1403 FT HARRISON AVE Si;4z-
-CC
Planning
Department
CITY OF CLEARWATER �.
MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE
POST OFFICE BOX 4748, CLEARWATER, FLORIDA 33758 -4748
Telephone (727) 562.4720 Fax (727) 562 -4735 0
Compliance Notice L
RELIGIOUS COMNTY SVC INC
503 S M L KING JR AVE
CLEARWATER, FL 33756
RE: 1403 N FT HARRISON AVE
Dear Property Owner:
CDC2008 -02409
The City of Clearwater Planning Department has done a re- inspection at the above address and has
found the property is in compliance of the following City code:
Section of City Code violated: 3- 1204.6. Facts behind violation: *"LANDSCAPE COVER" All
landscaped areas must be covered with shrubs, ground cover, turf, three inches of organic mulch or other
suitable material which permits percolation. Where mulch is used, it must be protected from washing out of
the planting bed. Inorganic mulch, such as gravel or rock, should only be used where washouts occur.
Plastic sheets shall not be installed under mulches.
Section of City Code violated: 3- 12041. Facts behind violation: **DEAD, DECLINING, MISSING AND
DISEASED PLANT MATERIAL *" shall be replaced with healthy material of similar type in keeping with the
landscaping requirements at the time of original planting and i a cordance i he approved landscape
plan.
Inspector Sign t re
DATE MAILED: 10/27/2008
INSPECTOR: Matthew Anderson
INSPECTOR TELEPHONE: 562- 4567xt2504
G
X�
Z' U
�
U
r:\Forms\CDC_Compliance-Tree.rpt
il���i'y`t
CITY OF CLEARWATER
gj _.
MUNICIPAL SERVICES BUILDING 100 SOUTH MYRTLE AVENUE
POST OFFICE BOX 4748, CLEARWATER, FLORIDA 33758 -4748
ti
TEIk,
Courtesy Notice
Planning
Department
CDC2008 -02409
RELIGIOUS COMNTY SVC INC
503 S M L KING JR AVE
CLEARWATER, FL 33756
RE: 1403 N FT HARRISON AVE
Dear Property Owner'
The City of Clearwater Planning Department has done an inspection at the above address and has found
the property is in violation of the following City code:
Section of City Code violated: 3- 1204.B. Facts behind violation: "LANDSCAPE COVER" All
landscaped areas must be covered with shrubs, ground cover, turf, three inches of organic mulch or other
suitable material which permits percolation. Where mulch is used, it must be protected from washing out of
the planting bed. Inorganic mulch, such as gravel or rock, should only be used where washouts occur.
Plastic sheets shall not be installed under mulches.
Section of City Code violated: 3- 12041. Facts behind violation: * *DEAD, DECLINING, MISSING AND
DISEASED PLANT MATERIAL' shall be replaced with healthy material of similar type in keeping with the
landscaping requirements at the time of original planting and in accordance with the approved landscape
plan.
Specifically, To be in Compliance you must make the property refelect the approved
landscaping plan. mulch any and all landscaping beds on the property in accordance with
Section 3- 1204.B. Inspect and insure that all irrigation is working properly.
No further action is required on your part if the violation is corrected by September 22, 2008.
Our goal is to achieve voluntary compliance through education, communication and cooperation. We
would appreciate your assistance in achieving this goal. If you have any questions concerning this matter,
or if you need any additional information, please do not hesitate to contact the City of Clearwater Planning
Department.
Inspector Sig a ure
DATE MAILED: 8/21/2008
INSPECTOR: Matthew Anderson
INSPECTOR TELEPHONE: 562- 4567xt2504.
r: \Forms \CLW CourtesyLtrC DC. rpt
A--Vr
J
-ILL;
{
J
STORMWATER INSPECTION REPORT
NUMBER 24
SITE: Relicrious Community Services PARCEL: 09/29/15/92808/000 /0040
SITE ADDRESS: 1403 Ft. Harrison Ave. N.
BASIN: Coastal BASIN No. 02- 02 -08 -01
DRAINAGE AREA: 3553 SO FT
REQUIRED VOL.: 148 CU FT PROP. VOL.:
POND TYPE DRY
WEIR TYPE: None
WEIR: L:
PROPOSED
a
SKIMMER: NO
UNDERDRAIN: NO
UNDERDRAIN C.O.: NO
LITTORAL SHELF: NO
NOTES
EXISTING
WEIR: L:
a
SKIMMER: NO
UNDERDRAIN: NO
UNDERDRAIN C.O.: NO
LITTORAL SHELF: NO
INSP.DATE:03 /27/1995
EROSION: NO OVERGROWN: NO
DENUDED: NO COLLECTION SYS: YES
POND CONSTRUCTED PER PLAN YES
CONTROL STRUCTURE CONST. PER PLAN NONE
COMMENTS:LANDSCAPE: Install 7 shrubs (18" hgt.) in the west landscape buffers.
STORMWATER: Remove or edge sod adjacent to retention pond to allow
water flowing off parking lot to enter pond.
C I T Y OF C I.. E A R W A T E R
POST OFFICE BOX 4748
CLEARWATER, FLORIDA 34618 -4748
NOTICE OF COMPLIANCE
05/08/1995
The City of Clearwater Environmental Management Office has
completed its compliance stormwater and landscape reinspection
at your site. The site now meets the requirements set forth by
the stormwater and landscape ordinance's in effect at the time
of site development or modification. If you have any questions
regarding this report, please contact Rick Albee' at (813)
462 -6598.
SITE: Religious Community Services
SITE ADDRESS: 1403 Ft. Harrison Ave. N.
OWNER: Religious Community Serv. Inc.
OWNER REP.: Beanie Korosy .
Original Compliance Date: 05/01/1995
INSPECTION DATE: 05/05/1995
RECOMMENDATIONS: Typical irrigation systems cycled at twice
a week do not supply enough water for newly planted landscape
material. At this time Southwest Florida Water Management
District (SWFWMD) allows watering of new landscape material on a
daily basis for 30 days. To obtain current watering
restrictions, call SWFWMD at 1- 800 - 848 -0499.
Inspect drainage system periodically for clogged - drains, sediment
buildup, erosion and overgrowth; then maintain as needed to
insure future compliance.
AM
"Equal Employment and Affirmative Action Employer"
03/29/1995
C I T Y O F C L E A R W A T E -R
POST OFFICE BOX 4748
CLEARWATER, FLORIDA 34618 -4748
NOTICE OF NON - COMPLIANCE
The City of Clearwater Environmental Management Office has
completed its stormwater and landscape inspection at your site.
The site is in non - compliance with the stormwater and /or
landscape ordinance's in effect at the time of'site development
or modification. If you have any questions regarding this
report, please call Rick Albee at (813) 462 -6598
SITE: Religious Community Services
.91TE . A.DDRESS e' 1�-23 Ft. Harrison Ave. N.
OWNER: Religious Community Serv. Inc.
OWNER REP.: Francis Lewis
INSPECTION DATE: 03/27/1995
CODES VIOLATED:LANDSCAPE: Sec. 136.023(c)(1),(h)(1)
STORMWATER: Sec. 43.24(4)(8)
REQUIREMENTS:LANDSCAPE: Install 7 shrubs (18" hgt.) in the west
landscape buffers.
STORMWATER: Remove or edge sod adjacent to retention pond to
allow water flowing off parking lot to enter pond.
COMPLIANCE DATE: 05/01/1995
RECOMMENDATIONS:Request an on site meeting for a. detailed
explanation of the requirements.
To insure compliance, a reinspection of the site will be
conducted after the above compliance date. Failure to correct
the requirements by the compliance date will result in the
issuance of a "NOTICE OF VIOLATION ".
A
too*.
"Equal Employment and Affir.mative Action Employer'
PN10 -01 CITY OF CLEARWATER
PARCEL ID 09 -29 -15 -92808 -000 -0040 PAZIP YRB LT /EFF FLRS TOT SOFT $ /SOFT AVR
1403 FORT HARRISON AVE 00000 19Z56 1945 5,790 19.86
OWNER'S NAME AND ADDRESS V P W G B LDGS == IMPROVEMENT == HEAT SOFT
RELIGIOUS COMMUNITY 4 04 SINGLE FAMILY (CO 5,728
SERVICES INC LEGAL DESCRIPTION CENSUS PBOOK /PG
1855 HIGHLAND AVE S TWIN OAKS SUB 261.00 5 50
CLEARWATER, FL 346161750 LOTS 4 AND 5 & W 80 FT OF NBHD
LOT SIZE __} ISC COUNTY S 10 FT OF LOT 3 & W 1/2
800 SO FT 10 X 80 VAC ALLEY ON E & ENGHURST
YEAR IMPROVEMENT LAND ASSESSMENT SO /FT YEAR TAXES PD D TX/ FT
1- 994 - 1.46. � 214.,.1.0.0 - _36_.9- 7....199- 4. O .. 00 -Y - -N O . 00 , .
SALE DATE AMOUNT BOOK /PAGE DT 0 T SALE DATE AMOUNT BOOK /PAGE DT 0 T
DEC. 1983 115,000 5681 2184 U C
MAY 1981 85,000 5195 543 U C
SELLER'S NAME _____= LAND / PROPERTY USE _ ______= HOMESTD LP
O1 210 SINGLE FAMILY HOME O N
MORTGAGE COMPANY AMOUNT DATE MTG TYPE RATE NUMBER
i
i
GENERAL REVIEW DATE
Religious Community Services, Inc.
00 Clearwater, �r 1855 Highland Avenue South
Clearwater, Florida 34616
f
06 '* pcs FRANCIS W. "BUD" LEWIS
e Executive Director
Q'Coot wa'1`
(813)584 -3528
; . C I T Y OF C L E A R W A T E R
POST OFFICE BOX 4748
CLEARWATER, FLORIDA 34618 -4748
August 10, 1992
The City of Clearwater Environmental Management Office has
completed its landscape inspection at your site. The following
report is the result of our inspection. If you have any questions
concerning this report, please contact Rick Albee at (813)462 -6598.
SITE: Religious Community Service 1403 Ft. Harrison Ave. N.
OWNER: Religious Community Services Inc.
OWNER REP.:
INSPECTION DATE: 08/05/92
FAILED
DEFICIENCIES: Requires 10 shrubs (18" ht.) along the south
landscape buffer, 4 shrubs along the east buffer and 5 shrubs along
the west buffer.
CODES VIOLATED: Sec.136.023(c)(1)(2)(3),(h)(1) Oct. 1985
COMPLIANCE DATE: 09/11/92
RECOMMENDATIONS:
INSPECTOR: Rick Albee
To insure compliance, a reinspection of the site will be
conducted after the compliance date. Failure to correct the
deficiencies above by the compliance date will result in the
issuance of a formal "Notice of Violation ".
' E q u a l E m p l o y m e n t a n d A f f i r m a t i v e A c t i o n E m p l o y e r ' '
k
C I T Y O F CL E A R W A T E R
POST OFFICE BOX 4748
Rt +� CLEARWATER, FLORIDA 34618 -4748
August 31, 1992
The City of Clearwater Environmental Management Office has
completed its compliance landscape reinspection at your site. The
following report is the result of our reinspection. If you have any
questions concerning this report, please contact Rick Albee at
(813)462- 6598.
SITE: Religious Community Service 1403 Ft. Harrison Ave. N.
OWNER: Religious Community Services Inc.
OWNER REP.: Bud Lewis
�i
ORIGINAL COMPLIANCE DATE: 09/11/92
REINSPECTION DATE: 08/31/92 PASSED
IF PASSED: Maintain landscaping in a healthy growing condition
to insure future compliance.
IF FAILED: A formal Notice of Violation will accompany this
report.
'Equal Employment and Affirmative Action Employer'
APPLICATION FOR LAND CLEARING & GRUBBING PERMIT
CITY OF CLEARWATER
PUBLIC WORKS DEPARTMENT
ENVIRONMENTAL MANAGEMENT
(813) 462 -6747
DATE '
RECEIPT NO,_> C0 U< �
A non - refundable filing fee of $10.00 is required per Resolution 86 -9. Permit applicable for 6 months from date of approval.
In accordance with Section 98.30, 1 hereby apply for permit to land clear and /or grub the property described below.
1. Location of Property
2. Project Name
3. Purpose of clearing and /or grubbing
4. General description of existing vegetation, topography, and surface water (including all existing and /or proposed
ditches, canals, and swales) u, /c% e2irg
5. Proposed method of debris disposal Q
6. Date you plan to begin work Z, C_e.yJ l AF
7. Proposed method of soil erosion control
8. X No -Tree Verification Required ❑ Tree Removal Permit Required
I AM AWARE AND UNDERSTAND THE REQUIREMENTS OF SECTION 98, CITY CODE OF ORDINANCES REGARDING
TREE PROTECTION DURING CONSTRUCTION AND HAVE READ CITY'S EROSION AND SILTATION CONTROL POLICY
ignature of Owner or Owners Representative
Al
Printed Name
Address
J,9 i
City State Zip
Representatives' Firm i Telephone
Subscribed and Sworn before me
this day of
Signature of Notary
NAME OF NOTARY
COUNTY
COMMISSION EXPIRES
19
Applicant must include Aerial Photograph or Scaled Drawing showing property boundaries and limits of work. This is NOT
a Tree Removal Permit.
DO NOT WRITE BELOW THIS LINE
Comments
Comments
Water Resource Spec. Date
2
Urban Forester Date
Based on the above comments and information submitted, the above removal application is:
Approved ATA ubmitted L] Approved — Modified As Noted Above El Denied
Signed: Date:
City Manager or Designee
Rev. 9/87
White — Applicant Yellow — Environmental Pink — Inspector
n-
Wig. _......: _....._.,. .... «. .... ... ..a.,.. ...............
1t W 4
i t SCE C?vti FCC
If
F.,Y
�..�.. __
„ r t64c '
i
•
Y
d
q.
g`� �q
r P'
... ....... ................,
r
Dent. of
».
6
o
Yh
A -1A /e,5 AI�4 2-Z- -577.
P 14 9 ) �:L I DA
2
11 1 1 mg M III I'll
1g, � /a
Wi IMIMi
MWIngn M16
P. 2 9
NOTE: Elevations shown are
relative to M.S.L.
L) PAV'� N G S
P l—,4-r4 0 —1 PA%R 1<1K G Alt:k U A
C-
&$
— DWG- NO. 100
G -5 -:=15
V. eA -T 0 A4'i`,'� V4 m 7 �A T' v'JL- t -
--------
CE E
T �2,1 5
DRAWN
Ot '-ti:P. V)1�)S'>
i. ur4A 7-
Cfig IECKE'D
&$
— DWG- NO. 100
G -5 -:=15
AREA A
5CALE 1/8" = l'-O"
rA39mmmq=
50ALE 1/8" = V-0"
rimer
e-pe-,Alm
VIASH fAL.M Floo-t
WNclTk-11+1
Ll-�NDSC. APE PLAN
1* - :V-0,
0
10
TWIE-1 TO on R-114avm
NORTH
7/7'
lu
>
F,
<
z
<
Lv
u-
T
EX
C)
fv-
KII'll
10
LL
L
z
50ALE 1/8" = V-0"
rimer
e-pe-,Alm
VIASH fAL.M Floo-t
WNclTk-11+1
Ll-�NDSC. APE PLAN
1* - :V-0,
0
10
TWIE-1 TO on R-114avm
NORTH
a FLY R—=NF ORfErj�fzm
5-nc, HC5--,E
TS TAGON6
MN LEN6TH
6A5E (5ALVANL= MR-E5 SPACED AT
IZOVNI;� TRF—= ANV SEET AT 45 AN6LE KTH
5 MCK E31LL ANC—HOR6 OR E=AL
F Ci 501L A LMRE
3'KN MULCH
3m. MAN 5AUCER
REMOVE CONTANER FROM
P-00TVALL
—E)C,50INfa S-O:L
SHRUB FLANTIN6 DETAIL
N. T S.
N,
ra
0
10
7/7'
Mai
F,
<
u-
C)
KII'll
oc U
ra
0
10
7/7'
<
u-
u-
z
Lu
>
Y-
z
ul
m
Gib
z
ra
roo *
No
EX5 TIN
C7 CEDAR
fiffi���
LAND5CAPE DETANL ON
m
IS)
di
>
F-I
LL
E=4
UA
lu
7
>
z
re)
Lu
LU
<
IS)
>
LL
UA
lu
7
>
z
Lu
LU
<
[I]
t I
I
17-
I.Tf7T nr 1111A=?Tlfrsr,
A-1 SITM PLAU, SYIICOLS AND .ZG-?IDS
A-2 FIRST FL001 PLAN - NORTH AREA
A-3 FIRST MCOa PLAII SOUTH AREA,
C-ECCIII) FLOOR VLMI
A-4 M:TMIOR ELEVATIONS
A-3 CZCTIONS AND DETAILS
A-G C_rCTrONIS MID DETAILS
A-7 nCC7 PL MI DETAILS
A-3 CMICDULES, D'-.:TAI[. -,, 111TEnron ELEVATIOTM
S-1 MUNDATIOU A!ID 171"'AMI'M PLANS, DETAILS
S-2 nCOF REPLACEME:1T F''2AIIING® VOTES
^ °:
CLD ASPHALT PAVING TO E= R=!107Z:D 330 S. r.
A/C
WALL LEGEND
Elevation
Above finished floor
AHU
SCHEDULE OF ALTMIATES:
ALU11
p. Existing to remain
The dratringn arc shown with Altornatcon
A, 13 C h
E::icting to be removed
The base bid for the project will not
include the alternates. The
I
alternates are additive 'n1tornatoo.
Beam
Wood stud vall
Construction joint
W 141 145-
Wood stud wall vith insulation
Altnrnati- A Add the following to the
scope of the work:
clilu
Concrete manonry unit
IN I-rr_7
Rated wood stud wall (see plan
UVAC oyoton 03 serving main xi. tin
otructuro. Include all
for rating)
mechanical, electrical, plumbing,
now colfito in main existing
.gyp
building.- all windows, valla and
finichea for Ouiot Room 116®
Rated-,wood stu wall with insulation
Section number
EXP JT
Concrete masonry unit (CHU)
Altornntr% 11 Add the following to the
scope of the work:
GAL V
Add the 3 c1tylighto in Room 115.
GFI
.qvhnny. I.TC;T
1� A,4,4 4�ke% F^1 I mir4nrT fri fhr%
nnnno of the work:
[I]
t I
I
17-
I.Tf7T nr 1111A=?Tlfrsr,
A-1 SITM PLAU, SYIICOLS AND .ZG-?IDS
A-2 FIRST FL001 PLAN - NORTH AREA
A-3 FIRST MCOa PLAII SOUTH AREA,
C-ECCIII) FLOOR VLMI
A-4 M:TMIOR ELEVATIONS
A-3 CZCTIONS AND DETAILS
A-G C_rCTrONIS MID DETAILS
A-7 nCC7 PL MI DETAILS
A-3 CMICDULES, D'-.:TAI[. -,, 111TEnron ELEVATIOTM
S-1 MUNDATIOU A!ID 171"'AMI'M PLANS, DETAILS
S-2 nCOF REPLACEME:1T F''2AIIING® VOTES
^ °:
CLD ASPHALT PAVING TO E= R=!107Z:D 330 S. r.
A/C
Air condition
Elevation
Above finished floor
AHU
Air handling unit
ALU11
Aluminum
Door number
Aliminum threshold
A"'OD
Anodized
ASPH
Asphalt
Winder type
Beam
ci
Construction joint
W 141 145-
Concrete
Room number
Condencer
clilu
Concrete manonry unit
IN I-rr_7
Diopocal
Interior elevation
Dryer
Dill
Drywall
ELEV
Elevation
SECTION
Electric
C'4 " I S T
Section number
EXP JT
Expansion Joint
Sheet shown on
Fncrory Mutual
GAL V
Galvanl=ed
GFI
Ground fault interrupting
DETAIL
Insulation
HS
Kitchen oink
LAV
Lavitory
Detail number
Pound
tic
Sheet shown on
ILIC
[I]
t I
I
17-
I.Tf7T nr 1111A=?Tlfrsr,
A-1 SITM PLAU, SYIICOLS AND .ZG-?IDS
A-2 FIRST FL001 PLAN - NORTH AREA
A-3 FIRST MCOa PLAII SOUTH AREA,
C-ECCIII) FLOOR VLMI
A-4 M:TMIOR ELEVATIONS
A-3 CZCTIONS AND DETAILS
A-G C_rCTrONIS MID DETAILS
A-7 nCC7 PL MI DETAILS
A-3 CMICDULES, D'-.:TAI[. -,, 111TEnron ELEVATIOTM
S-1 MUNDATIOU A!ID 171"'AMI'M PLANS, DETAILS
S-2 nCOF REPLACEME:1T F''2AIIING® VOTES
^ °:
CLD ASPHALT PAVING TO E= R=!107Z:D 330 S. r.
A/C
Air condition
AFF
Above finished floor
AHU
Air handling unit
ALU11
Aluminum
ALTH
Aliminum threshold
A"'OD
Anodized
ASPH
Asphalt
S * I
Beam
ci
Construction joint
CONC
Concrete
COND
Condencer
clilu
Concrete manonry unit
DISP
Diopocal
DRY
Dryer
Dill
Drywall
ELEV
Elevation
ELECT
Electric
C'4 " I S T
Existing
EXP JT
Expansion Joint
F M
Fncrory Mutual
GAL V
Galvanl=ed
GFI
Ground fault interrupting
INSUL
Insulation
HS
Kitchen oink
LAV
Lavitory
LB
Pound
tic
Hodicino cabinet
ILIC
Hot in contract
NTS
flot to scale
0C
On center
PL AII
Plastic lamlnnto
PL Y111
Plywood
PIIL
mane I
PT
Pressure treated
PVC
Poly vinyl chloride
REr
Refridgerator
REINF
Reinforcement
SECT
Section
STL.
Steel
T
Tounge and groove
Typ
Typical
UL
Underwriter o Labratory
W/
With
WASH
hasher
WD
Wood
Will
Welded wire mesh
VPS
Veneer plaster system
[I]
t I
I
17-
I.Tf7T nr 1111A=?Tlfrsr,
A-1 SITM PLAU, SYIICOLS AND .ZG-?IDS
A-2 FIRST FL001 PLAN - NORTH AREA
A-3 FIRST MCOa PLAII SOUTH AREA,
C-ECCIII) FLOOR VLMI
A-4 M:TMIOR ELEVATIONS
A-3 CZCTIONS AND DETAILS
A-G C_rCTrONIS MID DETAILS
A-7 nCC7 PL MI DETAILS
A-3 CMICDULES, D'-.:TAI[. -,, 111TEnron ELEVATIOTM
S-1 MUNDATIOU A!ID 171"'AMI'M PLANS, DETAILS
S-2 nCOF REPLACEME:1T F''2AIIING® VOTES
^ °:
CLD ASPHALT PAVING TO E= R=!107Z:D 330 S. r.
A?,t.r,.'TA1'r7
7,
ll'CIAJDE
I" 131S
-,k�'_'. -.)!D
i" -1,1 L4 -, :71 k r-_
-zliz-
PER
YAnD FOn
ALL CAnPCT AND
CARPCT DM.3E SHWIll MI
DRAWVIG
x A'IIWC7Z
LIST-D
1:1 -IMEDULESI.
TIIIS ALLMIANCT`� SMALL
INCLUD-.
=T
V:= IA L LA
-T fS
T I C: 1. CARP. Ill. 3
:0 C,::T.T:tC'1 r !:CUI6'l_'7D M SITE
SHALL DE SU"GVM BY
TM: C',":771
11' M-1-7.,
-Ali-
CONTRACT.
[I]
t I
I
17-
I.Tf7T nr 1111A=?Tlfrsr,
A-1 SITM PLAU, SYIICOLS AND .ZG-?IDS
A-2 FIRST FL001 PLAN - NORTH AREA
A-3 FIRST MCOa PLAII SOUTH AREA,
C-ECCIII) FLOOR VLMI
A-4 M:TMIOR ELEVATIONS
A-3 CZCTIONS AND DETAILS
A-G C_rCTrONIS MID DETAILS
A-7 nCC7 PL MI DETAILS
A-3 CMICDULES, D'-.:TAI[. -,, 111TEnron ELEVATIOTM
S-1 MUNDATIOU A!ID 171"'AMI'M PLANS, DETAILS
S-2 nCOF REPLACEME:1T F''2AIIING® VOTES
^ °:
CLD ASPHALT PAVING TO E= R=!107Z:D 330 S. r.
A?,t.r,.'TA1'r7
1. 7111: MNTRAC TOR 1-3)ITALL
ll'CIAJDE
I" 131S
-,k�'_'. -.)!D
TOTAL i:::'.1 PrMVICUS Alil,=A 249 13. F.
015.00 (FIFT-1-2-H DOLLARS)
PER
YAnD FOn
ALL CAnPCT AND
CARPCT DM.3E SHWIll MI
DRAWVIG
x A'IIWC7Z
LIST-D
1:1 -IMEDULESI.
TIIIS ALLMIANCT`� SMALL
INCLUD-.
=T
V:= IA L LA
-T fS
T I C: 1. CARP. Ill. 3
:0 C,::T.T:tC'1 r !:CUI6'l_'7D M SITE
SHALL DE SU"GVM BY
TM: C',":771
11' M-1-7.,
-Ali-
CONTRACT.
T"M"1
I CO EOT C-e.ALZ D-IJUM:C5.
2. V!"71IFY 471'D r:7071T TO AMC11T=C71 V:11C:1
70 CCMIICIIICV3
1% VCnI•Y CC!'DITIC:'S A!'D -10
A2C1IIT::CT1 r�IC71 TO CC::!L:�Cl*.3 1—::.
C:: .a -11.1- !:C-1 9_9:71 ALIL