Loading...
2012 BRIDGE REHABILITATION PROJECT - 11-0043-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINAL CERTIFICATE OF SUBSTANTIAL COMPLETION Project: 2012Bridge Rehabilitation Project (11-0043-EN) Location: Bridge #155507 (FairwoodAv. Bridge Over Alligator Creek) . Bridge #155509 (Overbrook Ave. Bridge Over Stevenson Creek Bridge #155522 (CR-183 & CR 699 Clearwater Pass/Sand Key Bridges Date of Substantial Completion: 02/06/2013Contract Date:05/03/2012, NTP: 06/04/2012 . Authorized representatives of the Owner, and Contractor have inspected the work performed under this Contract, and the Project (or specified part of the Project, as indicated above) is hereby declaredto be substantially complete on the above date. DEFINITION OF SUBSTANTIAL COMPLETION Substantial completion is defined as the stage in construction when a project can be utilitized for the purpose for which it was intended. At substantial completion, minor items that may be seasonally restricted need not be completed, but the items that affect operational integrity and function of the facility must be capable of continuous use. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the Contractors to complete all the work in accordance with the Contract Documents. The Contractor accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. Biltmore Construction Co., Inc.By: ____________________________________ ContractorAuthorized Representative Date The Owner accepts the specified area of the Project as Substantially Complete and will assume full possession of the specified area of the Project on February 06, 2013.The responsibility for utilities, security, and insurance under the Contract Documentsshall be as set forth in the Contract Documents. Engineering Construction Manager By: _____________________________________ City of ClearwaterAuthorized Representative Date ., . » , . ADMINISTRATIVE CHANGE ORDER #1 & Final PROJECT: 2012 Bridge Rehabilitation Project CONTRACTOR: Biltmore Construction Co., Inc. 1055 Ponce de Leon Blvd. Belleair, Florida 33756 Date: Apri18, 2013 PROJECT NUMBER: 11-0043-EN PO REFERENCE NO.: ST 108436 AWARD DATE: May 03, 2012 . CONTRACT DATE: May 31, 2012 CODE: 0315-92274-563800-541-000-OOOa A STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT Adm. CO#1 & Final NEW CONTRACT AMOUNT Camilo Soto, Assistant City Attorney Date: ATTEST: l � � Rosemarie Call, City Clerk Date: �� p`L�.-Q.. �,2 �/, J G� / CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA $281,540.04 Biltmore Constru�tioxt C�o:;�I�a�.. ' , $658.12 $280,881.92 - ' �, , B - . �+���-) Jq�f r er, Vice=Presfl'd'ept� � / Date: � ° �' '' 3 WITNESSES: �. � ,�� �, , .� � '`�i�� . �I, i /.► / �,�. iI% � ' l�� � �-�-' i, -' � x '* i � �`• r . . ; ��.. � .�'��+.-tit�� William B. Horne, II City Manager ecommended by: City of Clearwater ������ . Tara L. Kivett Engineering Construction Manager ti � Michael D. Quil en, PE City Engineer .• . . � Page 2 of 2 Administrative Change Order 1& Final : 2012 Bridge Rehabilitation Project ITEM DESCRIPTION 4UANTITY UNIT Sand Kev Decreases• 13 Repair delamination of South bulkhead cap 1 LS $ Additions• 21 Sand Key - 16 Wales 22 Sand Key - Re-Fasten 600 Planks 23 Remove/Replace 90 LF of Seawall UNIT COST 10,857.24 1 LS $21,667.00 1 LS $2,200.00 1 LS $27,270.00 Total additions Sand Key: TOTAL COST ($10,&'.i 7.24) $21,6ti7.00 $2,2{)0.00 $27,2'10.00 $51,137.00 Total net (decreases)/additions Sand Key: $40,279.76 Overbrook Additions: 24 Overbrook - Paint Bridge/Anchor Rails 1 LS $1,050.00 $1,0`.i0.00 25 Overbrook - Paint Water pipe 1 LS $639.40 $639.40 26 Overbook - New Seawall Concrete Cap for 1 LS $2,967.00 $2,967.00 Sheet Pile Total additions Overbrook: $4,656.40 Fairwood Ave Decreases• Alt 10 Repair undermined approach slab 1 LS $ 2,012.44 ($2,0 l 2.44) Additions: 27 Restripe Fairwood Bridge 1 LS $709.50 $709.50 28 Fairwood Hand Rail Replacement 1 LS $2,632.00 $2,632.00 Total additions Fairwood Ave: $3,341.50 Total net (decreases)/additions Fairwood Ave: $1,3�9.06 20 Contingency @ 20% 1 LS $36,584.74 ($36,584.74) Alt ll 20% Contingency Alternates (if required) 1 LS $10,338.60 ($10, �38.60) Total (decreases): ($46,973.34) Total net (decreases)/additions: ($6'�8.12)