Loading...
1000 HERCULES S.� ]\\[E W I 000 ORPORA� L ' , H '�AR A -/\\[ G ' LL—F-�'ARWATER,' "A ~L -1-4 ��A-�r Ndj--1L ~JL 'L A-1 -L Iq krA-L JLA Wom- SCALE : 2.381 , � ouc o ono wm em � pssr 1� NO HAZARDOUS OPERERAIIONS WILL BE PR0FQRMED |N5UUE HANGER PER NFPA 409, SECTION EiQ. #&9.1 2. ALL WORK UNDER THIS HEADING SHALL BE PERFORMED AND ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN STRICT COMPLIANCE WITH ALL RATINGS, CODES AND STANDARDS OR OTHER AUTHORITY HAVING JURISDICTION, J, ALL LICENSES, PERMITS, INSPECTIONS AND F[FS AS KEQU|RFD BY WORK UNDER THIS HEADING SHALL BE 5ECURED, PERFORMED AND P4|O FOR BY THIS CONTRACT. 4. ALL MATERIALS SHALL BE N[M\ FREE FROM FLAWS AND n[F[CTS. AND FULLY EQUAL T0 THE QUALITY SPECIFIED. WORK SHALL B[ P[RFORMFD BY SKILLED MECHANICS AND WORKMANSHIP 5MN-L RE FIRST CLASS IN EVERY RESPECT. CONTRACTOR SHALL HAVE A COMPETENT SUPERINTENDENT IN CHAHGE OF THE WORK AT ALL TIMES DURING CONSTRUCTION WHO IS EXPERIENCED IN nU WORK TO BE INSTALLED UNDER THIS CONTRACT. 5� ALL PIPES SHALL BE NEW AND SHALL HAVE THE MxwUFACruRER'S NAME ROLLEO INTO EACH LENGTH, OR SHALL 07HERNSE BE IDENTIFIED. AFTER CUTTING, ALL PIPE SHALL BE REAMED BULL BORE BEFORE ERECnOm, ALL CUTTINGS AND FOREIGN MATTER SHALL BE REMOVED, 5. VALVES SHALL BE N|BCO, CRANE, JENK|NS OR APPROVED EQUAL. VALVES OF EACH TYPE, SUCH AS GATE OF GLOBE, SHALL BE PRODUCTS OR ONE MANUFACTURER, VALVES SHALL BEAR THE NAME OR TRADEMARK OF THE MANUFACTURER AND WORKING PRESSURE CAST DR STAMPED ON THE VALVE, 7. INTERIOR COLD WATER PIPE SHALL BE TYPE L HARD OHAWm COPPER Y0Tn WROUGHT COPPER FITTINGS SOLDER TYPE, GALVANIZED STEEL wxT}| APPROVED FITTINGS. PROVIDE DIELECTRIC FITTINGS BETWEEN D|SS|W|LAn w[rxLS, m N A/ | ^ ^ ^ � ' ��- � � --������ � �~ � ~~_~-�_. ~ =~�� ° ="�^' ��"�' ~� �~��~ ~~~� ~"^°�� �� �_ jy�� �� ' �_ �� ° -� ����Jr ���»�� � � ��� �� �v " « � ��� � ~��� ��-�~ x�Dv,���~� ����� � ~= �~ �� " .� �� ~��^�� �__ ° "~ a -202a 01m a O O LA rb 6 Y FOR STORY DRAIN oRPORA A(GAR 7F sEE PAGE 6 EE PAGE 6 PROJECT L), X� ti............. ]ia"' EXIST IFUNWA Y CLEARWATER AIRPARK 3. NEW WATER MAIN LOCATION CORRECTED NOTE MEW CORPORA 7F HAMGAA� CONSTRUC770N S17F SEE FA GE 6 Fw'ecl 12, Twn 29 5, Rng 15 E -I� 0 NEW CORPORATE HANGAR AT CLEARWATER AIRPARK PLAN p a CfTY ENGINEER MICHAEL D_ QUILLEN, PZ IF 33721 DATA CONST 8" P VC SAN 294 L.F 9.4X 72 70 ME, I mol m • 0 I __T I I 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 NEW CORPORATE HANGAR AT CLEARWATER AIRPARK WA TER A iVD SA M TA R Y SE WER PL A /V ViECKM BY CONTRACT NO. GLB 02-0051-AP J,WG NAME 2002055 CITY ENGINEER UIr L D. QUIUJEN, P.E. f 33721 DATE K "4A 6, s2�1 72 70 ME, I mol m • 0 I __T I I 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 NEW CORPORATE HANGAR AT CLEARWATER AIRPARK WA TER A iVD SA M TA R Y SE WER PL A /V ViECKM BY CONTRACT NO. GLB 02-0051-AP J,WG NAME 2002055 CITY ENGINEER UIr L D. QUIUJEN, P.E. f 33721 DATE K V, I m M* mtf� w m ml 13+50 14+00 14+50 15+00 2. RELOCATE WATER MAIN 62 60 58 1 56 1 54 DRAW BY BVD DESIGNED BY RSF CHECKED By GLB 02- 0051 -A NEW CORPORATE HANGAR SCALE VERT. 1 "=2p SURVEYED BY REID 13WK NO. 500 M NO. 2002055 "=20" DATE DRAW DWG NA ME 2002055 SHEET NO. 4 OF 15 HORIZ 1 06 /02 AT CLEARWATER AIRPARK APPROVED FOR CONSTRUc,nON I CITY ENGINEER MICHAEL D. QUILLEN, P.E. # 33721 DATE Match Line I I I L i 68.72 7.7 67.63 64.50 69.04 69.51 tk 4' R K 0 a ' t } t om r {`} 6 69.03 Orr)c r 18'0 VER r 66.93 CLE,1RA UNDLIq SAN TA Y TA D 7A (SEE Df THIS P0 GE) 6% 67.98 64.82 68.4 0- 0 J� 0 0 ii i -A -4 ONST 30 L.F. 'V. 8 DI P1 W a tam. t 69.71 7p't, 70.30 69.31 66.30 N. 0 0 2. 6. 66.86 3. RELOCATE WATER MAIN LOCA11ON ADDED SEC11ON DETAILS I OJAI I CITY ENGINEER MICHAEL D. QUILI.EN, P.E. J 33721 DATE RAW Mw Match Line E 0 -54 . . . . . . . . . . . . . . . . " 04V 'T 93 F 8 DIP w T -7- CP edge of as 69.8- -k­, A, 6&25 Nsr POINT co 7_4 _4V OP 20' 40' E E 41 e 1b, SCALE: 1" 20' G RAPIUC SCALE (IN FEET) - - - - - . . . . . . . . T f�O L. F. 8 _P W 0 Ml­ N- A a 4 ✓ 77r, . . . . . . . . . . . . . . . . . . ---- �g x 69.06 x 69,16 69�00 00 x 69, x 69.09 X69.01 69,14 '6 U) 01b� X 69. 10 c6 X 9.41 3 CONS T CHL ORINA TON TAP 67.98 68.93 .5 g: 68.95 exist. p 21 6&96 69.18 x 69. x69 X 68.88 C, 8 PIP _90 8END x 6&87 x 68.81 10 Q.0 69.02 O'VT X C6 V) 0 CONS E C: Jr L. 8; 69.15 01 Tf5LF �-D No 7 le�' wy 69.33 4, 68.82 69A9 68.80 0 -0, 'A n. 7"ook 12"ook bl) 0 69,14 Inv 69.68 x 0 X 67A3 R 9�62 X 7"ook x 69.52 x 69.27 Opp 0 69�30 X 6,9, 69,16 bfpDC.X6:�(1 L 2.4 cl- 8' chain link fence 69�26 0 38 X69�38 69-16 0 ------ - 0 n 0 property line - 68.95 69.14 69,25 69.10 Fr T 69.12/ YI)VIMUM 10 P 69.90 X 6 02 69�36 77CN SEPARA • 6 1 69A7 - - - - - - - - - - - - - - - - - - - - - 69.07 x 69.03 CONST 305 LF. 8" DIP W 9.10 69.13 69A8 1021 ------- X- - 9 s5 . ... ... .... A x 6'N PMI� Storm grate inlet �__ ­1 1 k I �M 4n USE 45 BENDS (4) FOR COWST El 9.90 '.�s OFFSET - 18"' CLEARMICE inv. 4.37 box bottom 6 4 9.28 J TAPPING SLEE E R Ul WER DRA INA GE & 80 GA7F VALW J��EC A& J7 -PET _.iU_P 69.16 6" 9 _aT '9 69.12 edge of pavement 68.61 p" 0 ----- - - 0-0 0 =�-_6' clf�:�o --- �_b Z7 -0 Q Q ---- ----- 68.90inv 68.94- 6&91 68.32 _68 003 67.54 68,54 68,14 68.00 68.12 67.58 C/I 6T42 67.81 F0 24- 67.28 67.41 6� 6T02 6&37 �54 t_J*'�� 69 70.92 - ----- *48-89 0 0 - ------ 0-0 0 69,21 0- A -0 J W� 3 @ 18" 67-51 k 69Z1 act 69�60 69.44 0 69.56 0 0 69,69 - 69� 67 69.63 69.51 69.50 69.63 I 69.63 x69.47 cane 69,42 9.31 cone cane slab T 7n 9;z 67.53 cane x Rq 44 x 69.42 slab T Existing Surface ---------------------------------- Ductile Iron Retainer Gland RESTRAINED Restrained (typ. All Joints LENGTH Length In Pipe Adjustment) PER - - I (typ) DETAIL EXISTING PIPE n PAGE 8 2%-0" 2P-O" Min. 7'1 c7� t� Min. q ,JC7 $-6 �Z F�3 Min. 8" Ductile E D M Di 45* Bend Iron Pipe (typ) (typ. X4) U U �JJ 6698, 68--25 .Cot PLANNiiv, "ES CITY u'_ -'WATER TYPICAL WATER LINE OFFSET NOT TO SCALE No= MM 00 MEM NEW CORPORATE HANGAR AT CLEARWATER AIRPARK ;DRAYM BY BVD I eb, at CHECKED BY I I GLB FICORTFUCT NO. i 02-0051-AP SURVEYED BY REID BOOK NO. 500 NO. 2002055 !DATE DRAYN 06/02 APPROVED FOR CONSTRUCTION CITY ENGINEER MICHAEL D. QUI11104. P.E. # 3YI21 DA77-5 I I ol I I 11 I I I I I N I m I I u— O 8 I 9 1 10 I 11 I 12 1 13 1 14 um rx ffi ul 11101 20 CLIENT: CITY OF CLEARWATER PUBLIC WORKS ADMINISTRATION R 1- ! i m I I LLJ LU C) < I 10.0, 10.0, U- Z ow ui < a- WOMFUNUMMill `ser SITE PLAN I A a BY E SLOPE 1/4!''PER FOOT SLOPE 1/41' PER FOOT 2" ASPHALTIC CONCRETE EXISTING GRADE F' -33 1) MEOW c 6" COMPACTED LIMEROCK BASE COURSE 9sp STABILIZED/ COMPACTED SUBGRADE (FDOT .- — (FDOT. P-160 B TYPICAL TAXIWAY PAVEMENT SECTION SCALE: N.T.S. NOTE. PAVEMENT MATERIALS AND THICKNESS, AND BASE MATERIALS AND THICKNESS SHALL BE TO FDOT AVIATION SPECIFICATIONS A 1 2 I 3 4 5 6 8 9 lo 11 1 12 13 1 14 1 15 `ser SITE PLAN I A a BY E 2 3 4 5 6 ✓ 1 8 10 11 1 12 13 14 15 16 1i 18 0 GI A Ij 1.) General Intent: It is the intended that the Contractor shall comply with all requirements of the airport security the R. plan and with 5 6 7 8 9 10 CONTRACTOR'S SAFETY AND SECURITY REQUIREMENTS 03am a ff N SECURITY Ij 1.) General Intent: It is the intended that the Contractor shall comply with all requirements of the airport security the R. plan and with security requirements specified herein. The Contractor shall designate to the Engineer in the his writing name of "Contractor Security Officer (C.S.O.).* The C.S.O. shall represent the Contractor on the security requirement's for the contract. PROJECT: 2.) Construction Security Committee.-- The committee shall be established concurrent with the life AIRPLANE T-HANGERS AT CLEARWATER AIRPARK 0 of this contract to monitor, coordinate and adopt new security provisions, if required, on all matters of airport security relating to this contract. Meetings shall be scheduled by the Engineer. Committee membership shall include the "Contractor Security Officer", Engineer, and on-e N representative each from FBO Operations and the City. 3.) Contractor Personnel Security Orientation: CLIENT: The Contractor Security Officer shall be responsible. for CITY OF CLEARWATER briefing all Contractor personnel on these requirement-s prior to working In the construction area. PUBLIC WORKS ADMINISTRATION M 4.) Access to the Site: Contractor's access to the site shall be as shown on the plans or as directed by the Engineer. No other points shall be allowed unless approved by the Engineer. All Contractor traffic authorized to enter the site shall be experienced In I CONSULTANT: L the route or guided by the Contractor personnel. The , Contractor shall be responsible for traffic control to and from RUSSELL A. FERLITA, P. E. the various - construction areas on the site and for the 9808 N. ARMENIA AVENUE operations of the access gate to the site:' A Contractor's TAMP Al FLORIDA 33612 flagman or traffic control person shall not permit any y TELEPHONEi 18131930-6755 unauthorized construction personnel or traffic to the AOA. P.E. a 47075 K The Contractor is responsible for immediate clean up of any 'along debris deposited the access route as a result of his construction traffic. Diree.tional signing at the access gate ISSUED FOR BIDDING DATE and along the delivery route to the storage area, plant site or work site shall be as- directed by the Engineer. REVISIONS .5.) Materials Delivery, to the Site: NO DATE DESCRIPTION BY Ail Contractor's material orders for delivery to the work site will use as a. delivery address, the gate number assigned to the access point at the Contractor's storage site at the airport. This will preclude delivery trucks from entering through the perimeter gates and entering into aircraft operations ardas inadvertently. 6.) Construction Area Limits: ISSUED FOR CONSTRUCTION The limits of construction, material storage areas, parking area and other areas defined as required for the Contractor's exclusive use during construction shall be marked. The ADDENDUM REVISIONS H Contractor shall erect and maintain around the perimeter of NO DATE DESCRIPTION BY these areas, suitable fencing, marking and/or warning devices visible for day/night use. Temporary barricades, flagging and flashing warning lights will be required at critical access points. Type of marking and warning devices- shall be approved by the City through the Engineer. 7.) Identification — Vehicles: KEYPLAN The Contractor shall establish and maintain a list of Contractor and Sub—Contractor vehicles authorized to operate on the site and shall issue a permit to each vehicle to be made available upon demand by the Engineer. Vehicle F permits shall be 'assigned in a manner to assure positive identification of the unit at all times. In lieu of issuing individual permits, the C.S.O. can require each vehicle to display a large company sign on both sides of the vehicle and advise the City through the Engineer, a current list of EIVED companies authorized to enter and conduct work on the c. E airport. Contractor employee Personal vehicles shall be restricted to the -Contractor's storage area and are not FEB, 16 2001 allowed on the airfield at any time. i7EVELOPMEP4T SERVICES OF CLEARWATER D DRAWN BY: CWS JOB NO.: 01951-00005 CHECKED BY. CH DATE: 01/30/01 en rw 8. m INDEX OF PLANS SHEET # SHEET DES. 1 2 3 4 5 6 7 8 9 10 ml llll� I , '' U. 0 d 'ilk CL EA RYn 1A - TER A IRPA RK 11 u t ° _ n � 1z")� � sale ¢f�7�� rim 69 15'e, t, 6 5. to ` _. _._ .. ;nv fi a _ f _ _ _ W___w_. .. ._._ '°°van '. .........,.._,... `,,,_... ...._ - �..,.�_... „,„. ®.�.. i . • f •• ( }um..-- .._» -.u,. «.-- :^.^°°°.«` ®.sue. _��` .m° � :^. ®" .®- ... -... ....__.e..- ,_....._ ��..... � m... »..._. °. _ � ¢'� � m3 �� _. ; ¢„ cry �_. ,.:e I A rcp inv ; 3 rim 68,69 aturn ,• r I ?Got 15" nw 63,75 note: Fd is C7 1``s s 0 -a ; 7 f rt i `�i c°+ f° 19 top dip 10 r . i RECORD DRAWINGS till l ®PPIPS ®jam, TE SEA c �' I GWXJ SURVEYED BY BRA BY � BEFORE Fa4CAYAig LIBC PUTCALL LOCAL GI I UTILITY NQii IGAN RED BY 1 DRAM BY [CHECKED BY 00-0009—MA + I JOB NO. 2000029 DATE DRAM DWGNAME w...J i. 01/11/01 2000 0 a FLORIDA BEFORE YOU SURVEYED BY DRS BY ®tr �'� C'o = ' cAvA REMEWED BY GALL LO PUBLIC AIR RK LANDS "APING ° ^^ ¢ ENGINEERING UTILITY NOTCFIGA -nON PROJECT ENGINEER DATE °ice . ^: 0 1 fl t% 1 P_s_t 7 A CF ht Tit? 0 A s s a ► ■ I' DRAWN OLE SURVEYED BY .. 0 BEN VERT. PC 20000 291 DATE DRAWN DWG NAME � r t 1 1 py F $ q ,► �( t « rirn 6.27 • 4 t a 4 a threat .6 ,.18 pp '. = f4 .� inv 12x18e 65,53 i ' pit �3.59 i ' 12x13 c 66.76 6" s 67.28 I e Grr df. 36 ., b ro rt 67, 37 f i - 112%1" crn 1 12x18 w e, 7 7 } ._ a 12"xl t -6 1A rcpT CL 0 4' tree F 6 p p , tc6_ 4 fi1Q.nucl It winch I mv 66.56 3 C;nv 6 4 .0 inv 64 .0 t , $ ij 4t a aFn ! g i$ hb r� I S f =i = r.torrn A PfF4 X126 py rim f c a c A y . E, BY ` ;� CONTRACT NO. iii • N Q JOB NO. c 0 of 0 #000 • I DATE DRAWN DWG NAME V�I it o .... w 3 a n 0 0 o. 3 -o a. 0 0 0 U (L a c m Mv se 61.50 f k 2,. gtrell it g f ' � i .. III ..... y SEAL..., CITY OF* CLEARWATER,, FLORB91M YOU EXCAVATE PUBLIC WORKS ADMINISTRATIO�r I CALL LOCAL PUBLIC AIRPARK IDA LANDSCAPING aidaw ENGINEERING • DRAWN i . E, BY ` ;� CONTRACT NO. iii • N JOB NO. #000 • I DATE DRAWN DWG NAME V�I .- iii# i RECORD DRAWINGS .a r a• w r . • PUBLIC WORKS ADMINISTRATIO% LOCAL PUBLIC t t ENGINEERING UTILITY • • DRAWN BY t CHECKED BY CONTRACT Nd.- RECORD DRAWINGS .a r a• w r . • PUBLIC WORKS ADMINISTRATIO% LOCAL PUBLIC t t ENGINEERING UTILITY • • DRAWN BY DES:GNED BY CHECKED BY CONTRACT Nd.- VERT. r RECORD DRAWINGS I 1 MGATE 5EA CITY OF CLEARWATER, FLORIDA surcRE YOU i • PUBLIC WORKS r �s L 1 ®' � A LOCAL PUBLIC r DRAWN BY- • CHECKED w i «• • 1+ 1 ■ a. . I I I! J DATE !L DRAWN • N ti E O Han. # #ii# • OF 10 jv/ UZED LANDSCAPE ARCHITECT 238 DATE RECORD DRAWINGS A CITY OF LEA ATER FLORIDA :Fl�A c Y«, SUR B Y DRAWN BY i CZ ATE � ®` P LIC w OKS DMIJTATIO L (D CALL LOeBL[G REVIEWED BY 1 f ) % M Q® ENGINEERING UTILITY N®MN q2'Q oon rrr`r�or1.�ccn ... ».- � r4% .+vti_ "'^- . ". _ � ors rTr— — e. avi T1 i# # ##• MA +� III * .I. _. .�• • O: !' 2000029 i i 2000029 SHEET 1 7 OF # •, 11 CITY OF: r s FLORIDA RECORD � a. BEFORE YOU >f v �f PUBLIC WORKS 1 l t i CALL LOCAL PUBLIC r ►, i i DRAM V . r DESIGNED BY CHECKED d CONTRACT NO. 00-00 0 i DATE r DWG NAME SHEET �♦ .., i 01/11/011': 20000 29 8 OF i DRAWINGS RECORD r CITY OF CLEARWATER,- r EXCAVATE W a� PUBLIC ORKS r r r r l r l O CALL s LOCAL PUBLIC Z ENGINEERING UTILITY or ►O DRAWN BY DESGNED BY CHECKED BY r• Al � it # #i DATE DRAWN DWG NAME SHEET No. a• i # i # # 029 •' OF 1 1238 DATE X] —SHRUB (T)?.) o MAINLINE VALVE SCHEDULE - CONTROLLER 'A'. r'1 11["17 % I A I Aft- e_ A f M Mr-1 Ir-r- NOTES¢ ALL WIRING SMALL BE CHRISTY I.D. TAG NUMBERED TO PER LOCAL CODE. MATCH 'PLANS i PROVIDE EXPANSION COILS AT ° j RECTANGULAR PLASTID EACH WIRE CONNECTION IN VALVE i VALVE BOX (10 WRAPS AROUND VALVE BOX W/ LOCKING COVER A 1/2" 0 PIPE). USE EPDXY FILLED CONNECTORS TO ATTACH PVC MALE ADAPTOR I WIRES TO SOLENOID WIRES. FINISH GRADE; COMPACT SOIL AROUND VALVE BOX TO SAME i DENSITY AS UNDISTURBED SOIL r YT ^� I L ,. REMOTE CONTROL VALVE 1 1 } < SCH. 80 NIPPLE - (TYP) ! �� �� ;,'•�, 1' -- PVC SCH.40 SxT ELL j I �f �11y 3/4" 0 PEA GRAVEL; 1 CU. FT MIN j LEAVE A 1" GAP BETWEEN THE BOTTOM i OF THE VALVE AND THE TOP OF THE GRAVEL € r } to 4 O j -.� O __ - PVC SCH. 40 PIPE ° PVC SLIP FITTING + CONTROL WIRE j COMMON WIRE CONTROL WARE IL PVC MAINLINE; SEE PIPING /WRING DETAIL PVC LATERAL LINE; SEE PIPING /WIRING DETAIL. USE ELLS AS REQ`D IMMEDIATELY OUTSIDE BOX TO TRANSITION TO REQUIRED DEPTH ® NOT TO SCALE ; t REMOTE CONTROL VALVE 1 _"1 L- t 8 `'r,/ / / ®!IL►i� ®.� WVES1IGATE , SEA( CITY O CLEARWATER, FLORIDA >, ,`�t C, • EXCAVATE PUBLIC WORKS ADMINISTRATION _ 1 IC La i CALL LOCAL PUBLIC o r_ ( M , , ENGINEERING UTILITY NOTIFICATION ,. ® _ 4 i 1 o MAINLINE VALVE SCHEDULE - CONTROLLER 'A'. WRING ZONE #1 A -- 57 GPM - 1.5" CONTROL VALVE - ROTOR l # ZONE #2A' - fC 1.5" CONTROL 1 y ZONE #3A - 56 GPM- - 1.5" CONTROL 1 SPRAY. ZONE #4A -- 56 GPM - ALL MAINLINE SHALL_BE 3F ;fINSTALL ALL 120 V c �'_ WIRE IN CONDUIT VALVE - SPRAY -�� INSTALLED PER MFG'S J r TER LOCAL CODE. 1.5" CONTROL VALVE - ROTOR SPECIFICATIONS. ZONE #6A - 56 . GPM - { CONTROL VALVE - t ,! f i j PROVIDE A 20" LOOP IN WIRE ZONE #7A - 40 GPM - 1.5" AT ALL CHANGES IN DIRECTION TAPE AND BUNDLE WIRING AT S i GREATER THAN 30% REMQVE TIES AFTER ALL CONNECTIONS 10 FT. O.C. MAXIMUM. 40 GPM - _ ; I4 $ HAVE BEEN MADE. VALVE - SPRAY SNAKE ALL PLASTIC PIPE ZONE #9A - _43.5 GPM INTO TRENCHES AS SHOWN. - ROTOR o 0 to I ZONE #10A - 26 GPM N ° NOT TO* SCALE CONTROL VALVE - BUBBLER p I P 11N'G W I R I IN]G #11A - 28: GPM` i 1 a.� rN i I VALVE SCHEDULE - CONTROLLER 'A'. ZONE #1 A -- 57 GPM - 1.5" CONTROL VALVE - ROTOR l # ZONE #2A' - 56 ` GPM - 1.5" CONTROL VALVE - SPRAY ZONE #3A - 56 GPM- - 1.5" CONTROL VALVE - SPRAY. ZONE #4A -- 56 GPM - 1.5" ' CONTROL VALVE - SPRAY ZONE #5A - 58 GPM - 1.5" CONTROL VALVE - ROTOR ZONE #6A - 56 . GPM - 1.5" CONTROL VALVE - SPRAY ZONE #7A - 40 GPM - 1.5" CONTROL VALVE_- SPRAY ZONE #8A - 40 GPM - 1.5" CONTROL VALVE - SPRAY ZONE #9A - _43.5 GPM - 1.5" CONTROL VALVE - ROTOR ZONE #10A - 26 GPM - 1" CONTROL VALVE - BUBBLER ZONE, #11A - 28: GPM` - 1„ CONTROL VALVE - DRIP ` ZONE #1 2A - 12 GPM - 1„ CONTROL VALVE - SPRAY STATION NUMBER A TIMER DESIGNATION VALVE SIZE 1.5 f GPM VALVE i 1 a.� rN i I f r ar : r♦ i1 iii' ', . " 000029 l # DWG NAME 2000029 v i i i`I ' ME mfi''' DATE