Loading...
FLD2003-01005 ) . e. ~ Clearwater -~~ ~ Planning Department 100 South Myrtle Avenue Clearwater. Florida 33756 Telephone: 727-562-4567 Fax: 727-562-4865 CASE #: DATE RECEIVED: RECEIVED BY (staff initials): ATLAS PAGE #: ZONING DISTRICT: LAND USE CLASSIFICA nON: SURROUNDING USES OF ADJACENT PROPERTIES: NORTH: SOUTH: WEST: EAST: r7' SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION c:( SUBMIT 12 COPIES OF THE ORIGINAL APPLICATION including 1) collated, 2)' stapled and 3) folded sets of site plans o SUBMIT APPLICATION FEE $ tJlA * NOTE: 13 TOTAL SETS OF INFORMATION REQUIRED (APPLICATIONS PLUS SITE PLANS SETS) RECE1V A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Section 4-202.A) APPLICANT NAME: City of Clearwater MAILING ADDRESS: 610 Franklin Street. Clearwater. FL 33756 E-MAIL ADDRESS: whanson@clearwater fl.com PHONE NUMBER: ( 727) 562-4334 CELL NUMBER: ( 727) 224-7360 FAX NUMBER: ( 727) 562-4328 PROPERTY OWNER(S): City of Clearwater (Must include ALL owners) AGENT NAME(S): TBE Group MAILING ADDRESS: 380 Park Place Boulevard, Suite 300, Clearwater, FL 33759 E-MAIL ADDRESS: bzarlenga@tbegroap.com PHONE NUMBER: ( 727) 531-3505 CELL NUMBER: ( 727) 639-5569 FAX NUMBER: ( 727) 539-1294 B. PROPOSED DEVELOPMENT INFORMATION: STREET ADDRESS of subject site: 1720 Overbrook Drive LEGAL DESCRIPTION: As shown on enclosed boundary survey (see attached). (if not listed here, please note the location of this document in the submittal) PARCEL NUMBER: PARCEL SIZE: 1. 59 acres. 69,2?4 SF (acres, square feet) PROPOSED USE AND SIZE: Fire and Rescue Station - Single Story - 12.300 SF +/- (number of dwelling units, hotel rooms or square footage of nonresidential use) DESCRIPTION OF REQUEST(S): Reduction in number of parking s pac e s ~ ~)i ~~ >r~~~:())CJX. (include ali requested code deVIations; e.g. reduction In required number of parking soaces, specific use, etc.) increase height of solid PVC fence from 6 feet to 8 feet. f-ttj 1 B [U03 FLEXIBLE DEVELOPMENT APPLICATION Comprehensive Infill Redevelopment Project (Revisedp~ING DEPARTMENT CITY UI- vLI::AF{WATER -PLEASE TYPE OR PRINT-use additional sheets as necessary Page 1 of 7 - Flexible Development Application - Comcrehensive Infill Redevelopment Project- City of Clearwater 1" , J, DOES THIS APPLICATION INVOLVE THE I , NSFER OF DEVELOPMENT RIGHTS (TDR), A PREV USL Y APPROVED PLANNED UNIT DEVELOPMENT, OR A PREVIOUSLY APPROVED (CERTIFIED) SITE PLAN? YES _ NO --L (if yes, attach a copy of the applicable documents) C. PROOF OF OWNERSHIP: (Section 4-202.A) o SUBMIT A COpy OF THE TITLE INSURANCE POLICY, DEED TO THE PROPERTY OR SIGN AFFIDAVIT ATTESTING OWNERSHIP (see page 6) D. WRITTEN SUBMITTAL REQUIREMENTS: (Section 3-913.A) o Provide complete responses to the six (6) GENERAL APPLICABILITY CRITERIA - Explain how each criteria is achieved, in detail: 1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is locatep. 1 . d . d t b . h . h th . d t' 1 1 The proposed deve opment 1S eS1gne 0 e ln armony W1t e reS1 en 1a sca e and use of materials as much as possible given the nature of the facility. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. The surrounding prooerty is liqht industrial and residential. The proposed development is in keeping with the tone and tenor of the neighborhood and should encouraqe similar development. 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. () The prooerty development is a Public-Safety Facility Fire Rescue Facility and so will improve the health and safety of the neighborhood. 4. The proposed development is desiQ.ned to minimize traffic congestion. The proposed f1re stat10n will have a staff of only 9 people which may double only at shift change. There is no expectation that there will be any more traffic qenerated beyond this. 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. Community character of the area is liqht industrial and residential. The proposed development uses residential materials and scales. 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjac~t properties. Hours OT operation are 24 hours/day, 7 days/week - The building has been placed to sheild truck and siren noise from the residential area to the south upon the fire rescue vehicles exitinq the facility. Also, proposed is an ~ foot high PVC privacy fence along the south property line. o Provide complete responses to the ten (10) COMPREHENSIVE IN FILL REDEVELOPMENT PROJECT CRITERIA (as applicable) _ Explain how each criteria is achieved in detail: 1. The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use. intensity and development standards. The buildinq height is dictated by the equipment required to fit under it, and on-site parkinq is limited by area constraints. The increased height of the fence is an improvement to the already existing 8 foot dilapidated metal fence. Page 2 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . . 2. The development of the parcel proposed for development as a comprehensive infill redevelopment project or residential infill project will not reduce the fair market value of abutting properties. (Include the existing value of the site and the proposed value of the site with the improvements.) The proposed development will reduce insurance rates and fire rescue response times in the vicinit The current property is valued at ml lone 3. The uses within the comprehensive infill redevelopment project are otherwise permitted in the City of Clearwater. Fire rescue stations are a public. civic use and are permitted in the City of Clearwater. 4. The uses or mix of use within the comprehensive infill redevelopment project are compatible with adjacent land uses. Adjacent land use is typically residential and liqht industrial and all adjacent land uses will be serviced by the proposed fire rescue facility. 5. Suitable sites for development or redevelopment of the uses or mix of uses within the comprehensive infill redevelopment project are not otherwise available in the City of Clearwater. This site was chosen after an exhaustive search for suitable property. Studies in fire orotection dictated this qeneral location. 6. The development of the parcel proposed for development as a comprehensive infill redevelopment project will upgrade the immediate vicinity of the parcel proposed for development. Firp prntection response times are expected to be cut dramatically in the immediate vicinity of the proposed development. 7. The design of the proposed comprehensive in fill redevelopment project creates a form and function that enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. Building mass is broken into smaller portions to more closely relate to residential surroundinqs. 8. Flexibility in regard to lot width, required setbacks, height and off-street parking are justified by the benefits to community character and the irTJm~diate vicinity of the pijrcel wpposed for develoP,rTlel1l a"q the City of Clearwater as jl whple. He1qnt Var1anCe 1S a1ctated by ne1gnt ot equ1pment to De housed - off-street parking is provided for designed shift-changes only. 9. Adequate off-street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on-s\riEl,t parking in the immedi"lte vicinity .of parcel proposed fqr development. There Wl I be no snarea parK1ng agreement. 10. The design of all buildings complies with the Tourist District or Downtown District design guidelines in Division 5 of Article 3 (as applicable). Use separate sheets as necessary. The building is not in the tourist disctrict or downtown district. Page 3 of 7 - Flexible Development Application - Comprehensive Intill Redevelopment Project- City of Clearwater E. SUPPLEMENTAL SUBMITTAL: EQUIREMENTS: (Code Section 4-202.A) ~ SIGNED AND SEALED SURVEY (including legal description of property) - One original and 12 copies; 'if TREE SURVEY (including existing trees on site and within 25' of the adjacent site, by species, size (DBH 4" or greater), and location, including drip lines and indicating trees to be removed); if LOCATION MAP OF THE PROPERTY; (~.a.,r..y ~ ~"'.:.:.\c~c.J c..,<,j;\.r....d-\,j."\ pk\r\c;" - c...v-~.- She~+ ') o PARKING DEMAND STUDY in conjunction with a request to make deviations to the parking standards (ie, Reduce number of spaces). Prior to the submittal of this application, the methodology of such study shall be approved by the Community Development Coordinator and shall be in accordance with accepted traffic engineering principles, The findings of the study will be used in determining whether or not deviations to the parking standards are approved; Nj A 'fIf' GRADING PLAN, as applicable; o PRELIMINARY PLAT, as required (Note: Building permits will not be issued until evidence of recording a final plat is provided); (flIA) COpy OF RECORDED PLAT, as applicable; ~ F. ~ )l A :;: ,. "- ):, ..L L '" ~ ~ SITE PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A) SITE PLAN with the following information (not to exceed 24" x 36"): All dimensions; North arrow; Engineering bar scale (minimum scale one inch equals 50 feel), and date prepared; Location map; Index sheet referencing individual sheets included in package; Footprint and size of all EXISTING buildings and structures; Footprint and size of all PROPOSED buildings and structures; All required setbacks; All existing and proposed points of access; All required sight triangles; Identification of environmentally unique areas, such as watercourses, wetlands, tree masses. and specimen trees, including description and location of understory, ground cover vegetation and wildlife habitats, etc; Location of all public and private easements; Location of all street rights-of-way within and adjacent to the site; Location of existing public and private utilities, including fire hydrants, storm and sanitary sewer lines, manholes and lift stations, gas and water lines; All parking spaces, driveways, loading areas and vehicular use areas, including handicapped spaces; Depiction by shading or crosshatching of all required parking lot interior landscaped areas; Location of all solid waste containers, recycling or trash handling areas and outside mechanical equipment and all required screening {per Section3-201(D)(i)andlndex#701};__ j -. .. ~'_n~16: Location of all landscape material; Location of all jurisdictional lines adjacent to wetlands; Location of all onsite and offsite storm-water management facilities; Location of all outdoor lighting fixtures; and Location of all existing and proposed sidewalks ~ L ~ ~ l x ;oil,., ~ ~ ~ SITE DATA TABLE for existing, required, and proposed development, in written/tabular form: Land area in square feet and acres; Number of EXISTING dwelling units; Number of PROPOSED dwelling units; Gross floor area devoted to each use; Parking spaces: total number, presented in tabular form with the number of required spaces; Total paved area, including all paved parking spaces and driveways, expressed in square feet and percentage of the paved vehicular area; Size and species of all landscape material; Official records book and page numbers of all existing utility easement; Building and structure heights; Impermeable surface ratio (I.SR,); and Floor area ratio (FAR.) for all nonresidential uses x jl. ".( X ~ ~ A.. )( L o REDUCED SITE PLAN to scale (8 'h X 11) and color rendering if pOSSible ~ L )0: :,.; KIA 2:.- )l,. ;0:.. 'X: FOR DEVELOPMENTS OVER ONE ACRE, provide the following additional information on site plan: One-foot contours or spot elevations on site; Offsite elevations if required to evaluate the proposed stonmwater management for the parcel; All open space areas; Location of all earth or water retaining walls and earth berms; Lot lines and building lines (dimensioned); Streets and drives (dimensioned); Building and structural setbacks (dimensioned); Structural overhangs: Tree Inventory; prepared by a "certified arborist", of all trees 8" DBH or greater, reflecting size. canopy (drip lines) and condition of such trees Page 4 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . G. LANDSCAPING PLAN SUB ~ LANDSCAPE PLAN: ;.. All existing and proposed struc ~ Names of abutting streets; ..L Drainage and retention areas i - Delineation and dimensions of ...L Sight visibility triangles; ~ Delineation and dimensions of A- Proposed and required parking ..::l.- Existing trees on-site and imm required tree survey); .L Location, size, description, spe common names; -1- Typical planting details for tree protective measures; - Interior iandscaping areas hat f'Ji" percentage covered; Conditions of a previous devel .2L Irrigation notes ~ REDUCED LANDSCAPE PLA 0 IRRIGATION PLAN (required 0 COMPREHENSIVE LANDSC H. STORMWATER PLAN SU 4-202.A.21) ri STORMWATER PLAN includi .1L Existing topography extending .:L Proposed grading including fi 2L All adjacent streets and munic ~ Proposed stormwater detentio ..x.. Stormwater calculations for a ~ Signature of Florida registere 0 COPY OF PERMIT INQUIRY (SWFWMD approval is requir 0 COpy OF STATE AND COU I. BUILDING ELEVATION P Required in the event the applicati of a Comprehensive Infill Redevel ./ BUILDING ELEVATION DRAWIN crI REDUCED BUILDING ELEVATIO possible) as required J. SIGNAGE: (Division 19. SI 0 All EXISTING freestanding and att to remain. rd All PROPOSED freestanding and i:J Comprehensive Sign Program ap a Reduced signage proposal (8 Y:z X Page 5 of 7 - Flexib . . MITTAL REQUIREMENTS: (Section 4-1102.A) tures; ncluding swales, side slopes and bottom eievations; all required perimeter landscape buffers; all parking areas including landscaping islands and curbing; spaces; ediately adjacent to the site, by species, size and locations, including dripline (as indicated on cifications and quantities of all existing and proposed landscape materials, including botanical and s, palms, shrubs and ground cover plants including instructions. soil mixes, backfilling, mulching and ched and/or shaded and labeled and interior landscape coverage. expressing in both square feet and opment approval (e.g. conditions imposed by the Community Development Board); N to scale (8 Y:z X 11) (color rendering if possible) for Level Two and Three applications) APE PROGRAM application, as applicable BMITTAL REQUIREMENTS: (City of Clearwater Design Criteria Manual and ng the following requirements: 50 feet beyond all property lines; nished floor elevations of all structures; ipal storm systems; n/retention area including top of bank, toe of slope and outlet control structure; ttenuation and water quality; d Professional Engineer on all plans and calculations LETTER OR SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT (SWFWMD) PERMIT SUBMITTAL ed prior to issuance of City Building Permit), if applicable NTY STORMWATER SYSTEM TIE-IN PERMIT APPLICATIONS. if applicable LAN SUBMITTAL REQUIREMENTS: (Section 4-202.A.23) on includes a development where design standards are in issue (e.g. Tourist and Downtown Districts) or as part opment Project or a Residential Infill Project. GS - all sides of all buildings including height dimensions. colors and materials NS - four sides of building with colors and materials to scale (8 Y:z X 11) (black and white and color rendering, if GNS I Section 3-1806) ached signs; Provide photographs and dimensions (area, height, etc.), indicate whether they will be removed or attached signs; Provide details including location. size, height, colors, materials and drawing plication, as applicable (separate application and fee required). 11) (calor), if submitting Comprehensive Sign Program application. Ie Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater K. TRAFFIC IMPACT STUDY: (Section 4-202.A.13 and 4-801.C) a Include as required if proposed development will degrade the acceptable level of service for any roadway as adopted in the Comprehensive Plan. Trip generation shall be based on the most recent edition of the Institute of Transportation Engineer's Trip General Manual. Refer to Section 4-801 C of the Community Deveiopment Code for exceptions to this reql,lirement. L. SIGNATURE: I. the undersigned, acknowledge that all representations made in this application are true and accurate to the best oi my knowledge and authorize City representatives to visit and photograph the property described in this application. ~~~C'~ Signature of property owner or representative ).c).)l..{ Page 6 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . . M. AFFIDAVIT TO AUTHORIZE AGENT: City of Clearwater (Names of all property owners) 1. That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location): 1720 Overbrook Drive (previouslv known as "Central FLA Used AIJtn Pi'lrtc;lI) 2. That this property constitutes the property for which a request for a: (describe request) Construction of Northwest Fire and Rescue Station No. 51 3. That the undersigned (has/have) appointed and (does/do) appoint: TBE Group as (his/their) agent(s) to execute any petitions or other documents necessary to affect such petition; 3. That this affidavit has been executed to induce the City of Clearwater. Florida to consider and act on the above described property; 4. That the applicant acknowledges that all impact fees (parks and recreation, traffic, etc.) will be paid PRIOR to the issuance of a building permit, certificate of occupancy, or other mechanism, whichever occurs first; 5. That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City representatives to visit and photograph the property described in this application; 6. That (I/we), the undersigned authority, hereby certify that the foregoing is true and correct. City of Clearwater Property Owner ~/~ C--' ;ft;~~ Property Owner Before me the undersigned, an officer duly commissioned by the laws of the Sta,te of Florida, on this r""l"",*^/ , ;:l 003 personally appeared RtJvJJ4Y>d E. H .uqJt;( Deposes and says that he/she fully understands the contents of the affidavit that he/she signed. q)}\ V'~ My Commission Expires: Ya..", )7/ )Ov If. ~\""'t1U"""'l '1t.",... ~a~ne Hat} 'II"" ~~. ......... ~o~ ~ ~ .~. SION /:':~" ~ J ~ .0 1"~27~' ~ 1J q ~ .. ~ .:j~ ' <''tL~ .. ;... ~ - ~ : ~ dav ot "'-: 1rrsi _.4 .* who having beEl!! Ir duly sworn . ~ 'Z ~ #CC905979 : ;S '--0- .~ ~ ::;.\ .. effi ~ ~~...:''by~~.A,'''Q~ ;" -;. .0 "'-lII-lffl\I<";. ~~ 'III/ Ie ST"; "", """'11111\\"'" COUNTY OF PINELLAS STA TE OF FLORIDA, S:IPianning DepartmentlApplication Formsldevelopment review\2002 Formslcomprehensive infi" application 2002.doc Page 7 of 7 - Flexible Development Application - Comprehensive Infilf Redevelopment Project- City of Clearwater 1212/18/21211213 1219:19 72756. \....OrpOrale ranty Deed ENG . \ This Indenture, made this 31st: day of October A.D. 2002 Between CE~RAL FLORID~ USED AUTO PARTB, INC. whose post office address is: a corporation existing under the Jaws of tl)e State of FLORIDA CIT~ OF CLEARWA~ER ,Grantor 8.lId whose post office address is: P . O. :BOX 4748 CLEARWAT~R, Ft 33758-4746 Grantee. Witnesseth, that the sald Grantor, for and in consideration of the sum of ( Ten &, NO/10 0 ) Dollars, to It In hand paid by the said Grantee, the receipt whereof is bereby acknOWledged, bas granted, bargained and sold to the said Grantee lorever, tbe following deacrjbecj land, situate, lying and being in the COUXllY of Pinellaa , State off/lorida. to wit SEE ATTACHED SCHEDULE "A" LEGAL DESCRIPTION Subject to covenants, restrictiona and easements of record. Subject also to taxe~ for 2002 and subsequent years. Parcel Identificqtion Number: 03/29/lS/00000/430/0S00 And tbe said Grantor does hereby fullywarranl the title to said land, and will defend the same against the lawful claims of all persons wl)omsoever. In Witness Whereof, the said Grantor has caused lIJ.is instrument to be e;x:ecuted in its name by Its duly authorimi officer and caused ita corporate seal to be affi;x:ed the day and year fil'st above written. USED A~O P~RTS, By: (COlporate Sea.I) S~te of County of Florida Pinellas The foregoing instrument was acknowledged before me this 31st day of October J~CK VASILARoS, ~RESIDENT of CEN'I'RAL FLORIDA, USED AUTO P~RTg, INC. , :2 0 02 ,by a COrporation eXisting under the laws of the State of He/She is personally known to me or hu produced CWD-l 6/99 . on behalf of the colporatiol~. a . (cation. PRE~ARED BY, RECORD & RETURN TO: L~DIA M~SSINA - File #92103 EPIC DIVISION Firet American Title Insurance 7360 Bryan Dairy Road, Suite 200 Largo, FL 33776 I l... NIi!SSlN" ~ NoWyPullio,st&itolAll!l<la My Comm. E)!I). Jan. S. 20116 . ',' ^I"'(\A?n4f\ PAGE 1212 02/18/2003 09:19 72756.5 ENG ~ -> SCHEDULE A LEGAL DESCRIPTION " . PAGE El3 That Part of the SW 1/4 of the SE 1/4 of Section 3, To~nShiP 29 S, Range 15 E,described as folloWSt Beginning in the W st boundary of the public thoroughfare known as "Betty La e" at a point which bears N 89036'07" W, 68.91 feet from the Scorner of said SW 1/4 of SE 1/4; and running thence on the s~e bearing, along the south boundary of said SW 1/4 of th~ SE 1/4, 694.24 feet, thenCe N 006'21." Wt513.94 feet to the Soubhwesterly . I boundary of sa1d thoroughfare known as "Betty Lane", tHence S 530 26'09 II E, along said l:loundary 838.9 feet to the heginn:iJng of a curve in said thoroughfare boundary, the Chord of whiCh curve I bears S 47Q55'51." E from this point, thence following aaid curve along the Betty Lane thoroughfare boundaryt 28.62 feet ito the Point of Beginning. " I, I I. II . . Z!q', Pu<>......."''"~_ (I) ~98-"<!l.L-(,a:.Ll XW:l . ~!a80-&i!l'.L-U.i!l'.L) "Hd UIl7II 'lBI.lIlIIIImO ~31~";;'<?~~~~~ ~ DNINNV"1d " DNI"':I;!NIDN3 - 3Io1nl.::>3.uH~l=ru' I I $1:cl}:::.:il I I 3roB:I '3HI:J ~ 0 Y3.1.VMalV31O:IO .wO ~ . . IIlI I I ~ I I I I ! ~ n ~ \I H ! 11 ! ,IF:: ,::c J ~st NOUVlS 3l:ll:ll.S3MH1l:lON i I I :,* I j I I I f w r I . I . I I I . t ~ ~ ~ I I I I t tr tt ~~ h tl i! I i II ~ I I II z !~ I! I I ~ Ii I ~a I I ~ ~~ I '. I I w i ~I di ~ ~ t tr n I I ~ ~~ ~ ~ ~ IJ . . I . . I I I II I I II I II .1 I II ~ ~ II II i ~ ~ ~r M "I .p ~ ! "'''' I I I I ~~ I! ~ II il i ~ ~~ a~ i.!I' ~ ~ ~~ I Ii I- Ii I.. i~ i I~I ~I II~ ~l I~I ~'" .~ ' I- I I I I I ~ , I' 1 I I II I I I II I I I II I I 1 II 1 II I I J1 I it ~~ ~ ~,~~, .OC-.~ OO.LOL~1ilOOO "ON ~. ~:. , -~ ~ ~. ~ ] ~ ~~ ~ ~" ~. ~- ~ ~~ ~,m ~0 ~ g2 ~ -~ . ~ ~ i~ ~ ~~ ~ ~~ ~ -I ..~ ~~. ~ ~~ a ~~~ ~ -~ : ~i~ ~ g~ ~ ~ ~ i~ ~-",: ~p L i!i ~ ~ ~ ~ ~ ttt ~ : 8 ~ ~~~ ~ ~ " ~ ~ " ~ ~~ ~ ~ ~ . . N ~ ! ;; !! is ~ - ffi - ~ ~ !i 'i ~ " ~ ~ . . ..: "'..;.:..; ~ - il i :.f .~ !~~ ~g;~ ~!~ q~~ ~ t;;t;;~ di~ g~ ~~ H., ~H .' 0 0; g ~~ ~ ==n~ ~~~~~~ ~~~M~ ~~~~~~ ~=~~~~ .;,; ~~ ~i ~~ o ~ ; .. ~ - ~~ ~ !! "Ilo. ~ ~~~>S~ S m~~~ . Il~._~~ ~ ~~S~~. .iil~~~~ " .; d Ii ~~.~- d d 2 ~ qH~ ~ d n ~ ~ t; ~ ~ ~ ~dn e m~w~~ . . , . ..8.. ~~.:;~~~::.~~ ~-~ ~~lllIM~I~dli~: bll:1i ~~;~~~~~~ ~:'';~;:;i:i~~ DO ~t ~~ ~ ~i ~ ~ < ~ ~~ ii ~ ~ ~ ~~ I ~U .~~~ !!~ . .~ .~~ >- 'il~~ ~.i~ i m~!~~il; ~i ~ ~~iii~~ldi;t~ ~i1 " "'~oen<al. XY~ SWI1oW1l..u:t Kltt """"'1:1 .~ llOl:_'-w>llDdOK =1l (d~ ~ I ~O NYld 311S ~Illl l~4S lS 'ON NOl1Y1S 3n::>S3H aNY 3HI:I 1S3MH1HON ~I~!l P~OJd ~ ~ ~~! ~~~ ~!;(i ~~ ~~~ :c'lltS 090 :g~ ~:::J< ;::~l!!: ~~~ ".0 ~gi ~!!il:5 2' ~ ~s a ffi~ 0 :. ~~ . if ~ ~~ ~ U 0; ~ ~~~ b ~~ ~ ~ iii~~ ~~ ~: o ~ ~" ~ ~~ z . ~il~ ~~ f~ :3 ~ ~~~ ~~ ~~ '" ffi -.- ~o ~~ ~ ~ ~~~ ~~ ~~~ - ~ ~~ii1 .~ ~~ ~ -- -,- ~-:M"1i:ua--~-------- ; ; . _ ll~d~ I" ~!nl;~;; 1 -I ~nUal3 .,1.'$ i ~;~ ~ .~., u ~u ~ ~7 I~ 1 I '; 1 I "/"-" 1 I 1 .. 1 =-___x~ '~., " '. ,: I" ....,;).' ~Ji i i . m ~I i ~ ~: ~ I I c:>"!~ ~ ~ ~ i ~~ ~ ~ ~ ~ is ~ ~ ;' ~I ~ I ~ ~ g~ i I ~ ~ ~ ~ ~ I n-~t9.JI 10 i{'> ~ !ill GJ /(~~ '," I ' ,J - -- - - -L'i,_~/~ . "..;(;i(.;.,.. :~ ,:,~,.,,:../%), .):.';::' !:::' .,.,.....,. .wE_ " .:",~:;.: / I ~ I- I / , / / ,j, ----- 7// ,1'1,/ ./( 1Yi~~1 '7/ I I/{;/ ;jI /;/. (I//;' ,Ir.'i I 1/ /:/;' . '/y;7 ;......1..... .:/ /. ..ri r- / L L --------------- ,"'--------- ~ \'~ -------------------- J6lJ8 iJ.&SIZJXJH 1'1'00] ~ ~ :3:ltW ~~l!6dN3CDOIIIl.3OVXXI1S ~ ~,g.;iO.f1oa:J,.S~ ,." ~, ~ Z1lI rOllill[~~ tl qt.:lIJ.:I IIIIp.U8....-'\0lI.10lOllJOCl',,~ . . ENVIRONMENTAL RESOURCE PERMIT APPLICATION PROJECT: NORTHWEST FIRE & RESCUE STATION NO. 51 CLEARWATER, PINELLAS COUNTY, FLORIDA Prepared for: Southwest Florida Water Management District Prepared by: ~ TBE Group, Inc. 380 Park Place Boulevard, Suite 300 Clearwater, Florida 33759 TBE Project No. 00083-101-00 February 17, 2003 . . PROJECT DESCRIPTION The City of Clearwater's Northwest Fire and Rescue Station No. 51 is a proposed fIre and rescue facility to be constructed on approximately 1.59 acres of land in Section 3, Township 29 South, Range 15 East, at 1720 Overbrook Avenue, in the City of Clearwater, Pinellas County, Florida. The property is located at the southwest intersection of Overbrook Avenue, and North Betty Lane. See the Site Vicinity Map and USGS Quadrangle Map, Figure 1 and Figure 2, respectively, located in Section 2 ofthis Engineering Report. The project area is bordered to the north by Overbrook Avenue, commercial and residential property; residential property to the south; North Betty Lane and residential property to the east; and City of Clearwater commercial property adjacent to the west side of the project area. West of the City's property is wetlands and Stevenson Creek. EXISTING CONDITIONS The existing site is currently a junkyard facility. The total project area consists of approximately 1.59 acres. The site consists of dilapidated buildings, and concrete and asphalt surfaces, with some open space and few trees. The existing conditions ofthe project area are as follows: ITEM AREA IMPERVIOUS AREA OPEN SPACE POND AREA EXISTING BASIN 1.59 AC 1.31 AC 0.28 AC o The existing drainage pattern generally runs north and west on the property. Adjacent to the north is an existing Pinellas County ditch system. Adjacent to the west of the project area is a City owned parcel, which is an extended area of the existing junkyard facility. Both the ditch and westerly-owned parcels flow overland to the southwest into adjacent wetland area. The wetland area is bordered at the south end by Stevenson Creek (see Construction Drawings, Aerial Site Plan). The United States Department of Agriculture, Soil Conservation Service (SCS) Soil Survey for Pinellas County identifIes the soil at the site to be represented by Made Land (Ma) (see Soil Survey Exhibit). Tierra Geotechnical and Materials Engineering, results of Double Ring InfIltration Test along with associated hand auger borings in general accordance with ASTM standards are located in Section 3 of this Engineering Report. Tierra indicated that the groundwater was encountered at approximately three feet below existing grade. Based on the subsurface material encountered, Tierra recommends over excavating two to three feet of the existing site and replacing the material as needed with clean, engineered fIll. They estimate that the seasonal high groundwater table will be encountered at a depth of approximately one foot below existing grade. Therefore, the seasonal high water table for design is assumed to be elevation 18.0 feet, which is consistent with the soil boring location and geotechnical recommendation. Based on the results of the DR! test, the infIltration rate is estimated to be 10 feet/day. TBE G roup, Inc. J:\O0083\000831OI.OO\OOC\ReportsIENGREPORT -rev I.doc January 2003 . . PROPOSED CONDITIONS The design criteria for this project are based on general conformance with the current City of Clearwater Stormwater Manual and the requirements of the Southwest Florida Water Management District (SWFWMD). A SWFWMD Individual Environmental Resource Permit has been included in Section 1 of this Engineering Report. The proposed conditions include the construction of a 12,280 square foot fIre station, associated parking, driveway, and stormwater management system. The proposed site modilications are as follows: ITEM AREA IMPERVIOUS AREA GREEN AREA POND AREA EXISTING BASIN 1.59 AC 0.70 AC 0.57 AC 0.32 AC The proposed site will continue to maintain existing drainage patterns while collecting runoff through a drainage collection system directed through three dry retention stormwater ponds as shown on the Paving, Grading, and Drainage Plan. Stormwater management systems must comply with the rules of SWFWMD and the City of Clearwater per the latest update of August 23,2002. The stormwater management for dry retention systems will comply with SWFWMD rules for water quality and quantity. The basic drainage criteria are as follows: A. Stormwater Management Facilities 1. Total treatment volume shall again be available within 24 hours from a major design storm event, however, only that volume which can again be available within 36 hours may be counted as part ofthe volume required for water quality storage. 2. The design of the system must be such that the water velocities and associated flow path through the storage pond do not cause the accumulated pollutants to be flushed out of the treatment pond up to the 25-year, 24-hour design storm. 3. Perimeter maintenance and operation easements, with a minimum width of 20 feet and slopes no steeper than 4:1 (horizontal: vertical), should be provided landward of the control elevation water line. Linear stormwater management facilities may be permitted to have a maintenance and operation easement on one side, only, if the entire site can be maintained from this provision. Widths less than 20 feet are allowed when it can be demonstrated that equipment can enter and perform the necessary maintenance for the system. B. Water Quality Results The proposed dry retention ponds were designed to retain the treatment volume of one-half inch over the entire 1.59 acre basin area. The criteria for the drainage area is defmed as follows: TBE G roup, Inc. J:\00083\000831 OI.OO\DOC\Reports\ENGREPORT -rev I.doc 2 January 2003 . . a) All proposed paved areas. b) All proposed building areas. c) All proposed grassed areas within the basin boundaries. d) Pond bottom elevation shall be at least one foot above the seasonal high water table to allow for positive percolation. e) The pond is to recover within a five-day period with a safety factor of two applied to the drawdown calculations. Treatment Volume Required: Basin Area = 69,224 SF = 1.59 AC 69,224 SF x ((1/2")/12) = 2,884 CF = 0.066 AC-FT Treatment Volume Provided: Top Area of Treatment = 7,994 SF ELEV. 20.4 Bottom Area of Treatment = 6,926 SF ELEV.20.0 Depth of Pond (for Treatment) = 0.40 FT Treatment Volume = (7,994 + 6,926)/2 x 0.40 = 2,984 CF = 0.069 AC-FT The treatment volume required for recovery will be adequate. Ponds Version 3.2.0068 was used for the water quality drawdown calculations. The water quality volume staged to an elevation of 20.4, which is equal to the excess run-off weir elevation, and will percolate to a dry condition in less than ten hours, providing for the desired recovery. See the Ponds results for the water quality drawdown calculation located in Section 2 of this Engineering Report. c. Water Quantity (SWFWMD Requirements) The Impermeable Surface Ratio (ISR) is approximately ~ of the existing conditions. Since the proposed impervious area is less than pre-conditions, that is, Cnpost < Cnpre, attenuation was not required. ICPR Version 2.2 was used to route the 24-hour, 25-year storm through the stormwater management system for the proposed conditions. See all calculations in Section 2 of this Engineering Report. The stormwater run-off for pre-conditions, and post development discharge is, 8.57 cfs, and 6.02 cfs, respectively. D. Stormwater Runoff As shown on the attached Node Diagram, Exhibit 1, Basin 4 collects 0.81 acres of the site runoff via a series of drainage collection pipes and directs the flow to a proposed pond (node 4) at the southeastern portion of the site. From this pond (node 4) an equalizer pipe is connected to an inlet (node 3). The equalizer pipe from node 3 connects to another proposed dry retention pond (node 2) located at the southwestern portion of the site, which collects 0.27 acres (Basin 2) of runoff via a swale. Basin 1 collects 0.52 acres of site runoff via a series of drainage collection pipes and directs the flow to a proposed pond (node 1) at the northwestern portion of the site. The southwest pond (node 2) is connected to the northwest pond (node 1) via a 24-inch RCP storm pipe. TBE Group, Inc. J :\00083\000831 0 1.00\DOC\Reports\ENG REPORT-rev i.doc 3 January 2003 , ., . . The proposed retention ponds were designed to have the bottom elevation at 20.0 and top of banks at 21.5. The ponds will be approximately eight to nine inches deep at Design High Water (DHW) for the 24-hour, 25-year storm. The discharge from the ponds was routed through an FDOT Type "D" modified inlet located in the northwest pond (node 1). An oil skimmer will be provided around the proposed outfall structure (see pond control structure detail on the Drainage Details sheet). The outfall structure will have a 45 LF, 15 inch RCP discharge pipe, which will connect to an existing Pinellas County ditch at the northwest comer of the project area, and on the south side of Over brook Avenue. (see Paving, Grading, and Drainage Plan). The stormwater flows form this ditch west to another ditch located at the south side of Over brook Avenue, and eventually flows west to southwest to Stevenson Creek, which is located southwest of the project area. DRAJNAGESTRUCTURES The following drainage structures have been provided: A. Endwall Types 1. Mitered End Section, FDOT Index No. 272. 2. Side Drain Mitered End Section, FDOT Index No. 273 B. Entrance Loss Coefficient (Ke) 1. Mitered End Section - 0.7 C. Storm Drains 1. A design storm frequency of 10 years has been used to comply with City of Clearwater requirements. 2. A minimum longitudinal grade within the inverted crown of the paved areas of 0.3 percent has been designed for shallow swale conveyance. D. Minimum Culvert Size 1. Storm Drain 14 x 23 inch E. Maximum Pipe Lengths without Access Structures 1. I8-inch Pipe 300 feet 2. 24-inch to 36-inch Pipe 400 feet 3. 42 inch and larger 500 feet F. Manning's Roughness Coefficient 1. Concrete Pipe 0.012 (Concrete is proposed as the primary pipe material on the project) METHODS USED TO ESTIMATE DESIGN DISCHARGE A. Storm Drains THE Group, Inc. J:\00083\00083I 0 1.00\DOC\Reports\ENGREPORT -rev I.doc 4 January 2003 ~ , ~ -... . . 1. The rational method may be used for all projects, which have major basins not exceeding 10 acres. B. Stormwater Management Facilities 1. The SCS Unit Hydrograph Method has been used in the ICPR model for dynamic modeling of the pond system. 2. Shape Factor 256 (Flat terrain with slopes less than five percent) 3. Rainfall Distribution Florida Modified 4. Design Rainfall Depths 7.5 inches (10-year storm event - storm drains) 9.0 inches (25-year storm event - stormwater management facilities) METHODS USED TO DELINEATE DRAINAGE AREAS A. Field Reviews and Surveys B. SWFWMD Aerial Contour Maps CONCLUSION The proposed development will enhance the surrounding properties, and will not impact the surrounding environment in a negative manner by the provision of new stormwater management ponds. The proposed conditions, Impermeable Surface Ratio (ISR), is approximately Y2 of the existing conditions. The proposed impervious area at the site will be approximately 0.70 acres, which is less than the existing conditions of 1.31 acres. The proposed development stormwater discharge (Qpost) is 6.02 cfs, which is less than the existing conditions stormwater run..:off(Qpre) of8.57 cfs. The stormwater management system will be provided to satisfy. the treatment requirements of SWFWMD and the City of Clearwater. The City of Clearwater will be responsible for managing all stormwater management facilities. THE Group, Inc. J :\00083\000831 0 1.00\DOCIReports\ENG REPORT-rev l.doc 5 January 2003 J 'It) '00 '0 I ..... ';or') I ... , CD , o , I lD ... '00 PRE-CAST CONC. TOP - SAME PROFILE AS ON BWLDlNC, SECTIONS SOLDIER COURSE BRICK VENEER AS ON BIILDlNC, V1' THICK ALUMINUM LETTERS TYP (PAINTED> FINISH C,RACE AT CENTER OF SKiN IS AT APPROX. 35.88 - VERIFY C,RACE unTH OVlL AND ADJUST HC,HT, OF SKiN TO MATCH AS CLOSELY AS POSSIBLE THESE DIMENSIONS ELEVATION OF SIGN SCALE. 3/4' = 1'.()' PRE-CAST CONC, TOP - SAME PROFILE AS ON BUlLDlNC, SECTIONS SOLDIER COURSE 8' MASONRY - SEE STRUCTURAL FOR FIlLED CELLS AND REINFORONC, TYP. BRICK VENEER AS ON BUlLDlNC, X't.~'lETTERS TYP (PAINTED> VERIFY FINISH C,RACE WI SITE CONDITIONS AND III CIVIL DRAUNC,S TYP , C,ROUT SOUD ALL SPACES BELOII C,RACE TYP. CONe. FOUNDATION - SEE STRUCTURAL SECTION @ SIGN SCALE-3/4'= 1'.()' . '. \ . ~ Planning Department 100 South Myrtle Avenue Clearwater, Florida 33756 Telephone: 727-562-4567 Fax: 727-562-4865 '. ~Cle.arwater ~ ~ CASE #: DATE RECEIVED: ,. 7.'1,~ RECEIVED BY (staff initial~: I) ATLAS PAGE #: 260 1$ ZONING DISTRICT: C- LAND USE CLASSIFICATION: c.f. SURROUNDING USES OF ADJACENT PROPERTIES: NORTH: SOUTH: WEST: EAST: ~ SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION ~ SUBMIT 12 COPIES OF THE ORIGINAL APPLICATION including 1) collated, 2) stapled and 3) folded sets of site plans o SUBMIT APPLICATION FEE $ fJ/A * NOTE: 13 TOTAL SETS OF INFORMATION REQUIRED (APPLICATIONS PLUS SITE PLANS SETS) ~PLEASE TYPE OR PRINT ~ use additional sheets as necessa t: i tr~~-~..,~.Ji_~:.__- '; .J <l , !'\ I' N JAN 2 3 2007i ) FLEXIBLE DEVELOPMENT APPLIC Comprehensive Infill Redevelopment Project (Revised 1 APPLICANT NAME: A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Section 4-202.A) City of Clearwater MAILING ADDRESS: 610 Franklin Street. Clearwater. FL 33756 E-MAILADDRESS:whanson@clearwaterfl.com CELL NUMBER: (727) 224-7360 PHONE NUMBER: (727) 562-4334 FAX NUMBER: (727) 562-4328 PROPERTY OWNER(S): City of Clearwater (Must include ALL owners) MAILING ADDRESS: TBE Group ",......".'" Z"",.(~, 380 Park Place Boulevard, Suite 300, Clearwater, FL 33759 AGENT NAME(S): E-MAIL ADDRESS:bzarlenga@tbegroup.com CELL NUMBER: (727) 639-5569 PHONE NUMBER: (727) 531-3505 FAX NUMBER: (727) 539-1294 STREET ADDRESS of subject site: B. PROPOSED DEVELOPMENT INFORMATION: 1720 Overbrook Drive LEGAL DESCRIPTION: As shown on enclosed boundary survey (see attached). (if not listed here, please note the location of this document in the submittal) PARCEL NUMBER: PARCEL SIZE: 1.59 acres, (acres, square feet) 69,224 SF PROPOSED USE AND SIZE: Fire and Rescue Station - Single Story - 12.300 SF +/_ (number of dwelling units, hotel rooms or square footage of nonresidential use) DESCRIPTION OF REQUEST(S): Reduction in number of parking spaces; height reduction. (include all requested code deviations: e.g. reduction in required number of parking spaces, specific use, etc.) Page 1 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater ~''', D~~S THIS APPLICATION INVOLVE THE TRANSFER OF DEVELOPMENT RIGHTS (TDR), A PREVI. Y APPROVED PLANNED UNIT DEVELOPMENT, OR A PREVIOUSLY APPROVED (CERTIFIED) SITE PLAN? YES _ NO ~ (if yes, attach a copy of the applicable documents) , , c. PROOF OF OWNERSHIP: (Section 4-202.A) o SUBMIT A COPY OF THE TITLE INSURANCE POLICY, DEED TO THE PROPERTY OR SIGN AFFIDAVIT ATTESTING OWNERSHIP (see page 6) D. WRITTEN SUBMITTAL REQUIREMENTS: (Section 3-913.A) o Provide complete responses to the six (6) GENERAL APPLICABILITY CRITERIA - Explain how each criteria is achieved, in detail: 1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is locate,d. 1 . d . db' h . th th . d t' 1 1 The proposed deve opment 1S eS1gne to e 1n armony W1 e reS1 en 1a sca e and use of materials as much as possible given the nature of the facility. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. The surrounding property is liqht industrial and residential. The proposed development is in keeping with the tone and tenor of the neighborhood and should encourage similar development. 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed Th~sproperty development is a Public-Safety Facility (Fire Rescue Facility) and so will improve the health and safety of the neighborhood. 4. The proposed development is desig,ned to minimize traffic congestion. The proposed f1re stat10n will have a staff of only 11 people which may double only at shift change. There is no expectation that there will be any more traffic generated beyond this. 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. Community character of the area is light industrial and residential. The proposed development uses residential materials and scales. 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjac~nt properties. Hours OT operation are 24 hours/day, 7 days/week - The building has been placed to sheild truck and siren noise from the residential area to the south upon the fire rescue vehicles exiting the facility. o Provide complete responses to the ten (10) COMPREHENSIVE INFILL REDEVELOPMENT PROJECT CRITERIA (as applicable) - Explain how each criteria is achieved in detail: 1. The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards. The building height is dictated by the equipment required to fit under it, and on-site parking is limited by area constraints. Page 2 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . . 2. The development of the parcel proposed for development as a comprehensive infill redevelopment project or residential infill project will not reduce the fair market value of abutting properties. (Include the existing value of the site and the proposed value of the site with the improvements.) d The propose development will reduce insurance rates and fire rescue response times in the vicinity resulting in equal or greater property values. 3. The uses within the comprehensive infHI redevelopment project are otherwise permitted in the City of Clearwater. Fire rescue stations are a public. civic use and are permitted in the City of Clearwater. 4. The uses or mix of use within the comprehensive infill redevelopment project are compatible with adjacent land uses. Adjacent land use is typically residential and light industrial and all adjacent land uses will be serviced by the proposed fire rescue facility. 5. Suitable sites for development or redevelopment of the uses or mix of uses within the comprehensive infill redevelopment project are not otherwise available in the City of Clearwater. This site was chosen after an exhaustive search for suitable property. Studies in fire protection dictated this qeneral location. 6. The development of the parcel proposed for development as a comprehensive infill redevelopment project will upgrade the immediate vicinity of the parcel proposed for development. Fire protection response times are expected to be cut dramatically in the immediate vicinity of the proposed development. 7. The design of the proposed comprehensive infill redevelopment project creates a form and function that enhances the community character of the immediate vicinity of the parcel proposed for develoRment and the City of Clearwater as a whole. Building mass is broken into smaller portions to more closely relate to residential surroundings. 8. Flexibility in regard to lot width, required setbacks, height and off-street parking are justified by the benefits to community character and the ilT!m~diate viciniJy of the pwcel wpposeq forddevelop,mellt aflq the City of Clearwater as p whple. He1qnt vanance 1S olctate by ne1gnt ot equ1pment to De housed - off-street parking is provided for designed shift-changes only. 9. Adequate off-street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on-strllEl,t P'ilrking in the ;mmedi~te vicinity.of parcel proposed fqr development. There W1 I I De no snareo parK1ng agreement. 10. The design of all buildings complies with the Tourist District or Downtown District design guidelines in Division 5 of Article 3 (as applicable). Use separate sheets as necessary. The building is not in the tourist disctrict or downtown district. Page 3 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater " r-- E. , M' ,tf rJf Q . SUPPLEMENTAL SUBMITTAL REQUIREMENTS: (Code Section 4-202.A) SIGNED AND SEALED SURVEY (including legal description of property) - One original and 12 copies; TREE SURVEY (including existing trees on site and within 25' of the adjacent site, by species, size (DBH 4" or greater), and location, including drip lines and indicating trees to be removed); LOCATION MAP OF THE PROPERTY; (Re..t'e.... ~ e""c\.,~eJ Co"s.\r.....d-\cw, p\"'"1O .,~ CPv~,-$hee+) PARKING DEMAND STUDY in conjunction with a request to make deviations to the parking standards (ie. Reduce number of spaces). Prior to the submittal of this application, the methodology of such study shall be approved by the Community Development Coordinator and shall be in accordance with accepted traffic engineering principles. The findings of the study will be used in determining whether or not deviations to the parking standards are approved; fiI'" GRADING PLAN, as applicable; Q PRELIMINARY PLAT, as required (Note: Building permits will not be issued until evidence of recording a final plat is provided); & /A ) COPY OF RECORDED PLAT, as applicable; ~ F. ~ )( )( ): X ,., X L X- '" X ~ SITE PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A) SITE PLAN with the following information (not to exceed 24" x 36"): All dimensions; North arrow; Engineering bar scale (minimum scale one inch equals 50 feet), and date prepared; Location map; Index sheet referencing individual sheets included in package; Footprint and size of all EXISTING buildings and structures; Footprint and size of all PROPOSED buildings and structures; All required setbacks; All existing and proposed points of access; All required sight triangles; Identification of environmentally unique areas, such as watercourses, wetlands, tree masses, and specimen trees, including description and location of understory, ground cover vegetation and wildlife habitats, etc; Location of all public and private easements; Location of all street rights-of-way within and adjacent to the site; Location of existing public and private utilities, including fire hydrants, storm and sanitary sewer lines, manholes and lift stations, gas and water lines; All parking spaces, driveways, loading areas and vehicular use areas, including handicapped spaces; Depiction by shading or crosshatching of all required parking lot interior landscaped areas; Location of all solid waste containers, recycling or trash handling areas and outside mechanical equipment and all required screening {per Section 3-201 (D)(i) and Index #701};.I<~sr 1'lJI'l. bi.N-X 6AAIieL,S; Location of all landscape material; Location of all jurisdictional lines adjacent to wetlands; Location of all onsite and offsite storm-water management facilities; Location of all outdoor lighting fixtures; and Location of all existing and proposed sidewalks ~ )L ~ ~ ~ x "'/'" ~ ~ ~ SITE DATA TABLE for existing, required, and proposed development, in written/tabular form: Land area in square feet and acres; Number of EXISTING dwelling units; Number of PROPOSED dwelling units; Gross floor area devoted to each use; Parking spaces: total number, presented in tabular form with the number of required spaces; Total paved area, including all paved parking spaces and driveways, expressed in square feet and percentage of the paved vehicular area; Size and species of all landscape material; Official records book and page numbers of all existing utility easement; Building and structure heights; Impermeable surface ratio (I.SR.); and Floor area ratio (F.A.R.) for all nonresidential uses )( )<.. ~ )(. ~ ~ f- ~ Q REDUCED SITE PLAN to scale (8 Yz X 11) and color rendering if possible ~ -.L )I: T iilA ~ )C.. ~ )( FOR DEVELOPMENTS OVER ONE ACRE, provide the following additional information on site plan: One-foot contours or spot elevations on site; Offsite elevations if required to evaluate the proposed stormwater management for the parcel; All open space areas; Location of all earth or water retaining walls and earth berms; Lot lines and building lines (dimensioned); Streets and drives (dimensioned); Building and structural setbacks (dimensioned); Structural overhangs; Tree Inventory; prepared by a "certified arborist", of all trees 8" DBH or greater, reflecting size, canopy (drip lines) and condition of such trees Page 4 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . . . , G. LANDSCAPING PLAN SUBMITTAL REQUIREMENTS: (Section 4-1102.A) ~ LANDSCAPE PLAN: ~ All existing and proposed structures; -.L Names of abutting streets; ~ Drainage and retention areas including swales, side slopes and bottom elevations; - Delineation and dimensions of all required perimeter landscape buffers; -""- Sight visibility triangles; -$- Delineation and dimensions of all parking areas including landscaping islands and curbing; ~ Proposed and required parking spaces; -L Existing trees on-site and immediately adjacent to the site, by species, size and locations, including dripline (as indicated on required tree survey); -L Location, size, description, specifications and quantities of all existing and proposed landscape materials, including botanical and common names; --i.- Typical planting details for trees, palms, shrubs and ground cover plants including instructions, soil mixes, backfilling, mulching and protective measures; - Interior landscaping areas hatched and/or shaded and labeled and interior landscape coverage, expressing in both square feet and f'J j,. percentage covered; Conditions of a previous development approval (e.g. conditions imposed by the Community Development Board); x.. Irrigation notes ~ REDUCED LANDSCAPE PLAN to scale (8 Y2 X 11) (color rendering if possible) D IRRIGATION PLAN (required for Level Two and Three applications) D COMPREHENSIVE LANDSCAPE PROGRAM application, as applicable H. STORMWATER PLAN SUBMITTAL REQUIREMENTS: (City of Clearwater Design Criteria Manual and 4-202.A.21) I , STORMWATER PLAN including the following requirements: L Existing topography extending 50 feet beyond all property lines; .:L Proposed grading including finished floor elevations of all structures; It- All adjacent streets and municipal storm systems; -X- Proposed stormwater detention/retention area including top of bank, toe of slope and outlet control structure; X Stormwater calculations for attenuation and water quality; i Signature of Florida registered Professional Engineer on all plans and calculations D COPY OF PERMIT INQUIRY LETTER OR SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT (SWFWMD) PERMIT SUBMITTAL (SWFWMD approval is required prior to issuance of City Building Permit), if applicable D COPY OF STATE AND COUNTY STORMWATER SYSTEM TIE-IN PERMIT APPLICATIONS, if applicable I. BUILDING ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A.23) Required in the event the application includes a development where design standards are in issue (e.g. Tourist and Downtown Districts) or as part of a Comprehensive Infill Redevelopment Project or a Residentiallnfill Project. ~ BUILDING ELEVATION DRAWINGS - all sides of all buildings including height dimensions, colors and materials ~ REDUCED BUILDING ELEVATIONS - four sides of building with colors and materials to scale (8 Y2 X 11) (black and white and color rendering, if possible) as required J. SIGNAGE: (Division 19. SIGNS I Section 3-1806) D All EXISTING freestanding and attached signs; Provide photographs and dimensions (area, height, etc.), indicate whether they will be removed or to remain. ri' All PROPOSED freestanding and attached signs; Provide details including location, size, height, colors, materials and drawing D Comprehensive Sign Program application, as applicable (separate application and fee required). D Reduced sign age proposal (8 Y2 X 11) (color), if submitting Comprehensive Sign Program application. Page 5 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . K. TRAFFIC IMPACT STUDY: (Section 4-202.A.13 and 4-801.C) o Include as required if proposed development will degrade the acceptable level of service for any roadway as adopted in the Comprehensive Plan. Trip generation shall be based on the most recent edition of the Institute of Transportation Engineer's Trip General Manual. Refer to Section 4-801 C of the Community Development Code for exceptions to this requirement. L. SIGNATURE: ~C:~d Signature of property owner or representative ~~'~"" STATE OF FLORIDA, LAS w4 Sworn to and s i. ~..~f~ ~ this ~ day of ~Y\U\tlrIJ ~,.~S :il! rne and/or by ouJlo-v>-ef E. 44/~(j ~#'i,27,'4'JJ.!~ sonally now has prod~ced. =: ~ "3 ~ cJl \ 1\ :: as Identification. =*: ... . = ~ .z. \ #CC905979 :~. i ~,-o. .~~ ~?-' l;8onded~#..'O~ .... ~FIIin-~"'. i:f. z.. ~ rOt NOYary public, My commission expires: ).00'1 I, the undersigned, acknowledge that all representations rnade in this application are true and accurate to the best of rny knowledge and authorize City representatives to visit and photograph the property described in this application. Page 6 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . . M. AFFIDAVIT TO AUTHORIZE AGENT: City of Clearwater (Names of all property owners) 1. That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location): 1720 Overbrook Drive (previouslv known as "Central FLA Used Alltn Parts") 2. That this property constitutes the property for which a request for a: (describe request) Construction of Northwest Fire and Rescue Station No. 51 3. That the undersigned (has/have) appointed and (does/do) appoint: TBE Group as (his/their) agent(s) to execute any petitions or other documents necessary to affect such petition; 3. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 4. That the applicant acknowledges that all impact fees (parks and recreation, traffic, etc.) will be paid PRIOR to the issuance of a building permit, certificate of occupancy, or other mechanism, whichever occurs first; 5. That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City representatives to visit and photograph the property described in this application; 6. That (I/we), the undersigned authority, hereby certify that the foregoing is true and correct. City of Clearwater Property Owner ~ C 4t?~dd Property Owner Before me the undersigned, an officer duly commissioned by the laws of the Sta,te of Florida, on this ..J4.,Y\""'~ ' ;I 003 personally appeared ROv.}}1b\d E, H ~rqJd.... Depos s and says that he/she fully understands the contents of the affidavit that he/she signed. My Commission Expires: yo-", ,)'7- )00 'f <[JJ~ ~,\\\\""I1I11"ll 1'l."'~~a~ne Hans. ~II~ ~~. ......... o;? ~ ~ .~. ~SION ~:.. ~ ~. ~. ~ d $ .. ~~27,<'a z e. ~ J '1 "'_~ :$~~ ~~:. t?'- 0'- =. d~ of : * who having beES trJ duly s~m : ~ -z :. #CC905919 : i:f ,-<p.. -ffi ~ ~~ ... ~~~...... ... <::J'~ ~'I}- ..IFain-illS~'~. <<:'~ ~/I. Ie STr-.\ . "..... III"", 1I11"\\\\~ STATE OF FLORIDA, COUNTY OF PINELLAS S:IPlanning DepartmentlApplication Formsldevelopment reviewl2002 Formslcomprehensive inti/l application 2002.doc Page 7 of 7 - Flexible Development Application - Comprehensive Infill Redevelopment Project- City of Clearwater . - , ", , , '. . . SCHEDULE A LEGAL DESCRIPTION That Part of the SW 1/4 of the SE 1/4 of Section 3, Township 29 S, Range 15 E,described as follows: Beginning in the West boundary of the public thoroughfare known as "Betty Lane" at a point which bears N 89036'07" W, 68.91 feet from the SE corner of said SW 1/4 of SE 1/4; and running thence on the same bearing, along the south boundary of said SW 1/4 of the SE 1/4, 694.24 feet; thence N 006'21" W,513.94 feet to the Southwesterly boundary of said thoroughfare known as "Betty Lane"; thence S 530 26 '09 " E, along said boundary 838.9 feet to the beginning of a curve in said thoroughfare boundary; the chord of which curve bears S 47055'51" E from this point; thence following said curve along the Betty Lane thoroughfare boundary, 28.62 feet to the Point of Beginning. " I I II " II " ) ,~ Corpo.e Warranty Deed . This Indenture, made this 31st day of October A.D. 2002 Between CENTRAL FLORIDA USED AUTO PARTS, INC. whose post office address is: a corporation existing under the laws of the State of FLORIDA CITY OF CLEARWATER , Grantor and whose post office address is: P.O. BOX 4748 CLEARWATER, FL 33758-4748 Grantee, Witnesseth, that the said Grantor, for and in consideration of the sum of ( Ten & NO /100 ) Dollars, to it in hand paid by the said Grantee, the receipt whereof is hereby acknowledged, has granted, bargained and sold to the said Grantee forever, the following described land, situate, lying and being in the County of Pinellas , State of Florida, to wit: SEE ATTACHED SCHEDULE "A" LEGAL DESCRIPTION Subject to covenants, restrictions and easements of record. Subject also to taxes for 2002 and subsequent years. Parcel Identification Number: 03/29/15/00000/430/0500 ~q.no:;>8PUOaUJ"IIII_oIl.>uP^" _B6-S;~<:"~"r,~~~"~~L) Hd ElNINNV'ld ':-g~I~~~r-:;~~~~"'~~3..lIH::>ld"'" UIlJlI 'IBIWMnI ::~:itii!:J ~ ;til II . . 3IlOS3H , 31:11:1 ~VMW3"IO:IO AOO 19t NOU.VlS ~.1.S3MH.UION ! I I. II i. t tt tt I !! ~; ~ ~ ~ ~\~ ! I ! I I il ~ I ~I ~! I ~ I ~~ I a. III ~ ~ Ii I ~ g' I wJ . I~ ~ ~ ~ ~ ' ~ a ~ h d r if fr !I~ ~ ~ ~J I~ I I I II ~~ I I I II z e I I I I I ~ _, I ~a I I I ~ ~~, I ,~I I I ~ ~I i ~! ~ i ~ "'''' ~ ~~I UI B,~ Kh~ I !~ ,In ~ g' ! ~ I ~ ~ . s ~ ~ I~ J I JlW o ~ . . I r . I J J J t tr tt ~ ~ ~ IJ . . I . . I I I II I I I II I I I II I ! I II ~I W i I II ~ ~. I II a g iil;li~ ..,. N ~r ~ "I i ~ ~ I I' I ! , I I ~ I I I I ~ I I I I . I I I I I II I J1 I I I Jl + + ++ ,~__!; "".... :o~ - -- .~. ---- ~ ;-- 'f .JOa ._ ,($"', ' ./ t'/; ,#. ~ .. .' . / . , / / 'i/ . .://, :,) / . ::'4 _ :fJ ~~..., " , .' . :~" ,I " . . ..o:;.~-'.. .~ '.- -~. ...,- .. ;:.1 N'tld :3d't ::lSON'tl ,..... ..~~ '.~ .-:;~~ii'.~~~ 'YCJ!-'OT~ '~]J......""..3'::) .'.1...... ".!S. ..... ,':;ewti'=, ot..t......~.t..'-~.. , IN]IIrI.l"Yd~O lO~9:JV OfoIV :1Ift.~ i!~~ Y3J.YM~"J':J :I<? A.L~O '~..........>' ~50N NOIIV1S 30::lS3M ON't 3MI:! lS3MHIMON " " 'o' ~ ;;]: 'j il. , . ~ w.. .- . ~~~ ;,~" d';: ! -1' .~. '. / ,,~ - / ,~ I / ",', I / d ~~~ . "~I'" ..l.l ".!r, / 1/ ._..'to /:; :-- ~" :', .. , ~ ~. '-..--~ ~ ro/'i:t/L ...0 no ,or-.. iOO"l(JI-rlIOOCl "ON P"Io.Id n" , ~ I - , N'Vld 31lS I=.::;::.:.:.,-~". ~ '.1 _.'~. Q;Il>__~-"D:l1 ;[, l ~.'i'i''':~i*3""'"AY8~.1I'1~ LS 'ON NOIl'V1S 3n:::lS3ij aN" 3ijl::l lS3MH1l:tON ~~ il oe ~ i .~ ~ b ~~ ~ l! ~ ~ ~ ~ I ~ ~~. ~~ ~~ .. ~ i~~ .~ B ~~~i ~ '" ~ ~u~ ~" ~. ;1 .... lIlit~ o~ ffii ~ ~ ~ 's ~ ~ ~ ~ b z ~ ii~~ ~~ ~~ ~ ~ ~ i! ~ ~ ~. " ~ iI iw ~ 0; .~ ~ . ~ ~ ;~ e~ ~; I I ~ h. ~o ~~ t DO ~ c~~ 0 " . u ~ ~..u " ~~u ~~ ~~~ .t ~ a:: i ~ B ~ :a ~~~ ~-- :~ ----- ~ n .. ~~nn'~M < ~ ,""c~,g"C ..f'.....-..~_..... I ",-~.-...~-... ~ -~- - "" .............w.-..."-..."'... ~~ III III III III III III III "''- .. ~~~~~~~~~ <u "" -" 111"'''''''_............. -_ "'_"'0""'" ~~ DO l~ _. ~g ~ ~ - -----,-------_.,,----~ / / ,'" ,0. , , ~ !I ~ &l~ . ~ ~ ~~ ~ S ~.~'-~ c~~g~s- ~i~;~~; ;1 <~ ,,~ ~ ~~~ ~~ ~ / ,t1 " ,- jl JI II l~ ,... jl '1 11 A.I ,il I g~e I I I <.~I n I ~ii I !i / ;~: IH' I ~~.~ I fl' Il 11 II <I II I l'j"I)n!1 I: 'ii II lUll [ I fI ,II I" Ili!1 ~ II I" , ! ili il I ;~! i i'l! " ~.: I !l ij Ii Ii I: I ! li!1~ \,\...~\f 1~1:~li 111 \,\..!. l ,l'ji,! I' 1-1,1' 1~li bUI. "'. V8l~/ ! ~j:'fzfi I I III W1 fI / .! 14 .,);;. ..~~,- <";;/ /. " < ~ ~ < ~~ 2 <"i ; ~ ~ ~ <. e< - <~~ < !! w< ~ w< ~ ;; ~ :a :~ ~ ~w~~ ~ ~~ ~ ~ -i2"~; I ~ " ~ ~~ ~~ 0 ~~ ~ ~ ~ 9 ~~ ~~m~ i i ~ ~ ;; E ii ~5 H . - " ..; .; ;; , , / , I / ;; ~ :~~ " - ~ b I , / , / , , / , l! ~V." i,e,..' . .' ,., .----',--_______-J ',It , , ""'" ......, ./ ~-----7// ;:/1' - ..' ff t... V.l. /'iJ'//j . // /;j /A1 ,I.~/;I 1/ /1; /1 //."'/ / ..ti,'" r -~;-~~/ r///' ,f )/ " r.....:.!/ (Xl I ,:;~~J~ , ." 11~i()1 "Ilc.....; r.n; I ;P~:J';d)~ 111& I! ;:i: ~I , ~ : ! .. ---,J ill ; ~ . . ~ 'Ie ~ I ~ ;." I .. 'Ie ~ . I CD .. 'Ie PRE-CAST CONe. TOP - SAnE PROFILE AS ON. BULOING SECTIONS SOLDIER COURSE BRICK VENEER AS ON BlILDING X't."Un~~ETTERS TIP (PAINTED) FINISH URADE AT CENTER OF SIGN IS AT APPROX. M.88 - VERFY GRADE UTH OVIL AND ADJUST HGHT. OF SIGN TO nA TCH AS CLOSELY AS POSSIBLE THESE DmENSIONS ELEVATION OF SIGN SCME. 1/2". 1'.(l" PRE-CAST CONe. TOP - SAnE PROFILE AS ON BIIILDINc. SECTIONS SOLDIER COURSE 8" nASONRY - SEE STRUCTURAL FOR FILLED CELLS AND RElNFORONG TYP. BRICK VENEER AS ON BlILDING X't."UnIlff~ETTERS TYP (PAINTED) VERFY .FINISH URADE 11/ SITE CONDITIONS AND II OVIL 0RAlIINc.s TYP CONe. FOUNDATION - SEE STRUCTURAL SCME.II2'= 1'.(l" - . ~ - f_ .. 14'1-- , '1' . ,. :::1- ~ . . ~ ~ . - . ~ . .. ~ . ~ . . . " ~ . ~ . !' . .' . . . -~ . . .. L 1..1 . MDR I...... ' r--.. . . - __J: ~. .. 't.. . . .. -~ ''"' .~! Je ~ - ' I M P. e.. ".~,~,-, ~. ~~~~ . ? . -"~'" ......... "'-. /. I~ -J- It.... . . .,~ II. . ~.. . . ~ ~J - . . 'I'" ~c . '~, . ... SFR . . -1-1-1. .. . . . " . .. ... . ", -~.... . . IJ-!- ~ p l/ I:i,~ ;- ....!... . SFR ' ,.... ~l . ... I - I- - . ~ .. . . . I- ,- e ... . ~.~ . !lo... I- . .. .. . . . .~JI!i - /. SFR ~ ~- IL . . - rt' ~. . . .. . . . " , ~ ::... ....y:.J -1-1.1.,.1-1-1-'- I... _ ........ . - . ~ _ SFR .? IL LMDR . _.~ .. . . . . . - 1- ~ - 1 I 1 \ ..-- . . . . ~ I.- ..!.. . .. . .. . . . .. . . . -... . .. ,~~:?~. ~ . . .. .. . . . . . III , ~ ~.[il '-- I .~- . - J"- - . . . .. .. . -1-1.'- .. %'.... I . \. . ,,~:<...... . . .. . . I . - - , 'h;- " "". OSIR . '.., " . . . . C ... . ~ . ....)..... .. 1 , ", I I I , I I I . - .. " 1 I Map Request with 500 foot buffer . ',;t":, ;,,-< ' ~~ ,-~$ ",''; ! '.:)j '~',,- -- -':'~,':'. .~-' ''':,,!~--''-:~': Owner: City of Clearwater Case: FLD2003-G 100.9. Site: 1720 Overbrook Avenue Property Size 1.59 (Acres): PIN: 03-29-15--00000-430--0500 Atlas Page: 260B S:\Planning Department\C D B\Flex\Pending cases\Up for the next DRC\Overbrook /720 Fire and Rescue Station NW\Maps\Overbrook 1720 Map Request,doc ~ e CDB Meeting Date: March 18,2003 Case Number: FLD2003-01005 Agenda Item: B2 ORIGINAL CITY OF CLEARWATER PLANNING DEPARTMENT STAFF REPORT BACKGROUND INFORMATION: APPLICANT: City of Clearwater REPRESENT A TIVE: Mr. Brian Zarlenga (TBE Group) LOCATION: 1720 Overbrook A venue REQUEST: Flexible Development approval to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000) and to increase the height of a solid PVC fence from six feet to eight feet in height, as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C. PLANS REVIEWED: Site plan submitted by TBE Group SITE INFORMATION: PROPERTY SIZE: 1.59 acres; 69,224 square feet DIMENSIONS OF SITE: 100 feet of width by 125 feet of depth PROPERTY USE: Current Use: Proposed Use: Vacant buildings Governmental use (Fire and Rescue Station) PLAN CATEGORY: RH, Residential High Classification ZONING DISTRICT: MHDR, Medium High Density Residential District Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 - Page 1 e e ADJACENT LAND USES: North: minor and major vehicle service, warehouse and automotive scrap yards West: Vacant (proposed park) East: Single-family residential South: Single-family residential CHARACTER OF THE IMMEDIATE VICINITY: A mix of single- and multi-family residential and a variety of non- residential uses including minor and major vehicle service, warehouse and automotive scrap yards. ANALYSIS: The 1.59-acre site is located at the southwest comer of Overbrook A venue, Betty Lane and Fairmont Street. The site is the subject of a recent annexation application and review (ANX2002- 11019). The City Commission is expected to approve the annexation of the site into the City with a Commercial District designation and a Commercial General land use classification on March 6, 2003 at the final reading. The site is located along a highly developed area with a mix of single- and multi-family residential and a variety of non-residential uses including minor and major vehicle service, warehouse and automotive scrap yards. The subject property includes four vacant one-story metal buildings, is generally paved and has undergone substantial deterioration. The site has five, existing driveways along the front (north) property line (Overbrook Avenue). The request is to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000) and to increase the height of a solid PVC fence from six feet to eight feet in height, as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2- 704.C. The proposal includes the demolition of all four existing, metal structures and constructing a fire and rescue station (Northwest Fire and Rescue Station No. 51) that will be approximately 12,280 square feet in size and 23 feet in height. The building area dedicated to equipment and vehicle storage and living area will be evenly split between the two. The building will house four fire trucks and nine firefighters. The proposal includes 20 parking spaces and two driveways along Overbrook A venue. The smallest building feasible has been designed for the site. The reductions in setbacks are to pavement only and are required to provide adequate turning radii for fire trucks and other emergency vehicles necessary to effectively operate the fire station. The site will generally be staffed with nine employees at any given time and the provided number of parking spaces will more than adequately serve the proposed use. The building will include a brick and earth-tone stucco fac;ade, scoring and other architectural features. The roofline will be articulated to provide additional aesthetic interest. Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 - Page 2 e e The landscape plan exceeds the requirements of Code utilizing a variety of colorful groundcovers (including liriope and dune sunflower), shrubs (including Indian hawthorn, silverthorn and viburnum), shade and ornamental trees (including live oak, magnolia and crape myrtle and Sabal palms). A PVC fence, eight feet in height will be located along the rear, south property line between the subject site and the adjacent residential use properties to the south for additional buffering. A monument-style, freestanding sign, 37.5 square feet in area and 5.5 feet in height, is proposed with this development. The Minimum Development Standards of the Code permit a freestanding sign 20 square feet in area. The sign, as submitted, will require a review by Staff as part of a Comprehensive Sign Program. Solid waste will be removed via a screened dumpster. All stormwater requirements have been met. CODE ENFORCEMENT ANALYSIS: There are no outstanding enforcement issues associated with this site. A. COMPLIANCE WITH MAXIMUM DEVELOPMENT POTENTIAL STANDARD IN THE COMMERCIAL DISTRICT (Section 2-701.1): STANDARD REQUIRED/ EXISTING PROPOSED IN PERMITTED COMPLIANCE? FLOOR AREA 0.55 0.24 0.17 Yes RA TIO IMPERVIOUS 0.95 0.82 0.44 Yes SURFACE RATIO (ISR) B. FLEXIBLE DEVELOPMENT STANDARDS FOR COMPREHENSIVE INFILL REDEVELOPMENT PROJECTS IN THE COMMERCIAL DISTRICT (Section 2- 704.C): STANDARD PERMITTED/ EXISTING PROPOSED IN REQUIRED COMPLIANCE? LOT AREA N/A 69,224 square 69,224 square Yes (minimum) feet feet LOT WIDTH N/A 507 feet 507 feet Yes (minimum) FRONT N/A North: 40 feet to North: 40 feet to Yes SETBACK building; zero building; zero feet to pavement feet to pavement STANDARD PERMITTED/ EXISTING PROPOSED IN Staff Report - Community Development Board - March 18, 2003 - Case FLD2003-0 1 005 - Page 3 e e REQIDRED COMPLIANCE? REAR N/A South: one foot South: 67 feet to Yes* SETBACK to building; zero building; 13.63 feet to feet to pavement* pavement* SIDE N/A West: zero feet West: nine feet Yes* SETBACK to pavement; to pavement; 59 zero feet to feet to building* building* HEIGHT N/A 15 feet 23 feet Yes maximum PARKING Determined by The site does not 20 (1.65 spaces Yes SPACES the Community include any per 1,000 square minimum Development striped parking feet of gross Director based spaces floor area) on the specific use and/or ITE Manual standards * The Code does not address lot lines for triangular lots. Staff has set policy that triangular lots shall have a front lot line (which shall be the side which has the main access), a rear lot line (which shall be the side most closely to parallel to the front) and the remaining lot line shall be the side lot line. C. FLEXIBILITY CRITERIA FOR COMPREHENSIVE INFILL REDEVELOPMENT PROJECTS IN THE COMMERCIAL DISTRICT (Section 2-704.C): 1. The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards. The subject property, currently being annexed for the purpose of locating a fire and rescue station, has been developed with several, one-story metal buildings and is generally paved and has undergone substantial deterioration. The area is intensely developed with a mix of single- and multi-family residential and a variety of non-residential uses including minor and major vehicle service, warehouse and automotive scrap yards. The proposal includes the demolition of all four existing, metal structures and constructing a fire and rescue station (Northwest Fire and Rescue Station No. 51) of approximately 12,280 square feet. The smallest building feasible has been designed for the site. The reductions in setbacks are to pavement only and will provide adequate turning radii for the fire trucks and other vehicles necessary to operate a fire station. The building will meet all required setbacks. The site will generally be staffed with nine employees at any given time and the provided number of parking spaces will more than adequately serve the proposed use. 2. The development of the parcel proposed for development as a Comprehensive Infill Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 - Page 4 e e Redevelopment Project will not reduce the fair market value of abutting properties. The ultimate redevelopment of this site will likely enhance abutting properties with an attractively designed building and extensive landscaping. The existing buildings are deteriorating, metal structures and the site is generally paved without any landscaping. The current assessed valuation of the site is $318,000. The anticipated value of the site is expected to be in excess of $2,000,000. 3. The uses within the Comprehensive Inflll Redevelopment Project are otherwise permitted in the City of Clearwater. The proposed governmental use is permitted in City of Clearwater. 4. The use or mix of uses within the Comprehensive Inflll Redevelopment Project is compatible with adjacent land uses. Adjacent land uses are a mix of single- and multi-family residential and a variety of non- residential uses including minor and major vehicle service, warehouse and automotive scrap yards. The subject property, developed with four, one-story metal buildings, is generally paved and has undergone substantial deterioration. The site has five, existing driveways along the front (north) property line (Overbrook Avenue). The proposal will provide a new, attractively designed building and extensive landscaping. 5. Suitable sites for development or redevelopment of the uses of mix of uses within the Comprehensive Inflll Redevelopment Project are not otherwise available in the City of Clearwater. Studies undertaken by the City indicate that a fire station in this area is needed. The subject site was the only site in the area suited to the proposed use. In addition, the demolition of the existing structures on the site will constitute an improvement to the site and the neighborhood as a whole. 6. The development of the parcel proposed for development as a Comprehensive Inflll Redevelopment Project will upgrade the immediate vicinity of the parcel proposed for development. The subject property has been developed with four, one-story metal buildings, is generally paved and has undergone substantial deterioration. The site has five, existing driveways along the front (north) property line (Overbrook Avenue). The proposed building will be attractively designed with a light colored stucco finish and a red brick facade, an extensive use of windows along the street (Overbrook Avenue), various architectural details and a peaked roof. Landscaping will be provided along all property lines and will exceed the requirements of Code. 7. The design of the proposed Comprehensive Inflll Redevelopment Project creates a form and function which enhances the community character of the immediate vicinity Staff Report- Community Development Board - March 18,2003 - Case FLD2003-01oo5 - Page 5 e e of the parcel proposed for development and the City of Clearwater as a whole. The proposal includes the demolition of all four existing, metal structures and constructing a fire and rescue station (Northwest Fire and Rescue Station No. 51) of approximately 12,280 square feet. The proposal includes an attractive building finished with a brick and light sand colored, stucco finish, peaked roof, arches, banding and other architectural features. Landscaping will be provided along all property lines and will exceed the requirements of Code. The proposed development will enhance the community character of the immediate vicinity of the parcel proposed for development the City of Clearwater as a whole. 8. Flexibility in regard to lot width, required setbacks, height and off-street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. The site is almost completely paved and at least one of the existing buildings encroaches on a neighboring property. The proposed fire station will both beautify the area and provide a much-needed service by protecting the citizens of Clearwater. The smallest building feasible has been designed for the site and will meet all required setbacks. The reductions in setbacks are to pavement only and will allow for an adequate turning radii for the vehicles necessary to operate a fire station. The site will generally be staffed with nine employees at any given time and the provided number of parking spaces will more than adequately serve the proposed use. 9. Adequate off-street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on-street parking in the immediate vicinity of the parcel proposed for development. The site will generally be staffed with nine employees at any given time and the provided number of parking spaces will adequately serve the proposed use. Staff Report - Community Development Bo~rd - March 18,2003 - Case FLD2003-01005 - Page 6 . e D. GENERAL APPLICABILITY (Section 3-913): Conditions which are imposed by the Community Development Coordinator and the Community Development Board pursuant to a Level One or a Level Two Approval shall ensure that: 1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density, and character of adjacent properties in which it is located. The area is characterized with one- and two-story single- and multi-family dwellings and a variety of non-residential uses ranging from warehousing, a variety of vehicle service uses and light industrial-type businesses. The proposal includes the demolition of all four existing, metal structures and constructing a 12,280 square foot fire and rescue station (Northwest Fire and Rescue Station No. 51) located well outside all required setbacks. It will be 23 feet in height with 6,125 square feet of living area and 6,155 feet of equipment and vehicle storage area. The proposal includes 20 parking spaces and two driveways along Overbrook A venue. The smallest building feasible has been designed for the site and the reductions in setbacks are to pavement only in order to provide adequate turning radii. The site will generally be staffed with nine employees at any given time and the provided number of parking spaces will more than adequately serve the proposed use. It will provide a positive redevelopment example for the area. The development complies with density and impervious surface ratio standards within the Commercial District. The proposal is consistent and in harmony with scale, bulk, coverage, density and character of the adjacent properties. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. The site is zoned Commercial District and characterized by single- and multi-family dwellings. The character and intensity of the proposed development will be in compliance with that zoning classification with a new, attractively designed residentially scaled building with abundant landscaping. The development complies with density and impervious surface ratio standards within the Commercial District. The proposal will help encourage similar redevelopment of adjacent sites. 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. The proposed governmental use should not create any adverse health or safety impacts in the neighborhood. Conversely, the development should enhance the health and safety of persons residing and/or working in the neighborhood. Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 - Page 7 . e 4. The proposed development is designed to minimize traffic congestion. The proposed development will eliminate three of the five driveways along Overbrook A venue. The proposal includes redeveloping the site with a single building. The overall vehicle trip generation should not increase in the area with the proposal and should not have any significant, negative impact on affected intersections or roadways and with no reduction in level of service (LOS) on Overbrook A venue. 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. The proposed development is consistent with and will raise the standards of the community character of the immediate vicinity, through attractive architecture and well-designed landscaping. 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. The proposal includes removing existing pavement and constructing a 12,280 square foot building with attractive architecture and well-designed landscaping. Adequate parking and landscaping in excess of Code requirements will be provided. The level of service on Overbrook A venue will not be degraded. SUMMARY AND RECOMMENDATION: The application and supporting materials were reviewed by the Development Review Committee on February 13, 2003. The Planning Department recommends APPROVAL of the Flexible Development application to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000) and to increase the height of a solid PVC fence from six feet to eight feet in height, as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C for the site at 1720 Overbrook A venue, with the following bases and conditions. Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-704.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 - Page 8 e - Conditions of approval: 1. That all Stormwater requirements be met prior to the issuance of any permits; 2. That a Tree Preservation Plan, prepared by a Certified Arborist, which indicates how the proposed building, parking, stormwater and utilities impact the critical root zones (drip lines) and how those impacts will be mitigated, tree barricade limits and details be submitted to and approved by Staff prior to the issuance of any permits; 3. That the final design and color of the building be consistent with the conceptual elevations submitted or as modified by the CDB; 4. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity; and 5. That evidence of a County right-of-way permit for all work within right-of-way of Overbrook A venue be submitted to Staff prior to the issuance of any permits Prepared by: Planning Department Staff: . V M~, Planner ATTACHMENTS: Aerial Photograph of Site and Vicinity Location Map Future Land Use Map Zoning Atlas Map Application S:\Planning Department\C D B\FleXIPending cases\Upfor the next DRClOverbrook 1720 Fire and Rescue Station N'MOverbrook 1720 STAFF REPORT. doc Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 - Page 9 ~ . . CDB Meeting Date: Case Number: Agenda Item: R ~.' ~.'.'. ,~. M' ','~ FLD2003 01005 . CITY OF CLEARWATER PLANNING DEPARTMENT STAFF REPORT BACKGROUND INFORMATION: APPLICANT: City of Clearwater REPRESENTATIVE: Mr. Brian Zarlenga (TBE Group) LOCATION: 1720 Overbrook Avenue REQUEST: Flexible Development approval to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000 square feet of gross floor area, reduce the side (west) setback from 10 feet to nine feet (to pavement) and reduce the rear (south) setback from 20 feet to 13 feet (to pavement), as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C. .PLANS REVIEWED: Site plan submitted by TBE Group SITE INFORMATION: PROPERTY SIZE: 1.59 acres; 69,224 square feet DIMENSIONS OF SITE: 100 feet of width by 125 feet of depth PROPERTY USE: Current Use: Proposed Use: Parking lot Multi-family residential PLAN CATEGORY: RH, Residential High Classification ZONING DISTRICT: MHDR, Medium High Density Residential District ADJACENT LAND USES: North: Multi-family residential DRAFT Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 _ Page 1 It . West: Multi-family residential East: Multi-family residential South: Multi-family residential CHARACTER OF THE IMMEDIATE VICINITY: Multi-family dwellings, retail, office and overnight accommodation uses dominate the immediate vicinity. ANALYSIS: The 1.59-acre site is located at the southwest comer of Overbrook Avenue, Betty Lane and Fairmont Street. The site is the subject of a recent annexation application and review (ANX2002- 11019). The City Commission is expected to approve the annexation the site into the City of Clearwater with a Commercial District designation and a Commercial General Land Use classification on March 6, 2003 at the final reading. It is located along a highly developed area with a mix of single-familyresidential and a variety of non-residential uses including vehicle service, warehouse and p~~~. The subject property has been developed with four, one-story metal buildings, is generally paved and has undergone substantial deterioration. The site has five, existing driveways along the front (north) property line (Overbrook A venue). The request is to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000 square feet of gross floor area, reduce the side (west) setback from 10 feet to nine feet (to pavement) and reduce the rear (south) setback from 20 feet to 13 feet (to pavement), as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-402.G. The proposal includes the demolition of all four existing, metal structures and constructing a 12,280 square foot fire and rescue station (Northwest Fire and Rescue Station No. 51). It will be _' ,,^ori _'!'U~ :!_!'!''':~''_:__ _',~ 23 feet in height with ~ square feet of living area and ~ feet of equipment and vehicle storage area. .t\lnajority of the building is dedicated to equipment and vehicle storage. The building will house II fire trucks and @ firefighters. The proposed building will be located well outside all required setbacks. The proposal includes 20 parking spaces and two driveways along Overbrook A venue. The smallest building feasible has been designed for the site. The reductions in setbacks are to pavement only and will provide adequate turning radii for the fire trucks and other vehicles necessary to operate a fire station. The building will meet all required setbacks. The site will generally be staffed with 11 employees at any given time and the provided number of parking spaces will more than adequately serve the proposed use. The building will include a brick and earth-tone stucco fa<;:ade, scoring and other architectural features. The roofline will be articulated to provide additional aesthetic interest. DRAFT Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 _ Page 2 . e The landscape plan exceeds the requirements of Code utilizing a variety of colorful groundcovers (including liriope and dune sunflower), shrubs (including Indian hawthorn, silverthorn and viburnum), shade and ornamental trees (including live oak, magnolia and crape myrtle and Sabal palms. ..iFm:Be::7reniovedi'via"bI~~ _t'<)~~>'~"_:-':~~>Lr,,<, - ", '_ _ -.p:/>: :_,' ,"_,_"',':,::':: 411j!e~, ,;'&:vilr~.~~qui~~~.t~~.~ paJ4:!jUQ ~.. teg~{tCqui~m~htsl1a.Y::f;.'1:>een.lneq CODE ENFORCEMENT ANALYSIS: There are no outstanding enforcement issues associated with this site. A. COMPLIANCE WITH MAXIMUM DEVELOPMENT POTENTIAL STANDARD IN THE COMMERCIAL DISTRICT (Section 2-701.1): STANDARD REQUIRED/ PERMITTED 0.55 EXISTING PROPOSED IN COMPLIANCE? Yes FLOOR AREA RA TIO IMPERVIOUS SURFACE RATIO (ISR) 0.95 N'a:'lnf ........,...~.... Q~g 0.17 0.44 Yes B. FLEXIBLE DEVELOPMENT ST ANDARDS FOR COMPREHENSIVE INFILL REDEVELOPMENT PROJECTS IN THE COMMERCIAL DISTRICT (Section 2- 704.C): STANDARD PERMITTED/ EXISTING PROPOSED IN REQUIRED COMPLIANCE? LOT AREA N/A 69,224 square 69,224 square Yes (minimum) feet feet LOT WIDTH N/A 507 feet 507 feet Yes (minimum) FRONT N/A North: 40 feet to North: 40 feet to Yes SETBACK building; zero building; zero feet to pavement feet to pavement DRAFT Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 _ Page 3 Determined by the Community Development Director based on the specific use and/or ITE Manual standards The Code is silent on triangular lots with regards to which property lines constitute sides and which constitute rear for the purposes of determining setbacks. Staff has determined that in the case of triangular lots, the property line which most nearly runs parallel to the front property line (that which runs along a street right-of-way) will be considered a rear property line. The third property line is considered a side provided is does not run along a street right-of-way (in which case it would be considered a front property line). STANDARD REAR SETBACK SIDE SETBACK HEIGHT maximum PARKING SPACES minimum * . PERMITTED/ REQUIRED N/A EXISTING South: one foot to building; zero feet to avement* West: zero feet to pavement; zero feet to building* . PROPOSED South: 67 feet to building; 13.63 feet to avement* West: nine feet to pavement; 59 feet to building* 23 feet 20 (1.65 spaces per 1,000 square feet of gross floor area) IN COMPLIANCE? Yes* Yes* Yes Yes DRAFT Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 - Page 4 N/A N/A Nl.~~". t,,,,,,~ . . C. FLEXIBILITY CRITERIA FOR COMPREHENSIVE INFILL REDEVELOPMENT PROJECTS IN THE COMMERCIAL DISTRICT (Section 2-704.C): 1. The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards. The subject property has been developed with several, one-story metal buildings and is generally paved. The site has undergone substantial deterioration. The area is intensely developed with a mix of single-family resigen.tial and a variety of non-residential uses including vehicle service, warehouse and !J~,~. The proposal includes the demolition of all four existing, metal structures and constructing a 12,280 square foot fire and rescue station (Northwest Fire and Rescue Station No. 51). The smallest building feasible has been designed for the site. The reductions in setbacks are to pavement only and will provide adequate turning radii for the fire trucks and other vehicles necessary to operate a fire station. The building will meet all required setbacks. The site will generally be staffed with 11 employees at any given time and the provided number of parking spaces will more than adequately serve the proposed use. 2. The development of the parcel proposed for development as a Comprehensive Infin Redevelopment Project will not reduce the fair market value of abutting properties. The ultimate redevelopment of this site will likely enhance abutting properties. The existing buildings are deteriorating metal buildings and the site is g;ellerally paved without any landscaping. The current assessed valuatio~()fthesite is $(7,2QlGGg. The anticipated value of the site is expected to be in excess of $!1~2:f!im)i(Qu. 3. The uses within the Comprehensive Infin Redevelopment Project are otherwise permitted in the City of Clearwater. The proposed governmental use is a permitted use in City of Clearwater. 4. The use or mix of uses within the Comprehensive Infin Redevelopment Project is compatible with adjacent land uses. Adjacent land uses are a mix of single-family residential and a variety of non-residential uses including vehicle service, warehouse and US~. The subject property has been developed with four, one-story metal buildings, is generally paved and has undergone substantial deterioration. The site has five, existing driveways along the front (north) property line (Overbrook Avenue). The proposal will provide a new, attractively designed building that replaces four existing, deteriorating metal buildings. DRAFT Staff Report - Community Development Board - March 18, 2003 - Case FLD2003-0 1 005 - Page 5 . . 5. Suitable sites for development or redevelopment of the uses of mix of uses within the Comprehensive Infill Redevelopment Project are not otherwise available in the City of Clearwater. Studies undertaken by the City indicate that a fire station in this area is needed. The subject site was the only site in the area suited to the proposed use. In addition, the demolition of the existing structures on the site will constitute an improvement to the site and the neighborhood as a whole. 6. The development of the parcel proposed for development as a Comprehensive Infill Redevelopment Project will upgrade the immediate vicinity of the parcel proposed for development. The subject property has been developed with four, one-story metal buildings, is generally paved and has undergone substantial deterioration. The site has five, existing driveways along the front (north) property line (Overbrook A venue). The proposed building will be attractively designed with a light colored stucco finish and red brick, windows along the street, architectural details and peaked roof. Landscaping will be provided along all property lines and will exceed the requirements of Code. 7. The design of the proposed Comprehensive Infill Redevelopment Project creates a form and function which enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. The proposal includes the demolition of all four existing, metal structures and constructing a 12,280 square foot fire and rescue station (Northwest Fire and Rescue Station No. 51). The proposal includes an attractive building finished with a brick and lights sand colored, stucco finish, peaked roof, arches, banding and other architectural features. Landscaping will be provided along all property lines and will exceed the requirements of Code. The proposed development will enhance the community character of the immediate vicinity of the parcel proposed for development the City of Clearwater as a whole. DRAFT Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 - Page 6 . . 8. Flexibility in regard to lot width, required setbacks, height and off-street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. The site is almost completely paved and at least one of the existing buildings encroaches on a neighboring property. The proposed fire station will both beatify the area and provide a much-needed service by protecting the citizens of Clearwater. The smallest building feasible has been designed for the site. The reductions in setbacks are to pavement only and will provide adequate turning radii for the fire trucks and other vehicles necessary to operate a fire station. The building will meet all required setbacks. The site will generally be staffed with 11 employees at any given time and the provided number of parking spaces will more than adequately serve the proposed use. 9. Adequate off-street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on-street parking in the immediate vicinity of the parcel proposed for development. The site will generally be staffed with 11 employees at any given time and the provided number of parking spaces will more than adequately serve the proposed use. D. GENERAL APPLICABILITY (Section 3-913): Conditions which are imposed by the Community Development Coordinator and the Community Development Board pursuant to a Level One or a Level Two Approval shall ensure that: 1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density, and character of adjacent properties in which it is located. The area is characterized with one- and two-story single- and multi-family dwellings and a variety of non-residential uses ranging from warehousing, vehicle service and light industrial-type businesses. The proposal includes the demolition of all four existing, metal structures and constructing a 12,280 square foot fire and rescue station (Northwest Fire and Rescue Station No. 51). It will be 23 feet in height with XN square feet of living area and II feet of equipment and vehicle storage area. A majority of the building is dedicated to equipment and vehicle storage. The proposed building will be located well outside all required setbacks. The proposal includes 20 parking spaces and two driveways along Overbrook A venue. The smallest building feasible has been designed for the site and the reductions in setbacks are to pavement only in order to provide adequate turning radii. The building will meet all required setbacks. The site will generally be staffed with 11 employees at any given time and the provided number of parking spaces will more than adequately serve the proposed use. It will provide a positive redevelopment example for the area. The development complies with density and impervious surface ratio standards within the Commercial District. The proposal is consistent and in harmony with scale, bulk, coverage, density and character of the adjacent properties. DRAFT Staff Report - Community Development Board - March 18,2003 - Case FLD2003-01005 _ Page 7 . . 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. The site is zoned Commercial District and characterized by single- and multi-family dwellings. The character and intensity of the proposed development will be in compliance with that zoning classification with a new, attractively designed residentially scaled building with abundant landscaping. The development complies with density and impervious surface ratio standards within the Commercial District. The proposal will help encourage similar redevelopment of adjacent sites. 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. The proposed governmental use should not create any adverse health or safety impacts in the neighborhood. The proposal includes a new fire station with landscaping and the and should enhance the health and safety of persons residing and/or working in the neighborhood. 4. The proposed development is designed to minimize traffic congestion. The proposed development will eliminate three of the five driveways along Overbrook Avenue. The proposal includes redeveloping the site with a single building. The overall vehicle trip generation should not increase in the area with the proposal and should not have any significant, negative impact on affected intersections or roadways and with no reduction in level of service (LOS) on Overbrook Avenue. 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. The proposed development is consistent with and will raise the standards of the community character of the immediate vicinity, through attractive architecture and well-designed landscaping. 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. The proposal includes removing existing pavement and constructing a 12,280 square foot building with attractive architecture and well-designed landscaping. An adequate parking and landscaping in excess of Code requirements will be provided. The level of service on Overbrook Avenue will not be degraded. DRAFT Staff Report - Community Development Board - March 18, 2003 - Case FLD2003-0 1005 - Page 8 - e SUMMARY AND RECOMMENDATION: The application and supporting materials were reviewed by the Development Review Committee on February 13, 2003. The Planning Department recommends APPROVAL of the Flexible Development application to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000 square feet of gross floor area, reduce the side (west) setback from 10 feet to nine feet (to pavement) and reduce the rear (south) setback from 20 feet to 13 feet (to pavement), as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C for the site at 1720 Overbrook A venue, with the following bases and conditions. Bases for Approval: 1. The proposal complies with the Flexible Development crite11a as a Comprehensive Infill Redevelopment Project per Section 2-704.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the sun-ounding area and will enhance other redevelopment efforts. Conditions of approval: 1. That the final design and color of the building be consistent with the conceptual elevations submitted or as modified by the CDB; ';ettPaf~i~nd RecreatibnfesS'fwi~E'6el1l.llredtobe; aid ria~1il1ii~.ffi~~isstiant~.<:)i 1:"'--\,_:: :-::H:" -'^-;--~^, ,', _i~ ',_0,;,-;0 ,/4' ,"')0' :.,,', ' ,- - - ---,--. .'.n.. I,,,,,",: '" '_N_' ,.;.-,:"~.,."g~!_,N',~_,""~_!".i,l\:\?:",JlliI10"'_",,,,_,,_,~,,:,,;,,-.t..-...:..ffi..:___ """".-.;':..,,:'" - '" .- _.:" - "-,, ," _'"up __" "":,, '''"n P_ ;"-,;:..{",,,,*lJl-'--:__;___;"._;.:m\M;-"":_:___'___'__";__;"'~':!i:,:1;_,_1:_ _ ,_ .-.-".-"",:,,", ':-'"".."m:l: errriits'anQ '__'00;'__--___'_",,,__ ",-,',",,,-<,,, "" 3. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity; Prepared by: Planning Department Staff: Mark T. Parry, Planner ATTACHMENTS: Aerial Photograph of Site and Vicinity Location Map Future Land Use Map Zoning Atlas Map Application S:\Planning Department\C D B\Flex\Pending cases\Up for the next DRC\Overbrook 1720 Fire and Rescue Station NW\Overbrook 1720 STAFF REPORT. doc DRAFT Staff Report - Community Development Board - March 18,2003 - Case FLD2003-0l005 _ Page 9 . . ~~\~.~. .~ ~~ ~ ,,)I/~ ~\ ~.'l~~l) +fJ'4TE~ ,~~ ~.,~~ CITY OF CLEARWATER POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUIWING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4865 PLANNING DEPARTMENT March 21, 2003 Mr. Brian Zarlenga TBE Group 380 Park Place, Suite 300 Clearwater, FL 33757 RE: Development Order regarding Case FLD2003-0 1 005 at 1720 Overbrook A venue Dear Mr. Zarlenga: This letter constitutes a Development Order pursuant to Section 4-206.D.6 of the Community Development Code. On March 18, 2003, the Community Development Board reviewed your application for Flexible Development approval to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000) and to increase the height of a solid PVC fence from six feet to eight feet in height, as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C. The proposal includes a 12,280 square foot fire and rescue station. The Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-704.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. BRIAN]. AUNGST, MAYOR-COMMISSIONER WHITNEY GRAY, VICE MAYOR-COMMISSIONER HoYT HAMILTON, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BILL]ONSON, COMMISSIONER "EQUAL EMPLOYMENT AND MFIRMATNE ACTION EMPLOYER" March 21,2003 Zarlenga - Page Two . . Conditions of approval: 1. That all Stormwater requirements be met prior to the issuance of any permits; 2. That a Tree Preservation Plan, prepared by a Certified Arborist, which indicates how the proposed building, parking, stormwater and utilities impact the critical root zones (drip lines) and how those impacts will be mitigated, tree barricade limits and details be submitted to and approved by Staff prior to the issuance of any permits; 3. That the final design and color of the building be consistent with the conceptual elevations submitted or as modified by the CDB; 4. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity; and 5. That evidence of a County right-of-way permit for all work within right-of-way of Overbrook A venue be submitted to Staff prior to the issuance of any permits Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (March 18, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. The issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. In addition, an appeal of a Level Two approval (Flexible Development) may be initiated by a property owner abutting the property (which is the subject of the approval) within 14 days of the date of the CDB decision. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case will expire on April 1 , 2003. If you have any questions, please do not hesitate to call Mark Parry, Planner at 727.562.4558. Zoning information is available through the City's website at www.clearwater-fl.com via the "Clearwater Parcel and Zoning" link and "Community Development Code" link (via the Planning Department site). Very truly yours, ~:~ Cynthia H. Tarapani, AICP Planning Director S:\Planning Departmenfl.c D B\FlelNnactive or Finished Applications\Overbrook 1720 Fire and Rescue Station NW - Approved\Overbrook 1720 DEVELOPMENT ORDER. doc . . P-!~ ~\~~LOFrN~ ~.~4~ ~~ -=- ~s ~~I1;~dPt~~' ~~l-~~~ CITY OF CLEARWATER POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4865 PLANNING DEPARTMENT March 21, 2003 Mr. Brian Zarlenga TBE Group 380 Park Place, Suite 300 Clearwater, FL 33757 RE: Development Order regarding Case FLD2003-0 1 005 at 1720 Overbrook A venue Dear Mr. Zarlenga: This letter constitutes a Development Order pursuant to Section 4-206.D.6 of the Community Development Code. On March 18, 2003, the Community Development Board reviewed your application for Flexible Development approval to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000) and to increase the height of a solid PVC fence from six feet to eight feet in height, as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C. The proposal includes a 12,280 square foot fire and rescue station. The Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-704.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. BRIAN]. AUNGST, MAYOR-COMMISSIONER WHITNEY GRAY, VICE MAYOR-COMMISSIONER HoYT HAMILTON, COMMISSIONER FRANK HIIlBARD, COMMISSIONER * BILl. JONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" March 21, 2003 Zarlenga - Page Two . . Conditions of approval: 1. That all Stormwater requirements be met prior to the issuance of any permits; 2. That a Tree Preservation Plan, prepared by a Certified Arborist, which indicates how the proposed building, parking, stormwater and utilities impact the critical root zones (drip lines) and how those impacts will be mitigated, tree barricade limits and details be submitted to and approved by Staff prior to the issuance of any permits; 3. That the final design and color of the building be consistent with the conceptual elevations submitted or as modified by the CDB; 4. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity; and 5. That evidence of a County right-of-way permit for all work within right-of-way of Overbrook Avenue be submitted to Staff prior to the issuance of any permits Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (March 18, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. The issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. In addition, an appeal of a Level Two approval (Flexible Development) may be initiated by a property owner abutting the property (which is the subject of the approval) within 14 days of the date of the CDB decision. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case will expire on April 1, 2003. If you have any questions, please do not hesitate to call Mark Parry, Planner at 727.562.4558. Zoning information is available through the City's website at www.clearwater-fl.com via the "Clearwater Parcel and Zoning" link and "Community Development Code" link (via the Planning Department site). Very truly yours, ~.~ Cynthia H. Tarapani, AICP Planning Director S:\Planning Department\C D BlFlex\lnactive or Finished Applications\Overbrook 1720 Fire and Rescue Station NW - Approved\Overbrook 1720 DEVELOPMENT ORDER. doc . . :1!!~ ~~~~LOFT~~~ fdi1f~ c:-,-_- . ~ ~- ~ ~~ -==- p~ ~~/A~~"t~., ~,,~. CITY OF CLEARWATER POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4865 PLANNING DEPARTMENT March 21, 2003 Mr. Brian Zarlenga TBE Group 380 Park Place, Suite 300 Clearwater, FL 33757 RE: Development Order regarding Case FLD2003-01005 at 1720 Overbrook Avenue Dear Mr. Zarlenga: This letter constitutes a Development Order pursuant to Section 4-206.D.6 of the Community Development Code. On March 18, 2003, the Community Development Board reviewed your application for Flexible Development approval to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000) and to increase the height of a solid PVC fence from six feet to eight feet in height, as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C. The proposal includes a 12,280 square foot fire and rescue station. The Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-704.C. . 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. BRIAN]. AUNGST, MAYOR-COMMISSIONER WHITNEY GRAY, VICE MAYOR-COMMISSIONER HoYT HAMILTON, COMMISSIONER FRANK HIllBARD, COMMISSIONER * BILL]ONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" March 21, 2003 Zarlenga - Page Two . . Conditions of approval: 1. That all Stormwater requirements be met prior to the issuance of any permits; 2. That a Tree Preservation Plan, prepared by a Certified Arborist, which indicates how the proposed building, parking, stormwater and utilities impact the critical root zones (drip lines) and how those impacts will be mitigated, tree barricade limits and details be submitted to and approved by Staff prior to the issuance of any permits; 3. That the final design and color of the building be consistent with the conceptual elevations submitted or as modified by the CDB; 4. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity; and 5. That evidence of a County right-of-way permit for all work within right-of-way of Overbrook A venue be submitted to Staff prior to the issuance of any permits Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (March 18, 2004).. All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. The issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. In addition, an appeal of a Level Two approval (Flexible Development) may be initiated by a property owner abutting the property (which is the subject of the approval) within 14 days of the date of the CDB decision. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case will expire on April 1, 2003. If you have any questions, please do not hesitate to call Mark Parry, Planner at 727.562.4558. Zoning information is available through the City's website at www.clearwater-fl.com via the "Clearwater Parcel and Zoning" link and "Community Development Code" link (via the Planning Department site). Very truly yours, ~.~ Cynthia H. Tarapani, AICP Planning Director S:\P/anning Departmenf\C D B\F/eXlInactive or Finished Applications\Overbrook 1720 Fire and Rescue Station NW - ApprovedlOverbrook 1720 DEVELOPMENT ORDER. doc - . . ~ ~~w.., C:$. Md" ~)o\. c-:a - - - ~s ~~~.~ ~~~l-E~~ CITY OF CLEARWATER POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4865 PLANNING DEPARTMENT March 21, 2003 Mr. Brian Zarlenga TBE Group 380 Park Place, Suite 300 Clearwater, FL 33757 It=;~ '(; pi r>.~ '" ,-. >,", . ',.' " ~ h;,tl...:-,.:~' ~~:i~ __v____ Development Order regarding Case FLD2003 QI005 at 1720 Overbrook Avenue RE: Dear Mr. Zarlenga: This letter constitutes a Development Order pursuant to Section 4-206.D.6 of the Community Development Code. On March 18, 2003, the Community Development Board reviewed your application for Flexible Development approval to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000) and to increase the height of a solid PVC fence from six feet to eight feet in height, as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C. The proposal includes a 12,280 square foot fire and rescue station. The Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-704.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. BRIAN J. AUNGST, MAYOR-COMMISSIONER WHITNEY GRAY, VICE MAYOR-COMMISSIONER HoYT HAMILTON, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BILL]ONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" March 21, 2003 Zarlenga - Page Two . . Conditions of approval: 1. That all Stormwater requirements be met prior to the issuance of any permits; 2. That a Tree Preservation Plan, prepared by a Certified Arborist, which indicates how the proposed building, parking, stormwater and utilities impact the critical root zones (drip lines) and how those impacts will be mitigated, tree barricade limits and details be submitted to and approved by Staff prior to the issuance of any permits; 3. That the final design and color of the building be consistent with the conceptual elevations submitted or as modified by the CDB; 4. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity; and 5. That evidence of a County right-of-way permit for all work within right-of-way of Overbrook Avenue be submitted to Staff prior to the issuance of any permits Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (March 18, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. The issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. In addition, an appeal of a Level Two approval (Flexible Development) may be initiated by a property owner abutting the property (which is the subject of the approval) within 14 days of the date of the CDB decision. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case will expire on April 1, 2003. If you have any questions, please do not hesitate to call Mark Parry, Planner at 727.562.4558. Zoning information is available through the City's website at www.clearwater,..fl.com via the "Clearwater Parcel and Zoning" link and "Community Development Code" link (via the Planning Department site). Very truly yours, ~.~ Cynthia H. Tarapani, AICP Planning Director S:\Planning Department\C D l!\Flex\Inactive or Finished Applications\Overbrook 1720 Fire and Rescue Station NW - Approved\Overbrook 1720 DEVELOPMENT ORDER. doc -~ ~ ...;;- . . . ~~(1.. LOFTH~~ ~" SC"2 -= f!1f,r;n ~C ~~- ~~ ~ -==- ~ ~~m'~ CITY OF CLEARWATER POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4865 PLANNING DEPARTMENT January 24,2003 Mr. Brian Zarlenga TBE Group 380 Park Place, Suite 300 Clearwater, FL 33759 p.... . '.' -~ ....".- . t'. . U . . .' , L: .~ RE: Application for Flexible Standard approval (PI .02001.-12044) to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000 square feet of gross floor area, reduce the side (west) setback from 10 feet to nine feet (to pavement) and reduce the rear (south) setback from 20 feet to 13 feet (to pavement), as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C. Dear Mr. Zarlenga: The Planning staff has reviewed your application to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000 square feet of gross floor area, reduce the side (west) setback from 10 feet to nine feet (to pavement) and reduce the rear (south) setback from 20 feet to 13 feet (to pavement), as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-402.G at 1720 Overbrook A venue. The proposal includes a 12,280 square foot fire and rescue station. After a preliminary review of the submitted documents, staff has determined that the application is complete pending receipt of the following information/data: 1. Provide existing ISR and FAR; 2. Indicate the height of the existing building; 3. Provide four-sided, rendered, dimensioned, scaled elevations (indicate the color and all materials); 4. Indicate the number of existing parking space; 5. Clarify the number of employees who will be on-site at any given time (it was specified that there be generally 11 employees on the site in the application. Clarify if this also refers to the number of employees who will be living at the site during their shifts); BRIAN J AUNGST, MAYOR-COMMISSIONER WHITNEY GRAY, VICE MAYOR-COMMISSIONER HoYT HAMILTON, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BII.L]ONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATNE ACTION EMPLOYER" January 24, 2003 Zerglenga - Page Two . . 6. The height listed on sheet C-4 (28.5 feet plus roof height) appears to be inaccurate. The height of the building to the midpoint of the peak of the roof appears to be approximately 23 feet. Provide the height of the building as measured from grade to the mid-point of the peak of the roof; 7. Provide a breakdown of the floor area including office space, living area (including kitchen and bathrooms) and garage and utility area (i.e. storage of equipment including vehicles); 8. Indicate the number of fire trucks to be stored at the site at any given time; 9. Clarify how the driveways operate along Overbrook Avenue (one-way or two- way); 10. Indicate what, if any, signage is proposed for the site - provide dimensioned, scaled and rendered drawings; and 11. Provide the existing and anticipated value of the site; The application has been entered into the Department's filing system and assigned the case number: FLD2003-01005. The Development Review Committee (DRC) will review the application for sufficiency on February 13, 2003 in the Planning Department conference room - Room 216 - on the second floor of the Municipal Services Building. The building is located at 100 South Myrtle A venue in downtown Clearwater. Please call Sherrie Nicodemus, Administrative Analyst at 727.562.4582 no earlier than one week prior to the meeting date for the approximate time that your case will be reviewed. You or your client must be present to answer any questions that the committee may have regarding your application. Additional comments will be generated by the DRC at the time of the meeting. If you have any questions, please do not hesitate to call me at 727-562-4558. ~----:; Mark Parry Lead Planner S:\Planning Departmenf\C D B\FleX\Pending cases\Up for the next DRC\Overbrook 1720 Fire and Rescue Station NW\Overbrook 1720 complete letter.doc I I I I I I I I I I I I I I I I I I I ENVIRONMENTAL RESOURCE PERMIT APPLICA TION PROJECT: CLEARWATER MALL FIRE AND RESCUE STATION NO. 51 TBE Project No. 00083-101.00 Prepared for: Southwest Florida Water Management District Submitted by: TBE GROUP, INC. 380 Park Place Boulevard, Suite 300 Clearwater, FL 33759 RECEIVED February 2993.'~'_ __ rtn 1 R 7003 PLANNING DEPARTMENT CITY OF CLEARWATER FORM 547.27/ERP (8-94) Rule 4OD-1.659, FAG. J :1000831000831 01.00lDOGIPERMITSISEGTIONA.DOC I I I I I I I I I I I I I I I I I I I Section 1 Section 2 Section 3 Section 4 Section 5 FORM 547.27/ERP (8-94) Rule 40D-1.659, FAC. TABLE OF CONTENTS Environmental Resource Permit Application (Sections A, C and H) Drainage Design Calculations Geotechnical Report Project Maps (Pocket) Attachments: Project Construction Plans J:I00083100083101.00IDOCIPERMITSISECTIONA.DOC I I I I I I I I I I I I I I I I I I I FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION! WATER MANAGEMENT DISTRICTS! U.S. ARMY CORPS OF ENGINEERS JOINT APPLICATION FOR ENVIRONMENTAL RESOURCE PERMIT! AUTHORIZATION TO USE STATE OWNED SUBMERGED LANDS! FEDERAL DREDGE AND FILL PERMIT FORM 547.27/ERP (8-94) Rule 40D-1.659, FAC. J:I000831000831 01 .00lDOCIPERMITSISECTIONA.DOC I I I ENVIRONMENTAL RESOURCE PERMIT ApPLICATION I SOUTHWEST FLORIDA WA TER MANAGEMENT DISTRICT 2379 BROAD STREET · BROOKSVILLE, FL 34609-6899 (904) 796-7211 OR FLORIDA WATS 1 (800) 423-1476 I FOR AGENCY USE ONLY I ACOEApplication# Date Received Proposed Project Latitude ___ ProposedProjeclLongitude ~ _'_" DEP/WMD Application # Date Received Fee Received $ Fee Receipt # I SECTION A I PART 1: Are any of the activities described in this application proposed to occur in. on. or over wetlands or other surface waters? Dyes 0no Is this application being filed by or on behalf of an entity eligible for a fee reduction? Dyes 0 no I PART 2: A. Type of Environmental Resource Permit Requested (check at least one) D Noticed General - include information requested in Section B. D Standard General (single family dwelling) - include information requested in Sections C and D. D Standard General (all other projects) - include information requested in Sections C and E. o Standard General (minor systems) - include information requested in Sections C and H. D Standard General (borrow pits) - include information requested in Sections C and I. D Individual (single family dwelling) - include information requested in Sections C and D. D Individual (all other projects) - include information requested in Sections C and E. D Individual (borrow pits) - include information requested in Sections C and I. D Conceptual - include information requested in Sections C and E. D Mitigation Bank (construction) - include information requested in Section C and F. (If the proposed mitigation bank involves the construction of a surface water management system requiring another permit listed above, check the appropriate box and submit the information requested by the applicable section.) D Mitigation Bank (conceptual) - include information requested in Section C and F. I I I B. Type of activity for which you are applying (check at least one) o Construction or operation of a new system, including dredging or filling in. on or over wetlands and other surface waters. (If reapplying for an expired, denied or withdrawn permit! application, please provide previous permit # .) D Alteration or operation of an existing system which was not previously permitted by SWFWMD or DEP. D Modification of a system previously permitted by SWFWMD or DEP. Provide previous permit # and check applicable modification type. D Alteration of a system D Extension of permit duration D Abandonment of a system D Construction of additional phases of a system D Removal of a system I I I C. Are you requesting authorization to use State Owned Submerged Lands. Dyes 0 no If yes, include the information requested in Section G. I D. For activities in, on or over wetlands or other surface waters, check type of federal dredge and fill permit requested: D Individual D Programmatic General D General D Nationwide 0 Not Applicable E. Are you claiming to qualify for an exemption? Dyes 0 no If yes, provide rule number if known I I I FORM 547.27/ERP(8-94)A Page 1 of 5 J:\00083\00083101.00\DOC\PERMITS\SECTIONA.OOC I I I PART 3: A. OWNER(S) OF LAND B. APPLICANT (IF OTHER THAN OWNER) NAME NAME Rowland Herald Same as Owner COMPANY AND TITLE COMPANY AND TITLE City of Clearwater, Fire Chief ADDRESS ADDRESS 610 Franklin Street CITY, STATE, ZIP CITY, STATE, ZIP Clearwater, FL 33756 TELEPHONE (727) 562-4334 TELEPHONE ( ) FAX (727) 562-4328 FAX ( ) C. AGENT AUTHORIZED TO SECURE PERMIT (IF AN D. CONSULTANT (IF DIFFERENT FROM AGENT) AGENT IS USED) NAME NAME N/A Bryan L. Zarlenga, PE COMPANY AND TITLE COMPANY AND TITLE TBE Group, Inc. Project ManaQer, Civil Division ADDRESS ADDRESS 380 Park Place Boulevard Suite 300 CITY, STATE, ZIP CITY, STATE, ZIP Clearwater, FL 33759 TELEPHONE ( ) TELEPHONE (727) 531-3505 FAX ( ) FAX (727) 539-1294 PART 4: PROJECT INFORMATION A. Name of project, including phase if applicable: Northwest Fire & Rescue Station No. 51 B. Is this application for part of a multi-phase project? 0 yes ItI no C. Total applicant-owned area contiguous to the project: ~ acres D. Total project area for which a permit is sought: 1.59 acres E. Total impervious area for which a permit is sought: 0.70 acres F. Total area (metric equivalent for federally funded projects) of work in, on, or over wetlands or other surface waters: ~ acres or square feet '--- hectares or _ square meters) G. Total number of new boat slips proposed: N/A I I I I I I I I I I I I I I I I FORM 547.27/ERP(B-94)A Page 2 of 5 J:I00083100083101.00IDOCIPERMITSISECTIONA.DOC I I I PART 5: PROJECT LOCATION (use additional sheets, if needed) County(ies) Pinellas Section(s) 3 Section(s) Land Grant name, if applicable Tax Parcel Identification Number 03/29/15/43740/000/0240 Street address, road, or other location 1720 Overbrook Avenue City, Zip Code, if applicable Clearwater Township Township 29S Range 15E Range I I I PART 6: DESCRIBE IN GENERAL TERMS THE PROPOSED PROJECT, SYSTEM, OR ACTIVITY. I The new 12.280 square foot Clearwater Mall Fire & Rescue Station No. 51 is a split floor fire and rescue facility to be constructed on an existino iunkyard parcel. I I The existinQ conditions include: old metal buildinos, concrete and asphalt pavement areas. and open space. The existino site is primarily flat and difficult to determine existino drainaoe patters: however. it appears the site drains overland north towards the Overbrook Ditch Systems and west towards the I adiacent wetland eventually discharoina to Stevenson Creek. I The proposed plan will maintain the existino drainaae pattern. however. a stormwater collection system will be installed via a series of underaround pipes and inlets. The first 1/2" of rainfall from the I I I site will be treated in the three (3) stormwater (drv-retention) ponds on the site. thus discharaina throuah a control structure which will discharae to the existina Pinellas County ditch at the northwest corner of the proiect area. This ditch discharaes west to additional ditches that eventually outfalls to Stevenson Creek. which is southwest of the proiect area. I I I I I FORM 547.27/ERP(8-94)A Page 3 of 5 J:I00083100083101.00lDOCIPERMITSISECTIONADOC I I I PART 7: A. If there have been any pre-application meetings for the proposed project, with regulatory staff, please list the date(s), location(s), and names of key staff and project representatives. Date(s) Location(s) Names N/A B. Please identify by number any MSSW/WRM (dredge & fill)!ERP!ACOE permits or applications pending, issued or denied and any related enforcement actions at the proposed project site. Agency Date Number! Type Action Taken C. Note: The followinq information is required for proiects proposed to occur in. on or over wetlands that need a federal dredqe and fill permit and!or authorization to use state owned submerqed lands. Please provide the names, addresses and zip codes of property owners whose property directly adjoins the project (excluding applicant) and!or is located within a 500- foot radius of the project boundary (for proprietary authorizations, if any). Please provide a drawing identifying each owner and adjoining property lines. (Use additional sheets, if needed). 1. N!A 2. 3. 4. 5. 6. I I I I I I I I I I I I I I I I FORM 547.27/ERP(B-94)A Page 4 of 5 J:IOOOB31000B3101.00IDOCIPERMITSISECTlONA.DOC I I I PART 8: I A. By signing this application form, I am applying, or I am applying on behalf of the owner or applicant, for the permit and/or proprietary authorizations identified above, according to the supporting data and other incidental information filed with this application. I am familiar with the information contained in this application, and represent that such information is true complete and accurate. I understand that knowingly making any false statement or representation in the application is a violation of Section 373.430, F.S. and 18 U.S.C. Section 1001. I understand this is an application and not a permit and work prior to approval is a violation. I understand that this application and any permit or proprietary authorization issued pursuant thereto, does not relieve me of any obligation for obtaining any other required federal, state, water management district or local permit prior to commencement of construction. I agree, or I agree on behalf of the owner or applicant, to operate and maintain the permitted system unless the permitting agency authorizes transfer of the permit to a responsible operation entity. I I Rowland Herald Typed/Printed Name of Owner, Applicant or Agent ~~C:~~dd Signature of Owner, Applicant or Agent City of Clearwater Fire Chief Corporate Title, if applicable /-v~03 Date I B. AN AGENT MAY SIGN ABOVE ONLY IF THE FOllOWING IS COMPLETED: I I hereby designate and authorize the agent listed above to act on my behalf, or on behalf of my corporation, as the agent in the processing of this application for the permit and/or proprietary authorization indicated above; and to furnish, on request, supplemental information in support of the application. In addition, I authorize the above-listed agent to bind me, or my corporation, to perform any requirement which may be necessary to procure the permit or authorization indicated above. I Typed/Printed Name of Owner or Applicant Corporate Title, if applicable Signature of Owner or Applicant Date I I C. PERSON AUTHORIZING ACCESS TO THE PROPERTY MUST COMPLETE THE FOllOWING: I I either own the property described in this application or I have legal authority to allow access to the property, and I consent, after receiving prior notification, to any site visit on the property by agents or personnel from the Department of Environmental Protection, the Southwest Florida Water Management District and the U.S. Army Corps of Engineers necessary for the review and inspection of the proposed project specified in this application. I authorize these agents or personnel to enter the property as many times as may be necessary to make such review and inspection. Further, I agree to provide entry to the project site for such agents or personnel to monitor authorized work if a permit is granted. I Rowland Herald Typed/Printed Name z;?~~r'.;,z.~~ Signature City of Clearwater Fire Chief Corporate Title, if applicable /~O::J Date I D. I certify that the engineering features of this surface water management system have been designed by me or under my responsible charge and in my professional opinion conform with sound engineering principles and all applicable rule nd specifications. I further agree that I or my engineering firm will furnish the applicanUpermittee with a set of g . //ines and hies for mainte nce and operation of the surface water management system. ~ Bryan L. Zarlenqa 52167 Slg ture f En~" e'~r .cord Name (please type) FL P.E. No. ,-..... TBE Group, Inc. . . 'jA ~ F I X S Company Name !I'VI ~D':7 380 Park Place Boulevard. Suite 300 Company Address I By: I I Date: Phone: (727) 531-350:; Clearwater. FL 33759 City, State, Zip I I FORM 547.27IERP(8-94)A Page 5 of 5 J:\00083\00083101.00IDOCIPERMITSISECTIONA.DOC I I I ENVIRONMENT AL RESOURCE PERMIT ApPLICATION I I SOUTHWEST FLORIDA WA TER MANAGEMENT DISTRICT 2319 BROAD STREET. BROOK5VILLE, FL 34609-6899 (9041 196-1211 OR FLORIDA W A T5 1 (800) 423-1416 SECTION C I ENVIRONMENTAL RESOURCE PERMIT NOTICE OF RECEIPT OF APPLICATION This information is required in addition to that required in other sections of the application. Please submit five copies of this notice of receipt of application and all attachments. PLEASE SUBMIT ALL INFORMATION ON 8 %" BY 11" PAPER. Project Name: Northwest Fire & Rescue Station No. 51 County: Pinellas Owner: City of Clearwater Applicant: City of Clearwater - Rowland Herald, Fire Chief Applicant Address: 610 Franklin Street. Clearwater. FL 33756 I I I 1. Indicate the project boundaries on a USGS quadrangle map, reduced or enlarged as necessary to legibly show the entire project. If not shown on the quadrangle map, provide a location map, that shows a north arrow, a graphic scale, Section(s), Township(s), and Range(s), and detail sufficient to allow a person unfamiliar with the site to find it. See attached USGS Quadrangle Map I I 2. Provide the names of all wetland or other surface waters that would be dredged, filled, impounded, diverted, drained or would receive discharge (either directly or indirectly), or would otherwise be impacted by the proposed activity, and specify i(they are in an Outstanding Florida Water or Aquatic Preserve: Discharge will be to vacant land adjacent west of the City property, which is following the same drainage pattern as existing conditions. The land historically slopes west to southwest to a wetland area adjacent to Stevenson Creek. I 3. Attach a depiction (plan and section views), which clearly shows the works or other facilities proposed to be constructed. The depiction must use a scale sufficient to show the location and type of works. See enclosed construction plans. I I 4. Briefly describe the proposed project (such as "construct a deck with boatshelter", "replace two existing culverts", "construct surface water management system to serve 150 acre residential development"): Construct dry stormwater retention systems to service 12,197 SF fire and rescue facility at the southwest intersection of N. Betty Lane and Overbrook Avenue. I I 5. Specify the acreage of wetlands or other surface waters, if any, that are proposed to be disturbed, filled, excavated, or otherwise impacted by the proposed activity: N/A 6. Provide a brief statement describing any proposed mitigation for impacts to wetlands and other surface waters: N/A I FOR AGENCY USE ONLY Application Name: Application Number: Office where the application can be inspected: I I NOTE TO NOTICE RECIPIENT: The information in this notice has been submitted by the applicant and has not been verified by the outhwest Florida Water Management District. It may be subject to change prior to final agency action. FORM 541.21/ERPIB-941( Page 1 of 1 J \0008l \0008l 101.00\OO[\P E RMIT S \ SECTIONC WPD I I I I I I ENVIRONMENT AL RESOURCE PERMIT ApPLICATION SOUTHWEST FLORIDA WA TER t1ANAGEt1ENT DISTRICT 2379 BROAD STREET. BROOKSVILLE, FL 34609-6899 (904) 796-7211 OR FLORIDA W A TS 1 1800) 423-1476 SECTION H INFORMATION FOR STANDARD GENERAL ENVIRONMENTAL RESOURCE PERMITS FOR MINOR SURFACE WATER SYSTEMS I To obtain a Standard General Permit for a Minor Surface Water Management System, the project must meet all of the requirements of Section A, Part 1 OR one of the requirements of Section A, Part 2 and both of the requirements of Section A, Part 3. Indicate which thresholds apply to your project and submit the information requested in Section B. I A. Project Thresholds I Part 1. v" v" v" I I I Part 2. I I Part 3. v" I ,./ v" The total land area does not equal or exceed 10 acres; The area of impervious surface will not equal or exceed two acres; Any activities to be conducted in, on or over wetlands or other surface waters will consist of less than 100 square feet of dredging or filling; The activities will not utilize pumps for storm water management; The activities will not utilize storm drainage facilities larger than one 24 inch diameter pipe or its hydraulic equivalent; Discharges from the site will meet State water quality standards, and the surface water management system will meet the applicable technical criteria for stormwater management in the Basis of Review; The proposed building floors will be above the 100-year flood elevations; The surface water management system can be effectively operated and maintained, and; The proposed activities will not cause significant adverse impacts to occur individually or cumulatively. v" v" v" v" 400-4.051(4) - DISTRICT PERMIT RECEIVED PRIOR TO OCTOBER 1, 1984 400-4.051(6) - NOTICED DRI/PHASED PROJECT APPROVED PRIOR TO OCTOBER 1, 1984 400-4.051(1) - NORMAL AND NECESSARY FARMING AND FORES TRY v" Discharges from the site will meet State water quality standards, and the surface water management system will meet the applicable technical criteria for stormwater management in the Basis of Review described in Rule 400-4.091(1), and The Surface Water Management System can be effectively operated and maintained. I 1. B. Technical and Legal Information I I FORM 541.21/ERPIB-94IH I Provide a copy of the boundary survey and/or a legal description and acreage of the total land area of contiguous property owned or controlled by the applicant, including the project site. See attached survey and legal descriptions. Pag.1al2 J \ 000 8 3 \ 0008310 1.00 \ 0 D[\PERMITS \ SECTIDNH. WPD I I I I I I I I I I I I I I I I I I FORM 541.21/ERPI8-94JH I 2. Provide recent aerials, legible for photo interpretation with a scale of 1" 400' or more detailed, with total land, project area and anyon-site wetlands delineated. See enclosed Aerial Maps attached in the Engineering Report. 3. Provide a detailed topographic map (with contours) of the site and adjacent hydrologically related area. The location and descript-ion of bench marks (minimum of one per major water control structure) should be included. See enclosed Aerial Maps, and Construction and Survey Drawings. 4. Describe the location, size (in acres) and type of anyon-site wetlands or other surface waters. N/A 5. Provide the project site development plan and acreage of the total area of impervious surface, See attached construction drawings: Total impervious area = 30,492 SF (0.10 acres). 6. Provide the Surface Water Management System design plans, calculat-ions and reports signed and sealed by a Florida Registered Professional Engineer, as required by law. See attached construction drawings and Engineering Report with drainage design calculations. 1. Provide construction drawings signed and sealed by the design engineer showing the location and details of the Surface Water Management System including but not limited to any preserved wetlands, lakes, culverts, pipes, under drains, ex filtration trenches, discharge structures, pumps and related facilities such as paving, grading and erosion or sediment control measures to be employed. See construction drawings. 8. Indicate type of water quality treatment system used: Wet detention ,/ On-line retent-ion On-line detent-ion w/effluent filtration Off -line retention Off-line ex filtration Other (explain) 9. If a Water Use Permit has been issued for the project, state the permit number, N/A 10. Indicate how any exist-ing wells located within the project site will be utilized or abandoned, N/A 11. Provide a letter or other current evidence of potential acceptance by the operat-ion and maintenance ent-ity, if the ent-ity is to be a public body such as a city or drainage district-. If the entity is a homeowners or other associat-ion, final draft documents verifying either the present or imminent existence of such an organizat-ion and its ability to accept operation and maintenance responsibility are required. See attached letter. Page 2 of 2 J I 00 0 831 00 083101.00 100 [\PERMIT S ISE [TIONH. WPO I I I I I I I I I I I I I I I I I I I DRAINAGE DESIGN CALCULATIONS PROJECT: NORTHWEST FIRE & RESCUE STATION NO. 51 CLEARWATER, PINELLAS COUNTY, FLORIDA Prepared for: Southwest Florida Water Management District Prepared by: r:E TBE Group, Inc. 380 Park Place Boulevard, Suite 300 Clearwater, Florida 33759 TBE Project No. 00083-101-00 February 17,2003 I I I I I I I I I I I I I I I I I I I T ABLE OF CONTENTS Title Page PROJECT DESCRIPTION ............. .............................. .... ........ ............ ........ ......... .......... ... ...1 EXISTING CONDITIONS.... ........ ... .............. ... .... .......... ...... ................... ...... ........ ....... .........1 PROPOSED CONDITIONS ......... ........................... ..................... ....................... ............... 2-4 A. Stormwater Management Facilities B. Water Quality (SWFWMD Requirements) C. Water Quantity (SWFWMD Requirements) D. Stormwater Runoff DRAINAGE STRUCTURES.. ... .... ................. .......................... ... .... ... ...... ....... ....... ... ..... ... .....4 A. Endwall Types B. Entrance Loss Coefficient (Ke) C. Storm Drains D. Minimum Culvert Size E. Maximum Pipe Lengths without Access Structures F. M'3.nning's Roughness Coefficient METHODS USED TO ESTIMATE DESIGN DISCHARGE .............................................4 A. Storm Drains and Gutter Drains B. Stormwater Management Facilities METHODS USED TO DELINEATE DRAINAGE AREAS...............................................5 CONCLUSION....................... ... ............. ....... ... ......... ............... ..... .......... ..... ..... .... ........... ... ....5 TBE Group, Inc. J:\00083\000831 01 OO\DOC\Reports\ENGREPORT-revl doc 11 February 2003 I I I I I I I I I I I I I I I I I I I LIST OF GRAPHIC FIGURES (SECTION 2) FIGURE DESCRIPTION 1 VICINITY MAP 2 USGS QUADRANGLE 3 SCS SOILS SURVEY MAP EXHIBIT DESCRIPTION 1 NODE DIAGRAM LIST OF CALCULATIONS (SECTION 2) NO. DESCRIPTION 1. EXISTING CONDITION 25- YEAR STORM (DRAINAGE AREAS) 2 PROPOSED CONDITION 25- YEAR STORM (DRAINAGE AREAS) 3 PROPOSED CONDITIONS 25- YEAR STORM (BASIN AREAS) 4 TREATMENT/POND VOLUME CALCULATIONS 5 POND VOLUME GRAPH 6 RETENTION POND RECOVERY-REFINED METHOD (WATER QUALITY) 7 ICPR V. 2.2 POND ROUTING 8 STORM SEWER/ROOF DRAIN SCHEMATIC 9 STORM SEWER/ROOF DRAIN 10- YR STORM EVENT ICPR CALCS ATTACHMENTS (SECTION 2) NO. DESCRIPTION 1 FIGURE D-5 - SWFWMD 24 HR/25 YR RETURN PERIOD RAIN FALL MAP 2 TABLE 2-2A-RUNOFF CURVE NUMBERS FOR URBAN AREAS 3 AERIAL CONTOUR MAP GEOTECHNICAL ENGINEERING STUDY (SECTION 3) SWFWMD AERIAL (SECTION 4) PROJECT CONSTRUCTION DRAWINGS (SECTION 5) TBE Group, Inc. J:\00083\00083101.00\DOC\Reports\ENGREPORT-revl.doc 11 February 2003 I I I I I I I I I I I I I I I I I I I PROJECT DESCRIPTION The City of Clearwater's Northwest Fire and Rescue Station No. 51 is a proposed fire and rescue facility to be constructed on approximately 1.59 acres of land in Section 3, Township 29 South, Range 15 East, at 1720 Overbrook Avenue, in the City of Clearwater, Pinellas County, Florida. The property is located at the southwest intersection of Overbrook Avenue, and North Betty Lane. See the Site Vicinity Map and USGS Quadrangle Map, Figure 1 and Figure 2, respectively, located in Section 2 of this Engineering Report. The project area is bordered to the north by Overbrook Avenue, commercial and residential property; residential property to the south; North Betty Lane and residential property to the east; and City of Clearwater commercial property adjacent to the west side of the project area. West of the City's property is wetlands and Stevenson Creek. EXISTING CONDITIONS The existing site is currently a junkyard facility. The total project area consists of approximately 1.59 acres. The site consists of dilapidated buildings, and concrete and asphalt surfaces, with some open space and few trees. The existing conditions of the project area are as follows: ITEM AREA IMPERVIOUS AREA OPEN SPACE POND AREA EXISTING BASIN 1.59 AC 1.31 AC 0.28 AC o The existing drainage pattern generally runs north and west on the property. Adjacent to the north is an existing Pinellas County ditch system. Adjacent to the west of the project area is a City owned parcel, which is an extended area of the existing junkyard facility. Both the ditch and westerly-owned parcels flow overland to the southwest into adjacent wetland area. The wetland area is bordered at the south end by Stevenson Creek (see Construction Drawings, Aerial Site Plan). The United States Department of Agriculture, Soil Conservation Service (SCS) Soil Survey for Pinellas County identifies the soil at the site to be represented by Made Land (Ma) (see Soil Survey Exhibit). Tierra Geotechnical and Materials Engineering, results of Double Ring Infiltration Test along with associated hand auger borings in general accordance with ASTM standards are located in Section 3 of this Engineering Report. Tierra indicated that the groundwater was encountered at approximately three feet below existing grade. Based on the subsurface material encountered, Tierra recommends over excavating two to three feet of the existing site and replacing the material as needed with clean, engineered fill. They estimate that the seasonal high groundwater table will be encountered at a depth of approximately one foot below existing grade. Therefore, the seasonal high water table for design is assumed to be elevation 18.0 feet, which is consistent with the soil boring location and geotechnical recommendation. Based on the results of the DR! test, the infiltration rate is estimated to be 10 feet/day. TBE Group, Inc. J:I00083100083101.00IDOCIReportsIENGREPORT_revl.doc January 2003 I I I I I I I I I I I I I I I I I I I PROPOSED CONDITIONS The design criteria for this proj ect are based on general conformance with the current City of Clearwater Stormwater Manual and the requirements of the Southwest Florida Water Management District (SWFWMD). A SWFWMD Individual Environmental Resource Permit has been included in Section 1 of this Engineering Report. The proposed conditions include the construction of a 12,280 square foot fire station, associated parking, driveway, and stormwater management system. The proposed site modifications are as follows: ITEM EXISTING BASIN AREA 1.59 AC IMPERVIOUS AREA 0.70 AC GREEN AREA 0.57 AC POND AREA 0.32 AC The proposed site will continue to maintain existing drainage patterns while collecting runoff through a drainage collection system directed through three dry retention stormwater ponds as shown on the Paving, Grading, and Drainage Plan. Stormwater management systems must comply with the rules of SWFWMD and the City of Clearwater per the latest update of August 23,2002. The stormwater management for dry retention systems will comply with SWFWMD rules for water quality and quantity. The basic drainage criteria are as follows: A. Stormwater Management Facilities 1. Total treatment volume shall again be available within 24 hours from a major design storm event, however, only that volume which can again be available within 36 hours may be counted as part of the volume required for water quality storage. 2. The design of the system must be such that the water velocities and associated flow path through the storage pond do not cause the accumulated pollutants to be flushed out of the treatment pond up to the 25-year, 24-hour design storm. 3. Perimeter maintenance and operation easements, with a minimum width of 20 feet and slopes no steeper than 4: 1 (horizontal : vertical), should be provided landward of the control elevation water line. Linear stormwater management facilities may be permitted to have a maintenance and operation easement on one side, only, if the entire site can be maintained from this provision. Widths less than 20 feet are allowed when it can be demonstrated that equipment can enter and perform the necessary maintenance for the system. B. Water Quality Results The proposed dry retention ponds were designed to retain the treatment volume of one-half inch over the entire 1.59 acre basin area. The criteria for the drainage area is defined as follows: TBE Group, Inc. J:\00083\000831 0 I .00\DOC\Reports\ENGREPOR T -revl.doc 2 January 2003 I I I I I I I I I I I I I I I I I I I a) All proposed paved areas. b) All proposed building areas. c) All proposed grassed areas within the basin boundaries. d) Pond bottom elevation shall be at least one foot above the seasonal high water table to allow for positive percolation. e) The pond is to recover within a five-day period with a safety factor of two applied to the draw down calculations. Treatment Volume Required: Basin Area = 69,224 SF = 1.59 AC 69,224 SF x ((112")/12) = 2,884 CF = 0.066 AC-FT Treatment Volume Provided: Top Area of Treatment = 7,994 SF ELEV. 20.4 Bottom Area of Treatment = 6,926 SF ELEV.20.0 Depth of Pond (for Treatment) = 0.40 FT Treatment Volume = (7,994 + 6,926)/2 x 0040 = 2,984 CF = 0.069 AC-FT The treatment volume required for recovery will be adequate. Ponds Version 3.2.0068 was used for the water quality draw down calculations. The water quality volume staged to an elevation of 20.4, which is equal to the excess run-off weir elevation, and will percolate to a dry condition in less than ten hours, providing for the desired recovery. See the Ponds results for the water quality drawdown calculation located in Section 2 of this Engineering Report. C. Water Quantity (SWFWMD Requirements) The Impermeable Surface Ratio (ISR) is approximately Yz of the existing conditions. Since the proposed impervious area is less than pre-conditions, that is, Cnpost < Cnpre, attenuation was not required. ICPR Version 2.2 was used to route the 24-hour, 25-year storm through the stormwater management system for the proposed conditions. See all calculations in Section 2 of this Engineering Report. The stormwater run-off for pre-conditions, and post development discharge is, 8.57 cfs, and 6.02 cfs, respectively. D. Stormwater Runoff As shown on the attached Node Diagram, Exhibit 1, Basin 4 collects 0.81 acres of the site runoff via a series of drainage collection pipes and directs the flow to a proposed pond (node 4) at the southeastern portion of the site. From this pond (node 4) an equalizer pipe is connected to an inlet (node 3). The equalizer pipe from node 3 connects to another proposed dry retention pond (node 2) located at the southwestern portion of the site, which collects 0.27 acres (Basin 2) of runoff via a swale. Basin 1 collects 0.52 acres of site runoff via a series of drainage collection pipes and directs the flow to a proposed pond (node 1) at the northwestern portion of the site. The southwest pond (node 2) is connected to the northwest pond (node 1) via a 24-inch RCP stornl pipe. TBE Group, Inc. J:\00083\00083 J 01.00\DOC\Reports\ENGREPORT-revl.doc 3 January 2003 I I I I I I I I I I I I I I I I I I I The proposed retention ponds were designed to have the bottom elevation at 20.0 and top of banks at 21.5. The ponds will be approximately eight to nine inches deep at Design High Water (DHW) for the 24-hour, 25-year storm. The discharge from the ponds was routed through an FDOT Type "D" modified inlet located in the northwest pond (node 1). An oil skimmer will be provided around the proposed outfall structure (see pond control structure detail on the Drainage Details sheet). The outfall structure will have a 45 LF, 15 inch RCP discharge pipe, which will connect to an existing Pinellas County ditch at the northwest comer of the project area, and on the south side of Over brook Avenue. (see Paving, Grading, and Drainage Plan). The stormwater flows form this ditch west to another ditch located at the south side of Overbrook Avenue, and eventually flows west to southwest to Stevenson Creek, which is located southwest of the project area. DRAJNAGESTRUCTURES The following drainage structures have been provided: A. Endwall Types 1. Mitered End Section, FDOT Index No. 272. 2. Side Drain Mitered End Section, FDOT Index No. 273 B. Entrance Loss Coefficient (Ke) 1. Mitered End Section - 0.7 c. Storm Drains 1. A design storm frequency of 10 years has been used to comply with City of Clearwater requirements. 2. A minimum longitudinal grade within the inverted crown of the paved areas of 0.3 percent has been designed for shallow swale conveyance. D. Minimum Culvert Size 1. Storm Drain 14 x 23 inch E. Maximum Pipe Lengths without Access Structures 1. I8-inch Pipe 300 feet 2. 24-inch to 36-inch Pipe 400 feet 3. 42 inch and larger 500 feet F. Manning's Roughness Coefficient 1. Concrete Pipe 0.012 (Concrete is proposed as the primary pipe material on the project) METHODS USED TO ESTIMATE DESIGN DISCHARGE A. Storm Drains TBE Group, Inc. .1:\00083\00083101.00\DOC\Reports\ENGREPORT-revl.doc 4 January 2003 I I I I I I I I I I I I I I I I I I I 1. The rational method may be used for all projects, which have major basins not exceeding 10 acres. B. Stormwater Management Facilities 1. The SCS Unit Hydrograph Method has been used in the ICPR model for dynamic modeling of the pond system. 2. Shape Factor 256 (Flat terrain with slopes less than five percent) 3. Rainfall Distribution Florida Modified 4. Design Rainfall Depths 7.5 inches (lO-year storm event - storm drains) 9.0 inches (25-year storm event - stormwater management facilities) METHODS USED TO DELINEATE DRAINAGE AREAS A. Field Reviews and Surveys B. SWFWMD Aerial Contour Maps CONCLUSION The proposed development will enhance the surrounding properties, and will not impact the surrounding environment in a negative manner by the provision of new stormwater management ponds. The proposed conditions, Impermeable Surface Ratio (ISR), is approximately Y2 of the existing conditions. The proposed impervious area at the site will be approximately 0.70 acres, which is less than the existing conditions of 1.31 acres. The proposed development stormwater discharge (Qpost) is 6.02 cfs, which is less than the existing conditions stormwater run-off (Qpre) of8.57 cfs. The stormwater management system will be provided to satisfy the treatment requirements of SWFWMD and the City of Clearwater. The City of Clearwater will be responsible for managing all stormwater management facilities. TBE Group, Inc. J:I00083100083101.00IDOCIReportsIENGREPORT-revl.doc 5 January 2003 I I I I I I I I I I I I I I I I I I I Figure 1 VICINITY MAP I I I I I I I I I I I I I I I I I I I I PROJECT LOCA TI ON ~ <> ~ z <> :> J!! iii r ~ <> <> o ;;; ., <> <> <> :; .;:; s '" ~ ;;: g '" bl ., <> ~ .;:; S F '" <> N N o IE .;:; t- '" <> UCer1se No. 384-J I 53 T295 R15E :\ <J I \ ! \ . I \ \ , \ ~-~-\~ \ \ ~, \ \j@ I Egmont Key Notionol ~ W~dl;fe Refuge ~ Pa~if:1e~~ona 0 AnDa Ilarla IfDlmeO Beach Bradentoll Beach VICINITY MAP NT5 TBE GROUP, INC. Civil Engineering .Transportation -En vironmen tal-Planning CLEARWATER TMtPA 380 Pork Place BMI 102 W. 'Mllting Street (727) 53'-3505 (813) 221-0048 PROJECT: NORTHWEST FIE /IJtC) FESClE STATlON NO. 51 APPUCANT: CITY OF a..EARWATER COUNTY: PN:U..AS COlNTY SHEET: -.J I I I I I I I I I I I I I I I I I I I Figure 2 USGS QUANDRANGLE I I I I I I I I I I I ~ '" vi '" 1Il ::J /' I 1Il r- iD r i:j /' '" ~ <5 I ;;; '" '" '" '" /' .., '" '" '" '" /' I '" < u .:.; W '" < I 9 "' I I I I S3 T29S R15E 'i.. ..~ r'." . Oli' I:t ... ... ~ c- it ..J . f i L.~.~.~-: .. ~! ::.:I!I) .' ~r~".---"~~:ril<: .' ~ > ,. ,. . t-t I " ,I,. ~,' : ; ~ 'l ~- ~";:f l ;,1 r , 1 -'--=~~---i-;-tT l~ r-J!~L; ','~ ~~~__~~_ _ i ~.*.,~ l' . - - . ~;' . ~ ~Hii"7',",:~~~ ! 'f;.." '1'1 I I ,~.~ 1i~~t"~Lf"_ ?:'-. ' 1'~t~ h ! i- I ~ 'N . ;: ;~~ ----~-<~---~~.,-:%,:-'-::--.- -- ~ ~ ""',. r~,v...:;. ~r'''''_''C' 'A~ - ~.;,.::-, r ."/ l~#~"i'~'>':'::: ~;1"1Ji1j,= :~f'.!l"{~r .~=:; .' l:;.,r(~}.:~~.~.3r. ...,J.t. \\~. f, .~t 'S. '1,,1 ~~.= j . /.J::~::J~' . 'C;; ". H ; l... f --- ..rXliI- ~"'\'3~e"'. .\ ,," J -" 'nr" . ~- ~"'-L.l ., "",,;,d- '..' ,.,,' :1. .'. If. "j '.I.....'~.~.. ~..'.... '\'J~ .,-' ~I. , 11;...........=.l. r.~.~c.....,~. lScI,r I v f I 1'1 ~ _! h alc_.__ _ . ~ SpbSillt! r ;.J: r'~. ........... I'f >) C": ~,_.~ --'J' " -~..~ L~1,........ 11 - ..1" ~ (-'11~';. :./ ; ,'''~' ; ..-... , '...... -.PROJECT .. ,: .='>""'T fj"'lo.--;"'; ,LaI<.. 'il<ti'r~ '.' I" to.'!_ _ f- ~F.' ,f I '.__00____ 'li :'I~rk.". /U4:"P'Il~"'I,.."cc~1! LOCA TION..~! t' ,\~~<~~~sdJ 'I. ~.'~{i:~ ..::"}~i#'~":l ~~TL~.l.;.~ .~'fX~f:~.- _O~ ~ r;-r:.t... 1- '''',........; ,r. :\,'I!ri f;~lf' ; taL" t ' -i "- q --) 'I -, )" /...; sc~/N,QLtl} - ~ ,I..~,., .. :-~ ",1" r,~.:~-:'.'r,:-.~\~_-,h~~z "~i~J:'tr~.t- I -"-; " ~ ;;.... ' ~Ir""f'~ ,1''''''-~. _4'"1.---- 1~ ..-- '.t, Uf.r;;;>: t ~J .::-_::_="~;-",'.!t~ _~,:':,::;;_. ~i ,'!/' /1 .,L i . :. ......G~t.y. JFI"~~r?~.." .,t." ~i :"I/.~~f l~... . ;J~"'Ksy"'..:.+1"~~ !:"bl,~,," ,I ~-....~.t ' 0=1i, ~l,...".....!.. ,;...,1,'" __~J_ ..~,,!(: ' " .. ,'.J I ~ . . ' !:...:F...~l: ".~")\.' i: . I. Ill:'... JL ''=1-c=...:!: "'t'ifE';.,,.tihl>..na. I :' r-' rL-:, $.: ." .. \: Id' Cc. i;' St,-'l;;-~~:;?"= ;/CIt. Conftr 'I 'f -~II,:~i~J....}4 ";:~i...{CLB.1W~ i ,:>~..'I I i [;~:];7"\ ",' ... :.: "'~(\;=r' "~;:;, .1 Light .,;....'1' . L !!:~.l'-FI F (-[..1. I I Jill " i" 1;.': " ! -, ~ < U 1Il U.S.G.S. QUADRANGLE MAP SCALE APPROX. 1: 2,000 2l ~ w '" F .., o IE PROJECT: NORTHWEST fILE AJII) REsaE STATION NO. 51 APPUCANT: aTY OF ClEAAWAlEA "- "- N '" TBE GROUP, INC. Civil Engineering. Transporta lion -En y;ronmen tal- Planning CLEARWA 1ER TAIJPA 380 Pari< Place Blvd 102 W. Whitin9 Street (727) 531~3505 (B13) 221~OO'B SHEer: ~ < '" License No. 38+3 COUNTY: f'tB.LAS COUNTY PINELLAS COUNTY. PI N ELLAS COU NTY. I I I I I I I I I I -I I I I I I I I I Exhibit 1 NODE DIAGRAM TAMPA BAY ENGINEERING, INC. Civil Engineering · Transportation · Environmental. Planning tBJECT' )JOfZ7i-1iVe sr FII'E! R(f!;"$4ue Sr;.-Tf"A No. 51 NDDe M-AE I X I 8i IN G- C.~tJ??1 "'(:~E!Y .5t : I . I'~IS-TIN G~~..r'0 l5"9 Ale I CN-;;:;;;96..lIZ 7c .:= 10 ,rn./n. I I I I I I I I I I I I I~RDPO<SI;D Oo~i-r; ONS Pay!): 20.0' 0.055"(;. 20.S' ".~7 AL 21.0' tJ.o79Ac.. t).5' !y.,Oc;i/ Ac. COMP. BY: Me" CHK. BY DATE: t -/'1"03 SHEET NO.: PROJ. NO.: CIooSJ-lat . C/o K'IJ N - 0 FF ~A S'f:,~ .tJ,-,) II y~ Dt!Hl,4Pif 0.52 A'C,. eN:: E~ 7. f.?7 Ie::; 10 r>")1t1. ( j ~ o.27/Je- 13 po. ~\Nl c,.) == 9/.? S 1C;::; /() mr'n. t?t'.d.l~ : 20.01 0.011 A Co Zo.L{' ().oi~ ik 2.1.0' (}. Ol(... '" c.. l/tS? 0.033 Ac. 11)t6!,.J 41 POr/l) : 0, f3( 4c.. ~"'': e {. q (;} Ie. ~ 1&1 m/n. / 20.0 2,0.5' 2/. 0 ( c). 0'12 Ac.. &i. 10 7 A ~ O. /2 '3 A~ o. /39 Ac L/.5 I I I I I I I I I I I I I I I I I I I Calculations I I I I I I I I I I I I I I I I I I I TBE TAMPA BAY ENGINEERING, INC. Civil Engineering Transportation Environmental Planning Subject: Existing Condition 25 Year Storm NORTHWEST FIRE STATION NO. 51 Drainage Areas: Compo By: Chk. By: Date: Sheet No. Proj. No. Weiqhted SCS Curve Number Calculation (Existinq) Land Use Hyd. Gr. Area (Ac) CN Weighted CN D 0.38 98 37.24 D 0.28 89 24.92 D 0.93 98 91.14 i 1.59 t=i 96.42 Buildings Open Space (fair condition) Paved ITotal Weighted Curve Number (CN) = 96.42 25 Year - 24 Hour Rainfall Depth (P) = 9 Inches SCS Runoff Volume Calculation Potential Storage Abstraction (S) = (1 000/CN)-1 0 = 0.37 Runoff Depth (Q) = ((P - 0.2 S)^2) 1 (P + 0.8 S) = 8.57 Inches 25 Year - 24 Hour Rainfall Volume from Drainaqe Area V=A*Q/12= 1.14 Ac/Ft J:\00083\000831 01.00\DOC\Calcs\[fs51_ SCS _ CN.xls]Existing 25 1/22/200321 :37 M. Giuliani 1/22/2003 00083-101.00 I I I I I I I I I I I I I I I I I I I TBE TAMPA BAY ENGINEERING, INC. Compo By: Chk. By: Date: Sheet No. Proj. No. Civil Engineering Transportation Environmental Planning Subject: Proposed Condition 25 Year Storm NORTHWEST FIRE STATION NO. 51 Drainage Areas: WeiQhted SCS Curve Number Calculation (ExistinQ) Land Use Hyd. Gr. Area (Ac) CN Weighted CN 0.280 98 27.44 0.630 61 38.43 0.260 100 26.00 0.420 98 41.16 i 1.590 d 83.67 Buildinos Open Space Pond Paved and Sidewalk ITotal B Weighted CUNe Number (CN) = 83.67 25 Year - 24 Hour Rainfall Depth (P) = 9 Inches SCS Runoff Volume Calculation Potential Storage Abstraction (S) = (1000/CN)-10 = 1.95 Runoff Depth (Q) = ((P - 0.2 S)^2) I (P + 0.8 S) = 7.02 Inches 25 Year - 24 Hour Rainfall Volume from Drainaqe Area V = A * Q I 12 = 0.930 Ac/Ft Net ON Site Compensating Detention Storage Volume Required Proposed Vol. - Existing Vol. = -0.205 Ac/Ft Water Quality Treatment Volume Required (first 1/2") Water Quality Treatment Vol. (Drainage Area 112) * 0.50 = 0.066 Ac 1Ft J:\00083\000831 01.00\DOC\Calcs\[fs51_ SCS _ CN.xls]Existing 25 1/22/200321 :37 M. Giuliani 1/22/2003 00083-101.00 I I I TBE I TAMPA BAY ENGINEERING, INC. Camp. By: M. Giuliani Civil Engineering Transportation Environmental Planning Chk. By: Date: 1/22/2003 I Subject: Proposed Condition 25 Year Storm Sheet No. BASINS Proj. No. 00083-101.00 I NORTHWEST FIRE STATION NO. 51 BASIN 1 I Weighted SCS Curve Number Calculation (ExistinCl) Land Use Hyd. Gr. Area (Ac) CN Weighted CN Impervious 0.280 98 27.44 I Pervious B 0.150 61 9.15 Pond B 0.090 100 9.00 I ITotal I I 0.520 d 87.67 I BASIN 2 I Weiqhted SCS Curve Number Calculation (Existinq) Land Use Hyd. Gr. Area (Ac) CN Weighted CN Impervious 0.120 98 11.76 Pervious B 0.120 61 7.32 I Pond B 0.030 100 3.00 ITotal I I i==i I 0.270 81.78 I BASIN 3 Weiqhted SCS Curve Number Calculation (Existinq) Land Use Hyd. Gr. Area (Ac) CN WeiQhted CN I Impervious 0.000 98 0 Pervious 0.000 61 0.00 I ITotal I I 0.000 d 0.00 I I BASIN 4 Weiqhted SCS Curve Number Calculation (Existinq) Land Use Hyd. Gr. Area (Ac) CN Weighted CN I Impervious 0.310 98 30.38 Pervious B 0.360 61 21.96 Pond B 0.140 100 14.00 I ITotal I I 0.810 d 81.90 I J:\00083\000831 01.00\DOC\Calcs\[fs51_BASINS .xls]Proposed 25 I I 1/22/200322:02 I I I NORTHWEST FIRE STATION NO. 51 TBE #: 00083-101.00 I Treatment for Pond Basin = ~acres I Treatment Critertia = 0.5 inches of runoff Treatment Volume = Area x Depth /12 x 43560, cf Treatment Volume = 1 28861 cf or I 0.0661Iac-ft I Elev Area, sf Area, ac Incr. Vol Cum. Vol Cum.ac-ft 20.00 6926 0.1590 0 0 0.00 Batt Elev 20 I 20.20 7586 0.1742 1451 1451 0.0333 Batt Area 6926 20.40 7994 0.1835 1558 3009 0.0691 SET WEIR Top Elev 21.5 20.50 8364 0.1920 818 3827 0.0879 I 20.80 8724 0.2003 3344 6353 0.1458 Top Area 11500 21.00 9888 0.2270 1861 8214 0.1886 21.20 10291 0.2362 2018 10232 0.2349 21 .40 10700 02456 2099 12331 0.2831 I 21.50 11500 0.2640 1110 13441 03086 I I I I I J:\00083\00083101.00\DOC\CALCS\TREA TVOL 1.xLS I I I I I I I I ~ ~~:~~~~~~~~~~i"9 I SUBJECT: WOTCtHWFiSi Fie.~/l2:el5c-(.,)E Sr/fnalll AJo. 51 I I I I I I I I I I I I I I I I - k ~ ~ 2().'2.. l:: ~ :::. '" "J ~ 20./ PlilJ.l2 JLl~~JJMe ..~A-~H 26.' lO.~ ./~- to. 4 ZtJ,; . ~ I / 20 o ~ 0.. o'"~ AC.,F1 WA-TElL e:N~ ir t \"f ~ ""I' o.OS VOLUMf (At..-t:/) f'- /' ",'" ./ /' COMP. BY: MtG CHK. BY DATE: I-Z3"'~3 SHEET NO.: PROJ. NO.: oooe3.1r;1,~ ./ "f//~ '" .r'" ,~,~,$.t#!,!t' O,!~ I I I I I I I I I I I I I I I I I I I PONDS Version 3.2.0068 Retention Pond Recovery - Refined Method Copyright 2000 Devo Seereeram, Ph.D., P.E. Proiect Data Project Name: NORTHWEST FIRE/RESCUE STATION NO. 51 Simulation Description: Water Quality Drawdown Calculations J:\00083\00083101.00\DOC\CALCS\FS51.PRM Project Number: 00083-101-00 Engineer : Michelle C. Giuliani Supervising Engineer: Bryan Zarlenga, P.E. Date: 01-22-2003 Aquifer Data Base Of Aquifer Elevation, [B] (ft datum): Water Table Elevation, [WT] (ft datum): 16.00 18.00 Horizontal Saturated Hydraulic Conductivity, [Kh] (ft/day): Fillable Porosity, [n] (%): 10.00 25.00 Vertical infiltration was not considered. Geometry Data Equivalent Pond Length, [L] (ft): Equivalent Pond Width, [W] (ft): 427.5 17.1 Ground water mound is expected to intersect the pond bottom Staae vs Area Data Stage (ft datum) 20.00 20.50 21.00 21.50 Area (ft2) 6926.0 8364.0 9888.0 11500.0 Ditch Data Ditch parallel to length axis is inactive Ditch parallel to width axis is inactive Discharae Structures Discharge Structure #1 is inactive Discharge Structure #2 is inactive NORTHWEST FIRE/RESCUE STATION NO. 51 01-22-2003 22:15:53 Page 1 I PONDS Version 3.2.0068 Retention Pond Recovery - Refined Method Copyright 2000 Devo Seereeram, Ph.D., P.E. I I Scenario Input Data Scenario 1 :: Treatment I I I I I I I I I I I Hydrograph Type: Slug Load Modflow Routing: Routed with infiltration Treatment Volume (fP) 2886 Initial ground water level (ft datum) 18.00 Time After Storm Event (days) 0.100 0.250 0.500 1.000 1.500 Time After Storm Event (days) 2.000 2.500 3.000 3.500 4.000 I I I I I NORTHWEST FIRE/RESCUE STATION NO. 51 01-22-2003 22:15:55 Page 3 I I PONDS Version 3.2.0068 Retention Pond Recovery - Refined Method Copyright 2000 Devo Seereeram, Ph.D., P.E. I Modflow Loa I MODFLOW CONTROL PARAMETERS Perimeter boundary condition: constant head Maximum iterations of outer loop: 150 Maximum iterations of inner loop: 60 Instantanerous storage coefficient: Volumetric balance Default head closure tolerance: .01 Default residual closure tolerance: .5 Target water budget error: 1 On failure to converge: Rerun limiting inner loop to one iteration > Maximum number of iterations of outer loop: 500 Running Average Porosity is active > Starting on pass: 2 > When outer iteration reaches: 50 > Number of data points: 4 Running Average Pond Stage (for discharge structures with tailwater) is active > Starting on pass: 2 > When outer iteration reaches: 50 > Number of data points: 4 Grid size: 1000 ft (from pond centerline) Mound Output: none I I I I I Begin Scenario 1 1/22/2003 22:14:20 Default GWT has been overridden. Using 18.0 ft. End Scenario 1 1/22/2003 22: 14:20 I I I I I I I I I I NORTHWEST FIRE/RESCUE STATION NO. 51 01-22-2003 22:15:55 Page 4 I I PONDS Version 3.2.0068 Retention Pond Recovery - Refined Method Copyright 2000 Devo Seereeram, Ph.D., P.E. I Sort-Bv-Cateaorv Report Scenarios Considered: 1 I Stage. Maximum Maximum Stage (ft datum) 20.385 Time (hours) 0.002 Treatment Description I Scenario Rank Number I Stage. Minimum Minimum Stage (ft datum) 18.7 43 Time (hours) 96.000 Treatment Description I Scenario Rank Number I Inflow - Rate - Maximum Positive I Maximum Positive Scenario Inflow Rate Rank Number (fP/s) 481.0000 Time (hours) 0.002 Treatment Description I I Inflow - Rate - Maximum Negative Maximum Negative Scenario Inflow Rate Time Rank Number (ft3/s) (hours) Description None NA Treatment Inflow - Cumulative Volume - Maximum Positive Maximum Positive Cumulative Scenario Inflow Volume Time Rank Number (ft3) (hours) Description 2886.0 0.002 Treatment Inflow - Cumulative Volume - Maximum Negative Maximum Negative Cumulative Scenario Inflow Volume Time Rank Number (ft3) (hours) Description None N.A. Treatment I I I I I I I I NORTHWEST FIRE/RESCUE STATION NO. 51 01-22-2003 22:15:55 Page 5 I I PONDS Version 3.2.0068 Retention Pond Recovery - Refined Method Copyright 2000 Devo Seereeram, Ph.D., P.E. I Sort-Bv-Cateaorv Report (cont'd.) Inflow - Cumulative Volume - End of Simulation I I Scenario Rank Number Cumulative Inflow Volume End Of Simulation (fP) 2886.0 I Infiltration - Rate - Maximum Positive I Scenario Rank Number I Maximum Positive Infiltration Rate (fP/s) 0.4497 Infiltration - Rate - Maximum Negative I Scenario Rank Number I Maximum Negative Infiltration Rate (fP/s) None Time (hours) 96.000 Treatment Description Time (hours) 0.002 Treatment Description Time (hours) N.A. Description Treatment Infiltration - Cumulative Volume - Maximum Positive I Maximum Positive Cumulative Scenario Infiltration Volume Rank Number (fP) I 2886.0 Time (hours) 12.000 Treatment Description Infiltration - Cumulative Volume - Maximum Negative I I Scenario Rank Number I Maximum Negative Cumulative Infiltration Volume (fP) None Time (hours) N.A. Treatment Description Infiltration - Cumulative Volume - End of Simulation I Scenario Rank Number I I Cumulative Infiltration Volume End Of Simulation (fP) 2886.0 Time (hours) 96.000 Description Treatment I NORTHWEST FIRE/RESCUE STATION NO. 51 01-22-2003 22:15:55 Page 6 I I PONDS Version 3.2.0068 Retention Pond Recovery - Refined Method Copyright 2000 Devo Seereeram, Ph.D., P.E. I Sort-Bv-Cateaorv Report lcont'd.) Discharge - Rate - Maximum Positive I Scenario Rank Number Maximum Positive Discharge Rate (fP/s) I None I Discharge - Rate - Maximum Negative Scenario Rank Number Maximum Negative Discharge Rate (fP/s) I None I Discharge - Cumulative Volume - Maximum Positive Maximum Positive Cumulative Scenario Discharge Volume Rank Number (fP) I None NA Treatment I Discharge - Cumulative Volume - Maximum Negative I Maximum Negative Cumulative Discharge Volume (fP) Scenario Rank Number I None Discharge - Cumulative Volume. End of Simulation I Cumulative Discharge Volume End Of Simulation (fP) I Scenario Rank Number 0.0 I I I I Time (hours) N.A. Treatment Description Time (hours) NA Treatment Description Time (hours) Description Time (hours) NA Treatment Description Time (hours) 96.000 Treatment Description I NORTHWEST FIRE/RESCUE STATION NO. 51 01-22-2003 22:15:55 Page 7 I PONDS Version 3.2.0068 Retention Pond Recovery - Refined Method Copyright 2000 Devo Seereeram, Ph.D., P.E. I I Summary of Results .. Scenario 1 .. Treatment I Time Stage (hours) (ft datum) Stage Minimum 96.000 18.74 Maximum 0.002 20.39 Inflow Rate - Maximum - Positive 0.002 Rate - Maximum - Negative None Cumulative Volume - Maximum Positive 0.002 Cumulative Volume - Maximum Negative None Cumulative Volume - End of Simulation 96.000 Infiltration Rate - Maximum - Positive 0.002 Rate - Maximum - Negative None Cumulative Volume - Maximum Positive 12.000 Cumulative Volume - Maximum Negative None Cumulative Volume - End of Simulation 96.000 Combined Discharge Rate - Maximum - Positive None Rate - Maximum - Negative None Cumulative Volume - Maximum Positive None Cumulative Volume - Maximum Negative None Cumulative Volume - End of Simulation 96.000 Discharge Structure 1 - inactive Rate - Maximum - Positive disabled Rate - Maximum - Negative disabled Cumulative Volume - Maximum Positive disabled Cumulative Volume - Maximum Negative disabled Cumulative Volume - End of Simulation disabled Discharge Structure 2 - inactive Rate - Maximum - Positive disabled Rate - Maximum - Negative disabled Cumulative Volume - Maximum Positive disabled Cumulative Volume - Maximum Negative disabled Cumulative Volume - End of Simulation disabled Discharge Structure 3 - inactive Rate - Maximum - Positive disabled Rate - Maximum - Negative disabled Cumulative Volume - Maximum Positive disabled Cumulative Volume - Maximum Negative disabled Cumulative Volume - End of Simulation disabled Pollution Abatement 36 Hour Stage and Infiltration Volume 36.000 19.14 72 Hour Stage and Infiltration Volume 72.000 18.85 I I I I I I I I I I I I ,I I Rate (ft3/s) Volume (ft3) 481.0000 None 2886.0 None 2886.0 0.4497 None 2886.0 None 2886.0 None None None None 0.0 disabled disabled disabled disabled disabled disabled disabled disabled disabled disabled disabled disabled disabled disabled disabled 2886.0 2886.0 I NORTHWEST FIRE/RESCUE STATION NO. 51 01-22-2003 22:15:56 Page 8 I PONDS Version 3.2.0068 Retention Pond Recovery - Refined Method I Copyright 2000 Devo Seereeram, Ph.D., P.E. I (wnlep U) UO!leAa13 "': "! co (0 "': "! 0 co (0 0 0 CJ) CJ) CJ) CJ) CJ) co co I N N 0 0 I I Q) OJ 0 co CJ) U5 "0 C I 0 0.. Q) en E 0 'x co <( I l- N "C >- Q) VI i c. i I cu 0 W r-- Q) OJ "- VI i co ..c > i u I Q) i .!Q C) i 0 cu i 0 Q) - (0 - > VJ- i VI ~ r::: ! I.. "C1Il .c: ::l I I: E - E Ota Q) ::l O-e E () "C~ 0.- I: .. L!)I- i I cu~ "C i VI .g Q) c VI Q) lU C. 0 E ~ cu ~ ~ u oW :E: I _en t;::: 0 ~ E > Q) Q) > > ~ I :; ::l cu E ~ 0 ::l C") () E ~ I I CJ I .... 3: 0 0 - 0 ti= 0 N C I 0- Q) > ~ ::l 0 E ::l I .- () en ~ I ------- ----------------.-.- .... 0 >- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 L!) 0 L!) 0 L!) 0 L!) L!) 0 C") C") N N .- , .- I I (eU) sawnlO^ aA!lelnwn:::> I NORTHWEST FIRE/RESCUE STATION NO. 51 01-22-2003 22:15:56 Page 9 I I I I I I I I I I I I I I I I I I I Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.21) [1] Copyright 1995, Streamline Technologies, Inc. NORTHWEST FIRE/RESCUE STATION NO. 51 FILE NAME:NWFS51 FILE LOCATION: J:\00083\0008310100\DOC\CALC\ICPR\PROPREV INPUT REPORTS 25YR-24HR STORM ********** Input Report ******************************************************** -----u-Class: Name: BNDY Group: BASE Comment: OUTFALL Node---------____________________________________________________ Base Flow (cfs): 0 Init Stage (ft): 18.8 Warn Stage (ft) : 19 NORTHWEST OF PROPERTY FROM NODE 1 Time (hrs) Stage (ft) o 18.8 24 19 --------Class: Name: NODE1 Group: BASE Comment: NORTHWEST POND Node----------___________________________________________________ Base Flow(cfs): 0 Init Stage(ft): 20.4 Warn Stage(ft): 21.5 Stage(ft) Area (ac) 17 0.001 19.9 0.005 20 0.055 20.5 0.0665 21 0.0786 21.5 0.0914 --------Class: Node--------_____________________________________________________ Name: NODE2 Base Flow(cfs): 0 Init Stage (ft) : 20.4 Group: BASE Warn Stage(ft): 21.5 Comment: SOUTHWEST POND Stage(ft) Area (ac) 16.5 0.001 19.9 0.005 20 0.0117 20.4 0.0162 20.5 0.0183 21 0.0256 21.5 0.0334 --------Class: Node---------____________________________________________________ Name: NODE3 Base Flow(cfs): 0 Init Stage(ft): 20.4 Group: BASE Warn Stage (ft) : 22 Comment: INLET Stage (ft) 16.7 22 Area (ac) 0.1 0.1 [Manhole, Flat Floor] I I I I I I I I I I I I I I I I I I I Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.21) [2] Copyright 1995, Streamline Technologies, Inc. NORTHWEST FIRE/RESCUE STATION NO. 51 FILE NAME:NWFS51 FILE LOCATION: J:\00083\0008310100\DOC\CALC\ICPR\PROPREV INPUT REPORTS 25YR~24HR STORM ********** Input Report ******************************************************** Stage(ft) Area (ac) 17 0.001 19.9 0.005 20 0.0923 20.5 0.1072 21 0.1228 21.5 0.1389 ~~~~~~~~Class: Basin~~~~~~~~~~~~~~~~~~~~---_~~______~_____~____~_______~______~_ Basin: BASIN1 Node: NODE1 Status: On Site Type: SCS Unit Hydr Group: BASE Unit Hydrograph: Rainfall File: Rainfall Amount (in) : Area (ac) : Curve #: DCIA(%) : -------~Class: Name: NODE4 Group: BASE Comment: SOUTHEAST Node-~----~~-~--~-------~~______~______~_________________~____~~_ Base Flow(cfs): 0 Init Stage (ft) : 20.4 Warn Stage(ft): 21.5 POND 00256 FLMOD 9 0.52 87.67 o Peak Factor: 256 Storm Duration (hrs) : 24 Concentration Time (min) : 10 Time Shift (hrs) : 0 NORTHWEST CORNER RETENTION POND ~-----~-Class: Basin-----~----~------~--------_______~_____~__________~_____~___ Basin: BASIN2 Node: NODE2 Status: On Site Type: SCS Unit Hydr Group: BASE Unit Hydrograph: Rainfall File: Rainfall Amount (in) : Area(ac) : Curve #: DCIA(%) : 00256 FLMOD 9 0.27 81.78 o Peak Factor: 256 Storm Duration(hrs): 24 Concentration Time (min) : 10 Time Shift (hrs) : 0 SOUTHWEST CORNER RETENTION POND --~----~Class: Basin-------~----~-------~~-----~______~_________________________ Basin: BASIN4 Node: NODE4 Status: On Site Type: SCS Unit Hydr Group: BASE Unit Hydrograph: Rainfall File: Rainfall Amount (in) : Area(ac) : Curve #: DCIA(%) : 00256 FLMOD 9 0.81 81. 9 o Peak Factor: 256 Storm Duration (hrs) : 24 Concentration Time (min) : 10 Time Shift (hrs) : 0 SOUTHEAST CORNER RETENTION POND I I I I I I I I I I I I I I I I I I I Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.21) [4J Copyright 1995, Streamline Technologies, Inc. NORTHWEST FIRE/RESCUE STATION NO. 51 FILE NAME:NWFS5l FILE LOCATION: J:\00083\0008310100\DOC\CALC\ICPR\PROPREV INPUT REPORTS 25YR-24HR STORM ********** Input Report ******************************************************** --------C1ass: Pipe-------------------__________________________________________ Name: P-3 From Node: NODE3 Length(ft) : 36 Group: BASE To Node: NODE2 Count: 1 UPSTREAM DOWNSTREAM Equation: Average K Geometry: Circular Circular Flow: Both Span(in) : 24 24 Entrance Loss Coef: 0.5 Rise (in) : 24 24 Exit Loss Coef: 1 Invert (ft) : 17 16.7 Bend Loss Coef: 0 Manningls N: 0.013 0.013 Outlet Cntrl Spec: Use dc or tw Top Clip (in) : 0 0 Inlet Cntrl Spec: Use dn Bottom Clip(in) : 0 0 Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall 1 Downstream FHWA Inlet Edge Description: Circular CMP: Mitered to slope 2 PIPE FROM INLET NODE 3 TO POND NODE 2 --------Class: Pipe-----------------------______________________________________ Name: P-4 From Node: NODE3 Length (ft) 112 Group: BASE To Node: NODE4 Count: 1 UPSTREAM DOWNSTREAM Equation: Average K Geometry: Circular Circular Flow: Both Span(in) : 24 24 Entrance Loss Coef: 0.5 Rise(in) : 24 24 Exit Loss Coef: 1 Invert (ft) : 17 16.7 Bend Loss Coef: 0 Manning's N: 0.013 0.013 Outlet Cntrl Spec: Use dc or tw Top Clip (in) : 0 0 Inlet Cntrl Spec: Use dn Bottom Clip(in) : 0 0 Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular CMP: Mitered to slope Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge wi headwall 1 PIPE FROM POND NODE 4 TO INLET NODE 3 I I I I I I I I I I I I I I I I I I I Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.21) [5J Copyright 1995, Streamline Technologies, Inc. NORTHWEST FIRE/RESCUE STATION NO. 51 FILE NAME:NWFS51 FILE LOCATION: J:\00083\0008310100\DOC\CALC\ICPR\PROPREV INPUT REPORTS 25YR-24HR STORM ********** Input Report ******************************************************** --------Class: Drop Name: D-2 Group: BASE Structure--------------------_______________________________ From Node: NODE1 Length(ft): 45 To Node: BNDY Count: 1 Outlet Cntrl Spec: Use dc or tw Upstream Geometry: Circular UPSTREAM Inlet Cntrl Spec: Use dn Downstream Geometry: Circular DOWNSTREAM Span (in): 15 Rise(in): 15 Invert (ft) : 17.3 Manning's N: 0.012 Top Clip (in): 0 Bottom Clip(in): 0 15 15 17 0.012 o o Entrance Loss Coef: 0.5 Exit Loss Coef: 1 Flow: Both Equation: Aver Conveyance Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular CMP: Mitered to slope 1 1 2 2 FROM NORTHWEST POND NODE 1 DROP STRUCTURE TO OUT ... Weir 1 of 1 for Drop Structure D-2 ... [TABLE] Count: 1 Bottom Clip (in) : 0 Type: Mavis Top Clip (in) : 0 Flow: Both Weir Discharge Coef: 3.3 Geometry: Rectangular Orifice Discharge Coef: 0.6 Span (in) : 172 Rise(in): 6 Invert (ft) : 20.4 Control Elev(ft): 20.4 I I I I, I I I I I I I I I I I I I I I Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.21) Copyright 1995, Streamline Technologies, Inc. Northwest Fire/Rescue Station No. 51 File Location: J:\00083\00083101.00\DOC\CALCS\ICPR \PROPREV\ FILE NAME:NWFS51 25YR-24HR Basin Name ********** Basin Results Summary - NWFSSl ****************** Time Max (hrs) Flow Max (cfs) Runoff Volume (in) ------------------------------------------------------------ Runoff Volume (cf) BASIN1 BASIN2 BASIN4 EXISTING 12.04 12.04 12.04 12.04 2.62 1. 27 3.80 8.54 7.51 6.78 6.80 8.57 14167 6650 19992 49443 [lJ I I I I I I I I I I I I I I I I I I I Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.21) Copyright 1995, Streamline Technologies, Inc. [lJ Northwest Fire/Rescue Station No. 51 File Location: J:\00083\00083101.00\DOC\CALCS\ICPR \PROPREV\ FILE NAME:NWFS51 25YR-24HR ********** Basin Summary - NWFS51 ********************************************** -------------------------------------------------------------------------------- Basin Name: BASIN1 BASIN2 BASIN4 EXISTING Group Name: BASE BASE BASE BASE Node Name: NODE1 NODE2 NODE4 EXISTING Hydrograph Type: UH UH UH UH Unit Hydrograph: UH256 UH256 UH256 UH256 Peaking Factor: 256.00 256.00 256.00 256.00 Spec Time Inc (min) : 1. 33 1. 33 1. 33 1. 33 Comp Time Inc (min) : 1.33 1. 33 1. 33 1. 33 Rainfall File: FLMOD FLMOD FLMOD FLMOD Rainfall Amount (in) : 9.00 9.00 9.00 9.00 Storm Duration (hr) : 24.00 24.00 24.00 24.00 Status: ONSITE ONSITE ONSITE ONSITE Time of Conc. (min) : 10.00 10.00 10.00 10.00 Lag Time (hr) : 0.00 0.00 0.00 0.00 Area (acres) : 0.52 0.27 0.81 1. 59 Vol of Unit Hyd (in) : 1. 00 1. 00 1. 00 1. 00 Curve Number: 87.67 81.78 81.90 96 .42 DCIA (%) : 0.00 0.00 0.00 0.00 Time Max (hrs) : 12.04 12.04 12.04 12.04 Flow Max (cfs) : 2.62 1. 27 3.80 8.54 Runoff Volume (in) : 7.51 6.78 6.80 8.57 Runoff Volume (cf) : 14167 6650 19992 49443 I I I I I I I I I I I I I I I I I I I Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.21) Copyright 1995, Streamline Technologies, Inc. [ 1J Northwest Fire/Rescue Station No. 51 File Location: J:\000B3\000B3101.00\DOC\CALCS\ICPR \PROPREV\ FILE NAME:NWFS51 25YR-24HR ********** Node Maximum Conditions - NWFS51 ******************************************************************************** (Time units - hours) Node Group Max Time Name Name Conditions Warning Stage (ft) Max Stage (ft) Max Delta Stage (ft) Max Surface Area (sf) Max Time Inflow Max Inflow (cfs) Max Time Outflow Max Outflow (cfs) BNDY BASE 24.00 19.00 19.00 0.0001 0.00 12.15 6.02 0.00 0.00 NODE1 BASE 12.15 20.65 21.50 -0.0023 3065.23 12.13 6.04 12.15 6.02 NODE2 BASE 12.22 20.73 21.50 -0.0049 952.99 12.24 3.92 12.26 3.93 NODE3 BASE 12.23 20.76 22.00 -0.0043 4363.40 0.00 0.00 2.54 1. 46 NODE4 BASE 12.22 20.80 21.50 -0.0048 5078.67 12.00 1. OB 0.00 0.00 I I I I I I I I I I I I I I I I I I I Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.21) Copyright 1995, Streamline Technologies, Inc. [1] Northwest Fire/Rescue Station No. 51 File Location, J,\00083\00083101.00\DOC\CALCS\ICPR \PROPREV\ FILE NAME,NWFS51 25YR-24HR ********** Link Maximum Conditions - NWFS51 ************************************************************** (Time uni ts Link Name - hours) Group Max Name Time Flow Max Flow (ds) Max Delta Q (cfs) Max Time U/S Stage Max Time D/S Stage Max US Stage 1ft) Max DS Stage (ft) ---------------------------------------------------------------------------------------------------------- D-2 BASE 12.15 6.02 -0.07 12.15 20.65 24.00 19.00 P-l BASE 12.26 3.93 1. 07 12.22 20.73 12.15 20.65 P-3 BASE 12.32 3.01 1. 74 12.23 20.76 12.22 20.73 P-4 BASE 2.54 0.29 -0.42 12.23 20.76 12.22 20.80 I I I I I I I I I I I I I I I I I I I Attachments , I ~. I I - - - - ~ _. - - I I I I I I. I SOUTHWEST FLORIDA WATER ..MA...N'AGEMENT DISTRICT "'f' ~ '- I Lr-------r-; "-J '--- I /___~ I I J \ I /- , J {I 1..u - J I , I l I I ^ I r--~ I _j--"--1-L \ \ I) __-~ ~ L-__ ''l. I -, I \ ~ ;., ____i ~ ) ~ I '-- t---1 I r/ ~ L_I._ rrENTY'FOU~ HOUR TlTENTY FIVE YEAR RETURN PERIOD I I I +--~--...- AAI NF ALL MAP \ \ \- ""? "':::I "- 't I..... N 10 SCAlE o 10 20 30 LEGEND ~ RAINFALL CONTOUR IN INCHES. ..--10 . J BOUNDA~Y OF THE SOUTHWEST FLORIDA I WA TER MANAGEtwENT D I STR I CT r ____I - - COUNTY BOUNDARY FIGURE D-5 Table 2-2a..-Runoff curve numbers for urban areas1 Cover description Cover type and hydrologic condition Fully developed urban areas (vegetation established) Open space Qawns, parks, golf courses, cemeteries, . etc.)3: Poor condition (grass cover < 50%) .............. Fair condition (grass cover 50% to 75%). ,. ........ Good condition (grass cover > 75%) . . . . . . . . . . . . . . Impervious areas: Paved parking lots. roofs, driveways, etc, (excluding right-of.way). '" . . . . . . . . . . . . . . . . . . . . . . Streets and roads: Paved; curbs and storm sewers (excluding right-of.way) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Paved; open ditches (including right-of-way) . . . . . . . Gravel (including right-of.way) ..... . . . . . . . . . . . . . . Dirt (including right.or.way) ....... . .. . . . .. . . . . . . Western desert urban areas: Natural desert landscaping (pervious areas only"... Artificial desert landscaping (impervious weed barrier, desert shrub with 1. to 2.inch sand or gravel mulch and basin borders). .............. Urban districts: . Commercial and business. ... .. .. . . . . .. . ... : . . . . .. . Industrial. . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Residential districts by average lot size: 1/8 acre or less (town houses) . . .. . . . .. . . .. . . . . . .. . . 1/4 acre ......................................... 1/3 acre .......................................... I/2..acre ......................................... 1 acre.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 acres . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Develcping urban areas Newly graded areas (pervious areas only, no vegetation)5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Idle lands (CN's are determined using cover types similar to those in table 2.2c). Curve numbers for hYdrologic..soil group- Average percent impervious area2 A C B D 68 79 86 89 49 69 79 84 39 61 74 80 98 98 98 98 98 98 98 98 83 89 92 93 76 85 89 91 72 82 87 89 63 77 85 88. 96 96 96 96 85 89 92 94 95 72 81 88 91 93 65 77 85 90 92 38 61 75 83 87 30 57 72 81 86 25 54 70 80 85 20 51 68 79 84 12 46 65 77 82 77 86 91 94 IAverage runoff condition, and 1. = 0.28. . 2'J'he aver.1ge percent impervious area shO\\ll was used to develop the composite CN's. Other assumptions are as follows: impervious areas are direl:tly connected lothe dr.una~e system, impervious areas have a CN of 98, and pervious areas are considered equivalent lo open ... space in good h,vdrologic condition. eN's for other combinations of conditions may be computed using figure 2-3 or 2-4. :l(;N'::; shown are equh'alent to those of pasture. Composite eN's may be computed for other combinations of open space cover type. ; "Composite CN's for natul"dl desert landsC'dping should be computed using figures 2-3 or 2-4 ba.sed on the impervious area percentage (CN ,= 98) and the pervious area CN. The pervious area CN's are assumed equivalenl to desert shMlb in poor hydrologic condition. .-Composite CN's to use for the design of lempol"J.ry measures during gT'oldirig and construction should be comput.erl usin~ figure 2-3 or 2-4, based on lhe degree of development (imperyioU5 area percentage) and the CN's for the newly grdded pervious areas. (210-VI-TR-55, Second Ed., June 1986) 2.5 I I I I I I I I I I I I I I I I I I I OQ::&~...~.oo i T IERRA January 13, 2003 TBE Group, Inc. 380 Park Place Boulevard, Suite 300 Clearwater, Florida 33759 Attn: Mr. Brian Zarlenga, P.E. RE: Geotechnical Engineering Services Report Proposed Clearwater Fire/Rescue Station No. 51 Overbrook and Betty Lane Pinellas County, Florida Tierra Project No.: 6511.02.199 Ms. Zarlenga: Per your authorization, Tierra, Inc. has completed the geotechnical engineering study for the referenced project. The results of the study are provided herein. Should there by any questions regarding the report, please do not hesitate to contact our office at (813) 989-1354. Tierra would be pleased to continue providing geotechnical services throughout the implementation of the project, and we look forward to working with you and your organization on this and future projects. Respectfully Submitted, TIERRA, IN~ f.. . (}[/2;J) '-/ Environmental Scientist H nri ;;e-d~0 Senior Geotechnical Engineer FL Registration No. 55420 7805 Professional Place. Tampa, FL 33637 Phone (813) 989-1354. Fax (813) 989-1355 I I I I I I I I I I I I I I I I I I I TABLE OF CONTENTS Page 1 of 1 PROJ E CT DESCRIPTION ...... ...... ...... ............. ....... ........ ..................... ................. ........ 1 Project Information..................................................................................................... 1 Scope of Services......... ............... ...... .... ..... ....... ..................... ............ ............ .... ....... 1 SITE AND SUBSURFACE CONDITIONS .................................................................... 3 General Site Information ....... ........... ... ...................... ........ ................. ............... .......... 3 Subsurface Conditions....... ...... ............. ........ ........... ..... .................. .... ............... ........ 3 Pinellas County Soil Survey............. ...... ................. ..... .... ................. .................... ..... 4 Groundwater Information. ............ ....... ... ....... ..... ..... ...... .................... ............... .......... 4 Double Ring Infiltration Test............................................................. ......................... 4 LABORATORY TESTI NG................... ......................... ........ .............. ............ ............... 5 General.. .. '" ........ .. . . .... .. . . . ....... '" . . .. .. . . . ... ... .. ..... . .. .. .. . ............... '" . .. . . . . ...... ...... .. . .. ..... ... 5 Soil Classification....................................................................................................... 5 Organ ic Co ntent.. .. .. ... . .. ... .. . .. '" .. .. .. .. .. . .. . ... .... ..... ..... . . . . .......... .. ... . .. . . .. .. .. ..... . .. .. .. . ... ..... 5 Moisture Content............. ................... ...... .... .......... ......................... ...... .............. ...... 5 EVALUATION AND RECOMMENDATIONS ................................................................ 6 Gene ra I ..... ....... . .. .. . . . . . ... .......... ... . ..... . ..... .... .. . .. . . . .. . .. . .. ... .......... '" . . . ... . .. .. ...... .. .. . ..... ..... 6 Site Preparation.......... ........ ............. ....... ................ ............................ ........ ............... 6 Foundation Recommendations.................................................................................. 7 Settlement.................................................................................................................. 7 Floor Slab and Interior Parking Bay Drive.................................................................. 8 Pavement Recommendations..... ........ ...... ......... ........ ....................... ............ .... ...... ... 8 CONSTRUCTION CONSIDERATIONS ........................................................................ 9 General...................................................................................................................... 9 Fill Placement and Subgrade Preparation ............................................................... 10 Drainage and Groundwater Concerns ..................................................................... 11 Structural Fill............................................................................................................ 12 Excavations ... ..... .... ... ... ............... ......... .... .... ..... ..... ......................... ..... ........... ........ 12 REPORT LIMITATIONS. ....... ............... ........ ................. .................... .......... .......... ...... 13 APPENDIX Boring Location Plan Soil Profiles Summary of Laboratory Results Sheet 1 Sheet 2 Table 1 I I I I I I I I I I I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 1 of 13 PROJECT DESCRIPTION Project Information The project is located south of Overbrook Drive and east of in Douglas Avenue in Clearwater, Florida. The project, as we understand it, consists of developing a new single story, fire/rescue structure. Parking facilities and a retention pond will support the proposed development. The site, as Tierra understand it, was a previous low lying area which was backfilled with random fill and construction debris. In addition, site development is anticipated to include stripping up to 3 feet of the existing site. Scope of Services The objective of our study was to obtain information concerning subsurface conditions at the site in order to obtain data from which to base engineering estimates and recommendations in each of the following areas: 1 . Feasibility of utilizing the anticipated shallow spread foundation system for support of the structure. Suitability of a slab-on-grade. 2. Design parameters required for the foundation system, including allowable bearing pressures, foundation sizes, foundation levels and soil subgrade treatments. Estimation of soil modulus of subgrade reaction for in-situ soils encountered in the area of the proposed fire truck parking bay. 3. Suitability of materials on-site for use as structural fill, pavement subgrade fill and general backfill. Recommendations for placement and compaction of approved fill materials. 4. Engineering criteria for placement and compaction of approved fill materials. 5. General location and description of potentially deleterious materials discovered in the borings which may interfere with construction progress, pavement and structure performance, including existing fills or surficial organics. 6. Identification of groundwater levels and pavement subgrade conditions. 7. General pavement section recommendations and construction considerations. I I I I I I I I I I I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 2 of 13 8. Estimation of seasonal high groundwater levels and shallow soil infiltration characteristics. In order to meet the proceeding objectives, we provided the following services. 1. Reviewed readily available published soils and topographic information. This published information was obtained from the appropriate Florida Quadrangle Map published by the United States Geological Survey (USGS) and the Soil Survey of Pinellas County, Florida published by the United States Department of Agriculture (USDA) Soil Conservation Service (SCS). 2. Executed a program of subsurface exploration consisting of borings, subsurface sampling and field-testing. We performed three (3) Standard Penetration Test (SPT) borings in the structure area to a depth of 25 feet below existing site grades. In each boring, samples were collected and SPT resistances measured virtually continuously for the top 10 feet and on intervals of 5 feet thereafter. We also performed four (4) hand auger borings in the parking areas to an approximate depth of 5 feet below the existing ground surface. 3. A Double Ring Infiltration Test (DRIT) will be completed within the proposed retention area. In addition, we plan to perform one (1) power auger boring in the proposed retention area to an approximate depth of 15 feet below the existing ground surface or until seasonal high groundwater levels are determined. 4. Visually classified the samples in the laboratory using the Unified Soil Classification System (USCS). Conducted a limited laboratory-testing program. Identified soil conditions at each boring location and formed an opinion of the site soil stratigraphy. 5. Collected groundwater level measurements and estimated normal wet seasonal high water tables. 6. Prepared a formal engineering report in accordance with the request for proposal (RFP) provided by TBE Group which summarizes the course of study pursued, the field and laboratory data generated, subsurface conditions encountered and our engineering recommendations in each of the pertinent topic areas. The scope of our services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic materials in the soil, bedrock, groundwater, or air, on or below or around this site. Any statements in this report or on the boring logs regarding odors, colors, unusual or suspicious items or conditions are strictly for the information of our client. I I I I I I I I I I I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 3 of 13 SITE AND SUBSURFACE CONDITIONS General Site Information The project is located south of Overbrook Drive and east of in Douglas Avenue in Clearwater, Florida. Based on the Clearwater, Florida, United States Geological Survey (USGS), topographic map, the ground surface elevation at the property is approximately +19 to +20 feet National Geodetic Vertical Datum (NGVD) across the site. Subsurface Conditions The subsurface conditions were explored using three (3) Standard Penetration Test (SPT) borings in the structure area to a depth of 25 feet below existing site grades. In addition, four (4) auger borings were performed to a depth of five (5) feet within the proposed parking areas. The borings were located in the field by an engineering technician measuring distances from existing site features. The approximate boring locations are presented in the Appendix. The SPT borings and power auger boring were performed with the use of a track-mounted drill rig using Bentonite Mud drilling procedures. The soil sampling was performed in general accordance with American Society for Testing and Materials (ASTM) test designation D-1586 titled Penetration Test and Split-Barrel Sampling of Soils. SPT resistance N-values were taken continuously in the initial 1 0 feet and at intervals of 5 feet thereafter. The soil samples were classified in the field and transported to our laboratory for review. The soil strata encountered in the borings performed at the proposed development are summarized in the following table: 1 Brown Fine SAND to Slightly Siltly Fine SP, SP-SM SAND 2 Muck Pt 3 Blue-Green Sandy CLAY CL 4 Blue-Green CLAY to Indurated CLAY CH 5 Brown to Blue-Green Clayey SAND SC I I I I I I I I I I I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 4 of 13 The subsurface soil stratification is of a generalized nature to highlight the major subsurface stratification features and material characteristics. The soil profiles included in the Appendix should be reviewed for specific information at individual boring locations. These profiles include soil description, stratifications and penetration resistances. The stratifications shown on the boring profiles represent the conditions only at the actual boring location. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the actual transition may be gradual. Pinellas County Soil Survey The Soil Survey of Pinellas County, Florida published by the USDA, SCS was reviewed for general near surface soil information. This information indicates there is one (1) primary mapping unit at the project location. Unit Ma - Made Land - This soil unit consists of "mixed sand, clay, hard rock, shells, and shell fragments that have been transported, reworked, and leveled by earth-moving equipment." Groundwater Information The groundwater levels were measured at depths of approximately two (2) to three (3) feet below existing grade. It should be noted that groundwater levels tend to fluctuate during periods of prolonged drought and extended rainfall and may be affected by man-made influences. In addition, a seasonal effect will also occur in which higher groundwater levels are normally recorded in rainy seasons. ltis estimated that the seasonal high groundwater table (SHGWT) will be encountered at a depth of approximately 1 foot below existing grade. Double Ring Infiltration Test The DRIT was completed at a depth of 1 % feet below the existing site grade for the proposed pond. The groundwater table was encountered at approximately 3 feet below existing grade. Based on the results of the DRI test, the infiltration rate is estimated to be 10 ftlday. The DRIT location was moved approximately 135 feet south and performed within an area which appeared to consist of more natural soil due to the construction debris encountered within the proposed pond area. This location is included in the Appendix. Given that the site will be over excavated and backfilled with clean sands, infiltration rates similar to the natural soil rate observed should be suitable for site development. I I I I I I I I I I- I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 5 of 13 LABORATORY TESTING General Representative soil samples collected from the borings were classified and stratified in general accordance with the Unified Soil Classification System. Our classification was based on visual inspection, using the results from the laboratory testing as confirmation. Laboratory tests were assigned to aid in classification of the explored soils. These tests included organic content and natural moisture content. Soil Classification The auger boring soil samples were classified using the Unified Soil Classification System in general accordance with the ASTM test designation 0-2487. This test method classifies soils into specific categories based on the results of the laboratory testing program. The assignment of a group name and symbol is then used to aid in the evaluation of the significant engineering properties of a soil. Organic Content Moisture free samples are used for this test. Drying is accomplished by heating the samples in a warm (2300 F) oven. The dried soil samples are then heated in a muffle furnace at a temperature of 8330 F for six hours, thereby burning off all organic-type material, leaving only the soil minerals. The difference in weight prior to and after the burning is the weight of the organics. The weight of the organics divided by the weight of the dried soil before the burning process is the percentage of organics within the sample. Organic contents that exceed five (5) percent are considered detrimental by FOOT criteria. Tests were performed in general accordance with AASHTO T-267. Moisture Content The laboratory moisture content test consists of the determination of the percentage of moisture contents in selected samples in general accordance with AASHTO test designation T-265 (ASTM test designation 0-2216). Briefly, natural moisture content is determined by weighing a sample of the selected material and then drying it in an oven. Care is taken to use a temperature of 2300 F and does not destroy any organics. The sample is removed from the oven and reweighed. The difference of the two weights is the amount of moisture removed from the sample. The weight of the moisture divided by the weight of the dry soil sample is the percentage by weight of the moisture in the sample. I I I I I I I I I I I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 6 of 13 EVALUATION AND RECOMMENDATIONS General The results of the field exploration program indicate approximately 2 to 3 feet of random fill and construction debris across the site. An organic laden material "muck", was encountered in borings AB-2 and AB-3 between the depths of 1 to 3 feet below existing grade. Organic contents ranged from 11 to 17 percent by weight. Allowable percentages are less than 5 percent. Based on the subsurface material encountered, Tierra recommends over excavating 2 to 3 feet of the existing site and replacing the material as needed with clean engineered fill. The excavation process should be observed by a qualified geotechnical engineer or representative during the removal and replacement of the site fill. In addition, isolated areas of deeper debris or material deemed detrimental should be expected during site development. The area should be over excavated to the suitability of the site inspector and backfilled with engineered fill in accordance with this report. Dewatering of the site may be necessary to facilitate proper placement and compaction the engineered fill. As a minimum, groundwater will need to be lowered to a depth of 18 inches below bottom of excavation. Following completion of the over excavating process and backfilling, the site may be developed utilizing conventional shallow foundation supported on compacted engineered fill. Our recommendations for site preparation, foundation design criteria, settlement, floor slabs and construction considerations are presented in the following report sections. Site Preparation Prior to construction, the location of any existing underground utilities within the construction area should be established. Provisions should then be made to relocate any interfering utility lines within the construction area to appropriate locations and backfilling the excavation with compacted structural fill. In this regard, it should be noted that if abandoned underground pipes are not properly removed or plugged, they might serve as conduits for subsurface erosion, which subsequently may result in excessive settlement. As a minimum, it is recommended that the clearing operations extend to the depth needed to remove surface vegetation and associated root materials and other material considered deleterious at least 15 feet beyond the proposed development area. Fill placement and subgrade preparation recommendations are presented in the "Construction Considerations" Section of this report. I I I I I I I I I I I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 7 of 13 Foundation Recommendations The borings performed in the proposed building generally encountered medium to dense fine sand underlying the fill material and muck type soil. Following the removal of the material, the remaining natural soil should be adequate for support of site development following proper site preparation. Based on our evaluation and analyses, these soils are capable of supporting the proposed structure on shallow foundations after proper subgrade preparation, including vibratory surface compaction. Based on the anticipated light construction, shallow foundations should be designed for a net maximum allowable bearing pressure not to exceed 2,500 pound per square foot (pst). The foundation and floor slab should bear on properly placed and compacted cohesionless (sand) structural fill. The existing near surface sandy soils should be improved by heavy vibratory compaction after clearing operations to improve foundation support and reduce total and differential settlement. Compaction criteria are presented underthe Construction Considerations Section of this report. All footings should be embedded so that the bottom of the foundations is a minimum of 18 inches below adjacent compacted grades on all sides. Strip or wall footings should be a minimum of 18 inches wide and pad or column footings should be a minimum of 30 inches wide. The minimum footing sizes should be used regardless of whether or not the foundation loads and allowable bearing pressures dictate a smaller size. These minimum footing sizes tend to provide adequate bearing area to develop bearing capacity and account for minor variations in the bearing materials. All footings should be constructed in a dry fashion. All footing excavations should be covered during rain events. Uncovered excavations may become oversaturated and difficult to compact during rain events. Surface run-off water should be drained away from the excavations and not allowed to pond. It is important that the structural elements be centered on the footings such that the load is transferred evenly unless the footings are proportioned for eccentric loads. Settlement After the removal of the suspect soil and replacing the material with clean engineered fill, the settlement of shallow foundations supported on the compacted sand fill and natural sandy soils should occur rapidly after loading. Thus, the expected settlement should occur during construction as dead loads are imposed. Provided the recommended site preparation operations are properly performed and the recommendations previously stated are utilized, the total settlement of wall and isolated column footings should not exceed approximately % inch. Differential settlement is estimated to be on the order of % of the total settlement. Differential settlement of this magnitude is usually considered tolerable for the anticipated construction; however, the tolerance of the proposed structure to the I I I I I I I I I I I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 8 of 13 predicted total and differential settlement should be confirmed by the structural engineer. Floor Slab and Interior Parking Bay Drive The floor slab may be safely supported as a slab-on-grade provided any undesirable materials are removed and replaced with controlled structural fill. It is also recommended that the floor slab bearing soils be covered by a lapped polyethylene sheeting in order to minimize the potential for floor dampness which can affect the performance of glued tile and carpet (if any are used). This membrane should consist of a minimum six (6) mil single layer of non-corroding, non-deteriorating sheeting material placed to minimize seams and to cover all of the soil below the building floor. This membrane should be cut in a cross shape for pipes or other penetrations; the membrane should extend to within one-half inch of all pipes or other penetrations. All seams of the membrane should be lapped at least 12 inches. Punctures or tears in the membrane should be repaired with the same or compatible material. Based on the results ofthe field exploration program, subsequent site development recommendations and experience with similar projects, Tierra recommends a modulus of subgrade reaction of 290 pounds per cubic inch (pci). Pavement Recommendations In general, following the completion of the recommended clearing and grading operations and fill placement, the compacted fill and natural shallow sandy soils should be acceptable for construction and support of a flexible (Iimerock, crushed concrete, or shell base) or semi-flexible (soil cement base) type pavement section. Any fill utilized to elevate the cleared pavement areas to subgrade elevation should consist of reasonably clean (maximum 12% passing #200 sieve sizes) fine sands uniformly compacted to a minimum density of 98% of the modified Proctor maximum dry density. The choice of pavement base type will depend on final pavement grades. If a minimum separation of 18 inches between the bottom of the base and the seasonal high groundwater level is obtained, then a limerock, shell, or crushed concrete base can be utilized. A soil cement base should be utilized if the separation between final grade and the seasonal high groundwater is a minimum of 12 inches and less than 18 inches. Base material elevations should not be designed for saturated conditions. If the designer wishes to have base material closer then 12 inches to the SHGWT, then an under drain system should be utilized that will maintain the 12 inches of separation. Limerock and shell base material should meet Florida Department of Transportation (FDOT) requirements including compaction to a minimum density of 98% of the modified Proctor maximum dry density and a minimum Limerock Bearing Ratio (LBR) of 100%. Crushed concrete should have an LBR value of 100% and be graded in accordance with FDOT Standard Specification Section 204. Due to the expected subgrade soil conditions, we recommend Type B stabilized subgrade (LBR = 40%) as specified by the FDOT Standard Specifications for Road and Bridge Construction. A soil cement base should be designed according to FDOT or PCA modified short cut design procedures. A strength of 300 psi should be achieved on laboratory cured compressive strength specimens molded from samples taken from the base material as it is placed. A stabilized subgrade need not I I I I I I I I I I I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 9 of 13 be incorporated with a soil cement base. As a guideline for pavement design, we recommend that the base course be a minimum of 6 inches thick in parking areas and 8 inches thick in heavily traveled drives. The subgrade should be compacted to a minimum depth of 12 inches to a minimum density of 98% of the modified Proctor maximum dry density, and should be firm and true to line and grade prior to paving. Traffic should not be allowed on the subgrade as the base is placed to avoid rutting. Before paving, the base should be checked for soundness. The asphaltic concrete structural course should consist of at least one and one-half (1~) inches of Type S asphaltic concrete material. The asphaltic concrete should meet standard FDOT material requirements and placement procedures as outlined in the current FDOT Standard Specifications for Road and Bridge Construction. The asphaltic concrete should be compacted to a minimum of 96% of the Marshall maximum laboratory unit weight. As an alternate to the above referenced flexible pavement design, a rigid (concrete) pavement design could be used. The concrete should have a minimum compressive strength of 4,000 psi at 28 days when tested in accordance with ASTM C-39. Based on our experience, a minimal thickness of five (5) inches should be utilized for standard duty applications and a minimal thickness of six (6) inches should be utilized for heavy-duty applications. The steel reinforcement within the concrete pavement should be designed by the project civil engineer. The subgrade should be prepared to achieve a minimum LBR of 20% as mixed and pulverized to a depth of 12 inches below the pavement base elevation. The subgrade soils should be compacted to a minimum density of 98% of the modified Proctor maximum dry density. Actual pavement section thickness should be provided by the design civil engineer based on traffic loads. volume. and the owners design life requirements. The above sections represent minimum thicknesses representative of typical load and construction practices and as such periodic maintenance should be anticipated. All pavement materials and construction procedures should conform to the FDOT or appropriate city or county requirements. CONSTRUCTION CONSIDERATIONS General It is recommended that a qualified and certified material engineering firm be retained to provide observation and testing of construction activities involved in the foundation earthwork, and related activities of this project. Tierra cannot accept any responsibility for any conditions, which deviate from those, described in this report, if not engaged to provide construction observation and testing for this project. I I I I I I I I I I I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 10 of 13 Fill Placement and Subgrade Preparation The following are our recommendations for overall site preparation and mechanical densification work for the construction of the proposed development based on the anticipated construction and our boring results. These recommendations should be used as a guideline for the project general specifications prepared by the design engineer. The site should be cleared; this primarily includes removing any deleterious materials encountered. It is recommended that any undesirable material be removed to the satisfaction of Tierra prior to beginning construction at the site. Any cavities formed should be replaced with compacted structural fill. The site should be root raked as previously described. As a minimum, it is recommended that the clearing operations extend at least fifteen (15) feet beyond the development perimeters. Following the clearing operations, the exposed existing subgrade should be evaluated and proofrolled as directed by representatives of Tierra to confirm that all unsuitable materials have been removed. The proofrolling should consist of compaction with a large diameter, heavy vibratory drum roller. The vibratory drum roller should have a static drum weight on the order of eight (8) to ten (10) tons and should be capable of exerting a minimum impact force of 36,000 pounds (DYNAPAC CA-250 or equivalent is expected to provide acceptable results). The vibratory roller should not be used within 50 feet of any existing structures. These areas should be compacted using a fully loaded 2 cubic yard capacity front-end loader or equivalent. Careful observations should be made during proofrolling to help identify any areas of soft yielding soils that may require overexcavation and replacement. Prior to any field operations, we recommend that a survey be performed (including pictures and/or video) of the existing structures (including utilities) located adjacent to the proposed construction. Documentation should be made of any foundation problems or cracking noted by the owners and the survey crews. It is also recommended that a follow-up photographic survey be performed after the construction activities. The proofrolling equipment should make a minimum of eight (8) overlapping passes over the structure and pavement areas with the successive passes aligned perpendicular. It is recommended that within the building area, the natural ground, to a minimum depth of one (1) foot below stripped grade, be compacted to a dry density of at least 95% of the modified Proctor maximum dry density. Following satisfactory completion of the initial compaction, the structure and pavement areas may be brought up to finished subgrade levels, if needed, using structural fill. Imported fill should consist offine sand with less than 12% passing the No. 200 sieve, free of rubble, organics, clay, debris and other unsuitable material. Fill should be tested and approved prior to acquisition. Approved sand fill should be placed in loose lifts not exceeding 12 inches in thickness and should be compacted to a minimum density of 95% of the modified Proctor maximum dry density. Density tests to confirm compaction should be performed in each fill lift before the next lift is placed. I I I I I I I I I I I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 11 of 13 Priorto beginning compaction, soil moisture contents may need to be controlled in orderto facilitate proper compaction. If additional moisture is necessary to achieve compaction objectives, then water should be applied in such a way that it will not cause erosion or removal of the subgrade soils. A moisture content within the percentage range needed to achieve compaction is recommended prior to compaction of the natural ground and fill. After compaction and proofrolling, the building foundation excavations can begin. All foundation excavations should be observed by the geotechnical engineer or a representative to explore the extent of any loose, soft, or otherwise undesirable materials. If the foundation excavations appear suitable as load bearing materials, the bottom of the foundation excavations should be compacted to a minimum density of 95% of the modified Proctor maximum dry density for a minimum depth of one (1) foot below the bottom of the footing depth, as determined by field density compaction tests. Backfill soils placed adjacent to footings orwalls should be carefully compacted with a light rubber-tired roller or vibratory plate compactor to avoid damaging the footings or walls. Approved sand fills to provide foundation embedment constraint should be placed in loose lifts not exceeding 6 inches and should be compacted to a minimum density of 95% of the modified Proctor maximum dry density. If soft pockets are encountered in the footing excavations, the unsuitable materials should be removed and the proposed footing elevation may be re-established by backfilling after the undesirable material has been removed. This backfilling may be done with a very lean concrete or with a well-compacted, suitable fill such as clean sand, gravel, or crushed FDOT No. 57 or FOOT No. 67 stone. Sand backfill should be compacted to a minimum density of 95% of the modified Proctor maximum dry density. Immediately prior to reinforcing steel placement, it is suggested that the bearing surfaces of all footing and floor slab areas be compacted using hand operated mechanical tampers. In this manner, any localized areas, which have been loosened by excavation operations, should be adequately recompacted. A representative from our firm should be retained to provide on-site observation of earthwork and ground modification activities. Density tests should be performed in the top one (1) foot of compacted existing ground, each fill lift, and the bottom of foundation excavations. It is important that Tierra be retained to observe that the subsurface conditions are as we have discussed herein, and that foundation construction ground modification and fill placement is in accordance with our recommendations. Drainage and Groundwater Concerns The groundwater levels presented in this report are the levels that were measured at the time of our field activities. Fluctuation should be anticipated. We recommend that the Contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact on this construction procedure. Groundwater control will be necessary for the construction of the proposed structure. Groundwater can normally be I I I I I I I I I I I I I- I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 12 of 13 controlled in shallow excavations or rim ditches with a sump pump. During subgrade soil preparation, any soils below design grade could become disturbed by construction activities. If this becomes the case, the contractor may be directed by the owner's representative to remove the disturbed or pumping soils to a depth of 12 to 18 inches below design grade and backfill the area with structural fill. Water should not be allowed to collect in the foundation excavation, on the floor slab areas, or on prepared subgrades of the construction either during or after construction. Undercut or excavated areas should be sloped toward one corner to facilitate removal of any collected rainwater, groundwater, or surface runoff. Positive site drainage should be provided to reduce infiltration of surface water around the perimeter of the building and beneath the floor slabs. The grades should be sloped away from the building and surface drainage should be collected and discharged such that water is not permitted to infiltrate the backfill and floor slab areas of the building. Structural Fill All materials to be used for structural fill or backfill should be evaluated and, if necessary, tested by Tierra prior to placement to determine if they are suitable for the intended use. Suitable fill materials should consist of fine to medium sand with less than 12% passing the No. 200 sieve, free of rubble, organics, clay, debris and other unsuitable material. Excavations Site excavations for foundations and utilities will encounter groundwater. Stratum 1 may be used as structural fill. The clayey soil comprising Strata 3, 4, and 5 should not be used as backfill material due to the difficulty in obtaining compaction. The organic soils (Stratum 2) should be excavated from below the proposed pavement and structure areas with clean fine compacted sand in accordance with FOOT Standard Indexes 500 and 505. In Federal Register, Volume 54, No. 209 (October 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, Part 1926, Subpart P". This document was issued to better insure the safety of workmen entering trenches or excavations. It is mandated by this federal regulation that excavations, whether they be utility trenches, basement excavations or footing excavations, be constructed in strictly enforced and if they are not closely followed, the owner and the contractor accordance with the new OSHA guidelines. It is our understanding that these regulations are being could be liable for substantial penalties. I I I I I I I I I I I I I I I I I I I Clearwater Fire/Rescue Station No. 51 Pinellas County, Florida Tierra Project No. 6511-02-199 Page 13 of 13 The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractors "responsible persons", as defined in 29 CFT Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in all local, state, and federal safety regulations. We are providing this information solely as a service to our client. Tierra does not assume responsibility for construction site safety orthe contractor's or other party's compliance with local, state, and federal safety or other regulations. REPORT LIMITATIONS The Geotechnical Engineer warrants that the findings, recommendations, specifications, or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. The scope of the exploration was intended to evaluate shallow soil conditions. The recommendations submitted are based on the available subsurface information obtained by Tierra and design details furnished by TBE Group, for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, Tierra should be notified immediately to determine if changes in the foundation recommendations are required. If Tierra is not retained to perform these functions, Tierra will not be responsible for the impact of those conditions or the geotechnical recommendations for the project. After the plans and specifications are more complete, the Geotechnical Engineer should be retained and provided the opportunity to review the final design plans and specifications to check that our engineering recommendations have been properly incorporated into the design documents. At this time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use ofTBE Group and it's consultant(s) for the specific application to the proposed Clearwater Fire/Rescue Station No. 51 in Pinellas County, Florida. I I I I I I I I I I I I I I I I I I I APPENDIX Boring Location Plan Soil Profiles Summary of Laboratory Results / / --I -0 Ow (/)0:: Ww 0...1- ~~ ~O Uu ::lz :2w z o f= u ::l 0::0 I-w (/)1- Zo 8z ~~ <(ro ww IO w ::) 0<1: (./)(f)e wwo<: 80::0 >~-l o<:wL.... tlo:::; -lG::!z <1: => uo::o :ZWU If-(./) GJ<(<1: t:;:;:=:J Wo::~ ~<(a: w -.J U f- W W I t-1 ~ ~ ~ ~ (J'o (J'o 'I ru o .!.. Li1 \D !l ~ M o Z <1: -, i ::E "" W U <1: I '" W f- o Z "" u :r i ~ ~ ~ o z w C) W ---! Cll < T o '" "" L "" . CJ) q: 01 t: OO:J 1: III!.JIl <[ o :r;'~ 0.. ~ :::J 0 (.? ~ ...a: 0.. tt.- ~ __ 4.- C 0 ~ CJ C C Jl!Ii: C 001."'00 ~ +> ~ :p d d -ud d UUfUU o 0 t~1I 0 ...J ...J --.J ...J OJ QJ ~ Qj +" ~ ...... .... d d ..."'I!lI d {: {: rE. E X X ""it( X o 0 Q 0 s.. L ~ L a. a. .it1. a. a.a.m.a. <t: <I: .CC[ <t: ~@.s z <( ---! 0.- z o I- <( U o ---! ~-~...".'" ~ , u (./) , Z <1: . -l 0-- 0... C) Z 0:::: o m C\J W I- =:J w '" r::: w z () I <l: J: CD. <[ V? '" ~~ (/) Ul ~ ~ 8 G "'~ w w li1 < >- ~ '" 8cr G: <l: ~d 0 ,., .J '" >"-"""' u z "'~ ~Wu.. ~ ." <l: <l:~ <; '" :5 ~cr:; ~ ~ < ,., .. ,., . :p 8 0 ~ ~,., 0 c::: l- e ,., .... .<: < """' Z .<: >- ~ 0 ~ '" 0 <[ ::::> SP ." 13 "'''' ~.. 0 Vi '" .s "'~ ~ U cr 0 .J < < ... 00 'Z u u ~E 0 oe~ W Z 0 0 ~ ......." .. ,., .. .. =tit '" ~~: I l- V? W ." e 0... , U <[ '" < >- l:l :;:g W <( z 0 <l: , U.. """' C) <l: '" .J .. ;;:'" .. iii~" I- 5: """' '" u ~ Vi~ > 0 < ;;; ~<l: .. D~ W cr W w ~& .. < .J C .. Z .. .. 0 Uo ~~e ~ <( 0: --.J ",-, e .. .. e ..~.. "- l:l e ~~ --" ~ ;3'<:'<: W <'" l:l < -".. a~ .. _u.. . -" , , . uo 0 d<o ~ ~o: u .. .. 0 00 . >- () ~ ~ ~ e "'''' ~~ ." :!~~ ..~ x ;;; ;;; .. < .<:.<: ~ ~ ~ . ISSI ~ ~ ..... ~o 0 ~~] 55 <e e ::m l:l G 8 B e 8 "- l>jJt ;z '" ~ W L P'l P'l I- W U U 0 <[ I I Z ~ I I ~ DEPTH IN FEET DEPTH IN FEET II !!l o N i\] 1111'111111111111111111111 rnrrl "I <[ (L @G 1 ... . Be ..~ '>T I >Q <[ G _ka ~ ~ ~ (") I fII ~I ~ ~ t:; ;::: G e 0 ....~ ....~ ;D g ~ (") I >Q <[ . ~ (f) w ~ LL o 0::::: 0.- .. .. It) It) ~ ru I >Q J. G 0 e '< ~ ~ ~ ~ ~ ~ ~ ~ ru I >Q <[ ~ ~ ~ o (f) "I >Q ......... . . . ...... ......... . ZgJlG~~R:: ~ ~ ~ ~ "I >Q <[ G .~ ~ ~ II11111111111111111111 II luuJ II !!l c N It) N 133..:1 NI Hld3a 133J NI Hld3U I I I I I I I I I J!l "5 III ... .. ... ~g:~ :: l;l Cj> ~G.I~ i:' '7 .., 'P. ~~d su.z ~!11 -IcaO' o~Q: i:'.!! ~ E (.) .. e i= = Ul I I I I I I I I I I -::..- f! :; ii - "'"': N :3 U; - ~ 'll:t . -_C:.;.....CO ~~8 ~'" u- - c c.. _ ~gc 0(.) J!l "5 :J .!:!... e' i] of ii:-l .. ~ III i OJ c <C .. > .. in 0- I- 0 ::J:.I:I Ul[ ~Ul e lii =.1:1 iO e .:: = UlZ 01; C.l:l ;: e o = lllZ COlt) cci~ ~~ ~raCD~ "''''CG'J., O~~:c Zii:9t!! C _... ~ t;'i; J!::ICC> Ul 0 .. III (.) 0 = III Z ~~U III .. .. eE.5-o III D.. ... ... D.. ii: '" ... ~ .. .. t; t= ! '" III i3 ~ - >< ..!! .. -'CI III C '"- ii: 'CI_ "5"5 1:7"_ ::i-l o o ~ C> o ;; o 11 o ~ C> ... 'It ~ e e .., .,; e e ~ lXlCCl C(C( g .:: C. .. c .. Q. e '" Ul 00 <"iN 00 N~ N '" IDID <(<( . -:,- . Aerial Photograph Own er: City of Clearwater Case: FLD2003-01005 Site: 1720 Overbrook Avenue Property Size (Acres): 1.59 PIN: 03-29-15-00000-430-0500 Atlas Page: 260B <; " . . REQUEST: Flexible Development approval to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000) and to increase the height of a solid PVC fence from six feet to eight feet in height, as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C. ANALYSIS: The 1.59-acre site is located at the southwest comer of Overbrook A venue, Betty Lane and Fairmont Street. The site is the subject of a recent annexation application and review (ANX2002- 11019). The City Commission is expected to approve the annexation of the site into the City with a Commercial District designation and a Commercial General land use classification on March 6, 2003 at the final reading. The site is located along a highly developed area with a mix of single- and multi-family residential and a variety of non-residential uses including minor and major vehicle service, warehouse and automotive scrap yards. The subject property includes four vacant one-story metal buildings, is generally paved and has undergone substantial deterioration. The site has five, existing driveways along the front (north) property line (Overbrook Avenue). The request is to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000) and to increase the height of a solid PVC fence from six feet to eight feet in height, as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2- 704.C. The proposal includes the demolition of all four existing, metal structures and constructing a fire and rescue station (Northwest Fire and Rescue Station No. 51) that will be approximately 12,280 square feet in size and 23 feet in height. The building area dedicated to equipment and vehicle storage and living area will be evenly split between the two. The building will house four fire trucks and nine firefighters. The proposal includes 20 parking spaces and two driveways along Overbrook A venue. The smallest building feasible has been designed for the site. The reductions in setbacks are to pavement only and are required to provide adequate turning radii for fire trucks and other emergency vehicles necessary to effectively operate the fire station. The site will generally be staffed with nine employees at any given time and the provided number of parking spaces will more than adequately serve the proposed use. The building will include a brick and earth-tone stucco fa~ade, scoring and other architectural features. The roofline will be articulated to provide additional aesthetic interest. The landscape plan exceeds the requirements of Code utilizing a variety of colorful groundcovers (including liriope and dune sunflower), shrubs (including Indian hawthorn, silverthorn and viburnum), shade and ornamental trees (including live oak, magnolia and crape myrtle and Sabal palms). A PVC fence, eight feet in height will be located along the rear, south property line between the subject site and the adjacent residential use properties to the south for additional buffering. CDB Notes -'-- Community Development Board - March 18,2003 - Case FLD2003-01005 - Page 1 . . "- A monument-style, freestanding sign, 37.5 square feet in area and 5.5 feet in height, is proposed with this development. The Minimum Development Standards of the Code permit a freestanding sign 20 square feet in area. The sign, as submitted, will require a review by Staff as part of a Comprehensive Sign Program. Solid waste will be removed via a screened dumpster. All stormwater requirements have been met. SUMMARY AND RECOMMENDATION: The application and supporting materials were reviewed by the Development Review Committee on February 13, 2003. The Planning Department recommends APPROVAL of the Flexible Development application to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000) and to increase the height of a solid PVC fence from six feet to eight feet in height, as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C for the site at 1720 Overbrook A venue, with the following bases and conditions. Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-704.C. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. Conditions of approval: 1. That all Stormwater requirements be met prior to the issuance of any permits; 2. That a Tree Preservation Plan, prepared by a Certified Arborist, which indicates how the proposed building, parking, stormwater and utilities impact the critical root zones (drip lines) and how those impacts will be mitigated, tree barricade limits and details be submitted to and approved by Staff prior to the issuance of any permits; 3. That the final design and color of the building be consistent with the conceptual elevations submitted or as modified by the CDB; 4. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity; and 5. That evidence of a County right-of-way permit for all work within right-of-way of Overbrook A venue be submitted to Staff prior to the issuance of any permits S:\Planning Department\C D B\FlexVnactive or Finished Applications\Overbrook 1720 Fire and Rescue Station NW - Approved\Overbrook 1720 CDB Notes. doc CDB Notes - Community Development Board - March 18,2003 - Case FLD2003-01005 - Page 2 '"'~~- R: -~ .... :~ .' ~-,~'---...: ..'--- -f """'- ,J -J' ,-' ;c $ " -t'l:>' _# I / \ / , ~ / /' .:/1. " _/ / . ... -,! "r'-' ~.~ . . '';;''''G'I ,. ~:c~-~:.:~~ ~, .--~ ~.,:. H"'''' _."...._.. -'," '.~'. ---- ,.............. .. NVld 3d't8S0NVl ;:~ ..i.-.-....,_J__.,.~.__, ... =- .~~_~.Y.._y..,J. ___"_~~, f "VCII.O';;M-__)_'.lYM_ "V~'j '.1___"_"_"_ 8__ ..-,WtY-ti-~ OIa__~-_~'~~~ r -- : 0" IN:MHiYdiiO 3n:lS3l' OHV 3"':1 t~! - :',-1 1.. it.a..l.VM"V)'~ ~Q.~J.I:) ....;.....' ,_ --:.':'" J LSON NOll.'tl._S 3n8S3M ONV 3MJ.:J l.S3MHl.MON " -' , '. ~. , ' ,_.- ." ~- , ~ , . li AU ..~ A'.~; ~ ~ ~!'S .; h:~- ".~~;~! <~ oi ~'" I ~ ! ~. ,* ,"/" .~.l ': '" ,,;j/ .~. (, II.'.:~ -' j/ ;):"~>:" ~I /1/' ::::~~~~-,~t .j / ~~~jl " I ~r / '~n- / ";{.-:"'! /~')' \:i'(i~'l1 ;('\ , !}:,I \il 'I ,I / :~'.--' , . ~ ;- " " ' '. >- 3~ /, ,.J/J ~>/ ,4 ~ /, ," ,,"~" ../ :~ , ~ ~=.=.:.~:. ; "I: I'! . Q::: w ~ ~L{) <r:z ~O u~ LLI--" Ocn ~~ U~ e e ~ . . . . I ~t ) ! - ~~~ .. ~\.ALOF TIIl(J~ ~I~ '.~ ,) 1/ I ~, ~-_- I OO;::Ci'l '~-~~ ~7f4TE~ ~~.~ ~~ CITY OF CLEARWATER POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758-4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562-4865 PLANNING DEPARTMENT March 21, 2003 Mr. Brian Zarlenga TBE Group 380 Park Place, Suite 300 Clearwater, FL 33757 ~ ~ n ri?II I;~ ~ Ik. ~ RE: Development Order regarding Case FT n?()()~-01005 at 1720 Overbrook Avenue Dear Mr. Zarlenga: This letter constitutes a Development Order pursuant to Section 4-206.D.6 of the Community Development Code. On March 18, 2003, the Community Development Board reviewed your application for Flexible Development approval to reduce the number of required parking spaces for a governmental use (fire station) from 49 spaces (four spaces per 1,000 square feet of gross floor area) to 20 spaces (1.65 spaces per 1,000) and to increase the height of a solid PVC fence from six feet to eight feet in height, as part of a Comprehensive Infill Redevelopment Project under the provisions of Section 2-704.C. The proposal includes a 12,280 square foot fire and rescue station. The Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Section 2-704.C. . 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3-913. 3. The development is compatible with the surrounding area and will enhance other redevelopment efforts. BRIAN J. AUNGST, MAYOR-COMMISSIONER WHITNEY GRAY, VICE MAYOR-COMMISSIONER HoYT HAMILTON, COMMISSIONER FRANK HIBBARD, COMMISSIONER * BILL]ONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" ( ~ i March 21, 2003 Zarlenga - Page Two . e . Conditions of approval: 1. That all Stormwater requirements be met prior to the issuance of any permits; 2. That a Tree Preservation Plan, prepared by a Certified Arborist, which indicates how the proposed building, parking, stormwater and utilities impact the critical root zones (drip lines) and how those impacts will be mitigated, tree barricade limits and details be submitted to and approved by Staff prior to the issuance of any permits; 3. That the final design and color of the building be consistent with the conceptual elevations submitted or as modified by the CDB; 4. That all signage meet the requirements of Code and be designed according to a common theme including similar style, color, material and other characteristics to provide a sense of uniformity; and 5. That evidence of a County right-of-way permit for all work within right-of-way of Overbrook A venue be submitted to Staff prior to the issuance of any permits Pursuant to Section 4-407, an application for a building permit shall be made within one year of Flexible Development approval (March 18, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. The issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. In addition, an appeal of a Level Two approval (Flexible Development) may be initiated by a property owner abutting the property (which is the subject of the approval) within 14 days of the date of the CDB decision. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case will expire on April 1 , 2003. If you have any questions, please do not hesitate to call Mark Parry, Planner at 727.562.4558. Zoning information is available through the City's website at www.clearwater-fl.com via the "Clearwater Parcel and Zoning" link and "Community Development Code" link (via the Planning Department site). Very truly yours, ~.~ Cynthia H. Tarapani, AICP Planning Director S:\Planning Departmenf\C D B\FlexVnactive or Finished Applications\Overbrook 1720 Fire and Rescue Station NW - Approved\Overbrook 1720 DEVELOPMENT ORDER. doc