Loading...
FLD2003-09047A o '.' Cl Planning Department (I .. 100 South Myrtle Avenue " earnrater Clearwater, Florida 33756 =.~ Telephone: 727-562-4567 l,l~. Fax: 727-562-4865 () o SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION CASE #: ____________ DATE RECEIVED: ____________ RECEIVED BY (staff initials): ______ ATLAS PAGE #: ____________ ZONING DISTRICT: ___________ LAND USE CLASSIFICATION: ______ SURROUNDING USES OF ADJACENT PROPERTIES: NORTH: _______________________ SOUTH: ______________________ VVEST:________________________ EAST: ________________________ o SUBMIT 14 COPIES OF THE ORIGINAL APPLICATION including 1) collated, 2) stapled and 3) folded sets of site plans o SUBMIT APPLICATION FEE L________ * NOTE 15 TOTAL SETS OF INFORMATION REQUIRED (APPLICATIONS PLUS SITE PLAN SETS) 0 RIG I N A I FLEXIBLE DEVELOPMENT APPLICATION Comprehensive Inflll Project (Revised 12/30/2004) - PLEASE TYPE OR PRINT - A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Code Section 4-202.A) APPLICANT NAME: ____g T .f:__K~_Q~ r-<iL__c.L~QLLJJ.!li._QIL_______________________________________________________ MAILING ADDRESS: __L!J__~~__p a_!~_ M a_ b ~Y__!f i ..9.b..~~Y_~__~_~ill2~L_!.:.~__)_~_~Q_~____________________________ PHONE NUMBER, ________________ FAX NUMBER, _________~------- ~~ER~OVVNER~: _~_~~~_~e~j~_~~_______________~~ (Must include ALL owners as listed on the deed - provide original signature(s) on page 6) ------------------------------------------------------------------------------------------~~~-1--1~------- AGENT NAME: --g-~f"-<il~~Lb_~__fj~~!LJ;:.9 k-i--~13-9-l!i--~-~--------------------------_FiAI\jj\J'NG DEPARTMENT- MAILING ADDRESS: --2.5..lQ-P..e.rrn.iL-.E.la~~_--Ho.li.da.ll-l--..E.L-3.4.6.5.5------____.cJJV 01;.1'" ~^'''A 'A~.e___ "-~~,,,-'K PHON E N UMBER: ---(~22j__.9.42-=-O_ll3______________ FAX NUMBER: ---L7...2.1.J__.9..4-4=:..3.1.ll___________________ CELL NUMBER: ----________________________________ E-MAIL ADDRESS: -----fLgHJ)L~._'d....._D_.e.t..___________________ B. PROPOSED DEVELOPMENT INFORMATION: (Code Section 4-202.A) STREET ADDRESS of subject site:-----.LZ_~g__.N.Q_J;:.!JJ_~_~)_~_l:!S?_~__R<.2~ d ______________________________________________ LEGAL DESCRIPTION: S-~~--_-l.S!_9A1.__.sW_G..LQ.fi~_q_______________________________________________________________ (if not listed here, please note the location of this document in the submittal) PARCEL NUMB ER: 0 1 / 2.9J-1..5.jJ).6.2.1.4LO.'O''O'LO-.OlO_____________________________________________________________ PARCEL SIZE: -3.~2B..B--.a-CJ:.~_.s__QJ;:__L43_L2LQ__S..E.____________________________________________________ (acres, square feet) PROPOSED USE(S) AND SIZE(S): _-12i sg i bu t i on -.fa c i li..~ 0 f f i CL...&L~~d.i tun ~___ (number of dwelling units, hotel rooms or square footage of nonresidential use) ---------------------------------------------------------------------------------------------------------------------- DESCRIPTION OF REQUEST(S): ----------~~-~__9J~.!_9s: h_~Q~________________________________________________________ Attach sheets and be specific when identifying the request (include all requested code deviations; e.g. reduction in required number of parking spaces, specific use, etc.) ---------------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------------- Page 1 of 7 - Flexible Development Comprehensive Infill Application 2005- City of Clearwater o o DOES THIS APPLICATION INVOLVE THE TRANSFER OF DEVELOPMENT RIGHTS (TOR), A PREVIOUSLY APPROVED PLANNED UNIT DEVELOPMENT, OR A PREVIOUSLY APPROVED (CERTIFIED) SITE PLAN? YES ____ NO ___ (if yes, attach a copy of the applicable documents) (lnl~If\I^1 I ,I \ I I .. I I 'i i \. , -- .. ;:. C. PROOF OF OWNERSHIP: (Code Section 4-202.A.5) 0 SUBMIT A COpy OF THE TITLE INSURANCE POLICY, DEED TO THE PROPERTY OR SIGN AFFIDAVIT ATTESTING OVVNERSHIP (see page 6) D. WRITTEN SUBMITTAL REQUIREMENTS: (Code Section 3-913.A) SEE ATTACHED EXHIBIT o Provide complete responses to the six (6) GENERAL APPLICABILITY CRITERIA - Explain how each criteria is achieved, in detail: 1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is located. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. --------------------------------------------------------------------------------~Ji~[~~Ii[-~~--------- ----------------------------------------------------------------------------~Q ~_lbl_V_~]------ 4. The proposed development is designed to minimize traffic congestion. MAR 3 1 2005 --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------~~~~~~-------- ----------------------------------------------------------------------------------~L1)(C)f_~~~~~llE~_________ 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- o Provide complete responses to the ten (10) COMPREHENSIVE INFILL REDEVELOPMENT PROJECT CRITERIA (as applicable) _ Explain how each criteria is achieved in detail: , . The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- Page 2 of 7 - Flexible Development Comprehensive Infill Application 2005- City of Clearwater o Q 2. The development of the parcel proposed for development as a comprehensive infill redevelopment project or residential infill project will not reduce the fair market value of abutting properties. (Include the existing value of the site and the proposed value of the site with the ---~:~~-::".~-------_--------------------------------------------------------------~~~--- --------------------------------------------------------------------------------------------------------------------- 3. The uses within the comprehensive infill redevelopment project are otherwise permitted in the City of Clearwater. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- 4. The uses or mix of use within the comprehensive infill redevelopment project are compatible with adjacent land uses. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- 5. Suitable sites for development or redevelopment of the uses or mix of uses within the comprehensive infill redevelopment project are not otherwise available in the City of Clearwater. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- 6. The development of the parcel proposed for development as a comprehensive infill redevelopment project will upgrade the immediate vicinity of the parcel proposed for development. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- 7. The design of the proposed comprehensive infill redevelopment project creates a form and function that enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- 8. Flexibility in regard to lot width, required setbacks, height and off-street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- 9. Adequate off-street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on-street parking in the immediate vicinity of parcel proposed for development. --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------- 10. The design of all buildings complies with the Tourist District or Downtown District design guidelines in Division 5 of Article 3 (as applicable). Use separate sheets as necessary. --------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------- - - ~~1t:JI. Jljf~.. ..~ -- -- ------ I~~~D ", ~~- --------------------------------------------------------------------------------------------~~1--1~-------- PtANNI~r: ')I=DAOTI\11ENT en'\l V. ::'Lc~"'VvATt:Q Page 3 of 7 - Flexible Development Comprehensive Infill Application 2005- City of Clearwater (l n '-I E. STORMWATER PLAN SUBMITTAL REQUIREMENTS: (City of Clearwater Storm Drainage Design Criteria Manual and 4-202.A.21) A STORMWATER NARRATIVE MUST BE SUBMITTED WITH ALL APPLICATIONS. All applications that involve addition or modification of impervious surface, including buildings, must include a stormwater plan that demonstrates compliance with the City of Clearwater Storm Drainage Design Criteria manual. A reduction in impervious surface area does not qualify as an exemption tc this requirement. If a plan is not required, the narrative shall provide an explanation as to why the site is exempt. ORIGINAL o At a minimum, the STORMVVATER PLAN shall include the following: -- Existing topography extending 50 feet beyond all property lines; --- Proposed grading including finished floor elevations of all structures; ___ All adjacent streets and municipal storm systems; --- Proposed stormwater detention/retention area including top of bank, toe of slope and outlet control structure; --- A narrative describing the proposed stormwater control plan including all calculations and data necessary to demonstrate compliance with the City manual. --- Signature and seal of Florida Registered Professional Engineer on all plans and calculations. o COPY OF PERMIT INQUIRY LETTER OR SOUTHVVEST FLORIDA VVATER MANAGEMENT DISTRICT (SVVFVVMD) PERMIT SUBMITTAL (SVVFVVMD approval is required prior to issuance of City Building Permit), if applicable o Acknowledgement of stormwater plan requirements (Applicant must initial one of the following): -_______ Stormwater plan as noted above is included -------- Stormwater plan is not required and explanation narrative is attached. At a minimum, a grading plan and finished floor elevations shall be provided. CAUTION -IF APPLICATION REVIEW RESULTS IN THE REQUIREMENT FOR A STORMWATER PLAN AND NONE HAS BEEN SUBMITTED, APPLICATION MUST BE RESUBMITTED AND SIGNIFICANT DELAY MAY OCCUR. If you have questions regarding these requirements, contact the City Public VVorks Administration Engineering Department at (727) 562-4750. F. SUPPLEMENTAL SUBMITTAL REQUIREMENTS: (Code Section 4-202.A) o SIGNED AND SEALED SURVEY (including legal description of property) - One original and 14 copies; o TREE SURVEY (including existing trees on site and within 25' of the adjacent site, by species, size (DBH 4" or greater), and location, including drip lines and indicating trees to be removed) - please design around the existing trees; o LOCATION MAP OF THE PROPERTY; o PARKING DEMAND STUDY in conjunction with a request to make deviations to the parking standards (ie. Reduce number of spaces). Prior to the submittal of this application. the methodology of such study shall be approved by the Community Development Coordinator and shall be in accordance with accepted traffic engineering principles. The findings of the study will be used in determining whether or not deviations to the parking standards are approved; o GRADING PLAN, as applicable; o PRELIMINARY PLAT, as required (Note: Building permits will not be issued until evidence of recording a final plat is provided); o COPY OF RECORDED PLAT, as applicable; G. SITE PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A) o SITE PLAN with the following information (not to exceed 24" x 36"): All dimensions; North arrow; Engineering bar scale (minimum scale one inch equals 50 feet), and date prepared; Location map; Index sheet referencing individual sheets included in package; Footprint and size of all EXISTING buildings and structures; Footprint and size of all PROPOSED buildings and structures; All required setbacks; All existing and proposed points of access; All required sight triangles; Identification of environmentally unique areas, such as watercourses, wetlands, tree masses, and specimen trees, including description and location of understory, ground cover vegetation and wildlife habitats, etc; Location of all public and private easements; Location of all street rights-of-way within and adjacent to the site; RECEIVED MAR 3 1 2005 PLANNING DEPARTMENT CITY OF CLEARWATER Page 4 of 7 - Flexible Development Comprehensive Infill Application 2005- City of Clearwater ,...,. U Location of existing public and private utilities, including fire hydrants, storm and sanitary sewer lines, manholes and lift stations, gas and water lines; All parking spaces, driveways, loading areas and vehicular use areas; Depiction by shading or crosshatching of all required parking lot interior landscaped areas; Location of all solid waste containers, recycling or trash handling areas and outside mechanical equipment and all required screening {per Section 3-201 (D)(i) and Index #701}; Location of all landscape material; Location of all onsite and offsite storm-water management facilities; Location of all outdoor lighting fixtures; and Location of all existing and proposed sidewalks. ORIGINAL o SITE DATA TABLE for existing, required, and proposed development, in written/tabular form: Land area in square feet and acres; Number of EXISTING dwelling units; Number of PROPOSED dwelling units; Gross floor area devoted to each use; Parking spaces: total number, presented in tabular form with the number of required spaces; Total paved area, including all paved parking spaces and driveways, expressed in square feet and percentage of the paved vehicular area; Size and species of all landscape material; Official records book and page numbers of all existing utility easement; Building and structure heights; Impermeable surface ratio (I.S.R.); and Floor area ratio (F.A.R.) for all nonresidential uses. o REDUCED SITE PLAN to scale (8 y, X 11) and color rendering if possible; o FOR DEVELOPMENTS OVER ONE ACRE, provide the following additional information on site plan: One-foot contours or spot elevations on site; Offsite elevations if required to evaluate the proposed stormwater management for the parcel; All open space areas; Location of all earth or water retaining walls and earth berms; Lot lines and building lines (dimensioned); Streets and drives (dimensioned); Building and structural setbacks (dimensioned); Structural overhangs; Tree Inventory; prepared by a .certified arborist", of all trees 8" DBH or greater, reflecting size, canopy (drip lines) and condition of such trees. H. LANDSCAPING PLAN SUBMITTAL REQUIREMENTS: (Section 4-1102.A) o LANDSCAPE PLAN: All existing and proposed structures; Names of abutting streets; Drainage and retention areas including swales, side slopes and bottom elevations; Delineation and dimensions of all required perimeter landscape buffers; Sight visibility triangles; Delineation and dimensions of all parking areas including landscaping islands and curbing; Proposed and required parking spaces; Existing trees on-site and immediately adjacent to the site, by species, size and locations, including driplines (as indicated on required tree survey); Plant schedule with a key (symbol or label) indicating the size, description, specifications and quantities of all existing and proposed landscape materials. including botanical and common names; Location, size, and quantities of all existing and proposed landscape materials, indicated by a key relating to the plant schedule; Typical planting details for trees, palms, shrubs and ground cover plants including instructions, soil mixes, backfilling, mulching and protective measures; Interior landscaping areas hatched and/or shaded and labeled and interior landscape coverage, expressing in both square feet and percentage covered; Conditions of a previous development approval (e.g. conditions imposed by the Community Development Board); Irrigation notes. o REDUCED LANDSCAPE PLAN to scale (8 y, X 11) (color rendering if possible); o IRRIGATION PLAN (required for level two and three approval); o COMPREHENSIVE LANDSCAPE PROGRAM application, as applicable. Landscape associated with the Comprehensive Landscape Program shall exceed minimum Code requirements to offset the areas where minimum Code will not be met. RECEIVED MAR 3 1 2005 PlANNING DEPARTMENT Page 5 of 7 - Flexible Development Comprehensive Infill Application 2005- City ~m~rQfteCLEARWATER I. o 0 BUILDING ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A.23) Required in the event the application includes a development where design standards are in issue (e.g. Tourist and Downtown Districts) or as part of a Comprehensive Infill Redevelopment Project or a Residentiallnfill Project. o BUILDING ELEVATION DRAVVINGS - all sides of all buildings including height dimensions, colors and materials; ORIGINAL o REDUCED BUILDING ELEVATIONS - four sides of building with colors and materials to scale (8 Y:z X 11) (black and white and color rendering, if possible) as required. J. SIGNAGE: (Division 19. SIGNS I Section 3-1806) o All EXISTING freestanding and attached signs; Provide photographs and dimensions (area, height, etc.), indicate whether they will be removed or to remain. o All PROPOSED freestanding and attached signs; Provide details including location, size, height, colors, materials and drawing; freestanding signs shall include the street address (numerals) o Comprehensive Sign Program application, as applicable (separate application and fee required). RECEIVEr o Reduced signage proposal (8 Y:z X 11) (color), if submitting Comprehensive Sign Program application. K. TRAFFIC IMPACT STUDY: (Section 4-202.A.13 and 4-801.C) o Include if required by the Traffic Operations Manager or his/her designee or if the proposed development: · VVill degrade the acceptable level of service for any roadway as adopted in the Comprehensive Plan. · VVill generate 100 or more new vehicle directional trips per hour and/or 1000 or more new vehicle trips per day. · VVill affect a nearby roadway segment and/or intersection with five (5) reportable accidents within the prior twelve (12) month period or that is on the City's annual list of most hazardous intersections. 05 PLANNING DEPARTME~ T CllV OF CLEARWATER Trip generation shall be based on the most recent edition of the Institute of Transportation Engineer's (ITE) Trip General Manual. The Traffic Impact Study must be prepared in accordance with a .Scoping Meeting" held with the Traffic Operations Manager and the Planning Department's Development Review Manager or their designee (727-562-4750) Refer to Section 4-801 C of the Community Development Code for exceptions to this requirement. o Acknowledgement of traffic impact study requirements (Applicant must initial one of the following): -------- Traffic Impact Study is included. The study must include a summary table of pre- and post-development levels of service for all roadway legs and each turning movement at all intersections identified in the Scoping Meeting. ________ Traffic Impact Study is not required. CAUTION -IF APPLICATION REVIEW RESULTS IN THE REQUIREMENT FOR A TRAFFIC IMPACT STUDY AND NONE HAS BEEN SUBMITTED, APPLICATION MUST BE RESUBMITTED AND SIGNIFICANT DELAY MAY OCCUR. If you have questions regarding these requirements, contact the City Public VVorks Administration Engineering Department at (727) 562-4750. L. SIGNATURE: I, the undersigned, acknowledge that all representations made in this application are true and accurate to the best of my knowledge and authorize City representatives to visit and photograph the property dC~C~b1f~~~ClfPI~~lfpB1T UNION y L~. ~-L--~________________ Si ~ at of r ert owner or repres ntative ~tep e~'o~ter, Vice ~resident, Real Estate STATE OF FLORIDA, COUN~ OF PINELLAS Sworn ~ and subscribed beforOS me this ]..!:.<L_ day of __tIi!.-If___________, A.D. 20____ to me and/or by -Stg.Qb_~J;L.E.Q.t'Lt~.!'_______, who is personally known has produced as identification. . FREeDMAN .,.,~~ Dff\.(I EXPIRES: May './2006 l-8OO3-NOTARY Fl NotIIy SIrwtot & 1JorlcIn{j, 1M Page 6 of 7 - Flexible Development Comprehensive Infill Application 2005- City of Clearwater o o AFFIDAVIT TO AUTHORIZE AGENT: ~lfjL GTE FEDERAL CREDIT UNION \~ I \ (Names of all property owners on deed - please PRINT full names) 1. That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location): 1750 North Belcher Road 2. That this property constitutes the property for which a request for a: (describe request) Modification to existing Flexible Development Application approved by Communitv Development Board on December 16, 2003, Case FLD2003-09047. 3. That the undersigned (has/R~fjQ appointed and (does/cw) appoint: Gerald A. Figurski, Esquire. - as (ljI;i~their) agent(s) to execute any petitions or other documents necessary to affect such petition; 4. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 5. That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City representatives to visit and photograph the property described in this application; 6. That (1/we), the undersigned authority, hereby certify that the foregoing is true and correct. GTE ~CREDIT.u -/ ,c.I A proPeirty wner Stephen Foster Vice President, Real Estate Property Owner Property Owner Property Owner STATE OF FLORIDA, COUNTY OF PINELLAS Before me the undersigned, an officer duly commissioned by the laws of the State of Florida, on this 3rd day of Mrlrcn 200') personally appeared Stephen Foster who having been first duly sworn Deposes and suys that he/she fully understands the contents of the affidavit that ne/she signed. ~~ ~ 7??~~ ~~y 1'11~ MICHAEL J. FREEDMAN My Com n~i~'S~oMMISSION 1/ DO 117723 otary Public "'1' Of l\.~" EXPIRES: May 14, 2006 ~ -. 8. Bondina. Inc. RECEIVED S:IPlanning DepartmentlApplication Formsldevelopment reviewlnexible development comprehensive infill application ZOOS. doc MAR 3 1 2005 PLANNING DEPARTMENT cnv OF CLEARWATER Page 7 of 7 - Flexible Development Comprehensive Infi" Application 2005- City of Clearwater o o ORIGINAL B. Description of Request Site Location. The 3.288-acre site is located at the southwest comer of North Belcher Road and Calumet Street. North Belcher Road is a four-lane divided roadway. The east side of North Belcher Road is residentially developed with single-family detached dwellings. The west side of North Belcher Road is developed industrially. Prior Community Development Board Approval. On December 16, 2003, the Community Development Board (CDB) reviewed a Flexible Development application to permit retail sales (financial services) with deviations to allow direct access to a major arterial street (North Belcher Road), to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C. The CDB approved the application. The CDB's bases for approval included: 1. The proposal complies with the Flexible Development criteria as a Comprehensive rnfill Redevelopment Project per Section 2-1304.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with and will not be detrimental to development/redevelopment efforts of the surrounding area. Condition of Approval to be Considered bv CDB. One of the conditions of approval required: That use of the building on the subject property be limited to a credit union with hours of operation ending at 5:00 pm daily. The applicant shall record a covenant in the public records restricting the use of the building on the subject property, as contained in this condition, prior to the issuance of a Certificate of Occupancy for the credit union. Any future change of use of this building to a bank shall require the following: a. Construction plans be submitted and approved showing the installation of a left turn lane of adequate storage length, according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Road. R~e~~VIEI5S 1 MAR 3 1 2005 PLANNING OEPARTMENT ('ITV 0'" ~i ~ 0 PIIII A fCD o ~RIGINAL improvement must be completed pnor to the issuance of an Occupational License for the bank; b. Establishment of an escrow account with the City, prior to the issuance of an Occupational License for the bank, for the future construction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if warranted by a Traffic Signal Warrant Study. The funds in the escrow account will be a shared portion of the full cost of a traffic signal light. The City's shared portion shall not exceed 50 percent of the full cost. If, in the event that a traffic signal light is not warranted based on the Study, funds will be refunded to the applicant. This condition as written was predicated on a traffic study prepared by Florida Design Consultants, Inc., dated November 20, 2003, and review thereof by staff and the CDB. The Reauest. GTE Federal Credit Union requests that the condition requiring closing by 5:00 p.m., each day be modified to allow closing on Fridays to be extended to 6:00 p.m. This will allow banking services to be available to customers after working hours on Fridays. This extended hour service is customary in the banking business. Traffic Study. The 2003 Traffic Study has been updated by the traffic engineer. The conclusion of this updated study states: Based on the above review, it has been demonstrated that Belcher Road and Calumet Street will operate at acceptable levels of service and the Belcher Road at Calumet Street intersection will operate at an acceptable level of service if the GTE Federal Credit Union is allowed to stay open until 6:00 PM on Fridays. Because acceptable operation can be maintained on the adjacent roadways, the GTE Federal Credit Union should be allowed to remain open on Fridays. RECEIVED MAR 3 1 2005 Response To Sections D. General Applicability Criteria and Comprehensive Infill Redevelopment Proiect Criteria PLANNING DEPARTMENT CITY OF CLEARWATER Responses to Sections D. General Applicability Criteria and Comprehensive Infill Redevelopment Project Criteria were included in the prior application and in light of the limited nature of this request seem not to be applicable. However, the 2 - o ~R\G\NAL Applicant will repeat herein the pertinent portions provided in the prior application to General Applicability Criteria 4 and 6 as follows: 4. The proposed development is designed to minimize traffic congestion. The site is designed for ease of traffic flow in and out of the property. Access will be to Calumet Street and Belcher Road (right in/out only). The number of curb cuts will be reduced by one. Certain cross access features exist which will also improve traffic flow. Vehicle trip generation will not have any significant impact on affected intersections and roadways. The Level of Service category will remain as is. 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts on adjacent properties. Twenty- four hour operation will not exist. The addition of one hour to closing on Fridays will not impact adjacent properties as supported by the FDC traffic study. As to Paragraphs E, F, and H of the application, these materials were previously considered by the CDB. As to Paragraph G regarding Site Plan Submittal Requirements, the primary sheet of the prior application, as directed by staff, is included with this application. The information set forth on such site plan remains the same as when originally approved by the CDB. RECEIVED MAR 3 1 2005 PLANNING DEPARTMENT CI1Y OF CLEARWATER 3 I o o .., . OR\G\NAL ,., . ~ 3 TRAFFIC STUDY II . FOR PROPERTY LOCATED IN THE SOUTHWEST QUADRANT OF BELCHER ROAD AND CALUMET STREET 'IN THE CITY OF CLEARWATER r'1 . ,., ... fl . SUBMITTED TO: CITY OF CLEARWATER fl . PREPARED FOR: GTE FEDERAL CREDIT UNION ~ RECEIVED ~ PREPARED BY: MAR 3 1 2005 PLANNING DEPARTMENT CITV OF CLEARWATER .. n ROY CHAPMAN, P.E. FL. PE NO. 34438 all ..., . FLORIDA DESIGN CONSULTANTS, INC. 3030 STARKEY BOULEVARD NEW PORT RICHEY, FL 34655 Phone: (727) 849-7588 Fax: (727) 848-3648 fl . ,.., . February 15, 2005 ,.., . .., IIIlI .. . I I I I I I I I I I I I I I I I I I I o o T ABLE OF CONTENTS 1.0 INTRODUCTION. ....... ........ ..... .... ......... ................ ...... .... ........... ....... .... ..... ....... .... ....... 1 2.0 EXISTING ROADWAY NETWORK ........................................................................ 1 3.0 PROJECT TRAFFIC. ............ ..... ...... ....... ...... ...... ............ ................. ........... ....... ......... 1 3.1 TRIP GENERATION .............. ... .......... .......... ................ ...... ............................... ........ 1 FIGURE 1. PROJECT LOCATION MAP ................................................................ 2 3.2 INTERNAL AND PASS-BY CAPTURE .................................................................... 3 4.0 TRIP DISTRIBUTION..... ............ ........... .......... ....... ..... .... .......... .... .................. ........ ...3 5.0 EXISTING TRAFFIC .... ...... .......... ... ... ........... ................ ........... ........ ........ ..................3 TABLE 1. PROJECT TRIP GENERATION ............................................................4 TABLE 2. INTERNAL CAPTURE AND PASS-BY TRAFFIC ..............................4 FIGURE 2. PROJECT TRIP DISTRIBUTION .......................................................5 TABLE 3. BELCHER ROAD AT CALUMET STREET INTERSECTION VOLUMES .....................................................................................6 7.0 TRAFFIC ANALYSIS ........ ......... ...... ......... ...... ........ .......... ..... ...... ...... ......... ....... ......... 7 7.1 BELCHER ROAD AT CALUMET STREET INTERSECTION ..................... 7 TABLE 4. BELCHER ROAD AT CALUMET STREET UNSIGNALIZED INTERSECTION OPERATION ............................................................ 7 8.0 LINK ANALYSIS .......... ........... ....... .......... ........ ..... ........ ........ ......... ............. ....... ......... 7 TABLE 5. LINK LEVEL OF SERVICE .................................................................... 7 9.0 CONCLUSION .............................................................................................................. 7 FIGURE 3. TRAFFIC VOLUMES ............................................................................ 8 APPENDIX I I I I I I I I I I I I I I I I I I I 1.0 2.0 3.0 3.1 o o INTRODUCTION A traffic study was prepared by Florida Design Consultants, Inc., dated November 20, 2003 to examine potential impacts to the transportation network resulting from the redevelopment of a parcel of property located in the southwest quadrant of the Belcher Road at Calumet Street intersection in the City of Clearwater, Florida. That study resulted in approval of the proposed change in development for the site with the limitation that the credit union with drive-in facilities be "restricted to closing by 5:00 PM. GTE Federal Credit Union, which is developing the credit union land use desires to have the hours of operation extend through 6:00 PM on Fridays. This report has been prepared to examine the operation of the proposed land uses on the impacted roads for Friday traffic volumes, examining PM peak hour operation from 4:00 PM to 6:00 PM including the extension of hours of operation of the credit union through 6:00 PM. At the time of the original traffic study the existing general light industrial building located on this site was proposed for replacement with three smaller structures to include a newspaper distribution center, a credit union with drive-in windows, and a small office. The following sections summarize the projected impact of these land use changes on the Friday peak hour operation from 5:00 to 6:00 PM. EXISTING ROADWAY NETWORK As indicated in Figure 1, Project Location Map, Belcher Road is oriented in a north-south direction. Belcher Road is a four lane divided roadway with a left turn lane provided in the median for turns to westbound Calumet Street. The southbound roadway has two lanes that provide a through lane and a combined through right turn lane. Calumet Street is a two lane undivided roadway extending from Belcher Road to Hercules A venue, having "T" intersections with both Belcher Road and Hercules A venue. A single lane for left and right turns is provided on Calumet Street approaching Belcher Road. The Belcher Road at Calumet Street intersection is unsignalized. Signalized intersections in the project vicinity include Belcher Road at N.E. Coachman Road, Belcher Road at Sunset Point Road, and Calumet Street at Hercules A venue. The posted speed limit on Belcher Road is 45 miles per hour (MPH) and on Calumet Street is 30 MPH. PROJECT TRAFFIC TRIP GENERATION The proposed land uses include a 12,000 square foot office, a 3,528 square foot credit union with drive in facilities, and a 16,700 square foot general light industrial building. The number of trips that would be generated by these land uses has been estimated using information from the Institute of Transportation Engineers (ITE) informational report Trip Generation. Because limited information is available for credit unions, ITE Land Use Code (LUC) 912, Drive-in Bank, was used for this proposed building. The GTE Federal Credit Union is developing the credit union on this site. Their facility will close at 5:00 P.M. every weekday except Friday when the hours of operation will extend to 6:00 PM. The general light industrial building -1- I I I I I I I I ~ I ~ ~ I CI) UJ :3 (J 8s fn ~ c ~ 0 n7 L~ ;;:; a; r-1lI I 0 l..5 N r--t ..f I u u SUNSET POINT ROAD CALUMET STREET Q ~ <:> 0::: fn ~ (J Ld en '" '" rn ~ ~ (; rJl ..~ 2 :c :c ~ DESCRIPTION, Q, o ~ o W? I- DREW PROJECT LOCATION MAP PROJEC T No. 699-190 I ~ FLORIDA DESIGN CONSULTANTS, INC. Il ENGINEERS, ENVIRONMENT ALIS TS, SURVEYORS 8 PLANNERS 3030 Starkey Blvd, New Pori Richey FL 34655 Tel. (727) 849-7588 - Fox. (727) 848-3648 JMS Drawings and concepts moy not be used or reproduced without written permission. DATE, 2/11/05 DRAWN BY, @Copyright 2005 Florida Design Consultants, Inc. N NOT TO SCALE STREET EPN, 101 FIGURE. 1 I I I I I I I I I I I I I I I I I I I 3.2 4.0 5.0 o o proposed for this site will be occupied by the St. Petersburg Times and will be used as a distribution center for their newspaper. Since this is a morning delivery paper, their hours of operation are from midnight to 7:00 a.m. Therefore, this land use will generate no PM peak hour trips. No trips for this land use have been estimated during the PM peak hour, but daily traffic volumes have been estimated. Table 1 summarizes the trip generation for the proposed land uses. The proposed land uses are projected to generate 1,313 daily and 211 PM peak hour trips. The proposed project traffic has been assigned to the highway network. INTERNAL AND PASS-BY CAPTURE The mix of land uses proposed for this site may have some of their trips that are generated by one land use on site going to other land uses on site. This internal capture could occur between the office and credit union land uses. To be conservative, no subtractions for internal capture have been made for this analysis. A number of trips already traveling on the adjacent roads may turn into the site to use the credit union. These pass-by trips have been recognized by ITE and estimates on the amount of these trips by land use type are provided in their Trip Generation Handbook dated. March 2001. According to Table 5.26 provided on Page 71 of that document, approximately 47 percent of the traffic to Drive-in Banks (ITE LUC 912) comes from pass-by traffic. It is assumed that 47 percent of the trips to the credit union will come from traffic already on Calumet Street or Belcher Road. The internal capture and pass-by trips are summarized in Table 2. As is indicated, following the pass-by capture, the project is expected to add 873 daily trips and 120 PM peak hour trips to the highway network. This is an increase of 696 daily and 95 PM peak hour trips above the current approval. TRIP DISTRIBUTION Trip distribution to this site has been estimated using information from the traffic counts taken for this project. Based on the existing traffic patterns for traffic entering and exiting Calumet Street at Belcher Road, the trip distribution for project traffic has been estimated and is shown in Figure 2. EXISTING TRAFFIC Existing traffic volumes at the Belcher Road and Calumet Street intersection were counted from 4:00 to 6:00 P.M. on Friday, February 04, 2005. A copy of the traffic count is provided in the Appendix. Since the purpose of this study is to review the operation of the road network to extend the operation to 6:00 PM the time period from 5:00 to 6:00 PM was analyzed. This count was adjusted to annual average conditions using the appropriate "SF" factor from the Florida Department of Transportation's (FOOT's) 2003 Peak Season Factor Category Report for Pinellas Countywide data sheet, see copy in the Appendix. At the time the traffic count was taken the existing facility on the project site was not open, but some construction activity was taking place on the project site. The traffic count represents background and some project related construction traffic. Background and project traffic volumes are shown in Table 3. -3- I I I I I I I I I I I I I I c: o ~ cu ~ G) c: G) C> Co "i: I- I I .oJ o G) "0' ~ a. I " ~ G) .c cu I- I I ro ..... o I- 00('1')0..- ..- Q) ..- ..- "I '- :J 0-010 Ic..- ~ :J ro 0 Q)B a.. :J 20 0..-0('1') C :J o .0 C 1'--0..- Q) ..- ..- 1'--00 Q) 0 ..- !.... ro 'C ..... en :J -0 C o ..- o lE cu ~ I- >a .c . I/) I/) cu a. "C c: cu G) ~ :J ... Co cu () cu c: ~ G) .oJ c: N Q) .c cu I- ..- ..- "I 0..-..-0 ..- Q) "I "I ..- ..- ..- ..- O..-IOCO ..-..;tco ..- o o ..- 001O..;t 0..;t1O ..- ('I') ..- ('I') 0('1')0('1') ..-..;tl'-- ('I')..;too ..- ..- Q)en~en '-o..co.. :J.c ro'c 0..1-0:11- ro-c- () ro ._ ro c I c -,-Q),- ro Q) > Q) c......- ..... '- x '- x Q)wOw C E"'" o Q) '-Z ...... Q) '- :J ..... 0.. ro () >- .0 I en en ro a.. -0 Q) ..... ro '- Q) c Q) <9 en 0.. 'C I- -4- o en 0.. 'C ..... '- :J o .c ~ ro Q) 0.. 2 a.. Q) ~ Q) c Q) 0) '0 c ..- ..... Q) Q) .c C/) Vi' ~ c Q) <9 0.. 'C t:. - c o 10" o ~ o Q) No.. -0 0>- ..- ro ~;Q ro '- :Jl1.. '- - .00 Q)Q) l1.."- I Q) .. Q) 2co ro-:-: 01- ~~ co CO ('I') ('1')..-..- Q)..-('I') (/)...;...;....; ~l1..l1..l1.. Cc-c-c- -=:JC/)C/)C/) Q)8008 .~ ~ ~ 1'--_ C/)N -CO ..-('1')..- W()ONO I--=:J"-"-"- --.JI'--Q)..- 03 ro 'C ..... en :J -0 C ..... .c 0) ::J ro '- Q) c Q) <9 -0 Q) en o 0.. o '- a.. ... Q) en -=:J -0 C ro -.J -E1: ro oQ> 0:I-.J o~ ro Q) I '- o Q) Q) ~ o~ cQ) ...... '- 00<9 -0 Q) en o 0.. o '- a.. I I I I I I I I I tn a) E :J I 0 > c: 0 I ; 0 a) tn .... a) +J I c: +J a) a) .... +J I en +J a) E :J I ca U +J ca I "0 ca 0 c::: .... I a) ..c: 0 a) m I (II') a) .c I ca l- n . ... c: I/) ~ CD":':: (,) (,) 0 ... ::l 0 CD ... N 0.1- ... 10 c: CD 0 ::l'" --- o C'Cl ~ UC N ... ~ 10 "<t 0 "<t "<t "<t "<t 0::: "C c: ::l ::l 0 ... 0 0 0 0 .0 .l: ... .... I/) C'Cl W ;:: 0> ex:> C\l 0 CD "<t "<t T""" <0 ...J ::l 10 N 10 "C ... "<t ..- (\') C\l c: .c: <0 <0 T""" <0 ::l .... ..- T""" T""" 0 .0 .c: t:: 0 ;:: C\l N ....... 0> Z CD N N ..- C") ...J ... .l: C") C\l 0 C\l "'C ~ c: C") (\') ..- "<t ::l 0::: 0 ..c .l: ... ::l ::l 0 ... "<t <0 0 <0 (/) .l: C\l 0 T""" T""" I- 0> 0> 0) eo ~ ....... 0 a.. I- 0 ~ 0 a... <0 "0 0 I 0 c: 0 0 :J <0 0 10 ~ 0 E ....... ~ 0 0 U L- eo <;:! - m ....... II) ....... u c: 10 a> II) :J 0 -e 0 0 0 0 () N a.. N o T""" ....... a> a> .I::. C/) W >< <3 :E eo L- I- >. eo "0 "t: !:!::. -- c: o :p eo ... a> C- o >. eo "0 10 "t: ou. --- -- 00 ..- 0> N'7 0> ""0> 2<0 co-;-: 01- o -6- I I I I I I I I I o o 7.0 TRAFFIC ANALYSIS 7.1 BELCHER ROAD AT CALUMET STREET INTERSECTION This existing traffic volumes and trips from the proposed project land uses are indicated in Figure 3 and have been analyzed to determine the expected Level of Service (LOS). Analysis of this unsignalized intersection has been completed using the Highway Capacity Software (HCS 2000). The results are summarized in Table 4 and copies of the print outs from this analysis are provided in the Appendix. Table 4. Belcher Road at Calumet Street Unsi alized Intersection Operation. Background Plus Proposed Project Traffic D 32.1 2.21 As can be seen from the above table, the intersection is projected to operate at an acceptable LOS 0 the savings and loan being open until 6:00 p.m. ~ 8.0 LINK ANALYSIS I I I I I I I I A review has been made of the link level of service on both Belcher Road and Calumet Street with the proposed project. The project traffic volumes and projected level of service are indicated in Table 5. The maximum service volumes for levels of service have been obtained from the FOOT Quality/Level of Service Manual 2002, see Generalized Peak/Hour Directional Volumes for Florida's Urbanized Areas Table 4-7, see copy in the Appendix. Table 5. Link Level of Service Road Direction LOSD Existing Proposed Total LOS Max. Service Volume Traffic Proiect Trips Traffic Belcher Road NB 1,860 1,612 13 1,625 C Belcher Road SB 1,860 938 20 958 B Calumet Street EB 760 92 12 104 C All road segments worked at acceptable LOS C or better conditions. 9.0 CONCLUSION Based upon the above review, it has been demonstrated that Belcher Road and Calumet Street will operate at acceptable levels of service and the Belcher Road at Calumet Street intersection will operate at an acceptable level of service if the GTE Federal Union is allowed to stay open until 6:00 PM on Fridays. Because acceptable operation can be maintained on the adjacent roadways, the GTE Federal Credit Union should be allowed to remain open on Fridays. :es K:\Be1cher at Calumet\Reports\Traffic Study 2-8-05.doc ,., . -7- - I r U U N " I Q NOT TO 0 ~ SCALE r-o.,~ a:: 0'-" ~+ '-"to +0 NOl ~~ N~ vOl CALUMET STREET j ! 60=48+(12) j i 1 44=44+(0) -. r-o.,r-o., 1'10 ~ ~ '-" '-" + + N N N ~ ffi II to Ol" :t: 100.{) U N to ljj ~ en PROJECTED PM PEAK HOUR LEGEND xx - 2005 BACKGROUND TRAFFIC VOLUMES . (XX) - PROPOSED PROJECT TRAFFIC I I DESCRIPTION. TR AFFI C VOLUMES PROJECT No. EPN, 699-190 101 DATE, FIGURE, ~ FL~~. P.!.i!!!:!tg.,'!!~r ~!!~.fNC. 2/11/05 DRAWN BY. 3 3030 Slorkey Blvd. New Pori Richey FL 34655 "- Tel. (727) 849-7588 - Fox, (727) 848-3648 JMS @Copyright 2005 Florida Design Consultants. Inc. Drawings and concepts may not be used or reproduced without written permission. I I I I I I I I ~ u c ~ ri ~ ;n a. ~ n ...s N 11 L.~ '" it r~ o ~ g n5 '-l 1] :0 ~ ,- L..~ Q, ~ => l.P I- I I 0 0 I I I I I I I I I APPENDIX I I I I I I I I ., I 02/07/2005 08:19 8136598688 o ADAMS TRAFFIC PAGE 02 I A~ TY'affi,o, I ttGt. P.O. Box 997 I Plant City, FL 33564 Tel:(813) 763-7763 Fax:(813) 659-8688 I I I I I I I I I I o Project No.: o503~ Turning Movement Count Field Data Sheet .z8J05 ~ h-;A~ ~Jck Qo~ (',....tv,^,- e- t Sk c:~ t C\uv~~t~ \ ?~~C...s ~ .r Count Times: c..{.. ~fM N-S Speed Limit: LIS mph E-W Speed Limit: . 3c mph CI~ Date: Major Street: Direction: Minor Street: Direction: City/County: Weather: Phasing: 3 Cycles Measured: ~ \A.,^S' ,~J ( u.d Intersection Sketch ,CO'1- A~~~ . ~ tt.r C~:"~~~J r, ~\V~t . r . ~cc...+ I ~$ I ~r I I Co~shvc::..-!l OV\ -0 J ..., d 0 I 04 '\0 ~ I ~ f'l 1212/1217/21211215 1218: 19 8136598688 ADAMS TRAFFIC PAGE 1213 I Qi 0 0 E --01O:il~ Il'l~OJ<OQ) ~ :f6 co 01) .~i~;o$<OiN ....... 1l'l;2;'''- 'l:S N l::: ::J ....... <0 <0 I"'" N ...... ..... n; 'N 1.0 N I Om :s ;~ 0 001l(V)l() co ....00 co Q)l()O c::i .cOC::! 00 Q)O~ ;g"~~~~'Si ~ ~ ~ ~'(1j 18 1.0 :g ..- (0 ~g <100 I .L;lON.... .... .. . . . . . . M .~ ..- M ..... c-:lc-:l ~ ..- ..... .- I'-: Q) (I) cU ci.. ci. c::i 0 E"roo c.. c.. I'lIOOZ <: .<: I zOt::q,) cU (I) I'll Ol ==~.....m LL.CI)U)a.. :1- lJ:m......OlT"""CD <IOno..,.1.O .-OJ..... I- Z ..-oa:> Ol .-0 01 w .Q>I ..........~ ..- ..- .- ~ 0) . . UJ .t1I tOu-j....... .- (0' W ,0:: . a:> .... W ~ IE) ~ 1.0 It) !g: 'g' 0::." ~c: I .(j) BI ' (j)=> II- I- ~. UJ (Il' I , W (Il' I::E llll 2'0 0 000 00000 000 .~~ 2 000 0 00 0 :Jw'.c 60 '3 ~ 6 0 ~ f- .<( :<3 I ,U ~Im;: ~ ......~ to (0 01 lD.OI U'l.-a:> 'ii OCtO :E~ 00 0> T""" ... .tIIlif OJ . . U'lLri'- ~1O<fi~"- ...J ... - ...J 1.0 'q' a. a. '<to. I ~ g 0 M ;g ~ ;.; 0 (1) :~I~"-'-lQ;<D E OJ 10 MO.,.... n ....... 'lii <'? 0> 0> ,.... M 01 ..... ",. IO'-ON ~~~~:g Ol g '!:S. a:> <0 ~~ <10 ~~ I f- ~ (")....,.v~ ;;; ..... (0 v (0 , .... ..- 0 0- ::l Q.,J 'ci. 0 c.. 9; 31 '<: <: U E. I~ ~ .gJo 0 0 0:0 o 0 0 OiO c~q .- oqo 0 00 0 . oS: ~Q '.- : 00 0 0> 0 0 III <( ;~ c( a: <.) cpO"O 101:l .,J :r:o::S :C( 5 c:: '10:: 0, 0::.8 I~ ~,w~: . W..c: ~ U ::t: 1:: 2101 ~ cD <")'2 Ll)~O(Oli'l 01<0 to ::c 1::'2 OlOlE) I{) $: 10 :.c'~~'..c:~ 001 (0 00l'~ '<t . . U~..c: ~aj~ <D (0 ..,. M v ('); ..-tOO> u:J f- v ..,. 0 ~Iw I~ 'q' '<t,..... - ",,0>Ll) ....0) .....01 ~ ....CO aJ I'~ Ql en c. l'til ....... ....... M 10 N <Il </) ~""'(')'q'N :J:"':<I:! !l (')'q''<I' ..,. ~~~~..,. :J (1) ..- N N . ::E I- III -'i .N ....0 ..... a. Q. a. a. ~. ! ! I 0 0 0 I 0 M 0 :g :.:. .n c: 0 0 'C . , , , 0- I~'~~~~!~ 0..,........ <D~""'" l3 Cl:! ~ ;:t; 0 0.0 ll; 0(0 UJ' N ~ ~ ~.~ ....... N:8 .......00 0.. f-NNNNOI '" I{) 01 N 01 NOJ => .... c-:l f- ci 0 ,., e g; & I C!> :< . <: . I I IZ OJ 0 0 N'T"' 01....... OJ Oll") vO)~ :C' to..-O) 0) I")'q' 0) o '.2' ............'<t \"} ..... . . 0 C> l'? . \"} . ~ -g cr. l'?- <( .- ..,. M o-gCl:: 0:: ;;J. O:::J ,0::.81 0:::0 w..c! w~ - I n :5' 2:CO.... ~ N...... ':I: - . '0 -- ....... en ............ ....-'<t U 5'2 <001..... q; .,. lD ~ ...J ~.~!~ ~ N Ni~ ~ N N ~!Si <<;:g;:r; ~~~ N - uj"'c N oX OI~ .w - .... m ,[0 IJl III '5 a. I VI , .... ::a ~ooooo 00000 000 ~ III 000 :!:o a. j!l 60 ....o..~ c:l ll')::a0~::E0 ~ ...J. '0. a. ~a.. a. .f: ~o :5 ll"lo ~ a... a..<") 00 I -.:: '4 .. .{) 2.n 10 C1l :.r; ~ 0 ::Eo 0 - '0 ~ ~I~ ::a :::'i: ::a:E ~::r;~:lin; 19~;ie rf.26mt:(U5-E~5 o.tidl~ 'cIJ'- -- a. a. a. a.'o a. a. a.. >(5 O..c:- .- :f .- E 8 E ti - t) o eq~s E~ I1l '';;'8 U) 0 1011- 01{)0 I{):~ l-u2 1-.0.. u';!.....2 1II.c..2 1'0 ~~.:!.....c..21l1 (V)~ l.!!l -.:. ~~: O-M'q' -00.0 ~'g ~ ~ ~ ~ LL. ,21~ LL (! l5.~ ~ .Qlg lL. I umO(\) ~(I) ~ c; c; ~ .n.n.nu-; c 0.1- (1)1. - Q) .:.:: ~ oX E~ ::c ~ lE I'- .. J!! 0000 ~<( ~- 8m m " E~ "a.. Q. 0;:... ,r ~~.?;-o e :g &t1Jl /-("}c.. ... m:J'- ..... ::) Ill........ 0 ~ 5 0 I E'-"O- 0 :t: 11l~~~ .:t: oX .>0: m " co .- 3: Jll <Il q;: __ 0 a.. a. I 02/07/2005 I - C1) E :J ~(O ""(")1,() "'00 C1)IOO tlOt::! -O..r C1)O_ .cON...... I C1) C1) C1) EUiiJo l\l8oZ Z t:9t ~~S iU' LL.CI)Q.la. I I I I I I~ 8 I) ~ ~ I,r :::J I- I I I I I CIl E1 4) c c:: ~ Q) ~ (0 ('I)~"'" u<oum IE..... ,-~ ~ ~ ~() 1-~5L: CIlr-O~ E-U- ~~~m co.t:!> _U;> I I 1 . 08:19 :c5lt'oJ..-r-...mj<>> I cs ',.... N 't- l() ......, 'I '5 I I .1. i I~ .... 0 ..- 0 N I'"":! i I~ 1 Ii. '18 I~"" 0 ..- o(~ 0::'0 t; 31 ; It- 01 W ~ ~ : I~ rolc'oooo'o :;)w,:: .;;)! , I() ; I , , ;~loOOO!O I , . ;~I~IOQ)Niln '0 .N '~ : ! ~ . I i oil 1 I.. ' ~I'~ .I'~o 0 0 oio 410"0 , >o::c >.: is I >10:: .0' 1 row.c' 1 i: 5 61 cl'lD ,.... to t'oJ'r'j I ..J Z = IN ll~ If- ! 0.. i I ~ 115,:..- .... 0 0 'N e -' 1 (:)j i 1 . , ! I' ,. 1 - '<t M to I'- 'N .~.... r'j 1-'-' . i'~ i !~ ' I I I! ! . ..:c'o N 0 ..- M I~'UI~ i Oc . ~:::> I ffi ~I I 1 IG gle'..,..... <0 <oim '...J~~i.... t'oJ I~ ! : I I l!l!o 0 0 010 . I I . I I' I I.. . ~;::i ~ ~ ~:]j '-Ie.. c.. 0.. 0../0 :~8>og1l)1- 1'5..;'" 'lI: (/)'~ ~ ~~! I ! 8136598688 o ~ N M 11)1..". ~ ,.... ..- .- l.O + 00..-0.,.... i o 0.... OJ''''' 00 0 0'0 o 0 0 OjO , ..,. ..,. .,. ~ I~ OOOOrO I 1 I M.,.M..,...,. 1"- ...-O.......O.N 010110...,.... ..... ..- <"l N..-..->oo> 1 I I to ,.... ~ <oIQJ N , I ! ooooio :::!1 :::!1 :::!1 ::E1]i a. a.. 0:: 0.. 0 ~ ~ ~ ~I~ 2:g 88, M ..- .... C") r-... N I' , C")o~ gN .... 000 00 000 00 ..- .,. 000 do :;,~~ ON Ol M ~ClOIt'l ai..} fB N .,. <0 r-,....:.o .... ...... r-...<o~ It) . , :il~ 000 do m~~ 0=- ....~Sl "Oa.Q e~1- Cl I.... l.:c' UJ ,~ Iw a:: I .~~!' (/):::> , II- B! . I~ w:q: 2: :::l I":: ...J f- .e( .u M ~ i !.:c '0 '0> c( ii:: '0"0 i 1a::!3, . ~ 01 w~' ::I: 5'21 '~zl~ w . :00 " l"di . '...J '-: .... <0 ., , 1;51 i~ 'ei. ~ I ADAMS TRAFfIC Il' u; ..- N ~ ~ o o :ii 0.. 'fl .... ;; 115 .... '.:JC '31'~::E 0 :; 0 ~ 0 '0.. 0- j .~ u) 'fl I a....- ,..... i~~ ;; :~iB.~ ~i;; ~ ~c! E ~ I~ g: ~.= ~ j;! ~ ~..2 ~ ,i'g !2 ~ ~ ~ u. ,9~ LL tnl" III ~ :;r;: .:0: ~c ~m m I .~- ~a. ~ : u.. ::i ,0 i~ :cf o .-~ N o t'oJ ...~ ci PAGE 05 . '.<:1 !Q 1.!2> <C . Q:; 0'0 . 1a::!5 ! io::.81 ' ~~i 10oE; ,....lC/).!-. I~ ; !~. i~' 1-. ,~ !.:tj -00 8 000 c:i '~i i CJ 0 0 o NO o o .... o 00 o o , .~. f-I ei. C1. ~ N to N 000 o amI'- N ' o OJ N .... ..- ai <0 M M ..- It)NN C"i .... \"") co .... Mg..- ::EO 0.. o M i, ::EOC!~O 0.. 00. 8 g ;; ~ ~~ co <0 ci >0 N CD .... co ,.... ci o 00 0 o ,.... MO ,.... NN 0> M...... .....M ~ o t'oJO .- ~ .;: Q. a)0- 8 ~ ~ ~ ~ M ...... ......~ o t'oJ IllN t'oJ C"i ..... ..- ..- '0 .... .... .x I'tI cf (") CD (") , :8 ::E a.. 00 0 ~::E o~ "c.. 0- :g~ ~ 0" .. ;6 6 8M~-E~~ .. e.2 ~,I;j;! m (!; ~~~~~~ E c( 111 e>. .f u..0l 5 o J: m Q. Iprint Date: Feb/07/2005 C Florida Department of Transportation 0 Transportation Statistics Office 2003 Peak Season Factor Category Report IPINELLAS COUNTYWIDE MOCF = 0.94 Category: 1500 Week Dates SF PSCF 1 01/01/2003 - 01/04/2003 1.05 1.12 I 2 01/05/2003 - 01/1I/2003 1.05 1.12 3 0I/12/2003 - 0I/18/2003 1.05 1.12 4 01/19/2003 - 01/25/2003 1.03 1.10 I 5 01/26/2003 - 02/01/2003 1.00 1.06 ~6 02/02/2003 - 02/08/2003 0.98 1.04 * 7 02/09/2003 - 02/15/2003 0.96 1.02 * 8 02/16/2003 - 02/22/2003 0.95 1.01 I * 9 02/23/2003 - 03/01/2003 0.94 1.00 * 10 03/02/2003 - 03/08/2003 0.93 0.99 * 11 03/09/2003 - 03/15/2003 0.93 0.99 I * 12 03/16/2003 - 03/22/2003 0.93 0.99 * 13 03/23/2003 - 03/29/2003 0.93 0.99 * 14 03/30/2003 - 04/05/2003 0.93 0.99 * 15 04/06/2003 - 04/12/2003 0.93 0.99 I * 16 04/13/2003 - 04/19/2003 0.94 1.00 * 17 04/20/2003 - 04/26/2003 0.95 1.01 * 18 04/27/2003 - 05/03/2003 0.96 1.02 I * 19 05/04/2003 - 05/10/2003 0.97 1.03 20 05/11/2003 - 05/17/2003 0.98 1.04 21 05/18/2003 - OS/24/2003 0.99 1.05 = 22 OS/25/2003 - 05/31/2003 0.99 1.05 23 06/01/2003 - 06/07/2003 1.00 1.06 24 06/08/2003 - 06/14/2003 1.00 1.06 25 06/15/2003 - 06/2I/2003 1.01 1.07 I 26 06/22/2003 - 06/28/2003 1.00 1.06 27 06/29/2003 - 07/05/2003 1.00 1.06 28 07/06/2003 - 07/12/2003 1.00 1.06 I 29 07/13/2003 - 07/19/2003 1.00 1.06 30 07/20/2003 - 07/26/2003 1.00 1.06 31 07/27/2003 - 08/02/2003 1.00 1.06 I 32 08/03/2003 - 08/09/2003 1.01 1.07 33 08/10/2003 - 08/16/2003 1.01 1.07 34 08/17/2003 - 08/23/2003 1.02 1.09 35 08/24/2003 - 08/30/2003 1.03 1.10 I 36 08/31/2003 - 09/06/2003 1.04 1.11 37 09/07/2003 - 09/13/2003 1.04 1.11 38 09/14/2003 - 09/20/2003 1.05 1.12 I 39 09/21/2003 - 09/27/2003 1.04 1.11 40 09/28/2003 - 10/04/2003 1.04 1.11 41 10/05/2003 - 10/11/2003 1.03 1.10 I 42 10/12/2003 - 10/18/2003 1.02 1.09 43 10/19/2003 - 10/25/2003 1.03 1.10 44 10/26/2003 - 11/0 I/2003 1.03 1.10 45 11/02/2003 - 11/08/2003 1.04 1.11 I 46 11/09/2003 - 11/15/2003 1.04 1.11 47 11/16/2003 - 11/22/2003 1.04 1.11 48 11/23/2003 - 11/29/2003 1.05 1.12 I 49 11/30/2003 - 12/06/2003 1.05 1.12 50 12/07/2003 - 12/13/2003 1.05 1.12 51 12/14/2003 - 12/20/2003 1.05 1.12 52 12/2I/2003 - 12/27/2003 1.05 1.12 I 53 12/28/2003 - 12/3I/2003 1.05 1.12 I Note: "*" indicates peak season week Page I HCS2000: unsc:lalized Intersections Relea<:)4.1d TWO-WAY STOP CONTROL SUMMARY Major Street: Vehicle Approach Movement ~ Analyst: KKG Agency/Co.: FDC Date Performed: 2/7/2005 I Analysis Time Period: Peak Hour 5:00 to 6:00 Intersection: Belcher at Calumet Jurisdiction: County I Units: U. S. Customary Analysis Year: 2005 Project 10: Analysis with Proposed Project I East/West Street: Calumet Street North/South Street: Belcher Road Intersection Orientation: NS I I Volume Peak-Hour Factor, PHF I Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage I RT Channelized? Lanes Configuration II Upstream Signal? I Minor Street: Approach Movement Volumes and Northbound 2 T 1 L 39 0.95 41 2 Raised 7 L 1625 0.95 1710 curb 1 L 2 T No Westbound 8 T Volume I Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 I Flared Approach: Exists?/Storage Lanes Configuration I Approach I Movement Lane Config PM Study period (hrs): 0.25 Adjustments 3 R Southbound 4 5 6 L T R ----- 916 42 0.95 0.95 964 44 / 1 2 0 T TR No Eastbound 10 11 12 L T R 60 0 44 0.95 0.95 0.95 63 0 46 2 0 2 0 / No / 0 1 0 LTR 9 R Delay, NB 1 L Queue Length, and Level of SB Westbound 478 9 41 683 0.06 0.19 10.6 B Service Eastbound 10 11 LTR 12 I v (vph) C (m) (vph) v/c I 95% queue length Control Delay LOS Approach Delay I Approach LOS I 109 239 0.46 2.21 32.1 o 32.1 o I o o HCS2000: Unsignalized Intersections Release 4.ld I I I Phone: E-Mail: Fax: TWO-WAY STOP CONTROL (TWSC) ANALYSIS I Analyst: KKG Agency/Co.: FDC Date Performed: 2/7/2005 I Analysis Time Period: Peak Hour 5:00 to 6:00 PM Intersection: Belcher at Calumet Jurisdiction: County I Units: U. S. Customary Analysis Year: 2005 Project ID: Analysis with Proposed Project East/West Street: Calumet Street I North/South Street: Belcher Road Intersection Orientation: NS I Study period (hrs): 0.25 Major Street Movements Vehicle Volumes and Adjustments 123 4 L T R L 5 T 6 R Volume Peak Hour Factor, PHF Peak-IS Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) I Flared Approach: Exists?/Storage RT Channelized? Lanes I Configuration n Volume . Peak-Hour Factor, PHF Peak-IS Minute Volume I Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage I RT Channelized? Lanes Configuration Upstream Signal? I I I 39 0.95 10 41 2 Raised curb 1625 0.95 428 1710 916 0.95 241 964 42 0.95 11 44 / 1 2 0 T TR No 9 10 11 12 R L T R 60 0 44 0.95 0.95 0.95 16 0 12 63 0 46 2 0 2 0 / No / 0 1 0 LTR 1 L 2 T No Minor Street Movements 7 L 8 T o Pedestrian Volumes and Adjustments 13 14 15 16 I Movements Flow (ped/hr) o o o o I I Lane Width (ft) 012.0 12.0 12.0 12.0 0 Walking Speed (ft/sec) 4.0 4.0 4.0 4.0 Percent Blockage 0 0 0 0 I Upstream Signal Data I Prog. Sat Arrival Green Cycle Prog. Distance Flow Flow Type Time Length Speed to Signal vph vph see see mph feet ~ S2 Left-Turn Through S5 Left-Turn I Through ----- Movement 2 Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles I I Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: III Number of major street through lanes: I Worksheet 4-Critical Gap and Follow-up Time Calculation Critical Gap Calculation I Movemen t ~ I 8 T 4 L 7 L 9 R t(c,base) t(c,hv) P(hv) t(c,g) I Grade/lOO t(3,lt) t (c,T) : 4. I 2.00 2 2.00 2.00 2.00 2.00 0.20 0.00 0.20 0.00 0.10 0.00 0.00 0.00 0.00 4.1 4.1 I-stage 2-stage I-stage 2-stage 0.00 0.00 0.00 1. 00 0.00 1. 00 0.00 0.00 ': t(c) III 10 L 7.5 2.00 2 0.20 0.00 0.70 0.00 1. 00 6.8 5.8 Movement 5 11 T 6.5 2.00 o 0.20 0.00 0.00 0.00 1. 00 6.5 5.5 12 R 6.9 2.00 2 0.10 0.00 0.00 0.00 0.00 6.9 6.9 ~ Follow-Up Time Calculations . Movemen t 1 4 L L 7 L 8 T 9 R It (f, base) t(f,HV) P (HV) I t(f) 10 L 11 T 12 R 1. 00 2.20 1. 00 2 2.2 1. 00 1. 00 1. 00 I Worksheet 5-Effect of Upstream Signals 3.50 1. 00 2 3.5 4.00 1. 00 o 4.0 3.30 1. 00 2 3.3 Computation I-Queue Clearance Time at Upstream Signal Movement 2 V(t) V(l,prot) I I V prog Movement 5 V(t) V(l,prot) (vph) o on green P Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta T rave 1 time, t ( a ) ( s e c) I Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) I Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 ~ Computation 3-Platoon Event Periods Result p (2) I p(5) p(dom) p (subo) I Constrained I 0.000 0.000 or unconstrained? Proportion unblocked for minor movements, p (x) ( 1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II n p(l) W p (4) p(7) P (8) r1 p (9) ..! p(10) P (11) I p(12) Computation 4 and 5 Single-Stage Process I Movement I 1 L 4 L 7 L 8 T 9 R 10 L 11 T 12 R v c,x s Px I V c,u,x 1008 1923 2778 504 C r,x C plat,x I Two-Stage Process 7 8 10 11 I I I I C(r,x) C(plat,x) Stagel V(c,x) s P (x) V(c,u,x) StaO Stagel Stage2 I Worksheet 6-Impedance and Capacity Equations I Step 1: RT from Minor St. Conflicting Flows Potential Capacity I Pedestrian Impedance Movement Capacity Probability of Queue Factor free St. I Step 2: LT from Major St. Conflicting Flows I Potential Capacity Pedestrian Impedance Factor Movement Capacity n. Probability of Queue free St. Maj L-Shared Prob Q free St. Step 3: TH from Minor St. I I Conflicting Flows Potential Capacity Pedestrian Impedance Factor n Maj. L, Min T Impedance factor . Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding I Movement Capacity I Conflicting Flows Potential Capacity Pedestrian Impedance Cap. Adj. factor due Movement Capacity Probability of Queue I Factor to Impeding mvmnt free St. Step 4: LT from Minor St. Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance i I mvmnt Step 3: TH from Minor St. I Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Cap. Adj. factor due Movement Capacity Probability of Queue I Factor to Impeding mvmnt free St. Stagel sOe2 986 937 3000 9 1. 00 1. 00 4 1. 00 1. 00 8 1. 00 0.94 1. 00 7 1. 00 0.94 0.95 0.87 8 134 1. 00 0.94 126 1. 00 Stagel Stage2 986 1792 3000 12 504 513 1. 00 513 0.91 1 1008 683 1. 00 683 0.94 11 2778 19 1. 00 0.94 18 1. 00 10 1923 59 1. 00 0.94 55 11 986 328 1. 00 1. 00 328 1. 00 I Part 2 - Second Stage Conflicting Flows I Potential Capacity Pedestrian Impedance Cap. Adj. factor due I Movement Capacity -0- o Factor to Impeding mvmnt 321 1. 00 1. 00 321 1792 134 1. 00 0.94 126 Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Cap. Adj. factor due I Movement Capacity I Factor to Impeding mvrnnt 1. 00 0.94 2778 19 1. 00 0.94 18 Result for 2 stage process: a 0.91 0.91 2.87 90 1. 00 I ~ t Probability of Queue free St. 1. 00 I Step 4 : LT from Minor St. Part 1 - First Stage I Conflicting Flows Potential Capacity Pedestrian Impedance Factor I Cap. Adj. factor due to Impeding mvrnnt Movement Capacity I Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor I Cap. Adj. factor due to Impeding mvmnt Movement Capacity 7 10 121 1. 00 0.94 114 986 322 1. 00 1. 00 322 593 1. 00 0.91 540 937 342 1. 00 0.94 321 I Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor I Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding Movement Capacity mvmnt 1. 00 0.94 0.95 0.87 1923 59 1. 00 n . 0.94 55 1"1 . Results for Two-stage process: a y C t 0.91 0.91 1. 00 172 . Worksheet 8-Shared Lane Calculations Movement 7 L 8 T 9 R 10 L 11 T 12 R I I Volume (vph) Movement Capacity (vph) Shared Lane Capacity (vph) 63 172 o 90 239 46 513 fl . -. I Worksheet 9-Computation o~ffect of Flared Minor Streec:lpproaches I Movement 7 L 9 R 10 L 11 T 12 R C sep I Volume Delay Q sep Q sep round 172 63 90 o 513 46 I +1 (Qsep +1) 1-. n max C sh SUM C sep n I C act 239 II Worksheet 10-Delay, Queue Length, and Level of Service -- Movement 1 4 7 8 9 10 11 12 Lane Config L LTR v (vph) 41 109 C(m) (vph) 683 239 vlc 0.06 0.46 95% queue length 0.19 2.21 Control Delay 10.6 32.1 LOS B D Approach Delay 32.1 Approach LOS D I - I I Worksheet 11-Shared Major LT Impedance and Delay p(oj) v (il) , ., v(i2), . s(il), s (i2) , I P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through I d(rank,l) Delay for stream 2 or 5 Volume for Volume for Saturation Saturation stream 2 or 5 stream 3 or 6 flow rate for flow rate for stream stream Movement 2 Movement 5 ---- 0.94 1. 00 2 or 5 3 or 6 10.6 ,., . I . lanes I I I ~ I o o I TABLE 4 - 7 GENERALIZED PEAK HOUR DIRECTIONAL VOLUMES FOR FLORIDA'S URBANIZED AREAS. Level of Service ABC D 100 340 670 950 1,060 1,720 2,500 3,230 1,600 2,590 3,740 4,840 STATE TWO-WAY ARTERIALS Class I (>0.00 to 1.99 signalized intersections per mile) Level of Service B C 220 720 1,530 1,810 2,330 2,720 3,030 3,460 ~ I Lanes Divided I Undivided 2 Divided 3 Divided I Lanes Divided I Undivided 2 Divided 3 Divided 4 Divided I UNINTERRUPTED FLOW HIGHWAYS A .. 250 380 490 m Lanes Divided I Undivided 2 Divided 3 Divided 4 Divided Class II (2.00 to 4.50 signalized intersections per mile) Level of Service B C 100 590 220 1,360 340 2,110 440 2,790 D 810 1,710 2,570 3,330 I A .. .. .. .. D 860 1,860 2,790 3,540 Class III (more than 4.5 signalized intersections per mile and not within primary city central business district of an urbanized area over 750,000) FREEWAYS E 1,300 3,670 5,500 Interchange spacing ~ 2 mi. apart Level of Service B 'C 2,110 2,940 3,260 4,550 4,410 6,150 5,560 7,760 6,710 9,360 D E 3,580 3,980 5,530 6,150 7,480 8,320 9,440 10,480 11,390 12,650 D E 3,440 3,910 5,410 6,150 7,380 8,380 9,340 10,620 11,310 12,850 Lanes 2 3 4 5 6 A 1,270 1,970 2,660 3,360 4,050 E 890 Interchange spacing < 2 mi. apart Level of Service B C 1,840 2,660 2,890 4,180 3,940 5,700 4,990 7,220 6,040 8,740 ... ... ... Lanes 2 3 4 5 6 A 1,130 1,780 2,340 3,080 3,730 E 850 1,800 2,710 3,500 BICYCLE MODE (Note: Level of service for the bicycle mode in this table is based on roadway geometries at 40 mph posted speed and traffic conditions, not number of bicyclists using the facility.) (Multiply motorized vehicle volumes shown below by number of directional roadway lanes to determine maximum service volumes.) Paved Shoulder/ Level of Service Level of Service Bicycle Lane Lanes Divided A B C D E Coverage A B C D E I Undivided .. .. 280 660 810 0-49% .. .. 170 720 >720 2 Divided .. .. 650 1,510 1,720 50-84% .. 130 210 >210 ... 3 Divided .. .. 1,020 2,330 2,580 85-100"10 160 380 >380 ... ... 4 Divided .. .. 1,350 3,070 3,330 I I .., . Class IV (more than 4.5 signalized intersections per mile and within primary city central business district of an urbanized area over 750,000) Level of Service Lanes Divided A B C I Undivided .. .. 270 2 Divided .. .. 650 3 Divided .. .. 1,000 4 Divided .. .. 1,350 I PEDESTRIAN MODE (Note: Level of service for the pedestrian mode in this table is based on roadway geometries at 40 mph posted speed and traffic conditions, not the number of pedestrians using the facility.) (Multiply motorized vehicle volumes shown below by number of directional roadway lanes to determine maximum service volumes.) D E 720 780 Level of Service 1,580 1,660 Sidewalk Coverage A B C D E 2,390 2,490 0-49% .. .. .. 330 810 3,130 3,250 50-84% .. .. .. 520 990 85-100% .. 120 590 >590 ... NON-STATE ROADWAYS Major City/County Roadways BUS MODE (Scheduled Fixed Route) Level of Service (Buses per hour) Lanes Divided A B C D E Level of Service I Undivided .. .. 480 760 810 Sidewalk Coverage A B C D E 2 Divided .. .. 1,120 1,620 1,720 0-84% *. >5 ~ ~3 ~2 3 Divided .. .. 1,740 2,4 50 2,580 85-100% >6 >4 ~3 ~2 ~I Florida Department of Transportation Systems Planning Office 605 Suwannee Street, MS 19 Tallahassee, FL 32399..Q450 http://wwwll.myflorida.comlplanninglsystems/smllos/defaulthtm ONE WAY FACILITIES Increase corresponding volume 20% .This table does not constitute a standard and should be used only for general planning applications, 10e computer models from which this table is derived should be used for more specific planning applications. The table and deriving computer models should not be used for corridor or intersection design, where more refined techniques exist. Values shown are hourly directional volumes for levels of service and are for the automobile/trud:: modes unless specifically stated, Level of service letter grade thresholds arc probably not comparable across modes and. therefore, cross modal comparisons should be made with caution. Furthennore, combining levels of service of different modes into one overall roadway level of service is not recommended. To convert to aMual average daily traffic volumes. these. volumes must be divided by appropriate 0 and K factors. The table's input value defaults and level of service criteria appear on the following page, Calculations are based on plarming applications ofthc flighway Capacity Manual. Bicycle WS Model. Pedestrian LOS Model and Transit Capacity and Quality of Service Manual. respectively for the automobile/truck, bicycle. pedestrian and bus modes. "Cannot be achieved using table input value defaults. . ...Not applicable for that level of service letter Snide. For automobileltruck modes., volumes greater than level of service 0 become F because intersection capacities have been reached. For bicycle and pedestrian modes. the level of service letter grade (including F) is not achievable, because there is no maximum vehicle volume threshold using table input value defaults. 1 . I I Lanes Divided I Undivided 2 Divided I Source: I I I Other Signalized Roadways (signalized intersection analysis) Level of Service ABC .. .. 250 .. .. 580 D 530 1,140 02/22/02 E 660 1,320 ARTERIAUNON-STATE ROADWAY ADJUSTMENTS DlVIDEDIUNDlVIDED (alter corresponding volumes by the indicated percent) Lanes Median Left Turns Lanes Adjustment Factors I Divided Yes +5% I Undivided No -20% Multi Undivided Yes -5% Multi Undivided No -25% 97 o e ORIGINAL DESCRIPTION: A part of Lot J 2, CLEAR WATER INDUSTRIAL PARK, according to tbe plat thereof, recorded in Plat. Book 44, Page 46, Public Records of Pinellas County, FIOIida, more particularly described as follows: Commence at the Northwest corner of said Lot 12; thence South 89 degrees 2] '49" East (plat bearing and basis of bearings for this descri.ption), along the North boundary of said Lot 12,208.00 feet for a POTNT OF BEGINNING; thence South 89 degrees 21 '49" East, continuing along the North boundary of said Lot 12,377.16 feet; thence Soutb 00 degrees 02'48" West, along the West right-of-\\lay line of Belcher Road, 55.00 feet Westerly of and parallel to the East boundary of the Southeast one-qumier (1/4) of Section ], Township 29 South, Range 15 East, Pinellas County, Florida, being the West boundary of public right-of-way conveyed to Pinellas County by Quit-Claim Deed recorded November 17, 1976 in O.R. Book. 4478, Page 21 J 3, Public Records of Pinellas County, Florida, 379.98 feet; thence North 89 degrees 2)'49" West, along the South boundary of said Lot 12, 376.66 feet to a point lying South 89 degrees 21'49" Ea,:>t of and 200.00 feet from the Southwest corner of said Lot 12; thence North 00 degrees 01'42" West, 379.98 feet to the POINT OF BEGINNING. RECEIVED MAR 3 1 2005 PlANNING DEPARTMENT cnv OF CLEARWATER Apr 15 2005 12:39PM "tI ." 0'0 (I> o ..., -t ::T (ii' Ql '0 '2. C'j' ~ o' :J ~ cr <tl m;l ~. iii' ::!: /A' 1Il t:J;J 0.... ~~-t a. (D :r ~ "S'U; c: 0' (j) f~z -:JO C"llJ-l CD -0 . :J "C >. o ="'D ::-.0 m ffi" ~, ::0 0.05: Q1:J_ CIl O':-l 0; :r"C CD co o 3 c: _, n-:-t' o 3 <D ~ ::; <tl tll '0 '2. g o' :J ,., ;Q ~ ~. ~ ,~ 0- 1=.Qe -<~m oc< .,.,.YiI'l'. %t'"' .. 000 , "'O"t'l "'01: > m :Dmz ::em... >:0 "'<fID m- ;zoO m en -...... C----, ... ~'-'J C'-". . '---- . .....- Inii1 ~ Gii11 l::J ~t Ifiii) ~_-::J ,. -0 ^' - "" ~ ~ t:)LASERJET 3330 fllIl- .... N N => 0 VI Ul 1= b Q 0 "'d Il.l S II> ::I .... ~ ; o ~ ~ ~ t'I1 ~ ~ ~ ::j ~ ~ ;;0 b \C o ./:>. o ..... - ::s i:l C> .... '" o ::s > 9 Q a ~ Q, ~ [ ~ ~ It ., e: eo ~ ~ ~ :0:- ~ n g a ~ g= ~ ~ ~. -< It Q. "'d Il.l '< ~ ::I !? t"'" g ~ n ~ o I ~ 8 ~ I..t1 I o I.>.l 8 I.>.l p.2 '-T .~ ~ n ~ _. ~ =#: 0" l>> 1-01 ;"N ... Q == !.NlJl ~= S8 == == U'lQ Q Q Q = N ~ 1-01 .i- ~ :;3 ~ ~ "' ::!l '=' ~ m 0: 9. n ~ n <s- o = ~ ~ ~ too ~. i ~ Q g := ~ '? -<: ~ f ~ ~ to,,) 8 a ~ .~. .... ~ .....~ 0'1 IN ~s 'tl 8- s: l)1i'; 'I: -, .~. ~ .... ~ ~ 1= => r !a ..., e:. Q. - N ~ 8 o o FLD2003-0904 7 A 1750 N BELCHER RD Date Received: 04/04/2005 GTE CREDIT UNION ZONING DISTRICT: IRT LAND USE: IL ATLAS PAGE: 262B PLANNER OF RECORD: WW CLWCoverSheet _1011111"1'",,;:-..,. . il ~ r.. ~.LOF Ih'f.< -<::~.;.. tV.~ ~\;"y..,.. ,t',1;l,;'" A~L~~.,tl ....#..;....?,.l:~~ ..~'-......,' j ~-~'" ~'e.:;.' \ I . ~ c>.. 11 t~'r\!J- ~ ~.~ ,,~~ .=:.._~~~.Ir\ ;;.~; ===_ ......."..l!~~ ...d - ---- --- "-,;.,n,;:' 'Il ~'.Y.L);.--_. .'('~;" .S:-.($......_~~;,-..~~,\\ ~......,~TH\"". 1'~.III' o CITY OF o CLEARWATER LONG RANGE PLA."lNING DEVELOPMENT REvIEW PLANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORlDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTIE AVENUE, CLEARWATER, FLORlDA 33756 TElEPHONE (727) 562-4567 FAX (727) 562-4576 May 18, 2005 Mr. Gerald A. Figurski, Esquire 2550 Permit Place Holiday, FL 34655 RE: Development Order - Case No. FLD2003-09047 A 1750 North Belcher Road Dear Mr. Figurski: This letter constitutes a Development Order pursuant to Section 4-206.D.6 of the Community Development Code. On May 17, 2005, the Community Development Board reviewed your request for Flexible Development approval to modifY an adopted condition of approval relating to hours of operation for retail sales (financial services), as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C (previously approved under Case No. FLD2003-09047, approved by the Community Development Board on December 16, 2003, a Flexible Development application to permit retail sales [financial services] with deviations to allow direct access to a major arterial street (North Belcher Road], to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C). The Community Development Board (CDB) APPROVED the applications with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section "l-1304.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with and will not be detrimental to development/redevelopment efforts of the surrounding area. Conditions of Approval: (* Previously imposed under Case No. FLD2003-09047) * 1. That the final design and color of the buildings be consistent with the conceptual elevations submitted to, or as modified by, the CDB; *2. That use of the building on the subject property be limited to a credit union. The applicant shall record a covenant in the public records restricting the use of this building on the subject property, as contained in this condition, prior to the issuance of a Certificate of Occupancy for the credit union. Any future change of use of this building to a bank shall require the following: a. Construction plans be submitted and approved showing the installation of a left turn lane of adequate storage length, according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Road. Construction of this BRJAN J. AUNGST, MAYOR-COMMISSIONER HoYf HAMILTON, VICE MAYOR-COMMISSIONER WHITNEY GRAY, COMMISSI01>ER FRANK HIllIlARD, COMMISSIONER * BII.I.]ONSON, CO_\I~tlSSIOt'iER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" o o t May 18, 2005 Figurski - Page Two improvement must be completed prior to the issuance of an Occupational License for the bank; b. Establishment of an escrow account with the City, prior to the issuance of an Occupational License for the bank, for the future construction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if warranted by a Traffic Signal Warrant Study. The funds in the escrow account will be a shared portion of the full cost of a traffic signal light. The City's shared portion shall not exceed 50 percent of the full cost. If, in the event that a traffic signal light is not warranted based on the Study, funds will be refunded to the applicant. *3. That revised landscape plans be submitted and approved prior to the issuance of building permits for the proposed credit union reflecting Code foundation plantings; *4.. That outdoor lighting fixtures be integrated into the landscape site design to avoid shielding of the lighting by tree canopy; and *5. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity. Freestanding signage shall be limited to monument-style, not to exceed six feet in height. Submission of a Comprehensive Sign Program is required for more than one freestanding sign on either street frontage. Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (May 17, 2006). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Coordinator may grant an extension of time for a period not to exceed one year and only within the original period of validity. The Community Development Board may approve one additional extension of time after the community development coordinator's extension to initiate a building permit application. . The issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4-502.B by the applicant or by any person granted party status within 14 days of the date of the CDB meeting. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on June 1, 2005 (14 days from the date of the CDB meeting). If you have any questions, please do not hesitate to call Wayne M. Wells, Planner ill, at 727-562-4504. You can access zoning information for parcels within the City through our website: www.myclearwater.comlgov/depts/planning. *Make Us Your Favorite! I I I , I I I Sincerely, __ ~jp~ Mic~~kp Planning Director S:IPlanning DepartmentlC D BIFLEX (FLD)I/nactive or Finished ApplicationslBelcher N /750 GTE Federal Credit Union (/RT) _ ApprovedlBelcher N /750 Development Order #2 5./8. 05. doc ll.. o . o >- u TO: FAX COVER MEMO CITY OF CLEARWATER PLANNING DEPARTMENT 100 S. MYRTLE AVE. CLEARW A TER, FL 33756 (727) 562-4567 FAX: (727) 562-4865 ~Q_J:"\"" ~5~~~\..\ ~. . 9 44-.. ~-, \\ FAX: Phone: q +- '2... - 'D,:3 '3 FROM: ~)0'vA ~ W ~\ \~ Phone: S \.1 1. -=-- -+ s U~ DATE:c- S \5\ ~S RE: 17:Jt) N. l3u1c\-u \~ . MESSAGE:_~~~'t~~~'~t ~,~t~ bor~J ~fo :k rye, ~~~. . p-r-~Si1 \~~ ~ ~ .~ ., ~c\.\\~" i;-=o-LC€f~\'\t. \oj n-i;\~~ ~ I~J1.o<>~. NUMBER OF PAGES(INCLUDING THIS PAGE) 7 '::,Et j[I I t JCl PEF'OF'T o o .. Ma~. 09 2005 02:50PM YOUR LOGO YOUR FAX NO. Cit~OfClearwater-F'lan Dept 727 562 4865 NO. OTHER FACSIMILE 01 99443711 START TIME USAGE TIME MODE PAGES RESULT Ma~.09 02:47PM 03'03 SND 07 OK TO TURN CFF REPffiT, PRESS 'MENU' 1:*04. TI-B-l SELECT CFF BY USI~ '+' OR '-'. FOR FAX ADUANTAGE ASSISTANCE, PLEASE CALL 1-800-I-I8..P-FAX (435-7329). : i.~ ..:11.... " .~ ',., . . ..", ~. '. . '^'~. ..~. . - .'........., "., · .,It.v PREPA:Rl!D BY dTURll TO, J. PAUL RAYMOND, Esquire Macfarlane Fergu50n & MCMull~n 625 Court Street, .Suite 200..... Post Office .Box 1669 (33757)~' Clearwater, Florida 33756 o KARlEEN F. De 1ll.AKER, C~ Of' COURT PlNaJ.Aa COUNTY FLllImA INSTIl Z1lO42047S1 0S/11i2OO4 .. 11~ AM Ol'F REC BK: 13'7' PO: 10'7-1011 DacType:cefDRECOIUlIHO: $1"'0 o DOC STAMP: $~600.DO WARRANTY DEBD ORIGINAL . ..,. THIS INDBNTURE made. this. K day of May, 2004, by and between l3ELCAL. :PROPSR'l'lES ':.. l.LC,' a Florida 11m! ted liability company of the County of PINELLAS, in the State of FLORIDA, Party of the First Part, whose mailing address is 2040 Northeast coachman Road, Clearwater, FL 33765, and G'l'E FEDERAL CREDIT UNrO~. a credit Union organized and existing under the lawS of the united States of America of the County of Hillsborough, in the State of Florida, Party of the second Part, whose mailing address is 711 l I I South Dale Mabry Highway, Tampa, FL 33609. WIT N S S S B T H: That the said Party of the First Part, for and in consider- ation of the sum of Ten Dollars ($10.00) to him in hand paid by the said Party of the Second Part, the receipt whereof is hereby acknowledged, has granted, bargained and sold to the said party of the Second Part, their heirs and assigns forever, the following described land, sitl)ate lying and being in the County of Pinellas, State of ~lorida, to-wit: That certain oondominium parC!e~ described as Unit I, and an undivided sha.re in the C01lllllon e~ements appurtenant thereto I. according to the. Declaration of Condominium of BELCAL COMMERCIAL CONDOMINIUM, and rB~ated documents.as recorded in O.R. Book 13544, page 1992 and the .P~at thereof as recordod in Condomni.um plat Book 132, at pages 32, all in the public records of pine11as count~, Florida. Subj ect to reservations HEREBY, ~arcel I.D. No. NOT YET ~SSIGNED 2004 real estate taxes, re~trictions, and easements of record, NOT REIM~OSED RECEIVED MAR. 3 1 2005 PlANNING DEPARTMENT CllV OF ClEARWATfP ~ o ~RlGl[~J-\L And the said I?arty of the 'First Part does hereby fully warrant the title to said land, and will defend the same against the lawful claims of all persons whomsoever. IN WITNESS WHEREOF I the said Party of the First Part haa herewlto set his hand and seal.the day a~d year first above writ- ten. Signed, Sealed and Delivered in Our Presence; i~//J 7pany .~p,~ By: Print '" ~....t~ (SEAL) Member ~~~~"~ PritNm C4lCj ..t:t:'k~,1-t StAl'E: OF Fl:.ORIDA COUNTY OF PINELLAS I HEREBY CBRTIFY, that on this day personally appeared before me, an officer duly authorized to administer oaths and take acknowledgments, MARK S. KLEIN, Managing Member of BELCAL PROPERTIES, LLC, a Florida limited liability company, to me personally known or who has produced Nlr as identification and who did take an oath, and known to me to be the individual(sl described in and who executed the foregoing instru- ment and he acknowledged before me that he executed the same for the purposes therein expressed. WITNESS my p~~ and official seal and State, this ~ day of May, 2004. County h:ldlIlaln:llbullclhcl(II-dtd.doc '?J J I'N Aormond . . i4y CCf!IIl_ D01~ \': .i E>cpI.... ....UV..l 10, 200lI RECEIVED MAR 3 1 2005 PlANNING DEPARTMENT CITY OF CLEARWATER o o jf,g~ffL,-r;'r..r, 1 V ~x.!\ OF rtl!.if's:" "l~'.j, ~,I,"UJ,;#c;7>",_ .4.." ;.. -"J ...."" ,.1.... .;'::--:.;" I ~~...-" ~~:~,\ //Yf'{i' 1~ ~ ':- ~C":3:-(\-~...... '~'1 '" r:: ~ :::::::=-.:.'~ .~i. -- ........... .----- .~ Si, ..... -:. --==- L'i::''' ~~..~._-- .,~~~ .... ........._~.t \ -.... If/.''~III'''~'\:),.\ ~~~.)1TE~,. ,t' -""'1'" CITY OF CLEARWATER PLANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTIE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 loNG RANGE PlANNING DEVELOPMENT REVIEW April 22, 2005 Mr. Gerald A. Figurski, Esquire 2550 Permit Place Holiday, FL 34655 Re: Community Development Board Meeting (Case No. FLD2003-09047A) - 1750 North Belcher Road Dear Mr. Figurski: The Case No. FLD2003-09047A for Flexible Development approval to modify an adopted condition of approval relating to hours of operation for a retail sales (financial services), as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C (previously approved under Case No. FLD2003-09047, approved by the Community Development Board on December 16, 2003, a Flexible Development application to permit retail sales [financial services] with deviations to allow direct access to a major arterial street [North Belcher Road], to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C), has been scheduled to be reviewed by the Community Development Board on May 17, 2005. The meeting will take place at 1 :00 p.m. in the City Council Chambers, 3rd floor of City Hall at 112 S. Osceola Avenue, Clearwater. If you have any questions, please do not hesitate to call me at 727-562-4504. Sincerely, W~~ M.\N~ Wayne M. Wells, AICP Planner III S:IPlanning Department\C D BIFLEX (FLD)IPending cases I Up for the next CDBIBelcher N 1750 GTE Federal Credit Union (/RT) - Approved - 5./7.05 CDB - WWlBelcher N /750 5./7.05 CDB Letter.doc BRIAN J. AUNGST, MAYOR-COMMISSIONER HOYT HAMILTON, VICE MAYOR-COMMISSIONER WHITNEY GRAY, CO~IMISSIONER FRANK HIBllARD, COMMISSIONER * BILL JONSON, COMMISSIOKER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" .. .~!_~. _~~_.2 0 ?_~._~~ :.3 9!.~-V A S E R J~! 3330 o p. 1 Fax FIGURSKI & HARRILL THE HOLIDAY TOWER 2435 u.s. HIGHWAY 19, SUITE 350 HOLIDAY, FLORIDA 34691 Phone Number: (727) 942-073 D IE @II01tJ'O;--St Fax Number: (727) 944-3711. 11: W NEIGHB~EhoPMENT & C /Tv o~ COlOEDA RSWE R V ICE S . ATE q To: April 15, 2005 Wayne Wells Date Sent: Fax No: 562-4576 From: Gerald A. Figurski, EsquireIMaureen Re: GTE Total pages, including cover: 2 . (If you do not receive all of the pages indicatedt please call our office as soon as possible) COMMENTS: Wayne, Following is the receipt as you requested. Please call if I can be of further assistance. Maureen CONFIDENTIAL WARNING - THIS TRANSMISSION MAY CONTAIN CBRT AIN INFORMATION WHICH IS PRIVILEGED OR CONFIDENTIAL. IF YOU ARE NOI'THE INTENDED RECIPIENT OF THIS 1RANSMISSION AND RECEIVED [T IN ERROR. PLEASE CONTACT TIlE SENDER IDENTIFIED ABOVB FOR FURTHER INSTRUCTIONS. -, GERALD A. FIGURSKI, P.A. J. BEN HARRILL, P.A. SHELLY MAY JOHNSON L. RICK RIVERA c;IGURSKI & HARRILO ATTORNEYS AT LAW THE OAKS AT PERRINE RANCH 2550 PERMIT PLACE NEW PORT RICHEY, FLORIDA 34655 www.fhlaw.net TELEPHONE: (727) 942-0733 FAX: (727) 944-3711 ORIGINAL March 29,2005 HAND DELIVERED Wayne M. Wells, AICP Senior Planner City of Clearwater Planning Department Municipal Services Building 100 South Myrtle Avenue Clearwater, Florida 33756 RE: GTE Federal Credit Union Case No. FLD2003-09047, 1750 North Belcher Road Dear Wayne: This firm represents GTE Federal Credit Union. Enclosed on my client's behalf please find the original Flexible Development Application, appropriate copies, supporting documentation and fees. Should you have any questions or comments regarding the enclosed, please do not hesitate to contact me. '" J m nclosures cc: Michael J. Freedman, Esquire CDB Meeting Date: Case Number: Agenda Item: Owner/Applicant: Representative: Address: o o May 17. 2005 FLD2003-0904 7 A F2 GTE Federal Credit Union' Mr. Gerald A. Figurski. Esquire 1750 North Belcher Road ORIGINAL CITY OF CLEARWATER PLANNING DEPARTMENT STAFF REPORT GENERAL INFORMATION: REQUEST: EXISTING ZONING/ LAND USE: PROPERTY SIZE: PROPERTY USE: ADJACENT ZONING/ LAND USES: Flexible Development approval to modify an adopted condition of approval relating to hours of operation for retail sales (financial services), as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C (previously approved under Case No. FLD2003-09047, approved by the Community Development Board on December 16, 2003, a Flexible Development application to permit retail sales [financial services] with deviations to allow direct access to a major arterial street [North Belcher Road], to allow the use llS a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C). Industrial, Research and Technology District (IRT) Industrial Limited (IL) 3.288 acres Current Use: St. Petersburg Times distribution building (constructed under BCP2003-03528), GTE Credit Union (constructed under BCP2004-06245) and an office building (being constructed under BCP2004-02057) Proposed Use: St. Petersburg Times distribution building, GTE Credit Union and office building North: Industrial uses West: Vehicle repair (Hunter Blood Services - Bloodmobile) East: Detached dwellings South: Fire Station Staff Report - Community Development Board - May 17, 2005 Case FLD2003-09047 A - Page 1 of 6 o o ANALYSIS: Site Location and Existing Conditions: The 3.288-acre site is located at the southwest comer of North Belcher Road and Calumet Street. North Belcher Road is a heavily traveled, four-lane divided roadway. The east side of North Belcher Road is residentially developed with single- family detached dwellings. The west side of North Belcher Road is developed industrially. The site was formerly developed with an office building, which was demolished under BCP2003- 03525. Under BCP2003-03528, the site has been developed with a St. Petersburg Times distribution building on the west side facing Calumet Street. The site has also been constructed with the GTE Credit Union (constructed under BCP2004-06245) and an office building (being constructed under BCP2004-02057). The GTE Credit Union was approved by the Community Development Board (CDB) under Case No. FLD2003-09047 on December 16, 2003, with five conditions. Proposal: The proposal approved by the CDB in 2003 for the GTE Credit Union included the following condition: 2. That use of the building on the subject property be limited to a credit union with hours of operation ending at 5:00 pm daily. The applicant shall record a covenant in the public records restricting the use of this building on the subject property, as contained in this condition, prior to the issuance of a Certificate of Occupancy for the credit union. Any future change of use of this building to a bank shall require the following: a. Construction plans be submitted and approved showing the installation of a left turn lane of adequate storage length, according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Road. Construction of this improvement must be completed prior to the issuance of an Occupational License for the bank; b. Establishment of an escrow account with the City, prior to the issuance of an Occupational License for the bank, for the future construction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if warranted by a Traffic Signal Warrant Study. The funds in the escrow account will be a shared portion of the full cost of a traffic signal light. The City's shared portion shall not exceed 50 percent of the full cost. If, in the event that a traffic signal light is not warranted based on the Study, funds will be refunded to the applicant. The applicant is now requesting to modify this condition to allow the credit union to be open until 6:00 pm on Fridays, to allow banking services available to customers after working hours on Fridays. The original condition was included due to the Traffic Study conducted by the applicant in 2003, which indicated the Level of Service (LOS) on Belcher Road to be LOS F. However, a new Traffic Study has been conducted that indicates the LOS on Belcher Road to now be a LOS D, which is within acceptable ranges. The primary factor affecting this Level of Service change was the opening of Keene Road. From a Traffic Engineering standpoint, these changed circumstances support the applicant's request. No street modifications or additional conditions are required for this modification of the operating hours. The portion of the condition regarding turn lanes and a Staff Report - Community Development Board - May 17, 2005 Case FLD2003-0904 7 A - Page 2 of 6 o o traffic signal study if the property is converted to a full service bank should be retained as a condition of approval for this modification. All applicable Code requirements and criteria including but not limited to General Applicability criteria (Section 3-913) and Comprehensive Infill Redevelopment Project criteria (Section 2- 1304.C) have been met. ' Code Enforcement Analysis: There are no outstanding enforcement issues associated with this site. COMPLIANCE WITH STANDARDS AND CRITERIA (Sections 2-1301.1 and 2-1302): (Th till . . r d d FLD2003 09047 db h CDB D b 16 2003) e 0 owmg IS as Iste un er - , approve lyt e on ecem er , STANDARD PROPOSED CONSISTENT INCONSISTENT MAXIMUM FLOOR 0.21 X AREA RATIO (FAR) (0.65) IMPERVIOUS 0.72 X SURFACE RATIO (ISR) (0.85) LOT AREA (20,000 143,210 square feet; 3.288 acres X sq. ft. minimum) LOT WIDTH (200 Belcher Road: 380 feet X feet minimum) Calumet Street: 377 feet FRONT SETBACK Belcher Road: 20 feet (to pavement) X (20 feet minimum) Calumet Street: 21 feet (to pavement) REAR SETBACK (15 N/A (Comer lots have two front X feet minimum) setbacks and two side setbacks) SIDE SETBACK (15 West: 15 feet (to pavement) X feet minimum) South: 30 feet (to pavement) HEIGHT (50 feet St. Pete Times building: 20 feet X maximum) Office building: 38 feet GTE Credit Union buildinp: 24 feet PARKING SPACES 125 spaces X (Distribution: 1.5/1000 sf; Office: 3/1 000 sf; Retail: 5/1 000 sf) (76 spaces rea.) Staff Report - Community Development Board - May 17, 2005 Case FLD2003-0904 7 A - Page 3 of 6 - o o COMPLIANCE WITH FLEXIBILITY CRITERIA (Section 2-1304.C): Consistent Inconsistent 1. The development or redevelopment of the parcel proposed for X development is otherwise impractical without deviations from the use, intensity and development standards. 2. The development of the parcel proposed for development as a X Comprehensive Infill Redevelopment Project will not reduce the fair market value of abutting properties. 3. The uses within the Comprehensive Infill Redevelopment Project are X otherwise permitted in the City of Clearwater. 4. The use or mIX of uses within the Comprehensive Infill X Redevelopment Proiect is compatible with adiacent land uses. 5. The development of the parcel proposed for development as a X Comprehensi ve Infill Redevelopment Project will upgrade the immediate vicinity of the parcel proposed for development. 6. The design of the proposed Comprehensive Infill Redevelopment X Project creates a form and function that enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. 7. Flexibility in regard to lot width, required setbacks, height and off- X street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. 8. Adequate off-street parking in the immediate vicinity according to the X shared parking formula in Division 14 of Article 3 will be available to avoid on-street parking in the immediate vicinity of the parcel proposed for development. COMPLIANCE WITH GENERAL STANDARDS Section 3-913 : Consistent Inconsistent 1. X 2. X 3. X 4. X 5. of the X 6. X Staff Report - Community Development Board - May 17,2005 Case FLD2003-0904 7 A - Page 4 of 6 - o o FINDINGS OF FACT AND CONCLUSIONS OF LAW: FINDINGS 1. The subject 3.288 acres is zoned Industrial, Research and Technology District (IRT); 2. The GTE Credit Union was approved by the Community Development Board (CDB) under Case No. FLD2003-09047 on December 16,2003, with five conditions; 3. This portion of the site has been developed with the GTE Credit Union, under Building Permit # BCP2004-06245; 4. The Traffic Study submitted in 2003 indicated Belcher Road was at a Level of Service (LOS) F and the proposed credit union would not improve the LOS; 5. A new Traffic Study has been conducted that now indicates the LOS on Belcher Road to be a LOS D, due primarily to the opening of Keene Road; 6. The condition of approval imposed by the Community Development Board on the original approval of the credit union was based on the LOS F for Belcher Road; 7. The changed circumstances support the applicant's request to modify the hours of operation restriction imposed on the original approval; CONCLUSIONS OF LAW 1. Staff concludes that the proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-803.C; 2. Staff further concludes that the proposal is in compliance with the General Applicability criteria per Section 3-913 and the other standards of the Code; and 3. Based on the above findings and proposed modified conditions, Staff recommends approval of this application. SUMMARY AND RECOMMENDATION: The Development Review Committee reviewed the original application and supporting materials on October 30, 2003. The Planning Department recommends APPROVAL of the Flexible Development application to modify an adopted condition of approval relating to hours of operation for retail sales (financial services), as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-l304.C (previously approved under Case No. FLD2003-09047, approved by the Community Development Board on December 16, 2003, a Flexible Development application to permit retail sales [financial services] with deviations to allow direct access to a major arterial street [North Belcher Road], to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C) for the site at 1750 North Belcher Road, with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-l304.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. Staff Report - Community Development Board - May 17,2005 Case FLD2003-0904 7 A - Page 5 of 6 o o 3. The development is compatible with and will not be detrimental to development/redevelopment efforts of the surrounding area. Conditions of Approval: (* Previously imposed under Case No. FLD2003-09047) * 1. That the final design and color of the buildings be consistent with the conceptual elevations submitted to, or as modified by, the CDB; *2. That use of the building on the subject property be limited to a credit union "'lith hours of operation ending at 5 :00 pm daily. The applicant shall record a covenant in the public records restricting the use of this building on the subject property, as contained in this condition, prior to the issuance of a Certificate of Occupancy for the credit union. Any future change of use of this building to a bank shall require the following: a. Construction plans be submitted and approved showing the installation of a left turn lane of adequate storage length, according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Road. Construction of this improvement must be completed prior to the issuance of an Occupational License for the bank; b. Establishment of an escrow account with the City, prior to the issuance of an Occupational License for the bank, for the future construction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if warranted by a Traffic Signal Warrant Study. The funds in the escrow account will be a shared portion of the full cost of a traffic signal light. The City's shared portion shall not exceed 50 percent of the full cost. If, in the event that a traffic signal light is not warranted based on the Study, funds will be refunded to the applicant. *3. That revised landscape plans be submitted and approved prior to the issuance of building permits for the proposed credit union reflecting Code foundation plantings; *4. That outdoor lighting fixtures be integrated into the landscape site design to avoid shielding of the lighting by tree canopy; and *5. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity. Freestanding signage shall be limited to monument-style, not to exceed six feet in height. Submission of a Comprehensive Sign Program is required for more than one freestanding sign on either street frontage. Prepared by: Planning Department Staff: M. hA ATTACHMENTS: Aerial Photograph of Site and Vicinity Location Map Future Land Use Map Zoning Atlas Map Application S:IPlanning DepartmentlC D BIFLEX (FLD)IPending cases I Up for the next CDBIBelcher N 1750 GTE Federal Credit Union (IRT) - Approved - 5.17.05 CDB - WWlBelcher N 1750 Staff Reportfor 5.17.05 CDB.doc Staff Report - Community Development Board - May 17, 2005 Case FLD2003-0904 7 A - Page 6 of 6 ~ o o Wells, Wayne From: Sent: To: Cc: Subject: Rice, Scott Thursday, April 21,20053:33 PM Wells, Wayne Elbo, Bennett FLS2003-0904 7 A - 1750 N Belcher Wayne, Bennett and I have completed review of the referenced application. Due to the opening of Keene Road since the initial revievv vvas conducted, the intersection of Calumet and Belcher now has a Level of Service D. No street modifications or additional conditions are required for this modification of the operating hours. The conditions from the DO regarding turn lanes and a traffic signal study if the property is converted to a full service bank, should be repeated as conditions of approval of this modification. Permit Plan has been updated. D. Scott Rice Land Devel. Engr. Manager 727-562-4781 scott.rice@MyC/earwater.com 1 Wells, Wayne From: Sent: To: Cc: Subject: Wells, Wayne Monday, April 04, 2005 2:09 PM Watkins, Sherry; Rice, Scott Elbo, Bennett FLD2003-09047A - 1750 N. Belcher Road, GTE Credit Union Sherry & Scott - The original case for the above address was approved by the COB on December 16, 2003 (Case FLD2003-09047). Included in the approval vvas a condition: pm That use of the building on the subject property be limited to a credit union with hours of operation ending at 5:00 daily. The applicant shall record a covenant in the public records restricting the use of this building on the subject property, as contained in this condition, prior to the issuance of a Certificate of Occupancy for the credit union. future change of use of this building to a bank shall require the follovving: a. Construction plans be submitted and approved showing the installation of a left turn lane of adequate storage according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Construction of this improvement must be completed prior to the issuance of an Occupational License for the Any length, Road. bank; b. Establishment of an escrovv account with the City, prior to the issuance of an Occupational License for the bank, for the future construction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if vvarranted by a Traffic Signal Warrant Study. The funds in the escrovv account vvill be a shared portion of the full cost of a traffic signal light. The City's shared portion shall not exceed 50 percent of the full cost. If, in the event that a traffic signal light is not vvarranted based on the Study, funds vvill be refunded to the applicant. The above case has been (re)submitted to request an amendment of this condition. A revised Traffic Study has been submitted. Duet to the nature of the request, this case is not being scheduled for DRC revievv, but rather going straight to the COB. Only 15 copies have been submitted for COB packages. Please come over and review the information to determine vvhether it is acceptable (sufficient) to be placed on the May 17, 2005, COB agenda. Should you have any questions, see me or call me. Wayne 1 ~inellas County Property Apprr' ~er Information: 01 29 15 06214 000 001 f) Page 2 of5 01 / 29 / 15 / 06214 / 000 / 0010 o 5-Ap r- 2 0 0 5 JiM 5Mi th, CFA Pinellas County Property Appraiser 07:34:42 Ownership InforMation Condo/Pud Property Add ress. Use. and SaJ.es GTE FEDERAL CREDIT UNION OBK: 13579 OPG: 1087 711 5 DA L E HABRY HWY TAHPA FL 33609-4408 EVACUA T ION ZON E: NONE COMparable sales value as Prop Addr: 1750 BELCH ER RD of Jan 1, 2004, based on Census Tract: .00 sales froM 2002 - 2003: 0 5ale Date OR Book/Page Price (Qual/UnQ) Vac/ IMp Plat InforMation 5 /2.004 13.519/1. 087 500.000 (U) I 2004: Book 132 Pgs 032- 0 /0 0/ 0 0 ( ) 0000: Book Pgs - 0 /0 0/ 0 0 ( ) 0000: Book Pgs - 0 /0 0/ 0 0 ( ) 2004 Value EXEMPTION5 Just/Market: 113.100 HOMestead: NO Ownership % .000 Govt ExeM: NO Use %: .000 Assessed/Cap: 113.100 Institutional ExeM: NO Tax ExeMpt %: .000 Historic ExeM: 0 Taxable: 113.100 Agricultural: 0 2004 Tax InforMation District: CW 5eawall: Frontage: CJ.earUJater View: 04 Mi llage : 22.9694 Land 5ize Unit Land Land Land Front x Depth Price units Meth 04 Taxes: 2.597.84 1) 0 x 0 .00 .00 5pecial Tax .00 2) 0 x 0 . 00 . 00 3) 0 x 0 . 00 . 00 Without the 5ave-Our-HoMes 4) 0 x 0 . 00 .00 cap, 2004 taxes will be : 5) 0 x 0 . 00 .00 2.597.84 6) 0 x 0 .00 .00 Without any exeMptions, 2004 taxes will be : 2.597.84 5hort Legal BELCAL COHHERCIAL CONDO UNIT 1 Description Building Information http://pao.co.pinellas.f1. us/htbinlcgi -scr3 70= 1 &a= 1 &b= 1 &c= 1 &r=.16&s=4&t3= 1 &u=O&p... 4/5/2005 Pinellas County Property Apprr' ~er Information: 01 29 15 06214 000 001 () Page 3 of5 Prop~Jj:.Y_andLand l1~eC_Qde des~ripJions 01 / 29 / 15 / 06214 / 000 / 0010 05-Apr-2005 JiM SMith, CFA Pinellas County Property Appraiser 01:34:41 General InforMation Property Use: 248 Yr BIt: 2,004 Apt **: Size: 29,565 Floor: 01 RECREATION SITE DATA None View Building Location Balcony/Porch standard warehouse co rne r none es Condo/Planned Unit Extra Featur Description DiMensions Price Units Value RCD Year 1) .00 0 0 0 0 2) .00 0 0 0 0 3) .00 0 0 0 0 4) .00 0 0 0 0 5) .00 0 0 0 0 6) .00 0 0 0 0 TOTAL RECORD VALUE: 0 Map With Property Address (non-vacant) ~~[t][f]~~ http://pao.eo.pinellas.fl. us/htbin/egi -ser3 ?o= 1 &a= 1 &b= 1 &e= 1 &r= . 16&s=4&t3= 1 &u=O&p... 4/5/2005 Pinellas County Property Apprr' ~er Information: 01 29 15 06214 000 001 f) 2JIS~ C/JLUMET ST ':::>180 C.4LJ.JMET ::,1 2198 CALUMET ST STREET 1750 r- -, BEL~ER (~{::: ~::' I 4 <.-' '__I L- ~-~ 165 ,,~4v1E T .:) -----~ -~~ 1/8 Mile Aerial Photograph (2002) @] a:: UJ ::I: U ..J UJ CD 2201 M.A.t'-lOR BLVD 17b2 MANOR AVE \~C ~ Ie) tvA.~l R AVE 175Ll M.A f'.l 0 F.' ,AVE 17t:1Q M.At',l 0 R ,AVE 1748 MAf'.lO R ,AVE 1736 M.ANOR .A,VE 1740 MANOR ,bVE 173,::] MAf'.lOR .AVE 17,32 tvlA~J~R A. '.,{ 1728 MAI"JDR .AVE 172"1 Page 4 of5 r l.LJ ~ Z U.J > < tv~~1 BL' Il t tv1M, AV I,'f M8.~, ,A. V 17f MAJ. ,A. V 17f tvlAt'-. ,A,v 17 Ll MA.~\ Air -TTZI MAt'-. ,6. V 17.: MAt' ,r:" \ If.: M~~ ,IJ.. \. 17 tvlA A --17 MA A t~.L /1" - a::: o z ~ . http://pao.co.pinellas.fl.us/htbinlcgi-scr3?0=I&a=l&b= 1 &c=1 &r=.16&s=4&t3=1 &u=O&p... 4/5/2005 Pine lIas County Property Apprr' ~er Information: 01 29 15 06214 000 001 f) Page 5 of5 Pinellas County Property Appraiser Parcel Information 8'lCk.Jo$carch...Pagc A:tL~xplanatioILof thiss.-CIC_CJ1 http://pao.eo.pinelIas.fl. us/htbin/egi -ser3 ?o= 1 &a= 1 &b= 1 &e= 1 &r= . 16&s=4&t3= 1 &u=O&p... 4/5/2005 CITY OF CLEARWATER NOTICE OF COMMUNITY DEVELOPMENT BOARD PUBLIC HEARINGS The Community Development Board of the City of Clearwater, Florida, will hold public hearings on Tuesday, May 17, 2005, beginning at 1:00 P.M., in the City Council Chambers, in City Hall, 3rd floor, 112 South Osceola Ave, Clearwater, Florida, to consider the following requests: NOTE: All persons wishinl! to address an item need to be present at the BEGINNING of the meetinl!. Those cases that are not contested by the applicant. staff. neil!hborinl! property owners. etc. will be placed on a consent al!enda and approved by a sinl!le vote at the bel!inninl! of the meetinl!. 1. (Cont. from 04-19-05) Clearwater Yacht Club. Inc. is requesting Flexible Development approval to permit a 3 story, 18,500 sq ft Yacht Club with offices, exercise room, restaurant and parking garage structure, with reductions to the front (south) setback from 15 ft to zero ft to pavement and 4 ft to building structure; to permit a building within the sight visibility triangles along Bayway Blvd, a reduction of rear (north) setback from 20 ft to zero ft to paver deck and 18 ft to building and an increase in building height from 25 ft to 46.5 ft to mean roof height, as a Comprehensive Infill Project, under the provisions of Sec 2-803.E. (Proposed Use: Marina) at 830 Bavway Blvd, Bayside Sub No 6 Unit A, Blk D, Lots 5-11 Inc!. FLD2005-01008 2. (Cont. from 04-19-05) Skiff Point of Clearwater. LLC is requesting Flexible Development approval to permit 15 attached dwelling units with reductions to the front (east) setback from 25 ft to 15 ft to building and from 25 ft to 3 ft to pavement; a reduction to the side (north and south) setbacks from 10 ft to 6.5 ft to building and 5 ft to parking; a reduction to the rear (south) setback from 15 ft to zero ft to pool deck, 5 ft to pool and 7.5 ft to parking; and an increase in height from 30 ft to 49 ft to roof deck and additional 4 ft for parapet (from roof deck to top of parapet) and an additional 16 ft for elevator overrun (from roof deck), as a Residential Infill Project, in the Island Estates Neighborhood Conservation Overlay District (IENCOD) / Medium High Density Residential (MHDR) District under the provisions of Secs 2-404(F) and 2-1602(C). [Proposed Use: Attached dwellings (15 dwelling units)] at 200 and 201 Skiff Point, Island Estates of Clearwater, Unit 5-A, Lots 35-36. FLD2005-01012 3. K & P Clearwater Estate. LLC is requesting Flexible Development approval to modify the location of an elevated pedestrian walkway over South Gulfview Blvd, as a Comprehensive Infill Redevelopment Project, under the provisions of Sec 2-803.C (previously approved under Case No. FLD2004-02013, approved by the Community Development Board on October 19,2004, for a (1) Flexible Development application to Terminate the Status of a Nonconformity for density within the Tourist District, under the provisions of Sec 6-109.C; (2) Flexible Development application to permit 350 overnight accommodation units and 75 attached dwellings as a mixed use (with increase in density of 250 hotel rooms from the Beach by Design density pool), with a reduction to the front (east along Coronado Dr) setback from 15 ft to zero ft (to building), a reduction to the front (south along proposed Second St) setback from 15 ft to zero ft (to building), a reduction to the front (west and north along South Gulfview Blvd) setback from 15 ft to zero ft (to building), an increase to the building height from 35 ft to 150 ft (to roof deck) with an additional 5 ft for perimeter parapets (from roof deck) and an additional 33 ft for elevator, stair, mechanical rooms/architectural embellishments (from roof deck), deviations to allow stacked parking, allow access to a major arterial St and allow a building within the required sight visibility triangles at the intersection of Coronado Dr and proposed Second St, as a Comprehensive Infill Redevelopment Project, under the provisions of Sec 2-803.C, and to \fJ(L~ 1110 eliminate the required foundation landscaping along Coronado Dr and proposed Second St, as a Comprehensive Landscape Program, under the provisions of Sec 3-l202.G; and (3) the vacation of a portion the right-of-way for Gulfview Blvd between Coronado Dr and proposed Second St, the vacation of the First St right-of-way between Coronado Dr and Gulfview Blvd, the dedication of right-of-way for proposed Second St between Coronado Ave and Gulfview Blvd and the dedication of right-of-way for Coronado Dr between proposed Second St and Gulfview Blvd). (Proposed Use: Hotel of 350 rooms (127.78 rooms/acre), 75 attached dwellings (27.38 units/acre) and a maximum of 37,000 sq ft (0.31 FAR) of amenities accessory to the hotel, at a height of 150 ft (to roof deck) with an additional 5 ft for perimeter parapets (from roof deck) and an additional 33 ft for elevator, stair, mechanical rooms/architectural embellishments (from roof deck) at 100 Coronado Dr and 201. 215 and 219 South Gulfview Blvd, Lloyd-White-Skinner Sub, Lots 44-55, 90-100, 102, and parts of lots 56 and 101, & Vac St and Columbia Sub Blk A. FLD2004-02013A G GTE Federal Credit Union is requesting Flexible Development approval to modify an adopted condition of approval relating to hours of operation for a retail sales (financial services), as a Comprehensive Infill Redevelopment Project, under the provisions of Sec 2-1304.C (previously approved under Case No. FLD2003-09047, approved by the Community Development Board on December 16,2003, a Flexible Development application to permit retail sales [financial services] with deviations to allow direct access to a major arterial St [North Belcher Rd], to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Sec 2-1304.C). (Proposed Use: Credit Union) at 1750 North Belcher Rd, Belcal Commercial Condo, Unit 1. FLD2003-09047A 5. Corbett Development. Inc. is requesting Flexible Development approval to permit offices with a reduction to the minimum lot area from 20,000 sq ft to 14,810 sq ft, a reduction to the front (west) setback from 20 ft to 15.5 ft (to pavement), a reduction to the front (south) setback from 20 ft to 10 ft (to pavement), a reduction to the side (north) setback from 15 ft to 5 ft (to pavement), reductions to the side (east) setback from 15 ft to 9 ft (to building and garage) and from 15 ft to 5 ft (to pavement) and to increase the size of an accessory garage structure from 10 percent to 15 percent of the gross floor area of the primary structure, as a Comprehensive Infill Redevelopment Project, under the provisions of Secs 2-1304.C and 3-201. (Proposed Use: A two-story, 4,000 sq-ft office building with an accessory 600 sq-ft garage) at 1315 South Fort Harrison Ave, Belleair, Blk 13, Lots 9-11 Incl & W 12 Vac Alley. FLD2005-02019 6. Power Le2al Advisory. Inc. is requesting (1) Flexible Development approval to permit 2 attached dwellings with a reduction to the minimum lot area from 15,000 sq ft to 9,486 sq ft, a reduction to the minimum lot width from 150 ft to 70 ft and a deviation to permit parking that is designed to back into the public right-of-way, as a Residential Infill Project, under the provisions of Sec 2-404.F; and (2) Preliminary Plat approval for a 2 lot subdivision, under the provisions of Sec 4-702 (PLT2005-00005). (Proposed Use: 2 attached dwellings) at 111 Kenwood Ave, R.H. Padgett's Estates Re Sub, Lot 10. FLD2005-02023 7. Spinecare Properties. LLC is requesting Flexible Development approval to permit a 2 story, 45,000 sq ft medical clinic with non-residential off-street parking in the Low Medium Density Residential District under the provisions of Sec 2-204.C; a reduction to the front (west) setback from 25 ft to 15 ft to pavement; a reduction to the side (south) setback from 10 ft to 4 ft to parking; and an increase in building height from 30 ft to 35 ft for top of parapet and to 43 ft for elevator/stair tower; as a Comprehensive Infill Project, under the provisions of See 2-l204.A and a Comprehensive Landscape Program under the provisions of Sec 3-l202.G. (Proposed Use: Medical Clinic) at 3280 McMullen Booth Rd, Geiger Tract, Lot 1, & Sec 21-28-16, M&B 22.01. FLD2005-01014 8. Four Seasons Development. LLC, (Pierre Cournoyer) are requesting Preliminary Plat approval for 4 residential townhome lots to be called "Four Seasons Townhomes" as previously approved under FLD2002-l2044. (Proposed Use: Attached Dwellings) at 100 North Ladv Mary Dr, Brookwood Terrace Revised, Blk 2, Lots 15-16 & part of Lot 14. PLT2005-00003 Interested parties may appear and be heard at the hearings or file written notice of approval or objection with the Planning Interested parties may appear and be heard at the hearing or file written notice of approval or objection with the Planning Director or City Clerk prior to the hearing. Any person who decides to appeal any decision made by the Board or Council, with respect to any matter considered at such hearings, will need to request a record of the proceedings and, for such purpose, may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based per Florida Statute 286.0105. Community Development Code Sec 4-206 states that party status shall be granted by the Board in quasi-judicial cases if the person requesting such status demonstrates that s/he is substantially affected. Party status entitles parties to personally testify, present evidence, argument and witnesses, cross-examine witnesses, appeal the decision and speak on reconsideration requests, and needs to be requested and obtained during the case discussion before the CDB. An oath will be administered swearing in all persons giving testimony in quasi-judicial public hearing cases. If you wish to speak at the meeting, please wait to be recognized, then state and spell your name and provide your address. Persons without party status speaking before the CDB shall be limited to three minutes unless an individual is representing a group in which case the Chairperson may authorize a reasonable amount of time up to 10 minutes. Five days prior to the meeting, staff reports and recommendations on the above requests will be available for review by interested parties between the hours of 8:30 a.m. and 4:30 p.m., weekdays, at the City of Clearwater, Planning Department, 100 S. Myrtle Ave., Clearwater, FL 33756. Please contact the case presenter, at 562-4567 to discuss any questions or concerns about the project and/or to better understand the proposal and review the site plan. Michael Delk Planning Director Cynthia E. Goudeau, CMC City Clerk City of Clearwater P.O. Box 4748, Clearwater, FL 33758-4748 NOTE: Applicant or representative must be present at the hearing. A COpy OF TillS AD IN LARGE PRINT IS AVAILABLE IN OFFICIAL RECORDS AND LEGISLATIVE SERVICES. ANY PERSON WITH A DISABILITY REQUIRING REASONABLE ACCOMMODATION IN ORDER TO PARTICIPATE IN TillS MEETING SHOULD CALL (727) 562-4093 WITH THEIR REQUEST. Ad: 05-01-05 FLOdOO::> "0 ~CYlf]A \150101 -e:,e-,cher~ ANDERSON, ROBERT 0 BEACH, CRAIG S ANDERSON,ROWENA BEACH,SHERYLL 1724 RAGLAND AVE 1750 RAGLAND AVE CLEARWATER FL 33765 - 1635 CLEARWATER FL 33765 - 1635 vJ~~l~ BELCAL COMMERCIAL CONDO ASSN I 2040 NE COACHMAN RD CLEARWATER FL 33765 - 2614 BELCAL PROP 2040 NE COACHMAN RD CLEARWATER FL 33765 - 2614 BONIFACE, DOUGLAS L BONIFACE, JEAN E 2212 MANOR BLVD N CLEARWATER FL 33765 - 1612 BOULES, MICHAEL F BOULES, ANSAF S 2201 MANOR BLVD N CLEARWATER FL 33765 - 1613 BRONSON, RICHARD A BRONSON, DAWN M 2200 S LAGOON CIR CLEARWATER FL 33765 - 1606 BROWN, JOSEPH N BROWN, DOROTHY L 1750 W MANOR AVE CLEARWATER FL 33765 - 1610 BUTLER, FREDERICK J 5900 SHORE BLVD S # 401 GULFPORT FL 33707 - 5933 CALABRESE, FRANK 1728 RAGLAND AVE CLEARWATER FL 33765 - 1635 CARPENTER, RALPH A CARPENTER, MARY A 1736 RAGLAND AVE CLEARWATER FL 33765 - 1635 Clearvvater Neighborhoods Coalition Doug Williams, President 2544 Frisco Dr Clearvvater, FL 33761 CLEVELAND-OSCEOLA LLC 519 CLEVELAND ST STE 101 CLEARWATER FL 33755- COE, JAY L COE, DEBORAH L 1762 W MANOR AVE CLEARWATER FL 33765 - 1610 CONSOLIDATED ELECTRICAL DISTRI 330 19TH AVE N STE 210 NASHVILLE TN 37203 - 2129 CROCKETT, ADDISON R 4029 E AMBERWOOD DR PHOENIX AZ 85048 - 7474 CURRENT OWNER 2224 LAGOON CIR S CLEARWATER FL 33765 - 1619 DEPCO PUMP CO INC POBOX 7714 CLEARWATER FL 33758 - 7714 DERZEKOS, CHRIS 1720 RAGLAND AVE CLEARWATER FL 33765 - 1635 DOWNIN, ROBERT R 12000 CREEKBEND DR RESTON VA 20194 - 5615 DURAVA,CHARLOTTE 1815 STETSON DR CLEARWATER FL 33765 - 1422 EASTHAM, STEPHEN R 1711 W MANOR AVE CLEARWATER FL 33765 - 1611 ESTER, STEPHEN F ESTER, RENDA K 1759 W MANOR AVE CLEARWATER FL 33765 - 1611 EVANS, ARTHUR C 1744 RAGLAND AVE CLEARWATER FL 33765 - 1635 FLORIDA BLOOD SERVICES INC PO BOX 22500 ST PETERSBURG, FL 33742 - 2500 Gerald A. Figurski Esq. 2550 Permit Place Holiday, FL 34655 GRIDER, ANGELA M GRIDER, JOEL 0 1734 W MANOR AVE CLEARWATER FL 33765 - 1610 GTE FEDERAL CREDIT UNION 711 S DALE MABRY HWY TAMPA FL 33609 - 4408 HARRIS, SEAN HARRIS, NASHUN 1716 MANOR AVE W CLEARWATER FL 33765 - 1610 HEILMANN, FRANCIS J III 1758 W MANOR AVE CLEARWATER FL 33765 - 1610 . HERRERA, JUSTIN HEUSINGER, CHERYL S HUBER, GAIL A 1741 W MANOR AVE 1754 W MANOR AVE HUBER, LAUREN CLEARWATER FL 33765 - 1611 CLEARWATER FL 33765 - 1610 2216 MANOR BLVD N CLEARWATER FL 33765 - 1612 JOHNSON, STEVEN F LA MASTRA, JOSEPH S LAWSON, JAMES R JENKINS, PATTY A LA MASTRA, MARY LAWSON, SANDRA K 1728 W MANOR AVE 1733 W MANOR AVE 1754 RAGLAND AVE CLEARWATER FL 33765 - 1610 CLEARWATER FL 33765 - 1611 CLEARWATER FL 33765 - 1635 MALlNOVIC, DRAGAN MAQUET, GORDON L MAXWELL, WALTER K MALlNOVIC, MICA MAQUET, LORETTA MAXWELL, JERI S 1763 W MANOR AVE 1762 RAGLAND AVE 1740 W MANOR AVE CLEARWATER FL 33765 - 1611 CLEARWATER FL 33765 - 1635 CLEARWATER FL 33765 - 1610 MAYES, CHRISTY L MINIERI SEMINOLE INC NGUYEN, MANH V 1732 MANOR AVE W 29656 US HIGHWAY 19 N STE 100 PHAM, LE ANH CLEARWATER FL 33765 - 1610 CLEARWATER FL 33761 - 1729 W MANOR AVE CLEARWATER FL 33765 - 1611 PCM LLC PINELLAS COUNTY RUTZ, CHARLES J TRE 8310 S VALLEY HWY # 400 315 COURT ST RUTZ, JANET C TRE ENGLEWOOD CO 80112- CLEARWATER FL 33756 - 5165 2694 BRA TTLE LN CLEARWATER FL 33761 - 1200 SCHNEIDER, ROLAND H TRE SHOWER, BARBARA A SIMPSON, BETTY L 1770 RAGLAND AVE SHOWER, DONNA A MC CRACKEN, DAVID CLEARWATER FL 33765 - 1635 1748 W MANOR AVE 2144 CALUMET ST CLEARWATER FL 33765 - 1610 CLEARWATER FL 33765 - 1309 SISK, CHARLOTTE S SLACK, BARRY R SORENSEN, DONNA L 1740 RAGLAND AVE SLACK, CHRISTINE R 1732 RAGLAND AVE CLEARWATER FL 33765 - 1635 1736 W MANOR AVE CLEARWATER FL 33765 - 1635 CLEARWATER FL 33765 - 1610 TAYLOR, LOIS A THRAP, CHRISTOPHER E JR TIFFIN, JAY H TRE 1721 W MANOR AVE 1749 W MANOR AVE CATLIN, HELEN 0 TRUST CLEARWATER FL 33765 - 1611 CLEARWATER FL 33765 - 1611 5 DESOTO PL BELLEAIR FL 33756 - 1021 TILLERY, BILLY G TORRE, ERMINDA F TRUSTEE CO TRE 1751 W MANOR DR 3076 GLENHURST AVE 119-80-1716 TRUST CLEARWATER FL 33765 - 1611 LOS ANGELES CA 90039 - 2319 PO BOX 466 DUNEDIN FL 34697 - 0466 TUCKER, MARK L UNDERWOOD, BARBARA A USSERY, J C TUCKER, LISA M 1724 W MANOR AVE USSERY, CAROL YN R 2201 S LAGOON CIR CLEARWATER FL 33765 - 1610 1944 REDBUD WAY CLEARWATER FL 33765 - 1607 SEVIERVILLE TN 37876 - 0850 . ~ . VAN SCOYOC, ROBERT VAN SCOYOC, MARIL YNNE 1725 W MANOR AVE CLEARWATER FL 33765 - 1611 WICKMAN, CLIFFORD L JR 5900 SHORE BLVD S # 401 ST PETERSBURG FL 33707 - 5933 YOUSSEF, NABIL F YOUSSEF, NADIA Z 1735 W MANOR AVE CLEARWATER FL 33765 -1611 WALKER, BRIAN R WALKER, JENNIFER M 2213 LAGOON CIR S CLEARWATER FL 33765 - 1607 WALKER, JOSEPH 0 WALKER, BETTY L 2217 MANOR BLVD N CLEARWATER FL 33765 - 1614 WOOD, JAMES E WOOD, ELIZABETH A 1755 W MANOR AVE CLEARWATER FL 33765 - 1611 YOST, L MARTIN YOST, ELISABETH A 1431 RIDGETOP WAY CLEARWATER FL 33765 - 1733 FLD2003-0904 7 A 1750 N Belcher Rd \ C I T Y 0 F CLEARWATER PLANNING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAl SERVlCES BUILDING, 100 SOUTH MYRTIE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4576 LONG RANGE PLA."iNING DEVELOPMENT REvIEW May 18, 2005 Mr. Gerald A. Figurski, Esquire 2550 Permit Place Holiday, FL 34655 RE: Development Order - Case No. FLD2003-09047A 1750 North Belcher Road Dear Mr. Figurski: This letter constitutes a Development Order pursuant to Section 4-206.D.6 of the Community Development Code. On May 17, 2005, the Community Development Board reviewed your request for Flexible Development approval to modify an adopted condition of approval relating to hours of operation for retail sales (financial services), as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C (previously approved under Case No. FLD2003-09047, approved by the Community Development Board on December 16, 2003, a Flexible Development application to permit retail sales [financial services] with deviations to allow direct access to a major arterial street [North Belcher Road], to allow the use as a permitted use and in a separate, primary building and to allow the use to serve patrons beyond the industrial area, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2-1304.C). The Community Development Board (CDB) APPROVED the applications with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-1304.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with and will not be detrimental to development/redevelopment efforts of the surrounding area. Conditions of Approval: (* Previously imposed under Case No. FLD2003-09047) * 1. That the final design and color of the buildings be consistent with the conceptual elevations submitted to, or as modified by, the CDB; *2. That use of the building on the subject property be limited to a credit union. The applicant shall record a covenant in the public records restricting the use of this building on the subj ect property, as contained in this condition, prior to the issuance of a Certificate of Occupancy for the credit union. Any future change of use of this building to a bank shall require the following: a. Construction plans be submitted and approved showing the installation of a left turn lane of adequate storage length, according to City and Florida Department of Transportation design standards, on Calumet Street at North Belcher Road. Construction of this BRIAN J. AUNGST, MAYOR-COMMISSIONER HoYf HAMILTON, VICE MAYOR-COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BILl. JONSON, COMMISSIONER "EQUAl EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" May 18, 2005 Figurski - Page Two improvement must be completed prior to the issuance of an Occupational License for the bank; b. Establishment of an escrow account with the City, prior to the issuance of an Occupational License for the bank, for the future construction of a traffic signal light at the intersection of North Belcher Road and Calumet Street, if warranted by a Traffic Signal Warrant Study. The funds in the escrow account will be a shared portion of the full cost of a traffic signal light. The City's shared portion shall not exceed 50 percent of the full cost. If, in the event that a traffic signal light is not warranted based on the Study, funds will be refunded to the applicant. *3. That revised landscape plans be submitted and approved prior to the issuance of building permits for the proposed credit union reflecting Code foundation plantings; *4. That outdoor lighting fixtures be integrated into the landscape site design to avoid shielding of the lighting by tree canopy; and *5. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity. Freestanding signage shall be limited to monument-style, not to exceed six feet in height. Submission of a Comprehensive Sign Program is required for more than one freestanding sign on either street frontage. Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (May 17, 2006). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Coordinator may grant an extension of time for a period not to exceed one year and only within the original period of validity. The Community Development Board may approve one additional extension of time after the community development coordinator's extension to initiate a building permit application. The issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4-502.B by the applicant or by any person granted party status within 14 days of the date of the CDB meeting. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on June 1, 2005 (14 days from the date of the CDB meeting). If you have any questions, please do not hesitate to call Wayne M. Wells, Planner 1lI, at 727-562-4504. You can access zoning information for parcels within the City through our website: www.myclearwater.com/gov/depts/planning. *Make Us Your Favorite! S.incer. el.y~ .. ... " ~-o ~~~... Mic~~L lCP Planning Director S:IPlanning DepartmentlC D BIFLEX (FLD)IInactive or Finished ApplicationslBelcher N 1750 GTE Federal Credit Union (IRT) - ApprovedlBelcher N 1750 Development Order #2 5.18. 05.doc