CLEARWATER HARBOR PROJECTS A & B - 10-0008-UT & 08-0049-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALa ADMINISTRATIVE CHANGE ORDER 1 & Final Date: November 14, 2013 PROJECT: Clw Harbor Reclaimed Water System & PROJECT: 10- 0008 -UT & 08- 0049 -UT LS 21 Decommissioning CONTRACTOR: Gregory Electric Co., Inc. 2333 Feather South Dr., Suite #203 Clearwater, FL 33762 PO REFERENCE NO: ST 107561 AWARD DATE: June 02, 2011 CONTRACT DATE: June 30, 2011 CODE: 0315- 96739 - 563800 -533- 000 -0000 A CODE: 0376 - 96665 - 563800 -535- 000 -0000 B CODE: 0327 - 96665 - 563800 -535- 000 -0000 C SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order decreases, increases, and adds items to account for unforseen field conditions - see attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 & Final - CM NEW CONTRACT AMOUNT Camilo Soto, Assistant City Attorney Date: . .,e_LvUa Yz 13/ a() 14 ATTEST: $1,882,577.11 ($269,104.71) $1,613,472.41 Rosemarie Call, CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA tota William B. Horne, II City Manager ACCEPTED BY: Gregory Electric Company, Inc. By: Lisa Phillips, • 701 ' V ice - resident I ) 3 Date: 12-1 Sol Zo l 3 Witnesses: 4Rk01-0- fAktfluv Recommended By: City of Clearwater zeot Tara L Kivett, Engineering Construction Manager Michael D. Quillen, PE, City Engineer Page 2 of 3 Admin Change Order 1 & Final - Clw Harbor Reclaimed Water System (10- 0008 -UT) & LS #21 Decommissioning (08- 0049 -UT) ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL COST Clw. Harbor RCW System Code A: 0315- 96739 - 563800 -533- 000 -0000 Decreases: 4 Tree Barricades 1 LS $4,500.00 ($4,500.00) 5 Root Pruning 787 LF $5.25 ($4,131.75) 6 12" Ductile Iron Pipe by Open Cut 102.5 LF $58.08 ($5,953.20) 7 4" Ductile Iron Pipe by Open Cut 500 LF $36.58 ($18,290.00) 10 6" C900 PVC Pipe by Open Cut 325 LF $24.50 ($7,962.50) 11 4" C900 PVC Pipe by Open Cut 1436 LF $23.67 ($33,990.12) 12 8" C900 RJ PVC Pipe by Directional Bore 180 LF $34.22 ($6,159.60) 16 Compact Ductile Iron Fittings 2.32 TON $3,177.00 ($7,370.64) 17 12" Restrained Joint 19 EA $75.00 ($1,425.00) 18 8" Restrained Joints 38 EA $39.00 ($1,482.00) 20 4" Restrained Joints 64.5 EA $33.75 ($2,176.88) 23 8" Gate Valve and Box 2 EA $1,334.00 ($2,668.00) 26 Combination Air Release Valve Assembly 2 EA $1,917.00 ($3,834.00) 28 2" Long Side Service 1 EA $1,993.00 ($1,993.00) 31 1" Short Side Service 11 EA $577.00 ($6,347.00) 33 Tree Removal 11 EA $800.00 ($8,800.00) 34 Unsuitable Material Excavation Below Grade 100 CY $110.00 ($11,000.00) 35 Select Backfill Below Grade 100 CY $110.00 ($11,000.00) 36 Concrete Driveway Replacement (Owner 100 SY $72.50 ($7,250.00) Directed) 37 Concrete Sidewalk Repalcement (Owner 100 SY $70.50 ($7,050.00) Directed) 38 Concrete Curb Replacement (Owner Directed) 100 LF $28.00 ($2,800.00) 40 Asphalt Overlay (Owner Directed) 1 SY $29.00 ($29.00) 41 10% Contingency 1 LS $131,461.48 ($131,461.48) Total (Decreases): (5287,674.17) Increases: 9 8" C900 PVC Pipe by Open Cut 80 LF $ 22.66 $1,812.80 13 6" C900 RJ PVC Pipe by Directional Bore 302 LF $24.54 $7,411.08 14 4" C900 RJ PVC Pipe by Directional Bore 1639 LF $19.10 $31,304.90 15 10" SDR11 HDPE Pipe by Directional Bore 8.5 LF $49.50 $420.75 19 6" Restrained Joints 9 EA $44.50 $400.50 25 4" Gate Valve and Box 6 EA $1,078.00 $6,468.00 27 Permanent Blowoff Assembly 6 EA $1,115.00 $6,690.00 30 1" Long Side Service 1 EA $608.15 $608.15 39 Asphalt Road Replacement (Owner Directed) 211 SY $46.00 $9,706.00 Total Increases: $64,822.18 Additions: 42 Install 6" Potable at Nursery Rd. 200 SY $25.45 $5,090.00 43 Manatee Sign 1 EA $516.20 $516.20 44 Grout Storm Pipe 1 LS $4,100.00 $4,100.00 45 Unforeseen Conditions 1 LS $4,866.42 $4,866.42 46 Plowable Fill 1 LS $2,236.05 $2,236.05 47 Extra Surveying 1 LS $651.00 $651.00 48 Excavation at 1052 Sunset Point 1 LS $2,533.00 $2,533.00 • Page 3 of 3 Admin.Chabge Order 1 & Final - Clw Harbor Reclaimed Water System ITEM DESCRIPTION QTY 49 Manhole #4 50 Excavation on Sunset 51 Thermoplastic Striping on E/B Sunset 52 1044 Sunset Point Rd. Plumber Reimbursement 53 Unknown Sewer (10- 0008 -UT) & LS #21 Decommissioning (08- 0049 -UT) UNIT LS LS LS LS LS UNIT COST $391.26 $861.68 $2,400.00 ($185.00) $3,276.00 Total Additions: Total Net (Decreases)/Increases /Additions Code A: TOTAL COST $391.26 $861.68 $2,400.00 ($185.00) $3,276.00 LS 21 Decommissioning Code C: 0327 - 96665- 563800 -535- 000 -0000 Decreases: 105 Cosntruction of 12" PVC Sanitary Sewer 107 Construction of Sanitary Laterals (Connect to Existing Private Lateral) 110 Residential Potable Water Service Connection & Reconnection 111 Connect Sidewalk Restoration (Including Detectable Surfaces 112 Roadway Reconstruction 113 Type 1 Curb Construction (Including Drop Curb & Valley Gutter) 114 Concrete Driveway Restoration 117 10% Contingency Increases 104 Unsuitable Material Removal & Replacement 108 Cleanout Construction 115 Sodding (Match Existing) 116 Asphalt Driveway Restoration 10 LF $ 88.29 6 LF $ 22.34 70 LF $ 12.50 331 SF $ 62.00 13 SY $ 18.00 357 LF $ 22.50 1398 SF $ 55.00 1 LS $39,681.89 Total (Decreases): 740 CY $60.00 2 EA $495.00 4290 SF $ 4.50 208 SY $46.00 Total Increases: Total Net (Decreases)/Increases Code B: $26,736.61 ($196,115.38) ($882.90) ($134.04) ($875.00) ($20,522.00) ($234.00) ($8,032.50) ($76,890.00) ($39,681.89) ($147,252.33) $44,400.00 $990.00 $19,305.00 $9,568.00 $74,263.00 ($72,989.33) Total Net (Decreases)/Increases /Additions: ($269,104.71) Clearw U Interoffice Correspondence Sheet To: William B. Horne, II, City Manager From: Michael D. Quillen, PE, Engineering Director CC: Tina G. Wilson, Budget Director; Tara Kivett, Engineering Specialist II; Stephanie Sansom, Senior Accountant/Engineering /ESM; Karen Maldonado, Construction Specialist Date: February 5, 2014 A- dnnini�lr& -t c- RE: Change Order No. 1 & Final Clearwater Harbor Reclaimed Water System & LS 21 Decommissioning (10- 0008 -UT & 08- 0049 -UT) RECOMMENDED ACTION: Approve Administrative Change Order No. 1 and Final for Gregory Electric Co., Inc. of Clearwater, Florida, for the "Clearwater Harbor Reclaimed Water System & LS 21 Decommissioning (10- 0008 -UT & 08- 0049 -UT) for a decrease of $269,104.71 making a final contract amount of $1,613,472.41. BACKGROUND: This change order decreases, increases and adds items to account for unforeseen field conditions. OFFICE OF MANAGEMENT AND BUDGET DEPARTMENT REVIEW recommend approval based on the administrative change order criteria: 1. Increases do not exceed 10% of the Council approved amount on a cumulative basis. 2. Change does not change the scope of the project. 3. Price increases do not require additional appropriation to the project. 4. Contract price decreases may be approved without limitation. 5. Completion date is not extended more than 60 days. Tina G. Wilson Date