Loading...
PROPOSED CAPITAL IMPROVEMENT BUDGET FISCAL YEARS 1997/98 - 2002/03 DRAFT 5/30/97• 1 O earwa er Proposed Capital Improvement Buc� et g Fiscal Years 1997/98 - 2002/03 Draft 5/30/97 � � G � � T � � �. � � � � � � � � � �. �I � � � � � 0 -� � , W � � CAPITAL IMPROVEMENT PROGRAM INTRODUCTION The Capital Improvement Program is a management, legislative, and community tool used to facilitate the planning, control, and execution of the functions of government. The purpose of such a program is to plan for, and better manage, growth. This section outlines the City policies regarding the Capital Improvement Program, provides definitions relative to the Capital Improvement Program, describes the summary schedules included in this document, and details the proposed capital improvement projects, along with the proposed funding schedule and funding source for each project. POLICIES AND PROCEDURES Capital Projects are utilized to account for resources used in the acquisition and construction of capital facilities and fixed assets. The City Commission adopts the first year of the six-year Capital Improvement Program as the Capital Improvement Budget. The appropriation of annual transfers to the Capital Improvement Fund are included in the budget of the specific source fund. Individual project budgets for the Capital Improvement Program are adopted on a multi-year program basis and do not lapse at year end. Authorization The City of Clearwater Code of Ordinances, Chapter 2(Section 2.516), sets forth the requirements far a Capital Improvement Program and Budget. Responsibility It is the responsibility of the department director charged with delivery of specific City services to anticipate the need for capital improvement expenditures in advance of having to initiate projects. This enables the development of a long range financial plan to fund these needs. Further, it is the responsibility of the department director to ensure the long-range capital adjectives interface and are consistent with the City of Clearwater's Long-Range Comprehensive Plan. DEFINITIONS Capital Improvement Project: A property acquisition, a major construction undertaking, or a major improvement to an existing facility or property, with a minimum useful life of at least five years and a cost greater than $25,000. Capital Improvement Program: A comprehensive schedule of approved capital improvements projects indicating priority as to urgency of need and ability to finance. The program shall be for a six year period, the first year of which shall be adopted as the next fiscal year's capital budget. The program shall be revised annually and projected an additional year to allow for changed conditions and circumstances. Each fiscal year, the capital improvement program shall be submitted to the City Commission for approval. Capital Improvement Budget: The capital budget covers those approved projects contained in the first year of the six year capital improvement program. The approved Capital Improvement Budget establishes the total dollar cost of each project and the source of revenue. Any change which increases the cost of a project or changes the revenue source must be approved by an amendment through the City Commission. Capital Improvement Element ( CIE): The Capital Improvement Element is limited to those capital improvement projects included in the other elements of the City's Comprehensive Plan. In particular, the CIE includes the cost and timing of essential public facilities, such as transportation, drainage, potable water, education, parks and recreation, and public health. Only those projects with an estimated cost of more than $100,000 are included. Ongoing Projects: Ongoing projects do not automatically lose the previous year's budgeted amount, but are cumulative in nature, i.e., the previous fiscal year's remaining balance is added to the new approved budgeted amount. CAPTAL IMPROVEMENT PROJECT DETAIL The Capital Improvement Project Detail contains a description of each improvement project, along with the proposed funding schedule and funding source for each project. The projects in the Proposed FY 1997/98-2002/03 Capital Improvement Program are presented in such a way as to make it easy to compare with the current approved program. • Amendments, or changes to projects in the current approved six-year plan are presented with changes underlined. • Deletions to projects included in the current approved six-year plan are presented with text that reflects a strike through. • New projects are presented in bold text. TABLE OF CONTENTS PUBLIC SAFETY Police Protection ................................ 1 Fire Protection ................................... 7 TRANSPORTATION New Street Construction .................... 10 Major Street Maintenance ................. 13 Sidewalks .......................................... 14 [ntersections ...................................... 15 Parking .............................................. 16 MISCELLANEOUS ENGINEERING. 19 GENERAL PUBLIC BUILDINGS & EQUIPMENT Garage................................................................... 49 Maintenance of Buildings ...................................... 51 CityHall ................................................................ 54 Miscellaneous ........................................................ 55 ENGINEERING/PUBLIC SERVICES Stormwater Utility ................................................. 66 PUBLIC SERVICES WaterSystem ........................................................ 71 ENGINEERING/PUBLIC SERVICES LEISURE Sewer System ........................................................ 75 Land Acquisition ............................... 20 Park Development ............................. 21 GAS SYSTEM...................................................... 85 Park Beautification ............................ 43 Marine Facilities ................................ 44 SOLID WASTE/RECYCLING Libraries............................................ 48 Solid Waste............................................................ 89 Recyc I in g ......... .. .. . .... .. ...... ..... .. .... ......... .... .... ..... .... 92 ENGINEERING/PUBLIC WORKS Utilities Miscellaneous .......................................... 94 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SAFETY - Police Protection: Police Computer Network - 91127 This project was originally established in the FY 1993/94 Capital Improvement Budget and provided for the Police Department's entire computer plan including the laptop computers, the CADD system, and other network operations. The continued funding starting in FY 1999/2000 provides for the upgrade, replacement and enhancement of computer equipment for the Police Department. It also includes upgrading both the system's technology and capabilities by adding functionality to the system with items such as computer printers in the vehicles, magnetic stripe readers in the police cars to read information from driver's licenses, and video cameras in the police cruisers to enable imaging within the DepartmenYs system. This is a planned program of maintaining the Police computer network to provide replacement of obsolete computer equipment necessary to maintain compatibility with outside agencies, such as the State of Florida, and to assure vendor support will be available for all vital programs. These upgrades will be the State of the Art at the time of purchase but due to the nature of computer technology, it is too far in the future to be specific. (Continuous annual funding) Annual Operatinq Costs: Annual debt service expense. Comprehensive Plan Obiective: Not applicable. Current Available Recommended Fundin Fundinq Source L/P 1997/98 1998/99 1999/00 2000/01 2001/02 500,000 500,000 500,000 2002/03 500,000 Total Proposed ✓ ��� ��� Beach District Substation Renovation — 91134 As a result of the extensive deterioration of the Beach District Substation facility, located at 700 Bayway Blvd., the Police Department finds itself in an er�►eFQeps� situation where� the existing facility � cannot be repaired under normal maintenance procedures to be able to continue operations from this buildinp Maior renovations and construction are necessarv to brinq this facilitv up to acceptable standards _for continued oaerations. The Citv Commission is currently reviewinq existinq facilities on the Beach and a study is underwav which will determme whether the Police Department will continue to operate from this facility or be provided another facility from which to operate at a different location on the beach The amount of a325 000 previouslv allocated to this prolect was reduced to �250 000 to allow fundmq of the South Greenwood Neiqhborhood Patrol Substation in FY 97198. � . Annual Operatinq Costs: No significant increase in existing operating costs. Comprehensive Plan Obiective: Not applicable. Current Available Fundin Recommended Fundinq Source 1997/98 Infra Tax 250,000 Total 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Page -1- 250,000 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SAFETY - Police Protection (continued): Radio Communications Tower Link - 91137 The current radio system transmits signals from the Communications Center to the transmittal tower by telephone line. The problems that can occur with the current system include quality of the transmission and possible disruption during a major storm. The Fiber Optic link replaces the telephone line with a dedicated fiber optic line which runs between the Communications Center and the main radio site. Annua� OperatinQ Costs: None. Comprehensive Plan Obiective: Not applicable. Current Available Recommended Fundinq Fundinct Source 285,000 Total 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Countryside Substation Expansion — 91138 As a result of expanded growth and demand for services in the East and Northeast sections of the City, existing facilities must be expanded to accommodate additional officers assigned to the East Patrol District. Both male and female locker room facilities are inadequate at the present time. Existing lockers have inadequate space to store officers' assigned equipment and uniforms. General storage space at the facility at the present time is extremely limited. In addition to officers assigned to general patrol duties in the East District, officers assigned to Neighborhood Policing Teams in Condon Gardens and Comer/Fulton Apartments also work out of the East District Station. Also, officers undergoing SWAT, K-9, and In-Service Training at the Department's training Facility are supported through this facility. Annual Operatinq Costs: No significant increase in existing operating costs. Comprehensive Plan Obiective: Not applicable. Current Available Recommended Fundinq Fundinq Source 325,000 1997/98 1998/99 1999/00 2000/01 �2a�A99 2001/02 2002/03 Total Proposed LLi.r.T. Page -2- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SAFETY - Police Protection (continued): City Driver Training Facility - 911xx This project is for the development and construction of a City-wide driver training facility. The complex will incorporate modern, complex, proven, operational courses for the enhancement of driver activities for all City employees. The driving track will be constructed for multi-purpose use for Ciry fleet vehicle types of police cruisers through fire trucks and heavy equipment. The Patterson Road site is proposed for this facility, and is presently owned by the City. Annual OperatinQ Costs: Approximately $3,000 plus the annual debt service expense on the borrowed funds which will be repaid bv the General Fund. Comprehensive Plan Obiective: Not applicable. Current Available Fundin Recommended Fundinq Source 1997/98 Internal Borrowing 4A9;9A9 1998/99 1999/00 400,000 Total 2000/01 2001/02 2002/03 Proposed 400,000 Old Clearwater Bay Neighborhood Patrol Substation - 911xx In FY 93/94 the Police Department expanded its Neighborhood Patrol Team program to the N Ft Harrison Ave. corridor to deal with neighborhood specific enforcement problems. Office space was provided in a storefront office on Ft Harrison Ave. through a monthly rental agreement. The Patrol Team has attained significant success in its law enforcement efforts and the Police Department would like to find a Neighborhood Patrol permanent residence for this unit. This project would provide for either the purchase of an existing property, or the purchase of a parcel of property on which to then build a new substation. The project also includes the associated startup costs of a new building to include furniture, phone and computer systems, and security needs. Funding source changed from SLEFT funding to Infrastructure Tax and increased by $65,000. Annual Oqeratinq Costs: $4,800 estimated for utilities and phone service. Comprehensive Plan Obiective: Not applicable. Current Available Recommended Fundin Fundinct Sources Infra Tax 1997/98 _ .T.T.i 1998/99 1999/00 125,000 Total 2000/01 2001/02 2002/03 Proposed 125, 000 Page -3- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SAFETY - Police Protection (Continued): Mobile Command Operations Center - 911xx High risk and emergency situations occur with some regularity in a city the size of Clearwater. For years the Police Department has had the need for a special purpose vehicle that could be used for a variety of purposes associated with taking command of a potentially dangerous situation. These types of situations include barricaded suspects, suicidal subjects, manhunts, searches for missing persons, major crime scene management, and forward command posts for natural disasters. Traditionally, the department has "made due" with less than adequate resources such as utilizing another vehicle not designed for such a purpose. The department is now in need of a vehicle capable of housing command personnel so that they can manage high profile situations from the scene where the situation is occurring. The department is planning for the acquisition of such a vehicle in the FY 98/99 budget. Annual OperatinQ Costs: m�'�'°~' ° '^° °�; °"°° �20_934 for FY 97198; annual debt service of approximately a41,868. Comprehensive Plan Obiective: Not applicable. Current Available Recommended Fundin Fundinq Sources UP 1997/98 1998/99 1999/00 2000/01 2001/02 180,000 �989 Total 2002/03 Proposed 180,000 Traffic Homicide Investigation Vehicle - 911xx Due to the ever increasing complexity of the task of investigating traffic crashes with life threatening injuries or deaths, the Police Department for several years has had the need to have a special purpose vehicle to be assigned to those personnel on the scene who are investigating the incident. In FY 94/95, the department converted its 1986 Beach Mobil Substation Vehicle to a special purpose vehicle for Traffic Homicide Investigators. This vehicle now allows investigators the oppo�tunity to have an "office" to work from at the scene of a serious crash, which is able to run on its own power through the use of a built-in generator. The vehicle is also designed to transport additional equipment to the scene of the incident, such as traffic barricades, traffic signs and cones, and other equipment to help manage tra�c during the time of the investigation at the scene. Complex investigations such as these could last from 4-10 hours, depending on the complexity of the incident. The current vehicle is already 10 years old and the department projects that it will need to be replaced in no more than three years. Annual Operating Costs: Annual debt service expense. Comprehensive Plan Obiective: Not applicable Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed �/p 80,000 �9;AA9 80,000 Page -0- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SAFETY - Police Protection (Continued): Hostage Negotiator Vehicle - 911xx In FY 94/95, the Police Department acquired from the Fire Department an excess EMS transport vehicle. This vehicle was being replaced within the Fire DepartmenYs fleet with a new EMS vehicle. The Police Department has had the need for such a vehicle for a number of years for the purpose of providing transport and a secure work environment for the departmenYs SWAT team hostage negotiators. When high risk situations occur and the SWAT team is called upon to assist in bringing the situation to closure, the SWAT team's hostage negotiators are the communicators between the Police Department and the suspect. It is through their negotiation effo�ts that suspects are talked out and the situation brought to a successful conclusion with no loss of life or injury. In order for the negotiators to perform their tasks effectively, taking into consideration civil and criminal liability, special requirements must be met. Just one of those requirements is the need to record all conversations which occur with the suspect as well as all conversations with which occur between the negotiators themselves. To do this, they need a separate and secure environment, free of external noise and interference. The fore mentioned vehicle was converted from an EMS vehicle to a special purpose vehic�e for the hostage negotiators at a minimal cost to the budget to get the department through a limited number of years until a special purpose vehicle could be acquired. The department projects that the present vehicle should be replaced no later than the FY 9�89 99/00 budget. Annual Operatinq Costs: Annual debt service expense. Comprehensive Plan Obiective: Not applicable Current Available Recommended Total Fundin Fundinq Sources 1997198 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Up 80,000 �8;9A9 80,000 Replacement of Detective Vehicle Fleet — 911xx This proiect provides for the replacement of aainq Detective vehicle fleet fo� which the Police Department has not paid replacement costs. Annual Operatina Costs• Annual operatinq costs for debt service and operat�nq costs for replacement and mamtenance of vehicles. Comprehensive Plan Oblective: Not applicable. Current Available Recommended Fundin Fundin4 Sources UP 1997/98 1998/99 1999/00 2000/01 819,000 Total 2001/02 2002103 Proposed 819,000 Page -5- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SAFETY - Police Protection (continued): South Greenwood Neiqhborhood Patrol Station — 911xx The Police Department is workinq in comunction with the Community Service Foundation in the construction of a combination police substationlcommuni center and residential a artment com lex to be located at the corner of Woodlawn Street and Greenwood Avenue. This prolect would provide for the construction costs for a 1500 square foot substation facility which would be attached to the community center, to be constructed at the same time utilizinq CDBG fundmq The location is centrallv located withm the ne�qhborhood tarqeted by the South Greenwood Neiqhborhood Patrol Team Furniture, phones and computer equipment would be relocated from the rental office location currentiv beinq used as a Neicthborhood Substation. Annual Operatinq Costs: Comprehensive Plan Oblective: Not aqplicable. Current Available Recommended Fundin Fundinq Sources Infra Tax 1997/98 1998199 1999/00 2000/01 2001 /02 75,000 SUBTOTAL: PUBLIC SAFETY - POLICE PROTECTION Current Available Fundin 610,000 Recommended Funding Sources 1997/98 505,000 1998/99 1999/00 2000/01 2001/02 480,000 705,000 Page -6- 1,319,000 500,000 2002/03 2002103 575,000 Total Proposed 75,000 Total Proposed 4,009,000 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SAFETY - Fire Protection: Major Fire Apparatus Refurbishment - 91213 This project provides for the refurbishment of fire vehicles and equipment to extend useful life. It includes the replacement of corroded vehicle water tanks, vehicle painting and modifications to meet new National Fire Protection Association (NFPA) mandated vehicle requirements. Annual OperatinQ Costs: No increase of existing operating costs. Comprehensive Plan Obiective: Not applicable, Current Available Fundinq 71,747 Recommended Fundina Sources General Fund 1997/98 1998/99 23,750 25,000 1999/00 2000/01 26,250 27,500 ���I�jII�Ya 28,900 2002/03 30,400 Total Proposed 161,800 Fire Engine Replacement Program - 91218 FY 1998/99: Replacement of a 1966 Pirsch Fire Engine that will have exceeded its useful life by Fiscal Year 1998/99, and at the time of replacement will be 33 years old. FY 1999/2000: Replacement of a 1974 Maxim Fire Engine that will have exceeded its useful life by Fiscal Year 1999/2000 and at the time of replacement will be 26 years old. FY 2002/03: Replacement of a 1979 Simon Snorkel that will have exceeded its useful life bv fiscal year 2002/03, and at the time of replacement will be 24 vears old. The national average for useful life of a fire engine is 15-20 years. Funding for all fire engine replacements wilt be partially reimbursed by the County, since they also serve the unincorporated area of the Clearvvater Fire District. Annual Operatinq Costs: . , . Comprehensive Plan Obiective: Not applicable, Current Available Recommended Total Funding Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 357,000 UP 375,000 395,000 766,000 1,536,000 Emergency Operations Center — 91220 The project was originally established in FY 1989/90 for the design, construction, and equipage of the City's emergency Operations Center. During FY 1994/95, additional funds were appropriated, representing a reimbursement from FEMA for the August, 1995 storm, to support future capital acquisitions for emergency operations. Current Available Fundin 142,376 Recommended Total Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Page -7- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SAFETY- Fire Protection (continued): EMS Capital Equipment — 9�8 91221 This project provides for the procurement of capital equipment for the EMS system per County EMS agreement. Equipment includes vehicles, life packs, radios, stretchers, splints, oxygen regulators, etc. Annual OperatinQ Costs: No increase of existing operating costs. Comprehensive Plan Obiective: Not applicable_ Current Available Recommended Total Fundinq Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 161,756 UP �8 ��8 �99 89,500 94,000 98,700 691,200 130,000 136,000 143,000 Facilities Automation - 912xx This project provides for new desktop computers facilitating office automation at the remote fire facilities. Establishing electronic communication between all of Fire Department facilities in extension of the enterprise network. This includes 12 PC's running the standard suite of applications, 7 printers, and the required networking components for communications. Enhancing the capabilities of stations 45, 46, 47, 48, 49 and 50, as well as the Training and EMS facilities. Annual Operating Costs: Debt service payments of $16,768. Comprehensive Plan Objective: Not applicable. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 90,000 Page -8- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SAFETY- Fire Protection (continued): Stores 8� Supplies Buildinq — 912xx This proiect will provide for the construction of a prefabricated steel-type buildinq on the Fire Traininq Grounds for the storaqe of all Fire and EMS suppiies and items associated with the department's Emerqency Operations function. Currentiv, the depa�tment uses a section of the Fire Station at Lakeview 8 Hiqhland and has rapidly outqrown the caaabilities of this site. The Traininq Ground site will provide a more centralized location with the buildinq encompassinq a small office are for the Storeskeeper, as well as a climate-controlled area for temperature-sensitive items and druqs. The finished area will comprise of 450 square feet. The balance of the buildinq will be standard, unfinished steel construction, with one overhead door openinq and the required exit doors. Fundinq will be partialiv reimbursed bv the County since the facilitv also serves the unincorporated area of the Clearwater Fire Deaartment. Annual Operatinq Costs: No anticipated increase in annual operatinq costs. Comprehensive Plan Obiective: 1. To provide existinq levels of service, or expanded service ranges where indicated within the City, throuqhout period of plan horizon; 2. To promote the coordination of proqrams, proiects, and activities which are of mutual concern and benefit in order to reduce fraqmentation and duplication of effort. Current Available Fundin9 Recommended Fundinq Sources 1997/98 1998/99 1999/00 2000/01 General Fund SUBTOTAL PUBLIC SAFETY -F IRE PROTECTION: Current Available Fundin 822,879 Recommended Fundinq Sources 1997/98 153,750 2001IO2 2002/03 1998/99 1999/00 2000/01 2001/02 536,000 564,250 117,000 122,900 Page -9- 174,000 2002/03 1,069,100 Total Proposed 174,000 Tota I Proposed 2,563,000 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET TRANSPORTAT/ON - New Street Construction Highland Avenue Widening — 92140 The project widens Highland Avenue to three lanes along its length between Gulf-to-Bay and Sunset Point Road, a distance of 2.0 miles, to increase capacity. Design of the project began in FY 1990/91 with funding approved in the First Quarter Review. It includes design services, right-of-way property acquisition, and construction. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Oblective: (6.3) To meet desired Level of Service standards as set forth in Policy 5.5.1. of the Comprehensive Plan. Current Available Fundin 184,729 Recommended Total Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Drew Street Widening — 92141 The project is being coordinated with the Florida Department of Transportation improvements to Northeast Coachman and Pinellas County improvements to Drew Street east of Northeast Coachman. It will prepare construction plans, stormwater treatment facilities, right-of-way maps and storm treatment areas in cooperation with the Florida DOT. The project was originally established in the first quarter FY 90/91. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: (6.6) The City shall direct its own expenditures toward alleviating its most severe congestion problems, providing continuity in roadway lane arrangements, and providing for economic development and redevelopment needs, before less severely congested areas are improved. (6.8) The City shall encourage and assist the County, State, and any other governmental transportation authority, to prepare and adopt right-of-way maps for roads under their jurisdiction. Current Available Funding 368,027 Recommended Total Fundinq Sources 1997198 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Page -10- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET TRANSPORTATION - New Street Construction (continued): Landmark Drive Extension — 92145 This project extends Landmark Drive from Enterprise Drive to Lake Chautauqua Park. Permits for a three lane design have been obtained for both stormwater management (expires September 23, 1997)and dredge and fill (expires June 23, 1998). It includes right-of-way and mitigation acquisitions, stormwater facilities and construction. Annual OperatinQ Costs: No increase of existing operating costs. Comprehensive Plan Obiective: (6.3) To meet desired level of service standards as set forth in policy standard 5.5.1. Current Available Fundinq 114,845 Recommended Fundina Sources Infra Tax 1997/98 1998/99 1999/00 2000/01 ... ... Totat 2001/02 2002/03 Proposed ... ... Druid Road Widening — 92146 The project improves Druid Road to three lanes along its length from Alt. U.S. 19 to U.S. 19. It includes design services, and construction for various intersection improvements. The next ten vear cvcle of Pennv for Pinellas fundinq includes S12 million for this prolect. Annual Operatin4 Costs: No increase of existing operating costs. Comprehensive Plan Obiective: (6.3) To meet desired level of senrice standards as set forth in policy standard 5.5.1 by 2000. Funding for improvements should be included in the Transportation Improvement Program, in order of priority group 2. Current Available Fundin 1,000,000 Recommended Fundinq Sources Gas Tax 1997/98 1998/99 �-5A8;AA6 1,200,000 1999/00 2000/01 300,000 Total 2001/02 2002/03 Proposed 1,500,000 Beach Streetscape Projects — 921xx This project includes reconstruction and rehabilitation of Mandalay Avenue, Baymont Street, Papaya Street and Gulfview Blvd to create a people-friendly atmosphere. Improvements include wider sidewalks, increased landscaping, outdoor caf� areas, enhanced street furnishing and various roadway improvements. Annual Operating Costs: No increase of existing operating costs. Comprehensive Plan Objective: (6.3) To meet desired level of service standards as set forth in policy standard 5.5.1. Current Available Fundin Recommended Fundinq Sources 1997/98 92,303 Infra Tax 1,000,000 1998/99 1999/00 2000/01 2001/02 Page -11- Total 2002/03 Proposed 1,000,000 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET TRANSPORTATION - New Street Construction (continued): SUBTOTAL TRANSPORTATION - NEW STREET CONSTRUCTION: Current Available Recommended Fundin Fundina Sources 1,759,904 1997/98 1998/99 1,000,000 1,200,000 TRANSPORTAT/ON - Major Street Maintenance: 1999/00 2000/01 300,000 Total 2001/02 2002/03 Proposed 2,500,000 Paving Unpaved Streets — 92258 The project paves unpaved streets in older areas of the City which were constructed before City codes were revised to require standard paved city streets. Targeted initially are those neighborhoods and areas where there is little possibility of abutting property owners approving an assessment program to fund the street improvements. Annual Operatinct Costs: No increase of existing operating costs. Comprehensive Plan Obiective: Efforts shall be made to maintain the road system in such a fashion that at no time shall more than 20% of the total street mileage in the City be rated in poor or fair condition, based on road condition criteria established by the Engineering Department.. Current Available Recommended Total Fundinq Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 57,894 Infra Tax 50,000 50,000 50,000 100,000 250,000 Road Millage �g �g Gas Tax 100,000 100,000 200,000 Page -12- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET TRANSPORTAT/ON - Major Street Maintenance (continued): Traffic Calming Program — 92259 In-house design project to promote traffic calming within Clearwater neighborhoods and establishment of a methodology for implementation. City staff to implement in succeeding years through capital programming. Annual Operating Costs: None. Comprehensive Plan Obiective: Much of Cleanivater's future planning efforts will need to be focused on making improvements to backlogged facilities. Current Available Recommended Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 100,000 Infra Tax 150,000 Trans Impact 200,000 200,000 250,000 250,000 2002103 300,000 Total Proposed 150,000 1,200,000 Street Maintenance and Resurfacing - 92260 The project prevents deterioration of City streets by adherence to a 10 year maintenance cycle, allowing approximately 30 miles of street to be treated annually, and provides for the construction and renewal of underdrain systems to keep ground water from infiltrating and eroding road beds, thus extending the life and lowering the cost of roadway maintenance. It also provides funds for repair and replacement of curbs, gutters, and other street features. The criteria for ranking streets and prioritizing their dates of resurfacing is based solely on their structural integrity, safety, and appearance. Annual OperatinQ Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: Efforts shall be made to maintain the road system in such a fashion that at no time shall more than 20% of the total street mileage in the City be rated in poor or fair condition, based on road condition criteria established by the Engineering Department. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001IO2 2002/03 Proposed 354,554 Road Millage 1,450,630 1,454,980 1,459,340 1,463,720 1,468,110 1,472,520 8,769,300 Gas Tax 300,000 145,000 145.400 145,800 146,240 146,680 1,029,120 I SUBTOTAL TRANSPORTATION — MAJOR STREET MAINTENANCE: Current Available Recommended Fundinq Fundinct Sources 512,448 1997/98 1998/99 1999/00 2000/01 2001/02 1,950,630 1,849,980 1,854, 740 1, 959, 520 1, 964, 350 Page -13- 2002/03 2,019,200 Total Proposed 11, 598,200 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET TRANSPORTATION - Sidewalks �i�Fe-�afls: Civic CenterlMarina Crosswalk - 92337 Provides for the installation of a lighted crosswalk with signal across Causeway Blvd. between the City Marina and the Memorial Civic Center. Comprehensive Plan Obiective: To provide for maximum protection of health and safety in Clearwater's transportation system by installing sidewalks in developed areas as rapidly as possible, priority areas being school routes, major thoroughfares, and high accident locations. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 100,000 Sidewalks — New - 92338 The project includes construction of new sidewalks in areas which function as pedestrian routes where no sidewalks now exist. Sidewalk locations are prioritized from lists of requests form citizens, the Pinellas County School Board, and the Traffic Engineering Division. Emphasis will be placed on school routes to promote the safety of children walking to school, with remaining areas constructed as funds permit. The prolect also includes replacement of existinq sidewalks to maintain public safetV and public access. Annual Oqeratinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: To provide for maximum protection of health and safety in Cleanivater's transportation system by installing sidewalks in developed areas as rapidly as possible, priority areas being school routes, major thoroughfares, and high accident locations. Current Available Fundin 476,445 Recommended Fundina Sources Gas Tax Infra Tax Dev Imp 1997/98 4�8A6 285,000 25,000 SUBTOTAL SIDEWALKS • Current Available Fundin 576,445 1998/99 1999/00 397,000 425,000 25,000 25,000 2000/01 2001/02 400,000 425, 000 25,000 �A98 25,000 Recommended Fundin4 Sources 1997/98 1998/99 1999/00 2000/01 2001/02 310,000 422,000 450,000 450,000 425,000 Page -14- 2002/03 400,000 25,000 2002103 425,000 Total Proposed 800,000 1,532,000 150,000 Total Proposed 2,482,000 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET TRANSPORTATION - Intersections; City-Wide Intersection Improvements - 92551 The project provides intersection improvements of a minor nature to facilitate traffic flow, such as radii, right turning lanes, and minor channelization, which often accompany the new signalization of an intersection. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: To provide intersection and channelization improvements, where needed, to facilitate traffic flow. Current Available Recommended Fundin Fundinq Sources 1997/98 135,370 Trans Impact 50,000 1998/99 50,000 1999/00 2000/01 2001/02 50,000 50,000 50,000 2002/03 50,000 Total Proposed 300,000 Signal Renovation — 92552 Renovation of substandard signalized intersections is required to meet the standards set by the national and State of Florida mandates to increase safety and reduce liability. This project also provides money to support the costs of relocating traffic signal equipment due to road widening projects or intersection improvement projects where the cost of such relocation can not be included in the cost of that project. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: To provide intersection and channelization improvements, where needed, to facilitate traffic flow. Current Available Fundin 157,406 Recommended Fundinq Sources 199T/98 Road Millage 45,000 1998/99 1999/00 45,000 45,000 2000/01 2001102 45,000 45,000 2002/03 45,000 Total Proposed 270,000 New Signal Installation 8 Renovations - 92553 The project provides for new traffic signals, and the renovations of existing traffic signals, that meet traffic signal warrants. Annual OperatinQ Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: To provide intersection and channelization improvements, where needed, to facilitate traffic flow. Current Available Fundin 315,125 Recommended Fundinq Sources Trans Imp 1997/98 1998/99 1999100 40,000 40,000 40,000 2000/01 2001 /02 40,000 40,000 2002/03 40,000 Total Proposed 240, 000 Page -15- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET TRANSPORTATION - Intersections (continued): Intersection Improvements — 92555 These are intersection improvements of a relatively major nature to facilitate traffic flow by increasing the capacity of the intersection. Infrastructure funding is provided through FY 97/98, and funding from a� Transportation Impact Fees are estimated , . Specific projects in FY 9� 97198 will include intersections at Myrtle and Ft Harrison Avenues and Myrtle Avenue and Lakeview, Gulf to Bav and Duncan. Annual Operating Costs: No significant increase of existing operating costs. Comprehensive Plan Objectives: (6.3) To meet desired level of service standards as set forth in policy 5.5.1. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 946,630 Infra Tax 150,000 Trans Imp Gas Tax II SUBTOTAL INTERSECTIONS: Current Available Recommended Fundinq Funding Sources 1, 554, 531 aAB;-9A9 190,000 175,000 190,000 200,000 200,000 190,000 200,000 200,000 1997/98 1998/99 1999/00 2000/01 2001/02 285,000 500,000 515,000 535,000 535,000 200,000 200,000 2002103 535,000 150, 000 980,000 965,000 Total Proposed 2,905,000 TRANSPORTAT/ON - Parking: Parking Lot Resurfacing — 92630 The project provides for the resurfacing of various City Parking lots as determined necessary by C� P�4is�AFer-IES Engineering Deaartment. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: To provide for systematic maintenance and improvement of the City's physical plant, and for increased efficiency in governmental operations. Current Available Recommended Total Fundin Fundina Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 211,995 Parking Rev 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Page -16- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET TRANSPORTATION - Parking (continued): Parking Garage Maintenance 8 Repair — 92632 The City owned parking garages are showing signs of structural wear and tear which will require repair in the years ahead. Fundina modifications are to address unexpected structural rehabilitation of the Garden Avenue Parkinq Garaqe for lonq-term serviceability and safetv issues. Fiscal Vear 1997198 fundinq is a rehabilitation of the existinq structure based upon the analys�s bv Post Buckley• Annual Operatinq Costs: No significant increase of existing operating costs. � Comprehensive Plan Obiective: To provide convenient and attractive downtown parking facilities. Current Available Fundin 185,470 Recommended Fundinct Sources 1997/98 Parking Rev �5;A96 Borrowing 500,000 1998/99 1999100 75,000 75,000 2000/01 2001/02 75,000 75,000 2002/03 75.000 Total Proposed 375,000 500,000 Downtown Parking Facility - 926xx The Parking System's facilities are designed to help meet the City's parking needs where available on-street parking and private off-street facilities are not sufficient. The need for long-term parking is continuing to be a factor for the parking system. Presently, the Garden Avenue Parking Garage is at 85% capacity. Planning for providing additional facilities is in line with the Parking System's mission as well as the growing need for long-term parking. The vear 2000 fundinq antici ates the construction of a new facili downtown. Fundin modification to address additional costs includin estimated desi n and construction fees, for additional downtown parkina facilities. Annual Operatinq Costs• No siqnificant increase of existmq operatinq costs. Comprehensive Plan Obiective• To provide convenient and attractrve downtown parkinq facilities. Current Available Fundin Recommended Funding Sources Parking Rev Bonds Total 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed a-9A; 9A9 �g 200.000 2,500,000 2,500.000 200,000 5,000,000 Page -17- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET TRANSPORTAT/ON - Parking (continued): Revenue Control Equipment Svstem Uqqrade — 926xx This prolect will upqrade the existinq computerized revenue control equipment to an on-line svstem for the beach parkinq lots and downtown parkinq garaqe. The existinq equipment is between 5 and 10 years of aqe and is becominq difficult to maintain as well as obsolete. Annual Operatinct Costs: No siqnificant increase of existinq operatinct costs. Comprehensive Plan Objective: To provide convenient and attractive downtown parkinq facilities. Current Available Recommended Fundinq Fundinq Sources Parkinq Rev 1997/98 1998/99 75,000 75,000 1999/00 2000/01 75,000 Total 2001/02 2002/03 Proposed 225,000 Parkinq Lot Improvement — 926xx The proiect provides for interior improvements, both functionaliv and aesthetically, to the parkinq svstem parkinp lots. Parkinq lot locations will beqin with the beach lots immediately adiacent to Mandalay Avenue and expand to include all parkinq system lots. Imarovements include items such as brick pavers, parkinq meter and siqn upqrades. Annual Operatina Costs: No siqnificant increase of existinq operatinq costs. Comprehensive Plan Obiective: To provide convenient and attractive downtown parkinq facilities. Current Available Recommended Funding Fundinq Sources SUBTOTAL PARKING: Current Available Fundin 397,465 Parkinq Rev 1997/98 1998/99 85,000 25,000 Recommended Fundinq Sources 1997/98 •.� ��� 1999/00 2000/01 25,000 25,000 2001 /02 25,000 1998/99 1999/00 2000/01 2001/02 2,775,000 2,775,000 200,000 200,000 Page -18- 2002/03 25,000 2002/03 200,000 Total Proposed 210,000 Total Proposed 7,110, 000 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET MISCELLANEOUS ENGINEERING: North Greenwood Business Area - 92816 The project provides funds to ' improve pedestrian movement, improve street liqhtinq and construct parking lots in the north Greenwood business area. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 59, 573 Memorial Causeway Bridge Replacement — 92820 The project is to perform a formal Project Development and Environmental Study (PDB�E) for the replacement of the Memorial Causeway Movable Span Bridge in conformance with the requirements of the Florida Department of Transportation (FDOT) and the Federal Highway Administration (FHWA). Replacement of the bridge with a fixed span is desirable to alleviate significant delays and backups of vehicular traffic on State Road 60 which is the primary access to Clearwater's beach communities as well as to replace a functionallv obsolescent structure. The bridge is owned by FDOT and any replacement by the FDOT will rely upon the use of the FHWA funding. The formal PD&E process must be used to obtain FHWA/Coast Guard approval and funding. The City proposes to prepare the PD&E to advance the FDOT schedule for bridge replacement. The project was originally established during the Mid-Year FY 93/94 Review. $22,000,000 is estimated for construction costs for FY 8�/9� 98/99. This project is included in the list of proposed Penny for Pinellas infrastructure projects for the years 2000- 2010. Bridqe costs are dependent upon Citv Commission's preferred alternative. Fundinq will be provided bv FDOT in the amount of $13 million, by Pinellas County's contribution of S70 million from its share of the Penny for Pinellas tax and the City's contribution of $10 million from its share of Pennev for Pinellas. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: (6.6) The City shall direct its own expenditures toward alleviating its most severe congestion problems and is consistent with the coastal zone management element.. Current Available Fundin 4,020,594 Recommended Fundinq Sources Future Pennv Pinellas Cty FDOT 1997/98 1998/99 1999100 2000/01 2001/02 13,000,000 10,000,000 13,000,000 Total 2002/03 Proposed 13.000,000 10,000,000 13,000,000 Page -19- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET MISCELLANEOUS ENGINEERING (continued): Miscellaneous Engineering — 92822 . . . . . . Establishes a project to provide funding for miscellaneous contractual services related , , � , , .priority or conceptual proiects, public presentations, coordination of workshop-formatted presentations. Current Available Recommended Total Fundin Funding Sources 1997/98 1998199 1999/00 2000/01 2001/02 2002/03 Proposed 2,gg5 To be 35,000 35,000 35,000 35,000 35,000 175,000 determined SUBTOTAL MISCELLANEOUS ENGINEERING: Current Available Recommended Fundin Fundinq Sources 4,083,052 1997/98 1998/99 35,000 1999/00 2000/01 2001/02 35,000 36,035,000 35,000 2002/03 35,000 Total Proposed 36,175,000 LEISURE - Land Acquisition: Parkland Acquisition — 93111 This project is for the purchase of land for open space and recreation facilities in accordance with the Recreation Element of the City's Comprehensive Plan for use by future generations: to maintain the current ratio of open space and recreation facility land to population. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: The City of Clearwater shall continue to cooperate with all levels of government and coordinate efforts with the private sector to increase public recreational opportunities and open space acreage. Current Availabte Recommended Fundin Fundinq Sources Open Space Rec Land 1997/98 200, 000 150,000 1998/99 1999/00 2000/01 2001/02 300, 000 150,000 Page -20- Total 2002/03 Proposed 500,000 300,000 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Land Acquisition (continued): SUBTOTAL LAND ACQUISITION: Current Available Recommended Funding Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 350,000 450,000 Total Proposed 800,000 LEISURE - Park Deve/opment: Concrete Sidewalk and Pad Repairs - 93204 This project will provide for the removal and replacement of damaged concrete sidewalks and pads in various parks around the City as well as provide for new sidewalks for safetv reasons. Approximately �b;AAA 50,000 sq ft is currently in need of replacement.. Annual Operatinq Costs: No additional increase in operating costs. Comprehensive Plan Obiective To develop a system of open spaces, parks and recreation facilities which are designed for the maximum satisfaction of the recreational needs of Clearwater's residents and tourists. Current Available Recommended Total Funding Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 48,550 Gen Fund �b-0A9 25,000 25,000 25,000 30,000 30,000 135,000 Page -21- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET LE/SURE - Park Development (continued): Countryside Recreation Center Furnishings - 93205 This project will provide for the furniture and equipment needed to complete the recreation center. Equipment needs will include such items as fitness equipment, game room equipment (pool tables, table tennis, bumper pool, etc.) gymnasium equipment (mats, scoreboard, PA system, etc.), kitchen lobby, and maintenance equipment; security and a phone system; office equipment; and table and chairs for meetings and rentals. - Annual Operatinq Costs: Increase in operating costs included with original Center approval. Comprehensive Plan Obiective: Provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. To ensure that all possible measures are taken to protect the health, safety, and welfare of individuals using City recreational lands and facilities. Current Available Recommended Total Fundin Fundinq Sources 1997198 1998199 1999/00 2000/01 2001/02 2002/03 Proposed 24,953 Roller Hockey Facility - 93206 This project will provide for a new roller hockey #asil+t� facilities consisting of an asphalt rink, side boards and goals. � . at various parks throu4hout the Citv Some of the locations may include Ross Norton Park McMullen Tennis Complex, Frank Tack Park and Forest Run Park. Annual Operatinq Costs: $16,000 per year for each facility, requiring no additional personnel. Comprehensive Plan Obiective: To develop a system of open spaces, parks and recreation facilities which are designed for the maximum satisfaction of the recreational needs of Clearwater's residents and tourists. Current Available Fundin 51,000 Recommended Fundina Sources Gen Fund 1997/98 1998/99 1999/00 50,000 100.000 100,000 2000/01 2001102 100,000 Total 2002/03 Proposed 350,000 Page -22- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Development (continued): Softball Complex Development - 93208 The project includes development of a three field softball complex including a restroom, storage facility, parking lot, and other park amenities at E.C. Moore Complex-West. The number of ballfields available for youth and adult softball has not increased since 1979 (14), while the number of teams and participants serviced by these facilities has quadrupled (172 teams to 673 teams). There continues to be rapid growth in girls softball and senior softball and these facilities will help meet the demand created by these age groups. Annual OperatinQ Costs: $70,000 requiring an additional 1.0 FTE in 1997/98. Comprehensive Plan Obiective: To provide City residents and tourists with sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. Current Available Funding 142, 903 Recommended Fundina Sources Infra Tax 1997/98 280,000 Total 1998/99 1999I00 2000101 2001/02 2002/03 Proposed r:� ��� Del Oro Park Renovations - 93209 This project will provide for the renovation of Del Oro Park including the basketball court, ballfield, playground, exercise course, and other park amenities. The park is approximately 20 years old and in need of a major face lift. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: Provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 75,090 Page -23- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LE/SURE - Park Development (continued): McMullen Tennis Complex Buiiding/Restroom Renovations - 93211 This project will provide for the renovations of the McMullen Tennis Complex Building including the restroom and shower facilities. The facilities are in need of interior renovations especially in the restroom areas. It is important to upgrade these facilities since they are supported in part by user fees and the modernization of this facility is needed in order to continue to maintain, or increase, the revenue to the Center. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Oblective: Provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. To ensure that all possible measures are taken to protect the health, safety, and welfare of individuals using City recreational lands and facilities. Current Available Fundinq 84, 803 Recommended Total Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Recreation Path - 93212 Construction of recreation paths for walking, jogging, roller blades and bicycles which will connect City parks and greenways within the City. The City presently has approximately 7 miles of paths within city limits. The next phase of recreational paths will be the connection of Cliff Stephens Park to the EC Moore Complex through the City owned property west of EC Moore. Project includes upgradinq existing path from six foot wide to a minimum width of ten feet. Annual Operatinq costs: $12,000 per year, requiring no additional personnel. Comprehensive Plan Obiective: To develop a system of open spaces, parks and recreation facilities which are designed for the maximum satisfaction of the recreational needs of Clearwater's residents and tourists. Current Available Fundinq 150,000 Recommended Funding Sources Infra Tax 1997/98 1998/99 200,000 200,000 1999/00 2000/01 250,000 Total 2001/02 2002/03 Proposed 650,000 Page -24- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Development (continued): Grandstand and Bieacher Renovations - 93213 This project will provide for the renovation of wooden grandstands at Phillip Jones and Countryside Sports Complex by replacing wooden planks with aluminum and provide for the replacement and repair of other bleacher systems at various spo�ts facilities. Annual Operatinq Costs: No additional costs since this is for maintenance purposes only. Comprehensive Plan Oblective: To develop a system of open spaces, parks and recreation facilities which are designed for the maximum satisfaction of the recreational needs of CleanNater's residents and tourists. Current Available Fundin 25,000 Recommended Fundin4 Sources Gen Fund 1997/98 1998/99 �;9A6 �AA9 50,000 1999/00 2000/01 25,000 Total 2001/02 2002/03 Proposed 75,000 Phillip Jones Clubhouse Expansion - 93214 This project will provide for the expansion of the Phillip Jones Clubhouse by approximately 720 square feet as requested by the Greenwood Panthers Culture and Sports Organization, Inc. Annual Operatinq Costs: $1,000 per year, requiring no additional personnel Total Current Available Recommended Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 39, 530 Tennis Court Resurfacing — 93229 The project includes regularly scheduled resurfacing of tennis courts to include, but not be limited to, the following: McMullen 9-17; and Bayfront. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: To develop a system of open spaces, recreational needs of Clearwater's residents and tourists. Current Available Fundin 21,123 Recommended Fundinq Sources Gen Fund 1997/98 _ ... prevent deterioration of same. Courts to be resurfaced in FY �� 1997198 may parks and recreation facilities which are designed for the maximum satisfaction of the 1998/99 1999/00 25,000 32,500 Page -25- 2000/01 2001 /02 30,000 30,000 2002/03 32,500 Total Proposed 150, 000 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Deve/opment (continued): Playground Equipment Replacement/New — 93230 Phased replacement of major playground equipment and new equipment at the City's 27 playgrounds is included in this project. Playgrounds to be replaced in FY �996E8� 1997/98 may include, but not be limited to: Countrvside Communitv Park, Clearwater Beach Recreation Complex and fitness courses at Ma�tin Luther Kinq Complex and Countrvside Complex. This project also includes phased replacement of fitness equipment and basketball posts and backboards at the City's 21 courts. As equipment is added and/or replaced, it is evaluated to assure it meets ADA requirements. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: To develop a system of open spaces, parks and recreation facilities which are designed for the maximum satisfaction of the recreational needs of Clearwater's residents and tourists. Current Available Fundinq 1,341 Recommended Fundinq Sources Gen Fund 1997/98 1998/99 58;98A 60,000 100,000 1999/00 2000/01 60,000 60,000 2001 /02 65, 000 2002/03 70,000 Total Proposed 415, 000 New Parking Lots — 93249 The project includes improvements to parking facilities at various recreation sites includinq the Countryside Sports Complex i� FY 1995/96, Frank Tack Park if► FY �88�9� 1999/00, a�David Martin Soccer Field in FY 1998/99 and Jack Russell Stadium in 2001/02. Annual Operating Costs: $600, requiring no additional personnel. Comprehensive Plan Objective: To provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. Current Available Fundinq 24,437 Recommended Fundinq Sources Infra Tax To be determ 1997/98 1998l99 1999/00 2000/01 2001/02 40,000 125,000 125,000 Tota I 2002/03 Proposed 165, 000 125,000 Page -26- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Deve/opment (continued): Fencing Replacement Program - 93262 The project includes phased replacement of oid, worn out and rusted fencing at the various recreation sites. The largest amount of fencing to be replaced on an annual basis exists at the 44 ballfield sites which include backstops and dugout fencing. Fence replacement in FY �861997/98 may include, but not be limited to: ,.. , Morninqside, E.C. Moore and Countryside Community Park. Annual OperatinQ Costs: No increase of existing operating costs. Comprehensive Plan Obiective: To provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. Current Available Fundinq 19,814 Recommended Fundinq Sources Gen Fund 1997/98 1998199 �A;AA9 30,000 25,000 1999/00 35,000 2000/01 2001 /02 35,000 35,000 2002/03 40,000 Total Proposed 200,000 Light Replacement and Repair - 93269 The project includes replacement and repair of lighting systems including light fixtures, poles, service panels, and wiring at various Parks & Recreation sites. Project may include, but not be limited to, the following locations in FY . , , , 1997/98: Bomber Stadium, Countrvside Sports Plex, Carpenter Field and St. Pete JC. Annual OperatinQ Costs: No increase of existinq operatinq costs. Comprehensive Plan Obiective: Not applicable. Current Available Fundin 92,047 Recommended Funding Sources Gen Fund 1997/98 1998l99 1999/00 2000/01 2001/02 �SA; 9A9 150 , 000 150, 000 150, 000 150, 000 5 100,000 2002/03 150,000 Total Proposed 850,000 Page -27- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Development (continued): Sand Key City Park - 93282 This project is for the development of a new park on South Sand Key, east of Gulf Blvd. To include parking for beach re-nourishment project if approved, two tennis courts, shuffleboard cou�ts, playground, and other park amenities, as requested by the residents of Sand Key. Annual OperatinQ Costs: $28,000, requiring no additional personnel. Comprehensive Plan Oblective: The City of CleanNater shall continue to cooperate with all levels of government and coordinate efforts with the private sector to increase public recreational opportunities and open space acreage. Current Available Fundin 19,114 Recommended Total Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Jack Russell Stadium S�s�� /Carpenter Complex Infrastructure Repairs - 93285 The project provides for �ral infrastructure repairs needed at the stadium and Carpenter Complex. The project was originally established in the FY 1994/95 Capital Improvement Budget. The funding for FY 96/97 will provide for structural repairs needed for the metal supports, roof, and concrete portions of the stadium as well as painting the structural steel and roof over the upper stands. Fundinq for FY 97/98 will qo to renovate the infield and irriqation systems at Jack Russell. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: To develop a system of open spaces, parks and recreation facilities which are designed for the maximum satisfaction of the recreational needs of Clearwater's residents and tourists. Current Available Fundinq 7,488 Recommended Fundinq Sources Gen Fund 1997/98 1998/99 69;AA9 60,000 90,000 1999/00 100,000 2000/01 2001 /02 ��� ��� Total 2002/03 Proposed 550,000 Page -28- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Development (continued): Parking Lot Resurfacing and Improvements - 93286 The project includes regularly scheduled resurfacing of parking lots to prevent deterioration and minor improvements to parking lots being resurfaced. Parking lots to be resurfaced in FY1996/97 may include, but not be limited to: , , Norton Park, McMullen Tennis Comalex and Recreation Facilities Field Office. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: Not applicable. Current Available Fundin 21,663 Recommended Fundina Sources Road Millage 1997/98 1998/99 30,000 30,000 1999/00 2000/01 2001/02 30,000 30,000 35,000 2002/03 40,000 Total Proposed 195,000 Lake Chautauqua Park - 93295 The project includes the phased development of a passive park on property purchased with a grant from the Depa�tment of Natural Resources: Phase I- 1995/96 Picnic area, nature trails, entrance roadway and parking lot. Phase II - 1996/97 Water oriented development, docks, boat launching facilities and storage/restroom facilities. Annual Operating Costs: $45,000, requiring an additional 1.0 FTE. Comprehensive Plan Objective: 1. To advance the development of a complete recreational system through cooperative efforts with other governments and agencies. 2. The City should utilize areas of ecological, historical, or archaeological value for resource-based parks and recreation development in order to achieve efficient land utilization and resource protection. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 400,492 Page -29- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Development (continued): Clearwater Beach Aquatics Park and Pool - 93296 This project will provide for the design and construction of a mini aquatics park/pool to be built east of Mandalay Ave. and no�th of the tennis courts at the Clearwater Beach Recreation Complex. This mini aquatics park will provide for the same type of programming offered at the Pier 60 pool (swim lessons, lap swimming, competitive swimming). In addition there will be other aquatic amenities such as slides, water sprays and fountains, playground equipment, etc. to attract the recreational users and tourists on Clearwater Beach. Annual Operating Costs: $105,000 annual budget and $12,500 one time start-up costs; 3.9 FTE positions. Comprehensive Plan Objective: Provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. To ensure that all possible measures are taken to protect the health, safety, and welfare of individuals using City recreational lands and facilities. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 512,472 �e Cooper's Bavou Park — 93297 This project is for the development of a-�ew-�ar� Cooper's Bavou Park located on Bayshore Blvd. and will include a picnic area, sidewalks, parking lot, dock, and other park amenities Annual Operatinq Costs: $6,000, requiring no additional personnel. Comprehensive plan Obiective: Provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. To advance the fullest utilization of all public land (including unused and under-used) compatible with other goals. Current Available Recommended Total Fundin Fundinct Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 23,607 Page -30- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Development (continued): Picnic Sheiters - 93298 , Wood Valley 97198 , and Kings Highway 97/98 , and This project will provide for the construction of new picnic shelters at , Martin Luther Kinq and Morninctside. Countrvside (981991 similar to the shelter installed at Ross Norton Park Annual OperatinQ Costs: No significant increase of existing operating costs. ry 9 pp Comprehensive Plan Obiective: Provide City residents and tourists with recreational sites of the highest quality which permit sufficient and va in o ortunitie$ for the enjoyment of active and passive recreational activities. Total Current Available Fundin 83,299 Recommended Funding Sources 1997l98 Infra Tax �g To be determ 1998199 1999/00 40.000 2000/01 2001/02 2002/03 Proposed 40,000 Northeast Coachman Park -932xx The project provides for a picnic area & parking for Northeast Coachman Park located on the southwest corner of Old Coachman. This park, coupled with t e proposed active park on the northwest corner of Old Coachman, will complete the park system for this quadrant of the City. Annual Operatin4 Costs: $10,000, requiring an additional .20 FTE. Comprehensive Plan Obiective: To provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. Total Current Available Recommended Fundin Fundina Sources 1997/98 Infra Tax 1998/99 25 1999/00 2000101 2001102 2002/03 Proposed Page -31- ��� 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LE/SURE - Park Deve/opment (continued): McMullen Tennis Complex — aa�aN Soft Courts - 932XX This project provides for the construction of �ba11-soft tennis courts at the McMullen Tennis Complex. Annual Operatinq Costs: $3;8A9 20 000, requiring fle- 7.0 FTE additional personnel. Comprehensive Plan Obiective: To advance the fullest utilization of all public land (including unused and under-used) compatible with other goals. Provide Ciry residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. Current Available Recommended Fundinq Fundinq Sources Infra Tax 1997/98 1998/99 1999/00 150, 000 Total 2000/01 2001/02 2002/03 Proposed 150, 000 State Street Park - 932XX The project includes the development of a new park on the north east corner of State Street and Betty Lane. This will consist of two tennis courts, basketball court, playground equipment, picnicking, nature trail and parking facilities. A portion of the park was secured by donations from the Open Space/Recreation Impact Fee dedication requirements. Annual Operatinq Costs: $28,000, requiring an additional .30 FTE. Comprehensive Plan Obiective: To advance the fullest utilization of all public land (including unused and under-used) compatible with other goals. Provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreation activities. Current Available Recommended Fundinq Fundin4 Sources Infra Tax 1997/98 1998/99 1999/00 2000/01 2001 /02 ��AA9 �;9A9 225,000 25,000 Total 2002/03 Proposed 250,000 Page -32- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Development (continued): Ross Norton Park - 932XX This project will develop urts a realacement basketball cou�t aad-s+dewall�s, and provide renovations to the recreation center building at Ross No�ton Park. Annual Operatinq Costs: No increase of existing operational costs. Comprehensive Plan Obiective: Provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. Current Available Recommended Fundin Fundina Sources Infra Tax 1997/98 1998/99 1999/00 �AAB 100.000 Total 2000101 2001/02 2002/03 Proposed 100,000 D.D. Davis Park - 932XX The project includes development of a new park south of Marlo Blvd. and east of the proposed Landmark Drive Extension. Park development will consist of finro tennis courts, a basketball court, playground equipment, parking and other park amenities. Annual Operatinq Costs: Approximately $28,000, requiring an additional .20 FTE. ry g Pp Comprehensive Plan Obiective: Provide City residents and tourists with recreational sites of the highest qualiry which permit sufficient and va in o ortunities for the enjoyment of active and passive recreational activities. To advance the fullest utilization of all public land (including unused and under-used) compatible with other goals. Current Available Recommended Fundin Fundin4 Sources Infra Tax Total 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 250,000 250,000 Page -33- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Development (continued): - - - - - - � �- - - - - .- - - -� • - - - - - - - - - - Rese�►w+e�� F��di �#fa-�a* �99�98 �-998/S9 a�9891A9 �008/&'� �99aa8� �AA;AA9 �A4-9A9 � �AA2�A3 e�es�e� . .. ... .. _ ... _ Rese��e�ed � � _ 488�88 �888�98 4899198 �98AEA� 29A�9� �99�A3 r�sed � . ... � . ... Page -34- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LE/SURE - Park Development (continued): Countryside High Practice Field Renovations - 932XX This project will provide for the renovation of the practice fields north of the Countryside High School Stadium by providing an irrigation system, grading, and sprigging. Many of the City's co-sponsor groups in the Countryside area use the practice fields at Countryside High under the joint-use agreement between the school board and the City. ' Annual Operatinq Costs: $3,000; no significant increase in personnel. Comprehensive Plan Obiective: Provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. To ensure that all possible measures are taken to protect the health, safety, and welfare of individuals using City recreational lands and facilities. Current Available Recommended Fundin Fundin4 Sources 1r�#fa�a� To be determ 1997/98 1998/99 60.000 Total 1999100 2000/01 2001/02 2002/03 Proposed , . .T.T. .� ��� Swimming Pool Renovations - 932XX This project will provide for #�e a renovation study and costs of the various pools in the City, i�►sl�+c�g for facility improvements leisure pool enhancements and lonq-term maintenance such as marciting and repair of gutters, tile, and decking. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: Provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. To ensure that all possible measures are taken to protect the health, safety, and welfare of individuals using City recreational lands and facilities. Current Available Recommended Fundin Fundinq Sources Infra Tax 1997/98 1998199 1999/00 100,000 b�999 Total 2000/01 2001/02 2002103 Proposed _. ... 100,000 Page -35- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET LE/SURE - Park Deve/opment (continued): Cultural Arts Workshop Replacement - 932XX This project provides for the replacement of the Cultural Arts Workshop Building located on Drew Street. The County is proposing, at sometime in the future, to extend Keene Road north from Gulf-to-Bay Blvd. and through the property which houses the Cultural Arts Workshop. A new facility will be required in order to accommodate the needs of the cultural programming. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: Provide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of active and passive recreational activities. To ensure that all possible measures are taken to protect the health, safety, and welfare of individuals using City recreational lands and facilities. Current Available Recommended Fundinq Fundinq Sources To be determ 1997/98 1998/99 1999/00 350,000 Total 2000/01 2001/02 2002/03 Proposed 350, 000 Recreation Portable Stage (Showmobile) - 932XX This project will provide for the purchase of a portable stage unit that can be transported throughout the city to various parks and recreation events. The stage can be used for special events and a multitude of other public functions. Annual Oqeratinq Costs: No additional increase in operating budget unless purchased by lease arrangement. Comprehensive Plan Obiective: To develop a system of open spaces, parks and recreation facilities which are designed for the maximum satisfaction of the recreational needs of Clearwater's residents and tourists. Current Available Recommended Total Funding Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002l03 Proposed Rec Fac Imp 75,000 75,000 Page -36- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LE/SURE - Park Deve/opment (continued): Disc Golf Course Renovations - 932XX This project will provide for the renovation of the two disc golf courses located at Cliff Stephens Park and Northeast Coachman Park. The City and volunteers have worked in a partnership to provide two excellent disc golf courses however funds will be required to maintain the course holes and tee areas. Also, the addition of one new course is planned for. Annual Operatinq Costs: No additional costs since this is for maintenance purposes only. Comprehensive Plan Obiective: To develop a system of open spaces, parks and recreation facilities which are designed for the maximum satisfaction of the recreational needs of Clearvvater's residents and tourists. Current Available Recommended Fundinq Fundin4 Sources Gen Fund 1997/98 1998/99 1999/00 25,000 25,000 2000/01 2001 /02 25,000 Total 2002/03 Proposed 75, 000 Countryside High School Ballfield Restrooms - 932XX This project will provide for the construction of new restroom facilities for participants using the Countryside High School baseball field and open field practice areas. While the facility may be used for school use, the primary use will be for City co-sponsor groups utilizing school facilities. Annual Operatinq Costs: $16,000; requiring an additional .2 FTE. Comprehensive Plan Obiective: To develop a system of open spaces, parks and recreation facilities which are designed for the maximum satisfaction of the recreational needs of Clearwater's residents and tourists. Current Available Recommended Funding Fundinq Sources Gen Fund 1997/98 1998/99 40,000 1999/00 2000/01 .T.T.T.T. Total 2001/02 2002/03 Proposed 40,000 Page -37- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Development (continued): CulturallSocial Recreation Center — 932xx This ro'ect will rovide for a stud in FY 97/98 and construction costs FY 98199 for a cultural/social recreation center. The center will be used for ballroom dancinq, duplicate bridqe, social and cultural proqrams special events, rentals, etc. Ideallv it would be located in an area that is central to the citizens of Clearwater. ' Annual Operatinq Costs• 5150,000 per vear required 2.0 additional personnel. Comprehensive Plan Objective• To develop a svstem of open spaces parks and recreation facilities which are desiqned for_the maximum satisfaction of the recreational needs of Clearwater's residents and tourists. Current Available Recommended Fundin Fundina Sources Infra Tax 1997/98 1998/99 1999I00 2000/01 2001/02 50,000 Total 2002/03 Proposed 50,000 To be determ 1,450,000 1,450,000 Skateboard Parks — 932xx This proiect will provide for the construction of three skateboard parks which will include parkinq restrooms and the skateboard park. The exact sites are to be determined. Annual Operatinq Costs• �20 000 per year per facilitv requirinq 0 3 FTE Comprehensive Plan Obiective• To develop a svstem of open spaces parks and recreation facilities which are desiqned for the maximum satisfaction of the recreational needs of Clearwater's residents and tourists. Current Available Fundin Recommended Fundinp Sources 1997/98 General Fund 260,000 To be determ 1998/99 1999/00 2000/01 250,000 2001 /02 250,000 Total 2002/03 Proposed 260,000 500,000 Page -38- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LE/SURE - Park Development (continued): Marshall Park Renovations — 932xx This prolect will provide for the renovation of Marshall Street Park includinq the replacement of the existinq picnic shelter, an additional picnic shelter, new restrooms 2,200 linear feet of 8 foot wide recreation path, decorative liqht poles, picnic tables and other park amenities. Annual Operatinq Costs: ;4,800, requirinq 0.1 FTE. Comprehensive Plan Oblective: To provide Citv residents and tourists with recreational sites of the hiqhest qualitv which permit sufficient and varyinq opportunities for the eniovment of active and passive recreational activities. To ensure that all possible measu�es are taken to protect the healthy, safetv, and welfare of individuals usinq City recreational lands and facilities. Current Available Recommended Fundin Fundinq Sources Infra Tax 199T/98 266,540 Total 1998/99 1999/00 2000/01 2001102 2002/03 Proposed 266,540 Clearwater Beach Pinellas Trail Spur — 932xx This proiect will provide for a trail spur off the Pinellas County Trail from Turner Street to Clearvvater Beach via the Memorial Causewav. The trail will be developed utilizinq the current Pinellas Trail specifications and will be similar to the recently constructed Dunedin Spur from Alternate 19 to Honeymoon Island Safetv improvements to the bridaes as well as a wider trail on the Memorial Causeway is planned. Annual Operatinq Costs: 54,800 per vear, requirinq 0.2 FTE. Comprehensive Plan Obiective• To provide Citv residents and tourists with recreational sites of the hiqhest quality which permit sufficient and varvinq opportunities for the eniovment of active and passive recreational activities. Current Available Recommended Fundinq Fundina Sources To be determ 1997/98 1998/99 1999/00 2000/01 500,000 Total 2001/02 2002/03 Proposed 500,000 Page -39- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET LE/SURE - Park Development (continued): Pinellas Trail Amenities — 932xx This proiect will provide for additional amenities to the Pineilas Trail portion that will run throu4h Clearwater Amenities mav include but not be limited to, benches, water fountains picnic tvpe shelter, bicvcle racks, restroom, landscapinq (primarily trees etc ► Site for these amenities to be determined. Annual Operatinq Costs: $2,000 per Vear, requirinq 0.1 FTE. � Comprehensive Plan Obiective• To beautifv parks and selected open space sites to enhance the quality of life in the city and to make it a more attractive plant to live and visit To provide City residents and tourists with recreational sites of the hiqhest qualitv which permit sufficient and varying opportunities for the eniovment of active and passive recreationai activities. Current Available Recommended Fundin Fundinq Sources Infra Tax 1997/98 1998/99 1999/00 2000/01 2001/02 100,000 Total 2002/03 Proposed 100,000 Crest Lake Park Master Plan — 932xx This proiect will provide for a master plan for one of the Citv's most important and visible parks While there have been some improvements and or additions to the park, there has never been a comprehensive plan as to the direction and vision the Citv wants to take concernmq this park. Annual Operatinq Costs• No additional cost for the plan, however• there would be costs assoc�ated with any recommended improvements. Comprehensive Plan Obiective• To provide City residents and tourists with recreational sites of the hiqhest quality which permit suff�cient and varying oppo�tunities for the enloyment of active and passive recreational activities To advance the fullest utilization of all public land includmct unused and under-used compatible with other qoals. Current Available Recommended Fundin Fundina Sources Infra Tax 1997/98 1998/99 1999/00 2000/01 2001/02 50,000 Tota I 2002/03 Proposed 50,000 Page -40- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LE/SURE - Park Development (continued): Moccasin Lake Nature Park Improvements — 932xx This prolect will provide for a master plan of the nature park (FY 1998199) Habitat Manaqement Proqram (FY 19991001, trail enhancement 8 development (FY 2000101) and exhibit development (2001/02) This park is the onlv nature park m the citv and is visited by school children, res�dents and tounsts. Improvements and repairs are needed for this 15 vear old park. Annual Operatina Costs No additional cost for the plan however there would be costs associated with any recommended improvements. Comprehensrve Plan Obiective To provide Citv residents and tourists with recreational sites of the hiqhest quality which perm�t sufficient and varving 0 o�tunities for the eniovment of active and passive recreational actrvities To ensure that all possible measures are taken to protect the health, safety, and welfare of individuals usina Citv recreational lands and fac�lit�es. Current Available Recommended Fundin Fundina Sources To be determ Total 1997/98 1998199 1999/00 2000/01 2001/02 2002/03 Proposed 50,000 100.000 50.000 50.000 250.000 Coachman Bandshell Renovations — 932xx This proiect will provide for the renovation of the bandshell roof and staqe area so that events can better be accommodated at this facility. The roof continues to be a maintenance problem and it offers no protection for the performers or their equipment durina inclement weather. Annual Operatinq Costs• no siqnificant increase requirinq no additional personnei Comprehensrve Plan Obiective To provide Citv residents and tourists with recreational sites of the hiqhest qualitv which_ permit su�cient and vaNinq 0 ortunities for the eniovment of active and passrve recreational actrvities To ensure that all possible measures are taken to arotect the health, safetv and welfare of individuals usinq Citv recreational lands and facilities. Current Available Recommended Fundin Fundin4 Sources To be determ 1997/98 1998/99 150.000 Total 1999/00 2000/01 2001/02 2002/03 Proposed 150,000 Page -41- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Park Development (continued): Cleveland Street Linear Park — 932xx This proiect will provide for a linear park on the north side of Cleveland Street from Mvrtle Ave. and North Prospect Ave. It will include pedestrian walkwavs fountain small aazebo seatinq and landscaqinq. It will be constructed in coniunction with the development of the proposed Winn Dixie Store. Annual Operatinq Costs: �9,000 per vear requirinq 0.2 FTE Comprehensive Plan Obiective: To provide Citv residents and tourists with recreational sites of the hiqhest qualitv which permit sufficient and varvinq opportunities for the eniovment of active and passive recreational activities. To advance the fuilest utilization of all public land includinq unused and under-used compatible with other qoals. Current Available Recommended Funding Fundina Sources CDBG 1997198 1998/99 1999/00 2000/01 2001/02 140,000 Tota I 2002/03 Proposed 140,000 Island Estates Plav4round — 932xx This proiect will provide for the development of a vacant city owned lot located on the south side of Windward Passaqe on Island Estates. Development wilt include plavqround equipment, seatinq sidewalks, fencina landscapinq and other park amenities This is the only city property on Island Estates that is available for a citv park. Annual Operatinq Costs: no additional operatinq costs Comprehensive Plan Obiective: To provide Citv residents and tourists with recreational sites of the hiqhest quality which permit sufficient and varyinq opportunities for the enioyment of active and passive recreational activities. To advance the fullest utilization of all public land includinq unused and under-used compatible with other qoals. Current Available Recommended Fundinq Fundina Sources Infra Tax 1997/98 45,000 Total 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 45,000 Page -42- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LE/SURE - Park Deve/opmenf (continued): Allen's Creek Rehab Proiect — 932xx This proiect will provide for the park amenities to be added to the Allen's Creek Rehab Proiect located on the East side of Hercules at Lakeview Ave. Park improvements will include plavqround equipment benches, sidewalks, landscapinQ, fencina, siqnaqe and other misc. items. Annual Operatinq Costs: 525,000 per vear requirinq 0.5 FTE Comprehensive Plan Obiective• Preserve natural open space areas which constitute aesthetic and /or ecoloqical community assets. To advance the fullest utilization of all public land includinct unused and under-used compatible with other qoals. Current Available Recommended Fundin Fundinq Sources To be determ SUBTOTAL PARK DEVELOPMENT: Current Available Fundin 1,868,546 1997/98 1998/99 1999/00 2000/01 2001 /02 Recommended Fundin4 Sources 1997198 LE/SURE - Park Beautification: 1, 926, 540 80,000 1998/99 1999/00 2000/01 2001/02 3,310,000 2,332,500 805,000 770,000 Total 2002/03 Proposed 2002/03 362,500 80,000 Total Proposed 9,496,540 Bayfront Park Renovations - 93316 The project was established in compliance with the conceptual Bayfront renovation plan adopted by the City Commission to include the phased renovation and beautification of the downtown park system. The project was originally established in the FY 1990/91Capital Improvement Budget. Current Available Fundin 310,012 Recommended Total Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Page -43- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LE/SURE - Park Beautification (continued): Gulf-to-Bay Beautification Project — 93321 This project will provide for the installation of Washingtonian Palms at various intersections on Gulf-to-Bay Boulevard from U.S. 19 to Highland Avenue. Annual Operatinq Costs: $8,000 per year, requiring no additional personnel. Comprehensive Plan Obiective: Preserve natural open space areas which constitute aesthetic and/or ecological community assets. Current Available Fundin 13,033 Recommended Fundina Sources SUBTOTAL PARK BEAUTIFICATION: Current Available Fundin 323,045 Recommended Fundinq Sources LEISURE - Marine Facilities: 1997/98 1997/98 1998/99 1998/99 1999/00 1999100 2000/01 2000/01 2001/02 2001/02 2002/03 2002/03 Total Proposed Total Proposed Utilities Service Replacement - 93413 The project provides for ' ' ' � , a continuous repair and/or replacement of deteriorated electrical wiring, power outlet stations main and east dock f9�8�} and water service at the City's Municipal Marina and Island Estates Marina; to continue to maintain the City-owned marinas in usable condition. In 97198 fundinq of a46,000 is budqeted to replace 62 power outtet utility stations on the main and east docks. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: 1. To continue to maintain Marina operations on a self-supporting basis. 2. To ensure that dock site space is being utilized to the fullest extent. 3. To provide for optimum use of Marina management resources. Current Available Fundin : .. � Recommended Fundinq Sources Marine Rev 1997/98 1998/99 1999/00 56,000 10,000 10,000 2000/01 2001/02 10, 000 10, 000 2002/03 10,000 Total Proposed 106, 000 Page -44- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Marine Facilities (continued): Dock Replacement and Repair - 93429 The project provides for continuous repair and/or replacement of deteriorated docks at municipal docking facilities and Island Estates Marina, installation of portable sewage pump out system at Island Estates Marinal utilizing the Marine Services section and equipment to continue to maintain City owned marina in usable condition. Annual OperatinQ Costs: No significant increase of existing operating costs. � Comprehensive Plan Oblective: 1. To continue to maintain Marina operations on a self-supporting basis. 2. To ensure that dock site space is being utilized to the fullest extent. 3. To provide for optimum use of Marina management resources. Current Available Funding 6,612 Recommended Fundinq Sources Marine Rev 1997l98 1998/99 15,000 15,000 1999/00 2000/01 15,000 15,000 2001 /02 15,000 2002/03 15,000 Total Proposed •i ��� Waterway Maintenance - 93436 The project provides for continuous repair and/or replacement of deteriorated City-owned aids to navigation and information signage (buoys, beacons, wake control and navigational signs); removal of derelict vessels and menaces/hazards to navigation; and procuring of piling, sign material to fabricate buoys and sinkers, utilizing the Marine Service section and equipment, in order to continue to maintain City-owned waterways in a usable condition Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: To continue to maintain Marina operations on a self-supporting basis; to ensure that dock site space is being utilized to the fullest extent; and to provide for optimum use of Marina management resources. Current Avaifable Fundinq . �:� Recommended Fundinq Sources Marina Rev 1997198 1998/99 10,000 10,000 1999/00 2000/01 10,000 10,000 2001 /02 10,000 2002/03 10,000 Total Proposed .� ��� Page -45- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Marine Facilities (continued): Seminole Launch Ramp Dredging - 93443 The project provides for the repairs and/or replacement of floating docks, ramp area and pilings; maintenance and operation of sewage dump station; and the purchase of permits (launch parking). Maintenance dredging of the boat basin at ramp area may be required in FY 8�88 99/00 because of silting, to continue to insure that City-owned boa4 launching facilities are in usable condition. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: 1. To continue to maintain Marina operations on a self-supporting basis. 2. To ensure that dock site space is being utilized to the fullest extent. 3. To provide for optimum use of Marina management resources. Current Available Fundin 19,551 Recommended Fundinct Sources Marine Rev Marine Borrowing 1997/98 1998/99 5,000 5,000 �5A;989 1999/00 2000/07 2001/02 �899 5,000 5,000 250.000 2002/03 5,000 Total Proposed 25,000 250,000 Bridges, Docks and Seawall Renewal and Replacement - 93470 This is a continuous maintenance program to keep the City's eighteen bridges, and several thousand feet of seawall at street ends, in good repair. Annual Operatinq Costs: No increase of existing operating costs. - Comprehensive Plan Obiective: To provide for maximum protection of health and safery in Clearwater's transportation system. Current Available Fundin 118,710 Recommended Fundinq Sources Road Millage Infra Tax 1997/98 1998/99 1999/00 70,000 70,000 75,000 80,000 80,000 75,000 2000/01 2001 /02 75,000 100,000 75,000 2002/03 100,000 Total Proposed 490, 000 310,000 Page -46- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Marine Facilities (continued): Fishing Piers - 93487 The project was originally established in the first quarter of FY 93/94 for the construction of concrete fishing pier on the west end of the Memorial Causeway Bridge. The additional funding of $200,000 for FY 96/97 will be for a fishing pier located near Clearwater Pass Bridge. Annual Operatin4 Costs: No increase of existing operating costs. Comprehensive Plan Obiective: To advance the fullest utilization of public land and waterways. P�ovide City residents and tourists with recreational sites of the highest quality which permit sufficient and varying opportunities for the enjoyment of recreational activities. Current Available Fundin 208,069 Recommended Total Fundinq Sources 1997198 1998199 1999100 2000/01 2001/02 2002/03 Proposed Fuel System Replacement 8 Repair - 93490 The project provides for continuous repair and/or replacement of deteriorated fuel lines, dispenser and underground pollutant storage tanks at the municipal marina, utilizing contractors to continue to maintain city-owned marina fuel system in usable condition. Annual OperatinQ Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: Not applicable. Current Available Fundin 1, 998 Recommended Fundinq Sources 1997/98 Marine Rev 5,000 1998/99 1999/00 5,000 5,000 2000/01 2001/02 5,000 5,000 2002/03 5,000 Tota I Proposed K� ���` Pier 60 Maintenance - 934xx This project provides for continuous repair and/or replacement of electrical services, water service, fire protection equipment and structural components of the pier. Annual Operating Costs: None. Comprehensive Plan Objective: Continue repair and/or replacement for Pier 60 electrical service, water service, fire protection equipment, pier structure and retail sales equipment, utilizing contractor and Marine Services/equipment. Current Available Fundin 14,540 Recommended Fundinq Sources Gen Fund Rev 1997/98 1998/99 20,000 1999/00 2000/01 2001/02 20,000 20,000 20,000 2002/03 20,000 Total Proposed 100,000 Page -47- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE - Marine Facilities (continued): Marina Restroom Renovation — 934xx This proiect provides for renovation of the municipal marina men's and women's restroom. The scope of the proiect includes, demolition of space, new walls floor tiles plumbina, �xtures, electric, doors and ceilinct, includinct meetinct ADA requirements. Annual Operatinq Costs: Comprehensive Plan Obiective• Renovation of municipal marina restrooms to provide citv residents and tourists with facilities of the hiqhest quality, utilizinq contractors and the Marine Services Section equipment. Current Available Recommended Fundinq Fundinq Sources Marine Rev SUBTOTAL MARINE FACILITIES: Current Available Fundin 384,220 1997/98 1998/99 1999/00 2000/01 50,000 Recommended Fundinq Sources 1997/98 291,000 Total 2001/02 2002/03 Proposed 1998/99 1999/00 2000/01 2001 /02 215,000 460,000 215,000 165,000 2002/03 165,000 50.000 Tota I Proposed 1,511,000 LEISURE - Libraries: Books and Materials Collection — 93521 This project is for the acquisition of books, publications, and related materials for the Main, East, Countryside, North Greenwood, and Beach Libraries. The Pinellas Public Library Cooperative provides annual funding, which will be used again in FY 95/96 to purchase library materials to serve added county residents using the East and Countryside Branches. . Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: The mission of the Clearwater Public Library System is to make readily available to patrons library materials and information services in a cost effective manner proportionate to levels of demand and use, and to provide access to resources outside the library system. Current Available Fundin 301,442 Recommended Fundinq Sources General Fund Library Coop 1997/98 1998/99 1999/00 2000/01 2001/02 490,000 500,000 510,000 520,000 530,000 200,000 200,000 200,000 200,000 200,000 2002/03 540,000 200,000 Total Proposed 3,090,000 1,200,000 Page -48- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET LEISURE — Libraries (continued): Checkpoint Self-Checkout System for Circulation — 93522 Self-checkout systems allow staff more time to work with customers at the checkout desks. Purchase of self-check systems eliminates the need to hire new staff as circulation increases. Three units are requested for Main, Countryside and East Libraries. Annual Operating Costs: Debt service payments of approximately $16,300. Comprehensive Plan Objective: Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 77,600 SUBTOTAL LIBRARIES: Current Available Recommended Fundin Fundinq Sources 1997/98 1998/99 1999/00 379,042 690,000 700,000 710,000 GENERAL PUBL/C BUILD/NGS 8 EQUIPMENT - Garage 2000/01 720,000 2001/02 2002/03 730,000 740,000 Total Proposed 4,290,000 �de�-Fas.i�i�� Motor Pool Refurbishment- 94210 The project provides for the construction and refurbishment of the Garaqe facility. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 426,667 Page -49- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILD/NGS 8 EQUIPMENT - Garage (continued): Motorized Equipment Replacement - Cash - 94222 This project is for the replacement of motorized equipment for all City departments, on an ongoing basis. The equipment will be purchased with cash. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: Ne�applisable To provide for the svstematic improvement of the Citv's phvsical plant and for increased efficiencv in qovernmental operations. Current Available Fundin 499,672 Recommended Fundinct Sources Garage 1997/98 1998/99 �8A9 �a,-8A9 100,400 85,000 1999/00 2000/01 2001/02 �989 �A;�9� ��-A98 85,000 90,000 90,000 2002/03 95,000 Total Proposed 545,400 GaragelBuilding 8 Maintenance Technology Upgrade - 94223 This project provides for necessary upgrades of �►e-6afage General Services computer system. Upgrade needed to replace existing "°°' ^^�' F,�°'�^^ °,�°+°^' Fleet and Buildinq 8 Maintenance svstem. New system will replace #�+e4+�s}�sie�-a� current GEMS Fleet svstem and the Buildinq 8 Maintenance workorder system. This will provide improved cost tracking for Fleet, Radio and Building & maintenance divisions. Current Available Fundin 360,573 Recommended Total Fundinq Sources 1997l98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Motorized Equipment Replacement - UP - 94227 This project is for the replacement of motorized equipment for all City departments, on an ongoing basis. The equipment will be lease purchased. Annual Operatinq Costs: No increase of existing operating costs. Annual debt service of $48�9 approximatelv $504,536 for FY �996E8� 1997/98, to be paid by the Garage Fund. Comprehensive Plan Obiective: �le�--ap�4iea�le To provide for the sVStematic improvement of the Citv's phvsical plant and for increased efficiency in clovernmental operations. Current Available Fundin 1,077,955 Recommended Fundinq Sources UP 1997/98 1998/99 1999/00 2000/01 2001102 �ggg;�gg �;g9g;gA9 �A8;AA9 2,200,000 2,300,000 2,169,150 2,200,000 2,200,000 Page -50- 2002/03 2,400,000 Total Proposed 13,469,150 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBL/C BU/LD/NGS 8 EQUIPMENT - Garage (continued): SUBTOTAL GARAGE: Current Available Fundinq 2, 364, 867 Recommended Funding Sources 1997/98 2,269,550 1998/99 1999/00 2000I01 2001 /02 2;285,000 2,285,000 2,290,000 2,390,000 GENERAL PUBLIC BUILD/NGS 8 EQU/PMENT - Maintenance of Buildings 2002/03 2,495,000 Total Proposed 14,014,550 Air Conditioners - City-Wide Replacements - 94510 The project provides for the replacement of several air conditioning systems that are in need of replacement due to age, deterioration, and excess energy usage. � , . For FY 97198 —�5,000 for Moccasin Lake O�ce, �15,000 for Kinqs Hiqhwav Recreation (2 units), �16,000 for Ross Norton Recreation (3 unitsl, 510,000 for Morninqside Recreation, 525,000 for Main Library (4 units), 55,000 for Marina, $30,000 for Parks Field Office (3 units) and 55,000 for miscellaneous small units. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: Ale�l+sa� To provide for the svstematic improvement of the City's physical plant for increased efficiencv in qovernmental operations. Current Available Fundinq 95, 392 Recommended Fundinq Sources General Fund Water/Sewer Garage Marine Parking Sys 1997/98 1998/99 106,000 78,000 20,000 20,000 5,000 1999/00 a-AA;A99 135,000 �a-9A8 2000/01 2001 /02 4a;-999 a�-A99 90,000 38,000 20, 000 20, 000 ... � � � � ... � ��� 2002/03 130,000 Total Proposed 577,000 60, 000 20,000 25, 000 20, 000 Page -51- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILDINGS 8 EQU/PMENT - Maintenance of Buildings (continued): Roof Replacements — 94514 The project includes roof replacements necessary to preserve the integrity of the structure and its contents. � � � ' � � . For FY 97198 -$15,000 for Nurserv, 10 000 for Countryside Sports Plex, 560,000 for Fleet Maintenance ce Office Garaqe �5 000 Ross Norton Rec and �4 000 for specifications for the Fleet Maintenance facilitv. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Oblective: Ne�--ap�l}sab4� To provide for the svstematic improvement of the Citv's phvsical plant for increased efficiencv in qovernmental operations. Current Available Fundin 189,235 Recommended Fundina Sources General Water/Sewer Gas Rev Garage Solid Waste 1997/98 1998/99 1999/00 gg;ggg �4,gg8 89,000 30.000 59.000 4A;AAA 55.000 44;999 64,000 2000/01 2001/02 �9;AA9 4A;998 44,000 34,000 �a;g98 25.000 6�AA8 60,000 30,000 2002/03 145.000 Tota I Proposed 401,000 80,000 60,000 64,000 30, 000 Page-52- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILDINGS 8 EQUIPMENT - Maintenance of Buildings (continued): Roof Repairs — 94512 The project inctudes roof repair of various City buildings as needed to prevent water damage to interiors of buildings. ��, , , , . FY 97/98 — 54,000 for Ervin's Recreation Center, $3 000 for Fire Station #49 S2 000 for East Librarv �2,000 for Main Librarv and S3 000 for Moccasin Lake. Funds are currentiv available in the project for these reaairs. Annual Operatinq Costs: No increase of existing operating costs. Comp�ehensive Plan Obiective: Not applicable. Current Available Funding 48,884 Recommended Fundinq Sources General Fund Water/Sewer Gas Rev 1997/98 1998/99 1999/00 2000/01 2001102 �4;AA9 14,000 �AA9 6,000 6,000 3,000 5,000 6,000 6,000 �;AAB 5,000 2002/03 8,000 5,000 Total Proposed 37,000 22, 000 5, 000 Building and Maintenance Facility — 94513 The project provides for the relocation of an existing building and the centralization of the Building & Maintenance Division with the General Services Department. The building will be located in the vicinity of the current garage complex. Project was originally established in the FY 1992/93 Capital Improvement Budget. Current Available Recommended TO�� Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 64,886 Page -53- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BU/LD/NGS 8 EQUIPMENT - Maintenance of Buildings (continued): Radio Replacement Proqram — 945xx This prolect will establish a three year replacement proqram for older radios that have exceeded their life expectancv. Existinq radios will be replaced with new models. Most older radios have been in service since the radio system was purchasinq in July 1987. Annual Operatinq Costs: For FY 97198 approximatelv $88,920 for debt service costs. Comprehensive Plan Obiective: To replace obsolete radios that are becominq difficult and expensive to maintain. Parts are becominq difficult to secure due to the aqe of the radios. Most models are no tonqer manufactured. Current Available Recommended Fundin Fundinq Sources 1997/98 1998199 1999/00 2000/01 2001/02 L/P 382,330 445,000 445,000 SUBTOTAL MAINTENANCE OF BUILDINGS: Current Available Fundin 398,397 Recommended Fundinq Sources 1997/98 587,330 1998/99 1999100 2000/01 2001/02 691,000 682,000 196,000 229,000 GENERAL PUBLIC BUILD/NGS & EQU/PMENT - City Hall: Total 2002/03 Proposed 2002/03 288,000 1,272,330 Tota I Proposed 2,673,330 Municipal ServiceslPublic Safety and Police Compiex - 94602 The project provides for the construction of a consolidated Municipal Services and Public Safety complex on the property known as the Bilgore site. This project was originally established in the FY 93/94 Capital Improvement Budget. Current Available Recommended Fundin Fundinq Sources 573,719 1997/98 1998/99 1999/00 Page -54- Tota I 2000/01 2001/02 2002/03 Proposed 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILDINGS 8 EQUIPMENT - City Hall (continued): SUBTOTAL CITY HALL: Current Available Fundin 748,930 Recommended Fundinq Sources 1997198 1998199 1999/00 2000/01 GENERAL PUBLIC BUILDINGS 8� EQUIPMENT - Miscellaneous: A.D.A. Transition Plan — 94702 The project was established to bring all City facilities in compliance with the Americans with Disabilities Act. Current Available Recommended Fundin Fundinq Sources 199T/98 1998/99 1999/00 2000/01 76,615 2001/02 2001/02 2002/03 2002103 Total Proposed Total Proposed Alpha Computer-HR/FinancelPayroll — 94705 The project was originally established in the FY 94/95 Capital tmprovement Budget. Additional funding mid-year FY 94/95 provides for the purchase of an Alpha Computer to replace the current Finance computer. Ne vee onlof the Rosls Financ alrSystemaer to add a Human ResourceslPayroll client/server application to the computer, and to prepare to support a new clienUse Total Current Available Recommended Fundin Fundin4 Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Propose 9,953 Page -55- � 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILDINGS & EQUIPMENT — Miscellaneous (continued): Occupational LicenselCode Enforcement/Permitting Upgrade — 94707 This project replaces the current mainframe based, 12 year old Occupational License system; Cornerstone PC-based permitting system and Comply, the PC based code enforcement system. The project was originally established in the FY 94/95 Capital Improvement Budget. Current Available Fundinq 19, 764 Recommended Total Funding Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Engineering Computer Upgrade — 94712 . The proiect provides for computer hardware and software upqrades necessary to maintain compatibility with consultinq enqineers, provide up-to-date mappinq, enqineerinq drawinps and future GIS data for other departments. Current Available Fundinq 4,250 Recommended Funding Sources 1997/98 1998/99 60,000 1999/00 2000/01 2001 /02 55,000 Total 2002/03 Proposed 115,000 Airpark Master Plan Improvements - 94713 Project established with the Commission approval of the eNg+�a�Clearwater Airpark va��'rr^icSS ��vri Masterplan. Project calls for the maintenance of existing facilities and for the installation of major improvements as called for in the Airpark Masterplan. Major improvements scheduled are � runway/taxiway lights €�86�8�; refurbishment of Hanqar "A: and Masteralan update FY 97/98; runwav safety overuns, resurface and re-mark runwav and taxiways FY 98199; 8 executive hangars and 10 enclosed hanqars FY 99/00 ; S�SB; new terminal building and parkinq lot expansion FY 89l�AA4-00101; 10 enclosed T-hanqars FY 200112002; 10 enclosed T-hanqars FY 02/03. Annual Operatinq Costs: No increase in operating costs. Comprehensive Plan Obiective: To provide for improvement and maintenance of Airpark facilities to meet the present and future air transportation needs of Clearwater and Pinellas County. Current Available Funding 37,821 Recommended Fundina Sources General Fund Grant 1997/98 1998/99 200,000 300,000 200,000 300,000 1999/00 2000/01 225,000 100,000 225,000 100,000 2001 /02 150,000 150,000 2002/03 150,000 150,000 Total Proposed 1,125, 000 1,125, 000 Page -56- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET � GENERAL PUBLIC BUILDINGS 8 EQU/PMENT - Misce/laneous (continued): Harborview Center — 94717 Project funding for the refurbishment and restoration of the "Maas Brothers" building to provide a shopping, restaurant, and convention center site in the heart of the downtown district. (Project established mid year 1993/94) Current Available Recommended Fundinq Fundin4 Sources 72,340 Total 1997/98 1998199 1999/00 2000/01 2001/02 2002/03 Proposed PayrolllHuman Resources System — 94722 This project provides for the purchase of a new payroll/human resource system. Current Available Recommended Total Fundinq Fundinq Sources 1997/98 1998199 1999/00 2000/01 2001/02 2002/03 Proposed 85, 543 Graphics Communication System — 94725 This project provides for the purchase of (2) personal computer systems for the Graphics Communications Program. The project was originally established in the FY 94/95 Capital Improvement Budget. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 26,620 Page -57- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILDINGS & EQUIPMENT - Miscellaneous (continued): Beach Redevelopment Project Planning — 94727 The project provides funding for the development of plans for large scale infrastructure improvement projects and similar programs, such as the Mandalay Avenue Streetscape project, to facilitate redevelopment and revitalization of the beach. The project was originally established in the FY 94/95 Capital Improvement Budget as "East Shore Development." Total Current Available Recommended Fundin Fundina Sources 1997/98 1998/99 1999/00 2000101 2001102 2002/03 Proaosed 95,740 Citv-Wide Connectivitv Infrastructure- 94729 � � � ' .This proiect was established in mid-vear 1994/95 as the Enterpr�se NetworklWAN Connection proiect The first phase of the proiect (installation of fiber optic cable to link MSB _to City Hall and Police) is completed, and is used, not only for computer connectivitv, but also for vo�ce and video. Connect�on of other, larger City buildinqs (General Service, Main Libra Solid Waste via fiber ma not alwa s be a cost effective alternatrve. The Parks 8 Recreation ro ect #94739 Parks 8� Rec Wavelan will be combined with the Citv wide connectivity proiect resultinq in one unified proiect for the entire City. Information Manaqement is forminq a team to research the alternatives for rovidin coordinated Ci -wide connectivi which ma include fiber o tics wireless commumcations and other technoloqies as deemed most cost effective for the Citv. Annual Operatin4 Costs: No increase in existing operating costs. Current Available Fundin 170,000 Recommended Fundin4 Sources Infra Tax Solid Waste Water/Sewer Gen Svc 1997/96 1998/99 1999/00 150,000 91,000 553,000 Total 2000/01 2001/02 2002/03 Proposed 150,000 91, 000 553,000 Page -58- _...w.r 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILDINGS 8 EQU/PMENT - Miscellaneous (continued): Harborview Center F F 8 E— 94734 The project provides for the establishment of a separate project to monitor F F& E purchases for the Harborview Center. (Established 3rd quarter 94/95). Current Available Recommended Total Fundin Fundina Sources 1997/98 1998199 1999/00 2000101 2001IO2 2002/03 Proposed 26,254 Geographic Information System — 94736 The City currently has many databases which contain similar information regarding parcels and property ownership. This information is included in the Occupational License, Building Permit, Utility Billing, Police Computer Aided Dispatch, and the Engineering Mapping systems. Although all of these systems contain some similar information, no information can be shared between databases. This results in redundant data entry by the City staff and greatly increases the opportunity for inaccuracy. The development of a Geographic Information System would provide valuable information to both the public and private sector. Funding for FY 95/96 includes the hardware costs to support the County GIS System, to allow City staff to add data and inquire. Annual OperatinQ Costs: This would require two additional employees (a programmer) with an estimated starting annual personal service cost of $35,200 and a technician at approximately $29,600 per year for personal costs; an additional $25,000 for operating and maintenance expenses yearly, plus the debt service of approximately $172,700 per year. Current Available Fundin 193,675 Recommended Fundinq Sources UP 1997198 1998/99 1999/00 750,000 Total 2000/01 2001/02 2002/03 Proposed 750,000 Information Services UPS System — 94737 . . Information Services and Engineering/Traffic will be sharing an 18 year old UPS system in the Municipal Services Building. . If maintenance of this unit becomes too expensive to iustifY. or if it becomes unreliable, it will need to be realaced with a 35KVA unit. Other associated costs include $5,000 for installation. Annual Operatinq Costs: The annual debt service, estimated at approximately $9,080/year. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 45,000 Page -59- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILD/NGS 8 EQUIPMENT - Miscellaneous (continued): Telephone System Replacements — 94738 This project will relocate existing Norstar phones; "" ;� � � ' � ., add new Norstar phones as needed and provide State contract CentraNet service to standardize the level of phone service throuqhout the City Locations to be upqraded include all Librarv locations the WPC lab facility several Parks & Recreation facilities and General Services. , Annual Operatinq Costs: The annual debt service , $33,500 and $5,000 cash for the first vear. Current Available Fundincl 335,666 Recommended Total Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Enterprise Network - Phase I— 94740 Phase I of the City's Enterprise Network will provide new desk top computers to all computer users in the Municipal Services and City Hall buildings. This includes desk top PCs capable of running the MicroSoft Suite and Client/Server software, and includes networking hardware in the Municipal Services building and City Hall, Network Management software, MicroSoft software, and Virus Checking software. Annual OperatinQ Costs: Approximately $�1-A9A 42 725 per year for an additional 1.0 FTE to support the nefinrork, and annual debt service of approximately $204,570. Current Available Recommended Total Fundinq Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 4, 501 Automated Time Recording System - 94741 The project provides for the purchase of an automated time entry system that utilizes a magnetic card to log staff in and out, and loads that data to the Payroll system with no data entry required. Clerical staff would still need to visually verify entries for accuracy and correct errors, but it would reduce entry time and key punch errors. . � s�sEe�- The svstem will intertace with the new PeopleSoft Human ResourcelPayroll Svstem. Annual OperatinQ Costs: Annual debt service of approximately $17,460. For FY 95/96 one payment is anticipated for $4,360. Current Available Fundin 125,000 Recommended Total Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Page -60- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILDINGS 8 EQUIPMENT - Miscellaneous (continued): District Parking Plan — 94T45 This project provides for the acquisition of several sites in the North Fort Harrison and North Greenwood Commercial Districts to create a district parking plan. This plan will reduce the mandated on-site parking requirements and facilitate business development in both districts. In the North Greenwood Neighborhood Commercial District only three out of thirty-six sites can accommodate the on-site parking requirements. In the North Fort Harrison commercial In-Fill District fewer than twenty sites can accommodate the parking requirements. Annual Operatinq Costs: No increase in existing operating costs. Comprehensive Plan Obiective: District parking is a critical element of the proposed Enterprise Zone Strategic Plan. Current Available Fundin 64,012 Recommended Fundinq Sources Infra Tax 1997/98 1998/99 1999/00 2000/01 2001/02 �58 232,650 185,210 Total 2002/03 Proposed 417, 860 Enterprise Network - Phase II — 94749 Phase II of the Enterprise Network will upgrade the balance of the City's PC users to allow them to run the MicroSoft Suite and Client/Server software. This phase of the project is slightly less expensive than Phase I, as the buildings involved have fewer users, hence the networking communications and hardware is less complex. This includes desk top PCs, nefinrorking, virus checking software, and MicroSoft Suite. Annual Operatinq Costs: Annual debt service. Current Available Fundin 631,948 Recommended Total Fundin4 Sources 199T/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Color Copier 8� Digital Interface — 94751 This project provides for a medium volume full color copier in Graphics, as well as a computer interface. This would allow City staff to bring a floppy disk (or electronically send) as a draft product to Graphics, where it can be enhanced on the computer and sent directly to the color copier to print. It would eliminate the need for color separations for low volume jobs and would create masters for higher volume color jobs. Annual Operatinq Costs: Annual debt service of approximately $19,780 and $5,280 per year for maintenance of equipment. For FY 95/96 debt service would be approximately $4,950 and $1,320 for maintenance (June 1996 estimated purchase date). Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 85,000 Page -61- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILDINGS 8 EQUIPMENT - Miscellaneous (continued): Centralized Recordsllmaging System — 94753 The project provides for Optical Disk Storage hardware and computer aided software for the consolidated storage of City records, known as the CAR System (Computer Assisted Retrieval). The project was originally established in the FY 93/94 Capital Improvement Budget. The title of the project was updated to reflect a more accurate description (was titled - City Clerk Optical Disk/CAR System). Research and the request-for-proposal wifl begin in the later part of FY 95E96 97/98. Annual Operatinq Costs: Annual debt service, plus $75,000 in software, and an additional .5 FTE in Information Services to support system. Comprehensive Plan Obiective: Not applicable. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 175, 000 Community Response Team Vehicles — 94754 This project provides for the purchase of two replacement vehicles. They will replace the current vehicles that were originally retrieved from Fleet Maintenance's "surplus" vehicles. Annual Operating Costs: Approximately $9000 per year for monthly maintenance and mileage. Comprehensive Plan Object: Not applicable. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 37, 000 PC's for Parks 8 Recreation — 97455 Parks and Recreation continues to have requirements for new personal computers. In from 1994-1996, Parks acquired many old 286 & 386 PCs during the implementation of the Enterprise Network. These PCs were stand alone systems, used at outlying Recreation Facilities, and were not part of the Enterprise Network scheme. Now Parks and Recreation is ready to integrate the outlying sites onto the Enterprise Nefinrork. In preparation for this eventuality, these sites need to received new computers that meet the City standard. Annual Operating Costs: Approximately $6,891. Comprehensive Plan Objective: Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 140,000 Page -62- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILDINGS 8 EQUIPMENT - Miscellaneous (continued): Utility Billing Year 2000 Compliance Project — 94757 The Utility Billing computer software package was purchased in 1989 with a stated, industry standard 5 year life span. We have extended the life of the system through and including the current year by maintaining it and enhancing it in -house. It was planned the system would be replaced prior to the year 1999, when computer software will need to sta�t handling the year 2000 date. At this time, the process to start the system replacement is requested in the 97198 budget. However, selecting the implementing a complex system such as Utility Billing can be a long process. Such projects sometimes experience unexpected delays which make a definitive, "drop dead" completion date difficult to meet without compromising the integriry of the system data. This project is being requested to ensure that the City is not left in an untenable situation in 1998. The purpose of the project is to hire a consultant to do the extensive modifications required to allow the current UB system to handle the year 2000. Information Services only has one staff member assigned to the UB system, and that person will be fully occupied maintaining the status quo on the current system as well as leading the selection of the new system, hence the year 2000 conversion will need to be handled via contract programming. This project may not be needed, if the selection of a new system and the installation of same progresses without unexpected delays. Annual Operating Costs: Comprehensive Plan Objective: Current Available Recommended T��� Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000101 2001102 2002l03 Proposed 100,000 Wide Format Plotter — Engineering - 947XX This project provides for an additional plotter that is capable of producing wide output plots, 4�50" wide, for City area maps and atlases. T�� ,.,�" °'�^��^''° ±� . This prolect will also provide for larqer displavs for public meetinqs as well as producinq hiqh qualitv photo- like imaqes used for electronic aerials. Annual Operatinq Costs: The annual debt service. Current Available Recommended Fundin Fundinq Sources LAI'i 1997/98 1998199 35,000 Total 1999/00 2000/01 2001/02 2002/03 Proposed 35,000 Page -63- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILD/NGS 8 EQUIPMENT - Miscellaneous (continued): Financial System Replacemen - 947XX The project provides for the replacement of the Ross Financial System which will be approximately 5 vears old in FY 1997/98. The date for this proiect has been moved to 1997198 in case the Ross Financial Svstem is unable to handle the vear 2000. At the time of the development of this budqet Ross Svstems is supposed to provide a vear 2000 update to the system bv summer, 1997. IF we do not receive this enhancement or if it does not work correctly we will need to look into replacinq the software. Fundinq is increased to reflect the realistic cost of purchasinq and implementinq a client/server system and does not include new server hardware, as we are planninq to use current AXP computer. If we cannot select a suitable svstem that runs on the AXP platform, we will have to purchase a new server and adiust the cost accordinqly. Annual Operatinq Costs: Annual debt service and maintenance on hardware. Current Available Fundin Recommended Fundinq Sources 1997/98 1998/99 1999/00 To be determ 200,000 To be determ 400,000 2000/01 2001 /02 . ... .. ... Total 2002/03 Proposed 200, 000 400,000 Utility Billing System Replacement - 947xx This project provides for the replacement of the eight year old Utility Billing software. The average usable life span of any piece of computer software is five years, but due to in-house enhancements, we hope to extend it to eight years. Costs could increase based on computer hardware platform required. The costs associated with this proiect are adiusted to reflect the realistic costs of purchasinq and implementinq client/server software, Price assumes the continued use of the AXP server platform. (Combined with Prolect 94730) Annual Operatinq Costs: Annuat debt service. Current Available Recommended Fundin Fundin4 Sources L�l� Utility Funds 1997/98 1998/99 1999/00 2000/01 aA;AA9 200,000 �aA; AA9 400,000 Total 2001/02 2002/03 Proposed 200, 000 400,000 Page -64- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILDINGS & EQUIPMENT - Miscellaneous (continued): High Speed Copy Machine - 947xx This project will replace the large Xerox copier in the Graphics "Quik Copy" Center. The current machine will be 8 years old at the time of replacement. As with all machinery, the cost of maintaining the older technology equipment and the increase in incidences of breakdown increased with age. Eight years is an expected life span. The new machine would provide digital masters, computerized cct and paste, and an interface to a desk top publishing system, reducing pre-press manual work. Annual Operatinq Cost: Comprehensive Plan Obiective: Current Available Recommended Fundin Fundinq Sources UP 1997l98 1998/99 1999100 2000/01 r�� ��� Total 2001/02 2002/03 Proposed 200,000 Enterprise Network PC Software Up4rades — 947xx In 1996-1997 the ma'ori of the PCs and network serversle ui ment in the Ci was u raded to run Windows 95 8 O�ce 95. In addition the network o eratinq svstems and virus checkinq software packaqes were also updated. Even before this process was complete, upclrades were released for many of these software roducts. Past ex erience has roven that in order for IS to su ort all the PCs m the Ci to recerved techrncal su ort from the software vendors to ain the most from Ci s onsored trainin and to ensure 'ob skill cross trainin it is necessa to u rade the PC and network soflware ackaqes Citv wide on a periodic basis This proiect was discussed with the Commissioners and Citv manaqement durinq the Technoloqy Day process in 1996. Annual Operatinq Costs: nla Comprehensive Plant Obiective: nla Current Available Fundin Recommended Fundin4 Sources 1997/98 Adm Svc 90,000 1998/99 1999/00 90,000 Total 2000/01 2001/02 2002l03 Proposed 180,000 Page -65- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GENERAL PUBLIC BUILD/NGS 8 EQUIPMENT - Miscellaneous (continued): Affordable Housinq Infrastructure — 947xx Economic Development is requestin4 the infrastructure and riqht-of-wav improvements for affordable home ownership development containing seven new sinqle family homes Completion of this development wiil add new ad valorem valuation of a315,000 and pav $26,159 in impact fees. Current Available Recommended Fundin Fundinq Sources Infra Tax SUBTOTAL MISCELLANEOUS: Current Available Fundin 2,561,432 1997/98 1998/ 99 1999/00 2000/ 01 2001/02 47,440 Recommended Fundinq Sources 1997/ 98 1, 822,650 1998/99 2,561,650 ENGINEERING/PUBLIC SERVICES - Stormwater Utility: 1999/ 00 2000/ 01 2001/ 02 650,00 200,000 355,000 2002/ 03 2002/ 03 300,000 Total Proposed 47,440 Total Proposed 5,989,300 Stevenson Creek Improvements - 96102 The original funding for this project was established in response to major storm events of July '87, and September and November '88. A Stevenson Creek Master Drainage Plan had been prepared for phased improvements to Stevenson Creek in two stages. The proposed location of improvements, Phase II, is along the main branch of Stevenson Creek from Pierce St to St. Thomas. Construction generally consists of channel widening, lining, and environmental treatment and mitigation. Insufficient funds presently exist in this account to complete Phase II. Annual OperatinQ Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: Lower high water profiles during storm events, as necessary, to reduce house flooding occurrences, and to lessen the resulting adverse effects on public health, the natural environment, public and private property, and inconvenience; maintenance and improvements of existing drainage facilities shall continue during the time of the Stormwater Management Plan preparation. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/ 02 2002/ 03 Proposed 142,090 Page -66- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES - Stormwater Utility (continued): Stormwater �uality ImprovementslProperty Purchases - 96103 The project's primary purpose is to improve the quality of stormwater in the City of Clearwater with consideration for the multiple benefits and uses of the City's surface and groundwater resources through new structural modifications, non-structural modifications and water quality monitoring. Examples of anticipated new project starts include land acquisitions such as the Kapok Mobile Home Park, the downtown retention lakes, re-vegetating drainage systems, development of regional retention/detention systems, project specific water quality monitoring, etc., and to promote improved water quality. The establishment of projects identified through this project shall be consistent with federal NPDES permit requirements and Watershed Management Plans. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: (23.1) Protect, improve and enhance surface waters from stormwater runoff discharging into interior and coastal surface waters by 1990. Current Available Fundin 686,902 Recommended Fundinq Sources Stm Water 1997/98 1998/99 1999/00 2000/01 2001102 ��g �ggg q.�;ggg 4�AA8 4�;889 532,000 407,000 522,500 522,500 522,500 2002/03 522,500 Total Proposed 3,029,000 Habitat Restoration & Improvement — 96105 The project's primary purpose is to support the removal of undesirable vegetation from the natural environment associated with Clearwater's natural and man-made water bodies, through restoration design, public education, purchase and installation of plant material, and monitoring as necessary to improve water quality, habitat diversity and public safety. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: (CPO 22.2) To protect floodplains, drainage ways, and all other natural areas having functional hydrological characteristics; and (CPO 22.3) To maintain and enhance the City's wildlife and natural native vegetation resources. Current Available Fundin 550,410 Recommended Fundina Sources Stm Water 1997/98 1998/99 1999/00 a.�g;ggg a.�A;A89 �8A9 143.000 143.000 27,500 2000/01 2001102 �AA9 �A98 27,500 27,500 2002/03 27,500 Total Proposed 396,000 Page -67- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES — Stormwater Utility (continued): Pollutant Storage Tank Removai/Replacement - General Fund - 96108 This project is proposed to keep the City's pollutant storage tank locations in compliance with the current Florida Department of Environmental Regulations Pollutant Storage Tank Rules, and to reduce the potential risk of groundwater contamination. Included in this project are abandoned tanks at locations to be determined, Fire Station #45 and FDEP registration fees. Annual OqeratinQ Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: To protect all City owned and maintained potable water wells from contamination by potentially dangerous land uses and associated activities which could contaminate groundwater aquifers. Current Available Recommended Total Fundinq Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 87,517 General Fund 55,000 55,000 55,000 55,000 55,000 55,000 330,000 Downtown Lake — 96109 This project will provide funding for a feasibility study of the possibility of creating a regional water quality lake system for the treatment of stormwater to improve water quality and provide treatment banking for redevelopment in downtown Clearwater. The project was originally established in FY 94/95 Capital Improvement Budget. Current Available Fundinq 73,191 Recommended Fundinq Sources 1997/98 ... ... Tota I 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed ...�... Page -68- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERINGIPUBLIC SERVICES — Stormwater Utility (continued): Groundwater Quality Protection — 96111 The City of Clearwater owns and operates facilities on properties that may have contaminated soil and/or groundwater. Assessment of the lateral and vertica extent of this pollution, followed by pollution remediation, is required before planned construction can proceed. This project will fund site clean-up to facilitate any new project development. The Clearwater Executive Airpark, a former landfill, is an example of this type of property. Annual Operatinq Costs: No increase in existing operating costs. Comprehensive Plan Obiective: Objective 18.7 - To protect all natural rechar ayout aa da operationl of the a �pagk sha la ecog Sze envi on9ment I andnresource specific to the Clearwater Executive Airpark, Goal 11.0 - The construction, conservation constrains and impact, both on and off site. Total Current Available Fundin 368,519 Recommended Fundinq Sources 199T/98 Infra Tax 100,000 To be determined 1998/99 1999/00 100,000 100,000 2000101 2001102 100.000 100,000 2002/03 100.000 Proposed 300,000 300,000 Pollutant Storage Tank RemovallReplacement - Fire Station #6 - 96113 This project will replace the fuel tanks and clean-up any groundwater contamination at Fire Station #6. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: To protect all City owned and maintained potable water wells from contamination by potentially dangerous land uses and associated activities which could contaminate groundwater aquifers. Total Current Available Recommended Fundin Fundin4 Sources 1997/98 1998/99 1999/00 2000101 2001102 2002103 Propose 99,775 Page -69- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES — Stormwater Utility (continued): Pollutant Storage Tank Removal/Replacement - Annex - 96115 This project will remove/replace storage tanks on the Annex site which is necessary for the sale or redevelopment of the property. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: To protect all City owned and maintained potable water wells from contamination by potentially dangerous land uses and associated activities which could contaminate groundwater aquifers. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/07 2001/02 2002/03 Proposed 493,281 Pollutant Storage Tank RemovallReplacement - WPC - 96116 This project provides for the systematic replacement of below ground tanks at all water pollution control plants. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: To protect all City owned and maintained potable water wells from contamination by potentially dangerous land uses and associated activities which could contaminate groundwater aquifers. Current Available Fundin 28,000 Recommended Fundinq Sources Sew Rev 1997/98 1998/99 28,000 28,000 1999/00 2000/01 2001/02 28,000 28,000 28,000 2002/03 28,000 Total Proposed 168,000 Mechanical Street Sweeper — 96117 This project provides for the purchase of an additional mechanical street sweeper that will be used in the Stormwater Utility program. Currently the two vacuum street sweepers are used to clean the main streets/arteries on the City's mainland. By adding the third sweeper, we will be able to sweep residential streets from debris, which will help reduce catch basin clogging, less flooding of streets and intersections and help to achieve a cleaner run-off from the streets into the City's water bodies. (Mechanical sweeper to be pu�chased in the third quarter of 96197.) Annual Operatinq Costs: No additional personnel costs; annual debt service estimated at $29,260/year not to begin until �ep� Dec.1997. Comprehensive Plan Obiective: Protect and enhance the quality of receiving waters by the establishment and maintenance of stormwater pollution control methods in accordance with the Stormwater Management Plan. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 130, 000 Page -70- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES — Stormwater Utility (continued): Storm Drainage Renewal and Replacement - 96118 The project includes repair and restoration of major storm system components to original design capability, by providing for projects in the five major drainage basins which constitute the 400 miles of drainage system. It provides for City-wide repair, rehabilitation, or replacement of, storm drainage lines, structures and fixtures. Annual OperatinQ Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: To remove excess surface water as necessary to prevent flooding and consequent adverse effects on public health, the environment, and public and private property and inconvenience to the citizenry. Current Available Fundin 472, 327 Recommended Funding Sources Stm Water SUBTOTAL STORMWATER UTILITY: Current Available Fundin 3,132,012 1997/98 1998/99 1999/00 2000/01 2001/02 750,000 750,000 �aA;AA6 �8A9 �A�Ag 825,000 825,000 825,000 Recommended Fundinq Sources 1997198 1,608,000 1998/99 1999/00 2000/01 2001/02 1,483,000 1,558,000 1,558,000 1,558,000 2002103 825,000 2002/03 1,558,000 Total Proposed 4, 800, 000 Total Proposed 9, 323, 000 PUBLIC SERVICES — Water System: System Renewal and Replacement - Maintenance - 96721 This is an on-going program of system maintenance consisting of the repair or replacement of water mains, service lines, valves, fire hydrants, miscellaneous equipment, and damaged facilities. The maintenance portion of this project involves repairs and replacements of facilities that do not involved upgrading. Sufficient funding exists so that no additional funding is anticipated until FY 1998/99. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: Continue to maintain the water system in a safe, sound and efficient manner on a daily basis through the year 2000. Current Available Fundin 140,471 Recommended Fundina Sources Water R&R 1997/98 1998/99 25,000 1999/00 2000/01 2001/02 25,000 25,000 25,000 Page -71- 2002/03 25,000 Total Proposed 125,000 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SERVICES — Water System (continued): Reclaimed Water Distribution System - 96739 . This proiect provides for the continued expansion of the City's Reclaimed Water Distribution Svstem. Durinq the fiscal year 1996/97, Phase I was implemented which includes the transmission main and distribution pipinq to Island Estates, transmission main to Clearvvater Beach, distribution mains to Jack Russell Stadium and Rav Green Field, and transmissionldistribution mains to Eagles Landing Condominiums. In FY 1997/98 work will beqin on the desiqnlenqineerinq for: replacinq the inter- coastal waterway crossinq pipeline; transmission main to Sylvan Abbey; transmission and distribution to Harbor Oaks; and distribution within the corridor in the Marshall St Plant vicinitv. The actual construction of these projects is to be accomplished durinq the followinq two vears. In the vears 2000 throuqh 2003 the followinq reclaimed water proiects are currently planned: transmission and distribution to the City's industrial area; the Marshall St plant interconnect line to the Northeast Plant; transmission and distribution to the Del Oro area; pump upqrades at Marshall St plant; and Northeast Plant storaqe and pumpinq facilities. Schedulinq of proiects may chanqe as a result of the update of the Reclaimed Water Master Plan that is beinq undertaken. Annual OperatinQ Costs: . Additional operatinq costs will incur when the Island Estates proiect is completed, which is estimated to be at the beqinninq of FY 1998199. Comprehensive Plan Obiective: r-ese�se� To provide adequate quantities and qualities of water services to all customers in the Clearwater service area; for the City' water svstem to be compatible with the environment; and also seek to conserve and protect sensitive natural resources. Current Available Fundinq 4,154,220 Recommended Fundinq Sources Water Rev �e+�-4ssae Reclm Wtr Rev Grant Fundincl Sewer Rev 1997/98 1998/99 7999/00 �a,-A88 �5;9A8 �AA9 195,000 1,915,000 1,093,000 aAA;989 �-�9�-988 �A9�9A9 75,000 175,000 339,000 190,000 785,000 580,000 195,000 1,915,000 1,093,000 2000/01 2001/02 ��;-A99 �; 9A8 1,311,750 853,750 �1-AA�88 �AA;8A9 379,000 379,000 700,000 2,000,000 1,311,750 853,750 2002/03 1,965,5000 379,000 550,000 1,965,500 Tota I Proposed 7,334,000 a;3A9;A99 1,726,000 4,805,000 7,334,000 Page -72- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SERVICES- Water System (continued): Water Supply and Treatment - 96T40 This project provides funding for maintenance, replacement, and expansion of supply facilities. . As a result of the wellfield manaqement plan, it is anticipated that the CitY will discontinue the operation of its potable water supply wells in 1999 and purchase all of its potabte water supalv probablv from Pinellas Countv Additional fundmq is necessarv in FY 1997198 to arovide for a new Inter Connection with the Pinellas County Water System to serve Reservoir #1 (900 No�th Saturn Avenue . Annual Operatinq Costs: Cannot be determined at this time. Comprehensive Plan Obiective: To provide adequate quantities and qualities of water services to all customers in the Clearwater service area. Current Available Fundin 1,067,190 Recommended Fundinq Sources F��eads Water Rev 1997198 1998/99 1999/00 2000/01 2001/02 q3pgp,gpg �OAA,BAA �;AAA;AAB �AAA;A08 �90�008 �Ag-0g9 100, 000 100, 000 100, 000 100, 000 1,500.000 2002/03 100.000 Total Proposed �AA9;A9A 2,000,000 System Renewal and Replacement — Capitalized — 96741 This project involves the repair and replacement of water mains, service lines, valves, fire hydrants, facilities, equipment, etc. that are upgraded during the repair/replacement process. Funding for capitalized labor, equipment and material for in-house work is included. Additional funding is requested in €�896�9� h water main replacement phases (15-17). The initial water bond issue funding for the water main � 1997/98 to complete t e remaining replacement program has been depleted. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: To continue to maintain the water system in a safe, sound and efficient manner on a daily basis. Current Available Fundin 392,852 Recommended Fundinq Sources Water R&R Water Rev 1997/98 1998/99 1999/00 2000/01 2001/02 350,000 350,000 350,000 350,000 350,000 ���-A99 �8 1,750,000 2002/03 350,000 Total Proposed 2,100,000 1,750,000 Page -73- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SERV/CES- Water System (continued): Line Relocation - Capitalized - 96742 This is an on-going project to relocate water mains and related facilities conflicting with public works projects of various governmental entities and which are upgraded during relocation. Funding for capitalized labor, equipment and material for in-house work is included. Some of the aAnticipated work in FY 97/98 includes Gulf Blvd. on Sand Key; . ;� . '; ; Sunset Point from US 19 to McMullen-Booth Union Street from Soule Road to McMullen Booth Road• intersection improvements on US 19. Sufficient funding exists so that no additional fundinq is anticipated until FY 1998199.. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: To provide sound fiscal management for the operation and maintenance for potable water service in the City's service area. Current Available Fundin 1,840,387 Recommended Fundinq Sources Water Rev Water R&R 1997/98 1998/99 1999/00 2000/01 2001/02 3ag;AA9 350,000 350,000 350,000 350,000 �54,�A9 350,000 350,000 350,000 350,000 2002/03 350.000 350,000 Total Proposed 1, 750, 000 1,750, 000 Meter/Backflow Prevention Device Repair andlor Change-Out - 96743 This is an ongoing project to repair/replace water meters, backflow prevention devices, and accessories to assure accurate flow measurement, maximum revenues, and proper operation. Meters slow down as they age, so a regular change-out program is necessary to assure accurate readings to maximize revenue. Backflow prevention devices are tested annually which determines whether they need to be repaired or replaced to ensure proper operation. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. Current Available Fundin 129,497 Recommended Fundina Sources Water R&R 1997/98 1998/99 1999/00 2000/01 2001102 �A9 �AA9 �,�A9 �888 �A89 200,000 225,000 225,000 225,000 225,000 2002/03 225.000 Total Proposed 1,325,000 Page -74- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET PUBLIC SERV/CES - Water System (continued): System Expansion - 96744 This project provides funding and capitalizes Water Division labor, equipment and material expenses relating to additions to Clearwater's distribution system, including new meters, backflow prevention devices, main extensions, etc. Locations of work areas is determined by customer demand. Annual Operatinq Costs: No significant increase of existing operating costs. Comprehensive Plan Obiective: To provide adequate quantities and qualities of water services to all customers of the Clearwater service area. Current Available Recommended Total Fundinq Fundinq Sources 1997198 1998/99 1999/00 2000101 2001/02 2002/03 Proposed 213,986 Water Rev �9;9A9 �8;AA9 110,000 110,000 110,000 110,000 565,000 25,000 100,000 Water Impc �&AA9 �8,�9A9 110,000 110,000 110,000 110,000 565,000 25.000 100,000 SUBTOTAL WATER SYSTEM: Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 7,938,603 4,505,000 6,390,000 4,725,000 5,322,500 5,706,500 6,480,000 33,129,000 ENGINEERING/PUBLIC SERVICES - Sewer System: Sanitary Sewer Extensions — 96630 This project extends sanitary sewer service on an assessment basis to property owners in the Clearwater service area requesting such service. Annual Operatinq Costs: No siqnificant increase of existinq operatinq costs. Comprehensive Plan Objective: To provide optimum levels of sewer service in the City's service area. Current Available Recommended Total Fundin Fundina Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 388,186 Sewer Imp �;889 �A8�A8 100,000 100,000 100,000 300,000 Page -75- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES - Sewer System (continued): Sanitary Utility Relocation Accommodation — 96634 The project provides funding for the relocation/extension of various sanitary utilities to accommodate roadway improvements by Florida DOT, Pinellas County, and the City of Clearwater. Projects include: Gulf Blvd. (Sand Key), Sunset Point Road (Keene Road to U.S. 19), Belcher Road (SR 60 to Sunset Pt. Rd), McMullen Booth Road (Phase 2, Main St. to SR 580 & Phase 3, SR 580 to Curlew Rd) and U.S. 19 Interchange (SR 580, Countryside Blvd. to McMullen Booth Rd). Annual Operatinq Costs: $24,000 when completed. Comprehensive Plan Obiective: To provide optimum sanitary utility service for the City's sanitary service area. Current Available Fundin 1,584,178 Recommended Fundinq Sources Sewer Rev 1997/98 1998/99 1999/00 2000/01 2001/02 400,000 400,000 400,000 400,000 400,000 2002/03 400,000 Total Proposed 2,400,000 Laboratory Upgrade — 96645 Provides new analytical components to upgrade the capability of the existing gas chromatography and atomic absorption instruments to meet state and federal testing requirements for wastewater, environmental monitoring, stormwater treatment and potable water. The project was originally established in the FY 1990/91 Capital Improvement Budget. Current Available Fundin 178,926 Recommended Fundinq Sources Sewer Rev 1997/98 1998/99 1999/00 100,000 25,000 25,000 2000/01 2001 /02 25,000 25,000 2002/03 25,000 Total Proposed 225,000 Morton Plant Pump Station Replacement - 96652 The Morton Plant Hospital Complex continues to grow with increased demand on the existing sanitary pumping station. The existing pumping station will need to be replaced and may need to be relocated to provide sufficient space for proposed improvements and access for maintenance. The project was originally established in the FY 94/95 Capital Improvement Budget. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: 1. To provide optimum levels of sewer service in the City's service area. 2. To protect and improve the quality of water resources in both interior and coastal areas. Current Available Fundin 1,170, 000 Recommended Total Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Page -76- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES - Sewer System (continued): A�IIFF-F,asili�ies -Facilities Uaarade and Imarovement— 96654 The project provides funding for future improvement and upqrades at the City's three AWT plants and biosolids facilitv. Current Available Fundinq 320,106 Recommended Fundina Sources Sewer Rev 1997/98 1998/99 200,000 200,000 1999/00 2000/01 2001/02 200,000 200.000 200,000 2002/03 200,000 Total Proposed 1.200,000 WPC Pre-Treatment Program – 96655 Effective in May 1995, coincident with FDEP delegation of the USEPA-NPDES permitting authority, Chapter 62-625.00, F.A.C. requires all public utilities operating wastewater treatment facilities with a capacity greater than 5 MGD to develop a sanitary discharge pretreatment program. This program must be in place prior to renewal of operating permits for the facilities. Failure to do so can result in revocation of the City's operating permits. The City's operating permits begin to expire in March, 1996 and at present, does not have a pretreatment program which meets state requirements. This project will provide specific discharge limitations to our treatment plants based on a technical evaluation of the planYs treatment capabilities. The project will also provide a pretreatment review and approval process to meet state requirements and facilitate renewal of the City's operating permits. The scope of this existing project has been expanded to 3 phases. Phase 1 to be completed in FY 95/96 and phase 2 and 3 in FY 96/97. The additional phases for monitoring of inflow to the treatment plants, ordinance drafting, and a public information campaign. Annual Operatinq Costs: No increase in existing operating costs. Comprehensive Plan Obiective: Objective 14.2 - Accomplish advanced wastewater treatment improvements at all water pollution control facilities in accordance with FDEP and USEPA requirements. Current Available Recommended Total Fundinq Fundinq Sources 1997198 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 25,736 Page -77- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES - Sewer System (continued): Laboratory Building — 96656 The project provides for the construction of a new laboratory building at a AWT Facility in order to consolidate the two existing laboratories into one larger, centralized laboratory. The Marshall Lab, built in 1976, and the Northeast Lab, built in 1978, were designed, sized, and equipped to perform analyses for three secondary treatments plants. Therefore, the laboratories performed only basic wet chemistry and bacteria analysis. Currently, the laboratories provide, in addition to wet chemistry and bacteria analysis, more sophisticated automated testing for three advanced wastewater treatment facilities, a bio-solids processing facility, the City Environmental Group, and the Water Division. Annual OQeratinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: (1) To provide optimum level of testing and reporting services for the City's WPC, Environmental Management, and Water Division to comply with US-EPA and FDEP mandates. (2) To comply with current federal and state OSHA standards for laboratories to provide a safe employee work environment. (3) To provide sufficient work area for automated instrumentation, wet chemistry, and bacteria testing to be conducted in separate rooms to prevent cross contamination of samples which may lead to false results. Current Available Funding :� ��� Recommended Funding Sources 1997/98 Sewer R&R �AA;8A8 Sewer Rev a9�;A89 1998/99 1999/00 300,000 695,000 Total 2000/01 2001/02 2002/03 Proposed 300,000 695,000 Chlorine Handling :���"�sB;� T 8 Storaqe Facilities— 96658 Build a new chlorine storage and handling facility and a new chlorine contact chamber at the Northeast AWT facility. The current chlorine facility is directly underneath the employee breakroom, offices, laboratory, and control room. Adjacent to chlorine storage is employee locker rooms, mechanic shop and office. Moving the storage/handling facility away from its current location will provide a safer condition for employees. The Northeast Plant currentiv does not have a chlo�ine chamber for disinfection purposes. A new chamber (tank) will provide improved disinfection of effluent that is reused or discharged into Tampa Bay. Annual Operatinq Costs:. Comprehensive Plan Obiective: Not applicable Current Available Fundin 640,000 Recommended Fundina Sources Sewer Rev 1997/98 1998/99 1999/00 2000I01 2001/02 750,000 Total 2002/03 Proposed 750,000 Page -78- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES — Sewer System (continued): Compactor — 96659 To dispose of unsanitary materials removed from sewage in an efficient, cost effective manner and conforming to local government guidelines. Purchase a compacting device to remove liquid from screenings collected off the bar screens. Screenings are hauled by a private contractor to the Pinellas County Landfill. Pinellas County charges by the pound. A compactor will remove the liquid and reduce the weight, thus reducing the weight charges. Annual Operatin4 Costs: Comprehensive Plan Obiective: To continue current practices of effluent disposal, including outfall of tertiary-treated effluent, and spray irrigation on open spaces; establish a multi-modal approach to effluent disposal to insure that the most resource-efficient methods are used, consistent with environmental and economic considerations. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001102 2002/03 Proposed 55,000 East AWT Facility Sea Wall — 96661 Protect City owned property, buildings, and structures from erosion. Construction of a sea wall on the shoreline at the East wastewater treatment plant. Sea wall will provide added protection and help preserve the property embankment. Wall will prevent erosion of City properry and prevent structural damage to buildings and tanks due to undermining. Annual Operatinq Cost: Comprehensive Plan Obiective: Not applicable. Current Available Fundin 420,000 Recommended Total Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Page -79- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES — Sewer System (continued): Digester Cleaning, Marshall Street � Northeast AWT Facilities - 96662 To maintain the proper operation of the City's anaerobic system in order to treat sludge as required to meet regulatory agency's requirements. The City has four anaerobic digesters each with a capacity of about 1 million gallons. During normal operation, indigestible materials (sand, plastics, grease, etc.) are pumped into the tanks. These materials are not removed and eventually take up digester space and reduce available capacity of the tank. Periodically (approximately every 10 years) these tanks must be shut down, and emptied of this debris. Annual Operatinq Cost: Comprehensive Plan Obiective: To continue current practices of effluent disposal, including outfall of tertiary-treated effluent, and spray irrigation on open spaces; establish a multi-modal approach to effluent disposal to insure that the most resource-e�cient methods are used, consistent with environmental and economic considerations. Current Available Fundin 75,000 Recommended Fundinq Sources Sewer Rev 1997/98 1998/99 75,000 75,000 1999/00 2000/01 2001 /02 75,000 75,000 75,000 2002/03 75,000 Total Proposed 450,000 Portable Lift Station - 96663 This project provides for the purchase of a portable sewage pumping station designed for unattended sewage bypass pumping operations during emergency or scheduled work. This self contained pumping unit will allow for a quick response to lift station failures that are mechanical or electrical, and require continuous around the clock pumping operations until repairs are completed. Annual Operatinq Costs: Estimated operating and replacement costs of $7,500. Comprehensive Plan Obiective: To maintain adequate levels of service for existing and future populations through the year 2000. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 30,000 Page -80- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES - Sewer System (continued): Water Pollution Control Renewal and Replacement — 96664 The project provides for the design, repair, rehabilitation, and replacement of Water Pollution Control plants and bio-solids facilitv items s�s�e� such as sludge chains, pumps, motors, associated plumbing, instruments, and minor facility repair to return or maintain the Water Pollution Control plaat� facilities to or at designed capabiliry. , Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: 1. To provide optimum levels of sewer service in the City's service area. 2. To protect and improve the quality of water resources in both interior and coastal areas. Current Available Fundinq 610,513 Recommended Fundinq Sources Sewer R&R 1997198 1998/99 1999/00 2000/01 2001/02 �AA;AA9 350,000 350,000 350,000 350,000 350,000 2002/03 400,000 Total Proposed 2,150,000 Sanitary Collection 8 Transmission Renewal and Replacement - 96665 The project provides for major rehabilitation of the existing sanitary collection and transmission systems throughout the City including: sewer mains, utility access portals, force mains, and pumping stations. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: 1. To provide optimum levels of sewer service in the City's service area. 2. To protect and improve the quality of water resources in both interior and coastal areas. Current Available Fundin 3,835,820 Recommended Fundinq Sources Sewer Rev Sewer R&R 9997/98 1998/99 1999/00 2000/01 2001/02 1, 300,000 1, 500,000 1, 500,000 1, 500,000 1, 500,000 450;000 475,000 475,000 475,000 475,000 Total 2002/03 Proposed 7,300,000 2,350,000 Page -81- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES - Sewer System (continued): Upqrade G-395 to Vac-Con Sewer Cleaner — 966xx The current vehicte G 395 is a 1985 International Jet Truck that flushes sewer debris with hiqh-force water pressure. A Sewer Vac-Con Cleaner vacuums the sewer debris out of the sewer lines• is a more effective way of cleaninq sewer lines bv removinq sand and debris from the system opposed to lust movinq it to some other place in the system• and this ultimatelv helps to elimmate sewer stoppaqes. Vehicle G-395 is currently on Fleet's Replacement List, and in order to uparade it to a Vac-Con Cleaner, an additional $91 500 is needed This w�ll be considered a"Contribution to the Garaqe" and Fleet will actuallv purchase the vehicle under the Citv's Lease Purchase proqram. Annual Operatinq Costs: Comprehensive Plan Obiective• To provide optimum sanitarv utifitv service for the Citv's sanitarv service area. Current Available Recommended Funding Fundinq Sources Sewer Rev 1997198 1998/99 1999/00 2000/01 2001/02 91,500 Total 2002/03 Proposed 91,500 Portable Generator — 966xx Several of the small trailer type qenerators currently housed at the Public Services Complex are very old Thev had oriqinally been obtained throuqh militarv surplus and the Civil Defense Proaram some datinp back to the 1950's These are difficult to maintam when replacement parts are needed. Several of these are now readv to be sold for "scrap-value" This new qenerator is necessary to have dependable qenerators for back-up m case of power failure at the City's many lift stations, as well as anv other unforeseen emerqencies that mav arise throuqhout the Citv. Annual Oaeratina Costs: Comprehensive Plan Obiective: n/a Current Available Recommended Fundinq Fundinq Sources Sewer Rev 1997/98 1998/99 1999/00 2000/01 2001/02 28,900 Total 2002/03 Proposed 28,900 Page -82- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES - Sewer System (continued): Front-End Loader — 966xx This unit will be used in the City's bio-solids processinq facility. The loader will be used to move sludqe and other materials in order to maintain and move non-processed and processed sludqes. Current loader is too small and does not have enoucth vertical lift to perform dailv duties. Annual Operatinq Costs: Comprehensive Plan Obiective: Aid bio-solids processinq and maximize daily bio-solids production. Meet USEPA and FDEP requlations reqardinq bio-solids. Current Available Recommended Fundinq Funding Sources uP 1997/98 1998/99 1999/00 2000/01 2001/02 so,000 Total 2002/03 Proposed so,000 Rotary Screen Sludqe Thickener — 966xx This proiect is one component of the WPC five year master plan developed bv the Citv's consulfinq enqineers. This aroject includes the desiqn and construction of a sludqe thickeninq facility. This facilitv will upqrade the slude thickeninq capabilities at the Northeast AWT facilitv. Annual Oaerating Costs: Comprehensive Plan Obiective: To provide optimum levels of wastewater treatment to arotect the health and safetv of the citizens of Clearwater. To provide qualitv wastewater to ensure the protection of Florida's outstandinq waterwavs. Current Available Recommended Fundinq Fundinq Sources Sewer Rev 1997/98 1998/99 710,000 Total 1999/00 2000/01 2001/02 2002/03 Proposed 710,000 Page -83- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES — Sewer System (continued): Northeast AWT Carousel — 966xx This proiect is to desiqn and construct a new carousel and aeration svstem to increase the orqanic treatment capacitv at the Citv's No�theast AWT facilitv Needed expansion will ensure continued qualitv treatment as well as increasinq the plant's abilitv to handle orqanic loadinqs. Annual Operatinq Costs: Comprehensive Plan Obiective• To provide optimum levels of wastewater treatment. To provide the health and safetv of the citizens of Clearwater and Safety Harbor To protect and improve the qualitv of Florida's outstandinq waterwavs. To provide the citizens and businesses of Clearwater with qualitv reuse water. Current Available Recommended Fundin Fundinq Sources Sewer Rev 1997/98 1998/99 1999/00 2000/01 5,290,000 Total 2001/02 2002/03 Proposed 5,290,000 Holdinq/Storaqe Buildinq — 966xx This proiect will desiqn and construct a sludqe storaqe and handlinq facility The Florida Department of Environmental Protection is expected to pass new sludqe leqislation that will effect the samplinq and testinq of bio-solids. The new leqislation will require all bio-solids meet certain parameters prior to beinq removed from the plant premises To meet new requirements and prevent nuisance odors, an enclosure with odor control equiqment will be required New leqislation is exaected to take effect in October 1997. Annual Operatinq Costs: Comprehensive Plan Obiective• To meet new FDEP bio-solids samplinq and analvsis requirements. To prevent nuisance odors. Current Available Recommended Fundin Fundinq Sources Sewer Rev 1997/98 1998/99 1999/00 2000/01 747,000 Total 2001/02 2002/03 Proposed 747,000 Page -84- 1998 THROUGH 2O03 CAPITAL INPROVEIVENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC SERVICES — Sewer System (continued): Bio-Solids Imarovements — 966xx This prolect will upqrade and improve existinq bio solids equipment at the City's bio-solids processinq facilitv This proiect entails replacinq and upqradinq existinq equipment with new equipment that was not available durina the oriqinal construction. Annual OperatinQ Costs: None. Comprehensive Plan Obiective• To maintain qualitv bio-solids treatment and meet EPA and FDEP bio-solids requirements. To maintain the Citv's capital investment in bio-solids processinq. Current Available Recommended Fundin Funding Sources Sewer Rev SUBTOTAL SEWER SYSTEM: Current Available Fundin 9,413,465 1997/98 1998/99 1999/00 2000/01 2001 /02 Recommended Fundinq Sources 1997/98 3,075,400 840,000 1998/99 1999/00 2000/01 2001 /02 5,480,000 10,002,000 3,125,000 3,125,000 Total 2002/03 Proposed 2002/03 1,100,000 840,000 Total Proposed 25,907,400 GAS SYSTEM Environmental Remediation - 96358 This project will provide funding for cleaning up the old gas plant site as may be required by the Florida Department of Environmental Protection. The site is located between Jones Street on the south, Maple Street on the north, Myrtle Avenue on the east, and Railroad Avenue on the west. Funding in FY 1995/96 will provide start-up funding for the remediation. The Florida Department of Environmental Protection will be providing us, as some future date, their requirements for the remediation on the property. Other environmental locations requiring remediation will also be funded from this project as the requirement is determined. Funding for this will be recovered through the Environmental Imposition Adjustment clause in the Gas System rates. Current Available Fundin 102,546 Recommended Fundinq Sources Gas Rev 1997/98 a-AA;8A8 150,000 1998/99 1999/00 2000/01 2001/02 100, 000 100, 000 100, 00 100, 000 Page -85- 2002/03 150,000 Total Proposed 700,000 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GAS SYSTEM (continued): System Renewal and Replacement - Capitalized - 96364 This is a continuing project to maintain the gas system, including replacement of original cast iron pipes with plastic pipe, to State and Federal specifications. This portion of the project involves work that adds to the value of the gas system and is therefore capitalized. Additional funding, replacing gas revenue funds, for this project for the next seven years are included in the Pinellas and Pasco expansion bond issue. Annual Operatinq Costs: No increase of existing operating costs. Comqrehensive Plan Obiective: To provide for a safe and efficient gas system that meets State and Federal regulations Current Available Recommended Fundin Fundinq Sources 1997/98 438,362 Gas Rev 190,000 1998/99 1999/00 2000/01 2001/02 197,000 204,000 210,000 210,000 2002/03 220,000 Total Proposed 1,231,000 Line Relocation - Maintenance - 96365 This is a continuing project to fund the removal of abandoned gas lines as required by the State Department of Transportation. The project was originally established in the FY 1987/88 Capital Improvement Budget. Annual Operatinq Costs: No increase in existing operating costs. Comprehensive Plan Obiective: To provide for a safe and efficient gas system that meets State and Federal regulations. Current Available Recommended Fundin Fundinq Sources 1997/98 166,089 Gas Rev 25,000 1998/99 1999/00 25,000 25,000 2000/01 2001 /02 25,000 25,000 2002/03 25,000 Total Proposed 150, 000 System Renewal and Replacement - Maintenance - 96366 This is a continuing project to maintain the gas system, such as conducting cathodic protection and leak surveys, as required by State and Federal specifications. The maintenance portion of this project invotves work that is not capitalized. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: To provide for a safe and efficient gas system that meets State and Federal regulations. Current Available Fundin 55,915 Recommended Fundina Sources Gas Rev 1997/98 59,000 1998/99 1999/00 60,000 61,000 2000/01 2001/02 62,000 63,000 2002/03 65,000 Total Proposed 370,000 Page -86- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GAS SYSTEM (continued): Gas Meter Change Out - 96367 To provide funding for continually maintaininq accurate qas meters to maximize aas revenues. Current Available Fundinq 35, 000 Recommended Fundinq Sources Gas Rev 1997198 1998/99 40,000 45,000 1999/00 2000/01 2001/02 50,000 55,000 55,000 2002/03 55,000 Total Proposed 300,000 Pasco Expansion — 96369 This project will provide funding for the extension of gas mains and services within West Pasco County. It will also fund various related activities such as a Pasco Sales/Operations Center and Appliance Showroom in West Pasco County, liquid propane service, and the purchase of natural gas vehicles, refueling equipment, and computers. Annual OperatinQ Costs: Approximately $425,000 for operating costs for FY 1995196, plus the annual debt service on the Bond Issue. Comprehensive Plan Obiective: To provide utility service in the coastal zone consistent with consumer demand and sound environmental management. Current Available Funding 6,111,735 Recommended Fundinq Sources 1997/98 1998/99 946 Bond Iss ' "'�� �A9 4,845,000 2,428,000 Fut Bond Iss �g 1999/00 2000/01 2001 /02 51,200 a-;9�AA9 �§� �AB 1.145,800 1,026,000 1,276,800 2002/03 1,915,200 Total Proposed 7,324,200 5,363,800 Pinellas Phase 11 New Gas Mains 8 Services 96370 This project will provide for the future extension of gas mains and services within Pinellas County. It will fund related activities such as gas main relocation for road construction, capital replacement of obsolete cast iron and galvanized mains, liquid propane service, and gas meter change outs, Annual Operatinq Costs: Annual debt service on the Bond Issue. Comprehensive Plan Obiective: To provide utility service in the coastal zone consistent with consumer demand and sound environmental management. Current Available Fundin 74,000 Recommended Fundina Sources 1997/98 94B Bond Iss �998 Fut Bond Iss 1998/99 1999/00 2000/01 2001102 �A4�-AA9 . .. __ ... , ... Total 2002/03 Proaosed ' - - - . . . ... Page -87- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET GAS SYSTEM (continued): Line Relocation Capitalized - 96374 This is a continuing project to relocate gas mains for road construction and upgrades to the mains. This portion of the project involves work that adds to the value of the gas system and is therefore capitalized. Current Available Recommended Total , Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 4g2,g2g Gas Rev 538,080 807,130 1,048,390 860,000 1,282,490 1,300,000 5,836,090 Pinellas Expansion - 96375 This proiect will provide for the future extension of qas mains and services within Pinellas County. It will fund related activities such as qas main relocation for road construction capital replacement of obsolete cast iron and qalvanized mains liquid propane service and qas meter chanqeouts. Current Available Fundin 3,944,400 Recommended Fundina Sources 94B Bond Iss 1997/98 1998/99 �998 �;94�A9 3 944 400 2,736.000 Total 1999/00 2000/01 2001/02 2002/03 Proposed 3,043,800 9,724,200 Fut Bond Iss 3;9a5�89 3,055,200 �4&�?4A8 2,462,400 8,379,000 2,861.400 New Mains 8 ServiceLines — 963xx This is a project to provide for extension of gas mains and services. requirements once the Strategic Plan has stabilized. Current Available Recommended Fundin Fundinq Sources 1997198 1998/99 Gas Rev SUBTOTAL GAS SYSTEM: Current Available Fundin 11,420,976 Funding of this project will come from available gas system revenues to reduce future bond 1999/00 2000/01 2001/02 316,630 Recommended Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 9,791,480 6,398,130 5,729,190 5,393,200 5,873,690 Page -88- 2002103 450,000 2002/03 6.192,600 Total Proposed Total Proposed 39,378,290 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET SOLID WASTE/RECYCLING - Solid Waste Mini Transfer Station - 96424 The construction of the mini transfer station will permit the hauling of trashLyard waste, recyclables a��e and the modification of the transfer station drainage to meet current environmental codes. Current Available Recommended Fundin Fundinq Sources 328, 502 Total 199T/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed Facility Renewal and Replacement - 96426 This project provides for the repair of machinery and equipment at the finro Solid Waste facilities. Major emphasis on maintenance is required at the Transfer Station, to ensure minimum downtime. The Transfer Station requires replacement of necessary components to maintain and upgrade the original equipment installed in 1971. Annual Oaeratin4 Costs: No increase of existing operating costs. Comprehensive Plan Obiective: To provide sound fiscal management for solid waste collection, transport, disposal and recycling as it develops through State legislation by 1994. Current Available Recommended Fundin Fundina Sources 1997198 165,627 Sol Wst Rev 75,000 1998199 1999/00 2000/01 2001 /02 80,000 95,000 100,000 105,000 2002/03 110,000 Total Proposed 565,000 Residential Container Acquisition - 96427 The project includes the replacement of approximately 10% of the 26,800 automated containers in the field, and the acquisition of new automated containers to meet the anticipated less than 1% annual growth of residential customers. Experience indicates that �59 approximatelv 2,700 containers will be required annually, at a current cost of approximately $5� 53 each. This also includes cost for replacement parts, when automated containers can be repaired. Annual OperatinQ Costs: No increase of existing operating costs. Comprehensive Plan Obiective: Not applicable. Current Available Fundin 262,724 Recommended Fundinq Sources Sol Wst Rev 1997/98 1998/99 1999/00 2000/01 2001 /02 �BA�AA6 205,000 210,000 215,000 220,000 100,000 2002f 03 220,000 Total Proposed 1,170,000 Page -89- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET SOLID WASTE/RECYCLING - Solid Waste (continued): Commercial Container Acquisition - 96429 This is an on-going project for the replacement of �# containers and dumpsters for approximately 3,200 commercial accounts, which entails the replacement of containers damaged or deteriorated during their normal useful life of five years; and the acquisition of additional roll-offs and dumpsters to meet system growth. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: Not applicable. Current Available Fundin 160,753 Recommended Fundina Sources Sol Wst Rev 1997/98 1998/99 1999/00 2000/07 2001/02 250,000 180,000 190,000 195,000 200,000 2002/03 205,000 Total Proposed 1,220,000 Solid Waste Complex - 96436 Project provides for improvement and expansion of the Solid Waste complex on the Campbell property. The project was originally established in the FY 1991/92 Capital Improvement Budget, and the new complex was completed 6/20/94. Further site improvements, such as paving, curbinq, roofina and drainaqe still needed. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 99, 511 Roll-Off Container Hauling Vehicle - 96438 This project provides for the acquisition of finro new roll-off collection and hauling vehicles to expand commercial solid waste operations into the large volume, solid waste generating establishments. These customers, such as department stores, hotels, and large multi-family complexes, have been served by outside contractors approved by the City. Effective �86 211197, Clearwater w+�ev�ide beqan providinq roll-off service to commercial customers in comaetition with rivate haulers The annual debt service of approximately another �25,200 with 4 payments estimated for FY 99/00 for the second vehicle plus an estimated 1.0 FTE. Annual Operatinq Costs: The annual debt service of approximately $�9;489 25 200, with �--1 payments estimated for FY 8�� 97/98of $3�A8 $6,300 for the first vehicle plus an estimated �-9 1_0 FTE. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed 233,500 Page -90- 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET SOLID WASTE/RECYCLING - Solid Waste (continued): Container Screening Program - 96439 To provide screening for Solid Waste containers by using vegetation or enclosures in order to improve the appearance of streets and yards by removing containers from view. This proiect provides fundinct for public education materials pa�ticipation incentives and public relations efforts as well as capital outlaVs for screeninq site improvements. Annual Operatinq Costs: None. Comprehensive Plan Obiective: Not applicable. Current Available Fundin 100,000 Recommended Fundinq Sources Sol Wst Rev 1997/98 1998/99 1999/00 2000101 2001 /02 �9A;8A9 100,000 200,000 Total 2002/03 Proposed 300,000 Commercial Weiqht Based Manaqement Svstem — 964xx This proiect provides for the development and implementation of a commercial solid waste system that more equitablv charctes the commercial customers for the appropriate cost of disposal Currentiv rates for commercial containers (dumpsters) are based on cubic year capacitv while disposal charqes are based on weiqht With technoloqv beinq developed and tested now commercial customers would be charqed for their disposal cost based on the actual weiqht of their refuse when implemented in FY 2000101. Annual Operatinq Costs• Debt service payments. Comprehensive Plan Objective: Not applicable Current Available Recommended Fundin Fundinq Sources SUBTOTAL SOLID WASTE: Current Available Fundin 1,350,617 LIP 1997/98 1998/99 1999/00 2000/01 2001/02 140,000 Recommended Fundina Sources 1997/98 625,000 1998/99 565,000 1999/00 2000/01 2001/02 635,000 510,000 525,000 Page -91- Total 2002/03 Proposed 2002/03 535,000 140,000 Total Proposed 3,395,000 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET SOLID WASTE/RCYCLING - Recycling: Recycling Vehicles - 96801 This project provides for the purchase of recycling vehicles and support required to meet the City's recycling agreement and proforma. For FY 86E9� 97/98 -(1) multi-family recycling vehicle for $105, Annual Operatinq Costs: FY 8618� - the annual debt service plus an estimated 1.0 FTE ' was approved for hire as needed after January 1, 1997 as part of the approved Recyclinq Business Plan. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000l01 2001/02 2002/03 Proposed 151,440 Recycling Building 8 Process Ramp - 96802 Provide funds for the expansion of the recycling materials processing and marketing center as volume increases. Current Available Fundin 25,315 Recommended Fundinq Sources Recyc Rev 1997/98 1998199 1999/00 2000/01 140,000 Total 2001/02 2002/03 Proposed 140,000 Recycling Carts � Dumpsters Acquisition - 96804 This project provides for the purchase and replacement of recycling carts/containers and dumpsters for the City's three Recycling Programs - Residential, Multi- Family, and Commercial, in order to meet the City's recycling agreement and proforma financial statements. Annual Operatinq Costs: No increase in existing operating costs. Comprehensive Plan Obiective: Not applicable. Current Available Fundin 274,636 Recommended Fundinq Sources Recyc Rev 1997/98 1998/99 28,600 28,600 1999/00 2000/01 2001/02 15,000 30,000 40,000 2002/03 50,000 Total Proposed 192,200 Page -92- 1998 THROUGH 2O03 CAPITAL IMPROVEMENT BUDGET AND 1997/98 CAPITAL BUDGET SOLID WASTEIRCYCLING - Recycling ( continued): Recycling Grant - 96805 A state recycling grant has been approved to assist counties and municipalities in promoting recycling and increasing the amount of recyclable materials removed from the waste stream. The grant is derived from the State Solid Waste Trust Fund and allocated to the counties annually on a population basis. Pinellas County reallocates their grant on a population basis also. Annual recycling grants will fluctuate based upon revenue available and must be estimated for budget purposes. Expenditures are controlled by the state and are generally limited to education, promotion, capital acquisition and operating cost reimbursement. Current Available Recommended Total Funding Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001102 2002/03 Proposed 379,374 Recyc Rev �7�;AA9 �999 �A89 �99 ��AA9 35,000 285,000 60,000 55,000 50,000 45,000 40,000 Recycling Equipment Replacement - 96806 This project provides for a reserve for the replacement of M& O automotive equipment for all three recycling programs, on an on-going basis. This equipment will be purchased with cash. Current Available Recommended Total Funding Fundinq Sources 1997/98 1998199 1999/00 2000/01 2001/02 2002/03 Proposed 222,000 Recyc Rev 243,000 243,000 243,000 243,000 243,000 263,000 1,478,000 SUBTOTAL RECYCLING: Current Available Recommended Funding Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 1,052,765 331,600 326,600 448,000 318,000 323,000 Page -93- 2002/03 348,000 Total Proposed 2,095,200 1998 THROUGH 2O03 CAPITAL IMPROV EMENT BUDGET AND 1997/98 CAPITAL BUDGET ENGINEERING/PUBLIC WORKS - Utilities Miscellaneous Citywide Aerial Photography - 96516 The Engineering Department maintains a 100 scale atlas of aerial photography which is updated on the desirable schedule of every four years. The aerial atlas is widely used by the public and many divisions of the city for information and planning. The Engineering Division uses the aerials in conjunction with permitting, construction drawings, and as an important source of historical information. The aerial atlas presently in use was flown in March 1990. The cost of the aerial photography is estimated at $33,000 for FY 94/95. Annual Operatinq Costs: No increase of existing operating costs. Comprehensive Plan Obiective: To support other elements in the plan. Current Available Fundin 18,435 Recommended Fundina Sources Water Rev Sewer Rev StormWtr 1997/98 1998/99 1999/00 2000/01 12,000 12,000 12,000 Tota I 2001/02 2002/03 Proposed 12,000 12,000 12,000 Island Estates Reclaimed Water - 96520 This project provides funding for planning, design and construction services for pumping facilities, storage, transmission piping and distribution piping for a reclaimed water system on Island Estates. Current Available Recommended Total Fundin Fundinq Sources 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 Proposed SUBTOTAL UTILITIES MISCELLANEOUS: Current Available Recommended Fundin Fundinq Sources 18,435 1997198 1998/99 1999/00 2000/01 36,000 Page -94- Total 2001/02 2002/03 Proposed