Summary of the Capital Development Plan
The Clearwater Airpark Capital Improvement Program and phased Development Plan are
the primary products of the master planning process. Overall, the plan presented here
represents a program that will create a neighborhood friendly, first-class general aviation
airport and facilities tailared to meet considerable demand in the region far high-end
aviation facilities.
❑ The plan prescribes developing the airfield incrementally over 12 years of the 20-year
planning period. Overall, if implemented as planned, the concepts presented will
steer the Clearwater Airpark from its position as a$100,000 annual City-dependent
operation in 1999 to a self-sufficient $5 million annual operation with 12 years.
❑ Financial self-sufficiency for the Airpark should be accomplished within the first
three years of the development program. The delay in achieving a positive budget
balance is attributable to the need to accomplish some critical capital-intensive, non-
revenue improvements, such as rehabilitating the runway/taxiway system, terminal
apron and fuel farm relocation, among others.
❑ The airport business contractor is projected to grow over this period from a$150,000
annual business to a$2 million annual business, providing the highest quality
facilities and services in the West Central Florida region, but at competitive rates.
❑ The total capital development program involves the investment of approximately
$20.5 million over the first 12 years of the planning period. Of this amount,
approximately $15.1 million will come from state airport development grant
assistance and $4 million in local share contributions generated by the Airpark. An
additional $1.4 million will come from other sources, including private investors in
the proposed facilities. A significant portion of the terminal development project will
come from a public-private investment partnership.
(Financial projections are in 1999 dollars, not adjusted for inflation).
�
The development plan is the result of extensive research and analysis conducted over
approximately 20 months. Key analysis and findings and reported in each chapter of the
� 1999 Clearwater Airpark Master Plan Update. The findings are summarized graphically
in the Airport Layout Plan and the figures illustrating the report. The capital
�
� C:\window�s\TEMP\execsmmq.doc
�
�;
� .J
�
�
�
�
�
�
-DRAFT-
improvement program facilities and staging of development are summarized in Figures 9-
1, 9-2 and 9-3 of the report, "Short Term, Mid Term and Long Term Development,"
respectively.
Alternatives Analysis
The planning program included an Alternatives Analysis evaluating three major options:
1. Do Nothing
— Non-compliant / not acceptable
2. Limited Improvement
— Achieves regulatory compliance but will not meet city-mandated financial goals
3. Limited Expansion
— Maximizes revenue use of existing airfield; acquire property to southwest and
northeast for aviation-related revenue generating facilities) �
— Achieves regulatory and safety goals, community compatibility goals and economic
and financial self-sufficiency goals. Meets all compliance issues, compatibility
issues and financial goals. Preferred alternative.
The development plan proposed in these pages addresses each of these major issues,
which are interlinked. That is, the problems and solutions are often intertwined. For
example, expansion, even on a limited basis is not possible without some objective or
subjective community impacts. Yet, by carefully planning the expansion, a program can
simultaneously be implemented not only to reduce existing impacts, but also to
simultaneously anticipate and build in features to mitigate future impacts.
� The solutions are found in the Development Plan and Cost, Phasing and Financial Plan
chapters of the Technical Report, and depicted graphically on the Airport Layout Plan
sheets. The solutions are detailed in each of the pro�ects that are itemized annually in the
� Capital Improvement Program (CIP). The CIP is a list of airport development projects to
meet the goals of the City and the Airpark. The strategy to concurrently accomplish these
goals during the plannmg period is in their phasing.
�
� Major Issues
�
�
�
Safety and Regulatory Compliance
Compatibility with Neighboring Residential Development
Economic Self-Sufficiency (CLW Enterprise Fund: FY 2001)
� C:\windows\TEMP\ezecsmmy.doc 2
�
-DRAFT-
� Proposed Solutions
�
�
0
Safety and Regulatory Compliance
■ Relocate western airfield boundary fence by minimum of 8 feet (Part �7 Compliance)
■ Decommission non-precision GPS approach to reduce the number of obstructions
- Compliance with FAR Part 77 standards: Reduces size of critical safety areas
� ■ Trim/remove/relocate or mark and light remaining obstructions (overgrowth, poles
and structures for - Compliance with FAA AC 150/�300-13, "Airport Design," and
FAR Part 77).
�
■ Remove high-mounded rubble from existing spoil collection area
- NE Airfield Area, used by Public Works Dept. (FAR Part ,77 compliance);
Convert to compatible aviation-related use
A ■ Reconfigure terminal apron area for FBO fleet and transient aircraf't parking (FAR
Part 77 compliance)
� ■ Extend Runway / Taxiway System pavement for operational safety (overruns)
■ Apply Declared Distances concept to allow greater operational safety margin by use
of variable approach/departure zones �
Compatibilitv with Nei�hbaring Residential Development
A growth program designed to meet neighborhood compatibility concerns first through
the following methods:
Strategies
(a) strategic placement of facilities as buffers to minimize noise impacts
(b) strategic timing in construction (phased development) of airport facilities
(c) beautification of facilities that will include external noise attenuation features
(d) use of sound attenuating internal design features and materials of new facilities
(e) continuing re-examination of operational procedures to minimize sound impact
(� redesign and reconfigure airfield pavement to increase operational safety; reduce
noise impacts
Implementation
■ Institute "Grow Slow" staged development policy with reduction of impacts on
community as primary goal
■ Relocate runway landing and takeoff thresholds northwestward along the extended
runway pavement to allow higher approaches over residential areas
C:\windows\TEMP\execsmmy.doc 3
-DRAFT-
■ Apply Declared Distances concept to attain maximum noise reduction by allowinQ
higher approaches over sensitive residential areas y
■ Center noisiest aircraft operations in airfield area bordering existing industrial
development to minimize noise impacts.
■ Position new airfield development to place sound-insulated hangars as a buffer
between airfield operations and residential neighbarhoods
■ Construct earthen noise berms beautified with landscaping vegetation selected for
additional noise attenuating characteristics
Amend City zoning ordinances to include airport operations area overlay zoning
Acquire easements in designated Runway Protection Zones
■ Construct modernized general aviation terminal with meeting rooms for community
arganizations and attractive restaurant facilities. Promote aviation-oriented youth
activities and other civic organization activities from this community center.
■ Institute continuous maintenance program to monitor upkeep of new and existing
facilities.
■ Institute continuous safety, security and noise monitoring program using trained off-
duty police; institute neighborhood "hotline" to FBO/Security for immediate response
to citizen complaints.
Economic Development for Financial Self-Sufficiencv
A phased airport facilities development program designed to "Grow Slow." At the same
time, the objective is to provide high-quality facilities that will create the financial base
needed to pay operating costs, as well as providing local share for subsequent capital
development.
■ Promote business aviation focus on NE and Midfield `'triangles" to attract high-end
operators. Revenues generated from these facilities w-i11 help finance subsequent
facilities
■ Provide runway/taxiway system capability to attract high-quality GA business
operators, thereby enhancing FBO's market position and FBO/Airport financial
strength
■ Promote T-hangar availabilit�� in terminal area to maximize existing airfield revenue
potential and to meet market demand for sheltered aircraft starage
■ Develop existing airfield first in keeping with "Grow Slow" policy; build out Phase II
and Phase III areas in increments with market demand
C:Awindows\TEMP\execsmmy.doc 4
�
�
�
�
�
�
�
��
�
�
�
�
�
�
�
�
�
-DRAFT-
Next Steps
Remaining Studies and Implementation
❑ Apply Declared Distance Concept
❑ Finalize Airport Layout Plan; Complete Noise Impact Modeling (Future Case)
❑ FDOT Coordination, Review/Approval of Master Plan
❑ FAA Coordination, Review/Approval of Declared Distance concept
❑ Update Master Stormwater/Drainage Plan; Coordination and Permitting with Water
Management District
❑ Design/Engineering & Construction of Phase I Facilities(2001-2005)
Terminal Area:
■ Relocate Western Airport Boundary Fence
■ Remove existing obstructions: brush; stacked rubble
■ Construct Drainage Facilities
■ Enclose unsheltered aircraft parking with T-hangars
■ Reconfigure Terminal Apron Area
■ Relocate Fuel Farm
■ Construct New Terminal, Meeting Rooms, Pilot Facilities, Community rooms
and Terminal Auto Parking
■ Construct Supplementary Maintenance Hangar
❑ Construct apron, hangars and access taxiways for NE and Midfield business aviation
areas (2001-2005)
❑ Construct Phase II — Southwest Development Area, staged (2006-2010)
❑ Construct Phase III — Northwest Development Area (2011-2012)
� C:\windo�cs\TEMP\execsmmy.doc 5
�
�
�
�
��
�
�
�
O
�
�
�
�
�
�
�
�
.�
�
�
V
�
■�
�
�
�
�
�
�
�
�
�
.�
��■■+
�
�
L
�
�■■+
�
Q
�
�
�
�
�
�
L
�
.�
�
�
�
�
O
■�
��
�
�
O
�
�
�
�
�
�
0
L
�
�
�
�
��
�
�
�
�
Z
� �!
��
�
eQ
�
0.
*■■r
�
�
�
�.
�
�
�
�
�
�
�
�
�
�i
�
V
��
��
N
r
� �
O N
� �+
c� sZ
L
� �
Q �
� •
�
- L
� �,
� Q
� 0
� _
Q �
O �
O =
O �
� Q
O
O �
�. , O
.� _
� �-
� `
� �j'�
_ { f}
�
Q.
�
�
�
�
�
v
�
a�
L
�
C.�
.
M
O
0
N
�
.�
�
v
�
�
.�
�
�
�
�
y-.
�
�
�
.
V
i
c�
�
�
a�
>
a�
�
v
Q
.
r�
�
L.
�
�
i'
N
�
�
�
0
�
�
�
�
O
�
�
�
�
.�
�
V
�
0
.
—
—
�
�
o.
N
�
.
y
��
y
�
�
CQ
�
Q
C/�
�
�
�
e�
�
�
�
=
Q
�
�
�
�
._
�
�
O
Z
O
0
V
V
■
�
�
�
�
�
�
�
t�
t�
Q
�
O
Z
�
�
�
c�
.—
—
�.
�
O
t�
�
O
Z
1
�
�
4�
�
�
>
0
�
�
�
—
�
�
._
�
._
J
N
�
t�
�
ca
._
—
�
�
O
C�
'a
a�
=
�
._
J
�
4�
>
.�
�
t�
Q
�
�
�
�
O
C��
—
c�
._
t�
�
ca
_
._
LL
�
>
a�
._
�
v
a
�
�
�
�
O
0
1
_
O
._
�
�
c�
�
�
W
�
�
._
�
._
J
■
M
�
�
■
�
■�
�
■
�
�
�
�
O
C�
�
�
t�
_
.� �
_ _
�- ca
�o
o C�
C� v
._
��
� O
> �
'� O
� v
v W
Q
1 �
y
�
�
y
C/�
�
�
O
��
�
�
O
��
�
-
�
�
a�
�
.�
.
�
�
�
�
c�
tn
�
C�
�
ca
._
-
�
O
V
�
�
■�
�
�
�
�
■�
�
� �
� L
0
s�
�
'_ �
�
�
4�
�'= Z
_
._
�
._
�
c�
�
O
V
�
�
�
�
■�
�
■�
�
.�
�
�
�
4�
Ci�
c�
._
O
�
O
t�
W
�
�
�
�
�
�
�
�1
.
�
�
�
�
�l
�
�
�
i
�
�
�
0
�
�
�
O
y
�
0
�
�
_
�
�
�
o�
o�
.r
�
�
�
y
�
V
�
4�
�
�
�
c�
v
0
—
�
�
�
s
v
c�a
0
L
�
�
Q
�
�
a�
�
�
�
�
�
—
�
O
._
�
.�
�
�
0
v
a�
0
.
�
�
�
.�
�
V
�
�
�
�
�
0
�
�
0
�
L
ca
N
�
_
4�
>
O
�
a�
�C
.
c�
a�
L
Q
�
�
�
�
a
_
�
�
._
�
L
4�
�
4�
L
�
�
�
�
0
v
a�
OC
.
�
�
a�
�
�
�
�
a
�
�
�
._
�
�
�
�
�
�
�
�
�
�
�
�
�
�
w
�
�
�
�
V
�
0
V
a�
�
�
�
�
�
._
0
'�
�
L
�
�
V
�
0
�
—
�
�
a
.
y
�
O
��
�
�
�
y
y
�
O
�
_
�
��
�
Z
�
��
�
��
�
y■■�
e�
�
�
0
v
�
■
�
�
0
�
�
�
�
�
�
O
—
�
>
�
�
�
�
�
�
�
�
�
�
�
O
�
�
O
L
�
V
V
�
�+
�
�
v
_
O
C.�
�
t�
�
�
�
.�
�
�
i
�
v
�
0
�
—
�
�
Q
�
�
�
�
�
�
�
L
s
�
�
�
ca
t�
O
�
�
u
�
�
L
Q
�
�
._
.r
�
�
�
�
L
�
�
Z
�
�
.o
�
�
L
�
�
O
�
.�
�
Z
�
�
�
�
�
L
�
�
V
�
�
tn
_
O
._
�
�
�
�
�
�
�
� �
� i
� �
� .-
V� L
� ca
'_ m
�
� �
� �
� .-
� 0
� Z
�
C/�
��■
�
�
�
�
�
y
�
�
�
•�
�
�
0
U
�
0
�
�
.�
�
�
�
•,�
•' �
�
C�
�
�
0
V
�
■�
� �
� �
� ■�
� �
� O
� N
c�
J >+
� �
� L
� �
� �
I O
L
� �
m o
� �
� �L
. �
0
Z �,
� =
v V
� �
�
� �
_ �
0 �
V Q
. .
�
�
�
�
�
�
�
�
�
�
_
�
N
_
O
.�
�1�+
V
�
�
�
L
a
�
�
�
i
�
OC
�
.�
�
�
V
Q
.
L
�
f�
�
�
�
�
�Ir
.�
_
�
�
�
�
�
�
�
�
.__
�
L
�
H
�
v
�
�
�
_
�
C�
.
�
�
�
�
�
�
�
.�
�+
.�
�
._
t�
ca
�
L
�
�+
_
�
�
�
W ,
�
■�
�
�
�
_
ca
�
�
L
�
V
�
� �
��
�1 L
� �
� �
� �
� a
� �
���
� .—
� �
� �
� _
� O
� �
.
y
�
O
�
�
�
�
C�
�
%■�
�
,�
,v
�
�
y
�•
�
�
�
�
��
�
O
�
O
C�
W
�
�
�
0
�
_
�
.�
f+
.�
>
Q
�
�
�
�
._
�
�
m
�
.�
�
�
._
�
�
♦.+
�
�
�
L
�
�
�
�
�
.�
�
�
�
�
�
c�
�
�
�
OC
�
�
C�
_
�
�
�
W
_
Q
�
�
�
�
L
�.
�
�
�
_
._
�
ca
._
ca
>
Q
L
�
ca
�
H
�
.�.+
�
�
0
L
�
�
�
■�
�
■�
�
�
�
._
�
�
._
�
w
�
�
._
�
O
-
�
�
�
0
�
.,
�
O
-
�
�
0
L
�
�
V
�
�
��
�
�
�
�
L
V
_
�
.
—
—
a�
�
ca
s
a
�
�
�
�
�
ca
�
�
�
�
�
�
.�
�
�
�
y
�
�
�
�
�
�
Z
�
�
�
�
ii
a�
�
�
�
�
�
�
o�
y
a�
�
�
y
�
�.
�
V
_
0
V
�
v
_
�
�
.N
0
'a
�
�
�
C�
�
0
>+
�
�
Q
�
_
�
—
0.
�F+
�
0
�
�
J
�
0
�
L
._
Q
a�
N
._
�
�
.
_
�
.
�
_
.�
�
�
�
0
�
�+
V
�
�
�
—
4�
.�
0
Z
�
�
a�
—
�
�
�
V
�:
F"'
�
�
�
L
0
�
_
c�
0.
L
�
�
�
�
�
�
0
�
.L'
Q
�
�
�
�
�
.
_
�
>
O
�
�
�
Q
Q
Q
�
L
�
�
�
�
�
�
�
�
v
�
�
�
.�
0
�
i
�
�
V
�
0
�
�
�
�
�
.
_
�
>
O
L
�
�
Q
L
�
�+
�
�
�
�
�
�
�
._
c�
L
�
�
L �
� ��
� �
� •—
�
� L
L �
� a
�
Ci� �
a� _
� �
ca �
� �
� �
�a
.
y
�
a�
�
y
�
�
�
�
�
�
�
�
0
c�
�
0
�
�
a�
�
�
�i
�
�
�
y
�
�
�
y
�
�
�
s
a
�
0
�
,o
�
t�
�
�
�
�
0
V
�
� �
� �
_ .—
� =
,_ -
� �t�
� �
0 �
�
�
V
�
a�
�
�
0
�
,L
Q
_
L
�
�
�
�
�
�
�
ca
v
O
-
�
�
�
�
�
0
._
�
�
�
�
�
�
O
�
L
�
�
�
�
.�
L
�
�
9
O
�
�
�
�
�
.�
�
—
._
v
�a
�
�
�
�
._
L
�
�
C�
�
.}
�
�
O
V
�
�
L
�
�
�
�
_
�
�
ca
�
�
�
�
�a
�
�
_
�
�
�
L
�
_
�
�
O
-
t�
�
W
�
�
L
�
�
�
�
�
�
�
c�
t�
O
-
�
�
�
�
�
Q
�
0
�
�
Q
_
�
._
�
L
�
�
�
L
�
.�
�
�
O
t�
�
�
�
y
�
�
y■■�
y
�
a�
z
�
�
�
�
�
�
�
�
�
0
�
CQ
�..r
�
a�
�
a�
_
�
�
_
�
y
�
��
'�
�
�
�
�
�
■
�
■�
�
�
�
�
�
�
._
�
L
a�
H
�
a�
z
�
V
�
�
�
�
O
V
�
..
�
��
O
O
�
�
._
�
a�
a� �
� �
�._
��
._ _
� ._
� �
�
� �
��
O
O -
._
C� a
�
�
�a
L
�
�
�
�
�
�
�
�
�
O
O
L
�
�
ca
—
V
—
0
0
�
�
�
�
�
�
._
-
�
�
�
�
._
�
L
c�
a
0
�
�
Q
�
�
�
._
�
L
�
H
�
�
�
�
�
�
�
�
�
._
�
�
�
ca
�
�
a�
� L
� �
_ �
�. �
��
� _
�
�
y
�
�
*.+
y
�
a�
z
�
�
�
�
�
�
0
�
�
0
�
CQ
�..i
�
�
�
a�
_
�
�
_
o�
y
�
��
�
�
y■■r
y
�
O
O
N
�
r
O
O
N
�
�
■�
�
�
.�
�
�
�
�
�
�
Q
♦..+
�
�
�
s
�
0
z
�
t�
�
�
�
�
0
V
�
�
�
�
.�
�
�
�
�
�
�
v
�
Q
�
�
c�
�
�
ca
�
�
c�
_
�
�
O
L
�
Q
0
�
O
N
�
�
O
O
N
�
�
L
Q
�+
�
�
�
�
�
�
O
Cn
—
�
�
ca
s
a
�
t�
�
L
�
N
�
�
V
N
�
O
N
�
r
�
O
N
�
�
L
Q
�+
�
�
�
s
�
O
Z
-
—
—
�
�
c�
�
a
�
v
�
�
�
�
�
V
�
tl
H
�d..
�
�
�
�
W
H
O
V
C
�
�
Q
0
d
d
�
� �''
c.i �
� a
� O
C �
C
Q 0
� �
Y d
� �
a�
O
Q L
� N
w
�
�
�
d
U
�€ �
,,,,y Q N
� � �
a
�
W
x
�
0
J W
a�e e
o2�°N
J fq
W
J
� m o 0
LL � � �
J
W
W
J
Q m
LL �
J
W
f
W �
J O
O U
H
O H N
Q 7 �C.'
� y H
�
DU='
zr
� U
fq Z
W W
W �
a� i
e Z
0
H V
H
O
U
F�
z
�
�
z
�
!-�
z
7
Q
�
�
E
�
Z
}
�
N N f�1 M� M� M�
O O O O t0 O O O
p O O � � � O O
O � O O ch {O N t0 {O
P1 O l0 "
U! � �M f9 � � � � �
O O � O� n N <�
N t0 N �Op f� C uy ��
N9 !A � (A U► M � �
Nf9 d�9 �U►�N U�9 �M
O O � O� V� � p
O [O � �
�� � w �»witri
O
O � n[� O O O
O R e� �O O O
0
° �« �� �«
O O m� O S O
0 on�o� o0
� 0 N
Vi IA��� � �
°o°o �° $<o�o°o 00
f�0 N N � V �[J LL'1
� M f'7 l'�7 M� f'7 f`�7 f`�') M f`�') M
0
0
0
0
�
M
�
� � r f�0 � �! N� CN7 N� N
�Q - m
N � f9 IA W� d�9 dN9 U�9 4�9 �M d�9
w
� °f n o cn °o M n u� o 0 0
^ O Q�� � m c7 O O O
� � Of O� M� n O Q V
� �f9 � �M� ���M W fAtA
O O O O O O O O O O O O
IA IA M fA f!i 4i Vi 4i fA fA f!i fA
O
� n �(rD � N N� O O O
p m A p m� O fh �!O t0 (O
^ � C7 � N a f0 N(O 1� 1� 1�
�w '�'�� uquq�iu9uqw
w
� � Ol O�V � � O"= O R V
� �« ��� �I« ;����
O
� � C7 C7 � O O O O O
� �� Vid�9� �fAf9�4�9 �
�
p 0 0 0p
O f0 f0 � V O N N aD S.O O
� � � � �
J J J� J(n fQ J J W J (n (A fn (n W J J J Il� W tl�
� � � Of � � � � fD p N O Q � �
� GD Of C7 1� Y1 O f7 f� 1n
N l7 O O N O � m�^
N�- N �< � C7 C7
O
a a`�
� LL A � d
a �' m � � Q
J � � C N a R
¢ � � 7 C � y
N T N OI S �p m E Ir �
� �+ � D O
C .� C � .x m ICO y F� Z
N N LL N C C W C D N � y 'd" '�" d
y Cl � C � W N� Q U N W l0
C w C
j � � c E � —Q1 ¢ m � � � � v� ayi ti >. �i, �i.
C LL d 10 3 W �~ Ol p1 �� 7 7 7
� v m .N m a o, `%' m � � rn c°° c rn� o �
ay Q wa A: ` i€ € � x c.� �u, X inu>v�i
m � '€ x
°' O c o a c � `� � 3 W W� o W m m m m
E � m v� H r� d
°m' c € � rnU rn ~� Z w d �° c m c yy ���
�o � ,< < <a � >>
W W � C y y y '- Q 2 0 0 O O�N p) d' � N W l0
�E d ii NLCt wa° c � i°10 n`0� 10 `O a3i a3i �i a;i
g rn �E � y y d m <? == w�a� d??zzzz
€ V � y E'o—�o 'o'o rn °m m a`a o o`�----
o� 0 8 E E E F� �, LL r, � u E :°-1010«
O d y y� C y d N N N tll
v��� � �8 � �� o �� vi�nw �z ��_ �
C � N � l7 ��t N t0 1� O Of �p O �^ N LIl e+1 ' U1 i+ t0 P m O) O
.0 � p � � C � � � � ? � � �.- N N
� � � � C U
Ia � E ~ � _ �
�i o " g � �
Ir ; °
�x N
� C
W
��+ U
3 a
�
a �
O p
0 o g v
� (U
� � N
01
O O
M
O � < m
'n� � °a_
M �M p
H H H
O
O
p� O
�
O
O p
� �
O
� O
�
�� M� � ��
rn
N T 01 � O ^1 �
m m r m
t0 t0 � � �O vj
� 1fl V� � � yg fA
N � � � N (O 1�
f1
� r� "O oi �o
W fl9 � � f!! (A
N�9 N�9 H� �M � f A
Of
� � f`] �f1 � � �
U�9 � � � H H �M
O� < O� m O � O
N � � � � �
aC � yj �" O�p O C�p
� � � N� 1A � 4i
(�O (�O O T O � c7
N �[f O tD O
Oi O t+i � Nj O�Nij
H f A �� f 9 � N
��� �
g a � � m
�ew �i � c�'�
V� �
�
O fD N a�0 fh
{p R
N m � � �
fAMM Vi
O O O O
fA /A fH W
O O O O
O O O aD N
M N � f0 �K
fA W � V�
O O g N �
� n �
�� V�N!
� �I
0
�
M
(�O f�0 �
m
� � N
M
A
< V vj
a
f•�j � A
� � N
O O
� �
O O
O O
� �
O
N
O O O O
O O O (O � 0
O N N O�D ' fA
IA fA f9 fA �
p O O �<O f0 <O O �� p O O O ^
O O � O � Q �
N c7 � N
Q Q J fn !A V1 fA W f�np f0 W W W W fA
aD O < O �� � t0 f�0 N� N N �
�^ O1 � O f0 � O t'�
�- f+7
W �
C �
� .... l0 Q
N =
a n F C
N x 0 'C
C p
� W m p W W
jp 7 V O � � F��
N � N � C A �
O 2 � N 3 p N�� t�
� N N O V N E C��
� y N N �
0 N N N � _ _
Q =r X a� � p� � y N Ol N
Q � W a OC'� C � C Q m A�
T C � � Q � �� � C N T y
�. � N� C Q� V �p a €� m m C
X pN /0 {p
dp � L � f�1 L d C C Q y F O O�
� y N F >, a � y Oi N� C O O tA W
'uw E m � r �~ o ` m 'cnnm m
3 m 5 U �'� 'm 3 3 3 �
�a ou� � X z� � F� aEizzz €
�� d'� TiF iiii �n Tiii �iiFiii ~
a?� 0 2v 22 22 d222 rn
��7 � J N� N N �p N W > N N N �
� S N C O-X O O y O O O O O O N
� Q a' l0 � ii W v c.i 5 <.% Ci :.i <.i <.i <.i �
0 0
G ~ p�
O N N 7p N � C C N N a N N C N C�� W ���� q� Q
W � — N E � � � N
'� � N E 'R � 10 m m Q m
S `�o � a x
Q 1L C% ` C $ U7 N �. �
� � Q �S � � �
c � LL o W 10 �o
m o .� o c L°' `o �
J N W n t � u� �°
H Q �
� � c� c�i
� ,� a >
a
O
O
�
J J�
�
�
N
� �
C �
N ~
o �
A
E g' y
m '� '�
°i o
� � J
c
m c �
0 J W �
O °
O ~
1� CO IL � C
('� ('� O C Q
o a 'o
`r E E
a �.i °'
} �n
LL °o
N
� M M f7 M� M f�+9 � �I � M MI M[��7 M M
O c7 C a�D �(�O O N a�D
O p� aD �O �j u7 f0 � O
� � � � • ' " �p
f9 M IH fA �M fA 19 Ui
O
� M � N � N Q < �
� ����� ���
H �K H N N�9 � H� �M
S ('7 O � Of 0 Op O 0
� O�f N�(O � O f0 a
� �°'��� w�»�
V�
O � f0 f0 � N O Q(O
r
� � � H � H � f 9 �W
O p O� N$ g p 0 O
O^� M N(O O � CD O
� � �HU►!A Hi�d�9 �
O O O
O O O
pp 0 0 O N O O
O ��'Q � $ 11Y l+7 � $
� � �
J f/i W W fn J W J W W
� N f7 M N � � � � ^
LL) � f� f0
ao 0
.�- �p
L
m �
C J N
� �
A L O y O
N � � N a �
� C G/ L C N
L = L � ~ CFn'
� y y � C l�p ~
c V A g Y c �
m
� �'�o�w
�€ O�� � 3 � � m a
~ H;��� V W m o
� W x� O X C � 2 Hm
� L � � � p � m H G
y ~�j„ p� � U C 01 W
w ; 3� 3" � Ep� m 2 a�
.c ���� �x W � N o ij W
o �'�m� � �u�z 2 0
�y � m m � o a m m � �
O �
a �� a� �<< U e�
o°
�
01 Of O N f7 < N �f1 f0 1� �i 1n LL�
r� c o v v v c o v o a � v� c
c °p a
g`m = N E
� o
� d LL U
� � m
� � o
�
� W
J �
v �
� a
a
v'm r °<
aD N N
f0
O � �
V� (A
O {�p
�j O �?
N m
� a
i N
j�j � N
H � �
�
N M O
� � N
v � �
� m
� � N
�
O t� O
� M m
aD � N
N � O
f9 W
M r
M �
N
� N
�
� a �
�
N
f� (� W
� f`�') n
e ao
N
N
� � N �
N � � �
�' O �
Hi �
O
� � N �
� O N �
� �A � �
W � � N�9I
Of � p N
� n � �
rn
��� �
�
O
O � a �
p � O
N � � �
O �
� (O r
O < N 1�
^ O
� � � �
O
O
� � O �
�
N
f� f� w p
fD f`�7 � f'7
�n rn r
N
l°J
O
OOi
N
N
1"f
A
N
L
/�l a N d
� � OI Q
� l0 C
= n C = � � r
� f9 = T � (O V
� � m � � �a
m ~ m N
N C C �p �
C N N Cp1 M
o �' E E �
Q $Z o 0 2
y > L' > y '° °o
Q � m �
10 B'G �a
c w �`� ��m � �su,
a> 2 = fq (A x
� � �.~ ��o �FO- V ��
� C m� C C O LL� C C
o��e o o; ; w m�
w '� co t �'� a� a� t E F
Z w x� m m Z Z� O C
t'i a' W a a t'i ii � m LL
d$ dd
� a � a a y �..°i a�, «
o �= a3i � �= �= o 0 9 � C
U <nZ� � mrnU UF � € a
�~ o~ t'�
6 O �< a�� �<� 1n N LL d � C
W c oa c c� °oa �s
� = a� = N a E � E
� � � V � LL U H C�.'
� o `�
0 0 o a
N � N y
W �
f`S U
Q ¢
0
d N
ao
O N
>
�
�
m
H
��� ����I � � �� �
m
� � �
� � N
fA � d9
N
�
� O �
� � �
� �
H �M �
O
Q
C m �
m
117
W � f9
O
� r �
O � m
H � f 9
•1 � f�0 N N O
< N Of � �
a0 a
� � O m � �
� H f 9
n O O O � �
� m � V � O
� � � � aD d
fA � � W tl�9 /A
H tl�9 4�9 � H d i
O�p O
N O a�0 10 O !O
� � N @ � I�
� � � � �
N
N O N O � O
C7 N c�7 l�'�1 N Q
(A � � � yq f9
O
m i�fi � m O O N O O
m< I� �� m O N
� � � � � � � � �
O O � O
�� � � O O � O
O �
� � �
N
N (�O
n �
� �
C�D N
� H
� H �
O O
f0 a�0 O I
l7 f V � II
� �
8 O QI�
O N
N
�K N �
N�{ �Q O�p
fA f9 H.
O �
O �
� � O
[�1
� �� �� ��
O
O
�
O
O
O
�
�
O
O
S
�
S
O
Vi
N � O W
� � N t0
� �M �K H
� N M N
fV '�! c0 1�
� N N N
� � � �
�K H N�9 H
� � � �
O
� �M H �W
N O O
r �
m O r
� � � �
S N
(O O�
r �
N O
f9 fA
O �
V �
o "
n �
�
H
� �
O O
O t�0
a�0 O
O �
Vi 4�9
O
O R
H �
O
O O a �� O N
� W � �� ViH
�p � O
O �p �p Q Q O
� O N
N � N
N�N N W LL1LLi h LL7 W W J J tp� yN LL]LLl
�o n c� ao t� c� � � � �o rn o ao �n
f7 Q N f7 O V fh aD l'7 R {O
N CD N O l") � (O O
N � f�1 N N 117 LL] <
N
N N
N
N p�
Q Q OI N
C W C i N
o E �-La 1O h � Fm Na a
c. ,� a _ N
°-' � a a r3ii N � n d y a�i a`, a 3 �
� y -� ?' w m a c
C 0 ��!/I � N A � y N � O O �� M
'L � f/7 y OI � � W t ~ � � x Gl 41 � N
m� �L� rnm a 'c °'� N `� �. " °'
L� c
v � � = m�= � � �g L' 3; �g �_
T C= T y 'X - �� C
U C N m= lT0 m J � � LL LL N W (n fA = m
d b � ~ �
- d G �~ m O O) � �` � G) W 3; �
= aEi u � c�n o ic � a�i � c p � � Q 2 Z � m o
�'� x xo 't` � x� F d 'x xoH
10 °o�no � m o � m� °° o0
�ax �a�� a E t� �' LL �v� c c a �'
€ 3 3 4 3 3 3 3 U m c r 3 3 3 4 4 3 3 r
y d w w w d d m d m d d
F 2 Z � Z Z 2 Z 3 � v c y 2 Z Z �� Z Z y
ii 2"i ii a Ti ii ii ii d � 9 a W t5 F'i iT a a i'i i'i A
222 �'222 2 2 zm �0 2 22 �'�' 220
4/ N� a N W Vl N N R W � J Yl Vl N a a N N J
C C C « C C C C C� C C C Y« C C�
O O O O O O O � �� �p C O O O O O C
U U U fQ U U U U C C C J F� U U U �/1 h U U��
�p p� � ~ {p O ~
G U � U�'7 �^ 1n � f) � � i�0 �= 10 C tN0 10 7� LL� ��O Y1 f0 t^O � f�0 f�0 � N O n 1�L d
E �� � � ge m � � �� ►•c
m c �o � c� � � o� o . c g'm $a
��p i a a u� � !y� `�' E in ro x = a ''' E
C �� � C q IrLC7 7 �} OI � W LL C1
LL p �0 Q L � � � LL W l0 N Q
N N� � L N .� y N�
W
R � � 1�`p " l�`p
` .� °6 U U
a ,E �' c a
'a
z
� ���
�� � n p N
� � � A
� � N � V
d9 � Ki N
Of
m
l'�7 N N {O m
O
�
H � � f A �
H � �M �W
N
O
M
N N N N
�
� ��w
� �
� � M �
W � m �
� � �
��
� � m
� NW M
O O
n N N
� � y
(fl M
U�9 H
�
w
0
�
O
N M� O V O
� � R � � �
fA Vi
`r° ���
v �
m
�� � � M� �I
�
0 O � N O� N� N
�.s-� � �p c7 O V? � e0
� 1 A � f A nM NW �M p �
N
O
r � n �
�� � V N^ O r aD
f`9 � f0 � N OD Q N N
� fA � fA 19 � fA p f0
N
H N�9 � �K � � fA
� � � � � � �
o � o �o o n
�� � w �w w
� c°Dn � v�i r�i a�o �
N � � r- N R
' N �IA W � 6�9 �M �
{p m
� 1� �! LL^9 iQ� N N
� �W � �M fIi Vi W
O
va 'r fO �� $
} yry }� >} } r >r �
h f� f� N t� y y f� N (� y
O m m N f7 1n � � l�7 1A f7
O O � N M N � < O N fh
N ^� O 01 I� � N CD � R
N
C �
O
h � i � N �
X G O � m O C(0 � � �
W W m ma o �ox „ � _ ,
�, � o C . � S T 3 Z � �
3_ � a` .N,. E� y m 0° `x° � °/ � w
m rn rn o° � o�n y � �j M
H c c w L' e m H � o
c �i � y rn ,� 'n �+ i� -
E a a � ` � m `� a '� �°,r �
m ¢
a v v � s d L � v � m
> E�� a 3m a aa o �. E�° d a e°�rc
� p m/n � Z LL] � z� Q � p N N� �
� N U U~ .Q 1x ~ .�r .�r W N �� K f � G�7
3 � Q Q W O T� W O O a a �3 a3 � W U+
2 t�qy�y AZy t° i0 Z Z ZZ V V=f mF
ii ii ii Ti � n ii W a n ii ii ii F'i w W a O
2 2220 �20 �'�' 2 2 22 Zo oa
� a � a a �.� �
O O O O C � O C �� O O O O H C � FC
U U U U 1p — fn U IC — N VI U U U U � W� F
~ O ~ O ~ O C ?
C M- O H $ 1- F �°
W N W ln V 1(1 LL 9 l+I f0 1� LL CO Ol N O N M N C'f Q LL� L
�n m��r.� � W ynr�� � ��� am Nao maoo �`ao 9 a
gp c g� �� oc �a
X < N E `m L e°r E m a[ x Q �i N E E
� C IrL V �� I�L C1 N Q � � � IrL U F U
LL O � � L� Q �� N N �
�°a a $ ° ° —° `0 3 a
� (n � N (A q 'x
U W W Q F- U
W � � °� N
> Q Q � >
�
O
w N �n
d N rn
� ' m
r =
a�
d
� N LL
41
�
`
m
�
� �i
0 00
rn ,� a
� �o
� � m
� � N
O �
f�0 � O�D
� �
10
' � �
� N
O O
fA W
O
O
� �
M �
�
�
H
O �
� �
N �
H �
O f0
N N
n �
�
O
O
O �p
V
N
Q }
ll1 fn
Q N
N
N
� � �I
e
� � � N 1�
� � � N N
�
� p O
O
O � N 1�0 �
p� � 1�'!
N
� � fA M �
N
� N �
,Q O
O 0 O
m
� � H
`-: O O(p
�� N W
�
O
� O O
O "
� � �
O O
O p O
O � �
W W J
� O
N
W
Q
N
� Z N O
' � N
T N d
Z 3 � Q N
X N � y
L
C G7 � J N
� W � �
� W N � O
a = LL _
m
m � � o � � m
x a H x � F �
o C1
m `r � M � � �
� �'C N C L m
Z Ky Z 'v c� y
2 2 0 2 m � o �
� = �-' a
O O C � N W C
� v�- � � JW-
oF $o €
m N��`�' �� C� 7 m LL m C
N � C � � N N C J
. e� c � � o a
X N E m � ,o a E a
t � U d � � a Cl H
C y
�. N A
� 0 � �
X � �
W L
H w
p J
N � V
� �� �
N ¢
�, � r�
O N 1� a0
i'..
ti � � �
•�.
� � E,9 Ef-? d�4 b4
� �;.
K� ,�;.
� ��
� -' ; -,
'�„ j" , � C4 � M �
� � � M O f�
� H? � N N
_� = E!-� t9 Ef?
,a o
m c�
:� '
°�,.� - u� o u� o
g r � N
, , ,
� �o r �
�.: o o � r
N N N N
�
N �
� C
� �
� �.
�
� �' O O � � N
��` O O O O O
3
�
�
Q�� M�� oO N N tD �A � � O� I� � �� tn O N QO
�� O 1� � N I� N CO M �(O � I� 00 M� I� CO O�
y„ �1, �(D DO O M CO �� 00 O M OD '� � M 1n N O OO M CD
_" I� f� M�� O r r- c- N 00 QO �� O 1� 00 �� O O
Q� � � N N N M M M M M�� st �� t0 CO Cfl CO f� I�
,� � Ei? Efl Ef3 69 69 fA t9 EA Ef3 EA GA EA 69 6R EA fA 69 EA 69 69 Ef3
fA.
C� �
�"
'p �3;
L
a' N O M Cfl � Of N�� N � N 00 �� N 00 � � CO M
� �` N I� O � M 1D ��- rn aD N� 00 N I� e"! C� � f� � O
� e- oO 1� � r' O M Cfl OO � O> M I� N(D M� tL') � f� �
L � � c'7 a0 oD � � � � �' � 1� 00 00 � � M M � � � C�
(� jp �- ��- r- � N N N N N M c7 M M M 1n tn ����L")
s.. Efi EA di 6R Gfi d�? E� EA EA d9 Vl d9 GH 69 l� f�4 Efi d9 tf? d9 d�i
L �
Q 'Q
d �.
w+ i
� ' O � N M�� Cfl I� CO � O � N M� 1p CO I� aO � O
�' O O O O O O O O O O O O O O O O O O O O O
d;m''' N N N N N N N N N N N N N N N N N N N N N
V
� �
}, � o
� � ia
. � � �
3 "
�
� ` c 3 a�
a
w. � � U N
O
� (0 U
C N .`.. ' �
� fn C d
'0 '� 4J U Q'
C � p � N 7
(� 7 > Q
C � ... �
?' � � � L
C (0 '++ T U �«-
��> N C N O
.� fp t f0 0- \
� N � p (A o
� y N N � M
�
(�0 C N � � �
� � y � � �
` . f� .-+ O 7
?� N O �
fU � U j N �
C .0 C �
� � � U :D �
C C N � C �'
� � N � (0
�
�
O C O � '� �
` O � C � -�
� >` Q C
u� ? � � � �
U 3 � � T �
� � V (n � f0
� tf� L
O N � L `
O � � � � N
� N � N C �
�, � N N � 7
N T
r-
c0 � O "' � O
C C —
�1 � V '` N N
O � •� � O �
' � 3 O � � �
N � 0' � � �-
�
tn � p L +-� � L
a? a y- � � a �
O
Z r- N M �
� o 0 0\°����o°��o\°o\° o\°
�.- u� t0 .- �D do � O �- �l o) f� O
� �t o0 I� !Y �D �' ) N o� � e- C� O�
.� M O M ch � u� u� � M c0 M c0 1�
V ��F � V<F � N N N N N M M
�
Q
00 �n O�� O� rn(D O O O p r�
M(p N N� 00 ��� N N N ly �} _
N 00 a0 N I� N O f� � CO CO CO (p tf �^
�t M M I� � N�� N I� 1� I� f� t� �
� � � � � � � � � � � � � � y
d4 EA Efl Efl 69 � � � 69 d9 EA 6H 69 ^ y
� p b4 EA EA � •
� O
Q� o\° a° o o° o o° o\° o o e\° o\° o o° e\°
CO Of OD Ih �! f� �h O O N N � ^ �
� O Oi OD DO Ih Ih t0 Cb Oi ^ (V ��C
� N �h t0 �O �t �O ln �t h M 7 �! O �
U
0
ln � CO O���� 117 � CO �A � f� r
p � O O M� rf � N N N a�O N��
� M�� GO f� 00 f� N M 0�0 � nj O Y�
I� �� O � r I� N f� (� (O �(�p 4�
� Cfl (fl � I� I� 1� (fl t0 � 69 1�
Of b9
�
m e\° e\° o 0 0 0 0 0 0\° o\° o 0 0 0\°
C1 O N �- N O) M .- .- 1. O) �- � �t ^
� O (V O �h � �- �h N �C �O 1� O h
_ <"1 � � � ' N �'- N � N OD
U
0
e
�[y � M�A � O(fl 00 ►A tA � �A � N N�
p � O O f� ��� M� OO 00 CO O N �
p ��n � d' d' CO tD `- ��� N c+j tC �
� O f� N N� M f� � M� M Op p> l,
� `p l!') ll') lf) tn CD (� � � � � (fl � � �
� � i
N o � o � e\° o\° o\° o\° o\° o e\° \ o\° \ �
O� 1� .� �O N O� ch ao f� W N •� N ^ •� e
m tC a0 lh �O O h t0 uy .� tC � cV N � j
= t0 GO 7 O 1� f� O � e- e�- �- �
U P
e
o c
� (� ln � M� N N I� � N OD QO DO O p� � U
3 ���(O M�� O� I� 1� r- CO M Op 1� G
= p p O . f� �A �A � M O) p p �
I� � 00 O� I� N O�(D M�(V 1l� i
�� N c'7 N M N M CO tfl �� tn �� p �
� � � y
�
0
d 0
� 0
i/i `
� o �. °� <
d -
' � .Q = � 1
Y � � Q o � o
°w„' w ��;
� �
°- °c. � ; � .E
aa Qe �
� � ��
� t�i d a`� a`� � "`° �
� ' � � :
C � ��� �co � �
� L
G: :/i � N N��`— ), N�, Q� fl. G
V=�L � Z �� li � Q��� Q fn C
�
�_�
�
�
�
��
�
�
��
�i °
�
� N
� ,S N
V
e
m �
r� ' �
Li.r'Z _ �
t� '
�' .
0 0 0
M � �'''�
N N N
0 0 0
M O �
� � �
0 0
m �
N N
o �
� l(')
� N
� �
� �'�. 0� O N�(O OD O N�� t0 a0 O N� N I� � N M�
� ��' <D t� I� 1� I� 1� 00 CO 00 00 00 CO ��� Of �� O O O
'��L��, � � � � � � � � � � a� �- � � � � � � N N N
��
y
C
�
'.�
��, :'fl N�� I� 00 Of � N� ln t0 OO �.- C7 �(O CO � � N
:-0> M M c7 M('7 M���� V' ���� In 1!7 ln ln CO 10
�_'_ -:C � � � � � � � � � � � � � � � � � r- .- � �
� �
� i y'.
f9 L
� �
C
�, � O � N M� �fl CO f� CO � O�- N M� �lf tD h a0 � O
O O O O O O O O O O r- � � � � � � � N
� O O O O O O O O O O O O O O O O O O O O O
,�,.; '.`. N N N N N N N N N N N N N N N N N N N N N
� �'
C ': N I� (O a0 M� h N ���� M��t o0 00 � a0 N f�
�0 � � O� 1� (O a0 I� I� f� � M��(O O� c'1 � 00 O� M
� .� N� f� O M t0 � N�(O 00 �� 1� � �� h � N�
Gi ... C: tC ���f �A 1i) Ln �(O CO �O f0 f� 1� 1� 1� CO 00 00 ���
Q -, �_� N N N N N N N N N N N N N N N N N N N N N
@ L
i °';,$
•� y.�
� -. � "C � � M � 00 I� � (O � � h h � � N � O aO Q� CO
LL �:'-� >,, N CO 00 O N�A CD �� 00 C� O��� N I� c''1 a0 ��
.� ;p. - r�� �� (O N� h� O N tn h� O M t17 h O N� f� � N c'7
��; C::� ����� O O O O O.- � � � N N N N N M M
�� p-.. e- �.- .- � N N N N N N N N N N N N N N N N
V � � f �.
d C
•O �
L Q: �� � M � O> N� f� O N N M I� � t0 ('7 � 00 � O
a '� � O O��� � N t0 �f � M M I� N Y'f �!� � O�
� �-� . �-. � N � � M N � N 00 � O h � � � <O � M N � N
N� O� t� O`0' 00 � tn 00 O N�� M� 1� � t1') � � M
V �.:. �.,.,-' ��� O O O � � � N N N N c'7 M M����f) �A
Q��-� N N N M M M M M M M M M M M M M M M M M e'�
L � �,�
a���
� �
���, �_.�` � tf) � CO � GO M� I� (fl Of N f� (D c0 N N� CO � a
h(O �� M CO N 00 OD � O 00 CO N� tC ���� �
� @`�. M � I� d_ ��O � �� CO OD (O lf) 1n � i0 (O I� 00 � 1(1
C.'tC 49 e- M CO � O C'7 CO OD � N ln GO �� t0 O� N lt� CD O
_ Q.,��- : M M M M M����� 1ff ln 4� CO CO t0 CO f� I� 1� OO
R �_ N N N N N N N N N N N N N N N N N N N N N
U �' �
$
N
m
�
a
�
�
�
�
�
C
ea
a
�
N
lC
�
�
Q
�
Q1
Qi
r
Y
L
a
Q
�
C
R
�
U
0
� �
0 �
�
N
C
0 �
v
�c
m
(� U
v�
�
01
�O �
o�i �
r �
�
� m
� �
� U
� �
7 °
N
lfl
� �
C
Q �
� �
N
d
R
�
d
7
�
�
_
\o \o°o 0 0 0°0\°0 \o° a`'
�D N r- � N M N t� f� V O�! ^
� �h C) �O V�► O O� CO N N��
�
O cV <O cV <"i oi t� cG �i O ui �t ^
N �- �- �- �- �- �- � �- N �- N
�.- O M M � e- r- � O O O O�. �
m
(� � O I� N c� O� c'� �t O O O O p;
O� I� c'7 c'7 � Cfl c'7 N�� I� h N c
I� CO �� � h � �`7 N N N N
L� ���� OD �� Ln f0 f0 ffl f� I�j w
� � � � a- � � � � � e- •- p� N
r
\\ a°. a° o o\° a°. o�° 3° o 0 o I c
�D I� M h R N �h h �O � O1 �h �
� R�V � M M N M �� N n O
�
� N O 1� � M I� � �(O W � � t�
M � O� Oi Oi c'M �� tn I� � ch p
h N CD (O tC) t� � sT CO N M���►
� �� �('7 C'7 lA �� 1� N� I� {"1
M �� N O� tn d' M� c'7 �.-- hj
��-- � e- �- � � � � y�
�
3° o\° a° o o�° 3° \ o�° a° o\° 3u ac I a°
N � N O� ch .- �- f� o� �- h 7 ^
CNj � � � � m N 1D fD N Or N GD
� f0 O N O N CO f� � N� N O�
� O ��t o0 Ci � N I� (O � N h�.
00 O a0 O� O� M c'� d' .- O� a0 �.- tr
� � V �t '�t �� lL� ln h� f0 � O!
O O � O O('� N c") � O � N O r:
� � � � � � � � � � � � ��
�
���o �����o ;e�la°
oi N f� � N �- 1� CD N.� N � �
�� N N � N � � � � � N
� M O�� f� � CO Cfl CD O f� t0
O � �t M � � � � c'M 1� (O � nj
N I� M aO M`ct e- �- a0 1� 00 r- O
f� N N� N O �� M(O � OO tp
r- � O� � N N����� 1�
� � � � � N rn
n q
rn
Ci
� C _
�
v � �0
e � �
� � Q
► �
�f j m
� � y Q e �
� � � � Q v
Z' m E
E E�` t in y o m
> c�i �� �•� T� >.rna 1� �
Z � --�i li � Q � -�i � Q � �°
>. �
� U
c o �
f0 0 � O
N
>. � N �
T �' �
O �p � j
N �
� C C
n. O N ,c
y N y � Y
�L,, � N
N
f0
� ` N O_
� � ,C C Q
�
� � � � w
f6
y tan� � � f6
p_ f0 j U N
o � � � V
� c � � io
C
O > � � 7
N � n � �
L U
@ � C � ,�O
� � N �
� V1 fA L N
L E
m.��'�Qv
� E o � .c
y� a�UL
SV °�w rn
� `� °� � c�
t O � � �
� N N � O�
� � � ° �n
� ` U �
� � N �? w
li �' O @ ui
W
�
C
�
C
�
N
�
3
w
N �
w �
,C �
� O
`� Y �
U � �
a� n �
� � �
O a �<p
N `�
7 N CC
O
N N -O
o U �
fC N
U V1 �
U
t/1 2 N ,�
7
T � � O
f5 � «: �
t`- •C N C
�N � c0
�
>.� �a
m � � ,.
� � N f0
� N f0 O
N � U `.
U � � �
C E N .�
. �
� w' .0 f0
a> c � �
c�i L � �
� � � N
— rn._ m
•� � C �
y � U .0
c ,�
� N � >`
� O � C
.�
� 7 fD w
m �
tA .N N �
� y � �N
li � LL 3
N
C
�
.N
�
t7
C
O
U
�
�
�
.�
�
N
�
N
�
v
0
N
O
�
N
x
�
v
.5
.y
N
C
.�
�
f0
�
N
L
�
� Clearwater Airpark Revenues
;�
,� Revenue Sources Single Uni Airport
Cost Avg. FY 1996
Base Facilities sq ft/unit No. Units To. sq ft$/sq ft/mt $/sf/yr Rates (estimated)
AIRCRAFT STORAGE UniUMnth To. Units/Mth Annual
T-Hangars
Small (SEL) 1,400 0 $0.14 $200.00 $0.00 $0.00
� Older T-Hangars (Row C) 2,275
Mid-Size 55x35 1,925
Large (MEL), or with Amenity 2,275 8 18,200 $0.11 $0.76 $250.00 $2,000.00 $24,000.00
Reserved (non-revenue) 2,275 2 4,550 0 0 0 0
� Shade Hangars 2,275 40 91,000 $0.05 $1.58 $120.00 $4,800.00 $57,600.00
Tie-Downs
Hardstand 1,400 29 40,600 $0.03 $2.92 $40.00 $1,160.00 $13,920.00
Sod 1,400 50 70,000 $0.02 $3.89 $30.00 $1,500.00 $18,000.00
� Apron (Transient $5) 1,400
Reserved-Flt Schl (non-revenue) 1,400
Small (SEL) 1,400
Large (S/MEL) 2,275
� Helicopter Pads - 125x125 15,625
Corporate (Bay) Hangars
35 x 40 1,400
35 x 65 2,275
,� 70 x 70 4,900
85 x 85 7,225
100 x 85 8,500
100 x 100 10,000
� Average S per sf to FBO $0.06 $2.29
OTHER BLDGS 8 Concessions
� FBO Terminal 8� Office Bldg 2,214 1 2,214 $0.00
FBO Maintenance Hangar 8,487 1 8,487 $0.00
� SuppI.F80 M. Hgrs. (70x70 ea. ) 4,900
Restaurant 6,300
Subtotal, Revenue Lease Space 131 235,051 $9,460.00 $113,520.00
� FBO Facilities Lease Return to Ci 0.02 $4.84 $4 050.00 $48,600.00
ty s
Fuel Flowage Fees $/Gallon Gals. Sold Fuel Fee Revenue
,� 0.03; 0.05 127,603 $5,050.74
Percent of Gross Receipts n/a
Total FBO Fees to city $53,650.74
� Remaining FBO Operating Revenue $59,869.26
Ratio of Remainng FBO Revenue to Fees 1.1159
�
�
�
�
�
�.
� Revenue Sources Single Uni Airport
Cost Avg. FY 1997
Base Facilities sq fUunit No. Units To. sq ft$/sq fUmt $/sf/ r Rates (estimated)
AIRCRAFT STORAGE UniUMnth To. Units/Mth Annual
� T-Hangars
Small (SEL) 1,400 0 $0.18 $250.00 $0.00 $0.00
Older T-Hangars (Row C) 2,275
� Mid-Size 55x35 1,925
Large (MEL), or with Amenity 2,275 8 18,200 $0.11 $0.76 $250.00 $2,000.00 $24,000.00
Reserved (non-revenue) 2,275 2 4,550 $0.00 $0.00 $0.00 $0.00
Shade Hangars 2,275 40 91,000 $0.07 $1.26 $150.00 $6,000.00 $72,000.00
,� Tie-Downs
Hardstand 1,400 29 40,600 $0.04 $2.33 $50.00 $1,450.00 $17,400.00
Sod 1,400 50 70,000 $0.03 $2.92 $40.00 $2,000.00 $24,000.00
Apron (Transient $5) 1,400
� Reserved-Flt Schl (non-revenue) 1,400
Small (SEL) 1,400
Large (S/MEL) 2,275
Helicopter Pads - 125x125 15,625
Corporate (Bay) Hangars
35 x 40 1,400
35 x 65 2,275
70 x 70 4,900
� 85 x 85 7,225
100 x 85 8,500
100 x 100 10,000
� Average Month/y per sf to FBO $0.07 $1.82
OTHER BLDGS & Concessions
� FBO Terminal 8 Office Bidg 2,214 1 2,214 $0.00
FBO Maintenance Hangar 8,487 1 8,487 $0.00
� SuppI.F60 M. Hgrs. (70x70 ea.) 4,900
Restaurant 6,300
Subtotal, Revenue Lease Space 131 235,051 $11,450.00 $137,400.00
� F80 Facilities Lease Return to City $0.02 $3.73 $5,250.00 $63,000.00
Fuel Flowage Fees $/Gallon Gals. Sold Fuel Revenue
� 0.05 141, 921 $6, 996.22
Percent of Gross Receipts n/a
Total FBO Fees to city $69,996.22
emaining FBO Operating Revenue $67 403.78
� of Remainng FBO Revenue to Fees 0.9630
�
�
�
�
'� Capital Program
Add 17 new T-Hangars (Large, 35x65, two bldgs.). SE Trm. Area
�
� Revenue Sources Single Uni Airport
Cost Avg.
Base Facilities sq ftlunit No. Units To. sq ft$/sq ft/mt $/sf/yr
AIRCRAFT STORAGE
� T-Hangars
Small (SEL) 40x35 1,400 0 0 $0.21 $0.00
Older T-Hangars (Row C) 2,275 10 22,750 $0.12 $0.69
� Mid-Size 55x35 1,925 17 32,725 $0.17 $0.49
Large (MEL) 65x35, or with Amenity 2,275 8 18,200 $0.11 $0.76
Reserved (non-revenue) 2,275 2 4,550 $0.00 $0.00
Shade Hangars 2,275 40 91,000 $0.07 $1.18
� Tie-Downs
Hardstand 1,400 29 40,600 $0.04 $1.94
Sod 1,400 50 70,000 $0.04 $2.33
Apron (Transient $5) 1,400
� Reserved-Flt Schl (non-revenue) 1,400
Small (SEL) 1,400
Large (S/MEL) 2,275
Helicopter Pads - 125x125 15,625
� Corporate (Bay) Hangars
35 x 40 1,400
35 x 65 2,275
� 70 x 70 4,900
85 x 85 7,225
100 x 85 8,500
100 x 100 10,000
� Average $ per sf to FBO
OTHER BLDGS 8 Concessions
� FBO Terminal 8 O�ce Bldg 2,214 1 2,214
FBO Maintenance Hangar 8,487 1 8,487
� SuppI.F60 M. Hgrs. (70x70 ea) 4,900
Restaurant 6,300
Subtotal, Revenue Lease Space 158 290,526
� FBO Facilities Lease Retum to City
Fuel Flowage Fees $/Gallon Gals. Sold
� 0.05 153,310
Percent of Gross Receipts n/a
Total FBO Fees to city
Remaining FBO Opereting Revenue
� Ratio of Remainng FBO Revenue to Fees
�
�
�
�
$0.101 $0.93
02 I $4.61
UniUMnth
$300.00
$275.00
$325.00
$250.00
$0.00
$160.00
$60.00
$50.00
FY 1998
Rates
To. Units�
$0.00
$2,750.00
$5,525.00
$2,000.00
$0.00
$6,400.00
$1,740.00
$2,500.00
Annual
$33,
$0.00
$0.00
520,915.00 $250,980.00
$5,250.00 $63,000.00
Fuel Revenue
$7,565.61
$70,565.61
$180,414.40
2.5567
.75' Rev. Lse Sp $188,235
� Capital Program
�
� Revenue Sources
Base Facilities sq ff/unit No. Units To. sa ft
AIRCRAFT STORAGE
,� T-Hangars
Small (SEL) 1,400
Older T-Hangars 65x35 (Row C) 2,275
� Mid-Size 55x35 1,925
Large (MEL), or with Amenity 2,275
Reserved (non-revenue) 2,275
Shade Hangars 2,275
Tie-Downs
Hardstand 1,400
Sod 1,400
Apron (Transient $5) 1,400
� Reserved-Flt Schl (non-revenue) 1,400
Small (SEL) 1,400
Large (S/MEL) 2,275
Helicopter Pads - 125x125 15,625
Corporate (Bay) Hangars
35 x 40 1,400
35 x 65 � 2,275
70 x 70 4,900
"�' 85 x 85 7,225
100 x 85 8,500
100 x 100 10,000
Average $ per sf to FBO
� OTHER BLDGS 8 Concessions
� FBO Terminal & Office Bldg 2,274
FBO Maintenance Hangar 8,487
� SuppI.FBO M. Hgrs., (70x70 ea.) 4,900
Restaurant 6,300
Subtotal, Revenue Lease Space
� F80 Facilities Lease Retum to City
Fuel Flowage Fees
� Percent of Gross Receipts
Total FBO Fees to city
Remaining FBO Operating Revenue
� Ratio of Remainng FBO Revenue to Fees
�
�
�
�
0 0
10 22,750
17 32,725
8 18,200
2 4,550
40 91,000
29 40,600
50 70,000
Single Uni Airport
Cost Avg.
$/sq ft/mt $/sflyr
$0.21
$0.12
$0.17
$0.14
$0.00
$0.07
$0.04
$0.04
$0.69
$0.49
$0.58
$0.00
$1.18
$1.94
$2.33
UniUMnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.10 $1.03
1 2,214 $0.00
1 8,487
158 290,526
0.06 195,240
n!a
$0.00
FY 1999
Rates
To. Units/Mth
$0.00
$2,750.00
$5,525.00
$2,600.00
$0.00
$6,400.00
$1,740.00
$2,500.00
Annual
$0.
$33,000.
$66, 300.
$31,200.
$0.
$76,800.
$20,880.
$30,000.
521,515.00 $258,1
uel Revenue
$11,714.41
$101,114.41
$157,065.59
1.5533
75' Rev. Lse Sp $193,635
�
Capital Program
�
� Revenue Sources
� Base Facilities sq ft/unit No. Units To. sa ft
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 1,400
� Older T-Hangars 65x35 (Row C) 2,275
Mid-Size 55x35 1,925
Large (MEL), or with Amenity 2,275
Reserved (non-revenue) 2,275
� Shade Hangars 2,275
Tie-Downs
Hardstand 1,400
Sod 1,400
� Apron (Transient $5) 1,400
Reserved-Flt Schl (non-revenue) 1,400
Smail (SEL) 1,400
Large (S/MEL) 2,275
� Helicopter Pads - 125x125 15,625
Corporate (Bay) Hangars
35 x 40 1,400
35 x 65 I 2,275
� 70 x 70 4,900
85 x 85 7,225
100 x 85 8,500
� 100 x 100 10,000
Average $ per sf to F80
OTHER BLDGS 8 Concessions
� FBO Terminal 8 Office Bldg 2,214
� FBO Maintenance Hangar 8,487
SuppI.F60 M. Hgrs., (70x70 ea.) 4,900
Restaurant 6,3�0
Subtotal, Revenue Lease Space
,�
FBO Facilities Lease Return to City
� Fuel Ftowage Fees
Percent of Gross Receipts
Total FBO Fees to city
� Remaining FBO Operatin Revenue
Ratio of Remainng FBO Revenue to Fees
,� .
�
,�
�
0 0
10 22,750
17 32,725
8 18,200
2 4,550
40 91,000
29 40,600
50 70,000
Single Uni
Cost
$/sq ft/mt
$0.21
$0.12
50.17
$0.14
$0.00
$0.07
50.04
$0.04
Airport
Avg.
$0.69
$0.49
$0.58
$0.00
$1.18
$1.94
$2.33
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.10 $1.03
1 2,214 $0.00
1 8
158 290,526
0.06 195,240
n/a
$0.00
FY 1999
Rates
To. Units/Mth
$0.00
$2,750.00
$5, 525.00
$2,600.00
$0.00
$6,400.00
$1, 740.00
$2,500.00
Annual
$0.
$33,000.
$66,300.
$31,200.
$0.
$76,800.
$20,880.
$30,000.
$27,515.00 $258,
uel Revenue
$11,714.41
$101,114.41
$157,065.59
1.5533
75 * Rev. Lse Sp $193,635
Capital Program
Revenue Sources Single Uni Airport
Cost Avg.
Base Facilities No. Units To. sq ft$/sq ft/mt $/sf/yr
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 0 0 $0.21
Older T-Hangars (Row C) 10 22,750 $0.12 $0.69
Mid-Size 55x35 17 32,725 $0.17 $0.49
Large (MEL), or with Amenity 8 18,200 $0.14 $0.58
Reserved (non-revenue) 2 4,550 $0.00 $0.00
Shade Hangars 40 91,000 50.07 $1.18
( Tie-Downs
Hardstand 29 40,600 $0.04 $1.94
� Sod 50 70,000 $0.04 $2.33
Apron (Transient $5)
Helicopter Pads
Corporate (Bay) Hangars
35 x 40
35 x 65
70 x 70
85 x 85
100 x 50
100 x 100
Average $ per sf to FBO
�
OTHER BLDGS 8 Concessions
�
FBO Terminal & Office Bidg
Passenger Office Space
Counter Space
FBO Maintenance Hangar
Supplemental FBO M. Hgrs. (70x70 ea.)
Restaurant
Subtotal, Revenue Lease Space
F80 Lease Return to
�
Percent of Gross Rece
Total FBO Fees to
Remaining FBO Operating Revei
Ratio of Remainng FBO Revenue to f
UniUMnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
0
0
0
0
0
0
$0.10 $1.03
1 2,214 $0.00
�
158 290,526
0.06 290,904
n/a
FY 2000
Rates
To. Units/Mth
$0.00
$2,750.00
$5,525.00
$2,600.00
$0.00
$6,400.00
$1,740.00
$2,500.00
Annual
$0.
$33,000.
$66,300.
$31,200.
$0.
$76,800.
$20,880.
$30,000.
$0.00
$21,515.00 $258,180.00
$7,450.00 $89,400.00
Fuel Revenue
$17,454.22
$106,854.22
$151,325.78
1.4162
.75 ' Rev. Lse Sp $193,635
(Prior)
CIP Item Capital Program
Convert 10 shade hangar units to T-hangar units
Revenue Sources Single Uni Airport
Cost Avg.
Base Faci No. Units To. sq ft$/sq ft/mt $/sf/yr
AIRCRAFT STORAGE
T-Hangars
Small T (SEL) 0 0 $0.21
Older T-Hangars (Row C) 10 22,750 $0.12 $0.69
Mid-Size 55x35 17 32,725 $0.17 $0.49
Large T, or T with Amenity 35 79,625 $0.14 $0.58
Reserved (non-revenue) 2 4,550 $0.00 $0.00
Shade Hangars 30 68,250 $0.07 $1.18
� Tie-Downs
Hardstand 29 40,600 $0.04 $1.94
I Sod 50 70,000 $0.04 $2.33
Apron (Transient $6.50)
Helicopter Pads �
Corporate
35x40
35 x 65
70 x 70
85 x 85
100 x 85
100 x 100
Average S per sf to F80
OTHER BI
FBO Terminal & Office Bldg
Passenger Office Space
Counter Space
FBO Maintenance Hangar
�
Restaurant
Subtotal, Revenue Lease Space
(Bay) Hangars
0 $0.29 $3.48
0
0 $0.28 $3.36
0 $0.27 $3.24
0 $0.26 $3.12
0 $0.26 $3.12
$0.17 $1.03
_DGS 8 Concessions
1 2,214
1 8,487
175 329,201
FBO Lease Retum to City 50.07
Fuel Flowage Fees $/Gallon Gals. Sold
( 0.06 294,209
Percent of Gross Receipts 2.50%
Total FBO Fees to ci
Remainin FBO Operating Revenue
Ratio of Remainng FBO Revenue to Fe�
2001
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
FY 2001
Rates
To. Units/Mth
$0.00
$2, 750.00
$5,525.00
$11, 375.00
$0.00
$4,800.00
$1,740.00
$2,500.00
Annual
$0.
$136
$57
$30,000.
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00
$0.00
$28,690.00 $344,280.00
$21,517.50 $258,210.00
Fuel Revenue
$17,652.56
$275,862.56
$68,417.44
0.2480
.75' Rev. Lse Sp $258,210
CIP Item Capital Progrem CIP Item
Convert Remaining Shade Hangars
Construct Apron Aircraft Tiedowns
Resenred
Small
Large
Convert Hardstands to Lrg.T-Hangars
Cnstr 70x70 Maint. Hgr (trm.)
Cnstr 70x70 Bay Hgr-Midfld
Cnstr 85x85 Bay Hgr-Mdfld
Revenue Sources Single Uni Airport
Cost Avg.
Base Faci No. Units To. sq ft$/sq ftlmt $/sf/yr
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 0 0
Older T-Hangars (Row C) 10 22,750
Mid-Size 55x35 17 32,725
Large (MEL), or with Amenity 81 184,275
Reserved (non-revenue) 2 4,550
Shade Hangars 0 0
I Tie-Downs
Hardstand 0 0
Sod 50 70,000
Apron (Transient - $6.50 ovemight)
Reserved-Flt Schl (non-revenue) 20 28,000
Small (SEL) 21 29,400
Large (MEL) 8 18,200
Helicopter Pads
Corporate 8ay Hangars
35 x 40 0
35x65 0
70 x 70 2 9,800
85 x 85 2 14,450
100 x 85 0
100 x 100 0
Average S per sf to FBO
�
FBO Terminal 8 Office Bldg (T. = 12,600 s�
Passenger Office Space
Counter Space
FBO Maintenance Hangar
Supplemental FBO M. Hgrs. ( 70x70 ea.)
Restaurant
Subtotal, Revenue Lease Space
$0.21
$0.12
$0.17
$0.14
$0.00
$0.07
$0.04
$0.04
$0.14
$0.69
$0.49
$0.58
$0.00
$0.00
$2.33
$0.00
$0.60
$0.97
UniUMnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.00
$195.00
$195.00
FY 2002
Revenue
$0.00
$2,750.00
$5,525.00
$26,325.00
$0.00
$0.00
$0.00
$2, 500.00
$0.00
$4,095.00
$1, 560.00
Annuai
$0.
$33,000.
$66, 300.
$315, 900.
$0.
$0.
$0.
$30,000.
$0.
$49,140.
$18, 720.
$0.29 $3.48 $0.00 $0.00 $0.
$0.28 $3.36 $0.00 $0.00 $0.
$0.28 $3.36 $2,744.00 $5,488.00 $65,856.
$0.27 $3.24 $3,901.50 $7,803.00 $93,636.
$0.26 $3.12 $0.00 $0.00 $0.
50.26 $3.12 $0.00 $0.00 $0.
$0.16 $0.68
1
1 3,300 $2.25 $27.04 $7,434.90 $7,434.90 $89,218.
1 3,000 $1.05 $12.66 $3,164.00 $3,164.00 $37,968.
1 8,487 $0.17 $1.99 $1,410.26 $1,410.26 $16,923.
1 4,900 $0.17 $1.99 $814.22 $814.22 $9,770.
1 6,300 $3,078.50 $3,078.50 $36,942.
219 440,137 $71,947.87 $863,374.
FBO Lease Retum to City 50.12
Fuel Flowage Fees $/Gallon Gals. Sotd
I 0.08 297,553
Percent of Gross Receipts 2.50%
Total FBO Fees to ci
Remainin FBO Operetin Revenue
Ratio of Remainng FBO Revenue to Fees
2002
68
C647,530.86
uel Revenue
$23,804.22
,039.4a
0.2861
75 " Rev. Lse Sp $647,531
CIP Item Capital Program (revenue development assumes prior -yr completion of txwy 8 infrestructure)
45 Construct 40x35 T-Hgrs, SE Trm. Area
Revenue Sources S
Base Faci No. Units To. sq ft$
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 15 21,000
Older T-Hangars (Row C) 10 22,750
Mid-Size 55x35 17 32,725
Large (MEL), or with Amenity 81 184,275
Reserved (non-revenue) 2 4,550
Shade Hangars 0 0
I Tie-Downs
Hardstand I 0 0
Sod (overflow parking, S. Terminal Area) 9 12,600
I Apron (Transient $6.50)
Reserved-Fit Schl (non-revenue) 20 28,000
Small (SEL) 21 29,400
Large (MEL) 8 18,200
Helicopter Pads
Corporate Bay Hangars
35x40 0 0
35 x 65 0 0
70 x 70 2 9,800
85 x 85 2 14,450
100 x 85 0 0
100 x 100 0 0
Average $ per sf to FBO
OTHER BLDGS 8 Concessions
FBO Terminal 8 O�ce Bldg 1
Passenger Office Space 1 3,300
Counter Space 1 3,000
FBO Maintenance Hangar 1 8,487
Supplemental FBO M. Hgrs. ( 70x70 ea.) 1 4,900
Restaurant 1 6,300
Subtotal, Revenue Lease Space 193 403,737
ngle Uni Airport
Cost Avg.
sq ft/mt $/sf/yr
$0.21 $0.39
$0.12 $0.69
$0.17 $0.49
$0.14 $0.58
$0.00 $0.00
$0.07
$0.1
$0.28
$0.27
$0.26
$0.26
a0.16
$2.25
$1.05
$0.17
$0.17
$0.00
$2.33
$0.00
$0.60
$0.97
$3.48
$3.36
$3.36
$3.24
$3.12
$3.12
$0.64
$27.04
$12.66
$1.99
$1.99
FBO Lease Retum to City 50.14 50.60
Fuel Flowage Fees $/Gallon Gals. Sold
I 0.08 300,934
Percent of Gross Receipts 2.50%
Total FBO Fees to ci
Remaining FBO O ratin Revenue
Ratio of Remainng FBO Revenue to Fees
2003
UniUMnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.00
$195.00
$195.00
$0.00
$0.00
$2,744.00
$3,901.50
$0.00
$0.00
$0.00
$7,434.90
$3,164.00
$1,410.26
$814.22
$3,078.50
FY 2003
Rates
To. Units,
$4, 500.00
$2,750.00
$5,525.00
$26,325.00
$0.00
$0.00
$0.00
$450.00
$0.00
$4,095.00
$1,560.00
$0.00
$0.00
$5,488.00
$7, 803.00
$0.00
$0.00
$7,434.90
$3,164.00
$1,410.26
$814.22
$3,078.50
a74,397.87
$54,000.
$33,000.
$66,300.
$315,900.
$0.
$0.
$0.
$5,400.
$0.
$49,140.
$18,720.
$0.
$0.
$65,856.
$93,636.
$0.
$0.
$89,218.80
$37,968.00
$16,923.08
$9,770.60
$36, 942.00
$892,774.48
uei rcevenue
$24,074.72
$199,118.9C
0.2871
75' Rev. Lse Sp $669,581
CIP Item Capital Program
48 Construct New 100x85 Bay Hgrs, NE Area
Revenue Sources S
Base Faci No. Units To. sq ft$,
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 15 21,000
Older T-Hangars (Row C) 10 22,750
Mid-Size 55x35 17 32,725
Large (MEL), or with Amenity 81 184,275
Reserved (non-revenue) 2 4,550
Shade Hangars 0 0
I Tie-Downs
Hardstand 0 0
Sod 9 12,600
Apron (Transient $6.50)
Reserved-Flt Schl (non-revenue) 20 28,000
Small (SEL) 21 29,400
Large (MEL) 8 18,200
Helicopter Pads
Corporate Bay Hangars
35 x 40 0 0
35 x 65 0 0
70 x 70 2 9,800
85 x 85 2 14,450
100 x 85 7 59,500
100 x 100 0 0
Average $ per sf to FBO
OTHER BLDGS 8 Concessions
FBO Terminal 8 Office Bldg 1
Passenger O�ce Space 1 3,300
Counter Space 1 3,000
FBO Maintenance Hangar 1 8,487
Supplemental FBO M. Hgrs. (70x70 ea.) 1 4,900
Restaurant 1 6,300
Subtotal, Revenue Lease Space 200 463,237
gle Uni Airport
Cost Avg.
a ft/mt $/sf/vr
$0.21
$0.12
$0.17
$0.14
$0.00
$0.07
$0.04
$0.04
0
$0.14
$0.09
$0.39
$0.69
$0.49
$0.58
$0.00
$0.00
$2.33
$0.00
$0.60
$0.97
$0.29 $3.48
$0.28 $3.36
$0.28 $3.36
$0.27 $3.24
$0.26 $3.12
$0.26 $3.12
$0.16 $0.64
$2.25 $27.04
$1.05 $12.66
$0.17 $1.99
$0.17 $1.99
FBO Lease Retum to City a0.30
Fuel Flowage Fees $/Gallon Gals. Sold
I 0.08 304,354
Percent of Gross Receipts 2.50%
Total FBO Fees to city
Remaining FBO Operating Revenue
Ratio of Remainng FBO Revenue to Fe�
2004
50.28
Unit/Mnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.00
$195.00
$195.00
FY 2004
Rates
To. Unitsi
$4,500.00
$2,750.00
$5,525.00
$26,325.00
$0.00
$0.00
$0.00
$450.00
$0.00
$4,095.00
$1,560.00
Annual
$54,000.00
$33,000.00
$66,300.00
$315,900.00
$0.00
$0.00
$0.00
$5,400.00
$0.00
$49,140.00
$18,720.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$2,744.00 $5,488.00 $65,856.00
$3,901.50 $7,803.00 $93,636.00
$15,470.00 $108,290.00 $1,299,480.00
$0.00 $0.00 $0.00
$0.00
$7,434.90 $7,434.90 $89,218.80
$3,164.00 $3,164.00 $37,968.00
$1,410.26 $1,410.26 $16,923.08
$814.22 $814.22 $9,770.60
$3,078.50 $3,078.50 $36,942.00
$182,687.87 $2,192,254.48
$24,348.29
539.15
715.33
0.3139
75 " Rev. Lse Sp $1,644,191
CIP Item Capital Program
51 Construct New 100x85 Bay Hgr., Midfield
Revenue Sources Single Uni Airport
Cost Avg.
Base Faci No. Units To. sq ft$/sq ft/mt $/sf/yr
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 15 21,000
Older T-Hangars (Row C) 10 22,750
Mid-Size 55x35 17 32,725
Large (MEL), or with Amenity 81 184,275
Reserved (non-revenue) 2 4,550
Shade Hangars 0 0
I Tie-Downs
Hardstand I 0 0
Sod 9 12,600
Apron (Transient $6.50)
Reserved-Flt Schl (non-revenue) 20 28,000
Small (SEL) 21 29,400
Large (MEL) 8 18,200
Helicopter Pads
Corporate Bay Hangars
35 x 40 0 0
35 x 65 0 0
70 x 70 2 9, 800
85 x 85 2 14,450
100 x 85 8 68,000
100 x 100 0 0
Average $ per sf to F80
OTHER BLDGS 8 Concessions
FBO Terminal 8� Office Bldg 1
Passenger Office Space 1 3,300
Counter Space 1 3,000
FBO Maintenance Hangar 1 8,487
Supplemental FBO M. Hgrs. ( 70x70 ea.) 1 4,900
Restaurant 1 6,300
Subtotal, Revenue Lease Space 201 471,737
50.21
$0.12
$0.17
$0.14
$0.00
$0.07
$0.04
$0.04
0
$0.14
$0.09
$0.29
$0.28
$0.28
$0.27
$0.26
$0.26
50.16
$0.39
$0.69
$0.49
$0.58
$0.00
$0.00
$2.33
$0.00
$3.12
$3.12
$0.64
$2.25 $27.04
$1.05 $12.66
$0.17 $1.99
$0.17 $1.99
F80 Lease Retum to City 50.34 50.24
Fuel Flowage Fees $/Gallon Gals. Sold
I 0.10 308,219
Percent of Gross Receipts 2.50%
Total FBO Fees to city
Remaining FBO Operating Revenue
Ratio of Remainng FBO Revenue to Fees
2005
UniUMnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.00
$195.00
$195.00
FY 2005
Rates
To. Units/Mth
$4, 500.00
$2,750.00
$5,525.00
$26,325.00
$0.00
$0.00
$0.00
$450.00
$0.00
$4,095.00
$1,560.00
Annual
$54,000.
$33,000.
$66, 300.
$315, 900.
$0.
$0.
$0.
$5,400.
$0.
$49,140.
$18, 720.
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$2,744.00 $5,488.00 $65,856.00
$3,901.50 $7,803.00 $93,636.00
$17,680.00 $141,440.00 $1,697,280.00
$0.00 $0.00 $0.00
$0.00
$7,434.90 $7,434.90 $89,218.80
$3,164.00 $3,164.00 $37,968.00
$1,410.26 $1,410.26 $16,923.08
$814.22 $814.22 $9,770.60
$3,078.50 $3,078.50 $36,942.00
$215,837.87 $2,590,054.48
$161,878.40 $1,942,540.86
Fuel Revenue
$30,821.94
$1.973,362.8
0.3125
75 " Rev. Lse Sp $1,942,541
CIP Item Capital Progrem
53 Construct Helicopter (small) Pad, Trm. Area
55 Construct (Bell 205) Helicopter Pad, NE Area
Revenue Sources
Base Faci No. Units To. s ft
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 46 64,400
Older T-Hangars (Row C) 10 22,750
Mid-Size 55x35 17 32,725
Large (MEL), or with Amenity 81 184,275
Reserved (non-revenue) 2 4,550
Shade Hangars 0 0
I Tie-Downs
Hardstand 0 0
Sod 9 12,800
Apron (Trensient $6.50)
Reserved-Flt Schl (non-revenue) 20 28,000
Small (SEL) 27 29,400
Large (MEL) 8 18,200
Helicopter Pads 4 62,500
Corporate Bay Hangars
35 x 40 8 11,200
35x65 0 0
70 x 70 2 9,800
85 x 85 2 14,450
100 x 85 8 68,000
100 x 100 2 20,000
A verege S per sf to FBO
FBO Terminal 8 O�ce Bldg
PassengerOffice Space
Counter Space
FBO Maintenance Hangar
Supplemental FBO M. Hgrs. ( 70x70 ea.)
Restaurant
Subtotal, Revenue Lease Space
Fuel Flowage
�
Percent of Gross Rec
2006
Single Uni Airport
Cost Avg.
$/sq fUmt $/sfNr
$0.21
$0.12
$0.17
$0.14
$0.00
$0.07
$0.04
$0.04
0
$0.14
$0.09
$0.05
$0.29
$0.28
$0.28
$0.27
$0.26
$0.26
50.15
t
1 3,300 S2
1 3,000 $1
1 8,487 $0
1 4,900 $0
1 6,300
246 608,837
Retum to City � 50.33
$/Gallon Gals. Sold
0.10 1,588,245
2.50%
Fees to city
FBO Operatlng Revenue
�mainna FBO Revenue to Fees
EO
$0
SO
SO
$0.
$1.
$3.36
$3.3fi
53.24
$3.12
53.12
50.64
$27.04
a�2.ss
$1.99
$1.99
CtP Item
57 Construct 40x35 T Hgrs. SW, Ph. 1
58 Construct 40x35 Bay Hgrs. SW, Ph. 1
59 Construct 100x100 Bay Hgrs. SW. Ph. t
UniUMnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.00
$195.00
$195.00
$B00.00
$3,248.00
$0.00
$2,744.00
$3, 901.50
$17,680.00
$5,200.00
$0.00
$7,434.90
$3,164.00
$1,410.26
$814.22
$3,078.50
FY 2006
Rates
To. Units
$13,800.00 $165,6
$2,750.00 $33,0
$5,525.00 $66,3
$26,325.00 $315,9
50.00
$0.00
$0.00
$450.00 $5,4
$0.00
$4,095.00 $49,1
$1,560.00 $18,7
$3,200.00 $38,4
$25,984.00 $311,8
$0.00
$5,488.00 $65,e
$7,803.00 $93,E
$141,440.00 $1,697,2
$10,400.00 $124,8
$7,434.90 $89,218
$3,164.00 $37,968
$1,410.26 $16,923
$814.22 $9,770
$3,078.50 $36,942
E264,721.s7 53,176,662
Projection
Cumulative
Total
$828,000.00
$165,000.00
$331, 500.00
$1, 579, 500.00
$0.00
$0.00
$0.00
$27,000.00
$1, 559, 040.00
$329,280.00
$468,180.00
$6,486,400.00
$624,000.00
$184,710.
$15, 883, 312.
5198,541.40 $2,382,496.86 $11,912,484.29
Fuel Revenue
$31,172.19 $174,928.10
$2,413,669.05 $12,068,345.23
5762,993.43 $3,814,967.16
0.3161
75 ' Rev. Lse Sp $2,382,497
CIP Item Capital Program
70 Construct New 40x35 T Hgrs, SW Ph 2
71 Construct New 100x85 Bay Hgrs, SW Ph 2
Revenue Sources S
Base Faci No. Units To. sq ft$,
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 114 159,600
Older T-Hangars (Row C) 10 22,750
Mid-Size 55x35 17 32,725
Large (MEL), or with Amenity 81 184,275
Reserved(non-revenue) 2 4,550
Shade Hangars 0 0
� Tie-Downs
Hardstand 0 0
Sod 9 12,600
Apron (Transient $6.50)
Reserved-Flt Schl (non-revenue) 20 28,000
Small (SEL) 21 29,400
Large (MEL) 8 18,200
Helicopter Pads 4 62,500
Corporate Bay Hangars
35 x 40 8 11,200
35 x 65 0 0
70 x 70 2 9,800
85 x 85 2 14,450
100 x 85 14 119,000
100 x 100 2 20,000
Average $ per sf to FBO
OTHER BLDGS 8 Concessions
FBO Terminal 8 Office Bldg 1
Passenger Office Space 1 3,300
Counter Space 1 3,000
FBO Maintenance Hangar 1 8,487
Supplemental FBO M. Hgrs. (70x70 ea.) 1 4,900
Restaurant 1 6,300
Subtotal, Revenue Lease Space 320 755,037
Cost
a ft/mt
$0.21
$0.12
$0.17
$0.14
$0.00
$0.07
$0.04
$0.04
0
$0.14
$0.09
$0.05
$0.29
$0.28
$0.28
$0.27
$0.26
$0.26
$0.15
$2.25
$1.05
$0.17
$0.17
FBO Lease Retum to City 50.57
Fuel Flowage Fees $/Gallon Gals. Sold
I 0.10 0
Percent of Gross Receipts 2.50%
Total FBO Fees to city
Remaining FBO Opereting Revenue
Ratio of Remainng FBO Revenue to Fees
2007
Avg.
$0.39
$0.69
$0.49
$0.58
$0.00
$0.00
$2.33
$0.00
$0.60
$0.97
$1.63
$3.24
$3.12
$3.12
$0.64
UniUMnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.00
$195.00
$195.00
$800.00
$3,248.00
$0.00
$2,744.00
$3, 901.50
$30,940.00
$5,200.00
$0.00
$27.04 $7,434.90
$12.66 $3,164.00
$1.99 $1,410.26
$1.99 $814.22
$3,078.50
i0.15
FY 2007
Rates
To. Units/Mth Annual
$34,200.00 $410,400.00
$2,750.00 $33,000.00
$5,525.00 $66,300.00
$26,325.00 $315,900.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$450.00 $5,400.00
$0.00 $0.00
$4,095.00 $49,140.00
$1,560.00 $18,720.00
$3,200.00 $38,400.00
$25,984.00 $311,808.00
$0.00 $0.00
$5,488.00 $65,856.00
$7,803.00 $93,636.00
$433,160.00 $5,197, 920.00
$10,400.00 $124,800.00
$7,434.90 $89,218.
$3,164.00 $37,968.
$1,410.26 $16,923.
$814.22 $9,770.
$3,078.50 $36,942.
$576,841.87 $6,922,102.
631.40
uei Kevenue
$31,526.42
999
0.3�
75' Rev. Lse Sp $5,191,577
CIP Item Capital Program
Revenue Sources
Base Faci No. Units To. sq ft
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 114 159,600
Older T-Hangars (Row C) 10 22,750
I 17 32,725
Large (MEL), or with Amenity 81 184,275
Reserved (non-revenue) 2 4,550
Shade Hangars 0 0
I Tie-Downs
Hardstand 0 0
Sod 9 12,600
I Apron (Transient $6.50)
Reserved-Flt Schl (non-revenue) 20 28,000
Small (SEL) 21 29,400
Large (MEL) 8 18,200
Helicopter Pads 4 62,500
Corporate Bay Hangars
35 x 40 8 11,200
35 x 65 0 0
70 x 70 2 9,800
85 x 85 2 14,450
100 x 85 14 119,000
100 x 100 2 20,000
Average $ per sf to F80
OTHER BLDGS 8 Concessior
FBO Terminal 8 Office Bldg 1
Passenger Office Space 1 3,300
Counter Space 1 3,000
FBO Maintenance Hangar 1 8,487
Supplemental FBO M. Hgrs. (70x70 ea.) 1 4,900
Restaurant 1 6,300
Subtotal, Revenue Lease Space 320 755,037
Fuel Flowage
�
Percent of Gross Rec
2008
to
Single Uni Airport
Cost Avg.
$/sq ft/mt $/sf/yr
$0.21
$0.12
$0.17
$0.14
$0.00
$0.07
$0.04
$0.04
0
$0.14
$0.09
$0.05
$0.29
$0.28
$0.28
$0.27
$0.26
$0.26
$0.15
$0.39
$0.69
$0.49
$0.58
$0.00
$0.00
$2.33
$0.00
$0.60
$0.97
$1.63
$3.12
$3.12
$0.64
UniVMnth
5300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.00
$195.00
$195.00
$800.00
$3,248.00
$0.00
$2,744.00
$3,901.50
$30,940.00
$5,200.00
$0.00
$2.25 $27.04 $7,434.90
$1.05 $12.66 $3,164.00
$0.17 $1.99 $1,410.26
$0.17 $1.99 $814.22
$3,078.50
).57 $0.15
0.10 0
ipts 2.50°/a
FBO Fees to city
iining FBO Opereting Revenue
of Remainng FBO Revenue to Fees
FY 2008
Rates
To. Units/Mth Annual
$34,200.00 $410,400.00
$2,750.00 $33,000.00
$5,525.00 $66,300.00
$26,325.00 $315,900.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$450.00 $5,400.00
$0.00 $0.00
$4,095.00 $49,140.00
$1,560.00 $18,720.00
$3,200.00 $38,400.00
$25,984.00 $311,808.00
$0.00 $0.00
$5,488.00 $65,856.00
$7,803.00 $93,636.00
$433,160.00 $5,197,920.00
$10,400.00 $124,800.00
$7,434.90 $89,21
$3,164.00 $37,9E
$1,410.26 $16,92
$814.22 $9,77
$3,078.50 $36,94
$576,841.87 $6,922,1d
$432, 631.40 $5,191, 576. 86
Fuel Revenue
$31, 884.67
75 ` Rev. Lse Sp $5,191,577
CIP Item Capital Program
77 Construct New 35x65 Bay Hgrs, SW Ph 3
Revenue Sources
Base Faci No. Units To. sq ft
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 114 159,600
Older T-Hangars (Row C) 10 22,750
Mid-Size 55x35 17 32,725
Large (MEL), or with Amenity 81 184,275
Reserved (non-revenue) 2 4,550
Shade Hangars 0 0
I Tie-Downs
Hardstand I 0 0
Sod 9 12,600
Apron (Transient $6.50)
Reserved-Flt Schl (non-revenue) 20 28,000
Small (SEL) 21 29,400
Large (MEL) 8 18,200
Helicopter Pads 4 62,500
Corporate Bay Hangars
35 x 40 8 11,200
35 x 65 5 11,375
70 x 70 2 9,800
85 x 85 2 14,450
100 x 85 14 119,000
100 x 100 2 20,000
Average $ per sf to FBO
FBO Terminal 8 Office Bldg
Passenger Office Space
Counter Space
FBO Maintenance Hangar
Supplemental FBO M. Hgrs. (70x70 ea.)
Restaurant
Subtotal, Revenue Lease Space
1
1 3, 300
1 3,000
1 8,487
1 4,900
1 6, 300
325 766,412
igle Uni Airport
Cost Avg.
�a fUmt $/sflvr
$0.21
$0.12
$0.17
$0.14
$0.04
$0.04
0
$0.14
$0.09
$0.05
$0.29
$0.28
$0.28
$0.27
50.26
$0.26
$0.15
$0.39
$0.69
$0.49
$0.58
$0.00
$0.00
$2.33
$0.00
$0.60
$0.97
$1.63
$3.48
$3.36
$3.36
$3.24
$3.12
$3.12
$0.64
$2.25 $27.04
$1.05 $12.66
$0.17 $1.99
$0.17 $1.99
F80 Lease Retum to City 50.58
Fuel Flowage Fees $/Gallon Gals. Sold
I 0.10 0
Percent of Gross Receipts 2.50%
Total FBO Fees to ci
Remaining FBO O rating Revenue
Ratio of Remainng FBO Revenue to Fees
2009
14
UniUMnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.00
$195.00
$195.00
$800.00
$3,248.00
$3,185.00
$2,744.00
$3, 901.50
$30, 940.00
$5,200.00
$0.00
$7,434.90
$3,164.00
$1,410.26
$814.22
$3,078.50
FY 2009
Rates
To. Units/Mth Annual
$34,200.00 $410,400.
$2,750.00 $33,000.
$5,525.00 $66,300.
$26,325.00 $315,900.
$0.00 $0.
$0.00 $0.
$0.00 $0.
$450.00 $5,400.
$0.00 $0.
$4,095.00 $49,140.
$1,560.00 $18,720.
$3,200.00 $38,400.
$25,984.00 $311,808.
$15,925.00 $191,100.
$5,488.00 $65,856.
$7,803.00 $93,636.
$433,160.00 $5,197,920.
$10,400.00 $124,800.
$7,434.90 $89,21
$3,164.00 $37,96
$1,410.26 $16,92
$814.22 $9,77
$3,078.50 $36,94
$592,766.87 $7,113,20
15 $5,334,901.86
Fuel Revenue
$32,034.04
75 * Rev. Lse Sp $5,334,902
CIP Item Capital Program
Revenue Sources
Base Faci No. Units To. sq ft
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 114 159,600
Older T-Hangars (Row C) 10 22,750
Mid-Size 55x35 17 32,725
Large (MEL), or with Amenity 81 184,275
Reserved (non-revenue) 2 4,550
Shade Hangars 0 0
� Tie-Downs
Hardstand 0 0
Sod 9 12,600
Apron (Transient $6.50)
Reserved-Fit Schl (non-revenue) 20 28,000
Small (SEL) 21 29,400
Large (MEL) 8 18,200
Helicopter Pads 4 62,500
Corporate Bay Hangars
35 x 40 8 11,200
35 x 65 5 11,375
70 x 70 2 9,800
85 x 85 2 14,450
100 x 85 14 119,000
100 x 100 2 20,000
Average $ per sf to F80
FBO Terminal 8 Office Bldg
Passenger O�ce Space
Counter Space
FBO Maintenance Hangar
Supplemental FBO M. Hgrs. (70x70 ea.)
Restaurant
Subtotal, Revenue Lease Space
1
1 3, 300
1 3,000
1 8,487
1 4, 900
1 6, 300
325 766,412
Single Uni Airport
Cost Avg.
$/sq ft/mt $/sf/yr
$0.21
$0.12
$0.17
$0.14
$0.00
$0.07
$0.04
$0.14
$0.09
$0.05
$0.29
$0.28
$0.28
$0.27
$0.26
$0.26
$0.15
$2.25
$1.05
$0.17
$0.17
FBO Lease Retum to City 50.58
Fuel Flowage Fees $lGallon Gals. Sold
I 0.10 0
Percent of Gross Receipts 2.50%
Total FBO Fees to ci
Remainin FBO Opereting Revenue
Ratio of Remainng FBO Revenue to Fees
2010
$0.39
$0.69
$0.49
$0.58
$0.00
$0.00
$2.33
$0.00
$0.60
$0.97
$1.63
$3.48
$3.36
53.36
$3.24
$3.12
$3.12
$0.64
$27.04
$12.66
$1.99
$1.99
UniUMnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.00
$195.00
$195.00
$800.00
$3,248.00
$3,185.00
$2,744.00
$3,901.50
$30,940.00
$5,200.00
$0.00
$7,434.90
$3,164.00
$1,410.26
$81422
$3,078.50
FY 2010
Rates
To. Units/Mth Annual
$34,200.00 $410,400.
$2,750.00 $33,000.
$5,525.00 $66,300.
$26,325.00 $315,900.
$0.00 $0.
$0.00 $0.
$0.00 $0.
$450.00 $5,400.
$0.00 $0.
$4,095.00 $49,140.
$1,560.00 $18,720.
$3,200.00 $38,400.
$25,984.00 $311,808.
$15,925.00 $191,100.
$5,488.00 $65,856.
$7,803.00 $93,636.
$433,160.00 $5,197,920.
$10,400.00 $124,800.
$7,434.90 $89,218.
$3,164.00 $37,968.
$1,410.26 $16,923.
$814.22 $9,770.
$3,078.50 $36,942.
$592,766.87 $7,113,202.
15 $5,334,901.86
Fuel Revenue
$48, 310.79
$5,383,212.6
$1,729,989.8
0.321
75 * Rev. Lse Sp $5,334,902
CIP Item Capital Program
85 Construct New 85x85 Bay Hgrs, NW Area
Revenue Sources Single Uni Airport
Cost Avg.
Base Faci No. Units To. sq ft$/sa fUmt $/sf/vr
AIRCRAFT STORAGE
T-Hangars
Small (SEL) 114 159,600
Older T-Hangars (Row C) 10 22,750
Mid-Size 55x35 17 32,725
Large (MEL), or with Amenity 81 184,275
Reserved (non-revenue) 2 4,550
Shade Hangars 0 0
I Tie-Downs
Hardstand 0 0
Sod 9 12,600
Apron (Transient $6.50)
Reserved-Flt Schl (non-revenue) 20 28,000
Small (SEL) 21 29,400
Large (MEL) 8 18,200
Helicopter Pads 4 62,500
Corporate Bay Hangars
35 x 40 8 11,200
35 x 65 5 11,375
70 x 70 2 9,800
85 x 85 6 43,350
100 x 85 14 119,000
100 x 100 2 20,000
Average $ per sf to FBO
OTHER BLDGS 8 Concessions
FBO Terminal 8 Office Bldg 1
Passenger Office Space 1 3,300
Counter Space 1 3,000
FBO Maintenance Hangar 1 8,487
Supplemental FBO M. Hgrs. (70x70 ea.) 1 4,900
Restaurant 1 6,300
Subtotal, Revenue Lease Space 329 795,312
$0.21
$0.12
$0.17
$0.14
$0.00
$0.07
$0.1
$0.27
$0.26
$0.26
$0.15
$2.25
$1.05
$0.17
$0.17
FBO Lease Return to City 50.62
Fuel Flowage Fees $/Gallon Gals. Sold
I 0.10 0
Percent of Gross Receipts 2.50%
Total FBO Fees to ci
Remainin FBO Operating Revenue
Ratio of Remainng FBO Revenue to Fees
2011
$0.39
$0.69
$0.49
$0.58
$0.00
$0.00
$2.33
$0.00
$0.60
$0.97
$1.63
$3.48
$3.36
$3.36
$3.24
$3.12
$3.12
$0.64
UniUMnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$60.00
$50.00
$0.00
$195.00
$195.00
$800.00
$3,248.00
$3,185.00
$2, 744.00
$11,704.50
$30,940.00
$5,200.00
$0.00
$27.04 $7,434.90
$12.66 $3,164.00
$1.99 $1,410.26
$1.99 $814.22
$3,078.50
C0.13
FY 2011
Rates
To. Units/Mth Annual
$34,200.00 $410,400.
$2,750.00 $33,000.
$5,525.00 $66,300.
$26,325.00 $315,900.
$0.00 $0.
$0.00 $0.
$0.00 $0.
$450.00 $5,400.
$0.00 $0.
$4,095.00 $49,140.
$1,560.00 $18,720.
$3,200.00 $38,400.
$25,984.00 $311,808.
$15,925.00 $T91,100.
$5,488.00 $65,856.
$70,227.00 $842,724.
$433,160.00 $5,197,920.
$10,400.00 $124,800.
$7,434.90 $89,218.
$3,164.00 $37,968.
$1,410.26 $16,923.
$814.22 $9,770.
$3,078.50 $36,942.
$655,190.87 $7,862,290.
15
5, 896, 717:86
uel Revenue
$48, 859.78
$5,945,577.6
$1,916,712.8
0.322
75' Rev. Lse Sp $5,896,718
CIP Item Capital Program
87 Construct New 35x40 T Hgrs, NW Area
Sources Single Uni
Cost
I No. Units To. sq ft S/sG fVmt
� T-Hangars
Small (SEL) 119 166,600
Older T-Hangars (Row C) 10 22,750
Mid-Size 55x35 17 32,725
Large (MEL), or with Amenity 81 184,275
Reserved (non-revenue) 2 4,550
Shade Hangars 0 0
I Tie-Downs
Hardstand 0 0
Sod 9 12,600
Apron (Transient $6.50)
Reserved-Flt Schl (non-revenue) 20 28,000
Small (SEL) 21 29,400
Large (MEL) 8 18,200
Helicopter Pads 4 62,500
Corporate 8ay Hangars
35 x 40 8 11,200
35 x 65 5 17,375
70 x 70 2 9,800
85 x 85 6 43,350
100 x 85 14 119,000
100 x 100 2 20,000
Average S per sf to FBO
OTHER BLDGS 8 Concessions
FBO Terminal & Office Bldg 1
Passenger Office Space 1 3,300
Counter Space 1 3,000
FBO Maintenance Hangar 1 8,487
Supplemental FBO M. Hgrs. (70x70 ea.) 1 4,900
Restaurant 1 6,300
Subtotal, Revenue Lease Space 334 802,312
FBO Lease
Fuel Flowage Fees
�
Percent of Gross Receipts
2012
to
$0.21
$0.12
$0.17
$0.14
$0.00
$0.07
$o.oa
$0.04
0
30.14
$0.09
$0.05
$0.29
$0.28
$0.28
$0.27
$0.26
$0.26
$0.15
$1
$0
$0
0.10 0
2.50%
'ees to city
FBO Oaeratina Revenue
Avg.
ao.
ao.
$0.
ao.00
$2.33
$0.00
$0.60
$0.97
$1.63
53.48
$3.36
33.36
$3.24
$3.12
$3.12
$0.64
$27.04
$12.66
$1.99
$1.99
UniUMnth
$300.00
$275.00
$325.00
$325.00
$0.00
$160.00
$so.00
$50.00
$0.00
$195.00
$195.00
$800.00
53,248.00
$3,185.00
$2,744.00
$17,704.50
$30,940.00
$5,200.00
$0.00
$7,434.90
$3,164.00
$1,410.26
$814.22
$3,078.50
FY 2012
Rates
To. Units/Mth Annua
$35,700.00 $428,4
$2,750.00 $33,Q
$5,525.00 $66,3
$26,325.00 $315,9
$0.00
$0.00
$0.00
$450.00 $5,4
$0.00
$4,095.00 $49,1
$1,560.00 $18,7
$3,200.00 $38,4
$25,984.00 $311,8
$75,925.00 $191,1
$5,488.00 $65,e
$70,227.00 $842,7
$433,160.00 $5,197,5
$10,400.00 $124,8
$7.434.90 $89,21
$3,164.00 $37,9E
$1,410.26 $16,9e
$874.22 $9,77
$3,078.50 $36,94
E656,690.87 E7,880,29
2020 Projection
:umulative 2010-2
Total Years
10
$4,284,000.00
$330,000.00
$663,000.00
$3,159,000.00
$0.00
$0.00
$0.00
$54,000.00
$0.00
$491,400.00
$187,200.00
$384,000.00
$3,118, 080.00
$1,911,000.00
$658,560.00
$8,427,240.00
$51, 979, 200.00
$1,248,000.00
$369,420.00
$78,802,904.78
5492,518.15 $5,910,217.86 $59,102,178.59
Fuel Revenue
$49,415.00 $614,353.97
E5,959,632.86 $59,596,328.59
51,920,657.62 $19,206,576.19
0.3223
75 ` Rev. Lse Sp $5,910,218