CREATIVE/BEERS CHANGE ORDER #7
CHANGE
ORDER
replication of
PJA Document 0701
PROJECT:
Clearwater Municipal Services Center CHANGE ORDER NUMBER:
Seven (7)
INITIATION DATE:
11/24/97
TO (Contractor): Creative/Beers, a Joint Venture
P.O. Box 1728
Clearwater, FL 34617-1728
ARCHITEcrs PROJECT NO:
2846.13
CONTRACT FOR: Construction
CONTRACT DATE: August 15, 1994
You are directed to make the following changes in this Contract:
Decrease the GMP by the issuance of an advance return of a portion of GMP cost savings.
~ ~dlx A for add",onol terms and cond~lons of the Chango Ordor.
Total (advance return of cost savings) of Change Order #7
($353,129.00)
Not valid until signed by both the Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The original (CoFltraGt Sl.Ill'l) (Guaranteed Maximum Cost) was........................................................... $
Net change by previously authorized Change Orders........................................................................... $
The (CoRtrast Sblm)(Guaranteed Maximum Cost)prior to this Change Order was............................... $
The (CoRtraGt Sl.Ill'l)(Guaranteed Maximum Cost) will be (increaseEl)(decreased)(blRGhaRgeEl)
by this Change Order.... ................................................................. .... ......... .................. ................... $
The new (ClilRtraGt Sl.Im)(Guaranteed Maximum Cost) including this Change Order will be........ $
The Contract Time will be (iRGreaseEl)(decreaseEl)(unchanged) by
The Date of Substantial Completion as of the date of this Change Order therefore is
15,875,000.00
(3,926,371.00)
11,948,629.00
(353,129.00)
11,595,500.00
(0 ) Days
January 30, 1998
B:
Authorized:
City of Clearwater
Owner
P.O. Box 4748
Clearwater, FL 34618
Rowe Architects Incorporated
Architect
100 Madison St., Suite 200
~
B:_~
Date: IIj 2..191
Creative/Beers, a Joint Venture
Contractor
P.O. Box 17
Clearwate
'By:
Date:
Date:
CHANGE
ORDER
.
a. ..
,,:.
e
replication of
AJA Document G701
PROJECT:
Clearwater Municipal Services Center CHANGE ORDER NUMBER:
Seven (7)
INITtA TION DATE:
11/24/97
TO (Contractor): Creative/Beers, a Joint Venture
P.O. Box 1728
Clearwater, FL 34617-1728
ARCHITECT'S PROJECT NO:
2846.13
CONTRACT FOR: Construction
CONTRACT DATE: August 15, 1994
You are directed to maKe the following changes In this Contract:
Decrease the GM? oy the issuance of an advance return of a portion of GMP cost savings.
{see Appendix A for eddOlonellerm. and condition. of the Change Order.
Total (advance return of cost savings) of Change Order #7
($353.129.00)
Not valid until signed by both the Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The original (Contrast Swm) (Guaranteed Maximum Cost) was......................................................... $
Net change by previously authorized Change Orders........................................................................... $
The (ContFast Swm)(Guaranteed Maximum Cost)prior to this Change Order was............................... $
The (Contrast Sl:Im)(Guaranteed Maximum Cost) will be (insreasfKI)(decreased)(l:IAGhangeEl)
by thIS Change Order................................................................................................................ ..... $
The new (Contrast Swm)(Guaranteed Maximum Cost) Including this Change Order will be....... $
The Contract Time will be (insreaseEl)(ElesreaseEl)(unchanged) by
The Date of Substantial Completion as of the date of this Change Order therefore is
15,875,000.00
(3,926,371.00)
11,948,629.00
(353.129.00)
11.595.500.00
(0 ) Days
January 30. 1998
Rowe Architects Incorporated
Architect
100 Madison St.. Suite 200
Ta~3602 -( _
By:~I//J~
Date: ~/ts/ fJ
Creative/Beers, a Joint Venture
Contractor
P.O. Box 1728
Clearwater, 346 8
Authorized:
City of Clearwater
Owner
P.O. Box 4748
Clearwater, FL 34618
B:
By:
Date:
Date:
'~ Fh0M HILL lARD p.EN~~r~SON
! ~ -
,(iED; IJ. 26' 91 1 t ;49i~l i ~:~'I 'HI). ~~bUU44U~ to ,
APPENDIX A .
e
AODmoNAL TUMS AND CONDI'I1ONS OJ'
CJlA.NCI ORDER
1. ~l1ftWl.ftt 10 the Qua,..",., Mmmu", ~ Tbe GuwInteed Maximum Prict for
tbe Projcu ... be iDcnued only Ity d..1mOWIl .. fri ill chiI a.np Order. The Ownet .....
hM no ~~~ ~ 10 JlI1 WIJ ftIrtbIr IInOUIU 10 c..c.ot in __ oIthi. e4ultecl Ouuuneed
~ 1fiiDe.. eoncr..or thai .. "'I' 0."''' tfJ COlI 0WNnI ~ reluIna to tN
WOlt.
2. ~~'. .".-- GItha Owpr. CCln~ IIawb1 tuJ11 lUll..., reI~
qWs Iftd fiac.i.~' cliJcharaa che Owner ud ill __, employees. ~. ~uon
and IlIi.n,- - and from Iny aad 111 rteJatS, daiJnJ, demand., dam..", actiOftt, and c:aUICS or
actiOftl, of ...hale'Yer kind and ftlllR, known or unknown, whether ariline at II.". or ,It "Quity.
whleb Conmaetor In&l bva hid or 11II1 now haw tpinst IN Owner bl R&SOd of any ntIIW,
tIlJJe, ~ or thiI" from the be&iMiaa rllhc Projctt throup the date of dOl Clwtp
Order, ari.. out or or IMtina 10 daimI wbida have been ClC could haw beeft wencd bJ
COfItrador ~ the l'nJjeet inc1udina. withouc JimitadOn. all clairas for additional CONlIUCIion
coita, u.... .c.ncnJ cooditfon. and all odIet daInapI wt.baew:r reIatint fO tM Pro,fect.
,. n~~'1 R--cptW. 8lai,." nis O&nae Older is aoC laleftded to Id .
a waiver or _J lit rI Ul tuQUe c!IImJ b ~..don It\aJ may be IDIde by ... ea.trIctvf for
b future WIlt 011 tk Owaer', Partiaa GaIIa.iftd.. futuN et.Iacn 10 lilt ~ a.r.,.,
if M)', 10" U lilY future du" is p~ IUCtsorbed in writiq by Ibc Owaet iliaC Ih
.... fJI ~ ConcrIct Docwnena. In addlti<la, tlis Orqe Order is not intended II) let U a waiver
Of mQIC fluy futute dafma eiQ ~ .J bve apimt die Oner uisI"l out 01_
....tin. ID .,. lOr! iabi1icr c:tai1Dl for J*1Of1II irUw7 or ~ damqe IhalIDloY be I.IIettOd
;a die IuCLItc 1JJ IJa1r4 ,.,.. aplnlt Cora.... uisIna eM 01.... ~
<t. OH.'. ........ ~ r~~, 0wNr Weby fuDJ lata4a. ......, toquita lad
rom. di..Mr,. Coanc:cor ud lIS .,enta. tIrfIo/.... npClCnflliwl. MCtIton ancIlSIips
fI lid ftom ." 1M aD DPII. cIIInls. en...ICIiou. Iftd Qua 01 ~ or wbaaeYer kind
and IIIIUJe, .... or UDtnovm, whtcher ....... It law or ia ....itJ, wbich lite Owner _y bne
had (Jt ma,__ 11IM ...... Contnclor 'r ,.. 01111 ~ .-,_ " I'eIIOII or..,
~m. "7 .. Owner IriaiD& 08t 01 or rdadq to claim. wtdch 11M ... . could .ve been
...,., ~-;!- die Owner" IDwt ~ 1IICDl~ (11II- A1dUaea1. tram 1H ~
ttllhe Projec:I ~ .... oIdds a.n,. 0lW nit.... ~ dIi.. wI1idI ha"ft been
or ~ ... beat ISIel1ed by die ow.. Iw... iKumId 10 IInI GIber fIcJI1l1a tor PI"tiaI.
,. o.mw. ~ pf RW..... 11Da a.,e Order ""'JIG(" deemed in lilY wa1
· to be a .... 0111I1 cIaiInI wIUda Ihe 0.. "'If ~ apiall the Coabador rda!ina to dIIecb
In ill ~ Wen an lilt Project. bldudi.... wldtouC 111'11ldoft. puldaUa daima, WUlUl7
dlima or dIimI for JaIeIIt.,., <<oGIer ...... ~ die Owner IIIJ 11M ldIdn& 10 die fI_
worII on .,.. ParIdn& Gan&e. III addidon, chis 0.,. Ordu Is ftOl In&ended to act u . wai..
er rdcIae at., Adurt claims -"icb 0MIct JIII1"'lIpi12SI Canr-. abiI& out 0' 01 nIatinJ
6:
~
v
e
e
ao uy tort IiabUity elUms for penonaI injury or propeltJ damqe thai may be I.Ia8I1ed in rbe
t\lture by third parda apinIt ~ Oner ariMC out 0' the Proje(t.
6, 'ftd.!~III~. To the fvUclt ex_ pamlued by law. Contractor u.Jt indemn1iy,
deffad and hold the 0wIMt IwmJoa fiom &lid api/1ft lilY and .u clIima. demuds, clatu&es.
actiana Ind cauea or dona, of whIIewr kind and nature. known or unbowD, wheUler uiliD.
al law or "' lCluicy, ft'tlJcb 11\11 be wa1ed by uy of ContrKtor'l ~tne1on. sub-
~ or ~ by NUCn of 1117 _. CUte, bappeftinl or dH"I, from the be&inninJ
of 1M Project throu~ the dale ~ dUt aan,o Onter.
7. nw n. ....... o.a.b JfJI1Ilins oblipted under ilr acrecnacnl wi... d1e
Owner to provide the Ovmerwidl III IppIOpriIII clole out iCenu Rquired by U.C Contnct
OoeuntcatJ indudiJ\c, bur DOl UmJted to, all Vt'UTatIty documentation ud allapplic:abJe operaIion
muuab.
It AQdit .nd ~~,. TIle 0WDer shalt be perm;UId ~ ~ 1ft audit or aU of
CcnIr&1or's 0DItI mocitled with the items deIMbed in 1M Chanp Order u "l1maolwd Wort
1IemI.. 1IoCh,.,. ICknowJcdp UIa the ClOftI beiq carried lor these ittl:1. under die adjult8d
Guaranteed MaximIna Price are -lOt 10 QOMd. _mila lAd _ My COst savinI' reaJu.cs at
these work ilanS sJWl ~ to dae benefit 01 1M Owner. ConU'lCtOr sbalIllIo ptO\'ide to the
Owlet, It Ihe doK_ or Ibe Praject, with . ftnaJ aaunlinl of aD COllI charpd apiDst d1e
ConUlClGr" con~ fund .nder die a.ns ot die COntract Documeau.
9. .I..IfMft'1 at Jil"llDlJ- 8Ich put)' .... ...... and expressly nrranu d2at
the J*IDII wt.- ..... appea.. below Oft ill behalf... IuD JIO'WZ lad aulbority 10 aecute Ihis
ChlDp Order OA ib behalf. Ind Ibat such authority is 4aMd by virtue of tJaat pmon'. tide.
10. ~... and >>nf'li~J. nit c..e Order .elts fro1D ....oIiationt ~
Ow.-1IId eo...... and its hn.~tIoe ahaII flOC be COIISb* apiDtl.y aae party siDce
eadt bu W . appclI1Uaky eo modify ill drIftiaa.
Jl. rftll&tt~_ lb. ~ 0nSer is CIOnMcent upon die Owner'llimuJlancou.
exeeWon 01 a Setdemeftt end IlMu. Apmat behrccn .... 0wDer .. the Ardittct.
CITY 0.. (OLIUWATD
By. -....
Princ Nemr.
JII:
CUA 11VIJIuas.. WIt. V.tore
By. ~~
:'~~~~~MW~K
Da!ecl; .fuJ"
Dltld:
..
-2*
.
CHANGE
ORDER
replication of
AlA Document G701
PROJECT:
.
Seven (7)
Clearwater Municipal Services Center CHANGE ORDER NUMBER:
INITIATION DATE:
TO (Contractor): Creative/Beers, a Joint Venture
P.O. Box 1728
Clearwater. FL 34617-1728
11/24/97
ARCHITECT'S PROJECT NO:
2846.13
CONTRACT FOR: Construction
CONTRACT DATE: August 15, 1994
You are alrected to maKe the follOWing Changes In thiS Contract
Decreass tne GM? by the Issuance of an aavancs return 0: a pOrtl::Jr. 0' 3MP cost savings.
See Appendix A for additional terms and conditions of the Change Order.
Total (advance return of cost savings) of Change Order #7
($353.129.00)
Not valid until signed by both the Owner and Architect
Signature of the Contractor indicates hiS agreement herewith. including any adjustment in the Contract Sum or Contract Time
The original (Contrast StJm) (Guaranteed Maximum Cost) was........... ................................. $
Net change by previously authorized Change Orders................... ........... $
The (Contract SlJm)(Guaranteed Maximum Cost)prior to this Change Order was............................... $
The (Contract Sl:lm)(Guaranteed Maximum Cost) will be (irH:re3sge)(decreased)(tJAElRaFl!jge)
by thiS Change Order........... ................................. ... ............. . . ..........................
The new (Contract Sl:lm)(Guaranteed MaXimum Cost) including this Change Oraer will be..
The Contract Time will be (lncreaced)(aecrea&ed)lunchanged) by
The Date of Substantial Completion as of the Oate of this Change Oroer therefore is
Rowe Architects Incorporated
Architect
100 Madison St.. Suite 200
Tampa, FL 33602 t;
BY:~ 1//1 ~
Date: ~Jt~Jfl
By:
Date:
15,875,000.00
(3,926,371.00)
11,948,629.00
.... $
$
(353,129.00)
11.595.500.00
(0 ) Days
January 30.1998
Authorized:
City of Clearwater
Owner
P.O. Box 4748
Clearwater, FL 34618
By:
Date: