EMIL AND MARIANNE WEBER
.
..
'.:1
! '.
J
Clearwater Thst South Interceptor
CLEI - 33J
48674B OcR, 1633 PAGE483
\
~ /
I
, .\
i /
\ J
EASEMENT
FOR AND IN CONSIDERA TION of the sum of One Dollar ($1. 00) cash in hand
paid to tl'H'~m , the receipt of which is hereby acknowledged, and the benefits
to be derived therefrom, Emil Weber and Marianne Weber, husband and wife,
~
CoO
-
j=
~klI
,~
Cll(,;)
(.) '..
tojZ
001(0
....1.....
-...10::
1olJ1U
~.~
Q,.-
of:!
~a.=
Q:>.:
l:Cq:
0""
u>
~oOl
do hereby grant and convey to the CITY OF CLEAR WATER, FLORIDA, an
easement over, under and across the following described land, lying and being
situate in the County of Pinellas, State of Florida, to-wit:
A permanent easement 51 in width being the north 51 of the NE 1/4
of the SE 1/4 of Section 19, Township 29 S, Range 16 E except the
easterlyu 100' thereof; and, except the westerly 223. 11' thereof.
In further consideration for the granting of this easement, the City
agrees that (l) plug stubs will be provided at planned manholes and
will be available for future use; (2) that sewer tap charges will be
waived, and that no front foot assessment be levied against the owner
of this property of record, insofar as the main transmission line
is concerned; and (3) that the use of the main transmission line will
become available to the grantor at such time as this property may
come in the municipal limits of the City of Clearwater.
2::
....
-
.,.,
C"J
"'"
II::
2!
Restoration of property shall be made as set forth in the Addendum to
Easement attached hereto and made a part hereof by reference.
This easement being for sanitary sewer installation and maintenance.
The CITY OF CLEARWATER, FLORIDA, shall have the right to enter upon
the above described premises and to construct, install and maintain thereon any
sanitary sewer line and to inspect and alter such sanitary sewer line from time
to time.
IN WITNESS WHEREOF, the J>~ ies he~o ha ve ,set
hand s and seal s this /15 - day of t:/~r'..L-7
Signed, sealed and delivered
in the presence of:
their
" 196 3
(SEAL)
STATE OF FLORIDA
)
COUNTY OF PINELLAS)
Before me personally appearcE!d . EmiiWe'berand .Mari'anne Weber, husband
and wife,
to mewe}t'kriown
and known to me to be the individual s described in and who execute}:(the '
foregoing instrument and acknowledged before me that they ~Jie,cuted
the same for the purposes therein expressed.
/ cA-- '7 ':--
/ d-- day--6W"~v-'~-;7
~N~~
Notary Pub!ic, State of Florida at Larg~ N otary Pu~-
.. . My Commlss.on Expires March 30 1965'
My Commls Slon ExpIres Sanded by American Surety Co. of N. y~
WITNESS my hand and official seal this
A. D. 196 3
--',..
lito_53 - O() 0
. ~~
I
Clearwlter East South Interceptor
CLEI -133
- OcR, 1633 PAGE484
ADDENDUM TO EASEMENT
..
The following requirements will govern clearing, excavation and restoration of
property and public rights of way for construction of the interceptor sewer and are
an explicit part of the construction contract:
Final Cleaning Up
Before the work is considered complete, all rubbish and unused material due to
or connected with the construction must be removed and the premises left in a con-
dition satisfactory to the Owner. All property, both public and private, disturbed
or damaged duting the prosecution of the work shall be restored to its former
condition. Final payment will be withheld until such work is accomplished.
. Safety, Pr otecHon and Sanitation
a,. Safety
The Contractor shall furnish and install all necessary temporary works for
the protection of the work and the safety of the public and shall carryon his work in
the manner best calculated to avoid injury to the public or to the workmen.
b. Pl"otection of Adjacent Property and Utilities
The Contractor shall conduct his work in such manner as to avoid damage to
adjacent private or public property and shall immediately repair or pay for any
damage incurred through his operations.
Construction Procedure
Portions of the work are along the water front of Tampa Bay. It shall be the
Contractor's responsibility to preserve, protect and/ or replace existing water
front structures, bulkheads, piers, and docks without additional compensation.
Earthwork for Pipe Line Construction
1. Clearing
(a) Clearing operations in areas of wild growth (brush, mangrove, et c.)
shall be confined to the actual easement or right of way provided. Clearing
parallel to the provided easement for construction purposes will be allowed if the
permission of the property owner is obtained by the Contractor for such clearing.
The cleared area shall be of adequate width for purposes of sewer construc-
tion, access of equipment, layout and stockpiling of excavated material.
Brush and trees cleared from the work site shall be removed from the site
and satisfactorily disposed of by the Contractor. Disposal by burning may be allowed
if, in the opinion of the Engineer, adequate precaution has been taken to prevent
spreading of the fire and nuisance to adjacent properties. The Contractor shall,
however ,be fully responsible for a.ll ,c:'onseql:lences of srichburnirig.
(b) Clearing operations in cultivated areas (groves, shrubbery and plant-
ings) will be limited to the easement or right of way required and within such
right of way to trees and shrubs which must be removed for construction purposes.
In public rights of way and in easements on private property all lawns,
plantings and shrubs will be restored either by removal and replacement of
existing plantings or by replanting with plants equal to that existing prior to
construction. The Contractor is expected to cooporato 'Nith invnlved property
owners in protecting existing plantings.
Sprinkler systems, cables and/ or other privately owned buried improve-
ments shall be protected, preserved and/ or replaced without additional com-
pensation.
.I'.
, "r...
I
clearwate~IEast South Interc. eptor
48675B CLEI - 33 noR 1633 PAGE 485
I
-.....
I' '
\ ~/'
EASEMENT
FOR AND IN CONSIDERA TION of the sum of One Dollar ($1. 00) cash in hand
paid to them ,the receipt of which is hereby acknowledged, and the benefits
to be derived therefrom, Emil Weber and Marianne Weber, husband and wife,
do hereby grant and convey to the CITY OF CLEARWATER, FLORIDA,
an easement over, under and across the following described land, lying and
being situate in the County of Pinellas, State of Florida, to wit:
~
c.a
..
:z:
G-
Oo
U'l
M
.eM:
....Ice
.";~
C:>C,;)
(..),'....
~.~.
.~
-'a:.
...Iw
3~
lIl.,-
Cilce
W!II:
C>a
~15
u>
~<
A temporary easement 10. in width being the South 10. of the
North IS! of the Northeast 1/4 of the Southeast 1/4 of Section
19, Township 29 South, Range 16 East except the Easterly
100' thereof; and, except the Westerly 223. 11' thereof.
f'.I
IlII::
C
2:
This easement is granted for the purpose of allowing access to a permanent
easement in which a sanitary sewer is being installed by the City of Clearwater,
Florida. It is mutually agreed and understood that the City of Clearwater and/or
its agents will have the right of access for delivery of personnel, equipment
and materials over existing traveled roadways to the site of work; the right
to clear and dispose of underbrush, vines, brambles and trees less than six
. h . d' mejisured f b d) "d . h
lnc es In lameter I\at pOInt two eet a ove groun In sal easement; rIg t
to remove muck, peat or other soft or unsound material from trench, and
to replace same with sound material; and right to enter for surveys and to
make borings and soil investigations. This easement is temporary and
expires automatically after one year from date hereof or upon the completion
of the project, whichever is sooner, unless extended by written agreement
of the parties hereto. Restoration of property shall be made.as set forth in the
Addendum to Easement attached hereto and made a part hereof by reference.
IN WITNESS WHEREOF, the ..p./.1 ies heretva ve set their
hand s and seal s this /tf _ day of ~4AA-' ..,-,.,..._ ,196 3
p-- ---
Signed, sealed and delivered
in the presence of:
&~ ~(SEAL)
~fuil eher ?'f
/" -M'~~EAL)
arianne Weber
$#&+
tA:;i~~
STATE 0; FLORIDA ')
)
COUNTY OF PINELLAS )
Before me personally appeared Emil Weber and Marianne Weber, husband
and wife, to me well
known and known to me to be the individual s described in and who executed the
foregoing instrument and acknowledged before me that they executed the
same for the purposes therein expressed.
WITNESS my hand and official seal this
A. D. 196 3
/J11fday o~"-r- ~'
N{~~
:- .';"':XotaryP~~r~ ....
,'" .,' J- "~. . ".. -, ~
.~'" ,
My Commission Expires:
Notary Pub:ic, State of Florida at large
My Commiss;on Expires March 30 1965
60nded by American Surety Co. nf N V ~
. 'T ~ .
j
. ~
. ..
I
Clearwater last South Interceptor
CLEI - 33. 1 t:'33 A86
D,R _U~ PAGE Lf
..
ADDENDUM TO EASEMENT
The following requirements will govern clearing, excavation and restoration of
property and public rights of way for construction of the interceptor sewer and are
an explicit part of the construction contract:
Final Cleaning Up
Before the work is considered complete, all rubbish and unused material due to
or connected with the construction must be removed and the premises left in a con-
dition satisfactory to the Owner. All property, both public and private, disturbed
or damaged during the prosecution of the work shall be restored to its former
condition. Final payment will be withheld until such work is accomplished.
Safety,Pibfectioiiarid Sanitation
a. Safety
The Contractor shall furnish and install all necessary temporary works for
the protection of the work and the safety of the public and shall carryon his work in
the manner best calculated to avoid injury to the public or to the workmen.
b. Protection of, Adjacent Property and Utilities
The Contractor shall conduct his work in such manner as to avoid damage to
adjacent private or public property and shall immediately repair or pay for any
damage incurred through his operations.
Construction Procedure
Portions of the work are along the water front of Tampa Bay. It shall be the
Contractor's responsibility to preserve, protect and/ or replace existing water
front structures, bulkheads, piers, and docks without additional compensation.
Earthwork for Pipe Line Construction
1. Clearing
(a) Clearing operations in areas of wild growth (brush, mangrove, et c.)
shall be confined to the actual easement or right of way provided. Clearing
parallel to the provided easement for construction purposes will be allowed if the
permission of the property owner is obtained by the Contractor for such clearing.
The cleared area shall be of adequate width for purposes of sewer construc-
tion, access of equipment, layout and stockpiling of excavated material.
Brush and trees cleared from the work site shall be removed from the site
and satisfactorily disposed of by the Contractor. Disposal by burning may be allowed
if, in the opinion of the Engineer, adequate precaution has been taken to prevent
spreading of the fire and nuisance to adjacent properties. The Contractor shall,
nh.Q:w~v3~~'~be fully- t'P. sponsible fOJ:-a.ll.censeque-nce&uf S l.Lch burning.
(b) Clearing operations in cultivated areas (groves, shrubbery and plant-
ings) will be limited to the easement or right of way required and within such
right of way to trees and shrubs which must be removed for construction purposes.
In public rights of way and in easements on private property all lawns,
plantings and shrubs will be restored either by removal and replacement of
existing plantings or by replanting with plants equal to that existing prior to
construction. The Contractor is expected to coopora.to v.ri.th involved property
owners in protecting existing plantings.
Sprinkler systems, cables and/ or other privately owned buried improve-
ments shall be protected, preserved and/ or replaced without additional com-
pensation.