Loading...
06/17/2013 SPECIAL CITY COUNCIL MEETING MINUTES CITY OF CLEARWATER June 17, 2013 Present: Mayor George N. Cretekos, Vice Mayor Paul Gibson, Councilmember Doreen Hock-DiPolito, Councilmember Bill Jonson, and Councilmember Jay E. Polglaze. Also Present: William B. Horne - City Manager, Jill S. Silverboard - Assistant City Manager, Rod Irwin - Assistant City Manager, Pamela K. Akin - City Attorney, Rosemarie Call - City Clerk, and Nicole Sprague - Official Records and Legislative Services Coordinator. To provide continuity for research, items are listed in agenda order although not necessarily discussed in that order. 1. Call to Order - Mayor George N. Cretekos The meeting was called to order at 1:00 p.m. at City Hall. 2. Council Discussion Items 2.1 Area Plan Overview - Michael Delk An Overview of Beach by Design In 1997, the City undertook a planning effort to address community concerns about the overall physical and economic conditions of Clearwater Beach. The age and obsolescence of buildings and the conditions of the public realm did not support modern-day travel needs and the strength of the City's tourism was not sufficient to support modernization and redevelopment. In order for the market to support new residential, hotel and retail development, the negative aspects of character and the quality of the public realm, including traffic circulation, would need to be improved. To that end, Clearwater Beach: Strategies for Revitalization included the following generalized topics, which if implemented, could lead to beach redevelopment. • Transportation and parking • Redevelopment of the superblocks between Clearwater Beach and the Hilton and redevelopment of the Mandalay retail district Special Council 2013-06-17 1 • Upgrading of the Beach • Gulfview-Coronado hotel/retail redevelopment • East Shore entertainment district and marina • Bayside multi-family redevelopment • Brightwater Finger redevelopment In 2001, Beach by Design was adopted to guide implementation of the recommendations developed in Strategies of Revitalization in light of fiscal and legal constraints, analysis of the economy and market, as well as changed conditions. The document is the special area plan governing Clearwater Beach and sets forth revitalization strategies addressing six components: land use, mobility, off-street parking, catalytic projects, and economic feasibility and financing, and design guidelines. It is based on the following series of strategies: • creation of an attractive and efficient "arrival and distribution" system at the intersection of State Road 60 and North Mandalay and Coronado; • transformation of North Mandalay into an attractive, pedestrian-friendly street which provides a high quality address for retail and restaurant uses; • renovation of South Gulfview to the west to create a unique two-way, local street as part of a destination quality beachfront place; • improving traffic circulation to the south of State Road 60; • improving sidewalks and creating an entire beachfront transit system; • constructing new parking facilities south of Pier 60 park to support beach visitors and north of Pier 60 park to support the North Mandalay retail/restaurant corridor; • promoting a small number of catalytic redevelopment projects; and • the adoption of design guidelines, which are necessary to achieve the objectives of Beach by Design. The plan has been amended on seven occasions to address changing conditions and City Council concerns. Below is a summary of the six components of the Plan. Land Use Special Council 2013-06-17 2 The Plan divides Clearwater Beach into eight distinct character districts (see map on page three) which govern development and are as follows. • Old Florida — a transitional district between the tourist area and the residential area of north Clearwater Beach. The plan supports the development of new overnight accommodations and attached dwellings throughout the District with limited retail/commercial and mixed use development fronting Mandalay Avenue between Bay Esplanade and Somerset Street and restaurants located on the waterfront. Old Florida includes very specific height, setback and building stepback requirements in addition to the Design Guidelines that apply to the entire plan area. Destination Resort — the prime area for quality beachfront redevelopment to spur revitalization and redevelopment north of Pier 60. The preferred form of redevelopment is mixed with resort residential and hospitality uses fronting on the Beach and retail, restaurant and residential uses fronting on North Mandalay Avenue. Marina District — the northern gateway to Clearwater Beach and a desirable place for tourists and residents alike. The plan supports the development of a destination waterfront neighborhood that is pedestrian and boater-friendly and includes a mix of hotels, commercial, restaurant, residential and mixed use development, water related uses and a public boardwalk. The District offers development incentives of increased building height in exchange for redevelopment proposals with larger lot sizes, preferred District uses and the inclusion of public amenities such as the boardwalk and streetscape improvements. The District also considers the vacation of East Shore Drive in certain circumstances. Site design criteria in addition to those included in the Design Guidelines are required to be met to foster a pedestrian-oriented waterfront neighborhood. Retail and Restaurant — the prime retail and restaurant area of Clearwater Beach. The District stresses the need for a public garage to accommodate anticipated commercial development in the District. Pier 60 — the major public area of Clearwater Beach. The District supports beautification efforts and the development of a Pier 60 Plaza as a place of assembly on the Beach. Small Motel District — an area where renovations to existing improvements are anticipated. The only exception is on Brightwater Drive, which is anticipated to redevelop with new townhomes and timeshares two to four stories above parking. The Plan supports consideration of a shared parking facility along the street to provide some of the required parking. Special Council 2013-06-17 3 Beach Walk — the primary beachfront destination of Clearwater Beach. The District supports the redevelopment of South Gulfview into a great beachfront promenade (Beach Walk) that will involve removal of some parking west of Gulfview Boulevard. This strategy was identified as the means to stimulate this section of the Beach. Clearwater Pass District — an area of strategic revitalization and renovation in response to improving conditions in other areas of the Beach. Mobility The Mobility element focuses on the arrival and distribution of traffic, the need and desirability of alternative transportation modes including pedestrian, bicycle and intra-beach transit, transit between downtown, and transit between Clearwater Beach and the other barrier islands. The section also discusses access rationing and the need for residential and guest priorities in such a system and the possibility of access rationing by controlled access lanes. Specific improvements proposed in Beach by Design includes the widening of Coronado to a three lane section; relocation of South Gulfview Boulevard to the west of its current location to create Beach Walk; a continuous sidewalk system south of the Roundabout; real sidewalks along North Mandalay; and an intra beach transit system. Off-Street Parking Off-street parking is identified as a key issue in Beach by Design due to following: The need for additional parking space to serve peak day, peak season demand; The cost of structured parking being a substantial disincentive for community redevelopment while additional off-street parking being key to revitalization; Many existing properties with nonconforming parking, which limits the revitalization of such properties. Removal of surface parking lots on the west side of South Gulfview Boulevard was central to creating an attractive "beachfront address." Due to the above, the Plan proposes at least two parking garages — one south of Pier 60 Park and the other behind the Pelican Walk retail center. Additional garage sites were also identified on the west side of North Mandalay between Rockaway and Bay Esplanade, in the Clearwater Pass District and at the Clearwater Marina. Catalytic Projects Special Council 2013-06-17 4 In order to overcome the economic constraints associated with beach redevelopment, Beach by Design proposes a number of catalytic resorts projects that could transform Clearwater Beach into a quality family resort community. In addition to the Beach Roundabout, these catalytic initiatives were conceptualized as the means to create a "positive sense of momentum" for Clearwater Beach. The Plan identified the following constraints that impeded the construction of destination resorts on Clearwater Beach. They included the regulatory structure which limited hotel development to 40 rooms per acre and the cost to acquire enough land to support the minimum number of rooms to support a destination resort (6.25 acres). In order to overcome these constraints, Beach by Design established a limited pool of 600 additional hotel rooms that would be available in key locations on the Beach provided the development complied with specific criteria. This pool was established by designating the Beach a Community Redevelopment District on the Countywide Future Land Use Plan Map. The pool was originally put in place for five years but later Council extended that to 10 years. In 2007, the Plan was updated due to the impacts of the condominium boom which had resulted in the significant loss of numerous mid-sized, mid priced hotel rooms. To overcome the constraints upon hotel development due to the economic disparity with condominium development, a new hotel density reserve of 1,385 units was created. The issues in 2007 were similar to those in 1997 but more pronounced due to the condo boom. Hotels would require a density of 150 — 210 rooms per acre to be an economically viable alternative to condominiums where only 50 hotel rooms per acre were permitted. The number of rooms established in the reserve was derived from the findings of a traffic study that determined what density could be achieved on Clearwater Beach while maintaining the established Level of Service for transportation concurrency. Economic Reality and Feasibility This section of Beach by Design estimated the cost of all of the road, sidewalk and landscaping improvements included in the Plan. It proposes that a mix of existing City revenues and a special assessment on benefited properties finance the investments, as well as federal funding for the capital costs of the intra-beach and beach access transit systems. Design Guidelines Because Beach by Design involves private development and redevelopment, design guidelines were included to ensure that the City's design objectives would be met. This section includes provisions that guide the following: • Density • Building height • Building design, scale and mass Special Council 2013-06-17 5 • Setbacks • Street level facades • Parking areas • Sidewalks • Street furniture • Street lighting • Fountains • Materials and colors Implementation Significant progress has been made in implementing Beach by Design. Many public infrastructure and private redevelopment projects have made significant improvements in the quality and character of both the public and private realm on Clearwater Beach. Since the adoption of Beach by Design, a total of 673 overnight accommodation units have been constructed. A total of 66 units are currently under construction and another 1191 rooms been approved and still have valid development approvals. There are also 503 overnight accommodation units pending final approval by the Community Development Board or City Council. Specifically, the 600-unit Destination Resort Density Pool has resulted in the catalytic resort redevelopment envisioned by the Plan. Three resort projects have been approved which utilized 599 units of those units. Two resorts, the Sand Pearl and Hyatt Aqualea, have been constructed and the Kiran Grand approval is still in effect and a redesigned project should be forth coming. With regard to the Hotel Density Reserve, a total of 412 units out of the 1385 have been allocated. One hotel has been constructed (Pier 60 Hotel) and one is under construction (Shepard's); two hotels are pending approval, which if approved, would use 135 Reserve units. A total of 799 condominium and townhouse units have been constructed since Beach by Design was adopted. Nine units are currently under construction and another 153 units have valid development orders and three units are pending approval. Many infrastructure projects identified in the Plan have been completed through both public and private investment and include: • Mandalay Streetscape Improvements • Beach Walk • Sidewalks on Coronado Avenue, Brightwater Drive, Bayway Boulevard, and Somerset Street Special Council 2013-06-17 6 • Clearwater Beach Connector Trail (1.2 mil connection between Downtown and the Beach) • 400 public parking spaces in the Hyatt Hotel • 300 public parking spaces in the Surf Style garage • 25 public parking spaces on Devon Street Outstanding Implementation Items/Issues to be Addressed: • The construction of new parking facilities on North Beach • Construction of the public boardwalk in the Marina District • Alternative modes of transportation including include access rationing and transit from Downtown to the Beach. An Overview of the Clearwater Downtown Redevelopment Plan The construction of the new Memorial Causeway Bridge was the catalyst for rethinking the form and function of Downtown. In 2003, the City adopted a major update to the Clearwater Downtown Redevelopment Plan that included the boundaries of the City's original Community Redevelopment Area, the areas contained in the Clearwater Downtown Periphery Plan and the area included in the expanded Community Redevelopment Area (East Gateway). The Plan serves as the Special Area Plan and the Community Redevelopment Plan of the Downtown. As a Special Area Plan, it guides development through goals, objectives and policies and regulates uses and development potential for six unique character districts. As a Community Redevelopment Plan, it establishes policies that guide future actions and projects of the City's Community Redevelopment Agency. The Clearwater Downtown Redevelopment Plan contains the following four sections: Introduction; Existing Conditions; Land Use Plan/Redevelopment Plan; and Plan Implementation The Introduction Chapter provides a history of planning in Clearwater and in the Downtown and identifies the purpose of the Plan. The Existing Conditions Chapter provides information on existing land use, future land use and zoning within the Downtown area. It also provides information about historic resources, demographics, infrastructure, public recreation facilities, existing Downtown redevelopment programs and investment that has occurred in Downtown in recent years. Land Use Plan/Redevelopment Plan Special Council 2013-06-17 7 The Land Use Plan/Redevelopment Plan Chapter establishes the goals, objectives and policies for Downtown. There are three overriding goals identified in this Plan, which evolved from the five goals contained in the 1995 Clearwater Downtown Redevelopment Plan and are as follows: People Goal: Downtown shall be a place that attracts people for living, employment and recreation. The City shall encourage redevelopment that will attract residents and visitors to Downtown as a recreation, entertainment and shopping destination. Movement Goal: Create an environment where both people and cars can circulate throughout Downtown safely and effectively. Amenity Goal-Create Downtown as a memorable place to be enjoyed by residents and visitors that capitalizes on Clearwater's waterfront location, natural resources, built environment and history. In order to attain these goals, objectives and policies were included to guide private and public actions. For example, when a site plan is submitted, the project is reviewed for compliance with the goals, objectives and policies of this Plan. In addition, public actions must comply. In an attempt to provide the flexibility needed to support redevelopment, the Downtown Redevelopment Plan established six character districts to govern development. These districts were determined based on existing and desired future development patterns, concentration of uses, street patterns, number of lanes and natural and manmade boundaries. Recently constructed or soon to be constructed capital projects were also considered. Each District includes a vision for future development. The vision includes a description of uses, function, development patterns, prohibited uses and policies that are specific to implementing the vision of each District. Each district specifies the amount of floor area ratio or density that can be built, as well as any height restrictions and prohibited uses. See the attached map entitled Development Potential Permitted by Downtown Plan Character Districts. Below is a summary of each district. Downtown Core District The Downtown Core District is envisioned to be the most dense and intense district and should continue to be a center for government and office uses. The Plan permits a floor area ratio of 4.0 or a density of 70 dwelling units per acre or 95 hotel units per acre. No height regulations are imposed in the Downtown Core, except that along Cleveland Street height should be consistent with the historic building patterns and consistent with alternatives specified in the design guidelines. Special Council 2013-06-17 8 A key component of the redevelopment strategy is to attract residential development to the Downtown Core. The Plan supports the redevelopment of the Calvary Baptist Church and City Hall site with a mixed project containing residential and retail uses. The Plan also supports redevelopment in the Harborview building footprint with retail/restaurant/hotel and entertainment uses. Old Bay District The Old Bay District, which essentially has the same boundaries as the former Northwest Periphery Plan Area, is considered to be a mixed-use neighborhood supporting the Downtown employment base with residential uses, limited neighborhood commercial uses and office uses. The District supports 25 units per acre for development west of Osceola Avenue along the waterfront. The Plan provides a density bonus of an additional 25 units per acre in the event over two acres of land are consolidated for a total of 50 units per acre. Lower density, in keeping with the existing character of development, is permitted in the balance of the district, unless an acre of land is consolidated. In that instance, density can be increased from 7.5 units per acre to 25 units per acre. The preferred housing styles in this area will be single-family detached and townhouses. Commercial development is limited to a FAR of 0.5. There are different several different height allowances for this character district as follows: West of Osceola Avenue: Between Drew and Georgia Streets — 150'; Between Georgia and Eldridge Streets — 120'; Between Eldridge Street and the Old Bay northern boundary — 100'; Between Osceola and Ft. Harrison Avenues and between Jones and Drew Streets — 150'; East of Osceola Avenue — 40' South Gateway District The South Gateway District, formerly known as the Southwest Periphery Plan Expansion Area, is Downtown's primary gateway from the south. This District anticipates development of new housing and limited retail uses along South Fort Harrison, while existing offices are encouraged to remain. The balance of the District's vacant land is envisioned to redevelop with residential uses at an urban scale. The Plan provides for a FAR of 1.0 for commercial and office uses. The allowable density is 25 units per acre, 35 units per acre if over two acres are consolidated and 50 units per acre if over two acres are consolidated and developed with a mixed-use project including retail and residential uses. Town Lake Residential District Special Council 2013-06-17 9 The Town Lake Residential District surrounds Prospect Lake Park and extends north to Drew Street. This district encompasses land governed by the 1995 Plan, the Northeast and a portion of the Southeast Periphery Plan Expansion Areas, as well as areas zoned Medium Density Residential, Commercial and Office. This District is primarily reserved for new residential construction at a maximum of 30 units per acre. Hotel construction is allowed on Cleveland Street at 40 units per acre. It is anticipated that new residents in the area will enliven Downtown and provide a market for new retail and restaurant uses. The Plan requires that development within this District be at a lower scale and density than that allowed in the Downtown Core and limits height to 75 feet. The District supports the addition of neighborhood commercial uses to serve the new residences and allows community commercial uses along the major streets within the District at a maximum FAR of 1.0. The development pattern north of Cleveland Street must be mindful of the existing single-family development along Grove Street and generally heights should be lower than that south of Cleveland Street. Renovation of the small historic single-family dwellings along Grove Street is encouraged. Town Lake Business Park District The Town Lake Business Park District is comprised of a portion of the former Southeast Periphery Plan Expansion Area, land within the boundaries of the 1995 Plan and land within the newly expanded CRA. It is envisioned to be a place for business park development consisting of corporate and professional offices and those that conduct research or light assembly not exceeding a total FAR of 1.0. Accessory commercial uses are encouraged and an incentive is provided that excludes that floor area in FAR calculations. The character of development in this District is anticipated to be more typical of suburban development than that envisioned for the other character districts. Residential development may only occur in Town Lake Business Park if a minimum of four acres is consolidated and the density does not exceed 30 units per acre. The maximum allowable height for all development is 50 feet. East Gateway The East Gateway District is primarily comprised of land located within the newly expanded CRA. It is envisioned to be a stable and diverse neighborhood defined by its unique Hispanic cultural base. The medium density character of the neighborhood should remain and include neighborhood commercial and professional offices. The District serves as the primary entrance from the east into the Downtown Core, therefore, its redevelopment and improved infrastructure is essential. The existing residential areas should retain their scale and development patterns and any infill development should maintain the existing low- rise scale. It is intended that new commercial development provide employment opportunities for District residents, as well as serve the daily commercial and Special Council 2013-06-17 10 personal service needs of the neighborhood. The area is governed by nine Future Land Use Plan categories ranging from Residential Urban, which allows 7.5 units per acre to Commercial General, which allows a FAR of .55 and a density of 24 units per acre. A portion of this District is part of the original CRA and is designated Central Business District. Downtown Design Guidelines The Design Guidelines are organized into four subsections: purpose and applicability; new construction; the rehabilitation of designated historic structures; and signs and miscellaneous. An explanation of the general and specific design principles promoted by each aspect of the Guidelines is included, as well as a series of statements describing appropriate and inappropriate design solutions to implement those principles. Photographs and drawings are also included to illustrate acceptable and unacceptable design solutions. This approach values creativity and allows for numerous design solutions for any particular project. Housing and Neighborhood Element Florida Statutes requires that a residential use and neighborhood assessment be conducted for any CRA. The Housing and Neighborhood Element contains a residential use section, which details existing residential conditions within the Downtown Plan area, as well as by character district. It also explores the homeless issues that face Clearwater and the particular impact they have on Downtown. The residential use analysis confirms that Downtown does not lack land available for residential purposes nor does it have a housing shortage. In fact, it is projected that Downtown could absorb 1000 new housing units. The analysis indicates, however, that there are issues impacting Downtown's desirability as a place to live such as high rental occupancies, absentee landlords, overcrowding in certain areas, older housing stock, deferred housing maintenance and a disproportionate number of low-moderate income residents. Policies related to housing and the homeless are established to support improving the condition of the existing housing stock, constructing new housing and improving the situation for the homeless. The neighborhood impact evaluated the following and found the Plan would not have a detrimental impact. • Relocation • Traffic Circulation • Environmental Quality • Availability of Community Facilities and Services • Effect on School Population • Other matters affecting the physical and social quality of the neighborhood. Special Council 2013-06-17 11 Plan Implementation Chapter 4, Plan Implementation, details the public strategies or actions that will be undertaken to implement the goals, objectives and policies. It provides a Capital Improvement Plan that establishes the major improvements needed in Downtown ranging from street repaving projects to public uses. This Chapter also lists the existing redevelopment incentives that are currently available to property owners and the development community. The final section of this Chapter is the Tax Increment Revenue projections for the CRA. Projections were included for the existing CRA because the City planned to use tax increment financing in this area. Implementation Progress has been made in implementing the Clearwater Downtown Redevelopment Plan. The City has invested in infrastructure improvements and some private redevelopment projects have been constructed. Since the adoption of the Plan, approximately 367 residential units have been constructed and 33 are currently under construction. Another 60 units have been approved and 85 were being constructed until the market crashed. Several offices and a 115 unit hotel have also been built. Significant capital investment identified in the Plan has been made and includes the following projects. • Memorial Causeway Landscaping • Cleveland Street and Memorial Causeway Repaving • Wayfinding • Ft. Harrison Avenue/Alternative US Highway 19 resurfacing • Pump Stations 12 and 16 • Cleveland Streetscape • Intersection improvements related to the bridge • Myrtle Avenue Reconstruction and Streetscape • Clearwater Beach Connector Spur (Pinellas Trail) • Gulf-to-Bay Boulevard and Highland Avenue Gateway Intersection Improvements • Glen Oaks Park Stormwater Retention Facility • Cleveland Street and Gulf to Bay Boulevard Repaving between Fredrica and Highland Avenue • Downtown Marina • Pinellas Trail and East Avenue Improvements • Portion of the Cleveland Streetscape identified Between Highland and Myrtle Avenues. Outstanding Implementation Items/Issues to be Addressed: Special Council 2013-06-17 12 • Streetscape Improvements on Cleveland Street and Gulf-to-Bay Boulevard • Integration of East Gateway Vision into Plan • New City Hall • Multi-modal Transportation Center • Maintain Design Standards • Beautification of Downtown • Sidewalks of Insufficient Width to Provide Full Pedestrian/Urban Experience Planning and Development Director Michael Delk provided an overview of Beach by Design and requested direction regarding the current philosophical approach to encourage redevelopment of existing small parcels versus going back to a suburban redevelopment plan that provides for larger setbacks and property assemblages. He also requested guidance regarding areas of Beach by Design that may require change. In response to a question, Mr. Delk said the view corridors and building mass are part of the design review component and are regulated by Beach by Design, which are not reviewed by Council. Staff is concerned that projects meeting Beach by Design guidelines may be turned down by Council because the developer may not go far enough. Discussion ensued regarding the view corridors with comments made that current view corridors are not adequate and the setbacks are too liberal. Concerns were expressed with vehicular traffic, lack of parking on the beach and project mass on limited parcel space. A concern was expressed that placing limitations now on Beach by Design would limit mid-priced hotels, which are still needed. It was suggested that hotels should be encouraged to use more shared parking. In response to questions, Mr. Delk said the number of hotel rooms lost since 2002 was 1,743. The City has gained 632 rooms. Less than 5% of Clearwater's population lives on Clearwater Beach. Planning and Development Assistant Director Gina Clayton said when the Old Florida provisions were amended, the maximum residential building height was limited to 65 ft. and 75 ft. for hotels. The additional setback and stepback requirements do not apply in other districts. Ms. Clayton said these restrictions were intended to keep view corridors open, in particular from the Bay to the Gulf of Mexico. Depending on where the land is located, one side of East Shore or two sides of East Shore, the height bonus thresholds are '/2 acre, 1 acre, and 2 acres. Staff was directed to provide a spreadsheet with the current density, setbacks, stepbacks, and view corridor guidelines. The City Attorney suggested that staff provide information for each character district. Special Council 2013-06-17 13 One individual suggested clarifying the infill development criteria and one individual supported the review of Beach by Design. One individual expressed concern with the current vehicular traffic on Clearwater Beach and supported clarification of infill development. Discussion ensued regarding reviewing Beach by Design district by district; there was consensus for Councilmembers to provide the City Manager with their proposed amendments. The proposed amendments would be discussed at a future meeting. Council recessed from 4:41 p.m. to 4:50 p.m. Planning and Development Assistant Director Gina Clayton reviewed the Downtown Redevelopment Plan. In response to questions, Ms. Clayton said the project at 1100 Cleveland Street received an allocation from the public amenities incentive pool, which is greater than 30 units per acre. The project received the allocation because of contributions to streetscape. A concern was expressed that little redevelopment has occurred along the Ft. Harrison Avenue corridor due to the plan's design guideline restrictions. Discussion ensued regarding the potential relocation of Walgreens to Ft. Harrison. Assistant City Manager Jill Silverboard said staff was concerned with aspects of the proposed site layout, such as multiple curb cuts on two primary thoroughfares that are high-volume moving roadways and the proposed suburban model, which is typically used in less intensive locations. Ms. Silverboard said the proposed project would degrade the thoroughfare's level of service and potentially cause a vehicular stacking issue. Mr. Delk said downtown Clearwater does not have the supporting infrastructure for an urban retail store. The City Manager said the design guidelines are constructed to provide staff discretion in terms of how it interprets whether the guidelines are being complied with. If the guidelines are not specific enough, then staff needs direction to review those areas that may need change. In response to questions, Mr. Delk said the design guideline restrictions have not been an issue in the South Gateway area redevelopment. South Ft. Harrison Avenue has been urbanized over the last ten years and is taking on an attractive appearance that will tie-in with the medical complex to the south. There was no consensus to amend the downtown redevelopment plan. Special Council 2013-06-17 14 2.3 1999 Development Code Review - Michael Delk Discussion deferred to a future meeting. 3. Adjourn The meeting adjourned at 5:38 p.m. Attest City Clerk —Room ncrcFckos Mayor City of Clearwater Special Council 2013 -06 -17 15