MANDALAY AVENUE STORMWASTER OUTFALL - 11-0031-EN - ADMINISTRATIVE CHANGE ORDER #1ADMINISTRATIVE CHANGE ORDER 1 PROJECT: Mandalay Avenue Stormwater Outfall CONTRACTOR: Kamminga & Roodvoets, Inc. 5219 Cone Road Tampa, FL 33610 Date: December 21, 2013 PROJECT NUMBER: 11- 0031 -EN PO REFERENCE: ST109281 AWARD DATE: February 21, 2013 CONTRACT DATE: March 18, 2013 CODE: 0315- 96183 - 563700- 539 - 000- 0000(A) 0327 - 96742 - 563800- 533 - 000- 0000(B) 0315- 96739- 563800- 533 - 000- 0000(C ) 0327 - 96634- 563800 -535- 000- 0000(D) SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order approves a time extension of 59 days and an increase in the total contract for additional storm improvements.' STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Administrative C s M - NEW CONT T APPROV i AS T P CI i _water/ ACCEPTED BY: $1,343,615.35 Kamminga & Ro $134,352.50 $1,477,967.85 By: Camilo Soto, ATTEST: ()j1g Rosemarie Call, Date Je-&ructAi i 3 Assistant City Attorney CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA g William B. Home, II City Manager Witnesses: ecommended By: City of Clearwater bvkaA Tara L Kivett,Enginfering Construction Manager Michael D. Quillen, PE, City Engineer . Page 2 of 3 Administrative Change Order 1: Mandalay Avenue Stormwater Outfall ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Stormwater Code A: 0315 - 96183 - 563700- 539 - 000 -0000 Decreases: 2.1 Swale Construction 70 LF $15.00 ($1,050.00) 2.3 Rock Excavation 25 CY $14.00 ($350.00) 2.4 Additional Backfill Material (Flowable Fill) (If 60 CY $120.00 ($7,200.00) Needed) 2.5 Additional Pipe Bedding Material (FDOT No. 55 CY $56.00 ($3.080.00) 57 Stone) (if needed) 3.2 24" RCP 4 LF $81.00 ($324.00) 3.3 36" RCP 19.5 LF $104.00 ($2,028.00) 3.4 42" RCP 25.5 LF $116.00 ($2.958.00) 3.6 29 "x 45" ERCP 2 LF $151.00 ($302.00) 3,7 34" x 53" ERCP 24 LF $169.00 ($4,056.00) 3.8 4' x 2' Box Culvert 2 LF $433.00 ($866.00) 3,9 6' x 3' Box Culvert 16 LF $407.00 ($6,512.00) 3.10 8' x 3' Box Culvert 15 LF $501.00 ($7,515.00) 3.11 City Standard Curb Inlet (S.D. A -9) 1 EA $1,700.00 ($1,700.00) 3.28 15" Storm Pipe Abandonment (Manadalay) & 0.5 LS $1,500.00 ($750.00) 15" Pipe Plug Construction (East Shore) 3.29 Underdrain Removal & Replacement (6" & 8 ") 75 LF $24.00 ($1.800.00) 4.6 Header Curb 79 LF $25.00 ($1,975.00) 4.8 City Type I Curb (includes drop) 106 LF $26.00 ($2,756.00) 4.10 Paver & Concrete Base Restoration (utilize 831 SF $12.00 ($9.972.00) exist. pavers) 5.2 Tree Barricade (including Cushioning Surface) 136 LF $3.00 ($408.00) Total (Decreases) Code A: ($55,602.00) Increases: 1.1 Mobilization, General Conditions, 0.223792697 LS $169,800.00 $38,000.00 Demobilization 1.2 Maintenance of Traffic (Vehicular & 0.45 LS $10,000.00 $4,500.00 1.3 Erosion and Sediment Control 0.416666667 LS $6,000.00 $2,500.00 2.2 Unsuitable Material Removal & Replacement 5 CY $33.00 $165.00 (Pipe /Culvert & Structure Bedding Only) 2.6 Additional Roadway Base Material (Crushed 5 CY $83.00 $415.00 Concrete) (if needed) 3.1 15" RCP 24.5 LF $69.00 $1,690.50 3,5 19 "x30" ERCP 301 LF $93.00 $27,993.00 3.24 FDOT Type "F" D.B.I. 4 EA $2,200.00 $8,800.00 4.1 Milling (Up to 2 ") 4347.826087 SY $3.45 $15,000.00 4.2 Type S -1 Asphalt 275.2727273 TN $110.00 $30,280.00 4.3 Type S -IIl Asphalt Overlay (within project 55 TN $111.00 $6,105.00 4.4 Asphalt Pavement Restoration (City Approval 10 SY $10.00 $100.00 Required) 4.5 Straight Curb 15 LF $23.00 $345.00 4.11 Pavement Markings / Striping Restoration 1.348314607 LS $4,450.00 $6,000.00 4.12 Concrete Sidewalk Restoration (Match Existing Thickness) 200 ' SF $4.70 $940.00 4.13 Concrete Driveway Restoration 1600 SF $4.80 $7,680.00 4.15 Roadway Reconstruction (East Shore, 0.856531049 LS $46,700.00 $40,000.00 Poinsettia & Papaya) 5.1 Tree Removal 1 EA $350.00 $350.00 5.4 Replace Removed Landscape and Decorative 0.315789474 LS $3,800.00 $1,200.00 Ground Cover (Project Area Less Median on Mandalay Ave.) 5,5 Sod Restoration (in kind) 750 SF $1.00 $750.00 Total Increases Code A: $192,813.50 • • Page3of3 Administrative Change Order 1: Mandalay Avenue Stormwater Outfall ITEM Additions: 3.30 3.31 DESCRIPTION FDOT Type J -7T M.H. (4' x 4') Connect to Existing Structure B -1 / Remove Newly Installed 15" RCP 3.32 Conenct to Existing Structure B -3 / Rebuilt Structure Wall 3.33 Adjust Grated Inlet QUANTITY 3 1 UNIT UNIT COST EA $3,200.00 LS $2,500.00 LS $2,000.00 EA $1,500.00 Total Additions Code A: Total Net (Dec reases)/Increases/Additions Code A: TOTAL COST $9,600.00 $2,500.00 $2,000.00 $1,500.00 $15,600.00 $152,811.50 Water Code B: 0327-96742-563800-533-000-0000 Decreases: 7.1 4" D.I.P. Water Main Adjustment 7.2 8" D.I.P. Water Main Adjustment 7.3 12" D.I.P. Water Main Adjustment 7.4 16" D.I.P. Water Main Adjustment 7.6 Potable Water Service Reconstruction (2 ") Increases: 7.5 Potable Water Service Reconstruction(3 /4 " &1 ") 7.7 Potable Water Fittings (Ductile Iron) 7.8 Remove & Replace Corporation Stop (Potable water) (all sizes) 7.9 Remove & Replace Curb Stop (Potable water)(all sizes) 7.10 Potable Water Main Line Stop (Size Varies) Additions: 7.26 6" D.I.P. Water Main Adjustment 60 LF $44.00 169 LF $53.00 9 LF $85.00 80 LF $136.00 220 LF $13.00 Total (Decreases) Code B: 160 0.18 4 4 1.666667 LF TN EA $12.00 $9,100.00 $488.00 EA $412.00 EA $6,000.00 Total Increases Code B: 50 LF $67.00 Total Additions Code B: Total Net (Dec reases)/Increases/Additions Code B: Reclaimed Water Code C: 0315- 96739 - 563800 -533- 000 -0000 Decreases: 7.12 8" D.I.P. Reclaimed Water Main Adjustment 7.14 Reclaimed Water Service Reconstruction (1 ") 7.15 Reclaimed Water Service Reconstruction (2 ") 7.17 Remove & Replace Corporation Stop (Reclaimed Water)(All Sizes) 7.18 Remove & Replace Curb Stop (Reclaimed Water)(All Sizes) 15 10 70 3 LF LF LF $67.00 $13.00 $14.00 EA $488.00 3 EA $412.00 Total (Decreases) Code C: ($2,640.00) ($8,957.00) ($765.00) ($10,880.00) ($2.860.00) ($26,102.00) $1,920.00 $1,638.00 $1,952.00 $1,648.00 $10,000.00 $17,158.00 $3,350.00 $3,350.00 ($5,594.00) ($1,005.00) ($130.00) ($980.00) ($1.464.00) ($1.236.00) ($4,815.00) Sewer Code Code D: 0327 - 96634 - 563800 -535- 000 -0000 Decreases 7.20 7.21 7.23 7.24 8" D.I.P. Sanitary Sewer Replacement (Gravity) 12" D.I.P. Sanitary Sewer Replacement Sanitary Lateral Conflict Sturcture Sanitary Lateral Cleanout 45 40 2 1 EA $460.00 Total (Decreases) Code D: LF LF EA $54.00 $69.00 $2,400.00 Increases: 7.22 Sanitary Lateral Reconstruction 160 LF $15.00 Total Increases Code D: Total Net (Decreases) /Increases Code D: ($2.430.00) ($2.760.00) ($4,800.00) ($460.00) ($10,450.00) $2,400.00 $2,400.00 ($8,050.00) Total Net (Decreases)/Increases /Additions to Contract: $134,352.50 To: William B. Home, II, City Manager From: Mike Quillen, Engineering Director CC: rwater o Interoffice Correspondence Sheet Tina G. Wilson, Budget Director; Phuong Vo, Project Manager; Tara Kivett, Construction Manager; Stephanie Sansom, Senior Accountant, Engineering; Karen Maldonado, Construction Office Specialist Date: December 21, 2013 RE: Administrative Change Order 1 Mandalay Avenue Stormwater Outfall (11 -0031- EN) RECOMMENDED ACTION: Approve Administrative Change Order 1 to Kamminga & Roodvoets, Inc., of Tampa, FI, for Mandalay Avenue Stormwater Outfall (11- 0031 -EN) Increasing the contract amount by $134,352.50 for a new contract total of $1,477,967.85 and add 59 calendar days to the contract. BACKGROUND: Administrative change order 1 decreases unused items, increases and adds items for additional storm improvements on East Shore to Baymont and adds 59 calendar days to the contract. OFFICE OF MANAGEMENT AND BUDGET DEPARTMENT REVIEW I recommend approval based on the administrative change order criteria: 1. Increases do not exceed 10% of the Council approved amount on a cumulative basis. 2. Change does not change the scope of the project. 3. Price increases do not require additional appropriation to the project. 4. Contract price decreases may be approved without limitation. 5. Completion date is not extended more than 60 days. 47/ Tina G. Wilson Date � J