Loading...
1055 FT HARRISON AVE SAPPLICATION FOR LAND CLEARING & GRUBBING PERMIT CITY OF CLEARWATER PUBLIC WORKS DEPARTMENT ENVIRONMENTAL MANAGEMENT '813) 462 -6747 DATE 10/24/94 RECEIPT NO. A non - refundable filing fee of $ 10.00 is required. Permit applicable for 6 months from date of approval. In accordance with Section 50.22,1 hereby apply for permit to land clear and /or grub the property described below. 1. Location of Property: 1055 South Ft. Harrison 2. Project Name: Bay Area Women's Care 3. Purpose of clearing and /or grubbing: ?_� New Construction ❑ Demolition ❑ Tank Removal ❑ Other 14. General description of existing vegetation, topography, and surface water (including all existing and /or pro- posed ditches, canals, and swoles) Trees and underbrush - land flat 5. Proposed method of debris disposal Haul to the dump 6. Date you plan to begin work 7. Proposed method of soil erosion control Silt Barriers 8. ❑ No -Tree Verification Required ® Tree Removal Permit Required I AM AWARE AND UNDERSTAND THE REQUIREMENTS OF SECTION 52.08, CITY CODE OF ORDINANCES REGARDING TREE PROTECTION DURING CONSTRUCTION AND SECTION 50.43 REGARDING EROSION AND SILTATION CONTROL. 5565 9th Street North Signatur of Owner or Owners Represe ative Address Jo n Wm. Barger St. Petersburg Florida 33703 Printed Name City State Zip Mid COunty Inc. ,821 -5421 Representatives' Firm Telephone Applicant must include Aerial Photograph or Scaled Drawing showing property boundaries and limits of work. This is NOT a Tree Removal Permit. Comments —!� p C // lEnviro/nnrft t�l nspectof Date �� Td � —'� / I f-` C 0 � hl / ti / 2 I 'C 4.0 4T C) nELd ' / ,v 6C I r� X� �'�/� li/V�. zoo r Cr 4-�' (i'1 ZO KJ Pl- <��rbon Forester Date Based on the above comments and information submitted, the above clearing ,& grubbing application is: ❑ Approved As Submitted pproved - Modified As Noted Above 0 Denied Signed: Date: City Manager or Designee %446 4 ^ 3 TE,.,� Planning Department CITY OF CLEARWATER MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE POST OFFICE BOX 4748, CLEARWATER, FLORIDA 33758 -4748 Telephone (727) 562 -4720 Fax (727) 562 -4735 LOTUS LAND 1055 S FORT HARRISON AVE CLEARWATER, FL 33756 RE: 1055 S FT HARRISON AVE Dear Property Owner: Compliance Notice CDC2008 -02379 The City of Clearwater Planning Department has done a re- inspection at the above address and has found the property is in compliance of the following City code: Section of City Code violated: 3- 12041. Facts behind violation: **DEAD, DECLINING, MISSING AND DISEASED PLANT MATERIAL" shall be replaced with healthy material of similar type in keeping with the landscaping requirements at the time of original planting and in accordance ith the approved landscape plan. AA. . /// I 1-- Inspector Stdnature DATE MAILED: 10/27/2008 INSPECTOR: Matthew Anderson INSPECTOR TELEPHONE: 562- 4567xt2504 rAForms \CDC_ Compliance- Tree.rpt Planning Department CITY OF CLEARWATER MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE POST OFFICE BOX 4748, CLEARWATER, FLORIDA 33758 -4748 LOTUS LAND 1055 S FORT HARRISON AVE CLEARWATER, FL 33756 RE: 1055 S FT HARRISON AVE Dear Property Owner: Courtesy Notice CDC2008 -02379 The City of Clearwater Planning Department has done an inspection at the above address and has found the property is in violation of the following City code: Section of City Code violated: 3- 12041. Facts behind violation: *`DEAD, DECLINING, MISSING AND DISEASED PLANT MATERIAL ** shall be replaced with healthy material of similar type in keeping with the landscaping requirements at the time of original planting and in accordance with the approved landscape plan. Specifically, To be in Complaiance you must replace the missing Holly Tree, Viburnum, and Lirope in the 2 interior islands in the rear parking lot. Replace the dead and missing shrubs in the perimeter hedge around property. Replace the missing Lirope plants 45 1 gallon and Azalea Formosa 25 3 Gallon plants in the perimeter island near the retention pond in the North perimeter. Replace the 6 missing Live Oak trees in the perimeter. Replace the dead and missing Aztec Grass Lirope in the front parking lot landscaping bed on ther edge of the retention pond. Mulch any and all landscaping beds on the property. Inspect and insure that all irrigation is working properly. No further action is required on your part if the violation is corrected by September 20, 2008. 3 L'✓eek5 Our goal is to achieve voluntary compliance through education, communication and cooperation. We would appreciate your assistance in achieving this goal. If you have any questions concerning this matter, or if you need any additional information, please do not hesitate to contact the City of Clearwater Planning Department. DATE MAILED: 8/20/2008 INSPECTOR: Matthew Anderson INSPECTOR TELEPHONE: 562- 4567xt2504 Inspector Signature �7" o^ r:\Forms\CLWCourtesyLtrCDC.rpt • f V 5 / •y /�� . Aad red, I I I f k, Kr kk, R �-' IJ,� kf ro�1�5�� & L_,J_ rl AA.`-) ArZ�- A bA F �s Ps AA . 7z ra ,' (A e, � ITv-�d 04 6 ! es - ! /��]p OX i r��p�a )Ux\ G CCU 7L,' s- ��� �u �0� o�� ues s T ens l erg\d. %ee !n dl kc% l DZ Z t S`��LOf Trees /ns' = Z R� p b! 04-- q \ c3 zo WtMwt Adt,4 rx(s), Iko V = 3sx /s �x3s el-Q0 QK ,4(0,k s6-ys (z 7 fs Z 2 ©x S- x / Q e, 4t (s -6- o Cs,r-z-t� /Uc) SFI�cJgS S /��c�/n% ��cppr�St1,oi' S) `'ts'`fS.Ea"flNf -`P C I T Y O. F C L E, A R WA T E R sia POST OFFICE BOX 4748 ++ CLEARWAT'ER, FLORIDA 34618 -4748 ee 0 e REG02- 02- 08 -01• }" `Environmental Management March 21, 1995 Mr. John Barger 5565 9th Street North St. Petersburg, FL 33703 Re: Bay Area womens Care 1055 S. Fort Harrison Avenue Dear Mr. Barger: This letter is to inform you that Environmental Management has received and approved a revised landscape plan for the subject project. The plan was prepared by Excel Landscape. Based on this revised landscape plan, the tree replacement calculations for this Site (Tree Removal Permit #058) are now as follows: Total original inches on site= 279" Less 3 trees removed at the recommendation of Environmental Management and to be replaced on a tree for tree basis= 31" Existing diameter inches= 248" Additional inches removed= 230" Inches remaining= 18" Required diameter inches= .75 x 24811= 186" Required replacement inches= 186 " -18 "= 168" Inches to be replanted as per Excel Landscape plan approved March 20, 1995: 15 oaks @ 411= 60." 2 sabal palm clusters @ 211= 4" 7 tree ligustrum @ 4'11= 28" 4 east palatka holly @ 211= 8" 11 bald cypress @ 311= 33" 4 wax myrtle @ 411= 16" Total Replacement Inches= 149" Remaining deficit= 168" - 149 " = 19" too ''Equal Employment and Affirmative Action Employer'' Mr. John Barger March 21, 1995 Page Two This deficit must be met by replanting additional inches on site or payment to the City Tree bank at a rate of $42.00 /inch, or any combination of the two. The deficit must be satisfied prior to issuance of a Certificate of Occupancy for the site. If you have any questions or need additional information, you may contact me at 462 -6382. Sincerely: ; Michael D. Quillen, P.E. Water Resource Engineer xc: Bay Area Womens Care Tom Armstrong, Excel Landscape N:\ DATA \WPFILES \MICHAEL \BAWCTR.MDQ 01 -11 -1995 03 :09PM F A X T0: Bea, Barger Construction FROM: Anita Ramirez, BAWL RE: Environmental Problems 813 447 5978 P.01 Yi E M 0 DATE: 1/n/95 I just talked tti :, ].ck A L} a� ; ='from the environmental department of Clearwater. He i very upset about the environmental violations that have not been corrected. The following are the areas that need to be corrected. He was going to close down the site but has decided to hold off and give us a chance to correct. 1. A tree was removed from the site and it:was not permitted. He wants the tree removal permit amended, 2. The tree barricades were never installed. There is a lot of dirt around the trees and this is not good for them. He wants the dirt removed from around the trees and the barracudas installed. 3. He wants all the silk frames put up and'make them stay up. a. Remove sediment on Ft. Harrison curve which has accumulated due to the.silk fences being down b. Remove sediment i be filled in and further sediment If, you have any questions, give things taken care of by.the end can't. a ditch portion that is not to put up silk barricade to prevent from building up. me a call. Please have these .of the week or call me if you 1 1-10 PERMIT TO REMOVE TREE(S) r. v NAME OF OWNER Lotus �_ , th Limit d partnp nah p �"'"" OWNER'S ADDRESS 617.Lakev;_ew Read `- PHONE 4A1___ 1.8.6 SITE ADDRESS 1055 South _ Harr; man LOCATION OF TREE(S) ON LOT SPECIES AND NUMBER OF TREES) Pine -4 Oak - 2 058 REASON FOR REMOVAL: C.1 Construction • Hazardous • Declining ❑ Dead ❑ Other (Specify) TO APPLICANT: A non - refundable fee of S 15.00 for up to five trees to Fee Recd. $ I R 0 be removed, plus S100 for every tree.above 5,to be Receipt removed is required Date __I le. 1. For new construction, add! flor,,s or other modiflcations of d property which involve the removal of a protected tree(s), a site plan is required, This site plan must have a rn' inimum sca e of I =2o fot Single site plan must include: family lots, or 1' =50' for all others. The a. Major Changes of Grade I All se, 'e'nts and Rights -of -Way b. Structure Locations r j ;t Ail Protected Trees Including: c, Driveways and Walks (i) Diameter of 4.5' above grade (DBH) d. Parking Arrangement < (if) d' Location / e. Required Number of Parking Spaces (iii.) Species, f. Proposed Number of Parking Spaces g. Proposed Underground Utilities {iv;)' Diseased or Insect Infested Trees p; h. Zoning Setbacks (v) Trees to be Removed1 ` ID k.; Tree Barricade Detail & Locations olT` 2. Protective barriers are regwred around all trees remaining on site durrng`COnstT "iicfiori These barricades must remain intact during construction. The barriers u f meek City Specifications 3. Tree replacement minimum standards 8 overall height r2 caliper Flori da Grdde # 1 'See, inspectors note below to determine•the number of replacement trees requited.. I hereby certify that as property owner or as representative of the property A J to be removed is wholly on property owner I have verK6 that the tree(s) sought Y owned. by the above idenfitiied property owner anc "' oilI it the tree(s) are located wholly or partially on property owned by be determined that some other person then l `b ree to hold the City of Clearwater harmless in any claim made for wto`rx)ful remaval of such treats) 1 Hereby certify.ahat this application to gether with any plans submitted is a true representation of dli.facts concerning the:proposed removal of the treats). Any de 'ation om the permit issued shall fender -it null and 'old and be considered, a, violation of Chapter 52, Code of Or i ce z 'John Wm Barger Sig ture of owner or appli ant "Printed Name 5565 9th Street North Address F> '; St. Petersburg Flor ida.s33703 Agency Representing (IfNotOwner) 821 =5421 City Stata Zip . Phone DO NOT WRITE 8EILP, SIN97,Nqt.Vblicl Until Signed By Monageror, fits Designated Agent Inspector's Comments: - �- - -� J!G� Recommended Replacement Trees���-�f � Requ/� iredReplacementTrees: /0/'0 �/i/% 4 -A r-! a(z 4CC�6, y Applicable Code Section: 5 Z- c, > //i j r0/1 N. C - 1122 /its � - ('/q < . 1.57 Signed: Date Inspector Based on the Inspector's comments and information submitted, the above removal application is: U Approved as Sub itied roved - Modified as Noted Above O Denied Signedt�'� `� Date: f�- City Manager or Desig e ZA/Ip.S /b B -94 t I y ! ADDENDUM TO TREE REMOVAL PERMTT #058 {:r - LOTUS PATH LIMITED PARTNERSHIP r ,TREE REPLACEMENT CALCULATIONS: Existing Diameter Inches= 279" Inches to be Removed= 230" Remaining Diameter Inches =.49" Required Diameter Inches= f75 x 279 " = 209" Required Replacement Inches= 209" - 49 160" •:Inches to be Replanted as per Approved Landscape Plan: 18 trees @ 1.511= 27" Remaining Deficit= 1.60" - 2711= 133" This deficit must be met,by replanting additional inches on site or payment to the City Tree Bank fund at a rate of $42.00 /inch, Pr any combination of the two. The deficit must be satisfied prior to issuance of a Certificate of Occupancy for the site. A0 61 FZ1 Inc h�:seo v jq� �O Ue 5�S fl ��7 cii` 11,e �� /-r e e � ►`n , J � �� �b��� 0 I�,y� Qp 6 b �„ r v 01 -11 -1995 @3! a1DP1[11 F A X M E M 0 TO: Bea, Barger Construction FROK: Anita Ramirez, BAWL w M 447 S979 P . 01, RE: Environmental Problems DATE: 1/11/95 I just talked tc x k A_. e_ rom the environmental department of Clearwater. He is very upset about the environmental violations that have not been corrected. The following are the areas that need to be correoted. He was going to Close down the site bUt has decided to hold off and give us a chance to correct. 1. A tree was removed from the site and it was not permitted. He wants the tree removal permit amended. 2. The tree barricades were never installed. There is a lot of dirt around the trees and this is not good for them. He wants the dirt removed from around the trees and the barracudas installed. 3. He wants all the silk frames put up and'make them stay up. a. Remove sediment can Ft. Harrison curve which has accumulated due to the silk fences being down b. Remove sediment in ditch portion that is not to be filled in and put up silk barricade to prevent further sediment from building up.! Tf you have any questions, give me a call. Please' have these things taken care of by the end of the week or call me if you can't. TOTAL P.01 ' CITY O F C I L R A R W A T E R POST OFFICE BOX 4748 CLEARWATER, FLORIDA 34618 -4748 REG02 =02 -08=01 Environmental Management , May 23, 1995 Mr. John Barger 5565 9th Street North St. Petersburg, FL 33703 Re: Bay Area Womens Care 1055 S. Fort Harrison Avenue 'Dear Mr. Barger: This letter is to inform you that Environmental Management has received as -built tree replacement calculations_ from Excel Landscape for the subject project. Based on these calculations, the tree replacement calculations for this site (Tree Removal Permit #058) are now as follows: Total original inches on site= 279" Less 3 trees removed at the recommendation of Environmental Management and to be replaced on a tree for tree basis= 31" Existing diameter inches= 248" Additional inches removed= 230" Inches remaining= 18" Required diameter inches= .75 x 24811= 186" Required replacement inches= 186 " -18 "= 168" Inches replanted as per Excel Landscape plan approved March 20, 1995 and correspondence of May 19, 1995: 16 oaks @ 611= 96" 2 oaks @ 4 "= 8" 2 sabal palm clusters @ 211= 4" 7 tree ligustrum @ 4 "= 28" 4 east palatka holly @ 211= .8" 11 bald cypress @ 311= 33" 4 wax myrtle @ 4 "= 16" Total Replacement Inches= 193" Consequently there is no further remaining tree deficit. If you have any questions or need additional information, you may contact me at 462 -6382. Sincerely: Michael D. Quillen P.E. Water Resource Engineer xc: Bay Area Womens Care Tom Armstrong, Excel Landscape "Equal Employment and Affirmative Action Employer" Excel landscape 9- Mal.ntenance, 1no. P.O. Box 2773 Dunedin, FL 34697 May 19, 1995 City of Clearwater Environmental Management P.O. Box 4748 Clearwater, FL 34618 -4748 Attention: Mike Quillen Re: Bay Area Womens Care 1055 S. Fort Harrison .Avenue Dr. Mr. Quillen: Per your request, I am suf,mi.ttiri,-; a letter to advise you that 16 of the 18 Live Oaks installed at the above address were 6 inch caliper instead of 4 inch caliper as was previously credited. Sincerely yours, Thomas G„ Armstrong Excel Landscape & intenance, Inc. a� MA'Y 2 1 1995 Ak `°The Standard of Excellence +,�uEny� in �O �4 Home Inspections" ��uuuu` HOME CONSULTING Ken R. Young, Pres. State Cert. Contractor, CRC 032274 American Society of Home Inspectors (813) 733 -5186 S.B.C.C.I. Registered Building Inspector 525 S. Paula Drive EAA Dunedin, FL 34698 lieu • cAjjister Construction, Inc. Michael D. Miller President P. O.Box 990 • Pinellas Park, FL 34664 Mobile 710-1131 • Tel. (813) 573-4650 • Fax (813) 572-4180 1. All elevations refer to N,G,%'.I), 2, Contractor must verify the location and elevation Of .111 existilil.' utilities I fore start of construction. 3_ The location of-existing utilities are approximate, Contractor shall conform to [tie intent of tire plan. Any rcquired challges or edjusurierns sliail be approved by Oic F-Jighleer, 4. All con,,tniction and material shall conform to the rniminum sModards iled specifications of 'rile City of' Clearwater subdivision arld/or zoning regidafions 5 All 1,00r drains to be controlled and directed to [lie retention basin. 6. Existing pavement shall tae saw-cut %vhere net) pa\,eluelit to be added or existing pavement to be eliminated, 7, Pavement in the property shall consist of I" asphalt on 6" finierock compacted to 98%, of maximum density on sub -base compacted to 95% of maximuni density Asphalt shall be F,D,o,,r, type S-3, Is Site c leart n /stripping, The initial site preparation shall consisf of Cle�lrillc' the vee,etation with their root system and theh stripping the surficial topsoil, 9, After stripping the site, the exposed near-surface soil beneath tile coustructiOn area, 6" minimum, shall be compacted to densities equivalent 95✓ of nrodified proctor, martrinurn dry density (AS` NI 13 1557). 10, Pavement in R,O,W, shall consist of 2" aspliah, type PC-1, an 8" firnerock compacted to 98% of maximum density on 10" subbase L,B,R, 40, 11, Pavement stripping shall be while paint, 11 Colopaction of pipe backfill shall comply with AASIIT0 t-99 (005), 13, Water pipe shall consist of polyvinyl chloride pipe (PVC) as per AWWA C -900- 75 and ASTM 0 -2241, DR 18 or less and be pressure tested to 150 psi for 2 hours. 14. All gate valves to be resilient seat, 15. Sanitary sewer pipes shall consist Of polyviriyi chloride pipe (IlVC) conforrurw_, to ASTM D-3034 D-1784� The pipe shall be SDR-35, Joints shall be bell and spigot as per ASTIM D-3212, using, factory installed flexible elastorrieric seals as per •s,rm F-477. 16, 'File retention basin shall be rough graded prior to construction, with all storni water directed to it, After completion of tall work-, remove debris and siltation frorn the b(atoni of' the reternion basin, and fine m-ade the final 6" and sod. Contractor to maintain the side Mope required and shws�lrl oil tile plan, and notify E'naincer for in inspection prior to sodding, 7. DUctile-iron pipe sh,,A be AVNJA C151, with cement mortar hning complying with A 0104-1 Glass 51 UrfleSS othervose indicated, Fittings shall be ductile-iron, A 0110; cement lined, AMA 0104: and rubber-gasket joints, A 0111 IRRIG AIJLTO',ti 1N(3FLS_- Hic irrigation contractor Shall provide an 11 ride r- rou rid irrruation sv,,teru to co%cr s s,sten, 100% of all on site planting area. Thi ck)ntaill 1)ut not fimited w thc follo%vina: 1. Underground piping, JWC schedule 40 or better. 1 Seven (7) day programmable time clock- to activate zones, 3. Sprinkler heads compatible %vith tire type of planting. .1. Electric valves, 5, Gage 14 Up copper wire, 6. Fiberglass or plastic zone valve boxes. Where piping is under driveway and concrete %valfl-s• the pipes shall lee installed in schedule 40 sleeves 18" below glrade- Materials supplied shall be equal to those manufactured by Rain Bird or ecluaL 'I'lle eontractor shall subluit a S)�stcul along with caudo- sheets Of 1111 Component in the systern to the owner for approval prior to instailation. The entire system shall be inraranteed J)y the contractor for i )'car trout tile date of' acceptance by the owner,. LANI&C, PF NK-P~9_-ES1, 1, All landscape material snap be Florida grade #1 or better, selected from tree Coy of Clearwater approved species list. 1 Required trees shall be a minnnun, of 8' ffiah, 1 1/2" cafipt-F mininaurn at the inne of planting. To promote diversity, at least 2 diffe—It sllccies, in proportional numbers, must be utilized, 3, Required hedges shall be a minialurn of 24" high and planted @ 30" O,C, and be maintained at a minimum of 36" in height, 4. Irrigation systems shall utilize low wolulne design to provide direct application and low evaporation. Water 4upply shall be piped to each individual planter island, with 100% coverage. Water supply shall be provided via city water. a. A Habitat Management and Landscape permit Application information oaivel must be obtained from the Environmental Department before the building permit can be issued, 6„ All exotic species, i.e,, Brazilian Pepper must be removed, 7. Trees planted under overhead obstructions (j,c_ power lines) most be chosen front a species oil the City ot'Clear-,vater approved species list that is compatiMe with the spatial/height o:.strlcfion, 8. All stortnwater runoff must be directed to tile retention SYsle'll 9. Any area subject to erosion (e_-, grass swaies, retention area crnbankments) must be stabilized by solid sod. 10, Construction equipment is not allowed oil site until the Habitat Management and Landscape permit is ill hand. 11. Required tree barricades and erosion control measures must remain intact throughout construction, Encroachment into of failure to maintain these barricades will result in enforcement action which may include citations and/or permit revocation. 11 The Contractor is to spray all existing pine trees prior to construction which are to be saved with in approved insecticide for protection against the prominent pine beetle, 13, No grade changes should occur vsithin the canopy dripline of pirie trees and 21/3 the canopy dripline of hardwood trees to be saved, 'the footprint of utilities 0.e, storm, sanitary, Florida Power, water, etc,) as well as the limits of trenching or fill material is not permitted to encroach within the above stated finins, 14 All planting beds to receive 3" thickness of mulch, 15. Njulch shall be 100% Cypress. 16. All required permits shall be approw," d by tile installing Contractor. 17. All trees and shrubs shall be fertilized at the time of planting with Agriforin 20- 15-5 planting tablets, "Tablets shall be placed around the root mass at a depth that is between the middle and the bottom of the root mass Application Rate-, I (Tallon can 1­21 Gram Tablet 3 gallon can 2-21 Gram 'Tablet 5 gallon can 3-21 Grain Tablet 7 gallbri can 4-21 Grant Tablet Trees 5-21 Grain Tablet IS. Fel-tilize ground Cover and s0d with grarimar fertilizer within 5 days after planting With 6-6-6, 19. Fertilize seed groskii grass with 6-6-6 after first cutting. 11 he responsible for grass both seed crown and sod The landscape contractor sha 11 seed for a period of sixty days after planting, Any, bare ground are�'S in the grown grass shall be reseeded. Dead areas of grass in the sodded area shall be replaced. All trees and shrubs shall be suaranteed for a period of I year front the date of project acceptance by the owner, plants that die during the guarantee period shall be replaced with like kind and size at no cost to the owner. 22, Prior to sodding or seedinc, treat soil with Round-Up plant killer al rate Of 2 0Z per gallon, 23, Seed shall be spread <lt rate of Soft, per acre. 24. Planting beds, planters shall have 10?s0il 12" deep, 25. Grass types:. a, 95% weed free Argentine Liable Seed b, 98% St, Augustine "Floratam" sod. 26 Trees, 4" DBH and smaller, debris and rubbish are not shown on the plans, lims'ever, the contractor to relocate trees at owners direction and remove debris and rubbish from the site° 27 All existing trees shall be inspected by the landscape contractor to determine the extent of trinintin1c; and pruning-fre(Juired W "Shape Up" trees, Remove dead branches and frons, and prune bran hcs hangint, or arowina, below S' 2& Remove all trimmings front the site ill� Signs and lcncinu/vw ails are subject to separate review arid permitting t City of' Ucor%Nater Transportation Inipact Fee Project: Bay Area "'onien's Care A d Ll rc a S: 1055 S. Ft. Harrison Dr. Proposed Usc: Medical Office Impact fee rate for medical office; 5,063/1000 sq. ll. Proposed Building Area: t1,897 Transporation Inipace Fee = S5,003 x 11,597 = $60,234.51 Credit for Previous De%elopinerit previous Use: Automobile Sales Business Building Area: 1500 Square Feet Impact fee rate for automobile sa1cs: 52,63501000 sq. It, IV Credit toward impact fee: 52,635 x 1.5 � S3,95150 Transpoltation Impact Fee 560,234.51 Credit 53,952,50 Total Transportation Impact Fee = 556 28101 _10 .4 J Of, 1.4 e TP j i 0 "a 6 4 4' ' iMAG1N0L.1A,-'-, %; rya X --t 10 77T�� • 'A I tVi 1, 7, A: V v A ry 1k, ic Q A -'s 'z .. ' d V S N 4, — Ld Li 0, J, F FO RD S" 4, _1* 11 , 'T %ft 1 R"T �.n r , . '11w , � 14 17" "c RMAMMINUM EXISTING PROPOSED fNfln.or Max.) Zoning District: CG CG Use: VACANT CLINIC - LOT AREA (Sq.Ft, and Acres): Gross Area (within property 53,788 s.f, 53,788 s.f. 10,000 S. p Min. line: 1.235 acres 1.235 acres 229 acres Net Area (Gross minus 8% Max for vehicular accesswayt)- - - - LOT WIDTH: 151 same 100 LOT DEPTH: 351.41 same 100 DENSITY (Based on net acres): - - - BUILDING COVERAGE(sq,ft, and 11,897 s.f, % of Gross site); 012% 40% GROSS FLOOR AREA and 11,897 s.f, EA,R.: 0.22% 4 SETBACKS (Also include dimensions on site plan drawing): Front: 70 25 S-20' C► IMlllllrl Side: N-10* 10 Rear: 155'+ 10 Between Structures, - - WATERFRONT: Side: - Rear: - 4� IiEIG' HT: - 26 50 With Bonus Provisions (if r-O applicable): - - PAVED VEHICULAR AREAS (sq,ft, 23,288 S,17, and % of site): - 043% 00 OPEN SPACE f mail for the 1-ot (sq,ft, and 10,696 s,f, 00 % of site): 100% 20% 50✓ For the front yard (sq,ft. and 2,700 s.f, % of required front yard)- 1000 - Clear Space (Waterfront Property: Exterior Perimeter Buffers-, Parking FAA Interior Landscaping (sq,ft, and % of Paved Vehicular areas; also, depict on site plan 1660 1 drawing by shading/cross hatching). 7, 0 PARKING (Give applicable formula)-. 5 7 54 11,897 x 4 53,5 1.000 V) W D L a U) LM �d LU U. Ln Lr) W rw C► IMlllllrl -J U 4� 00 r-O cc r4'o "o 00 f 00 PC's a. tai V) W D L a U) LM LU U. Ln Lr) W rw C► IMlllllrl -J U I Date JAtl, 14,1:)4 E Scale E—EE Joob 4No. Mal M10 51 F1 I k5 av-* fib I I t --------- T-- CNEW 4"D.I.P R.R. SPIKE IN POWER POLE 0 INGRESS EG RESS EASEM. ENT WATE R ELEV. 37-54 NEW PERMANENT ffmag 0 �-v %2j 1W �* H " VACATED Qvp WAI I QF7r1T1eNpj 0A EL. 36 M5 ljvv� PCI I DN 121 cowc. WA.1 r0 Y, 0*G 141#18mom 4. ru Cherry Laurel Rz 5536-85' (R) Viburnum flew R = 5709.58 (F Az 135.48 (R A= 137,92 (F) CH= 135.47 (R New Interior Landscclpl CH= 137. 92 JF CH.BRG.= S304201,E (R) CH.BRG.z S3 ®38`35` E (F) Ex Oak Tree Ex. Palm Tree Tree to be Removed 25SHRUBS THIS AREA iR NOTE' 31 ALL ROOF DRAINSTODISCHARGETO rLIC7 0CrCk1r1APd MACIP,1101 Ir II LAo-U�'DSCAPE 1' mi" 'V E TVITT3 EE-S areas abul, TRENCH DETAIL ANY Cfl.,a --NGES IN S-!`,'�CTES, SPEC KACATIONS, OR N.T.S. 01" -.JIS PLAN CLEARING AND R E Q U f77"µ D A GUNTROL MJETH(�D6, Im CG LL• D U6140 . NEW RETENTION BASIN TOP L. 38.0 RnT F1 lk�A NJ (-1? 28 SHRUBS TH IS AREA F1 I k5 av-* fib I I t --------- T-- CNEW 4"D.I.P R.R. SPIKE IN POWER POLE 0 INGRESS EG RESS EASEM. ENT WATE R ELEV. 37-54 NEW PERMANENT ffmag 0 �-v %2j 1W �* H " VACATED Qvp WAI I QF7r1T1eNpj 0A EL. 36 M5 ljvv� PCI I DN 121 cowc. WA.1 r0 Y, 0*G 141#18mom 4. ru Cherry Laurel Rz 5536-85' (R) Viburnum flew R = 5709.58 (F Az 135.48 (R A= 137,92 (F) CH= 135.47 (R New Interior Landscclpl CH= 137. 92 JF CH.BRG.= S304201,E (R) CH.BRG.z S3 ®38`35` E (F) Ex Oak Tree Ex. Palm Tree Tree to be Removed 25SHRUBS THIS AREA iR NOTE' 31 ALL ROOF DRAINSTODISCHARGETO rLIC7 0CrCk1r1APd MACIP,1101 Ir II LAo-U�'DSCAPE 1' mi" 'V E TVITT3 EE-S areas abul, TRENCH DETAIL ANY Cfl.,a --NGES IN S-!`,'�CTES, SPEC KACATIONS, OR N.T.S. 01" -.JIS PLAN CLEARING AND R E Q U f77"µ D A GUNTROL MJETH(�D6, Im LL• U6140 . z 7 z Ol- 0 LAo-U�'DSCAPE 1' mi" 'V E TVITT3 EE-S areas abul, TRENCH DETAIL ANY Cfl.,a --NGES IN S-!`,'�CTES, SPEC KACATIONS, OR N.T.S. 01" -.JIS PLAN CLEARING AND R E Q U f77"µ D A GUNTROL MJETH(�D6, Im 2 7 V. Sheet: LL• U6140 . z 7 z Ol- 0 • LU • In 0 rr 2 7 V. Sheet: LL• U6140 . z 7 z Ol- 0 LU In 0 2 7 V. Sheet: SAMPLE TAP 2' Boll Vc(ve ...... Hose Bibb 3/4' Galvanized 2- Galvanized 2' Corpercticn,' BLOWOFF DETAIL Restwner plug Per Dctoil No, 403 N T.S. a V 1. kit RETENTION BASIN SECTION A2- A2 N TS m 7NT TRANSITION DETAIL PAVEM5 N,T S. CLEANOU' B"MIN, CONC. SIGN POST ENCASEMENT 6" Pvc s. 1. ALL LETTERS ARE I" SERIES "C"(FD.O.T.) 6" PVC 6" PVC 1/12 SEND WYE 3000 PSI CONC. T_ 3. BOTTOM PORTION OF SIGN SHALL HAVE A REFLECTORIZED WHITE BACKGROUND WITH PLUG 6 "X 4" REDUCER (IF REQUIRED) S��ANITA-,RRAN.-O�UT sg vmEE STCP _S"AL_ OP CILI.—, GRASS —, I '< p r m GRASS CURB MWER161m LL—_ *VEHICLE OVERHANG C PRE A - IAST CONC. WHEELSTOIrr WT S 0 CONIC. WALK DETAIL N. t. S. IV8 z- d/4 TRANSVERSE CONTRACTION OR LONGITUDINAL JOINT, SAWED OR PRE —MOLDED. FILL WITH JOINT SEALANT, CONTRACTION JOINT ASPH 1/4 1. PER FOOT SLOPE EXC_ AS NOTED PARKING a DRIVEWAY SECTION N.T & SIGN POST NOTES: T s. 1. ALL LETTERS ARE I" SERIES "C"(FD.O.T.) 2. TOP PORTION OF SIGN SHALL HAVE A REFLECTORIZED BLUE BACKGROUND WITH 3000 PSI CONC. WHITE REFLECTORIZED LEGEND AND BORDER. PARKING a DRIVEWAY SECTION N.T & I: Y-11 9 101, 1#111 j &I SIGN POST NOTES: T s. 1. ALL LETTERS ARE I" SERIES "C"(FD.O.T.) 2. TOP PORTION OF SIGN SHALL HAVE A REFLECTORIZED BLUE BACKGROUND WITH 3000 PSI CONC. WHITE REFLECTORIZED LEGEND AND BORDER. 3. BOTTOM PORTION OF SIGN SHALL HAVE A REFLECTORIZED WHITE BACKGROUND WITH BLACKIOPAQUE LEGEND AND BORDER. 4. SIGN F�BRICATION FROM 0,063 STEEL, POST PARKING BY TO BE U' TYPE FLANGED STEEL AND SET IN CqNCRETE 12"XI2"X36"DEEP, TOP OF SIGN DISABLED AT 8-6"ABOVE GRADE, MIT ONLY L_j 2 w FTO-25(FDO.T) I: Y-11 9 101, 1#111 j &I m N.T.S. POST OPTIONS: 2`X4® OR 29120 DIA'WOOD; 1.33LBS/FT MIN. STEEL SILT SCREEN DETAIL -- ----- --- -- -- - --------- NT S 0 EL. 38.0 TOP EL-38. I NEW SWALE 6 > NEW i2"PVC, rawn 14' SECTION C-C EX. PROPERTY LINE • • T NEW RETENT ION BASIN 3 SOD S 01 D TOP EL.38. SIGN POST FINISHED GROUND G [ "DROP 3000 PSI CONC. SIGN POSTDETAIL t4.7.5, m N.T.S. POST OPTIONS: 2`X4® OR 29120 DIA'WOOD; 1.33LBS/FT MIN. STEEL SILT SCREEN DETAIL -- ----- --- -- -- - --------- NT S 0 EL. 38.0 TOP EL-38. I NEW SWALE 6 > NEW i2"PVC, rawn 14' SECTION C-C EX. PROPERTY LINE • • T NEW RETENT ION BASIN 3 SOD S 01 D TOP EL.38. 1-H NOV I 0 I s �UIL- T��1�1� 3o I L� it s. " A ME