Loading...
2011 UNDERDRAINS PROJECT - 10-0016-EN - ADMINISTRATIVE CHANGE ORDER #2 & FINALAdministrative Change Order #2 & Final Date: July 31, 2013 PROJECT: 2011 Underdrain Contract PROJECT NUMBER: 10- 0016 -EN CONTRACTOR: Adkins Contracting, Inc. 3516 Gulf City Road Ruskin, Florida 33570 PO REFERENCE NO.: ST 107955 AWARD DATE: October 20, 2011 CONTRACT DATE: November 04, 2011 CODE: 0315-92277-563700-541-000-0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order decreases and increases items according to field conditions, adds 30 days to contract and closes out the project. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT Change Order 1 - CC - 1/17/2013 Adm. CO#2 & Final NEW CONTRACT AMOUNT Camilo Soto, Assistant City Attorney ATTEST: , Lfl ./2/ i.i Rosemarie Call, City Clerk CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA ifka,, 644,,,,E---xt, William B. Horne, II City Manager $538,012.84 $253,010.89 (510,223.81) 5780,799.92 • ckie Dean Adkins, President Adkins Contracting, Inc. Fi< V AL) Y Date: g// j 2(143 Witnesses: RECOMMENDED BY: CITY OF CLEARWATER Tara L.Kivett, Eng. Construction Manager e7V6 Michael D. Quillen, E, City Engineer Page 2 of 2 Admininstrative Change Order 2 & Final - 2011 Underdrain Contract ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Code B: 0315-92277-563700-541-000-0000 Decreases: 1 Mobilization 1 EA $612.53 (8612.53) 3 Maintenance of Traffic - Under Drain, Multi 2 EA , $597.40 ($1,194.80) Lane 6 Sediment & Erosion Control 3 EA $83.17 (8249.51) 8 Root Pruning 694 LF $6.00 ($1,164.00) 9 Tree Barricades 930 LF $3.80 ($3,534.00) 11 Remove Existing Concrete Sidewalk, 4" 1,204 SF $2.73 ($3,286.92) 16 ADA Sidewalk Ramp, 4" Concrete 1,170.5 SF $10.80 ($12,641.40) FDOT Underdrain Inspection Box, Index 18 #245 3.0 EA $870.96 ($2,612.88) 19 6" Underdrain 4.0 LF $23.57 ($94.28) 22 8" Underdrain 2,486.5 LF $26.12 ($64,947.38) 26 Modified Curb (Remove & Replace) 163 LF $34.37 ($5.,602.31) 27 Valley Gutter Curb (Remove & Replace) 176 LF $44.57 ($7.,844.32) 28 Swale Curb, 4' Wide, (bid includes adjacent 14 LF $72.37 ($1[ 013.18) asphalt) 35 10% Contingency 1 LS $48,910.26 ($48,910.26) Total (Decreases): ($156.,707.77) Increases: 2 Maintenance of Traffic, Underdrain, 2 Lane, 2 5 EA $262.11 $1.,310.55 Way 4 Maintenance of Traffic - Kapok Park Trail 1 EA $115.40 $115.40 10 Remove Existing Underdrain 4,085 SF $2.53 $10,335.05 12 Remove Existing Concrete Sidewalk, 6" 9,884.78 SF $2.19 $21,647.67 13 Remove Existing Asphalt 175.24 SY $18.45 $3.233.18 14 Core Existing Storm Inlet 19 EA $375.50 $7.,134.50 15 Concrete Driveway, 6" 9,914.78 SF $4.07 $40,353.15 17 Concrete Sidewalk, 4" 24 SF $3.54 $85.67 23 8" Clean Out 24 LF $229.63 $5.,511.12 24 8" Solid PVC Storm Pipe 2,167 LF $12.45 $26.972.93 25 Type I Curb (remove and replace) 441 LF $26.37 $11.,629.17 30 Asphalt 1 -1/2" Thick PC III 49.07 SY $30.09 $1,476.52 31 10" Thick Crushed Concrete Road Base 56.18 SY $26.91 $1.,511.80 32 Sod Replacement (Bahia) 4,719 SF $0.58 $2.737.02 33 Sod Replacement (St. Augustine) 14,064 SF $0.71 $9.,985.44 34 Sod, Cynodon Dactylon (Bermuda 419- 1,040 SF $1.82 $1,892.80 Certified) 37 Install 8x8 tee 4 EA $138.00 $552.00 Total Increases: $146,483.96 Total Net (Decreases)/Increases: ($10.223.81)