2011 SIDEWALK CONTRACT - 11-0012-EN - ADMINISTRATIVE CHANGE ORDER #5CHANGE ORDER 5 Date: October 30, 2013 PROJECT: 2011 Sidewalk Contract PROJECT NUMBER: 11- 0012 -EN PO REFERENCE NO: ST108005 CONTRACTOR: CONTRACT AWARD: November 03, 2011 Central Florida Contractors, Inc. CONTRACT DATE: December 13, 2011 PO Box 3987 Seminole, Florida 33775 CODE: 0315- 92339 - 563700 -541- 000 -0000 A CODE: 0315 - 92277 - 563700 -541- 000 -0000 B SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT Extends the contract for 360 days and increases the funding on a unit price basis for a not to exceed amount, with all other terms and conditions remaining the same, see attached for details. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT $ 568,337.00 Admin CO 1 - CM - 2/15/2012 $ 56,832.00 Admin CO 2 - CM - 3/20/2012 $ - Admin CO 3 - CM - 4/25/2012 $ - CO 4 - CC - 09/20/2012 $ 400,000.00 CO 5 - CC - 11/ i /21 13 $ 200,000.00 NEW CON C ' A it UNT $ 1,225,169.00 APPR O D A s ;1' S T Ai le ►A Camilo Soto, Assistant City Attorney cteo<<< n ciAkt-0s George N. Cretekos, Mayor ATTEST: Ari 0a-0-- Rosemarie Call, City Clerk Date:. 8,un /to 4 JG /3 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Niriltvt. k a i'9 ir1 Zvi; iam B. Horne, II City Manager r/ Central Florida ' 0,01,41.01P I II es, esident By: George Date: ctors-, Inc: /al 3 (SEA.L) Recommended By: City of Clearwater 76(-A0(- Tara L Kivett, Eng Construction Manager /zc Michael D Quillen, E, City Engineer Page 2 of 3 Change Order 5 - 2011 Sidewalk Contract ITEM DESCRIPTION Estimated UNIT UNIT COST TOTAL COST Quantity New Sidewalks Code A: 0315 - 92339 - 563700 -541- 000 -0000 Increases: 28 Construct New 4" Concrete 3500 SF $2.45 $8,575.00 Sidewalk (3000 PSI w/Fiber Mesh) 29 Construct New 6" Concrete 1000 SF $3.80 $3,800.00 Sidewalk (3000 PSI w/Fiber Mesh and 6 "x6" /#10 x #10 Welded Wire Mesh) 30 Root Pruning 230 LF $3.00 $690.00 31 Install Detectable Warning Mat on 30 EA $250.00 $7,500.00 Existing Sidewalk 32 Preparation, installation and 1 EA $500.00 $500.00 maintenance of Project Sign 33 Construct 4 ft. Wide ADA Ramp 7 EA $500.00 $3,500.00 34 Construct 5 ft Wide ADA Ramp 7 EA $500.00 $3,500.00 35 Upgrade 4 ft. wide ADA Ramp 8 EA $1,050.00 $8,400.00 36 Upgrade 5 ft. wide ADA Ramp 8 EA $1,050.00 $8,400.00 39 Contingency 1 LS $4,486.00 $4,486.00 Total Increases Code A: $49,351.00 Remove and Replace Sidewalks Code B: 0315 - 92277 - 563700- 541 - 000 -0000 Increases: 40 Install Detectable Warning Mat on 1 EA $250.00 $250.00 Existing Sidewalk 41 Preparation, installation and 1 EA $500.00 $500.00 maintenance of Project Sign 42 Remove & Replace 4" Concrete 14500 SF $3.20 $46,400.00 Sidewalk (3000 PSI w/Fiber Mesh Reinforcing) 43 Remove & Replace 6" Concrete 100 SF $3.80 $380.00 Sidewalk (3000 PSI w/Fiber Mesh Reinforcing) 44 Remove & Replace Valley Gutter 312.5 LF $16.00 $5,000.00 Curb 45 Remove & Replace Type I Curb 20 LF $16.00 $320.00 46 Remove & Replace Modified 20 LF $16.00 $320.00 47 Remove & Replace Straight Curb 50 LF $16.00 $800.00 48 Construct 4 ft. wide ADA Ramp 30 EA $1,050.00 $31,500.00 49 Construct 5 ft. wide ADA Ramp 30 EA $1,050.00 $31,500.00 50 Sod 10000 SF $0.45 $4,500.00 51 Adjust Sanitary Sewer Manhole 2 EA $500.00 $1,000.00 52 Root Pruning 500 LF $3.00 $1,500.00 53 Install Gravity Wall (Maximum 5 LF $50.00 $250.00 Height 24 Inches) 54 Install Straight Curb 500 LF $16.00 $8,000.00 1 Page 2 of 3 Change Order 5 - 2011 Sidewalk Contract ITEM DESCRIPTION Estimated UNIT UNIT COST TOTAL COST Quantity 55 Removal of 4" sidewalk 100 LF $2.00 $200.00 57 Clearing & Grubbing 1 LS $5,007.00 $5,007.00 60 Contingency 1 LS $13,222.00 $13,222.00 Total Increases Code B: $150,649.00 Total Increases to the Contract: $200,000.00