EWING & TUSKAWILLA STORM PIPE REPLACEMENT - 11-0061-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINAL
� ADMINISTRATIVE CHANGE ORDER 1& Final � PROJECT: Ewing & Tuskawilla Storm Pipe Replacement CONTRACTOR: Adkins Contracting, Inc. 3516 Gulf City Road Date: Aari115, 2013 PROJECT NITMBER: 11-0061-EN PO REFERENCE NO.: ST 108967 AWARD DATE: November Ol. 2012 CONTRACT DATE: November 20, 2012 Ruskin, Florida 33570 CODE: 0315-96169-563700-539-000-0000 SCOPE OF CHANGE: THIS CAANGE ORDER ACCEPTS REVISIONS TO THE CONTRA � T This change order decreases unused items, increases and add items according to field conditions. �. � _ __ STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ,�:�;:,;., ORIGINAL CONTRACT AMOUNT $152,496.30 Admin CO #1 & Final $8,869.72 NEW CONTRACT AMOUNT � � / . .,�%/ �I% � Camilo Soto, Date: � ( � � I � $161,366.02 Assistant City Attorney Rosemarie Ca11, Date: ���, � � ..�G13 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA � ��.� � 4 �^l�r..- ..IW� William B. Horne, II City Manager Adkins Contracting, Ina .��� ��� , a., � j r � r . �a • � 4� �^�' � !I „�'. . �; , � - � = C, ; , �- - r _ ,�`,•, - i�• `c' ,�.rri' ,��: - By: � ���� -�(s��'►I.) .� ;. f. ,+: �ckie Dean Adkins, PresiB+e�q�,, ,,,,,��ti°`'` Date: � �� Z%2 d/ � Witnesses: /�i.r .i� � . 1 '� Recommended By: City of Clearwater � Tara L Kivett, Engineering Construction Manager � \ C ( Michael D. Quillen, PE, City Engineer � page 2 of 2 AdminiatraNve Change Order 1& Fiaal: Ewing & Tuskavilla Storm Pipe Replacement ITEM DESCRIPTION Decreases• 10 Slip Line Existing 36" Pipe with 18" Pipe 15 Pipe, Storm, 15" 17 Pipe, Storm, 36" 20 Valley Gutter Curb (Remove & Replace) 23 Sod Replacement - In-Kind 26 10% Contingency Increases• 5 Root Pruning - Hand 7 Remove Existing Concrete Sidewalk 4" 8 Remove Existing Asphalt 9 Grout Existing 36" CMP 14 Pipe, Storm, 6" PVC 16 Pipe, Storm, 18" 18 Concrete Sidewalk, 4" 19 Concrete Driveway, 6" 21 Asphalt 1 - 1 /2 22 Base Additions• 27 Remove additiona136"x21" pip� 28 Plug Old Pipe 36" x 21" 29 Sidewalk Curbing 30 Additional Grading to Lower Drive 31 Core Inlet for 8" pipe 32 Install8" Drain Pipe for swale 33 Retaining Wall at Inlet 34 Grout 15" RCP - Belleview OUANTITY ITNIT ITNIT COST TOTAL COST 2.73 LF 4.52 LF 4.83 LF $91.35 $44.00 $67.Q0 ($249.39) ($198.88) ($323.61) ($1,023.50) 44.50 LF $23.00 1100.00 SF $0.56 ($616.00) 1 LS $13,863.30 ($13,863.30) Total (decreases): ($16,274.68) 100 453.6 1,131 20 10 2.06 453.6 211 93.5 93.5 45 1 119.5 1 1 4 18 1 LF $10.80 $1,080.00 SF $3.50 $1,587.60 SF $3.25 $3,675.75 CY $135.50 $2,710.00 LF $25.00 $250.00 LF $42.00 $86.52 SF $4.00 $1,814.40 SF $4.50 $948.38 sY $46.50 $4,347.75 SY $21.00 $1,963.50 Total increases: $18,463.90 LF EA LF EA EA LF LF LS $10.00 $450.00 $160.00 $160.00 $10.00 $1,195.00 $760.00 $375.50 $12.45 $28.00 $3,1$6.20 Total additions: $760.00 $375.50 $49.80 $504.00 $3,186.20 �6,680.50 Total net (decreases)/increases and additions: $g,g69.72