Loading...
FLD2003-09047 -...... ., :e , Clearwater ~~j~~~:::::::; ",_~'~~r'^-,_",,, Planning Department 100 South Myrtle Avenue Clearwater, Florida 33756 Telephone: 727-562-4567 Fax: 727-562-4865 CASE #: ~t>'2-DDr- o1704-7 DATE RECEIVED: 9 ~ +} '0 ~ RECEIVED BY (staff initi Is): W 50 N ATLAS PAGE#: 2l.a2.: ~ ZONING DISTRICT: \ ~ 'T LAND USE CLASSIFICATION: \ 1- SURROUNDING USES OF ADJACENT PROPERTIES: NORTH: SOUTH: WEST: EAST: ~ SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION .6 SUBMIT 12 COPIES OF THE ORIGINAL APPLICATION including 1) collated, 2) stapled and 3) folded sets of site plans , SUBMIT APPLICATION FEE $ \2.-05. a-o * NOTE: 13 TOTAL SETS OF INFORMATION REQUIRED (APPLICATIONS PLUS SITE PLANS SETS) FLEXIBLE DEVELOPMENT APPLICATION Comprehensive Infill Redevelopment Project (Revised 11/05/02) ~PLEASE TYPE OR PRINT ~ use additional sheets as necessary A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Section 4-202.A) APPLICANT r'>JAME: BelCal Properties, LLC MAILING ADDRESS: 2040 N.E. Coachman Road, Clearwater, Florida 33765 E-MAIL ADDRESS: msketampabay.rr.com PHONE NUMBER: 727-441-1951 CELL NUMBER: 727-458-6907 FAX NUMBER: 727-449-1724 PROPERTY OWNER(S): BelCal Properties, LLC (Must include ALL owners) AGENT NAME(S): Gerald A. Fiqurski, Esquire MAILING ADDRESS: 2435 u. S. Hi q h w a y 1 9, Sui t e 350, H 01 i d a y, F lor i d a 34691 E-MAIL ADDRESS: fig(c1fhlaw.net PHONE NUMBER: 727-942-0733 CELL NUMBER: FAX NUMBER: 727-944-3711 B. PROPOSED DEVELOPMENT INFORMATION: STREET ADDRESS of subject site: 1750 Nor t h Bel cher Road LEGAL DESCRIPTION: See enclosed boundary survey (if not listed here, please note the location of this document in the submittal) 01/29/15/J6488/000/0120 PARCEL NUMBER: 3.288 acres or 143,210 SF (acres, square feet) PROPOSED USE AND SIZE: Redevelopment of property to three uses: (number of dwelling units, hotel rooms or square footage of nonresidential use) distribution facility, office and credit union. PARCEL SIZE: DESCRIPTION OF REQUEST(S): SEE ATTACHED EXHIBIT (include ali requested code deviations; e,g. reduction in required number of parking spaces, specific use, etc.) Page 1 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City Off)afttt G f N A L -- . Dofs THIS APPLICATION INVOLVE THE TRANSFER OF DEVELOPMENT RIGHTS (TDR), A PREVIOUSLY APPROVED PLANNED UNIT DEVELOPMENT, OR A PREVIOUSLY APPROVED (CERTIFIED) SITE PLAN? YES _ NO _ (if yes, attach a copy of the applicable documents) C. PROOF OF OWNERSHIP: (Section 4-202.A) o SUBMIT A COPY OF THE TITLE INSURANCE POLICY, DEED TO THE PROPERTY OR SIGN AFFIDAVIT ATTESTING OWNERSHIP (see page 6) D. WRITTEN SUBMITTAL REQUIREMENTS: (Section 3-913.A) SEE ATTACHED EXHIBIT o Provide complete responses to the six (6) GENERAL APPLICABILITY CRITERIA - Explain how each criteria is achieved, in detail: 1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is located. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. 4. The proposed development is designed to minimize traffic congestion. 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. o Provide complete responses to the ten (10) COMPREHENSIVE IN FILL REDEVELOPMENT PROJECT CRITERIA (as applicable) _ Explain how each criteria is achieved in detail: 1. The development or redeveiopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards. Page 2 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater -, - . 2. The development of the parcel proposed for development as a comprehensive infill redevelopment project or residential infill project will not reduce the fair market value of abutting properties. (Include the existing value of the site and the proposed value of the site with the improvements.) 3. The uses within the comprehensive infill redevelopment project are otherwise permitted in the City of Clearwater. 4. The uses or mix of use within the comprehensive infill redevelopment project are compatible with adjacent land uses. 5. Suitable sites for development or redevelopment of the uses or mix of uses within the comprehensive infill redevelopment project are not otherwise available in the City of Clearwater. 6. The development of the parcel proposed for development as a comprehensive infill redevelopment project will upgrade the immediate vicinity of the parcel proposed for development. 7. The design of the proposed comprehensive infill redevelopment project creates a form and function that enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. 8. Flexibility in regard to lot width, required setbacks, height and off-street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. 9. Adequate off-street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on-street parking in the immediate vicinity of parcel proposed for development. 10. The design of all buildings complies with the Tourist District or Downtown District design guidelines in Division 5 of Article 3 (as applicable). Use separate sheets as necessary. Page 3 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater E. SUPPLEMENTAL SUBMITTAL REQUIREMENTS: (Code Section 4-202.A) ~ SIGNED AND SEALED SURVEY (including legal description of property) - One original and 12 copies; e TREE SURVEY (including existing trees on site and within 25' of the adjacent site, by species, size (DBH 4" or greater), and location, including drip lines and indicating trees to be removed); 0[ LOCATION MAP OF THE PROPERTY; o PARKING DEMAND STUDY in conjunction with a request to make deviations to the parking standards (ie. Reduce number of spaces). Prior to the submittal of this application, the methodology of such study shall be approved by the Community Development Coordinator and shall be in accordance with accepted traffic engineering principles. The findings of the study will be used in determining whether or not deviations to the parking standards are approved; [2( GRADING PLAN, as applicable; o PRELIMINARY PLAT, as required (Note: Building permits will not be issued until evidence of recording a final plat is provided); o COPY OF RECORDED PLAT, as applicable; F. SITE PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A) Q[ SITE PLAN with the following information (not to exceed 24" x 36"): All dimensions; North arrow; Engineering bar scale (minimum scale one inch equals 50 feet), and date prepared; Location map; Index sheet referencing individual sheets included in package; Footprint and size of all EXISTING buildings and structures; Footprint and size of all PROPOSED buildings and structures; All required setbacks; All existing and proposed points of access; All required sight triangles; Identification of environmentally unique areas, such as watercourses, wetlands, tree masses, and specimen trees, including description and location of understory, ground cover vegetation and wildlife habitats, etc; Location of all public and private easements; Location of all street rights-of-way within and adjacent to the site; Location of existing public and private utilities, including fire hydrants, storm and sanitary sewer lines, manholes and lift stations, gas and water lines; All parking spaces, driveways, loading areas and vehicular use areas, including handicapped spaces; Depiction by shading or crosshatching of all required parking lot interior landscaped areas; Location of all solid waste containers, recycling or trash handling areas and outside mechanical equipment and all required screening {per Section 3-201(D)(i) and Index #701}; Location of all landscape material; Location of all jurisdictional lines adjacent to wetlands; Location of all onsite and offsite storm-water management facilities; Location of all outdoor lighting fixtures; and Location of all existing and proposed sidewalks ~ SITE DATA TABLE for existing, required, and proposed development, in written/tabular form: Land area in square feet and acres; Number of EXISTING dwelling units; Number of PROPOSED dwelling units; Gross floor area devoted to each use; Parking spaces: total number, presented in tabular form with the number of required spaces; Total paved area, including all paved parking spaces and driveways, expressed in square feet and percentage of the paved vehicular area; Size and species of all landscape material; Official records book and page numbers of all existing utility easement; Building and structure heights; Impermeable surface ratio (I.S.R.); and Floor area ratio (F.A.R.) for all nonresidential uses I:iI:: REDUCED SITE PLAN to scale (8 Y, X 11) and color rendering if possible I:iI:: FOR DEVELOPMENTS OVER ONE ACRE, provide the following additional information on site plan: One-foot contours or spot elevations on site; Offsite elevations if required to evaluate the proposed stormwater management for the parcel; All open space areas; Location of all earth or water retaining walls and earth berms; Lot lines and building lines (dimensioned); Streets and drives (dimensioned); Building and structural setbacks (dimensioned); Structural overhangs; Tree Inventory; prepared by a "certified arborist", of all trees 8" DBH or greater, reflecting size, canopy (drip lines) and condition of such trees Page 4 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . e G. LANDSCAPING PLAN SUBMITTAL REQUIREMENTS: (Section 4-1102.A) ell LANDSCAPE PLAN: All existing and proposed structures; Names of abutting streets; Drainage and retention areas including swales, side slopes and bottom elevations; Delineation and dimensions of all required perimeter landscape buffers; Sight visibility triangles; Delineation and dimensions of all parking areas including landscaping islands and curbing; Proposed and required parking spaces; Existing trees on-site and immediately adjacent to the site, by species, size and locations, including dripline (as indicated on required tree survey); Location, size, description, specifications and quantities of all existing and proposed landscape materials, including botanical and common names; Typical planting details for trees, palms, shrubs and ground cover plants including instructions, soil mixes, backfilling, mulching and protective measures; Interior landscaping areas hatched and/or shaded and labeled and interior landscape coverage, expressing in both square feet and percentage covered; Conditions of a previous development approval (e.g. conditions imposed by the Community Development Board); Irrigation notes i/9 REDUCED LANDSCAPE PLAN to scale (8 Y:z X 11) (color rendering if possible) o IRRIGATION PLAN (required for Level Two and Three applications) o COMPREHENSIVE LANDSCAPE PROGRAM application, as applicable H. STORMWATER PLAN SUBMITTAL REQUIREMENTS: (City of Clearwater Design Criteria Manual and 4-202.A.21) Ql STORMWATER PLAN including the following requirements: Existing topography extending 50 feet beyond all property lines; Proposed grading including finished floor elevations of all structures; All adjacent streets and municipal storm systems; Proposed stormwater detention/retention area including top of bank, toe of slope and outiet control structure; Stormwater calculations for attenuation and water quality; Signature of Florida registered Professional Engineer on all plans and calculations ~ COpy OF PERMIT INQUIRY LETTER OR SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT (SWFWMD) PERMIT SUBMITTAL (SWFWMD approval is required prior to issuance of City Building Permit), if applicable Ql COPY OF STATE AND COUNTY STORMWATER SYSTEM TIE-iN PERMIT APPLICATIONS, if applicable I. BUILDING ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A.23) Required in the event the application includes a development where design standards are in issue (e.g. Tourist and Downtown Districts) or as part of a Comprehensive Infill Redevelopment Project or a Residentiallnfill Project. Q{ BUILDING ELEVATION DRAWINGS - all sides of all buildings including height dimensions, colors and materials Q{ REDUCED BUILDING ELEVATIONS - four sides of building with colors and materials to scale (8 Y:z X 11) (black and white and color rendering, if possible) as required J. SIGNAGE: (Division 19. SIGNS I Section 3-1806) o All EXISTING freestanding and attached signs; Provide photographs and dimensions (area, height, etc.), indicate whether they will be removed or to remain. o All PROPOSED freestanding and attached signs; Provide details including location, size, height, colors, materials and drawing o Comprehensive Sign Program application, as applicable (separate application and fee required). o Reduced signage proposal (8 Y:z X 11) (color), if submitting Comprehensive Sign Program application. Page 5 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater SENT BY: FIGURSKI&HARRILLi - 727 9443711 i NOV - 5 - 03 15: 11 ; . ' PAGE 2/2 K. TRAFrlC IMPACT STUDY: (Section 4.202.A.13 and 4-801.C) o Incll.tde as required 11 proposed development will d$9rade the aGcept.abl~ level of ~<:>IYIC8 for llny roadway el;l adapted In lhe Compreh,msiv8 PI;:m, TnI' generation sh.1I1 be ba,!;ed an lhe moet reo,iml edition of the Instltl.tte of TronBportatlon Englnliler'~ Trip GeMral ManuaL Refer IQ $ectlon 4-801 C of the Commllnil,y PI;l"",lopmenl Code for ell;ceptlQns 10 Ihls requirement ,_..1 L. SIGNATURE: I, the undersigned, llck.nowledge lhat all representations mad.. i" this Elpp!il;lalion af.. e and accurate kl the be:!;t of my knowledge Md authorize Y re r8Iamtatl"i1!i to visil and pholograph the prOpel1Y des crib in Ihis 'ppIlC<lllon. STATE OF FLORIDA, COUNTY OF PINEl-LAS S~ Sworn \0 and subscrlbod beronl me this . day rA -Npvr=>rnbF>r , A.D. 20..J}3 to I1le and/or by ~i'1rk .8- Klein, who Is peroor1<1lly known !lEIs p~uood u identification. y: Slgna[ure of property owner or r8presentative Mark S. Klein N,,,~1?(?~/~CM6 ./ , My commission explre.s: ....111lH/,.., [ ,"''.'J'.~!'.u';'' r; I 8 " ,~,~?' B .:o~ are (jl II...UI I .......-, f~( .ifl !:~ MY COMMISSION # CC894575 EXPIRES '~.)i."':~';'\~/) January 10, 2004 ",'Nf.,\~'" bONDED THRU TROY FAIN INSURANCE, INC. Page 6 of 7 - FloxJble DsvelopmentApplicallon - Compreher1!;1'i9 Infill Rede'islopmenl Project-. City of CI<;lslWater . . M. AFFIDAVIT TO AUTHORIZE AGENT: BelCal, LLC (Names of all property owners) 1. That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location): 1750 North Belcher Road, C]earwatpr 2. That this property constitutes the property for which a request for a: (describe request) To allow a credit union within the IRT Zoning District 3. That the undersigned (has/have) appointed and (does/do) appoint: Gerald A. Fiqurski, Esquire ) Fiqurski & Harrill, 2435 u.s. 19, Suite 350, HolidFlY, PT, l4Gql as (his/their) agent(s) to execute any petitions or other documents necessary to affect such petition; 3. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 4. That the applicant acknowledges that all impact fees (parks and recreation, traffic, etc.) will be paid PRIOR to the issuance of a buiiding permit, certificate of occupancy, or other mechanism, whichever occurs first; Property Owner 5. That site visits to the property are necessary by City representatives in order to process this applic representatives to visit and photograph the property described in this application; 6. That (lIwe), the undersigned authority, hereby certify that the foregoing is trjiE3 and correct. / /' I ( " Mark S. Klein Property Owner COUNTY OF PINELLAS STATE OF FLORIDA, S:IPlanning DeparlmentlAppiication Formsldevelopment reviewl2002 Forms\comprehensive inti/! application 2002.doc Page 7 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . M. AFFIDAVIT TO AUTHORIZE AGENT: Mark S. Klein (Names of all property owners) . 1. That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location): 1750 North Belcher Road, Clearwater 2. That this property constitutes the property for which a request for a: (describe request) To allow a credit union within the IRT Zoning District 3. That the undersigned (has/have) appointed and (does/do) appoint: Gerald A. Fiqurski, Esquire Figurski & Harrill. 2435 u.s. 19, Suite 350, Holiday, FL 34691 as (his/their) agent(s) to execute any petitions or other documents necessary to affect such petition; 3. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 4. That the applicant acknowledges that all impact fees (parks and recreation, traffic, etc.) will be paid PRIOR to the issuance of a building permit, certificate of occupancy, or other mechanism, whichever occurs first; 5. That site visits to the property are necessary by City representatives in order to process this applicatio representatives to visit and photograph the property described in this application; 6. That (I/we), the undersigned authority, hereby certify that the foregoing is true andcorrecl. ; / / Property Owner Property Owner STATE OF FLORIDA, COUNTY OF PINELLAS go the un~~d, an officer duly commissioned by the laws of the State of Florida, on this , personally appeared Mar k S. K 1 e i n eposes and says that e/she fully understands the contents of the affidavit that he/she sign .. "'''~'''''''' Gerald A Figurski My Commission ~~:,1~~ MY COMMISSION # DD118111 EXPIRES ~~. ,~"~ .: ff July 17, 2006 ~"i'.'",,~ BQNOO)THIlU TROY FAIN INSURAllCf.INC. I'~I\'''\ ~LfJL day of who having been first duly sworn """) S:IPlanning OepartmentlAppiication Forms\development reviewl2002 Formslcomprehensive intill application 2002.doc Page 7 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . - M. AFFIDAVIT TO AUTHORIZE AGENT: Steven C. Klein (Names of all property owners) 1. That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location): 1750 North Belcher Road, Clearwater 2. That this property constitutes the property for which a request for a: (describe request) To allow a credit union within the IRT Zoning District 3. That the undersigned (has/have) appointed and (does/do) appoint: Gerald A. Fiqurski, Esquire F'igllrski ^' Hrlrrill, ?4ll) IT S. lq, .Sllitp ll)(), HnlinrlY, F'lnrinrl l4fiql as (his/their) agent(s) to execute any petitions or other documents necessary to affect such petition; 3. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 4. That the applicant acknowledges that all impact fees (parks and recreation, traffic, etc.) will be paid PRIOR to the issuance of a building permit, certificate of occupancy, or other mechanism, whichever occurs first; 5. That site visits to the property are necessary by City representatives in order to process this apPlicatibn~l the own representatives to visit and photograph the property described in this application; j .i , ,I 6. That (I/we), the undersigned authority, hereby certify that the foregoing is true and correct. / I, / , / r?'---'''-'~- T Property Owner a10rizes City I ) ~ Property Owner COUNTY OF PINELLAS STATE OF FLORIDA, M~~he unQersig~d, an officer duly commissioned by the laws of the State of \Iorida, on this , ).(.)0 S personally appeared S t eve n e. K 1 e l n Deposes and says that he/she fully understands the contents of the affidavit that he/she signed. My commiSSil;J~D't.~"t"'" : Gerald A Figurski f*f'~ }'1MY COMMISSJON # DD.118111 EXPIRES ~'" /, ."~ July 17, 2006 "~Rr:,f.-<W BONDED THRU TlIOY FAJNlNSURANC~ 1He. :JW S:\Planning DepartmentlAppiication Forms\development reviewl2002 Formslcomprehensive intilf application 2002.doc Page 7 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . . M. AFFIDAVIT TO AUTHORIZE AGENT: Julia Klein (Names of all property owners) 1. That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location): 1750 North Belcher Road, Clearwater 2. That this property constitutes the property for which a request for a: (describe request) To allow a credit union within the IRT Zoninq District 3. That the undersigned (has/have) appointed and (does/do) appoint: Gerald A. Figurski, Esquire Figurski & Harrill, 2435 IJ.S. 19, Suite 350, Holiday, FL 34691 as (his/their) agent(s) to execute any petitions or other documents necessary to affect such petition; 3. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 4. That the applicant acknowledges that all impact fees (parks and recreation, traffic, etc.) will be paid PRIOR to the issuance of a building permit, certificate of occupancy, or other mechanism, whichever occurs first; 5. That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City representatives to visit and photograph the property described in this application; 6. That (I/we), the undersigned authority, hereby certify that the foregoing is true and correct. /."/ . ....' y~. .'.;: " ~",4U__~4---- Property Owner~1 J u 1 i a K 1 e i n Property Owner COUNTY OF PINELLAS STATE OF FLORIDA, A.1C1!or't):e ~e un~e~~i~,ed, an officer duly commissioned by the I?ws of the St?te of Florida, on this U . n 'X , :){C)~ personally appeared J U II a K 1 e l n Deposes and says that he/she fully understands the contents of the affidavit that he/she signed. ~/ ( My Commission Expires: .::-'.r,~~:'f~!?i~" Map! I'll. won -"'A<>~ , N ," ':*1 MY COMMISSION /I DD004238 EXPIRE' ~.r:"'."', ./!/ March 6, 2005 'Ii. ... o~, BONDEDTHRU 0 - S:IPlanning DepartmentlApplication Formsldevelopment reviewl2002 Formslcomprehensive Infilf application 2002.doc Page 7 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . - B. Description of Request: The application seeks the right to develop a third building. Two currently have been approved, the first for a new St. Petersburg Times' distribution center and the second an office. The third will be for a GTE Federal Credit Union. Clearly, this third building will complement the first two. The use overall will be less intense than allowed. In that the zoning is IRT, certain deviations from guidelines set forth in the Code must be addressed as follows: Flexible Development approval to permit retail sales (financial services) with deviations to allow direct access to a major arterial street (Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redeveloplnent Project, under the provisions of Section 2-1304.C. D. GENERAL APPLICABILITY CRITERIA 1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is located. The GTE Federal Credit Union building will be located in the midst of one of the largest, if not the largest, industrial sections within the City. The area is land-use designated as Industrial Limited. The zoning is primarily IRT. Properties immediately adjacent include Cox Air Conditioning, a City Fire Training station, and property used for parking of Blood Bank vehicles. Properties slightly removed include a pump company, a Roger's Bar-B-Que restaurant, a UPS facility, and an office building. The GTE Federal Credit Union will rest in an area that is primarily industrial and IR T. The area is bordered on the east and west by Belcher and Hercules. The majority of the buildings are older and truly "industrial" in appearance especially those on the Hercules side. The actual development of the area does not necessarily conform to the intent of the IRT zoning designation. Most of the buildings do not include the retail sales and service use contemplated by the Code. Banking services are identified as a permitted use under "Retail Sales and Services" subject to certain guidelines. Obviously, this type of service is needed by individuals working within this IRT e e area. A separate primary building to service these needs at a comer location would well serve the needs of employees within this industrial area. Additionally, this service at this location would capture employees and individuals working within and using the Belcher corridor. Other than one bank to the north, a significant piece of the Belcher and Hercules Corridors is without this service. An alternate would be U.S. 19 but appropriate capture by the proposed project would also be of value to traffic along U.S. 19. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. The GTE Federal Credit Union Building will be aesthetically pleasing, more so than most of the adjacent buildings as well as the overall IRT District. Except for the Blood Bank vehicle storage parcel to the west, the adjacent properties are developed with a City fire training tower and an air conditioning company. This use would not cause a buyer from investing in nearby property. 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. The GTE Federal Credit Union use will not generate the kind of pollutants or toxins or other substances dangerous to the health of residents or workers. 4. The proposed development is designed to minimize traffic congestion. The site is designed for ease of traffic flow in and out of the property. Access will be to Calumet Street and Belcher Road (right in/out only). The number of curb cuts will be reduced by one. Certain cross access features exist which will also improve traffic flow. Vehicle trip generation will not have any significant impact on affected intersections and roadways. The Level of Service category will . . remam as IS. 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. The community is industrial in nature. The overwhelming majority of structures are more "industrial" than the kind of development believed intended by the IR T District. The GTE Federal Credit Union building will be at the higher end of the scale aesthetically, compatible with other existing uses, non-detrimental to adjacent -- - uses or the expectations of adj acent owners, and consistent with the Comprehensive Plan. 6. The design of the proposed development mInImIZeS adverse effects, including visual, acoustic and olfactory and hours of operation impacts on adjacent properties. The structure will be attractive. The intensity of use of the subject parcel will allow a greater degree of open space. No offensive odors or noise will be created. Twenty- four hour operation will not exist. COMPREHENSIVE INFILL REDEVELOPMENT PROJECT CRITERIA. 1. The development or redevelopment of the parcel proposed for the development is otherwise impractical without deviations from the use, intensity and development standards. The request is to permit "Retail Sales and Services," in particular, "Financial Services." The application seeks a deviation from certain guidelines set forth in Section 2-1303(L), two of which are as follows: The use of the parcel will involve direct access to a major arterial street. The GTE Federal Credit Union, if approved by the Community Development Board, will be the third building on the parcel at Belcher and Calumet. Two other buildings - one for a new St. Pete Times Distribution Center and the second for an office building have heretofore been approved by the City as Level One approvals. Direct access to Belcher Road was approved by staff for these two other structures. The access point however is only right in/right out. Allowing this deviation of direct access to Belcher Road for the GTE Federal Credit Union is not only reasonable in light of the prior approvals, it will enhance overall traffic flow. The service will be located in a building of its own, not as part of another structure, and will occupy one hundred percent of the building. The IRT guidelines for Retail Services view a retail service as being part of a structure providing another permitted use. So, the thrust of the IRT District guidelines is to allow retail services and restaurants in conjunction with other uses, e.g., manufacturing or vehicle service. However, the area within which the subject parcel is located, albeit IRT, is filled with existing industrial buildings without such services being provided internally within . . such buildings. A GTE Federal Credit Union use would well serve this large IRT District stretching for some distance between Hercules and Belcher. In this area, a financial services use is only provided by one other such institution. Otherwise, workers need to access such services son1ewhere on U.S. 19. The employee numbers of this individual area would suggest that such service is needed. Further, a banking service would fill the void created by existing buildings with a dearth of internal retail services. The GTE Federal Credit Union building will be located in the midst of one of the largest, if not the largest, industrial sections within the City. The area is land-use designated as Industrial Limited. The zoning is primarily IRT. Properties immediately adjacent include Cox Air Conditioning, a City Fire Training station, and a property used for parking of Blood Bank vehicles. Properties slightly removed include a pump company, a Roger's Bar-B-Que restaurant, a UPS facility, an office building. The parcel had an older 28,000 square foot structure (UP ARC) which has been demolished. The GTE Federal Credit Union will rest in an area that is primarily industrial and IRT. The area is bordered on the east and west by Belcher and Hercules. The majority of the buildings are older and truly "industrial" in appearance especially those on the Hercules side. 2. The development of the parcel proposed for developn1ent as a comprehensive infill redevelopment project or residential infill project will not reduce the fair market value of abutting properties. (Include the existing value of the site and the proposed value of the site with the improvements.) Far from reducing the value of abutting properties, the project will tremendously enhance the value thereof. The current assessed value of the property is $650,000.00. The projected value of the site with improvements will increase to approximately $3,000,000.00. 3. The uses within the comprehensive infill redevelopment project are otherwise permitted in the City of Clearwater. The proposed use as Retail Sales and Service is otherwise permitted in the district subject to approval of the deviations requested. 4. The uses or mix of use within the comprehensive infill redevelopment project are compatible with adjacent land uses. . . The proposed use is compatible - like - with other surrounding uses. Most important, it will not have an adverse public impact and will not be a detriment to the value of, and owner expectations for, surrounding properties. One other deviation from the guidelines set forth in Code Section 2-1303(L) relates to who is served by the proposed use: The guidelines suggest the use primarily serve employees or patrons of other uses in the area. The focus of the services of the GTE Federal Credit Union is primarily workers. Although others will be served, a significant void for workers in this large industrial area will be filled by this use. Not only will this use be therefore compatible and mesh with existing uses, it will also in addition well serve the larger area. 5. Suitable sites for development or redevelopment of the uses or mix of uses within the comprehensive infill redevelopment project are not otherwise available in the City of Clearwater. The applicant has reviewed and is extremely familiar with real estate in Clearwater. There are currently no available sites anywhere surrounding the Clearwater Industrial Park. 6. The development of the parcel proposed for development as a comprehensive infill redevelopnlent project will upgrade the immediate vicinity of the parcel proposed for development. The immediate vicinity includes the Salvation Army, the Long Center, a Clearwater fire station, a newly approved 7Y2 acre flex space development, Regions Bank, Roger's Bar-B-Que, Cox Air Conditioning, and a multiple for existing industrial uses. The proposed redevelopment carries on the tradition of newer surrounding structures. Continued improvement of this area will only continue to enhance the City as a whole. The development and design of the project will benefit the community both functionally and aesthetically. 7. The design of the proposed comprehensive infill redevelopment project creates a form and function that enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. - - Approval of the proposed comprehensive infill project will allow redevelopment of the property in a manner which minimizes other impacts. It will enhance and further upgrade this area of the City. Additional development of this nature is a key component to appropriate growth in this area. The City will especially benefit by having an attractive building complex located in a developing area. The function of financial services will well serve the area. 8. Flexibility in regard to lot width, required setbacks, height and off-street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. As to these matters, the project will fully comply with the Code. No deviation therefrom is being requested. 9. Adequate off-street parking in the immediate VICInIty according to the shared parking formula in Division 14 of Article 3 will be available to avoid on- street parking in the immediate vicinity of parcel proposed for development. On-site parking exceeds Code requirements. 10. The design of all buildings complies with the Tourist District or Downtown District design guidelines in Division 5 of Article 3 (as applicable). Not applicable. e - FLORIDA DESIGN CONSULTANTS, INC. ENGINEERS, ENVIRONMENTALISTS, SURVEYORS & PLANNERS November 21,2003 Mr. Bennett Elbo Public Works Administration/Engineering City of Clearwater Municipal Services Building, Room #220 100 S. Myrtle Avenue Clearwater, FL 33756 Re: DEM Partnership Property Belcher Road at Calumet Street Dear Mr. Elbo: Enclosed for your review are five (5) copies of the traffic study prepared to review potential impacts for the proposed redevelopment on the project site. Our review indicates that this proposed change in land use would result in less than 100 vehicles per hour increase in traffic during the PM peak hour. It is believed that this small of an increase in traffic would result in only minor impact to the surrounding road network. The traffic counts taken for this study identified that the PM peak hour was from 5:00 to 6:00 p.m. The credit union that will occupy this site will be closed by 5:00 p.m. weekdays, thereby limiting their impact on the peak hour. Please contact me following you review of this study should you have any questions. Sincerely, ,/) /.:; j i~%a~~~r~7tc--~ Vice President of Transportation Services :es K:\Belcher at Calumet\Letters\Elbo.doc Encl. cc: Mark Klein, w/Encl. Jerry Figurski, w/Encl. Michael Lloveras, w/Encl. File 699-190-40.06 6321 GRAND BOULEVARD · NEW PORT RICHEY, FLORIDA 34652 Tel: (727) 849-7588 · Fax: (727) 848-3648 I 'I I I I 'I I I I I I II I I I I I I I - . orff{/ W ~ ~ PLAII4NC/fNlYO& OEVHOPMtNT ('~iCtl F CLEARWATER v TRAFFIC STUDY FOR PROPERTY LOCATED IN THE SOUTHWEST QUADRANT OF BELCHER ROAD AND CALUMET STREET IN THE CITY OF CLEARWATER SUBMITTED TO: CITY OF CLEARWATER PREPARED FOR: DEM PARTNERSHIP PREPARED BY: FLORIDA DESIGN CONSULTANTS, INC. 6321 GRAND BOULEVARD NEW PORT RICHEY, FL 34655 Phone: (727)849-7588 Fax: (727)858-3648 November 20, 2003 ", 1 I f / !i ,~' :1 "\ ,/ ~ i J I · , f f ! II, ; . ( . \ " ') ,,-, :,-~ " .I / I I I I I I I I I I I I I I II I I I I - e TABLE OF CONTENTS 1.0 INTRODUCTION .........................................................................................................1 2.0 EXISTING ROADWAY NETWORK.........................................................................1 3.0 PROJECT TRAFFIC .................. ..... ......... ....................... ....................... ........... ...... .....1 FIGURE 1. PROJECT LOCATION MAP ................................................................2 TABLE 1. PROJECT TRIP GENERATION ............................................................ 3 4.0 INTERNAL AND PASS-BY CAPTURE ....................................................................4 5.0 TRIP DISTRIBUTION.. ........... ............... ....................... .................. ....................... .....4 6.0 EXISTING TRAFFIC ................ .................................... ..................... ................... ....... 4 FIGURE 2. PROJECT TRIP DISTRIBUTION........................................................ 5 7.0 TRAFFIC ANALYSIS ................... ........................................................... ............. .......6 7.1 BELCHER ROAD AT CALUMET STREET INTERSECTION ..................... 6 FIGURE 3. TRAFFIC VOLUMES...................................................... ..... ................. 7 8.0 LINK ANALySIS...... ......... ............ ............... .......... ........ .... .............. ............................8 9.0 CONCLUSION ............... ...... ............ ............................................. ....... ......................... 8 APPENDIX I I I 1.0 I I I I 2.0 I I I 3.0 I I I I :1 I I I I e . INTRODUCTION This traffic study was prepared to examine potential impacts to the transportation network resulting from the redevelopment of a parcel of property located in the southwest quadrant of the Belcher Road at Calumet Street intersection in the City of Clearwater, Florida. An existing general light industrial building located on this site is proposed for replacement with three smaller structures to include a newspaper distribution center, a credit union with drive-in windows, and a small office. The following sections summarize the projected impact of these land use changes. EXISTING ROADWAY NETWORK As indicated in Figure I, Project Location Map, Belcher Road is oriented in a north-south direction. Belcher Road is a four lane divided roadway with a left turn lane provided in the median for turns to westbound Calumet Street. The southbound roadway has two lanes that provide a through lane and a combined through right turn lane. Calumet Street is a two lane undivided roadway extending from Belcher Road to Hercules A venue, having "T" intersections with both Belcher Road and Hercules Avenue. A single lane for left and right turns is provided on Calumet Street approaching Belcher Road. The Belcher Road at Calumet Street intersection is unsignalized. Signalized intersections in the project vicinity include Belcher Road at N.E. Coachman Road, Belcher Road at Sunset Point, and Calumet Street at Hercules Avenue. The posted speed limit on Belcher Road is 45 miles per hour (MPH) and on Calumet Street is 30 MPH. PROJECT TRAFFIC It is proposed to redevelop the existing project site. A comparison has been made between the existing approved development and proposed land use for the site. The existing approval is for a 25,415 square feet general light industrial building. The proposed land uses include a 12,000 square foot office, a 3,528 square foot credit union with drive in facilities, and a 16,700 square foot general light industrial building. The number of trips that would be generated by these land uses has been estimated using information from the Institute of Transportation Engineers (ITE) informational report Trip Generation. Because limited information is available for credit unions, ITE Land Use Code (LUe) 912, Drive-in Bank, was used for this proposed building. The GTE Credit Union has been identified as the occupant for the drive-in bank land use. Their facility will close at 5 :00 P.M. every weekday. This will limit their impact in the PM peak hour which runs from 4:00 to 6:00 P.M. The general light industrial building proposed for this site will be occupied by the St. Petersburg Times and will be used as a distribution center for their newspaper. Since this is a morning delivery paper, their hours of operation are from midnight to 7:00 a.m. Therefore, their PM peak hour trip generation will be zero. No trips for this land use have been estimated during the PM peak hour, but daily traffic volume have been estimated. Table 1 summarizes the trip generation for the existing approved development and the proposed land uses. As is indicated the existing land use is projected to generate 177 daily and 25 PM peak hour trips. The proposed land uses are projected to generate 1,313 daily and 211 PM peak hour trips. -1- I I I I I I I I I I I. ~ ___ IV U C <1> I .~ ~ E o '"' Ii) I~ ,-~ 0 o N I~ "- z I - -- SUNSET POINT ROAD CALUMET STREET ~ ~ ~ CI) lLJ :S u Q:: lLJ ::r: Cl ~ a Q:: Q:: lLJ ::r: u -.I lLJ CQ N NOT TO SCALE DREW PROJECT LOCATION MAP PROJECT No. 699-190 10> ;0 u >- t )"0 ---- :> v; I. ] ! I --' 0 / 2 I ~ DESCRIPTION, ,----, 0 -0 o If /" '" ~ FLq!!.!~~. ~~~!!:t!AL~C?'!u~tt~:: ~"!LI~~R!NC. 6321 Grand Blvd, New Pori Richey FL 34652 Tel, (727) 849-7588 - Fax, (727) 848-3648 DATE, 11/20/03 DRAWN BY, JMS Drawings and concepts may not be used or reproduced without written permission. @Copyright 2003 Florida Design Consultants. Inc. STREET EPN, 101 FIGURE, 1 ,I I I I I I I I I I I I I I c o :;:; ra I- C1l C C1l C) 0. "i: I- :1 I .... o C1l '0' I- a.. I T"'" C1l .0 ra I- I I WOo I--::J"- - -1 ..- co - o I-- L- :J O-oN ICN ..:.:: :J CO 0 <D:8 0... :J 20 0... -0(") C :J o .n C I"- >>1"- - ..- CO o en~ ;t=LL C rr ::JCf) I.() <D..- ,t::! .q-~ Cf)1.() N CO oc - en :J <D-o en C ::J -0 C CO -1 - J:: 0> :.:i CO L- <D C <D C) CO > o L- 0. 0. <t: - C <D L- L- :J o - I.() N CO(")O..- ..- (J') ..- ..- N I.() 1"-0..- ..- (J') ..- ..- (")1"-00 (J') 0 ..- o (0 (0 (") (0(")..-..- N(J')..-(") ..- .....; ~ ..; LLLLLL rrrrrr Cf)Cf)Cf) OCOO oNo o~ I.() 1"-_ N -(0 ..-(")..- ONO ..- ..- ..- I"-(J')..- !... CO oc - en :J -0 C ..:.::- c~ ~:.:i C CO <D oJ; a; .~ > c :t:: 0 C <D ooC) -0 <D en o 0. o L- 0... ..- 0..-..- 0 ..- ..- (J') N N N ..- ..- 0..- L{') <0 ..- ..- "<:t <0 ..- ..- o OOI.()"<:t o o"<:t L{') ..- ..- ..- ..- C'? 0 C') 0 C') ..- ..- "<:t t--- C') (") "<:t co <Den..:.::en L-o.co. :J oc CO "C a.1--11l1-- co c o co,, co '" E <D E \V <D > <D Ex oc X 2woW c E- o <D L-Z '+- <D L- :J - 0. co o >> .0 I en en co 0... -0 <D -- lIJ ctI C1l L- lIJ <D ::J a3 "'0<.9 C en ra 0. ..J oc "01- C1l lIJ o 0- o L- a. - o &: ra ;., ... >- ..c I lIJ lIJ ra a. "'0 C ra C1l L- ::s .... 0- ra U ra s:: L- C1l .... s:: N C1l ..c ra ... -3- I.() L{') N(J') N"<:t N"<:t (") ..- L{') 1"-<0 1"-0) ..- <0 co <D > en o co L- <D 0.L- o..() <t: c - 0.. C "C ~I-- :J <D 0:3 E-o o c ~ co en.....J 0.-0 'C <D I-- en o 0. o L- a.. '. en 0. "C - L- :J o J:: ..:.:: co <D 0. 2 0... <D - co L- <D C <D 0> - o c .~ co "C - en :J -0 C C') o o N co ..- L- <D .n E <D > o Z - J:: 0> :.:i co L- <D C <D C) -0 <D en o 0. o L- 0... -l< <D - co o I I I I I I I I I 5.0 I I 6.0 I I I I I I I I - . 4.0 INTERNAL AND PASS-BY CAPTURE The mix of land uses proposed for this site may have some of their trips that are generated by one land use on site going to other land use on site. This internal capture could occur between the office and credit union land uses. To be conservative, no subcontractors for internal capture have been made for this analysis. A number of trips already traveling on the adjacent roads may turn into the site to use the credit union. These pass-by trips have been recognized by ITE and estimates on the amount of these trips by land use type are provided in their Trip Generation Handbook dated March 2001. According to Table 5.26 provided on Page 71 of that document, approximately 47 percent of the traffic to Drive-in Banks (ITE LUC 912) comes from pass-by traffic. It is assumed that 47 percent of the trips to the. credit union will come from traffic already on Calumet Street or Belcher Road. The internal capture and pass-by trips are summarized in Table 2. As is indicated, following the pass-by capture, the project is expected to add 873 daily trips and 120 PM peak hour trips to the highway network. This is an increase of 696 daily and 95 PM peak hour trips above the current approval. TRIP DISTRIBUTION Trip distribution to this site has been estimated using information from the traffic counts taken for this project. Based on the existing traffic patterns for traffic entering and exiting Calumet Street at Belcher Road, the trip distribution for project traffic has been estimated and is shown in Figure 2. EXISTING TRAFFIC Existing traffic volumes at the Belcher Road and Calumet Street intersection were counted from 4:00 to 6:00 P.M. on Wednesday, November 12, 2003. A copy ofthe traffic count is provided in the Appendix. The PM peak hour, defined as the four consecutive 15 minute periods with the highest volumes, was from 5:00 to 6:00 P.M. This count was adjusted to annual average conditions using the appropriate "SF" factor from the Florida Department of Transportation's (FDOT's) 2002 Peak Season Factor Category Report for Pinellas Countywide data sheet, see copy in the Appendix. For the week of November 10 through 16, 2002, the adjustment was to increase the traffic count by a factor of 1.04. This was applied to all traffic volumes entering the intersection. At the time the traffic count was taken the existing facility on the project site was not open, therefore, the traffic count represents only background or non-project traffic. -4- :;::- 2 I! DESCRIPTION, --, 2 o o If _u /' ""' I I I I I I I I I I I I~ -.- Q) u c C1> I .~ _u E o <Xl I~ ---- 0 o N I~ -- z I Ii ,---' :J if) u 1:1 . ~ <::{ o ct: ...... CD ~ ~ ,17 CALUMET STREET 1 33 ---!! 30, 0, ii ot') t')t') 1 PROJECT SITE ...... t') CD 37 , ct: Ll.J :r:: u -.I Ll.J CO PROJECT TRIP DISTRIBUTION (PERCENT) ~ FLqt!.!~~. ~~~!~!:!AL~C?~~tt~!:~'tLI~h!NC. 6321 Grand Blvd, New Pori Richey FL 34652 Tel, (727) 849-7588 - Fox, (727) 848-3648 @Copyright 2003 Florida Design Consultants, Inc. PROJECT No. 699-190 DATE, 11/20/03 DRAWN BY, JMS N NOT TO SCALE EPN, 101 FIGURE, 2 Drawings and concepts may not be used or reproduced without written permission. I I II 7.0 I I I I I I I I I I I I I I I I e - TRAFFIC ANALYSIS 7.1 BELCHER ROAD AT CALUMET STREET INTERSECTION This existing traffic volumes and trips from the existing approved uses and proposed uses for this project are indicated in Figure 3 and have been analyzed to determine the expected Level of Service (LOS). Analysis of this unsignalized intersection has been completed using the Highway Capacity Software (HCS 2000). The results are summarized in Table 3 and copies of the print outs from this analysis are provided in the Appendix. Table 3. Belcher Road at Calumet Street Unsignalized Intersection Operation. Existing Background Plus Background Plus Background Existing Approved Proposed Proj ect Traffic Project Traffic Traffic Level of Service F F F Approach Delay (Seconds) 66.2 77.0 109.5 95% Queue Length (Vehicles) 4.6 5.26 6.69 As can be seen from the above table, the intersection is projected to operate at LOS F either with the existing approved land use on the project site or with the proposed land uses. As mentioned earlier, the credit union will be closed at 5 :00 p.m. which is prior to the counted peak hour period which ran from 5:00 to 6:00 p.m. If the traffic from the credit union is subtracted, the net change in volume would be insignificant. The above review indicated that this unsignalized intersection would not operate at an acceptable level of service. This intersection's poor operation results from the high traffic volumes on Belcher Road that do not provide significant gaps in the traffic to allow traffic from Calumet Street to enter Belcher Road. An improvement to Keene Road that will extend it to Sunset Point Road will be open soon. This will help reduce traffic volumes on Belcher Road, thereby increasing the size of gaps in traffic allowing turning movement from Calumet Street to be made easier. Most of the delay to vehicles on Calumet Street trying to enter Belcher Road comes from Traffic turning left which must first cross both southbound lanes on Belcher Road before entering the northbound traffic stream. If these vehicles experience excessive delay, they can travel westbound on Calumet Street to Hercules Avenue where an existing traffic signal would provide easier entry into the northbound traffic stream. -6- I I I I I I I I I I Iv -- -~ 0 c ., I .~ ----- 0 "- If) I; ___J 0 o N I~ II >. '-- -g Vi I~I '_n__ 0 ./ ~ N NOT TO SCALE Q "':::( ata ~n= ~I:g +~ ~ II II~ NO v~ j ! CALUMET STREET Q ----"':::( ~a ____~ n= Ola) '---'0 +~ ~ II IIg 00 l[)~ j ! CALUMET STREET 1 i 74=67+ 1-.1 57=57+Q .... 1 i ~I at + + .....Ol tOo II ~ a)N ct: to II LlJ Ol ::t:: 0 t..> N -.I LlJ Cl:l EXISTING PM PEAK HOUR LEGEND 82=67+(15) -.1 57=57+(0) .... xx - EXISTING AADT TRAFFIC VOLUMES XX - EXISTING APPROVED PROJECT TRAFFIC (XX) - PROPOSED PROJECT TRAFFIC I ! DESCRIPTION, -- .8 o o I~ ~ - /' ,:: I TRAFFIC VOLUMES ~ FLq!!!~~. R~~!!f!:!AL~t?~~V~~:: ~f-!LI~h!NC. 6321 Grand Blvd, New Pori Richey FL 34652 Tel, (727) 849-7588 - Fax, (727) 848-3648 @Copyright 2003 Florida Design Consultonts, Inc. .--.... ---- 010 ~ '---' '---'+ +Ol .....0 to ~ ct: II N LlJ to II ::t:: a) 8 t..> -.I LlJ Cl:l N PROJECTED PM PEAK HOUR PROJECT No. 699-190 DA TE. 11/20/03 DRAWN BY, JMS EPN, 101 FIGURE, 3 Drawings and concepts may not be used or reproduced without written permission. I I . I I I I I I I I I I I I I I I I I I - e 8.0 LINK ANALYSIS A review has been made of the link level of service on both Belcher Road and Calumet Street with the proposed project. The project traffic volumes and projected level of service are indicated in Table 4. The maximum service volumes for levels of service have been obtained from the FDOT Quality/Level of Service Manual 2002, see Generalized Peak/Hour Directional Volumes for Florida's Urbanized Areas Table contained in the Appendix. Table 4. Link: of Level of Service Road Direction LOSD Existing Proposed Total LOS Max. Service Volume Traffic Project Trips Traffic Belcher Road NB 1,860 2,176 19 2,195 F Belcher Road SB 1,860 1,123 17 1,140 B Calumet Street EB 760 124 15 139 C Calumet Street WE 760 108 28 136 C While the northbound direction of Belcher Road carries more traffic than the FDOT generalized service volume tables indicate is acceptable, the amount of traffic contributed by the proposed development is relatively minor. Project traffic contributes less than one percent of the total traffic in the northbound direction. Additionally the improvement to Keene Road sited above is likely to reduce traffic volumes on Belcher Road, which should allow it to return to acceptable operating conditions. The other road segments all worked at acceptable LOS D or better conditions. 9.0 CONCLUSION Based upon the above review, it has been demonstrated that the traffic impact likely to result from the proposed land use changes in the southwest quadrant of the Belcher Road and Calumet Street intersection are likely to be minor. An alternative entrance and exist using Calumet Street to Hercules Avenue could be used by traffic on Calumet Street during peak periods to avoid delay at the Calumet/Belcher intersection. Additionally an improvement to Keene Road that will open soon is likely to reduce traffic volumes on Belcher Road, thereby improving area operations. It is believed that the impact from the proposed development is so minor that approval should be granted for this land use change. :es K:\Belcher at Calumet\Reports\Traffic Study.doc -8- - - I I I I I I ,I I I 1__, I I I I I II I I I I APPENDIX I I I I I I I I I I I I I I I I I I I . . PM PEAK HOUR DATA PROJECT: OEM Partnership PROJECT NO: 699-190 LOCATION: (N-S) Belcher Road & (E-W) Calumet Street DATE: Wednesday, November 12, 2003 LANE TYPE: SPEED LIMIT: NB SB EB WB 2L 2L 1L NB SB EB WB 45 - 45 30 PM PEAK HOUR COUNTS TIME PM NB L NB T NB R SB L SB T SB R EB L EB T EB R WB L WB T WB TOTAL HOURLY R VOLUME VOLUMES ---------------------------------------------~ 4:00-4: 15 13 383 215 9 13 8 641 641 4:15-4:30 6 359 239 11 6 7 628 1,269 4:30-4:45 24 431 248 6 24 23 756 2,025 4:45-5:00 14 394 253 9 14 16 700 2,725 5:00-5: 15 18 531 268 16 18 19 870 2,954 5: 15-5:30 10 520 258 8 10 6 812 3,138 5:30-5:45 25 520 279 5 25 25 879 3,261 5:45-6:00 11 457 235 10 11 5 729 3,290 ----------------- 121 3,595 0 0 1,995 74 121 0 109 0 0 0 6,015 PEAK HOUI:! TIME NB NB NB SB SB SB EB EB EB WB WB WB TOTAL PM L T R L T R L T R L T R VOLUME ----------------------- 5:00-5: 15 18 531 0 0 268 16 18 0 19 0 0 0 870 5:15-5:30 10 520 0 0 258 8 10 0 6 0 0 0 812 5:30-5:45 25 520 0 0 279 5 25 0 25 0 0 0 879 5:45-6:00 11 457 0 0 235 10 11 0 5 0 0 0 729 -------------------------- 64 2,028 0 0 1,040 39 64 0 55 0 0 0 3,290 INTERSECTION PEAK HOUR 5:00 - 6:00 INTERSECTION PHF 0.93572 INTERSECTION PEAK HOUR VOLUME 3,290 PEAK HOUR VOLUME NB 2,092 PHF NB 0.95 PEAK HOUR VOLUME SB 1,079 PHF SB 0.95 PEAK HOUR VOLUME EB 119 PHF EB 0.60 PEAK HOUR VOLUME WB 0 PHF WB #OIV/O! NB NB NB SB SB SB EB EB EB WB WB WB L T R L T R L T R L T R 2003 Traffi Count 64 2,028 0 0 1,040 39 64 0 55 0 0 0 3,290 2003 Annual Avg. Traffic 67 2,109 0 0 1,082 41 67 0 57 0 0 0 3,422 Note: Season Factor = 1.04 T:1699-190ITraffic Countsl[Belcher Calumet.xls]Sheet1 1 /1" I Print Date: N?v/18/2003 . Florida Department of Transportation e Transportation Statistics Office 2002 Peak Season Factor Category Report I PINELLAS COUNTYWIDE MOCF = 0.94 i_Category: 1500 Week Dates SF PSCF I OliO lI2002 - 0 lI05/2002 1.06 1.l3 I 2 Oll06/2002 - Olll2/2002 1.05 1.l2 3 Oll13/2002 - Oll19/2002 1.04 1.l1 4 o lI20/2002 - 0 lI26/2002 1.02 1.09 I 5 Oll27/2002 - 02/02/2002 1.00 1.06 6 02/03/2002 - 02/09/2002 0.98 1.04 * 7 02/10/2002 - 02/16/2002 0.96 1.02 * 8 02/17/2002 - 02/23/2002 0.95 1.01 I * 9 02/24/2002 - 03/02/2002 0.94 1.00 * 10 03/03/2002 - 03/09/2002 0.93 0.99 * 11 03/10/2002 - 03/16/2002 0.92 0.98 I * 12 03/17/2002 - 03/23/2002 0.92 0.98 * 13 03/24/2002 - 03/30/2002 0.93 0.99 * 14 03/3l12002 - 04/06/2002 0.93 0.99 * 15 04/07/2002 - 04/13/2002 0.94 1.00 I * 16 04/14/2002 - 04/20/2002 0.94 1.00 * 17 04/2l12002 - 04/27/2002 0.95 1.01 * 18 04/28/2002 - 05/04/2002 0.96 1.02 I * 19 05/05/2002 - 05/1l12002 0.97 1.03 20 05/12/2002 - 05/18/2002 0.99 1.05 21 05/19/2002 - OS/25/2002 0.99 1.05 I 22 OS/26/2002 - 06/0ll2002 0.99 1.05 23 06/02/2002 - 06/08/2002 1.00 1.06 24 06/09/2002 - 06/15/2002 1.00 1.06 25 06/16/2002 - 06/22/2002 1.00 1.06 I 26 06/23/2002 - 06/29/2002 1.00 1.06 27 06/30/2002 - 07/06/2002 1.00 1.06 28 07/07/2002 - 07/13/2002 1.01 1.07 I 29 07/14/2002 - 07/20/2002 1.01 1.07 30 07/2l12002 - 07/27/2002 1.01 1.07 31 07/28/2002 - 08/03/2002 1.01 1.07 I 32 08/04/2002 - 08/10/2002 1.01 1.07 33 08/11/2002 - 08/17/2002 1.02 1.09 34 08/18/2002 - 08/24/2002 1.03 1.l0 35 08/25/2002 - 08/31/2002 1.03 1.l0 I 36 09/0ll2002 - 09/07/2002 1.04 1.l1 37 09/08/2002 - 09/14/2002 1.05 1.l2 38 09/15/2002 - 09/2l12002 1.06 1.l3 I 39 09/22/2002 - 09/28/2002 1.05 1.l2 40 09/29/2002 - 10/05/2002 1.04 1.l1 41 10/06/2002 - 10/12/2002 1.03 1.l0 42 10/13/2002 - 10/19/2002 1.02 1.09 I 43 10/20/2002 - 10/26/2002 1.02 1.09 44 10/27/2002 - Il102/2002 1.03 1.l0 45 Il103/2002 - 11/09/2002 1.03 1.l0 :1 46 11/10/2002 - 11/16/2002 1.04 1.l1 47 Il117/2002 - 11/23/2002 1.04 1.l1 48 Il124/2002 - 11130/2002 1.05 1.l2 I 49 12/01/2002 - 12/07/2002 1.05 1.l2 50 12/08/2002 - 12/14/2002 1.06 1.l3 51 12/15/2002 - 12/2l12002 1.06 1.l3 52 12/22/2002 - 12/28/2002 1.05 1.l2 I 53 12/29/2002 - 12/3l12002 1.04 1.l1 I Note: "*" indicates peak season week Page I - e I HCS2000: Unsignalized Intersections Release 4.1c TWO-WAY STOP CONTROL SUMMARY I Analyst: REC Agency / Co. : FDC Date Performed: 11/18/2003 Analysis Time Period: PM Peak Hour Intersection: Belcher at Calumet Jurisdiction: County Units: U. S. Customary Analysis Year: 2003 without Project Project ID: DEM Partnership East/West Street: Calumet Street North/South Street: Belcher Road Intersection Orientation: NS Study period (hrs): 0.25 I I Vehicle Approach Movement 1 L Volumes and Northbound 2 T Adjustments Major Street: I Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Median Storage Flared Approach: Southbound 4 5 6 L T R 1082 41 0.95 0.95 1138 43 2 0 T TR No Eastbound 10 11 12 L T R 67 0 57 0.95 0.95 0.95 70 0 60 1 0 1 0 No 0 1 0 LTR Service Eastbound 10 11 12 LTR 130 178 0.73 4.60 66.2 F 66.2 F I 3 R I Volume 67 Peak-Hour Factor, PHF 0.95 Hourly Flow Rate, HFR 70 Percent Heavy Vehicles 1 Median Type Raised curb RT Channelized? Lanes 1 Configuration L Upstream Signal? 2109 0.95 2220 I 2 T No I Minor Street: Approach Movement Westbound 7 8 9 L T R o I 1 Exists? Storage RT Channelized? Lanes Configuration I I Approach Movement Lane Config Delay, NB 1 L Queue Length, and Level of SB Westbound 4 7 8 9 I v (vph) C (m) (vph) v/c 95% queue length Control Delay LOS Approach Delay Approach LOS 70 593 0.12 0.40 11.9 B I I I :1 :1 /.~..? {1 ,/ I - HCS2000: Unsignalized Intersections Release 4.1c I. TWO-WAY STOP CONTROL(TWSC) ANALYSIS I Analyst: REC Agency /Co. : FDC Date Performed: 11/18/2003 Analysis Time Period: PM Peak Hour Intersection: Belcher at Calumet Jurisdiction: County Units: U. S. Customary Analysis Year: 2003 without Project Project ID: DEM Partnership East/West Street: Calumet Street North/South Street: Belcher Road Intersection Orientation: NS Study period (hrs): 0.25 I I Vehicle Volumes and Adjustments Major Street Movements 1 2 3 4 5 6 L T R L T R Volume 67 2109 1082 41 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 Peak-15 Minute Volume 18 555 285 11 Hourly Flow Rate, HFR 70 2220 1138 43 Percent Heavy Vehicles 1 Median Type Raised curb RT Channelized? Lanes 1 2 2 0 Configuration L T T TR Upstream Signal? No No Minor Street Movements 7 8 9 10 11 12 L T R L T R Volume 67 0 57 Peak Hour Factor, PHF 0.95 0.95 0.95 Peak-15 Minute Volume 18 0 15 Hourly Flow Rate, HFR 70 0 60 Percent Heavy Vehicles 1 0 1 Percent Grade (%) 0 0 Median Storage 1 Flared Approach: Exists? No Storage RT Channelized? Lanes 0 1 0 Configuration LTR I I I I I I I Pedestrian Volumes and Adjustments Movements 13 14 15 16 Flow (ped/hr) 0 0 0 0 Lane Width (ft) 12.0 12.0 12.0 12.0 Walking Speed (ft/sec) 4.0 4.0 4.0 4.0 Percent Blockage 0 0 0 0 I I Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph see see Prog. Speed mph Distance to Signal feet Prog. Flow vph I S2 Left-Turn Through S5 Left-Turn Through I Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Movement 2 Movement 5 I Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: I I fi~ ; ; I e I e e Worksheet 4-Cri tical Gap and Follow-up Time Calculation Critical Gap Calculation Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(c,base) 4.1 7.5 6.5 6.9 t(c,hv) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 P(hv) 1 1 0 1 t(c,g) 0.20 0.20 0.10 0.20 0.20 0.10 Grade/lOa 0.00 0.00 0.00 0.00 0,00 0.00 t(3,lt) 0.00 0.70 0.00 0.00 t (c, T) : I-stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2-stage 0.00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 0.00 t (c) I-stage 4.1 6.8 6.5 6.9 2-stage 4.1 5.8 5.5 6.9 Follow-Up Time Calculations Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(f,base) 2.20 3.50 4.00 3.30 t (f,HV) 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 P(HV) 1 1 0 1 t(f) 2.2 3.5 4.0 3.3 I I I I I I Worksheet 5-Effect of Upstream Signals Computation I-Queue Clearance Time at Upstream Signal Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) I I V prog Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (sec) Cycle Length, C (sec) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g(q) I I Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 Movement S V(t) V(l,prot) V(t) V(l,prot) I alpha beta Travel time, t (a) (sec) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 I Computation 3-Platoon Event Periods Result I 0.000 0.000 I p(2) piS) p(dom) p (sOOo) Constrained or unconstrained? I Proportion unblocked for minor movements, p(x) (1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II :1 p(l) p(4) p(7) p(8) p(9) p(10) pill) p(12) I I ;\ ~~ '1"- '::;) I -- . I Computation 4 and 5 single-Stage Process Movement 1 L 4 L 7 L 8 T 9 R 10 L 11 T 12 R I v c,x s Px V c,u,x 1181 2410 3520 590 C r,x C plat,x I Two-Stage Process I 7 Stagel Stage2 8 Stagel Stage2 10 Stage1 Stage2 11 Stage1 Stage2 V(c,x) s P(x) V(c,u,x) 1160 1250 3400 1160 2360 3400 I C(r,x) C(plat,x) I Worksheet 6-Impedance and Capacity Equations Step 1: RT from Minor St. 9 12 590 453 1. 00 1. 00 453 1. 00 0.87 4 1 1181 593 1. 00 1. 00 .593 1.00 0.88 8 11 3520 6 1. 00 1. 00 0.88 0.88 5 1. 00 1. 00 7 10 2410 28 1. 00 1. 00 0.88 0.91 0.79 0.88 25 I I Conflicting Flows Potential Capacity pedestrian Impedance Factor Movement Capacity Probability of Queue free St. Step 2: LT from Major St. I Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. Maj L-Shared Prob Q free St. I Step 3: TH from Minor St. I . , Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free St. I Step 4: LT from Minor St. I Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity I Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance Step 3: TH from Minor St. 8 11 I I Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free St. 69 1. 00 0.88 61 1. 00 1160 272 1. 00 1. 00 272 1. 00 Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt 266 1. 00 1. 00 2360 69 1. 00 0.88 I I .\ I R'b I e - Movement Capacity 266 61 Part 3 - Single Stage Conflicting Flows 3520 Potential Capacity 6 Pedestrian Impedance Factor 1. 00 1. 00 Cap. Adj. factor due to Impeding mvmnt 0.88 0.88 Movement Capacity 5 Result for 2 stage process: a 0.91 0.91 y 4.77 C t 47 Probability of Queue free St. 1. 00 1. 00 Step 4 : LT from Minor St. 7 10 Part 1 - First Stage Conflicting Flows 1160 Potential Capacity 59 263 Pedestrian Impedance Factor 1. 00 1. 00 Cap. Adj. factor due to Impeding mvmnt 0.88 1. 00 Movement Capacity 52 263 Part 2 - Second Stage Conflicting Flows 1250 Potential Capacity 535 235 Pedestrian Impedance Factor 1. 00 1. 00 Cap. Adj. factor due to Impeding mvmnt 0.87 0.88 Movement Capacity 464 207 Part 3 - Single Stage Conflicting Flows 2410 Potential Capacity 28 Pedestrian Impedance Factor 1. 00 1. 00 Maj. L, Min T Impedance factor 0.88 Maj. L, Min T Adj. Imp Factor. 0.91 Cap. Adj. factor due to Impeding mvmnt 0.79 0.88 Movement Capacity 25 Results for Two-stage process: a 0.91 0.91 y 1. 31 C t 117 Worksheet 8-Shared Lane Calculations Movement 7 8 9 10 11 12 L T R L T R Volume (vph) 70 0 60 Movement Capacity (vph) 117 47 453 Shared Lane Capacity (vph) 178 I I I I I I I I I I I I Worksheet 9-Computation of Effect of Flared Minor Street Approaches II Movement 7 8 9 L T R C sep Volume Delay Q sep Q sep +1 round (Qsep +1) n max C sh SUM C sep n C act Worksheet 10-Delay, Queue Length, and Level of Service 10 L 11 T 12 R 117 70 47 o 453 60 I I 178 I I Movement 1 4 7 8 9 10 11 12 Lane Config L LTR v (vph) 70 130 C(m) (vph) 593 178 Ii ") I I . e I vlc 0.12 95% queue length 0.40 Control Delay 11.9 LOS B Approach Delay Approach LOS 0.73 4.60 66.2 F 66.2 F I Worksheet II-Shared Major LT Impedance and Delay I !1ovement 2 Movement 5 I p (oj) v(il) , v(i2) , s (il), s (i2) , P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through d(rank,l) Delay for stream 2 or 5 Volume for Volume for Saturation Saturation stream 2 or 5 stream 3 or 6 flow rate for flow rate for stream 2 or 5 stream 3 or 6 0.88 1. 00 11. 9 lanes I T:\699-190\HCS Runs\Belcher Calumet wo Project.doc :1 I I I I I I I I I I I I fIe 7 I - ,tt I HCS2000: Unsignalized Intersections Release 4.1c TWO-WAY STOP CONTROL SUMMARY I Analyst: REC Agency/Co.: FDC Date Performed: 11/18/2003 Analysis Time Period: PM Peak Hour Intersection: Belcher at Calumet Jurisdiction: County Units: U. S. Customary Analysis Year: 2003 with Existing Approval Project ID: DEM Partnership East/West Street: Calumet Street North/South Street: Belcher Road Intersection Orientation: NS Study period (hrs): 0.25 I I Vehicle Approach Movement 1 L Volumes and Adjustments Northbound 2 3 T R Major Street: I Volume 68 Peak-Hour Factor, PHF 0.95 Hourly Flow Rate, HFR 71 Percent Heavy Vehicles 1 Median Type Raised curb RT Channelized? Lanes 1 Configuration L Upstream Signal? 2109 0.95 2220 Southbound 4 5 6 L T R 1082 42 0.95 0.95 1138 44 2 0 T TR No Eastbound 10 11 12 L T R 74 0 57 0.95 0.95 0.95 77 0 60 1 0 1 0 No 0 1 0 LTR Service Eastbound 10 11 12 LTR 137 173 0.79 5.26 77.0 F 77.0 F I I 2 T No I Minor Street: Approach Movement Westbound 789 L T R I Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Median Storage Flared Approach: o I 1 Exists? Storage RT Channelized? Lanes Configuration I I Approach Movement Lane Config Delay, NB 1 L Queue Length, and Level of SB Westbound 4 7 8 9 I v (vph) C (m) (vph) v/c 95% queue length Control Delay LOS Approach Delay Approach LOS 71 592 0.12 0.41 11.9 B I I I I I (4 9 I e . HCS2000: Unsignalized Intersections Release 4.1c I TWO-WAY STOP CONTROL(TWSC) ANALYSIS I Analyst: REC Agency / Co. : FDC Date Performed: 11/18/2003 Analysis Time Period: PM Peak Hour Intersection: Belcher at Calumet Jurisdiction: County Units: U. S. Customary Analysis Year: 2003 with Existing Approval Project 10: OEM Partnership East/West Street: Calumet Street North/South Street: Belcher Road Intersection Orientation: NS Study period (hrs): 0.25 I I I Vehicle Volumes and Adjustments Major Street Movements 1 2 3 4 5 6 L T R L T R Volume 68 2109 1082 42 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 Peak-15 Minute Volume 18 555 285 11 Hourly Flow Rate, HFR 71 2220 1138 44 Percent Heavy Vehicles 1 Median Type Raised curb RT Channelized? Lanes 1 2 2 0 Configuration L T T TR Upstream Signal? No No Minor Street Movements 7 8 9 10 11 12 L T R L T R Volume 74 0 57 Peak Hour Factor, PHF 0.95 0.95 0.95 Peak-15 Minute Volume 19 0 15 Hourly Flow Rate, HFR 77 0 60 Percent Heavy Vehicles 1 0 1 Percent Grade (%) 0 0 Median Storage 1 Flared Approach: Exists? No Storage RT Channelized? Lanes 0 1 0 Configuration LTR I I I I I I Pedestrian Volumes and Adjustments Movements 13 14 15 16 Flow (ped/hr) 0 0 0 0 Lane Width (ft) 12.0 12.0 12.0 12.0 Walking Speed (ft/sec) 4.0 4.0 4.0 4.0 Percent Blockage 0 0 0 0 I I Prog. Flow vph Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Speed mph Distance to Signal feet I S2 Left-Turn Through S5 Left-Turn Through I Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Movement 2 Movement 5 I I Shared ln volume, major th vehicles: Shared 1n volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: I A". r-> .~./ I e . Worksheet 4-Critical Gap and Follow-up Time Calculation Critical Gap Calculation Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(c,base) 4.1 7.5 6.5 6.9 t(c,hv) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 P(hv) 1 1 0 1 t(c,g) 0.20 0.20 0.10 0.20 0.20 0.10 Grade/lOO 0.00 0.00 0.00 0.00 0.00 0.00 t (3,lt) 0.00 0.70 0.00 0.00 t (c,T): I-stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2-stage 0.00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 0.00 t(c) I-stage 4.1 6.8 6.5 6.9 2-stage 4.1 5.8 5.5 6.9 Follow-Up Time Calculations Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(f,base) 2.20 3.50 4.00 3.30 t(f,HV) 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 P(HV) 1 1 0 1 t(f) 2.2 3.5 4.0 3.3 I I I I I I Worksheet 5-Effect of Upstream Signals Computation I-Queue Clearance Time at Upstream Signal Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) I I V prog Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (see) Cycle Length, C (see) Rp (from Exhibit 16--11) Proportion vehicles arriving on green P g(ql) g(q2) g(q) I I Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 Movement 5 V(t) V(l,prot) V(t) V(l,prot) I alpha beta Travel time, t (a) (see) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 I Computation 3-Platoon Event Periods Result I I p(2) p(5) p(dom) p(subo) Constrained or unconstrained? 0.000 0.000 I Proportion unblocked for minor movements, p (x) (1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II !I P (1) p(4) P (7) P (8) P (9) P (10) p(l1) p (12) ;1 I A - f I e I Computation 4 and 5 Single-Stage Process Movement 4 L 1 L I v c,x s Px V c,u,x 1182 I C r,x C plat,x Two-Stage Process I 7 Stagel Stage2 8 Stage 1 Stage2 V(c,x) s P(x) V(c,u,x) I C(r,x) C(plat,x) I . 7 L 8 T 9 R 11 T 12 R 10 L 2412 3522 591 10 Stage1 Stage2 11 Stagel Stage2 1160 1252 3400 1160 2362 3400 Step 1: RT from Minor St. Worksheet 6-Impedance and Capacity Equations I Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. I Step 2: LT from Major St. :1 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. Maj L-Shared Prob Q free St. I Step 3: TH from Minor St. I Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free St. II Step 4: LT from Minor St. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity I I 1___-' 9 12 591 453 1. 00 1. 00 453 1. 00 0.87 4 1 1182 592 1. 00 1. 00 592 1. 00 0.88 8 11 3522 6 1. 00 1. 00 0.88 0.88 5 1. 00 1. 00 7 10 2412 28 1. 00 1. 00 0.88 0.91 0.79 0.88 25 Step 3: TH from Minor St. Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance 11 I Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free St. I I Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt I 8 69 1. 00 0.88 61 1. 00 1160 272 1. 00 1. 00 272 1. 00 266 1. 00 1. 00 2362 69 1. 00 0.88 -, I~ /'''1 , ' ~~- I - e Movement Capacity 266 61 Part 3 - Single Stage Conflicting Flows 3522 Potential Capacity 6 Pedestrian Impedance Factor 1. 00 1. 00 Cap. Adj. factor due to Impeding mvmnt 0.88 0.88 Movement Capacity 5 Result for 2 stage process: a 0.91 0.91 y 4.77 C t 47 Probability of Queue free St. 1. 00 1. 00 Step 4 : LT from Minor St. 7 10 Part 1 - First Stage Conflicting Flows 1160 Potential Capacity 58 263 Pedestrian Impedance Factor 1. 00 1. 00 Cap. Adj. factor due to Impeding mvmnt 0.88 1. 00 Movement Capacity 51 263 Part 2 - Second Stage Conflicting Flows 1252 Potential Capacity 535 235 Pedestrian Impedance Factor 1. 00 1. 00 Cap. Adj. factor due to Impeding mvmnt 0.87 0.88 Movement Capacity 464 207 Part 3 - Single Stage Conflicting Flows 2412 Potential Capacity 28 Pedestrian Impedance Factor 1. 00 1. 00 Maj. L, Min T Impedance factor 0.88 Maj. L, Min T Adj. Imp Factor. 0.91 Cap. Adj. factor due to Impeding mvmnt 0.79 0.88 Movement Capacity 25 Results for Two-stage process: a 0.91 0.91 Y 1. 31 C t 117 Worksheet 8-Shared Lane Calculations Movement 7 8 9 10 11 12 L T R L T R Volume (vph) 77 0 60 Movement Capacity (vph) 117 47 453 Shared Lane Capacity (vph) 173 I I I I I I I I I I I I Worksheet 9-Computation of Effect of Flared Minor Street Approaches I Movement 7 8 9 L T R C sep Volume Delay Q sep Q sep +l round (Qsep +1) n max C sh SUM C sep n C act Worksheet 10-Delay, Queue Length, and Level of Service 10 L 11 T 12 R 117 77 47 o 453 60 I I 173 I I Movement Lane Config 1 L 4 7 8 9 10 11 LTR 12 v (vph) C (m) (vph) 71 592 137 173 I A ~/3 I . I vlc 0.12 95% queue length 0.41 Control Delay 11.9 LOS B Approach Delay Approach LOS I Worksheet 11-Shared Major LT Impedance and Delay I p(oj) v(il) , v(i2) , s (il), s (i2), P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through d(rank,l) Delay for stream 2 or 5 Volume for Volume for Saturation Saturation stream 2 or 5 stream 3 or 6 flow rate for flow rate for I I T:\699-190\HCS Runs\Belcher Calumet w Exist ApprovaI.doc I I I '-~ I I I I II I I I I I stream 2 or 5 stream 3 or 6 lanes f) \ 4, Movement 2 0.88 11.9 - 0.79 5.26 77.0 F 77.0 F Movement 5 1. 00 I - . I HCS2000: Unsignalized Intersections Release 4.lc TWO-WAY STOP CONTROL SUMMARY I Analyst: REC Agency/Co.: FDC Date Performed: 11/18/2003 Analysis Time Period: PM Peak Hour Intersection: Belcher at Calumet Jurisdiction: County Units: U. S. Customary Analysis Year: 2003 with Proposed Project Project ID: DEM Partnership East/West Street: Calumet Street North/South Street: Belcher Road Intersection Orientation: NS Study period (hrs): 0.25 I I Major Street: Vehicle Approach Movement 1 L Volumes and Adjustments Northbound 2 3 T R ,I Volume 86 Peak-Hour Factor, PHF 0.95 Hourly Flow Rate, HFR 90 Percent Heavy Vehicles 1 Median Type Raised curb RT Channelized? Lanes 1 Configuration L Upstream Signal? 2109 0.95 2220 Southbound 4 5 6 L T R 1090 50 0.95 0.95 1147 52 2 0 T TR No Eastbound 10 11 12 L T R 82 0 57 0.95 0.95 0.95 86 0 60 1 0 1 0 No 0 1 0 LTR Service Eastbound 10 11 12 LTR 146 158 0.92 6.69 109.5 F 109.5 F I I 2 T No I Minor Street: Approach Movement Westbound 789 L T R I Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Median Storage Flared Approach: o I 1 Exists? Storage RT Channelized? Lanes Configuration I Delay, NB 1 L Queue Length, and Level of SB Westbound 4 7 8 9 I Approach Movement Lane Config I v (vph) C(m) (vph) v/c 95% queue length Control Delay LOS Approach Delay Approach LOS 90 584 0.15 0.54 12.3 B I I I I I A I ,:::: ..-/ I - e I Computation 4 and 5 Single-Stage Process Movement 1 L 4 L 7 L 8 T 9 R 10 L 11 T 12 R I V c,x s Px V c,u,x 1199 2463 3573 600 I C r,x C plat,x Two-Stage Process I 7 Stagel Stage2 8 Stagel Stage2 10 Stagel Stage2 11 Stagel Stage2 I V(c,x) s P(x} V(c,u,x) 1173 1290 3400 1173 2400 3400 C(r,x) C(plat,x) I Worksheet 6-Impedance and Capacity Equations Step 1: RT from Minor St. 9 12 600 447 1. 00 1. 00 447 1. 00 0.87 4 1 1199 584 1. 00 1. 00 584 1. 00 0.85 8 11 3573 6 1. 00 1. 00 0.85 0.85 5 1. 00 1. 00 7 10 2463 25 1. 00 1. 00 0.85 0.88 0.76 0.85 21 I I Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. Step 2: LT from Major St. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. Maj L-Shared Prob Q free St. I I Step 3: TH from Minor St. I Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free St. I Step 4: LT from Minor St. I Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity I Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance Step 3: TH from Minor St. 8 11 I I Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free St. 66 1. 00 0.85 56 1. 00 1173 268 1. 00 1. 00 268 1. 00 I Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap_ Adj. factor due to Impeding mvmnt 261 1. 00 1. 00 2400 66 1. 00 0.85 I Ii '6 I - I Movement Capacity I Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity . 261 56 1. 00 0.85 3573 6 1. 00 0.85 5 I Result for 2 stage process: a 0.91 0.91 5.16 44 1. 00 y C t Probability of Queue free St. 1. 00 I Step 4: LT from Minor St. 10 7 I Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity 56 1. 00 0.85 47 1173 258 1. 00 1. 00 258 I Part 2 - Second Stage Conflicting Flows Potential Capacity pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity I 533 1. 00 0.87 461 1290 224 1. 00 0.85 189 Part 3 - Single Stage Conflicting Flows Potential Capacity pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity I I 1. 00 0.85 0.88 0.76 2463 25 1. 00 0.85 21 Results for Two-stage process: a 0.91 0.91 1.41 109 y C t I Worksheet 8-Shared Lane Calculations 12 R Movement I 7 L 8 T 9 R 10 L 11 T 60 447 Volume (vph) Movement Capacity (vph) Shared Lane Capacity (vph) I 86 109 o 44 158 I Movement Worksheet 9-Computation of Effect of Flared Minor Street Approaches 10 L 7 L 8 T 9 R 11 T 12 R I C sep Volume Delay Q sep Q sep +1 round (Qsep +1) 109 86 44 o 447 60 I 158 I n rnax C sh SUM C sep n C act I Movement Lane Config 7 Worksheet 10-Delay, Queue Length, and Level of Service 12 1 L 4 8 9 10 11 LTR v (vph) C (m) (vph) 90 584 I A \ (1 146 158 I I I I I I I Worksheet 5-Effect of Upstream Signals Computation 1-Queue Clearance Time at Upstream Signal Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) I I V prog Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (see) Cycle Length, C (see) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g(q) I I Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta Travel time, t(a) (see) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 I I Computation 3-Platoon Event Periods Result I 0.000 0.000 I p(2) p(5) p(dom) p (subo) Constrained or unconstrained? I Proportion unblocked for minor movements, p(x) (1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II I P (1) p(4) p(7) P (8) P (9) P (10) P (11) p(12) I I All I - - I HCS2000: Unsignalized Intersections Release 4.lc TWO-WAY STOP CONTROL (TWSC) ANALYSIS I Analyst: REC Agency/Co.: FDC Date Performed: 11/18/2003 Analysis Time period: PM Peak Hour Intersection: Belcher at Calumet Jurisdiction: County Units: U. S. Customary Analysis Year: 2003 with Proposed Project Project ID: DEM Partnership East/West Street: Calumet Street North/South Street: Belcher Road Intersection Orientation: NS Study period (hrs): 0.25 I I Vehicle Volumes and Adjustments Major Street Movements 1 2 3 4 5 6 L T R L T R Volume 86 2109 1090 50 Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 Peak-IS Minute Volume 23 555 287 13 Hourly Flow Rate, HFR 90 2220 1147 52 Percent Heavy Vehicles 1 Median Type Raised curb RT Channelized? Lanes 1 2 2 0 Configuration L T T TR Upstream Signal? No No Minor Street Movements 7 8 9 10 11 12 L T R L T R Volume 82 0 57 Peak Hour Factor, PHF 0.95 0.95 0.95 Peak-IS Minute Volume 22 0 15 Hourly Flow Rate, HFR 86 0 60 Percent Heavy Vehicles 1 0 1 Percent Grade (%) 0 0 Median Storage 1 Flared Approach: Exists? No Storage RT Channelized? Lanes 0 1 0 Configuration LTR I I I :1 I I I Pedestrian Volumes and Adjustments Movements 13 14 15 16 Flow (ped/hr) 0 0 0 0 Lane Width (ft) 12.0 12.0 12.0 12.0 Walking Speed (ft/sec) 4.0 4.0 4.0 4.0 Percent Blockage 0 0 0 0 I I Prog. Flow vph Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Speed mph Distance to Signal feet I S2 Left-Turn Through S5 Left-Turn Through I Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Movement 2 Movement 5 I I Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: I A"/ b I - e I vlc 0.15 95% queue length 0.54 Control Delay 12.3 LOS B Approach Delay Approach LOS 0.92 6.69 109.5 F 109.5 F I Worksheet ll-Shared Major LT Impedance and Delay Movement 2 Movement 5 I p(oj) v(il) , v(i2) , s (il), s (i2) , P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through d(rank,l) Delay for stream 2 or 5 0.85 1. 00 :1 Volume for Volume for Saturation Saturation stream 2 or 5 stream 3 or 6 flow rate for flow rate for stream 2 or 5 stream 3 or 6 12.3 lanes I T:\699-190\HCS Runs\Belcher Calumet w Prop Proj.doc I I I I I I I I I I I I I ;1 ),.~ I e - I TABLE 4 - 7 GENERALIZED PEAK HOUR DIRECTIONAL VOLUMES FOR FLORIDA'S URBANIZED AREAS* I UNINTERRUPTED FLOW HIGHWAYS FREEWAYS I Leve[ of Service Interchange spacing 2: 2 mi. apart Lanes Divided A B C D E Level of Service I Undivided 100 340 670 950 1,300 Lanes A B C D E 2 Divided [,060 1,720 2,500 3,230 3,670 2 1,270 2,110 2,940 3,580 3,980 3 Divided 1,600 2,590 3,740 4,840 5,500 3 [,970 3,260 4,550 5,530 6,150 STATE TWO-WAY ARTERIALS 4 2,660 4,410 6,150 7,480 8,320 Class I (>0.00 to 1.99 signalized intersections per mile) 5 3,360 5,560 7,760 9,440 10,480 Level of Service 6 4,050 6,710 9,360 11,390 12,650 Lanes Divided A B C D E I Undivided ** 220 720 860 890 Interchange spacing < 2 mi. apart 2 Divided 250 1,530 1,810 1,860 *** Level of Service 3 Divided 380 2,330 2,720 2,790 *** Lanes A B C D E 4 Divided 490 3,030 3,460 3,540 *** 2 1,130 1,840 2,660 3,440 3,910 3 1,780 2,890 4,[80 5,410 6,150 Class II (2.00 to 4.50 signalized intersections per mile) 4 2,340 3,940 5,700 7,380 8,380 Level of Service 5 3,080 4,990 7,220 9,340 10,620 Lanes Divided A B C D E 6 3,730 6,040 8,740 11,310 12,850 I Undivided ** 100 590 810 850 2 Divided ** 220 1,360 1,710 1,800 BICYCLE MODE 3 Divided ** 340 2,110 2,570 2,710 4 Divided ** 440 2,790 3,330 3,500 (Note: Level of service for the bicycle mode in this table is based on roadway geometries at 40 mph posted speed and traffic conditions, not number of Class III (more than 4.5 signalized intersections per mile and not bicyclists using the facility.) (Multiply motorized vehicle volumes shown below within primary city central business district of an by number of directional roadway lanes to determine maximum service volumes.) urbanized area over 750,000) I I I I I Paved Shoulder/ Level of Service Level of Service Bicycle Lane Lanes Divided A B C D E Coverage A B C D E I Undivided ** ** 280 660 810 0-49% ** ** 170 720 >720 2 Divided ** ** 650 1,510 1,720 50-84% ** 130 210 >210 *** 3 Divided ** ** 1,020 2,330 2,580 85-100% 160 380 >380 *** *** 4 Divided ** ** 1,350 3,070 3,330 I I Level of Service Lanes Divided A B C I Undivided ** ** 270 2 Divided ** ** 650 3 Divided ** ** 1,000 4 Divided ** ** 1,350 D E 720 780 Level of Service 1,580 1,660 Sidewalk Coverage A B C D E 2,390 2,490 0-49% ** ** ** 330 810 3,130 3,250 50-84% ** ** ** 520 990 85-100% ** 120 590 >590 *** PEDESTRIAN MODE (Note: Level of service for the pedestrian mode in this table is based on roadway geometries at 40 mph posted speed and traffic conditions, not the number of pedestrians using the facility.) (Multiply motorized vehicle volumes shown below by number of directional roadway lanes to determine maximum service volumes.) I Class IV (more than 4.5 signalized intersections per mile and within primary city central business district of an urbanized area over 750,000) I NON-STATEROADWAYS Major City/County Roadways BUS l\IODE (Scheduled Fixed Route) Level of Service (Buses per hour) Lanes Divided A B C D E Level of Service I Undivided ** ** 480 760 810 Sidewalk Coverage A B C D E 2 Divided ** ** 1,120 1,620 1,720 0-84% ** >5 2:4 2:3 2:2 3 Divided ** ** 1,740 2,450 2,580 85-100% >6 >4 2:3 2:2 2:1 I I Lanes Divided I Undivided 2 Divided Other Signalized Roadways (signalized intersection analysis) Level of Service ABC ** ** 250 ** ** 580 D 530 1,140 E 660 1,320 ARTERIAIJNON-ST A TE ROADWAY ADJUSTMENTS DIVIDED/UNDIVIDED (alter corresponding volumes by the indicated percent) I Source: Florida Department of Transportation Systems Planning Office 605 Suwannee Street, MS 19 Tallahassee, FL 3239941450 http://wwwll.myflorida.com/planning/systems/sm/los!default.htm 02/22/02 Lanes Median Left Turns Lanes Adjustment Factors I Divided Yes +5% I Undivided No -20"10 Multi Undivided Yes -5% Multi Undivided No -25% I ONE WAY FACILITIES Increase corresponding volume 20% .This table does not constitute a standard and should be used only for general planning applications. The computer models from which this table is derived should be used for more specific planning applications. The table and deriving computer models should not be used for corridor or intersection design, where more refined techniques exist. Values shov,{l1 are hourly directional volumes for levels of service and arc for the automobile/truck modes unless specifically stated. Le,,'el of service letter grade thresholds are probably not comparable across modes and, therefore, cross modal comparisons should be made with caution. Furthermore, combining levels of service of different modes into one overall roadway level of seryice is not recommended. To convert to annual average daily traffic volumes, these. volumes must be divided by appropriate D and K fJctors. The table's input value defaults and level of ser\;ce criteria appear on the following page. Calculations are based on planning applications of the Highway Capacity Manual, Bicycle LOS Model, Pedestrian LOS Modd and Transit Capacity and Quality of Service ~13nual, respectively for the automobile/truck, bicycle, pedestrian and bus modes. -.Cannot be achieved using table input vaLue defaults. -"'Not applicable for that level of service letter grJdc. For automobile/truck modes, volumes greater tha~ level of service D become F because intersection capacities have been reached. For bicycle and pedestrian modes, the blel of service letter grade (including F) is not achievable, because there is no maximum ychicle volume threshold using table input value defaults. I I 97 A J,I I I I I I I I I I I I I I I I I I I I . . - - COMMISSIONERS BOARD OF COUNTY COMMISSIONERS PINELLAS COUNTY, FLORIDA DEPARTMENT OF PUBLIC WORKS 440 COURT STREET CLEARWATER, FLORIDA 33756 PHONE: (727) 464-3251 n-: ""''''':0F'l T~T17\ 'D it.,:.~ ~_,~ s.._-",:<c:_-~,_~JL -V J.2J KAREN WILLIAMS SEEL - CHAIRMAN SUSAN LATVALA - VICE CHAIRMAN CALVIN D. HARRIS JOHN MORRONI ROBERT B. STEWART BARBARA SHEEN TODD KENNETH T. WELCH MAY 2 0 2003 Utilization Permit #03-00320 May 19, 2003 -. ,-"-,-,,o'AS B ,."ry " 0'n"'\'mNS i:,Lu ~'J'ih t 1\\,l.h, c<; ~~.~.u '/"_ L1overas, Baur & Stevens 29228 US Highway 19 North Clearwater, FI. 33761 Attn: Michiel S. L1overas, PE Re: Utilization Permit for OEM Partnership - Belcher Road & Calumet Street. (01/29/15) Dear Mr. L1overas: We are enclosing your approved Utilization Permit covering the proposed construction described below: Construct a driveway, sidewalk & storm drain connection on Belcher Road. This letter must be attached to and made part of the approved Utilization Permit, making the following conditions binding to the Permit: 1. It is the responsibility of the engineer of record to procure all necessary permits that are required by the agencies that are affected by the proposed construction. 2. Contact Pine lias County Highway Inspector Gene Crosson prior to beginning work. (Ph. #464-8900, 48 Hrs. Minimum Notice) 3. An eighteen (18) month maintenance bond may be required. The maintenance bond must be a minimum of 20% of the completion bond with the owner/developer as Principal. Before this Permit becomes effective, it will be necessary to contact the Utility Notification Center, "Call Sunshine", (1-800-432-4770) not less than 48 hours or more than five (5) days prior to construction. SinCffi;ely, ~,'1\,/ , , " ~', ':...." // , i -'f, . :\ Patrick S. Fox- Public Works Engineering Technician Right-of-Way Utilization Permits Permitting Services Ipf Enclosure/cc: Highway Department - "Pinellas County is an Equal Opportunity Employer" · Member.Pinellas Partnership for a Drug Free Workplace '-J printed on recycled paper Plllellas County Department of Public Works - 03~ oo:::GD_ eRM1T NO I RIGHT OF WAY UTILIZATION PERMIT THE COUNTY OF PINELLAS, a political subdivision of the State of Florida, hereinafter called the Permitter, hereby grants to Mark S. Klein ofDEM Partnership, a Florida general partnership (Street Address, City, State, Zip) operateD, maintainD, renewD and/or removeD Improvement wi thin (Name) hereinafter called the Permittee, a Permit to constructQ(J, the right-of-way of Belcher Road on attached plan along, across, beneath, or over right of way and/or property of Permitter at the following location County Road No. 501 Name Belcher Road situated at SW corner of Belcher Rd. & Calumet St. (Address C(" Street Intersection) Section 1 29 Township _ South 15 Range _ East, . Florida, subject to the following provisions and conditions 2. Construction, operation and maintenance of such utility SiBil not interfere with property and rights of prior occupant. The construction, operation and maintenance of such utility shall not create obstruction or conditions which are or may become dangerous to the traveling public. 4 5. !\II \Nork ",';st be done in keeping with standards of the Florida Department of Transportation Manual of Uniform Minimum Standards for Design. Construction and Maintenance for Streets and Highways, Roadway and Traffic Design Standards, Florida Department of Transportation standard Specifications for Road and Bridge Construction, AASHTO and by the County Director or his agent All materials and equipment shall be subject to rnspection by an Engineer of the County or his agent The Permittee shall and does hereby agree to rndemnify, pay the cost of defense, and save harmless the Permitter from and against payment of all claims, suits, actions, costs, attorneys' fees, expenses, damages, judgments, or decrees by reason of any person or persons or property being damaged or injured by the permittee, his employees, agents or sub-contractors or in any way attributable to the performance, prosecution, construction, operation, or maintenance of work herein permitted by Permitter and resulting from negligent acts or omiSSions of said Permittee in connection with the work 11erein permitted 6. The Permittee shall repair any damage or injUry to the road or highway or other County property by reason of the exercise of any of the privileges granted in this Permit, and shall repair the same promptly, within seven (7) days of opening, restonng it to a condition at least equal to that which existed immediately prior to the infliction of such damage or Injury (Note: All portions or the rrght of way other than paved areas disturbed by the construction of this utility Will be compacted, grassed and mulched or sodded as required) All overhead installations shall conform to clearance standards of the State Utilities Accommodation Guide and all underground crossing installations shall be laid at a minimum depth of 36" below pavement, or at such greater depth as Permitter may require. In the event of widening, repair or reconstruction of said road, the Permittee shall move or remove said utility Installation at no cost to the Permitter. This permit creates a permiSSive use only and the placing of facilities upon County property pursuant hereto shall not operate to create or to vest any property rights In said Permitee and IS granted in perpetuity subject to termination by the Permitter upon the giVing of 30~days notice in writing to the Permittee. The Permittee shall furnish the Permitter with a survey showing tile exact locations of all facilities to be Installed pursuant to thiS permit, said survey to be sufficiently detailed to aliow location of said installation by reference thereto The attached plan, covering details of thiS installation, shall be a part of this permit. 7 8. 9. 10. Upon completIon of instaliation, if field adjustments are made, an as-built drawing will have to be submitted 11 Section comer monuments subject to displacement shall first be rererenced and later reset by a Florida Registered Land Surveyor. 12 "''.11 activities in accordance with this permit will require conformance to the "Manual on Traffic Control and Safe Practices for street and Highway Construction, Maintenance and Utility Operations."' (Chapter 316 Florida Statutes) 13 The Permittee's attention is directed to the provisions of the Trench Safety Act (Florida Statutes, Section 55360 et seq) and the Occupational Safety and Health Administration EXC3vat:cn Safety Standards (29 C.F.R. Section 1926.650] Subpart P) which shal1 apply to construction, operation, and maintenance pursuant to thiS permit 14 Compaction within right of way to meet Plnellas County Minimum Standards. 15. Highway Department is to be notified a minimum of 48 hours prior to beginning work at 464-8900, otheN/ise the Permit Will be VOided 16. If this permit is for a monitor well, copies of all testrng reports are to be fON/arded to the Pinellas County Highway Deptartment 17 The Permittee shannce c ithrn 60 days from the date of thiS permit and it shall be completed within l E>o days Poem,n,eo,Age"' ~ A Pt,Ooo 1;1,1-1951 Dole ~f/, Rev 9f8/99 Mark S. APPLICATION SUBMITTAL INSTRUCTIONS Description and nature of the propose_tallation shall be outlined In the two blank lines o_lication 2 The bottom of Application Sheet 1 shall be signed by applicant or his agent. 3. On the attached plan, the following data shall be supplied: a. The plan shall show the right of way lines and the widths of right of way The offset distance from the centerline of the proposed installation shall be shown and the scope of the proposed proJect, with all the distances and si.:::es clearly indicated b. Typical cross section shall be furnished showing width of pavement, Width of right of way on each Side, offset distance from centerline to proposed installation and any pertinent data to sidewalks, curbs and gutters, etc 48 HOUHS BEFORE YOU DIG CALL SUNSHINE d. All pertinent drainage information and calculations or Justification for si.:::e of pipe andrcf ~60 0 -432 -4770 All improvements within County maintained right of way shall conform to FlOrida Departme~J~Srlli€rtkAW~J}.jelii6Q9~<iDAPinellas County Subdivision requirements c Indicate type of installation on both typical cross section and plan View. 4. 5. All applications for water and sewer lines must be separate applications and countersigned by the utility Involved prior to submittal 6. This form is to be made out in QUADRUPLICATE with four (4) drawings, one fully executed copy will be returned to you after approval 7. There is a variable processing fee which must be received prior to the issuance of the permit Please make check payable to Board of County Commissioners 8. Due to the extensive work being done in Pinelias County right of way, ple2se provide proof that you meet the following insurance requirements "Comprehensive General Liability Insurance including, but not limited to, Independent Contractor, Contractual, Premises/Operations, Products/Completed Operation, Explosion, Collapse and Underground, and Personal InjUry covering the liability assumed under indemnification proviSions of this permit, with limits of liability for personal l!lJury and/or bodily injury, including death, of not less than $300,000, each occurrence; and property damage of not less than $100,000, each occurrence (Combined Single Limits of not less than $300,000, each occurrence, will be acceptable unless otherwise stated.) Coverage shall be on an "occurrence" basis, and the policy shall include Broad Form Property Damaqe coverage, and Fire Leqal liability of not less than $50,000 per occurrence, unless otherwise stated by exception herein" THE UTILITY NOTIFICATION CENTER "CALL SUNSHINE" (1-3004324770) MUST BE NOTIFIED 48 HOURS IN ADVANCE OF CONSTRUCTION. Pinellas County Public Works Permitting Services Section 440 Court Street, 2nd Floor Clearwater, FL 33756 (727l 464-3670 P U B, L It.... \t;i II q V S j IV .1\..dd\ I~ I ~~J UTILIZq,..~, r"-,, 'T(' . f-\',Ui'i reGii,) I I 1- UTILITY COUNTERSIGN (NamelTilfe) I I (Uale) Sod required Open cut TO BE FILLED OUT BY PINELLAS COUNTY DEPARTMENT OF PUBLIC WORKS _ COMPACTION WITHIN blr2Lt"T- ___ "'Clrl r Ur- WAY TO MEET P/NElLAS COUNTY M/NIMIIM Q,^ ......... ~__ Jack and bore 0 Y es O;;~~ Directional bore 0 Yes D110 ~/ 0 No, DYes SEE ATTACHED LEDER FOR ADDITIOr'-JAL CONDITIONS TO THIS UTILITY PERMIT PINELLAS COUNTY, FLORIDA, A SIICjlG~) Date for - e COMMISSIONERS BOARD OF COUNTY COMMISSIONERS PINELLAS COUNTY, FLORIDA DEPARTMENT OF PUBLIC WORKS 440 COURT STREET CLEARWATER, FLORIDA 33756 PHONE: (727) 464-3251 KAREN WILLIAMS SEEL - CHAIRMAN SUSAN LATVALA - VICE CHAIRMAN CALVIN D. HARRIS JOHN MORRONI ROBERT B. STEWART BARBARA SHEEN TODD KENNETH T. WELCH Utilization Permit #03-0281 U May 19, 2003 L1overas, Baur & Stevens 29228 US Highway 19 North Clearwater, FI. 33761 Attn: Michiel S. L1overas, PE Re: Utilization Permit for OEM Partnership - Belcher Road & Calumet Street. (01/29/15) Dear Mr. L1overas: We are enclosing your approved Utilization Permit covering the proposed construction described below: Construct a potable water connection on Belcher Road. This letter must be attached to and made part of the approved Utilization Permit, making the following conditions binding to the Permit: 1. IUs the responsibility of the engineer of record to procure all necessary permits that are required by the agencies that are affected by the proposed construction. 2. Contact Pinellas County Highway Inspector Gene Crosson prior to beginning work. (Ph. #464-8900,48 Hrs. Minimum Notice) 3. An eighteen (18) month maintenance bond may be required. The maintenance bond must be a minimum of 20% of the completion bond with the owner/developer as Principal. Before this Permit becomes effective, it will be necessary to contact the Utility Notification Center, "Call Sunshine", (1-800-432-4770) not less than 48 hours or more than five (5) days prior to construction. S. (~I '"' In." ere y' . ;~. ..-.. Patrick S. Fox Public Works Engineering Technician Right-of-Way Utilization Permits Permitting Services /pf Enclosure/cc: Highway Department "Pinellas County is an Equal Opportunity Employer" · Member-Pinellas Partnership for a Drug Free Workplace C.: printed on recycled paper - - COMMISSIONERS BOARD OF COUNTY COMMISSIONERS PINELLAS COUNTY, FLORIDA DEPARTMENT OF PUBLIC WORKS 440 COURT STREET CLEARWATER, FLORIDA 33756 PHONE: (727) 464-3251 KAREN WILLIAMS SEEL - CHAIRMAN SUSAN LATVALA - VICE CHAIRMAN CALVIN D. HARRIS JOHN MORRONI ROBERT B. STEWART BARBARA SHEEN TODD KENNETH T. WELCH Utilization Permit #03-0282 U May 19, 2003 L1overas, Baur & Stevens 29228 US Highway 19 North Clearwater, FI. 33761 Attn: Michiel S. L1overas, PE Re: Utilization Permit for OEM Partnership - Belcher Road & Calumet Street. (01/29/15) Dear Mr. L1overas: We are enclosing your approved Utilization Permit covering the proposed construction described below: Construct a sanitary sewer connection on Belcher Road. This letter must be attached to and made part of the approved Utilization Permit, making the following conditions binding to the Permit: 1. It is the responsibility of the engineer of record to procure all necessary permits that are required by the agencies that are affected by the proposed construction. 2. Contact Pinellas County Highway Inspector Gene Crosson prior to beginning work. (Ph. #464-8900,48 Hrs. Minimum Notice) 3. An eiahteen (18) month maintp.nance hand mrlV be reauired The maintp.nrlncP' hond -- - -...;:." - - _0- - - - '\ . -., "" - - - - -- - - - - ____ - - - - - ___ - - - __ - . "__ _ _ _ _OJ ._ _ _ _ -. __.~ _ ___ _ _ _ _ . _ _ ____ _ _ _ _ . _". _ _ _ _ _. ._. must be a minimum of 20% of the completion bond with the owner/developer as Principal. Before this Permit becomes effective, it will be necessary to contact the Utility Notification Center, "Call Sunshine", (1-800-432-4770) not less than 48 hours or more than five (5) days prior to construction. Sincr\'~..eIY: ~~ V~ , >) \. " , 1\ ' Patrick S. Fox Public Works Engineering Technician Right-of-Way Utilization Permits Permitting Services /pf Enclosure/cc: Highway Department "Pinellas County is an Equal Opportunity Employer" · Member-Pinellas Partnership for a Drug Free Workplace CJ printed on recycled paper - - 1. Description and nature of the proposed installation shall be outlined in the two blank lines on application. 2. The bottom of Application Sheet 1 shall be signed by applicant or his agent. 3. On the attached plan, the following data shall be supplied: a. The plan shall show the right of way lines and the widths of right of way. The offset distance from the centerline of the proposed installation shall be shown and the scope of the proposed project, with all the distances and sizes clearly indicated. b. Typical cross section shall be furnished showing width of pavement, Width of right of way on each side, offset distance from centerline to proposed installation and any pertinent data to sidewalks, curbs and gutters, etc. c. Indicate type of installation on both typical cross section and plan view. d. All pertinent drainage information and calculations or justification for size of pipe and/or grading. 4. All improvements within County maintained right of way shall conform to Florida Department of Transportation requirements and/or Pinellas County Subdivision requirements. 5. All applications for water and sewer lines must be separate applications and countersigned by the utility involved prior to submittal. 6. This form is to be made out in QUADRUPLICATE with four (4) drawings: one fully executed copy will be returned to you after approval. 7. There is a variable processing fee which must be received prior to the issuance of the permit. Please make check payable to Board of County Comm:sslor1@fS. 8. Due to the extensive work being done in Pinellas County right of way, please provide proof that you meet the following insurance requirements: "Comprehensive General liability Insurance including, but not limited to, Independent Contractor, Contractual, Premises/Operations, Products/Completed Operation, Explosion, Coilapse and Underground, and Personal Injury covering the liability assumed under indemnification provisions of this permit, with limits of liability for personal injury and/or bodily injury, including death, of not less than $300,000, each occurrence; and property damage of not less than $100,000, each occurrence. (Combined Single limits of not less than $300,000, each occurrence, will be acceptable unless otherwise stated.) Coverage shall be on an "occurrence" basis, and the policy shall include Broad Form Property Damaqe coverage, and Fire Leqal Liability of not less than $50,000 per occurrence, unless otherwise stated by exception herein." , THE UTILITY NOTIFICATION CENTER .CALL SUNSHINE" (1-8004324770) MUST BE NOTIFIED 48 HOURS IN ADVANCE OF CONSTRUCTION. Plnellas County Public Works Permitting Services Section 440 Court Street, 2nd Floor Clearwater, Fl 33756 (727) 464-3670 UTIUTYCOUNTERSIGN l'< UTlurl QWNER(S) IS TO BE NOTIFIED A MINIMUM OF 4U HRS PRIOn TO CONNECTION OF THEIR FACiliTIES, ~~fi~ ' ('r '). J c' ^:f,'''-.1? r:'r , (NamelTille) <- _I ~ () j ae TO BE FILLED OUT BY PINELLAS COUNTY DEPARTMENT OF PUBLIC WORKS Sod required Open cut es DYes Jack and bore DYes Directional bore DYes ~' 9...bJ.o-.e PINELLAS COUNTY, FLORID ,-:-" llG'J,\,:::)_ Date:~ SEE ATTACHED LETTER FOR ADDITIONAL CONDITIONS TO THIS UTILITY PERMIT Pi;,ellas County Department of Public Works e RIGHT OF WAY UTILIZATION PERMIT Sewer eERMIT NO. 09 _ '128:2. U I L :)0 ) --0\ THE COUNTY OF PINELLAS, a political subdivision of the State of Florida, hereinafter called the Permitter, hereby grants to Mark Klein of DEM Partnership, a Florida general partnership (SlreelAddress, City, Stale, Zip) sanitary sewer renewD and/or removeD improvements with in (Name) hereinafter called the Permittee, a Permit to constructm, operateD, maintainD, the right-of-way of Belcher Road. and/or property of Permitter at the following location: County Road No. 501 Name: Belch.er Road situated at SW corner of Belcher Road and (Address CY Slreet Intersedion) on attached plan along, across, beneath, or CNer right of way Section -L Calumet' St. Township ~South Range ~ East, , Florida, subject to the following provisions and conditions: 1. Construction, operation and maintenance of such utility shall not interfere with property and rights of prior occupant. 2. The construction, operation and maintenance of such utility shall not create obstruction or conditions which are or may become dangerous to the traveling public. 3. All work must be done in keeping with standards of the Florida Department of Transportation Manual of Uniform Minimum Standards for Design, Construction aiid Maintenance for Streets and Highways, Roadway and Traffic Design Standards, Florida Department of Transportation Standard Specifications for Road and Bridge Construction, AASHTO and by the County Director or his agenl 4. All materials and equipment shall be subject to inspection by an Engineer of the County or his agent. 5. The Permittee shall and does hereby agree to indemnify, pay the cost of defense, and save harmless the Permitter from and against paymeGt of ail claims, suits, actions, costs, attorneys' fees, expenses, damages, judgments, or decrees by reason of any person or persons or property being damaged or injured by the permittee, his employees, agents or sub-contractors or in any way attributable to the performance, prosecution, construction, operation, or maintenance of work herein permitted by Permitter and resulting from negligent acts or omissions of said Permittee in connection with the work herein permitted. 6. The Permittee shall repair any damage or injury to the road or highway or other Ccunty property by reason of the exercise of any of the privileges granted in this Permit, and shall repair the same promptly, within seven (7) days of opening, restoring it to a condition at least equal to that which existed immediately prior to the infliction of such damage or injury. (Note: All portions of the right of way other than paved areas disturbed by the construction of this utility will be compacted, grassed and mulched or sodded as required.) 7. All overhead installations Shall conform to clearance standards of the State Utilities Accommodation Guide and afl underground crossing installations shaH be laid at a minimum depth of 36" below pavement, or at such greater depth as Permitter may require. 8. In the event of widening, repair or reconstruction of said road, the Permittee shall move or remove said utility installation at no cost to the Perm:ttc,_ 9. This permit creates? permissive use only and the placing of facilities upon County property pursuant hereto shall not operate to create or to vest any property rights in said Permitee and is granted in perpetuity subject to termination by the Permitter upon the givin9 of 30-days notice in writing to the Permittee. 1-__ The pe..rmittee ;hall furnish the Permitter with a survey showing the exact locations of all facilities to bk jnstaIlecJp:fWE~tJtliiJ~. ermit, said survey to be sufficiently detailed to allow location of said Installation by reference thereto. r r----.~~OUNTY The attached plan, covering details of this instal/ation, shall be a part of this permit. I i ~ Upon completion Of installation, if fleid adjustments are made, an as-built drawing will have to be su1~itte1 FE B 1 1 I Section corner monuments subject to displacement shall first be referenced and later reset by a F!Orra ~e~:d survi~).l ! All actIVIties In accordance WIth thiS permit WIll reqlJ!re conformance to the "Manual on Traffic Control aT a Sare t-'rac~~way ConstrUction, Maintenance and Utility Operations." (Chapter 316 FlOrida Statutes) UTILlZA T10YI'p1.~~IT ~.. The Permittee's attention is directed to the provisions of the Trench Safety Act (Florida Statutes, Section 553.60 et. seq.) an e S Safety and Health Administration S--::cavation Safety Staiida.ds (29 CF.R. Section 1926.650, Subpart P) which shall apply to construction, operation, and maintenance pursuant to this permit. Compaction within right of way to meet Pinellas County Minimum Standards. Highway Department is to be notified a minimum of 48 hours prior to beginning work at 464-8900, otherwise the Permit will be voided. el/, c ies of all testing reports are to be forwarded to the Pinellas County Highway Deptartment ithin 60 days from the date of this permit and it shall be completed within days 10. 11. I I f 12. 13. 14. 15. 16. 17. Permittee or Agent: ,x... Rev9J8/99 Mark S. Klein Phone: 4Ld-1951 Date: !-2C)-os APPLICATION SUBMITTAL INSTRUCTIONS e e 1 Description and nature of the proposed Installation shall be outlined in the two blank lines on application 2. The bottom or Application Sheet 1 shall be signed by applicant or his agent. 3. On the attached plan, the following data shall be supplied: a. The plan shall show the right of way lines and the widths of right of way. The offset distance from the centerline of the proposed installation shall be shown and the scope of the proposed project, with all the distances and sizes clearly indicated b. Typical cross section shall be furnished showing width of pavement, width of right of way on each side, offset distance from centerline to proposed installation and any pertinent data to sidewalks, curbs and gutters, etc. c. Indicate type of installation on both typical cross section and plan view. d. All pertinent drainage information and calculations or justification for size of pipe and/or grading. 4. All improvements within County maintained right of way shall conform to Florida Department of Transportation requirements and/or Pinellas County Subdivision requirements. 5. All applications for water and sewer lines must be separate applications and countersigned by the utility involved prior to submittal. 6. This form is to be made out in QUADRUPLICATE with four (4) drawings; one fully executed copy will be returned to you after approval. 7. There is a variable processing fee which must be received prior to the issuance of the permit. Please make check payable to Board of County Commissjonars, 8. Due to the extensive work being done in Pinellas County right of way, please provide proof that you meet the following insurance requirements: "Comprehensive General Liability Insurance including, but not limited to, Independent Contractor, Contractual, Premises/Operations, Products/Completed Operation, Explosion, Coiiapse and Underground, and Personal injury covering the liability assumed under indemnification provisions of this permit, with limits of liability for personal injury and/or bodily injury, including death, of not less than $300,000, each occurrence; and property damage of not less than $100,000, each occurrence. (Combined Single Limits of not less than $300,000, each occurrence, will be acceptable unless otherwise stated.) Coverage shall be on an "occurrence" basis, and the policy shall include Broad Form Property Damaqe coverage, and Fire Leqal Liability of not less than $50,000 per occurrence, unless otherwise stated by exception herein." THE UTILITY NOTIFICATION CENTER 'CALL SUNSHINE" (1-800-432-4770) MUST BE NOTIFIED 48 HOURS IN ADVANCE OF CONSTRUCTION. Pinellas County Public Works Permitting Services Section 440 Court Street, 2nd Floor Clearwater, FL 33756 (727) 464-3670 UT'U,;I OWNEl (8) IS TO BE NOTIFIED IX rvllNIMUM OF 4:3 HRS PRIOn TO CONNECTION OF T-;[IFt FAC>UTIES. UTILITY COUNTERSIGN ~J~ <',. 'J:J ""11\, 9" "~r:':.c ~ (Name/tilfeJ< ,-I c.f'-o j ae : 't.. l \ "'; '\ TO BE FILLED OUT BY PINELLAS COUNTY DEPARTMENT OF PUBLIC WORKS i Sod required Open cut ~.. DYes Jack and bore 0 Yes Directional bore 0 Yes ~. o No for Public SEE A TI ACHED LETIER FOR ADDITIONAL CONDITIONS TO THIS UTILITY PERMIT. An Equal Opportunity Employer Ronnie E. Duncan Chair, Pinellas Thomas G. Dabney, II Vice Chair, Sarasota Heidi B. McCree Secretary, Hillsborough Watson L Haynes, II Treasurer, Pinellas Edward W. Chance Manatee Monroe "AI" Coogler Citrus Maggie N. Dominguez Hillsborough Pamela L. Fentress Highlands Ronald C. Johnson Polk JanQt D. Kovach Hillsborough Gene A. Heath Interim Executive Director William s. Bilenky General Counsel Protecting Your Water Resources South~st Florida Water Managelnent District e 2379 Broad StreloC, Rrooksville, Florida 34604-6899 (352) 796-7211 or 1-800-423-1476 (FL only) SUNCOM 628-4150 TOD only 1-800-231-6103 (FL only) On the Internet at: WaterMatters.org Tampa Service Office 7601 Highway 301 North Tampa, Florida 33637-6759 (813) 985-7481 or 1-800-83&0797 (Fl only) SUNCOM 578-2070 Bartow Service Office 170 Century Boulevard Bartow, Florida 338;30-7700 (863) 534-1448 or 1-800-492-7862 (Fl only) SUNCOM 572-6200 Sarasota Service Office 6750 Fruitville Road Sarasota, Florida 34240-9711 (941) 377-3722 or 1-800-320-3503 (FL only) SUNCOM 531-6900 Lecanto Service Office 3600 West Sovereign Path Suite 226 Lecanto, Florida 34461-8070 (352) 527-8131 SUNCOM 667-3271 February 24, 20@1- RECEIVED Mark S. Klein DEM Partnership, a Florida General Partnership 2040 Northeast Coachman Road Clearwater, FL 33765 FEB 2 5 2003 LLOVERAS, BAUR & STEVENS Subject: Notice of Final Agency Action for Approval ERP General Construction Permit No: 44024317,000 Project Name: DEM Partnership - Belcher Road and Calumet Street County: Pinellas Secffwp/Rge: 1/29S/15E Dear Mr. Klein: This letter constitutes notice of Final Agency Action for approval of the permit application referenced above. Final approval is contingent upon no objection to the District's action being received by the District within the time frames described below. You or any person whose substantial interests are affected by the District's action regarding a permit may request an administrative hearing in accordance with Sections 120.569 and 120.57, F.S., and Chapter 28-1 06, Florida Administrative Gode (FAG.), of the Uniform Rules of Procedure. A request for hearing must: (1) explain how the substantial interests of each person requesting the hearing will be affected by the District's action, or proposed action, (2) state--aJl-mateFial-faGfsueisplJtefi--iJythe-per-S0RFefjldest-iRfftheheaFiRg_ or -state lhal tR€Fe--ar-e . no disputed facts, and (3) otherwise comply with Chapter 28-1 06, F.A. C. Copies of Sections 28-106.201 and 28-106.301, FAG. are enclosed for your reference. A request for hearing must be filed with (received by) the Agency Clerk of the District at the District's Brooksville address within 21 days of receipt of this notice. Receipt is deemed to be the fifth day after the date on which this notice is deposited in the United States mail. Failure to file a request for hearing within this time period shall constitute a waiver of any right you or such person may have to request a hearing under Sections 120.569 and 120.57, F.S. Mediation pursuant to Section 120.573, F.S., to settle an administrative aispute regarding the District's action in this matter is not available prior to the filing of a request for hearing. Enclosed is a "Noticing Packet" that provides information regarding the District Rule 40D-1.1 01 0, F.AC., which addresses the notification of persons whose substantial interests may be affected by the District's action in this matter. The packet contains guidelines on how to provide notice of the District's action, and a notice that you may use. The enclosed approved construction plans are part of the permit, and construction must be in accordance with these plans. - DEM Partnership, a Florida General Partnership Page 2 February 24, 2003 e If you have questions concerning the permit, please contact Richard M. Alt, P.E., at the Tampa Service Office, extension 2045. For assistance with environmental concerns, please contact Rick A. Perry, P.W .S., extension 2056. Sincerely, /J/1/J ~/~L f UZfi-.~F/~ Alba E. Mas, P.E., Director Tampa Regulation Department AEM:elb Enclosures: Approved Permit w/Conditions Attached Approved Construction Drawings Statement of Completion Notice of Authorization to Commence Construction _.Noticing2~keL(42.DO~Q3.9l_._,____. .. ___' ..... Sections 28-106.201 and 28-106.301, FAC. File of Record 44024317.000 S. "Sandy" L1overas, L1overas, Baur and Stevens celene: -l" - . SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE GENERAL CONSTRUCTION PERMIT NO. 44024317.000 I EXPIRATION DATE: February 24, 2008 I PERMIT ISSUE DATE: February 24,2003 This permit is issued under the provisions of Chapter 373, Florida Statutes (F.S.), and the Rules contained in Chapters 400-4 and 40, Florida Administrative Code (FAC.). 400-40, authorizes the Permittee to perform the work outlined herein and outlined herein and shown by the application, approved drawing(s), plans, specifications, and other documents, attached hereto and kept on file at the Southwest Florida Water Management District (District). All construction, operation and maintenance of the surface water management system authorized by this permit shall occur in compliance with Florida Statutes and Administrative Code and the conditions of this permit. PROJECT NAME: OEM Partnership - Belcher Road and Calumet Street GRANTED TO: OEM Partnership, a Florida General Partnership 2040 Northeast Coachman Road Clearwater, FL 33765 ABSTRACT: This permit is for the construction of a commercial site, the associated infrastructure, and an effluent filtration pond. OP. & MAINT. ENTITY: OEM Partnership, a Florida General Partnership PROPERTY LOCATION: Pinellas County SECnwP/RGE: 1/29S/15E TOTAL ACRES OWNED -OR-UNOeR-CQN~ROb~ a,2-g PROJECT SIZE: 3.29 Acres LAND USE: Commercial DATE APPLICATION FILED: October 15, 2002 AMENDED DATE: N/A - . Permit No. Project Name: Page 44024317.000 DEM Partnership - Belcher Road and Calumet Street 2 I. Water Quantity/Quality AREA ACRESAt... ...TOeOF BANK Eff!uent Filtration 1 O.?6 TOTAL 0.26 Mixing Zone required: YES ( ) NO (X) NO (X) Variance required: YES ( ) II. 1 OO-Year Floodplain -Eilcroacnmenl - n-COmpensatron CompensalTOn Encroachmel11 - r (Acre-Feet of fill) (Acre-Feet of excavation) Type Result (feet) 0.00 0.00 N/A N/A III. Environmental Considerations No wetlands or other surface waters exist within the project area. A regulatory conservation easement is not required. A proprietary conservation easement is not required. SPECIFIC CONDITIONS 1. If the ownership of the project area covered by the subject permit is divided, with someone other than the Permittee becoming the owner of part of the project area, this permit shall terminate, pursuant to Section 40D-1.6105, FAC. In such situations, each land owner shall obtain a permit (which may be a modification of this permit) for the land owned by that person. This condition shall not apply to the division and sale of lots or units in residential subdivisions or condominiums. 2. The discharges from this system shall meet state water quality standards as set forth in Chapter 62-302 and Section 62-4.242, FAC., for class waters equivalent to the receiving waters. 3. Unless specified otherwise herein, two copies of all information and reports required by this permit shall be submitted to: Tampa Regulation Department Southwest Florida Water Management District 7601 U.S. Highway 301 North Tampa, FL 33637 The permit number, title of report or information and event (for recurring report or information submittal) shall be identified on all information and reports submitted. e . Permit No. Project Name: Page 44024317.000 OEM Partnership - Belcher Road and Calumet Street 3 4. The Permittee shall retain the design engineer, or other professional engineer registered in Florida, to conduct on-site observations of construction and assist with the as-built certification requirements of this project. The Permittee shall inform the District in writing of the name, address and phone number of the professional engineer so employed. This information shall be submitted prior to construction. 5. Within 30 days after completion of construction of the permitted activity, the Permittee shall submit to the Tampa Service Office a written statement of completion and certification by a registered professional engineer or other appropriate individual as authorized by law, utilizing the required Statement of Completion and Request for Transfer to Operation Entity form identified in Chapter 400-1, FAC., and signed, dated, and sealed as-built drawings. The as-built drawings shall identify any deviations from the approved construction drawings. 6. The District reserves the right, upon prior notice to the Permittee, to conduct on-site research to assess the pollutant removal efficiency of the surface water management system. The Permittee may be required to cooperate in this regard by allowing on-site access by District representatives, by allowing the installation and operation of testing and monitoring equipment, and by allowing other assistance measures as needed on site. 7. The operation and maintenance entity shall submit inspection reports in the form required by the District, in accordance with the following schedule. For systems utilizing effluent filtration or exfiltration or systems utilizing effluent filtration or exfiltration and retention or wet detention, the inspections shall be performed 18 months after operation is authorized and every 18 months thereafter. 8. For dry bottom detention systems, the detention areas shall become dry within 36 hours after a rainfall event. If a detention area is regularly wet, this situation shall be deemed to be a violation of this permit. 9. Referto GENERAL CONDITION No. 15 herein. GENERAL CONDITIONS 1. The general conditions attached hereto as Exhibit "A" are hereby incorporated into this permit by reference and the Permittee shall comply with them. ~~ /i.llthnri7arl Qinn~::t1t11 ra I \.'-"LII'-'.''-:''''-'_ '-'1~IU.A."""J""'" ~..' .. e Exhibit A A part of Lot 12, CLEARWATER INDUSTRIAL PARK, according to the plat thereof, recorded in Plat Book 44, Page 46, Public Records of Pinellas County, Florida, more particularly described as follows: Commence at the Northwest corner of said Lot 12; thence South 89 degrees 21'49" East (plat bearing and basis of bearings for this description), along the North boundary of said Lot 12, 208.00 feet for a POINT OF BEGINNING; thence" South 89 degrees 21'49" East, continuing along the North boundary of said Lot 12, 377.16 feet; thence South 00 degrees 02'48" West, along the West right-of-way line of Belcher Road, 55.00 feet Westerly of and parallel to the East boundary of the Southeast one-quarter (1/4) of Section I, Township 29 South, Range 15 East, Pinellas County, Florida, being the West boundary of public right-of-way conveyed to Pinellas County by Quit-Claim Deed recorded November 17, 1976 in O.R. Book 4478, Page 2113, Public Records of Pinellas County, Florida, 379.98 feet; thence North 89 degrees 21'49" West, along the South boundary of said Lot 12, 376.66 feet to a point lying South 89 degrees 21'49" East of and 200.00 feet from the Southwest corner of said Lot 12; thence North 00 degrees 01'4211 West, 379.98 feet to the POINT OF BEGINNING. TOGETHER WITH an easement for drainage purposes, as created in an instrument recorded February 23, 1993, in Official Records Book 8188, page 825, described as follows: A part of Lot 12, CLEARWATER INDUSTRIAL PARK, according to the plat thereof recorded in Plat Book 44, page 46, of the Public Records of Pinellas County, Florida, more particularly described as follows: Begin at the Southwest corner of said Lot 12; thence North 00 deg. 05'30" West (plat bearing and basis of bearings for this description) along the West boundary of said Lot 12, 10.00 feet; thence South 89 deg. 21'49" East, 200.01 ~ feet; thence South 00 deg. 01'42" East, 10.00 feet; thence North 89 deg. 21'49" West, along the South boundary of said Lot 12, 200.00 feet to the POINT OF BEGINNING. National Society of Professional Engineers Florida Engineering Society American Society of Civil Engineers Florida Surveying and Mapping Sociefy American Congress on Surveying and Mapping Insfitute of Transportation Engineers Florida Planning and Zoning Association National Association of Environmental Professionals - . (;Jw.JJt- cmJ. Q~ , Engineers - Surveyors - Planners September 24, 2003 Mr. Mark S. Klein Klein & Heuchan, Inc. Realtors 2040 N.E. Coachman Road Clearwater, Florida 33765 Re: DEM Partnership - Belcher Road & Calumet Street GTE Federal Credit Union Comprehensive Infill Redevelopment Application Dear Mark: Enclosed please find the following information for your use in making the City of Clearwater application for the Comprehensive Infill Redevelopment associated with the GTE Federal Credit Union. 1. Fifteen (15) copies of the City of Clearwater Flexible Development Application for this Comprehensive Infill Redevelopment Project. 2. One (1) copy of a location map. 3. One (1) reduced set of the Site Plans, including the Landscape Plan. 4. One (1) reduced set of the credit union elevations. 5. One (1) copy of the Southwest Florida Water Management District Environmental Resource Pennit. 6. One (1) set ofthe Pinellas County Use Permits. 7. Fifteen (15) prints (24" x 36") of the Boundary Survey. 8. Fifteen (15) sets (24' x 36" - 2 sheets) of the building elevations. 9. Fifteen (15) sets (24" x 36' - 11 sheets) of the Site Construction Plans. Thirteen (13) copies of the application and the drawings are needed for submittal. Two (2) extra copies are enclosed for your use. Please let us know if you have any questions or if you need any assistance with the submittal of this application. Very truly yours, AND STEVENS overas, PE, PSM, AICP illS!: Iw/klein2 enclosures 29228 U.S. Hwy. 19 North Clearwater, Florida 33761 www.lbsonline.com Pinellas: (727) 784-3965 Pasco: (727) 842-7635 Fax: (727) 784-8153 CL WCoverSheet - e , f"""'"", ,:, "-"~',~':;:', ,"', '/ ["':l ,,:c:., , "" "', ,'i, \ Ii, L, I'~' } ~, '; " : '" \ 1 ',1!" ..L}.:~.,,,,., "j \ I,: [" j" I ~' ,'I ijl,) , \ :J ,-:., . '.', :',,7'\-;':::';"~:'--,~ -'_.(",;-:~'~-,',:-:"'J;'::';f'::;:'_::'-;,=~;'::;'r'"r, , ,;.-) . f t_', .",1 ,",',,~ '~.,... ...)0: ,".1 ':_, _ > 1~" "<.::::,":"': ~:;:_,',': :, ~_' . V~ _:AIY 0": (;I!:.i,c,>I;\1 L;1, FLD2003-09047 1750 N BELCHER RD Date Received: 09/24/2003 GTE FEDERAL CREDIT UNION ZONING DISTRICT: IRT LAND USE: IL ATLAS PAGE: 262B Oil l G. , Nil-\.. ~E.T \ t~'V~) \ I c~ \~\;, ~:j~f - . rlDVrWZ2Z;c.:>-/O:- ,~1~~-) ,(~:'\. (';;;)\~ <icY, t,.""",\, 1"" fy,ff;;::lj (;. (~~~" \, \ I (1'- - - F\ ''1'''''' = I' 'i~II~' =- u \,\\f'~ ~ - :I ""~?,.,A~~.., "".,. "",J11" """~""'" \,",' A', -\..""~ ~J.",~~7::,;;:il1f~lL,~<".J,i.'f ~i.j~"IFI:r' ", ~~) -, ~i!:;,.\ i:J /J tG ~ "t., .rj~ Y}C .-<:~,;c~ZV1.i1.1t CITY OF CLEARWATER LONG RANGE PLANNING DEVELOPMENT REVIEW PIANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUiLDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 December 18, 2003 Mr. Gerald A. Figurski, Esquire 2435 U.S. Highway 19, Suite 350 Holiday, FL 34691 RE: Development Order - Case FLD2003-09047 - 1750 North Belcher Road Dear Mr. Figurski: This letter constitutes a Development Order pursuant to Section 4-206.D.6 of the Community Development Code. On December 16,2003, the Community Development Board reviewed your Flexible Development application to permit retail sales (financial services) with deviations to allow direct access to a major arterial street (North Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2- 1304.C. The Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-1304.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with and will not be detrimental to development/redevelopment efforts of the surrounding area. Conditions of Approval: 1. That the final design and color of the buildings be consistent with the conceptual elevations submitted to, or as modified by, the CDB; 2. That use of the building on the subject property be limited to a credit union with hours of operation ending at 5 :00 pm daily. The applicant shall record a covenant in the public records restricting the use of this building on the subject property, as contained in this condition, prior to the issuance of a Certificate of Occupancy for the credit union. Any future change of use of this building to a bank: shall require the following: BRIAN j. AUNGST, MAYOR-COM~IISSIONER HoYT HAMILTON, VICE MAYOR-COMMISSIONER \VHITNEY GRW, CmlMISSIONER FRANK HII3BARD, COMMISSIONER * BIl,l.jONSON, Cml~IISSI0NER "EQUAL EMPLOYMENT AND AFFIRIvL'lTIVE ACTION EMPLOYER" It e December 18, 2003 Figurski - Page Two a. Construction plans be submitted and approved showing the installation of a left turn lane of adequate storage length, according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Road. Construction of this improvement must be completed prior to the issuance of an Occupational License for the bank; b. Establishment of an escrow account with the City, prior to the issuance of an Occupational License for the bank, for the future construction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if warranted by a Traffic Signal Wan-ant Study. The funds in the escrow account will be a shared pOliion of the full cost of a traffic signal light. The City's shared portion shall not exceed 50 percent of the full cost. If, in the event that a traffic signal light is not wan-anted based on the Study, funds will be refunded to the applicant. 3. That revised landscape plans be submitted and approved prior to the issuance of building pennits for the proposed credit union reflecting Code foundation plantings; 4. That outdoor lighting fixtures be integrated into the landscape site design to avoid shielding of the lighting by tree canopy; and 5. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity. Freestanding signage shall be limited to monument-style, not to exceed six feet in height. Submission of a Comprehensive Sign Program is required for more than one freestanding sign on either street frontage. Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (December 16, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Coordinator may grant an extension of time for a period not to exceed one year and only within the original period of validity. The Community Development Board may approve one additional extension of time after the community development coordinator's extension to initiate a building permit application. The issuance of this Development Order does not relieve you of the necessity to obtain any building pennits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy ofthis letter with you when applying for any pelmits or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4-502.B by the applicant or by any person granted party status within 14 days of the date of this Development Order. The filing of an applicationJnotice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on January 1, 2004 (14 days from the date of this Development Order). e e December 18, 2003 Figurski - Page Three If you have any questions, please do not hesitate to call Wayne M. Wells, Senior Planner, at 727- 562-4504. You can access zoning information for parcels within the City through our website: www.mycIearwater.com/gov/depts/planning. *Make Us Your Favorite! ~ Cynthia H. Tarapani, AICP Planning Director \IMS5c1PDSIPlanning DepartmentlC D BIFLLY\Pending cases I Up for the next CDBlBelcher N 1750 GTE Federal Credit Union (IRT) (CIRP- retail sales)IBelcher N 1750 Development Order. doc tit -- ~ Clearwater u City of Clearwater Planning Department 100 South Myrtle Avenue, 33756 P.O. Box 4748 Clearwate~ Florida 33758-4748 Fax To: Mr. Gerald Figurski From: Wayne Wells 562-4504 Fax: 944-3711 Pages: 8 Re: Staff Recommendation Date: 12/12/2003 CC: Phone: 942-0733 o Urgent 1KI For Review 0 Please Comment 0 Please Reply o Please Recycle . Comments: Attached staff recommendation re: FLD2003-09047 - 1750 North Belcher Road (BelCal Properties, LLC.) Community Development Board Meeting date: Tuesday, December 16, 2003, 2:00pm r I I DATE,TIME FA>< tm. /HAf'lE DURATIOH PAGE(S) RESULT MODE '.At'SMISSION VERIFICATION REPORT 12/12 15:31 9'3443711 00:04:25 08 m< STANDARD EeM TIME 12/12/2003 15:35 HAME PLAH FAX 7275524575 TEL 7275524557 I I I ~ - Engineers ~ Surveyors ~ Planners Lloveras, Baur and Stevens 29228 U.S. Highway 19 North Phone: (727) 784-3965 Clearwater, Florida 33761 Fax: (727) 784-8153 To: Wayne M. Wells, AICP From: Michael S. Lloveras, PE, PSM, AICP CC: Date: December 72, 2003 Re: Bel-Cal Wayne, Here are the reductions that you requested. Please call me if you have any questions. Thanks, Mike LL e 0 >- f-- U FAX COVER MEMO CITY OF CLEARWATER PLANNING DEPARTMENT 100 S. MYRTLE AVE. CLEARWATER, FL 33756 (727) 562-4567 FAX: (727) 562-4865 TO: jO-r- r v. ~"'j vr:\')::, FAX: .. .'14+\ 3711. Phone: '} + 2- - 0 73'3 FROM:\-) (N.-\ '0J.- W ~\ \:s DATE:c_ E-)4\~ 3 Phone: ~ ~ L' +S04- RE: PL-P 'U)O ~ * CJ ~ 0+ 7 11 SO N. D~ \c~v- IC~. MESSAGE: ~Pl ~J..~~, ;" ')htLJ~,.t. S~ e ~ plLt.-fl2.lt) f:} L + #.3 . NUMBER OF PAGES(INCLUDING THIS PAGE) L DATE,TIME FAX HO./HAME DURATIOH PAGE(S) RESULT MODE *RAHSMISSIOH \/ERIFICATIOH REPORT I 12,/04 12: 34 '3'3443711 OD: 00: 5E: 02 i]f< 5T A~mARD ECM TIME 12/04/2003 12:35 HAME PLAr~ FAX 7275524575 TEL 7275524557 e e DRAFT 3. The development is compatible with and will not be detrimental to development/redevelopment efforts of the surrounding area. Conditions of Approval: 1. That the final design and color of the buildings be consistent with the conceptual elevations submitted to, or as modified by, the CDB; (:!) That, prior to the issuance of building permits for the proposed credit union, revised plans be submitted and approved showing the construction a left turn lane of adequate storage length, according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Road; o That, prior to the issuance of building permits for the proposed credit union, the applicant establish an escrow V account with the City for the future construction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if warranted by a Traffic Signal Warrant Study. The funds in the escrow account will be a shared portion of the full cost of a traffic signal light. If, in the event that a traffic signal light is not warranted based on the Study, funds will be refunded to the applicant; 4. That revised landscape plans be submitted and approved prior to the issuance of building pemrits for the proposed credit union reflecting Code foundation plantings; 5. That outdoor lighting fixtures be integrated into the landscape site design to avoid shielding of the lighting by tree canopy; and 6. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of unifomrity. Freestanding signage shall be limited to monument-style, not to exceed six feet in height. Submission of a Comprehensive Sign Program is required for more than one freestanding sign on either street frontage. DRAFT Prepared by: Planning Department Staff: Wayne M. Wells, AICP, Senior Planner ATTACHMENTS: Aerial Photograph of Site and Vicinity Location Map Future Land Use Map Zoning Atlas Map Application I IMS5clPDSIPlanning DepartlllentlC D BIFLEX1Pending caseslUp for the next CDBIBelcher N 1750 GTE Federal Credit Union (IRT) (CIRP- retail sales)IBelcher N 1750 Staff Report. doc Staff Report - Community Development Board - December 16, 2003 - Case FLD2003-09047 - Page 5 - e C I T Y 0 F CLEARWATER LONG RANGE PlANNING DEVELOPMENT REvIEW PLANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 December 1, 2003 Mr. Gerald A. Figurski, Esquire 2435 US Highway 19, Suite 350 Holiday, FL 34691 Re: Community Development Board Meeting (FLD2003-09047) Dear Mr. Figurski: The Flexible Development application (Case No. FLD2003-09047) to permit retail sales (financial services) with deviations to allow direct access to a major arterial street (Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C for property located at 1750 North Belcher Road has been scheduled to be reviewed by the Community Development Board on December 16,2003. The meeting will take place at 2:00 p.m. in the City Commission Chambers, 3rd floor of City Hall at 112 S. Osceola Avenue, Clearwater. If you have any questions, please do not hesitate to call me at 727-562-4504. Sincerely, WarN- M . W~ Wayhe M. Wells, AICP Senior Planner \\MS5cIPDSIPlanl1ing DepartmentlC D BlFLEXlPending cases I Up for the next CDB\Belcher IV 1750 GTE Federal Credit Union (IRT) (retail sales)IBelcher IV 1750 CDB Letter.doc BRIAN]. AUNGST, MAYO)(-CmL\115SI0NER HoYr HAAilLTON, VICE IYlAYOR-CmIMISSIONER \VHITNEY GRAY, CmI:\1[5510NER FRANK HlI3lJARD, COM!v!lS5[ONER ('~ B[LL)01\5C1:'<, Cml\[[5510NE[{ ~y "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION E',IPI.O\1')(" GERALD A. FIGURSKI, P.A. J. BEN HARRILL, P.A. SHELLY MAY JOHNSON LAURALEE G. WESTINE .GURSKI & HARRIL~ ATTORNEYS AT LAW THE HOLIDAY TOWER 2435 U.S. HIGHWAY 19 SUITE 350 HOLIDAY, FLORIDA 34691 www.fhlaw.net TELEPHONE: (727) 942-0733 FAX: (727) 944-3711 EMAIL: law@fhlaw.net November 20, 2003 HAND DELIVERED Wayne M. Wells, AICP Senior Planner City of Clearwater Planning Department Municipal Services Building 100 South Myrtle Avenue Clearwater, Florida 33756 RE: BELCAL PROPERTIES, LLC Case No. FLD2003-09047, 1750 North Belcher Road Dear Wayne: Enclosed please find fifteen (15) copies of the revised narrative. Should you have any questions or comments regarding the enclosed, please do not hesitate to contact me. ~:9.Pl~1\~~ii~~~tiJt(L ' ErIi i 1/ i! '/ V /mjp Enclosures cc: Belcal Properties, LLC Michael S. Lloveras, PE, PSM, AICP 8 e KLEIN &HEUCHAN,INt! ~~ment/Real Estate Services -- A. D. Booth, Jr. Thomas A. Duncan, Sr. Aaron Fisch Linda Gardiner Lawrence D. Gilbert Mark S. Klein, CClM Steven G. Klein M. F. "Bud" Lytle Stanley Newmark Joseph T. Santolucito John l. Shannon Harvey Simon Martin A. Slavney November 14,2003 Mr. Wayne Wells Municipal Service Building 100 S. Myrtle Ave. Clearwater, FL 33756 Via: Hand Delivery RE: Belcal Properties LLC Dear Wayne: Thank you for your help in bringing to my attention the fact that we had not provided needed infonnation to you in our last packet. Enclosed are the following: Fifteen (15) sets of elevation drawings of the distribution building currently under construction. This elevation called for metal sidewalls with an option for block & stucco, the eastern & northem faces will be block & stucco, color chips will follow. Fifteen (15) sets of the elevation of the proposed Credit Union Building. Color rendering shall follow. Fifteen (15) sets of the elevation of the proposed office building, and an 8 'is x 11 color rendering of the proposed building. Please understand that fmal colors have not been selected at this time, however the color rendering is close. ,..., Mark S. Klein General Partner Cc: Michael Lloveras Gerald Figmski, Esquire [0]1] 2040 I\jE Coachman I\oad, CleorwOier, Florida 33765 Phone 727/441- '1951 . Fax 727/4,,:[.9-1724 . 'vV\il/WI~leinandheuchan.com [B REALTOrt INDIVIDUAL MEMBERSHIP LL . >- o FROM: \~~-W\~ DATE:~ ~) I +1 ~ ~ MESSAGE: RE: \ 7 SU N.. )!).e\~hu )C ~. PL.-V 2..<>\)~ - 0 '} cA 7 o \'-~)\~\ ~ \'L ~\\~cl NUMBER OF PAGES(INCLUDING THIS PAGE) .3 DATE,TIME F A>< HI]. / flAME DURATIOH F'AGE (S) RESULT HODE ~RAHSMISSION VERIFICATIOH REPOR~ .L __.J 11,/14 19: 15 99443711 00:01:49 03 OK STANDARD ECM TIHE 11/14/2003 19:18 HAME PLi~N FAX 7275524575 TEL 7275624557 GrATE. TIME FA>< HD. /tiAHE DURATION L PAGE(S) RESULT MDDE eRAtiSMISSICIH \lERIFICATIOH REPOR. L r 11/14 1'3: 1. 9 '34491724 00:01:48 03 OV ~;T At',jDARD ECM TIME 11/14/2003 19:21 NAME PLAH FAX 7275624575 TEL 7275524557 , I I I I I .----1 .RAHSHISSIOH \lER~FIC:A~IiJH REPOR. L- J DATE. TIME FAX t:~O. / t~Ar\1E DURA TI OH PAC:iE (:=;) RESULT 1"10DE 11/14 19:22 '37848153 00:01:48 03 or: ~=;T A~mARD EeM TIME 11/14/2003 19:23 r1AME PLAH FAX 7275524576 TEL 7275624567 I I I - e C I T Y 0 F CLEARWATER PLANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRUE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 LONG RANGE PlANNING DEVELOPMENT REvIEW November 14, 2003 Mr. Gerald A. Figurski, Esquire 2435 US Highway 19, Suite 350 Holiday, FL 34691 Re: Flexible Development approval to permit retail sales (financial services) with deviations to allow direct access to a major arterial street (Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C (Case No. FLD2003-09047, 1750 North Belcher Road). Dear Mr. Figurski: The Planning staff has reviewed your application for Flexible Development approval and, while deemed complete and sufficient for advertising purposes, there are still some changes to the plans and application requiring revision: 1. The applicant must provide a Traffic Impact Analysis for the proposed development. The expected trip volumes from the proposed site exceed the City's threshold of 100 vph or 1,000 vpd. Prior to conducting a TIA make an appointment for a scoping meeting with Traffic Operations Division (727) 562-4778. NOTE: We understand that the TIA has been ordered. Please provide as soon as possible. 2. Revise the responses to the General Applicability and the Comprehensive Infill Redevelopment Project criteria, submitted as an attachment, to provide broader and/or more specific statements that explain how, what, when and where the proposal of "retail sales (financial services)" meets the criteria, including the deviations listed above at the start of the letter. Do not repeat back the criteria as the response. 3. Unclear of the paved area at the northeast side ofthe proposed credit union (not shown to be striped for parking). If it will be parking, show it as parking. Advise/revise. 4. The interior landscape area provided on Sheet 7 of 11 in the Vehicular Use Are Tabulation indicates a total vehicular use area of 70,449 square feet, which is different than that indicated on Sheet 1 of 11 in the Tabulation of Notes (72,680 square feet shown). Revise Sheet 7 of 11. 5. Provide the location of outside mechanical equipment for each building and all required screening. If located on the roof, note such. BRIAN J. AUNGST, MAYOR-COMMISSIONER HOYT HAJvlILTON, VICE MAYOR-COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HI13BARD, COMMISSIONER * BILLJONSON, CmlMISSIONER "EQUAL EMPLOYMENT AND AFFIR1\L\.TIVE ACTION EMPLOYER" - e November 14, 2003 Figurski - Page 2 6. Regarding outdoor lighting, a note has been added to indicate that Florida Power Corporation will provide the light fixtures and that they will comply with Code provisions. When asked to address the location of outdoor lighting fixtures, this was to review in light of proposed site design and landscaping so as to minimize or eliminate conflicts with other proposed improvements (such as trees, parking spaces, etc.). If not indicated on these plans for this request, it will be necessary to show such on site plans prior to issuance of building permits to determine any conflicts. 7. Our prior comment was "Provide sign package. Show location of proposed freestanding sigJ,lage, including proposed setback from the property line(s), and provide the height, area and color of proposed signage. Include any proposed attached signage. Signs must be architecturally coordinated in terms of design, color and style with the proposed buildings." Your response was that signage will be handled separately. Any approval of this request will include a condition relating to signage, restricting the number and height of freestanding signage for this property, which may also require processing of a Comprehensive SigJ,l Program. 8. For presentation to the Community Development Board (CDB), you have indicated that you will provide rendered (colored) site and landscape plans and building elevations (one copy). You do not need to mount them (will not fit into our files and is difficult to microfilm later). 9. Provide color samples (paint samples, etc.) ofthe proposed exterior building materials. 10. Our prior comment required foundation landscaping, in accordance with Section 3- l202.E.2. On the north side of the credit union, the site plan was revised to indicate a sidewalk nine feet wide with only a four-foot foundation planting area. This does not comply with the Code provision. Based on a phone conversation with Mark Klein today, the site plan will be revised to show a four-foot wide sidewalk and a five-foot wide foundation landscape area. Revise all appropriate plans. 11. Plant sizes must be per Code Section 3-1202.B. Revise Sheet 7 of 11 to show them in the plant schedule, including the height at planting and spacing for each plant in a tabular format for clarification. Please provide 15 copies of the revised narrative (see #2 above) and 15 copies of revised site/landscape plans (not necessarily all sheets) bv 4 pm on Thursday, November 20, 2003. Note: Only two copies of the TIA is necessary to be submitted. If you have any questions, please do not hesitate to call me at 727-562-4504. You can access zoning information for parcels within the City through our website: www.clearwater-fl.com. *Make us your favorite! Sincerely, ~~fa1 rU.. ('1. W~ W ayn~ M. Wells, AICP Senior Plmmer \ IMS5clPDSIPlanning DepartmentlC D B\FLEXlPending caseslUp for the next CDBIBelcher N 1750 GTE Federal Credit Union (IRT)\Belcher N 1750 Revisions Letter 11.14.03.doc e GRAtlA~ DESIGN l' TO: Mark I<J.ein COMPANY: Bel Cal Properties LLC ADDRESS: PHONE NUMBER: RE: Klein Office Building o Via Regular Maii o Via Hand Delivery ARCHITECTS o MEMORANDUM o Via Overnight Express X Via Pickup . ASS<9CIA TES~ PLANNERS X TRANSMITTAL FROM: Jim Graham DATE: 11-13-03 TOTAL NO. OF PAGES iNCLUDING COVER: 1 coyer, 15 copies Exterior Eleyations FAX NUMBER: PROJECT NUMBER: 03-22 o Via Facsimile o Via Courier P. A. -------------------------------------------------------------------------~--------------------------------------------------------- WE ARE SENDING: o Shop Drawings o Samples SUBMITTED FOR: o Approval ITEM NO. 1 COPIES 15 ACTION TAKEN: o Approved As Submitted o Rejected o Application For Payment o Specifications o Review/Comment DATE 11-13-03 o Change Order o Other X Sketch/Drawing X As Requested X For Your Use DESCRIPTION Exterior Elevations ----------- ---- --- ---------------- -..---- --------._---- o Make Corrections Noted o Submit Specified Item o Revise/Resubmit REMARKS: ......................--..---......-..--....................---...............................-......--..--....................--......---....--..............................----.....................--.....-..-......-....-..-----....-....---..-- 28100 U.s. HIGHWAY 19 N., SUITE 507 CLEARWATER, FL 33761 PHONE: 727/791-3320 National Society of Professional Engineers Florida Engineering Society American Society of Civil Engineers Florida Surveying and Mapping Society American Congress on Surveying and Mapping Institute of Transportation Engineers Florida Planning and Zoning Association National Association of Environmental Professionals , e ()aWt-~ Q~ Engineers - Surveyors - Planners November 5, 2003 Mr. Wayne M. Wells, AICP Senior Planner City of Clearwater Planning Department Municipal Services Building 100 South Myrtle A venue Clearwater, Florida 33756 Re: DEM Partnership - Belcher Road and Calumet Street BelCal Properties, LLC Flexible Development Application Case FLD2003-09047 1750 North Belcher Road Dear Mr. Wells: In reference to the October 30, 2003 DRC meeting, enclosed please fmd fifteen (15) copies of the information listed below regarding the captioned project. 1. Revised Flexible Development Application form that has been modified as you requested. 2. Revised Site Construction Plans. The colored and mounted copies of the requested plans will be provided to you prior to the CDB hearing on December 16th. We appreciate your continued efforts in the processing of this Comprehensive Infill Redevelopment application. Please let us know if you have any further questions or if you need any additional information. ' Very tTuly yours, enclosures cc: Mark Klein w/enclosures Jerry Figurski, Esquire w/enclosures 29228 U.S. Hwy. 19 North Clearwater, Florida 33761 www.lbsonline.com Pinellas: (727) 784-3965 Pasco: (727) 842-7635 Fax: (727) 784-8153 LL . o >- f- () FAX COVER MEMO CITY OF CLEARWATER PLANNING DEPARTMENT 100 S. MYRTLE AVE. CLEARW A TER, FL 33756 (727) 562-4567 FAX: (727) 562-4865 TO: ~ \ Q..I' \"" '"'\ B :)'..l"-~\:' / tv! IV"\:- )( \ ~'1"" FAX: '.~ +~ ~ 3"l \ I / 4-+-~ - \ 7 L+ ./ '1~2-- 0;33 / H\- \<1~\ I FROM: \~ 0. .u'v-L~ we \ \S Phone: -S \:, 1.. -----=---- 4-'s C)4 . ) DATE:~ -1V~03> RE:YL-P 2..003" o9o+? 17 S\) N. () e( Ch..v- rz-~. MESSAGE: G~\ PJ~L ~~t-~ Phone: NUMBER OF PAGES(INCLUDING THIS PAGE) 4- .A~~SMISSliJH \/EF:IFICATlm~ I FEPiJRT . 1- Tn1E HAt',1E Fi',';..' H,.... TEL 10!31/200~: 15:13 PLAH 7275e,24575 7275524557 DATE,TIME F A>< ~~:]. / HAME DURATlm~ PA(iE (S) RESULT MiJDE 10/31 15: 11 'j944:::711 00:02:15 04 m< :3T A~mAF:D EeM DATE,TIME F A>< tJIJ. / [.lAME DURATIiJH PAI3E(S) RESULT MCIDE REPORT--. 1- .AH91ISSIOt'1 \,JERIFICATION TIME 10/31/2003 15:05 [JAr,'lE PLA~~ FAX 7275624575 TEL 7275624557 1[1/31 15: f:J3 'j4491724 00: 02: 1::: 04 [If< :3T At'-lDAf"D ECM - e 11 :30 a.m. Case: FLD2003-09047 - 1750 North Belcher Road Owner/Applicant: BelCal Properties, LLe. Representative: Mr. Mark Klein (2040 NE Coachman Road, Clearwater, FL 33765; phone: 727-441- 1951; fax: 727-449-1724; email: mske@tampabav.rr.com). Location: 3.288 acres located at the southwest comer of North Belcher Road and Calumet Street. Atlas Page: 262B. Zoning: IRT, Industrial, Research and Technology District. Request: Flexible Development approval to permit retail sales (financial services) with deviations to allow direct access to a major arterial street (Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.e. Proposed Use: Retail sales and services (GTE Federal Credit Union). Neighborhood Association: None. Presenter: Wayne M. Wells, AICP, Senior Plall11er. Attendees included: City Staff: Frank Gerlock, Bryan Beny, Wayne Wells, Duanne Anderson, Tom Glenn, Don Melone and Scott Rice. Applicant/Representative: Jell; Figurski, Mark Klein, Steve Klein The DRC reviewed this application with the following comments: 1. Parks and Recreation: a) An Open Space dedication assessment is required only if the bldg coverage expansion is 50% or more. Based on the site plan, the fee does not apply since the existing building coverage is 25,415 s.f. and only increasing to 26,228 s.f. 2. Stormwater: a) In reference to BCP2003-03528, reminder that the sub drains must discharge directly to outfall control structure. Plans submitted for this case indicate a subdrain flow to the pond; this would result in a constant "wet" pond condition. 3. Traffic Enl!:ineerinl!:: a) Traffic Impact Fee calculations incorrect on site plan. Traffic Impact Fee of the amount of $14,661.08 must be paid prior to e.O. (TIF reflect current rates as adopted by Pinellas County.) b) Create handicapped accessible path from office building to public sidewalk along Belcher Road per (Florida Building Accessibility Code Chapter 11, Section 11.4.3.2). Also an accessible route to and from on site buildings. c) Show vehicle-stacking drive through lanes for barue Since site plan shows 5 drive tluough lanes please show these lanes to accommodate a total of 22 cars. Vehicles must not block parking spaces or drive aisles. (City Community Development Code, Section 3-1404 3.B) d) The applicant must provide a Traffic Impact Analysis for the proposed development. The expected trip volumes from the proposed site exceed the City's threshold of 100 vph or 1,000 vpd. Prior to conducting a TIA make an appointment for a scoping meeting with Traffic Operations Division (727) 562-4778. e) All of the above to be addressed prior to CDB. 4. General Enl!:ineerinl!:: a) The Proposed 8" sanitary sewer main that serves the distribution center needs to be a minimum of 5 ft. from any structure. b) Separation from the 1" water service line and the 8" sanitary sewer main can be less than 1 0 ft. c) Since the sidewalk along Belcher Road is being constructed on the proposed site and not within the public right-of-way, an easement for such will be required. d) All of the above required prior to CDB. 5. Planninl!:: a) Revise the "applicant's name" on the application to "BelCal Properties, LLe." Show "BelCal Propeliies, LLC" as the property owner. b) Based on the building dimensions indicated on Sheet 2 of 11 for the St. Pete Times Distribution Building (also addressed at 1750 North Belcher Road) and under BCP2003- 03528, the distribution building should be 14,346 square feet, not 14,215 square feet. Revise/advise. Page 1 of 3 c) Revise. 1 of 11, based on the distribution building .1g either 14,346 square feet or 14,215 square feet (see Comment 2 above), under "Zoning Compliance Notes" and "Impact Fee Calculations" the distribution building from 16,700 square feet. d) Revise Sheet 1 of 11 to indicate the parking requirement for the credit union at five spaces per 1,000 square feet (not three spaces per 1,000 square feet). e) Revise Sheet 3 of 11 to indicate that existing driveways on Calumet Street no longer to be used will be removed, similar to those on Belcher Road (saw-cut & remove existing driveway). f) Complete the Affidavit to Authorize Agent, since BelCal Properties, LLC is the owner. g) Revise the responses to the General Applicability and the Comprehensive Infill Redevelopment Project criteria to provide statements that explain how, what, when and where the proposal of "retail sales (financial services)" meets the criteria, including the deviations listed above at the start of the letter. Do not repeat back the criteria as the response. In General Applicability criteria #2, please provide the anticipated improvement value of the proposed credit union (may also include the anticipated improvement value of all site improvements for the three buildings). Suggestion is to provide such responses as an attachment to the application, allowing for full discussion of your responses to the criteria. h) Provide the width of all landscape islands. i) Unclear of the paved area at the northeast side of the proposed credit union (not shown to be striped for parking). Also unclear the need for the small landscape island to the west of this paved area. Advise/revise. j) The note "car stop (typical)" with its arrow line at the northeast corner of the proposed credit union is unclear what it is pointing to (Sheet 2 of 11). Advise/revise. k) Unclear of the need for sidewalks greater than five feet on the north side of the proposed credit union and on the east and west sides of the proposed office building. Also unclear as to the need to concrete the north side of the proposed office building. Advise/revise. 1) All utilities, including electric, phone and cable television, must be located underground on- site. m) The interior landscape area provided on Sheet 7 of 11 in the Vehicular Use Are Tabulation is different than that indicated in the vehicular use area diagram at the top of the page. n) Provide the location of outside mechanical equipment for each building and all required screening. If located on the roof, note such. 0) Address the location of all outdoor lighting fixtures. p) Provide sign package. Show location of proposed freestanding signage, including proposed setback from the property line(s), and provide the height, area and color of proposed signage. Include any proposed attached signage. Signs must be architecturally coordinated in terms of design, color and style with the proposed buildings. q) Provide the proposed building heights in terms of feet, in accordance with Code provisions (see defmition of "height, building or structure" for measurement of height). r) For presentation to the Community Development Board (CDB), please provide rendered (colored) site and landscape plans and building elevations (one copy). s) Provide color samples (paint samples, etc.) of the proposed exterior building materials. t) Since this overall site has three proposed buildings, please provide building elevations of the other two proposed buildings (St. Pete Times distribution building and the office building). Include proposed exterior building materials and colors. u) Since a criteria for retail sales and services in the IRT District is that it take no access to a major arterial street (Belcher Road), is it possible to remove the proposed driveway from Belcher Road? Advise. v) Since all existing structures are being removed as part of the redevelopment ofthis site and to avoid confusion, remove from Sheet 2/11 the existing (ghosted) structures and pavement. 6. Solid Waste: a) Inadequate solid waste service. Reconm1end at least two dumpster enclosures. Suggest providing a recycling dumpster for St. Pete Times building. 7. Land Resources: a) No conm1ents. 8. Fire: a) Revise landscape islands to ensure proper turning radii for fire trucks and delivery trucks to access entire site. 9. Environmental: a) No comment. 10. Communitv Response: a) No comment. 11. Landscapinl!: Page 2 of 3 Per Sect_-1202.E.l table indicates that there must be .m back of curb to back of curb on interior islands. b) There is an existing plan for the site which will need to be revised to show the changes in parking / drive-thru layout and associated landscape changes. Per Section 3-1202.E.2. Foundation plantings shall be provided for 100% of a building facade with frontage along a street right of way, excluding space necessary for building ingress and egress, within a minimum five foot \vide landscaped area composed of at least two accent trees (or palm equivalents) or three palms for every 40 linear feet of building facade and one shrub for every 20 square feet of required landscaped area. A minimum of 50% of the area shall contain shrubs with the remainder to be ground cover. d) Plant sizes must be per Code Section 3-1202.B. a) c) NOTES: Resubmit 15 collated copies of the revised plans and application material addressing all above departments' comments by Thursday, November 6, 2003, no later than noon. I IMS5clPDSIPlanning DepartmentlC D BlFLEXlPending caseslUp for the next DRCIBelcher N I750 GTE Federal Credit Union IFinal DRC Comments IO.30.03.doc Page 3 of 3 - e LL o >- () FAX COVER MEMO CITY OF CLEARWATER PLANNING DEPARTMENT 100 S. MYRTLE AVE. CLEARWATER, FL 33756 (727) 562-4567 FAX: (727) 562-4865 TO: Mw-\, Y- \ ~~r-.. FAX: .. 4-4-; - \ 7 2-4 Phone: 4 4- ~ l S I FROM: ~ ~'-'\ ~ ~ Q.\ \ ~ \ DATE:~ ~a]lAJ 03 RE: Phone:~\Q "2-- +S\)+ MESSAGE: fL \) ~() 3 - \) ~ 1) 4- 7 I 7 ~\) N. 13~\t-~ I~. \) itA- f'- T ~ _...Q..,~A--~ -h ' I 0 - ~ \)- 0 3 V(t.C... M~e. ~) . NuTC:: ~\-. \.~~eaJ~1 ~r ~\: 3'\) ~ '1 0 " r crt;- :- ~fL I ~ 0 . M \A r- " L ~). ) NUMBER OF PAGES(INCLUDING THIS PAGE) 4 I DATE,TIME FA:< NO. /HAME DURATIOH PAGE(S) RESULT MODE .RA~~SMI~;SIOH \iER;FICATICJH REPO~ I r 1C/24 11: 11:, 944'31724 EH3: >=12: 1::: >=14 OK :3T AtmARD ECt"" TIME 10/24/2003 11:18 ['lAME F'lAtj FAX 7275524575 TEL 7275524557 -, I I I ! J e -- 11:30 a.m. Case: FLD2003-09047 - 1750 North Belcher Road Owner/Applicant: Be1Cal Properties, LLC. Representative: Mr. Mark Klein (2040 NE Coachman Road, Clearwater, FL 33765; phone: 727-441- 1951; fax: 727-449-1724; email: mske@tampabay.rr.com). Location: 3.288 acres located at the southwest comer of North Belcher Road and Calumet Street. Atlas Page: 262B. Zoning: IRT, Industrial, Research and Technology District. Request: Flexible Development approval to permit retail sales (financial services) with deviations to allow direct access to a major arterial street (Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Proj ect, under the provisions of Section 2-13 04. C. Proposed Use: Retail sales and services (GTE Federal Credit Union). Neighborhood Association: None. Presenter: Wayne M. Wells, AICP, Senior Plalmer. Attendees included: City Staff: Frank Gerlock, Bryan BetTy, Wayne Wells, Duanne Anderson and Scott Rice. Applicant/Representa tive: The DRC reviewed this application with the following comments: 1. Parks and Recreation: a) An Open Space dedication assessment is required only if the bldg coverage expansion is 50% or more. Based on the site plan, the fee does not apply since the existing building coverage is 25,415 s.f. and only increasing to 26,228 s.f. 2. Stormwater: a) In reference to BCP2003-03528, reminder that the subdrains must discharge directly to outfall control stmcture. Plans submitted for this case indicate a subdrain flow to the pond; tlus would result in a constant "wet" pond condition. 3. Tramc En!!:ineerin!!:: a) Traffic Impact Fee calculations incorrect on site plan. Traffic Impact Fee of the amount of $14,661.08 must be paid prior to C.O. (TIF reflect current rates as adopted by Pinellas County.) b) Create handicapped accessible path from office building to public sidewalk along Belcher Road per (Florida Building Accessibility Code Chapter 11, Section 11.4.3.2). Also an accessible route to and from on site buildings. c) Show vehicle-stacking drive through lanes for barlie Since site plan shows 5 drive through lanes please show these lanes to accommodate a total of 22 cars. Vehicles must not block parking spaces or drive aisles. (City Community Development Code, Section 3-1404 3.B) d) The applicant must provide a Traffic Impact Analysis for the proposed development. The expected trip volumes from the proposed site exceeds the City's threshold of 100 vph or 1,000 vpd. Prior to conducting a TIA make an appointrnent for a scoping meeting with Traffic Operations Division (727) 562-4778. e) All of the above to be addressed prior to CDB. 4. General En!!:ineerin!!:: a) The Proposed 8" sanitary sewer main that serves the distribution center needs to be a minimum of 5 ft. from any stmcture. b) Separation from the 1" ,vater service line and the 8" sanitary sewer main can be less than 1 0 ft. c) Since the sidewalk along Belcher Road is being constructed on the proposed site and not within the public right-of-way, an easement for such will be required. d) Continue the sidewalk along Belcher Road south of the driveway to the south property line. May be placed similarly on-site like sidewalk north of the driveway (see also comment regarding necessary easement). e) All of the above required prior to CDB. 5. Plannin!!:: a) Revise the "applicant's name" on the application to "BelCal Properties, LLC." Show "BelCal Properties, LLC" as the property owner. b) Based on the building dimensions indicated on Sheet 2 of 11 for the St. Pete Times Distribution Building (also addressed at 1750 North Belcher Road) and under BCP2003- 03528, the distribution building should be 14,346 square feet, not 14,215 square feet. Revise/advise. FLD2003-09047 - Page 1 of3 c) Revise S.l of 11, based on the distribution bUi1ding.g either 14,346 square feet or 14,215 square feet (see Comment 2 above), under "Zoning Compliance Notes" and "Impact Fee Calculations" the distribution building from 16,700 square feet. d) Revise Sheet 1 of 11 to indicate the parking requirement for the credit union at five spaces per 1,000 square feet (not three spaces per 1,000 square feet). e) Revise Sheet 3 of 11 to indicate that existing driveways on Calumet Street no longer to be used will be removed, similar to those on Belcher Road (saw-cut & remove existing driveway). f) Complete the Affidavit to Authorize Agent, since BelCal Properties, LLC is the owner. g) Revise the responses to the General Applicability and the Comprehensive Infill Redevelopment Project criteria to provide statements that explain how, what, when and where the proposal of "retail sales (financial services)" meets the criteria, including the deviations listed above at the start of the letter. Do not repeat back the criteria as the response. In General Applicability criteria #2, please provide the anticipated improvement value of the proposed credit union (may also include the anticipated improvement value of all site improvements for the three buildings). Suggestion is to provide such responses as an attachment to the application, allowing for full discussion of your responses to the criteria. h) Provide the width of all landscape islands. i) Unclear of the paved area at the northeast side of the proposed credit union (not shown to be striped for parking). Also unclear the need for the small landscape island to the west of this paved area. Advise/revise. j) The note "car stop (typical)" with its arrow line at the northeast corner of the proposed credit union is unclear what it is pointing to (Sheet 2 of 11). Advise/revise. k) Unclear of the need for sidewalks greater than five feet on the north side of the proposed credit union and on the east and west sides of the proposed office building. Also unclear as to the need to concrete the north side of the proposed office building. Advise/revise. 1) All utilities, including electric, phone and cable television, must be located underground on- site. m) The interior landscape area provided on Sheet 7 of 11 in the Vehicular Use Are Tabulation is different than that indicated in the vehicular use area diagram at the top ofthe page. n) Provide the location of outside mechanical equipment for each building and all required screening. If located on the roof, note such. 0) Address the location of all outdoor lighting fixtures. p) Provide sign package. Show location of proposed freestanding signage, including proposed setback from the property line(s), and provide the height, area and color of proposed signage. Include any proposed attached signage. Signs must be architecturally coordinated in terms of design, color and style with the proposed buildings. q) Provide the proposed building heights in terms of feet, in accordance with Code provisions (see definition of "height, building or structure" for measurement of height). r) For presentation to the Community Development Board (CDB), please provide rendered (colored) site and landscape plans and building elevations (one copy). s) Provide color samples (paint samples, etc.) of the proposed exterior building materials. t) Since this overall site has three proposed buildings, please provide building elevations of the other two proposed buildings (St. Pete Times distribution building and the office building). Include proposed exterior building materials and colors. u) Since a criteria for retail sales and services in the IRT District is that it take no access to a major arterial street (Belcher Road), is it possible to remove the proposed driveway from Belcher Road? Advise. v) Since all existing structures are being removed as part of the redevelopment of this site and to avoid confusion, remove from Sheet 2/11 the existing (ghosted) stmctures and pavement. 6. Solid Waste: a) Inadequate solid waste service. Recommend at least two dumpster enclosures. Suggest providing a recycling dumpster for St. Pete Times building. 7. Land Resources: a) No comments. 8. Fire: a) Revise landscape islands to ensure proper turning radii for fire trucks and delivery trucks to access entire site. 9. Environmental: a) No comment. 10. Communitv Response: a) No comment. 11. Landscapinl!:: FLD2003-09047 - Page 2 on -- -~ Per Secti_-1202.E.l table indicates that there must be h.m back of curb to back of curb on interior islands. b) There is an existing plan for the site which will need to be revised to show the changes in parking / drive-thru layout and associated landscape changes. Per Section 3-1202.E.2. Foundation plantings shall be provided for 100% of a building facade with frontage along a street right of way, excluding space necessary for building ingress and egress, within a minimum five foot wide landscaped area composed of at least two accent trees (or palm equivalents) or three palms for every 40 linear feet of building facade and one shrub for every 20 square feet of required landscaped area. A minimum of 50% of the area shall contain shrubs with the remainder to be ground cover. d) Plant sizes must be per Code Section 3-1202.B. a) c) NOTES: Resubmit 15 collated copies of the revised plans and application material addressing all above departments' comments by Thursday, November 6, 2003, no later than noon. FLD2003-09047 - Page 3 of3 - e CITY OF CLEARWATER PLANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUIlDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 LONG RANGE PLANNING DEVELOPMENT REVIEW October 6, 2003 Mr. Mark Klein BelCal Properties, LLC 2040 NE Coachman Road Clearwater, FL 33765 Re: Flexible Development approval to permit retail sales (financial services) with deviations to allow direct access to a major arterial street (Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 3-1304.C (Case FLD2003-09047, 1750 North Belcher Road). Dear Mr. Klein: The Planning staff has reviewed your application for Flexible Developmen~ approval to permit retail sales (financial services) with deviations to allow direct access to a rnajor arterial street (Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 3-1304.C at 1750 North Belcher Road. After a preliminary review of the submitted documents, staff has determined that the application is complete. While not part of a completeness review, I have provided preliminary information about the sufficiency of the application. More comments will be provided by the Development Review Committee (DRC) prioho or at the DRCmeeting. General Comments related to the sufficiency of the application: 1. Revise the "applicant's name" on the application to "BelCal Properties, LLC." Show "BelCal Properties, LLC" as the property owner. 2. Based on the building dimensions indicated on Sheet 2 of 11 for the St. Pete Times Distribution Building (also addressed at 1750 North Belcher Road) and under BCP2003- 03528, the distribution building should be 14,346 square feet, not 14,215 square feet. Revise/ advise. 3. Revise Sheet 1 of 11, based on the distribution building being either 14,346 square feet or 14,215 square feet (see Comment 2 above), under "Zoning Compliance Notes" and "Impact Fee Calculations" the distribution building from 16,700 square feet. 4. Revise Sheet 1 of 11 to indicate the parking requirement for the credit union at five spaces per 1,000 square feet (not three spaces per 1,000 square feet). BRIAN J. AUNGST, IvlAYOR-COMMISSIONER HOYT HAMILTON, VICE IvLc\YOR-COMMISSIONER WHIT'lEY GRAY, COMMISSIONER FAANK HIBBARD, COMMISSIONER ,'~ BILL]ONSON, COMMISSIONER W "EQUAl EMPLOY;v\ENT .A~'!D AFFlfu\L~T[VE ACTION EMPLOYER" - e October 6, 2003 Klein - Page 2 5. Revise Sheet 3 of 11 to indicate that existing driveways on Calumet Street no longer to be used will be removed, similar to those on Belcher Road (saw-cut & remove existing driveway). 6. Complete the Affidavit to Authorize Agent, since BelCal Properties, LLC is the owner. 7. Revise the responses to the General Applicability and the Comprehensive Infill Redevelopment Project criteria to provide statements that explain how, what, when and where the proposal of "retail sales (financial services)" meets the criteria, including the deviations listed above at the start of the letter. Do not repeat back the criteria as the response. In General Applicability criteria #2, please provide the anticipated improvement value of the proposed credit union (may also include the anticipated improvement value of all site improvements for the three buildings). Suggestion is to provide such responses as an attachment to the application, allowing for full discussion of your responses to the criteria. 8. Provide the width of all landscape islands. 9. Unclear of the paved area at the northeast side ofthe proposed credit union (not shown to be striped for parking). Also unclear the need for the small landscape island to the west of this paved area. Advise/revise. 10. The note "car stop (typical)" with its arrow line at the northeast comer of the proposed credit union is unclear what it is pointing to (Sheet 2 of 11). Advise/revise. 11. Unclear of the need for sidewalks greater than five feet on the north side of the proposed credit union and on the east and west sides of the proposed office building. Also unclear as to the need to concrete the north side of the proposed office building. Advise/revise. 12. For three buildings, unclear why only one dumpster is proposed for this site. Advise. 13. All utilities, including electric, phone and cable television, must be located underground on-site. 14. The interior landscape area provided on Sheet 7 of 11 in the Vehicular Use Are Tabulation is different than that indicated in the vehicular use area diagram at the top of the page. 15. Provide the location of outside mechanical equipment for each building and all required screening. If located on the roof, note such. 16. Since the sidewalk along Belcher Road is being constructed on the proposed site and not within the public right-of-way, an easement for such will be required. 17. Address the location of all outdoor lighting fixtures. 18. Provide sign package. Show location of proposed freestanding signage, including proposed setback from the property line(s), and provide the height, area and color of proposed signage. Include any proposed attached signage. 19. Provide the proposed building heights in terms of feet, in accordance with Code provisions (see definition of "height, building or structure" for measurement of height). 20. For presentation to the Community Development Board (CDB), it would be helpful to have rendered (colored) site and landscape plans and building elevations (one copy). 21. Provide color samples (paint samples, etc.) of the proposed exterior building materials. - e October 6, 2003 Klein - Page 3 Any responses to the above comments may be helpful at the DRC meeting, but additional comments will be provided at the DRC meeting. The above comments and comments you will receive at the DRC meeting must be addressed and revised documents submitted to the Planning Department by noon on November 6,2003 (15 copies of all submittals). The Development Review Committee will review the application for sufficiency on October 30, 2003, in the Planning Department conference room - Room 216 - on the second floor of the Municipal Services Building, 100 South Myrtle Avenue, in Clearwater. Please call Sherrie Nicodemus at 562-4582 no earlier than one week prior to the meeting date for the approximate time that your case will be reviewed. You or a representative must be present to answer any questions that the committee may have regarding your application. If you have any questions, please do not hesitate to call me at 727-562-4504. You can access zoning information for parcels within the City through our website: www.c1earwater-fl.com. *Make us your favorite! Sincerely, ~~ w~:,~~ Senior Planner I IlvIS5clPDSIPlanning DepartmentlC D BIFLEXlPending caseslUp for the lIext DRCIBelcher N 1750 GTE Federal Credit Union IBelcher N 1750 Complete Letter 9.8.03.doc . e LL o >- 1- u FAX COVER MEMO CITY OF CLEARWATER PLANNING DEPARTMENT 100 S. MYRTLE AVE. CLEARWATER, FL 33756 (727) 562-4567 FAX: (727) 562-4865 TO:~t \( \ Q.. \ f'.._ FAX: .. +4--~ - \ 72-+ Phone: 4-4 l - \ ~ s J FROM: ~-cl-_WQ.-\\S DA TE:~ ~t) ~I ~ "3> RE: Phone:~ lo 'L - 4- ~- 04- MESSAGE: " ~ ~ \ t \-.t. -, \.7Y"V N. 6~\~k~ ~~. Ft-~ 2.Do 3 - 0 ~ lJ4-7 \~t\-V-. G ~ \~,~) ~Cl\"-i ~.( \~cl. ,) NUMBER OF PAGES (INCLUDING THIS PAGE) 4 .A~6MISSIOH \iEF.~IFICATIOH REPORT L ~ ----.J TIME 10/06/2003 11:49 r,jAME F'LAH FAX 7275624576 TEL 7275624557 DATE, TItvlE FAX HO.;HAME DURA T IOt'-J PA(iE (S) RESULT MODE 1[1/06 11:45 '34491724 00: 02: 11 04 m< ST AHDAF.~D ECr," I I I I ---1 - . MEMORANDUM TO: FROM: RE: DATE: Members of the Community Development Board Wayne M. Wells, AICP, Senior Plalmer \.Jt\\.J FLD2003-09047, 1750 North Belcher Road December 16, 2003 ORIGINAL The Staff Report submitted to the Community Development Board (CDB) for the December 16, 2003, meeting was based on an analysis of a Traffic Impact Analysis (TIA), requested and reviewed by the City's Traffic Operations Division. The TIA was based on a proposed "bank," as there is no category for "credit union" by the Institute of Transportation Engineers (ITE). The credit union is proposed to close at 5 :00 pm daily, whereas identified peak traffic impacts occur between 5:00 and 6:00 pm (based on "bank"). The Traffic Operations Division, after discussion of the TIA with the applicant, has detennined that the credit union, as submitted, has different characteristics than a bank and that modification of Conditions 2 and 3 in the Staff Report are suggested. Should the credit union close in the future and a bank desire to open in this facility, the roadway improvements of a left turn lane and traffic signal light are necessary. The Staff recommendation for this case continues to be for APPROVAL of the Flexible Development application to permit retail sales (financial services) with deviations to allow direct access to a major mierial street (North Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C with the bases contained in the Staff Report and the following amended conditions: 1. That the final design and color of the buildings be consistent with the conceptual elevations submitted to, or as modified by, the CDB; 2. That use of the building on the subiect property be limited to a credit union with hours of operation ending at 5:00 pm daily. The applicant shall record a covenant in the public records restricting the use of this building on the subiect property, as contained in this condition, prior to the issuance of a Celiificate of Occupancy for the credit union. Any future change of use of this building to a bank shall require the following: a. Constmction plans be submitted and approved showing the installation of a left turn lane of adequate storage length, according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Road. Constmction of this improvement must be completed prior to the issuance of an Occupational License for the bank; b. Establishment of an escrow account with the City, prior to the issuance of an Occupational License for the bank, for the future constmction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if warranted by a Traffic Signal W arrant Study. The funds in the escrow account will be a shared portion of the full cost of a traffic signal light. The City's shared portion shall not exceed 50 percent of the full cost. If, in the event that a traffic signal light is not warranted based on the Study, funds will be refunded to the applicant. - . December 16, 2003 CDB Memo - Page 2 2. That, prior to the issuance of building permits for the proposed credit union, revised plans be submitted and appro'/ed showing the constmction a left turn lane of adequate storage length, according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Road; 3. That, prior to the issuance of building pern1its for the proposed credit union, the applicant establish an escro''v account "'lith the City for the future constmction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if '.varranted by a Traffic Signal \Varrant Study. The funds in the escrow account will be a shared portion of the full cost of a traffic signal light. If, in the event that a traffic signal light is not v{arranted based on the Study, funds '",ill be refunded to the applicant; ].4. That revised landscape plans be submitted and approved prior to the issuance of building permits for the proposed credit union reflecting Code foundation plantings; 1~. That outdoor lighting fixtures be integrated into the landscape site design to avoid shielding of the lighting by tree canopy; and ~6. That all sigt1age meet the requirements of Code and be desigt1ed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity. Freestanding signage shall be limited to monument-style, not to exceed six feet in height. Submission of a Comprehensive Sign Program is required for more than one freestanding sign on either street frontage. \\MS5cIPDSIPlanning DepartmentlC D BIFLEX1Pending caseslUp for the next CDBIBelcher N 1750 GTE Federal Credit Union (IRY) (CIRP- retail sales)IMemorandum re amended conditions #2 + #3 12.16. 03.doc - . CDB Meeting Date: Case Number: Agenda Item: Owner/Applicant: Representative: Address: December 16, 2003 FLD2003-09047 E4 BelCal Properties, LLC Mr. Gerald A. Figurski, Esquire 1750 NOlih Belcher Road OI?/G/N4L CITY OF CLEARWATER PLANNING DEPARTMENT ST AFF REPORT GENERAL INFORMATION: REQUEST: Flexible Development approval to per111it retail sales (financial services) with deviations to allow direct access to a major arterial street (North Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C. EXISTING ZONING/ LAND USE: Industrial, Research and Technology District (IRT) Industrial Limited (IL) PROPERTY SIZE: 3.288 acres PROPERTY USE: Current Use: Site plan approved under BCP2003-03528 for three buildings: St. Petersburg Times distribution building (under construction under BCP2003-03528) and two office buildings (no building permits issued yet) Proposed Use: St. Petersburg Times distribution building, office building and GTE Credit Union ADJACENT ZONING/ LAND USES: North: Industrial uses West: Vehicle repair (Hunter Blood Services - Bloodmobile) East: Detached dwellings South: Fire Station Staff Report- Conummity Development Board - December 16, 2003 - Case FLD2003-09047 - Page 1 - . ANALYSIS: Site Location and Existing Conditions: The 3.288-acre site is located at the southwest comer of North Belcher Road and Calumet Street. North Belcher Road is a heavily-traveled, four-lane divided roadway. The east side of North Belcher Road is residentially developed with single- family detached dwellings. The west side of North Belcher Road is developed industrially. The site was formerly developed with an office building, which was recently demolished under BCP2003-03525. Under BCP2003-03528, the site was approved to be developed with a St. Petersburg Times distribution building on the west side facing Calumet Street and two office buildings facing North Belcher Road. The site was approved with one driveway on Calumet Street close to the westem property line and one driveway on North Belcher Road approximately 80 feet north of the south property line. The St. Petersburg Times distribution building, as well as all other parking, drainage and landscaping improvements, is currently under constmction. Proposal: The proposal includes constmcting a GTE Federal Credit Union facing Calumet Street, in place of the northern office building approved on the site plan under BCP2003-03528. Under the Community Development Code, financial institutions (banks and credit unions) are included in the definition of "retail sales and services." In the Industrial, Research and Technology (IRT) District, retail sales and services is pem1itted as a Flexible Standard Development use, but with criteria prohibiting the use from locating contiguous to residentially zoned property and taking direct access to major arterial streets, and with criteria restricting the use to occupying no more than ten percent of a building used by a Minimum Standard Development use and that the use primarily serve the employees or patrons of the industrial-type uses. Under the adopted Countywide Plan Rules, financial services are included under the definition of "offices," which are pem1itted secondary uses in the Industrial Limited (IL) land use classification. Due to its inclusion under the definition of "retail sales and services" and its prohibitions and restrictions in the IRT District, the applicant must request approval of the proposed credit union under the Comprehensive Infill Redevelopment Project process. Staff notes that these same prohibitions and restrictions apply to restaurants desiring to locate within the IRT District. The site is not contiguous to residentially zoned property, as North Belcher Road separates the non-residentially- developed area on the west side from the residentially-developed area on the east side. The proposed redevelopment ofthe site meets all of the development standards ofthe IRT District. The applicant is requesting a deviation from the criteria prohibiting direct access to a major mierial street. Because North Belcher Road is a divided roadway, the driveway near the southem property line will permit only right in/right out tUl11ing movements. This driveway location was originally approved for pel111itted uses (under BCP2003-03528). There is only one driveway approved on Calumet Street. The change of use from an office building to a credit union should allow the continued access to North Belcher Road to provide necessary on-site traffic flow. The applicant is requesting a deviation to allow the use as a permitted use and in a separate, primary building. This Code restriction intends to limit the size and location of "retail sales and services" in the IRT District, relegating the use to a more "accessory" use. The site plan presently approved under BCP2003-03528 provides for three separate buildings. The proposed revision to allow the credit union in place of the northem office building does not materially change the site design otherwise already approved. If the site were to be developed at the maximum Floor Area Ratio pel111itted of 0.65, the site could be developed with a maximum of 93,086 square feet. The Staff Report - Community Development Board - December 16,2003 - Case FLD2003-09047 - Page 2 -- . site is being redeveloped with a total of 26,346 square feet. The Code does not mandate or restrict the development of property to one buildIng. Under the proposal, the 3,528 square-foot credit union building is 13.4 percent of the total building square footage shown on the site plan, slightly higher than the allowable ten percent maximum. Since the site is not being developed to its maximum Floor Area Ratio and the site plan provides more than the required parking spaces, the percentage increase requested is minimal. While the credit union could be developed in a larger building of several tenants, the applicant has chosen to separate the tenant spaces into different buildings based on their usage. This separation providing a primary building for the proposed credit union should not degrade the intent of the IRT District. Other properties in this large industrially zoned area west of North Belcher Road will continue to be developed for industrial- type uses. Finally, the applicant is requesting a deviation to allow the use to serve patrons beyond the industrial area. The credit union is proposed within a large industrial area, albeit on the eastem fringe of the industrial area. There is only one other financial institution in this general area. This proposed credit union will enhance financial services to employees of this industrial area, potentially reducing patron drive distances when services are necessary. It is recognized, however, that patrons of the GTE Federal Credit Union may live or work on the east side of North Belcher Road and would benefit by its location at this intersection. Staff reiterates that the Countywide Plan Rules place financial services under "offices," which were originally proposed at this location. A credit union at this location will be compatible with the sUlTounding area, will be in harmony with the scale, bulk, coverage, intensity and character of the adj acent properties and will enhance and upgrade the character ofthis immediate vicinity. The introduction of the proposed credit union does increase the anticipated traffic impact of the development of this parcel. A Traffic Impact Analysis submitted by the applicant, and reviewed by the City's Traffic Operations Division, indicates that intersection improvements are necessary. The applicant will need to construct a left tum lane with adequate storage length on Calumet Street at North Belcher Road. Additionally, the installation of a traffic signal light may be required, if walTanted by a Traffic Signal WalTant Study. An escrow account with the City will need to be established by the applicant for this potential future traffic signal light, where funds will be a shared portion of the full cost of a traffic signal light (funds will be refunded if the traffic signal light is not walTanted). Foundation plantings for the proposed credit union will need to meet Code provisions on revised plans prior to permitting. No freestanding sigI1age has been shown on the proposed site plan. Any freestanding signage should be limited to monument-style of no more than six feet in height, integI"ated with the design and color of the proposed buildings and into the proposed landscaping to avoid shielding. More than one freestanding sign on either street frontage will require the submission of a Comprehensive SigI1 Program. Placement of outdoor lighting fixtures should also be integrated into the landscape design to also avoid shielding of the lighting by tree canopy. All applicable Code requirements and criteria including but not limited to General Applicability criteria (Section 3-913) and Comprehensive Infill Redevelopment Project criteria (Section 2- 1304.C) have been met. Staff Report - Conununity Development Board - December 16, 2003 - Case FLD2003-09047 - Page 3 - e Code Enforcement Analysis: There are no outstanding enforcement issues associated with this site. COMPLIANCE WITH STANDARDS AND CRITERIA (Sections 2-1301.1 and 2-1302): STANDARD PROPOSED CONSISTENT INCONSISTENT MAXIMUM FLOOR 0.21 X AREA RATIO (FAR) (0.65) IMPERVIOUS 0.72 X SURFACE RATIO (ISR) (0.85) LOT AREA (20,000 143,210 square feet; 3.288 acres X SQ. ft. minimum) LOT WIDTH (200 Belcher Road: 380 feet X feet minimum) Calumet Street: 377 feet FRONT SETBACK Belcher Road: 20 feet (to pavement) X (20 feet minimum) Calumet Street: 21 feet (to pavement) REAR SETBACK (15 N/A (Comer lots have two front X feet minimum) setbacks and two side setbacks) SIDE SETBACK (15 West: 15 feet (to pavement) X feet minimum) South: 30 feet (to pavement) HEIGHT (50 feet St. Pete Times building: 20 feet X maximum) Office building: 38 feet GTE Credit Union building: 24 feet PARKING SPACES 125 spaces X (Distribution: 1.5/1000 sf; Office: 3/1 000 sf; Retail: 5/1000 sf) (76 spaces reQ.) Staff Report - Community Development Board - December 16,2003 - Case FLD2003-09047 - Page 4 - e COMPLIANCE WITH FLEXIBILITY CRITERIA (Section 2-1304.C): 1. The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards. The development of the parcel proposed for development as a Comprehensive Infill Redevelopment Proj ect will not reduce the fair market value of abutting properties. The uses within the Comprehensive Infill Redevelopment Project are otherwise permitted in the City of Clearwater. The use or mIX of uses within the Comprehensive Infill Redevelopment Project is compatible with adjacent land uses. Suitable sites for development or redevelopment of the uses of mix of uses within the Comprehensive Infill Redevelopment Project are not otherwise available in the City of Clearwater. The development of the parcel proposed for development as a Comprehensive Infill Redevelopment Project will upgrade the immediate vicinity of the parcel proposed for development. The design of the proposed Comprehensive Infill Redevelopment Project creates a form and function that enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. Flexibility in regard to lot width, required setbacks, height and off- street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. Adequate off-street parking in the immediate vicinity according to the shared parking fOl111Ula in Division 14 of Article 3 will be available to avoid on-street parking in the immediate vicinity of the parcel proposed for development. 2. 3. 4. 5. 6. 7. 8. 9. COMPLIANCE WITH GENERAL STANDARDS (Section 3-913): 1. Development of the land will be in hannony with the scale, bulk, coverage, density and character of adjacent properties. 2. Development will not hinder or discourage development and use of adjacent land and buildings or significantly impair the value thereof. 3. Development will not adversely affect the health or safety of persons residing or working in the neighborhood. 4. Development is designed to minimize traffic congestion. 5. Development is consistent with the community character of the immediate vicinity. 6. Design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts on adjacent propeIiies. Consistent Inconsistent [X] [ ] [X] [ ] [X] [ ] [X] [ ] [X] [ ] [X] [ ] [X] [ ] [X] [ ] [X] [ ] Consistent Inconsistent [X] [ ] [X] [ ] [X] [ ] [X] [ ] [X] [ ] [X] [ ] Staff Report - Connnunity Development Board - December 16,2003 - Case FLD2003-09047 - Page 5 -- e ATTACHMENTS: Aerial Photograph of Site and Vicinity Location Map Future Land Use Map Zoning Atlas Map Application II/vJS5c1PDSIPlanning DepartlllentlC D BIFLE)(IPending caseslUp for the next CDBIBelcher N 1750 GTE Federal Credit Union (fRT) (ClRP- retail sales)IBelcher N 1750 Staff Report. doc Staff Report - Community Development Board - December 16, 2003 - Case FLD2003-09047 - Page 7 . - SUMMARY AND RECOMMENDATION: The Development Review Committee reviewed the application and supporting materials on October 30, 2003. The Planning Department recommends APPROVAL of the Flexible Development application to pennit retail sales (financial services) with deviations to allow direct access to a major arterial street (North Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C for the site at 1750 North Belcher Road, with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-1304.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with and will not be detrimental to development/redevelopment efforts of the surrounding area. Conditions of Approval: 1. That the final design and color of the buildings be consistent with the conceptual elevations submitted to, or as modified by, the CDB; 2. That, prior to the issuance of building permits for the proposed credit union, revised plans be submitted and approved showing the construction a left turn lane of adequate storage length, according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Road; 3. That, prior to the issuance of building permits for the proposed credit union, the applicant establish an escrow account with the City for the future construction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if warranted by a Traffic Signal Warrant Study. The funds in the escrow account will be a shared portion of the full cost of a traffic signal light. If, in the event that a traffic signal light is not warranted based on the Study, funds will be refunded to the applicant; 4. That revised landscape plans be submitted and approved prior to the issuance of building pennits for the proposed credit union reflecting Code foundation plantings; 5. That outdoor lighting fixtures be integrated into the landscape site design to avoid shielding of the lighting by tree canopy; and 6. That all signage meet the requirements of Code and be designed according to a COllli110n theme including similar style, color, material and other characteristics to provide a sense of uniformity. Freestanding signage shall be limited to monument-style, not to exceed six feet in height. Submission of a Comprehensive Sign Program is required for more than one freestanding sign on either street frontage. Prepared by: Plmming Department Staff: Wayn Staff Report - COl1U11Unity Development Board - December 16, 2003 - Case FLD2003-09047 - Page 6 - . Wells, Wayne From: Sent: To: Cc: Subject: Melone, Donald Tuesday, December 02,2003 1 :51 PM Wells, Wayne Rice, Scott; Gluski, Roberta RE: FLD2003-09047, 1750 N. Belcher Road Doesn't engineering have a final inspection for this site which would bring up some of the issues set forth in the conditions? You have got to be kidding me on the meUnot met in conditions! If the fire department asked for a fire hydrant assembly to be installed or I ask for a dumpster to have an enclosure before issuance of a C.O., does that mean that before the city will issue a permit that they are to construct an enclosure and install the hydrant on a raw piece of property because it says met or any other condition including zoning like perimeter landscaping is required ( the contractor is to install prior to issuance of a permit), and list can go on, and on, ...........etc. Come on! I know you are going to say "I was just asking the question"! don -----Original Message----- From: Wells, Wayne Sent: Tuesday, December 02,2003 11:53 AM To: Melone, Donald Subject: RE: FLD2003-09047, 1750 N. Belcher Road Don - Under BCP2003-03528, for that condition, you marked it "met," which means to me (and James Wagner) that it is "done" and finished (no one will look at this again, even prior to issuance of the Certificate of Occupancy). With James' help, we copied and made this condition a "condition of C. O. Engineering," so now it will be picked up when someone tries to obtain the C. O. In the future, if you are going to wait to get something prior to issuance of the C. 0., you should add the "condition of C. 0." so that Development Services will pick it up. Once you obtain the easement, you would need to mark the condition as "met." From my standpoint, I will not add this in as a condition on FLD2003-09047, as it is a condition on BCP2003-03528 now. Wayne -----Original Message----- From: Melone, Donald Sent: Tuesday, December 02,2003 11:19 AM To: Wells, Wayne Cc: Rice, Scott; Gluski, Roberta Subject: RE: FLD2003-09047, 1750 N. Belcher Road The site permit that is active for 1750 N. Belcher Road, comment #22 in conditions is as follows: "Any/all easements shall be obtained (recorded) prior to C.O. being issued........... etc. This comment can be found in BCP2003-03528. don -----Original Messagen-n From: Wells, Wayne Sent: Tuesday, December 02,20037:47 AM To: Melone, Donald Cc: Rice, Scott Subject: FLD2003-09047, 1750 N. Belcher Road 1 - . Don - A sidewalk is being constructed along Belcher Road on the subject property. My plans for FLD2003-09047 now states that a "seven-foot wide easement will be dedicated to the City of Clearwater." This sidewalk will be constructed as part of the site improvements for the S1. Pete Times building (BCP2003-03528). How do you get the easement? Should there be a condition on the issuance of the Certificate of Occupancy for the S1. Pete Times building? If so, will you take care of such? Or, do I need to place a condition on the Development Order for FLD2003-09047? Please let me know today. Thanks. Wayne 2 C'l "'~ o ~ o <r:: ~ or, ~ If) Sj ~ t-- t-- "T o 0'\ o I ~ o o N 9 ~ o_,-,B 1:: Jj 0 :g~ ~ i:li{J '-' 1:5,-,8 1:: o.."a:j S bll~tIJ]~ a <,::;~~;:; c<l ~ '-' P ~.s;z;' <l) <.) 0 ..8 (J] .~ S 1:5 <B .~ ~~~ ~~o~i{Jo~ .....~ ~o..... ~ ~(J]~ B~o@B~~ 'e~o ~~~5 ~ ES~ <l)~ ~ 00 ~ Pi{J>Pp '-' .~ ~ ~c<l61:5;Sop~ <r::~o~o ~ P 00 2 'H ~ ,~ <,::; ~ .........,. ~ U tl '" 0 S ...... ..... o ~ S 0 'C or, i{J (J] ;g 'S C i@ oJ ..e ,...., 'o.~ .~ tl \0 ~ S .2 ~ ~ '-' s::s S ~ g ~ "0 8:'~ ~ '-'\Dc<l PC:::-~i{J@ OP _~~oJo ~ g ::!;"' ~ ~ [) ~ ~ -- .-- 6 u ~ U 'C <3 J::: ~ @ O~(J] ~~6~~.~u (J] ~.....~oJ.~..... .S '-H t;j oJ ~ 'p b i{J {J ~ oJ.S 1;:1"8 i{J ~ 'Fj i<J ~~~ ~~~~]>a~~1 ~~~g~ .~j 'p ::s [) c2..... ~ ~ ~ en '-' 0 p.., ~ <l) R' -: <r:: 0 0 ~ oJO~ ~,-,~......~~ui~p"", ~'-'~'Co .~~ ::sEa '-'~o~ ~~O<l)~.~o ><l)U~U:::; ~, ~oJo 0 ~ 8('1~~~;s o~ c<l'H c<l6 '"@ 1) t) ~ (!) 0.. ~ ~ C'l 'Ed ~ .g ;.... t-< (1) b1) cd b u o -B '-' ~ ~ ~'R '-' '-H '-' or, ~ ~ ~. B P ~ 12 &S '-' '-H <H d) bll -'- is > 0 > '<j- 1ii ~ 1ii c'p i:; '-' C1) 0 1) 0.. ~ U cd or- - ...... 0 ~ a ~ ;J <1.) ~ u -:5 ~D';; ~,-,"'" ~B,-,~~5o~~E""'oZSEa:!~'i ' u r~ ~ U cd ""do '-' V) ..... OH I ........ r'" 0 ........ 0...0 0 R bll . ~ -5 oJ_[-< ~~u~(J]c<l or,R~~R ~o .~~ o...........~ ~.. ~ oo~cd1)~B~1)u.E~~~ S i<J . ~ @ g.i ~.;::: ;> E 13 o'~ 0 >-.;.::: Ii; 2 B v r-- '~ z-. ~!qo~~~~]~oJ~~i<Jc<l~~'~.....<l)'<j-~~ ~~U~E~B;s(J]O~~~~~~~~.oS~~s 1;:1 .~ 0 >-. 6:l (J]'~ 0 ~ S bil '-' ~ 'B '-' ~ ~ g; bll \0 <t:: ;::; ~-:cu......~i{J~~E.E~E,-,~Eoo .5~<r::..... ~'H o::s ::0 oCIJ o~~~ >~~ 0~~0"Cl ~ot; (J] 8 'C 0 ~ ;::j u E ~ Ed 0 ~ 'C bJ) 0..." ~ ~ ;:::' [-< ~ U ('1 ~ <r:: ;::;)'(J] o:l ~ U '<j- ~ '1:: ~ P.. P.. > ~ t:, G' !:: ~ ~ 0" o ~>LI ---- I ;:q0:1 ---- ,...., >LI I 0:1 Q .....:l o ~ '-' P o Z or, - 0 .. 0 ..... ~ od Q '<j- ('1 ---- 0\ P .S ..... c<l ;s .~ P.. '-' :::.::: ~ .;;: u <r:: '-' ~:~ = 0::: .:: ..... ..... P bll C. '-' P ~~~ .;: S ~ ~ <l) <J ~ .~ 0 '" p u::: .. S <l) 'H Q 0 c<l '-' ..... <r::o::: [-< 00 0 .c 0 t-- -0 0 0 I- :E <r:: Q ..... Q Q <J ~ .....:l .....:l ~ ~ - '-H c<l ..... o ~ P . c 1:5..0 5;l:i"8 (Lj <'::;~ObllgJ S tJ~~=..o<l) -B1ij gc<l;soJ"8B ;s is ~ ~ g .~ ~ B v 0 ~ ~ i{J.~ 1;3 ~ S.g u.~ <l) - ;s ,~ ~'c 'o;l:i^ ~ E -0 ~ U .2 C ~.s oJ P ~ blli:I., U"@.!8'o (J] S 5-B C)SnS~.E~ ~ ~ -B.~ <H 0 bll ..... i13ffi -:s~~u:'=:Q) 8 c.gj .~ ~ t=: ::s"@::: - .~..... ~ ~ .~il ~ E U .g ~ ,..., ~.:S V~ Uj B&gg .-J4-<0v 5~t5i:S~~;::~2 ..... b1J Sb oJ .~ ]j 6 ~ '-' ~ ] .~ ~ ~ ~ ~ ro -E o~ '-'bilO ~ c> 8.] 6 :=ro~Cl)t);:>--o-.;....l.;: 52 ~ 8 oJ 2 c !!i7:i:8 '-' ^' Sb2!;,~ ~ 1- ""d ....., .,...... U) CJ -:= (/) 2 (3 'S: ~ [/) ~ tU V) R gJ @< 0 .p .~ '-' -B '-' oo<.::.....<8~~ ~ U '-' oJ p.., <l) c<l R.S ~~~SB~i3:::::5 ~ i> :::: 1:) -< 1A '" u ~ U .8 ..... .2 5.. 1:! o:l .~ ~ ~ ~ i{J ~ ~ o:l '-' ~ .8 '-' > o .D c<l .5 '-H o ~ ~ r-- '<j- '-H o '-' ~il p.., C<) :::8 ~ - - ~ 0 <ll 0 ~ ..0 i'S N C<) .,.., '"0 ';; ----- Vl .~ >:: .", N ~ oj " ----- 0\ '" ~ N N <ll >:: ~ 1A ...... ... oj 00 '" t'- ." B u <ll .~ ~ -B b <.i:< '"0 .S '" q:: @ q:: ~ Vl <ll N ill -B '+-< E ...... 0 '+-< CI >:: 6 <ll 00 '@ ;::l .~ ~6u 6 .... aJ '~ o .~ >-- q:: >::CO ~ oj I-< 'E CI <ll 0 '" <ll t;j ...... oj~ ~~ i$ ~ <ll...... .,..,"'" ...... ;o! B~ P-. .~ "2 ." <ll [2 '" ~ U '" <ll -B "0 CO 00 >:: B ~ aJ E--< '+-< 13Eill <ll ~ ~ 0 <.i:< ..0 <ll <ll '" 83 t5 @ ~ u >:: CO >:: 8..uCl 0 u -< oj o >:: .~ ~ '" <ll CO Ell I-< 0 '@ i@ i;J .~ P-. '.p n5 I-< P- I-< oj 6 P-. OJ OJ ;::l !5 fr I '" P-. 0 ..<::..0 ~ .,.., E--< '5 t) if] aJ CO ~ , s ~ ::l ~ ~ ,,-.,.~ p '-"'0 'J:: ...... '"0 '" M '" M = 0 P-. Z C<) C<) C<) rC) C<) '" rC) C<) C<) 0 0 0 0 0 0 0 0 0 0 ~I 0 Cfl 0 rs 0 rs 0 Cfl 0 ~ N rs 0 rs 0 rs 0 rs N > N N N ~ N ~I ----- N ~ ~ ----- ----- rs ----- rs ----- ----- N rs ----- rs rs rs Cfl ""'" ,...., N \0 ""'" C<) ...... \0 N \0 N ----- ----- N ----- ----- ----- ----- N 0 0 ----- 0 N 0 ----- ----- ...... 0\ ...... ...... 0\ ...... ...... ...... ...... rs rs ~ rs rs rs rs eJl t-- rs rs ~I rs rs rs rs = .... ...,. 0 ..... 0 0::: ~ 0\ .... 0 0::: ~ I W f'f'l >-. 0 J: ""'" '+-< ..... 0 () 0 .... r'l ...I N ., 9 w OJ .... III ~IJ ..... ill ill ill ill ill ill ill <:J P-. < ~ z Z Z Z Z Z z. z 0 0 0 0 0 0 0 0 Q) =It: 10 Q Q Q Q Q Q Q ~ CI) I"- ~ en .... U ~ OJ <ll OJ <ll 0 U 0 0 <ll U >:: q q q q q 0 0 0 0 i$ 0 i$ i$ 0 Z Z Z Z p:: Z p:: p:: z '" r<) rC) '" C<) C<) C<) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N ----- N N ----- N N N 0 ----- ----- t'- ----- ----- ----- \0 rC) \0 N \0 C<) ----- ----- N ----- ----- ----- ----- 0 0 ----- 0 N 0 ...... ...... ...... 0 ...... ...... ...... C<) M r<) r<) r<) C<) C<) C<) C<) C<) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ""'" ""'" ""'" ""'" ""'" ""'" ""'" ""'" ""'" ""'" N N N N N N N N ~ N ----- ----- ----- ----- ----- ----- ----- ----- ----- 0\ 0\ 0\ 0\ 0\ 0\ 0\ 0\ 0\ 0\ P- '" .S 0 I-< '" .,.., i$ P-. <ll q u '"0 q .S oj OJ OJ bIJ <ll P- A Q) '"0 .,.., '> ,S ;:; oj S :::.::: u "i u "5 0 <ll oj P <ll >-< ~:~ c ~ P ::l 0 ~ u u i$ ,~ oj ..0 '"0 '"0 Cil ~ bIJ '" ~ 0 ~ >. <ll U 4-< '-l - ,S .,.., U <ll .,.., oj '> ~~i Q. q 0 '@ ;;. oj I-< 'j:; I-< '+-< 5 <ll <ll <ll <ll <ll E--< 0 :::8 I-< bIJ E-< ~ <,; <ll S I-< Cfl U oj g '" q q I-< <ll I-< q OJ ;:l <ll <ll '"0 Cil ~ '51J u oj p ~ ..... 0 <ll it '@ '" 0 p:; ..... <ll U I-< <ll bIJ ;::: <ll <ll I-< :::8 I-< <ll <ll <ll <ll ill Q P-< .....:i 0 .....:i Q E-< Q~ > ~ .....:i 0 Vl en 0 ""'" 00 0 \0 Vl 0 -0 ~ 00 ""'" C<) C<) ""'" C<) ...... ...... \0 0 N N N N 0 ...... 0 0 0 .... :~ CI ~ ~ ~ ~ ~ ~ ~ ~ CI .,.., Q CI CI CI CI CI Q Q Q Q <,; < .....:i .....:i .....:i .....:i .....:i .....:i .....:i .....:i .....:i .....:i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r<1 :;s :5 <( C"l r<1 N <n ---- 0\ s::l C"l I:'-- el)r--- .s ""1' C ~ ~ 0:: ..... 0 0:: ~ M W ".O:I: ~ 0 () .S: N ...J ;: 9 ~ ~~z -< 0 Q):f:l:1O rIJ Cl.l..... ~ "'.... u~ ::'::u ~:~ ~~~ -0 u I- <'I o o ~ '1" ....... ---- o r<1 o o C"l ---- '1" C"l ---- 0\ ::: Il) '~ Il) ~ Il) o !3 o U) Il) ~ '"1j ~ oj .....1 o <n o o o .....1 r.r., - ~d:l Cl ~s ,~ :a >= s 0,.,,1 ,~ ..g ~ 0 ~U)(J)C/.) ]~:sg;] 5l p:; "2~ ~ 1;:; ,8, tZl -:S ~ [/J IiJBj:j----: '"1j u ~ >=: ~ .~ E E .g ;:2 1iJ~~;olLl ..... 00 >=:lLl ^tJ<H 8;z: ~ 8 ,S "0 G ~()~6Z S' ~ :8 p. lLl ",,'flf7j ~ O;:J <l) c.) ~ooj~_;~ o <l) o~13~;;: N'. .~ ;> r- ~~'g~~z ~ ......~ 0 ~ lLl 1:5;0 ~ oo~ 5 5bu ojf-<~ 53 a .~ .5 ::: 0 ~fj-:5+-J~U .....U)..........~o E;oc8~;S:Z <(I ~ r<1 o ~ ~] t::tZl ....... ....... " I o o ~ <(I ~o ---- o ~I tZl <(I o lLl Z o o lLl Z o o <l) ~ o Z Il) ~ o Z r<1 o o C"l ---- I:'-- --- ....... ....... r<1 o o C"l ---- 00 ---- o ....... r<1 o o C"l ---- '1" C"l ---- 0\ "" o o C"l ---- '1" C"l ---- 0\ ::: <l) '~ <l) ~ [j ~ oj ~ ..... o ..... tZl ::: Il) .~ Il) ~ Il) ..... ~ o ....... o Cl Cl ....:l r.r., o C"l o Cl Cl ....:l r.r., 0IJ1l) ;Q{J .D ~ <l) 8 ~ "a'~ ~ ~ ~ 0 >-. 'U'J oj ~ '"2 Il) IiJ 1ij o ~ 6 oj "O>=:u $l ~OOIJ ttl '::1 ] .S 4-i '"1j [oj;g~5 U)CO~C"lS .~ ....... C'1 0 ti ~ gjl 0' d3 6 0 '.p C'1 ~ S ,~ 0 ~""'o63;J)Il) OJ .~ ~ '* j:j ,~ i': >=: :;; ~ ?:l 1!J .S en g tJ B ~ o~ 'w ;:: ~ ~ ;0 >-. . >-. ~ 9 .~ '"& ~ '"d (J'J 1:5~p.O;.=:o 8.8.C'd"O@'U (/l~~@Q)5 >=<l)~'HttlliJ <l)~g~g.1ij 8~"O:;;~ S 56 <l).,-)::l::l "",U~C'1~"O "I o o~ ;:a;s: .:::0 o ~ ;s: Cl lLl Z o o Il) ~ o Z '" o o C"l --- '-0 ....... ---- o r<1 o o C"l --- '1" C'1 ---- 0\ ::: Il) .~ Il) ~ o Il) ~ a<l ~ ..... oj p.., o r<1 o o o ....:l r.r., <'I o o C"lt) ----....., Sf-< ---- ....... t) ....., f-< t) ....., f-< lLl Z o o Il) ~ o Z PI o o C"l ---- o ....... ---- ....... ....... r<1 o o ~ '1" C"l ---- 0\ r<1 o o C'1 --- '1" C'1 ---- 0\ ::: Il) .~ Il) ~ B U) oj ;s: :Q '0 tZl o '1" o Cl Cl ....:l r.r., r<1 o ~;s: ~~ C"l ....... ~ ~ lLl Z o o Il) ~ o Z r<1 o o C"l --- ....... --- C"l ....... r<1 o o C"l ---- '1" ("I ---- 0\ ,to: U) > Il) ..... VJ o '1" -< Cl ....:l r.r., "" o 23 r::: o ~ Cl of) o ~~ ;e~ o ....... ~ ~ lLl Z o o Il) ~ o Z of) o o N --- '-0 ---- o r<1 o o C"l ---- '1" C"l ---- 0\ bJ) '5 Il) Il) :;s u ~ o o '1" o <( o ....:l r.r., - f-< ~ U >-. .D 13 Q) Ci.. >= o u -0 Z of) o ~~ ~~ C"l ....... ~ ~ lLl Z o o Il) ~ o Z r<1 o o C"l ---- C"l ---- N ....... r<1 o o C"l ---- '1" C"l ---- 0\ ::: Il) '~ Il) ~ ~ u '-0 ....... o o o ....:l r.r., of) o ~~ ;e~ o ....... tZl ~ lLl Z o o Il) ~ o Z of) o o C"l ---- '1" ~ 0\ '"1j Il) ;> 'a:) o Il) ..... ~ .8 ..... oj ,S:l ....... p. < o ....... o <( o ....:l r.r., vi 'E ;0 >= o u :B tZl ;s: ;s: "" f;::> '-0 23 Of) o ~~ ;e~ o ....... ~ ~ o .....1 o ::r: Il) ~ o Z r<1 o o C"l ---- '-0 ---- o ....... r<1 o o C"l ---- '1" C"l ---- 0\ ~ Il) .~ Il) ~ bJ) ,S ~ o N C"l ....... o Cl Cl .....1 r.r., ~ i> '> '.0 u -< ~ '" u en >=: o 'p ~ o u <l) <l) U) r<1 o ~o Rs <(I o ....... o <(I Cl .....1 o ::r: '1" 'H o "" Il) ~ 0... Il) ~ o Z r<1 o o C"l ---- 0\ C"l ---- 0\ r<1 o o C"l ---- '1" C"l ---- 0\ ::: Il) '~ Il) ~ bJ) ~ '~ o U) '"1j ~ oj ....:l '1" ....... o o o ....:l r.r., C') ~ e -- ~ 0 0 -< i- N C') --- <n "> N "., --- 0\ " N << ,...., N ~ t""- '" U eJ)t-- .S "T C ...... 0 "" ~O'I'" ..... 0 0:: ~ M W >,O::I: ...... 0 U 'S: N...J ;: 9 ~ ~~z ~ 0 a.I=l:t:1() ~ '"-l r-.. ~ "-l.... U13 ::':::u ~:~ ~~~ -0 :0 Q) ~~ ~ C') o ~~ t""- I ___VJ ,...., ,...., <l) = >:. ~I QI:l:lVJ Q) .... 0: Q C') ..... 0 Q) 0 .... C'1 0: ___ Q ~ --- 0\ S: <l.l ":; <l.l ~ (;j c ..... o q ; 1.) .~ E <oJ 0 il:l ,..., Q "~ ~ I- N c3 :~ Q tJ Q -< .....:l >.r., ~ z C') o ~~ ~~ o ,...., ~ ~ ~ z o Q <l.l q o Z C') o o C'1 --- \0 --- o ,...., (f) o o N --- "1" N --- 0\ S: <l.l ":; <l.l ~ ~ ..... [/] ro ~ ;:; .D t;; :r:: o 0\ o Q Q .....:l >.r., "1" '- o "1" <l.l ~ 0.. e Conditions Associated Wit' FLD2003-09047 1750 N BELCHER RD .:..t'jlIl"",~ ~j'~I'II'<!""'''' ,{4.. """.r.<,:".~t...... Il,-!:'._/,j, ~'".~~''' :l::S:"',.<,)"l,/.,~9f/ff; "1::- "CC7'^^ ^ ~.q.. ':or:; ^ ^H^ ^ t::::i: ~ikuu"'~~~ -#",..)tTE~. ,1,1 Building Fac"<fll'~'[andscape Cc 12/03/2003 12/3/2003 - (A_D) Per Section 3-1202.E.2. Foundation plantings shall... ...composed of at least two accent trees (or palm equivalents) or three palms for every 40 linear feet of building facade and one shrub for every 20 square feet of required landscaped area. A minimum of 50% of the area shall contain shrubs with the remainder to be ground cover. Revise plan to meet Code for plantings in area. Arden Dittmer 562-4604 11/14/2003 revise plan to show 4' sidewalk and 5' landscape. revise plan to meet Code for plantings in area. 10/9/2003 Per Section 3-1202.E.2. Foundation plantings shall be provided for 100% of a building facade with frontage along a street right of way, excluding space necessary for building ingress and egress, within a minimum five foot wide landscaped area composed of at least two accent trees (or palm equivalents) or three palms for every 40 linear feet of building facade and one shrub for every 20 square feet of required landscaped area. A minimum of 50% of the area shall contain shrubs with the remainder to be ground cover. Traffic Eng Condition Bennett Elbo 562-4775 11/25/2003 Construct intersection turn lanes along Calumet with adequate storage length per City and the Florida Department of Transportation Design standards. 11/25/2003 Provide an escrow account with the City of Clearwater for the future construction of a traffic signal light, if warranted by a Traffic Signal Warrant Study. The funds in the escrow account can be a shared portion of the full cost of a traffic signal light. If in the event that a traffic signal light is not warranted based on the study, then the funds will be refunded back to the applicant. Zoning Condition Wayne Wells 562-4504 11/20/2003 11/20/03 - WW - revised plans submitted with note (include as a condition on D.O.). 11/14/03 - WW - Followup letter sent to applicant expressing concern for note on plans. 1 0/6/03 - WW Address the location of all outdoor lighting fixtures. 11/20/2003 11/20/03 - WW - Note on plans to be later. Add as a condition on D.O. 11/14/03 - WW - Followup letter sent to applicant. 10/6/03 - WW Provide sign package. Show location of proposed freestanding signage, including proposed setback from the property line(s), and provide the height, area and color of proposed signage. Include any proposed attached signage. Print Date: 12/02/2003 1 of 1 Not Met Not Met Not Met Not Met Not Met CaseConditons - - Wells, Wayne From: Sent: To: Cc: Subject: Elbo, Bennett Tuesday, November 25,200311 :13 AM Wells, Wayne; Rice, Scott Bertels, Paul; Brinson, Ryan FLD 2003-090407(1750 N. Belcher Road) Gentlemen, I have reviewed the Traffic Impact Analysis (date conducted Nov, 2003) submitted by Mr. Roy Chapman from Florida Design Consultants, Inc.. Attached is a copy of the letter that will be sent to Mr. Chapman. I also placed traffic conditions into the permit plan under case number FLD 2003-090407. These conditions are necessary to improve the turning delays encountered at the intersection of Belcher/Calumet at build out. If you have questions please call me. ~ TIA calumet & belcher.doc Bennett Elba Traffic Operations Division (727)562-4775 belbo@clearwater-fl.com 1 e e November 25,2003 Mr. Roy E. Chapman, P.E. Vice President of Transportation Services Florida Design Consultants, Inc. 6321 Grand Boulevard New Port Richey, FL 34666 Re: 1750 North Belcher Road (FLD 2003-09047) SW comer of Belcher/Calumet Dear Mr. Chapman: After reviewing the Traffic Impact Analysis (TIA) conducted by your finn in November, 2003 per reference, I submit the following conclusions. The unsignalized intersection of Belcher and Calumet has an existing Level of Service (LOS) of "F". The approach delay as indicated in Table 3 of the TIA shows 77 seconds. The proposed development will increase the delay to 109.5 seconds which is a 43% increase in delay. This is a significant increase in delay which is already operating at a LOS of "F". The Florida legislature passed the 1985 Growth Management Act which enables local agencies to enforce necessary mitigation to the developer in order to maintain or better the LOS. As a measure to decrease the delay at the intersection, I offer the following conditions: · Construct intersection turn lanes along Calumet with adequate storage length per City and the Florida Department of Transportation Design standards. · Provide an escrow account with the City of Clearwater for the future construction of a traffic signal light, if warranted by a Traffic Signal Warrant Study. The funds in the escrow account can be a shared portion of the full cost of a traffic signal light. If in the event that a traffic signal light is not wananted based on the study, then the funds will be refunded back to the applicant. - . If you have questions, please give me a call at (727)562-4775. Sincerely, Bennett Elbo Traffic Operations Engineer cc: Paul Bertels, Traffic Operations Manager, City of Clearwater Scott Rice, P.E., Land Development Engineering Manager, City of Clearwater Wayne Wells, Senior Plamler, City of Clearwater U:\My Documents\TIA calumet & belcher.doc . e 11 :30 a.m. Case: FLD2003-09047 - 1750 North Belcher Road Owner/Applicant: BelCal Properties, LLe. Representative: Mr. Mark Klein (2040 NE Coachman Road, Clearwater, FL 33765; phone: 727-441- 1951; fax: 727-449-1724; email: mske(a)tampabav.rr.com). Location: 3.288 acres located at the southwest comer of North Belcher Road and Calumet Street. Atlas Page: 262B. Zoning: IRT, Industrial, Research and Technology District. Request: Flexible Development approval to permit retail sales (financial services) with deviations to allow direct access to a major arterial street (Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Proj ect, under the provisions of Section 2-13 04. C. Proposed Use: Retail sales and services (GTE Federal Credit Union). Neighborhood Association: None. Presenter: Wayne M. Wells, AICP, Senior Planner. Attendees included: City Staff: Frank Gerlock, Bryan Berry, Wayne Wells, Dumme Anderson, Tom GleIm, Don Melone and Scott Rice. ApplicantlRepresentative: Jeny Figurski, Mark Klein, Steve Klein The DRC reviewed this application with the following comments: 1. Parks and Recreation: a) An Open Space dedication assessment is required only if the bldg coverage expansion is 50% or more. Based on the site plan, the fee does not apply since the existing building coverage is 25,415 s.f. and only increasing to 26,228 s.f. 2. Stormwater: a) In reference to BCP2003-03528, reminder that the sub drains must discharge directly to outfall control structure. Plans submitted for this case indicate a sub drain flow to the pond; this would result in a constant "wet" pond condition. 3. Traffic Enl!:ineerinl!:: a) Traffic Impact Fee calculations inconect on site plan. Traffic Impact Fee of the amount of $14,661.08 must be paid prior to e.O. (TIF reflect current rates as adopted by Pinellas County.) b) Create handicapped accessible path from office building to public sidewalk along Belcher Road per (Florida Building Accessibility Code Chapter 11, Section 11.4.3.2). Also an accessible route to and from on site buildings. c) Show vehicle-stacking drive through lanes for bank. Since site plan shows 5 drive through lanes please show these lanes to accommodate a total of 22 cars. Vehicles must not block parking spaces or drive aisles. (City Community Development Code, Section 3-1404 3.B) d) The applicant must provide a Traffic Impact Analysis for the proposed development. The expected trip volumes from the proposed site exceed the City's threshold of 100 vph or 1,000 vpd. Prior to conducting a TIA make an appointment for a scoping meeting with Traffic Operations Division (727) 562-4778. e) All of the above to be addressed prior to CDB. 4. General Enl!:ineerinl!:: . a) The Proposed 8" sanitary sewer main that serves the distribution center needs to be a minimum of 5 ft. from any structure. b) Separation from the 1" water service line and the 8" sanitary sewer main can be less than 1 0 ft. c) Since the sidewalk along Belcher Road is being constructed on the proposed site and not within the public right-of-way, an easement for such will be required. d) All ofthe above required prior to CDB. 5. . Planninl!:: a) Revise the "applicant's name" on the application to "BelCal Properties, LLe." Show "BelCal Properties, LLC" as the propelty owner. b) Based on the building dimensions indicated on Sheet 2 of 11 for the St. Pete Times Distribution Building (also addressed at 1750 North Belcher Road) and under BCP2003- 03528, the distribution building should be 14,346 square feet, not 14,215 square feet. Revise/advise. Page 1 01'3 c) Revise S. 1 of 11, based on the distribution building _g either 14,346 square feet or 14,215 square feet (see Comment 2 above), under "Zoning Compliance Notes" and "Impact Fee Calculations" the distribution building from 16,700 square feet. "d) Revise Sheet 1 of 11 to indicate the parking requirement for the credit union at five spaces per 1,000 square feet (not three spaces per 1,000 square feet). e) Revise Sheet 3 of 11 to indicate that existing driveways on Calumet Street no longer to be used will be removed, similar to those on Belcher Road (saw-cut & remove existing driveway). f) Complete the Affidavit to Authorize Agent, since BelCal Properties, LLC is the owner. 'g) Revise the responses to the General Applicability and the Comprehensive Infill Redevelopment Project criteria to provide statements that explain how, what, when and where the proposal of "retail sales (financial services)" meets the criteria, including the deviations 'f listed above at the start of the letter. Do not repeat back the criteria as the response. In General Applicability criteria #2, please provide the anticipated inlprovement value of the proposed credit union . (may also include the anticipated improvement value of all site improvements for the three buildings). Suggestion is to provide such responses as an attachment to the application, allowing for full discussion of your responses to the criteria. h) Provide the width of all landscape islands. i) Unclear of the paved area at the northeast side of the proposed credit union (not shown to be striped for parking). Also unclear the need for the small landscape island to the west of this paved area. Advise/revise. j) The note "car stop (typical)" with its arrow line at the northeast corner of the proposed credit union is unclear what it is pointing to (Sheet 2 of 11). Advise/revise. k) Unclear of the need for sidewalks greater than five feet on the north side of the proposed credit union and on the east and west sides of the proposed office building. Also unclear as to the need to concrete the north side ofthe proposed office building. Advise/revise. 1) All utilities, including electlic, phone and cable television, must be located underground on- site. m) The interior landscape area provided on Sheet 7 of 11 in the Vehicular Use Are Tabulation is different than that indicated in the vehicular use area diagram at the top of the page. n) Provide the location of outside mechanical equipment for each building and all required screening. If located on the roof, note such. 0) Address the location of all outdoor lighting fixtures. p) Provide sign package. Show location of proposed freestanding signage, including proposed setback from the property line(s), and provide the height, area and color of proposed signage. Include any proposed attached signage. Signs must be architecturally coordinated in terms of design, color and style with the proposed buildings. ....' q) Provide the proposed building heights in terms of feet, in accordance with Code provisions (see definition of "height, building or structure" for measurement of height). r) For presentation to the Connnunity Development Board (CDB), please provide rendered (colored) site and landscape plans and building elevations (one copy). ~ .s) Provide color samples (paint samples, etc.) of the proposed exterior building materials. ..0 Since this overall site has three proposed buildings, please provide building elevations of the other two proposed buildings (St. Pete Times distribution building and the office building). Include proposed exterior building materials and colors. u) Since a criteria for retail sales and services in the IRT District is that it take no access to a major arterial street (Belcher Road), is it possible to remove the proposed driveway from Belcher Road? Advise. v) Since all existing structures are being removed as part of the redevelopment of this site and to avoid confusion, remove from Sheet 2/11 the existing (ghosted) suuctures and pavement. 6. Solid Waste: a) Inadequate solid waste service, Recommend at least two dumpster enclosures. Suggest providing a recycling dumpster for St. Pete Tinles building. 7. Land Resources: a) No connnents. 8. Fire: a) Revise landscape islands to ensure proper turning radii for fire trucks and delivery U1ICks to access entire site. 9. Environmental: a) No C0llll11ent. 10. Communitv Response: a) No C0llll11ent. 11. Landscapinl!:: Page 2 of 3 Per Secti.-1202.E.l table indicates that there must be b_m back of curb to back of curb on interior islands. b) There is an existing plan for the site which will need to be revised to show the changes in parking / drive-thru layout and associated landscape changes. Per Section 3-l202.E.2. Foundation plantings shall be provided for 100% of a building facade with frontage along a street right of way, excluding space necessary for building ingress and egress, within a minimum five foot wide landscaped area composed of at least two accent trees (or palm equivalents) or three palms for every 40 linear feet of building facade and one shrub for every 20 square feet of required landscaped area. A minimum of 50% of the area shall contain shrubs with the remainder to be ground cover. Plant sizes must be per Code Section 3-l202.B. a) c) d) NOTES: Resubmit 15 collated copies of the revised plans and application material addressing all above departments' comments by Thursday, November 6, 2003, no later than noon. I IMS5clPDSIPlanning DepartmentlC D BIFLEXlPending cases I Up for the next DRCIBelcher N 1750 GTE Federal Credit UnionlFinal DRC Comments 10.30.03.doc Page 3 of 3 ~ r<o :::.E g p.., N 00 N 0 .--< 0 ----. 0 .--< .--< "1" '0 QJ :a~' :3' <:', o ~~ S:l~ ----. .--< .--< ~t- .5 '-.:t' c ~ ~ a: .- 0 a: ~ rA w >.oJ: ... 0 u .> N...J ~ 9 ~ ~~z -< 0 Q)::j:j:Ln rI'l Q)...... ~ "'.... u~ QJ - ~ Q :::':::u ~:~ ~~t -0 ;:1 .S '(;j .~ P- c .< ~ ~ '5 ~ 1 ~ ~"d:) Q S ~ --<0::: 00 ~g :E --< ti Q < H ~ I- o_oB ~ .s 0 :9gj ~ - g~ ~ so:~t .a~ Sbll uslii 1'0 .... <+=<.<::::: 2:;> <:: 0 = ;:g.S iLl . 0 ~ 8' 0 '" .1iJ -:::; .... <8 0 ..... ~~~ ._~~~~~~ ~~ ~~o~ s~ o..",~ B~Olii.<::~~ '~~o ~<J:1~5 ",80 ~~~ 8~~~""""""q 8~ ~~~~;:1 ~~<J:1 = 00 2 S ~ N <8 ~ ~.q 0.. U ~ ~ S ......o=..~ q iA ~ o c:: 0.. 0 'C r<j ~ {J ;g = ~ gj'~ ... U -<;:; ,~ o\(;..g 6.9,,: 1ii 0 8;j~ ~~ E~6 g:i5 .81:4-: o \0 ro .2 c:::: .--< ~ '" 0 = ...... 0.. '"d .... ...... 0 ~~'" _~ .....Do u~ u......-o<::'" oEe 0_ oj .<:: 0 ;:1bJJo..u 0 >-'-< ~.t::.<:: O:l B 'C'oj S g~'" ......O"O;j"'~U gje ~'"d"'0...... 0..=...... .R~B ro'"d~ooo~ -? ~oo~~ ~~ "'o~ O"rou....=>_ -~ ~_Hoj~ ~..... ..... ..... 0 0 <l)'<:: oj ...... ill ;td..... c- u..c; = (I) ~ (I) 5~~ -0:::00......- UZ......~ roO-l'Oo.. ~ '+=I;j[l P- ^~'<::ui'--'OO::,:,,:: <l)~~;::;0 ~<l)oj i~~ ~~~~~~~~~~ lj0~~ ~~~ - <l) ~ a:5 ~ bll.<:: ~ ."" ~ ~ .... t-< (I) ro <l) .~ .^ ~ .<:: r: w ~ _ e...... -~. 0!iJ 0... .<:: gjl.... ~..... ~o <l)~~ xbll~S2~~~~-'<:: ..................~f'-< ~~] <l) 0 0. e U ~ .r-" o-;;:l 'C 0 ;j (5 ill ;g 5 ..;g u .s ~ ~ ~~.... ~2<l)~~~'"d~~sZ88a3~'~ ~~E ~&~ ~~8~~~~M~~8~~~8~oo~]~~ 0..0,--, eoj ......~oo;:1uO u~ ......~wou<l)O 8 ro ':04 ro ~ ~..c; 0...... u 0;':::: U ;>.,;':::: > 2 B t) ~ 0 0.. 7; 0.. q 0'<:: 0 :=: ~ {i ~ a'13 0.. ~ ro o...g '0; .... 0 "i" -5 2 B q ~8u~B:9B~ 0"'rJ3~~~~'"d'"d.08~~p....~~ ~7;0;>"~""o;o1ii8bll Oi~0~~~~~~<l);j~ ~ S ~ '5 U ~ ~ ti 0.. @ .;:i ~"t: 0 I t: 0 0 '5. ~:< t: :2 0 roO-' ~u Ou""'~ >.<:: 8'8'"Clo~ -5;-, ~~'cUO~;j~~~U~Uo~'c.~~........o..u~~~'''''';~ -c- 0.. M O"......r") '" ro 0.. "i"'"d.....<n 0..0..> ",,--,\O-'"d "'M r<o o ~ 0:::1 t::r:/) .--< .--< r<o o ~ 0:::1 t::r:/) - .--< ~ I ill 0::: 1 r:/) Q H o ~ ~ z o Q <l) ;:1 o Z o 5 z r") o o N ----. t- ----. .--< .--< r<o o o N ----. "i" M ----. 0\ r<o o o M ----. "i" M ----. 0\ ~ <l) ':;' o 0::: b1l ;:1 ~ u !+1 ~ ro ~ ~ III ':;' III 0::: b1l .S .... III III P ..... b1l ;:1 ~ o t- o Q Q H ~ o 00 o Q Q H ~ -~ - '~ '" 00 III -B '"d 1ii III ;.@ o ~ '"d ;:1 oj ~ .~ .s ~ s:liLI ~8 ~~ '13 ~ 53 ~ 's q ~~~~ -.E~3 ~..;g~ -a3f'-< 15;:10 ..... III Z OJ [il . U,........ :: ::::: VJ 0) 'OJ gj ~ 6P;<~ !iJ$ ~ III '" III 'S: :04 ~o o ..... '"P @ <J:1 e o '.g ..... ro 0.. III r:/) ] ~ u ("<') = ("<') o Or:/) ~> "1",...., N ----. 0\ <l) p o Z r") o o N ----. "1" N ----. 0\ .S '1j o ..c: u ro p ro '" 1:1 III ;:::: S p u oj op:; Qp.., <n "i" N --< Q H ~ ~ i- .;;: ..", " -< 1A '" u ("<') o Or:/) ~~ N ----. 0\ r") ~ o III [?Jl p.., III ;:1 o Z '" o o N ----. "i" N 0\ 0.. o 0':; gf 'B ;::l ~ o f'-< ~ 6:) ~ ~ .30 <n r") N --< Q H ~ M :::E g p-< N 0 ----- ....... N ....... 0 ----- 0 ....... ....... """ OJ)t-- .s "'1' 0 t; ~ 0:: .... 0 0:: ~ rA w >,OJ: ... 0 () . > ("l ..J := 9 ~ CJ~z -< 0 Q)=tI:LO '" ~...... COd "'".... u~ :ll::::u ~:~ ~~i -0 '0 .. ~~ :5 M o ;::n;J: ~~ o ....... M o o N ----- """ N ----- 0'\ '" '" ~ 1=1 ~ ..... ~ ]- o U 4-< o I-< ~ :j::; ~ H I- o M N -< 9 ~ M o Or:/) ~~ N ----- 0'\ ~ 1=1 o Z M o o N ----- """ N ----- 0'\ ..... ;:j o "0 ~ '8 :::E o Q """ """ N -< Q ......l ~ M o ~ -<I ~P::: o ....... -< p:::1 i::LI Z o Q o s: ::r: of) o o N ----- M ----- o ....... t<') o o N ----- """ N ----- 0'\ "0 <.) ~ p::: >-. ~ ;> I-< ;:j r:/) ~ ~ I-< f-< 00 ....... o -< Q ......l ~ e <'I o ~~ Sj~ ----- ....... ~ ~ i::LI Z o Q ~ 1=1 o Z <', o o N ----- r--- 0'1 2; t<') o o N ----- """ N ----- 0'\ "0 ~ ..... oj ~ I-< U P. oj :::E o M ....... -< Q ......l ~ co -< co iil P-< I ~ o M o ~~ ~~ o ....... ~ ~ i::LI Z o Q o s: ::r: M o o N ----- \0 ----- o ....... t<') o o N ----- """ N ----- 0'\ 1=1 ,8 ..... oj '"5 <.) c:3 U ~ bIl oj ::1"0 .~ 0 I-< ~ QP::: ~ ....... o -< Q ......l ~ M o Or:/) ~> """>-> N ----- 0'\ o s: ::r: ('<', o o N ----- """ N ----- G\ ..... <.) oj p. a >-< <.) S oj I-< f-< ;f'", I-< ~ ~ ~ >~ tn ....... o -< Q ......l .~ ~ z M o ~~ ~~ o ....... ~ ~ i::LI Z o Q ~ ::1 o Z t<') o o N ----- \0 ----- o ....... M o o N ----- """ N ----- 0'\ s: ~ ';;' ~ P::: c:3 bIl ~ ......l o \0 o Q 9 ~ - -;:! 5) E E o u o Z <', o ~-< ~ p:::1 ----- o -< p:::1 i::LI Z o Q ~ ::1 o Z <', o o N ----- """ ....... ----- o <' I o o N ----- """ ....... ----- o t<') o o N ----- """ N ----- 0'\ s: ~ ';;' ~ p::: ~ <.) 3 o '" ~ p::: "0 1=1 oj ......l o tn o Q Q ......l ~ .....~ Q ~E .t:: 3 ~ E 0,.,,1 ,~"@ ~ SS ..s .,.... i::LI ..s g -Bo t:.:: ~o:]~ oj 0 r:/) -B v 0.. (I] iilB~>-<o "O<.)~':7" >=: ::J 0 0,<-, ';:; .l:: ..... '';:; i:2 5~S:'Bi::LI .... e .g 5 i::LI o ~ <.) z ~ 5 ,S "0 "" tnU oj >=:'-' 8;:::45 &~ ''fJ.g~...., 8 ::J <Ii ~ I-'< o 0 oj ::: i::LI s:: .8 1l - f-< u >->f3:'~ co'P'B~~z .8 ~ ,S ::: i:2 ~ ~ ,,.... ~ 8 0 <.)"Ogj 5 ~u ~t;~ .... .... '" '-::r: 0 ~..8:.s.:!:::f-<u .... ~ .... ~ ~ ~ E'Bt8~:5,<-, M o ~ P:::l t:::r:/) ....... ....... <'I o o ~ <r:1 ~Q ----- o P:::j r:/) -<I Q i::LI Z o Q i::LI Z o Q ~ 1=1 o Z ~ 1=1 o Z t<') o o N ----- r--- ----- ....... ....... t<') o o N ----- 00 ----- o ....... M o o N ----- """ N ----- 0'\ M o o N ----- """ N ----- 0'\ s: ~ ';;' ~ P::: .... ~ ..... oj ~ S o ..... r:/) o ....... o Q Q ......l ~ bIl~ ;:g-B .n 0 ~ g .s P..'~ ~E~ >-> 'c;; oj -a ~ ~ o -B 0 "0 >=: U ~ObIl 's "0 .S <+-i ar~:3rn l-< ro .~ 00 ",co ""N .,..... ~ N c: ~ gp \00 /J) O'.,p N E E .~ .8 ~5~bIl ~ ~ OJ.e w -B ~ >=: 0 ~ .9 ~ ;j b ~ .S ~ o ~ (/).,....... '6 .8 >->.Q t'l.) rn '0.. :::: ~ 8 ;}~ 0.. ;:t ~ c: (I]~Oro >=: ~ >=: 4-< OJ bIl~~ 8'~.g....... >=: ;> :B """0 -<8e;::.~ ~ b ';; 'n " -< 1A '" u <'I o op::: ~~ ~Q o p::: ~ Q i::LI Z o Q t<') 4-< o N ~ ~ P-< ~ 1=1 o Z <'I o o N ----- \0 ....... ----- o t<') o o N ----- """ N ----- 0'\ s: ~ ';;' ~ p::: ~ I-< ,,.... ~ s: ~ ';;' ~ p::: <.) ~ p::: "8 ~ oj p-< o N o Q Q ......l ~ 0> t<') o Q Q ......l ~ C') ::E - e ~ 0 0 P-< is C'l 00 .:;: --- 0 '.0 C'l " .--< 0 -< --- 0 1A .--< " .--< "1" U ~r-- ..... "T ~ 0 '" 0\ ..... 0 ~I ~ >.0 ~ 0 e> M ;=9 u ~ -< QJ =t:I: '" <:l) ~ rIl u~ ::':::u ~:~ ~~i -0 u I- (\) Cj .~ f11 (\) ~ [(j iJ:: S ] ~ fjlu (\) 5 t;j tJ &i7l ~~ ,5-0 C') ,..., 0 .. 0 - C'l ~ --- ~ ~ --- 0\ = .:: - t:l >--, f--< C') o Or./) ~> "1">--, C'l --- 0\ Il) ~ o Z tr, o o C'l --- "1" C'l --- 0\ :~ '" :> Il) ..... Vl o "1" .--< <r; CI .....:i >:r., t') o --- o ~ ,...., ~ Q t') o ~~ ~~ o ~ ~ ~ Z o CI Il) ~ o Z C') o o C'l --- \0 --- o .--< t') o o C'l --- "1" C'l --- 0\ 01J .S ..... Il) Il) ::E u ~ CI 6 "1" o <r; CI .....:i >:r., C') o Or./) ~~ C'l --- 0\ Il) ~ o Z C') o o C'l --- "1" C'l --- 0\ iJ:: Il) 'S; Il) ~ f--< ~ U \0 .--< o CI CI .....:i >:r., tr, o ~~ ~~ o ...... r./) > >--, ~ Z o CI Il) ~ o Z t') o o C'l --- "1" C'l --- 0\ "d Il) .::; Il) Cj Il) H ~ o .~ .~ P. < o ...... o <r; CI .....:i >:r., '" 5 .+: '6 5 Cj aJ (/) ~ ~ t') s;:: \0 --- o ...... t') o ~~ ~~ o ,...., ~ ~ Q .....:i o ::q Il) ~ o Z t') o o ~ \0 --- o .--< t') o o C'l --- "1" C'l --- 0\ iJ:: Il) 'S; Il) ~ 01J ~ '8 o N C'l ...... o Q Q .....:i >:r., '" B '.0 '6 B Cj Il) Il) '" C') o ~CI ~ <r;1 o ...... ~I CI .....:i o ::q Il) ~ o Z t') o o C'l --- 0\ C'l --- 0\ tr, o o C'l --- "1" C'l --- 0\ iJ:: Il) 'S; Il) ~ 01J ~ '5. o::l o '" "d ~ .....:i "1" ,...., o CI CI .....:i >:r., B j:; (\) ~ u o Z t') o o~ ~ I t::r./) ,...., ,...., ~I r./) ~ Z o CI It) ~ o Z t') o o C'l --- r-- --- ...... ...... t') o o C'l --- "1" C'l --- 0\ iJ:: Il) 'S; Il) ~ C;; 1:1 ~ o H .~ ~ C'l "1" o CI CI .....:i >:r., ~ Z t') o ~~ ~~ o ...... ~ ~ ~ Z o CI t') '+-< o t') Il) [?J 0.., Il) ~ o Z C') o o C'l --- \0 --- o .--< C') o o C'l --- "1" C'l --- 0\ iJ:: (\) 'S; Il) ~ [) ..... '" o::l ::E H o f: o::l ::q o 0\ o CI CI .....:i >:r., ~I-J"I",,#,# .".,- ~r:_lI~~,##~_. ~~::::~~\ ;~t\,.\_~: -~,"::'.""':95~ "-..:;P~";';;i"~-s'il ....,~...,:4TE~"t11 Building Fac"c1Ud'Landscape Cc Arden Dittmer 562-4604 10109/2003 Per Section 3-1202.E.2. Foundation plantings shall be provided for 100% of a building facade with frontage along a street right of way, excluding space necessary for building ingress and egress, within a minimum five foot wide landscaped area composed of at least two accent trees (or palm equivalents) or three palms for every 40 linear feet of building facade and one shrub for every 20 square feet of required landscaped area. A minimum of 50% of the area shall contain shrubs with the remainder to be ground cover. Landscape 10/09/2003 10/09/2003 10/09/2003 Zoning Condition 1 0/06/2003 1 0/06/2003 1 0/06/2003 1 0/06/2003 1 0/06/2003 1 0/06/2003 1 0/06/2003 10/06/2003 10/06/2003 - e Conditions Associated With FLD2003-09047 1750 N BELCHER RD Not Met Arden Dittmer 562-4604 Per Section 3-1202.E.1 table indicates that there must be 8' from back of curb to back of curb on Not Met interior islands. There is an existing plan for the site which will need to be revised to show the changes in parking / Not Met drive-thru layout and associated landscape changes. Plant sizes must be per Code Section 3-1202.B. Not Met Wayne Wells 562-4504 10/6/03 - WW Not Met Revise the "applicant's name" on the application to "BelCal Properties, LLC." Show "BelCal Properties, LLC" as the property owner. 10/6/03 - WW Not Met Based on the building dimensions indicated on Sheet 2 of 11 for the St. Pete Times Distribution Building (also addressed at 1750 North Belcher Road) and under BCP2003-03528, the distribution building should be 14,346 square feet, not 14,215 square feet. Revise/advise. 10/6/03 - WW Not Met Revise Sheet 1 of 11, based on the distribution building being either 14,346 square feet or 14,215 square feet (see Comment 2 above), under "Zoning Compliance Notes" and "Impact Fee Calculations" the distribution building from 16,700 square feet. 10/6/03 - WW Not Met Revise Sheet 1 of 11 to indicate the parking requirement for the credit union at five spaces per 1,000 square feet (not three spaces per 1,000 square feet). 10/6/03 - WW Not Met Revise Sheet 3 of 11 to indicate that existing driveways on Calumet Street no longer to be used will be removed, similar to those on Belcher Road (saw-cut & remove existing driveway). 10/6/03 - WW Not Met Complete the Affidavit to Authorize Agent, since BelCal Properties, LLC is the owner. 10/6/03 - WW Not Met Revise the responses to the General Applicability and the Comprehensive Infill Redevelopment Project criteria to provide statements that explain how, what, when and where the proposal of "retail sales (financial services)" meets the criteria, including the deviations listed above at the start of the letter. Do not repeat back the criteria as the response. In General Applicability criteria #2, please provide the anticipated improvement value of the proposed credit union (may also include the anticipated improvement value of all site improvements for the three buildings). Suggestion is to provide such responses as an attachment to the application, allowing for full discussion of your responses to the criteria. 10/6/03 - WW Not Met Provide the width of all landscape islands. 10/6/03 - WW Not Met Unclear of the paved area at the northeast side of the proposed credit union (not shown to be striped for parking). Also unclear the need for the small landscape island to the west of this paved area. Advise/revise. CaseConditons Print Date: 11/12/2003 1 of 2 Zoning Condition 10/06/2003 10/06/2003 1 0/06/2003 10/06/2003 10/06/2003 10/06/2003 10/06/2003 10/06/2003 10/06/2003 1 0/06/2003 1 0/06/2003 10/06/2003 10/19/2003 10/19/2003 10/19/2003 - e FLD2003-09047 1750 N BELCHER RD Wayne Wells 562-4504 10/6/03 - WW Not Met The note "car stop (typical)" with its arrow line at the northeast corner of the proposed credit union is unclear what it is pointing to (Sheet 2 of 11). Advise/revise. 10/6/03 - WW Not Met Unclear of the need for sidewalks greater than five feet on the north side of the proposed credit union and on the east and west sides of the proposed office building. Also unclear as to the need to concrete the north side of the proposed office building. Advise/revise. 10/6/03 - WW Not Met For three buildings, unclear why only one dumpster is proposed for this site. Advise. 10/6/03 - WW Not Met All utilities, including electric, phone and cable television, must be located underground on-site. 10/6/03 - WW Not Met The interior landscape area provided on Sheet 7 of 11 in the Vehicular Use Are Tabulation is different than that indicated in the vehicular use area diagram at the top of the page. 10/6/03 - WW Not Met Provide the location of outside mechanical equipment for each building and all required screening. If located on the roof, note such. 10/6/03 - WW Not Met Since the sidewalk along Belcher Road is being constructed on the proposed site and not within the public right-of-way, an easement for such will be required. 10/6/03 - WW Not Met Address the location of all outdoor lighting fixtures. 10/6/03 - WW Not Met Provide sign package. Show location of proposed freestanding sign age, including proposed setback from the property line(s), and provide the height, area and color of proposed signage. Include any proposed attached signage. 10/6/03 - WW Not Met Provide the proposed building heights in terms of feet, in accordance with Code provisions (see definition of "height, building or structure" for measurement of height). 10/6/03 - WW Not Met For presentation to the Community Development Board (COB), it would be helpful to have rendered (colored) site and landscape plans and building elevations (one copy). 10/6/03 - WW Not Met Provide color samples (paint samples, etc.) of the proposed exterior building materials. Since this overall site has three proposed buildings, please provide building elevations of the other Not Met two proposed buildings (St. Pete Times distribution building and the office building). Include proposed exterior building materials and colors. Since a criteria for retail sales and services in the IRT District is that it take no access to a major Not Met arterial street (Belcher Road), is it possible to remove the proposed driveway from Belcher Road? Advise. Since all existing structures are being removed as part of the redevelopment of this site and to Not Met avoid confusion, remove from Sheet 2/11 the existing (ghosted) structures and pavement. CaseConditons Print Date: 11/12/2003 2 of 2 ao~~ ~ '-I (D ~ ~ ~~ :c:;~003 &;' c:........~ z !S: ~. tOm C!. t.i ::J-oCO' !!!. Q'.....O SO ::l..... 0 -< 0. ~ f1 0 !! ~9P ~ -.. ::::!, 0 3 tnm 6.g.3" a ::rQ1w9 i' o >< (,J::; '" ,... ::l '-1;:0- " g~g;g ~ tS 3:;: 0. ~ 5i ./::0. ~. ....."? ~ !i ;:;. III ~ v. (.') ./::0. "til ~ ~~ ~lt- k\eiej ttll& (JQVJ~5 . fI[p[b3 lj([ ~&( 61 . · ~ ~~ (t0lA? !liur . ~lcico~+' ~ ~(b b~ -1ft Pew a.UbMfIw4lM 0/&/ --- 11 ~ 671lJlfl --u _. . --- ~ ~ ()(\1fV\ / reuJ Ut-J11-~ Ju ~. k CJ ~~uh W7 io tLJ VY\ 1Ae. (Iff? fSD J ~ CPA ~ ~~9 J<]O ~'kd l1i2'triA ~ct - SlL 6[~ cK Pfc ~ -- i1~ /ANx- ~- - t/Y.h<-€. : WU1 ~.cf ~ ~ M4y-~ (iJlLLcL ck cc ~. cmch (iw {I\ ~ wt ~~ I(~~ (;) ~ &v am pvt Serr -~!~~~ ~~ ~' c5 ~(~o ;(4." , \ / STATE OF FLORIDA COUNTY OF PINELLAS ~-" ~:r} . - - () l~ 0" j() 3 ".r\ DR u i ".j P,~GE._ 40 ,il CITY OF CLlEARV\fATER DEED OF CONVEYANCE } THIS INDENTURE, made the _____6_tb___ day of ___n_____n_J_anllaX+-_____________, A. D. 19IL__, between the CITY OF . . . . ' UPPER PINELLAS ASSOCIATION CLEARWATER, FLORIDA, a mUnIcIpal corpol atlOn, party of the fIrst part, and ___n___n'____nnn___nn_nn___nn_n'_______'___ FOR RETARDED CHILDREN~ a Florida non-profit corporatiofltl C t Pinellas ______________________________________n___________________________________________________, 0 Ie oun y of ----------------------------- and State of ___EJgriQ.~--n------------, party____ of the second part. whoMs e ma iling a,dd rets s iSF 11214 Sr:' 16 yrtle, G leaX'Na -e r, a. 33:J WITNESSETH, That the party of the first part, for and in consideration of the sum or _:.:-_=-_:.l'_E:Q=-_-=-::-___-=-_-:._Dollars and other good and valuable consideration to it in hand paid by said part+___n_ of the second part, at or before the en sealing and delivery of these presents, the receipt whereof is h~rebY ackno\'sJ-t?e'Cge ~:SSdFi3nted, bargained; sold, conveyed and confirmed unto the said parLV------ of the second part, and to _~t?__n________4l&rs and assigns forever, all the following piece, parcel, lot or tract of land, @,t1t.<lte, lying and being in the County of Pinellas and State of Florida, and described as follows, to-wit: ~UY . t".>~ ,i.... r::tt ~"'J '_~~ ~ '"8 ~ k~ ~. +--_~ 0 L':> ~: :t~J ~';~ ~6 :.:~ C.J () ;.1 .if61 .~ f~;:~ .:~; ~-4 (1) ~;~~ ~:: .,L:; ~, ;j ~~~ ~ .~ [-1 '-) G) ~ rc; 'H r-< ...., Ii:l 0 U '~P-l >-, r-~ p~ ~~ E-; r:;-:) U P:1 The East 291. 61 feet of the North 189.98 feet of Lot 12 of Clearwa te r Industrial Park, according to the map or plat thereof as recorded in Plat Book 44, page 46 of the Public Records of Pinellas County, Florida, containing 1. 27 acres M.O.L. " Subject to easements and restrictions of record. L0 ~3Tl~TE OF I-LORIDA DOCUMEf'~l!\,RY,-""W7'_"', 5T A t~ P r A X =' co I ^ i;TR 0 L L E R (~~:1E~s:1~t~ rc 8, -JAN -7'71 \\~~~~:;~#)i ~ 0 8. I 0 ;::10521 ~>Ji/ iJ) .....:[ ),.. (Y.} ~l:; v.;; 20 ~u en In = TOGETHER WITH all and singular the tenements, hereditaments and appurtenances thereunto belonging or appertaining; and every right, title or interest, legal or equitable, of the said party of the first part of, in and to the same. its successors t TO HAVE AND TO HOLD the same unto the said party______ of the second part, ________:aun:ars and assigns, to ____L~____ own proper use, benefit and behoof fdi-ever. IN WITNESS WHEREOF, the said party of the first part has caused these presents to be executed in its name by its City Manager, City Clerk, countersigned by its Mayor-Commissioner, and approved as to form and corr~ctnes!} 'by, tts City Attorney, and its corporate seal to be hereunto attached, the day and year first above written, _ '~ (): V ;"\,, " ' ~ ' /7. _.-",,~ \....':. "~: ~, ? \ CITY/0F Cj'fEAl{,!>i~T~P'';--l{~-:.tbHTJ??- ". ,"'",> \, , V'-;<I,j, 1 -<Jl, ,~--t ". ,,v I v.,-1 ~' : t J >~ ,t - ) By; ---------~~)~~~~-~-~~~1~~~;~!~-----~-~:~~~:----- Attest: _i!1~2~~irib~~,~~~:~:..:~~~~~-,j-----,-------- /7 '-' City Clerk , . " ','. ." {/ ,,' I , j/{" I /" counter~n),~:, / " L .,Jf" l /' oC',,!."; -"< ____ __ _ _ :tt:.~'b$~:j:.-----<i[..~~3i!~t!?r~~-~---n------ Mayor-Commissioner ./j"" I' )Y Signed, sealed anq delivered in pres\i~e of: 1. U"" ..,(...-,> .' 'i' \... '/ .,' ,./....: -:-/'"... /1/ / , .' / .~- / ,J I!.,/,' ,/ ____e_ . '-~. Lc.A'-'::'_-.--=~f}-.k:=.J~. --"=~---------..-. ---------..- ~.. ~.. ill )..' .;. // ' , -l/-' ,c/, -i' -j . ^ . - " '" .-- - .~~--J-- ---J---~~~-~-tJ-U--t--Sn3nJ-- / / I, flrc,,)~""C1 ~ "lriI1W'f"C;::..n.onIM ~~;~~j;~~r:r~ Approved; as to form and correctness: J / i /7 /i ' . -- ....... --/ /;' j ;/ \-- /1 ,/./1_ , , I ,<---\, /V'- \, /} / \ I I,)) f- 'c l./ '---i--~---,------------------------~-------~- City Attorney STATE OF FLORIDA COUNTY OF PINELLAS } JAH 7 2 ll. PH '71 T HEnEBY CEnTIFy, that OIl this n,__.f)_tO" ,__"'_ day oL-_.., J~9))cll':l)~Y_._,_,______. A. D, 191..1 ---, before me personall'y appeared l..1.e.r:i:.e.tLRJ..,S_tiJ::.rJJ.ccimJ tM.,J3.1:g\"/1l", ' FL )~: ve Lctt H n respectively City Manager, City Attorney, City Clerk and Mayor.Commissioner of the City of Ciearw:1l.8i', 2 municipai ~()rp()rawm existil1t; under the laws of the State of Florida, to me known to be the individuals and offIcers described in and who executed the foregoing conveyance to _'Qp..P-'~E_Ej.E ~.!~?: ~_.h_~_~~~_~~_tJ:.?!?:_ !_~E_~~ ~~_~_de_~_ _ ~~~~ ~~_~_e.~:.__c:_~,~?_~~~~__~_?=~_J?_~~~~~m____ ---- _____________c.Qr.p,Qr.a._ti9n~____'n'_'___~____ and severally acknowled,c;ed the ex,~cution thereof to he their free act and deed as such officers thereunto duly authorized; and that the official seal of said municipal corporation is d.ulY' :.,\Yi':~~'dj,~,j;lereto, and the said convey- ance is the act and deed of said corporation. ",", ~- -:ft. '''-''. " " ''''\.-., . . , . , , , - '.) --. WITNESS my signature and official seal at Clearwater in the County of Pinellaii' allll- Stat,e of -fIori\kt,' 'the day and year last above written. ~- ,~):' ('- to' . - -~ _Jic:ddCt';nVl"U<LcL .- -... Not,rry rPubli(,'State'ol Florlda'~ at Large \- (, ..: My Commission !\.xjJi'res:" " I '-- '- / l,Ffl( ':' C ~ \ "',,"" \",...,,. f':r''f'' t''.'' "J. " I~ii' ,,: ,> \, ~~\;",-. ['! ri':....~ q'qH4I'j,,~,~ \ ~ , ' G-J I' (': r'! I' 'I;':' ~,J \) -".I I'j '..: '1 /\ PV l,,;-") 1/' ~ ,,- \ \.0-, . u '1 '\ i I: .), .) I .~. : I'" '1'-." ! ~,I'I JI. ~, t \ f'.....",~ p f'~ !\/~'y l>:, . ,\' D e 7402278:1- ~~/,.. " \>/ '; l ? >/.7') )'7~~/:~/,:- " (fO TeY e u. k.4136 PAGE1958 CITY OF CLEARVVATER ! L, ~ I DEED Of CONVEYANCE STATE OF FLORIDA COUNTY OF PINELLAS } TIllS INDENTURE, made the ___11J_l:t___ day of ________:[~_9X1l~:r.Y----------------, A. D. 19_11__, between the CITY OF CLEARWATER, FLORIDA, a municipal corporation, party of the first part, and UI.?EER_P~NEL.L..8's__AS.sQ.c.lATIDJ:{__ X_Q~_B-_~?;:~_~!2~P--~~~~-:Q~~-~L-~-X-!?-~~-~~-~?~~p'~-~g~--~-~~-p-~; J1 t:Al~~ounty of __J2j.l1~U~~L_____________ and State of ----XJ9)~~-~r~--------------,J1..q,rt.Y..-a- of j;h.e1~cond part, whose mailing address is 2199 Calumet, \.J. earwater, Ylorl a 33~ j WITNESSETH, That the party of the first part, for and in consideration of the sum of.._..._..._~J'.~Il_...~~_~_~':"_~_Dollars and other good and valuable consideration to it in hand paid by said parLy_______ of the second part, at or before the ensealing and delivery of these presents, the receipt whereof is her~bY acknof3t1{l;'C'ik'J1~of~anted, bargained, sold, conveyed and confirmed unto the said party------ of the second part, and to ___].t~________XIW_n::s: and assigns forever, all the following piece, parcel, lot or tract of land, situate, lying and being in the County of Pinellas and State of Florida, and described as follows, to-wit: Lot 12, Clearwater Industrial Park, according to the map or plat thereof as recorded in Plat Book 44, page 46 of the Public Records of Pinellas C Qunty, Florida, LESS the East 291. 61 feet of the North 189.98 feet of said Lot 12. Subject to easements and restrictions of record. ~~,~\ DrJCUMENT!~RY : \&1:;C-~;;\\' '\ ;~; ,~ ; fl. "f'1. \ ru i ')'7 t, \ \1 \' _ 'L. ."" r- Ui P.R. 7 \....J ' = nVEKUE 11047 L TOGETHER WITH all and singular the tenements, hereditaments and appurtenances thereunto belonging or appertaining; every right, title or interest, legal or equitable, of the said party of the first part of, in and to the same. . successors . TO HAVE AND TO HOLD the same unto the said part.:ynn__ of the second part, :L.tB_____XiIDxs and assigns, to .!:.'t~________ proper use, benefit and behoof forever. 00:1- ::''1 -'2. ~:J Zc ~:~ u and own <= [~:~\~~~~~~&~~:;~;~'; i C' ~:.: >- co -}- -.....,. 4..::; :'::0 ;':u L" r--- '" IN WITNESS WHEREOF, the said party of the first part has caused tbes:: presents to be executed in its name by its City Manager, City Clerk, countersigned by its Mayor-Commissioner, and approved as to form and correctness by its City Attorney, and its corporate seal to be hereunto attached, the day and year first above written. I HEREBY CERTIFY, that on this n_11ib.__________ day oL___X~j;J.~i,1_'!1:.y____________ A. D. 19_7..1:__, before me personally app eared _:e~c:;__ ?J_ _:J? ~ _ __ J:i' J.9. y. <:'tL k1.. ~ 1:.9_",.1'. LM_,-- J? K9_wn..__B_._ _G.L_W_bi:t~h ~_Ml_9J.1._d_a_ Eye r.ett _I-IQug en ~ n ____ respectively City ~Ianagcr, City Attol:ney, City Clerk and l'ilayor-Commissioner of the City of Clearwater, a municipal corporation existinc' uncler the laws of the State of FlOrida, to me known to be the individuals and officers described in and who executed the foregoing conveyance to _____~ Pl)_~!. _ ~~~~f3_~~ ~_~___~ s _~_~~_~~_t_~()!~_ !_~!_ _~~ t~~ _c}~_ ~1_~l1._i!0.l.::~~"-Ln~_!.'_~?~i_~9-__~_c.!~:-J?.E~nL _ __ _______n___s:.g!];:().E?:.'tt()_Yl.L_n___._n_________ and severally acknowlfdged the execution thereof to be their free act and deed ~: ~~;I~ officers thereunto duly authorized; and that the official seal of saie! municipal corporation is (l1Jly '.hffixed. thereto and the said convey. ance is the act and deed of said eorporation, . ,.,., .", .... ' . ",' ...." " \.../'\,. ..' . ~. WITNESS my signature and official seal at Cle<.1rwater in the County of l)inell<!i: am). 'S~ate of 'lfI6,'r~d;;";.the day and year last above written. - /) ri~/~':"':' -)~ J' ?II, '-, ":\ € p - ---Is.J.1!/N~'O' (t"c'.:.!'l'~-" 1;'ll{j'J">l{C:'\ ~tat': :.,,~:____L'~_=,,--: .<\., - (i ' ' ,-' L -.u.;. Flor'lill.r at Large My COllllllisSiO\~' ]~)rj)i'r"'r .:.- <(.',' ,_ I ",:,' '~~ '. "_"J~\'l",,~.\;i- !\' 1- . . \l r 1, . \ . ,~ " I './ Ii,' 1;",:1; ".l, ~_~u n,k,;J t// i I,__,i. ~4 ,/ I.," A>-' I ' ,'7 I ,; CouIltersig~)ed/ /,;.Y'"' ,,/ 1}' ______IL~f~~;~~~f~~(::~~!~~ !~~~~:,?~;?~-~------------ Mayor,Cw:;;\)TIisspner /)<l/ jfix; ,,"~.-,. ,f ,.... .. Signe.d!, szal" and delivered ',n Pl" 2sgnce O.f: ~ t) 'iI:J!~' ,'=' . / C-/ . ; ;:: ~-~~-~~1}"~c::::.!~.:.~S::-::'-'~ - -we.LL.:.-L:~)!::~!?~.;.~L~--------------- Vp-'t~' .' . / ~ ~-~-t: _~_---. -- -- '~-==__n____n______._ ~.". r-:1;;<: . ~Q9~ ~~....~;.; ~ N ci <t; ~ p;?-; t.t:: -< &J ....:I C STATE OF FLORIDA ~!I/!i k ~'/~. ':~' (:[1 f :,.: t".' t \ /Mr('" "'r\_u-'l... \ ,) J,,-/j,',,,L..,. GLfRK CIHCUlf (OJ)({~ rfa 15 r;J OJ fH 97~ COUNTY OF PINELLAS } FJ-'l ~ 1 ','1, 1 1'1 '~': ';1',-:_'; ','1" I. -,/"{l r\ , ~ r.,:-. ,.1 ,. J 1~\" Cil" i.! , .' :1 " )} t.,) Clv;,; li...,.l.l .",',;,t,-',.' ) .I CITY OF ;LEAlnVATER, FLORIDA ( ,J<"- .-- "- ( \. /1 " ,:' ~ -.' !/~ <f "'\ By: _____: 1:1.:~~(;i_~.__t)~_+-J!~~-\.CJ'--__________ r- .) /" / CitY J\Ian;iger ,_~J. ---- ,/ / // / /- I _' ~ - . . //.r' ij2/ /<--~i{;;-:: // Att"" ", ,el_ /'"i;(:il~~!6~.------m.__m--..-- I' . Approved as to form and eorrectness: "-. ~';:./ / /; /) -~-Z}~'::1L-{.-c:1-/2.lt~;~!;~~(~!,~-=------------- '.i' .. II '~.,.., " ,; L"i\_l e e 2. Part Lot 17, Clearwater Industrial Park (Located on the south side of Calumet Street, west of Belcher Road) (<t:J UPARC., Inc.) Z 88-21 LU P 88-23 Zoning Atlas: FROM: P/SP (Public/Semi-Public) TO: IL (Limited Industrial) Land Use Plan: FROM: Public/Semi-Public TO: Industrial The above property is located on the south side of Calumet Street, west of Belcher Road. Mr. Mike Robertson, representative of ill UPARC., stated ill UPARC. is in the process of relocating its operations and the first stage has resulted in a contract for the sale of a portion of ill UPARC's. property along Calumet Street. He advised the intended use will not be consistent with the Public/Semi-Public zoning as offices and warehouse are proposed for the property. After questioning by Ms. Nixon, Mr. Robertson stated part of the property being sold is where the garden center is located. Mr. Chris Hughes, representative of ill UPARC., stated the garden center is already in the process of being relocated. - - Ms. Harvey advised as follows: This is a request for a zoning atlas amendment from P/SP (Public/Semi-Public) to IL (Limited Industrial) and a Land Use Plan amendment from Public/Semi-Public to Industrial; the proposed use of the property will be in accordance with the industrial zoning category; the property previously was zoned as Industrial and was amended during the areawide rezonings to more appropriately reflect. UPARC's. c::>>- use of the property; and, it will be necessary that a site plan and plat be submitted for development of the property. Ms. Harvey advised staff recommended approval of the request for a zoning atlas amendment from P/SP (Public/Semi-Public) to IL (Limited Industrial) and a Land Use Plan amendment from Public/Semi-Public to Industrial. No persons appeared in support of or in opposition to the above request. Motion was made by Mr. Hamilton, seconded by Mr. Ferrell, to recommend approval of the request for a zoning atlas amendment from P/SP ( Public/Semi-Public) to IL (Limited Industrial) and a Land Use Plan amendment from Public/Semi-Public to Industrial. Motion carried unanimously (5 to 0). . e 4. Lot 12, (Clearwater Industrial Park) (". UPARCtJ') LUP 89-13, Z-89-16 LAND USE PLAN: FROM: Public/Semi-Public TO: Industrial ZONING ATLAS: FROM: P/SP (Public/Semi-Public) TO: IL (Limited Industrial) The above property is located at the southwest corner of the Intersection of Calumet Street and Belcher Road. Mr. James Leach, Executive Director of. UPARC"', stated. UPARC'" wants to restore the property to its original zoning. After questioning by Board Members, Mr. Leach advised as follows: At . UPARC's"''' new location there will be more floor space and it is nearer to public facilities; and, the subject property is an industrial park and it is not on a bus line. He stated HUD just gave its conditional commitment on December 28, 1989 for the apartment complex on Highland. Mr. Polatty gave the background of the case and submitted, in writing, the staff recommendation. No persons appeared in support of or in opposition to the above request. Motion was made by Mr. Hamilton, seconded by Mr. Mazur, to recommend approval of the Land Use Plan amendment from Public/Semi-Public to Industrial and a Zoning Atlas amendment from P/SP (Public/Semi- Public) to IL (Limited Industrial). Motion carried unanimously (6 to 0). e - Clearwater Industrial Park Deed Restrictions The City received a request from <:=3::) UPARC. to resolve questions which have been raised with respect to certain deed restrictions imposed in 1957 on property located in the Clearwater Industrial Park Subdivision. More specifically, the City has been requested to either release the. UPARC" property from the covenance and rely on current zoning or to informally waive deed restrictions by letter upon a showing of compliance with current code requirements. It was stated the only significant difference between the deed restrictions and current code deal with setbacks. A question was raised regarding whether or not the Commission could unilaterally remove these restrictions if some people have previously met them. It was indicated we would need the consent of the owners. Michael Robertson, representing. UPARC" CS> and a perspective owner, stated they discovered the deed restrictions after plans had been developed. A concern is in regard to setbacks and usage and an office is planned for this site. Concerns were expressed regarding the legality of amending these deed restrictions. Mr. Robertson suggested the Commission consider a waiver of the restrictions for the one side setback in the interim and allow time to poll the property owners. Concerns were expressed regarding the City being responsible for enforcing these deed restrictions and approving a known violation of the restrictions. Mr. Robertson indicated the same buyer is on contract to buy the adjacent land and perhaps a unity of title would settle the setback problem. Concern was expressed that more research was needed. It was indicated if all the property owners agree that there should be no problem. e - The meeting was called to order at 12:15 p.m. for the purpose of discussing the Consistency Program. Jim Polatty, Planning Director, stated with the Consistency Program there would now be another level or two of processing for land use plan and zoning changes. He stated the City will have to process some amendments in order to come into consistency. This will include amendments to land use plan designations, zoning categories, and the land development code. Issues still to be addressed include transfer of development rights as, currently. city code allows all density from a wetlands area to be transferred to the upland property, and the PPC proposal will allow a maximum of one unit per acre. Another issue has to do with minor density/intensity reductions as, currently, the City uses net units per acre while the County plan will use gross units per acre. There will also be some slight changes in neighborhood commercial zonings regarding their floor area ratios. It was stated floor area ratios in the industrial zones will be reduced, but it was not felt that much would be lost although these figures have not been calculated. The City Manager indicated it will impact the industrial park and may impact <~) UPARCFA> (Upper Pinellas Association of Retarded Citizens) redevelopment. David Healey, Executive Director of the Pinellas Planning Council, stated there was a choice to leave these areas as they are until additional commercial is added and to deal with them at that time. The Planning Director indicated the overall issue has to do with the number of land use plan categories being instituted with it being felt there will be a loss of control over zoning decisions on the local level. He stated while the City is adopting the land use plan categories, not all of them will be used inside the City. He stated the designations are being recognized in order to allow the City to annex properties without having to go through the land use plan amendment process. Mr. Healey indicated that in May, 1991, there were 14 issues of disagreement between the Pinellas Planning Council staff and the City, and that both staffs have worked to address these concerns. He stated the PPC has members representing all the local governments in the County. Prior to 1987, Pinellas County staff worked for the PPC, and this has been corrected. Mr. Polatty indicated the Countywide Planning Agency is the County Commission. Mr. Healey stated a super majority of the Agency would be needed in order to overturn a PPC decision. Mr. Healey further indicated the changes being requested are a basis for streamlining and they are being asked for in order to eliminate some overlaps. In response to a question, he indicated the PPC's countywide plan does not supersede the local plan; however, they can not conflict. Mr. Polatty indicated some of the provisions do provide good checks and balances, but the City's position is that the PPC rules go too far in restricting the cities in their local matters. - e In response to a question regarding the consequences if the City does not change its plan, Mr. Healey indicated that once the plan is in place, each city must make an affirmative finding of consistency. This will be reviewed and, if determined not to be consistent, the inconsistencies will be listed and there will be mediation to resolve these situations. He stated there are no penalties spelled out for non-consistency. In response to a question, he did indicate that development being halted was one possible consequence of non-consistency. The City Manager indicated he felt the major impacts for the City of Clearwater would be on the beach, the downtown area, and at the airpark. Mr. Polatty, Planning and Development Director, indicated the North Fort Harrison/Myrtle study and the Downtown Plan zonings are not reflected in the Consistency Program. In response to a question regarding the differences between net acreage versus gross acreage, Sandy Glatthorn, Senior Planner, indicated that 10 units per net acre would equate to 9.5 units per gross acre. Scott Shuford, Planning Manager, indicated the Seville Development is being addressed separately to allow 10 units per acre. Mr. Healey indicated that, as distasteful as it may be to have someone else making these decisions, if the consistency plan works it will have balanced community prerogative with the need to have countywide consistency. Mr. Shuford indicated there were two major areas of concern, those being the beach commercial area and Morton Plant Hospital. Staff is recommending the Pinellas Planning Council revise their regulations to allow a 1.0 FAR. (floor area ratio) for hospitals. The question regarding the beach commercial area is whether or not to request a revision to the PPC staff's recommendation for a .95 impervious surface ratio. Mr. Healey indicated this is a component of measuring intensity and that it is an infrastructure issue regarding drainage, but also addresses aesthetics and economic concerns. He indicated there will be other techniques to deal with the nonconforming properties on the beach. He indicated PPC staff will take affirmative action to deal with the hospital's floor area ratio question, and that would be to provide a mechanism for local communities to deal with this problem. It was indicated this would be a good compromise. In response to a question regarding on what this mechanism would be based, Mr. Healey indicated it would be based on a locally approved process that would allow some local latitude based on a process of which both the local government and the ppe are comfortable. Mr. Polatty indicated they felt a major issue was that the Pinellas Planning Council should be concerned with countywide impacts, not local impacts; and the issue of impervious surface ratio was getting close to the zoning issue of local impact. There was some sentiment the County should deal with the land use categories and not specific development. - e Mr. Healey stated there were three areas on the beach that were zoned commercial, and there would be local nonconforming provisions to deal with the existing circumstances. In response to a question regarding whether or not a hotel which was nonconforming could expand, it was indicated there would be an ability to do this through the variance process, and that variances would be legitimate in some cases. Messrs. Carassas and Savage of the Planning and Zoning Board left the meeting at - e Item #16 - Public Hearing & First Readings, Ordinance 4707-88, 4708-88 - Land Use Plan Amendment from Public/Semi-Public to Industrial and Rezoning from Public/Semi-Public to Limited Industrial of part of Lot 17, Clearwater Industrial Park (~ UPARC", Inc.) Z 88-21, LUP 88-23. (PUD) The Upper Pinellas Association for Retarded Citizens CGII UPARC") presently operates from a facility located on the W side of Belcher Rd. on the S side of Calumet St. .... UPARC" is proposing to relocate its facility to the E of Belcher Rd. as part of the Center Foundation project. Part of the existing operation of a nursery and plant storage has been relocated to property on S.R. 580 E of McMullen-Booth Rd. The subject property is now surplus to .... UPARC's..l?t> needs and they are proposing to sell it for private development. The request for amendment is in anticipation of developing the property with offices and/or light industrial uses. Commissioner Berfield moved to approve the requested land use plan and zoning amendments on the subject property. Motion was duly seconded and carried unanimously. The City Attorney presented Ordinance 4707-88 for first reading and read it by title only. Commissioner Winner moved to pass Ordinance 4707- 88 on first reading. Motion was duly seconded. Upon roll call the vote was: "Ayes": Berfield, Regulski, Winner, Nunamaker and Garvey. "Nays": None. The City Attorney presented Ordinance 4708-88 for first reading and read it by title only. Commissioner Winner moved to pass Ordinance 4708- 88 on first reading. Motion was duly seconded. Upon roll call the vote was: "Ayes": Berfield, Regulski, Winner, Nunamaker and Garvey. "Nays": None. - ,e ITEM #14 - Public Hearing & First Reading Ordinances #4925-90 & #4926-90 - Amending land use element of comprehensive plan and rezoning for property located at SW corner of intersection of Calumet St. and Belcher Rd., Clearwater Industrial Park, Lot 12 (<<J UPARC"') LUP 89-13, Z 89-16) (PLD) The property is presently developed as an Upper Pinellas Association for Retarded Citizens (.. UPARC"'~) facility, which will be moving to the new Center Foundation facility on the east side of Belcher Road. The requested amendments are in anticipation of the move and the future sale of the subject property. If approved, the proposed amendment should not have any adverse impact upon public services and facilities including potable water supplies, wastewater treatment facilities and the adjacent traffic circulation system. The site does not contain any significant environmental constraints that would preclude its redevelopment. The request will require approval by the Pinellas Planning Council and the Florida State Department of Community Affairs. Commissioner Nunamaker moved to approve the Land Use Plan amendment on the subject property. The motion was duly seconded and carried unanimously. The City Attorney presented Ordinance #4925-90 for first reading and read it by title only. Commissioner Fitzgerald moved to pass Ordinance # 4925-90 on first reading. The motion was duly seconded. Upon roll call, the vote was: "Ayes": Regulski, Winner, Nunamaker, Fitzgerald and Garvey. "Nays": None. The City Attorney presented Ordinance #4926-90 for first reading and read it by title only. Commissioner Fitzgerald moved to pass Ordinance # 4926-90 on first reading. The motion was duly seconded. Upon roll call, the vote was: "Ayes": Regulski, Winner, Nunamaker, Fitzgerald and Garvey. "Nays": None. - e Item #14 - Public Hearing and First Reading Ordinances 4843-89 and 4844-89 - Land Use Plan Amendment to Industrial and a Zoning Amendment to IL for property (1.54 acres) located on the S side of Calumet St., Wof Belcher Rd., Clearwater Industrial Park, eastern portion of Lot 17. (National Data Products, Inc.) LUP 89-8, Z 89-10 (PL&D) The parcel is presently developed with offices and classrooms previously used by <$::) UPARCW/1>. The proposed Land Use Plan Amendment could result in the use of an additional 3,350 gallons per day of potable water. An equivalent amount of wastewater treatment will be required. It is expected a reduction of 1,320 vehicle trips per day would result from this change. The request is made to permit this property to be included in the site plan of the parcel to the west also owned by National Data Products, Inc. The present owner proposes no changes to the existing building footprint. A similar land use and zoning request was made for the parcel directly west of the subject property by" UPARCW/1>.. prior to its sale to National Data Products, Inc. The Board of County Commissioners approved that request in March 28, 1989, subject to the retention of the preservation area. The approved site plan for both sites includes a 50 foot drainage and utility easement which addresses and protects the County Future Land Use Plan designation of Preservation and conforms to the Pinellas County Master Drainage Plan. Commissioner Regulski moved to approve the Land Use Plan Amendment and Zoning Amendment on the subject property. The motion was duly seconded and carried unanimously. The City Attorney presented Ordinance 4843-89 for first reading and read it by title only. Commissioner Winner moved to pass Ordinance 4843- 89 on first reading. Motion was duly seconded. Upon roll call the vote was: "Ayes": Regulski, Winner, Nunamaker, Fitzgerald and Garvey. "Nays": None. The City Attorney presented Ordinance 4844-89 for first reading and read it by title only. Commissioner Winner moved to pass Ordinance 4844- 89 on first reading. Motion was duly seconded. Upon roll call the vote was: "Ayes": Regulski, Winner, Nunamaker, Fitzgerald and Garvey. "Nays": None. 10: 20 F'INELLAS COLllny PLAt'-l~~ING 727 46,::) 4155 II - __ FAX TRANSMISSION 1'I!'I"'R1fi mJ PINELLAS COlJNTY PLANl\TJ:NG DEPAR~rlVIENT 600 CLEVELAND STREE'11, SOl'J'E 750 CLEARWATER, FLORIDA 33755 (727) 464-8200 FAX' (727) 464-820.1 SUNCOJ' 57,0-8200 ~To: p-. r\ ($-~_L/C\~_9f~t~ (A (~~=---~_-:-=~ _,~FAX #--r j ---;::::.:=---- Pages: ~(incIuding this cover sheet) ~JFrom: -- l..::----t-y::e.e.~Q,..w _________ \</~~> -c: . .--:-- c "-1 G 6--='-"'~-a- /'-. \ '" \ \.d ~ Q ~ ,") ) ~ --~ l'ubJect .-".........J.____{.... \.-_S-C':l-B-'--:;""-"'&C'~'9 'Comments: (Please call, if this transmission is unreadable or missing pages). ----.-_____.______._..______,._ I. ':,>), ~~-X':.-f^\ <:>NL ( c,,- \ \ {~'" ~, ~~ \ h, 1 y'~ \.,~ ----- '. .....J-,Dt~ eJL _h e,,- "~ c\~~ C1..-vc. ~_ yt. ~ U ~ cf , ~W~ ,..C f~"e;"..-i~~".....,~.,~~;,,,.,(~~~l~,.,., '-~.,,' '" ,.'~",.v.~0~....c~t\~:.\r~\(~::'"C\\:y:>vt, .,," ,',' , ' '" '''',', , \ '\} C) -:~~-'---f\:------~. 'k\ ~n- r' r., \ .1 ~', ,..~: ".-\y~(\\Lc~\._._______.__..___:LnQ;._.__ .-/\ <; o':.:.___,r~ ~ E2 CLQS-J\._ .-.-..--...---.-...-.-.-..--.~~c-.--..i..ili ___________. . t':, }' .~ -..::'?'..-'. .....,.....'.60-~.~...."n;~n.-.-...c~.-----...---._-...-,..-- -f-GY"'V /C ~ ~~~ ~ --~--- . LJ . ~-i9 - I ----\..----1.-....- .<' .! 0 ' -:.,::':\...-.---.,----...--..7---.--.--...,,-:-i........:..JL:.!:~~,__",::!--~;.:-;---...:.....--,...,. .. ....,. ,nn":-'''-'T""7--- ~ ,.,/ '--/') 'j }' ----'::)'.>.',f ll.,.,/JI '! ..~ !'J ~' ..t.. ".._ ..c._'_..... J.,...,....__.._,.,.,.....,....'.'. " ' 'm_.~~-'._..""::.:r___'':./.._:;.____~:. ; ',,-. - _ _ _ i 1 \' ~:~ ::.-,---,-,---,_:,_,_~,,~----_.. .---',---,..------. . j" ....../ i \ / ~ .".1 ~' "'-'10':':.",:..., .....-, n....... ...,-._.... _.........,_.. ...__....____.___ " -- :--. -'-::,::;:...L_,__.__.,..::,:.+..__..._:~~_/_-)~ -" \..'- '~ 'f':...-, I' ;' :; ; ':: ('''J(.~,., )" __~_~L1.._.._ t 0' ~ (/.'; i \~,_('J ,~',.,.."-,...,,".,;'........,,.,.......'..,~~.....- ,...",.,~..._---""-,,,_..,.. 'w".,." '..,..., ",.."", '"'''_'''_<__''__''V''''''''' ..... "...._.."".__w",._,___~y_....m.... H:\CDR\PCPD.FAX.cdr, PMWs, 4/9/'03, AUG-29-"2003 10: 21 VIi '-rl I I l,~ ~ '0 z ><; ~ u... "" .. III o ~ q ~ .... ( PI t'-lELLAS COUHTY PLqf.ji,j I IJG e 727 464 4155 P.02/E13 . May 8, 199!) COl'!l!l),j,('!doner ChotJr'1\it; l"noved, coccnoed by COIl'J1\lBei,ono~ Greer and carr1ed unanimou~lYI tha~ OrdlnancQ No. 90-32 approv- ing Cas~ few 90-9 b~ adopted. 1/4e CASe ~cw 90-1,), PROPOSAL lH C~TY OF' CL~^RwM'l!:K '!'o .e':1eND LA,NO I)Sf~ Ol':,SlGNATION ON COUN'l'YWIOE PLAN r!~O)\ pTJ~LrClSEXI-PUBr,!::: iPl$P\ 'rC r..IGH1' !NPUS'l'RIAL (Ll) RE PROPf:R't'Y LCc,\'r1:0 ON TH~ SOIJ;!fWESl COR~ HEl'. Of '!'Hl: INTeRSECTION OF CALU~..E't STP,E~1' AlIO IlEI.C'HrFl "0,1.0 _ ANRQ.Y..t;.p; O.ROlN~!L~J.Q. 30-32 J\.pqJ'TED _w__ Pursu~nt to legal not1CG publi9hod in chQ Ap~~~ 20, 1990 i051.lf3 of the i'inell""" ~di.tion of ~h.~ l'd1'!'Ipa Tribune as gvi.. ~enced by pu~11Bh8r'6 aff1davit filed with tho Clark. publie hgaring wac held o~ CaA~ ~CW 90-10, a proposal by ~he City ct Clear\o{atr~r '-6 ctll1end '~hQ l:lnd l,l:ge deoign,;n:.ion on th,,', CO'JntYW.l.dO Pl..n from pub),ic/!>.(lIll:.-public rp/SPI to li9'ht il'\d\Jet4i,~l ILI) r9 proper~y loc~ted on the so~~hweg~ CDrnet' of the intersection ot cal~me~ Street dnd BAlcher Road. DQPL~y Cl~~k G. K. W~~t re- ported that no co~reapOndone~ hae boon r8calv6d; ~nd that ~hG matter is prDPQ~ly bofore thv Authority to by he~rd. Counqr Adm.iT1.i..~t.rJ.\tor Fraci !:. ~1;o\.;(q'.l.18 l.ndJ.t:::).'::.\jd UH.lt the P~f',ella6 Planning Cour.ell (PFe) r'"'lCQlftl'Mlnd.. dpprovell o! ':.h... propo~al; and that staff concurs with th8 ~PC reeo~~gndatlon. David H9~ley, Pinell~3 Planning Counc11 ExeCutive 01- rector. appoared and related t~a: ~he subject ~roPQrty 18 preD- ently o~cupLed by the Uppo~ Pinell.~ ^6eocLe~1on fOL Retatd~a Citlzsne IUPAAC) facility ~nd ~G 3ucro~nd8d by 1ndu6t~iJl uSQS: th~t th8 P?C h~a givon ~hH rBquest ~~r~ful conslclor3~~on duo tc tho fact tn<lt B@lch~J;' Road if> d@lI~gn.n;.)d <lEi d 9conic nonCOm;\lt;,r- cial cc~ridcr; th~t property on the ~eat D~de ot 8elcn~r RO.d for approximately 1.1/2 mile. in this a1'88 ha~ an indugt~Jij) l,:;nd lOse cl<ltio';'(.Lc4tJ.on: and t~,a~ thenl havu t;;"."n prl?vio'-l~ p.1,lHl ."..mendment:.i ::,:ado(Jigt\"'t~ng I.IPAl=lC prcpe:n.y i"n11\'1()C!icl.~~ly to tllil we.,:t .'i:J .indu5triel. ~r.;: BtilteC t.hat t.h.f! PPC recol'n.'t\Ol'!Ot: 3ppr0\1,~~ .)f the pro~osed change with a tU~~hAr or supp~om~nC~l <8~omm~nd~- ~~~n that eh0 Slte b~ Qevolo~ed in Q munnG~ con~~~~~nt ~itn ~n~ --+ 181 AUG-29-2003 10:21 P I ~1ELLAS C1JUt-jTY PLAHH I HG - - 727 464 4155 P.03/03 11dY 8, :99C d6uj.CJn~tj.o<\ QIi the COlJntywid~ FutUrfil Land Us.. illoln; .lnd ..:(- pldinad. that the ~1,;I:po~:n~ ot tht.i llupplemGJH.011 J:ocommenOe.ticJ'\ is to ensure Chat t~G property will be developed AS an ~nduetrial site rather. than a cOlllmercial Ol'\e, -'nd that the Cit.y ...!.It !;'~eor.- cil.a its lar.d U99 pl~n to confopn with the CountY""ido P1Clfl. No one app~~r.~d in rQijpon9~ to the Cha1~man'a cull fOr porQon~ in objection. Com~i6nioner Greer moved, soeo~ded by Co~,lSSion~( Todd and c&=ried unafti~ously, that Or~lnance No. 90-32 approving Laao lew 90-10 be adopted. . . .. Upon di~~c~ion of the Chairmun, thAr~ ~eing no objec~ion, th~ meeting waG adjourned at 10:56 A.n. Ch,u.l:!t1<ln ATTeST: KA~L~EN F. Oe E~ER, CLERK I;1Y_ oe~uty Clerk TDTAL F'. m - AN ORuiNANCE AMENDING THE COUNTYWIDE FUTURE LAND USE .. __' PLAN OF PINELLAS COUNTY, FLORIDA, BY ACTION ON ~ft E~T\I t:!) NUMBERS CW 90-7 , CW 90-8 , CW 90-9 , AND CW 90:-10 l""-":~"-""'''-'''''''''-'''-''-''-'\ I . TRANSMITTED FROM THE PINELLAS COUNTY PLANNiING ._.. I COUNCIL PROVIDING FOR THE AMENDMENT OF tHE ',tP n j 2003 i COUNTYWIDE FUTURE LAND USE PLAN; PROVIDING fOR ...J SEVERABILITY; PROVIDING FOR FILING OF THE ORDINA~CE AND FOR AN EFFECTIVE DATE ,i ,f" f' - ORDINANCE NO. 90- -32 WHEREAS, proposed amendments to the Countywide Future Land Use Plan, which is an element of the Countywide Comprehensive Plan of Pinellas County, Florida, have been presented to the Board of County Commissioners in their capacity as the Countywide Planning Authority; and WHEREAS, notice of public hearings and advertisements have been accom- plished as required by Chapter 73-594, Laws of Florida, and as required under Section 125.66 (5), F.S., as amended; and WHEREAS. the procedures of the Special Acts and County Charter have been followed concerning the Pine1las Planning Council and the Countywide Planning Authority for proposed amendments to the Countywide Future Land Use Plan; and WHEREAS, a recommendation on the proposed amendment(s) has been received '--., from the Pinellas Planning Council and considered by the Board as the County- wide Planning Authority. NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of Pinellas County, Florida, acting as the Countywide Planning Authority in regular meeting duly assembled on May 8, 1990, as follows: Section 1 - Amending the Countywide Future Land Use Plan The Countywide Future Land Use Plan for Pinellas County adopted in :~~,~;:; :'.'~,,:':",! Section 3(a) of Ordinance 89-4 is amended to reflect the changes ad;upted n accordance with the action described in composite Exhibit wh i ch ::X'ri'c:l ua~ s '\~.[:\ ':"~'; "J'" "A", Case Numbers CW 90-7, CW 90-8, CW 90-9, and CW 90-10. Section 2 - Severability r"" ."", .\'" ',. ".,," "",;.',)- 11 - e If any Section, Subsection, sentence, clause, phrase,. or provision of this Ordinance is for any reason held invalid or unconstitutional by a Court of Competent Jurisdiction, such holding shall not be construed to render the remaining provisions of this Ordinance invalid or unconstitutional. Section 3 - Filing of Ordinance; Effective Date A certified copy of this Ordinance shall be filed wi th the Secretary of State wi th the Ordinance and Exhi bi t "A" to be filed wi th Clerk of the Circuit Court. This Ordinance shall take effect upon receipt of notice from the Secretary of State that it has been filed. 12 ~ PI'-1:LLAB y1..VI""NG IAGENDA MEMORANDUMI ) ( AGENDA ITEM: cr- 'NCIL ( DATE: March 21, 1990 IV A-2. ) SUBJ ECT: Case /fCW 90-7 Jurisdiction: Tarpon Springs (Z/LU /f90-1) Description: Proposed amendment to the Countywide Future Land Use Plan; 0.18 acre From: Medium Density Residential (MD) To: Neighborhood Commercial (NC) RECOMMENDATION: "~ouncil recommend to the Countywide Planning Authod ty that the proposed amend- m~t to Neighborhood Commercial (NC) be approved. '" '"" B AC KG RO liN,D: Location: No~tJJ side of Spruce Street, 100 feet west of Alternate U.S. Highway 19 (ripellas Avenue). Purpose: To recog'l\ize the commercial use of this property and allow for its improvement>: Land Use Considerations: North: South: Land Use Plan Cate~ories Neighborhood Commercial (NC) Medium Density Residentl~l (MD) Neighborhood Commercial (N~ Medium Density Residential (XP) Existing Land Use business and residential furniture and cabinet factory (nonconforming) Mullet Boat Restaurant commercial storage and loading (nonconforming) East: West: The subject area is an existing unimpro'l(ed parHng lot located immediately west of the Mullet Boat Restaurant. The applf~ant' s intent is to improve and land- scape the parHng lot. The existing us~, is nonconforming, and the City is requesting a land use designation that would\recognize and permit improvement of this use. Impact Considerations: \\ Traffi c - Approval of the proposed amendment woulct',-? ncrease the number of vehi cle tdps per day on the adjacent traffic cl~culation system by approxi- mately 380. The existing level of servic (LOS) on this portion of Alternate U.S. Highway 19 is "E" (unstable t ffic flows with stoppages from congestions of momentary duration). Th projected year 1995 LOS is "F" (a forced-flow condition in which the cility acts as storage for vehicles backing up from a downstream bott eneck). According to (Backg~nd Continued) PINELLAS PLANNING COUNCIL ACTION: March 21, 1990 The Council recommended approval of the amendment from Medium Residential to Neighborhood Commercial. (Vote of 10-0) COUNTYWIDE PLANNING AUTHORITY ACTION: May 8, 1990 The Board acted to approve the Council's recommendation above. (Vote of 4-0) I L- 13 ~ PINELLAB F?LANN-INC3 [AGENDA M~MO'ANDUMI C~I.NC'IL PAG. 2 ( SUBJECT: Case ItCW 90-7 ) BACKGROUND {Cont'd'): the MPO Year 2010 Long Range Highway Plan, this portion of Alternate U.S. Highway 19 is planned to be upgraded to a six-lane divided arte- rial. The projected Year 2010 LOS on Alternate U.S. Highway 19 is LOS "D" (an unstable traffic flow condition with only tolerable operating speeds) . Water Supply/Wastewater Treatment - Approval of this request would decrease de- mands on potable water supplies and wastewater treatment facilities by approximately 536 gallons per day. Thi s area is served by the Tarpon Springs Wastewater Treatment Plant, which has a capacity of 4.0 million gallons per day and an average daily flow of 2.7 million gallons per day. \ A licabl~ Rules/Policies: The propose amendment is cons i s ten t wi th the followi ng rules of the Pinellas Planning Coun il regarding proper locations for neighborhood commercial designa- tions: \ \\ \ " , \ Areas wher~~lanned need has been local govern nt planning process, is not likely p occur. clearly documented, as through the and where a duplication of services On the periPher;\of definable neighborhoods or internal to major urban development projec~. "- The proposed amendment is ~onsistent with the following policies of the Pinellas Planning Council: ~ Provide for a system of neighborhood community and regional business service districts by faci itating new construction where it is war- ranted and by rehabili tati existing business centers which are well located. Land planning should weigh hea By the established character of pre- dominantly developed areas anges of use or intensity of develop- ment is contemplated. \ Related Plannin~ Considerations: Although approval of this request would ext commercial land use designation to the west sistent with the depth of this designation site. nd the depth of the neighborhood f Pinellas Avenue lit is con- the north and south of this It should be noted that this section of Pinellas venue designated as Neigh- borhood Commercial on the Countywide FLUP contain existing uses that would be more appropriate under another commercial Ian use designation. For example, there are in ten s i ve commerci al uses such as the furn i ture and cabinet factory to the south of the site and the r staurant to the east. The permitted uses under the City's NB (Neighborh od Business) zoning district appear to be inconsistent with the appropr ate uses under the Countywide FLUP Neighborhood Commercial category. ~ Thus, there appear to be inconsistencies both between th City's plan and zoning classifications and the countywide plan classifica ion. The City will be addressing the plan/zoning category relationship in ts updated land development regulations, and it would appear than an amendment~o the larger Neighborhood Commercial countywide plan classification would be in order based on the City's Tourist-Oriented Commercial plan designat on. It is recommended these reconciliations be addressed in the course of the overall countywide consistency program. Given the small size of this plan change, its use in relationship to an existing use, and the larger area designated Neighborhood Commercial, it is recommended this plan amendment be approved. 14 ~ PI~.eLLAB ~'_~N.NC3 MEMORANDUMI cru 'NCIL ( DATE: Karch 21, 1990 IV A-3 ) SUBJECT: Case IfCW 90-8 Jurisdiction: Pinellas County (L,U. 1-1-90) Description: Proposed amendment to the Countywide Future Land Use Plan; 0.4 acre From: Kedium Density Residential (MOl To: General Commercial (GC) " REboMMENDATION: coun~l" recommend to the Countywide Planning Authori ty that the proposed amend- ment to General Commercial (GCl be approved. '" ~ '" BACKGROUND: \ Location: Southea;'t, corner of the intersection of Haines Road and 54th Avenue North. \ Purpose: To recognize\lln existing commercial use that has been in existence for several years.\ Land Use Considerations: \ \ \ \ North: Land Use Plan Cate~ori~s General Commercial (GCl \ Existin~ Land Use motel, restaurant, and two gas stations mobile home park mobile home park tavern South: East: West: Medium Density Residential '(MOl Medium Density Residential (~D) General Commercial (GCl . The subject area contains termite extermination and boat sales businesses, which have been in existence since 1976. The\existing uses are nonconforming; there- fore, Pinellas County is requesting a la~'d, use designation that would bring the existing uses of the site into conformanc~', with the general commercial land use category. Impact Considerations: Traffic - This change from medium density residential to general commercial would ordinarily increase the number of vehicle trips per day by approxi- mately 150 on the traffic circulation sy's,tem. Since the subject area is already developed with commercial use,there should be no actual in- crease in the number of vehicle trips per day generated as a result of this amendment. The existing levels of service (LOS) on Haines Road and 54th Avenue North are "0" (an unstable traffic flow condition wi th only tolerable operating speeds) and "E" (unst~,ble with stoppages from congestion of momentary duration), respectively. , (Background Continued) PINELLAS PLANNING COUNCIL ACTION: Karch 21, 1990 The Council recommended approval of the amendment from Medium Density Residential to General Commercial. (Vote of 10-0) COUNTYWIDE PLANNING AUTHORITY ACTION: Kay 8, 1990 The Board acted to approve the Council's recommendation above. (Vote of 4-0l 15 ~ PIN_~LLA6 FI.I..ANNtNe IAGENDA MEMO'ANDUMI PAG. 2 COUNCIL - ( SUBJ ECT: '" ~ Case IICIJ 90-7 ) BACKGROUND (Cont'd.): the MPO Year 2010 Long Range Highway Plan, this portion of Alternate U. S. Highway 19 is planned to be upgraded to a six-lane divided arte- rial. The projected Year 2010 LOS on Alternate U.S. Highway 19 is LOS "D" (an unstable traffic flow condition with only tolerable operating speeds) . Water Supp1y/lJastewater Treatment - Approval of this reguest would decrease de- mands on potable water supplies and wastewater treatment facilities by approximately 536 gallons per day. This area is served by the Tarpon Springs Wastewater Treatment Plant, which has a capacity of 4.0 million ~~ gallons per day and an average daily flow of 2.7 million gallons per day. Applicab e Rules/Policies: The propos"d amendment is consistent with the following rules of the Pinellas Planning Cou~il regarding proper locations for neighborhood commercial designa- tions: '''. Areas where'~ planned need has been clearly documented, as through the local govern~'ept planning process, and where b. clupllcado" 0I services is not likely t\ occur. On the periphery'\{ definable neighborhoods or internal to maj or urban development project~ '\ The proposed amendment is c~sistent with the following policies of the Pinellas Planning Council: \ \ Provide for a system of ri~ighborhood community and regional business service districts by facilitating new construction where it is war- ranted and by rehabilitating 'oexisting business centers which are well located. \ Land planning should weigh heav~~ the established character of pre- dominantly developed areas when cha~es of use or intensity of develop- ment is contemplated. \ \ \ Related Plannin~ Considerations: \ Although approval of this reguest would extend\the depth of the neighborhood commercial land use designation to the west of 'Rinellas Avenue, it is con- sistent with the depth of this designation to t e north and south of this site. It should be noted that this section of Pinellas Aven e designated as Neigh- borhood Commercial on the Countywide FLUP contains eli ting uses that would be more appropri ate under another commercial land u des igna ti on. For example, there are intensive commercial uses such as the furniture and cabinet factory to the south of the site and the restau ant to the east. The permitted uses under the City's NB (Neighborhood \usiness) zoning district appear to be inconsistent with the appropriate 'uses under the Countywide FLUP Neighborhood Commercial category. '\ \ Thus. there appear to be i ncons i s tenci es both between the Ci t~s plan and zoning classifications and the countywide plan classification. The City will be addressing the plan/zoning category relationship in its up ted land development regulations, and it would appear than an amendment to the larger Neighborhood Commercial countywide plan classification would be in order based on the City's Tourist-Oriented Commercial plan designation. It is recommended these reconciliations be addressed in the course of the overall countywide consistency program. Given the small size of this plan change, its use in relationship to an existing use, and the larger area designated Neighborhood Commercial, it is recommended this plan amendment be approved. 16 "W!J ( DATE: Plr-'ELLAS -1-YIV-NB IAGENDA MEMORANDUMI ) ( AGENDA ITEM: cr- 'NCIL March 21, 1990 IV A-4. ) ~ ',- .'" SUBJ ECT: Case /fCW 90-9 udsdiction: D cdption: FrOil\: Suburb To: \, Publi c " Clearwater Proposed amendment to the an Low Density Residential /Semi-Public (P/SP) Countywide Future Land U~e Plan; 3.7 acres (LD) \ RECOMMENQATION: \ Council recommend to the Countywide Planning Authority that the proposed amend- ment to Public/Semi-Public (P/SP) be approved. \ \ '. BACKGROUND: \ Location: West side of Kc{'ullen-Booth Road, south of Curlew Road and opposite Msase Drive, " Purpose: To allow the parcel tp be used for a proposed new church sanctuary. Land Use Considerations: North: South: East: Land Use Plan Cate~ories Public/Semi-Public (P/SP) Public/Semi-Public (P/SP) Residential/Office (R/O) and Public/Semi-Public (P/SP) Suburban Low Density Residential (SLD)\ Existin~ Land Use single-family residence church Mease Hospital and the Northeast Professional Center single-family residences West: \ The subject area is cu"rrently vacant and the prqperty owner proposes to sell the site to the Holy Tri ni ty Epi scopal Church, who als\Q owns the adj acen t property to the south. The Holy Trinity Episcopal Church has \, contract to purchase the par- cel on which it pr9poses to build a church sanctuary \. , \ \\ Impact Considerat10ns: Traffi c - The c)lrrent land use des ignati on generates approximately 180 veh i c1e trips'> per day on the adjacent traffic circulation system. Approval of the Iproposed amendment would decrease the number \of vehicle trips per day' by approximately 16. The existing level of se'r,vice (LOS) for this pi'rt i on of McMullen-Booth Road is" B" (a s table flow 'condi t i on) and Cur- f'ew Road is "D" (an unstable traffic flow condition with only tolerable /operating speeds), respectively. The projected Year 1995 LOS on this portion of McMullen-Booth Road is "e" (a relatively sati~{actory condi- /' tion with good opera.ting speeds). This portion of McKull~n-Booth Road is planned to be upgraded to a four-lane enhanced di vided att;eri aI, and i / / (Background Contin~~d) PlN,ELLAS PLANNING COUNCIL ACTION: March 21, 1990 , lhe Counci 1 recommended approval (Residential to Public/Semi-Public. of the amendment (Vote of 10-0) from Suburban Low Density COUNTYWIDE PLANNING AUTHORITY ACTION: May 8, 1990 The Board acted to approve the Council's recommendation above. (Vote of 4-0) 17 I~J r- I I ... __ ... ... "'" ... r- ... "'" I ... I ... I I... ___ ~ '""" """ . ~ "-'I ... IAGENDA M~MO&NDUMI PAG~ 2 ( SUBJECT: Case /fCW 90-8 ) BACKGROUND (Cont'd.): '''" \, "\ ~ " Scheduled intersection improvements at U.S. Highway 19 and 54th Avenue North, for Fiscal Year 1990/91, will improve LOS along 54th Avenue North in the vicinity of the subject area from "E" to "D", thus, elimi- nating the existing deficiency on this facility. ~' ""-" Water It should be noted that the Year 2010 levels of service for these roads are "F" (a forced-flow condi t i on in wh i ch the fad Ii ty ac ts as storage for veh i cles backi ng up from a downstream bottleneck) and "D" (an un- " stable traffi c flow condi t i on wi th only tolera,ble opera t i ng speeds), 'respectively. Therefore, since Pinellas Coun~y's adopted level of ~'arvice is "C" for average daily traffic, it is recormnended that the Met)\~politan Planning Organization (MPO) reevaluate the future traffic patte'rc,ns and planned improvements for the.se roads as part of the update of the '\MfO Long Range Highway Plan. ' ", Supply/Wastewat~r Treatment - If approved, the proposed amendment would de- crease demands on potable water supplies and wastewater treatment facilities by\approximately 1,190 gallons per day. This area is served by the St. Peteh~burg Albert Whitted Wastewater Treatment Plant, which has an average dB:'i,ly flow of 9; 5 !1l.i 1.1 inn gallons per. day and I!. caoad ty is 12.4 million gallpns per day. - .,\., '\. Applicable Policy: The proposed amendment is Pla~ning Council: cons is t~t wi th the folIowi ng poli cy of the Pi nelIas Land planning should weigh hMvily the established character of predominantly developed areas ~hen changes of use or intensity of development is contemplated. Related Planning Considevations: . The location of this site at the intersection of two major transportation facili- ties is not an ideaL'location for residential'!ievelopment. In addition, except for the subject area,and a small section of the mo,pile home park to the south, ex- isting land uses along Haines Road consist of coin[nerdal development. In Cases ft8 3 -17 and /f86 -11 (Area 13) Cound 1 approved general' cormnerd al land use des i gna- tions for two p~cels of land located to the north and northwest of the subject area, in consigiration of the surrounding land use pattern and activity associ- ated with Haines Road and 54th Avenue North. / " 18 -6.' -- - --~~--~"'---= 1: ~ I~"-"$LLAS ~..AIj N "-~ G CpL1NCIL IAGENDA MEMORANDUMI 21, 1990 ) (AGENDA ITEM: IV A-5. ) /fCW 90-10 ear-water- (LUP 89-l3) oposed amendment to the Countywide Futur-e Land Use Plan; 5.0 acr-es mi-Public (P/SP) us td al (LI) ION: d to the Countywide Planning Authodty that the pr-oposed amend- dustdal (LI) be appr-oved. west cor-ner- of the inter-section of Calumet Str-eet and Belcher- low for- industdal use, in conjunction with the par-cel of land to est. r-ations: Plan Categor-ies Existing Land Use dustdal (LI) industdal uses tion (P) and City fir-e station emi -Publi c (P/SP) ity Residential (LD) single-family r-esidence dustdal (LI) industdal uses pr-esently developed as an Upper- Pinellas Association for- Retar-ded facility consisting of offices and classr-ooms. UPARC will be es and wor-kshops to a new faci li ty now under- constr-uction on the lcher- Road; ther-efor-e. the r-equested amendment is in anticipation the futur-e sale of the subject pr-oper-ty. tions: r-r-ent land use designation on this site gener-ates appr-oximately hicle tdps per- day on the adjacent tr-affic cir-culation system. al of this r-equest would decr-ease the number- of vehicle tdps per- appr-oximately 52. The existing level of ser-vice (LOS) on this n of Belcher- Road and Her-cules Avenue is LOS liD" (an unstable c flow condition with only toler-able oper-ating speeds) . The pr-o- Year- 1995 LOS on this por-tion of Belcher- Road is lIFIl (a for-ced- condition in which the facili ty acts as stor-age for- vehicles (Backgr-ound Continued) NING COUNCIL. ACTION: Mar-ch 21, 1990 ommended appr-oval of the amendment fr-om Public/Semi-Public to I; and fur-ther- r-ecommended it be developed consistent with the r-e Land Use Plan designation to which it is pr-oposed to be of 10-0) LANNING AUTHORITY ACTION: May 8. 1990 to appr-ove the Council's r-ecommendation above. (Vote of 4-0) 19 - ---~--->~~.....,...-,-----,~.~-.-._,-- -----~.------~ -,-~' --~ .-.--.-, ----~--,---- ---- - . - p ( DATE: Ma17ch SUBJECT: Case Judsdiction: Cl Descr-iption: Pr- Fr-om: Public/Se To: Light Ind RECOMMENDAT Counc i I recommen ment to Light In BACKGROUND: Location: South F.oad. Pur-pose: To al the 10' I Land Use Cons ide North: South: Land Use Light In Pr-eser-va Public/S Low Dens Light In East: West: The pr-oper-ty is Citizens (UPARC) moving the offic east side of Be of the move and Impact Consider-a Tr-affic - The cu 710 ve Appr-ov cay by por-tio tr-aff i j ec ted flow PINEL.LAS PL.AN The Council r-ec Light Industda Countywide Futu amended. (Vote COUNTYWIDE P The Boar-d acted ~ PIN~LLAS ~",AIN'~G IAGENDA MEMORANDUMI CO' -NeiL PAGI! 2 ( SUBJECT: Case IfCW 90-9 ) ~ACKGROUND \ \ " {Cont'dJ: the forecasted Year 2010 LOS would be LOS "C". The forecasted Year 2010 level of service on Curlew Road, which is planned to be upgraded to a six-lane divided arterial, would be at LOS "B". Water Supply/Wastewater Treatment - Demands on potable water supplies and waste- water treatment facilities would decrease by 3,220 gallons per day should the proposed amendment be approved. This area is served by the Clearwater Northeast Treatment Plant, which has an average daily flow 0[5.0 million gallons per day and a capacity of 8.0 million gallons per'liay. Applicable Rule/Policy: The proposed amerrqrnent is consistent with the Council's rules regarding appropri- ate uses for the public/semi-public land use category. " The proposed amendment is consistent with the following policy of the Pinellas Planning Council: Land planning shoald weigh h2il';~ly the e~t!ibli=hed ch'3.rarrer nf pre- dominantly developed areas when changes of use or intensity of develop- ment is contemplated. Related Planning Considerations: The subject area fronts McKullen-Booth Road, a designated scenic/noncommercial corridor. Although the rules of the Pinellas Planning Council seek to discourage other than open space and low density residential uses along the roadways and to protect their traffic-carrying capacity, the subject area's unique location adjacent to public/semi-public designations to the north, south, and east should be considered. In recent years, Council has approved several requests for public/semi-public land use designations along the McMullen-Booth Road Corridor for a variety of uses such as nursing homes. hospital facilities, and churches. More pertinent to this request is Case ItoA-87-7 adjacent to the south of the subject area, in which Council approved a public/semi-public land use designation for a church use. In addi tion to these church uses, the east side of McMullen-Booth Road contains the Mease Hospital Complex and related medical offices. The proposed church use is a communi ty service/support facility that in many municipali ties is provided for in residential classifications, Its location is well situated with regard to adjoining public/semi-public community facilities. Approval of the proposed amendment would be consistent with the existing land uses and land use designations located in the vicinity of the site, as well as with previous actions of the Council regarding public/semi-public land use desig- nations in this corridor. To recommend approval of this amendment the Council should make a finding that it is not inconsistent with the purpose and intent of the scenic/noncommercial corridor rule. j 20 - . STATE OF FLORIDA COUNTY OF PINELLAS I, KARLEEN F. De BLAKER, Clerk of the Circuit Court and Ex-officio Clerk to the Board of County Commissioners, in and for the State and County aforesaid, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of an Ordinance adopted by the Board of County Commissioners of Pinellas County, Florida, on Mav 8. 1990 relative to: PINELLAS COUNTY ORDINANCE NO. 90-32 AN ORDINANCE AMENDING THE COUNTYWIDE FUTURE LAND USE PLAN OF PINELLAS COUNTY, FLORIDA, BY ACTION ON CASE NUMBERS CW 90-7, CP 90-8, CT,] gn-q., AND CW 90-10 TRANSMITTED FROM THE PINELLAS COUNTY PLANNING COUNCIL PROVIDING FOR THE AMENDMENT OF THE COUNTYWIDE FUTURE LAND USE PLAN; PROVIDING FOR SEVERABILITY; PROVIDING FOR FILING OF THE ORDINANCE AND FOR AN EFFEC~IVE DATE. IN WITNESS WHEREOF, I hereunto set my hand and official seal this 11th day of May , 19 90 KARLEEN F. De BLAKER Clerk of the Circuit Court and Ex-officio Clerk to the Board of County Commissioners By < 'j L~/f{~ /J . ~ Deputy Clerk 21 it e 2.3.3.6 INDUSTRIAL CLASSIFICATION. 2.3.3.6.1 Category/Symbol- Industrial Limited aL). Purpose - It is the purpose of this category to depict those areas of the County that are now developed, or appropriate to be developed, in a limited industrial manner; and so as to encourage the reservation and use of consolidated areas for industrial use in a manner and location consistent with surrounding use, transportation facilities, and natural resource characteristics. Use Characteristics - Those uses appropriate to and consistent with this category include: . Primary Uses - Research! Development; Light Manufacturing/Assembly (Class A) and (Class B); Wholesale/ Distribution (Class A) and (Class B); Storage/Warehouse (Class A) and (Class B); . Secondary Uses -Office; Retail Commercial; Personal Service/Office Support; Commercial! Business Service; Commercial Recreation; Transient Accommodation; Institutional; TransportationlUtility; Recreation/Open Space; Transfer/Recycling Locational Characteristics - This category is generally appropriate to locations with sufficient size to encourage an industrial park type arrangement with provision for internal service access in locations suitable for light industrial use with minimal adverse impact on adjoining uses; and served by the arterial and thoroughfare highway network, as well as mass transit. Traffic Generation Characteristics - The countywide plan standard for the purpose of calculating typical traffic impacts relative to a plan amendment for this category shall be 170 trips per day per acre. DensitvlIntensitv Staridards - Shall include the following: . Transient Accommodation Use - Shall not exceed forty (40) units per acre. . All Other Uses - Shall not exceed a floor area ratio (FAR) of .65 nor an impervious surface ratio (lSR) of .85. The countywide plan standard for the purpose of establishing relative intensity and potential impacts shall be a FAR of .39 and an ISR of .65. Other Standards - Shall include the following: . Industrial; Residential Use - An appropriate buffer shall be provided in and between the Industrial Limited category and an adj oining Residential classification. . Acreage Limitations - Institutional; TransportationlUtility; Retail Commercial; Personal Service/Office Support; CommerciallBusiness Service; Commercial Recreation; Transient Accommodation Use - Shall not exceed a maximum area of five (5) acres. Any such use, alone or when added to existing contiguous like use(s), which exceeds this threshold shall require a plan map amendment which shall include such use and all contiguous like uses. Countywide Plan Rules .... ".... .L.-:J.L. September 30,2001 Pinellas County Property APp.r Information: 01 29 15 16488000 Oii Page 2 of5 01 / 29 / 15 / 16488 / 000 / 0120 01-0ct-2003 Jil'l Sl'li tt-I, CFA pine lla.s County Property Appraiser 08:56:53 Ownership In forrqa t ion tlon-Residential Prope rty Add ress, Use, and Sales BELCAL PROPERTIES C/O KLE ItL MARK S 2040 tiE COACHMAtI RD CLEARWATER Fl 33756-2614 COl'lparable sales value a.8 Prop A,j,jr: 1750 tl BELCHER RD of Jan 1, 2003, based on Censu:s Trac t : 267.02 sales frorq 2001 - 2002: 0 Sale Date OR Book/Page Price (Qual/UnQ) Vac/ Il'lp Plat Inforl'lation 8 /2,003 12,973/ 269 473,700 (U) I 1957 : Book 044 Pgs 046- 10/2,000 1 L 086/ 157 675,000 (Q) I 0000 : Book Pgs - 3 /1, 994 8,602/ 151 575,000 (U) I 0000: Book Pgs - 0 /1,971 3,463/ 346 2,700 (U) I 2003 Value EXEtl'lP T Iot~S Jus t / t',1a.rke t: 650,000 HCif'lestea.d: 0 OwnerShip % .000 Historic : 0 Use %: .000 Assessed/Cap: 650,000 Tax Exel'lpt %: .000 Other Exer,p t : 0 Taxable: 650,000 Agricultural: 0 2003 Tax In forrqa t ion Land In forrqa t ion District: CW ~iec1.l)Jall : Frontage: Clear'wate r' View: 03 Millage: 23.0851 La.nd Size Unit Land Land Land Front x Depth Price Units Meth 02 Taxes: 14,440.48 1) 384 x 380 4.00 145,920. 0 S Special Tax . 00 2) 0 x 0 .00 .00 3) 0 x 0 .00 .00 Without the Save-Our-HoP'ie:::, 4) 0 x 0 .00 .00 cap, 2003 taxes lo.lill tie : 5) 0 x 0 .00 .00 15,005.32 6) 0 x 0 .00 .00 l.Ji tflOU t any exep1p t ion:s., Total L a.n d Value: 583,680 2003 taxes will be : 15,005.32 Short Legal CLEARWATER ItlDUSTRIAL PARK PART LOT 12 DESC COM AT tlW Description COR OF LOT 12 TH E 208FT FOR POB TH COtn E 377. 16FT Building Information http://pao.co.pinellas.flus/htbin/cgi-scr3 ?o= 1 &a= 1 &b= 1 &c= 1 &r=.16&s=4&t= 1 &u=O&p... 101112003 PineJIas County Property APp.r Information: 01 29 15 16488000 Oii Page 3 of5 01 / 29 / 15 / 16488 / 000 / 0120 :01 01-Oct-2003 Jim Smith, CFA Pinellas County Property Appraiser 08:56:52 Commercial Card 01 of I Improvement Type: ~arehouse Property Address: 1750 "BELCHER RD Prop Use: 500 Land Use: 41 Structural Elements Foundation Sp read /Hono F ooting Heating & Air "one Floor System Slab on 6r'ade Fixtures 1Z Exterior Wall Concr'ete Bloc k Bath Tile "one Height Factor 0 Electric Ave r'age Party Wall "one Shape Factor Rectangle Structural Frarqe Hason r'y Pilla r'8:Steel Quality Above Average Roof Frame Bar Joist/Rig id F r'afil Year Built 1.971 Roof Cover Built Up/Heta 1/6yps E Hec t i ve Age 30 Cabinet & tvlill "one Other Depreciation 0 Floor Finish Concr'ete Fini sh Function Depreciation 10 Interior Finish "one Economic Depreciation 0 Partition Factor 0 Sub Areas Description Fa.ctor Hrea Description Factor Area 1) Base A r'ea 1. 00 21. 51Z 7) .00 0 2) Canopy .20 1Z5 8) .00 0 3) S al e s Se rvice A r'ea 1. 50 2,100 9) .00 0 4) Canopy .20 320 10) . 00 0 5) .00 0 11) . 00 0 6) .00 0 12) .00 0 Conunercial Extra Features Description o imens ion:::, Price Units 'v'alue RCD Year 1) ASPHALT 10500 1. 00 10,500 0 10,500 999 2) CO"C PAVE 3380SF 2.00 3,380 0 6,760 999 3) FE"C E 1130 8.50 1,130 0 3,840 1.971 4) .00 0 0 0 0 5) .00 0 0 0 0 6) .00 0 0 0 0 TiJ TA L RECORD VA L U E : 21.100 Map With Property Address (non-vacant) ~~[t][fJ~BJ http://pao.eo.pinellas.fl.us/htbin/egi -ser3 70= 1 &a= 1 &b= 1 &e= 1 &r=.16&s=4&t= 1 &u=O&p... 10/112003 . - ~ CITY OF CLEARWATER NOTICE OF COMMUNITY DEVELOPMENT BOARD PUBLIC HEARINGS The Community Development Board of the City of Clearwater, Florida, will hold public hearings on Tuesday, December 16, 2003, beginning at 2:00 p.rn., in the City Commission Chambers, in City Hall, 3rd floor, 112 South Osceola Avenue, Clearwater, Florida, to consider the following Level Two Application requests: NOTE: All persons wishin2: to address an item need to be present at the BEGINNING of the meetin2:. Those cases that are not contested bv the applicant. staff, nei2:hborin2: property owners, etc. will be placed on a consent a2:enda and approved bv a sin2:le vote at the be2:innin2: of the meetin2:. 1. (cont. from 10/21/03) Robert Hupp & Allen McMullen are requesting a flexible development approval to permit a reduction in the front (north) setback from 35 ft to 15 ft (to pavement) and from 35 ft to 16 ft (to generator pad) along Charles Avenue, a reduction in the required number of parking spaces from 98 spaces (5/1,000 sq ft) to 97 spaces (4.9/1,000 sq ft), an increase in building height from 30 ft to 38.5 ft, under the provisions of Section 2-1004.C and to vacate 242 feet of Allen Avenue right of way (Proposed Use: A 9,560 sq ft medical clinic.) at 3080 Allen Avenue., Acker's Sub, Blk 4, Lots 4-7 & 12- 15, part of Lots 8-11. FLD2003-08037 2. Griffin International Inc. are requesting a flexible development approval to permit the sale of alcoholic beverages on a parcel of land contiguous to a parcel of land which is designated as residentially zoned property in the Zoning Atlas, as part of a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-704.C. (Proposed Use: Alcoholic beverage sales within a 2,100 square-foot tenant space located in an existing shopping center) at 1575 S. Hi2:hland Ave., Sec. 23-29-15, M&B 34.31. FLD2003-09042 3. G T Leisure Corp. / R02:ers Beach Development (Villa del Sole of Clearwater Beach, LLC) are requesting a flexible development approval to permit 6 attached dwellings (townhomes) with a reduction in the side (east) setback from 10 ft to 5 ft (to building), the side (west) setback from 10 ft to 5 ft (to building), the rear (south) setback from 20 ft to 1 ft (to pool and decking) and to permit parking that is designed to back out into the public right-of-way, as part of a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-803.C, and Preliminary Plat approval for 6 lots [Proposed Use: Six attached dwellings (townhomes)] at 181 Bri2:htwater Dr., Bayside Sub. No.2, Lots 20 & 21 and riparian rights. FLD2003- 09046 4. Island Kev Development, LLC are requesting a flexible development approval for a multi-use dock for the construction/reconstruction of 11 slips, dock and 4 catwalks with boardwalk along the seawall for a residential condominium complex, with a reduction of the side (north and south) setbacks from 18 ft to 16 ft (to catwalks) and from 18 ft to zero ft (to boardwalk) and an increase of the width of the dock from 75 percent of the lot width (135 ft) to 100 percent of the lot width (180 ft), under the provisions of Section 3-601 (Proposed Use: Multi-use dock of 11 slips for Island Key Condominiums) at 692 Bavwav Blvd N., Bayside Sub. No.5, Elk A, Lots 21,22 & 23 and riparian rights. FLD2003-09044 5. BelCal Properties, LLC are requesting a flexible development approval to permit retail sales (financial services) with deviations to allow direct access to a major arterial street (Belcher Road), to allow the use as a permitted use and in a separate, primmy building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C. (Proposed Use: Retail sales and services (GTE Federal Credit Union), in addition to a proposed distribution center and offices) at 1750 N. Belcher Rd., Clearwater Industrial Park, a part of Lot 12. FLD2003-09047 6. Evervbodv's Tabernacle, Inc. & Homeless Emer2:encv Proiect. Inc. are requesting a flexible development approval to pemlit a residential shelter of eight unitslbeds in the Commercial District at 1211 North Betty Lane with a reduction of the front (west) setback along North Betty Lane from 25 ft to 17 ft (to stairway ramping) and from 25 ft to 23 ft (to pavement), as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-704.B, as an amendment to a previously approved Comprehensive Infill Redevelopment Proj ect (Case Nos. FLD 02-04-09 and FLD 02-04-09 A) [which pennitted a residential shelter of eight unitslbeds at 1215 N. Betty Lane with reductions in the front (west) setback along North Betty Lane from 25 ft to 15 ft (to stairwell) and from 25 ft to 23 ft (to building), a reduction of the side (north) setback from 10 ft to 4 ft (to building) and a reduction in the rear (east) setback from 20 ft to 8 ft (to stairway ramping), under the provisions of Section 2- 704.B] (Proposed Use: Residential shelter of 8 unitslbeds) at 1215 & 1211 N. Bettv Ln., Pinebrook Sub. No.2, Blk E, Lots 15 & 16. FLD2003-09048 e . 7. Homeless Emerl!encv Proiect, Inc. are requesting a flexible development approval to permit a residential shelter of 4 beds with a reduction of the front (north) setback from 25 ft to 5 ft (to pavement), a reduction of the side (east) setback from 10 ft to 4.46 ft (to pavement), and to permit parking that is designed to back out into the public right-of-way, as part of a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-803.C, and a reduction of the side (west) landscape buffer from 12 ft to 10ft, as part of a Comprehensive Landscape Program, under the provisions of Section 3-1202.G. (Proposed Use: Residential shelter) at 1003 Carlton St., c.E. Jackson's Sub., Blk 3, Lot 11 less rd. FLD2003-09049 8. Moorinl! Capital Fund, LLC (Family Resources, Inc.) are requesting a flexible development approval to permit a residential shelter (16 beds for youth in crisis) and a social/public service agency in the Institutional District with a reduction of the side (east) setback from 10 ft to 8.5 ft (to pavement), a reduction of the side (west) setback from 10 ft to 9.5 ft (to pavement), a deviation to allow the residential shelter 900 ft (instead of 600 ft) from a transit line and a deviation to allow a social/public service agency adjacent to residentially zoned property, as part of a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1204.A, and a reduction of the landscape buffer along the side (west) property line from 12 ft to 9.5 ft, as part of a Comprehensive Landscape Program, under the provisions of Section 3-1202.G. (Proposed Use: Residential shelter (16 beds) and a social/public service agency) at 1615 Union St., Sec. 02-29-15, M&B 12.05. FLD2003- 09051 9. Elias Anastopoulos is requesting a flexible development approval to permit retail sales and services with a reduction of the front (south) setback from 15 ft to 4 ft (to pavement), reductions of the front (west) setback from 15 ft to 2 ft (to building) and from 15 ft to zero ft (to sidewalk), reductions of the side (north) setback from 10 ft to zero ft (to ramp), from 10 ft to 1 ft (to building) and from 10 ft to 5 ft (to rubber matting), reductions of the side (east) setback from 10 ft to zero ft (to pavement) and from 10 ft to 3 ft (to rubber matting), a reduction of required parking from 5 spaces per 1,000 sq ft (38 spaces) to 3.19 spaces per 1,000 sq ft (23 spaces) and a reduction in the width of the required foundation landscaping adjacent to the building from 5 ft to 2 ft, as part of a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-803.C. (Proposed Use: A 7,610 sq-ft retail sales and services building) at 700 S. Gulfview Blvd., Bayside Shores, Blk C, Lots 11 & 12 and Bayside Sub. No.6 Unit B, Blk E, Lot 13 and 15 ft vac rd on S. FLD2003-09045 10. ABR Plymouth Plaza, Ltd. (Tampa Bay Water/Jerry 1. Maxwell, GM) are requesting a flexible development approval to permit an office building with an increase of building height from 30 ft to 55 ft and a reduction of the side (east) setback from 20 ft to 10 ft (to pavement), under the provisions of Section 2-1004.F. (Proposed Use: 37,000 sq ft three-story office building) at 2575 Enterprise Rd., Sec. 30-28-16, M&B 34.11. FLD2003-09053 11. South Gate Park, Inc. (Tree Tops at Druid) are requesting a flexible development approval to permit attached dwellings with a reduction of the side (west) setback from 5 ft to zero ft (to existing pavement), an increase of building height to allow perimeter parapets an additional 6 ft (from roof deck) and a deviation from the requirement to screen off-street parking from adjacent parcels of land and any adjacent street, as a Residential Infill Project, under the provisions of Section 2-304.G, and Preliminary Plat approval for 10 lots [Proposed Use: Attached dwellings (10 units, five per building)] at 2525 Druid Rd., Sec. 18-29-16, M&B 44.41 and Sever Park, Lot 3 less E 200 ft. FLD2003-08038 12. Dean C. & Anita J. Carlev are requesting a flexible development approval to reduce the rear (east) setback from 15 ft to zero ft as part of a Residential rnfill Project, under the provisions of Section 2-803.C. (Proposed Use: Residential deck) at 1601 Sand Kev Estates Ct., The Moorings of Sand Key, Lot 30. FLD2003-09043 13. Michael & Stefanie Markham are requesting an appeal of the decision ofa Level One (Flexible Standard Development) that approved an application reducing the side (east) setback from 15 ft to 10ft for a two-story addition to an existing single family dwelling, as a Residential Infill Project, under the provisions of Section 2-103.B (FLS2003-08038) (Owners: Jeffrev A. & Ambrvn E. Finstad) at 2959 Eal!le Estates Cir. W., Eagle Estates, Lot 38. APP2003-00003 Interested parties may appear and be heard at the hearings or file written notice of approval or objection with the Planning Director or City Clerk prior to the hearings. Any person who decides to appeal any decision made by the Board, with respect to any matter considered at such hearings, will need a record of the proceedings and, for such purpose, may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based per Florida Statute 286.0105. Community Development Code Section 4-206 states that party status shall be granted by the Board if person requesting such demonstrates that s/he is substantially affected. Party status entitles parties to: personally testify, present evidence, argument and witnesses, cross examine witnesses, appeal the decision and speak on reconsideration requests. An oath will be administered swearing all participants in public hearing cases. If you wish to speak please wait to be recognized, then state and spell your name and provide your address. Persons speaking before the CDB shall be limited to - . three minutes unless an individual is representing a group in which case the Chairperson may authorize a reasonable amount of time up to 10 minutes. Five days prior to the meeting, staff reports and recommendations on the above requests will be available for review by interested parties between the hours of 8:30 a.m. and 4:30 p.m., weekdays, at the City of Clearwater, Planning Department, 100 S. Myrtle Ave., Clearwater, FL 33756. Please contact Frank Gerlock, Development Review Manager, at 562-4557 to discuss any questions or concerns about the project and/or to better understand the proposal and review the site plan. This notice was sent by the Official Records and Legislative Services Department, Cynthia E. Goudeau, CMC, City Clerk City of Clearwater P.O. Box 4748, Clearwater, FL 33758-4748 NOTE: Applicant or representative must be present at the hearing. YOU ARE BEING SENT THIS NOTICE IF YOU ARE THE APPLICANT OR OWN PROPERTY WITHIN 500 FT. OF THE SUBJECT PROPERTY. A COPY OF THIS AD IN LARGE PRINT IS AVAILABLE IN THE OFFICIAL RECORDS AND LEGISLATIVE SERVICES DEPT. ANY PERSON WITH A DISABILITY REQUIRING REASONABLE ACCOMMODATION IN ORDER TO P ARTICIP ATE IN THIS MEETING SHOULD CALL THE OFFICIAL RECORDS AND LEGISLATIVE SERVICES DEPT WITH THEIR REQUEST AT (727) 562-4093. Ad: 11/30/03 FOUNT AINS BA YW A Y INC BA YW A Y MANAGEMENT INC 3802 S WESTSHORE BLVD TAMPA FL 33611 - 1002 CALUMET HOLDINGS 2120 CALUMET ST STE 3 CLEARWATER FL 33765 - CATLIN, HELEN 0 ANNUITY TRUST C/O VALDEZ, EVELIO JR 5602 N 50TH ST TAMPA FL 33610 - 4806 FLORIDA BLOOD SERVICES INC PO BOX 22500 ST PETERSBURG, FL 33742- 2500 MINIERI SEMINOLE INC 29656 US HIGHWAY 19 N CLEARWATER FL 33761 - 1529 - RUTZ, CHARLES J TRE RUTZ, JANET C TRE 2694 BRA TTLE LN CLEARWATER FL 33761 - CROCKETT, ADDISON R 4029 E AMBERWOOD DR PHOENIX AZ 85282 - CAPEL PROPERTIES INC 995 MONTE CRISTO BLVD TIERRA VERDE FL 33715 - 2036 CLEARWATER, CITY OF PO BOX 4748 CLEARWATER FL 33758 - 4748 SUMMORE ACQUISITION CORP 2121 LOGAN ST CLEARWATERFL 33765 - 1312 - - SIMPSON, BETTY L MC CRACKEN, JOHN L 2144 CALUMET ST CLEARWATER FL 33765 - 1309 CONSOLIDATED ELECTRICAL DISTRIBUTORS INC 330 19TH AVE N STE 210 NASHVILLE TN 37203 - 2129 DEM PARTNERSHIP 2040 NE COACHMAN RD CLEARWATER FL 33765 - 2614 HUNT, CLARK CONSTR INC 2165 LOGAN ST CLEARWATERFL 33765 -1322 BRENNTAG MID-SOUTH INC PO BOX 20 HENDERSON KY 42419 - BRADY, SHEILA FELDMAN, MARVIN J SUMMORE PLASTICS INC 2141 LOGAN ST FELDMAN, DA VID TRE 2121 LOGAN ST CLEARWATER FL 33765 - 1312 2161 LOGAN ST CLEARWATERFL 33765 -1312 CLEARWATER FL 33765 - 1312 FONTAINE, TYLER G PINELLAS COUNTY PINELLAS COUNTY 1603 SUNSHINE DR 315 COURT ST ATTN: ENGINEERING RlW CLEARWATERFL 33765 - 1317 CLEARWATER FL 33756 - 5165 315 COURT ST CLEARWATERFL 33756 - 5165 DEPCO PUMP CO INC DOUGLAS MACHINES CORP BUETTNER, CHESTER R POBOX 7714 2101 CALUMET ST KINKEAD, CARL E CLEARWATERFL 33758 -7714 CLEARWATERFL 33765 - 1310 2627 FRISCO DR CLEARWATER FL 33761 - 3823 LOULOURGASPROPLTD KLOPFER, ALFRED H ZARV ALAS ENTERPRISES INC 1700 SUNSHINE DR KRIS, BARBARA 1857 GLENVILLE DR CLEARWATERFL 33765 -1318 2134 SUNNYDALE BLVD CLEARWATER FL 33765 - 1416 CLEARWATER FL 33765 - 1274 KLOPFER, ALFRED H KLOPFER, ALFRED H POSER BUSINESS FORMS INC KRIS, BARBARA KLOPFER, ERICH POBOX 409 2134 SUNNYDALE BLVD 2134 SUNNYDALE BLVD F AIRHOPE AL 36533 - 0409 CLEARWATERFL 33765 - 1274 CLEARWATER FL 33765 - 1274 SOURCE RESEARCH INC 2160 SUNNYDALE BLVD CLEARWATER FL 33765 - 1203 MATHEWS, ROGER W JR MATHEWS, JAQUEL YN F 6851 66TH ST PINELLAS PARK FL 33781 - 5037 SNYDER, MELISSA A PO BOX 16685 CLEARWATER FL 33766 - 6685 CICATELLO, THOMAS F CICATELLO, THERESA A 2101 SUNSET POINT RD # 1405 CLEARWATER FL 33765 - 1250 DYS, PEGGY J 2101 SUNSET POINT RD BLDG 15 UNIT 1502 CLEARWATERFL 33765 - 1243 DAVIS, ALVIN G DAVIS, KIMBERLY J 1831 N BELCHER RD STE G-3 CLEARWATER FL 33765 - 1417 APPELT & NALL 1811 N BELCHER RD STE 1-2 CLEARWATER FL 33765 - 1417 DOW, M COLLEN GRAHAM, CHRISTINE L 1222 BUELL CT JOLIET IL 60435 - 6875 BELCHER POINT ASSOCIATION INC 1831 N BELCHER RD STE G 3 CLEARWATERFL 33765- GRAHAM, HAROLD P GRAHAM, PATRICIA A 1001 BUELL AVE JOLIETT IL 60435 - 6939 e MINIERI SEMINOLE INC 29656 US HIGHWAY 19 N CLEARWATER FL 33761 - 1529 MATHEWS, ROGER W JR MATHEWS, JACQUELYN F 6851 66TH ST PINELLAS PARK FL 33781 - 5037 HELM, MARION H TRE 2101 SUNSET POINT RD # 1403 CLEARWATER FL 33765 - 1250 VERRIER, URSULA M TRE 2101 SUNSET POINT RD # 1406 CLEARWATER FL 33765 - 1250 CAMPBELL LAND CO PO BOX 1661 DUNEDIN FL 34697 - 1661 ABRAHAMSEN, CHARLES E ABRAHAMSEN, NANCY M 727 16TH AVE NE ST PETERSBURG FL 33704- APPELT &NALL 1811 NBELCHERRD STE 1-2 CLEARWATER FL 33765 - 1417 SHEP ARD, JEANNE 705 PONCE DE LEON BLVD BELLEAIR FL 33756- CHESLOCK, ANTHONY R CHESLOCK, ALICE L 1831 N BELCHER RD # I-B CLEARWATER FL 33765 - 1442 DAVIS, ALVIN G 1831 N BELCHER RD STE G-3 CLEARWATER FL 33765 - 1417 - - NISK, ALICE H TRE NISK, RONALD P TRE 2170 SUNNYDALE BLVD STE W CLEARWATER FL 33765 - 1212 ANDRE, PATRICIA A 2101 SUNSET POINT RD # 1401 CLEARWATERFL 33765 -1250 WOOD, JACK B WOOD, DOROTHY M 2101 SUNSET POINT RD # 1404 CLEARWATER FL 33765 - 1250 CHESNUT, JOYCE B 2101 SUNSET POINT RD # 1501 CLEARWATER FL 33765 - 1243 YOST, L MARTIN YOST, ELISABETH A 1431 RIDGETOP WAY CLEARWATER FL 33765 - 1733 BELCHER POINT ASSN INC 1831 N BELCHER RD STE G-3 CLEARWATER FL 33765 - APPELT & NALL 1811 N BELCHER RD STE 1-2 CLEARWATER FL 33765 - 1417 KASS, LAWRENCE G KASS, BETTY L 6025 4TH ST N ST PETERSBURG FL 33703 - GRAHAM, HAROLD P GRAHAM, PATRICIA A 1001 BUELL AVE JOLIET IL 60435 - 6939 BELCHER POINT PROPERTIES INC 1831 N BELCHER RD # C1 CLEARWATER FL 33765 - 1442 REYNOLDS, HAROLD C 1831 N BELCHER RD STE G-3 CLEARWATER FL 33765 - 1417 HOUGHTON- WAGMAN PTR LTD 1219 DARLINGTON OAK CIR NE ST PETERSBURG FL 33703- MOORES, BLAKE E 1831 N BELCHER RD # F-3 CLEARWATER FL 33765 - 1417 PRESLEY, JAMES A 1831 N BELCHER RD STE G-3 CLEARWATER FL 33765 - 1417 DAVIS, ALVIN 1831 NBELCHERRD STE G-3 CLEARWATER FL 33765 - 1417 BELCHER POINT ASSN INC 1831 N BELCHERRD STE G-3 CLEARWATER FL 33765 - 1417 KNIGHT, TIMOTHY J 2248 MANOR BLVD N CLEARWATER FL 33765 - 1612 MARCUS, JAMES MARCUS, STEPHANIE P 2236 MANOR BLVD N CLEARWATERFL 33765 - 1612 MARTIN, JENNIFER L J MARTIN, DAVID W 2224 MANOR BLVD N CLEARWATER FL 33765 - 1612 BONIFACE, DOUGLAS L BONIF ACE, JEAN E 2212 MANOR BLVD N CLEARWATER FL 33765 - 1612 - . HOUGHTON-WAGMANPTR LTD 1219 DARLINGTON OAK CIR NE ST PETERSBURG FL 33703 - RSS 7710 ARALIA WAY LARGO FL 33777- REYNOLDS, HAROLD C 1831 N BELCHER RD STE G-3 CLEARWATER FL 33765 - 1417 PROSPORT MGMT INC 1831 NBELCHERRD STE G-3 CLEARWATERFL33765 -1417 GRAHAM, HAROLD P GRAHAM, PATRICIA A 1001 BUELL AVE JOLIET IL 60435 - 6939 WEYRES, JOSEPH P WEYRES, SABINE K 2256 MANOR BLVD N CLEARWATER FL 33765 - 1612 LULEK, THOMAS F 2244 MANOR BLVD N CLEARWATER FL 33765 - 1612 RUBERTO, JAMES E 2232 MANOR BLVD N CLEARWATER FL 33765 - 1612 ROESLER,LAWRENCEJ ROESLER, DEBORAH A 2220 MANOR BLVD N CLEARWATER FL 33765 - 1612 BUTLER, FREDERICK J 5900 SHORE BLVD S # 401 GULFPORT FL 33707 - 5933 - ... HOUGHTON-WAGMANPTR LTD 1219 DARLINGTON OAK CIR NE ST PETERSBURG FL 33703 - RSS 7710 ARALIA WAY LARGO FL 33777- MARSAR & CO INC 1831 N BELCHER RD # G-1 CLEARWATER FL 33765 - 1417 PROSPORT MGMT INC 1831 N BELCHER RD STE G-3 CLEARWATER FL 33765 - 1417 GRAHAM, HAROLD P GRAHAM, PATRICIA A 1001 BUELL AVE JOLIET IL 60435 - 6939 HELPHINSTINE, RICHARD L HELPHINSTINE, BESSIE 2252 MANOR BLVD N CLEARWATER FL 33765 - 1612 LAUZON, DOROTHY 2300 LAKESHORE DR CLEARWATER FL 33759 - FOSTER, GEORGE E IV FOSTER, PAMELA S 2228 MANOR BLVD N CLEARWATER FL 33765 - 1612 HUBER, GAIL A HUBER, LAUREN 2216 MANOR BLVD N CLEARWATER FL 33765 - 1612 WICKMAN, CLIFFORD L JR 5900 SHORE BLVD S # 401 ST PETERSBURG FL 33707 - 5933 -- - BOULES, MICHAEL F COE,JAYL - HEILMANN, FRANCIS J III BOULES, ANSAF S COE, DEBORAH L 1758 W MANOR AVE 2201 MANOR BLVD N 1762 W MANOR AVE CLEARWATERFL33765 -1610 CLEARWATERFL 33765- CLEARWATER FL 33765 - 1610 HEUSINGER, CHERYL S BROWN, JOSEPH N SHOWER, DONALD R 1754 W MANOR AVE BROWN, DOROTHY L SHOWER, BARBARA A CLEARWATERFL 33765 -1610 1750 W MANOR AVE 1748 W MANOR AVE CLEARWATER FL 33765 - 1610 CLEARWATER FL 33765 - 1610 SLACK, BARRY R MAXWELL, W ALTER K GRIDER, ANGELA M SLACK, CHRISTINE R MAXWELL, JERI S GRIDER, JOEL D 1736 W MANOR AVE 1740 W MANOR AVE 1734 W MANOR AVE CLEARWATER FL 33765 - 1610 CLEARWATERFL 33765 - 1610 CLEARWATER FL 33765 - ABAD, VICTOR G JOHNSON, STEVEN F UNDERWOOD, BARBARA A ABAD, CLARA D JENKINS, PATTY A 1724 W MANOR AVE 1732 W MANOR AVE 1728 W MANOR AVE CLEARWATERFL 33765 -1610 CLEARWATER FL 33765 - 1610 CLEARWATERFL 33765 - 1610 HARRIS, SEAN BRONSON, RICHARD A EASTHAM, STEPHEN R HARRIS, NASHUN BRONSON, DA WN M 1711 WMANORAVE 1716 MANOR AVE W 2200 S LAGOON CIR CLEARWATER FL 33765 - 1611 CLEARWATERFL 33765 - 1610 CLEARWATER FL 33765 - 1606 TORRE, ERMINDA F TAYLOR, LOIS A V AN SCOYOC, ROBERT 3076 GLENHURST AVE 1721 WMANORAVE V AN SCOYOC, MARIL YNNE LOS ANGELES CA 90039- CLEARWATER FL 33765 - 1611 1725 W MANOR AVE CLEARWATER FL 33765 - 1611 NGUYEN, MANH V LA MASTRA, JOSEPH S YOUSSEF, NABIL F PHAM, LE ANH LA MASTRA, MARY YOUSSEF, NADIA Z 1729 W MANOR AVE 1733 W MANOR AVE 1735 W MANOR AVE CLEARWATER FL 33765 - 1611 CLEARWATER FL 33765 - 1611 CLEARWATERFL 33765 - 1611 DONEY, ELLA M USSERY, J C THRAP, CHRISTOPHER E JR 1741 WMANORAVE USSERY, CAROLYN R 1749 WMANORAVE CLEARWATER FL 33765 - 1611 1944 REDBUD WAY CLEARWATERFL 33765 - 1611 SEVIERVILLE TN 37876 - 0850 TILLERY, BILLY G WOOD, JAMES E ESTER, STEPHEN F 1751 WMANORDR WOOD, ELIZABETH A ESTER, RENDA K CLEARWATER FL 33765 - 1611 1755 W MANOR AVE 1759 W MANOR AVE CLEARWATER FL 33765 - 1611 CLEARWATER FL 33765 - 1611 MALINOVIC, DRAGAN WALKER, JOSEPH 0 SCHNEIDER, ROLAND H TRE MALINOVIC, MICA WALKER, BETTY L 1770 RAGLAND AVE 1763 WMANORAVE 2217 MANOR BLVD N CLEARWATER FL 33765 - 1635 CLEARWATERFL 33765 - 1611 CLEARWATER FL 33765 - 1614 - e MAQUET, GORDON L DURAVA,CHARLOTTE - LAWSON, JAMES R MAQUET, LORETTA 1815 STETSON DR LA WSON, SANDRA K 1762 RAGLAND AVE CLEARWATER FL 33765 - 1422 1754 RAGLAND AVE CLEARWATERFL 33765 -1635 CLEARWATER FL 33765 - 1635 BEACH, CRAIG S DOWNIN, ROBERT R EVANS, ARTHUR C BEACH, SHERYL L 12000 CREEKBEND DR 1744 RAGLAND AVE 1750 RAGLAND AVE RESTON VA 20194- CLEARWATER FL 33765 - 1635 CLEARWATER FL 33765 - SISK, CHARLOTTE S CARPENTER, RALPH A SORENSEN, DONNA L 1740 RAGLAND AVE CARPENTER, MARY A 1732 RAGLAND AVE CLEARWATERFL 33765 - 1635 1736 RAGLAND AVE CLEARWATER FL 33765 - CLEARWATER FL 33765 - 1635 CALABRESE, FRANK ANDERSON, ROBERT D DERZEKOS, CHRIS 1728 RAGLAND AVE ANDERSON, ROWENA 1720 RAGLAND AVE CLEARWATERFL 33765 - 1635 1724 RAGLAND AVE CLEARWATER FL 33765 - 1635 CLEARWATER FL 33765 - 1635 TRUSTEE CO TRE CURRENT OWNER ROSEN, MARK F 119-80-1716 TRUST 2224 LAGOON CIR S ROSEN, SUSAN M C/O WROBEL INDUSTRIES INC CLEARWATERFL 33765- 1711 RAGLAND AVE PO BOX 466 CLEARWATER FL 33765 - 1636 DUNEDIN FL 34697 - 0466 HOLDEN, FAITH E SCOTTI, VICTORIA SCHMIDT, DONNA L HOLDEN, BRETT 1721 RAGLAND AVE 1725 RAGLAND AVE 1717 RAGLAND AVE CLEARWATER FL 33765 - 1636 CLEARWATER FL 33765 - 1636 CLEARWATER FL 33765 - 1636 CORBIN, ROY L HARWOOD, JOHN JEST BRYANT, CHARLES E CORBIN, DENISE A 1733 RAGLAND AVE BRYANT,ARLAYNED 1729 RAGLAND AVE CLEARWATER FL 33765 - 1636 1735 RAGLAND AVE CLEARWATERFL 33765 - 1636 CLEARWATER FL 33765 - 1636 LUENGAS, EV ARISTO JR PUSKAS, CHRISTOPHER ESAMANN, BRADLEY F LUENGAS, LINDA Y 1745 RAGLAND AVE ESAMANN, STACEYH 1741 RAGLAND AVE CLEARWATER FL 33765 - 1636 1749 RAGLAND AVE CLEARWATER FL 33765 - 1636 CLEARWATERFL 33765 - 1636 SUITERS, TERENCE A JENSEN, ROBERT A EV ANS, ARTHUR C SUITERS, KELLI J JENSEN, MARTHA I 1759 RAGLAND CT 1751 RAGLAND AVE 1755 RAGLAND CT CLEARWATER FL 33765 - 1638 CLEARWATER FL 33765 - 1636 CLEARWATER FL 33765 - 1638 BARRETT, ALFRED CARR, GREGORY S AMEY, DANIEL C JR 1763 RAGLAND CT 1767 RAGLAND AVE AMEY, DIANE E CLEARWATER FL 33765 - 1638 CLEARWATER FL 33765 - 1617 1771 RAGLAND AVE CLEARWATER FL 33765 - 1617 e . RUBERTO, MICHAEL A ROSA, PEDRO A MURPHY, DOUGLAS R RUBERTO, LINDA L ROSA, JEANETTE MURPHY, KAREN J 2239 MANOR BLVD N 2243 MANOR BLVD N 2247 MANOR BLVD N CLEARWATER FL 33765 - 1615 CLEARWATERFL 33765 - 1615 CLEARWATER FL 33765 - 1615 JEFFORDS, GEORGE F CREEGAN, MICHAEL C MYERS, DAVID S STOKER, JACQUELINE D CREEGAN, JO ANN 1756 W LAGOON CIR 1764 W LAGOON CIR 1221 PENNY CT CLEARWATER FL 33765 - 1608 CLEARWATER FL 33765 - 1608 DUNEDIN FL 34698 - 8273 SIMPKINS, ROBERT F JR CHAMBERLAIN, DALE J FRANCE, NANCY D SIMPKINS, LUANA R CHAMBERLAIN, JODY 3930 N PINE GROVE AVE # 601 1748 W LAGOON CIR 1744 W LAGOON CIR CHICAGO IL 60613- CLEARWATERFL 33765 -1608 CLEARWATER FL 33765 - 1608 JOHNSON, LARRY D GOMEZ, JOSE R ANG, KIM KEE JOHNSON, JUDITH A BACHE, KAREN V 1728 W LAGOON CIR 3109 SIL VERBROOK 1732 W LAGOON CIR CLEARWATER FL 33765 - 1608 LAPORTE IN 46350- CLEARWATER FL 33765 - 1608 MARSCHALL, SHEILA MAST, DONALD T STEGER, WILLIAM B 1724 W LAGOON CIR MAST, BRENDA L STEGER, DONNA J CLEARWATER FL 33765 - 1608 1720 W LAGOON CIR 1716 LAGOON CIR W CLEARWATER FL 33765 - 1608 CLEARWATER FL 33765 - 1608 DAVIS, JEFFREY ALBURY, MAXINE F TRE ALBURY, MAXINE F TRE ZIMMERMAN, ROY 1716 VERDE DR 1716 VERDE DR 1710 WLAGOON CIR CLEARWATER FL 33765 - 1639 CLEARWATER FL 33765 - 1639 CLEARWATER FL 33765 - 1608 FLASS, ALMA M GRA Y, DANA ASHER, JESSE W 1721 E LAGOON CIR GRA Y, ANGEL 1729 E LAGOON CIR CLEARWATER FL 33765 - 1602 1725 E LAGOON CIR CLEARWATER FL 33765 - 1602 CLEARWATER FL 33765 - 1602 COMBS, LEFF J MANNION, KEVIN L CHALLENER, ROBERT B COMBS, LESLEY D 1737 E LAGOON CIR MORROW, NELSON W 3250 ALLEN AVE CLEARWATER FL 33765 - 1602 1741 ELAGOONCIR SAFETY HARBOR FL 34695 - CLEARWATERFL 33765 - 1602 4803 TROUVILLE, EDWARD J PINELLAS COUNTY COOPER, TIMOTHY L TROUVILLE, PAMELA A ATTN: ENGINEERING R/W 2241 S LAGOON CIR 2261 S LAGOON CIR 315 COURT ST CLEARWATER FL 33765 - 1607 CLEARWATER FL 33765 - 1642 CLEARWATER FL 33756 - 5165 ANTHONY, HELEN J BAUMGARTNER, DAVID GARABELI, SILVANA 2247 S LAGOON CIR BAUMGARTNER, GAY PO BOX 3254 CLEARWATER FL 33765 - 1607 2233 S LAGOON CIR CLEARWATERFL 33767 - 8254 CLEARWATER FL 33765 - 1607 e e CRAIG, BETSY P KOPP, STACY L .. SHAW, JOHNR 2225 S LAGOON CIR 2221 S LAGOON CIR SHAW, CATHIE A CLEARWATER FL 33765 - 1607 CLEARWATER FL 33765 - 1607 2217 S LAGOON CIR CLEARWATERFL 33765 -1607 WALKER, BRIAN R TUCKER, MARK L SMITH, JAMES W COMO, HELEN J TUCKER, LISA M SMITH, JANET C 2213 LAGOON CIR S 2201 S LAGOON CIR 1827 GLENVILLE DR CLEARWATERFL 33765- CLEARWATER FL 33765 - 1607 CLEARWATER FL 33765 - 1416 HUNT, JAMES V CONZAMAN, TOULA KATAMAY, THEODOREB HUNT, BARBARA M 1815 GLENVILLE DR KAT AMA Y, MARIAN L 1821 GLENVILLE DR CLEARWATER FL 33765 - 1416 1809 GLENVILLE DR CLEARWATER FL 33765 - 1416 CLEARWATER FL 33765 - 1416 ROBINSON, DWIGHT K MATTINGLY, RONALD E W ATERKEYN, JOSEPH H JR ROBINSON, JOAN H MATTINGLY, ELAINE W ATERKEYN, KAREN 1810 ELMHURST DR 1816 ELMHURST DR 1822 ELMHURST DR CLEARWATER FL 33765 - 1411 CLEARWATER FL 33765 - 1411 CLEARWATER FL 33765 - 1411 V ASSILAKOS, SPYRO SIMON, JANET S WILSON, GARRY W 469 CENTER AVE 2249 VANDERBILT DR WILSON, SUSAN L WESTWOOD NJ 07675- CLEARWATER FL 33765 - 1432 2216 ST CHARLES DR CLEARWATERFL 33764- REPETTI, GARY L DUPUY, RICHARD E CENTER, JAMES H TRE 2237 VANDERBILT DR DUPUY, CAROL J 2374 WIND GAP PL CLEARWATER FL 33765 - 1432 2231 V ANDERBIL T DR CLEARWATER FL 33765 - CLEARWATER FL 33765 - 1432 SALVATION ARMY SMITH, MARVIN NIEUWKOOP, DOROTHY W PO BOX 8070 SMITH, LOIS J TRE CLEARWATER FL 33758 - 8070 204 HILL VIEW ST 1600 N OLD COACHMAN RD # CPE GIRARDEAU MO 63703 - 521 6328 CLEARWATER FL 33765 - 1625 GUTSHALL, WILLIAM S RUSSELL, JAMES H Gerald A. Figurski, Esquire GUTSHALL, ALBERTA G RUSSELL, LEONA M 2435 US 19 - Suite 350 1600 N OLD COACHMAN RD # 1600 OLD COACHMAN RD LOT Holiday, FL 34691 522 524 CLEARWATER FL 33765 - 1650 CLEARWATER FL 33765 - 1650 11f~;I1T.z;f:D-2?:2:h-::~ '(." If." filjOF lli,<~ \~"_" L-"\~';_J ..,"t"a"<:'::>.. , . ~i) ....~.n::a:r.-Qr~r. ~.I~2",?, i~-(P'- --...--.........~".!" ,'~-,..~ I 'I '1>-:4~;4'o=.. ~()' _ ,'. \ j ,f)~J~:)rJl' \ ~ ~ '~~g' "F; e~'" ~i~t~~::~~'i'~'\~:~ "<', .:.:0~ iJ"?I?'C'I \(\c,,:," ~/<:?~':::01_g2l~~'~~fJJ .~ CITY OF CLEARWATER PLANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 LONG RANGE PLANNING DEVELOPMENT REvIEW December 18, 2003 Mr. Gerald A. Figurski, Esquire 2435 U.S. Highway 19, Suite 350 Holiday, FL 34691 RE: Development Order - Case FLD2003-09047 - 1750 North Belcher Road Dear Mr. Figurski: This letter constitutes a Development Order pursuant to Section 4-206.D.6 of the Community Development Code. On December 16, 2003, the Community Development Board reviewed your Flexible Development application to permit retail sales (financial services) with deviations to allow direct access to a major arterial street (North Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2- 1304.C. The Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive lnfill Redevelopment Project per Section 2-1304.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with and will not be detrimental to development/redevelopment efforts of the surrounding area. Conditions of Approval: 1. That the final design and color of the buildings be consistent with the conceptual elevations submitted to, or as modified by, the CDB; 2. That use of the building on the subject property be limited to a credit union with hours of operation ending at 5 :00 pm daily. The applicant shall record a covenant in the public records restricting the use of this building on the subject property, as contained in this condition, prior to the issuance of a Certificate of Occupancy for the credit union. Any future change of use ofthis building to a bank shall require the following: BRIAN j. AUNGST, MAYOR-CO/Il~l1SSI0NER HoYT HAMILTON, VICE ~WO]{-CmlMISSIONER WHITNEY GI{'W, COM,llISSIOi'<ER F]{;\NK I-lIIJBARD, COMMISSIONER @ BILLJOi'<Sm:, COMWSSIOi\EI\ .A.. "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION E"lPLOYER" December 18, 2003 Figurski - Page Two a. Constmction plans be submitted and approved showing the installation of a left turn lane of adequate storage length, according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Road. Constmction of this improvement must be completed prior to the issuance of an Occupational License for the bank; b. Establishment of an escrow account with the City, prior to the issuance of an Occupational License for the bank, for the future constmction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if warranted by a Traffic Signal Warrant Study. The funds in the escrow account will be a shared portion of the full cost of a traffic signal light. The City's shared portion shall not exceed 50 percent of the full cost. If, in the event that a traffic signal light is not warranted based on the Study, funds will be refunded to the applicant. 3. That revised landscape plans be submitted and approved prior to the issuance of building permits for the proposed credit union reflecting Code foundation plantings; 4. That outdoor lighting fixtures be integrated into the landscape site design to avoid shielding of the lighting by tree canopy; and 5. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity. Freestanding signage shall be limited to monument-style, not to exceed six feet in height. Submission of a Comprehensive Sign Program is required for more than one freestanding sign on either street frontage. Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (December 16, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building pernlit. Time frames do not change with successive owners. The Community Development Coordinator may grant an extension of time for a period not to exceed one year and only within the original period of validity. The Community Development Board may approve one additional extension of time after the community development coordinator's extension to initiate a building permit application. The issuance of this Development Order does not relieve you of the necessity to obtain any building pennits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy ofthis letter with you when applying for any pelTI1its or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4-502.B by the applicant or by any person granted party status within 14 days of the date of this Development Order. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on January 1, 2004 (14 days from the date of this Development Order). December 18, 2003 Figurski - Page Three If you have any questions, please do not hesitate to call Wayne M. Wells, Senior Planner, at 727- 562-4504. You can access zoning infonnation for parcels within the City through our website: www.myclearwater.com/gov/depts/planning. *Make Us Your Favorite! ~ Cynthia H. Tarapani, AICP Plmming Director \\MS5cIPDS\Planning DepartmentlC D BIFLEX1?ending cases\Up for the next CDBIBelcher N 1750 GTE Federal Credit Union (JRT) (CIR?- retail sales)IBelcher N 1750 Development Order. doc - ~./ KARLEEN F. DE Bl.AKER, CLERK OF COURT ~ ~~~~~_~~~,_~~~~~~__~~7~_~~~=~~~8 6C314727 08-11-2003 10:53:35 PAD 51 DED-BELCAL PROFfRTIES LLC 028934 1":03334750 BK:12973 SPG:0269 EPG:02'll RECORDING 003 PAGES 1 $15.00 DOC STAMP - DR219 3 $3~315.90 03-334750 RUG- 11-2003 10: 54AM PINELLRS CO 8K 12973 PG 269 11111111111111111111111111111111111111111111111111 J PREPARED BY AND RETURN TO: J. Paul Raymond, Esquire Macfarlane Ferguson & McMullen 625 Court Street, Suite 200 Post Office Box 1669 (33757) Clearwater, Florida 33756 TOT At: CHECK AMI.TENDERED: CHANGE : BV (?ad!.-- DEPUTY ClH1< $3,330.90 $3,330.90 $.00 .3 i f~I~';il~ ._"_,.,";';"","~ f\Gi:.(~1' '# "u."..,,,,:.,:,,,,,:,,,;;,~,,,,,_~,''';'',J:J3 :':j.IG AMT ,,,,,,.,~,,.,,,",,",',_i,j :I( AMT _.,,,,___,, ~E(r-""-"-'-'7s' ~Ci<':) )80R2193.=r:zr.::,'.9o )5 Nl :EES --'-'"'--''''''''''''''''' A~rF ~,,,,,,,,,",...,.-_.....,,..,...,,,,.~. 'ie ~grAI m:i~ . . ~ ;;j WARRANTY DEED THIS INDENTURE made this 8th day of August, 2003, by and between DEM PARTNERSHIP, a Florida General Partnership, Party of the First Part, whose mailing address is c/o Mark S. Klein, 2040 N.E. Coachman Rd, Clearwater, Florida, and BELCAL PROPERTIES, LLC, a Florida limited liability company, Party of the Second Part, whose mailing address is c/o Mark S. Klein, 2040 N.E. Coachman Rd, Clearwater, Florida. WIT N E SSE T H: That the said Party of the First Part, for and in consider- ation of the sum of Ten Dollars ($10.00) to it in hand paid by the said Party of the Second Part, the receipt whereof is hereby acknowledged, has granted, bargained and sold to the said Party of the Second Part, his heirs and assigns forever, the following described land, situate lying and being in the County of Pinellas, State of Florida, to-wit: See Exhibit "A" attached hereto and made a part hereof by reference. Subject to 2003 real estate taxes, restrictions, reserva- tions and easements of record. Parcel I.D. No. 01/29/15/16488/000/0120 And the said Party of the First Part does hereby fully warrant the title to said land, and will defend the same against the lawful claims of all persons whomsoever. It . PINELLRS COUNTY FLR. OFF .REC.BK 12873 PG 270 IN WITNESS WHEREOF, the said Party of the First Part has hereunto set his hand and seal the day and year first above writ- ten. By: . / 'J() STATE OF FLORIDA COUNTY OF PINELLAS I HEREBY CERTIFY, that on this day personally appeared before me, an officer duly authorized to administer oaths and take acknowledgments, Mark S. Klein, Yvonne Gubner, and Julia Klein to me personally known or who has produced as identification and who did take an oath, and known to me to be the individual (s) described in and who executed the foregoing instrument and each acknowledged before me that (s)he executed the same for the purposes therein expressed and that they constitute all of the general partners of DEM PARTNERSHIP. WITNESS my hand and ofljcial seal at /2~dM..~ . f}!LyJ/cI~, said County and State, this ,~ day of May, 2003. I 0il;~1~~~L/ My commissio~~pires: ",-:;.nu-', Carol Duncan f'f';&~'S MY COMMISSION # CC894575 EXPIRES ~::~.kE January 10, 2004 ~-:1,i"" "$'" BONDED THRU TROY FAIN INSURANC~ INC. ',,9fl1\\'\ H:\DATA\ATY\JPR\BELCAL\WARRANTY DEED.WPD . ,- Exhibit A PINELLRS COUNTY FLR. OFF.REC.8K 12973 PG 271 A part of Lot 12, CLEARWATER INDUSTRIAL PARK, according to the plat thereof, recorded in Plat Book 44, Page 46, Public Records of Pinellas County, Florida, more particularly described as follows: Commence at the Northwest corner of said Lot 12i thence South 89 degrees 21'49" East (plat bearing and basis of bearings for this description), along the North boundary of said Lot 12, 208.00 feet for a POINT OF BEGINNINGi thence" South 89 degrees 21'4911 East, continuing along the North boundary of said Lot 12, 377.16 feet; thence South 00 degrees 02'4811 West, along the West righb-of-way line of Belcher Road, 55.00 feet Westerly of and parallel to the East boundary of the Southeast one-quarter (1/4) of Section I, Township 29 South, Range 15 East, Pinellas County, Florida, being the West boundary of public right-of-way conveyed to Pinellas County by Quit-Claim Deed recorded November 17, 1976 in O.R. Book 4478, Page 2113, Public Records of pinellas County, Florida, 379.98 feet; thence North ,89 degrees 21'4911 West, along the South boundary of said Lot 12, 376.66 feet to a point lying South 89 degrees 21'49" East of and 200.00 feet from the Southwest corner of said Lot 12; thence North 00 degrees 01'4211 West, 379.98 feet to the POINT OF BEGINNING. TOGETHER WITH an easement for drainage purposes, as created in an instrument recorded February 23, 1993, in Official Records Book 8188, page 825/ described as follows: A part of Lot 12, CLEARWATER INDUSTRIAL PARK, according to the plat thereof recorded in Plat Book 44, page 46, of the Public Records of pinellas County, Florida, more particularly described as follows: Begin at the Southwest corner of said Lot 12; thence North 00 deg. 05'30" West (plat bearing and basis of bearings for this description) along the West boundary of said Lot 12, 10.00 feet; thence South 89 deg. 21'4911 East, 200.01 ~ feet; thence South 00 deg. 01'4211 East, 10.00 feet; thence North 89 deg. 21'49" West, along the South boundary of said Lot 12, 200.00 feet to the POINT OF BEGINNING. It - MACFARLANE FERGUSON & McMuLLEN ATTORNEYS AND COUNSELORS AT LAW 400 NORTH TAMPA STREET, SUITE 2300 625 COURT STREET 1501 SOUTH FLORIDA AVENUE P.O. aox 1531 (ZIP 33601) P. O. BOX )669 (ZIP 33757> LAKELAND, FLORIDA 33803 (863) 680-9908 FAX (863) 683-2849 TAMPA, FLORIDA 33602 CLEARWATER, FLORIDA 33756 (?2?) 441-8966 FAX (727) 442-8470 (813) 273-4200 FAX(BI3) 273-4396 www.mfmlegal.com EMAIL info@mfmlegal.com IN REPLY REFER TO: Clearwater September 23, 2003 CITY OF CLEARWATER STATE OF FLORIDA CERTIFCATE OF TITLE The undersigned, J. Paul Raymond, a licensed attorney at law, does hereby certify that as ofthe date of this certificate that fee simple title to the property described in O.R. Book 12973, Page 269, Public Records of Pine lIas County, Florida, which legal description is attached hereto as Exhibit "A" and made a part hereof by reference, is presently vested in BELCAL PROPERTIES, LLC., a Florida limited liability company. Executed this 23rd day of September, 2003. Macfarlane Ferguson & McMullen // // ~ By: J.