4:45 PM 41 31 72 208 4 - 5 PM 208 5:00 PM 26 15 41 210 5:15 PM 27 20 47 206 5:30 PM 30 14 44 204 5:45 PM 24 21 45 177 5 - 6 PM 177 6:00 PM 27 14 41 177 6:15 PM 13 18 31 161 6:30 PM 17 9 26 143 6:45 PM 20 15 35 133 6 - 7 PM 133 7:00 PM 14 3 17 7:15 PM 26 10 36 7:30 PM 19 12 31 7:45 PM 12 9 21 105 8:00 PM 20 10 30 8:15 PM 10 3 13 8:30 PM 7 3 10 8:45 PM 10 3 13 66 9:00 PM 16 1 17 9:15 PM 13 1 14 9:30 PM 6 1 7 9:45 PM 4 0 4 42 10:00 PM 8 0 8 10:15 PM 4 2 6 10:30 PM 3 0 3 10:45 PM 4 2 6 23 11:00 PM 0 3 3 11 : 15 PM 2 0 2 11:30 PM 4 2 6 11:45 PM 4 3 7 18 2344 1195 1149 e e Weather: Good Counted By: JAMAR Location: Enterprise Rd S of Main St Start Time Northbound Southbound Total Hourly Daily 8/21/2003 5 2 7 12:15 AM 5 2 1 12:30 AM 0 1 1 12:45 AM 1 0 2 11 1 :00 AM 1 1 3 1:15AM 2 1 3 1 :30 AM 0 3 3 1 :45 AM 3 0 0 9 2:00 AM 0 0 1 2:15 AM 1 0 0 2:30 AM 0 0 0 2:45 AM 0 0 2 3 3:00 AM 2 0 3 3:15 AM 3 0 0 3:30 AM 0 0 0 3:45 AM 0 0 2 5 4:00 AM 0 2 1 4:15 AM 0 1 1 4:30 AM 0 1 1 4:45 AM 1 0 2 5 5:00 AM 0 2 3 5:15 AM 1 2 1 5:30 AM 0 1 6 5:45 AM 0 6 5 15 6:00 AM 1 4 15 6:15 AM 9 6 22 6:30 AM 8 14 15 6:45 AM 1 14 13 65 6-7AM 65 7:00 AM 4 9 27 77 7:15 AM 9 18 27 82 7:30 AM 4 23 23 90 7:45 AM 5 18 38 115 7-8AM 115 8:00 AM 12 26 24 112 8:15 AM 12 12 39 124 8:30 AM 8 31 45 146 8:45 AM 23 22 21 129 8-9AM 129 9:00 AM 10 11 45 150 9:15 AM 24 21 44 155 9:30 AM 20 24 39 149 9:45 AM 19 20 41 169 9 - 10 AM 169 10:00 AM 22 19 22 10:15 AM 9 13 37 10:30 AM 16 21 49 10:45 AM 28 21 26 134 11:00 AM 9 17 45 11:15 AM 26 19 51 11 :30 AM 29 22 46 11:45 AM 27 19 53 195 e e 12:00 PM 27 26 52 12:15 PM 30 22 66 12:30 PM 33 33 51 12:45 PM 29 22 41 210 1 :00 PM 15 26 46 1:15 PM 28 18 36 1 :30 PM 20 16 39 1 :45 PM 25 14 38 159 2:00 PM 22 16 31 2:15 PM 19 12 29 2:30 PM 11 18 40 2:45 PM 14 26 46 146 3:00 PM 29 17 52 3:15 PM 28 24 44 3:30 PM 18 26 47 3:45 PM 28 19 42 185 3 - 4 PM 185 4:00 PM 25 17 28 161 4:15 PM 15 13 40 157 4:30 PM 27 13 41 151 4:45 PM 26 15 47 156 4 - 5 PM 156 5:00 PM 34 13 46 174 5:15 PM 25 21 45 179 5:30 PM 29 16 36 174 5:45 PM 20 16 21 148 5 - 6 PM 148 6:00 PM 16 5 19 121 6:15 PM 12 7 48 124 6:30 PM 28 20 34 122 6:45 PM 19 15 15 116 6 - 7 PM 116 7:00 PM 9 6 20 7:15 PM 15 5 24 7:30 PM 12 12 25 7:45 PM 22 3 12 81 8:00 PM 7 5 20 8:15 PM 14 6 14 8:30 PM 11 3 13 8:45 PM 9 4 10 57 9:00 PM 8 2 4 9:15 PM 2 2 9 9:30 PM 5 4 16 9:45 PM 12 4 8 37 10:00 PM 4 4 12 10:15 PM 9 3 5 10:30 PM 4 1 8 10:45 PM 4 4 5 30 11:00 PM 2 3 1 11:15 PM 1 0 1 11:30 PM 1 0 5 11:45 PM 3 2 2194 2201 4381 1166 1028 e APPENDIX B e e DrivewayAM.txt Hcs2000: unsignalized Intersections Release 4.1c "TWO-WAY STOP CONTROL SUMMARY Analyst: Agency /co. : Date Performed: -Analysis Time period: Intersection: Jurisdiction: Units: U. s. Customary Analysis Year: 2003 project 10: Tampa Bay Water East/west Street: project Driveway North/south Street: Enterprise Road Intersection Orientation: NS URS Corporation 09/18/2003 AM Peak Hour Driveway Study period (hrs): 0.25 vehicle volumes and Adjustments Approach Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Major Street: volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy vehicles Median Type undivided RT channelized? Lanes configuration Upstream signal? Minor Street: Approach Movement 57 0.92 61 1 0 TR No westbound 7 8 9 L T R 8 0 5 0.92 1.00 0.92 8 0 5 2 0 2 0 No volume peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy vehicles Percent Grade (%) Median Storage Flared Approach: Exists? Storage RT channelized? Lanes Configuration 010 LTR 30 0.92 32 59 114 0.92 0.92 64 123 2 0 1 LT No Eastbound 10 11 12 L T R o Approach Movement Lane Config v (vph) C(m) (vph) v/c 95% queue length Control Delay LOS Approach Delay Approach LOS Delay, Queue NB SB 1 4 LT Length, and Level westbound 178 I LTR of Se rvi ce Eastbound 9 10 11 12 64 1501 0.04 0.13 7.5 A 13 738 0.02 0.05 10.0- A 10.0- A HCS2000: Unsignalized Intersections Release 4.1c phone: E-Mail: Analyst: Agency/co. : Date performed: Fax: TWO-WAY STOP CONTROL(TWSC) ANALYSIS URS Corporation 09/18/2003 page 1 e . Analysis Time period: AM peak Hour Intersection: Driveway Jurisdiction: units: u. s. Customary Analysis Year: 2003 project 10: Tampa Bay Water East/west Street: project Driveway North/South Street: Enterprise Road -Intersection orientation: NS DrivewayAM.txt Study period (hrs): 0.25 vehicle volumes and Adjustments 1 2 3 4 5 L T R L T 6 R Major Street Movements volume 57 30 59 114 Peak-Hour Factor, PHF 0.92 0.92 0.92 0.92 peak-IS Minute volume 15 8 16 31 Hourly Flow Rate, HFR 61 32 64 123 Percent Heavy vehicles 2 Median T1pe undivided RT Channe ized? Lanes 1 0 0 1 Configuration TR LT upstream signal? No No Minor Street Movements 7 8 9 10 11 12 L T R L T R volume 8 0 5 peak Hour Factor, PHF 0.92 1.00 0.92 peak-IS Minute volume 2 0 1 Hourly Flow Rate, HFR 8 0 5 Percent Heavy vehicles 2 0 2 percent Grade (%) 0 0 Median Storage Flared Approach: Exists? No RT channelized? Storage Lanes 0 1 0 Configuration LTR pedestrian volumes and Adjustments 13 14 15 16 Movements Flow (ped/hr) Lane width (ft) walking Speed (ft/sec) Percent Blockage o 12.0 4.0 o o 12.0 4.0 o o 12.0 4.0 o o 12.0 4.0 o prog. Flow vph Upstream signal Data Sat Arrival Green Flow Type Time vph sec Distance to Signal feet cycle prog. Length Speed sec mph S2 Left-Turn Through s5 Left-Turn Through worksheet 3-Data for computing Effect of Delay to Major Street vehicles Movement 2 Movement 5 shared ln volume, major th vehicles: Shared ln volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: 123 o 1700 1700 1 worksheet 4-Critical Gap and Follow-up Time Calculation cri ti cal Gap calculation Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(c,base) 4.1 7.1 6.5 6.2 t(c,hv) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 P (hv) 2 2 0 2 page 2 . '-.