RUTENBERG CONSTRUCTION COMPANY INCORPORATED (2)
I .'
/P
\ ' ..
"_.- il
... -<7 - -
I 6876113
U' (~7_1';.1
I
Clearwater East tuth Interceptor
CLEI - 67
EASEMENT
OR 1675 PAGE295
FOR AND m CONSIDERATION of the sum of One Dollar ($1. 00) cash in hand
paid to it, the receipt of which is hereby acknowledged, and the benefits to be derived
therefrom, RUTENBERG CONSTRUCTION CO., mc., a Florida corporation, does
hereby grant and convey to the CITY OF CLEARWATER, FLORIDA, an easement
over, under and across the following described land, lying and being situate in the
County of Pinellas, State of Florida, to wit:
A strip of land 10 feet in width lying five feet on each side of the
following described center line: ;'
From the Northwest corner of Lot 20, Sunset Gardens (See Plat
Book 41, Page 6, Public Records of Pinellas County, Florida) run
N 00 08t 46" E. alcmg the east line of the Southwest 1/4 of the
Northeast 1/4 of Section 2~, Township 29 South, Range 15 East
10.00 feet for a Point of Beginning; thence run N. 89 51' 12" W.,
170. feet; thence run N. 00 08t 46" E., 580. 89 feet; thence run N.
o 0
88 42' 56" W., 1021. 87 feet; thence run N. 0 19' 1511 E.,
parallel to and 145 feet east of the west line of the Northeast 1/4
of said Section 24, 743.47 feet to a Point of Ending on the north
line of the Southwest 1/4 of the Northeast 1/4 of said Section 24,
containing 25, 162 Square Feet.
Restoration of property shall be made as set forth in the Addendum to
Easement attached hereto and made a part hereof by reference.
This easement being for sanitary sewer installation and maintenance.
....
~..~
x
~
The CITY OF CLEAR WATER" FLORIDA-, shall bave the right to enter upon ~;::>
the above described premises and to construct, install and maintain thereon any
sanitary sewer line and to inspect and alter such sanitary sewer line from time
to time.
(.Q
~..
r....' ',-.
....::r:
r-n+-:-'"
;l:
Cr
...bo.
IN WITNESS WHEREOF, the party hereto has set its hand and seal this
,,'?-ayo!. April , 1963.
~-
~ ",/"j
~J.C',
(...... ~
~:.'
::o>.:~"
C>
-.J
-u
:x:
..
eM
(,J.,)
......~ ..,
~~neclt s ~~le'd-~nd./de1i ver ed
:J:n. tne,Pr-e.se.:Oe:e~o:f:
RUTENBERG CONSTRUCTION CO., mc.
r7\.,' .' I."~'
.~ -, -'~~
STATE OF FLORIDA )
COUNTY OF PINELLAS )
Before me,'lbe uil.derf:ii-gnedUauthority~ 'tliisday"persoria,llYappeared
Charles Rutenberg and Blanche T. Lorence to me well
known and known to me to be the individuals described in and who executed the fore-
going instrument as Vice President and Assistant Secretary respectively,
of the Corporation named in the foregoing instrument, and they severally acknowledged
to and before me that they executed said instrument on behalf of and. in the name of said
corporation as such officers; that the seal affixed to said instrument is the corporate
seal of said corporation and that it was affixed theret(,)bydu~ari-4r~gu1ar corporate
authority; that they are duly authorized by said corpol'a.ti'pn'~Qe,~~c.llte said instrument
and that said instrument is the free act and deed of~said:.iWJ:'p<n-atf6:n.
:- ~ ---.. "-..,-
IN WITNESS WHEREOF I have hereunto se-fmyhand aftd affixed my official
seal this /7;zK day of ~ //:_~ ~1<;)63.
~_~.'~';&V1/~
0/ .' Notary Public
My Commission eXPire~'1' /fb~'
By
c2-JL
ATTEST: ~J~ ~
Its ssi stant Secretary
.-
.
'-
..
~,<t:' C"" _it
I
Clearwater East South Interceptor
CLEI - 671
- OR, 1675 PAGE29fj
ADDENDUM TO EASEMENT
The following requirements will govern clearing, excavation and restoration of
property and public rights of way for construction of the interceptor sewer and are
an explicit part of the construction contract:
Final Cleaning Up
Before the work is considered complete, all rubbish and unused material due to
or connected with the construction must be removed and the premises left in a con-
dition satisfactory to the Owner. All property, both public and private, disturbed
or damaged during the prosecution of the work shall be restored to its former
condition. Final payment will be withheld until such work is accomplished.
Safety, Protection and Sanitation
a. Safety
The Contractor shall furnish and install all necessary temporary works for
the protection of the work and the safety of the public and shall carryon his work in
the manner best calculated to avoid injury to the public or to the workmen.
b. Protection of Adjacent Property and Utilities
The Contractor shall conduct his work in such manner as to avoid damage to
adjacent private or public property and shall immediately repair or pay for any
damage incurred through his operations.
Construction Procedure
Portions of the work are along the water front of Tampa Bay. It shall be the
Contractor's responsibility to preserve, protect and/ or replace existing water
front structures, bulkheads, piers, and docks without additional compensation.
E~:r.thWoI'kfor PipeLine Construction
,l..Cle arirtg
,,~~:,- .'"ta) \~learing operations in areas of wild growth (brush, mangrove, et c.)
: ',-shalLb~_5:cmfin:ed to the actual easement or right of way provided. Clearing
.. ~rarre~ ~~ -ih:~:l>rovided easement for construction purposes will be allowed if the
P~I!lt~~io~_,~~,the property owner is obtained by the Contractor for such clearing.
, .~ .The cleared area shall be of adequate width for purposes of sewer construc-
tion, access of equipment, layout and stockpiling of excavated material.
Brush and trees cleared from the work site shall be removed from the site
and satisfactorily disposed of by the Contractor. Disposal by burning may be allowed
if, in the opinion of the Engineer, adequate precaution has been taken to prevent
spreading of the fire and nuisance to adjacent properties. The Contractor shall,
however, ..., be , fully r e spon sibl~_~!_all_~~~~~<!~e?c:~_s_()f ,~ll~c:~l?~:r~~~~'____. _______.___ '..
(b) Clearing operations in cultivated areas (groves, shrubbery and plant-
ings) will be limited to the easement or right of way required and within such
right of way to trees and shrubs which must be removed for construction purposes.
In public rights of way and in easements on private property all lawns,
plantings and shrubs will be restored either by removal and replacement of
existing plantings or by replanting with plants equal to that existing prior to
construction. The Contractor is expected to COOpC1"atQ '.Vith ;nvnlverl property
owners in protecting existing plantings.
Sprinkler systems, cables and/ or other privately owned buried improve-
ments shall be protected, preserved and/ or replaced without additional com-
pensation.