PIER 60 REFURBISHMENT - 11-0046-MA - ADDENDUM TO AGREEMENT FOR CONSTURCTIONADDENDUM TO AGREEMENT FOR CONSTRUCTION OF
Pier 60 Refurbishment
CITY OF CLEARWATER CONTRACT No.11-0046-MA
In reference to contract 11-0046-MA dated December 20. 2012 between City of Clearwater, the
Owner, and Biltmore Constructio� Inc, the Contractor; it is further AGREED as follows:
L�.
1. The Owner has reserved the right to purchase certain portions of the material for the Project
directly in order to save applicable sales tax in compliance with Florida Law since owner is exempt from
the payment of sales tax.
2. The attachments lettered "A", "B", and "C", attached hereto (as amended by notations thereon)
and incorporated herein shall be executed by the Contractor and appiicable Sub-contractors and the
terms thereof shall govern the purchase of materials for the Project as determined by the Owner.
3. The contract price shall be reduced by the cost of the materials purchased by owner plus the
normally applicable sales tax as bid by the Contractor even if the cost is in excess of the cost for the
materials as bid by the Contractor. However, for purposes of calculating engineering fees, contractor
fees, architects fees, and any other amounts that are based on the contract amount, the original contract
amount shall be used.
4. The Contractor reserves the right to authorize payments for invoiced materials, prior to
Owner's authorization process, as outlined in Attachment "D".
5. The Contractor will assist Owner in owner's direct purchase of materials for the project.
However, owner acknowledges that Contractor's Sub-contractors nonetheless each reserves the right to
purchase project materials directly, without Owner's prior approval and consequent power to eliminate
reimbursement of sales tax.
This addendum, upon its execution by both parties, is made an integral part of the aforementioned
agreement.
CITY OF CLEARWATER:
Date: �%.�Q-G�Q.��r �r , a c%� 3
J � v�
� y Manager/Owner
ATTEST:
.�-�t� U� �O �.
City Clerk
(City's Corpp�r�ate Seal)
FORM:
�S�A��f'yF
C� >►'/ ,r ��
� `� T
r 1 �
►,�.� �
Camilo Soto, Assistant City Attorney
CONTRACTOR:
Da � ZZ
�� `,,�_._. v � Q .�'�✓� �
�=/��r��ti rT�-«�r�C'a
Contractor T
",,; �
ATTACHMENT "A"
FROM: CITY OF CLEARWATER (OWNER)
TO: BILTMORE CONSTRUCTION CO., INC. (CONTRACTOR)
OWNER-FURNISHED MATERIALS
PROJECT: Pier 60 Refurbishment (11-0046-MA)
1. The Contract Price includes Florida sales and other applicable taxes for material,
supplies, and equipment which will be a part of the Contractor's Work. The owner, being exempt from
sales tax, reserves the right to make direct purchases of various construction materials included in the
Contractor's contract. Owner-purchasing of construction material, if selected, will be administered on a
deductive Change Order basis. Additionally, Purchase Orders will include Owner's Certificate of
Exemption number.
2. The Contractor shall provide the Owner a list of all intended suppiiers, vendors, and
material for consideration as Owner-Furnished Materials. The Contractor shall submit price quotes from
the vendors, as well as a description of the materials to be supplied, estimated quantities, and prices.
3. The Contractor shall be fully responsible for all matters relating to the receipt of materials
furnished by the Owner in accordance with these Special Provisions including, but not limited to, verifying
correct quantities, verifying documents of orders in a timely manner, coordinating purchases, providing
and obtaining all warranties and guarantees required by the Contract Documents, inspection and
acceptance of the goods at the time of delivery due to the negligence of the Contractor. However, the
owner assumes the risk of damage or loss during the time that the building materials are
physically stored at the job site prior to their installation or incorporation into the project. The
Contractor shall coordinate delivery schedules, sequence of delivery, loading orientation, and other
arrangements normally required by the Contractor for the particular material furnished. The Contractor
shall provide all services required for the unloading and handling of materials. The Contractor agrees to
indemnify and hold harmless the Owner from any and all claims of whatever nature resulting from non-
payment of goods to suppliers arising from the action of the Contractor.
4. As Owner-Furnished Materials are delivered to the job site, the Contractor shall visually
inspect all shipments from the suppliers, and approve the vendor's invoice for material delivered. The
Contractor shall assure that each delivery of Owner-Furnished Materials is accompanied by
documentation adequate to identify the Purchase Order against which the purchase is made. This
documentation may consist of a delivery ticket and an invoice from the supplier conforming to the
Purchase Order together with such additional information as the Owner may require. The Contractor will
then forward the invoice to the Owner for payment, pursuant to Attachment A of this Contract.
5. The Contractor shall insure that Owner-Furnished Materials conform to the Specifications
and determine prior to acceptance of goods at time of delivery if such materials are patently defective,
and whether such materials are identical to the materials ordered and match the description on the bill of
lading. If the Contractor discovers defective or non-conformities in Owner-Furnished Materials upon such
visual inspection, the Contractor shall not utilize such nonconforming or defective materials in the
Contractor's Work and instead shall properly notify the Owner of the defective or nonconforming condition
so that repair or replacement of those materials can occur without undue delay or interruption to the
Project. If the Contractor fails to perform such inspection and otherwise incorporates into the Contractor's
Work such defective or nonconforming Owner-Furnished Materials, the condition of which it either knew
or should have known by performance of an inspection, Contractor shall be responsible for all damages
to the Owner, resulting from Contractor's incorporation of such materials into the Project, including
liquidating or delay damages.
6. The Contractor shall maintain records of all Owner-Furnished Materials it incorporates
into Contractor's Work from the stock of Owner-Furnished Materials in its possession. The Contractor
shall account monthly to the Owner for any Owner-Furnished Materials delivered into the Contractor's
possession, indicating portions of al► such materials which have been incorporated in the Contractor's
Work.
7. The Contractor shall be responsible for obtaining and managing all warranties and
guarantees for all materials and products as required by the Contract Documents. All repair,
maintenance, or damage-repair cails shall be forwarded to the Contractor for resolution with the
appropriate supplier, vendor, or subcontractor.
8. Notwithstanding the transfer of Owner-Furnished Materials by the Owner to the
Contractor's possession, the Owner shall retain legal and equitable title to any and all Owner-Furnished
Materials.
9. The Owner shall indemnify and hold Contractor harmless from any sales tax (and interest
and penalties incurred in connection therewith) in the event there is a final determination that sales made
by Owner, which Owner treats as being exempt from sales tax, are subject to sales tax. "Final
determination" shall mean an assessment by the Department of Revenue that is no longer subject to
protest, or a determination of a court having jurisdiction over such matters that is final and not subject to
appeal. Contractor agrees to promptly notify owner of any audit, assessment, proposed assessment or
notice of deficiency issued with regard to the Project and relating to Owner-Furnished Materials.
10. As invoices are received, Contractor shall be required to review invoices submitted by all
suppliers of Owner-Furnished Materials delivered to the Project during that delivery for use by the
Contractor and either concur or object to the Owner's issuance of payment to the suppliers, based upon
Contractor's records of materials delivered to the site and any defects in such materials.
11. In order to arrange for the prompt payment to the supplier, the Contractor shall provide to
the Owner a listing indicating the acceptance of the goods or materials within thirty (30) days of receipt of
said goods or materials. The list shall include a copy of all applicable Purchase Orders which will include
owner's Certificate of Exemption number, invoices, delivery tickets, written acceptance of the delivered
item, and such other documentation as may be reasonably required by the Owner.The check will be
released, delivered and remitted directly to the supplier. The Contractor agrees to assist the Owner to
immediately obtain partial or final release or waivers as appropriate. At the end of the Project, Contractor
will be provided with a deductive Change Order for the cost incurred by the Owner to provide all Owner-
Furnished Materials. Salvage materials shall be stored or removed from the site by the Contractor at the
Owner's direction, or may be turned over to the Contractor for salvage or disposal at the Contractor's
option.
12. The Contractor shall be entitled to the benefits of any discounts attributable to the early
payment of vendor invoices for materials furnished by the Owner pursuant to the Specifications.
13. The Contract between Contractor and Owner is hereby amended to clarify that Owner-
Furnished Material shall be included in the Cost of the Work for the purpose of determining the Contract
Sum due Contractor.
ATTACHMENT "B"
FROM Biltmore Construction Co., Inc. (CONTRACTOR)
TO Bedford Technoloqv, LLC (SUBCONTRACTOR)'S�PP��Ur�
OWNER-FURNISHED MATERIALS �a � � � � �
PROJECT: Pier 60 Refurbishment (11-0046-MA)
1. The Contract Price includes Florida sales and other applicable taxes for material,
supplies, and equipment which will be a part of the Subcontractor's Work. The Owner, being exempt from
sales tax, reserves the right to make direct purchases of various construction materials included in the
Subcontractor's contract. Owner-Purchasing of construction material, if selected, wili be administered on
a deductive Change Order basis. Additionaily, Purchase Orders will include owner's Certification of
Exemption number.
2. The Subcontractor shall provide the owner a list of all intended suppliers, vendors, and
material for consideration as Owner-Furnished Materials. The Subcontractor shall submit price quotes
from the vendors, as well as a description of the materials to be supplied, estimated quantities, and
prices.
3. The Subcontractor shail be fully responsible for all matters relating to the receipt of
materials furnished by the Owner in accordance with these Special Provisions including, but not limited
to, verifying correct quantities, verifying documents of orders in a timely manner, coordinating purchases,
providing and obtaining ali warranties and guarantees required by the Contract Documents, inspection
and acceptance of the goods at the time of delivery due to the negligence of the Subcontractor. However,
the Owner assumes the risk of damage or loss during the time that the building materials are physically
stored at the job site prior to their installation or incorporation into the project. The Subcontractor shall
coordinate delivery schedules, sequence of delivery, loading orientation, and other arrangements
normally required by the Subcontractor for the particular material furnished. The Subcontractor shall
provide all services required for the unloading and handling of materials. The Subcontractor agrees to
indemnify and hold harmless the Owner from any and all claims of whatever nature resulting from non-
payment of goods to suppliers arising from the action of the Subcontractor.
4. As Owner-Furnished Materials are delivered to the job site, the Subcontractor shail
visually inspect all shipments from the suppliers, and approve the vendor's invoice for material delivered.
The Subcontractor shall assure that each delivery of Owner-Furnished Materials is accompanied by
documentation adequate to identify the Purchase Order against which the purchase is made. This
documentation may consist of a delivery ticket and an invoice from the supplier conforming to the
Purchase Order together with such additional information as the Owner may require. The Subcontractor
will then forward the invoice to the Owner for payment, pursuant to Attachment "A" of this Contract.
5. The Subcontractor shall insure that Owner-Furnished Materials conform to the
Specifications and determine prior to incorporation into the Subcontractor's Work if such materials are
patently defective, and whether such materials are identical to the materials ordered and match the
description on the bill of lading. If the Subcontractor discovers defective or non-conformities in Owner-
Furnished Materials upon such visual inspection, the Subcontractor shall not utilize such nonconforming
or defective materials in the Subcontractor's Work and instead shall properly notify the Owner of the
defective or nonconforming condition so that repair or replacement of those materials can occur without
undue delay or interruption to the Project. If the Contractor fails to perform such inspection and otherwise
incorporates into the Subcontractor's Work such defective or nonconforming Owner-Furnished Materials,
the condition of which it either knew or should have known by performance of an inspection,
Subcontractor shall be responsible for ali damages to the owner, resulting from Subcontractor's
incorporation of such materiais into the Project, including liquidating or delay damages.
6. The Subcontractor shall maintain records of all owner-Furnished Materials it incorporates
into Subcontractor's Work from the stock of Owner-furnished Materials in its possession. The
Subcontractor shall account monthiy to the Owner for any owner-Furnished Materials delivered into the
� Subcontractor's possession, indicating portions of all such materials which have been incorporated in the
Subcontractor's Work.
7. The Subcontractor shall be responsible for obtaining and managing all warranties and
guarantees for all materials and products as required by the Contract Documents. All repair,
maintenance, or damage-repair calls shail be forwarded to the Subcontractor for resolution with the
appropriate supplier, vendor, or sub-subcontractor.
8. Notwithstanding the transfer of Owner-Furnished Materials by the Owner to the
Subcontractor's possession, the Owner shall retain legal and equitable title to any and all Owner-
Furnished Materials.
9. The Owner shall indemnify and hold Subcontractor harmless from any sales tax (and
interest and penalties incurred in connection therewith) in the event there is a final determination that
sales made by Owner, which Owner treats as being exempt from sales tax, are subject to sales tax. "Final
determination" shall mean an assessment by the Department of Revenue that is no longer subject to
protest, or a determination of a court having jurisdiction over such matters that is final and not subject to
appeal. Subcontractor agrees to promptiy notify Owner of any audit, assessment, proposed assessment
or notice of deficiency issued with regard to the Project and relating to Owner-Furnished Materials.
10. As invoices are received, Subcontractor shall be required to review invoices submitted by
all suppliers of Owner-Furnished Materials delivered to the Project during that delivery for use by the
Subcontractor and either concur or object to the Owner's issuance of payment to the suppliers, based
upon Subcontractor's records of materials delivered to the site and any defects in such materials.
11. In order to arrange for the prompt payment to the supplier, the Subcontractor shall
provide to the Owner a listing indicating the acceptance of the goods or materials within fifteen (15) days
of receipt of said goods or materials. The list shall include a copy of ail applicable Purchase Orders which
will include owner's Certificate of Exemption number, invoices, delivery tickets, written acceptance of the
delivered item, and such other documentation as may be reasonably required by the Owner. The check
wili be released, delivered and remitted directly to the supplier. The Subcontractor agrees to assist the
Owner to immediately obtain partial or final release or waivers as appropriate. At the end of the Project,
Subcontractor wiil be provided with a deductive Change Order for the cost incurred by the Owner to
provide all Owner-Furnished Materials. Salvage materials shall be stored or removed from the site by the
Subcontractor at the Owner's direction, or may be turned over to the Subcontractor for salvage or
disposal at the Subcontractor's option.
ATTACHMENT "C"
From: Biltmore Construction Co.. Inc. (CONTRACTOR)
To: Bedford Technoloqv, LLC (SUBCONTRACTOR) �$��Q1��i ��
G�iS
Project: Pier 60 Refurbishment (11-0048-MA)
This project qualifies the Owner to utilize its sales tax exemption for the purchase of materials used in the
project. In order to do this, the City of Clearwater, Florida, (Owner) must pay for the materials directly.
This shall be accomplished in the following manner:
1. Subcontracts will be issued by Contractor to Subcontractors in the usuai manner,
including sales tax.
2. Subcontractors will prepare their material orders and forward same to Contractor so that
City of Clearwater (owner) purchase orders may be placed for these materials.
3. Contractor will return to the Subcontractor a copy of the City of Clearwater (owner)
purchase order on behalf of the City of Clearwater (Owner). It shall read:
To: Supplier
For: Material per attached Subcontractor order,
4. The material supplier will then bill the City of Clearwater (Owner) c/o "Subcontractor" c/o
Contractor. Subcontractor will approve invoice and send to Contractor who wiil submit
same to City of Clearwater (Owner) for payment.
5. City of Clearwater (Owner) will then pay the invoice directly and the Subcontractor will be
issued a deductive change order for the amount of the invoice plus sales tax.
It is imperative that the Subcontractor approve the invoices and forward them to Contractor by the
25th of each month for payment by the 25th . Those received after the 25th will be
processed in the next month's billing cycle.
ATTACHMENT "D"
PROCEDURE FOR GENERATING SUB-CONTRACTOR DIRECT PURCHASE ORDERS FOR SALES
TAX CREDITS
1.
2.
3.
4.
General Contractor will submit requisition for materials with vendor information required
(see vendor application form), item description, quantity if applicable, price, etc.Also
included will be the sales tax savings amount.
Architect will review the requisition, and forward to the project manager for approval and
preparation of electronic purchase requisition. Requisition must contain project number
as well as correct account number.
Project Manager will then request requisition approval from the Finance Director.
Purchasing will issue purchase order and will mail, fax, or otherwise distribute purchase
order as requested.
5. A purchase order summary report will be maintained indicating the following: purchase
order number, owner Certificate of Exemption number, vendor, total amount of P.O., total
tax savings, amount previously requested, amount of current request, and remaining
balance of P.O. This report will be updated and issued with each group of payment
requests (monthly).
6. Payment requests with invoices must have receiving paperwork with authorized
signatures and must be submitted for approval as indicated below:
7. Payment authorization sequence: invoices must be submitted for approval in the
following order:
a. General Contractor
b. Architect
c. Project Manager
d. Engineering/City Manager
e. Purchasing/for processing only
f. Finance/for processing only
PROCEDURES FOR SALES TAX SAVINGS, REQUESTS TO
REQUISITION and RECEIVING/INVOICING
CITY OF CLEARWATER
PIER 60 REFURB/SHMENT (11-0046-MA)
Contractor: BILTMORE CONSTRUCTION CO, INC.
Addendum to Aqreement for Construction:
See separate instructions for completing the Addendum to Agreement.
Process procedures for tax savinqs:
Completion of the Request to Requisition forms by Contractor.
3. Approved by CEI.Approver(s):
4. Original to Owner's Representative for processing of P.O. requisition.
5. Based on Request to Requisition forms a schedule will be prepared for the City's
Purchasing Manager to reduce the Contractor's P.O. by the amount of the P.O.s to the
Materials Suppliers. It is important to process as many material supplier Requests to
Requisition as possible at one time thereby reducing the amount of changes necessary to
Contractor's P.O.Construction contract will not change and the sum of the P.O.s to the
Materials Suppliers plus the Contractor's P.O wiil represent the total contract
commitment. Before sendinp to the Purchasinq Manaper, the schedule will be
forwarded to the Owner's Representative, CEI and Contractor's representative for
approval. We will need the e-mail address for the Contractor's & CEI's contact
person(s) for this process.
6. The estimated sales tax savings for each materials requisition will be deducted from the
primary lines of Contractor's P.O.A related Sales Tax Savings line for each charge code
will be added to the Contractor's P.O.No changes will be made to the sales tax savings
lines until all materials are purchased, received, accepted and paid for unless additional
materiais purchases are necessary.
7. Closing of the sales tax savings line on the Contractor's P.O. can only be done through a
change order (Recommendation is that it's done on the final C/O).
Process procedures for request to requisition forms:
1. General description is a brief recap (sewer lines and manholes; water lines; etc)
2. Contractor should include their fax number as well as a contact number.
3. In the description section of the Request to Requisition include any special delivery
instructions.
4. Indicate whether or not retainage is to be withheld. City's standard is 5%.
5. Include the address where the supplier is to mail invoices.
6. Where applicable, shipping and handling costs should be listed as a line item on the
request to requisition.
7. City staff will complete the charge code line.
Procedures where a detailed line item proposal has been received from the ODP supplier:
a. On the request to requisition summarize the materials to be ordered by type of
system (stormwater, streets, water, sewer, reclaimed, etc) giving the total dollar
amount per for each system. Leave 2 line spaces between each system to allow for
the addition of the City's charge code.
b. Attach the supplier's proposal to be mailed as an attachment to the purchase order.
Attachment should include estimated quantities and tvpes of materials. Cost
information is oqtional.
Procedures where a detailed line item proposal is not available:
c. Provide quantities and detailed descriptions of the items to be ordered, per unit and
total cost as the City's P.O. will be sent directly to the Materials Supplier.
d. Materials on each request to requisition should be grouped in relation to the major
billing line items on Contractor's P.O. Leave 2 spaces befinreen each group, as the
City will add the appropriate charge codes.
The requesting official will be the Contractor's official with authority to procure materials.
Contractor's authorized procurer(s): Jeff Parker
The official approving that the materials requested meet the design specifications will be
authorized personnel from the CEI only. Authorized approvers:
NOTE: Anv materials ordered bv the contractor that are not included on the Citv's issued
purchase order or anv amounts ordered that exceed the amounts on the Citv issued
purchase order MUST be separatelv ordered pursuant to a nurchase order directiv
between the supqlier and the contractor. These materials MUST be invoiced separatelv
from the materials supplied pursuant to the Citv issued purchase order. Another
option would be to submit an additional Request to Requisition to increase the amount
of the ODP purchase order for that supplier.
Process procedures for receivinq and invoicinq:
1. Upon receipt of materials, Contractor's representative wifl veri the materials are in usable
condition and the quantity received.
2. The Materials Suppliers will be instructed on the City's P.O. to send their original invoice to
the Contractor to the attention of Jeff Parker.
3. Contractor must sign off on the invoice to approve the payment and, if no receiving report is
attached, must indicate on the invoice that all materials were received in usable condition.
Any discrepancies with the invoice are to be resolved between the Contractor and the
Materials Supplier. If the invoice is in error, it can be corrected by the Contractor before
forwarding for payment under the following conditions:
a. A corrected supplier's invoice can be paid up to the amount of the originally issued
invoice but not in excess of that amount.
b. None of the original data on the invoice can be obliterated. If it is the City will return
the invoice for replacement by a corrected one from the supplier.
c. If the corrections cause the invoice amount to exceed the original billed amount, the
excess must be invoiced separately by the supplier and is to have the same support
documentation and/or approvals as all other invoices to be paid.
4. Supplier invoices for retainage amounts, if any has been withheld, are not required support
documentation but must follow the approval process as all other invoices.
5. After approval the Contractor will forward the original invoice and any attachments to City of
Clearwater's Owner Representative:
City of Clearwater
Engineering Department
Attn: Jennifer Shannon, PE
100 S. Myrtle Ave
Clearwater, FL 33756
6. After approval and verification of the materials received the Owner's Representative will
forward the original invoice and any attachments to the appropriate City department for
payment processing.
7. Steps 1 through 7 will be followed for each materials receipt and invoice.
8. Materials purchase P.O.s can be closed only upon completion of the materials acquisition
and at the approval of the Contractor.
9. Upon closing of a materials purchase P.O. any unused balance will be added back to the
appropriate line(s) on Contractor's P.O.
Closinq of Contractor's P.O.:
1. All Materials Suppiiers' P.O.'s must be closed prior to the final change order and closing of
the Contractor's P.O.
General Item Description:
:�
�r ,����
� :� E� � �'s ,
�� �a, � a�
� �;� �' � ,
,
. . �-._
REQUEST TO REQUISITION
STANDARD PURCHASE ORDER
All Recycled Plastic Lumber
Vendor: Bedford Technology, LLC Jesse Hooge jesse.hooge@bedfordtech.cc�m
Street Address: 2424 Armour Rd., PO Box 609
City/State/Zip: Worthington; MN 56187 Phone No:507-372-555�3
Receiving Location (Ship to): Biltmore Construction Co., Inc. (Pelican Equipment) .
Street Address: 5390 150t" North
City/State/Zip: Largo, Florida 33760
Requested by: Biltmore Construction Co, Inc. — Jeff Parker jparker@biltmoreconstruction.rom
Phone Number: (727)639-0710 _
Date Needed by: 5-6 weeks from issuance of PO _
Expense Code: 0315-93417-563800-575-000-0000 .
Line #
Units Detailed Description Price Per
QuBntlt $, 2tC. (List shipping & handling charges, if applicable) Each
Color = Mink
Select Force = non-reinforced
Fiber Force = reinforced with chopped
1 2064
2 720
3 86
4 161
5 161
6 240
7
Requesting
1
Title and Organizatfbn - Contractor
PCS 2x2 — 7' Select Force
PCS 2x6 — 10' Fiber Force
PCS 4x6 — 10' Fiber Force
PCS 2x10 — 11' Fiber Force
PCS 2x12 — 11' Fiber Force
PCS 2x10 — 10' Select Force
LS Freight
Total Purchase Order Amount
Sales tax savings
$ 8.40
$ 56.60
$ 90.70
$ 77.44
$ 95.37
$ 51.40
$ 5,350.00
Total
$ 17,��37.60
$ 40,752.00
$ 7,E�00.20
$ 12,4.67.84
$ 15,�t54.57
$ 12,��36.00
��50.00
$ 111,c�98.21
$6, � 88.33
01/18/2013
� �. SA"" . Date: L�,.—.� 3
Ap ving fficial
Qrokitlaw.Q le"�.t,�.�. � (.��y� ai @-la.t.�.�r.st�i
Title and Organization — C.E.I. Services
0
❑
Completed forms are routed for approval to contracted C.E.&I. Firm and to Engineering. Engineering will process and provide records retention
, according to City of Clearwater's Records Management Program.
Page 1 of 2
To: City of Clearwater Florida
c/o Jeff Parker, Biltmore Construction
727-585-2084
Total Amount: $111,398.21
Shipping Method: 1.5 TLs
Requested Delivery Date:
Payment Terms:
February 2013
Net 30 With Approval
From: Bedford Technology LLC
Jim VanPelt
863-229-8456
Jim@LBRtimber.com
Quote ID: 103112JP/JVP-B
Date: 01-16-13
Effective From: 01-16-13
Effective To: 01-25-13
Mark Product Unit of Measure Quantity Price Sub Totall
Each
All Rec cled Plastic Lumber
Color = Mink
Select Force = non-reinforced
Fiber Force = reinforced with chopped
fiber lass
2x2 — T Select Force PCS 2064 $ 8.40 $ 17,337, 60
2x6 —10' Fiber Force PCS 720 $ 56.60 $ 40,752.00
4x6 —10' Fiber Force PCS 86 $ 90.70 $ 7,800.20
2x10 —11' Fiber Force PCS 161 $ 77.44 $ 12,467,84
2x12 —11' Fiber Force PCS 161 $ 95.37 $ 15,354.57
2x10 — 10' Select Force PCS 240 $ 51.40 $ 12,336.00
Sa/es Tax Savings $6, 78ti'.33
Comments
• All sizes are nominal x wild-over-lengths, not clean trimmed.
• Final Take-Off accuracy is Buyer's responsibility.
• Any Sales Tax Burden is for the Buyer; no tax will be charged
• Freight is a Budgeted amount and can change.
• Credit and Terms of Sale are subject to Bedford approval.
• To be re-confirmed before order acceptance.
Sub Total $ 106,048.;!1
Budgeted Freight $ 5,350.f10
Total w/ Budget $ 111, 398.521
FRT
�
TERMS AND CONDITIONS OF SALE
THE SALE OF PRODUCTS AND SERVICES ("PRODUCTS") BY BEDFORD TECHNOLOGY AND ITS DIVISIONS AND
SUBSIDIARIES ("BEDFORD TECHNOLOGY L.L.C.") ARE SUBJECT TO THESE TERMS AND CONDITIONS
("AGREEMENT") REGARDLESS OF OTHER OR ADDITIONAL TERMS OR CONDITIONS THAT CONFLICT OR
CONTRADICT THIS AGREEMENT IN ANY PURCHASE ORDER, DOCUMENT, OR OTHER COMMUNICATION ("ORDER"),
PREPRINTED TERMS AND CONDITIONS ON ANY CUSTOMER ("CUSTOMER") DOCUMENT (FOR EXAMPLE:
PURCHASE ORDERS OR CONFIRMATIONS) AND/OR BEDFORD TECHNOLOGY FAILURE TO OBJECT TO
CONFLICTING OR ADDITIONAL TERMS WILL NOT CHANGE OR ADD TO THE TERMS OF THIS AGREEMENT.
ORDERS
All Orders are subject to acceptance by Bedford Technology. Bedford Technofogy reserves the right to allocate the sale of
Products among its customers. Orders for special, custom, value-added and Products specifically identified by Bedford
Technology. as non-standard are non-cancelable and non-returnable ("NCNR"). The Customer may not cancei or reschedule
Orders for standard Products without Bedford Technology consent, which shall not be unreasonably withheld.
PRICES
Bedford Technology's quoted prices apply for one business day or as otherwise stated in its quote. All prices are quoted FOB
manufacturer. Bedford Technology may raise prices if Bedford Technology's costs rise or other circumstances beyond
Bedford Technology's reasonable control. Prices quoted are for Products & Services only and do not include taxes,
impositions and any other charges, fees, shipping charges and duties imposed by any government authority. Customer is
responsible for any additional fees and taxes. Bedford Technology requires fifed documentation of exempt tax status if exempt
status is claimed by customer.
TERMS OF PAYMENT
Upon approval of credit, payment of the totai invoice amount, without offset or deduction, is due based on terms and
conditions as stated on invoice. On any past due invoice, Bedford Technology, may charge interest from the payment due
date to the date of payment (at 1 1/2 % per month), pius reasonable attorney fees and collection costs. Bedford Technology
may change the terms of Customer's credit at any time. Bedford Technology may apply payments to any of Customer's
accounts.
DELIVERY AND TITLE
Title and risk of loss passes to Customer upon product being picked up from manufacturing location. Bedford Technology
delivery dates are estimates only and Bedford Technology is not liable for delays in delivery. A delayed delivery of any part of
an Order does not entitle Customer to cancel other deliveries.
ACCEPTANCE OF PRODUCTS AND PRODUCT RETURNS
Customer must notify Bedford Technology, in writing of any damage, shortage, or other discrepancy to Products within five
business (5) days after delivery. After the fifth (5th) day, Customer is deemed to have accepted the Products and may not
revoke acceptance. Customer canr�ot return Products without a return material authorization ("RMA") number. Returned
Products must be in original manufacturer's shipping cartons or equivalent. Customer must return all Products, freight prepaid,
as specified in the RMA and pays any applicable restocking charges. Customer is liable for product damage during return
transit. At Bedford Technology's discretion, Bedford Technology will return all Products not eligible for return to Customer
freight collect, or hold Products for Customer's account at Customer's expense.