Loading...
DRUID TRAIL WALKWAY - PHASE 3 - 04-0021-PR LL 0 atet ENGINEERING DEPARTMENT ►-- _ : _ CONSTRUCTION DIVISION U OFFICE COMMUNICATION TO: SUBJECT: One Year Warranty Check CEUINSPECTOR: Brad Hamilton PROJECT COMPLETION DATE: 03/0512014 PROJECT NAME: Druid Trail Walkwa Phase III (04-0021-PR CONTRACTOR: R.A.M. Excavating, Inc. Attn: Richard Slack 3349 Hannah Wa East Dunedin, FL 34698 727-463-6428 INSPECTOR: f5lr&o jA4r,%jjvJ DATE: 3 io/15 COMMENTS: Cv WA 2 8 +Jt it tt E �•.� - �itA tQ ,?� t,r 3. ♦ or � true„ �t +r- +s ,,M, rRPM", tis ,4uvXv Q4v, c M 1511 u vet. 0. k gh �` CASl- SIGNATURE: '0 Clearwater U CERTIFICATE OF SUBSTANTIAL COMPLETION Project: Druid Trail Walkwa Phase III 04-0021-PR Location: North side of Turner Street from the Pinellas Trail to Dr. Martin Luther King Jr.Avenue East side of MLK from'Turner to Druid, and north side of Druid from MLK to Betty Lane.And the Lake Ave intersection. Contract Date: January 28,2013 Notice to Proceed Date: February 18,2413 Substantial Completion Date: March 05,2014 Contractor's Warranty Exp.Date: March 05. 2015 Consultant: Wade Trim The work performed under this Contract has been inspected by authorized representatives of the Owner, Contractor,and Consultant,and the Project(or specified part of the Project,as indicated above) is hereby declared to be substantially completed on the above date. DEFINITION OF SUBSTANTIAL COMPLETION Substantial completion is the stage in construction when a project or designated portion thereof is sufficiently complete in accordance with contract documents so that the Owner can use the work or portion thereoffor its intended use. Items that affect operational integrity and function of the work must he capable of continuous use. The Contractor accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the punch list within the time indicated, Richard Slack, President,.. By: 17-/Y R.A.M. Excavating,Inc. Authorized Representative Date The Owner accepts the specified area of the Project as Substantially Complete and will assume full possession of the specified area of the Project on March 05, 2014. The responsibility for utilities, security,and insurance under the Contract Documents shall be as set forth in the Contract Documents. Tara K.ivett. Engineering Construction Manager By:A � �r 3/11/N City of Clearwater Authorized Representative Date � � � i i 1 1 � 1 � �� �� �� �� � � � � :� DRUID TRAIL WALK:WAY (PHASE 3) PROJECT NO. 04-0021-PR CONTRACT DOCUMENTS & � � � �-- � SPECIFICATIONS Prepared for ISSUED FOR BID OCTO B E R, 2012 ..---°"�".",� � ��t� tC?; T :.�� ��� ���t�"1FI��T� t�� �.��B�L�1�1f 1��� �C� ���������x ����►�,� ��� �����,��� d�:���,�� � � �,��� �� ������,��� g��.� �� ������� � �►��� �,��,�� ���-������: ��.��_�. �� c���sFi��t� ��� �r �����s��r�r��.�r o� w����v��:� �r���t�, �x�€�a� ca� e�a�� �� e�av��� ,��c��c��� � �� F�ca�.�ci�s ����': 'T?�S ��i�ii�f�lti� i:4� iNSlJ : L� �C3�S Nt9�" �i74`dSi'IY'U"i`I� �1 C€)t�T�'i' ��TWE�N '�11� i�5�34� i�S�fCE%'�S� �ii1�ItJ�tliL.i} �'�6��tESF�U7�t�'�VE Ct� �'�td�[DtiCE�€> ��1i3'Tl�t`E ��R71F1�tiT� i�L�3ER. 1�4�L)RT�T; iP th� cert�f"sc�ta� hatc3er i� an ,�d7��€3f�l, ii�5t9i��t�« tfie po3ac�(d�s� �rau� �+�r«tltsr��i. �t �U.�i��'�1t��,i r5 �+tt�iV'�t�, �+i�'sjact t� th� X�rrp�� �rrd c�a-�lations o# t� gs+�iicy, ��rtA�rs �at�+� rrr�s r+�quir� �ri �nd�s�s�ment. ;4 ��t�m�nt ts� #hi� ��rrtitic�te dc� nt�t �t�ni�t fii+�i�rts tu tt►e �+�ri�f �irs 1s�4t3�� i€� li�r c�t ��ch �rsd€�r�e�rrs�ss3{�� a�eg �3cs�Sr�r�r��a.4�c. 3#��1 xt�at� R�a�l � �t:v� �ar't ��c�i�y. �t. 3�4fi�� ,�r�iq�r� G. i�a� �22�i� �r�=�,�c Ra�P� Excauat��s�. In�. R sch�rd ��� ti�rrem�4t iir�u� �'��€r�1 �i�Yb��, �� 3=#�a� c�s������ c��r��r� �s��€� rAi =� �.c��;�� ,�.�- -.��._ �� ��:s��; �� i� 4�3�€d::af�t'� ?3�.?"a'�dfTkt,:',4Pvf�8�.'�%3�'�' R��,::R ��.�T?F&��a�E ���'C ��. '�S�m� ;,� �9a�s' �£RT.: �D��'C�3�@�j�d� ��" �C�P�i�-�i��a;� ''�f �=.lW�f ��Ltt ��� Y.»� � ,.... �.��" #tx R��.4Z.�' k'.µ� .... � L"�.�: .: �...,.,.. -._ .o � £w�» . . tl �.nC".E �'R�i t {.'s�3��.€T-:'' .. . �t� � � , ,;� �s = .. ., . K � ���: x . a = i � f E ..f� .. _. .. .. � �Ur�r�,g�:�alcc�: �L��.tr-� �.. . . � ; r �� � r�c . . ,.L , _ � . .i �€ r�+ f[ ( +i ji�i" :?,. �� ja� .. . �:. , � —�W--W, � � ����:���.n €.�x:� i F �xc��� w��� 4 e _. _ . � F . 3�. . 4)•; ��.i f 3 3• �._��_ �>���.�'4`������.�8��'i�.}.w,X,� .. .b'di� i �::t'�-> 'a ; , k&��K��� n��µ -PF_ae �9ta�:.isr.� � 8�f i ..... : :�� € ,..4 .. . . � .. �s�s��s � ��i�i�a�� t�AN#�%�A - ��� �� s y�c���ats� �€�ra�d� �nv�r�:a�e � rt��c a sras�� n.�ast�€rn C7s�n�� �n��r�nce ��. 94 t� 194 r : � ! � ,� �� ������r :-����� ���� G_.,s�:;� �r� �� �r����+��e ����c� �uc.`�.r� ��� =.aa�. ��fr�tc:�;. C�"�?hi ,°?ty (at:�j�%tl�z %�� �t�:f t:s�'JT �,v,'i�i" l�£? �?1}1�F'i [SC�C:4.)�1!%F»''i ii`VI1`i�i RC:��t�:€:7 f� �1►� i�;S':.��s�k�� ���!��c��"�' �Y' iHE Pe�LIC:ES E���Gtei��C�' HcE�vlt� :S SU�JEi"� i`J sciL `a8�lE: IS,. w i-i°:?S?d�� �r'�'� HA;�E EE�?� ��L�,i�Ev 8Y �,�.ip+rL�iM,�< ��i��� � p� � � . ; r� F`� � "4z'�MCf�Sd�f ��'{�B�12 � 1��i9� i ���+ � �� �:�.�� n. : � 3��9 : � � _ __ } f ��;s � -� =�r ��� , ., �. � . : ���£a � s � F�_ �,fl�it�si � 3 . 2,��b„i _� ,..€? t�� �9;i}�1 � � : ;,:. . _. �1�r�,�� ` ��F��iri ; ±j^ ,ny }"f n ...f f, . � : F .�,A • k'3 nt� , .:�:Sw - ,,,, __ __ � _ _._ .. . . .. _ .�,_._.. } � x. .} _°t-. . �� k . . � <,#i, p �; F �, .�,", . .��x; _.�� � � . r , ,. i ...;�?�ash «Z:�.N� .�F, Adaietia�l �stmt�i,zt ��ksn�it .! annrx �Pxea �s r�ulsa�f.4 ��.c��i�� �����r�c��� c�i��.�. �c�°r°r �� ���a���x�� �s �ra ���i�r€��a��. ������r� �rt� rw� �����:�� itail wa�teway �Pna�e 3} 1�re���ct � oa- i i ! :. 73 i� i r-� 3 t. ��.i *' 1 ! € � k `_:s=, # 2 � ,` , d SI� .������. .. . 3���� �� _ ._ �li���� �o�� a�� a� �r�� ;�er�� ��c�a�� ��cr�s �� cn�a���.�.��� �e��� �� �x�i����ra ��� ���. �vz�nc� ti�n�� �s� a�.€�r���ci �� �i'�"'� � F �L E�.F� �+'t�T�� nc��a� a�r�c� �nrrr� �t� �t�..oc�r ����►� E�N�1�t��i�I�GI C��PA�T���ST F�}{t�1�3-5���7�� ;;r�e���:���;�€���s�r.�r��r��� _ , � �f� StJi9�i� C�il"�tL.� A�1�' ���sR��A"i�F�. �t. ��7�fi ��. � ' �::�39�8-2 a�Cia�[3 ��iRPC?i2�1'�M. iidl ri�#�t� r�s��t�'�r�; ���E�� �� ��i3+���� �"�a� A��6�£� nam� �;�c� t��� �r� r�ist�r�ci marks �� ���kt3 �,,,.�.•.� �►�n�ac-� o� ��: � .,�►�.-��z;�► ��RTIFICATE C3F L.I�;:�iL.IT�Y ��SURAI�I�E �"�"���' �,�.�.-.- ��r����t�� 'iiilS GElil'fFICATE t8 [�ti�D A5 A MAi"fEl2 UF I#iFCfR1�iA1'ION i7�iLY A#�IC? Ct)I+ifEi2S Nt3 F�iGMT� UPfHit 7H� CE�FICATE H�Ot.�iER. TM[S G�RTiFICA7E �0�5 NOT AFFIRMAi1V�LY f.3R NEGAT1VEtY AMENG, EXTEAID QR AI..:TER THE C{}YERAGE {+iFFORt7Et} 8Y THE i�'t?I.lCIES 13�Lt,7VM. Tli1S CERTlFiGA'iE C� IAiStiRANCE Dt1ES NpT GONS3iTtITE A�tiIYTRAG"t` BETYYEEN THE ISStJ1�iC� INSURER(S}. e°+t►T6iU�� ����s��r�amr� c� �ts�uc��, �a� �� c���n��ca� r�o��. I lN1PC1i�'TAIdT: M fha t:arti�lcsts httFd�r i� �n Ai3D1T1Oti1#L 11!tSllii�C}� tF►e ►�sii�y{ies) mu�t be endo�ed. If �UB12CX3ATFi)N 15 4'�AIY�D, i�rrbje�t tcy N�e terrns and eondltiosts uf th� �aoti+��r� �e�tain peslictes �Y �iuir+a �n sc�t�me�t. A sta�ement ar► #his csrtificat,e doc�s not c�rrfer ri�trts k+� tfie certificate hWd�r i» #ieu of such a: �vuc�t 727'-T2�-337"7' �p��. . Fesale� A -�Gluarwr�r p�� �� _ 31�5 N Mc � � _ _ Buo#tt i��+r€, �-2 ?2T=72�-�JS �t�,, � � __._. _ _ i��a!��_ _ __ _. At4iY F � lVlAY . . . . E:rrri+'�ncacs:utcyH.r�crsrra.�4.+rcnn.., � E �tt '�.��+�.�Yif5�1� � 3 �.�"..E:�� Z;EF;'L Fi�1aft�s„A,7E UMii RFPs1�S ?ER ; ��...:....., �C;G � POk.Nv'Y ; `P�SQ� AU'Si)A1tKiMLE t:k18#4JTY � . : �rar aua� �' v�l L £1b1fi3�i}. �� wuN�ilU�.E[} ; .5U'?ib6 � ASS��'CYS ° fds�N,d�WN�D� t#iRE4Ai1tGS � � ALtT63S `; tlMBRECi.A i.t�kii = �. �Ufi �t Project; A�d �rail ��.lkwra� i�14X �Z?-5��-9'#55 c��y Or �i��18F ��������� �� �ao ����, �y�t��a�re., Clea►�r�rater, FL, 337�s AGG?Fti� 2S {2Ui t1105} C7F ANY CCINTRACT 4R C}i'HER [�+ �I7 8'! iN� POUGIES D£�G�iBEC1 9EEN REl7UCE� B"a' PAip GLAtktS. r wrrr� �esP�c� �ro v���ic�t tS SUB,IE�T 7i'� ALL il^IE TE --- ---_....,,.,,..�..�.__.___ iu�� ____._. .�Rr��r�e � � �........ i f�'�T7FEk'� ` 3 FE� s.s.�i±r��.� : ...— �... t111' �fi6 �fS�'+� y �i� .. .eaitUteu��t�2Y i.�S .._. -• !'t�vuue. c� - t,�.�w�r:c.�r „cw � a ____ �..... . , s. , ... 5,.... , . _. � _. .m }h���tEC, LE LlAttT • . • �Es�z?d�ent� . _. �. , b... �. _ee ..._,. Eir3Ciii� 4M�;�itE2'Y �P�parsein} S �._ . �y_. �.. -��-- �_ e�c�i:Y b�t;3u�v £� n i $"��f�cR°f1'��.eih%A r��v 5�... . .... . .. . �i� _�3 _— - ----- �Z t . E.d4i.�H C?C�.IfzREB�� : �$ . AC3t'"aFiE�FiT¢ �. ~$... � . E /i3�j n�ro°�r�� � o�ro���s ; � � � �c�o �o,, ��na«a�� a�,,.rks scn�u�.. �r„�,r 3) �zc���c� �C�a-no�1-i�t � � CA1+I�ELi.�AT#GiN �wiYG� ��u�.a n►�v t� �� asov� �a�sc�t��o r�c��s � c�r��u.��:� ���a� aat++� ��ar�o aa� ��t�o�, r�t'��� a�u �� DELIVEfiEt1 fW d4C�RDAi�iGE Wii�i 7HE PbUCY i�RC1YIS1tN�$. m��������� . �� � � �319�8-2U1U AGt�FtD �t��tFt?F�AR'i£?N. AI! ri�h#s a�s+�cve�i. i'ha AG{}RD rr�sme �r� ta�v ar� regiskered marks of ��C}RD � � ' , ' ' ' ' DATE ADDENDUM NO. 1 For DRUID ROAD WALKWAY (PHASE 3) Clearwater, Florida Project Number 04-0021-PR November 21, 2012 SUBJECT: Addendum No. 1 TO: Prospective Bidders and Others Concerned Bidders on the above project are hereby notified that the following Addenda are made to the Contract Documents: 1. The selected plan sheets provided in this addendum are to replace the original ' plan sheets of the same number. The attached plan sheets dated 11/14/2012 have been revised as noted below: ,I� , LJ ' � � ' ' ' � � � . . . . . . . GN-1, Added note 16 and deleted pay item notes 5 and 6. (Water utility will relocate meters, valves, and hydrants.) L-1, Revised legend C3-1, Added milling and resurfacing to Prospect Ave. Edited/added labels. C3-2, Added milling and resurfacing to MLK and Turner St intersection. Edited/added labels. C3-3, Edited/added label. C3-4, Added milling and resurfacing to MLK and Madison. Edited/added labels. C3-5, Added milling and resurfacing to Lincoln Ave. Edited/added labels. C3-6, Edited/added labels. C3-7, Added curb and gutter. Edited/added labels. C3-8, Added curb and gutter. Edited/added label. CD3-2, Revised details, notes and labels. CD3-3, Revised details, notes and labels. CD3-4, Revised details, notes and labels. 2. The attached revised bid sheet dated 11/14/2012 is to be used for this project. END OF ADDENDUM #1 THE CITY OF CLEARWATER PINELLAS COUNTY, FLORIDA Bv: /s/William B. Horne. II City Manager � � � � � � � � � � � � � � � � � � � � S �.J � �u�l v v � £_�:� H U Public Works Administration ORUlO ROAD /�V,4L K/�V,4 Y(PHASE 3l Sect 8, Twn 29 South, Rng l5 Eost Sect 9, Twn 29 South, Rng /5 Eost Sect /6, Twn 29 South, Rng /5 Eost Sect l5, Twn 29 South, Rng l5 Eost Sect l4, Twn 29 South, Rng /5 Eost Sect l3, Twn 29 South, Rng /5 Eost ''/�����` A` OF ryF n% � ��� v` ��%'�; �, ����i T � � �; =q,p�,q ��,p �,� .. lE R ,__,.� � yVADE�IM n. � �a. arm. �..r�w e Twq R A1!!1 HSlRNEp FA%HSlN.lYYD ......a.�m.� CITY OFFICIALS c�eorge x. cxefekos Domen Hock-DiPolito Jay Polgleze Bill Jonson Paul F. (i�ibson Bi71 Home Michael D. Quillen, PE City Eogineer �a�a aee�a: �,..o �.iaw.en. re /bl! NpYbron I/x ]ICl6 c.wur awnm+m w.: ss �c �++o+o. m . au�sum s.a.rw Mayor Seat 1 Councilmember Seat 2 Couocilmembec Seat 3 Counc�7member Seat 4 Cowcilmember Seet S Ciry MenaBer Appmved By mrmim�rmnaawwai,narm Uste Approved R£V/SAONS OSNEfTSGN-I,L-/�C3-1.C3-2�C3-3C3-4 /I//4/l2 C3-5. C3-6. C3'7. C3-8. C[�3-2, CO3-3.0O3-� � � � � � � � � � � � � � � � � � � � GENERAL NOTES l. GOVERNING STANOAROS SGECIFMaTqNS: A. Cl1Y OF CLEARNATER STANDAROS. 1ECNN/CAL SPEpFKA�fONS ANO CONTRKT LL1CUYfNTS. B. FLORIOA D£PARTNENT OF TRANSPoFTA7qN. SIANDARO SPfCIfICATIONS FOR FOAO ANO BRIOGE CONSTRLCTlOI/ , ZOq OR UTEST fD/TqN. C. FLORIOA OEPARTMENi OF TRANSPoRATION. ROAOWAY AND TRAFFIC OES/GA' STANOAROS J?NUARY ZOq OR LAT£5T EDITION. 2. NO WORN SHALL Bf PERFORMED W/IH/N p FE£T OF CSX R/R TRACKS CENTERUNE J. CALL WTS FOR SiA�lONS AND OFFSETS ARE FRON TNE C� OF ORUID ROAD FOR CUFB AND GU77fR, ipAOWAY PAVENENT. CONCRET£ SIOEWALK. ORNN[�'E STqUCTURES ANO OFNEWAYS. CURV£ DAiA FOR TNE WAlK WAY IS REffRENCEO FROM 4 OF THE JRAIL. I. tNE COMtFACTOR SMACI MAINTA/N COP/ES OF ALL APPUCABlE PERYITS ON-SIiE AND SNALL AOMERE TO ALL PERNIr CONQ'TpNS WR/NG CONSTRUCTMN. 5. rHE CONTRACTOR SHALI BE RESPoNSIBlE FOR PENALTIES/F/Nf5 LEV/ED LliE IO WORK THAT IS NOT IN ACCORDANLE WirH PERMIT LONpTlONS. 6. TNE CONrRMTOR SNALL USE APPROPR/ATE YEASURES TO PREVENT fR05/ON AND 7RANSPORT OF SEOINENr NA?ERIAL 70 /NLfTS, SURfACf ORA/N5. LAKfS AND WETLANO MEAS. THE CONTRMTOR SMALL USE SYNTNf7/C BALfS. SILT BARR/ERS OR OTHER APP/MPRiA7E MEASUHES r0 PRfVENT AD✓ERSE IMPACTS TO EX/5T/NG $URFACf WATER q/AL/iY. lF A SPECIFIC PAY ITEN I$ N0T PHOVIOEO FOR EROSIOM CONTl�L NEASURES. JHEN �HE PAYYfNT SHALC BE INCLUDEO UNOER PAY I7EM YNNTENANCE OF iRAFFIC lGI4P SUMI 7. TNE CONTkACTOR SNALL CH£[K ALL E/iOSION ANO 5/C7ATIOl/ CONTROL DEViCES FOLLOWING ANY 0.5 /NCH OR GF£ATER RAINFALL EVENi AND RfPAIR OR REPLALE TNEY AS REWIREO. B. 7HE CONTRACTOR SNALL CONTRO� ACL fUGITIVE pIST GENEFATED B/ CONSTRUCTION ALTIVITlfS ON THE PROJECT qI WA1ERiNC OR OTHER YETN005 AS FEW/RED. 9. PRIOR 70 TNE PRE-CONSTRUCTION YEETING. TNE CONtRMTOR SHALC NOtIfY THE VM/p/5 UTILI7Y CUYPANIES IN ORDER TO ESTABUSN FINAL LQCAilONS FOR TNE RELOCATION OF iHE ElflSrlNG UND£RGRIX/ND AND ABOVE GflCY/H0 UTIUTIES IN ADVANCE OF CONSTRUCTIOM. CONTACT SUNSHINE STATE ONE U�IUT/ES NOT/FKA�ION CENTfR A7 I-800-432-4770. q. TNE CON7RACTOR SNALL INSiALL EROS/ON ANO SILiATION CONTROL DfVICES IN ORDER i0 PREVENi OEBRIS FfqY ENTfR/NG THE EXISTINC SANITARY ANO STOR4 5£WER SYSTE45. ll. TMf CONTRAC70R IS TO ENSIIRE TNA7 THE ORNNAGE S"STEN FUNCTIONS THRpM•HOf/7 CONSTRUCTIOM AND $HALL CLEAN THE P�PoSED SiORN SYS�ENS PRqF TO FINAL INSPECTION. CONPENSAiION FOR THIS WORK IJEY SNALL BE CONSIOEFED /NCLUDEO WITN TNE CONSTRUCilOA' OF iHf PROPoSEO STORM SEWER. l2. TRAfFIC CONTROL OEVKfS SNACL BE /NSTALLEO ANO 4AIMTaN£O Ai APPHOPRIArf LOCA7ION5 O£7ERMINfO B/ TME flELO ENGiNE£R AND lN MCORDAXCE WITN TNE STANOPROS SfT FOR7H B/ THE NANUAL ON UNIFORY TRAFFiC CONTROL OEVIC£5 AS FD7PTE0 BY iHE FLORIOA DEPT. OF TRANS. UNOER RYIlE M-15.Oq, fLORIDA FDMINISrRATNE COOE. ANO THE F�T'S ROdaWAY ANO rRAFFIC PESIGN STANOAROS INOEX 600 OES�GN SERIES. /3. TESr/NG OF SlA&UZA!/ON. BASE. AMD PAVENENT. AS WELL AS CONPACr/ON OF BACKFILL. SNALL BE REWIRED MCOROING 70 TNE MINiNUM FRfWfNGY JESTING REW/REMENiS OF CITY Of CLEAHMAiER ANO THE CONTRACT SPECIfICATlO!/5. l4. ALL UNDEhY.R01/NO U7ICI7Y SYSTEMS AS NOTED ON 7NE PLANS MUST BE /NSTALLED BEFORE iNE iRA/L ANO ROAOWAY BASE AND SURFACE ARE CONSJRUCTEO. 15. ALL TEYPoRARI' MAIERIACS USEO FOR SEQ'YENi ANO fR05/ON CONTlNL WR/NG CONSTRUCT 5 LL BE RE EO PoN COMPIET OF ME ROJ CT. K. ANY SPRINKLER SYST£NS P/PIMG ENCp/NTERED BI TNE CON7RACTOR W/TN/N iME PfpJECT UMiTS SNALL BE CUT ANO CAPPED AT THE Rf6HT-Of-WA1' LINE. TMIS WORK l5 TO BE PAIO UMOER B/D 17EY 'CL£ARIAG AND 6M/BB/NG.' 0 PAY ITEM NOTES l. TMERMOPLASrM INLAY TO BE PAID UNOER PAT7ERNE0/TEX7URE0 PAVENENT ASPHALT. 2. EXCAVAiION AND EMBANKNENT TO PNO AS LUNP SUN. 3. RENOVAL WM'iit�ES FOR E.Y�STING CONCRETE PAVEMENT ITENS ARE FOR E57/NAT/ON PURR75E5 ONLY. EXISTING CONCRETE RENO✓AL l5 PNO UNO£R B/D /TEY 'CLEM/NG AND GRUBB/NC Cf/YP SUN. 4. BID ITE4'CONCR£T£ SIpE%'ALk f4'f SNALL INCW�E PAYNEN7 FOR TNE COST AHD INSTALLArION Of FRCNITECTURAI CdKR£T£. SEE OETNL ON SNEEi CO3-1. 5. OElEiEO m . OELETEO DEMOLITION NOTES l. OENOL/TION L/YITS ARE SNpYN IN iNE PLAN SET FOR p/ANTIIY PVRPOSfS AND TO ESTABUSN APPROX/YATf UN/TS FOR /YPRO✓EYENTS AND 70 /QENT/fY SPfGFIC ITEYS fOR REMOVAL SULN AS iREES. CVRB. PAVfMENT, f7C. TM£ OEYOUTION (/N/T$ AR£ NOT EXACT ANO NAY VARY. I7EN5 N07 SHOWN TO Bf RE40VE0 ARE TO REMAIN M'D SNALL BE PROTECrEO OI/R/NG THE CONSTRVC7ION OURATqN. 2. ALL fX/S7/NG PAVENENT, 5/OLIYALCS AMO WRBINC l0£NTIF/EO fOR REYOVAL ON JNE PLANS. SHALL BE OEYOUSHED ANO R£YO✓EO FfpY SITE /N ACCOROANCE WITM THE Cl1Y OF CL£AfM'ATER SPECIFICATIONS. J. SPfC/AL A77ENT/ON /S dRECTfO l0 THE fACT TMAT PoRTIONS OF $ONE ORAINAGf 57Rf/CTURES EXTfND INTO TNE STABIL/IED PoRTION OF TNf PoOAD BED AND ExiREME CNJTION WILL BE NECESSAAY /N STABlU2ATlON OPERATqNS AT 7HESf LOCA71ON5. 1. THE IOCATION OF EXISTING UTILITIES ARE APPfpXINATE AS SHOWN ANO IT IS TNE CONiRACTOR'S R£SPoNS/BlU1Y TO OETERN/NE TN£ EXAC7 LOCATIOMS Of 1NE UTIU7IE5 PRIOR 70 CONSTRUCTION. iHE CVNTRACTOR SMALL NOTIFY ALL UTIU7Y CO✓PANiES M THE AREA BEFORE BEGINN/NC CONSTRUCTIOM. lN ACCOROANCE WITN TNE C/7Y OF CfEAH1YATfR SPECIFMATqNS. 5. CONTRACTOR SNALL CY.1�R0/NAJE ABANOOkMENT AND/OR RELOCATqH OF EXISrING ABOVE AND UNO£AGfl0UN0 UTIU7Y UNES ANO PoLES W/TN THE APPROPRIATE UTlU7Y AGENLY. 6. ALL UNSUIJABlE NA7ERIAL ENLVUNTEREO d/RING CONSTRLY'TION, AS D£TERNMED BY TNE F�ElD £NG/NEER. 5/IALL BE RE40VE0 AND REPLACED w/TN CLfAN FiL(. 7. ALC iFAFFM CON7qOL WARNING 8 REGUUTOqI SIGNS lO£NTIF/EO ON THE P/AN5 TO BE RELOCAlEO OR REMOVED SMACL NOT BE TAKEM WT OF OPERATqN UNTIL PERMANENT lRAFF/C S/GNS ME /N57ALLED. /f REp//RED. WE i0 CONSiRUCTpN ACT/✓?IES. TNE EXISTING TRAFF2 CON7FOl 5/GNS YAYBf RELOCAifO iEMPoRMILI ONLY BY Cl7Y FORCES AS p/TUNED IN SPECIFKATlONS. B. PoSSIBL£ TREE TR/NY/NG AND REYOVAL MAY BE REWIRf� TO PRO'✓lOE dDEd/AiE 516NT AND CLEAR ZONE DISTANCE. OR AS ORD£R£D B/ iHE fNGINEER. ALL EXPENSES INCURREO FOR THlS WORN WILL Bf INCLUOED /N TN£ PR/C£ B/O Fqt C(EM/NG ANO GRUBB/MG. CONSTRUCTION NOTES l. CONCRE7E SIDfWALK RANP CONSTRUCJION SHALL BE lN ACCOROANCE f00T INDEX 304. 2. CONCRETf SID£WA(K CONSTMMTION SNALL BE IN ACCOROANC£ WITH FPOT INDfX Jp. 3. AlL S�OEWdIX AND SIDEWALK RAMPS CONSTRUCTION SHALL NEET ADA lANERICAM OISABIUTIES ACTI R£OUIREM£NTS. 9. THE CONrRACTOR SMALL PROVIO£ ORAINAGE STRIK'TURE SNOP ORAW/NGS TO iHE fNGIN£fR FOR APPqOVAL PRfOR ro cnxsraucrrox. 5. THE CONTRACTOR SNALL SUBN/T A TRAFFIC CONTRJL PLAN TO TNE Cl7Y FOR APPfAVAL PRIOR TO CONSTRUCTION COYNENCEYfNT. TNE CONiRACTOR SHALL Bf RfWIREO TO PROVIDE TRAFF2 CONTROL lN ACCOROAMCE W/TN F�T ROAOWAY AND TRAFFIC pESK',N STAND?ROS. 20q OR LATEST EP'TION. ANO F00T S7ANDARO SPECIFICATIONS FOR ROADS ANO BRIOCES. 20q OR lATESi EP'TqN. iRAFFIC QINTROL PROCEWRE$ $NALL AL`A BE IN COMPfIANLE W�TiI TNE MANUAL ON UNIFORM TRAFFM CONTqOI pEVK'ES lMVTCO) ZJ09 OR LATESi EOITION. TNE TFAFFIC GpNT/qL PLAM SMALL INCLUOE PGM'S FOR PEDESTRIAN TRAFFIC CONTROL. 6. TNE CI7Y REpIIRES 7HAT TNE SUPERVISOR OR FOREMAN CONTROLUNG THE WORK FOR 7HE TNE CONTRACTOR ON THE PNO./ECT NAVE A CURR£NT WORK ZONE TRAfFIC CONTipL SAFElY CER7IFICATpN OR WORKS/TE TRAFFIC SUPERVISOR CfRTIfICAiION FRON THE FIARIDA OEPARTMENT OF TRANSPoRTAiION. THE CERT/F/ED SUPERVISOk SMALL BE ON THE PROdECT SiTE Ai A[L TlN£5 WNiL£ WORK 15 BEING CONOVCTED. 7. NONCOMPLIANCE WIJH APPfpVEO NOi OR CREAT/NG AN UNSAFf EN✓IRONMENT WILL R£SUIT IN A WOR/( STOPPAGf UNlIL COMQ'tlONS ARE CORREC�ED FND APPRO✓ED 6Y Ci1Y FIElO ENCiNEER. B. PAYYENT FOR 7NE WORK OR REMO✓AC OF EX/STING ORAINAGE STRf/CTURES ANO PIPES SHALL BE INC(.UDED /N TME PAl' /7EM5 FOR NEW ORA/NAGE STRUCTURES. 9. TNE CI1Y OF CLEARWATER WILL OBJNN PERY/SSION FRO.V PROPER7Y 0.YNERS FOR ANY GRAD/NG PERNI75. ORNEWAY PERMITS OR RIGMi-0E-WAY NECESSARY TO CONSTRUCi TRAI�, ipApWAY, SID£WALR. ORNEWAYS. AMO LANOSCAP/NG. q. ASPHALT ANO COMCRfTf PAVEM£N1, lAC'U/pNG 5/D£WALKS SHALL BE SAW-LUT BEFOFE RE40VAL O/t ANY OTHER CONSTRUCiION. CITY OF CLEARMATER. FI.ORIDA ENGINEERINC DEPARTMENT 100 S. Myrtle Ave. Clearwater, FI 33758 TREE BARR/CADE NOTES l. ALL rREES WITHIM q FE£T OF iRNL ME i0 BE PflOTECTEO IN ACCOROANCE WiTM CITY OF CLEA/iWATER SPEGFICATION 62.1. 2. 7REE BARRICAOES TO B£ PA/O UNOfR BlD /TfN 'CLfARIMG AND GRUB&NC ROOT PRUNING NOTES l. ALL lRfE RDOTS ENCIX/NTERED ARE TO BE PRUNED iN MCORDANCE WITH Cl1Y OF C[EMWAT£R SPECIFICATqN 62.2. 2. RQ7T BARR/ER l5 TO BE USEO AT (a,'ATlOI/5 AS DIRECTED BI CI1Y ENGIIIEER. FWT BMRIER SNq/!D EXJENO p FEET BEFpRE ANO AFTER C£NIERUNE OF iREE. 5££ DETaL ON SNEET CO3-1. 3. RGVT PRVNINfi TO BE PNO 1/NOfR &0 I7E4 'CC£AR/N6 AND GRUBBINC DRUID ROAD WALKWAY GENERAL NOTES (PHASE 3) � NONE � � � � � � � � � � � � � � � � � � � � EXISTING SYMBOLS FOR EXISTING & PROPOSED UTILITIES FOR PLAN VIEW SYMBOLS LEGEND: ERISIING PROPOSED � = BOlL�FO O • CABLE LFLEVISIONBOX -----�---�BT �-��---�-� BURIEDIELEVHONE M/� OO = COMWNiC�ilOX51MNNOLE ----�---- BrV-�--���--- BURIED CABLE TV N�� �O� = C�BIE 1ELEVISION GEDfSi�L ---�--�--EFO---�-�---- BURIEOiIBEROPiIC H�� (EO} =ELECTPICALIMNXOLE LF� • ELECiIiIC�L VRUII ���•���-- OHF-�-•��---- OvEIiHEAOfIBER OPTIC M/� ��B f 1 BE A OPL I C BOX ----��--- 07----��---- OvERXEND iELE�XONE N/� = GUV RNCNOP C� = CRAIE IrvLEI --""""- O7V""""'--- OvEHHEADCRBLE iV Nl� .h =fINE HYONRNi ..-.....2•GM...'-"""" G�5 N/� Y =LIGMTVOLE ""•...-.GT''"""" ViILIIY N/A �=�MILBOX � M = IMNMOLE '"""""'".8'SAN.""""_"_ � SRNIiApVSENEA N/p =PEDESI�� 0 0�' = FOINI Of ELEV1ilON =='l2'STORM==_ S10NMSEwFR 'ep = PEflECiOR POLF '"""""6'WATER-•."""' WAtER N/� —�:SIGN " '-""..ZO' RLW ........ aECLAlEEO �IEN N/� D4� = RECL�I'.EDwATEPV�LVE ❑t = iELFPHONE BOz IAEE BPRFICRDE < / / / 5�0 = SANIi�RV SExFR CLEANOUi ROOt GRUHING IIMIiS — — — — — — — l'J = SANItARV SExER MONUO�E IN�ftICCON0Ul1 —�—�— � =SGIGOL � = iELfPNOHE WNNOLE SIIT fENCE ' E�� 58 - �ELEVHONE vRULt = vERI tON HANO NOLF PROPOSED YMBO • ND ��""=�A���ICSIGNPLBO%C = 1q�LiIC51GNAL POIE � FIRE HYOpANi m = IN�FfIC POLE AUJUST wATER VALVE IBT U11111Y POLE RBY�O7HERSUY ANCMOR �� 07NER51 � = UiIlI1v POIE wliH IIGMi � P-5 DRAINAGE INLET ,�ppyy A�JUSi YqNHOLE ITO BE �� RELOC�TE UTIIIiY POLE = CONCREiE UilLlir Po�E Wi1H LIGHL � DONE Br LpNTRACTOR) fB OTMER 1 m �=wp1ER,.ErEp f � DRRIN�GE INLET MY-M AOJUST �AS VALVE fBT OTXERS) /IEN RELOCATE NATfR AETER IBY �- WiiHE55Pa5t OTHER51 DQ = WAIEH VALVE RENOVE INLET (TO BE DONE RELOC�TE wATER AEtERS IBY �oo �-� BT CONTRACTORI ��� OTHER51 =FIBEROPIICWIINESSYOSi � P-6 DR4INAGE INLET �= G�5 W11NF55 POSi RELOCATE IMILBOX lT0 BE DONE ���� REMDVE UTILIi� POLE rE� � BY CONTp1CTOR1 (BT OTMERSI • rELEVHOHE wIiNE55 GoSr Q MdNHOIE RELOCATE TELEPHONE MARNER REPLACE COVER ITO BE �=AAIlRO�OIR�CXS e P-9 DRdINAGE INLET � rf�� �Bx OTNER51 ���� DONE BY CONTRACTORI e = SOII BORING/UiILItV iESi HOLE � XELOCOTE �ERIZON MAND XOIE ap•� FDOT CURB RETURN NU1.6ER Q = ExISTING uTllllv SiPUCIUaE HUL6ER tBr OTHERS) D MO /T/ON LF. ND SIDEWALK REMOVRL � DRIVEWAT REMOVAL OR RE4qVE TREE PROPOSED PAVEMENT L_FGEND PROPOSED ASPNALT ROADWAY PAVEI.ENT � PPOPOSED MILLING nND RESURFACINL � S CITY OF CLEARNATER. FIARIDA ENGINEER]NC DEPARTMENT 100 S. Myrtle Ave. Clearwater. Fl 33758 TREE LE�END: _ �USiF�IIAN PINE LREF A�= Av�U00 iqEf = BAY IREE BB _ BOI I L E BNUSN 1 NF E = C�MGHOa tREE �E • CEDAP LREE �= CNFPPY LPUREL TREE �� CNIN�BENHV iaEE = CIIRUS iPEE �Y = CrPNE55 iqEE = E�R TREE = EVERGFEEN iFFE ��= 1�CAX�NDA IqEE J�!= 1MCNOL I � L RF E '9r= WPLf iREE �NA= MvPitE iqEE � = OAK IREE = GRIM iqfE PINE iFEE SC = SvhE tCUM ��= PUNpUE iPEE UrvNNOVM ipEE p�- t1i0PICAL iHEE Ap01ilONAI �qEE LEGENO O5 = iPFf CLPSSIiICAt10N GRApE OI = POON CIi�OE O= E%CELLENt GPnDE ABBREVIATIONS LE6FN0: ASPH = ASPHALI SiA = SLRiION B/C = B�CX Oi CUIiB SLY = StORv BLDG = BUiL01NG 5/w = SIDEwI�Lx BM = BENCHWPN i8M = 1EA1°OFRRV BENCNANFn BOi = BOTION iEl = IELEPwONE � e BRSELINE lOB e LOP OF BANh C/5 = CONCFEiE S1�8 105 = t0E OF S�OVE CDW = CONCREiE ORIVEWAY }ppHS= IPANSiOfVMEF Clf = CHAIX LIXX fEM10E 1MV = iMVEPSF POINI CMI = CABIE WNMOLE ivv = 1vVICRI CAP = COfVHUGATEO �EiAL PIPE �/G = ULIIItY Pp�F CONC = CONCREiE UNn = UNnnOVM IpEE COP x �pqryER yCP = VITRIfIED CLAY PIVE CP9 = CONDOUINIUMVLAI B00K yER. NM = YER120N XpNO MOIE IDI -OffICI�LAECOP05900R8310.ORGE21]1 µ�� :wppDiENCE DIA =DIRAEtEF OIF =pUCi1lE1RONGIPE DM1 = DRAIWIGE AMNHOLE EIP = EOGE Oi GFVEI.ENt Et = ELEV�110p EIEt =ELECTfiICnl Ifl ={IELD�Ai� f1R =fOUX01FONROD lN60 = iOUMD N�I� �ND UISM1 GOB =flBEliOPiICBOx fOP =fOUNDOPENExDIliONPIPE iVC =FLORIDPPOV.FFCORPOHRiION fPK6D� f0UM0 V�PItEP XRLOn N�II ANO DISIt fPP =iOUNDVIM�HEDIRONVIPE i%C : FOUNp %�CUi IE = INVEPI ELEVP110N LLF = LONESIfINISME�fL00R ELEYAiION LB = LiCENSED BUSiNE55 LS = LICENSED SUPVEYOF Li = LF[i 1M5 = AMSONPY MES =MIIEREDEN�SECIiON Hao =nni�eMOOisK O/R = OVEP�II ONL =OVEfVHEAOLIrvES IVI - p�A1 O�IA PB = PLRL BOOX PE� = PEOFSL�L PG = V�GEI51 PI = POINi Of INIEFSEC110N VN6U = pqAxEN ItALON rvR� L 6 O�SM POL =VOINLONLINE PVC = POLYVInVL CXLONIOE R/W = PIGMi OL WAY FCV = FEINfORGEO CONCRETE OIOE Rl5 = PECIStENED lANO SURVEYOP Hl5 =FEGIStEFEDLPNDSUfivfvOR FR = pAIlNOAD pwH =RfCLAIMEDY/NTEABOk Sft = SFCiION SIP =SEIIRONP001/2'.LBS]16 SM1 = S�NIiPRY 1MNMOLE SPx60= SE� oAflxEP MRLON N�I� ANO 015/.. LB 5]]6 DRUID ROAD WALKWAY ��� LEGEND (PHASE 3) HWE � � � � � � � � � � � � � � � � � � � . ...__.� __> >. �. W CONST. 2/5 SY pf PAVEMENT . .... W. CONST. 52 LF OF TYPE l Q, , Of ASPNALT �� � •� �. FONC. CURB AND Gl1TTER ��+ ¢ TRAIL CONNECr �o ex�snNC TURNER ST. ,,,, ; Q, W Q STAIRIYELL INSIOE OF RfAIOVE /JO SY OF R£wOVE 16B Lf . . . 2� h 6UlLO/NG WITH CONC. AY CONC.::S/DEWALK. ` W . �� OF CONC. CURB � . ��. AND WTTER CON5T.78 LF OF �99 ~ 2� � REYOV£ 97 !F � EXT£NO CURB LIN£ 2�2 ZO.°J � ZO4 NEAO£R CURB 2OS � N I^'� W OUT TO ACCONODATE REYOVE /32 OF CONC. CURB 8' TRAIL SECT/ON. REIlOV£ 5N Sf OF ��• �� ,° � � CONGTSIOEWALC£ �VNST. U2 LF OF hl W - , '�-- EL/NINAT£ £X/ST. ��,�. ��,�,AY �,Q ,, y.- : � : v . NEAD£R CURB V1 I V1 CONST. 19B LF PARALLEL PARKING �p,yST. 526 SF OF • .. ��NST. WALRWAY � ':TO BE REYW£D RE40VE 237 SF OF : �Q Q OF H£AOER �'£ �� ' �p,y�RETE ORNEWAY �- � CONST. //9 5Y OF � -_ CONC• ORl✓fWAY AND . I � CURB � ��E . , ' R� . ' . ASPHALT TRA/L COMST. 656 Sf OF �� • _ _ � . - 2�l ' 9 LF OF �au-al � ; `L�2 . .� �. r RiWZO4 . � . N AY , 2�... 8 -- � . u. � � " , � cavc. cuee; � - � `4= �� � ; w t _ _. _. � : � ' . , g_ � , , _ : - 8 + '. � .' . ..�;,=,s �. _ _. .. <. g . , ,. � _ � . �,. _ , _.., . . � - . : ' .: CONS'�. 40 SF f7F - � . > _,. ..,.... �_:. - ,. � _. �AiG%�T fU, Q ,., ' ..:. COHST.IISf Of . LYX/ST. l6B LF OF ... CONC 5/tlfWALK " � n, �.. , . :.: � Q ,. AHCMIYECiURAtCONC. .... '. 5 5 <,.,, ' R£YOVE BQ SY Of � ~ 5 /0 JI E ' - . 5 89° 09 0/` E j .:_.:. , .., „ ,,,, , , HEAQ€R- CURB . _.. . , .. - ,.... . 5-6 , S UT l7YPJ CONC. S/OEWA[K .; ;. ¢ � ".•5 99'03'-03'-E V1 �•� � . SAWCUT flYPJ . :. , ., , . CONST.I% LF Of �. h R£MOVE IS SY Of ASPNACT CpNST. Z)I LF OF � ' : � CONST. TURNER ST. �� " CVNji 07 SF OF � STRA/GMY CURB �� .� N ly� PAVEMENT REGRADf TO . , �,: � CONST /09 SF 0.F - CONC. 5/DEWALK RAYP 2 �ORAIN NORTN iO�50l1TN � CONC.S/OEWAlK RA4PSTRA/GHTZCURQ .. . . ;... ".. /J . . I� ' . al5 .. � . ANO �5�. 15 SY°'OF - z"- W � ASPHALT PAVEI(fNT � .. ' . . `: 2 .: ._ . . ,; . . . ,..'. � J U ... . R£YOVE t3 SY OF �- � S 89' J'I'� 25" E : .. ; .. ... . .. I- � - ASPHALT PAV£NENT - @ SUR. TURNER SF. RfYOVE /33 SY V Q I -� CONST.73 SY OF � REMOVE ABANOONED ... .� OF PAVEYENT � � � a ASPHACT PAV£MENT '. RAILROAO TRACKS Q I,'�. � d ASPHALi BAS£ ' � . � " � �� REMOV£ 2/LF OF CURB � �� � I' ' BEGIN PROJECT (PHASE 31 cvHSr. zitF ov srrr��r � ��� , �Fl .I CURB CYINST 2/9 SF pF -, ', _ � � CONST. TURN£R� ST. Pl STA. 203+25.57= _ $ � ... �,.r, 5-5 S-6 CONC. 5/DEWALK RAYP , !. ..� a : � • '�� Sl1RVEY SlA.l1+2�.%lZ7.95 LTJ 5 Q � J J � �k CONST. TURNER 57. PI STA. 200+ppAp= STA 20/+jypp Ul,Sp LT) STA ZOJ+65.B0 112.� LTl •� i � . m 2 Q � SURVEY STA. /0+99.10 l30.61 LT) CONST. TYPE P-9 /N[ET CONST. TYP£ P-5 /NCET . . /NO£X 2H /NDEX 2l/ � 4� U� F�2f�43?5-EX15T/NGI, l2' RCP F2 ��!S-EX/STINGI. /8' RCP � 3 � � RfNOVf /35 SP OF � M/LL AND R£SURFACE 6i SY CONC. ORNEWAY ANO e CONST. 22 SY OF �MST. 933 Sf Of TURNER S J�. CONST. p45 Sf Of � CONST. 427 (F CONST. ZOI SF OF SAWC(/T AND REYOV£ `" ASPHALT p4NEWAY �.�NEWAY CVIIC.S/O£WACK RAMP . 228 LF OF CpNC. OF NEADER CURB CONC.ORNEWAY �: REMOVE CURB AND GUrT£R CONST. 74 LF Q7NST. 2y SY Of "� 2�rJ `��6 Of H£ADER WRB 20� REMOVE /93 SF Of ��. .L08 . "£XiSTiNG ASPHALT TRAIL �D CONST. 228 LF RfAfOVE 88 SF OF CVNC. ORIVEWAY �F C(/RB INLET 209 REMOV£ 12 SY OF 2/� C(/RB AND q/�fR 2/l - �p�y�, ppry�yqy CONST. 2!) SY REYOVE 73 CF ASPMALT ORNEWAY. RE,YWf 93 SF OF ASPNALT TRA/L REMOV£ 205 SF OF �' - � R£AIOVE 3/f Lf OF ���• REAIOVE /AD Sf Of CONC. ORN£WAY .. ,.. OF CVNC. CURB CONST. 25� SF Of CpNC. ' CONC. WRB 6 CUTTER �N�Ar : &' IXITTER ORNEWAY ANO Q�NST. ��� REwOVE /50 SF OF CONC. ORNfWAY ANO 8' A$PIIAIT TRAIL W/ � �. 9 SY OF ASPHACT ORIVfWAY CONC.ORN£WAY ANO � CONST. ffi2 SF OF CpNC. H£A�R CURB CO�V,$Y 19B $F � � CONSi. IJ4 !F RM' ,�. CONC. ORNEWAY `. � ...: � Of COAIC ` R£1/OVE /42 SY OF CONST. 2Q4 Sf OF $ Q OF HEADER CURB � , �OE , . �� SI�W �OF ZO � �ST.WALKWAY 'Z . Q7MC:ORN£WAY Z � ;rotwatx 209 coxc. s��ewqtK 2/0 8 i . � RAMP , � R/N ' , � �_ � � � � � - _ t ._ _ �._ . . .. �_ ,u.. _ a. � .M.._. � + -. , g .... � . . ,�. ,b,_�_.� _ -� � � - �-- � o _ ._ �� - ; N . . _ . .z _ .. ... , ., ' ;� ; � CU �' " � : " ' r �, � �� ' cV a � �.y i i t-iw tw �.� � SAWC(lT lTYPJ OF�VE� �- - 5-7 %" . �. �.g � t�r� �t a+✓ r iw �-r � i_ Q $ Vl .. .. .. .,�u�-rr . .. . 5�89'� �j•. �j• E '�� . CONST. 2B8 tF � CpNST. TURNER 5T. ... : � ', :� REYOVE 55 LF OF CONC. CURB b 6UTTER ' S 89' O6' 02' E �� lq � BY CON7RACTOR CONST.29� Lf OF OF' N£AOER CURB CONST. lISF Of �.. , .g,, ANO CON$,T,,,55 Lf,..p��.CONC. C!/RB..4Y�P fiUTT£R.: • „ 2 . . ��, . /7 STRA/GMT�CURB . l8 . -.ARCXITECTURAL.. . 5 .. � ,' ': 2f7 ... � .. � y •;� ' : .. � .. . 2 m � � CONC. - . �� .. : � J h...:�.a. , : . - � � . . , , ..: ._- - ,. _9. _ e .... � , _. .:.� .: �... .... ���. ... �� � . �� ... , .... J ry = : , s nzoe = . , ,. , o ~ � . ..W " RfNlN£ i35 SY Oi ASPNACt PAV£MfNi•':.- .'.' ... ..�. ti ANO LbNST. l35 SY OF PAVEMENT SECT/ON � � Q � � �� ORA�IN�AGE PIPE � 3� ¢ �SEE SHfET TR3-/FOR PAV£MfNT�,p£S/CNl B wR. TURN£R SL � � `�- .. . 5_� 5_8 � W � �. . NNST. OF l8' RCP . �. � STA 2QB+07.80 f2.15 LT) STA 2A9+55.90 !9$0 Lil . � ��� Pl @ SfIRVEY-SPK&D � STA 9+.Ip.Sg Q AlOOIFY YANHOLE CONST. TYPE P-5 /NCET EL-32.13 NOTUT /L 11'Y WORK TO BE �ON£, AS .� R/N 3/.5l MQEX 2ll � N l3/8791A57� fC 13.35 !NW-EX/STING7.60' RCP EOP 31.75 � . .�i� �., 3 0.51 �DENT/F�EDONLEGENDSN££TL-I FLZ5.5/f5E-EXISTlNG1.l5'RCP fL26.50(W).�8'RCP UNO£R PROPoSED SYMBOLS L£CENO. FL 22.39 15-EXISTlNC7 36' RCP .� V1 CONST. TURNER ST. PI STA. 208+l7.66= 0 � � AC50 REFER TO PAY i7£.M NOTES ON FG 25.55 ISW-fX/STINGI./5' fiCP ' SURyEI' SiA. KJ+pA2 l23.(H LT) � � � SH££T CN-l. FL 26A0 fEl�lB• mcP �� � Fee� n _ r+[coAO a+.v,NCS •� CI7'Y OF CI.SAR1fATER l7.ORIDA o���eot �oa-ui i vzv ro ��oxr �p xoten = ro�osPecrave �CALL811 DRUID ROAD WALKWAY -�•° °�- °�-^,ie �•^ i7 i EN(11NEERIN6 DEPARTNENT ��E SieiE � �;,o'd: CONSTRUCTION PLAN SHEET °'cfia,eox.oz� "'°°e„ °' eo '° c3-r 'a — 100 S. YyrUe �ve. ...��._ STA. 200+00 TO STA. 211+00 o �� � �" (PHASE 3) e �`"' �' Cleerwnler, FI 33768 �' •"0 ""°'° ^' � � � � � � � � � � � � � � � � � � � � S REMOVE i62 SF OF �*c.�rc u�i �r REMWE /56 SF OF CONST. Z(f/ SF OF CONC. CO�VST, �$� pF � �- CONC.ORNEWAY ANO ASPNACT ORIVEWAY. R£WO✓E 23 SY .. CONST. /69 Sf OF CONC. �N�' ORNEWAY AND 5/OEWALK RAYP,...., CONC Sl AtK RAAIP T CONST. 205 SF OF CONST. 16g SF OF ��' REMOVE 2/6 SF Of R£MOVE l70 SF OF ', COMS �16 LF' CONC.ORNEWAI' ORNEWAY AND CONST. CONC. ORNEWAY S/DfWALK TURNER ST. �oi✓sr�aNO��� � CONC. �NEWAY �.� ASPHALT'AAVf4£Nr ,.. Of H ApEf1 CURB �. 4 SY OF AS H T pW/VEWAY c� 2ll co�vsr. rr� sr or 2�1L'� 2/3 2/4 rnNC. a+rvewnr ZlS RfGRAAE TO ORA/N ZlG CUR+B & GU�re� n�°a �' � ASPNALT TRA/L REMOVf 20 SY Of . REA/OVE I SY OF NORTH..IO SWTH , ., , CONC. SIOEWALK , CONST. 3[ LF OF ttPE / RENNE'. 45 SY OF .. � _. . REYOV£ 7/ 51' -�.. CONC. SiDEIYALif � ANO CONST. l0 SY ,....... CONC. p/AB �.,4TIT"tER ', CONC. SIQEWALK � � � � . �� . . 9F� �p�. � REMIN£ 31/ Sf QF � � ASPiiAIT PAVEYENT � . .REI�VE 25 SY OF � RENOV£ 6 SY OF RE40Vf 22 SY OF ... . � St ACK �CONC.ORNfWAY i1N0 �.�..REAIO✓E 56 SY OF REA10'✓£ lBO SF OF CONC• SID[�YALK�� � � . � CONC: S/DEWAIR CT1NC. 5/OEWALK � � . COMST. J39 Sf OF -'� l CONC. ORNEWAY'ANO-.. '` . • ' � C�ONC. OR/VEWAY�� GONC. 5/OfWALK rnHSr. u2 sF oF �+• � 2%2 Rnv �w 2/3 � ' 2/4 ; 2/5 2/6 uove is r �ei-r ' , iyr� r i-u CiM'ST. B�SF��bF E p CONC. ORIVEWAY �;. ' t-u � .:. � ,, rccr , �. , , , ; � .�, , , COHC. 5/DEWALK ' . ' .� .. � ... 5 � CK .. O—.. . . -,.-' . -. ' � - — .. g� , .. _ , , r ... ,.� _. . .. . .. �, ..::.: . . . ..:. tw� r2 .::: ,. . � E CONST.WALKWAY �� ± / ::' aEt . ... , , ,� . ...... cV ' . ., . ..... � ,.. , �_ _ "�. _ �—MILL AND � ' xa :.. �i � -' �w , ,:, .., �. , aty - , . . � RESURFACf I¢- � � ` 5 89'O6' 02' £ CONST. 59 SF OF 13B �m f � � C CONST. TURN£R 5T. �pN�. SIp�WALK : $ :: , . .. : .. � ':: � ,.,,,, :, . . -... ... . . .. . ,�� W . .� . Zj . . . , .... :<- : �� 25. � � �� J 2 . ;`. , ..;; ' � , : �l _ _ . _ _ __ _.. _ _ ...,. y._..,.� - . _ . .. .�e .. ;: _ � . y• � --,..... �—�^ -'_" �_—_ f 884' .' .' , . . .,.._.. ._.. . — . .. U @$(/R. TURNfR 5T. � � REYOVE J29 SF OF CONST /IXIIB [F V� R/W CONC.DRNEWAY AND Of HEAD£R CURB R£MOVf 34 LF OF'CONC. .` Q � CONSr. �JO SF OF �- CURB & WT,TER'AND ��• 5 � , .. � . �� CONC.ORNfWAY N T. TURNER 5T. PI.ST . 2I6+51.933 _ �, �/Si. 35 Lf Of TYP£ l _; Q� m Vt1i JR ,AVE . . . . .. . ' .. ... , , . @�:: SURVEY STA. l9+/!A2 f2i25 LT! Q ..� . CONC. CURB & GUT?fR � .. . CONST. !75 SF Of -� � � '�� SAWCUT AND R£MOVE 550 lF CONC.S/D£WALK RAYP 2.' . .. .. OF CONC. q/RB AND IX/TTER /� SURVEY'SP .: Y: .'�. . AND CONST.557 (i OF .. . .. . . 1YPE /CO/IC.CURB 6 GUiT£R � EL�1/,55+7830 , � . N l3/97763195 � � W NOTf l. UTIL�TY WORK TO BE OONE AS IDENTifiEO ON LEGfNO SMEET L-1 UNDER PROPoSEO SYMAOLS LE6END. AL50 REF£R TO PAY ITEM MOTES OM � SHE£T GN-l. CITY OF CLEARNATER, F[ARIDA ENGINEERING DEPARTMENT 100 5. Myrtle Ave. Cleerwnter, FI 33758 •07i8 � CONST. �.9/ SY pf . -� ASPH. TRA/L CONST.26.i LF I� OF HEADfR CURB '�, � REAIOVE TS SY OF ��� g' CONC. S/DEWALK ��.�� $ .S k CONST. S NCK JR AVE. b'�. H MA7CH LINE STA DRUID ROAD WALKWAY CONSTRUCTION PLAN SHEET STA. 211+00 TO STA. 218+00 (PHASE 3) � � R/W N � . a ro �o � Fee� k l2l fP¢ESfMi ns NolEo 1 11 �E m � •° C3-2 � � � � � � � � � � � � � � � � � � � MATCH LINE STA.2/8+0p.00 �, AVOID CONFL�CTS .. �' � wirH uriuries avoio rE��e ca+nro� eox ,� - — — �ti T. : I' °' f' cavSS. wauwar . F B SUR. 5 NlK JR AV£. mIt cv � � RfAIOVE 53 SY Oi ... CONC. Si0£WaLK C CONST. 5 MLK ✓R AVE. � I.,,,� CONST.IIIIF � OF^.,YifAO£R C(1RB W' �_"___ ___ • : , > N Q ; ' �U � � � REYOVE 510 SF pf � �; �:. CONC. A41VEWAY AND � ... CONST. 329 Sf pF Z � � ; - � CONC. ORNEWAY Y RE�/OV£ /5 SY OF CONC. SIDfWAIK W �� � REIIOVE 53 SY OF ASPHALT. DRNtIYAY S � '•....-'. � . AND CONST.2p5 SF B J __. :.,. �. OF Q7NC. ORIV£WnY � J , ��� �? CONST. 22 SY Of Z B'ASPNALT TRAIL ASPHALT ORNEWAY � W/CONC.HEAAER CURB � � Q REAIOVE 63 SY OF 9 � I , _ NNC. 5/OEWAIK ° � �; � RAY CON$T. ZS Sf Of � I �.: HA-5 CONC. 5/DEWALK � N 4 � i � �� "c�+ cavsr. zo2 sr � - ASPHALT TRAIL _ SAWCU7 ANO REMOV£ 3� LF CONST. ZpISF pf OF CONC. CURB AND IX/T r£R CONC. SIOEIYAlK RAYP � AND CONSi. 3� !f OF iYP£ / � Ly/RB ANO IX/TTER � � �-� B �, >,... .""'6' WA�ER" " _ _' .... � --�OTV -. �._ '.' """"-'""":""" ' "'"__. o """"!'?Y�"' ;?`� �''. ; 'N ; . : IV „ P/NE S r. . ' ' . � ; _ f coNSr. ruRNerr � ----�-- = . ..rcr. ��.; _c.... � '• wr+ver sra. ai, 9 --�� �� SAWCUT AND RfMOVE SS LF o ." .,,,_,.i.2.G4 _a`:-:. -:.�""" OF CONC.CURB b Cl/iTER � N: ' .. AND CONSr. 35 LF 7YPf / >° I � OF CONC. p/RB M'0 GUTT£R � — —�— �HIfECTURAL �`�' CONST. 28� SF pf - CONCRETE CONC• SIC£1YALC RAYP .. .. . 3 CONST. 50 SY OF ASPNALT TRAI( _ .. E'. '. H CONST. I/5 [f � . ... � � � OF 1�.4pfR p/RB � b R� si�irur� �^ I C/7Y Of CL£ARWATER EXIST. £ASEYfNT MATCH L/NE SrA.22/+60.00 ry' acca+o a+.xwcs � � •� CITY OF CLEARWATER, FI.ORIDA ,. . ENGINEERINC DEPARTMENT g� � toa s. byrnia a��. � Cleerwnter. FI 33758 MATCH LINE STA.22/+60.00 � Y R/W �: ��REYOV£ +tl SY OF CONC. 5/DEWA[K I � � w N � � w � CONST. WALNWAY � _ @ SUR 5 MLK JR AVE• 'v : cavsr.-r5+ tF OF N£ADER �'(/RB j 3 m I E' Q .�.. 8 ��CONST. 2H SY Of � .� � . �7. . REMOV£T7/ SY �OF � b ASPHALT.ORN£WAY 2 ��_ H .. ?'��JW4�CLNST.3KJ SF OF CON�:OJ7NEWAY Y a ° � �. Y' . CONST. 8 SY OF _ � � ASPHALi ORNEWAY � J 2 j N ti �� W Q RENOVf 5.i St" OF � .�; CONC. S/pEWA(K � - t�rn I �k CONST. S.�IX JR AVE. ... :� �: ¢� . 4 �, . 3; I L-TEL YXF :�: � r. � cin oF c�aHwnreR � fX/ST. EASEMENT , � AIdT('H l lNF STd. 994+l�_(� d NOT£ l. UT/LITY WORK TO BE OONf AS i0£NTIFIED ON CEGENO S//EET L-1 UNDER PROPoS£D SYMBOLS LECEND. AL50 REF£R TO PAY ITEM NOTfS ON SHEfT GN-l. DRUID ROAD WALKWAY ^� CONSTRUCTION PLAN SHEET <`��ao� STA. 218+00 TO STA. 224+00 (PHASE 3) ..� o ro +o � Feet �fORESfMI AS NOtED � � � � � � � � � � � � � � � � � � � A�ATCH UNE STA 224+00.00 �v CITY OF CL£AAWATER N ORU/D RD. �°'�5T• gj° �°F EXlST. EASEN£NT ` CONST. l09 Lf Of CONST, 93 [F OF TYPE / w �� '� a, � HEAD£R CURB �- HEADER CURB 518 CONC.CURB 6 GUTIER 19 ,�..� tEMOVS/�$Y OF ..�.: �..; 2,L6 �� .L,L7 R£NOV£ 83 SY OF 228 �p/y5T.9 SF OF ��..... PZ9 �' ' CONST. lB SY OF REMOVE B7 !F ' ASPHALT DR/VEWAY CONC. 5/D£WALK CONC. S/DEWALK . W OF CONC. CURB ..�:,. ' � '. � -;� 41'@ SURVEY-Sl ... REYOV£ A� SY Of ,.. CONST. l2 SF OF .. .. � $��.' . STA.35t28.13 .m ASPHALi ORN£WAY �� M Y/LL AND RESURFACE 6� SY d�'. EL �+G.30': ., . .. ". ,.:..� ANO CONST. 3/I SF CONC. 5/0£WA[K ,:� .. :-' �MALTj�,T �l � V , � N 131802622G5 ' OF CONC.ORNEWAY .. CONSJ. 2ll Sf OF m �:. ? , ,. : �' 03.6f90 � ;� : _. �- coNC. smewain RauP ,. _ 226 �, 22T 228 W: REIIOVE 50 SY OF - _ � CONC. S/OEWAGK .:.,, � .. �� " . . .. . .. Vl. .. ,� .,.. _ . . _. ,.._ . . .. ._.. .... . . ... ..�. � . _' �r . . '-. . .. .:. p O W $ . ' � ._.; - ,.... o' v� - � �.i: o-rei , : .... . . ..... CONST. IO SF � .�� �' CpNST. lZO SF � .:: . '�• �-' REYWE . BIKE RKK ... �. 5 B3' 37' 1S E�... o g OF 5/DEWALK , .: � � .... CONC.SIDEWAkX �RAMP. _ . . .. � -- - � Oi g_� .. 5 89' /6' S6' E . �� S 89' 22' /5' £ � CONST. DRU/D RD. 5 89' 53' 05' E . .. .. N CONST. 70 SY OF . .� . - � �-�, ASPHALT-��7RA/L . � . �, :: .::i r� :. , . .. ... ':...�, � �. ; . . ��, ....: . ..:. . : . .. ��. '. � Q,.� , ��, . ,... 2 ' ," , _ ... .. •. � � r . - .. - . . -..- W � , ' . , �.... Y I.: .,,:.. . . ' .... . �,::.. . , . � ... 2 . „ - - ,� ._ .. , . ., .. , , „ , - ... ._._ , - . , - - ..; .:: . V� . .. .... ,. ' , ... � _ . ;...,._. ,� ,,. ;::: , . � � REAroVE 79 [F Of CONC. W '. �..� . • • � . ��` .. . , -: �; �.� .. . , . _. � 2 :' CURB AND CONST.79 LF �:. . _ �., :.` , •, ,,..:. � � .... _. V J'- pF TYP£ � CONC. CURB � � f CO�VST. OR11/D RD. P/ STA. 225+83.02= ��, ' 6 WTTER ;. ��, $URVEY STA. 36t12.77 M2.23 RT1 � -- � Q � = REMOVE 7$Y Of ASPHALT � - � $ ti PAV£YENT REf.RAO£ TO �. ?� STA. 221+9J.01 E CONSi. NLK JR AV£ 6 OPo//D RD EAST= . � � ORA/N NORTH TO SOYITN ���. STA. S19r07.00 �k CONST. p4UlD RD WEST - AND CONST 7 SY ASPNALT ,%� PAVEM£NT � � L/N/TS Of NILLINfi �� g" � tij � � AND RESURFACiNG Fee� s a _ g REMOVE '�B 1F OF MILL AND RESURfACE l�8 51' , ���� `" Q ASPHALT ORN£WAY � . CURB &�.6UrT£R AN ��� � CONSTrQRU/0' RD. STA. 2J�+f/./7= ANO COMST. N S' OF E *. � �� '� CONST, 18'Lf TYPE OF �...:,.., � � DRUID R0. . , �> waver��srA:���+�sse ASP/1ALT ORNEWAY m coxc.cuRe s currE AEarov£ 2+e sv ov �' 23P' � 232 ° 233 234 �. /N+ry�'ar 235 22g 230 coxsr. �zs sf oF Q coxsr. i� sv oF - ... CONC, SIp�y AIK RAMP I =.�. �pl/�. S/OEWALK RMIP � RENOVE 35 LF OF CURB CONST. �51 Lf OF FdtE'Hl'AQAMT �. O . , ' CONST: P66 LF OF .�� b IX/T7ER AND CONST. HEAOER C(1RB ^�£WNE � S'L� .. A55£YBtY �'�j ;1/p0/FY TELEP/fO�V£ 'TUBE'�����-' REYfNE l66 Sl' OF HEAD£R CURB 35 LF OF 7YPE /CONC. d Q7N5T.202.5l.OF � r,'Cf1NC.5/D£WAlK .� l23I+J0.00• '„ �. O: ' - 1/ARKER FLUSH W/TRA/L ro�. 5/DEWALK � CUR¢ & GU7TER ° , ASPNALT _TR2`L� � �. � ; �.. P.jO +_ 33.(U Gt) , - .L�, � Q �: . . ; , �: �SURfACE� � � .. CONSTi2�3�$' OF , ,.: A ' , � , '� � ' , �, . ; ASPHA�.l tRAIL . -,. :_. A�.. , , , - . , , $ g - � ` ix w av i- n.w 233 � 234 �' p R ; . , . .. : '..',�?� : , . . O ' : , - 7a. 232+04. :�. � . . ,� , ` 8 _ _ , .:_ � � . , m g � � � �� ���. � � � + � N ... �. .'�COHCrSIDEWALK REMOVE FIRE-M'ORANT ASSEMBCY ,, :.,V , � ,. ��. ' �� , ,� -;. . M - _ ' _ � �.. • � M�we,.�;... N g N � �. .. ,�4J :.�. . . S Q � ' S 89° 53' OS E �.. � ( CONST. tR NO � 5�. ll r CON57. 6i' Cf ti � � _.. -. �� " �. . .. -. _. ; .... ----------� 1IODIfY TFL£PFIONE CQMC. SIDEWALK . 5-p�OF l8' ACF � « W .' r. _ .. 5 B3 37' 15'E N 87 58' J3' � �.. , REMOVE 50 LF OF' ARKfR:.fLUSH RAAIP W ° ° , - . . ,�. CURB 6 G!ITTfR AND .,�''-�" ... W/TRAI _ 2 � ° 2 ;.. � . �.. . � .. � . . . CONSTi 50 (f 1YPE lOF ;,w.. ' , ��. . B 5!/R.ORUID R0. � ��., .. .� ._.1 - � » � - � , � . . �.<. , , � ... , � � , � � .'- CONC. Cl1RB &�� WTTfR � - $ . . . . a U 2 � .. . �_�_ . .�, ;:. ..:.. , . .. .:::. . � . � _ _. �.�.�I.. �� � J ¢ � , ; . ' . :.... .._,_. "� ` .. .. _ - , � ... . . ..:.. „ .• � - . M ,. , . ::. .� . � .. � � U Pl @ SURVEI SlR REMOVE 2/ SY OF ASPHALT REIIOVE 7"SY OF � STA N+�I.20 pqy£MENT RECRAOE TO � 5_ro �� �' CONC• 5/DEWAL!( �- � O � N�/3/7958./75� �A/N SOUTH TO NORTH ANO U ,. REAIWE 3/ lf OF CUR9' � 8 NNST. 2/ SY OF ASPHALT Y STA 2N+�18.00 !16.80 RTI E�10� �JJ576 PAV£YfXT � � y��py yp,yrp� NOTE '� & p1TT£R AND CONST.:- � CONST. 34 Sf � 0 O RlM T7.85 I. UTIL'YTY WORK TO BE DONE AS jj � TrPE lOF CONG.,� OF CONC. Ww � CONST.OFI/ID RD. PI STA.231+82.98= �- FL KJ.<6 fN-EX15TlNG)� 51'ACP �0£NTIFIfD ON LfG£ND SHEET L-I CURB & GUTT£R '. S/0£WACK RNIP �] C CONST. DRU/D RD. STA. 229+70.62= SURYEY STA. 12t1/.82 f13.6t LTl fL l9•85 15-EX/STINGI. 51' FiCP UNDER PROPoS£O SYMBOLS LfGENO. CONST. !7� SY Of ASPNALT PVYT FL 21.QB f5W-EX/STINCI.B' CMP AL50 REFER TO PAY /TEN NOTES ON �1 SY OF B' CRUSNED CONC. BASE SURVEY SiA. 39t98.p6 m FL 22.30 lSEI• l8' RCP 25 51' OF /2' STAB/L/ZATIpN . _ SNfET CN-l. 7YPE B � �"°"° °""""`s � �� CISY 0!' CLEAR1fATCR F7.�RIDA �CALL'811 °'�"'a drom-�� •'�' -=° ""� � [ ST�IE DRUID ROAD WALKWAY '� """° �' EOIT D/ADOfO L s . ENOiNEERIN6 DEPARTYENT �R��� CONSTRUCTION PLAN SHEET °�.,a�.� °"�� °`°m"a '°�� c3-� g���� ;` f00 8. Yyrtle Ave. ,........,,u:� " Claarwnter, A1 99768 ���•u-��ro STA. 224+00 TO rSTA. 235+00 �PHASE 3� � � � � � � � � � � � � � � � � � � r i CON57.5 $Y OF 2' "��� ��u' � ASPHA T P�Y£M£Ni RENOV£ 299 tF OF ' ASPHALT PATCN Q' �� CURB & p/TiER AND.� CONSi. 256 LF OF r:' l S(�FN� �Y-5/ �VST. 323'[F 7YP£ 7AF �" �' ' . CONC. NEAD£R CURB CONST. l97 SF � �'�, STA d8+8<72 . ��: � ��:.� R�MOV£ lOB $Y Of CONC. SIOEWALK RAVP �' ��:_, C�NC. CURB & p/TTER � ' CU,VC. 5/DEWACK COMST. 46 $Y OF R£YOVE 6I51' Of � �� N 13179BI.�IyB � : EMOVE CONC. S£PARATOR� m RfMOVE 33 SY OF ASPNAIT ORNfWAY � � . CONC. SIOEWA[X CONC. SIDEWALK , ci1 .. 5.TlIO .. . CONST. 83 Lf Of 235 236 DRUID RD. P37 � �_ Ne�rr cvRe � 2 , 239 m,vsr. �2 sv ov 240 24/ RfMOVE /J Sl' OF ,xi �; CONC. 5/OE1MA[K AND R£MWf 322 Sf qF CONC. SIDEWAU( REIIOVE l05 SY OF V) - CONST. 167 SF OF ASPHALT ORIVEWAY 0 . CONC.ORNEWAYAyD REMOVE /ll SF OF ' ANO COMST. 772 5 F�£� �j� R£MfJVE C(NfC. SEPARA7 CONC. 5/OEN'ALK RAMP CONST, J5p Sf 0� CONC. OR(Y£WAY`�,ANO ' Of CONC. ORNEWAY CNECK Z ,�� ��� �'. . 5-12� � �"� ' REMOV£ 71 SY OF LVNC. SIO£WALK CONC.ORNEWAY � GYINST.37 SF OF � ; a ;''. •__•..,,�: 08..w.�^°�°� v� �.. ._. MOVf 17 SYOF CON5T.22/SF OF � :,� CONC.ORNEWAY ,�:' . . � � � •-- �u. : ' � 5 .. �$pN�r DRNEWAY_.... CONC.S/D£WALK - K��rrP�� , � . . .. ., , . _ � ---�- . s' CONST. � CF OF D NST. 20 SY OF �. Riw •ZJ'S �. - c-v _ t ' � � . � FQOS TYPf � C�URB 38 ... 2.�9 ASPHALT DRNEM'AY WAC�%'AY QQ � . � � g . , a, . _ CON fi 279 5 . , .:... .; nnv , � Q NA- ° � 6'. RET£ ,} . . W z . ...,- ' ...... "',.... -a.. ... g . .. ..- . .... � .._.:: . - _ . , ,. .- .: , .. .. .. ..,... �:.. . � -"'.�"" 'w�rEa �'�' -. . ; B� END Y/LUNC d � R. lD�� .. .._ . .-.�. A N i[ . �r .. OF Y � � . NNST. ZO SF OF � .. : : " ; SURfACI ; '� :.;� e_/ �.: [ CONST. LWUID RD. . �'.,� � ; CONST � �0 5Y OF Q cMy .. ASPM T��PAVEYE 7�� T T RA STA. 237+70.89 . . SPHALT TRAI . � REMOVE' 95 !f CONST. 205 SY OF' . ... 5 0 .. . �. , . `-.. � ; g ST. i0 R . � .o.. S 89'32, O• E.�� � ' � � � REMOVf P67 !F OF � i t = � . . REMOVE.E02 �!F OF RE40VE 65� SY OF ��. �� B£ RErIpVEO � ��P/fACT TRAfL q. 'RfAIOVE 235� SY OF Q7AC.GVAB 6�GUTT�R x� CONC. SIOEWALK ln RfCOIISTRUCr plRB �tINE - WRB & C,T/iTER i1N0 � �. $URVfY STA. Q+9Bb3 A,SPF/ALT PAVENENT AND MNST. 202 [F lYP£ �� ? S-N TO EXTENO TURQIry(',,,(AHES. � CONST.26B LF 1YPE l� � o W � .. -:, `. CONC. Cf/RB & WTTER . :, : fi5.} RTl � : � ' ti pQ(/RB 6 p1TTER ` .�. � 2 , , t-U REAIOY£ M SYOF CONSL�73.LF�Q� . . • •..� • j BEGIN MILLlN6&:�+�.� .. ' j v < ,.., �. � � , . ` , ° CONQ 5/O�il'A!K . , . A CURB � � . . 4 .,.;: R£SURFACING . � , • . _ ' ..., � . ..:: .... t'ONST. 236 . . ! � STA.238r5237 m r �:' 5' SIQEW � � . _ ...�� ....._�c ....' '.._.._..:: ��LOh'CRETE�:�: ��' ' ..._.j..£,VOVECONCSEPARATOR ::f .'!��i.�, A....' a[i-r.,,.� Q ..+ .60 - a41.62-- .� ��-- �. p '.. , ��" � . • . � � � . . V� . CONC. 9Q {F OF ... � - ON/FOC ..... � � - 32.59' RT . 0 �- "� ... , _: ...tn fL1�i-;-tYPE ACURB �• . • - . . r . ... REAIOVE CONC. SEPMATOR '�'" L'V7/5 SF OF � CONST. 575 SF OF .� . . . .• - , : � � � ,. , � �.. � � : ! CVN�47�%NEWAY 0 CONST.l03 Lf OF CRAVl7Y WALL "� d CONC.S/0£WAIK fDOT INDfX 520 5-/2 -����.. ' S-l1 6 TE . ' , ,":.- .� _ CYMit.-'�` 30L�OF - _ :_ o 5-u SiA 23yf95 r0. $TA 235+98 O .. � ' k"°'•w""•,"", .'°,°"�° .. . �REIIOV 3F OF � CONST. 630 SF OF RM, :. .;. CONC. ORNEWAY '` '� � STA 238+53.�p f5B.00 LT1 � $TA 238+72.00 r�9.60 LT) y f`' CpNC. S/qEWA{X � STA 235+/1.60 l33.85 RTl �'ST 10: $Y Of� ASPHALT PVNT �pNST. T1PE P-6 /NIET - NST. PARTIAL MANNOIE fP-11 /�� �N�AY �` � COMST. 59 SY Of ASPMALT CONST. TYPE P-6 /NLET ��� g� CRUSHEO GVNC. BASE �N�X p�� -. ; � �'n �/NQEX 2W M' CONSi• �547 5£ � REAOVE 34J Sf OF PVYT 59 SY OF 8' CRUSNEO e INOEX 2/l CPURSf.67 SY i7F /2' SIIBCRAOE EOP 32.A7 . . � lM 33.60 ��. .�� CONC. ORNfWAY^ CONC. ORrvEWAY AND CONC.�BASf CIXIRSE� % SY STABIlIZATION TYPE B CONSr..i62 Sf OF OF l2' SUBGRAOE EOP 27.65 FL 25.30 !N£ £XIST/NC)• l8' ACP �.... �� � C 25.63 fhW EXISTINGIr /8' RCP'� � l . $ FC 22.50 lhWl. lB' RCP FL 25.30 !AY-£XISiI,�p',). l8' ACf' '. L 27.�0 15'£Xf$ilNGl�. l8' ACP �N�• �NEIY.AY ..:. �, STABILIZATION 7YPE B Z41 REYOVE 61I SF OF Z42 �� R�p�, 5�DE11epCK� R£MOYE 2l Lf °' :,::., DRUID RD. ' rv 243 oF cuRe a currer+ � 244 245 � co�vsr. ze sr ov 246 pEAroVE 62 SY OF 24� CONC. ORNEWAY AND �plyST, 2/3 SY Of AND CONSr. 273 CF � � �M�LL M'O RESURFAC£ /QB S' ASPNACT. ARNEWAY N CONST. SSI SF OF qSpHALT TRAIL YYP£ I OF OONC. ' 2 j .��� REYOV£. 202 CF OF .��£ �' �� .. CONC. S/DEWALK � �� ��.� �� RENOVE 31�/1SyF'Of CURB & WTTER � Q �_ p/RB 6� IX/TT£R r1N0 �� S��A� ASP�ACT ORN£WAY ��. CONST. 53B LF OF ` _ OF 'WRB�� � £ CONST. ANlJ CON51_,,�A7Y�, SF . ���09MST. ZO SF OF '�� � CONC. CURB &. GS1TT£HIOF 'J' � 4/ i�rwt WALKWAY 4��� Of CONC. DRNEM'AY; �- CONST �' �� y m� ' - CONST. 133,5f � CdNST. /72 SF�Of AND CONST. 2&t SF lfEAOER,C(IRB �, .ARCNlTECtU7tA1 CpNG. OF CONC• ORNEWAY CONST. 256 SY OF � .,, .,:, � cwrt� � MfAl1fR � ' CbMC.SlOE1YAtM��RAMP RM' .'...' aM. L- -. � ; ,�q . � .ZcQ. �. � .. , °zq5 , 2Q6 ASPMALZ l � .. - .: :' . '.:�i RM � HA-lle �� �.. 578 VCP �.. 5 . . " " " """" ""' , .. � � , , .� _ � ' . . � .. � ... .:: _' _ ' Ly1 m g � -:___. . . .. -- - : . ... - ::.;:: .:.. - r= � -- 8 _ -.. . .. ,. + � - �� � . � � __ + , __��. ;. . _ p N REMWE 322 SF OF �. xi•�w �- ... i CtIRB AND C0.MSY. 33B LF -,. . ...� F � OF T. 66 tf � OF . �a-wv • . � '�, . . . . . - � .. - . "-. � � N AY T I . Sl ALK V IX/TTER �� .: ^EC'�'� C CONST. pRUID'RQ. �� " er N 3 . - 5 3P' 2 E ."-.. � RE l9llf ; ��.,t� �r REMOVE 2/I LF 5�89' 22'72' E REAIOVE �I18 �SY OF Q o,° � OF COMC.ORN£WAY �i i-u �e� c � CWYC, Of CONC. CURB . OF CONC.�WRH CONC. S/QEWALK I� �/1 � - _s. . < . :-. , .r y _ �,..' ' � �.. : t- . w.z . � E W > >. . ' g . . : < ' ' • �� % " ; . ., : �: .. .; . ! �t . � _ . ,,.,:. , - � M � ,. ', , �: , � - , '. � � rv Z .. . . , �, . ,. . � . ; _ :� . , �. � e J „ m � . . . �--._.... .• �, � �:.�.� .. S.SIOEWALK .. . . . . . � .. .. . .::: :.- . ' _ � � � . .. .. : �-: � � - . S/ . � .: . . . � -• � - �� ', , RCE�MOVS I2 SY Of CONST. l0/B Sf CONSI CTURAL �� x „ - - - - � - CONST. 52 Sf OF ��,A� !l Sf OF ti..... � CONC. SIQEWALK . � • CONC. 5/DEWALK AflCH Tf w Q � �' � 5..� ID R °• - � LVNST. 2�3 LF OF 7YPE l ��� Q ` � , , �� �. ��.:� ' RCOMC S DEWNX F �CO£W�5 0£W�OF . .. ✓ Pl TA � f7� . CONC. CURB & GUTTER /FOC� -�-�- � ' / . � . . ..:r� . .' '.'_. . .=.; .. .:.s�! :.. D7y ��p 'i..:. . ..�.-5(IRVEY.STA..51W321: �:� ... CON5T..52.SF � RM..... � �E�ID' F 1�ENOv F f' . �: �E!!S8' ; _ . Rfl'..... -o.. _, .. .. '; . ." 510EWALR"R7QTN �� -.•-��- . ,:--- .. -- � ....... ._..._. � CONC. NEWAY`AN '. CONC.ORNEWAY . i CONC 4R/Y AY ` . � , , CONSr.2B5 SF Of � AND CON5T.281-5F � AND'ClNISi.'J% SF �Sn OF28' �SH£D�CONC. BAS£ � TRAN$liqN �RB 6 W E7 R�MOVE �68��Sf OF - -" "�� � RfYOVE 418 Sf OF . CONC.ORNEWAY OF CONC. atNfWAY OF CONC.ORN£WAY � 822 SY OF�. l2' Sl/BCRA'D£ , 2� (7YP.1• � T. � SFrOF� ro�. �N£WAY AND END Y/LUNfi & RESURFAC/NG REMOV£ 121 SY Of Cp,VC, pRNEWAYF D RCONC. ORNEIYAY � ��� STABILIZAiqN TYP£ B ; �� NOTE 40N.C.,ORNEWAY �p�r� �µ.A � . +• -. CONC• SID£WALK CONST.3�8 Sf pF ANO CONST. J74 Sf REMOVE %5 Sf Of' � �� �. UTIUTY WORK i0 8£ dONE A5 /D£NTIFiED 0 p-�� � COHC.ORrvEWAY WW ON Lf6END SMEET L-1 UNDER�PROPoSED LUNC.ORNEWAY OF LVNC.ORNEWAY �yy0 CQNST. 339 SF m =� SYMBOCS LECEND. AL50 R£fER,:TO PAY /TEY L/N/TS OF M/LLINf. � � OF CONC.ORNEWAY �V NOTES ON H£ T GN-1.��. � AND RESURFACMG ;�- F86i - xcca+o a+.w�cs Ml l AN R RF I � l � = CITY OF CLEARMATER. FLORIDA ��q�j,gj� DRUID ROAD �WALKWAY -�°"'�` ���� 6 ��' ��T "� "°"° - u v ' w �•- £DirEO/ D �BE�S R ENGINEERING DEPARTMENT �ME SielE 6 IS/11 �eE � � an`�: CONSTRUCTION PLAN SHEET a+aox.oxw �"e� ec c3- . .. , �-- � � „e. �..m.,�..� '""°"°" - Cleerrater, ei a3�ea � r� �+::� STA. 235+00 TO STA. 247+00 (PHASE 3) „ � .�,m � ; ---�,r- � ,�.,�� � .. � _. : �- - m""`° � � � r � � � � � � � � �■ � � � r ■� � CONST. 9 SY OF CONST. 5pB CF OF 2 ASPHALT TRAIL CONC.MEADER J . CONST. 20 LF OFi� �RB CONST. M$Y OF HEAQER CURB °' ASPNALT OR/VEWAY ORUID RD I � I � COHST. IOl SF OF 247 CONC. SIOEWALK ;RANP 248 249 250 �srsr�� I 25/ m �, 252 253 RE,WpyE /p Sy pF � CONST. WALKWAY .. 'REtlWE-.'d9 LF OF ASPHACT ORNEWAY � CONST. 270 SY OF . ., r AND CON5T.515 SF a� ASPMALT TRA/L �•a � ' 'WCONC. CURB & WTTER AND pF CVIy�. ptN£WAY �': ,: 6. :;� REMOV£ TJ LF 9F ' �� CONST: 39 �LF OF TYPE / ... + • ' ,. � •' � :, <CONC.C1/�RB R CUTiER m. . . : CO�T.2/LF� PE� OF� . . ;� , R�,° p49 ;,�P�wr • 250 x�-»� m�\ ;; coNC. cuRe a currerr g e �as _ _ _ _ �� _ ... .. . _ REPKOY[ . . ... .. � �� . , . .. �. e..�P . ,,.�" B.!'CP .,:.---r—HA /2'"' .. _. ...._ . .�� . .• ." "•�I2 D�P:� � , �'�, �� 63 66 �: . .""""" ""_""'"".. ... . 8 --.. ... ... .- -.... .. _. ... ... . .. -��, .. .. 6 " " ___" ,,. " " " ..... :.. .... .... .�. . . - . . . . .. ,.. . " '"'"": ... .. '" " _"_"... _. ..... �.. . ..¢ "s'._" _""-: . ""_' "' "" b] ' . '.- . .�.� � . � .�.. .._ ..�. _�-i� � cor+sr. u sF !i� s py, yz E_ e wR. aamo Ro. o-.r� re� ,�, �' N � � MCH/T CTURAL . Ye 5 88' 19' 26" E � REMOV£ 1/ 57 OF W REAIOVE 76 SY OF 5 89' z2 �2� E f CONSi. OR(1/D RD. R£YOVf /35 SY OF COMST. H2 SF OF ;Y .. � CONC. S10EWALK � �CONC. 5/OEWALK. ,�.:: CONC. SlD£WALK '..� . CONC. SID£WAIK . � : N . , ... , .1X1NST.97.'SF. � :. ».. ... � . __.... , - . . RAYP ' �:��.. . '' :: Z� ' . ' "CbNC. SJaEWALK RANP � . n — ,: , „ � .. . � - _ io' vGP' ., .. �� � _- J �� .. REU4V£ 53 LF Of '.�� ,. _.._ ... . .i: . .. .. . . ._ � ...' _ .. ...' ,�: _. _" M1 v` . . ..... ...... .:. . '.,REYQyE 36 S�' OF CONC. CURB & q1TTER AND -� ..,- .., .._.. " . ; 61 ,.." '"". ... i �: 2 = ASPKALT PAV£NENT roNST. SJ LF OF 7YPE l . �.. �. . , - ' � � _ , , : . "�: ; g �plpST. pRU/0 R0. Pi`STA. 25�+1@2p= . V ' Rf6RAOE T0. A4AIN �NC. LY/RB 6 CUTTER � .: , :. . QSq/iH TO MORTN AND�� . .,:. _ � "� '� .. � `.., m 3: '�: SURVEY STA.61677.11f/3,�K RTl ..�. m � asPN'a�i�aqv� H� .. STA. 250+95.52 � M1M1 - -'- `,-' --.- . -.-orvircr e ..-- - � ...... .._.orviva .,---� -- -` - . ..... ..ornroc '-- . ... . . - -- :. ..-- •orviva. ... . .. 1� �"' orvia ... ' a' - 4� v' ` — — � --t- ,T — — — -- ..._ — .. . --NOT£ ''-- , — �. � �� ° l. UT/L.1TY WORK TO Bf OONE AS h � 1qe - � IDENT/fif0 ON L£GEND SMEET L-/ W 0/0 40 UNDER PROPoSE� SYMBOLS LECEMD. m �� I � AL50 REfER TO PAY ITEY NOTES ON � N; Fee� SNEET GN-l. r+cca<o aurnHCS I / L l/H/l W.�reoe vao-m a �zr roa -�mrt � xaceu CITY OP CLEARIlATER TI.ORmA �CALL811 DRUID ROAD WALKWAY •�°� °° .. ENtlINEERINd DEPARTMENT wnsx�c surz . RA8 ,„, �' ioo e. y�u. n... ,,,�`«TM�" CONSTRUCTION PLAN SHEET ����.�� "aH ea C3-6 - — �.+,.,�- �TA. 247+00 TO STA. 253+00 lPHASE 31 �--- �_ ,� i � i i �„� ..,ee—o.o :. .. ......... � ;, - - ' � — � � � � � � � � � � ■� � � r �■ �■ � � � i � N SET YAC-MNL.-6 TT � m[ CpVST, ORUID RD. P/ STp, 5p5+83.b7= Survq P! STq p+ppAp �- DRUID ROAD SURVEY STA. 13+92bB 08.06 LTI EL=28.28 =�- l� rJ�2 REMOVE /06 SY OF 500 50l x �3�aoz�.os3s E 398867.7I52 v CONC. SIQEWALK 503 �504 �: W, coNSr. zeo sr oF . 505 ; � ASPHALT iRAIL CONST. 3/9 !f OF BEGlN PNASE 3 ? R£MOVE 29 SY OF NEADER CURB R£MOVf 9 SY OF I• �� %/�. lt . 4, ASPHAtT�pRNEWAY ' ASPHALi pRNEWAY W .. �.. .. AND CON57; IO 5Y OF REAIO'✓£ 3 3S OF AND CONST. 8 SY OF I,� , . . ASPMALZ�.A4NEWA1' ASPHALT pRN£WAY ASPNALT pRNEWAY p ..- : . ,, ., _ . AND.�OjVSt. 2 SY OF REA�OVE 2217 Sf OF � 9 . ��.. O .. 9 . . . . ' ,� . ; , ,,' R ASPr,�� T ORNEWAY CONC. QR/VEWAY ' p ni' — — . , , , — — — — , p o ; � � �_ i i . .. _ .. . .. ... B� . �: S 8I' OJ'.23 E — .. . .• . O ,.: .. . .. ... -_ . -:�. � ..._ . . �. , + . .. ... . . . ..'.... , ...._ .... /2 . . . , . � -. . .._.. ...'_". __"".. � � '� '_ . _. . _ .' � ... .. .. . , , ... . � K[ ,.�.....;. :..,.�_ ..'- . , �- , . . . .. .. � '., :�:: -:. ' ;�:. _ - . @ SUR. A?I/lD R . ; , R£MOVE /56 SF OF : , , ' ". � 5 89° 35' /6' E . / E . . CONC. ORNeWAY : ; �� . : � ...� _._._.B'.R6y .., .::r; -:r ' .. .:: .. .....: ... .i: ,. .. �,�-' :_: .•��""�.��0 nN...... ._ '_ -.. ..._. .' .._ . , _._..... - .... .. ' V1 " ' -.• .. . .. - . .. . -::: ��. ....__..'..0 CONST.[YMl/D RD. .. @ Survry..... .._. ..'l4 : 2 .... ' - S89'IO 40 �E�- � ., : � , . , , i .. -. . . . . ._ .. -'.P/NELLAS TRAlL — � ` — . —. . .. � � . . . _ � e• Acw .. . _ , '_ ' `- ---_ , � . _ ,::: � _ ....��.. ... -- 'on%.--�`. - , �., - ,`: . , ., . ... .b:�. ... _..*: eS ��: .. .=:! .�. .; :..... �— _ 2 .. . ��._..... . ���..._._ . , ..� p.oc - _ — — — — � �, . . '. , . ._ .:. . . . � - � ...., — — — — — �"'° —� 0 — — — � �f : � 9 � - Q; : x , �' l� ' ;; � � � CONST. p4U/0 RD.�PI STA. 502a13.86= V � CONST.ORU/D RD. STA. 501+09AI= ' � �: - .' - � 1��.• -- -. ;. SURVEY STA. q+2�A0 !/3.62 RTJ � SURVEY STA. l2+lg,�l �; m � CONST. p�7U10 RD. PI SiA. 503+/4.i4= m �; v 9 SURVEY STA. 11+2�.58 f9.7J RTl �� o _ ,: ° � . .. . ,:. REAIOVE � 26 LF � . � ORUID ROAD ' cavsr. rrPe l CONST. lB3 SF OF f' COMSr&26 LfE7YPf� OF r -�-"� � � -� .. , ' � CONQ 5/0£WALK �, � CONC. CURB S 6f/TTER CONST.61 $F OF CURB 6 GUTTER � I CONST.26 Sf OF � 5 ; LUNC. SIDEWALK RANP 507 508 RroeNC�. �Ne�ira � . '� 509 �, �, 5/0 ��. ' ��. o��� cav°�sr.s�i �A aF 5l2 • . CONST. 6 OF ��,. R£YOVE 72.SY OF ' GY/NST. .TIB 5Y OF .�"AND CONST. /6 SY Of •� .. � W` COHC. SIDEWALK RAMP • -.I: ASPHALr rRAIL ' REMOVE l/ SY OF ; pSPNALT ORN£WAY . ASPHALT NEWAY 'CONC. SIDEWAUC . � . I � ppH � TSTRpI� ° ASPNALT ORNEWAY AL " REAIOVE 57 SY OF ' .� � CONST. 23&�. SF OF -� � � � I. AND CONST. IJ SY OF, ' .. RENOVE 2J8 Sf OF .. CONC. 5/OEWACK ASPi/A/.T ORNEIYAY . REM�YE:�9 5Y OF . CONC. ORNEWAY � . , CONC. SlO£WALK RAMP CONST. l86 CF-OF �-� �' S ; �ST: ��� .. `�. ASPMALT ORrvE1YAY qN0 CONST. /JO Sf" .v R£YOVE 32 Lf OF ... NEAOER CURB u RfIIOVE 255 SF OF � � � p NfADER CURB ,['p�. ARNEWAY � Ri1Y Of CONC.OR/VfIPAY; : , �� CAMSi$3�LfETYPE�IOF :. � � � . .�. ,� �y�SiOEWAI.R�.. 6 a g �,<, �Riw �eri . , eei ,'.. i eei CONC.CURB Lc pITTER . ' � � i. • ' . .R „�..,. _ } _ — � — � � ` .�: ' - - 8 � � � � .. '� � �� � ' . N w ..': l0'WATER -..- . :.��-.� ..: ........ ...... . .'.'."" '"" • L(1 , ..... � .� "" � Q CONST. 7YPf' I R£MOVE H SY OF � .. .... .. ... : � - � � �'., �r� y � CtJRB & GU,TiER CONC. 510£WAffi CURBT 6 CUTTER . O,�•r �.r.. .°� � �-rc' .w-wv fQ— � W . . . _.. � ' . ..' S 89' �8' S3' E � � CONST. A4U10 RD `:' .. 16 - . �y "' ":.�� � ". . �0-,�.` - W 2 : l5 ' . . _ e' H[w AEMdVE � }2 Sv OF - ' 2 c � � � - - - ��-'-' ? � �� . � .. , ....... ... r: a � .....��_. . . _: . . ,.. ._ --.. . .o ---. . . _.. ' ..'.:. ..:�...Eb .5l . fJt , .:�: .. a . � ... - -.. 5 �• .. � ., � . .... .-_ _ . ....._- ' '- ... m T �. .:-: . . �-� . . . _ �: . a .. : N-'. . 55'.53' £ �� _ ... , '.. . ., ' . ... . _ 07v�FdC . - .. ... . ..6ntlFOC... .. .. m V .. ..��' ".. . ... . . . . _ ; � � ' ... ° """" """" ""'_' '.....�Y . .. .. . �. - _ ., _ £ � - - �` . . . ...� :•: . ..._ _. - �. n .... _ — , U � ' m . .� � ��. �ADER CURB ... Riw. �AOER �RB � . , � � 29 � �� RnY .....RLYINC.ORNEWAY �F �� � � � r .. . . m � " . ::.. ; � �. •c B SUR.OR!/10 RD. � ,. • .. � CO�S� �SF .. � � - �� �� , � . . . .. : � � . : .. . AY � L&/ 5£T SPKN . �� T@4 5£T MAG 6 NAIL � � �pAS�T�. 99 (f lYPE I @ Suney PI STA lI+2I.20 m EL 35 ZP� STA�lB+SIA� � Q CURB & q/TTfR '�.I 0 £L=23.J2, = NOIE N �30971.7&77 ~ ,. 0 /0 �0 N/3/797/.2653 /. UT IL ITY WORK TO B£ DONE AS E jy��y.�sj U E 399289.0095 /DENTlFiEO OM L£GEND SHEET L-I W � '� UNOER PROPoS£D SYMBOLS LEG£ND. � Feel AL50 REFER TO PAY /TEY NOTES ON m € CM�'ST. OM/lD RD. P/ STA. 5p*6/.2l= ; � SHEET GN-i . SURVEY SiA. i8+78./0 (/5.68 RT) � �„ � CITY OF CL6AR1fATCR, F7.ORIDA DRUID ROAD WALKWAY -r�="E' '°��' "°' ro`0H1� � ��� ���5 EDITED/A00£D � �CALL 811 � .� .e .� •• ENtlINEERIN6 DEPARTYENT a„E �� S� �• t00 9. YyrUe Ava. � CONSTRUCTION PLAN SHEET BYPASS SEGMENT °ci��.� °�°"ex ^ ea '°' cs a �� _ _ cte�wster. [Z 33768 �_�'"` STA. 500+00 TO STA. 512+00 �PHArSE 3� —�— � � � � � � � � � � � � � � � � � � � � - REMOVE 70 SY OF . �� : _ ca✓sr. s sr of _ nsPMacr �Nt�var ORUID ROAD ' ASPHALT ORNEWAY ANDCONST.291 SF � �y5T.600 Lf 7YPE l �-�� REIIOVE 27/SF OF � ��• �ry�Ar �� p/RB 6 IX/TiER . � 5/2 �� �ry�'Ar 5/3 CONST. 533 SY OF 5/4 5/5 5/6 5/7 RfNOV£ l76 SF OF 51g AN�D CONC. 225 SF p$pHACT TRAIC CONST. II SY OF REAIOVE 322 SF OF CON�• OR�✓£14'Ar OF-�:CpIJC. aiIVEWAY ASPHALT•,pRNEWAY - CpNC pRNEWAY ANO CONST 2p2 SF CONST. II $F��Of Rf1fOVE 2/7 SY OF CONST. 4 SY � . :.. �WD EONST. 250 Sf �� -..:� 'OF'', CONC.ORNEWAI' .. -. CONC. SIOEIYALR CpNC. SID£WAIR pF ASPHAlT ��� � OF CDNC. DRNfWAY ' RfYWf 231 SF QF . . REYOVE lB4 SF:pF . . �-, pRh2U'AY CONSi. 472 ff OF CaNC OWNEWAY .: �.CONST. 25 SY Of � � . CONC�'ORlVEWAC�. . . � "., .HEALIER CURB : AND CONST.3NSF : rASPMALT ORNEWAY AMD CONST. J64� SF CONSi:. �8C7 SF OF ��. REANn�£ P9 SY OF ���N�. ORrvEWar p O . OF CONC.ORNEIYAY CY1NC.�ORNEWAY i� �� kSPFtAIt Of7WEWAY � �-u �� O O _ . . � i . . ,.. i g - --- . - ` � ; �., -_ _ . : - - - � Q • - N ` - - .. ... ....... ., � � . . .. .__. .. . .__ . .. ' __ .,., ; . . ... � . � �,:.: . �, . , ,.. : �. ' . . � V Q m , m .; :-.- . . . . � � I _ Q I� ~ � / GdYST DAU/0 RQ. - � -� �COCA�[R�Ey.. _ '_. .. ._ . ._'. _...... � v1 g aCw ��� - . 2� � : 22 � �• �� P3 i6 Rcw' � 2� - � 25 �.�: 25 W W yC• ...: .. ...;.�..... ��.�_. .. ....��x. '...:�.. ._ _. ..._ o��:�. ,.:�:: .... ,, s ..'�- .. .. .:! . ui, '\���, . - , ,(SlbaoJ.it.2A'tea ... Z .. � �6• W v=i 2 .. 2 J' . . . , � ... � W .. .......-�. . .. ,....�: .. _.__�. .. -- -.. .� .-e� '--. _�� . .--: • SUR Q4UlD RO 4 5 89 /0 � .. '.." _� .".07 , , V/TOC..� "" " 'OTV/F0.^ ..: N1I'6Y � � .: � —.-� - — ' • ., ...—�--•-��. ,�- � � . _ � �� ��..-- .-.-^ . — — .. " . .. _ _ ��� � � . � . REA�V£ 21 SY OF � W TB,Y SIRRC � � SPFIALT2pRNfWAY � ASPHALT DRN£WAY ; ) � B Survey STA 23t36.63 : , �. �� . ..,. AMG CONST. i5P :SF M'0 QDNST. N/ SF . Q . L 32 /3 � . R£MOVE 467��SF OF .. ... . , OF CdNC.ORNEWAY OF CONC. DRNEWAY . � 2 . .. . �TA �St25.73.15.4i'.RT '�,' . CONC. ORNEWAY . � AND CONST. 3/7 SF NOTE OF CONC.CRNEWAY � �� i. UTIUTY WORK TO BE OONE AS � IDfNTIFIED ON LEGEND SH££T L-I :- UNOER PRpPo5E0 SYMBOLS CEGEN0. � ro � .._ ... AL50 REFER TO PAY ITEM NOTfS ON � � SNEET GN-l. F@Bi xcam a+�xncs U T l/l�/I • CITY OF CLEAR1fATER FLORIDA a�wrn :�.l� � an u��mrt EDITED/ o caeei �CALL811 DRUID ROAD WALKWAY -�- "�"°"° ENdINEERINtl DEPARTYENT �""� �K,"'E w �"` ��' ��� CONSTRUCTION PLAN SHEET BYPASS SEGMENT GLII[00l.OEY "°�"ax °'°� � '° cs-a � __ _ _ _ Ci�en9eey�m as7sa ��� �- STA. 512+00 TO STA. 518+00 (PHASE 3) � � � � � � � � � � � � � � � � � � � � S WIOTH I� YATCN EX/ST.OHWY. fX/Si. Riw I pR pSpHALT DRWY. f5£ � DATA TABLEI —j CENGrH 'B' �K � W SEE NOTE m � 8' 'i�yl ASPNALJ WALK I FACE OF WALK -- y— CONC. DAWY. � t �a � •A• STRAIGNT CURB £XIST. STRAIGHT CURB � fAS SHOWN ON PLANSI US SFIQYN QY PLAN51 6' �' W107H T' �' 6' SAWCUT AND YATCN EOGE OF PVM7. m £XIST. PVYT. NOR,VAL CVRB I�.Y/RB I OROP CURB I CURB I A�ORNAL CURB TRANSITION TRANSITION PLAN FOR CONCRETE OR ASPHALT ORIVEWAY DETAIL "A" NpTE: WNEN YATCMINC EXISTIMG ASPNAL! A4N£WAY CONT/NU£ CONCR£I£ SAWCUT AND MATCN Q N£ADER CURB THAqUGl1 ORN£WAY. AT CVNCR�i£ ORNEWAYS CONSTRUCT CONST. £XPANS/OM STMICK JOINT TO ENULAr£ CONTINUANCE OF MEAOER CURB TNIYXN,'M JOINT f£X15TlNG pR/yE}ypy, 8 � RETE ORNEWAY GVNST. £XPANSION �PHALr WAIX fxiSTixG PavEwar � SAWCUT m JOIMT F-2% V �8• ""-"""-'.. A. . . .:�.�.... -... . . _ I �xist�RdAD-SURF�E�4 SLOPE ..:...... .:. . .. .. :[: �. ` �'_' " """ I 0�40P CURB � i6' LENfiTM 'A' 8' L£NGTH 'B' PROFILE FOR CONCRETE OR ASPHALT DRIVEWAY DETAIL "A" CONCRETE OR ASPHALT DRIVEWAY DETAIL "A" DATA CITY OF CLEARNATER, FI.ORIDA ENGINEERINC DEPARTMENT I00 S. Myrtle Ave. CleerMeter. F1 33758 DRUID ROAD WALKWAY CONSTRUCTION DETAILS SHEET DRIVEWAYS (PHASE 3) � 2"!M/N/ ASPHACT CONC. lYPE 5 6" lM/N.l CRUSHED CONC. BASf ASPHALT DRIVEWAY SECTION 6" CONC., 3400 P5l CONPACT EX15T. BASE CONCRETE DR/VEWAY SECT/ON � "� r � � � � � � � � � ■� � � � � � � � � 6' W/OTH 'f' 6' OROP DAbP OTEE21� INOTEE2 MATCH EXfST. pqYYY. EXIST. R/W W � BACK OF WALK �• �'• LENCrH `E' W SEE ANOTE 2 _ — _ � �y2 SEE NOTE I �yz m YAX MAX �PHALT WAlK 8• m FACE OF WALK �.� �p,y�, p/�VI, (ENCTyH 'D' _1 EXIS7.CURB & GUT7ER J 7YPE /CONC.CURB & GUri£R OVERLAID W/TH ASPHALT 6' �' W/DiH 'f' �' 6' !AS SHOWN ON PLAM51 SAWCUT AND YA7CM fOGE OF PVMT. EX/ST. PAV£YENT �MA� �RB I CURB I OROP CURB I CURB l NORMAL C(/RB _ I Q � TRANSITION TRANS�T/ON s`' CONCRETE OR ASPHALT DRIVEWAY DETAIL "B" PLAN ° nor : F I:WN£N MATCH/NG EX/STMC ASPHALT pRNEWAY.CONTINU£ CONCRETE 8 MfAO£R CURB THRIXKN ORNEWAY. At CONCRETE ORN£WAYS CONSTRUCT 0 SrRUCK ,plNr TO EA�ULATE CONT/NUANCE OF HEAOER CURB TNfd01/GH ORNEWAY. P 2:CONSTRUCT WALNWAY OAOP ONLY WMERE INDICATED ON TM£ ORNEWAY 3 pETAiL 'B' DATA ON THIS SNE£J. � SAWCUT AllO MATCH CONST. EXPANS/ON JO/NT !EX/SiING CONCRET£ ORNEWAY � 8' ONLY) — ASPHALT WALK ENiST�,vG orNEWAY � SAWCUT �NTT.£XPANSION �_2% S�E ^E' ' � �E •�• � a XISTI OR P 5 : •: a.. ........ •.. •.. •.. •.. �---e...-�w s��e4.... I I I OROP CURB L�N�rN 'D' 8' LfNCTH '£' I & GUiTER CONCRETE OR ASPHALT DRIVEWAY DETAIL "B" PROFILE CONCRETE OR ASPHALT ORIVEWAY DETAII "B" DATA CITY OF CLEARKATER, FLORIDA ENGINEERINC DEPARTMENT 100 S. Myrtle Ave. Clearwnter, F1 33758 m 6" CONC., 34� PSl 2" (M/N/ ASPHAL7 CONC. 7YPE 5 COMPACT EXiST. BASE 6' (M/N.1 CRUSHEO CONC.BASE CONCRETE DRIVEWAY SECTION ASPHALT DR�VEWAY SECTION DRUID ROAD WALKWAY CONSTRUCTION DETAILS SHEET DRIVEWAYS (PHASE 3) � '� � � � � � � � � � � � � r � � � � � � � 3 8 TRANSITIO�V CURB INTO � pR/VEWAY F(ARE BACK OF 5/OfWALK RANP CURB fTYPJ CONC.HEAOER CURB (7YP.1 ASPNALT ASPHALT WA� IJ2 MAX lYPE ICONC. tB 6 GUTTER !AS SNOWN ON PLAN9 £OG£ OF PV4T, � WIOTH 'H' � I MATCM EXIST. p9WY. OONC. OR ASPNALT ORW1'. EXiST. RiW � y� � 5 E NOTE �' SLOPE G � _1_ BACK OF WALK 2Y, fMAXI � ASPHALT 1.Y2 YA.1' ASWA(l(T � FRON7 OF ASPMALT WALK N EXISr.CURB 6 q/TiER OVERLA/0 W/TH ASPHALT W/DTH 'C' �� 6' SAWCUT AND YATCH m , , EXISi. PAVL _ CONCRETE OR ASPHALT ORIVEWAY DETAIL "C" PLAN N.r.s SAWCUT ANO MATCN CONST. EXPANSlON JO/NT (EXISTING COMCRETE ORNEWAY av�n r� SAWCUr S�ppE 'G' ExiSjixC_Q?rv�trnr �-2Y. ' __' """"" I f�Xl�TI QR Piq .SFQ.... • e. � - �w"�e soavac� e � � I ,,�(,y/PTTER I 2 � g� LfNCTH 'C _I xza„�,r m�,o EXIST. R/W LlN£ - _ _ � _ ASPNAL7 �� /:/2 fMAXI WALK N 6" STRAIGHT CURB -� NORMAL CURB m 2'lMINI ASPHALT CONC. 7YPE 5 6" !M/NJCRUSHfD CONC. BAS£ lSEE NOTEI ASPHALT DRIVEWAY SECT/ON CONCRETE OR ASPHALT DR/VEWAY DETAIL "C" PROFILE r• WHEN YATCN/MC EXISTING ASPHALT ORNEWAY.CON1/NUE CONCRETE 6" CONC., 3400 PSl HE�OER CURB THROlM,H ORNEWAY. AT CONCRETE ORNEWAYS CONSTRUC m STRUCK JOINT TO EYULATE CONTINUANC£ OF HEADfR CURB THRWGH NEWAY. CO C TE OR ASPHALT DRIVEWAY DETAIL "C" DATA SrA. EDGE OF BACK OF CENfiTN SLOPE YATCH EXIST. W�07/1 fX/STING ORIYY. PROPOSED D/7WY. PVYT. ElEV. WALK ELEV. 'G' 'C' ORWI'. ECEV. H' MATERIAL YATERIAL 231+g7.46 27.82 27.98 �.89 -��NY. Zl•95 2430 ASPFIALT ASPMALT COMPACT 235+J0.97 28.18 283� 2.00 2.30Y. 29.39 /0.00 GRAVEL CONCRETE fX15T. BASE 236+!l.00 29.75 29.91 15.39 -0.45Y. 29.81 15.00 ASPHALi ASPNALr 239+992� 36b7 36.83 5.�6 -8.32% 36.36 25.38 ASPHALT ASPHACr z.o..e.es n.n .n.z� �j.0 -o.�er. a�.n �z.z2 CONCRETE Q9NCR£TE CONCRETE ORIVEWAY SECTION 507t5135 2�.68 2i.8� �.76 6.09% 25.13 22.62 ASPNALT ASPHALT - 508+69.5 28.61 28.77 0.2/ 2.7�% 29A5 /0.69 ASPMALi ASPNALT ' eccaro aunwcs ✓ �� ��� �� •� CITY OF CLEARMATER, FLORIDA \ . ENGINEERINC DEPARTMENT $ R � 100 S. Myrtle Ave. " Cleerrmter, F1 33758 d � - -- - W/DI I NI 1 4' I WIDTH "K' I 4' -TRANSITION CURB /NTO ORNEWAY FLARE BACK OF 5/DEWALK �RAMP CURB ITYP1 BACK OF SIDEWALK CURB fAS SHOWN _ _ ON PLAN51 1:12 lMAXI ¢ _ � ASPHAL7 WALK N CURB ASPHALT DRIVEWAY DETA/L "D" PLAN N.r.s Q SAWWT AND MA7C EXIST. PAVT. i SAWCUT fXl$TING ORVEWAY _ 'J� ... " �vc ..�'.. �' """ "__"_..._.._ �..£xisriaJ� wR�"a E��- f-2X I DROP CuRB . � 6' 6' I 8' LENCTM 'J' ASPHALT WALK ASPHALT ORIVEWAY DETAIL "D" PROFILE ASPHALT DR/VEWAY DETAIL "D" DATA STA. £OG£ OF BACK Of LENGTH SLOP£ MAfCH £X/5T. W/OTH Py,VT. £LEV. WALI( EL£V. 'J' 'J' OHWY. ELEV. 'K' 502+6/.23 2J.16 27.62 I.Si -9.32'/. 27.20 /9.69 50 +. 25.i2 252B 1.42 2.l1% 253/ /7.30 Spl+�l.l2 2�.84 25.00 336 63/% 25.2/ 2�.70 DRUID ROAD WALKWAY CONSTRUCTION DETAILS SHEET DRIVEWAYS (PHASE 3) °-�:« � � ' , , , ' � � ADDENDUM NO. 1 For DRUID ROAD WALKWAY (PHASE 3) Clearwater, Florida Project Number 04-0021-PR DATE: November 21, 2012 SUBJECT: Addendum No. 1 TO: Prospective Bidders and Others Concerned Bidders on the above project are hereby notified that the following Addenda are made to the Contract Documents: 1. The selected plan sheets provided in this addendum are to replace the original ' plan sheets of the same number. The attached plan sheets dated 11/14/2012 have been revised as noted below: ' ' ' ' ' ' , , � , u . . . . . . . GN-1, Added note 16 and deleted pay item notes 5 and 6. (Water utility will relocate meters, valves, and hydrants.) L-1, Revised legend C3-1, Added milling and resurfacing to Prospect Ave. Edited/added labels. C3-2, Added milling and resurfacing to MLK and Turner St intersection. Edited/added labels. C3-3, Edited/added label. C3-4, Added milling and resurfacing to MLK and Madison. Edited/added labels. C3-5, Added milling and resurfacing to Lincoln Ave. Edited/added labels. C3-6, Editedladded labels. C3-7, Added curb and gutter. Edited/added labels. C3-8, Added curb and gutter. Edited/added label. CD3-2, Revised details, notes and labels. CD3-3, Revised details, notes and labels. CD3-4, Revised details, notes and labels. 2. The attached revised bid sheet dated 11/14/2012 is to be used for this pro�ect. END OF ADDENDUM #1 THE CITY OF CLEARWATER PINELLAS COUNTY, FLORIDA Bv: /s/William B. Horne, II City Manager � � � i � r � � � � � � � � � � � � � � t � S s � � � � ���� H U Public Works Administration ORUID ROAD W,4L Kl�V,4 Y �PHASE 3l Sect 8. Twn 29 South, Rng l5 East Sect 9. Twn 29 South, Rng /5 Eost Sect /6, Twn 29 South, Rng /5 Eost Sect /5, Twn 29 South, Rng /5 Eost Sect l4, Twn 29 South, Rng /5 Eost Sect l3, Twn 29 South, Rng /5 Eost ��'��//S�` T Ii OF yF � � 1,`� �'� : ��, `���i o � � �� q OD =��AlER, �� �'� [�] w�E� f/tl IYlwsn isl, 8�]70, R�nYwiq 6 T�iq R S1MI nar2uro r�vcnaw.awo .�.....ar�naun CITY OFFICIALS (3eoxge x. GYetekoa Doceen Hock-DiPolito Jay Polglau Bi7lJonson Paul F. Cii'beon Bill Hoxne Micheel D. Quillen, PE City Engineer o�y..ar.m�a twiws G+orp�. x Floill� R�y�hla�llp. ]!E!6 oma. atinnnnrcn w.: sex e��v�am.a.drma.ere 1vfeYor Seat 1 Couacilmember Seat 2 Councilmember 3eat 3 Comci7member Seat 4 Coimcilmember Seat 3 City Meoeger ApprovedBy a:rwu��aauwu+at,scnu Date Approvod REV/SIONS Q SM£ETS GN-i. L-l. C3-l� C3-2, C3-3, C3-4 ///l4/l2 C3-5. C3-6. C3-7, C3-8, CO3-2, CO3-3,CO3-� � � � � � � � � � � � � � � � � � � � GENERAL NOTES l. Gb✓ERNING STANOAROS SPECIFMATWNS: A, CIIY OF CLEAlM'AiER SIANOAROS. T£CHNICAL SPECIFICATlO//5 AND CONTRACi OLCUYENTS. B. FLORIOA PEPARTNENT OF TRAHSPoRTATIOM, $TM'DARD SPECIFICAiIOMS FOR ROAD AND BRILGE CONSTR(tiTION . 20p OR LATEST fpTION. C. FlARIOA OEPARTN£Ni OF TRAMSPoRA71ON, ROAOWAI' AND TRAFF2 OESIGN STANOAROS JANUAR" ZJ.17 OR /ATE57 EOITION. 2. NO WORK SNALL BE PEFFORNED WIiHIN p FEEJ Of CSN R/R TRACNS CEMiERUNE 3. CALL IX/TS FOR STA�ION$ ANO OFf5ET5 Af7E F/pY 7NE �F OF ORUID ROAO FOR CURB AND CUTlER, FpAOWAY PAVENEN7. CONCRETE 5/OEWALK. ORAINpCE STRUCTURES ANO ORNEWAYS. CUME �ATA FOR THE wALK WAY IS REFERENCED fRON E OF THE TRAIL. 4. TME CONIRACTOR $NALL MNNTAIN COP/E$ OF ALL APPLICABfE PERM/t5 ON-5/iE AND SHALL ADHERE TO ALL PERNIT CONOITqNS p/RING CONSTRfICTqN. 5. TN£ NN7RACTOR SHALL BE RESPoNSiBLE FOR PENACTIES/FMES LEV/EO 0�/E TO WORK THAT IS NOT IN ACCOROANCE W/TH PER4/i CONpTlONS. 6. TNE CONIRACIOR SNACL USf APPi�PR/A7E YEASURES TO PREVEN7 EROSiOM AND 7RANSPoRi OF SEP'MfN7 NATER/AL TO INLETS. SURfACE ORAINS. LMES AND WEiLANO AREAS. 7ME CONTRKTOR SNALL USf SYNTHfTIC BAL£5. SILi BARRiERS OR OTNER APPfpPRIAiE NEASURfS TO PREVENr AOVERSE IMPACTS TO EXISJING SURFACE WATER WAG�1Y. IF A SPfCIFiC PAY ITEM IS MOT PROVIOEO FOR EROS�ON CONTIqL MEASURES. iHEN iNE PAYYENT SHALL BE iNCLU0E0 UNDER PAY IiEM YNNTENANCE OF TRAFFM fGUNP SUNI 7. rNE CONTRACTOR $NALL CNECK ALL EROS/ON AND SILTATION CONTROL OfVICES FOLLOW/NG ANY 0.5 INCN OR GREAiER RAINFALL EVfNT AND REPAIR OR RfPLACE 7NfN AS RfW/REO. B. iNE CONTRACTOR SNALL CONrROL ALL FUGTIVE WST GENERATED BY CONSTRUCTION ALT/VlTlES ON THE PAOJECl B/ WATERING OR OTHER NETH005 AS REWIRfO. 9. PRIOR TO 7NE PRE-CONSTRUCiION NEErING. THE CONiRAC70R SHALL N07IFY iNE VM/0(/5 UTILl11 CONPAN/ES IN OROER IO ESrABUSN FINAL LOCAT/ONS fOR TH£ RELOCAiION OF TNE EXISTING UNOERGRp/NO ANO A6WE GRWNO UTIUTIES IN AOYANCE OF CONSTRUCTION. CON�ACT S(/NSMINE SiATE ONE U71LlTIES NOTIFICAiqN CENrER ar i-ea�-+3z-+no. q. THE CONTRACTOR SNALL INSTALL EROSION ANO SILTATqN CONTROL OEVICES /N OROER TO PREVENi D£BRIS Flq4 ENTERIN6 7HE EX/SrING SANITARY AHD STORM SEWfF SYSTENS. Il. TNE CON7RACTOR l5 TO ENSURE JNAT THE P4AINAC£ SYSTEM FUNCTIONS TNFWGH01/T CONSTRUCTpN AND SNALL CL£AN TNE PROPoSEO $TORM SYSTEMS PRIOR t0 FINAL INSPECTION. CONPENSA7ION FOR THlS WORK ITEM SHALL BE CONSIOER£0 /NCLUOED WIfH THE CONSTRUCTION OF iN£ PROPoSED STORN SEW£R. /2. TRAFFIC LONiFOL OEV�CES SNALL BE /NSTALLED M'D NAIN7AINE0 AT APPROPR/A7E LOCATIONS D£TEFN/NEO BY 7HE FIEID ENGINEER ANO IN ACCOROANCE W?N TNE 57luVDAR05 SET FORTH BY TNE MANIIAL ON UN/FORN TRAFFIC CONTFOL OEV�CES AS ANPTEO BI THE FLORIOA 0£PT. OF TRANS. UNOER Rl1lE H-lS.Op, FlARIOA ADN/NISTRAiNE COOE. AND TH£ FOpT'S FUAOWAY AND TRAFFIC pESMrN STANOAROS INDEX 600 DESIGN SERIES. li. if57/NG OF STABlUTA7/ON. BASE. ANO PAVEMENT. AS w£LL AS COYPACTION OF BKKFILL. SMALL BE REp/IREO MCORDING TO TNE NININ(/N FREq/ENG1' T£ST/NG R£IX/IRENENTS OF Ci7Y OF CIEANNATER AND THE CONTRACT SPECIFICATIONS. N. ACL UNOEIiGR0UN0 UTlUT1' SYSTENS AS NOTfO ON THE PLANS MUST BE /NSTALIED BEFORE 1NE rRNL AND FOAOWAY BASE M'0 SURFACf ARE CONSiRUCTED. d. ALL r£NPoRARY NATER/AGS USED FOR SEOINENT ANO EROSION CONTlqL p/RING COHSrRUC� N 5 L BE R£4 ED PoN P(ET OF H£ ROJ C7. ,G. ANY SPRINKLER $YSTENS PIPING ENCWNTEREO B� �ME CONTRACTOR WITNIM iM£ PROJECT L/N/i5 $HALL BE CUT AND CAPPED AT THE RIGN7-0E-WAY LINE. 7NI5 WORK IS 70 BE Pa0 UNDER B/D �TE4 'ClEARING AND GRUBBING.' m PAY /TEM NOTES I. THERNOPUSTIC INUY TO BE PND UNOER PAT7ERNE0/iEXTURfO PAVENENT ASPHAC7. 2. EXCAVATION AND ENBANNMENT 70 PND AS LWP SUN. J. RENOVAL WANTITIES FOR EXISTIMG CONCRETE PdVEN£N� 17EM5 ARE FOR ESTIMAiION PURPoSES ONLY. EXISrING CONCRETE RENOVAI. IS PNO UNOER &0 IIEN 'CLEARING AND 6RUBBINC LUYP SUN. I. B/D /TE4 'CONCRETE 5/�EWAIX (PY SNALL INCLUD£ PAYMENT FpR THE COST AND /NSTALLAT/ON OF ARCNITECTURAL CONCRETE. SEE OETAIL ON SNEf7 COl-/. 5. OElEtEO � . OELErEO DEMOUTION NOTES l. DENOCIJlON UMITS AR£ SIAN'N �N THE PCAM SET FOR p/ANTITY PURPoS£S AND i0 fSTABUSN MPROX/YATE l/YITS fOR /YPHOVENENTS ANO TO IOENT/FI' SPEC/FIC /TE45 FOR R£YOVAL SUCN AS TREES. CURB. PAVENENT, ETC. TNE O£MOUTION Ll4iT5 ARE NOJ £XACT AND NAY VARY. ITE45 N07 SHOWN 70 BE REMO✓ED dRE TO RENNN ANO SHACL BE PROiECTEO IXIR/NG TM£ CONSTRUCTION p/RATl0.V. 2. ALL EX/STING PAVEMENr. S/DEWALKS AND CUR&NG �OENrIFIED FOR RE✓OVAI ON TN£ PLAMS, SNALL BE OEAIOUSNEO AND R£YO✓ED FROM SITE /N AttVROANCE WITN THE Cl1Y Of CLfANWATER $PECIFICATb/YS. 3. SPECIAL AiT£NTION IS D/RECiEO 70 IHf FACT iNAT PoRTbNS OF SOYf ORA/NAGf STRfKTURES £XTEND INTO TME STABiUZEO PORTION OF TMf ROAO BED AND EXiRENE CAVTION W/LG BE NECESSANY IN STABIUZAiIOM OPERA?qN5 AT iMESE LOCATlONS. 4. THf LLCATqN OF EXISTING UTILITIES ARE FPPROX/MATE AS SHOWN AND lT IS TNE Ct7NTRACTOR'S RESPoNS/B/LI7Y TO Df7ERN/NE 7HE EXACi LOCATpNS OF THE UTI!/il£S PRqR TO CVN57RUCTpN. THE Q'JNTRAC70R SNAl1 NOTlF1 ALL UiIUTY NYPANIES /N TN£ MEA BEFORf BffiINNING CONSTRUCrION. M ACCORDANC£ WITH rNE Cl7Y Of CIEANWATER SPEGFMATlONS. 5. CONTRACTOR SHALL COOROINATE 4BAN�A'YfNT ANO/OR RELLCA7lON OF EX157/NG ABOVE AND UNOERGRp/NO UilU7Y UN£5 ANO PoLES WITN iNE APPRl�PF/Aif UiIUIY AGENO'. 6. ALL UNSUITABLE MATERIAL ENCp/NTfREO OUR/NG CONSJRUCJION, AS OETERM/Nf0 B/ iN£ F/ElD £NG�NEER. SNALL BE REMOVEO ANO REPLACEO W/iN C[EAN FILL. 7. ALL TRAFFIC CONT/AL WARNING & FEWLATON/ 5/GNS IOFNrIFIEO QV lHf P(ANS TO BE RELOCATEO OR REYOVEO SHACL NO! BE iAK£N pl? OF OPERA7/O�V UNTIL PERYANENi TRAFf2 5/GNS ARE /NSTALL£D. IF REW�RED. p/E TO COMSTRUCTpN ACTNIilES. THE fx15TlNG TRAFFIC CONiROL SIGNS YAYBE RELOCAiEO TENPORARILI' ONLY BY CI1Y FOl�LES AS WTUNEO IN SPECIFKATlONS. B. PoSSIBLE TREE TRINY/NG AND REYOVAL MAI' BE REp/IRED TO PROVIOE AO£IX/ATE SI6H7 bV0 ClEAR ZONE OISTANCE. OR AS ORDEREO BI TH£ EN6iNEER. ALL EXPENS£5 INCURREO FOR TNIS WORK WILL BE /NClU0E0 /N THE PRICE B/0 FOR ClEARING AND GRUBB/MG. CONSTRUCTION NOTES l. CONCRETE SiDEWALK RAMP CONSTRLYTION SNALL BE IN KCOROANCE F00T INO£X 30e. 2. CONCRETE S/OEWALK CONSiRUCTION SNALL BE /N ACCORDANC£ WITM f00i INOEX 7q. J. ALL 5/OEWAUf ANO SIOEWAlK RA4PS CONSTRUCTION $NALL MEET AOA lANfRICAN OISABIUTIES ACrI REIX/iR£MEM�S. �, iHE CON7RACTOR SNALL PFWIOE ORNNAGf STRUCTURf SHOP ORAW/NGS TO TN£ ENGINEER FOR APPHOVAL PRlOR TO CONSiRUCIION. 5. THf CONTRACTOR SHALL SUBNIT A 7RAFFlC CONTROL PLAN 70 TME CI7Y FOR APPROVAC PRIOR TO CONSTRUCTION CONMENCENENT. 7NE CON7RACTOR SHALL BE REW/Rf0 TO PftOVIDE TRAFFIC CONTROL lN ACCORDANCE WITN FOOT RJAOWAI ANO TRAFfIC qES/GN STANDAROS. 20�V OR LATE57 EOITION, AND F00T STANDARD SPEC�FICATIONS FOR q0Ap5 ANO BR/OGES. 20�tl OR {,ATEST £0/TION. iRAFFIC CONTHOL PROCEOUF£5 SNALL ALSO BE IN CONPL/ANCE WIiH iHE MANIIA( ON UNIFORY 7RAFFM QAVTfqL OEVK'ES /NUTCOI 2.'V9 OR UiEST EO/TION. TNE TRAFFIC CONTROL PLAN SNALL INCLUOE PLAMS FOR PEOESTRIAM TRAfF,C QJNTROL. 6. THE p1Y R£OUiRES THAT THE SUPEMISOR OR fOREMAN CONTROLG/NG TME WORK FOR THE iNE CONTRACTOR QY TNE PNOJECi NAVE A C!/RFENT WORK ZONE TFAFFK' CONlROL SAFE�/' CfR7/FICATpN OR WORKSITE TkAFfIC SUPfMI50R LERTIFKAiION FRON iHE fLORIOA DEPMTMENT OF TRANSPORTATION. TNE CERTIFIED 5(/PERVISOR SHALL BE ON TNE PROJECT 5/TE AT ACL TINES WNILE WORK l5 Bf/NG CONOVC7E0. l. NONCOMPLIANCE WIiH APPRO✓ED MOT OR CREATINL AN UNSAFE EN✓/RONMENT WILL RESULT IN A WORK SlOPPAG£ UMiIL CONDITIONS ARE CORRECTEO ANO APPROVEO B/ CIT1" f/ELO ENG/NEER. B. PAYYEN� FOR THE WORK OR REMO✓AL OF EX157/Nfi ORNMAfiE STRUC7URE5 ANO PIPE$ SNALL BE /NLLUDED IN THE PAY ITEMS FOR NEw ORA/NAGE STRUC7URES. 9, iNE CI7Y OF CLfNM'ATER WILL OBTAIN PERYISSION fip4 PROP£R7Y QYNERS FOR ANY GRAp'NG PERNl75. ORIVEWAY PER4iTS OR RIGNi-0E-WAY NECESSARY 70 CONSTRUCT TRML, ROAOWAY, S/OEWA[X. DRIVfWAi'S. M'D lAMOSCAPING. p. ASPNALT ANO CONCRETE PAVEMENT. INCLUOING SIpEWA(RS SHALL BE $AW-C(/7 BEFORE REYOVAI OR AMY OTNER CV/ISTMMTION. CITY OF CLEARNATER, FIARIDA ENC[NEERINC DEPARTMENT I00 S. Myrtle Ave. Cleerwater, FI 33�58 TREE BARRICADE NOTES l. ALL TRfES WITNIN q FE£T OF TRAIL ARE TO Bf P/iOrELTEO lN ACCOROANCE WITH CI7Y Of CL£NM'ATER SPECIFiCATION 62.1. 2. TREE BARRICADfS TO BE PND UNDER BIO REN 'CL£AR/NG AND GRUBBINC ROOT PRUNIN� NOTES /. ALL TREE R00T5 ENCp/NTEREO A/tE TO BE PRIINED IN ACCORDANCE WITM CITY OF IXEARIYArER SPECIFICAiION 62.2. 2. ROOT BARRI£R l5 TO BE US£0 Af (ACATIONS AS OlREC7E0 9Y Cl7Y ENGINEER. F00� BMRIER SHq/LO EXTENO p FEE� BEFOFE ANO AFTER CENTERGNE OF TREE. SEE OETA/L ON SNEET CO3-1. 3. HOOT PRUN/N6 TO BE PAIO UNDER B/0 iTEY 'CLEAR/NC ANO CRf/BB/NC DRUID ROAD WALKWAY GENERAL NOTES (PHASE 3) ""�°"°' NONF � � � � � � � � � � � � � � � � � � � rv s EXIST/N� SYMBOLS LEGEND: SYMBOLS FOR EXISTING & PROPOSED UTILITIES FOR PLAN VIEW EXISIING PROPpSEO � = BOIL�PD ❑O • CAB�E LELEVISIOx BOx -•�-�••--�BT --�-�--�-� BUNIEO iEIEPNONE M/� O = COMAINIC�ilONS NtNHO�E --------- BTV-�---��--- BUFIEO CABLE Iv N�� �O� = CABIE tElEVI510N PF�ESiI,L --------- BFO��-�-��--- BUNIEDFIBER OPiIC H�� O=EIECiPIC�I KINXOLE =fLECTRIC�I VRUII �---�-�-- OHF-�---��--- OVEPHEAD FIBER OViIC M/� �B i1BEA OvTlt BOx �---���-- OT-�---�---- OvFHHENO tELEPNONE N/� • GIIVRHCNOR CI : CFAIE INIEI �---���- O7V------�--- OVERHfNO CRBLE iV N/A • f IRE HYOF�Nf ...-..-. p•G,y.........' GA$ N/� � z LICHi iOLE � = IM I l 80% """"""GJ£•••""" UtlLliv N/A Q =�,pNMOIE PFD , pFUf51�L ----��--'B'$AN--�-��--- SANIiAPV SENEA N/� �� � 0�' = GOINi OF ELEVAt10N =='.l2�STORM=== SIORMSENER •eP =RfFLECTORPOtE ...•.-.6°WATER�"'"""- WAiEN N/� �pC "SiGN "'"-'"'"pfKW"""-'-'- FECLPII.EDWAiFF N/� DQ :AECLAiMEOW�iENVAIVE ❑1 = iELEPHONE BOx LPEE BRflRICRDE } /--f—/ 50 = S�NIiRRV SEMER CLEAMOUi ROOLaPUNINCIIMIiS ------- O =S�NIi�RYSEMFIi1MNHOlE iAqFfIC CONOUIT — � — � — � ' SVICOI �EL� iELfPHONf MINNOLE Sllt FENCE �B = iELEVHONE vAULI � HHVE11i20nHAnDMOIE PROPOS 0 YMBO S ND �= rnnvncsicnn� eoxc • iq�fiIC51GNRL POLE � FIRE MrDNANt m = rn��ric voiE 1DJUST NATER V�LVE IBY uilLlir POIE '�� OTXER51 t� RELOCATE CUT ANCXOR =UilLlivPOLEwITHLIGNI �Br OtHERS� � P-5 DRAINAGE INIEi ,�y_yh ADJUST MpNHOLE (TO BE �y� RELOCATE UTILITT POLE = CONCRETE U1ILIlr PoLE wltHtlGHi O DONE BT CONTRACTORI IB OTHER 1 m �=raiEar[iEa � DRAIN�CE INLET w.V�N ADJUST GAS VALVE (BY OTXER51 pn RELOC�7E NATER 4ETER IBY e= WitNE55 Past OTHER51 pQ = �µ�IEP v,1LVE REMOVE INLET lT0 BE DONE RELOC�TE NAiER AETERS (Br vo ���� BY CONTR4CTOR 1 �� � OTXEfl57 = f iBEa Ovl l C wI1NE55 POSi � P-6 DNd�NCGE INLET �= c�5 w1INE55 POSt RELOCAtE M41LB0% 170 BE DONE ���? PEMOVE UTILITY POLE � BY LONTRICTORI (B7 OTMERSI /�yE� '�EIEVwONE wITNf55 VOS� Q MnNNOIE {.a : R�ILN0�0 iRACMS �-tEl� RELOCATE iELEPHONE MRRKER �p�� REPLACE COVER (TO BE O P-9 �RAINIGE INLET ��BY OTHER57 DONE BY CONTR�CTpql e = SOIL BOAINC/UilLiivlESt HOLF � RBY�OTNERS)p�ZON M�ND MOIE �� �DOT CURB RETURN NUA6ER �•ExIStINC ufllltY SiRUCTUNE NuMBEF nFMO lTION F, ND SI�ENALK REAqVAL � DRIVEWAY REMOVAL OR REMOVE TREE PROPO D PAV M Nr FGEND � °r���. PROPOSED ASPHAL7 ROAOWAT PAVEMENT OPROPOSED MILLING 1ND RESURFACING CITY OF CLEARXATER, FIARIDA ENGINEERING DEPARTMENT I00 S. Myrtle Ave. Cleer'weter. Fl 33758 TREE LEGEND� = �UStA�l1AH PINF TNEE ��= AVPCADO iFEE = BAV IqEE BB_ BOiiLfBRUSN iq[E = CRAPNOP LPEE �E = CEOnR iFEE �= CNERRV LAUREL TREE �� CXINABEFRV fREE = CI LRUS INEE Cv= �roqE55 iqEE = f�P iPEE = fvEHCNEEN IFEE ��= IAC�R�HD� ipfE �= 1MGnOlI� iflEE �= WPLE fREE �= AnqiLE tAEE • OAM INEE = PALMTREF PirvE LREE 5 =SxFEtGUM P�= PUNQUf iREE � UNItNONtI iPEf R - iROPICRL iFEE �O�ItIOfUL 1PEF LfGEND OS = LPEE C1n551fiC�ilON Gx�OF OI = VOOR CfV�DE O5 = E%CELLENT GIiADE �� � i ASPH =ASPXqLt SIA = SIAiION B/C = B�CIt Of CURB StY = SIOFY BLDC = BUiLOiNG 5/W = Si�EwRLN BM = BENCN�NNX 1BM = LEYVONARY BENCHIMRx BOi = BOIiOM lEl = IELEGHONE ( =BASELINf i0B =10GOFBANN C/5 = CONCREtE SI�B i05 = IOE OL SIOPF COW = CONCREIF OFIVEYMY iR�NS= iPANSiONMEN CLf =CH�INIIxnfExCE iq�v =ip�VEA5EP01N1 CIM = C�BLE 110NNOLE ivV = ivVICAI CAP =COFNUG�IEDI�Ei�LPIPF U/P =UIiLi1vPOLE CONC = CONCREtE UNN = IINXNOWN iPEE COR • CONNER VCG • VIiPIfIED CI�Y PIGf CPB = CONDOMiN�UMPL�I B00n VER. NX = VEPIiON HqHO NOIE ID� = O!i ICIRL RECORUS 900N 8310, PAGE 21I2 y��{ - yp00 iENCF OIA • OIAAEiEF 010 • OUCIILE IRONPIOE Ow =OfV�iN�CE1MnMOLE E/P = EDG[ Of OqVEtfN� EL = ELEVPiION EIEC = ELECiRiCRL lil =fIEIODAIR iIP =fOUN01PONR00 lN6D =f0UN0NRIL�NO�ISF fOB =fIBENOPtICBOX f0V =f011N00PENEN0IROXPIGE iVC =�LORID�VONfRCONGOFRiION FGX6D= f0UN0 P�RnEN X�LON NRIL ANp OISn fFP =FOUNDPINCHEDIFOt1PIVF fMC • iOUND %�CUf IE = �NVERi ELEV�110N �FE =LOV.E51fIrvI5NE0iL00RELEV�IIOrv LB = LiCEXSE� BUSiNE55 LS = LICFNSED SUFVEVOP Lt =LFfi 1M5 = �MSONRv �.f5 =MItFFEDENpSECtION nso =rui�eHOOisx 0/A = OVEP�II OXl = OVEPHF�D LINES IPI = Pl�l 0�1� PB = PLRI BOON PEO = PEOFSLAL PG = PACE151 PI =VOIN10i INLFFSEC110N PN60 = PAqNER RALON HPIL 6 DISX POL =POIXiONLINE PVC =POITYINYLCML0f110E F/W = NICHi OF WAT NCV = NF�NfONCEO COrvCRETE PIPE Fl5 = AECi51EPED lArvO SUNVEVO(1 Al5 = REGIS�EFEO LANO SUFVE'/ON FN e NAILfl0A0 Fx8 = NECLAItEO Mt4iEF BO% SEC = SECiION SIP •SEtIFOHP0U112'.LBSI)6 SM1 = SANITANV AMNXOLF SPK6D= SEI VqRKEN KALON 1UIL RHD DISK. �B 5)]6 DRUID ROAD WALKWAY LEGEND (PHASE 3) �"�°� NWE � � � � � � � � � � � � � � � i � � � ca+sr. zis "`"w` "o >, cavsr. sz �r oF rrve i V1 4j OF PAVEY£NT :.,,, . ��� W CONC.CURB ANO GUTTER :. ,. Q � oF asPHau TURNER ST. � - J�1 Q TRAIL COMN£CT TO EXISTINC '� '- ¢ � REYOVE 16B LF ' W¢ STAIRWELL lNSIOE OF RENOVE- /30 SY Of ��. �OF CONC. CURB . . 2� {� BUIIDING W/ iH CONC. SV CONC. 5/OEWACK. � � ..� ��.AND IX1TTfR GUNST. 78 Lf OF �99 ~ 2� N R£AIOVE 97 LF � EXTENO CURB LlN£ 2�2 2�3 � 2�4 H£AOER CURB 20rJ � N M Q ��� �RB Of/i TO ACLVNODAT£ REA/OVE 132� LF � LY3N5T. 76 Sf OF CONST. ll2 LF Of I W 8' TRAIL S£CTIpN� REYOVE 5N Sf OF OF CONC• CUNB, ,� � CONf. SiQEWA[K Ll W '�' ELIM/NATf EX/S!. �� �N�,Ay µ0 �� � : HEAOER CURB U1 Iln �p,y57./A4 LF PARALLEL PARKIHG ���� �, � CONST.WALRWAY , "�TO BE R£MOVED REMOVE 237 SF OF � Q ¢ OF NEAAER u,y£ � . COMST.526 SF Of ., � x �'x NRB � , -�. . CONCRETE OR/V£WAY -''� . � , CONP�T./l9 � Of .. COMC.r01R� AY� 0 .. � � � 201 N���8 ,,w � 202 . ar,r er� cons . c sv � � _ ��_. , � " ��, , ._ , x �R/WPOi ,' . N AY ..�. 8 ---� � ,� .E �;� � . . �: � . _ ; � ;'. �., � 8 � � : � � • . .. , � ` � . ; _ 1 , ..,_ . F.�,... . :... , � . , ` � S pi CONST 6 LC' 0 � � , _ . ...,,,, , - .�.,: , . � , �.�. . . ' � � gry.l6 , : � .- ,a CONSi. 5D SF OF ; , : STRA/GHi CURB � CONST. IISF Of . CCWST. �6B lf OF CONC. S70£WA(K ��. , � RE40VE 60 SY OF � Q . . ` . AHCKIYfCiURAt CONC. ..-. .: . . . 5 �` . ,:; ., �. ..If:FADER. GURB .. , . 5-6 SA T f 1YPJ CONC. 5/pENALK N . : �� ._ , _ , .._ . _ ., � S /0 i£ ' � 5 89° 09 Ol E .� .� •. ;. � SAWC!/T f ttPJ `5 -89° 03' 03^. E ' ti REYOVE l5 SY OF ASPHAGT � .. �. �t �A � SRA � CURB � �/1 PAVEMENT REGRAOE r0 COAr$i pg $F qF, Q�NST 2)l(i Of , � CONST. TURNER ST. 2 ORAIN NORTH,i'O�SWTH CONC. SIDEWAlX RALPSTRA/GHT Cl/R9� ,,, .. .".� �j - � l5 R W � AN4�'�.YSi:l5 9r'# . . � s.. , _q. ,12,,,,,.___ _ � o. . � � ' ., .. . '� � I� � . � � �� �� ,:, AS%fALT PAC�EMENT ' �� �, ' .:.: . . . ,. ._ ^�_.�.. ; ,..�.._. . .. ,.. ,. - . . :: : .,' ":' .T.,,.:.::.5/ �.c � AYP � � _ -. .. ,...'.. -, _. . ,... . . .;, - �REUOVE X3 SY�OF '' �. .�. S �Y�.i�,.n,E .' . . ._. ti � . ��. ASPHALT PAV£wENr .� : e SOR. TURNER 5F. ... :, � Q:. , :� . REAIOVf l33 A ., .. � � Q I�. CONST. 73 �SY OF RE1lOVE ABANDONED .. Of FAVEM£NT , , _ � � a ASPNALT PAVEMENi ;: ' ��. RA/LAOAO TRACXS � - „ , - `"' Q I' & ASPHACT BASE ° � � � I BEGIN PROJECT fPHASE 31 Rm£,b�srE2?cF o�siaucnr $ ���� �� ��.. A. tl .l CURB CONST. 25 SF Of . � CONST. fUHNER� Si. P15TA. 203+p5.9= � Q ��.�. 5'S S-6 CpNC. S/OEWALK RAVP ��:_ SURVEY SrA. 1I+,21.% f27.95 LT) J � � L Q7NST. TURNER 5T. P/ STA. 200+p0A0= STA 2lN+Jp,Op !I/.50 LT) STA ZOJ*65.80 f/2.&1 LTI -��� . d .... m 2 Q x SURVEY STA. 10+99.40 lJ0.61 LTl CONST. TYPE P-9 IN(ET CONST. 7YPE P-5 /NLET - - . INDEX 2H �NOEX 2l/ g �� vl 0 EOP 2�92 EOP 26.�0 �. U FL 20.13 f5-£XIST/NCI, l2' RCP FL 2/93 f5-EXISTINGI, l8' RL'P RE,VOV£ /35 Sf OF � M/LL ANO RESURFALE NI SY CONC.ORNEWAY AND SAWCUT AND RENOVE CONSr.72 SYOF �'ST.433 SF OF TURNER ST. cavsr.2as sv of � caosr.4z� cF CONST.201 $f pF z28 �F OF C�A,� NNC.ORN£WAY CONC. 5/OEWALK RAMP OF NfAOER CURB C�NC• DRNEWAY ASPHALi Q4N£WAY � REAIOVE CURB AND GUTT£R CONST. 7� Lf REYOVE /9J SF OF �:'::. EXISTIAM> CO�VST. 221 SY OF ANO CONST. 22B LF ZOS RE40VE 88 SF OF 206 � HEAD£R CURB PO7 �� �N�,Ay �� ZOB �:, CURB INLET ZO9 ASPNALT TRA/L 'z�O OF T1'?E /CONC. 'zll _ ��, �N�,�y, COA,ST. 247 yy �. REMOVf �2 SY OF CURB AND GUJTER ��93 SF OF ASPHALT TRAIL REAIOYE 2b5 SF OF �' - REYOVE 73 CF ASPMi1LT ORNEWAY. REMOVE J/I !f OF REIIOY£ I00 SF OF CONC. ORN£WAY � �_ Of CONC. CURB CONST. 25/ Si OF COA�C. ORN£WAY �,y�, �q�y�ypy pNp di GUTTER ORNEIYAY AND CONST. �� R£40VE /50 Sf OF 4 CONC. CURB & WTTER 8' ASPNALT TRA/L W/ 0 -� 9$Y OF ASPNAGT ORNEWAY CONC. ORNEIYAY ANO CONST. 262 SF OF CpNC. HEAOER CURB CONSY r9B SF - T. 2CM Sf OF m CON57. /3� !F rRiW � CONC. ORNEIYAY -:, " ':.' �pH� � REMOVE lI2 SY OF ro S: DRNEWAY Z p Of HEAD£R CURB /ZOE ,: . REMOVE lZl SY OF , ZO ¢�'ST. WALNWAY Z �. �ALK `2O9 CONC. S/DEWALK Z/O �. � 6 . . . . , ! ::. � �� CONC. SIOEWACK , . ,.. . . .. , RANP r RM'.. . �' .... ��_�. f , . ..�- .,:. ,r> e_,,._ . " . _. _.._ .., . _ .., ,� . �.�.. ,... �.:;: ,.. ..n.�.. �. ,. ..., . . .. . < .._.... O _ ' O = g ,. <��..�. -., r. ,-�-'! - ` - + � , , . � � . .. ,. _ a N . . �. , .. i . �„ •• ..,.: .. . - .. : „ i �., " �� N 9 Q i-u < < , , �-�w , cw � � SAWC�IT llYP:l .OF�I PAVEYEN �... . 5-7 ; � ..,�_8 ... �-m 2 iyr� r i-u �•r � i_ Q $ �/1 ... .�nr-w .. _ .. ..S..S9•Oj•� a3• E ... CONST: 288 iF � CONST. TURNER ST. ... ;..° R£MOV£ 55 Lf OF CONC IX/RB b�i"ifITTER 5 89° O5' 02' E � aei ��� 6Y..CONTRACTOR CONST.291 LF OF � NEMER CIlRB CONST.IISF pF .� ; ,. ANO CYlN$L,55 LF.{�� CONC Cf1RQ....iLYpGUTTER�, ` , n2 .. . �A� STRAMrNTCURB .. ., �� ..��. . lB ,:: �ITECTURAL.. . g ;�... ' . .r, c'O :,'...; ` , r, ,..�., p� . . .�: 2 m � .. ,, .. .� . e � � . � � . .,�. _ . . , . ,.. . .s: „ . �. _. r _. -ro ., . _. . � �; J �, . . .' _ .'. .� " . ., ^,-; �, ,�� , , . .. . , ry ; . .� . , . . . -: ., _ �. .. :.. ' ._. � . `„ _.. . ,.. . , 5 �... f/' 20 E ,. ... .. ., Z , ...... _ . " �. ,�::_ � � .::- . . � s ti ° ��. . �� - ' ;'W � REMOVE 935 SY OF ASP/1AGT PAVEMENL �- �•.1�. :- . Q • � ' � � AND CONST. /35 SY OF PAVEY£Ni �SECT/pN � � _ � R£.MOVE JJ Lf OF ., Q (5£E SHEET TRJ-IFOR PAVE4ENT�,O£S/GN1 � SUR. TURNER ST. . � ARA/MAGE P/P£ �, z ''� , V � ST. Of l8' RCP � � .. 5_� 5_e W , . �'�P/B SURV£Y-SPK&D STA 2pB�p/.8p (2./5 LTl STA ZOB+55.90 f9.B0 Li! � � , STA 19+�0.58 � NOTE AlOO�FY MANMOLE CO/IST. 7YPE P-5 /NLET Q EL=32JJ /. UTIUTY WORK TO BE OON£ AS .�� R/M 31.51 INQEX 2/l � N/3/8791.057� FL IJ.35 fMY-EXISJINCI, 60' RCP EOP J/.75 � � 3 0.51 IDENTIFIED ON LfGfNO 5M££T L-1 FL 25.SIfS£- EX/STINGI./5' RCP fL 26.30 (WJ,18'liCP �� UNOER PROPoSfO SYMBOLS LEGEND. FL 2239 !S-EXIST/NGI� 36' RCP �. � � � CONST. 7URNER 5T. Pl STA. 208+0.66= 0 i0 �0 AL50 REfER r0 PAY ITEM NOTfS ON FC 25.55 f5W-EXISTING). /5' RCP SURyE'y 57A. /9+/7A2 l2J.OI LT� � � SNEET CN-I . FC ffi.QO f£1.18' ACP � Feet - accaro d+.rwcs •� CITY OF CI.SAIMATER P7.ORIDA na�.aoi vao-m a v¢t ro��mrt = TO PROSPECT AVE �CALL811 ..�..: s... :` �e �o*� " i7 ♦ . ENtlINEERINd DBPARTIIENT wNV«e sisrc DRUID ROAD WALKf9AY °°- -,� S �� �` 100 9. LyrUe Ava. °M1�OeO' CONSTRUCTION PLAN SHEET c°i.�seo� "ex °`°'° ea ° C3-i ° ci�s�.ecs�, m 39768 i.��: STA. 200+00 TO STA. 211+00 (PHASE 3) � � � � � � � � � � � � � � � � � � � � s rce rwe u�r ur REMWE l% SF OF CVNST. 2p7 Sf OF CONC. CriNST. $F OF � ��'� R£MOVE r62 Sf OF REMW£ 23 SY ' CONC.ORNEWAY AND ASPMACi ORNEWAY. CO,VC. pRN£WAY AND ���. Rf40VE 2/6 SF OF S/OEWACK RAMP .. . ..... CONC. 5/ qjvC RANP �. CONSr. 205 SF OF �'�'Sr. l69 SF OF CVNC. �p,yST. 169 SF OF S�OEM•ALK CpN� ARryEN,AY M,� REMOVE /70 SF OF �� REMOVE /2 SY OF -' �•'� � L�C ORN£M.Ay ORNEWAY AND CO�YST. CONC, pRN£WAY TURNER ST. CpNST. lBO SF OF ��N�• �ry�Ar ASPKALT ��PAVE'M£NT . -�� � H�� CURB�� 1 SY OF AS il LT ORN£WAY 2/l roxsr. a� sr oF LPIZA 2/3 2/4 - eavc. arrvtwar `zl5 RECRAOE TO ORA/N .- � pl6 �R�e � cu�E��;WO � j R£NOVE E17 51' OF ASPHALT TRA/C � REMOVE � SY OF �� NORTN 70� SQU7N �, . �/ST. 3/ Lf OF T.'PE / CONC. 5/DEWALK �. R£MWE' i5 SY OF - .. ` .. � REYOVE 7/ SY •. CONC. SlqtIYAM ,. AND CONSl. /0 SY, �- �ONC. CURB � 6`DF7£R, L CONC. 5/DEWA(/( .. : R£MOVE ,6 SY OF ... ..� ,... ..� pF� �pq�. � REdK1VE 31� SF qF �� OF ASPHALT PAVEMENT , .. REA�VE 25 51' OF REMWf 22 SY OF �':.. ... ,' CONC.ORNEWAY r1N0 . „ ��..': . RENOVE /8D SF OF CONC. 5/OkZ1'ALK.: . SYf1EWALK �.� -,REMOVE % SY OF, � _,. , i. . CDHC:SID£W,ALK ,. LVNC. SIDEWALK � , COA'ST. 339 SF Of ,� . �� GVNC. 5/DEWALK - ' , �. ��. � CONC.ORNEWAY�AND�.. CONC.ORNEWAY �. . � coNSr.i�2 sr oF �+r�� 2l2 R�v �w 213s '2/4 .- 2/5 2/6 Eua'e is s' rciyr '�� � � � . � i+rr r i-u CONST. 8 SF Of CONC. p CONC. ORNEWAY ,.' '' t-u ., ,, .. ._ '. .� , • . .� . . �.; �, . . CQNC. SIOEWALK : , ' .._OF � .:. .. . .. , . '..,- — .:� SIL/fM'A4Y 8 ;.: - ± Ktir � . . . . . . . . .:. . . . . . . ' „ . ;,: . . . . ,.. ,. . � f . , , iom r , ::, �. � CON3T. WALNWAY �. ._. N � .. . _ .,.. ., „'°°•-„ _ "__-'°. _ � i—YILL ANO � �� ' � ia rtc��r � .. R£SURfACE {, . L . ....� . „ � S 89'Q6' 02' £ ._ . CONST. 5� Sf OF ��. " . 13B SYm. Vl , ,." ;, r:. N f CON5r. TURNfR ST. �. .._ M , .. ... . CONC. 5/OEWALK .. . . � : $� � . . . . 23 , .. . ' , �. � � 27 . , � . . ., . .. ... _ . 2 :. , . . . . . : � ' . . :_. . r . J ..,., � . ....:: . �...:� r � �.: _� � . . '• ;. , . ,.._' ,' .., .': � : � , '�, j�/ :.: w .. '.. �� � T (Zj ;. ,-$ SUR. TURNER ST. REUOV£ 329 SF OF CONST /OiOiB [f ���— � �� . REMWE 3i LF OF� C�C. � Q SUR. 5 � . �.. R�y CONC.ORN£WAY AND � OF HEADE'Pr.CURB n/RB & GUT,TER AND Q Q . .. �:: � CONST. i30 Sf OF . .. .. � � -'�-� COMC. ARNEWAY N T. TURNER ST. PI.ST,. 216+51.93� ,. �,:�1p�yST. 35 Lf OF lYPE l � ro MiX, JR.AV£ .. , . . .. . .. . .. .. .. ,. ' . @�:: SURVEY STA. 19+OA2 72�.25 GT) Q . .� CONC. CURB & GUtTfR � " m . CONST. l75 Sf� OF -�. �; ¢ CONSTi �� � � SAWCUT AND REAIOVE 550 l£ CONC• 5/DEWALK RMIP = I IfALNWAY �� . . .. OF COHC.CURB AND CUTTER lB SURVEY'SP �. Y: _ _ . � AND CONST. 557 LF � . 7YP£ ICONC.CURB 8 WiT£R Q£LA' �*,�8•30 '� , N 13187763�95 ', W RAV NOT£ l. UTILITY WORK TO BE DON£ AS IDENTIF/EO ON LfG£ND SNfET L-1 UND£R PROPoSED SYMBOLS [EGENO. AL50 REFER TO PAY ITEM NOT£5 ON SH££T GN-l. CITY OF CLEARMATER, FIARIDA ENCINEERINC DEPARTMENT l00 S. Myrtle Ave. ci�,r..eter. e� aa�ss .07/8 I � C10NST;�-.9/SYQF 4+ N ASPM. 7RA/L � CONST. 263 LF „ , ��: � I� OF HEADER CURB � p .- � > REMOVE 75 �SY OF 4` COMC. S/OEWA(K b � � � � � CONST. 5 MLK JR AVE. H MATCH LINE STA 2/9+pp•00 DRUID ftOAD WALKWAY CONSTRUCTION PLAN SHEET STA. 211+00 TO STA. 218+00 (PHASE 3) � o ro so � Feet e 'n �o.v� . �s Ho�o � � � � � � � � � � � � � � � � � � � � MATCN LINE STA.2/8+00.00 r� AV010 CONFL�TS— � ,��� T � � � W/TN UT/C/T/ES � AWID TELEPNONE conrrao� sox ; ,u _ — Kt-im • .4, �. . , � L1AVSi.WALKWAY B SUR. 5 AILK JR AVE• m � : ty/ .. , .�.::� � RE40V£ 53 SY OF CONC. SIO£WALK C CONST. 5 4LK JR AV£. � I .. CONST. 1N (f . Of•;IIfADER CURB � Q N , � � ' �� REMOVE SAO Sf OF � f� ',` carc. oeNEwar avo � ,. CONST. J29 SF OF 2 I ; � � CONC. AQNEWAY X '� R£AIOVE �5 SY OF W ':, � CONC. S/OEWA[X REMOVE 53 SY OF ASPHALT. pRNEWAY � AND CONST. 205 SF J ..__ ..': �'' � • . ��:. ..� OF CONC. ORNEWAY LtlA = 8' ASPHALT TRAIL A5� � W/CONC.NEADER CURB Q � REAIOVE 63 SY OF CONC. S/OEWALK � I R� CONST. 25 SF pf I . ''�, NA-5 .. CONC. Sl�IVALK � N w O �ELHIY i m � cavsr. zn2 sr oF ASPHALT TRAIL SAWCf/7 AND REMOVE 31 LF CONST.2{7/SF OF pF CONC. CURB ANO GUTTER CONC. 5/DEIVAIK RAMP AND CONST. J� LF OF TYPE � CURB AND GUTTER �-� 6' WATfR ' � "_ . _" " """..."""'. , ...OiV . ' � "_. ..,...�� "'_"'........ .""""!"H?""' ,� :' ""' �i . PINE ST. , . . , � '_"""'.��P. I:, _ p: , °,.:FZ:6k .a`:�. . O �� I • � CONST. l5 SF ' N ARCHIiEC7QRAL �,GOMCRETE� 3 ,. E' a � b N � MArCH L/NE STA.22/+(0.00 S —SAWIXIT AND RfYOVE JS LF OF CONC.CURB 8 GUTTER ANO CONST. 35 LF IYPE l OF CONC. C!/kB AND Cf/TT£R — —N— -CONST.2Bt SF OF CONC. SIqEIYA(K RAAIP — CONST. 50 SY Of ASPHALT TRAIL —CONST. �l5 [F OF MEAAER CURB � REMOVE �2 SY Of GOMC. SIUEWA[K �-C/7Y pF CLEMWATfR EXIST. fASEMENT r � ORNEWAY CITY OF CLEARMATER, FLORIDA ENCINEERINC DEPARTMENT I00 S. Nyrtle Ave. Cleer.ro[er. FI 33758 P/ STA. MATCH LINE STA.22/+60.00 � R/W ����R£NOVE +tl SY OF CONC. 5/DEWALK I � R N i w N � CONST. WALKWAY �.: � SUR 5 MLK JR AVf. T ���. : CONST..l51 [F , .: 3 �,..: m .�I OF dfAOER CURB o� ¢ �.... 8 .�. ASPHALT�4TRAl� � � ' REYOVE 7/ SY Of b ASPHALT. ORNEWAY 2 ..;. H .. .,'� . 2'cMV(Q�CON�SC�iNEWAY Y a ° � , � 1' , _ � . '. AS�AC� OR �Ar ~ � ., J 2 N ti I� : W �R£AIOVE 53 SY OF � ... CONC. SIDEWALX h - t-m� I �k CONST. S.:VLK JR AVE. � f ��� . i; t-rei wer ��f � I CITY OF CLEARN'ATER EXIST. EASEMENT �' N MArCH LINE STA.224+pp.pp a NOiE l. UT/LITY WORK TO BE DONE AS IOENT/Fl£D ON CE6EN0 Sh/EET L-I UNDER PROPoSED 51'MBOLS LEGEND. AL50 RfFER TO PAY /7EM NOTES ON SNEET CN-l. DRUID ROAD WALKWAY CONSTRUCTION PLAN SHEET <°�.aa: STA. 218+00 TO STA. 224+00 (PHASE 3) .�.� o ro a � Feei A�IXtE9GNT �SNOIED � � � � _ � � � w � � � � � � � � � � A/ArCH LINE STA.224+00.00 � DRUID RD. COMST. l09 LF OF CONST. 93 Ci OF TYPE / ��'^ � d NEADER CURB CONC. CURB S fiUTTER �_�� £YOl'E-!�9 SY Of ��:,, 5l8 /9 �2 • � bNC. s�otw 226,. RfMOVE B7lf � P�'@ SURVEY-SI � � OF CONC. CURB STA. 35+28A3 , m . V Y/LL AND RES(/RFACE 6/ SY N�13 �.2265 � � CONST. 21/ SF OF m' 3.6F5V W CONC. 5/QEWA(/! RAYP W; REMOV£ 50 SY Of ,. �,.� . - = CONC. SlD£WALK �.. .. _.� �...:...�y ..... AA� � �,.,: '� ,. .. ... - ... ,... .CONST. 830 Lf OF CIJY OF CL£ARMATER H£AOER CURB fXIST.fASEYENT � CON57. l8 SY OF R£MWE B3 SY OF ASPNALJ OR/VEWAY 227 CONC. 5/D£WALK 228 CONSr. 9 Sf OF ...... `ZZ9 CONC. S/0£WALK REMOVE 90 SY OF �p�yST /2 SF OF ASPHALT ORNEWqY ���p�•A(K , CONST. 368 SY 0£ ANO CONST. J/1 SF ..�, � .. .. ASPHALT .TRA�d �... OF CGNC. ORNEWAY ,� . . ,.. , 226 ' 227: _. _ I . ... .� ; . . � . � 2Gn8 '' W l�,////////////�,._ ; 8 � � � � _ CONST.IO SF �aEt'- . $� o-r[� ._ ,.::: ��..:.,::REMOY£ B/K£ RKK . -l. $�gj� Q CONST. 120 SF � . _ 37' IS• _. v g OF 5/D£WALK �., CONC.S/DEWALK�RAAIP -� - E 'i' . . ;. . .. ... �� . . . � 8, CONS � SY OfE � S 89' 22' l5' E k CONST. DRU/D RD. 5 89' 53' OS' E N � ASPHA(i'. TRAIL . � �. ' , - � h. '� " �2_ ''. .. ,....... , ...... � ' � � . , ... Y I;. . ... . r.-. :::. " .:. , ; . N � R£MOV£ 79 Lf OF CVNC. - . '.. W �:'. � .� . . . . „ ��. . - �� ' � � .. � . .. � � __._ � _.. .. �._ � _ .: - � �:.,.-„ � r 2 �: CURB ANO CONST. 79 Lf " _ . ,. . _:...: . . , .. . ., . ., . . ,..,... . . - - T ' OF ttPE l CONC. WRB � �- � � 6 p/T7ER .��. C CONST. ORUID RO. P/ STA. 225*83.02- '�, �- � ` �� SURVEY STA. J6*/2,77 U2.23 RTl � V REMOV£ 7 SY Oi ASPHALT .^= Q ... .. .. � ti PAVE4ENT REGRAOE TO �. SrA.221+B3.0I [ CONST.4LK JR AVf 6 ORUIO RO EA57� - a Q4A/N NORTN TO 50(1TN � !� ANO CONST 7 SY ASPMALT . STA. 519r07.00 F CON57.OAI//0 RO WEST PAVEYfNT � . .. � L/MITS OF YILLING 0 /0 40 � V1� AND R£SURfAC/NG F� REUOVE IB.�lF OF NILL ANO RESURFACE �l8 SY -_ �� -� , . :. �:�: . ���CONSTB� LFE7YPE OF � � DRUID RD. - ¢ �NSr, pvv�o-RO. sra.23<.n.n= � ANONCON5�4 SYAOF ., :.... ;�:.... COMC.LURB,#��:GUTTE . .. � . . 5l1RVEY��STA.���+75.68 ASPHALT pRNEWAY 229 •. 230 : 23F' � 232 233 aewave 2+9 sF oF coNSr. �zs sF oF Q 234 coNC. caaaewar 235 � � CONC. SIp�WAIK RAMP I 2. . CONST. IW SF OF ,, :��'. . .. CDNST.1$I L£ OF FIRE'M'ARANT COWL.S/OEWALK RAYP - REMOVE 35 /F QF CURB HEADfR CURB -REMOYE l01 SY OF . ASSf179lY . � O ..,. .. . . CONST: P65 (f OF .'- & C(/TTER AND CONST. CONST. 202 5�' OF � CA4C. SIDEWAlK. ' f2J(+J0.00. �� � M00)FY T£L£PHONE 'TIJB£" ��; ` REMOVE /66 SY OF , NEAD£R CURB �� 35 LF OF 7YPE /CONC. ASPNAI,T TR�� � ���� 230 ;. , j�� �r� :% O�� YARK£R fLUSH W/iRA/L L�M�• 5/OEI{'ALK CURB & G(/TTfR � � Q ': . : ' , wrtFACE. : . � coNSr: zdl, sr oF - ,,: ;" . . _ n -. ,_ � , � :' .. .. �- , "� ,,,� �, . . - ` . . " ASRHA(.,T,, iRA/L , . g `� `i' ' �eiH w '�_a rrFxi � � ' � nnr 23.i `' ,� � R.w- 234 .a.rv � S .. ,. . _ . ,_ . TA.232+09. ,. '� .. �.. . ;;, . 8 , F g �.+ocox5r. � 5F o� : ; _ _ +�-�"�:-- - � N CONC.510£WALK REMOV£ FIRE-NYORANT ASSEMBCY .� � . ., ..-��. � � H . ... _ � .�w-r�'...: N .... �,� . :�.43 .�: , r . . -: � � 5 B9' 53' 05 E � � � � CONST. �IR . ' S� .. Il. - . .. . � � ..._ . ." .. S 83 ,J�• is. E ... ` , ...... ---------____'_ I100/fY T£LEPIIONE CONCT Sl� LK 5-���� B: RCP� u1 �:, , -. . -._ N 5B' 33' E, ,, RfNOVE 50 LF OF'. ' ; • • ARKfR fLUSH RAAIP 2 � .. . . - CURB 6 CUTTfR, AND :. ,� .. W/TRAIL FTCE'----�—.;'_-------_.._--_ � . . ' 2 J �;" . � . '. -, � .. , , : �y CONST.50 !f 7YP£ /OF :, . ,,.. B SUR.ORUID RD. . ... .. -• � , � .:�.�- ". �� . - OONC.WRB &�WTT£R U � . .. . .. �.: ; , _ � :. ; , . . . ,. . " . :: . `�: , _. ._. . . ...: . _ . �,: �. :. .. . x � U ; �, ' r � � ._ ._ �_ . . _..� . -. . . . �- r. , , - I� Q� '. . � ' ' � ''' - .'. �.. . _ . .�. , ,a« ._ _. . . . .. .. Q � U Pl B SURV£Y'S/R REYOVE 21$Y OF ASPHALT � � ' .. ' .. . . , �. �� •. `.... � Q STA. �p+�120 PAyEYENT REGRAAE TO � " :;. � � � CON�C.VS/OEWALK � - O �� � EL=31.85' pRAIN $WTH TO NORiH ANO- U 5-10 ... .. �... ;, CONST. 21 SY OF ASPNALT STA 231+�B.OD f/6.�J RTl RENOVE 3l Lf OF CURB � � Q E����576 PAVfNENT �� � ��Fy w�,�� NOTE 3 CUTT£R AND CONST. CONST. JI SF W O RlM 27.85 /. UT lL /TY WORK TO BE OONE AS j3 � n'Pf l OF CONC. ` OF CONC. W C CONST. DAVID RD. PI STA.2JI+92.98= >- FL 5A6 fN-EX/STING1.51' ACP IDENT lFIfO ON LfGENO SHEET L-I CURB & GUrTER �, S/OfWALK RApP � �7 � CONST. ORf//D RD. STA. 229+70b2= 5(1RVEY STA. 12+I1.82 O3.(H LT) FL N.85 f5-EX/5T/NG), 5i' RCP UNQER PROPoSED SYMBOLS LEGEND. CONST. !l� 3Y pF ASPHALT PVNT � � SUiNfY STA. 39+9B.CG Q F� 22 ���-E� S�NGI� 8' CNP AL50 R£F£R TO PAY /7fM NOTES ON 25 �OF�9ZCRU �'OZCO �BASE SMEET CN-l. lYPE B � wccoxo a+.�w�cs /LLl / /I ��.aa too�u� � �sa roae9imrt •+ CITY OF CL6AR11AT6R, F7.ORIDA �CALL 8�1 DRUID ROAD WALKWAY --� �- � "� ""*� - 0�7 Oi 0 caBEtS . ENtlINEERINU DEPARTYENT ��K[ � ioo s. uncte e.a. CONSTRUCTION PLAN SHEET 2� o�� "°'a„ °`°° ;o ,° cs_ ` — Cleerweter, Pl 3976a � w� „`°�'",u-„�,�,A STA. 224+00 TO rSTA. 235+00 (PHASE 3� . � � � � � � � � r � � � � � � � � � � i coMSr. s r ov r;., J!"!` a' ���,. o�., �. � ASPMALJ PAiCN ' �PM T P y£Y£NT RENOVE 297 !f OF CON5T.256 lf OF � / 5ORk-•'S/ �.. p/RB 8 q/TtfR�ANO,� ., , CONC. HEADER CURB CONST. l97 Sf OF �" � SYA. IB+Bl,72 CONST. 323'CF 7YPE !� ' : ' - .. R�AIOVE lOB SY OF CONST. I6 SY OF CONC. SIqEWALK RAMP �� L�.� i CONC. CURB 8 WTTER . .. L1�NC. S/OEWALK RE�PoVE 33 SY OF ASPMALT pRNEWAY R� 51�� '.,� ��.. N�n�.71q � . EYOVE CONC. SEPARATOR m. 1Po � � CONST.83 IF OF 235 cavc. sinFwa�x 236 ORUID RD. 237 , l , ' rc�� ' neaogR cuRe � 2 239 cavsr. r�z sF oF 240 241 REMOVE �J SY OF �'��� �.� ., LONC. SlD£WALK ANO R£�VOV£ 322 Sf qF REMWE lOS SY Of CONC.ORNEWAYAyD �. S/p�y,� . .. l/1 .. CONST. l67 SF pF ASPHKT OXNEWAY Fl£!D � � COHC. SIO,EWALC RANP R£MWE ll7 SF OF ' AND CONST.772 5 CHECK 23� REAKNE CQ4C SEFARAT CONST. 350 SF 0/m C17NC.ORtYE1YAY-ANO ;, Of CONC.ORNEWAY �:: A.��tl �': . S-12... ." . �. REMOVE 7/SYOf CONC.S/OEWALK COMC.ORNEWAY ��. CONST.37SF OF '', • � `... '' "".<..;- se,,.-,_,.Y; v�, :..:.'... ..... ._.. REA(OVE..SC.SYOF . CON5T.22/$F OF...' , CONC.ORNEWAY �" �.38 S CONC.S/D£WALK ne[-wMn�'�. . . ...,.: . . _ � : < �sT. � ,� � �0"�5 °R r" � g ,R�' 2.3CJ ��. .. C� l-u � �ST: Z79 SF OfRe ... .3j ASPHALT ORNEWAY WA4rWAY � �. ' • 8 � q�_ � ' � . 6'� RfTE �� • .. . : _ , � ., - -- ,:... r - g � ` , 2 g ' ` , .. . WAT£R. . .. �• ; ,:. - pM 50 � � ..... . ..' ..- - '-B" , . . , .;.,-., .�"' "' .. ..: - . • ���- � ,F • . END M/LLINC E... � R.ORU/p � _ � N N "�P . � Of � Y CONST. ZO Sf OF � � : :', : STA. 237r7 � • �; ".�. .. C-1 � f �COMST. LWUID RO. � . •^c- -: � CONST. TO SY OF � Q ASPHA T PAVEY£ 7 T RA ASPHALT�.TRAI. ti � REUOVE" 95 LF CONST. 206 SY OF � �•���. � 5 ll J9: , � -: z :�... �:.'S 69' 32' /I' £ REMOVE.f02�,LF OF � Rf1HNE 65 SY OF � CURB-& WTTER � -. ASPMALT TR IG , . .. .. . � COI✓ST. pR1/l0 R . • . . . . � RE110V£ 267 lf OF' . . Pl T + m R£MOV£ 2J5 SY Of � CVNC.CVRB 6 p/TT�A �ec . S/OfWAII( �j/.v ar�- W � ip B£ REAIOVED RELYIMSTRUCT CURB :LlME' �� CUNB 8 WTiER ANO � � °� , $(/RyEy STA. t1+98.6J : �A,�MALT PAVENEMT ,�NP CONST. 20E LF 7YPE _ S-ll TO EXTEXO TURN7(Xf� LANES� COMST. 26B Lf TYPE f• o � 05d RT) ' � � o � � W � � -' - . COMC. CURB 6 p1TT£R � :...... ; : : '2 � J , A'COKB 6 CUTTfR ' '. 2 ,., t-v REMWE M SY Of W BfGIN YILLIN6 6, �� �� .. �. . •� CONST. 7J !F OF ?. , . � ` > ,.,. . . ._.. CONC SIOEMALK -, A CURB , q , �.c RESURfACING � � CONST. 236 � : ��� STA. 238+52 37 m �t� �. 5' SlD£W V�,: 5 .... � 6 LTHVCRfTE:: � � � EAIOV£ CONC SEPARATOR '".�.��i� ' ' '-" ' .. � � � , ....' .'.�.�:. ,_ ; ._ - _ .. . _ _ >,. .. c�, � Q ♦ .�.: � +9�.62 ' . � � �.. � . .. . v� CONC. 9D tF UF . _.. . ..� � �:. oN�roc- - � _ � nei-r � � '- 32.59'Ri � . � • "� tq ..fDOT�.-/YPE ACURB-_. . �� . - � � . CONST.575 Sf OF EAAOVE Q7NC.SfPMATOR ���: -. . ;�- , �-� �rsi�3§�SF OF � .i ...' '� •\ . � REYUV£ 3B4 Sf OF ...�p� d CONC. SIOEWAIK LONST. 103 LF OF GRAV/7Y WALL '_. ., :`. •'-� 6' C08ZRETE - '.. - ' CONC.r4�NfWAY ..- F00T /NDE�f 520 • , � � �. '- � � . 5-ll STA.23�t95 TD.3TA 2J5+pg 5-/2 .. .. 5-/3 � , ��, �� �y5T.630 SF QF �� rnN5 30L� ;. STA 238*53.q �5B.IX1 LT! "�"�"°«�.""��"„�,.""'.:: ' /� � CONC.ORIV£WAY y TA 238+72.00 119.80 LTl ��✓�' 8'5F OF pny 4 STA 235*1�.60 lJJ.85 RTl �'S7. q:. 3Y OF� ASPNALT PVYT �/yST. TYPE P-6 /NLET �N�� �� s��A� q SY OF $' CHY/SHEO CONC. B0.5E . ST. PARTIAL MrWNOLE lP-71 ���,�,ST. 5� � �� CONST. 59 SY OF ASPHAGT CONST. TYPE P-6 /N(ET INOEX 2U �. , �"< � INOEX 2k �� / : RENOVE i97 SF Of PVMT, 59 SY OF 8' CRUSHfO a INDEX 9/ CaURS£. 67 SY OF /2' SUBGRAOE EOP 32.A7 .. . /M 33.60 '� .! �'�• �N�'�., �dA'�. ORNEN'�U" M'D CONC. BASf CIX/RSE, % SY Epp ��r STABI[/ZArION TYPE B FL 25.30 fNE £X/ST/tiCl �l8' RCP .. � L 25.63 fMY EXISTINQI. /8' /iCP � � l . fONST. 362 SF OF OF l2' SU6GRAp£ � �� �l.'ONC.ORNEM'AY-�:.��. SiABILIZATION 7YPE B FL 22.50 fNWI� l8' RCP FL 25.30 !AY-EX/ST/NG7. l8" JKP �... L 27.10 f-EXI,$t,INGI:. /8' HL"P � 24/ REAlO✓E 6n Sf OF 242 R� s���� ��E. �� m , DRUID RD. ' CONC.ORNEWAY AND 243OF C!lRB 6 p/TT£R 0 ' 24�/`L ANO RESURFACE lOB SY 245 �HAL�OR �A�96 247 CONST. 551 SF OF CONST. 2l3 � SY Of AND CONST. 273 LF U W RfYOV£ 86 SY OF ..... �p�y�, 5/p�y �� CONC.ORNElYkY� � aS,PHA�T TRAIL , 1YPE /OF CONC. 2� REYOV£.2f12 Lf OF �p�, S�p�yq� Rf1lOV£ lSI SY OF � .� .� REYW£ 3/l SF Of CORB 6 WTTER .�. JQ ;'�' ' p/RB &� IX/TTER pN0 s- • o ASPHALT ORNEWAY -�; CONST. 53B LF OF REWWE; 2�6 LF �. CONC. ORN�1YAY '�CONST. ZO SF OF CQM3T. 202 LF '7YPE .�.OF . �. , -. OF WRB��� � CONST. AA%d,CONST:;J32 SF � COMC.CURB Q�.�GVTTER roNST, pp SF�OF AND CONST.2B� SF � H£AO£R CURB WALR'WAY OF CONC. ORN AY' �. �• 5/�� N �- A/�CHITECtURAL CONC. OF CONC.ORNEWAY CpNST. 256 5Y OF � 4/ ariyrw� 4 . COA'ST. 39F fF OF .: , ': COMSr. /SS SF OF . R�w .. ... Z46 ASPNAGL TRA/C � � � �rc�+rvrL � HEA,QER „fU?Q- . �.C1� 5/O£WALK�RAMP � :' ZA5 _ - -- - a�w - - : _ �� '. _ �. .: �;9J. :. � � . , , � , . _ � � : ' � R/W � .� .. g5., „A �,e - � 57e ,� ' 8 • � w m g ....:.. . • T. _ 8 � - - - ... ._ ,. ._ .._ . ... ... ... .... . ..: � . . . - P" " '. } � � _ � K[ ' . _ .. i- ` -..�._ r,.... - ... _ . ;,. . . - , ,-.. ,.. h y a' REMOV£ 3P2 SF OF i� ..�. . o-wi CURB AND Od1f$>:338 LF _. � T. �OF T.�66�CF OF ia�rv . �. ..` . c-rn � £ CONST.ORIIID RO. .. . er N C. AY � T. I� . 5/ A(K V GUTTER � a Q . � � 32' P E ,. `• . . REIKNE /9l !F . �� : � . ' � R£MWE 2l� Lf � 5 ��89' 22' 12' E R£1fWE !�8 � SY OF N $ N OF CONC. ORNfWAY �, i i-u Kt t '�� CONC. OF CONC. CURB +� , . OF CONC. CURH CONC. SIOEWALK ... , ti , , .. ., 'e W . . ., . : . � . �, .: _; a ,. F , y ? ' 6'. t � � � , ; . .,, _ . . . '�. , . _ � _ _. : ', . . . . ... . ._. . . .,.« , ,: . : . �. . �.. N .� . ' - W . . . .... , :... ,. . . , 2 �� � .. ; .. . :.�- .._.'_' � J :�.. � �S. S� .. . .......�� ...."'"... .:.: � ' ,. . ��_ .:- 5' S10£WALK . .. . . . /$F OF � ^ _ � - - - . � : , . COMST. 52 SF OF, , * REMOV£ �2 SY OF � CONST. pIB SF AHCHITTECTURAL : V . . _' _ _ . . � � CONF 5/0£WALK CONC_ � � CONC.SIDE'WALK • � CONC.SID£M'ACK ,. w Q ': �,-.• 5. ID CONCTCURB & CUT ERP£ l� .�✓£�� � ; � � . �. ' . "�. . PI TA � +7�. '�. T CONC 5 0£WAEK�f '. � R£YOV � iFa--����- � ' ' RE.iIQY ....f P ...� " �tEd��. F F � . ; ���,f . � ' -... . _ ..S(lfNE✓.S7A..51+OJTJ -� _.. CONSZ 52 Sf ..- - . .. " ' _... �� E Zl 51' OF _ CONC SID£WALK l �.c . -. . lifl .. .. .o.. : ' ""' ' - ' S/pEIYALC R7AT�F�� . ..��. . ........ env ..... " ---- ' - � � - � CONC NEWAY'AN '. CONC. ORNfWAY � � CONC �tlY AY yy�yST. 672 SY Of ASPNAL . PV�YT � U R IIOVE� Tt- l� � - - CON5T.285 SF OF '�' AND CON5T.281-5F ` µp CqySTI`3% SF � REMWf �69�Sf OF - RENOV£ 4IB SF OF' -'� "- bN SY OF � 8' CAC15HE0 CONC. BAS£ Q TRAN$/TpM WRB R GUTTER ��H� �N�,Ay µ� ro�, �NEWAY AND fN0 Y/LLING & Rf5(/RFAC/qG• � CONC.ORNEWAY pF CONC. ARNEWAY pi CpNC. pRNEIYAY ; �� 822 SY OF l2' $U6GRA0£ 2 (JYP.1• �pry5r�. �01 Sf pF �p�yST. MO SF OF ♦, RfYOVE /2/SYOF �p,y�.pRNEWAF O CONC.OR �AY � ��� STABILIIATpN 7YPE B ; �� NOTE �0{IC.,ORIV£WAY �p,y�.pqNEWAY • . CONC.SIOEWALK �p//57.J/8 Sf OF ANDCONST..i715f R£YOVE �65 SF OF � �� l. UTILITY WORK TO BE DONE AS IDENTIF/ED � p�� � L17NC. ORN£WAY OF CONC. ORN£WAY �0�' �ry�'AY m W� ON LEG£ND SN£ET L-1 UNDER� FROPoS£D �iNITS Of N/LL/NG AND CONST. JJ9 SF =V SYMBOLS Lffi£ND. ALSO.R£FER;TO PAY /T£N � � OF CO'VC•ORN£WAr � NOT£S ON SH£ET CN-1.-�. AND RES(/RFACING " FBef xcceo wunncs Yl l AN R RF l I 1/ � _ �� A� •� CITY OF CLEARNATER, FIARIDA �CALL'811 DRUID ROAD WALI{WAY � �aoa �oo-oi � ��� rancs�c�. � �� �°� fOlTEO/AGDEO LABECS ENGINEERING DEPARTMENT ��NE SiAiE �8 mn� °�.c � � ��"; CONSTRUCTION PLAN SHEET ���o�.o� "� °`°�� cs- _ I00 3. Myrtle Ave. '" Cleerweter. FI 33758 ��� u,a„A S�TA. 235+00 TO rSTA. 247+00 �PHA�S'E 3� � � � � � � � � � � � � � � � � � � � GVNST. 9 SY OF CONST. 508 LF OF 2 ASPHALT TRA/L CONC. M£AD£R � CON$T. 20 LF OFi� CURB CpNST. M SY OF � H£AQ£R CURB m ASPNALT QRNEWAY DRUID RD ' ' I COryST.AOISF Of 247 mNC. siaewax�;�awP 248 249 250 �TS �iva� ,, � 25l m I, 252 253 � RENW£ lf0 SY Of � CONST. WALAIYAY .. ��:: - REMOVE '079 LF OF ASPHALT ORNEWAY CONST. 270 SY OF s s 4{n ' ,,.� AND OOMST. 5/5 SF 4� ASPHALT TRAIL o ' "¢ CONC. WRB 6 GUTTER ANO Y; /+£ut)vE 71 �F 9F ' �tiCON5T.J9�LF OF TYPf I -�. Q� CONC.A7NEWAY k�. ti.� ,�� ; �. _ '3 CONC. Cl/�RB & GUTTER ' .. _. .. • � . . � a • N CO�T. 21 Lf' TYPE� OF� . g ' - -- ,�..�,F _::_.� -�--�---.. . — — E _ - 249 `° ,�.� 250 �r�-,« m � CpNC.CURBt& p/TT R RiW , � e y[P ; ..�6.YGP... ..... HA l2 .. .. � - � ... .. - .. �J2 DlP-.._... 6�d'r'?' ;. 63 b6 - . ' rtetyrr . ' ' • - . 8 .... ..-- - � _ . e -- .:.. ...- --.. . . . . ...".. . .: :. .. � � + - �� - - ...- - - � - - ..-" -. .... - . ... . . �.� .., . ,. .__.- -- -�-- ' � N '� .' .... AHCNIT /CTURN. '_ 5... 09,..�z..E_._@ SI/R.ORUID RD. � . , :�;: . , ' i-rei ru :: ,:. .... ....... I � :......::...__ _�_ ..— ,_ _;.�,,.,_ ¢ REAIOVf /i SY Of W REMWE 76. SY Of 5 89' 22 �2� f REUOVE lJS SY Of � '� S 88' �9' 26' £ V� F Q�NST. pWUlO R0. CON57. H2 SF OF , '��;' .�' � CONC.S/DEWA[K � CONC.SIDEWALK ': CY1NC.5/OEWALK CONC.S/OEWAYK. � N . . .._ • LVN3T.97�5F..�' �._ ,� ., .. .... . �, ��., �� RAAI�P �� ` � . � .: . �.:: 2 " ' �ONG. S/DEWALK RANP , ` .... . . � � � se _. .. ..... � :. REMavE 53 lf OF •,-�. ' . � .� ,� ,... , ro'ycP �l _. • .. CONC. CY/RB 6 p1TTER AND �. . . .. .: ' .... .. ''_ � " r __. _ . � . ..; _ ' . ' '.'.' , :." """ '.. �... . , REMOYE 36 ,S�' OF - .... CONST. � 53 (f OF 7YPE l • . . . . . . . . � _ . � , - . . . . p ' ; v v _ ' ASPMACi�PAVEM£NT.. ..... �,C.CURB b GUTTER ;,... i -- . � ,' C CONST. pR[/lD RP.�PISTA.25/t1B20= � V ' RE6RADE � TO ORA/N � ti � .. . , ...� < Q �. SOUTH TO AOHiM ANO �" . . : • .� m 3 ���: Sf/RVEY STA.6/�j72/fl3�K RTt �.�. �- coxst 3e sr oF . N PHA °� � ' ASPHALi Pqy£MENT .,�' .. �. ' STA. ,2�t95.5,Z .: ....ONiFOC """"' ""'"". ...... . _..'.DiV/FZ1C-...:. .."" '""". �...:.':UN/FOC. .`.�.�" ' ",'' "":. •� .':. ....-:OtV/FOC ""' _ "' " ' ' '"""" .OTV/f'OC--. .. . ......... � �'� _. _ — —_.— ��.— —. , , . — _ NOTE �. ..._� — �.,. . _ .. �..� —: — — — _ ' • l. UT/L1TY WORK TO BE QONE AS . � � �� � IDENTIF/ED ON LEGEND SM££T L-1 "` Q�Q � UNOER PltOP05£D SYNBOLS LEGEND. m ��' I � AL50 REFER TO PAY ITEY NOTES ON �-� SHEET cN-�. � � Fee� �cca�o �+����s � i � ����n •. CI'fY OT CLEAR1fATCR FfARmA � CALL 811 ..�°�•"'°°° ro'.:..°' • „' :,° a"� .a �mso . . EN6INEERINC DEPARTHENT ���M ��•� DRUID ROAD WALKWAY � ,� � «:,`�t CONSTRUCTION PLAN SHEET ��.��� "ex °`°m � "° C3-6 — ioo e. r�e �... ^ e�.....c..�: r� aavFa �� tg__ STA. 247+Q0 TO STA. 253+00 (PHASE 31 j� � i — . .. . _--- �� �,r—i � � �■ � � � � � � � � � � � � � � � � i 0 TBM SE7 YAC��NAl4:S TT � m ¢ CONST. ORUIO RD. P/ STA. 505+83.87� @ s�n� vr srq ro+oo.00 ti ORUID ROAD B wRVer srA. iJ+y2.ce ua.os cn EL=2828 = .. �. '. �J� .5�1 N i;�8(12i,p536 � 5�`Z REMOV£ /OS 51' OF �. E 39BB67.7i52 v. CONC. SIOEWALK 503 � W rnxsr.2eo sr ov ;504 505 �06 ASPHALT TRA/L CONST. 3l9 LF Of BEGlN PHASE 3 ? REYWE 29 SY OF �1EADER CURB �� .. lt . � ASPMALT�pRNEWAY ' � 5� £F9ORNEWAY - � � AND CONST. /0 SY pF REYWE 3 9i OF q,y0 CONST. B SY OF I% � � „ ASPHALT-.DRNEWAY ASPMALT �tNEWAY ASPHALT ORNfWAY , . -- , AND �PNSf 2 SY OF - . 9 .�: . ' :� �: _'; _ ASP T �R/VEWAY F OF - �- p,(� REAIOVE 220 5 � 9 • . � �. ' p, ., . ., ' RAY 'ti.� COWC..L14/VEWAY . , , �� ' . �_ . � � '� - , �e „ �.� . - -- g . _ _ �. ; .�. Q -.�,.. .... ��....... e�-�- 48COJ-'@3'E _:_ . . ��_ ._ ...��, . : ,.. , �., � ' ..>. � f I + .. _.' � -. -° .. .. __ . .. .. .... ,: ... _ _.. . .: , """ .._ � , . � .., .:�.:.,. """" ...�_... __;,. ,_' . �J . .. . .. .. . "_Kl ......-r". ..".._ . ,�i , .. .. �... . ..._.'..r ul ' B wr+. A�uin R . : . ; � : � ..::. -.. .. . �' � . .. �z , REMOV£ /56 SF OF . � '.' �' S B9' 35' l6' E ..� � E . , CONC. OR/VEWAY j ; ' . : � " ..".�i -�-�''9'"MW . ... :,:... ..':. :.:: :... " :v "' ::_ '. . : `. :::: -�.5.... �p qN .... ...... ..... ....". "._... ._ _.".'.. � ' N ,.. ,:, - � . ;. . . :� ; . � CONST. QM/ID RD. -. _ , r,q � W _. ... .... .. .. .. .. ... ., . , .., �� � .��, ,. ��: '• ..._._.'.__.e'r+cw-.... ' ..@ Sunq.""".... . : 2 . .. . : .. . :� .. . .��. ..:�:�"" ',: .... ,;'. , .. . ' ' � .. . .. ... � J .,; . .. .... . . ..�,..': ,�'_ .� , ,;�. ' :.:� P/NELLAS rRAIL - '� - �. ._... .:: _'. _' -- : -.. - -•- oft%= ; : .: - -=- . .. .... .,,- .. ' -----. ..... __ - � .. ..... ... ..._ . , — -.�,. (7�E - � — — � — — � — — � �— — - . . ;.: --- � � � . � —"'" m e� j, . � ... � ... - ¢: � � Q - � �.�:� x � _ ... � �. L CONST. pRU/D Rp.�PI STA. 502+/d.�= V C CONST. p4U/0 R0. STA. SOI+pg,71= � }.; --- �; SURVEY 57A. /O+p4,0p !/3,62 RTI 0 SURV£Y STA. 12�19.l7 ��� �: m �k COMST.Oh'(/ID R0. PI STA. 503+11.31� m , � �� F ' $ SUM£Y STA. I1+2�.58 f9.7J Ril _ �; v . .; .. . �� . :': •> REMOVE �..26 LF OF �. $ ---- � � , � CURB & IX/fT£R ANO ' ORUID ROAD cavsr. irvE i mnsr. ie3 sv oF : coi+sr. zc � 7YPE /OF � - � ' CURB b CUT iER � �� ' ��' S/D£WA(K . � ; CONC. CURB d p/TTER �� L17/15T.61 $F OF �� I CONST. 26 SF OF ; CWIC. 5/D£WA[X RANP .rJO� �8 RODNC• �NfWAY � .' �9 5/0 I '. o �j�� CONC. 5/DEWALK .cJl2 � CONST. 3�8 SY OF ,- ANO CONST. /6 S' OF-..; � .CONST. �6- $Y OF ��., �. REMOVE �2� 3Y Q� CONST. �IJ SF OF �:I ; , RE40VE I/ SY OF ¢� CONC. S/DfWALK RANP ' "ASPHALT DRNEWAY CONC• S/OEWAtI( � � d ASPNALT TRAIL ASPNALr ORNfWAY ' �PHALT ARN£WAG � ... ; ' : • � Q . . � - . ...�HALTSTRAI� . ^ I; REMOVE 57 SY Of ANO CONST.l3 SY OF, "� • REAMVE 238 SF 'QF CONST.23B-5F OF ' CONC. SIOtWACK ASPNAFT ORNEWAY ;' .. REMOYE.'9 SY OQ � QJNC. DRIVEWAY . CONC. SIOEM'ALK RAMP ; CONST. /d6 l� OF ���. g, O CONST. ZOI(F OF . R£YOVE 255 SF A� .�� �ASPNALT A4NfWAY � qND CONST.130 SF R£.YOV£ 32 LF OF � ' HEA[aER CURB � O iiEADfR CURB �. �n,�,y A RM, OF CONC• ORNEM+AY CURB��.& GUTTER ANO � ��� REMOVE' S5 SY OF p � p a.w � �' C(kIS1.32 LF 7YPE IOF LYM'C.5/OfWAtX' O fr 6 � � _ _ � . . ,.. . . xa '_:. �' _� . CONC, LY/RB & p/TTER . , , . R � � - . . .. �� . — — _,. . ' . . — _ • � K� °" : ` 8 ....... , � - . ..; N w .. ..... IO'�WATER ."""_'._ � "_' .:.:.'.. .... . ..... ._-... �- � Q CON5T. 7YPE• I .. _ _ .. _.. : �� , , ...: � '"� ` @ iy . iri REMWE M SY OF CONST. TYPE l ' . v „ . ..._. . :..� 'y 1� Ct1RB & W,iTER �p�, S�p�yq� 4`�'� �b Q o V1 . � I , CURB & GU77ER ,.o � ,"� :, .... � <_r[� � �''�. : �ar+v ' ` ' I� � .. . 5 89' l8' S3' E � ¢ �p,yST. ORU/D RD ,', o� /2 �6 E N � W . � _. . �g . . . , _ �g - 2pt; . y 2 /5 • .. .. '. AEMdpE ''J2 SY OF �:� _ W .. � . .. 8'FLW � - ... '.Fi . : -2G - . . _��:-�- 2 m� . .I .. . . .: ... ....... . _'.. . ...o ._ ' .__.. . ;�;. .5/ . Uc ,.. .. -. , " "_�' ° � � _ : .:. .. �...�: -N-ii 55 53'E-�:: .:.:, ' . Ott�YFOC _... . ...._ _._._. _ . �. . �°, U , . i . m- -.-.- ... . .: . . :� '✓:,," ; ��-orv/fOC .. _.. _ _ _ .�... . ..._. . . .� ' . .. ... �F. �:�. -. . ._. . S 89 tl £ . , . . � ...... .... ZG4— .. . . .. _ . ... _ �. ;. . � U . .. ... ... : ' Q -- , CONST. 28B LF OF : z[y�' , . _ Q / � � a .... •, . � � .... Q�NAAER CURB ... Rnv NEADER CURB , rtnY RCONC.ORNEriAY � ., � : , ... � ^ .;� @ SUR.OFUID RD. ,.� � , ! .... -ANO'CON57.260 SF .. � . ' .. �.�OF CONC.ORNEWAY � � ' "�:':: TBM SE7 A/AG 6 NA/L � .. CpiygP�.99 LF TYPE � @TBI/ �EeyT� SKj „*z, p , . NOTE m �L�J5A2P=5iA 1B+51.M � CURB & p/T7ER EL=2J.J2' = N 13/797/.7807 0 p qp ��.I m N�q��,�gj l. UT/L/TY WORK TO BE DONE AS U f 3997/92553 E,;ggpgg,pp95 /OENT/flEO ON L£C£ND SNE£T L-I � � 'I UNDER PROPoSED SYMBOLS CEGEND. [�yST.ORUI� RD. P/STA.5q+6721= . V1 Feei AL50 REFER TO PAY lTEY NO7E5 ON � � p; � SNE£T GN-l. SURVf✓ STA. /B�7B.p (ISbB RTl . Y � - r�ccaro a+.re�cs � . _ £0/7E0/ADDEO •� C17Y OF CL6AR1fATER F7.ORIDA �CALL 811 DRUID ROAD WALKWAY '�= "' °•°°m=' "e' `R 10PT "a "°''''° ° � . ENtlINEERIN6 DEPARTISENT g�� � too s. ur,eie ave. w"`�`"`�,,,E CONSTRUCTION PLAN SHEET BYPASS SEGMENT '�, �•"a„ °`°°"� ,° c3 �`' — Cleenrater, Pl 33768 ��� �u- STA. 500+00 TO STA. 512+00 (PHASE 3) s � � � � � � � � � � � � � � � � � � - RENOVE 70 SY OF cavsr. 9 sr oF ns�eacr �atwar pRUlO ROAD ' ASPHALT ORNEWAY AND CONST.29i SF • REYOVE 27l SF Of pF �pN�. pRryE1yAY CONST. 6pp (F 7YPE l .. Q1RB 3 p1TTER 5l2 C'�MC ORNEWAY 5/3 �VST. 533 SY OF 5l4 Si5 5/6 5/7 R£AIOVE O6 SF OF 5/8 AND CONC. 225 SF A$PNALT TRA/L CONST. tl5Y OF R£AWVE 322 SF OF . COMC.ORNEIIAY OF:CONC. p7NEWAY ASPHALT ORM1!EWAY '� CONC ORNEWAY AND CONST 202 $F CONST. H SF''OF ....... REMOVf 2/3 SY OF CONST. 1 SY - :: AMO-EONST. 250 Sf � �� � � -.-. ., �. OF': fONC.ORNEWAY .. �. CONC. S/OE)VALK CpNC.SIDfW'A[R . pF ASPoiAGT - � OF CONC. ORNEWAY " .. �' RE.IPoV£ 231 SF Qf ` . RE1bV£ l81 SF OF .�.. , � pRNEWAY CON5T.472 (f OF COIM ARNEWAY . �., CONST.25 SY QF � CONC ORlVEWAY • � NEAOIER CURB ANO CONST. J61 SF , ASPHALT ORNEWAI' ANO COIIST. 169 S£ CONSY. l80 $F OF ��. R£MOVE P9 SY OF �. � Of CONC. ORNEWAY O - OF Q7NC.'ORNEM'AY � CONC. �ORIVEWAY ���. . � .., i� �� �;- . . ' ��� .4SPNdL7 qtWf1YAY �� _ 6 Q ' � e[an � ` �.. � — � . , — — — r. i w g�. �, �., -_..: - . ....-, _ 8 Q N _ , "'.._� ..n .. .. .. . �.. _ � U � - . .. ._ -. _ � , �..: . . ` ' �,- ql Q m ... m � � .. ..' 0�' . �... : .�.-.� � Q h � . . . ln �� I GL1N.iT GWIO Rd �, . .. � RELOCAT� 4RE.... . .. � -. .. _ . - ....... . g' qay - 2l ... • � ' 22 . �94 -.�. .'23. 16 HLW .. 29 -. . .. �ryORANT ASSEMBLY � 41 2 Y/r '-' . . . ......:...... ....:.. , '� . . ' .. �. ._ . .. s..... .. . , t57b40J.If.20' LZl .. � ... � � :� , " " 'a �. " '.. . . SUR OR1/i0 RD �� 4 5 89 �p � f ..- - ...... � W .. _: ��.' ... .._..� ......._ � .�. .. . . . �� Il _ 0 ...:�: ....... .. .� . ,.: .... _..: . .:��:. .... '_ ....., ....� . .... ,'. , ptVlTOC .. ... . . .."'_"" N/FOC . .- = W /4 ��. Mi�'Gv U — . ..�-�.---•,_, � . ; -. .^--'^='sd ,— — . ., �+ . ' "' . ' � �,--�.^ — — — U . .: -:'."p ' ; ... , .. .._... .. ... . ... . ' .. � 1 , ; ' . ,.'• � ` _. . I� . .. � � R£MtlVE 35 5Y'Of , �. REMOV£ 21 SY OF � TBM SiRRC .� .. ` � --�–�' ..�, ¢ V1 ASPHAL7 pRIVEWAY �� �ASPMALT ORNEWAY ; j '� � @ Suney STA,23t35.63 � � • AND CONST. /52 $F M'O GO�VST. 11l SF , Q £L=32./J = ' �.:. ,.. .. .. :�. �.�:; OF CONC.-ORNEWAY OF CONC.Q4NEWAY : � ��� € CONST. "�-� � � REYOV£ �67�SF OF � . . , 2 . ° .. STA S15+25A3.15.9I' �RT , LpNC. ppNEWAv 3 .. .. AND CONST. J/1 SP W �� NOTf OF CONC.ORNEWAY l. UTILITY WORK TO BE OON£ AS �-� �� IDENT/F/ED ON Lffi£ND SH£ET L-1 - UNDER PRpPo5f0 51"M@OLS LEG£ND. � ro � ..._. .� AL50 REF£R TO PAY ITEM NOTfS ON � SNEET GN-l. FBB7 xccaro or+.w+es V AN T /// // •� CITY OF CLEARIIATEF, PLORIDA ��ene°� ,m-,°; ° rn F°�oxr £DITED/ ueei ��ALL811 DRUID ROAD WALKWAY � "�"°*'° ENtlINEERINO DEPARTYENT „ .� � "`t,E CONSTRUCTION PLAN SHEET BYPASS SEGMENT '��re�.� °'°"ax °°"� '° ci-a 100 9. Yyrtle Ave. " __ ___ — Cleerweteq RI 93768 _°;;,� �_ STA. 512+00 TO STA. 519+00 (PHASE 3) . � � � � � � � � � � � � � � � � � � � n � I� YATCN fX15T.0A1YY. �EXIST. RM' I �p/y�, p/7 p$pryALf ONWY. _ _ _ f5£f OATA TABLfI _ —( (EIICTH 'B' BACK OF WA SEE NOTE m � NI ASPMALT WAU( g, FAC£ OF WALK -- i— CONC.OAIYY. � I �` � •A• � STRAIGHT CURB fAS SMOWN ON PLAN51 6' �' WIOTH 'C' 4' 6' . . £aflE OF PVM7. PLAN FOR CONCRETE OR ASPHALT DRIVEWAY DETAIL "A" NOTE: K'H£N YAlCNINC EX/ST/NG ASPHALT ORNfWAY�CONT/NU£ LVNCRfTE SAWCUT AND MATCN MEAOER CURB THRWG/1 ORN£WAY. AT CONCRETE ORNEWAYS C�VSTRUCT CONST. EXPANS�ON 0 STRUCK JO/NT TO EMULAT£ CONT/NUANCf OF HEAOER CURB THFOY/GH JOINT lEX15T/NC ORN£WAY. CONCRETE ORNEWAY 8' ONLY1 CONST. EXPANSION F—PNUt WALK EXISTING ORVEWAY r� SAWCUT � JOINT �8• ""'.......... I A, Zy ., . . ,,... ' SLOPE .,;...�.: ;.;. . .• :i:�.y .ExisriNCOnvR��5E4.'-'-" ...; •. � ' - Mi47 A/RF,�f I OROP CURB � i6' (ENGTN 'A' 8' LENCTH 'B' PROF/LE FOR CONCRETE OR ASPHALT DRIVEWAY DETAIL "A" CONCRETE OR ASPHALT DRIVEWAY DETAIL "A" DATA CITY OF CLEARMATER, FLORIDA ENGINEERING DEPARTMENT 100 S. Nyrtle Ave. Clear�vnter, FI 33758 DRUID ROAD WALKWAY CONSTRUCTION DETAILS SHEET DRIVEWAYS (PHASE 3) � 2"lNIN1 ASPHACT CONC. TYPE 5 6"fMIN.1CRU5HE0 CONC. BASE ASPHALT DRIVEWAY SECTION 6" CONC., 3400 PSl couPacr EXISt. BASf CONCRETE OR/VEWAY SECTION � � � � � � � � � � � � � � � � � � � � r $ 9 � � � � S 6' W/DTH 'F' 6' OROP OROP f5££ ' (SEE OTE 2ll INOTE 2 YATCH EX15T. pRWY. �EXIST. RM __ W -I BACK OF WALK �• �ASPAALfGRiW LENCTH '£' WSEE NOTE 2 �yy 5£E NOTE I �y2 � m M�, M� ASPHALT WALK B' a �a � FACE OF WALK s� [pN�. p/71y�. (£NGTH 'D' � EXIST. CURB & GU7TER � 11'PE I CONC. Cf/RB b WTTER OVERLAID W/TH ASPHACT 6' 1' W/OTH 'F' �' 6' �� $�WN ON PLAN51 SAWCUT AND NATCH EDGE OF PVMT. EX/ST.PAVEMENT ppRNA� CURB I CURB I DROP CURB I CURB I NOR4AL CURB _I Q � TRANS/TfON TRANSITION CONCRETE OR ASPHALT DRIVEWAY DETAIL "B" PLAN NOT : /:WHEM MATCN/NG EX/5TlNG ASPMAGf ORN£WAY•CONT/NUE CONCR£TE HEAOER CURB THRp/fH ORNEWAY. Af CONCRETE ORNEWAYS CONSTRUCT � STRUGK ,pINT TO EMULATE CONTINI/ANC£ OF HEAD£R CURB TNRIX/CM ORNEWAY. 2: CONSTRUCT WA(XWAY OAOP ONLY WHERE INOlCATED ON TNE ORN£WAY pETA/L 'B' DATA ON THIS SM££T. SAWCUT AND NAfCH CONST. EXPANS�ON ,p/NT !EX/STINC CONCRETE ORNEWAY 8' ONLY1 A$PHALT WALK EXi57iNG ORVEwA1' CONST. EXPANSION E 'E' -- - � f� SAWCUT JOINt _-2Y. SIAP I S�PE •�• ..Exisri�d0'S�la�a �EQ'-' f" I � I DROP CURB Z� LENGTN 'D' 8' LENGTH 'E' � & Gl/TTER CONCRETE OR ASPHALT ORIVEWAY DETAIL "B" PROFILE CONCRETE OR ASPHALT ORIVEWAY DETAIL "B" DATA CITY OF CLEARIlATER. FLORIDA ENGINEERING DEPARTMENT 100 S. Myrtle Ave. Cleerneter, FI 33758 m 6' CONC., J400 PSI 2°lMIN1 ASPHALr CONC. 7YPE 5 COMPACT EX157.8ASE 6' fM/NJCRUSHED CONC.BASE CONCRETE DRIVEWAY SECTION ASPHALT ORIVEWAY SECTION DRUID ROAD WALKWAY CONSTRUCTION DETAILS SHEET DRIVEWAYS (PHASE 3) � � � � � � � � � � � i � � � � � � � s i TRANSI iION CURB INTO � ORIV£WAY F(ARE BACK Of 5/OEWA[K RANP CURB (7YPJ CONC./iEAOER CURB fTYPJ ASPNALT ASPHALT WA� I.Y2 YAX 7YPE iCONC. CURB b GUTTER !AS SHQYN ON PLAN51 EOCE OF PVMT. � W/OTH 'H' � I YArCH EXIST, pRWY. CONC.OR ASPMALt pHWY. fxiSL Rnv � }a 5 E N07E �' -___J.5lAP£'�--_ � BACK OF WALK 2Y. fYAXI � ASPHALT /.Y2 YAX ASPHALT � WALX FRON7 OF ASPHA(T WALK N EXlST. CURB 6 WTT£R OVERLA/O W/TH ASPNALT t' W/OrH 'C' �' _ 6' _ SAWCUT ANO YATCH 0 , , ExIST. PavT. _ CONCRETE OR ASPHALT OR/VEWAY DETAIL "C" PLAN N. i.5 r� sawcur .�- 2Y. EXIj7l QR PRJ $fQ____ j na"� wnva 0 I � I OqpP CURB & G(/tTER I 2 u, 0 EXlST. R/W LINE -' _ � _ ASPMALT ¢ l:12 (MAXI WALK � N 6" STRA/GMT ClIRB SAWCUT ANO YATCH CONST.EXPANSION JO/Nl !EX/STING CONCRETE ORNEWAY ONLYI m S�ppE •G" £xiSTixc Q4n�war_ 2'!M/N) ASPHALT CONC. , � , ... ........... 7YPE 5 6" !M/NJ CRUSHEO LENGTH 'G' CONC. BAS£ fSEE NOTE) ASPHALT DRIVEWAY SECT/ON CONCRETE OR ASPHALT ORIVEWAY DETAIL "C" PROFILE r• WMEN NATCMING EX/5T/NG ASPHALT ORNEWAY.CONTINUE CONCRET£ 6" CONC., 34G0 PSl m $TRUCK ,q/N� TOEM�LA�E O�NT/NUANC�F NEAD£R CURB �NRO(MrH NEWAY. CO C rE OR ASPHALT DRIVEWAY DETAIL "C" DATA S7A. EOCf OF BACK OF L£NCTM 510PE NATCH £XIST. WIOTH EXIST/NG ()HWY. PROPOS£D OViWY. PVMT. ELEV. WALK £L£V• 'C' 'G' OAWY. ELEV. "H' MATERIAL YATERIAC 234tB7.46 27.82 27.98 �.89 -0.6�Y. 27.95 21.30 ASPNALT ASPMALi COMPACT 235+30.97 28J8 28.31 2.00 230% 28.39 /O.IX1 GRAVEL QJNCRETE EXIST. BASE 236+�1.00 29.75 29.'N �5.39 -0.45Y. 29.84 15.00 ASPNALT ASPHALT 239+9�f.2� 36b7 36.8J 5A6 -832Y. 36.38 25.38 ASPNALT ASPHALi 240t.ig.96 J7Jl 37.ZJ IJ.// -0.76% 37./7 i2.52 CONCRETE CONCRETE CONCRETE ORIVEWAY SECTION 507+5135 24.68 24.8� 1.76 6A9Y. 25./3 22.62 ASPMALT ASPHALT - 5QB+69.55 28.61 2e.n 02l 2.74% 29A5 10.69 ASPHALT ASPHACT - xca+o or+.wrvcs ✓ / ��� �� CITY OF CLEARKATER, FIARIDA = ....m... v.. . •� ° ENCINEERING DEPARTMENT S • '�` too s. �yru� n�e. " _ _ Cleerneteq FI 33758 WID� N� - rRANSITION CURB /N70 ORNEWAY FLARE BACK OF 5/DEWALN � RAMP CURB l7YPl BACK OF 5/OfWALN CURB !AS SHOWN _ _ _ ON PLAN51 I•J2 lMAXI a _ � ASPNA(T WALK N 4' � WIOTH 'K' � 4' � 6' CURB ASPHALT DRIVEWAY DETA/L "D" PLAN N.T.S � SAWCUT AND YATC EXIST. PAVT. � SAWCUT ,�. EXIST/NG pRVEWAY P . ...• " """" """" _ fNISTING OR_ P SE,D _ `2� f - ad�(6 sDA�A E I OROP CY/RB ' � 6' 6' � I B' LENGTH 'J' ASPHALT WALK ASPHALT ORIVEWAY DETAIL "D" PROFILE ASPHALT DR/VEWAY DETAIL "D" DATA STA. EDGE OF BACK OF LENG7N SIAPE YATCH £X/ST. W/OTN PVYT. £LEV. WALK fLfV. 'J' 'J' ORWY. fLfV. 'K' 502+5i.23 27A6 27.62 I.53 -932i 27.20 19.64 50 +. 25.12 2528 /.42 2.1I% 25.J� /7.30 SOI+MJ2 2t.B4 25.00 3.36 6.3/% 25R/ 21.70 DRUID ROAD WALKWAY CONSTRUCTION DETAILS SHEET DRIVEWAYS (PHASE 3) � � City of Clearwater, Florida DRUID TRAIL WALKWAY (PHASE 3) PROJECT NO. 04-0021-PR SECTION I SECTION II TABLE OF CONTENTS ADVERTISEMENT OF BIDS & NOTICE TO CONTRACTORS INSTRUCTIONS TO BIDDERS SECTION III GENERAL CONDITIONS SECTION IV SECTTON V TECHNICAL SPECIFICATIONS CONTRACT DOCUMENTS Prepared in the Office of the City Engineer Cover.doc Page II ]0/10/2008 [� � � � � � � � � � � � ADVERTISEMENT OF BIDS & NOTICE TO CONTRACTORS DRUID TRAIL PHASE 3# 04-0021-PR CLEARWATER, FLORIDA Copies of the Contract Documents and Plans for this Project are available for inspection and/or purchase by prospective bidders at the City of Clearwater's Plan Room - website address: www.myClearwater.com/cityprojects, ON WEDNESDAY, OCTOBER 24, 2012, until no later than close of business three (3) days preceding the bid opening. Price of Contract Documents and Plans, as indicated on the website, reflects reproduction cost only. The work for which proposals are invited consists of: Construction of an eight (8) foot wide asphalt trail with concrete header curb along the north side of Turner Street from the Pinellas Trail to Dr. Martin Luther King Jr. Avenue for approximately 1,620 feet. Construction of an eight (8) foot wide asphalt trail with concrete header curb along the east side of Dr. Martin Luther King Jr. Avenue from Turner Street to Druid Road for approximately 830 feet. Construction of an eight (8) foot wide asphalt trail with concrete header curb along the north side of Druid Road from the Pinellas Trail to Betty Lane for approximately 4,320 feet. Construction of concrete pedestrian crossing ramps at roadway intersections. Construction of driveways. Reconstruction of north side of Turner Street from the Pinellas Trail to Prospect Avenue. Reconstruction and widening of Druid Road from York Circle to 100 feet east of Sherman McVeigh Drive to lengthen auxiliary lanes. Construction of roadway signing and striping as necessary for roadway realignments and at intersections. Construction of intersection improvements at Missouri Avenue, including roadway wark, pedestrian refuse islands, signs. Striping and pedestrian signals. Construction of concrete curb ramps on the northeast and northwest corners of Druid Road and Lake Drive along with associated crosswalk striping. Construction of trail amenities, associated drainage facilities and adjustment/relocation of existing utilities to accommodate the walkway alignment. A MANDATORY Pre-Bid Conference for all prospective bidders will be held on THURSDAY, NOVEMBER 7, 2012 AT 10:00 AM AT THE MBS BUILDING, 100 S. MYRTLE AVE., CONFERENCE ROOM 130, CLEARWATER, FLORIDA. Representatives of the Owner and Consulting Engineer will be present to discuss this Project. Various portions of this project involve signalization work that will likely be performed by a subcontractor working for the primary contractor. The City shall require all contractors who wish to bid on this project to provide a list of three (3) possible subcontractors that would be performing the signalization work. This list shall be provided in writing at least five (5) business days prior to the bid opening date. The City shall review the list and either accept or deny all or a portion of this list in writing within two (2) business days of receipt. If the contractor will be doing the signalization work themselves then this is to be provided in writing. Failure to provide this list within the time frames specified above will result in disqualification of the contractor for this project. Sealed proposals will be received by the Purchasing Manager, at the Purchasing Office, located � at the Municipal Services Bldg., 100 S. Myrtle Ave., 3�d Floor, Clearwater, Florida 33756-5520, until 1:30 P.M. on THURSDAY, NOVEMBER 29, 2012, and publicly opened and read at that hour and place for DRUID TRAIL PHASE III 04-0021-PR. � TIMES.docx Page 1 of2 7/23/2012 � A complete bidders package containing plans, specifications, bond forms, contract form, affidavits and proposal form is available to the general public (Contractors, Sub-contractors, suppliers, vendors, etc.) for review and purchase. However, sealed proposals will only be accepted from those Contractors that are currently City pre-qualified Contractors in the construction category of ROADWAY & PARKING LOT CONSTRUCTION with a minimum pre- qualification amount of $1,000,000. Contractors wanting to pre-qualify to bid this project must do so two (2) weeks/ten (10) workdays prior to the bid opening date. A 10% bid bond is required for all City of Clearwater projects. The right is reserved by the City Manager of the City of Clearwater, Florida to reject any ar all bids. The City of Clearwater, Florida Michael Murray, Purchasing Manager (727)562-4633 TIMES.docx Page 2 of 2 7/23/2012 � � ! � � � � � � � � � � � � � � � SECTION II INSTRUCTIONS TO BIDDERS Table of Contents: 1 COPIES OF BIDDING DOCUMENTS .......................................................................... 1 2 QUALIFICATION OF BIDDERS .................................................................................. 1 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE .................................1 4 INTERPRETATIONS AND ADDENDA ....................................................................... 2 5 BID SECURITY OR BID BOND .................................................................................... 3 6 CONTRACT TIME .......................................................................................................... 3 7 LIQUIDATED DAMAGES ............................................................................................. 3 8 SUBSTITUTE MATERIAL AND EQUIPMENT ......................................................... 3 9 SUBCONTRACTORS ......................................................................................................3 10 BID/PROPOSAL FORM ................................................................................................. 4 11 SUBMISSION OF BIDS .................................................................................................. 4 12 MODIFICATION AND WITHDRAWAL OF BIDS .................................................... 5 13 REJECTION OF BIDS .................................................................................................... 5 14 DISQUALIFICATION OF BIDDER .............................................................................. 5 15 OPENING OF BIDS ......................................................................................................... 5 16 LICENSES, PERMITS, ROYALTY FEES AND TAXES ........................................... 5 17 IDENTICAL TIE BIDS/VENDOR DRUG FREE WORKPLACE ............................. 6 18 AWARD OF CONTRACT ............................................................................................... 7 19 BID PROTEST .................................................................................................................. 7 20 TRENCH SAFETY ACT ................................................................................................. 9 21 CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL MANAGEMENTMEASURES ....................................................................................... 9 SectionIl.doc i 4/3/2012 � � � � Section I1— lnstructions to Bidders COPIES OF BIDDING DOCUMENTS l.l Complete sets of the Bidding Documents are available at the City of Clearwater's Plan Room — website address: www.myclearwater.com/cityprojects. Price of Contract Documents and Plans, as indicated on the City's Website, reflects reproduction costs only, which is non-refundable. A complete bidder's package containing plans, specifications, bond forms, contract form, affidavits and bid/proposal form is available only to pre-qualified bidders. Contractors, suppliers, or others who are not pre-qualified but who may be a possible subcontractor, supplier, or other interested person may purchase a"Subcontractor" package consisting of plans, specifications, and list of pay items. � 1.2 Complete sets of Bidding Documents must be used in preparing bids. Neither the City nor the Engineer shall be liable for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents, by Bidders, sub-bidders or others. � 13 The City, in making copies of Bidding Documents available on the above terms, does so only for the purpose of obtaining Bids on the Work and does not confer a license or gant any other permission to use the documents for any other purpose. � 2 QUALIFICATION OF BIDDERS r � � � ;� � � � 2.l Each prospective Bidder must pre-qualify to demonstrate, to the complete satisfaction of the City of Clearwater, that the Bidder has the necessary facilities, equipment, ability, financial resources and experience to perform the work in a satisfactory manner before obtaining drawings, specifications and contract documents. An application package for pre- qualification may be obtained by contacting the City of Clearwater, Engineering Department, P.O. Box 4748, Clearwater, Florida 33758-4748 (mailing address); 100 South Myrtle Avenue, Clearwater, Florida 33756-5520 (street address only) or by phone at (727) 562-4750. Pre-Qualification requirements information is also available on City of Clearwater Website at address: www.myclearwater.com/ o� v/depts/pwa/engin/Construction/prequal.asp. Contractors wanting to pre-qualify to bid on a project as a General Contractor must do so two weeks (ten work days) prior to the bid opening date. Bidders currently pre-qualified by the City do not have to make reapplication. 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE 3.l It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract Documents thoroughly; (b) visit the site to become familiar with local conditions that may in any manner affect cost, progress, performance or furnishing of the work; (c) consider and abide by all applicable federal, state and local laws, ordinances, rules and regulations; and (d) study and carefully correlate Bidder's observations with the Contract Documents, and notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. 32 In reference to the Technical Specifications and/or the Scope of the Work for identification of those reports of explorations and tests of subsurface conditions at the site which have been utilized by the Engineer in the preparation of the Contract Documents, bidder may rely upon the accuracy of the technical data contained in such reports but not upon non-technical data, interpretations or opinions contained therein or for the completeness thereof for the purposes of bidding or construction. In reference to those drawings relating to physical SectionIl.doc Page 1 of 9 4/3/2012 Section 11— Instructions to Bidders conditions of existing surface and subsurface conditions (except Underground Facilities) which are at or contiguous to the site and which have been utilized by the Engineer in preparation of the Contract Documents, bidder may rely upon the accuracy of the technical data contained in such drawings but not upon the completeness thereof for the purposes of bidding or construction. 33 Information and data reflected in the Contract Documents with respect to Underground Facilities at or contiguous to the site are based upon information and data furnished to the City and Engineer by owners of such Undergound Facilities or others, and the City does not assume responsibility for the accuracy or completeness thereof unless expressly provided in the Contract Documents. 3.4 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders on subsurface conditions, Underground Facilities, other physical conditions, possible conditions, and possible changes in the Contract Documents due to differing conditions appear in the General Conditions. 3.5 Before submitting a Bid, each Bidder shall, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing the work in accordance with the time, price and other terms and conditions of the Contract Documents. 3.6 On request in advance, City will provide each Bidder access to the site to conduct such explorations and tests at Bidder's own expense as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the site to its former condition upon completion of such explorations and tests. 3.7 The lands upon which the Wark is to be performed, rights-of-way and easements for access thereto and other lands designated for use by the Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by the Contractor. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by the City unless otherwise provided in the Contract Documents. 3.8 The submission of a Bid will constitute an unequivocal representation by the Bidder that the Bidder has complied with every requirement of these Instructions to Bidders and that, without exception, the Bid is premised upon performing and furnishing the Work required by the Contract Documents by such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions of performance and furnishing of the work. 4 INTERPRETATIONS AND ADDENDA 4.l All questions as to the meaning or intent of the Contract Documents are to be directed to the Engineer. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda, by the City's planroom to all parties recorded by the City's planroom as planholders having received the Bidding Documents. Questions received after the time frame specified at the pre-bid meeting prior to the date for opening of SectionlI.doc Page 2 of 9 4/3/2012 � � � � � 4� C�►•] � Section II — tnstructions to Bidders Bids may not be answered. Only information provided by formal written Addenda will be binding. Oral and other interpretations of clarifications will be without legal effect. Addenda may also be issued to modify the Bidding Documents as deemed advisable by the City or Engineer. BID SECURITY OR BID BOND 5.1 Each Bid must be accompanied by Bid Security made payable to the City of Clearwater in � an amount equal to ten percent (] 0%) ofthe Bidder's maYimum Bid price and in the fonn of a certified or cashier's check or a Bid Bond (on for►n attached) issued by a surety meeting the requirements of the General Conditions. A cash bid bond will not be accepted. ' � � � � � r � 5.2 The Bid Security of the Successful Bidder will be retained until such Bidder has executed the Agreement and furnished the required Payment and Performance bonds, whereupon the Bid Security will be returned. If the Successful Bidder fails to execute, deliver the Agreement and furnish the required Bonds within ten (10) days after the award of contract by the City Council, the City may annul the bid and the Bid Security of the Bidder will be forfeited. The Bid Security of any Bidder whom the City believes to have a reasonable chance of receiving the award may be retained by the City until the successful execution of the agreement with the successful Bidder or for a period up to ninety (90) days following bid opening. Security of other Bidders will be returned approximately fourteen (14) days after the Bid opening. 53 6 6.1 7 7.1 8 The Bid Bond shall be issued in the favor of the City of Clearwater by a surety company qualified to do business in, and having a registered agent in the State of Florida. CONTRACT TIME The number of consecutive calendar days within which the work is to be completed is set forth in the Technical Specifications. LIQUIDATED DAMAGES Provisions for liquidated damages are set forth in the Contract Agreement. SUBSTITUTE MATERIAL AND EQUIPMENT 8.1 The contract, if awarded, will be on the basis of material and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items. Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or equal" item may be furnished or used, application for its acceptance will not be considered by the Engineer until after the effective date of the Contract Agreement. The procedure for submittal of any such application is described in the General Conditions and as supplemented in the Technical Specifications. � 9 SUBCONTRACTORS 9.1 If requested by the City or Engineer, the Successful Bidder, and any other Bidder so � requested, shall, within seven (7) days after the date of the request, submit to the Engineer an experience statement with pertinent information as to similar projects and other evidence of qualification for each Subcontractor, supplier, person and organization to be used by the �' SectionII.doc � Page 3 of 9 4/3/2012 9.2 10 Section Il — Instructions to Bidders Contractor in the completion of the Work. The amount of subcontract work shall not exceed fifty percent (50%) of the Work except as may be specifically approved by the Engineer. If the Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, supplier, other person or organization, he may, before recommending award of the Contract to the City Council, request the Successful Bidder to submit an acceptable substitute without an increase in Contract Price or Contract Time. If the Successful Bidder declines to make any such substitution, the City may award the contract to the next ]owest and most responsive Bidder that proposes to use acceptable Subcontractors, Suppliers, and other persons and organizations. Declining to make requested substitutions will not constitute grounds far sacrificing the Bid security to the City of any Bidder. Any Subcontractor, supplier, other person or organization listed by the Contractor and to whom the Engineer does not make written objection prior to the recommendation of award to the City Council will be deemed acceptable to the City subject to revocation of such acceptance after the Effective Date of the Contract Agreement as provided in the General Conditions. No Contractor shall be required to employ any Subcontractor, supplier, person or organization against whom he has reasonable objection. BID/PROPOSAL FORM 10.1 The Bid/Proposal Form is included with the Contract Documents and shall be completed in ink or by typewriter. All blanks on the Bid/Proposal Forms must be completed. Unit Prices shall be to no more than two decimal points in dollars and cents. The Bidder must state in the Bid/Proposal Form in words and numerals without delineation's, alterations or erasures, the price for which he will perform the work as required by the Contract Documents. Bidders are required to bid on all items in the Bid/Proposal form. The lump sum for each section or item shall be for furnishing all equipment, materials, and labor for completing the section ar item as per the plans and contract specifications. Should it be found that quantities or amounts shown on the plans or in the proposal, for any part of the work, are exceeded or should they be found to be less after the actual construction of the work, the amount bid for each section or item will be increased or decreased in direct proportion to the unit prices bid for the listed individual items. 10.2 Bids by corporations shall be executed in the corporate name by the president or a vice- president (or other corporate officer accompanied by evidence of autharity to sign) and the corparate seal shall be affixed. The corporate address and state of incorporation shall be shown below the Signature. If requested, the person signing a Bid for a corporation or partnership shall produce evidence satisfactory to the City of the person's authority to bind the corporation or partnership. ] 0.3 Bids by partnerships shall be executed in the partnership name and signed by a general partner, whose title shall appear under the signature and the official address of the partnership shall be shown below the signature. 10.4 11 All names shall be typed or printed below the signature. SUBMISSION OF BIDS I1.1 Sealed Bids shall be submitted at or befare the time and at the place indicated in the Advertisement for Bids and shall be submitted in a 8.5"xl l" manila envelope with the project name and number on the bottom left hand corner. If forwarded by mail, the Bid shall be enclosed in another envelope with the notation "Bid Enclosed" on the face thereof and SectionlI.doc Page 4 of 9 4/3/2012 � � � � � � � � � � � � Section II — Instructions to Bidders addressed to the City of Clearwater, attention Purchasing Manager. Bids will be received at the office indicated in the Advertisement until the time and date specified. Telegraphic or facsim ile bids received by the Purchasing Manager will not be accepted. 12 MODIFICATION AND WITHDRAWAL OF BIDS 12.1 Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered as described in the Advertisement of Bids. A request for withdrawal or a modification shall be in writing and signed by a person duly authorized to do so. Withdrawal of a Bid will not prejudice the rights of a Bidder to submit a new Bid prior to the Bid Date and Time. After expiration of the period far receiving Bids, no Bid may be withdrawn or modified. 12.2 After a bid is received by the City, the bidder may request to modify the bid for typographical or scrivener's errors only. The bidder must state in writing to the City that a typographical or scrivener's error has been made by the bidder, the nature of the error, the requested correction of the error, and what the adjusted bid amount will be if the correction is accepted by the City. The City reserves the right at its sole discretion to accept, reject, or modify any bid. 13 REJECTION OF BIDS 13.1 To the extent permitted by applicable State and Federal laws and regulations, the City reserves the right to reject any and all Bids, and to waive any and all informalities. Grounds for the rejection of a bid include but are not limited to a material omission, unauthorized alteration of form, unauthorized alternate bids, incomplete or unbalanced unit prices, or irregularities of any kind. Also, the City reserves the right to reject any Bid if the City believes that it would not be in the best interest of the public to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the City. The City reserves the right to decide which bid is deemed to be the lowest and best in the interest of the public. 14 DISQUALIFICATION OF BIDDER 14.1 Any or all bids will be rejected if there is any reason for believing that collusion exists among the bidders, the participants in such collusion will not be considered in future proposals for the same wark. Each bidder shall execute the Non-Collusion Affidavit contained in the Contract Documents. 15 OPENING OF BIDS 15.1 16 Bids will be opened and read publicly at the location and time stated in the Advertisement for Bids. Bidders are invited to be present at the opening of bids. LICENSES, PERMITS, ROYALTY FEES AND TAXES 16.1 The Contractor shall secure all licenses and permits (and shall pay all permit fees) except as � specifically stated otherwise in the Technical Specifications. The Contractor shall comply with all Federal and State Laws, County and Municipal Ordinances and regulations, which in any manner effect the prosecution of the work. City of Clearwater building permit fees �' Sectionll.doc Page 5 of 9 4/3/2012 � Section I I—]nstructions to Bidders and impact fees will be waived except as specifically stated otherwise in the Technical Specifications. 16.2 The Contractor shall assume ali liability for the payment of royalty fees due to the use of any construction or operation process, which is protected by patent rights except as specifically stated otherwise in the Technical Specifications. The amount of royalty fee, if any, shall be stated by the Contractor. l 6.3 The Contractor shall pay all applicable sales, consumer, use and other taxes required by law. The Contractor is responsible for reviewing the pertinent State Statutes involving the sales tax and sales tax exemptions and complying with all requirements. 16.4 The City of Clearwater is exempt from state sales tax on materials incorporated into the WORK. The City of Clearwater reserves the right to implement the Owner Direct Purchase (ODP) Option, if indicated in the Scope of Work Description in Section IV — Technical Specifications and as defined in Section III — General Conditions. 17 IDENTICAL TIE BIDSNENDOR DRUG FREE WORKPLACE ] 7.1 In accordance with the requirements of Section 287.087 Florida Statutes regarding a Vendor Drug Free Workplace, in the event of identical tie bids, preference shall be given to bidders with drug-free workplace programs. Whenever two or more bids which are equal with respect to price, quality, and service are received by the City for the procurement of commodities or contractual services, a bid received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie bids will be followed if none or all of the tied bidders have a drug-free workplace program. In order to have a drug-free workplace program, a contractor shall supply the City with a certificate containing the following six statements and the accompanying certification statement: (1) Publish a statement notifying employees dispensing, possession, or use of a controlled specifying the actions that will be taken prohibition. that the unlawful manufacture, distribution, � substance is prohibited in the workplace and against employees for violations of such (2) Inform employees as to the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. (3) Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection (1). (4) In the statement specified in subsection (I), notify the employees that, as a condition of working on the commodities or contractual services that are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of chapter 893, or of any controlled substance law, of the United States, or of any state, for a violation occurring in the workplace no later than five (5) days after such conviction. (5) Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community, by any employee who is so convicted. SectionII.doc Page 6 of 9 4/3/2012 r � � �� � � � � � � Section li — lnstructions to Bidders (6) Make a good faith effort to continue to maintain a drug-free workplace through implementation ofthis section. I certify that this firm does/does not (select only one) fully comply with the above requirements. 18 AWARD OF CONTRACT 18.1 Discrepancies between words and itgures will be resolved in favor of words. � Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. � � �1 � u � � � � � ] 8.2 In evaluating the Bids, the City will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, unit prices, and other data as may be requested in the Bid/Proposal form. The City may consider the qualifications and experience of Subcontractars, suppliers and other persons and organizations proposed by the Contractor for the Work. The City may conduct such investigations as the City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons, and organizations to perform and furnish the Work in accordance with the Contract Documents to the City's satisfaction within the prescribed time. 18.3 If the Contract is to be awarded, it will be awarded to the lowest responsible, responsive Bidder whose evaluation by the City indicates to the City that the award will be in the best interest ofthe City. 18.4 Award of contract will be made for that combination of base bid and alternate bid items in the best interest of the City, however, unless otherwise specified all work awarded will be awarded to only one Contractor. 19 BID PROTEST 19.1 RIGHT TO PROTEST: Any actual bidder who is aggrieved in connection with the solicitation or award of a contract may seek resolution of his/her complaints initially with the Purchasing Manager, and if not satisfied, with the City Manager, in accordance with protest procedures set forth in this section. 19.2 PROTEST PROCEDURE: A. A protest with respect to the specifications of an invitation for bid or request far proposal shall be submitted in writing a minimum of five (5) work days prior to the opening of the bid or due date of the request for proposals, unless the aggrieved person could not have been reasonably expected to have knowledge of the facts giving rise to such protest prior to the bid opening or the closing date for proposals. Opening dates for bids or due dates for requests for proposal will be printed on the bid/request document itself. B. Protests in respect to award of contract shall be submitted in writing a maximum of five (5) work days after notice of intent to award is posted, or is mailed to each bidder, whichever is earlier. Notice of intent to award will be forwarded to bidders upon telephonic or written request. Protests of recommended award should cite � Sectionll.doc � Page 7 of 9 4/3/2012 Section 11 — Instructions to Bidders specific portions of the City of Clearwater Code of Ordinances that have allegedly been violated. C. Exceptions to the five (5) day requirements noted in both A and B above may be granted if the aggrieved person could have not been reasonably expected to have knowledge of the facts giving rise to such protest prior to the bid opening, posting of intent to award, or due date for requests for proposals. Request far exceptions should be made in writing, stating reasons for the exception. D. The Purchasing Manager shall respond to the formal written protest within five (5) work days of receipt. The Purchasing Manager's response will be fully coordinated with the appropriate Department Director and the Assistant City Manager. E. If the protestor is not satisfied with the response from the Purchasing Manager, he/she may then submit in writing within five (5) work days of receipt of that response his/her reason for dissatisfaction, along with copies of his/her original formal protest letter and the response from the Purchasing Manager, to the City Manager. F. The City Manager as Purchasing Agent for the City has the final authority in the matter of protests. The City Manager will respond to the protestor within ten (10) work days of receipt of the appeal. l 93 PROTEST FEE: When filing a formal protest, the protesting vendor must include a fee in the amount of 5% of the selected vendor's total bid to offset the City's additional expenses related to the protest. This fee shall not exceed $2,500 nor be less than $50. If either the Purchasing Manager or the City Manager upholds the protest, the City will refund l 00% of the fee paid. 19.4 STAY OF PROCUREMENT DURING PROTEST: In the event of a timely protest, the Purchasing Manager shall not proceed with the solicitation or award of contract until all administrative remedies have been exhausted or until the City Manager makes written determination that the award of contract without delay is necessary to protect the best interest of the City. SectionIl.doc Page 8 of 9 4/3/2012 � � �J � Section 11— Instructions to Bidders 20 TRENCH SAFETY ACT � 20.1 The Bidder shall comply with the provisions of the City of Clearwater's Ordinance related to trench digging (Ordinance No. 7918-08) along with the Florida Trench Safety Act (Sections 553.60-553.64, Florida Statutes) and the provisions of the Occupational � Safety and Health Administration's (OSHA) excavation safety standards, 29 C.F.R.s l 926.650 Subparagraph P, or current revisions of these laws. � 21 CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL MANAGEMENT MEASURES � 21.1 The Bidder shal] comply with the provisions of the Environmental Protection Agency (EPA) National Pollution Discharge Elimination System (NPDES) stormwater permit and implement stormwater pollution prevention plans (SWPPP's) or stormwater � management programs (both using best management practices (BMPs) that effectively reduce or prevent the discharge of pollutants into receiving waters. � �' , � � � II J � A. The control of construction-related sediment loadings is critical to maintaining water quality. The implementation of proper erosion and sediment control practices during the construction stage can significantly reduce sediment loadings to surface waters. B. Prior to land disturbance, prepare and implement an approved erosion and sediment control plan or similar administrative document that contains erosion and sediment control provisions. NPDES Management Measures available at City of Clearwater En in� eering Environmental Division and EPA websites to help address construction-related Best Management Practices. References EPA website � SectionII.doc ' Page 9 of 9 4/3/2012 � � SECTION Iil GENERAL CONDITIONS Table of Contents: ' 1 DEFINITIONS .................................................................................................................. 1 � � L�� 1_� � � 2 PRELIMINARY MATTERS ........................................................................................... 5 2.l DELIVERY OF BONDS AND CERTIFICATES OF INSURANCE ............................ 5 2.2 COPIES OF DOCUMENTS ............................................................................................ 5 23 COMMENCEMENT OF CONTRACT TIME/NOTICE TO PROCEED; STARTING THEPROJECT ................................................................................................................ 5 2.4 BEFORE STARTING CONSTRUCTION ..................................................................... 5 2.5 PRECONSTRUCTION CONFERENCE ........................................................................ 6 2.6 PROGRESS MEETINGS ................................................................................................ 6 3 CONTRACT DOCUMENTS, INTENT .................... 3.1 INTENT ........................................................................, 3.2 REPORTING AND RESOLVING DISCREPANCIES ............................................... 7 ............................................... 7 4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCEPOINTS .................................................................................................... 8 4.1 AVAILABILITY OF LANDS ......................................................................................... 8 4.2 INVESTIGATIONS AND REPORTS ............................................................................ 8 4.3 PHYSICAL CONDITIONS, UNDERGROUND FACILITIES ..................................... 8 4.4 REFERENCE POINTS .................................................................................................... 9 � 5 BONDS AND INSURANCE ............................................................................................ 9 5.1 PERFORMANCE AND PAYMENT BOND/CONTRACT BOND ............................... 9 5.2 INSURANCE ................................................................................................................... 9 � 5.2.1 WORKER'S COMPENSATION INSURANCE ......................................................... 1 Q 5.2.2 PUBLIC LIABILITYAND PROPERTYDAMAGE COVERAGE ............................ 10 5.2.3 COMPREHENSIVE A UTOMOBILE LIABILITY .................................................... 11 � 5.3 WAIVER OF RIGHTS .................................................................................................. 12 6 CONTRACTORS RESPONSIBILITIES ..................................................................... 12 6.1 SUPERVISION AND SUPERINTENDENCE ............................................................. 12 6.2 LABOR, MATERIALS AND EQUIPMENT ............................................................... ] 3 6.3 SUBSTITUTES AND "OR EQUAL" ITEMS .............................................................. 14 � 6.4 SUBCONTRACTORS, SUPPLIERS AND OTHERS .................................................. ]4 6.5 USE OF PREMISES ...................................................................................................... 15 6.5.1 STAGINGAREAS ....................................................................................................IS � 6.5.2 RESTORATION TIME LIMITS ................................................................................ 1 S 6.6 LICENSE AND PATENT FEES, ROYALTIES AND TAXES ................................... 16 6.7 LAWS AND REGULATIONS ...................................................................................... 16 1 6.8 PERMITS ....................................................................................................................... �� 6.9 SAFETY AND PROTECTION ..................................................................................... 17 6.10 EMERGENCIES ............................................................................................................18 � 6.11 DRAWINGS ..................................................................................................................18 SectionlII.doc i 7/31/2012 , 6.11.1 SHOP DRAWINGS, SAMPLES, RFIs, and SUBMITT.4L REVIEW....... 6.11.2 AS-BUILT DRAWINGS ........................................................................... 6.11.3 CAD STANDARDS .................................................................................. 6.11.4 DELIVERABLES :................................................................................... 6.12 CONTRACTOR'S GENERAL WARRANTY AND GUARANTEE.......... 6.13 CONTINUING THE WORK ....................................................................... 6.14 INDEMNIFICATION ................................................................................... 6.15 CHANGES IN COMPANY CONTACT INFORMATION ........................ .......... 18 .......... 19 .......... 21 .......... 23 ........... 23 ........... 23 ........... 24 ........... 24 7 OTHER WORK .............................................................................................................. 24 7.1 RELATED WORK AT SITE ........................................................................................ 24 7.2 COORDINATION ......................................................................................................... 25 8 9 10 11 9. l 9.2 93 9.4 9.5 9.6 OWNERSRESPONSIBILITY ...................................................................................... 25 OWNER REPRESENTATIVE'S STATUS DURING CONSTRUCTION .............. 25 OWNERSREPRESENTATIVE ................................................................................... 25 CLARIFICATIONS AND INTERPRETATIONS ........................................................ 26 REJECTING OF DEFECTIVE WORK ............................................................•--......... 26 SHOP DRAWINGS, CHANGE ORDERS, AND PAYMENTS .................................. 26 DECISIONS ON DISPUTES ........................................................................................ 26 LIMITATIONS ON OWNER REPRESENTATIVE'S RESPONSIBILITIES ............. 27 CHANGESIN THE WORK .......................................................................................... 28 CHANGES IN THE CONTRACT PRICE ................................................................... 28 1].l CHANGES IN THE CONTRACT PRICE .................................................................... 28 112 ALLOWANCES AND FINAL CONTRACT PRICE ADJUSTMENT ....................... 30 11.3 UNIT PRICE WORK .................................................................................................... 30 12 CHANGES IN THE CONTRACT TIME .................................................................... 31 13 TESTS AND INSPECTIONS, CORRECTION, REMOVAL OR ACCEPTANCE OFDEFECTIVE WORK ............................................................................................... 31 14 13.1 13.2 133 l 3.4 13.5 l 3.6 13.7 14.1 14.2 143 ] 4.4 14.5 14.6 14.7 14.8 TESTSAND INSPECTION .......................................................................................... 3l UNCOVERINGTHE WORK ....................................................................................... 32 OWNER'S REPRESENTATIVE MAY STOP THE WORK ....................................... 32 CORRECTION OR REMOVAL OF DEFECTIVE WORK ........................................ 33 WARRANTY/CORRECTION PERIOD ...................................................................... 33 ACCEPTANCE OF DEFECTIVE WORK ................................................................... 33 OWNER MAY CORRECT DEFECTIVE WORK ....................................................... 34 PAYMENTS TO CONTRACTOR AND COMPLETION ......................................... 34 APPLICATION FOR PROGRESS PAYMENT ........................................................... 34 CONTRACTOR'S WARRANTY OF TITLE ............................................................... 35 REVIEW OF APPLICATIONS FOR PROGRESS PAYMENTS ................................ 35 PARTIALUTILIZATION ............................................................................................ 36 FINALINSPECTION ................................................................................................... 37 FINAL APPLICATION FOR PAYMENT ................................................................... 37 FINAL PAYMENT AND ACCEPTANCE ................................................................... 37 WAIVEROF CLAIMS ................................................................................................. 38 SectionIII.doc �� �i3 �izo i2 t. , � ' � � LJ � � � � LJ � � � � � ' , ' 15 SUSPENSION OF WORK AND TERMINATION .................................................... 38 15.1 OWNER MAY SUSPEND THE WORK ...................................................................... 38 15.2 OWNER MAY TERMINATE ...................................................................................... 38 15.3 CONTRACTOR MAY STOP WORK OR TERMINATE ........................................... 40 16 DISPUTE RESOLUTION .............................................................................................. 40 17 MISCELLANEOUS ....................................................................................................... 40 17.1 SUBMITTAL AND DOCUMENT FORMS ................................................................. 40 17.2 GIVING NOTICE .......................................................................................................... 40 17.3 NOTICE OF CLAIM ..................................................................................................... 4l 17.4 PROFESSIONAL FEES AND COURT COSTS INCLUDED ..................................... 41 ] 7.5 ASSIGNMENT OF CONTRACT ................................................................................. 41 17.6 RENEWAL OPTION .................................................................................................... 41 l 7.7 ROLL-OFF CONTAINERS AND/OR DUMPSTERS ................................................. 41 18 ORDER AND LOCATION OF THE WORK .............................................................. 41 19 MATERIAL USED ......................................................................................................... 41 20 CONFLICT BETWEEN PLANS AND SPECIFICATIONS ..................................... 42 21 OWNER DIRECT PURCHASE (ODP) OPTION ....................................................... 42 22 RESIDENT NOTIFICATION OF START OF CONSTRUCTION .......................... 42 22.1 GENERAL .....................................................................................................................42 22.2 EXAMPLE .....................................................................................................................42 23 PROJECT INFORMATION SIGNS ............................................................................ 43 23.1 SCOPE AND PURPOSE ............................................................................................... 43 23.2 TYPE OF PROJECT SIGN, FIXED OR PORTABLE ................................................. 43 23.3 FIXED SIGN ................................................................................................................. 44 23.4 PORTABLE SIGNS ...................................................................................................... 44 23.5 SIGN COLORING ......................................................................................................... 44 23.6 SIGN PLACEMENT ..................................................................................................... 23.7 SIGN MAINTENANCE ................................................................................................ 44 23.8 TYPICAL PROJECT SIGN .......................................................................................... 45 24 AWARD OF CONTRACT, WORK SCHEDULE AND GUARANTEE .................. 45 25 SCRUTINIZED COMPANIES AND BUSINESS OPERATIONS WITH CUBA AND SYRIA CERTIFICATION FORM ..................................................................... 46 SectionIII.doc iii 7/31/2012 �J � ' � � � � � � � � � �� ��l L_ Y , � Section lll — Genera] Conditions 1 DEFINITIONS Addenda Written or graphic instruments issued prior to the opening of Bids which clarify, correct or change the Bidding Requirements or the contract documents. Agent Architect, engineer or other outside agency, consultant or person acting on behalf of the City. Agreement The written contract between Owner and Contractor covering the Work to be performed; other Contract Documents are attached to the Agreement and made a part thereof as provided therein. Application for Payment The form accepted by Engineer which is to be used by Contractor in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. Approve The word approve is defined to mean satisfactory review of the material, equipment or methods for general compliance with the design concepts and with the information given in the Contract Documents. It does not imply a responsibility on the part of the Engineer to verify in every detail conformance with the Drawings and Specifications. Bid The offer or proposal of the bidder submitted on the prescribed form setting forth the prices for the work to be performed. Bidding Documents The advertisement or invitation to Bid, instructions to bidders, the Bid form, and the proposed Contact Documents (including all Addenda issued prior to receipt of Bids). Bonds Performance and payment bonds and other instruments of security. Change Order A written order to Contractor signed by Owner and Contractor authorizing an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Time issued on or after the effective date of the Agreement. City The City of Clearwater, Pinellas County, Florida. Construction Inspector A person who is the authorized representative of the Construction Manager and inspects City construction projects in order to insure the Contractor's work complies with the intent of the Contract Documents. Construction Manager The person who is typically in responsible charge of City construction projects. The Construction Manager assumes responsibility for the management of construction contracts at the Preconstruction Conference. The Construction Manager chairs the Preconstruction Conference and is the authority on any disputes or decisions regarding SectionIILdoc Page 1 of49 7/31/2012 Section Ill — General Conditions contract administration and performance. The Construction Manager typically acts as the Owner's Representative during construction. Contract Documents The Agreement, Addenda (which pertain to the Contract Documents), Contractor's Bid (including documentation accompanying the bid and any post-Bid documentation submitted prior to the execution of the Agreement) when attached as an exhibit to the Agreement, the Bonds, Instructions to Bidders, these General Conditions, any Supplementary Conditions, the Specifications and the Drawings, any other exhibits identified in the Agreement, together with all Modifications issued after the execution of the Agreement. Contract Price The Contract price constitutes the total compensation (subject to authorized adjustments) payable by Owner to Contractor for performing the Work. Corrtract Time The number of days or the date stated in the Agreement for the completion of the Work. Contractor The Person with whom the Owner has entered into the Agreement. For the purposes of this contract, the person, firm or corporation with whom this contract or agreement has been made by the City of Clearwater or its duly authorized representative. Critical Path Method Construction Schedule—CPM A graphic format construction schedule that displays construction activities as they relate to one another for the purpose of identifying the most efficient way to perform the work in a timely manner. The critical path identifies which activity is critical to the execution ofthe schedule. Day A calendar day of twenty-four (24} hours measured from midnight to the next midnight. Defective An adjective which when modifying the word Work refers to Work that is unsatisfactory, faulty or deficient, or does not conform to the Contract Documents or does not meet the requirements of any inspection, reference standard, test or approval referred to in the Contract Documents, or has been damaged prior to Engineers recommendation of final payment. Drawings The drawings, which will be identified in Technical Specifications ar the Agreement, which show the character and scope of the Work to be performed and which have been prepared or approved by Engineer and are referred to in the contract documents. Shop drawings are not Drawings as so defined. Engineer The duly appointed representative of the City Manager of the City of Clearwater. For the purposes of this contract, the City Engineer of the City of Clearwater, Pinellas County, Florida, or his authorized representative. For certain projects, the Engineer may serve as the Owner's Representative during construction. Engineer's Consultant A Person having a contract with Engineer to furnish services as Engineer's independent SectionIII.doc Page 2 of 49 7/3l/2012 � � ' � �� � � � � � �, � � LJ , � �J � � �_J � � � � � � Section III — Genera] Conditions professional associate or consultant with respect to the Project and who is identified as such in the Supplementary Conditions. F.D.O.T Specifications The Standard Specifications for Road and Bridge Construction as issued by the Florida Department of Transportation (latest English edition). Furnish The wards "furnish", "furnish and install", "install", and "provide" or words of similar meaning shall be interpreted, unless otherwise specifically stated, to mean "furnish and install complete in place and ready for service". Inspection The term "inspection" and the act of inspecting means examination of construction to ensure that it conforms to the design concept expressed in the Drawings and Specifications. These terms shall not be construed to mean supervision, superintending or overseeing. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes and orders of any kind of governmental bodies, agencies, authorities and courts having jurisdiction. Liens Liens, charges, security interests or encumbrances upon real property or personal property. Milestone � A principal event specified in the contract Documents relating to an intermediate completion date or time prior to the fina) completion date. � � � Notice to Proceed (NTP) A written notice given by the Owner to the Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform his obligations under the Contract Documents. Owner The City of Clearwater, Florida. Far the purposes of this contract, the person who is the City's authorized representative from the City's Department with whom will be responsible for the maintenance and operation of the Work once the Work is completed. For certain projects, a designee of the Owner may serve as the Owner's Representative during construction. Owner's Representative Designee of the Owner with authority to act on behalf of the Owner during construction. Person Project A natural person, or a corporation, partnership, firm, organization, or other artificial entity. The total construction of which the Work to be provided under the Contract Documents � may be the whole or a part as indicated elsewhere in the Contract Documents. , SectionIIl.doc Page 3 of49 7/31/2012 u Section lll — General Conditions Partial Utilization Use by Owner of a substantially completed part of the Work for the purpose for which is intended (or a related purpose) prior to Final Completion of all the Work. Representative of C:ontractor The Contractor shall assign a responsible person or persons, one of whom shall be at the construction site at all times that work is progressing. The names and positions of these persons shall be submitted to the City Engineer at the time of the pre-construction conference. This person or persons shall not be changed without written approval of City Engineer. Request for Information (RFI) An official written request far clarification of the intent of the contract documents from the Contractor to the Engineer. Shop Drawing All drawings, diagrams, illustrations, schedules and other data which are specifically prepared by or for Contractor to illustrate some portion of the Work and all illustrations, brochures, standard schedules, performance charts, instructions, diagrams and other information prepared by a supplier and submitted by Contractor to illustrate material ar equipment for some portion ofthe Work. Specifications Those portions of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship as applied to the Work and certain administrative details applicable thereto. Subcontractor A person having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the site. Substantial Completion The Work (or a specified part thereo� which has progressed to the point where, in the opinion of Engineer, as evidenced by Engineer's definitive certificate of Substantial Completion, it is sufficiently complete, in accordance with the Contract documents, so that the Wark (or specified part) can be utilized for the purposes for which it is intended; or if no such certificate is issued, when the Work is complete and ready for final payment as evidenced by the Engineer's recommendation of final payment. The terms "substantially complete" and "substantially completed" as applied to all or part of the Work refer to Substantial Completion thereof. Supplementary Conditions The part of the Contract which amends or supplements these General Conditions. Supplier A manufacturer, fabricator, supplier, distributor, material man or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by the Contractor. Surety Any person, firm or corporation which is bound with Contractor and which engages to be responsible for Contractor and his acceptable performance of the Work by a Bid, Performance or Payment Bond. SectionIII.doc Page 4 of 49 7/31/2012 � L� � � �L Section Ill — General Conditions Underground Facilities All pipelines, conduits, ducts, cables, wires manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasements containing such facilities which have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal ar treatment, traffic or other control systems or water. Unit Price Work Work to be paid for on the basis of unit prices. Work � The entire completed construction or the various separately identifiable parts thereof required to be furnished under the Contract Documents. Work includes and is the result of performing or furnishing labor and incorporating materials and equipment into the � construction, and performing or furnishing services and furnishing documents, all as required by the Contract Documents. Work Change Directive � A written directive to Contractor, issued on or after the Effective Date of the Agreement and signed by the Engineer, ordering an addition, deletion, or revision in the Work, or responding to differing or unforeseen physical conditions under which the Work is to be , performed or emergencies. Work Change Directive will not change the Contract Price or Contract Time, but is evidence that the parties expect that the change directed or documented by a Work Change Directive will be incorporated in a subsequently issued � Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Times. � 2 PRELIMINARY MATTERS � � � 1 � 2.1 DELIVERY OF BONDS AND CERTIFICATES OF INSURANCE When Contractor delivers the executed Agreements to the Owner, Contractor shall also deliver to the Owner such Bonds and Certificates of Insurance as Contractor may be required to furnish by this contract. 2.2 COPIES OF DOCUMENTS Engineer shall furnish to Contractor one (1) copy of Contract Documents for execution. Additional copies will be furnished, upon request, at the cost of reproduction. 2.3 COMMENCEMENT OF CONTRACT TIME/NOTICE TO PROCEED; STARTING THE PROJECT The Contract Time will commence on the day indicated in the Notice to Proceed. Contractor � shall start to perform the work on the date the Contract Time commences to run. No work shall be done at the site prior to the date that the Contract Time commences to run. ' �, � � 2.4 BEFORE STARTING CONSTRUCTION Before undertaking each part of the Wark, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable SectionIII.doc Page 5 of 49 7/31/2012 Section lII — General Conditions field measurements. Contractor shall promptly report in writing to Engineer any conflict, error or discrepancy which Contractor may discover; and shall obtain a written interpretation or clarification from Engineer before proceeding with any work effected thereby; however, Contractor shall not be liable to the Owner for failure to report any conflict, error or discrepancy in the Drawings or Specifications, unless Contractor had actual knowledge thereof or should reasonably have known thereof. No verbal agreement or conversation with any officer, Agent or employee of the Owner or Engineer's Consultant, either before or after the execution of this Contract, shall affect or modify any of the terms or obligations herein contained. Contractor sha11 not commence any work at any time without approved insurance required by these General Conditions. Failure to obtain this insurance will be the sole responsibility of the Contractor. 2.5 PRECONSTRUCTION CONFERENCE Within twenty (20) days of Award of Contract and before the start of the Work, the Owner's Representative shall schedule a preconstruction conference to be attended by Contractor, Engineer, Owner and others as appropriate to establish a working understanding among the parties as to the Work and to discuss the schedule of the Work and general Contract procedures. Typically, oversight of the project officially passes from the Engineering Department to the Construction Department at the preconstruction conference. In these cases, the preconstruction conference is run by the Construction Department and chaired by the City's Construction Manager. The Contractor shall deliver to the Owner's Representative at the Preconstruction Conference a color Critical Path Method (CPM) Construction Schedule. This is to be a sequence of events including submittal review and procurement. Notice to Proceed is usually established at this conference and such date can be inserted into the schedule at that time. The Contractor shall also bring a Submittal Schedule for review by the Engineer. This is to make sure that the list is complete and this schedule shall be the basis of a Submittal Log. The Contractor shall deliver to the Owner's Representative at the preconstruction conference a completed Emergency Call List and a completed Authorized Signature List. The Owner's Representative shall deliver to the Contractor at the preconstruction conference a project disk that has all of the necessary data and survey control points for the purpose of construction stakeout and as-built survey. The Owner's Representative shall deliver to the Contractor at the preconstruction conference a Contractar evaluation package. This is for the purpose of rating the Contractor's performance for reference when considering future contracts and bid prequalification. 2.6 PROGRESS MEETINGS The Contractor is required to attend Progress Meetings. These meetings will be scheduled on a weekly, bi-weekly, or monthly basis depending on the needs of the project. The Contractor shall bring to each meeting an updated submittal log, an updated request for information (RFI) log, a look-ahead schedule to cover the project activity from the current meeting to the next meeting, and all material test reports generated in the same time period. SectionIII.doc Page 6 of 49 7/31/2012 � , � � ' � � � l_J � � u � � � � � � , , � � ' � � � � � ' ' r IJ � � � � �� L� ��i � Section Ill — General Conditions 3 CONTRACT DOCUMENTS, INTENT 3.1 INTENT The Contract Documents comprise the entire Agreement between Owner and the Contractor concerning the Work. They may be altered only by written agreement. The Contract Documents are complementary; what is called for by one is as binding as if called for by all. It is the intent of the Contract Documents to describe a functionally complete project (ar part thereo� to be constructed in accordance with the Contract Documents. Any Work, materials or equipment which may reasonably be inferred from the Contract Documents or from prevailing custom or from trade usage as being required to produce the intended result will be furnished and performed whether or not specifically called for. When words or phrases, which have a well- known technical or construction industry or trade meaning, are used to describe Work, materials or equipment, such words or phrases shall be interpreted in accordance with that meaning. Clarifications and interpretations of the Contract Documents shall be issued by the Owner's Representative. Reference to standards, specifications, manuals or codes of any technical society, organization or association, or to the code, Laws or Regulation of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual or code, or Laws or Regulations in effect at the time of opening of Bids except as may be otherwise specifically stated in the Contract Documents. However, no provision of any referenced standard specification, manual or code, whether or not specially incorporated by reference in the responsibilities of Owner or Contractor as set forth in the Contract Documents, shall change the duties and responsibilities of Owner, Contractor, Engineer or Owner's Representative, or any of their Agents or employees from those set forth in the Contract Documents. Clarifications and interpretations of the Contract shall be issued by the Owner's Representative. Each and every provision of law and clause required by law to be inserted in these Contract documents shall be deemed to be inserted herein, and they shall be read and enforced as through it were included herein, and if through mistake or otherwise, any such provision is not inserted, or if not correctly inserted, then upon the application of either party, the Contract Documents shall forthwith be physically amended to make such insertion. 3.2 REPORTING AND RESOLVING DISCREPANCIES If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity or discrepancy within the Contract Documents or between the Contract Documents and any provision of any such Law or Regulation applicable to the performance of the Work or of any such standard, specification, manual or code or of any instruction of any Supplier, Contractor shall report it to the Owner's Representative in writing at once, and Contractor shall not proceed with the Work affected thereby (except in an emergency) until an amendment or supplement to Contract Documents has been issued by one of the methods provided in these General Specifications, provided however, that Contractor shall not be liable to Owner, or Owner's Representative for failure to report any such conflict, error, ambiguity or discrepancy unless Contractor knew or reasonably should have known thereof. Sectionlll.doc Page 7 of 49 7/31/2012 4 4.1 Section lll — General Conditions AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS AVAILABILITY OF LANDS The Owner shall furnish, as indicated in the Contract Documents, the lands upon which the Work is to be Performed, rights-of-way, easements for access thereto, and such other lands which are designated for the use of contractor. The Owner shall identify any encumbrances or restrictions not of general application but specifically related to use of lands so furnished with which contractor will have to comply in performing the Work. Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by the Owner, unless otherwise provided in the Contract Documents. 4.2 INVESTIGATIONS AND REPORTS Reference is made to the Supplementary Conditions and Technical Specifications for identification of those reports of investigations and tests of subsurface and latent physical conditions at the site or otherwise affecting cost, progress or perfortnance of the Work which have been relied upon by Engineer in preparation of the Drawings and Specifications. Such reports are not guaranteed as to accuracy or completeness and are not part of the Contract Documents. Contractor shall promptly notify the Owner's Representative in writing of any subsurface or latent physical conditions at the site, ar in an existing structure, differing materially from those indicated or referred to in the Contract Documents. Engineer will promptly review those conditions and advise if further investigation or tests are necessary. Owner or Engineer shall obtain the necessary additional investigations and tests and furnish copies to the Engineer and Contractor. If Engineer finds that the results of such investigations or tests indicate that there are subsurface or latent physical conditions, which differ materially from those, indicated in the contract Documents, and which could not reasonably have been anticipated by Contractor, a work change or Change Order will be issued incorporating the necessary revisions. 4.3 PHYSICAL CONDITIONS, UNDERGROUND FACILITIES The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the site is based on information and data furnished to Owner or Engineer by the owners of such Underground Facilities or by others. Unless otherwise expressly provided in the Contract Documents, Owner and Engineer shall not be responsible for the accuracy or completeness of any such information or data; and the cost of all the following will be included in the Contract Price and contractor shall have full responsibility for: (i) reviewing and checking all such information and data, (ii) locating all Underground Facilities shown or indicated in the Contract Documents, (iii) coordination of the Work with the owners of such Underground Facilities during construction, and (iv) the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. The Contractor is required to call the LOCAL PUBLIC UTILITY NOTIFICATION CENTER prior to any excavation per State regulations and to notify any utility owners who are not a member of the LOCAL PUBLIC UTILITY NOTIFICATION CENTER prior to any excavation. The LOCAL PUBLIC UTILITY NOTIFICATION CENTER is an agency for the protection and location of utilities prior to any excavation and contact number is available in local telephone directory. SectionIII.doc Page 8 of 49 7/31/2012 �I � � ' �� �� � �� �1 � � � � � � � li , � � �I � � CJ � � ' � � , L� 1 � � G� � , � u Section I Il — General Conditions 4.4 REFERENCE POINTS Engineer shall provide engineering surveys to establish reference points for construction, which in Engineer's judgment are necessary to enable Contractor to proceed with the Work. Contractor shall be responsible for laying out the Work, shall protect and preserve the established reference points and shall make no changes or relocations without the prior written approval of the Owner and Engineer. Contractor shall report to Engineer whenever any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points by a surveyor licensed in the State of Florida. The Contractor is referred to the Technical Specifications for more specific information regarding the provision of construction surveys. If a City survey crew is assigned to the project and there is excessive stake replacement caused by negligence of Contractor's forces after initial line and grade have been set, as determined by the Engineer, the Contractor will be charged at the rate of $100.00 per hour. Time shall be computed for actual time on the project. All time shall be computed in one-hour increments with a minimum charge of one hour. 5 BONDS AND INSURANCE 5.1 PERFORMANCE AND PAYMENT BOND/CONTRACT BOND Contractor shall furnish a Performance and Payment Bond in an amount at least equal to the Contract Price as security for the faithful performance and payment of all Contractor's obligations under the Contract Documents. This bond shall remain in effect at least one year after the date when final payment becomes due, unless a longer period of time is prescribed by laws and regulations or by the Contract Documents. Contractor shall also furnish such other Bonds as are required by the Supplementary Conditions. All Bonds shall be in the form prescribed by the Contract Documents and shall be executed by such sureties as are named in the current list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Audit Staff, Bureau of Government Financial Operations, U.S. Treasury Department. All bonds signed by an agent must be accompanied by a certified copy of such agents' authority to act. All bonds shall be deemed to contain all of the Conditions of Section 255.05, Florida Statutes, even if such language is not directly contained within the bond and the Surety shall be licensed and qualified to do business in the State of Florida. Owner reserves the right to reject any surety. If the Surety on any Bond furnished by the Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of these Contract Documents, the Contractor shall within five days after notice thereof substitute another Bond and surety, both of which must be acceptable to Owner. 5.2 INSURANCE Contractor shall purchase and maintain such liability and other insurance as is appropriate for the Work being performed and furnished and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance and furnishing of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed or furnished by Contractor, and Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform or furnish any of the Work, or by anyone for whose acts any of them may be liable for the following: (i) Claims under worker's compensation, disability benefits and other similar employee benefit acts; (ii) Claims for damages because of bodily SectionIII.doc Page 9 of 49 7/31/2012 Seetion lil —General Conditions injury, occupational sickness or disease, or death of Contractor's employees; (iii) Claims for damages because of bodily injury, sickness ar disease, or death of any person other than Contractor's employees; (iv) Claims for damages insured by customary personal injury liability coverage which are sustained by any person as a result of an offense directly or indirectly related to the employment of such person by Contractor, or by any other person for any other reason; (v) Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including loss of use resulting therefrom; and (vi) Claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. The Contractor shall deliver to the Owner, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by the Owner or any other additional insured) which Contractor is required to purchase and maintain in accordance with this paragraph. The policies of insurance so required by this paragraph to be purchased and maintained shall: (i) include as additional insured (subject to any customary exclusion in respect of professional liability) Owner of Clearwater and any other persons or entities identified in the Supplementary Conditions, all of whom shall be listed as additional insured, and include coverage for the respective officers and employees of all such additional insures; (ii) include completed operations insurance; (iii) include contractual liability insurance covering Contractor's indemnity obligations in Article for Contractor's Responsibilities; (iv) contain a provision ar endorsement that the coverage afforded will not be canceled, materially changed or renewal refused until at least thirty days prior written notice has been given to the Owner, and Contractor and to each other additional insured identified in the Supplemental Conditions to whom a certificate of insurance has been issued (and the certificates of insurance furnished by the Contractor as described in this paragaph); (v) remain in effect at least until final payment and at all times thereafter when Contractor may be correcting, removing or replacing defective Work in accordance with Article for Correction of Defective Wark; (vi) with respect to completed operations insurance, and any insurance coverage written on a claims-made basis, shall remain in effect for at least two years after final payment. Contractor shall furnish the Owner and each other additional insured identified in the Supplementary Conditions to whom a certificate of insurance has been issued evidence satisfactory to the Owner and any such additional insured, of continuation of such insurance at final payment and one year thereafter and (vii) Name and telephone number of the authorized insurance agent for the Insurer. The limits of liability for the insurance required shall provide coverage for not less than the following amounts ar greater where required by laws and regulations: 5.2.1 WORKER'S COMPENSATION INSURANCE Contract Award Amount Contract Award Amount Under $1,000,000. $1,000,000. and Over (1) Workers' Compensation Statutory Statutory (2) Employer's Liability $500,000. $1,000,000. 5.2.2 PUBLIC LIABILITY AND PROPERTY DAMAGE COVERAGE Comprehensive General Liability including Premise/Operations; Explosion, Collapse and Underground Property Damage; Products/Completed Operations, Broad Form Contractual, Independent Contractors; Broad Form Property Damage; and Personal Injury liabilities: SectionIII.doc Page l0 of 49 7/31/2012 � � � � � �J � , � � � r ' LI LJ , i , ' �L � � � � L� �1 � � LJ � , � I� � LJ LJ � � Section IIl —General Conditions Contract Award Amount Contract Award Amount Under $1,000,000. $1,000,000. and Over (1) Bodily Injury: $500,000. Each $1,000,000. Each Occurrence Occurrence $1,040,000. Annual $1,000,000. Annual Aggregate Aggregate (2) Property Damage: $500,000. Each $1,000,000. Each Occurrence Occurrence $1,000,000. Annual $1,000,000. Annual Aggregate Aggregate (3) Personal Injury, with $1,000,000. Annual $1,000,000. Annual employment exclusion deleted Aggregate Aggregate 5.2.3 COMPREHENSIVE AUTOMOBILE LIABILITY including all owned (private and others), hired and non-owned vehicles: Contract Award Amount Contract Award Amount Under $1,000,000. $1,000,000. and Over (l) Bodily Injury $500,000. Each Person $1,000,000. Each Person $500,000. Each Accident $1,000,000. Each Accident (2) Property Damage $500,000. Each $1,000,000. Each Occurrence Occurrence Receipt and acceptance by Owner of the Contractor's Certificate of Insurance, or other similar document does not constitute acceptance or approval of amounts or types of coverages, which may be less than required by these Contract Documents. The Owner shall not be responsible for purchasing and maintaining any property insurance to protect the interests of Contractar, Subcontractors or others in the Work. Owner may at its option require a copy of the Contractor's Insurance Policy(s). All insurance policies required within this Contract Document shall provide full coverage from the first dollar of exposure unless otherwise stipulated. No deductibles will be accepted without prior approval from Owner. Longshore and Harbor Worker's Compensation Act: Section 32 of the Act, 33 U.S.C. 932, requires an employer, with employees in maritime employment, to secure the payment of benefits under the Act either by insuring with an insurance carrier authorized by the U.S. Department of Labor, or to be authorized by the U.S. Department of Labor as a self-insurer. For General Contractors: Section 4(a) of the Act provides that every employer shall be liable for and shall secure the payment to his employees of the compensation payable under Sections 7, 8, and 9 of the Act. In the case of an employer who is a subcontractor, only if such subcontractor fails to secure the payment of compensation shall the contractor be liable for and be required to secure the payment of compensation. SectionIII.doc Page ]1 of49 7/3U2012 Section I11— General Conditions 5.3 WAIVER OF RIGHTS The Owner and Contractor intend that all policies purchased in accordance with Article on Insurance will protect the Owner, Contractor, Subcontractors, Engineer, Engineer's Consultants and all other persons or entities identified in the Supplementary Conditions to be listed as insured or additional insured in such policies and will provide primary coverage for all losses and damages caused by the perils covered thereby. All such policies sha}I contain provisions to the effect that in the event of payment of any loss or damage the insurers will have no rights of recovery against any of the insured or additional insured thereunder, the Owner and Contractor waive all rights against each other and their respective officers, directors, employees and agents far all losses and damages caused by, arising out of or resulting from any of the perils covered by such policies and any other property insurance applicable to the work; and, in addition, waive all such rights against Sub-contractors, Engineer, Engineer's Consultants and all other persons or entities identified in the Supplementary Conditions to be listed as insured or additional insured under such policies for losses and damages so caused. None of the above waivers shall extend to the rights that any party making such waiver may have to the proceeds of insurance otherwise payable under any policy so issued. 1n addition, the Owner waives all rights against Contractor, Subcontractors, Engineer, Engineer's Consultant and the officers, directors, employees and agents of any of them for: (i) loss due to business interruption, loss of use or other consequential loss extending beyond direct physical loss or damage to the Owner property or the Work caused by, arising out of or resulting from fire or other peril, whether or not insured by the Owner and; (ii) loss or damage to the completed Project or part thereof caused by, arising out of or resulting from fire or other insured peril covered by any property insurance maintained on the completed Project or part thereof by the Owner during partial utilization, after substantial completion or after final payment. 6 CONTRACTORS RESPONSIBILITIES 6.1 SUPERVISION AND SUPERINTENDENCE Contractor shall supervise, inspect and direct the Wark competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. Contractor shall not be ' � ul �J u � � �l � � LI responsible for the negligence of others in the design or specification of a specific means, � method, technique, sequence or procedure of construction which is shown or indicated in and expressly required by the Contract Documents. Contractor shall be responsible to see that the completed work complies accurately with the Contract Documents. Contractor shall keep on the work at all times during its progress a competent resident superintendent, who shall not be replaced without notice to the Owner's Representative except under extraordinary circumstances. The superintendent will be Contractor's representative at the site and shall have authority to act on behalf of Contractor. All communications to the superintendent shall be as binding as if given to Contractor. The Contractor's superintendent shall keep a mobile cell phone on his person so he can be contacted whenever necessary. Contractor shal Representative incompetent, u SectionlII.doc 1 employ only competent persons to do the work and whenever the Owner's shall notify Contractor, in writing, that any person on the work appears to be nfaithful, disorderly, or otherwise unsatisfactory, such person shall be removed Page 12 of 49 LI , ' 7/31 /2012 � � ' L� �J � 1 � � ' � i � , � � Section I11 — General Conditions from the project and shall not again be employed on it except with the written consent of the Owner's Representative. Contractor shall reimburse Owner for additional engineering and inspection costs incurred as a result of overtime work in excess of the regular working hours or on the Owner normally approved holidays. At such times when Inspector overtime is required, the Contractor shall sign an overtime slip documenting such hours and the Contractor shall be provided a copy for his records. At the end of the project and prior to payment of withheld retainage funds, the Contractor shall deliver to the Owner a check made out to the Owner of Clearwater for full reimbursement of all lnspector overtime hours. Withheld retainage shall not be released until the Owner has received this check. Minimum number of chargeable hours for inspection costs on weekends or holidays shall be four hours. The cost of overtime inspection per hour shall be $60.00 per hour. Contractor shall provide and maintain in a neat and sanitary condition, such sanitary accommodations for the use of Contractor's employees as may be necessary to comply with the requirements of Laws and Regulations and the Engineer. 6.2 LABOR, MATERIALS AND EQUIPMENT Contractor shall provide competent, suitably qualified personnel to survey, lay out and construct the work as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the site. Except as otherwise required for the safety or protection of persons or the work or property at the site or adjacent thereto, and except as otherwise indicated in the Contract Documents, all work at the site shall be performed during regular working hours and Contractor will not permit overtime work or the performance of work on Saturday, Sunday, or any legal holiday without the Owner consent given after prior notice to Engineer. Unless otherwise specified in the General Requirements, Contractor shall furnish and assume full responsibility for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the furnishing, performance, testing, start-up and completion of the Work. All materials and equipment installed in the Work shall be of good quality and new, except as otherwise provided in the Contract Documents. If required by Engineer, Contractors shall furnish satisfactory evidence (including reports of required tests) as to the quality of materials and equipment. The Contractor shall provide suitable and secure storage for all materials to be used in the Work so that their quality shall not be impaired or injured. Materials that are improperly stored, may be rejected by the Engineer without testing. All materials and equipment shall be applied, installed, connected, erected, used, cleaned and ' conditioned in accordance with the instructions of the applicable manufacturer, fabricator, supplier, or distributor, except as otherwise provided in the Contract Documents. The City of Clearwater, at its sole discretion, reserves the right to purchase major equipment to ' be incorporated into the WORK under the Owner Direct Purchase (ODP) Option, if indicated in the Contract Documents. In such event, the Contractor shall cooperate and assist the Owner of Clearwater, at no additional cost, to implement the ODP documents and procedures. � , SectionIIl.doc Page 13 of 49 7/31/2012 � Section lil —General Conditions 6.3 SUBSTITUTES AND "OR EQUAL" ITEMS Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent or "or equal" item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be accepted by Engineer. If in Engineer's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by Engineer for approval. If in the Engineer's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or equal" item, it may be considered as a proposed substitute item. Contractor shall submit sufficient information as required by the Engineer to allow the Engineer to determine that the item of material or equipment proposed is essentially equivalent to that named and is an acceptable substitute therefore. Request for review of proposed substitute and "or equal" will be not be accepted by Engineer from anyone other than Contractor. Request for substitute and "or equal" items by Contractor must be submitted in writing to Owner's Representative and will contain all information as Engineer deems necessary to make a determination. All data provided by Contractor in support of any proposed substitute or "or equal" item will be at Contractor's expense. Engineer will be allowed a reasonable time to evaluate each proposal or submittal made per this paragraph. Engineer will be sole judge of acceptability. 6.4 SUBCONTRACTORS, SUPPLIERS AND OTHERS The Contractor shall deliver to the Owner's Representative before or at the preconstruction conference a list of all Subcontractors, suppliers and other persons and organizations proposed by the Contractor for Work to be performed on the Project. The Contractar shall include with this list the qualifications and references for each Subcontractor, supplier or other person and organization for review and approval. Any changes to this list must be submitted to the Owner's Representative for approval prior to the substitution of any Subcontractors, suppliers or other persons and organizations before performing any Work on the Project for the Contractor. Contractor shall be fully responsible to Owner and Engineer for all acts and omissions of the Subcontractors, Suppliers and other persons performing or furnishing any of the work under a direct or indirect contract with Contractor just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents shall create for the benefit of any such Subcontractor, Supplier or other person any contractual relationship between Owner or Engineer and any Subcontractor, Supplier or other person, nor shall it create any obligation on the part of Owner or Engineer to pay or to see to the payment of any moneys due any such Subcontractor, Supplier or other person. Contractor shall be solely responsible for scheduling and coordinating the work of Subcontractors, Suppliers and other persons performing or furnishing any of the work under a direct or indirect contract with Contractor. Contractor shall require all Subcontractors, Suppliers and such other persons performing or furnishing any of the work to communicate with the Engineer through Contractor. The divisions and sections of the Specifications and the identifications of any Drawings shall not control Contractor in dividing the work among Subcontractors or Suppliers or delineating the work to be performed by any specific trade. SectionllI.doc Page 14 of 49 7/31/2012 � � Cl � , � LJ � � � ' � � �� ' ' � r ' ' , � 1 , � Section lll — General Conditions All work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of Owner and Engineer. Contractor shall not pay or employ any Subcontractor, Supplier or other person or organization whether initially or as a substitute, against whom Owner or Engineer may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier or other person or organization to furnish or perform any of the work against whom Contractor has reasonable objection. Owner or Engineer will not undertake to settle any differences between Contractor and his Subcontractors or between Subcontractors. 6.5 USE OF PREMISES , Contractor shall confine construction equipment, the storage of materials and equipment and the operations of works to the site and land areas identified in and permitted by the Contract Documents on other land areas permitted by Laws and Regulations, right-of-way, permits and ' easements, and shall not unreasonably encumber the premises with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any adjacent land or areas, resulting ' from the performance of the Work. Should any claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly settle with such other party by negotiation or otherwise resolve the claim by arbitration or other dispute resolution proceed in � or at law. Contractor shall, to the fullest extent permitted by Laws and Regulations, indemnify and hold harmless Owner, Engineer, Engineer's Consultant and their officials, directors, employees and agents from and against all claims, costs, losses and damages arising out of or ' resulting from any claim or action, legal or equitable, brought by any such owner or occupant against Owner, Engineer or any other party indemnified hereunder to the extent caused by or based upon Contractor's performance of the Work. � During the progress of the Work, Contractor shall keep the premises free from accumulations of waste materials, rubbish and other debris resulting from the Work. At the completion of the Work or at intervals established by the Engineer, Contractor shall remove all waste materials, ' rubbish and debris from and about the premises as well as all tools, appliances, construction equipment and machinery and surplus materials. Contractor shall restore to original condition all property not designated for alteration by the Contract Documents. � , ' � 6.5.1 STAGING AREAS The Contactor shall obtain and deliver to the City written permission for the use of all staging and starage areas outside of the Limits of Construction. 6.5.2 RESTORATION TIME LIMITS The timely restoration of all impacted areas, especially right-of-ways, is very important to the Citizens of Clearwater; therefore these time limits are imposed: � Debris piles shall be removed within five (5) consecutive calendar days. • Concrete driveways and sidewalks shall be replaced within ten (10) consecutive calendar days of removal. Resident access shall be maintained at all times. ' SectionlIl.doc i Page 15 of 49 7/3 U2012 Section 111— General Conditions All arterial and collector roadways shall be restored ASAP. Local streets and asphalt driveways shall be restored as soon as a sufficient quantity is generated, however, this is never to exceed fifteen (l5) consecutive calendar days. Local and resident access shall be maintained at all times. • Sod must be restored within fourteen (l4) consecutive calendar days of a successful pipe pressure test, removal of concrete forms, backfill of excavations, replacement of driveways or sidewalks or other project specific milestone. It must be watered for a period of thirty (30) days after it is placed. Erosion control and dust control of denuded areas must be maintained at all times. If the project or a portion of it does not involve right-of ways, then a different schedule of sod restoration may be considered. 6.6 LICENSE AND PATENT FEES, ROYALTIES AND TAXES Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the work or the incorporation in the Work of any invention, design, process, product or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product or device is specified in the Contract Documents for use in the performance of the work and if to the actual knowledge of Owner or Engineer its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by Owner or Engineer in the Contract Documents. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless Owner, Engineer, Engineer's Consultants and the officers, directors, employees, agents and other consultants of each and any of them from and against all claims, costs, losses and damages arising out of or resulting from any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product or device not specified in the Contract Documents, and shall defend all such claims in connection with any alleged infringement of such rights. Contractor shall pay all sales, consumer, use and other taxes reguired to be paid by Contractor in accordance with the Laws and Regulations of the State of Florida and other governmental agencies, which are applicable during the performance of the work. 6.7 LAWS AND REGULATIONS Contractor shall give all notices and comply with all Laws and Regulations applicable to furnishing and performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, neither Owner nor Owner's Representative shall be responsible for monitoring Contractor's compliance with any Laws or Regulations. lf Contractor performs any work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses and damages caused by or arising out of such work: however, it shall not be Contractor's primary responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations to the Owner to report and resolve discrepancies as described above. When City projects include Federal or State funding, the requirements of Executive Order 11-02 shall be adhered to utilizing the Homeland Security E-Verify System to verify employment eligibility. SectionlII.doc Page 16 of 49 7/31/2012 , ' � ' ' � ' , ' � ' LJ ' � � � � � , ' ' ' � ' ' , � ' ' � ' ' ' C� , CJ Section ltl — General Conditions 6.8 PERMITS Unless otherwise provided in the Supplementary Conditions, Contractor shall obtain and pay for all construction permits and licenses. The Owner shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractar shall pay all governmental charges and inspection fees necessary for the prosecution of the Work, which are applicable at the time of opening of Bids. Contractor shall pay all charges of utility owners for connections to the work, and the Owner shall pay all charges of such utility owners for capital costs related thereto such as plant investment fees. Unless otherwise stated in the Contract Documents, Owner of Clearwater Building Permit Fees will be waived. 6.9 SAFETY AND PROTECTION Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: (i) all persons on the work site or who may be affected by the work, (ii) all the Work and materials and equipment to be incorporated therein, whether in storage on or off the site; and (iii) other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities and Underground Facilities not designated for removal, relocation or replacement in the course of construction. In the event of temporary suspension of the work, or during inclement weather, or whenever Owner's Representative may direct; Contractor shall, and shall cause Subcontractors, to protect carefully the Work and materials against damage or injury from the weather. If, in the opinion of the Owner's Representative, any portion of Work or materials shall have been damaged or injured by reason of failure on the part of the Contractor or any Subcontractors to so protect the Work, such Work and materials shall be removed and replaced at the expense of Contractor. The Contractor shall initiate and maintain an accident prevention program which shall include, but shall not be limited to the establishment and supervision of programs for the education and training of employees in the recognition, avoidance and prevention of unsafe conditions and acts. Contractar shall provide first aid services and medical care to his employees. The Contractor shall develop and maintain an effective fire protection and prevention program and good housekeeping practices at the site of contract performance throughout all phases of construction, repair, alteration or demolition. Contractor shall require appropriate personal protective equipment in all operations where there is exposure to hazardous conditions. The Engineer may order that the work stop if a condition of immediate danger to the Owner's employees, equipment or if property damage exists. This provision shall not shift responsibility or risk of loss for injuries of damage sustained from the Contractar to Owner, and the Contractor shall remain solely responsible far compliance with all safety requirements and for the safety of all persons and property at the site of Contract performance. The Contractor shall instruct his employees required to handle ar use toxic materials or other harmful substances regarding their safe handling and use. The Contractor shall take the necessary precautions to protect pedestrians and motorists from harm, and to prevent disruptions of such traffic due to construction activity. Contractor shall comply with all applicable Laws and Regulations of any public body having ' jurisdiction for safety of persons or property and to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and utility owners when ' SectionllI.doc Page 17 of49 7/31/2012 L� Section 111— General Conditions prosecution of the work may affect them, and shall cooperate with them in the protection, removal, relocation and replacement of their property. All damage, injury or loss to any property caused, directly or indirectly, in whole or part, by Contractor, any Subcontractor, Supplier or any other person or organization directly or indirectly employed by any of them to perform or furnish any of the work or anyone for whose acts any of them may be liable, shall be remedied by Contractor. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and Engineer has issued a notice to Owner and Contractor that the Work is acceptable. 6.10 EMERGENCIES In emergencies affecting the safety or protection of persons or the Work or property at the site or adjacent thereto, Contractor, with or without special instruction or authorization from Owner or the Owner's Representative, is obligated to act to prevent damage, injury or loss. Contractor shall give Engineer prompt written notice if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If the Owner's Representative determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Work Change Directive or Change Order will be issued to document the consequences of such action. 6.11 DRAWINGS 6.11.1 SHOP DRAWINGS, SAMPLES, RFIs, and SUBMITTAL REVIEW Contractor shall submit Shop Drawings to Engineer for review and approval as called for in the Technical Specifications or required by the Engineer. The data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials and similar data to show Engineer the materials and equipment Contractor proposes to provide and to enable Engineer to review the information. Contractor shall also submit Samples to Engineer for review and approval. Before submitting each Shop Drawing or Sample, Contractor shall have determined and verified: (i) all field measurements, quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers and similar information with respect thereto, (ii) all materials with respect to intended use, fabrication, shipping, handling, storage, assembly and installation pertaining to the performance of the Work, and (iii) all information relative to Contractor's sole responsibilities in respect to means, methods, techniques, sequences and procedures of construction and safety precautions and programs incident thereto. Contractor shall also have reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples with the requirements of the Work and the Contract Documents. Each submittal will bear a stamp or specific written indication that Contractor has satisfied Contractor's obligations under the Contract Documents with respect to Contractor's review and approval of that submittal. At the time of submission, Contractor shall give Engineer specific written notice of such variations, if any, that the Shop Drawing or Sample submitted may have from the requirements of the Contract Documents, such notice to be in a written communication separate from the submittal; and, in addition, shall cause a specific notation to be made on each Shop Drawing and Sample submitted to Engineer for review and approval of each such variation. The Contractor shall maintain a submittal log as mentioned in Article 2.5. The Engineer and Construction Services Department shall receive updated copies at each progress meeting, and the Engineer shall respond to each submittal within twenty-one (2l) consecutive calendar days. The SectionIIl.doc Page 18 of 49 7/31/2012 , , r , ' � L1 ' ' � ' � ' � L�' � , , � ' ' t , ' C_J ' , �I I �_ Section Ill —Genera] Conditions Contractor shall maintain a request for infonnation (RFI) log as mentioned in Article 2.5. The Engineer and Construction Services Department shall receive updated copies at each progress meeting, and the Engineer shall respond to each RFI within twenty-one (21) consecutive calendar days. The untimely submission of Submittal or RFIs shall not be grounds for a delay claim from the Contractor. Engineer's review and approval of Shop Drawings and Samples will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated the Contract Documents. Engineer's review and approva) will not extend to means, methods, techniques, sequences or procedures of construction (except where a particular means method, technique, sequence or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. Contractor shall make corrections required by Engineer, and shall return the required number of corrected copies of Shop Drawings and submit as required new Samples for review and approval. Contractor shall direct specific attention in writing to revisions other than the corrections called for by Engineer on previous submittais. Engineer's review and approval of Shop Drawings or Samples shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has in writing called Engineer's attention to each such variation at the time of submission and Engineer has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample approval; nor will any approval by the Engineer relieve the Contractor from responsibility for complying with the requirements of paragraph above discussing field measurements by the Contractor. � Contractor shall furnish required submittals with complete information and accuracy in order to achieve required approval of an item within two (2) submittals. Owner's Representative reserves the right to backcharge Contractor, for Engineer's costs for resubmittals that account for a ' number greater than twenty percent (20%) of the total number of first time submittals. Owner's Representative reserves the right to backcharge Contractor for all third submittals. The number of first time submittals shall be equal to the number of submittals agreed to by Engineer and ' Contractor. All costs to Engineer involved with subsequent submittal of Shop Drawings, Samples or other items requiring approval will be backcharged to Contractor at the rate of 3.0 times direct technical labor cost by deducting such costs from payments due Contractor for Work ' completed. In the event that Contractor requests a substitution for a previously approved item, all of Engineer's costs in the reviewing and approval of the substitution will be backcharged to Contractor, unless the need for such substitution is beyond the control of Contractor. , 6.11.2 AS-BUILT DRAWINGS The Contractor shall keep and maintain one set of blueprints, As-Built Drawings, in good order ' and legible condition to be continuously marked-up at the job site. The Contractor shall mark and annotate neatly and clearly all project conditions, locations, configurations and any other changes or deviations which may vary from the details represented on the original Contract Plans, , including revisions made necessary by Addenda, Shop Drawings, and Change Orders during the construction process. The Contractor shall record the horizontal and vertical locations, in the plan and profile, of all buried utilities that differ from the locations indicated or which were not ' SectionIll.doc Page 19 of 49 7/31/2012 � Section 111 — General Conditions indicated on the Contract Plans and buried (or concealed), construction and utility features which are revealed during the construction period. The As-Built Drawings shall be available for inspection by the Engineer, Engineer's Consultant, and the Owner's Representative at all times during the progress of the Project. The As-Built Drawings shall be reviewed by the Owner's Representative, or his designee, for accuracy and compliance with the requirements of "As-Built Drawings" prior to submittal of the monthly pay requests. The pay requests shall be rejected if the marked-up blueline prints do not conform to the "As-Built Drawings" requirements. As-Built Drawings shall be submitted to the Owner Inspector for approval upon completion of the project and prior to acceptance of final pay request. Final pay request shall not be processed until As-Built Drawings have been reviewed by the Engineer or the Engineer's Consultant for accuracy and completeness. Prior to placing new potable water mains in service, the Contractor shall provide the Engineer intersection drawings, as specified for the water mains. The Owner's acceptance of the "As-Built Drawings" does not relieve the Contractor of the sole responsibility for the accuracy and completeness of the As-Built Drawings. 6.11.2.1 General The Contractor shall prepare an "AS-BUILT SURVEY" per chapter SJ-17.052, Florida Administrative Code (see definition below), signed and sealed by a Florida registered land surveyor. The contractor will deliver to the Owner two hard copies of signed and sealed As-Built Drawings and an AutoCAD file. SJ-17.050 Definition: (10)(a) As-Built Survey: a survey perfoNmed to obtain horizontal and/or vertical dimensional data so that constructed improvements may be located and delineated: also knonw as Record Survey. This survey shall be clearly titled "As-Built Survey" and shall be signed and sealed by a Florida registered land surveyor. The survey must be delivered to the Owner of Clearwater Construction Division upon substantial completion of the project. If this condition is not met, the Owner will procure the services of a Professional Surveyor and Mapper registered in the State of Florida and will back charge the contractor a fee of $1,800 per day or any portion thereof to provide the Owner with the required As-Built Survey. 6.11.2.2 Sanitary and Storm Sewer Piping Systems Manholes and inlets shall be located by survey coordinates (northing, easting and elevation) based on the approved horizontal and vertical datum or utilize the stationing supplied on the construction plans. New sanitary service connections and replaced sanitary service connections shall be dimensioned to the nearest downstream manhole. All manholes, cleanouts and catch basin invert and rim elevations, manhole and catch basin dimensions, pipe sizes, and pipe material shall also be noted on the plan view and also on the profile if one exists. 2. Pipe materials and areas of special construction shall be noted. 6.11.2.3 Pressure Pipe construction (Water, Reclaimed Water, Forcemain) All pipes shall be located by survey coordinates (northing, easting and elevation) based on the approved horizontal and vertical datum or utilize the stationing supplied on the construction SectionIII.doc Page 20 of49 7/31/2012 � , r � , ' ' ' , ' � � �� �J � , ' LJ � , ' r-� I� ' ' LJ , r, ,i ' , ' ' ' ' ' � ' ' Section 111— General Conditions plans. Coordinates shail be at all pipe bends, tees, valves, reducers, and deflections. Also all new and replaced service connections for potable and reclaimed water wili be located as described above. Additionally there must be survey coordinates no further than l00 feet apart on linear type construction and shall denote top of pipe elevation at those points. 6.11.2.4 Electrical and Control Wiring The as-built drawings shall include all changes to the original Contract Plans. The as-built drawings shall also include the size, color, and number of wires and conduit. For projects where this information is too voluminous to be contained on the blueline prints, the Contractor shall prepare supplemental drawings, on same size sheets as the blueline prints, showing the additional conduit runs, l-line diagrams, ladder diagrams, and other information. The wiring schematic diagrams shall show termination location and wiring identification at each point on the ladder d iagram. 6.11.2.5 Horizontal and Vertical Control The As-Built survey shall be based on the original datum used for the construction design plans or if required by the Owner the datum shall be referenced to the North American Datum of 1983/90 (horizontal) and the North American Vertical Datum of 1988. The unit of ineasurement shall be the United States Foot. Any deviation or use of any other datum, (horizontal and or vertical), must be approved by the Owner of Clearwater Engineering Department. 6.11.2.6 Standards The As-Built survey shall meet the Minimum Technical Standards per Chapter SJ-17 and the Clearwater CAD STANDARDS set forth below. ln addition to locating all improvements that pertain to the as-built survey it is the requirement of the Owner to have minimum location points at every change in direction and no more than l 00 feet apart on all pressure pipes. 6.11.2.7 Other The As-Built drawings shall reflect any differences from the original Contract Plans, in the same level of detail and units of dimensions as the Plans. 6.11.3 CAD STANDARDS 6.11.3.1 Layer Naming 6.11.3.1.1 Prefixes and Suffixes DI prefix denotes digitized or scanned entities EP prefix denotes existing points - field collected EX prefix denotes existing entities - line work and symbols PR prefix denotes proposed entities - line work and symbols FU prefix denotes future entities (proposed but not part ofthis contract) - line work and symbols TX suffix denotes text — use for all text, no matter the prefix � Sectionlll.doc ' Page 21 of 49 7/31/2012 6. Section Ill — General Conditions 11.3.1.2 Layer Naming Definitions: GAS gas lines and appurtenances ELEC power lines and appurtenances PHONE telephone lines and appurtenances CABLE cable TV lines and appurtenances BOC curbs WALK sidewalk WATER water lines and appurtenances, sprinklers STORM storm lines and appurtenances TREES trees, bushes, planters SANITARY sanitary lines and appurtenances FENCE all fences BLDG buildings, sheds, finished floor elevation DRIVE driveways EOP edge of pavement without curbs TRAFFIC signal poles, control boxes TOPBANK top of bank TOESLOPE toe of slope TOPBERM top of berm TOEBERM toe of berm SEAWALL seawall CONCSLAB concrete slabs WALL walls, except seawall SHORE shareline, water elevation CL centerline of road CLD centerline of ditch CLS centerline of swale CORNER property corners, monumentation BENCH benchmark, temporary benchmarks Other layers may be created as required, using above format. 6.11.3.2 Layer Properties All layers will use standard AutoCAD linetypes, bylayer. All layers will use standard AutoCAD colors, bylayer. Sectionlll.doc Page 22 of 49 7/31/2012 � � LJ r � Section 111— General Conditions All text will use standard AutoCAD fonts. 6.11.3.3 Text Styles Text style for EX layers will use the simplex font, oblique angle of 0°, and a text height of .008 times the plot scale. Text style for PR and FU layers will use the simplex font, oblique angle of 22.5°, and a text height of .010 times the plot scale. 6.11.4 DELIVERABLES: The as-built survey shall be produced on bond material, 24" x 36" at a scale of 1"=20' unless , approved otherwise. The consultant shall deliver all drawing files in digital format. Acceptable file formats include: DWG, ofa shape file. � ' , I�' l__ ,� �I � J ' � �_ I ' � � ' Please address any questions regarding format to Mr. Tom Mahony, at (727) 562-4762 or e-mail address Thomas.Mahon�(c�myClearwater.com. 6.12 CONTRACTOR'S GENERAL WARRANTY AND GUARANTEE Contractor warrants and guarantees to Owner, Engineer and Engineer's Consultants that all Work will be in accordance with the Contract Documents and will not be defective. Contractor's warranty and guarantee hereunder includes defects or damage caused by abuse, vandalism, modification or operation by persons other than Contractor, Subcontractors or Suppliers. Until the acceptance of the Work by the Owner, the Work shall be under the charge and care of the Contractor, and he shall take every necessary precaution against injury or damage to any part thereof by action of the elements, or from any other cause whatsoever, arising from the execution or non-execution of the Work. The Contractor shall rebuild, repair and make good, at his own expense, all injuries or damages to any portion of the Work occasioned by any cause before its completion and final acceptance by the Owner. In addition, "the Contractor shall remedy any defects in the work at his own expense and pay for any damage to other work resulting therefrom which appear within a period of one year from the date of final acceptance". Contractor's warranty and guarantee hereunder excludes improper maintenance and operation by Owner's employees and normal wear and tear under normal usage for any portion of the Work, which has been partially accepted by the Owner for operation prior to final acceptance by the Owner. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: (i) observations by Owner's Representative, (ii) recommendation of any progress or final payment by Owner's Representative, (iii) the issuance of a certificate of Substantial Completion or any payment by the Owner to contractor under the Contract Documents, (iv) use or occupancy of the Work or any part thereof by Owner, (v) any acceptance by Owner or any failure to do so, (vi) any review and approval of a Shop Drawing or Sample submittal or the issuance of a notice of Acceptance by the Engineer. 6.13 CONTINUING THE WORK Contractor shall carry on the work and adhere to the progress schedule during all disputes or disagreements with the Owner. No work shall be delayed or postponed pending resolution of any disputes or disagreements, except as the Owner or Contractor may otherwise agree in writing. SectionIII.doc Page 23 of 49 7/31/2012 Section III — General Conditions 6.14 INDEMNIFICATION Contractor shall indemnify and hold harmless Owner, Engineer, Engineer's Consultants and the officers, directars, employees, agents and other consultants of each and any of them from and against all claims, costs, losses and damages (including but not limited to all fees and charges of engineers, architects, attorneys and other professionals and all court or arbitration or other dispute resolution costs) caused by, arising out of or resulting from the performance of the Work, provided that any such claim, cost, loss or damage: (i) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the work itsel�, including the loss of use resulting therefrom, and (ii) is caused in whole or in part by any negligent act or omission of Contractor, any Subcontractor, any Supplier, any person directly or indirectly employed by any of them to perform or furnish any of the Work, or anyone for whose acts any of them may be liable, regardless of whether or not caused in part by any negligence or omission of a person or entity indemnified hereunder or whether liability is imposed upon such indemnified party by Laws and Regulations regardless of the negligence of any such person. lf, through acts of neglect on the part of Contractor, any other Contractor or any Subcontractor shall suffer loss or damage on the work, Contractor shall settle with such other Contractor or Subcontractor by agreement or arbitration if such other Contractor or Subcontractor will so settle. lf such other Contractor or Subcontractor shall assert any claim against the Owner on such account of any damage alleged to have been sustained, the Owner shall notify Contractor, who shall indemnify and save harmless the Owner against any such claim. In any and all claims against Owner or Engineer or any of their respective consultants, agents, officers, directors, ar employees by any employee (or the survivor or personal representative of such employee) of Contractor, any Subcontractor, any Supplier, any person directly or indirectly employed by any of them to perform or furnish any of the work, or anyone for whose acts any of them may be liable, the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for Contractor or any such Sub-contractor, Supplier or other person or organization under workers' compensation acts, disability benefit acts or other employee benefit acts. The indemnification obligations of Contractor under this paragraph shall not extend to the liability of Engineer and Engineer's Consultants, officers, directors, employees, or agents caused by the professional negligence, errors or omissions of any of them. 6.15 CHANGES IN COMPANY CONTACT INFORMATION Contractar shall notify Owner by US mail addressed to the City Engineer of any changes in company contact information. This includes: contact phone, address, project manager, email addresses, etc. 7 OTHER WORK 7.1 RELATED WORK AT SITE The City reserves the right to have its own forces enter the construction site at any time and perform work as necessary related to the project or not. these purposes. SectionIll.doc , ' ' �' ' LJ , ' , , �+ I�I � , � ' ' in order to perform infrastructure repair or maintenance, whether The Contractor will allow complete access to all utility owners for ' Page 24 of 49 7/31/2012 , , � ' � ' � ,� ' ' � ' � � � � � Section Ill — General Conditions The City may have its own forces perform new work related to the project, however, this work will be identified in the Contract Scope of Work and coordination will be such that this activity is denoted in the Contractor's CPM Schedule so as not to cause any delays or interference with the Contractor's work or schedule. 7.2 COORDINATION lf the Owner contracts with others for the performance of other work on the Project at the site, the following will be set forth in the Scope of Work: (i} the person who will have authority and responsibility for coordination of the activities among the various prime contractors will be identified; (ii) the specific matters to be covered by such authority and responsibility will be itemized; and (iii) the extent of such authority and responsibilities will be provided. Unless otherwise provided in the Supplementary Conditions, the Owner shall have sole authority and responsibility in respect of such coordination. 8 OWNERS RESPONSIBILITY Except as otherwise provided in these General Conditions, the Owner shall issue all communications from the Owner to the Contractor through Owner's Representative. The Owner shall furnish the data required of the Owner under the Contract Documents promptly and shall make payments to Contractor promptly when they are due as provided in these General Conditions. The Owner is obligated to execute Change Orders as indicated in the Article on Changes In The Work. The Owner's responsibility in respect of certain inspections, tests, and approvals is set forth in the Article on Tests and Inspections. In connection with the Owner's right to stop work or suspend work, see the Article on Engineer may Stop the Work. The Article on Suspension of Work and Termination deals with the Owner's right to terminate services of Contractor under certain circumstances. Owner shall not supervise, direct or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences or procedures of construction or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the furnishing or performance of the Work. The Owner will not be responsible for Contractor's failure to perform or furnish the Work in accardance with the Contract Documents. 9 OWNER REPRESENTATIVE'S STATUS DURING CONSTRUCTION 9.1 OWNERS REPRESENTATIVE � Dependent of the project type, the Owner's Representative during the construction period will either be the Construction Manager, the Engineer, ar a designee of the Project's Owner. The duties, responsibilities and the limitations of authority of Owner's Representative during � construction are set forth in the Contract Documents and shall not be extended without written consent of Owner and Engineer. ' SectionIll.doc Page 25 of 49 7/31/2012 � Section lll — General Conditions 9.2 CLARIFICATIONS AND INTERPRETATIONS Engineer will issue with reasonable prompfiess such written clarifications or interpretations of the requirements of the Contract Documents regarding design issues only, in the form of Submittal responses, RFI responses, Drawings or otherwise, as Engineer may determine necessary, which shall be consistent with the intent of and reasonably inferable from Contract Documents. All other clarifications and interpretations of the Contract Documents shall be issued form the Owner's Representative. Such written clarifications and interpretations will be binding on the Owner and Contractor. If Contractor believes that a written clarification or interpretation justifies an adjustment in the Contract Price or the Contract Time and the parties are unable to agree to the amount or extent thereof, if any, Contractor may make a written claim therefore as provided in the Articles for Change of Work and Change of Contract Time. 9.3 REJECTING OF DEFECTIVE WORK The Owner's Representative or the Engineer will have authority to disapprove or reject Work which Owner's Representative or the Engineer believes to be defective, or that Owner's Representative or the Engineer believes will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. The Owner's Representative ar the Engineer will also have authority to require special inspection or testing of the Work whether or not the Work is fabricated, installed or completed. 9.4 SHOP DRAWINGS, CHANGE ORDERS, AND PAYMENTS In connection with Engineer's authority as to Shop Drawings and Samples, see articles on Shop Drawings and Samples. ]n connection with Owner's Representative authority as to Change Orders, see the articles on Changes of Work, Contract Price and Contract Time. In connection with Owner's Representative authority as to Applications for Payment, see the articles on Payments to Contractor and Completion. 9.5 DECISIONS ON DISPUTES The Owner's Representative will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the work thereunder. Claims, disputes and other matters relating to the acceptability of the work or the interpretation of the requirements of the Contract Documents pertaining to the performance and furnishing of the work and Claims under the Articles for Changes of Work, Changes of Contract Time and Changes of Contract Price will be referred initially to Owner's Representative in writing with a request for a formal decision in accordance with this paragraph. Written notice of each such claim, dispute or other matter will be delivered by the claimant to Owner's Representative and the other party to the Agreement promptly, but in no event later than thirty (30) days, after the start of the occurrence or event giving rise thereto, and written supporting data will be submitted to Owner's Representative and the other party within sixty (60) days after the start of such occurrence or event unless Owner's Representative allows an additional period of time for the submission of additional or more accurate data in support of such claim, dispute or other matter. The opposing party shall submit any response to Owner's Representative and the claimant within thirty (30) days after receipt of the claimant's last submittal, unless Owner's Representative allows additional time. Owner's Representative will render a formal decision in writing within thirty (30) days after receipt of the opposing party's submittal, if any, in accordance with this paragraph. Owner Representative's SectionIll.doc Page 26 of 49 7/31/2012 � ' � � � t � ' � � ' � � � � � � � 1 � � � � , � � � � ' � � � ' � ' Section III — General Conditions written decision on such claim, dispute or other matter will be final and binding upon the Owner and Contractor unless (i) an appeal from Owner Representative's decision is taken within thirty (30) days of the Owner Representative's decision, or the appeal time which may be stated in a Dispute Resolution Agreement between Owner and Contractor for the settlement of disputes or (ii) if no such Dispute Resolution Agreement has been entered into, a written notice of intention to appeal from Owner Representative's written decision is delivered by the Owner or Contractor to the other and to Owner's Representative within thirty (30) days after the date of such decision and a formal proceeding is instituted by the appealing party in a forum of competent jurisdiction to exercise such rights or remedies as the appealing party may have with respect to such claim, dispute or other matter in accordance with applicable Laws and Regulations within sixty (60) days of the date of such decision, unless otherwise agreed in writing by the Owner and Contractor. When functioning as interpreter and judge, Owner's Representative will not show partiality to the Owner or Contractor and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity. The rendering of a decision by Owner's Representative with respect to any such claim, dispute or other matter will be a condition precedent to any exercise by the Owner or Contractor of such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any such claim, dispute or other matter pursuant the Article on Dispute Resolution. 9.6 LIMITATIONS ON OWNER REPRESENTATIVE'S RESPONSIBILITIES Neither Owner Representative's authority or responsibility under this paragraph or under any other provision of the Contract Documents nor any decision made by Owner's Representative in good faith either to exercise or not exercise such authority or responsibility or the undertaking, exercise or performance of any authority or responsibility by Owner's Representative shall create, impose or give rise to any duty owed by Owner's Representative to Contractar, any Subcontractor, any Supplier, any other person or organization or to any surety for or employee or agent of any of them. Owner's Representative will not supervise, direct, control or have authority over or be responsible for Contractor's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the furnishing or performance of the work. Owner's Representative will not be responsible for Contractor's failure to perform or furnish the work in accordance with the Contract Documents. Owner's Representative will not be responsible for the acts or omissions of Contractor or of any Subcontractor, any Supplier, or of any other person or organization performing or furnishing any of the work. Owner Representative's review of the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, bonds and certificates of inspection, tests and approvals and other documentation required to be delivered by the Contractor will only be to determine generally that their content complies with the requirements of the Contract Documents and, in the case of certificates of inspections, tests and approvals that the results certified indicate compliance with the Contract Documents. The limitations upon authority and responsibility set forth in this paragraph shall also apply to Owner Representative's CEI, the Engineer's Consultants, and assistants. Sectionlll.doc Page 27 of 49 7/31/2012 Section Ill — General Conditions 10 CHANGES IN THE WORK Without invalidating the Agreement and without notice to any surety, the Owner may, at any time or from time to time, order additions, deletions or revisions in the Work. Such additions, deletions or revisions will be authorized by a Written Amendment, a Change Order, or a Work Change Directive. Upon receipt of any such document, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as may otherwise be specifically provided). If the Owner and Contractor are unable to agree as to the extent, if any, of an adjustment in the Contract Price or an adjustment of the Contract Time that should be allowed as a result of a Work Change Directive, a claim may be made therefore as provided in these General Conditions. Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any Work performed that is not required by the Contract Documents as amended, modified and supplemented as provided in these General Conditions except in the case of an emergency as provided or in the case of uncovering work as provided in article for Uncovering Work. The Owner and Contractor shall execute appropriate Change Orders or Written Amendments recommended by Owner's Representative covering: changes in the work which are (i) ordered by the Owner (ii) required because of acceptance of defective work under the article for Acceptance of Defective Work or correcting defective Work under the article for Owner May Correct Defective Work or (iii) agreed to by the parties; changes in the Contract Price or Contract Time which are agreed to by the parties; and changes in the Contract Price or Contract Time which embody the substance of any written decision rendered by Owner's Representative pursuant to the article for Decisions on Disputes; provided that, in lieu of executing any such Change Order, an appeal may be taken from any such decision in accardance with the provisions of the Contract Documents and applicable Laws and Regulations, but during any such appeal, Contractor shall carry on the Work and adhere to the progress schedule as provided in the article for Continuing the Work. If notice of any change affecting the general scope of the work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time) is required by the provisions of any Bond to be given to a surety, the giving of any such notice will be Contractor's responsibility, and the amount of each applicable Bond will be adjusted accordingly. 11 CHANGES IN THE CONTRACT PRICE 11.1 CHANGES IN THE CONTRACT PRICE The Contract Price constitutes the total compensation (subject to authorized adjustments) payable to Contractor for performing the Work. All duties, responsibilities and obligations assigned to or undertaken by Contractor shall be at Contractor's expense without change in the Contract Price. The Contract Price may only be adjusted by a Change Order or by a Written Amendment. Any claim for an adjustment in the Contract Price shall be based on a written notice of claim stating the general nature of the claim, to be delivered by the party making the claim to the other party and to Owner's Representative or promptly (but in no event later than thirty days) SectionIII.doc Page 28 of 49 7/31 /2012 � � � � � � � � , � � � � I _J � ' i � � � � � � Section lll — General Conditions after the start of the occurrence or event giving rise to the claim. Notice of the amount of the claim with supporting data shall be delivered within sixty (60) days after the start of such occurrence or event, unless Owner's Representative allows additional time for claimant to submit additional or more accurate data in support of the claim, and shall be accompanied by claimant's written statement that the claimed adjustment covers all known amounts to which the claimant is entitled as a result of said occurrence or event. No claim for an adjustment in the Contract Price will be valid if not submitted in accordance with this paragraph. The value of any Work covered by a Change Order or of any claim for an adjustment in the Contract Price will be determined as follows: (i) where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (ii) where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum (which may include an allowance for overhead and profit), (iii) where the Work is not covered by unit prices contained in the Contract Documents and agreement is reached to establish unit prices for the Work. Where the work involved is not covered by unit prices contained in the Contract Documents and where the Owner's Representative, the Owner, the Engineer, the Engineer's Consultant, and Contractor cannot mutually agree on a lump sum price, the City of Clearwater shall pay for directed changes in the WORK, on "COST REIMBURSEMENT" basis. The Contractor shall apply for compensation, detailing Contractors forces, materials, equipment, subcontractors, and other items of direct costs required for the directed work. The application for Cost Reimbursement shall be limited to the following items: 1. Labor, including foremen, for those hours associated with the direct work (actual � payroll cost, including wages, fringe benefits, labor insurance and labor taxes established by law). Expressly excluded from this item are all costs associated with negotiating the subject change. � , � � �' 2. Materials associated with the change, including sales tax. The costs of materials shall be substantiated through vendors' invoices. 3. Rental or equivalent rental costs of equipment, including necessary transportation costs if specifically used for the WORK. The rental rates shall not exceed the current rental rates prevailing in the locality or as defined in the rental Rate Blue Book for Construction Equipment (a.k.a. DataQuest Blue Book). The rental rate is defined as the full-unadjusted base rental rate for the appropriate item of construction equipment and shall cover the costs of all fuel, supplies, repairs, insurance, and other costs associated with supplying the equipment for work ordered. Contractor-owned equipment will be paid for the duration of time required to complete the work. Utilize lowest cost combination of hourly, daily, weekly, or monthly rates. Do not exceed estimated operating costs given in Blue Book. Operating costs will not be allowed for equipment on stand-by. 4. Additional costs for Bonds, Insurance if required by the City of Clearwater. The following fixed fees shall be added to the costs of the directed work performed by the Contractor or Subcontractor. ' A. A fixed fee of fifteen percent (15%) shall be added to the costs of Item 1 above. If work is performed by a subcontractor, the Contractor's fee shall not exceed five percent (5%), and the subcontractor's fee shall not exceed ten percent (10%). � SectionIll.doc � B. A fixed fee of ten percent (10%) shall be added to the costs of Item 2 above. Page 29 of 49 7/31/2012 Section ill — General Conditions C. No markup shall be added to the costs of Items 3 and 4. The fixed fees shall be considered the full compensation for all cost of general supervision, overhead, profit, and other general expense. 11.2 ALLOWANCES AND FINAL CONTRACT PRICE ADJUSTMENT It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be furnished and performed for such sums as may be acceptable to Owner and Engineer. Contractor agrees that: (i) the allowances include the cost to Contractar (less any applicable trade discounts) of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and (ii) Contractor's costs for unloading and handling on the site, labor, installation costs, overhead, profit and other expenses contemplated for the allowances have been included in the Contract Price and not in the allowances and no demand for additional payment on account of any of the foregoing will be valid. Prior to final payment, an appropriate Change Order will be issued as recommended by Owner's Representative to reflect actual amounts due Contractor on account of Work covered by allowances and all the Work actually performed by the Contractor, and the Contract Price shall be correspondingly adjusted. 11.3 UNIT PRICE WORK Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the established unit price for each separately identified item of unit price work times the estimated quantity of each item as indicated in the Agreement. The estimated yuantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by Owner's Representative. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. The Owner or Contractor may make a claim for an adjustment in the Contract Price if: (i) the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Contract Documents; and (ii) there is no corresponding adjustment with respect to any other item of Work; and (iii) if Contractor believes that Contractor is entitled to an inerease in Contract Price as a result of having incurred additional expense or the Owner believes that the Owner is entitled to a decrease in Contract Price and the parties are unable to agree as to the amount of any such increase or decrease. On unit price contracts, Owner endeavors to provide adequate unit quantities to satisfactorily complete the construction of the project. It is expected that in the normal course of project construction and completion that not all unit quantities will be used in their entirety and that a finalizing change order which adjusts contract unit quantities to those unit quantities actually used in the construction of the project will result in a net decrease from the original Contract Price. Such reasonable deduction of final Contract Price should be anticipated by the Contractor in his original bid. SectionIIl.doc Page 30 of 49 7/31/2012 i � �� � � � � � � � � � � � � � i � � � � � � � i ' � � ' � i � � , Section Ill — General Conditions 12 CHANGES IN THE CONTRACT TIME The Contract Time (or Milestones) may only be changed by a Change Order or a Written Amendment. Any claim for an adjustment of the Contract Time (or Milestones) shall be based on written notice delivered by the party making the claim to the other party and to Owner's Representative promptly, but in no event later than thirty (30) days, after the occurrence of the event giving rise to the claim and stating the general nature of the claim. Notice of the extent of the claim with supporting data shall be delivered within sixty (60) days after such occurrence, unless Owner's Representative allows an additional period of time to ascertain more accurate data in support of the claim, and shall be accompanied by the claimant's written statement that the adjustment claimed is the entire adjustment to which the claimant has reason to believe it is entitled as a result of the occurrence of said event. All claims for adjustment in the Contract Time (or Milestones) shall be determined by Owner's Representative. No claim for an adjustment in the Contract Time (or Milestones) will be valid if not submitted in accordance with the requirements of this paragraph. All time limits stated in the Contract Documents are of the essence of the Agreement. Where Contractor is prevented from completing any part of the work within the Contract Time (or Milestones) due to delay beyond the control of Contractor, the Contract Time (or Milestones) may be extended in an amount equal to the time lost due to such delay if a claim is made therefore as provided in the article for Changes in the Work. Delays beyond the control of Contractor shall include, but not be limited to, acts by the Owner, acts of utility owners or other contractors performing other work as contemplated by the article for Other Work, fires, floods, epidemics, abnormal weather conditions or acts of God. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. Where Contractor is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay beyond the control of both the Owner and Contractor, an extension of the Contract Time (or Milestones) in an amount equal to the time lost due to such delay shall be Contractor's sole and exclusive remedy for such delay. In no event shall the Owner be liable to Contractor, any Subcontractor, any Supplier, any other person, or to any surety for or employee or agent of any of them, for damages arising out of or resulting from (i) delays caused by or within the control of Contractor, or (ii) delays beyond the control of both parties including but not limited to fires, floods, epidemics, abnormal weather conditions, acts of God or acts by utility owners or other contractors performing other work as contemplated by paragraph for Other Work. 13 TESTS AND INSPECTIONS, CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.1 TESTS AND INSPECTION Contractor shall give Owner's Representative and Engineer timely notice of readiness of the Work for all required inspections, tests ar approvals, and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. Contractor shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests, or approvals required by the Contract Documents. The costs for these SectionIlI.doc Page 31 of 49 7/31/2012 Section 111— General Conditions inspections, tests or approvals shall be borne by the Contractor except as otherwise provided in the Contract Documents. If Laws or Regulations of any public body having jurisdiction require any Work (or part thereo� specifically to be inspected, tested or approved by an employee or other representative of such public body including all Owner Building Departments and Owner Utility Departments, Contractor shall assume full responsibility for arranging and obtaining such inspections, tests or approvals, pay all costs in connection therewith, and furnish Owner's Representative the required certificates of inspection or approval. Unless otherwise stated in the Contract Documents, Owner permit and impact fees will be waived. Contractor shall also be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests or approvals required far Owner's and Engineer's acceptance of materials or equipment to be incorporated in the Work, or of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation of the Work. If any Work (or the work of others) that is to be inspected tested or approved is covered by Contractor without written concurrence of Owner's Representative, it must, if requested by Owner's Representative, be uncovered for observation. Uncovering Work as provided in this paragraph shall be at Contractor's expense unless Contractor has given Owner's Representative and Engineer timely notice of Contractor's intention to cover the same and Owner's Representative has not acted with reasonable promptness in response to such notice. 13.2 UNCOVERING THE WORK If any Work is covered contrary to the written request of Owner's Representative, it must, if requested by Owner's Representative, be uncovered for Owner Representative's observation and replaced at Contractor's expense. If Owner's Representative considers it necessary or advisable that covered Work be observed by Owner's Representative or inspected or tested by others, Contractor, at Owner Representative's request, shall uncover, expose or otherwise make available for observation, inspection or testing as Engineer or Owner's Representative may require, that portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found that such Work is defective, Contractor shall pay all claims, costs, losses and damages caused by, arising out of or resulting from such uncovering, exposure, observation, inspection and testing and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); and the Owner shall be entitled to an appropriate decrease in the Contract Price for the costs of the investigation, and, if the parties are unable to agree as to the amount thereof, may make a claim therefore as provided in the article for Change in Contract Price. If, however, such Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time (or Milestones), ar both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement and reconstruction; and, if the parties are unable to agree as to the amount or extent thereof, Contractor may make a claim therefore as provided the article for Change in Contract Price and Change of Contract Time. 13.3 OWNER'S REPRESENTATIVE MAY STOP THE WORK If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to furnish or perform the Work in such a way that the completed Work will conform to the Contract Documents, Engineer or Owner's Representative may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been SectionIII.doc Page 32 of49 7/31/2012 ! � � � � � � � � � � '' � � �� � ' i 1 ' � � � � Section Ill — General Conditions eliminated; however, this right of Owner's Representative to stop the Work shall not give rise to any duty on the part of Owner's Representative or Owner to exercise this right for the benefit of Contractor or any surety or other party. If the Owner's Representative stops Work under this paragraph, Contractor shall be entitled to no extension of Contract Time or increase in Contract Price. 13.4 CORRECTION OR REMOVAL OF DEFECTIVE WORK If required by Engineer or Owner's Representative, Contractor shall promptly, as directed, either correct all defective Work, whether or not fabricated, installed or completed, or, if the Work has been rejected by Engineer or Owner's Representative, remove it from the site and replace it with Work that is not defective. Contractor shall pay all claims, costs, losses and damages caused by or resulting from such correction or removal (including but not limited to all costs of repair or replacement of work of others). 13.5 WARRANTY/CORRECTION PERIOD If within one year after the date of Substantial Completion or such longer period of time as may � be prescribed by Laws or Regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision ofthe Contract Documents, any Work is found to be defective, Contractor shall promptly, without cost to the Owner and in � accordance with the Owner's written instructions; (i) correct such defective Work, or, if it has been rejected by the Owner, remove it from the site and replace it with Work that is not defective and (ii) satisfactorily correct or remove and replace any damage to other Work or the work of � others resulting therefrom. If Contractor does not promptly comply with the terms of such instructions, or in an emergency where delay would cause serious risk of loss or damage, the Owner may have the defective Work corrected or the rejected. Work removed and replaced, and ' all claims, costs, losses and damages caused by or resulting from such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. � ' � � C ' ' In special circumstances where a particular item of equipment is placed in continuous service before Final Completion of all the Work, the correction period for that item may start to run from an earlier date if specifically and expressly so provided in the Specifications or by Written Amendment. Where defective Work (and damage to other Work resulting therefrom) has been corrected, removed or replaced under this paragraph the correction period hereunder with respect to such Work will be extended for an additional period of one year after such correction or removal and replacement has been satisfactorily completed. 13.6 ACCEPTANCE OF DEFECTIVE WORK If, instead of requiring correction or removal and replacement of defective Work, the Owner prefers to accept it, the Owner may do so. Contractar shall pay all claims, costs, losses and damages attributable to the Owner's evaluation of and determination to accept such defective Work such costs to be approved by Owner's Representative as to reasonableness. If any such acceptance occurs prior to Owner Representative's recommendation of final payment, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and the Owner shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree SectionIII.doc Page 33 of 49 7/31/2012 Section III—General Conditions as to the amount thereof, the Owner may make a claim therefore as provided in article for Change of Contract Price. If the acceptance occurs after the Owner Representative's recommendation for final payment an appropriate amount will be paid by Contractor to the Owner. 13.7 OWNER MAY CORRECT DEFECTIVE WORK If Contractor fails within a reasonable time after written notice from Owner's Representative to correct defective Work or to remove and replace rejected Work as required by Owner's Representative in accordance with the article for Correction and Removal of Defective Work or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, the Owner may, after seven days' written notice to Contractor, correct and remedy any such deficiency. In exercising the rights and remedies under this paragraph the Owner shall proceed expeditiously. In connection with such corrective and remedial action, the Owner may exclude Contractor from all or part of the site, take possession of all or part of the Work, and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment stored at the site or for which the Owner has paid Contractor but which are stored elsewhere. Contractor shall allow Owner, Owner's Representatives, Agents and employees, the Owner's other contractors, and Owner's Representative, Engineer, and Engineer's Consultants access to the site to enable the Owner to exercise the rights and remedies under this paragraph. All claims, costs, losses and damages incurred or sustained by the Owner in exercising such rights and remedies will be charged against Contractor and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and the Owner shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree as to the amount thereof, the Owner may make a claim therefore as provided in the article for Change of Contract Price. Such claims, costs, losses and damages will include but not be limited to all costs of repair or replacement of work of others destroyed or damaged by correction, removal or replacement of Contractor's defective Work. Contractor shall not be allowed an extension of the Contract Time (or Milestones) because of any delay in the performance of the Work attributable to the exercise by the Owner of the Owner's rights and remedies hereunder. 14 PAYMENTS TO CONTRACTOR AND COMPLETION Requests for payment shall be processed in accordance with F.S. 218.735 and as described herein. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.1 APPLICATION FOR PROGRESS PAYMENT Contractor shall submit (not more often than once a month) to Owner's Representative for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the 25th of each month and accompanied by such supporting documentation as is required by the Owner's Representative and the Contract Documents. Unless otherwise stated in the Contract Documents, payment will not be made for materials and eyuipment not incorporated in the Work. Payment will only be made for that portion of the Work, which is fully installed including all materials, labor and equipment. A retainage of not less than five (5%) of the amount of each Application for Payment for the total of all Work, including as-built survey and Inspector overtime reimbursement, completed to date will be held until final completion and SectionlIl.doc Page 34 of 49 7/31 /2012 � � � � � � � � � � ' � � ' � � , ' r ' � Section Ill — General Conditions acceptance of the Work covered in the Contract Documents. No progress payment shall be construed to be acceptance of any portion of the Work under contract. The Contractor shall review with the Engineer or the Construction Inspector all quantities and work for which payment is being applied for and reach agreement prior to submittal of an Officia] Pay Reyuest. The Engineer or the Construction Inspector will verify that the on-site marked up as-built drawings are up to date with the work and are in compliance with the Contract Documents. � In addition to all other payment provisions set out in this contract, the Owner's Representative may require the Contractor to produce for Owner, within fifteen (15) days of the approval of any progress payment, evidence and/or payment affidavit that all subcontractors and suppliers have , been paid any sum or sums then due. A failure on the part of the contractor to provide the report as required herein shall result in further progress or partial payments being withheld until the report is provided. , 14.2 CONTRACTOR'S WARRANTY OF TITLE Contractor warrants and guarantees that title to all Work, materials and equipment covered by ' any Application for Payment, whether incorporated in the Project or not, will pass to the Owner no later than the time of payment, free and clear of liens. No materials or supplies for the Work shall be purchased by Contractor or Subcontractor subject to any chattel mortgage or under a � conditional sale contact or other agreement by which an interest is retained by the seller. Contractor warrants that he has good title to all materials and supplies used by him in the Work, free from all liens, claims or encumbrances. Contractor shall indemnify and save the Owner � harmless from ali claims growing out of the lawful demands of Subcontractors, laborers, workmen, mechanics, materialmen, and furnisher's of machinery and parts thereof, equipment, power tools, and all supplies incurred in the furtherance of the performance of this Contract. � Contractor shall at the Owner's request, furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged, or waived. If Contractor fails to do so, then the Owner may, after having served written notice on said Contractor either pay unpaid , bills, of which the Owner has written notice, or withhold from the Contractor's unpaid compensation a sum of money deemed reasonably sufficient to pay any and all such lawful claims until satisfactory evidence is furnished that all liabilities have been fully discharged, � whereupon payment to Contractor shall be resumed in accordance with the terms of this Contract, but in no event shall the provisions of this sentence be construed to impose any obligations upon the Owner to the Contractor or the Surety. In paying any unpaid bills of the , Contractor, the Owner shall be deemed the agent of Contractor and any payment so made by the Owner shall be considered as payment made under the Contract by the Owner to Contractor, and the Owner shall not be liable to Contractor for any such payment made in good faith. � � ' � ' 14.3 REVIEW OF APPLICATIONS FOR PROGRESS PAYMENTS The Owner's Representative will within twenty (20) business days after receipt authorize and process payment by the Owner a properly submitted and documented Application for payment, unless the application requires review by an Agent. If the Application for payment requires review and approval by an Agent, properly submitted and documented Applications for payment will be paid by the Owner within twenty-five (25) business days. If an Application for payment is rejected, notice shall be given within twenty (20) business days of receipt indicating the reasons for refusing payment. The reasons for rejecting an Application will be submitted in writing, specifying deficiencies and identifying actions that would make the Application proper. Sectionlll.doc Page 35 of 49 7/31/2012 Section III — General Conditions In the latter case, Contractor may make the necessary corrections and resubmit the Application. The Owner's Representative or Agent may refuse to recommend the whole or any part of any payment to Owner. Owner's Representative or Agent may also refuse to recommend any such payment, or, because of subsequently discovered evidence or the results of subsequent inspections or test, nullify any such payment previously recommended, to such extent as may be necessary in Owner Representative's or Agent's opinion to protect the Owner from loss because: (i) the Work is defective, or completed Work has been damaged requiring correction or replacement, (ii) the Contract Price has been reduced by amendment or Change Order, (iii) the Owner has been required to correct defective Work or complete Work, or (iv) Owner's Representative or Agent has actual knowledge of the occurrence of any of the events enumerated in the article on Suspension of Work and Termination. The Owner may refuse to make payment of the full amount recommended by the Owner's Representative or Agent because: (i) claims have been made against the Owner on account of Contractor's performance or furnishing of the Work, (ii) Liens have been filed in connection with the Work, except where Contractor has delivered a specific Bond satisfactory to the Owner to secure the satisfaction and discharge of such Liens, (iii) there are other items entitling the Owner to a set-off against the amount recommended, or (iv) the Owner has actual knowledge of any of the events described in this paragraph. The Owner shall give Contractor notice of refusal to pay in accordance with the time constraints of this section with a copy to the Owner's Representative or Agent, stating the reasons for such actions, and Owner shall promptly pay Contractor the amount so withheld, or any adjustment thereto agreed to by the Owner and Contractor, when Contractor corrects to the Owner's satisfaction the reasons for such action. 14.4 PARTIAL UTILIZATION Use by the Owner at the Owner's option of any substantially completed part of the Work which (i) has specifically been identified in the Contract Documents, or (ii) Owner, Engineer, Owner's Representative, and Contractor agree constitutes a separately functioning and usable part of the Work that can be used by the Owner for its intended purpose without significant interference with Contractar's performance of the remainder of the Work, may be accomplished prior to Final Completion of all the Work subject to the following: The Owner at any time may request Contractor in writing to permit the Owner to use any such part of the Work which the Owner believes to be ready for its intended use and substantially complete. If Contractor agrees that such part of the Work is substantially complete, Contractor will certify to Owner, Owner's Representative, and Engineer that such part of the Work is substantially complete and request Owner's Representative to issue a certificate of Substantial Completion for that part of the Work. Contractor at any time may notify Owner, Owner's Representative, and Engineer in writing that Contractor considers any such part of the Work ready for its intended use and substantially complete and request Owner's Representative to issue a certificate of Substantial Completion for that part of the Work. Within a reasonable time after either such request, Owner, Contractor, Owner's Representative, and Engineer shall make an inspection of that part of the Work to determine its status of completion. If Engineer does not consider that part of the Work to be substantially complete, Engineer will notify Owner, Owner's Representative, and Contractor in writing giving the reasons therefore. If Engineer considers that part of the Work to be substantially complete, the provisions of the articles for Substantial Completion and Partial Utilization will apply with respect to certification of Substantial Completion of that part of the Work and the division of responsibility in respect thereof and access thereto. SectionIII.doc Page 36 of 49 7/31/2012 � � � � �� � ' � � � r ' �� � , ' , � ' , , � �� ' � � LJ � � � ' ,� � � ' r ' Section 1]1 —General Conditions 14.5 FINAL INSPECTION Upon written notice from Contractor that the entire Work or an agreed portion thereof is complete, Owner's Representative will make a final inspection with Engineer, Owner and Contractor and will within thirty (30) days notify Contractor in writing of particulars in which this inspection reveals that the Work is incomplete or defective. The Owner's Representative will produce a final punch list, deliver it to the Contractor within five (5) days of completion and assign a date for this work to be completed not less than thirty (30) days from delivery of the list. Failure to include any corrective work or pending items does not alter the responsibility of the contractor to complete all the construction services purchased pursuant to the contract. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 14.6 FINAL APPLICATION FOR PAYMENT After Contractor has completed all such corrections to the satisfaction of Owner's Representative and has delivered in accordance with the Contract Documents all maintenance and operating instructions, As-built/Record Drawings, schedules, guarantees, Bonds, certificates or other evidence of insurance required by the paragraph for Bonds and Insurance, certificates of inspection, Inspector overtime reimbursement as required in the Contract Documents and other documents, Contractor may make application for final payment following the procedure for progress payments. The final Application for Payment shall be accompanied (except as previously delivered) by: (i) all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by paragraph far Bonds and Insurance, (ii) consent of the surety, if any or if necessary, to final payment, and (iii) complete and legally effective releases or waivers (satisfactory to the Owner) of all Liens arising out of or filed in connection with the Work. In lieu of such releases or waivers of Liens and as approved by the Owner, Contractor may furnish receipts or releases in full and an affidavit of Contractor that: (i) the releases and receipts include all labor, services, material and equipment for which a Lien could be filed, and (ii) all payrolls, material and equipment bills and other indebtedness connected with the Work for which the Owner or the Owner's property might in any way be responsible have been paid or otherwise satisfied. If any Subcontractor or Supplier fails to furnish such a release or receipt in full, Contractor may furnish a Bond or other collateral satisfactory to the Owner to indemnify the Owner against any Lien. Prior to application for final payment, Contractor shall clean and remove from the premises all surplus and discarded materials, rubbish, and temporary structures, and shall restore in an acceptable manner all property, both public and private, which has been damaged during the prosecution of the Work, and shall leave the Work in a neat and presentable condition. 14.7 FINAL PAYMENT AND ACCEPTANCE If through no fault of Contractor, final completion of the Work is significantly delayed and if Owner's Representative so confirms, the Owner shall, upon receipt of Contractor's final Application for payment and recommendation of Owner's Representative, and without terminating the Agreement, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by the Owner for Work not fully completed or corrected is less than the retainage stipulated in the Agreement, and if Bonds have been furnished as required in paragraph for Bonds and Insurance, the written consent of the surety to the payment of the balance due for that portion of the Work fully completed and SectionIII.doc Page 37 of 49 7/31/2012 Section 111— General Conditions accepted shall be submitted by Contractor to Owner's Representative with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that such payment shall not constitute a waiver of claims. If on the basis of Owner Representative's observation of the Work during construction and final inspection, and Owner Representative's review of the final Application for Payment and accompanying documentation, all as required by the Contract Documents, Owner's Representative is satisfied that the Work has been completed and Contractor's other obligations under the Contract Documents have been fulfilled, Owner's Representative will indicate in writing his recommendation of payment and present the Application to Owner for payment. Thereupon, Owner's Representative will give written notice to Owner and Contractor that the Work is acceptable subject to the provisions of this article. Otherwise, Owner's Representative will return the Application to Contractor, indicating in writing the reasons for refusing to recommend final payment, in which case Contractor shall make the necessary corrections and resubmit the Application. If the Application and accompanying documentation are appropriate as to form and substance, the Owner shall, within twenty (20) days after receipt thereof pay contractor the amount recommended by Owner's Representative. 14.8 WAIVER OF CLAIMS The making and acceptance of final payment will constitute: a waiver of all claims by the Owner against Contractor, except claims arising from unsettled Liens, from defective Work appearing after final inspection, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from Contractor's continuing obligations under the Contract Documents; and a waiver of all claims by Contractor against the Owner other than those previously made in writing and still unsettled. 15 SUSPENSION OF WORK AND TERMINATION 15.1 OWNER MAY SUSPEND THE WORK At any time and without cause, Owner's Representative may suspend the Work or any portion thereof for a period of not more than ninety (90) days by notice in writing to Contractor, which will fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. Contractor shall be allowed an adjustment in the Contract Price or an extension of the Contract Times, or both, directly attributable to any such suspension if Contractor makes an approved claim therefore as provided in the articles for Change of Contract Price and Change of Contract Time. 15.2 OWNER MAY TERMINATE Upon the occurrence of any one or more of the following events; if Contractar persistently fails to perform the work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment or failure to adhere to the progress schedule as adjusted from time to time); if Contractor disregards Laws and Regulations of any public body having jurisdiction; if Contractor disregards the authority of Owner's Representative; if Contractor otherwise violates in any substantial way any provisions of the Contract Documents; or if the Work to be done under this Contract is abandoned, or if this SectionlIl.doc Page 38 of 49 7/31l2012 , , �� , � ' � � ' ' � ' ' � � r , ' ' ' � 1 ' � Section III — General Conditions Contract or any part thereof is sublet, without the previous written consent of the Owner, or if the Contract or any claim thereunder is assigned by Contractor otherwise than as herein specified, or at any time Owner's Representative certifies in writing to the Owner that the rate of progress of the Work or any part thereof is unsatisfactory or that the work or any part thereof is unnecessarily or unreasonably delayed. The Owner may, after giving Contractor (and the surety, if any), seven days' written notice and, to the extent permitted by Laws and Regulations, terminate the services of Contractor, exclude Contractor from the site and take possession of the Work and of all Contractor's tools, appliances, construction equipment and machinery at the site and use the same to the full extent they could be used by Contractor (without liability to Contractor for trespass or conversion), incorporate in the Work all materials and equipment stored at the site or for which the Owner has paid Contractor but which are stored elsewhere, and finish the Work as the Owner may deem expedient. In such case Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by the Owner arising out of or resulting from completing the Work such excess will be paid to Contractor. 1 If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to the Owner. Such claims, costs, losses and damages incurred by the Owner will be reviewed by Owner's Representative as to their reasonableness and when so approved by � Owner's Representative incorporated in a Change Order, provided that when exercising any rights or remedies under this paragraph the Owner shall not be required to obtain the lowest price for the Work performed. � ' C� � Where Contractor's services have been so terminated by the Owner, the termination will not affect any rights or remedies of the Owner against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by the Owner will not release Contractor from liability. Upon seven (7) days' written notice to Contractor and Owner's Representative, the Owner may, without cause and without prejudice to any other right or remedy of the Owner, elect to terminate the Agreement. In such case, Contractor shall be paid (without duplication of any items): for completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; for expenses sustained prior to the effective date of termination in performing services ' and furnishing labor, materials or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; ' for all ciaims, costs, losses and damages incurred in settlement of terminated contracts with Subcontractors, Suppliers and others; and for reasonable expenses directly attributable to termination. , � � � Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. SectionlIl.doc Page 39 of 49 7/31 /2012 Section Ill — General Conditions 15.3 CONTRACTOR MAY STOP WORK OR TERMINATE If, through no act or fault of Contractor, the Work is suspended for a period of more than ninety (90) days by the Owner or under an order of court or other public authority, or the Owner's Representative fails to act on any Application for Payment within thirty (30) days after it is submitted or the Owner fails for thirty (30) days to pay Contractor any sum finally determined to be due, then Contractor may, upon seven (7) days' written notice to the Owner and Owner's Representative, and provided the Owner or Owner's Representative does not remedy such suspension or failure within that time, terminate the Agreement and recover from the Owner payment on the same terms as provided in the article for the Owner May Terminate. However, if the Work is suspended under an order of court through no fault of Owner, the Contractor shall not be entitled to payment except as the Court may direct. In lieu of terminating the Agreement and without prejudice to any other right or remedy, if Owner's Representative has failed to act on an Application for Payment within thirty (30) days after it is submitted, or the Owner has failed for thirty (30) days to pay Contractor any sum finally determined to be due, Contractor may upon seven (7) day's written notice to the Owner and Owner's Representative stop the Work until payment of all such amounts due Contractor. The provisions of this article are not intended to preclude Contractor from making claim under paragraphs for Change of Contract Price or Change of Contract Time or otherwise for expenses or damage directly attributable to Contractor's stopping Work as permitted by this article. 16 DISPUTE RESOLUTION If and to the extent that the Owner and Contractor have agreed on the method and procedure for resolving disputes between them that may arise under this Agreement, such dispute resolution method and procedure will proceed. If no such agreement on the method and procedure for resolving such disputes has been reached, subject to the provisions of the article for Decisions on Disputes, the Owner and Contractor may exercise such rights or remedies as either may otherwise have under the Contract Documents or by Laws ar Regulations in respect of any dispute provided, however, that nothing herein shall require a dispute to be submitted to binding arbitration. 17 MISCELLANEOUS 17.1 SUBMITTAL AND DOCUMENT FORMS The form of all submittals, notices, change orders, pay applications, logs, schedules and other documents permitted or required to be used or transmitted under the Contract Documents shall be determined by the Owner's Representative subject to the approval of Owner. 17.2 GIVING NOTICE Whenever any provision of the Contract Documents requires the giving of written notice, notice will be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. SectionIII.doc Page 40 of 49 7/31 /2012 , ' CJ � � ' � , � � � C� � , , ' � � � , Section II I— General Conditions 17.3 NOTICE OF CLAIM ' Should the Owner or Contractor suffer injury or damage to person or property because of any error, omission or any act of the other party or of any of the other party's officers, employees or agents or others for whose acts the other party is legally liable, claim will be made in writing to � the other party within a reasonable time of the first observance of such injury or damage. The provisions of this paragraph shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitations or repose. � 17.4 PROFESSIONAL FEES AND COURT COSTS INCLUDED Whenever reference is made to "claims, costs, losses and damages," the phrase shall include in � each case, but not be limited to, all fees and charges of engineers, architects, attorneys and other professionals and all court or other dispute resolution costs. � � � � � � ' , � � �J r ' 17.5 ASSIGNMENT OF CONTRACT The Contractor shall not assign this contract or any part thereof or any rights thereunder without the approval of Owner, nor without the consent of surety unless the surety has waived its rights to notice of assignment. 17.6 RENEWAL OPTION Annual Contracts issued through the Engineering Department may be renewed for up to two (2) years, upon mutual consent of both the Owner and the ContractorNendor. All terms, conditions and unit prices shall remain constant unless otherwise specified in the contract specifications or in the Invitation to bid. Renewals shall be made at the sole discretion of the Owner, and must be agreed to in writing by both parties. All renewals are contingent upon the availability of funds, and the satisfactory performance of the Contractor as determined by the Construction Department. 17.7 ROLL-OFF CONTAINERS AND/OR DUMPSTERS All City construction projects shall utilize City of Clearwater Solid Waste roll-off containers and/or dumpsters for their disposal needs. For availability or pricing contact Mike Pryor at the City of Clearwater, Solid Waste Department, phone: (727) 562-4923 or email: Michael.Pryorna,myClearwater.com. 18 ORDER AND LOCATION OF THE WORK The City reserves the right to accept and use any portion of the work whenever it is considered to the public interest to do so. The Engineer shall have the power to direct on what line ar street the Contractor shall work and order thereof. 19 MATERIAL USED All material incorporated into the final work shall be new material unless otherwise approved by the Engineer. If requested by the Engineer, the Contractor shall furnish purchase receipts of all materials. SectionlII.doc Page 41 of 49 7/31/2012 Section lll — General Conditions 20 CONFLICT BETWEEN PLANS AND SPECIFICATIONS The various Contract Documents shall be given precedence, in case of conflict, error or discrepancy, as follows: Modifications, Contract Agreement, Addenda, Supplementary General Conditions, General Conditions, Supplementary Technical Specifications, Technical Specifications, Drawings. In a series of Modifications or Addenda the latest will govern. 21 OWNER DIRECT PURCHASE (ODP) OPTION The Owner reserves the right, when identified during the bidding process as part of the project's documents, to contract with the Contractor to purchase certain portions of materials identified in the project as a sales tax savings option in compliance with Florida Law since the Owner is exempt from payment of sales tax. The Contract price includes Florida sales and other applicable taxes for materials, supplies, and equipment, which will be a part of the Contractor's work. The Owner, being exempt from sales tax, reserves the right to make direct purchases of various construction materials included in the Contractor's contract. The Owner purchasing of construction materials, if selected, will be administered on a deductive Change Order basis. Additionally, Purchase Orders will include Owner's Certificate of Exemption number. See SECTION IV, ARTICLE 1.1 - SCOPE DESCRIPTION for ODP items included in the Contract Documents and the APPENDIX for ODP Documents. 22 RESIDENT NOTIFICATION OF START OF CONSTRUCTION 22.1 GENERAL The Contractor shall notify all residents along the construction route or within a 500-foot radius, unless stated otherwise in the Contract Documents, with a printed door hanger notice indicating the following information about the proposed construction work and the Contractor performing the work: City seal or logo; the scheduled date for the start of construction; the type of construction; general sequence and scheduling of construction events; possibility of water service disruption and/or colored water due to construction efforts, Contractor's name, the Superintendent's name, Contractor address and telephone number; Contractor's company logo (optional); requirement for residents to remove landscaping and/or other private appurtenances which are in conflict with the proposed construction; and other language as appropriate to the scope of Contract work. Sample door hanger including proposed language shall be approved by the City prior to the start of construction. Notification shall be printed on brightly colored and durable card stock and shall be a minimum of 4-'/4 by 11 inches in size. Notification (door hanger) shall be posted to residences and businesses directly affected by the Contractor's activities no later than seven (7) days prior to the start of construction activity. Directly affected by the Contractor's activities shall mean all Contractor operations including staging areas, equipment and material storage, principal access routes across private property, etc. Contractor cannot start without proper seven (7) day notice period to residents. Contractor is required to maintain sufficient staff to answer citizen inquiries during normal business hours and to maintain appropriate message recording equipment to receive citizen inquires after business hours. Resident notification by the Contractor is a non-specific pay item to be included in the bid items provided in the contract proposal. 22.2 EXAMPLE CITY SEAL Sectionlll.doc Page 42 of 49 7/3]12012 � � � � � � � u � , � � � � �J �J r �1 LJ ' r ' � ' ' ' L� � � ' � ' Section 111— General Conditions Of CITY OF CLEARWATER NOTICE OF CONSTRUCTION TODAY'S DATE: / / PLEASE EXCUSE US FOR ANY INCONVENIENCE We are the construction contractor performing (state type of contract) for the City of Clearwater in your area. The work will be performed in the public right-of-way adjacent to your property. This notice is placed a minimum of seven (7) days in advance of construction to notify property owners of the pending start of construction. (Brief description of the construction process to be expected by the property owners) The construction process may necessitate the removal of certain items from the right-of-way. Typical items such as sprinklers, grass, and postal approved mailboxes will be replaced by the contractor within a reasonably short period of time. The replacement of driveways and sidewalks will be made using standard asphalt or concrete materials. The property owner is responsible for the expense and coordination to replace driveways and sidewalks which have customized colors, textures and/or materials. Small trees, shrubs, landscaping materials, unauthorized mailboxes or structures within the right-of-way which must be removed due to the construction process will not be replaced. The property owner is responsible to relocate any such items which the property', owner wishes to save prior to the start of construction. Vehicles parked on the streets or within' the right-of-way may be required to be placed elsewhere. ', We are available to answer any questions you may have regarding the construction process orj any particular item that must be relocated. Please contact our Construction Manager', at (727) Construction is anticipated to begin on: We will be more than happy to assist you. Company Name Company Address Contractor Phone Number 23 PROJECT INFORMATION SIGNS 23.1 SCOPE AND PURPOSE The Owner desires to inform the general public on the Owner's use and expenditure of public ' funding for general capital improvement and maintenance projects. To help accomplish this purpose, the Contractor is required to prepare and display public project information signs during the full course of the contract period. These signs will be displayed at al] location(s) of active � work. Payment to Contractor for the preparation, installation and management of project sign(s} shall be included in the cost of the work. The number of and type of signs will be stated in SECTION IV, ARTICLE l.1 — SCOPE DESCRIPTION. u ' �� 1_ � 23.2 TYPE OF PROJECT SIGN, FIXED OR PORTABLE Sign type shall be "fixed" on stationary projects and "portable" on projects which have extended locations or various locations. The particular wording to be used on the signs will be determined after contract award has been approved. Contractor will be provided the wording to be used on sign at the preconstruction conference. SectionlIi.doc Page 43 of 49 7/31/2012 Section ]Il — General Conditions 23.3 FIXED SIGN Fixed sign shall be 4-foot by 6-foot (4'x6') in size and painted on a sheet of exterior grade plywood of the same size and a minimum thickness of 1/2-inches. Sign shall be attached to a minimum of two (2) 4-inch by 4-inch (4"x4") below grade pressure treated (P.T.) wooden posts and braced as necessary for high winds. Posts sha11 be long enough to provide secure anchoring in the ground. Bottom of sign must be a minimum of 24-inches above the ground. Alternate mounting system or attachment to fencing or other fixed structure can be considered for approval. Sign shall be painted white on both sides with exteriar rated paint. 23.4 PORTABLE SIGNS Portable sign shall be a minimum of 24-inches by 30-inches (24"x30") in size and will be attached to a standard sized portable traffic barricade. Sign material shall be aluminum, 0.080- inches or thicker, background of white reflective sheeting, and shall be silkscreen or vinyl lettering. Portable sign shall be two signs located and attached to each side of the traffic barricade. 23.5 SIGN COLORING Background shall be white. Project Descriptive Name shall be in blue lettering. All other lettering shall be black. Basic lettering on sign shall be in all capital letters, of size proportional to the sign itself. Each sign shall depict the City's sun and waves logo. The color of the sun shall be pantone yellow; the wave shall be process blue; and the text shall be black. 23.6 SIGN PLACEMENT Signs shall be placed where they are readily visible by the general public which pass by the project site. Signs are not to be placed where they may become a hazard or impediment to either pedestrian or vehicular traffic. For construction projects outside of the Owner's right-of-way, the signs will be placed on the project site. For projects constructed inside of the Owner's right-of- way, the signs will be placed in the right-of-way. Portable signs are to be moved to the locations of active work on the project. Multiple portable signs will be necessary where work is ongoing in several locations at the same time. Fixed signs are to be placed at the start of construction and will remain in place until the request for final payment. 23.7 SIGN MAINTENANCE The Contractor is responsible for preparation, installation, movement, maintenance, replacement, removal and disposal of all project signs during the full course of the contract period. The Contractor will place and secure portable signs from dislocation by wind or other actions. Signs are to be cleaned as necessary to maintain legibility and immediately replaced if defaced. Sectionitl.doc Page 44 of 49 7/31/2012 , , r ' � ' ' ' , � ' ' , , � ' , ' � ' 1� ' ' � ' II 1 Section 111 — General Conditions 23.8 TYPICAL PROJECT SIGN _ __ _ __ __ � .� PROJECT NAME (CONTRACT NUMBER) (DEPARTMENT NAME) PROJECT ` -� - CONTRACTOR: --- -- -- _ _ _-- _ _ __ COMPLETION DATE: _ __ _ _ ___ . FLINDING: OWNER'S REPRESENTATIVE: ____ ___ __ _ , ___- °�;��=arwat�� �- r _ __ _ � � � - ► ' , ' � , , LJ , f � 0 _ __ --- - _ - __ _ _�= # __ ____ _ 24 AWARD OF CONTRACT, WORK SCHEDULE AND GUARANTEE It will be required that the work will commence not later than five (5) calendar days after the Engineer gives written notice to proceed (NTP), which notice shall be given as outlined in Article 2 of these General Conditions. It is further required that all work within this contract be completed within the indicated number of consecutive calendar days as determined in SECTION IV, ARTICLE 1.1 - SCOPE DESCRIPTION. Contract date to commence at issuance of notice to proceed. If the Contractor fails to complete the work within the stipulated time, the City will retain the amount stated in the Contract, per calendar day, for each day that the contract remains incomplete. The work shaIl be discontinued on Saturdays, Sundays, and approved Holidays. If it becomes necessary for the Contractar to perform work on Saturdays, Sundays, and approved City of Clearwater Employee Holidays, that in the opinion of the Engineer, will require the presence of Inspectors, the SectionlII.doc Page 45 of 49 7/31/2012 Section Ill — General Conditions Contractor shall pay the City of Clearwater, Florida, the amount of Four Hundred Eighty Dollars ($480.00) per each eight-hour (8) day for each Inspector given such assignment. The Contractor shall remedy any defects in the work at his own expense and pay for any damage to other work resulting therefrom which appear within a period of one (1) year from the date of final acceptance. 25 SCRUTINIZED COMPANIES AND BUSINESS OPERATIONS WITH CUBA AND SYRIA CERTIFICATION FORM Any company, individual, principal, subsidiary, affiliate, or owner on the Scrutinized Companies with Activities in Sudan List, the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or is engaged in business operations in Cuba or Syria, is ineligible for, and may not bid on, submit a proposal for, or enter into or renew a contract with the City of Clearwater for goods or services for an amount equal to or greater than one million ($],000,000.00) dollars. Therefore, if applicable, each entity submitting a bid, proposal, or response to a solicitation must certify to the City of Clearwater that it is not on either list or engaged in business operations in Cuba or Syria at the time of submitting a bid, proposal or response, in accordance with section 287.135, Florida Statutes. Business Operations means, for purposes specifically related to Cuba or Syria, engaging in commerce in any form in Cuba or Syria, including, but not limited to, acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, military equipment, or any other apparatus of business or commerce. The certification form (the Certification) is attached hereto, and it must be submitted, along with all other relevant contract documents, at the time of submitting a bid, proposal, or response. Failure to provide the Certification may deem the entity's submittal non-responsive. If the City of Clearwater determines that an entity has submitted a false certification form, been placed either on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, (for contracts entered into or renewed on or after July l, 2011 through June 30, 2012), or submitted a false certification form, has been placed either on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List or been engaged in business operations in Cuba or Syria, (for contracts entered into or renewed on or after July 1, 2012) then the contract may be terminated at the option of the City of Clearwater. Other than the submission of a false certification, the option to waive the aforementioned deficiencies mentioned in the previous sentence may be asserted on a case-by-case basis, at the sole discretion of the City of Clearwater, if to the following conditions are found to exist: A. For Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, (all of the following must occur): SectionIIl.doc 1. The scrutinized business operations were made before July 1, 2011. 2. The scrutinized business operations have not been expanded or renewed after July 1, 2011. 3. The City of Clearwater determines that it is in the best interest of the City to contract with the company or entity. Page 46 of 49 ' �I r ' � ' �I , � � � L� ' �I � 1 � 7/31/20t2 , ' ' , ' , ' Section llI — General Conditions 4. The company or entity has adopted, has publicized and is implementing a formal plan to cease scrutinized business operations and to refrain from engaging in any new scrutinized business operations. B. For Companies Engaged in Business Operations in Cuba or Syria: 1. The business operations were made before July l, 2012. 2. The business operations have not been expanded or renewed after July 1, 2012. 3. The City of Clearwater determines that it is in the best interest of the City to contract with the company or entity. 4. The company or entity has adopted, has publicized, and is implementing a formal , plan to cease business operations and to refrain from engaging in any new business operations in Cuba or Syria. ' � , , i' � ' ' � � ' , Further, the City may allow a company to bid on, submit a proposal for, or enter into or renew a contract with the City of Clearwater for goods or services for an amount equal to or greater than one million ($1,000,000.00) dollars, if the City makes a public finding that, absent one of the above exemptions, the City would otherwise be unable to obtain goods or services for which the contract is offered. The City retains the right to pursue civil penalties and any other applicable rights and remedies as provided by law far the false submission of the attached certification form. ' sectionIII.aoc ' Page 47 of 49 7/31/2012 Section III — General Conditions SCRUTINIZED COMPANIES AND BUSINESS OPERATIONS WITH CUBA AND SYRIA CERTIFICATION FORM THIS FORM MUST BE COMPLETED AND SUBMITTED WITH THE BID PROPOSAL. FAILURE TO SUBMIT THIS FORM AS REQUIRED, MAY DEEM YOUR SUBMITTAL NONRESPONSIVE. The affiant, by virtue of the signature below, certifies that: 1. The vendor, company, individual, principal, subsidiary, affiliate, or owner is aware of the requirements of section 287.135, Florida Statutes, regarding companies on the Scrutinized Companies with Activities in Sudan List, the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or engaging in business operations in Cuba and Syria; and 2. The vendor, company, individual, principal, subsidiary, affiliate, ar owner is eligible to participate in this solicitation and is not listed on either the Scrutinized Companies with Activities in Sudan List, the Scrutinized Companies with Activities in the Iran Petroleum Sector List, or engaged in business operations in Cuba and Syria; and 3. Business Operations means, for purposes specifically related to Cuba or Syria, engaging in commerce in any form in Cuba or Syria, including, but not limited to, acquiring, developing, maintaining, owning, selling, possessing, leasing or operating equipment, facilities, personnel, products, services, personal property, real property, military equipment, or any other apparatus of business or commerce; and 4. If awarded the Contract (or Agreement), the vendor, company, individual, principal, subsidiary, affiliate, or owner will immediately notify the City of Clearwater in writing, no later than five (5) calendar days after any of its principals are placed on the Scrutinized Companies with Activities in Sudan List, the Scrutinized Companies with Activities in the Iran Petroleum Sector List, ar engages in business operations in Cuba and Syria. Sectionlll.doc Authorized Signature Printed Name Title Name of Entity/Corporation Page 48 of 49 ' ' � � � , ' ' , � i � ' 1 � ' ' r 7/31/2012 , , ' , ' , 1 , ' � 1 , , � , � ' , , ' ' Section Ill — General Conditions STATE OF COUNTY OF The foregoing instrument was acknowledged before me on this day of , 201_, by (name of person whose signature is being notarized) as the (title) of (name of corporation/entity), personally known to me as described herein , or produced a (type of identification) as identification, and who didldid not take an oath. NOTARYSEAL ABOVE Sectionlll.doc Notary Public Printed Name My Commission Expires: Page 49 of 49 7/31/2012 ' � 1 � � ' ' ' ' ' , � ' , ' ' ' ' ' SECTION IV TECHNICAL SPECIFICATIONS Table of Contents: SECTIONIV .................................................................................................................................. i TECHNICAL SPECIFICATIONS ............................................................................................... i 1 SCOPE OF WORK ........................................................................................................... 1 l .1 SCOPE DESCRIPTION ................................................................................................. I l.2 SCOPE OF WORK CHECKLIST .................................................................................. 2 2 FIELD ENGINEERING .................................................................................................. 3 2.1 LINE AND GRADE SHALL BE PERFORMED BY THE CONTRACTOR ............... 4 2. I.1 GRADES, LINES AND LEVELS ............................................................................. 4 2.1.2 LAYOUT DAT.4 ....................................................................................................... 4 2.2 LINE AND GRADE SHALL BE PERFORMED BY THE CITY ................................. 4 3 DEFINITION OF TERMS ............................................................................................... 4 3.1 REFERENCE STANDARDS ......................................................................................... 5 3.2 ABBREVIATIONS AND SYMBOLS ........................................................................... 5 4 ORDER AND LOCATION OF THE WORK ................................................................ 6 5 EXCAVATION FOR UNDERGROUND WORK .......................................................... 6 6 CONCRETE ......................................................................................................................7 7 EXCAVATION AND FORMS FOR CONCRETE WORK .......................................... 8 7.1 EXCAVATION ................................................................................................................ 8 7.2 FORMS ........................................................................................................................... 8 8 REINFORCEMENT .........................................................................................................8 8.l BASIS OF PAYMENT ................................................................................................... 8 9 OBSTRUCTIONS .............................................................................................................8 10 RESTORATION OR REPLACEMENT OF DRIVEWAYS, CURBS, SIDEWALKS AND STREET PAVEMENT ............................................................................................ 9 11 WORK IN EASEMENTS OR PARKWAYS .................................................................. 9 12 DEWATERING ...............................................................................................................10 12.1 GENERAL .................................................................................................................... 10 12.2 PERMIT REQUIREMENTS ........................................................................................ 10 12.2.1 DEWATERING CONTROL...---� ............................................................................ 10 12.2.2 GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUND WATER FROMANYNON-CONTAMINATED SITEACTIVITY ........................... 10 13 SANITARY MANHOLES .............................................................................................. 13 13.1 BUILT UP TYPE .......................................................................................................... 13 13.2 PRECAST TYPE .......................................................................................................... 13 SectionIV.doc i 5/IS/2012 13.2.1 MANHOLE ADJUSTMENT RINGS (GRADE RINGS) ........................................ 14 13.3 DROP MANHOLES ..................................................................................................... 14 13.4 FRAMES AND COVERS ............................................................................................ 14 13.5 MANHOLE COATINGS .............................................................................................. 14 13.6 CONNECTIONS TO MANHOLES ............................................................................. 14 14 BACKFILL ......................................................................................................................14 15 STREET CROSSINGS, ETC . ....................................................................................... 15 16 RAISING OR LOWERING OF SANITARY SEWER, STORM DRAINAGE STRUCTURES................................................................................................................15 16.1 BASIS OF PAYMENT ................................................................................................. 15 17 UNSUITABLE MATERIAL REMOVAL .....................................................................15 17.1 BASIS OF MEASUREMENT ...................................................................................... 15 17.2 BASIS OF PAYMENT ............................................................ l5 18 UNDERDRAINS ............................................................................................................. 15 18.] BASIS OF MEASUREMENT ...................................................................................... ]6 18.2 BASIS OF PAYMENT ................................................................................................. 16 19 STORM SEWERS .......................................................................................................... 16 l 9.1 AS BUILT INFORMATION ......................................................................................... ; 6 19.2 TESTING ...................................................................................................................... 19.3 BASIS OF PAYMENT ................................................................................................. 17 20 SANITARY SEWERS AND FORCE MAINS .............................................................. 17 20.1 MATERIALS ................................................................................................................ ] 7 20.1.1 GRAVITYSEWER PIPE ........................................................................................ 17 20.1.2 FORCE MAIN PIPE ............................................................................................. 18 20.2 INSTALLATION .......................................................................................................... l 8 20.2.1 GRAVITYSEWER PIPE ........................................................................................ 18 20.2.2 FORCE MAIN PIPE ............................................................................................. 18 20.3 AS BUILT DRAWINGS ............................................................................................... 18 20.4 TESTING ...................................................................................................................... l 9 20.4.1 TESTING OF GRAVITYSEWERS ........................................................................ 19 20.4.2 TESTING OF FORCE MAINS .............................................................................. 19 20.5 BASIS OF PAYMENT ................................................................................................. 19 20.5.1 GRAVITYSEWER PIPE ........................................................................................ 19 20. S. 2 FORCE MAIN PIPE ................. ............ ................. .................. ........... .................. 19 21 DRAINAGE .....................................................................................................................20 22 ROADWAY BASE AND SUBGRADE .......................................................................... 20 22.1 BASE ............................................................................................................................ 20 22.1.1 BASIS OF MEASUREMENT FOR BASE AND REWORKED BASE ................... 21 22.1. 2 BASIS OF PAYMENT FOR BASE AND REWORKED BASE ............................... 21 22.2 SUBGRADE ................................................................................................................. 22 22.2.1 BASIS OF MEASUREMENT ................................................................................ 22 22.2.2 BASIS OF PAYMENT ............................................................................................ 22 SectionIV.doc ii 5/15/2012 ' I�� , � �' ' ' , r , ' � J ' � , ' ' ' � �J � 23 ASPHALTIC CONCRETE MATERIALS ................................................................... 22 � � , ' I� ' � t � 23.1 ASPHALTIC CONCRETE ........................................................................................... 22 23.1.1 AGGREGATE ........................................................................................................22 23.1.2 BITUMINOUS MATERIALS ................................................................................. 22 23.2 HOT BITUMINOUS MIXTURES - PLANT, METHODS, EQUIPMENT & QUALITYASSURANCE ............................................................................................ 23 23.3 ASPHALT MIX DESIGNS AND TYPES .................................................................... 23 23.4 ASPHALT PAVEMENT DESIGNS AND LAYER THICKNESS ............................... 23 23.5 GENERAL CONSTRUCTION REQUIREMENTS .................................................... 24 23.6 CRACKS AND POTHOLE PREPARATION .............................................................. 25 23.6.1 CRACKS ................................................................................................................25 23.6.2 POTHOLES ...........................................................................................................25 23.7 ADJUSTMENT OF MANHOLES ............................................................................... 25 23.8 ADDITIONAL ASPHALT REQUIREMENTS ............................................................ 26 23.9 SUPERPAVE ASPHALTIC CONCRETE .................................................................... 26 23.10 BASIS OF MEASUREMENT ...................................................................................... 27 23.11 BASIS OF PAYMENT ................................................................................................. 27 24 ADJUSTMENT TO THE UNIT BID PRICE FOR ASPHALT .................................. 27 25 GENERAL PLANTING SPECIFICATIONS .............................................................. 28 25.1 IRRIGATION ................................................................................................................ 28 25.1.1 DESCRIPTION .... ............... ......... . .... ............. .............................................. ......... 28 25.1.2 PRODUCTS ..........................................................................................................29 25.1.3 EXECUTION .........................................................................................................33 25.2 LANDSCAPE ...............................................................................................................37 25.2.1 GENERAL .............................................................................................................37 25.2.2 PRODUCTS ..........................................................................................................42 25.2.3 EXECUTION .........................................................................................................45 , 26 � � � C 26.1 26.2 26.3 26.4 26.5 26.6 26.7 26.8 26.9 HDPE DEFORMED - REFORMED PIPE LINING ................................................... 52 INTENT........................................................................................................................ 52 PRODUCT AND CONTRACTOR/INSTALLER ACCEPTABILITY ........................ 52 MATERIALS................................................................................................................ 52 CLEANING/SURFACE PREPARATION ................................................................... 53 TELEVISION INSPECTION ....................................................................................... 53 LINERINSTALLATION ............................................................................................. 53 LATERAL RECONNECTION ..................................................................................... 54 TIME OF CONSTRUCTION ....................................................................................... 54 PAYMENT.................................................................................................................... 54 27 PLANT MIX DRIVEWAYS.. 27.1 BASIS OF MEASUREMENT 27.2 BASIS OF PAYMENT ........... � ..................................................... 54 ..................................................... 54 ................................................... 54 28 REPORTING OF TONNAGE OF RECYCLED MATERIALS ................................ 55 � 29 CONCRETE CURBS ..................................................................................................... 55 29.1 BASIS OF MEASUREMENT ...................................................................................... 55 ' 29.2 BASIS OF PAYMENT ................................................................................................. 55 SectionlV.doc iii 5/IS/2012 , 30 CONCRETE SIDEWALKS AND DRIVEWAYS ......................................................... 55 30.1 CONCRETE SIDEWALKS .......................................................................................... 55 30.2 CONCRETE DRIVEWAYS ......................................................................................... 55 30.3 BASIS OF MEASUREMENT ...................................................................................... 56 30.4 BASIS OF PAYMENT ................................................................................................. 56 31 SODDING ........................................................................................................................56 32 33 SEEDING......................................................................................................................... 56 STORM MANHOLES, INLETS, CATCH BASINS OR OTHER STORM STRUCTURES................................................................................................................ 57 33.1 BUILT UP TYPE STRUCTURES ................................................................................ 57 33.2 PRECAST TYPE .......................................................................................................... 57 33.3 BASIS OF PAYMENT ................................................................................................. 58 34 MATERIAL USED ......................................................................................................... 58 35 CONFLICT BETWEEN PLANS AND SPECIFICATIONS ...................................... 58 36 STREET SIGNS .............................................................................................................. 58 37 AUDIO/VIDEO RECORDING OF WORK AREAS .................................................. 58 37.1 CONTRACTOR TO PREPARE AUDIONIDEO RECORDING ................................ 58 37.2 SCHEDULING OF AUDIONIDEO RECORDING ................................................... 58 37.3 PROFESSIONAL VIDEOGRAPHERS ....................................................................... 58 37.4 EQUIPMENT ............................................................................................................... 58 37.5 RECORDED INFORMATION, AUDIO ...................................................................... 59 37.6 RECORDED INFORMATION VIDEO ....................................................................... 59 37.7 VIEWER ORIENTATION ............................................................................................ 59 37.8 LIGHTING ................................................................................................................... 59 37.9 SPEED OF TRAVEL .................................................................................................... 59 37.10 VIDEO LOG/INDEX ................................................................................................... 60 37.11 AREA OF COVERAGE ............................................................................................... 60 37.12 COSTS OF VIDEO SERVICES ................................................................................... 60 38 39 40 EROSION AND SILTATION CONTROL ................................................................... 60 38.1 STABILIZATION OF DENUDED AREAS ................................................................. 60 38.2 PROTECTION AND STABILIZATION OF SOIL STOCKPILES ............................. 60 38.3 PROTECTION OF EXISTING STORM SEWER SYSTEMS .................................... 60 38.4 SEDIMENT TRAPPING MEASURES ........................................................................ 6l 38.5 SEDIMENTATION BASINS ....................................................................................... 61 38.6 WORKING IN OR CROSSING WATERWAYS OR WATERBODIES ...................... 61 38.7 SWALES, DITCHES AND CHANNELS .................................................................... 61 38.8 UNDERGROUND UTILITY CONSTRUCTION ....................................................... 62 38.9 MAINTENANCE ......................................................................................................... 62 38.10 COMPLIANCE .............................................................................................................62 UTILITY TIE IN LOCATION MARKING ................................................................. 65 AWARD OF CONTRACT, WORK SCHEDULE AND GUARANTEE .................... 65 SectionlV.doc rv � � � � � � � ' ,� ' � , ' ' � ' , 5/IS/2012 , ' � � � � � � � � � � � � � � 1 � ' � 41 POTABLE WATERMAINS, RECLAIMED WATERMAINS AND APPURTENANCES ....................................................................................................... 65 41.1 SCOPE .......................................................................................................................... 65 41.2 MATERIALS ................................................................................................................ 66 41. 2.1 GENERAL ................ .. . ............ ..... .. . . ...... ..... ............ ......... ......... . ... ... ......... . .......... . 66 41.2.2 PIPE MATERIALSAND FITTINGS ..................................................................... 66 41.2.3 GATE VALVES ...................................................................................................... 68 41.2.4 V.4LVE BOXES ...................................................................................................... 68 41. 2. S ITYDRANTS .... ............. ............... ........................ ..... . .......... ............................ . ... ... 69 41.2. 6 SER vICE SADDLES ............................................................................................. 70 41.2.7 TESTS, INSPECTIONAND REPAIRS .................................................................. 70 41.2.8 BACKFLOW PREVENTERS ................................................................................ 70 41.2.9 TAPPING SLEEVES ............................................................................................. 71 41.2.10 BLOW OFF HYDRANTS ...................................................................................... 71 41.3 CONSTRUCTION ........................................................................................................71 41.3.1 MATERIAL HANDLING ....................................................................................... 71 41. 3. 2 PIPE LAYING ....................................................................................................... 71 41.3.3 SETTING OF V,4LVES, HYDRANTSAND FITTINGS ......................................... 73 41. 3. 4 CONNECTIONS TO EXISTING LINES ............................................................... 73 41.4 TESTS ...........................................................................................................................74 41.4.1 HYDROSTATIC TESTS ......................................................................................... 74 41. 4. 2 NOTICE OF TEST ....... ..................... . ............. . ... ....... ......... ...... . ..... .... .................. 74 41.5 STERILIZATION ......................................................................................................... 74 41.5.1 STERILIZING AGENT .......................................................................................... 74 41. S. 2 FL USHING SYSTEM ............. ........ ........ ................................... ..... .. ..................... 74 41. S. 3 STERILIZATION PROCED URE ...... . .... .. .................. ............ . . ...... ......... ... ........... 74 41. S. 4 RESID UAL CHL ORINE TESTS . . . . . . . . . . . . . . .. . . . .. . . .. . . . . . . .. . .. . .. . .. . . . . .. . .... .. . .. . . . . . . . .. . . . . . . . . . 75 41.5.5 BACTERIAL TESTS .............................................................................................. 75 41.6 MEASUREMENT AND PAYMENT ........................................................................... 75 41. 6.1 GENERAL ................... ........... . ............. ........... .............. ........ ................. ........ . ...... 75 41.6.2 FURNISHAND INSTALL WATER MAINS ........................................................... 76 41.6.3 FURNISHAND INSTALL FITTINGS ................................................................... 76 41.6.4 FURNISHAND INSTALL GATE VALVES COMPLETE WITH BOXESAND COVERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76 41.6.5 FURNISHAND INSTALL FIRE HYDRANTS ....................................................... 76 42 GAS SYSTEM SPECIFICATIONS .............................................................................. 77 43 TENNIS COURTS .......................................................................................................... 77 43.1 PAVED TENNIS COURTS .......................................................................................... 77 43.1.1 SOIL TREATMENTS ............................................................................................. 77 43.1.2 BASE COURSE ..................................................................................................... 77 43.1. 3 PRIME COAT ....................................................................................................... 77 43.1.4 LEVELING COURSE ............................................................................................ 77 43.1. S SURFACE COURSE ............................................................................................. 77 43.1. 6 COLOR COAT ...................................................................................................... 78 43.2 CLAY TENNIS COURTS ............................................................................................ 79 43. 2.1 GENERAL ......................................................................................... .................... 79 43.2.2 SITE PREPARATION ............................................................................................ 80 SectionIV.doc v 5/15/2012 43.2.3 43.2.4 43.2. S 43.2.6 43.2. 7 43.2.8 43.2.9 43.2.10 43.2.11 43.2.12 43.2.13 43.2.14 43.2.15 43.2.16 43.2.17 SLOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 0 BASECONSTR UCTION ....... ..... ..... ..... . . ...... ....... . . ............................. .... ............. .. 81 PERIMETER CURBING ....................................................................................... 81 SURF.4CE COURSE ............................................................................................. 81 ROOTBARRIER ................................................................................................... 81 FENCING............................................................................................................. 82 WINDSCREENS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82 COURT EQUIPMENT .......................................................................................... 82 SHADE STR UCT URE . ......... ........... ........ . ............ ........... .. . ..... . ....... ......... ............. 84 WATER SOURCE (Potable) .................................................................................. 84 CONCR E TE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 4 EXISTING SPORT TENNIS CO URT LIGHTING ................................................. 84 WATERCOOLER .................................................................................................. 85 DEMONSTRATION ..................... ............ ..... ..... ....... ............... ... .. . ................ . . ..... 85 WARRANTY . . . . . . . . ... . . . ... . .. . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . .. .. . . . . . . . .. . . . . . . . 85 44 WORK ZONE TRAFFIC CONTROL ......................................................................... 86 44.1 CONTRACTOR RESPONSIBLE FOR WORK ZONE TRAFFIC CONTROL ......... 86 44.2 WORK ZONE TRAFFIC CONTROL PLAN .............................................................. 86 44.2.1 WORK ZONE SAFETY ......................................................................................... 86 44.3 ROADWAY CLOSURE GUIDELINES ....................................................................... 87 44.3.1 ALL ROADWAYS ................................................................................................... 87 44.3.2 MAJOR ARTERIALS, MINOR ARTERIALS, LOCAL COLLECTORS ................. 87 44.3.3 MAJOR ARTERIALS, MINOR ARTEWALS ......................................................... 87 44.3.4 MAJOR ARTERIALS ............................................................................................. 87 44.4 APPROVAL OF WORK ZONE TRAFFIC CONTROL PLAN ................................... 87 44.5 INSPECTION OF WORK ZONE TRAFFIC CONTROL OPERATION .................... 88 44.6 PAYMENT FOR WORK ZONE TRAFFIC CONTROL ............................................. 88 44.7 CERTIFICATION OF WORK ZONE TRAFFIC CONTROL SUPERVISOR............ 88 45 45.1 45.2 45.3 45.4 45.5 45.6 45.7 45.8 45.9 CURED-IN-PLACE PIPE LINING .............................................................................. 88 INTENT........................................................................................................................ 88 PRODUCT AND CONTRACTOR/INSTALLER ACCEPTABILITY ........................ 89 MATERIALS................................................................................................................ 89 CLEANING/SURFACE PREPARATION ................................................................... 89 TELEVISION INSPECTION .......................................................................................90 LINERINSTALLATION ............................................................................................. 90 LATERALRECONNECTION ..................................................................................... 90 TIMEOF CONSTRUCTION ....................................................................................... 90 PAYMENT.................................................................................................................... 90 46 SPECIFICATIONS FOR POLYETHYLENE SLIPLINING ..................................... 91 46.1 MATERIALS ................................................................................................................ 91 46.1.1 PIPE AND FITTINGS ..................................... ..... .............. ................................... 91 46.1.2 QUALITYCONTROL ........................................................................................... 91 46.1.3 SAMPLES ..............................................................................................................91 46.1.4 RF7ECTION ..........................................................................................................91 46.2 PIPE DIMENSIONS ..................................................................................................... 91 46.3 CONSTRUCTION PRACTICES ................................................................................. 92 SectionIV.doc vi � � � � � '�I � I_� � � �I � �� ' 5/15/2012 , � � � � ' � � � 47 ' � 4 � � � , � � ' � , 1 46. 3. I HANDLING OF PIPE ........................................................................................... 92 46. 3.2 REPAIR OF DAMAGED SECTIONS .................................................................... 92 46.3. 3 PIPE JOINING ..................................................................................................... 92 46.3. 4 HANDLING OF FUSED PIPE ............................................................................. 92 46.4 SLIPLINING PROCEDURE ........................................................................................ 92 46. 4.1 PIPE REQ UIREMENTS AND DIMENSIONS ...................................................... 92 46. 4. 2 CLEANING AND INSPECTION ........................................................................... 92 46. 4. 3 INSERTION SHAFT AND EXCA UATIONS .......................................................... 93 46.4. 4 INSERTION OF THE LINER ................................................................................ 93 46.4. 5 CONFIRMATION OF PIPE SIZES ...................................................................... 93 46.4. 6 UNDERDRAIN CONNECTIONS IF REQUIRED ................................................ 93 46. 4. 7 BACKFILLING ..................................................................................................... 94 46.4.8 POINTREPAIR .....................................................................................................94 46.=�9 CLEAN UP OPERATIONS ................................................................................... 94 SPECIFICATIONS FOR POLYVINYL CHLORIDE RIBBED PIPE ...................... 94 47.1 SCOPE .......................................................................................................................... 94 47.2 MATERIALS ................................................................................................................ 94 47.3 PIPE .............................................................................................................................. 94 47.4 JOINING SYSTEM ...................................................................................................... 95 47.5 FITTINGS .....................................................................................................................95 8 GUNITE SPECIFICATIONS ........................................................................................ 95 48.1 PRESSURE INJECTED GROUT ................................................................................ 95 482 REHABILITATION OF CORRUGATED METAL PIPE WITH GUNITE ................. 95 48.3 COMPOSITION ........................................................................................................... 95 48.4 STRENGTH REQUIREMENTS .................................................................................. 96 48.5 MATERIALS ................................................................................................................ 96 48.6 WATER ......................................................................................................................... 96 48.7 REINFORCEMENT .....................................................................................................96 48.8 STORAGE OF MATERIALS ....................................................................................... 96 48.9 SURFACE PREPARATION ......................................................................................... 97 48.10 PROPORTIONING .......................................................................................................97 48.11 MIXING ........................................................................................................................97 48.12 APPLICATION .............................................................................................................97 48.13 CONSTRUCTION JOINTS ......................................................................................... 98 48.14 SURFACE FINISH ....................................................................................................... 98 48.15 CURING ....................................................................................................................... 98 48.16 ADJACENT SURFACE PROTECTION ..................................................................... 98 48.17 INSPECTION ............................................................................................................... 99 48.18 EQUIPMENT ............................................................................................................... 99 49 SANITARY AND STORM MANAOLE LINER RESTORATION ......................... 100 49.1 SCOPE AND INTENT ............................................................................................... 100 49.2 PAYMENT .................................................................................................................. 100 49.3 FIBERGLASS LINER PRODUCTS .......................................................................... ] 00 49.3.1 MATERIALS ........................................................................................................100 49. 3. 2 INSTALLATION AND EXEC UTION .................................................................. 101 49.4 STRONG SEAL MS-2 LINER PRODUCT SYSTEM .............................................. 101 SectionIV.doc vii 5/l 5/2012 49.4.1 MATERIALS ........................................................................................................102 49.5 INFILTRATION CONTROL ...................................................................................... ] 02 49.6 GROUTING MIX ....................................................................................................... l 02 49.7 LINER M1X ................................................................................................................ 102 49.8 WATER ....................................................................................................................... 103 49.9 OTHER MATERIALS ................................................................................................ 103 49.10 EQUIPMENT ............................................................................................................. ] 03 49.11 INSTALLATION AND EXECUTION ....................................................................... 103 49.11.1 PREPARATION ...................................................................................................103 49.11.2 MIXING ...............................................................................................................104 49.11. 3 SPRAYING .......................................................................................................... 104 49.11.4 PRODUCT TESTING ......................................................................................... 104 49.11. S C URING ............. ............................. ....... ...... . . .... .. ..... .. . .......... ..... .......... .. ...... ...... 104 49.11. 6 MANHOLE TESTING AND ACCEPTANCE ...................................................... 105 49.12 INNERLINE ENVIRONMENTAL SERVICES LINER PRODUCT SYSTEM ....... l05 49.12.1 SCOPE ................................................................................................................105 49.12.2 MATERIALS ........................................................................................................105 49.12. 3 INSTALLATION AND EXEC UTION . . ........ ....... . .... ..... ....... .............. ......... ....... .. 107 50 PROJECT INFORMATION SIGNS .......................................................................... lUy 51 IN-LINE SKATING SURFACING SYSTEM ............................................................109 Sl .l SCOPE ..........................................•-•-.......................................................................... 109 51.2 SURFACE PREPARATIONS ......................................................................................110 51.2.1 ASPHALT .............................................................................................................110 51.2.2 CONCRETE .........................................................................................................110 51.2.3 COURT PATCH BINDER MIX ............................................................................110 51.3 APPLICATION OF ACRYLIC FILLER COAT ..........................................................I 10 51.4 APPLICATION OF FORTIFIED PLEXIPAVE ...........................................................111 Sl.5 PLEXIFLOR APPLICATION ..................................................................................... l 1 l 51.6 PLAYING LINES ........................................................................................................ l 11 51.7 GENERAL ...................................................................................................................111 Sl .8 LIMITATIONS .............................................................................................................11 ] 52 53 54 RESIDENT NOTIFICATION OF START OF CONSTRUCTION ..........................112 GABIONSAND MATTRESSES ..................................................................................112 53.1 MATERIAL .................................................................................................................112 53.1.1 GABION AND RENO MATTRESS MATERIAL ....... ............... ... ........... ...............112 53.1.2 GABIONAND MATTRESS FILLER MATERIAL : ...............................................114 53.1. 3 MATTRESS WIRE ................................................................................................ I15 53.1. 4 GEOTEXTILE FABRIC ........................................................................................11 S 53.2 PERFORMANCE ........................................................................................................115 LAWN MAINTENANCE SPECIFICATIONS ...........................................................116 54. l SCOPE ......................................................... 54.2 SCHEDULING OF WORK ......................... 54.3 WORK METHODS ..................................... 54.3.1 MAINTENANCE SCHEDULING ........ 54.3.2 DUTIES PER SERVICE VISIT ............ SectionIV.doc ���� ...............................................................1 l6 ...............................................................116 ...............................................................1 l7 ...............................................................117 ....--� ........................................................117 siisi2oi2 � , � ►J � � � � i � � �� � � � ' � ' 1 54.4 LITTER ........................................................................................................................117 54.5 VISUAL CHECK ........................................................................................................117 54.6 PLANT TRIMMING AND PALM PRUNING ...........................................................117 54.7 PHOENIX SPECIES (CANARY DATE, INDIA DATE, PYGMY DATE, ETC.)......117 54.8 DEBRIS REMOVAL ...................................................................................................117 54.9 TRAFFIC CONTROL .................................................................................................] 18 54.10 PEDESTRIAN SAFETY .............................................................................................1 l 8 54.11 PLANT FERTILIZATION ...........................................................................................1 l8 54.12 WEED REMOVAL IN LANDSCAPED AREA ..........................................................] 18 54.13 MULCH CONDITION ................................................................................................118 54.14 1RRIGATION SERV ICE AND REPAIR .....................................................................118 54.15 LAWN AND ORNAMENTAL PEST CONTROL ......................................................118 54.16 PALM FERTILIZATION .............................................................................................118 54.17 FREEZE PROTECTION .............................................................................................119 54.18 LEVEL OF SERVICE ..................................................................................................119 54.19 COMPLETION OF WORK ........................................................................................1 l9 5420 INSPECTION AND APPROVAL ...............................................................................119 54.21 SPECIAL CONDITIONS ............................................................................................119 55 MILLING OPERATIONS ........................................................................................... 120 55.1 EQUIPMENT, CONSTRUCTION & MILLED SURFACE ...................................... 120 55.2 ADDITIONAL MILLING REQUIREMENTS .......................................................... ] 20 55.3 SALUAGEABLE MATERIALS ................................................................................. 121 55.4 DISPOSABLE MATERIALS ..................................................................................... 121 55.5 ADJUSTMENT AND LOCATION OF UNDERGROUND UTILITIES .................. 121 55.6 ADJUSTMENT OF UTILITY MANHOLES ............................................................ 121 55.7 TYPES OF MILLING ................................................................................................ 121 55.8 MILLING OF INTERSECTIONS .............................................................................. 122 55.9 BASIS OF MEASUREMENT .................................................................................... 122 55.10 BASIS OF PAYMENT ............................................................................................... 122 56 CLEARING AND GRUBBING ................................................................................... 122 56.1 BASIS OF MEASUREMENT .................................................................................... 122 56.2 BASIS OF PAYMENT ............................................................................................... 122 57 RIPRAP ......................................................................................................................... 122 57.1 BASIS OF MEASUREMENT .................................................................................... l22 57.2 BASIS OF PAYMENT ............................................................................................... 123 58 TREATMENT PLANT SAFETY ................................................................................ 123 58.1 HAZARD POTENTIAL ............................................................................................. 123 58.2 REQUIRED CONTRACTOR TRAINING ................................................................ l 23 59 TRAFFIC SIGNAL EQUIPMENT AND MATERIALS ...........................................123 59.1 BASIS OF MEASUREMENTAND PAYMENT ....................................................... l24 60 SIGNING AND MARKING ......................................................................................... 124 60.] BASIS OF MEASUREMENTAND PAYMENT ....................................................... 124 61 ROADWAY LIGHTING ..............................................................................................124 SectionlV.doc ix 5/ I S/2012 61.1 BASIS OF MEASUREMENTAND PAYMENT ....................................................... 124 62 TREE PROTECTION ..................................................................................................125 62.1 TREE BARRICADES ................................................................................................ 125 62.2 ROOT PRUNING ....................................................................................................... 125 62.3 PROPER TREE PRUNING ........................................................................................ 126 63 PROJECT WEB PAGES .............................................................................................. 127 63.1 WEB PAGES DESIGN ............................................................................................... l27 63.2 WEB ACCESSIBILITY GUIDELINES ..................................................................... 127 63.3 THE SUN AND WAVES LOGO AND ITS USE ....................................................... 127 63.4 MAPS AND GRAPHICS ........................................................................................... ] 28 63.5 INTERACTIVE FORMS ........................................................................................... l28 63.6 POSTING ....................................................................................................................128 63.7 WEB PAGES UPDATES ............................................................................................ 128 64 OVERHEAD ELECTRIC LINE CLEARANCE ...................................................... 128 64.1 CLEARANCE OPTIONS ........................................................................................... 128 64.2 REQUIRED MINIMUM CLEARANCE DISTANCES ............................................. 128 SectionIV.doc x 5/IS/2012 � r u �� � � � �� � � ' � � � � Section IV—Technical Specifications 1 SCOPE OF WORK 1.1 SCOPE DESCRIPTION Project Name: Druid Road Walkway (Phase 3) Project Number: 04-0021-PR Scope of Work: Construction of an eight (8) foot wide asphalt trail with concrete header curb along the north side of Turner Street from the Pinellas Trail to Dr. Martin Luther King Jr. Avenue for approximately 1,620 feet. Construction of an eight (8) foot wide asphalt traii with concrete header curb along the east side of Dr. Martin Luther King Jr. Avenue from Turner Street to Druid Road for approximately 830 feet. Construction of an eight (8) foot wide asphalt trai) with concrete header curb along the north side of Druid Road from the Pinellas Trail to Betty Lane for approximately 4,320 feet. Construction of concrete pedestrian crossing ramps at roadway intersections. Construction of driveways. Reconstruction of north side of Turner Street from the Pinellas Trail to Prospect Avenue. Reconstruction and widening of Druid Road from York Circle to l00 feet east of Sherman McVeigh Drive to lengthen auxiliary lanes. Construction of roadway signing and striping as necessary for roadway realignments and at intersections. Construction of intersection improvements at Missouri Avenue, including roadway work, pedestrian refuse islands, signs. Striping and pedestrian signals. Construction of concrete curb ramps on the northeast and northwest corners of Druid Road and Lake Drive along with associated crosswalk striping. Construction of trail amenities, associated drainage facilities and adjustment/relocation of existing utilities to accommodate the walkway alignment. The Contractor shall provide 6 project signs as described in SECTION II1, ARTICLE 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor's schedule of work submitted for approval. Additional project signs may be required above the indicated amount due to the Contractor's schedule of work, which will be provided at no additional cost to the Owner. CONTRACT PERIOD: 180 CONSECUTIVE CALENDAR DAYS 1 SectionlV.doc Page ] of 128 5/IS/2012 � Section 1V — Technical Specifications 1.2 SCOPE OF WORK CHECKLIST Project Name: Druid Road Walkway (Phase 3) Project Number: 04-0021-PR The following Articles of the Technical Specifications will apply to this contract if marked "X" as shown below: 1 X Scope Of Work 2.l X Line and Grade Shall Be Performed By The Contractor 2.2 ❑ Line and Grade Shall Be Performed By The City 3 X Definition OfTerms 4 ❑ Order And Location Of The Work 5 X Excavation For Underground Work 6 X Concrete 7 X Excavation And Forms For Concrete Work 8 X Reinforcement 9 X Obstructions 10 X Restoration Or Replacement Of Driveways, Curbs, Sidewalks And Street Pavement l] X Work In Easements Or Parkways l2 X Dewatering l3 X Sanitary Manholes 14 X Backfill 15 X Street Crossings, Etc. 16 X Raising Or Lowering Of Sanitary Sewer, Storm Drainage Structures ] 7 ❑ Unsuitable Material Removal l8 ❑ Underdrains 19 X Storm Sewers 20 ❑ Sanitary Sewers And Farce Mains 21 X Drainage 22 X Roadway Base And Subgrade 23 X Asphaltic Concrete Materials 24 ❑ Adjustment To The Unit Bid Price For Asphalt 25 X General Planting Specifications 26 ❑ Hdpe Deformed - Reformed Pipe Lining 27 ❑ Plant Mix Driveways 28 ❑ Reporting Of Tonnage Of Recycled Materials 29 X Concrete Curbs 30 X Concrete Sidewalks And Driveways 31 X Soddin 32 ❑ Seeding 33 X Storm Manholes, Inlets, Catch Basins Or Other Storm Structures 34 ❑ Material Used 35 ❑ Conflict Between Plans And Specifications SectionIV.doc Page 2 of 128 5/15/2012 ' � � �I � � � � , � �_ � � � 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Sl 52 53 54 55 56 57 58 59 60 6l 62 63 64 1.3 ly� � 0 0 � 0 � � � � � 0 Section IV — Technical Specifications Street Signs AudioNideo Recording Of Work Areas Erosion And Siltation Control Utility Tie In Location Marking Award Of Contract, Work Schedule And Guarantee Potable Water Mains, Reclaimed Water Mains and , Gas System Specifications Tennis Courts Work Zone Traffic Control C ured-in-Place Pipe Lining Specifications for Polyethylene Sliplining Specifications for Polyvinyl Chloride Ribbed Pipe Gunite Specifications Sanitary and Storm Manhole Liner Restoration Project Information Signs In-Line Skating Surfacing System Resident Notification of Start of Construction Gabions and Mattresses Lawn Maintenance Specifications Milling Operations Clearing and Grubbing U Treatment Plant Safety X Traffic Signal Equipment and Materials X Signing And Marking ❑ Roadway Lighting X Tree Protection ❑ Project Web Pages X Overhead Electric Line Clearance SIGNALIZATION WORK urtenances Various portions of this project involve signalization work that will likely be performed by a subcontractor working for the primary contractor. The City shall require all contractors who wish to bid on this project to provide a list of three (3) possible subcontractors that would be performing the signalization work. This list shall be provided in writing at least five (5) business days prior to the bid opening date. The City shall review the list and either accept or deny all or a portion of this list in writing within two (2) business days of receipt. If the contractor will be doing the signalization work themselves then this is to be provided in writing. Failure to provide this list within the time frames specified above will result in disqualification of the contractor for this project. � SectionlV.doc � Page 3 of 128 5/IS/2012 2 2.1 Section 1V—Technical Specifications FIELD ENGINEERING LINE AND GRADE SHALL BE PERFORMED BY THE CONTRACTOR The Contractar shall provide and pay for field engineering service required for the project. Such work shall include survey work to establish lines and levels and to locate and lay out site improvements, structures, and controlling lines and levels required for the construction of the work. Also included are such Engineering services as are specified or required to execute the Contractor's construction methods. Engineers and Surveyors shall be licensed professionals under the laws of the state of Florida. The Contractor shall provide three (3) complete sets of As- built Survey to the Engineer prior to final payment being made as outlined in Section III (General Conditions), Article 6.l 12 of these Contract Documents. 2.1.1 GRADES, LINES AND LEVELS Existing basic horizontal and vertical control points for the project are those designated on the Drawings or provided by the City. Control points (for alignment only) shall be established by the Engineer. The Contractor shall locate and protect control points prior to starting site work and shall preserve all permanent reference points during construction. In warking near any permanent property corners or reference markers, the Contractor shall use care not to remove or disturb any such markets. In the event that markers must be removed or are disturbed due to the proximity of construction work, the Contractor shall have them referenced and reset by a Land Surveyor qualified under the laws of the state of Florida. 2.1.2 LAYOUT DATA The Contractor shall layout the work at the location and to the lines and grades shown on the Drawings. Survey notes indicating the information and measurements used in establishing locations and grades shall be kept in notebooks and furnished to the Engineer with the record drawings for the project. 2.2 LINE AND GRADE SHALL BE PERFORMED BY THE CITY At the completion of all work the contractor shall be responsible to have furnished to the project inspector a replacement of the wooden lath and stakes used in the construction of this project. Excessive stake replacement caused by negligence of Contractor's forces, after initial line and grade have been set, as determined by the City Engineer, will be charged to the Contractor at the rate of $100.00 per hour. Time shall be computed for actual time on the project. All time shall be computed in one-hour increments. Minimum charge is $100.00. The City will generate the project Record construction drawings. 3 DEFINITION OF TERMS For the purpose of these Technical Specifications, the definition of terms from SECTION III, ARTICLE 1- DEFINITIONS of these Contract Documents shall apply. For the purpose of the Estimated Quantities, the Contractor's attention is called to the fact that the estimate of quantities as shown on the Proposal Sheet is approximate and is given only as a basis of calculation upon which the award of the contract is to be made. The City does not assume any responsibility that the final quantities will remain in strict accordance with estimated SectionlV.doc Page 4 of 128 5/15/2012 , � � � � � � � � � � �� ' ' ' � � � l� � � , � � � �l Section N — Technical Specifications quantities nor shall the contractor plead misunderstandings or deception because of such estimate of quantities or of the character or location of the work or of other conditions or situations pertaining thereto. 3.1 REFERENCE STANDARDS Reference to the standards of any technical society, organization, or associate, or to codes of local or state authorities, shall mean the latest standard, code, specification, or tentative standard adopted and published at the date of receipt of bids, unless specifically stated otherwise. 3.2 ABBREVIATIONS AND SYMBOLS Abbreviations used in the Contract Documents are defined as follows: � SectionlV.doc � AA Aluminum Association, Inc. AAMA Architectural Aluminum Manufacturers' Association AASHTO American Association of State Highway and Transportation Officials ACI American Concrete Institute AISI American Iron and Steel Institute AMA Acoustical Materials Association AMCA Air Moving and Conditioning Association, Inc. ANSI American National Standards Institute APA American Plywood Association ASAE American Society ofAgricultura) Engineers ASCE American Society of Civil Engineers ASHRAE American Society of Heating Refrigerating and Air Conditioning ASME American Society of Mechanical Engineers ASSE American Society of Sanitary Engineering ASTM American Society for Testing and Materials AWG American Wire Gauge AWMA Aluminum Window Manufacturer's Association AWS American Welding Society AW WA American Water Works Association CFR Code of Federal Regulations CISPI Cast Iron Soil Pipe Institute CRSI Concrete Reinforcing Steel Institute CS Commercial Standards and National Bureau of Standards DEP Department of Environmental Protection (Florida) DOT Department of Transportation (Florida) EPA Environmental Protection Agency FAC Florida Administrative Code FBC Florida Building Code FFPC Florida Fire Prevention Code FGC Florida Gas Code FMC Florida Mechanical Code FPC Florida Plumbing Code FedSpec Federal Specifications HI Standards of Hydraulic Institute Page 5 of 128 5/15/2012 IBBM IEEE IPS M IL NAAMM NBFU NEC NEMA NFPA NPT NWMA PCA PCI SBC SBCCI SDI SFPC SGC SJI SMACCNA SMC SPC SPIB SSPC TCA UL Section IV — Technical Specifications Iron Body, Bronzed Mounted lnstitute of Electrical and Electronics Engineers Iron Pipe Size Military Specification National Association ofArchitectural Metal Manufacturers National Board of Fire Underwriters National Electrica) Code National Electrical Manufacturers Association National Fire Protection Association National Pipe Thread National Woodwork Manufacturers' Association Portland Cement Association Prestressed Concrete Institute Standard Building Code (SBCCI) Southern Building Code Congress ]nternational, Inc. Steel Door Institute Standard Fire Prevention Code (SBCCI) Standard Gas Code (SBCCI) Steel Joist Institute Sheet Metal and Air Conditioning Contractors' National Association Standard Mechanical Code (SBCCI) Standard Plumbing Code (SBCCI) Southern Pine Inspection Bureau Steel Structures Painting Council Title Council ofAmerica Underwriters' Laboratories 4 ORDER AND LOCATION OF THE WORK This article deleted. See SECTION III, ARTICLE 18 — ORDER AND LOCATION OF THE WORK. 5 EXCAVATION FOR UNDERGROUND WORK The contractor is responsible to take all necessary steps to conduct all excavation in a manner which provides for the successful completion of the proposed work while at all times maintaining the safety of the workmen, the general public and both public and private property. The contractor's methods of work will be consistent with the standard practices and requirements of all appropriate Safety Regulatory Agencies, particularly the Occupational Safety and Health Administration (OSHA) requirements for excavation. Unless otherwise specifically stated in these plans and specifications, the methods of safety control and compliance with regulatory agency safety requirements are the full and complete responsibility of the contractor. For the purposes of the Contractor's safety planning in the bidding process, the contractor is to consider all excavation to be done in the performance of this contract to be in soil classified as OSHA "Type C". The Contractor's attention is called to specific requirements of OSHA for excavation shoring, employee entry, location of excavated material adjacent to excavation, the removal of water from the excavation, surface encumbrances and in particular the requirement of SectionlV.doc Page 6 of 128 5/15/2012 , � � � � L� �� � � � � � � L � ' � � � i Section IV —Technical Specifications a"Competent Person" to control safety operations. The Contractor will identify his Competent Person to City staffat the start of construction. City staff are required from time to time to perform inspections, tests, survey location work, or other similar activity in an excavation prepared by the contractor. City staff in conformance with the OSHA Excavation Safety Requirements are to only enter an excavation in compliance with these OSHA standards. The City's staff reserve the option to refuse entry into the Contractor's excavation if, in the opinion of the City's staff, the entry into the Contractor's excavation is unsafe or does not conform OSHA requirements. If this circumstance occurs, the contractor must either provide the necessary safety requirements or provide alternate means for the accomplishment of the City's work at the Contractor's expense. The restoration quantities, if any, contained in the bid proposal for this contract to not contain � sufficient quantities to allow the contractor to perform excavation work using strictly the "open cut" method whereby no shoring systems are used and trench side slopes are cut to conform to � OSHA safety requirements without a shoring system. In addition to safety reasons, the Contractor is required to use excavation and trench-shoring methods in compliance with all safety requirements which allow the Contractor to control the amount of restoration work � � � i , � � � ' � � necessary to complete the project. Not more than one hundred (l00) feet of trench shall be opened at one time in advance of the completed work unless written permission is received from the Engineer for the distance specified. For pipe installation projects, the trench shall be six (6) inches wider on each side than the greatest external horizontal width of the pipe or conduit, including hubs, intended to be laid in them. The bottom of the trench under each pipe joint shall be slightly hollowed, to allow the body of the pipe to rest throughout its length. In case a trench is excavated at any place, excepting at joints, below the grade of its bottom as given, or directed by the Engineer, the filling and compaction to grade shall be done in such manner as the Engineer shall direct, without compensation. 6 CONCRETE Unless otherwise directed, all concrete work shall be performed in accordance with the latest editions of the Design and Control of Concrete Mixtures by the Portland Cement Association, the American Concrete Institute, and FDOT's Standard Specifications. All appropriate testing shall be performed according to the American Society of Testing Materials. Unless otherwise specified, all concrete shall have fiber mesh reinfarcing and have a minimum compressive strength of 3000 p.s.i. at 28 days. The cement type shall be Type I and shall conform to AASHTO M-85. The aggregate shall conform to ASTM C-33. All ready mix concrete shall conform to ASTM C-94. The slump far all concrete shall be in the range of 3" to 5", except when admixtures or special placement considerations are required. The Contractor shall notify the Project Inspector a minimum of 24 hours in advance of all concrete placement. All concrete shall be tested in the following manner: Placement of less than 5 cubic yards (cy) shall be tested at the Engineer's discretion. Otherwise, far each class, for each day, for every 50 cy or part thereof exceeding 5 cy, one set of 3 compressive strength cylinders will be required (1 at 7 days and 2 at 28 days). At the discretion of the Engineer, unacceptable test results may require the Contractor to provide further tests, as SectionlV.doc Page 7 of 128 5/15/2012 Section 1V —Technical Specifications determined by the Engineer, to determine product acceptability, or need for removal, and compensation or denial thereof. 7 7.1 EXCAVATION AND FORMS FOR CONCRETE WORK EXCAVATION Excavating for concrete work shall be made to the required depth of the subgrade or base upon which the concrete is to be placed. The base or subgrade shall be thoroughly compacted to a point 6" outside said concrete work before the forms are placed. Concrete shall be poured "in the d�,�� 7.2 FORMS Forms for concrete work shall be either wood or metal (except curbs, metal only, unless by written permission from Engineer). They shall be free from warps or bends, shall have a depth equal to the dimensions required for the depth of the concrete deposited against them and shall be of sufficient strength when staked to resist the pressure of concrete without moving or springing. 8 REINFORCEMENT When required, reinforcement shall be placed in the concrete work. Bar reinforcement shall be deformed: ASTMA-A 615, steel shall be billet Intermediate or Hard Grade: Rail Steel A.A.S.H.T.O. M42. Twisted Bars shall not be used, Fabric Reinforcement shall conform to the requirements ofAASHTO M55 (ASTM A185). Welded deformed steel wire fabric for Concrete reinforcement shall meet the requirements of AASHTO M 221 (ASTM A497). Epoxy coated reinforcing Steel Bars shall meetASTM 775/A77 M-86 requirements. 8.1 BASIS OF PAYMENT Reinforcement shall not be paid for separately. The cost of such work shall be included in the contract unit price for the item of work specified. 9 OBSTRUCTIONS Any pipes, conduits, wires, mains, footings, driveways, or other structures encountered shall be carefully protected from injury or displacement. Any damage thereto shall be fully, promptly, and properly repaired by the Contractor to the satisfaction of the Engineer and the owner thereof. Should it become necessary to change the position of water or gas or other pipes, sewer drains, or poles, the Engineer shall be at once notified of the locality and circumstances, and no claims for damages arising from the delay in adjusting the pipe, sewer drains or poles shall be made. Failure of the plans to show the location, nature or extent of any existing structures or obstructions shall not be the basis of a claim for extra work. Any survey monument or benchmark which must be disturbed shall be carefully referenced before removal, and unless otherwise provided for, shall be replaced upon completion of the work by a registered land surveyor. Any concrete removed due to construction requirements shall be removed to the nearest expansion joint or by saw cut. Contractor shall consult Inspector for the approved means. SectionlV.doc Page 8 of 128 5/IS/2012 , � � , � � � � � � � ��, IJ ' LJ � , , � � � � � Section 1V —Technical Specifications 10 RESTORATION OR REPLACEMENT OF DRIVEWAYS, CURBS, SIDEWALKS AND STREET PAVEMENT Driveways, sidewalks, and curbs destroyed or damaged during construction shall be replaced and shall be the same type of material as destroyed or damaged, ar to existing City Standards, whichever provides the stronger repair. All street pavement destroyed or damaged shall be replaced with the same type of material, to existing City Standards, unless the existing base is unsuitable as determined by the Engineer, then the base shall be replaced with City approved material. All replaced base shall be a minimum 8" compacted thickness, or same thickness as base destroyed plus 2", if over 6", and compacted to 98% of maximum density per AASHTO T- 180. Unless called for in the proposal as separate bid items, cost of the above work including labor, materials and equipment required shall be included in the bid price per lineal foot of main or square yard of base. The bid price for street pavement, restoration or replacement when called for in the proposals, shall include all materials, labor and equipment required to complete the work, and shall be paid for on a square yard basis. When replacement is over a trench for utilities, the area of replacement shall be limited to twice the depth of the cut plus twice the inside diameter of the pipe. All over this will be at the Contractor's expense. � The bid price for restoration or placement of driveways, curbs and sidewalks, when called for in the proposals, shall include all materials, labor and equipment required to complete the wark and shall be paid for on the basis of the following units: Driveways, plant mix - per square yard: � concrete - per square foot; curbs - per lineal foot; sidewalk 4" or 6" thick - per square foot. Concrete walks at drives shall be a minimum of 6" thick and be reinforced with 6/6 X 10/10 welded wire mesh (also see Articles 8 and 30). � � � ' The Contractor shall notify the Project lnspector a minimum of 24 hours in advance of all driveway, curb, sidewalk and street restoration and replacement work. 11 WORK IN EASEMENTS OR PARKWAYS Restoration is an important phase of construction, particularly to residents affected by the construction progress. The Contractor will be expected to complete restoration Activities within a reasonable time following primary construction activity. Failure by the Contractor to accomplish restoration within a reasonable time shall be justification for a temporary stop on primary construction activity or a delay in approval of partial payment requests. Reasonable care shall be taken for existing shrubbery. Contractor shall replace all shrubbery removed or disturbed during construction. No separate payment shall be made for this work. The contractor shall make provision and be responsible for the supply of all water, if needed, on � any and all phases of the contract wark. The contractor shall not obtain water from local residents or businesses except as the contractor shall obtain written permission. Reuse water is available for the Contractor's use without charge from the City's wastewater , treatment plants, provided the water is used on City of Clearwater contractual work. Details for Contractar to obtain and reuse water from the treatment plants will be coordinated at the pre- � SectionlV.doc Page 9 of 128 5/15/2012 ' Section 1V — Technical Specifications construction conference. The Contractor's use of reuse water must conform to all regulatory requ irements. 12 DEWATERING 12.1 GENERAL Unless specifically authorized by the Engineer, all pipe, except subdrains, shall be laid "in the dry". The contractor shall dewater trench excavation as required for the proper execution of the work, using one or more of the following approved methods: well point system, trenched gravity underdrain system, or sumps with pumps. Well point systems must be efficient enough to lower the water level in advance of the excavation and maintain it continuously in order that the trench bottom and sides shall remain firm and reasonably dry. The well points shall be designed especially for this type of service, and the pumping unit used shall be capable of maintaining a high vacuum, and at the same time, of handling large volumes of air as well as of water. The Contractor shall be responsible for disposing of all water resulting from trench dewatering operations, and shall dispose of the water without damage or undue inconvenience to the work, the surrounding area, or the general public. He shall not dam, divert, ar cause water to flow in excess in existing gutters, pavements or other structures: and to do this he may be required to conduct the water to a suitable place of discharge may be determined by the Engineer. The cost of dewatering shall be included in the unit price bid per lineal foot of pipe, or, in the case of other underground structures, in the cost of such structures. 12.2 PERMIT REQUIREMENTS 12.2.1 DEWATERING CONTROL The City of Clearwater will hold the Contractor responsible for obtaining a Generic Permit for the Discharge of Produced Groundwater from Any Non-Contaminated Site Activity prior to dewatering or discharging into the City's streets, storm sewers or waterways. Prior to discharging produced groundwater from any construction site, the contractor must collect samples and analyze the groundwater, which must meet acceptable discharge limits. The following document has been incorporated into this section for reference... 12.2.2 GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUND WATER FROM ANY NON-CONTAMINATED SITE ACTIVITY City Notification Procedure - Contractor must provide the City of Clearwater Environmental Department with the following information priar to beginning dewatering activities: l) A copy of all groundwater laboratory results 2) A copy of the FDEP Notification It is recommended that the Contractor call or meet with the City Environmental staff if you have any yuestions. You may contact the City at 562-4750 for direction or further assistance. STATE OF FLORIDA SectionlV.doc Page ]0 of 128 5/15/2012 � ' �� � � � � l� � �J ' � � ' ' � Section IV — Technical Specifications DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMITOR THE DISCHARGE OF PRODUCED GROUND WATER FROM ANY NON-CONTAMINATED SITE ACTIVITY � The facility is authorized to discharge produced ground water from any non-contaminated site activity which discharges by a point source to surface waters of the State, as defined in Chapter 62- 620, F.A.C., only if the reported values for the parameters listed in Table 1 do not exceed any of the � listed screening values. Before discharge of produced ground water can occur from such sites, analytical tests on samples of the proposed untreated discharge water shall be performed to determine if contamination exists. , , ' � � � � CJ � � � ' Minimum reporting requirements for all produced ground water dischargers. The effluent shall be sampled before the commencement of discharge, again within thirty (30) days after commencement of discharge, and then once every six (6) months for the life of the project to maintain continued coverage under this generic permit. Samples taken in compliance with the provisions of this permit shall be taken prior to actual discharge or mixing with the receiving waters. The ef�luent shall be sampled for the parameters listed in Table l. �r:�:3��i Screening Values for Discharges into: Parameter Fresh Waters Coastal Waters Total Organic Carbon (TOC) 10.0 mg/1 10.0 mg/1 PH, standard units 6.0-8.5 6.5-8.5 Total Recoverable Mercury — by Method 1631 E 0.012 µg/1 0.025 µg/1 Total Recoverable Cadmium 9.3 µg/1 9.3 µg/1 Total Recoverable Copper 2.9 µg/1 2.9 µg/1 Total Recoverable Lead 0.03 mg/I 5.6 µg/1 Total Recoverable Zinc 86.0 µg/1 86.0 µg/1 Total Recoverable Chromium (Hex.) ] l.0 µg/1 50.0 µg/1 Benzene 1.0 µg/1 1.0 µg/1 Naphthalene 100.0 µg/1 l 00.0 µg/1 If any of the analytical test results exceed the screening values listed in Table 1, except TOC, the discharge is not authorized by this permit or by the City of Clearwater. (a) For initial TOC values that exceed the screening values listed in Table 1, which may be caused by naturally occurring, high molecular weight organic compounds, the permittee may request to be exempted from the TOC SectionlV.doc Page 11 of 128 5/15l2012 (b) Section 1V —Technical Specifications requirement. To request this exemption, the permittee shall submit additional information with a Notice of Intent (NOI), described below, which describes the method used to determine that these compounds are naturally occurring. The Department shall grant the exemption if the permittee affirmatively demonstrates that the TOC values are caused by naturally occurring, high molecular weight organic compounds. The NOI shall be submitted to the appropriate Department district office thirty (30) days prior to discharge, and contain the following information: l. the name and address of the person that the permit coverage will be issued to; 2. the name and address of the facility, including county location; 3. any applicable individual wastewater permit number(s); 4. a map showing the facility and discharge location (including latitude and longitude); 5. the name of the receiving water; and 6. the additional information required by paragraph (3)(a) of this permit. (c) Discharge shall not commence until notification of coverage is received from the Department. For fresh waters and coastal waters, the pH of the effluent shall not be lowered to less than 6.0 units for fresh waters, or less than 6.5 units for coastal waters, or raised above 8.5 units, unless the permittee submits natural background data confirming a natural background pH outside of this range. If natural background of the receiving water is determined to be less than 6.0 units for fresh waters, or less than 6.5 units in coastal waters, the pI-I shall not vary below natural background or vary more than one (1) unit above natural background for fresh and coastal waters. If natural background of the receiving water is determined to be higher than 8.5 units, the pH shall not vary above natural background or vary more than one (1) unit below natural background of fresh and coastal waters. The permittee shall include the natural background pH of the receiving waters with the results of the analyses required under paragraph (2) of this permit. For purposes of this section only, fresh waters are those having a chloride concentration of less than I500 mg/1, and coastal waters are those having a chloride concentration equal to or greater than I 500 mg/1. In accordance with Rule 62-302.500(1)(a-c), F.A.C., the discharge shall at all times be free from floating solids, visible foam, turbidity, or visible oil in such amounts as to form nuisances on surface waters. If contamination exists, as indicated by the results of the analytical tests required by paragraph (2), the discharge cannot be covered by this Generic Permit. The facility shall apply for an individual wastewater permit at least ninety (90) days priar to the date discharge to surface waters of the State is expected, or, if applicable, the facility may seek coverage under any other applicable Department generic permit. No discharge is permissible without an effective permit. If the analytical tests required by paragraph (2) reveal that no contamination exists from any source, the facility can begin discharge immediately and is covered by this permit without having to submit an NOI request for coverage to the Department. A short summary of the proposed activity and copy of the analytical tests shall be sent to the applicable Department district office within one (1) week after discharge begins. These analytical tests shall be kept on site during SectionlV.doc Page 12 of 128 5/IS/2012 i �_ � � � � ' � , � � � � � � ' � � ' , , , � � � ' � ' ' � � � �� � , � l 1 Section 1V —Technical Specifications discharge and made available to the Department if requested. Additionally, no Discharge Monitoring Report forms are required to be submitted to the Department. All of the general conditions listed in Rule 62-621.250, F.A.C., are applicable to this Generic Permit. There are no annual fees associated with the use ofthis Generic Permit. 13 SANITARY MANHOLES 13.1 BUILT UP TYPE Manholes shall be constructed of brick with cast iron frames and covers as shown on the drawings. Invert channels shall be constructed smooth and semicircular in shape conforming to inside of adjacent sewer section. Changes in direction of flow shall be made in a smooth curve of as large a radius as possible. Changes in size and grade of channels shall be made gradually and evenly. Invert channels shall be formed by one of the following methods: form directly into concrete manhole base, build up with brick and mortar, lay half tile in concrete, or lay full section of sewer pipe through manhole and break out top half of pipe. The manhole floor outside of channels shall be made smooth and sloped toward channels. Free drop in manholes from inlet pipe invert to top of floor outside the channels shall not exceed twenty four inches. Standard Drop Manholes shall be constructed wherever free drop exceeds twenty four inches. Manhole steps shall not be provided. Joints shall be completely filled and the mortar shall be smoothed from inside of manholes. The entire exterior of brick manholes shall be plastered with one half inch of mortar. Brick used may be solid only. Brick shall be laid radially with every sixth course being a stretcher course. 13.2 PRECAST TYPE Precast Sanitary Manholes shall conform to this specification unless otherwise approved by the City Engineer. AASHTO M 85 Type II cement shall be used throughout with a minimum wall thickness of 5 inches. The precast sections shall conform to ASTM C 478 latest revision. Section joints shall be a tongue and groove with "ram neck" gasket or "O" ring to provide a watertight joint. Minimum concrete strength shall be 4000 psi at 28 days. Three sets of shop drawings and location inventory shall be submitted to the City Engineer for approval. Approval of shop drawings does not relieve contractor of responsibility for compliance to these specifications unless letter from contractor requesting specific variance is approved by the City Engineer. Location inventory submitted with shop drawing shall detail parts of manhole per manhole as numbered on the construction plans. All manhole parts shall be numbered or lettered before being sent to the job site to permit proper construction placement. A plan or list of the numbering system shall be present on the job site when manhole components are delivered. Precast manhole dimensions, drop entry, grout flow of channel, etc., shall be as shown on City of Clearwater Engineering Index #302 Sheets 1 and 2 of 2. SectionIV.doc Page l3 of 128 5/15/2012 Section IV —Technical Specifications Manhole sections shall be rejected if abused during shipping or placement and if pipe openings are not properly aligned. The "break in" to precast manholes for pipe entry will not be allowed. The manhole base shall be set on a pad of A l or A 2 Classification soil approximately five (5) inches thick to secure proper seating and bearing. 13.2.1 MANHOLE ADJUSTMENT RINGS (GRADE RINGS) Between the top of the manhole cone and the manhole cover frame, a manhole adjustment ring shall be installed. The intent of the manhole adjustment ring is to accommodate future grade changes without disturbing the manhole. See Section IV, Article 23.7 — Asphaltic Concrete — Adjustment of Manholes. 13.3 DROP MANHOLES Standard drop inlets to manholes shal) be constructed of commercial pipe, fittings and specials as detailed on the drawings. 13.4 FRAMES AND COVERS Manhole frames and covers shall be set in a full bed of mortar with the top of the cover flush with or higher than finished grade as directed. Refer to Detail 301. 13.5 MANHOLE COATINGS The exterior and interiar of all built up manholes shall be coated with two (2) coats of Type II Asphalt emulsion, moisture and damp proof (Specification ASTM D 1227 Type II Class I) as manufactured by W.R. Meadows Sealtite or approved equal. Interior of built up manholes which have sewers entering with a free drop or which receive discharge from a force main shall have the inside plastered with 1/2-inch of grout and coated as precast manholes below. The exterior of all precast manholes shall have a 15 mil dry thickness of PROCO EP214-351 Sewper Coating or approved equal. The interior shall be AGRU SUREGRIP HDPE or PP-R Liner with a minimum thickness of 2 mm. 13.6 CONNECTIONS TO MANHOLES Connections to existing sanitary manholes using approved PVC sewer main shall be made with a manhole adapter coupling by Flo Control, Inc., or approved water stop coupling. 14 BACKFILL Material for backfill shall be carefully selected from the excavated material or from other sources as may be required by the Engineer. Such material shall be granular, free from organic matter or debris, contain no rocks or other hard fragments greater than 3" in the largest dimension and all fill shall be similar material. Backfill placed around pipes shall be carefully placed around the sides and top of pipe by hand shovels and thoroughly compacted to l2" above the pipe by tamping or other suitable means. Backfill under all types of paving shall be compacted in layers not to exceed 12" in thickness unless alternate method is approved by the Engineer. Backfill shall be a minimum of 98% compaction as determined by the modified Proctor Density Test to the bottom of pavement. SectionN.doc Page 14 of 128 5/IS/2012 � , � � � � � � � ' � LJ � � � � , � , ' , ' ' Section IV —Technical Specifications Backfill outside of pavement areas shall be compacted the futl depth to the ground surface to a minimum of 95% compaction ofAASHTO T 180 Standard Density Test. The cost of backfill shall be included in the unit price bid per lineal foot of the pipe, or, in the case of other underground structures, in the cost of such structure. 15 STREET CROSSINGS, ETC. At such crossings, and other points as may be directed by the Engineer, the trenches shall be ' bridged in an open and secure manner, so as to prevent any serious interruption of travel upon the roadway or sidewalk, and also to afford necessary access to public or private premises. The material used, and the mode of constructing said bridges, and the approaches, thereto, must be � � , � satisfactory to the Engineer. The cost of all such work must be included in the cost of the trench excavation. 16 RAISING OR LOWERING OF SANITARY SEWER, STORM DRAINAGE STRUCTURES Sanitary Sewer or Storm Drainage Structures shall be raised or lowered as indicated on the plans or as indicated by the Engineer. 16.1 BASIS OF PAYMENT Payment, unless covered by a bid item, shall be included in the cost of the work. , 17 UNSUITABLE MATERIAL REMOVAL All unsuitable material, such as muck, clay, rock, etc., shall be excavated and removed from the ' site. All material removed is property of the Contractor, who shall dispose of said material off- site at his expense. The limits of the excavation shall be determined in the field by the Engineer. ' ' ' � � LJ � � 17.1 BASIS OF MEASUREMENT The basis of ineasurement shall be the amount of cubic yards of unsuitable material excavated and replaced with suitable material as determined by either cross sections of the excavation, truck measure, or lump sum as specified in the Scope of Work and Contract Proposal. 17.2 BASIS OF PAYMENT The unit price for the removal of unsuitable material shall include: all materials, equipment, tools, labor, disposal, hauling, excavating, dredging, placing, compaction, dressing surface and incidentals necessary to complete the work. If no pay item is given, the removal of unsuitable material sha11 be included in the most appropriate bid item. 18 UNDERDRAINS The Contractor shall construct sub-surface drainage pipe as directed in the Contract Scope of Work and detail drawings contained in the Project construction plans. In general, underdrain pipe shall be embedded in a bed of #6 FDOT crushed aggregate, located behind the back of curb and aggregate surface covered with a non-degradable fibrous type filter material. A#57 aggregate may be used in lieu of #6 if it is washed and screened to remove fines. The aggregate may be stone, slag or crushed gravel. Unless otherwise noted on the plans, underdrain pipe shall be 8" SectionIV.doc Page 15 of 128 5/15/2012 Section 1V—Technical Specifications diameter, polyvinyl chloride pipe, in conformance with ASTM F-758 "Standard Specification For Smooth Wall PVC Underdrain Systems for Highways' latest revision, minimum stiffness of 46 in conformance with ASTM D2412, perforations in conformance with AASHTO M-189 described in FDOT Section 948-4.5 or latest revision and in conformance with ASTM D3034 - SDR 35. Alternate acceptable underdrain pipe material is Contech A-2000 which is a rigid PVC pipe exceeds ASTM Specifications D1784, minimum cell classification of 12454B or 12454C, manufactured per ASTM F949-93a, minimum pipe stiffness of 50 psi, with no evidence of splitting, cracking or breaking when pipe is tested in accordance with ASTM D2412 at 60% flatting and with a double gasket joint. Underdrain pipe placed beneath existing driveways and roadways shall be non-perforated pipe with compacted backfill. All poly-chloride pipe which has become deteriorated due to exposure to ultra violet radiation shall be rejected. Where ductile iron pipe is specified, pipe material shall be the same as specified for potable water pipe in these technical specifications. All underdrain aggregate shall be fully encased in a polyester filter fabric "sock" (Mirafi 140-N or approved equal) per the construction detail drawings. 18.1 BASIS OF MEASUREMENT Measurement shall be the number of lineal feet of 8" Sub-drain in place and accepted. 18.2 BASIS OF PAYMENT Payment shall be based upon the unit price per lineal foot for underdrain as measured above, which shall be full compensation for al] work described in this section of the specifications and shall include all materials, equipment, and labor necessary to construct the underdrain (specifically underdrain pipe, aggegate and filter fabric). Underdrain clean-outs, sod, driveway, road and sidewalk restoration shall be paid by a separate bid item. 19 STORM SEWERS All storm drain pipe installed within the City of Clearwater shall be reinforced concrete unless otherwise specified or approved by the City Engineer. Said pipe shall comply with Section 941 of the current FDOT Specifications. All reinforced concrete pipe joints shall be wrapped with Mirafi 140N filter fabric or equivalent (as approved by the City Engineer). The cost far all pipe joint wraps shall be included in the unit price for the pipe. All pipe, just before being lowered into a trench, is to be inspected and cleaned. tf any difficulty is found in the fitting the pieces together, this fitting is to be done on the surface of the street before laying the pipe, and the tops plainly marked in the order in which they are to be laid. No pipe is to be trimmed or chipped to fit. Each piece of pipe is to be solidly and evenly bedded, and not simply wedged up. Before finishing each joint, some suitable device is to be used to find that the inverts coincide and pipe is clear throughout. 19.1 AS BUILT INFORMATION The Contractor shall submit to the Engineer the stations and left or right offsets of all manholes, inlet structures and terminals ends of subdrains, as measured from the nearest downstream SectionIV.doc Page 16 of 128 5/15/2012 ' � � � L� ' � � � ' � � � � �� � LJ � � ' ' ' ' �J , L� ' � Section IV —Technical Specifications manhole along the centerline of the sewer along with the elevations of the north edge of manhole cover, inverts of all pipe in structures, and the flow line of inlets. (Gutter) 19.2 TESTING The Contractor shall take all precautions to secure a perfectly watertight sewer under all conditions. At the discretion of the City Engineer or his designee, the watertightness of a sewer which has a crown lying below groundwater level may be tested by measuring the infiltration. The watertightness of sewers having crowns lying above groundwater level may be tested by filling the pipe with water so as to produce a hydrostatic head of two feet or more above the crown of the sewer at the upper end of the test section of the water table outside of the sewer, whichever is higher, and then measuring the exfiltration. In no case shall the infiltration or exfiltration exceed 150 gallon per inch of diameter per mile per day. The Contractor shall furnish all labor, materials and equipment to test the amount of infiltration or exfiltration under the Engineer's direction. Where the infiltration or exfiltration is excessive the Contractor at his own expense shall take the necessary steps to remedy such conditions by uncovering the sewer, remaking the joints or by replacing the entire length of sewer as required by the Engineer. No trench made joints may be backfilled until after they have been tested and found to be acceptable. Care shall be taken to avoid flotation. The above tests shall be performed at the discretion of the Engineer on any or all sections of the line. 19.3 BASIS OF PAYMENT � Payment shall be the unit price per lineal foot for storm sewer pipe in place and accepted, measured along the centerline of the storm sewer pipe to the inside face of exterior walls of storm manholes or drainage structures and to the outside face of endwalls. Said unit price � includes all work required to install the pipe (i.e. all materials, equipment, filter fabric wrap, labor and incidentals, etc.). � 20 SANITARY SEWERS AND FORCE MAINS ' 20.1 MATERIALS 20.1.1 GRAVITY SEWER PIPE GRAVITY SEWER PIPE SHALL BE POLYVINYL CHLORIDE OR DUCTILE IRON. ' Polyvinyl chlaride pipe and fittings shall conform with ASTM specification D 3034 for S.D.R. 35. Sewer pipe with more than 10 feet of cover shall be SDR 26. The pipe shall be plainly marked with the above ASTM designation. The bell end of joints and fittings sha}1 have a rubber , sealing ring to provide a tight flexible seal in conformance with ASTM D 3212 76. The laying length of pipe joints shall be a maximum of 20-feet. , Unless otherwise noted in these specifications or construction plans, Ductile Iron pipe and fittings for gravity sewer shall conform to Section 41 of these Technical Specifications for DIP water main except pipe shall be interior "polylined" in accordance with manufacturer's ' recommendations. Where sanitary sewer main is to be placed between building lots in a sideline easement, the sewer main shall, insofar as possible, be constructed without manholes or lateral connections within the side easement. The pipe material in the side easement between streets ' SectionN.doc Page 17 of l28 5/IS/2012 , Section IV—Technical Specifications shall be C 900, SDR 18 polyvinyl chloride water main pipe as described in Technical Section 41 A two-way cleanout shall be installed on each lateral at the property line. 20.1.2 FORCE MAIN PIPE FORCE MAIN PIPE SHALL BE POLYVINYL CHLORIDE OR DUCTILE IRON. Unless otherwise noted in the specifications or construction plans, both polyvinyl chloride and ductile iron force main pipe and fittings shall conform to Section 41 of these Technical Specifications for water main pipe except that DIP shall be "polylined" in accordance with manufactures recommendations. All polyvinyl chloride pipe which has become deteriorated due to exposure to ultra violet radiation shall be rejected. 20.2 INSTALLATION 20.2.1 GRAVITY SEWER PIPE Installation of gravity sewer pipe shall be in conformance with recommended practices contained in ASTM D 2321 and Unibell UNI B 5. The bottom trench width in an unsupported trench shall be limited to the minimum practicable width (typically pipe OD plus 8 to 12-inch on each side) allowing working space to place and compact the haunching material. The use of trench boxes and movable sheeting shall be performed in such a manner that removal, backfill and compaction will not disturb compaeted haunching material or pipe alignment. Dewatering of the trench bottom shall be accomplished using adequate means to allow preparation of bedding, placement of the haunching material and pipe in the trench without standing water. Dewatering shall continue until sufficient backfill is placed above the pipe to prevent flotation or misalignment. Where pipe bedding is insufficient to adequately support pipe, the contractor will be required to remove unsuitable material and bed pipe in Class I material (1/2" Dia. aggregate) to provide firm support of pipe. Connections to manholes with sanitary pipe shall use a joint 2 feet in length and shall use an approved water stop around pipe joint entry. The laterals shown on the plans do not necessarily reflect exact locations. The contractor is required to locate all existing laterals for reconnection and to coordinate with the construction inspector the location of all new laterals. 20.2.2 FORCE MAIN PIPE Installation of force main pipe shall be in conformance with Section 41 of these Technical Specifications for water main pipe. 20.3 AS BUILT DRAWINGS The contractor shall submit to the Engineer a marked set of "As Built" construction drawings describing both the stations and left or right offset of all lateral terminal ends as measured from the nearest downstream manhole along the center line of the sewer main. The as built drawings SectionlV.doc Page 18 of 128 5/15/2012 ' , , , LJ , L! ' � � � � , , ' , , r , ' , LJ ' Section 1V —Tech�ical Specitications will also describe elevations of the north edge of the manhole cover rings and inverts of all main pipes in manholes. 20.4 TESTING 20.4.1 TESTING OF GRAVITY SEWERS The Contractor shall take all precautions to secure a perfectly water tight sewer under all � conditions. The water tightness of a sewer which has a crown lying below groundwater level may be tested by measuring infiltration. The water tightness of sewers having crowns lying above groundwater level may be tested by filling the pipe with water so as to produce a ' hydrostatic head of two feet or more above the crown of the sewer at the upper end of the test section or the water table outside of the sewer, whichever is higher, and then measuring the exfiltration. In no case shall the infiltration or exfiltration exceed 50 gallon per mch of diameter , per mile per day. The Contractor shall furnish all labor, materials and equipment to test the amount of infiltration or exfiltration under the Engineer's direction. Where the infiltration or exfiltration is excessive, the Contractor at his own expense shall take the necessary steps to remedy such conditions by uncovering the sewer, remaking the joints or by replacing the entire ' length of sewer as required by the Engineer. No such repaired joints may be backfilled until after they have been tested and found to be acceptable. Care shall be taken to avoid flotation. The Contractor shall TV inspect all mains to verify the true and uniform grade and the absence of � bellies or dropped joints prior to acceptance. Any infiltration, dips or sags of more than l/4- inches shall be cause for rejection. � � , ' ' ' ' ' ' , The above tests shall be performed at the discretion of the Engineer on any or all sections of the line. 20.4.2 TESTING OF FORCE MAINS Force mains shall be tested under a hydrostatic pressure of ] 50 P.S.I. for two (2) hours, as described in Section 41.04 of these Technical Specifications for the testing of water mains. 20.5 BASIS OF PAYMENT 20.5.1 GRAVITY SEWER PIPE Payment for in place sanitary sewer gravity main pipe shall be the unit price per lineal foot per appropriate range of depth of cut as contained in the contract proposal. Measurement for payment shall be along the centerline of the sewer main from center to center of manholes. Payment for laterals shall be the unit price per lineal foot of pipe as measured from the centerline of the sewer main pipe to the terminal end of the lateral pipe including a two-way cleanout at the property line. Payment for sewer pipe shall include all labor, equipment and materials necessary to complete the installation. This shall include clearing and grubbing, excavation, shoring and dewatering, backfill and grading. 20.5.2 FORCE MAIN PIPE Payment and measurement of force main pipe shall be the same as described in Section 41 of these Technical Specifications for water main pipe. SectionIV.doc Page 19 of 128 5/15/2012 Section IV —Technical Specifications 21 DRAINAGE The Contractor shall provide proper outlet for all water courses and drains interrupted during the progress of the work and replace them in as good condition as he found them. 22 ROADWAY BASE AND SUBGRADE 22.1 BASE This specification describes the construction of roadway base and subgrade. The Contractor shall refer to Section iV, Article 1"Scope of Work" of the city's Contract Specifications for additional roadway base and subgrade items. Roadway base shall be 8" compacted minimum thickness unless otherwise noted on the plans or directed by the Engineer. The subgrade shall be 12" compacted minimum thickness with a minimum Limerock Bearing Ratio (LBR) of 40 unless otherwise noted on the plans or directed by the Engineer. The Contractor shall obtain from an independent testing laboratory a Proctor and an LBR for each type material. The Contractor shall also have an independent testing laboratory perform all required density testing. Where unsuitable material is found within the limits of the base, Section IV, Article l7 (Unsuitable Material Removal) of the city's Contract Specifications will apply. Once the roadway base is completed, it shall be primed that same day (unless otherwise directed by the Engineer) per Section 300 of FDOT's Standard Specifications (latest edition). Repairs required to the base that result from a failure to place the prime in a timely manner shall be done to the City's satisfaction, and at the Contractor's expense. No paving of the exposed base can commence until the City approves the repaired base. The cost for placement of prime material shall be included in the bid item for base. The Contractor shall notify the Project Inspector a minimum of 24 hours in advance of all base and subgrade placement or reworking. The following base materials are acceptable: 1. SHELL BASE: Shell base shall be constructed in accordance with Sections 200 and 913 of FDOT's Standard Specifications (latest edition), and shall have a minimum compacted thickness as shown on the plans. The shell shall be FDOT approved. The cost of the prime coat shall be included in the bid item price for base. 2. LIMEROCK BASE: Limerock base shall be constructed in accordance with Sections 200 and 911 of FDOT's Standard Specifications (latest edition), and shall have a minimum compacted thickness as shown on the plans. The limerock shall be from a FDOT approved certified pit. The cost of the prime coat shall be included in the bid item price for base. 3. CRUSHED CONCRETE BASE: Crushed concrete base shall be constructed in accordance with Sections 204 and 901 of FDOT's Standard Specifications (latest edition), and shall have a minimum compacted thickness as shown on the plans. The crushed concrete material shall be FDOT approved. The Contractor shall provide certified laboratory tests on gradation to confirm that the crushed concrete base material conforms to the above specifications. The LBR shall be a minimum of 185. LBR and gradation tests shall be provided to the city by the Contractor once a week for continuous operations, or every 1000 tons of material, unless requested more frequently by the City SectionIV.doc Page 20 of 128 ' � ' ' LJ , ' ' �� � ' C ' , I� ' , 5/15/2012 ' , � 1 ' ' � , ' , CJ �'� ' � ' ' C ' ' Section 1V — Technical Specifications Engineer or designee. The eost of the prime coat shall be included in the bid item price for base. 4. SOIL CEMENT BASE: Unless otherwise noted, soil cement base shall be constructed in accordance with Section 270 of FDOT's 2000 Standard Specifications, and shall have a minimum compacted thickness as shown on the plans. An Asphalt Rubber Membrane Interlayer (ARMI) shall be included in the pavement design per Section 34l of FDOT's Standard Specifications (latest edition) to minimize reflective cracking unless otherwise noted in the project plans and specifications. The ARMI layer shall be overlaid with asphalt on the same day it is placed for the Contractor to receive full compensation for the work. The soil cement base design shall be by a certified lot under the direction of a Registered Florida Professional Engineer, and must be approved by the City Engineer. Said design shall provide for a minimum of 300 P.S.I. in seven days. All plant mixed soil cement shall be certified by a registered laboratory that has been approved by the Engineer. The only approved method for spreading the cement is the use of a spreader box. The use of a spreader bar for spreading cement will not be allowed. The applying of the cement shall not be allowed when the wind velocity is sufflcient to jeopardize material interests (i.e. vehicles, etc.) from airborne cement particles. The density testing frequency shall be at the discretion of the registered Florida Professional Engineer responsible for the soil cement design. 5. ASPHALT BASE: Full depth asphalt base shall be constructed in accordance with Section 280 of FDOT's 2000 Standard Specifications, and shall have a minimum compacted thickness as shown on the plans. The cost for preparation, placement and compaction shall be included in the per ton unit cost for asphalt unless otherwise noted in the project scope and plans. The cost of the tack coat shall be included in the bid item price for asphalt or base. 6. REWORKED BASE: When the plans call for the working of the existing base, the finished reworked base shall have a minimum compacted thickness of 8" unless otherwise shown on the plans or directed by the Engineer, and be constructed in accordance with the applicable FDOT requirements for the type of material used. The density requirements (except for asphalt and soil cement base) shall be per Section 200-7 of FDOT's Standard Specifications (latest edition). For asphalt, the density requirements are per Section 330-11 and for soil cement per Section 270-5 of FDOT's 2000 Standard Specifications. 22.1.1 BASIS OF MEASUREMENT FOR BASE AND REWORKED BASE The basis of ineasurement shall be the number of square yards of base in place and accepted as called for on the plans. The maximum allowable deficiency shall be a half-inch (1/2"). Areas deficient in thickness shall either be fixed by the Contractor to within acceptable tolerance, or if so approved in writing by the City Engineer, may be left in place. No payment, however, will be made for such deficient areas that are left in place. 22.1.2 BASIS OF PAYMENT FOR BASE AND REWORKED BASE The unit price for base shall include: all materials, roadbed preparation, placement, spreading, compaction, finishing, prime, base, subgrade (unless the plans specify a separate pay item), ' SectionlV.doc � Page 21 of 128 5/I S/2012 Section IV — Technica) Specifications stabilization, mixing, testing, equipment, tools, hauling, labor, and all incidentals necessary to complete the work. Payment for asphalt base shall be included in the per ton unit cost for asphalt unless otherwise noted in the project scope and plans. 22.2 SUBGRADE All subgrade shall be stabilized and constructed in accordance with Sections 160 and 9l4 of FDOT's Standard Specifications (latest edition) unless otherwise noted herein. All subgrade shall have a minimum compacted thickness of 12" unless otherwise shown on the plans or directed by the Engineer. If limerock is used, it shall also meet the requirements of Section 911 of FDOT's Standard Specifications (latest edition). Where unsuitable material is found within the limits of the subgrade, Section IV, Article 17 (Unsuitable Material Removal) of the city's Contract Specifications will apply. The extent of said removal shall be determined by the Engineer in accordance with accepted construction practices. The Contractor is responsible for clearing, grading, filling, and removing any trees or vegetation in the roadbed below the subgrade to prepare it per the plans. The cost of this work shall be included in the unit price for base or subgrade. The Contractor shall obtain from an independent testing laboratory the bearing value after the mixing of materials for the stabilized subgrade. 22.2.1 BASIS OF MEASUREMENT The basis of ineasurement shall be the number of square yards of stabilized subgrade in place and accepted as called for on the plans. The maximum allowable deficiency for mixing depth shall be per Section ] 61-6.4 of FDOT's 2000 Standard Specifications. Acceptable bearing values shall be per Section 160-7.2 of FDOT's 2000 Standard Specifications. Areas deficient in thickness or bearing values shall either be corrected by the Contractor to within acceptable tolerance, or if so approved in writing by the City Engineer, may be left in place. No payment, however, will be made for such deficient areas that are left in place (latest edition). 22.2.2 BASIS OF PAYMENT The unit price for subgrade shall include: roadbed preparation, placement, spreading, compaction, finishing, testing, stabilizing, mixing, materials, hauling, labor, equipment and all incidentals necessary to complete the work. If no pay item is given, subgrade shall be included in the bid item for base. 23 ASPHALTIC CONCRETE MATERIALS This specification is for the preparation and application of all S-Type Marshall Mix Design asphaltic concrete materials on roadway surfaces unless otherwise noted. 23.1 ASPHALTIC CONCRETE 23.1.1 AGGREGATE All aggregates shall be obtained from an approved FDOT source and shall conform to Sections 901 through 9l 5 of FDOT's 2000 Standard Specifications. 23.1.2 BITUMINOUS MATERIALS All bituminous materials shall conform to Section 916 of FDOT's 2000 Standard Specifications. SectionlV.doc Page 22 of 128 � , ' ' � ' , ' ' � , � , , �_J , , siisi2oi2 , � , ' ' ' Section IV—Technical Specifications 23.2 HOT BITUMINOUS MIXTURES - PLANT, METHODS, EQUIPMENT & QUALITY ASSURANCE The plant and methods of operation used to prepare all asphaitic concrete and bituminous materials shall conform to the requirements of Section 320 of FDOT's Standard Specifications (latest edition). Unless otherwise noted, all acceptance procedures and quality control/assurance procedures shall conform to the requirements of Section 330 of FDOT's 2000 Standard Specifications. � The Contractor shall note that the City shall have the right to have an independent testing laboratory select, test, and analyze, at the expense of the City, test specimens of any or all materials to be used. Tests to be performed by the independent testing laboratory every 1000 tons ' include, but are not limited to, Marshall stability and flow, extraction/gradation and cores to determine density and thickness. The results of such tests and analyses shall be considered, along with the tests or analyses made by the Contractor, to determine compliance with the applicable ' specifications for the materials so tested or analyzed. The Contractor hereby understands and accepts that wherever any portion of the work is discovered, as a result of such independent testing or investigation by the City, which fails to meet the requirements of the Contract ' documents, all costs of such independent inspection and investigation as well as all costs of removal, correction, reconstruction, or repair of any such work shall be borne solely by the Contractor. ' ' � � , ' ' , Payment reductions for asphalt related items shall be determined by the followin�: 1. Density per Section 330-11 of FDOT's 2000 Standard Specifications. 2. Final surface or friction course tolerances per Section 330-13 of FDOT's 2000 Standard Specifications. 3. Thickness will be determined from core borings. Deficiencies of '/4" or greater shall be corrected by the Contractor, without compensation, by either replacing the full thickness for a length extending at least 25' from each end of the deficient area, or when the Engineer allows for an overlay per Section 330-15.2.3 of FDOT's Standard Specifications 2000 edition. In addition, for excesses of'/4" or greater, the Engineer will determine if the excess area shall be removed and replaced at no compensation, or if the pavement in question can remain with payment to be made based on the thickness specified in the contract. The Contractor shall notify the Project Inspector a minimum of 24 hours in advance of the placement of all as�halt. 23.3 ASPHALT MIX DESIGNS AND TYPES All asphalt mix designs shall conform to the requirements of Sections 331 and 337 of FDOT's 2000 Standard Specifications. All asphalt mix designs shall be approved by the Engineer PRIOR to the commencement of the paving operation. Reclaimed asphalt pavement (RAP) material may be substituted for aggregate in the asphaltic concrete mixes up to 25% by weight. 23.4 ASPHALT PAVEMENT DESIGNS AND LAYER THICKNESS ' All asphalt pavement designs shall conform to the following requirements: � SectionIV.doc L Page 23 of 128 5/I S/2012 Section IV — Technical Specifications Table 1: Layer Thickness for Asphalt (Layers Are Listed in Sequence of Construction) COURSE LAYER THICKNESS (Inches) THICKNESS (Inches) Type S-1 Type S-I with Type S—III FC-3 Type S—III Type S—I Type S—III with FC-3 with FC-3 Top Layer Top Layer Top Layer ] st 2nd l st 2"a l st 2nd 1 st 2°d l st 2nd l st 2nd 1 l l l %z 1 '/z 2 � ��4 3�4 * � l 2��2 ���4 /��4 1��2 � 1��2 1 3 1'/2 1%z 2 l 2 1 * At the Engineer's discretion, 2" of S-III is acceptable for use on residential streets Additional Notes: l. Type S—III shall be limited to the final (top) structural layer (one layer only). 2. All asphalt pavement designs shall conform to the requirements of Sections 331 and 337 of FDOT's 2000 Standard Specifications. 3. All pavement designs shall include a minimum of two inches of asphalt. 4. The Contractor shall be responsible to review the project plans for complete pavement design detail. 5. Unless otherwise specified on the plans, Type S—Ill per Section 331 of FDOT's 2000 Standard Specifications shall be used as final riding surface on streets with the speed limit of less than 35 mph, streets with an average daily traffic (ADT) of less than 3000, and all residential streets. 6. An FC-3 friction course per Section 337 of FDOT's 2000 Standard Specifications shall be used on streets with a speed limit of 35 mph or greater, and streets with an ADT of 3000 or greater. 23.5 GENERAL CONSTRUCTION REQUIREMENTS The general construction requirements for all hot bituminous pavements (including limitations of operations, preparation of mixture, preparation of surface, placement and compaction of mixture, surface requirements, correction of unacceptable pavement, etc.) shall be in accordance with Section 330 of FDOT's 2000 Standard Specifications. SectionlV.doc Page 24 of 128 5/15/2012 ' ' ' ' ' � ' ' ' ' � � ' � , ' '� � , u ' , , Section IV —Technical Specifications 23.6 CRACKS AND POTHOLE PREPARATION 23.6.1 CRACKS Cracks in roadway pavement shall be repaired prior to the application of asphaltic concrete by the following steps: l. All debris to be removed from cracks by compressed air or other suitable method. � 2. Apply a multiple layered application of bituminous binder and fine aggregate, as appropriate to the depth of the crack until the void of the crack is completely filled to the level of the surrounding roadway surface. ' ' � � , ' II � 1 ' ' � �� 3. If application of asphaltic concrete is not to begin immediately after crack repair, cracks are to be sanded to prevent vehicular tracking. 4. Payment for crack filling shall be included in the unit price for asphaltic concrete. 23.6.2 POTHOLES Potholes shall be repaired prior to the application of asphaltic concrete by the following steps: 1. All debris is to be removed from potholes by hand, sweeping, or other suitable method. 2. A tack coat is to be applied to the interior surface of the pothole. 3. The pothole is to be completely filled with asphaltic concrete, and thoroughly compacted. 4. Payment for pothole preparation shall be included in the unit price for asphaltic concrete. 23.7 ADJUSTMENT OF MANHOLES The necessary adjustments of sanitary sewer and storm drain manholes and appurtenances shall be accomplished by the Contractor. The Contractor shall be paid on a per unit basis for each item. The use of manhole adjustment risers is acceptable under the following conditions: The riser shall meet or exceed all FDOT material, weld, and construction requirements. The riser shall consist of an A-36 hot rolled steel meeting or exceeding the minimum requirements of A.S.T.M. A-36. The riser shall be a single piece with a stainless steel adjustment stud and shall have a rust resistant finish. The use of cast iron, plastic, or fiberglass risers is not permitted. In addition, the installation of each riser shall be per manufacturer's specifications. Each manhole shall be individually measured, and each riser shall be physically marked to ensure that the proper riser is used. Also, the ring section shall be cleaned, and a bead of chemically resistant epoxy applied to the original casting, prior to installation of the riser. It is the Contractors responsibility to ensure that the manholes are measured, the risers are physically marked, the ring sections are thoroughly cleaned, and that the epoxy is properly applied prior to installation of each riser. If risers are not used, the adjustment of manholes shall be accomplished by the removal of pavement around manhole, grade adjustment of ring and cover, and acceptable replacement and compaction of roadway materials prior to paving. A full depth backfill using asphalt is acceptable. The use of Portland cement for backfill is not acceptable. ' SectionIV.doc L Page 25 of 128 5/15/2012 Section IV — I�echnical Specifications All manhole and valve adjustments shall be accomplished prior to the application of final asphaltic concrete surface. Unless otherwise noted in the specs or on the plans, the paving operation shall occur within seven (7) calendar days from the completion of the adjustment. On arterial roadways, the manholes are to be ramped with asphalt during the time period between initial adjustment and final resurfacing. Water and gas valves, sewer cleanouts, valve boxes, tree aeration vents, etc. will be adjusted by the Contractor with the cost for this work to be included in the unit cost of the asphalt. Care must be taken around said appurtenances to ensure that they are not paved over. It is the Contractor's responsibility to inform the owners of all utilities of impending work and coordinate their adjustments so they are completed prior to the scheduled paving. 23.8 ADDITIONAL ASPHALT REQUIREMENTS l. All impacted radius returns within project limits shall be paved unless otherwise directed by the Construction Inspector or Engineer, with payment to be included in the per ton bid item for asphalt. 2. All pavement markings impacted by placement of asphalt shall be replaced prior to the road being open to traffic unless otherwise noted in the contract scope and plans. 3. All project related debris shall be hauled off the job site by the Contractor in a timely manner and at their own expense in conformance with all regulatory requirements. 4. The Contractor shall pay particular attention to sweeping when paving. Prior to paving, all construction areas shall be swept with a Municipal type sweeper (either vacuum or mechanical type) that picks up and hauls off, dust and dirt. The sweeper must be equipped with its own water supply for pre-wetting to minimize dust. Moreover, the Contractor shall sweep debris off of sidewalks, driveways, curbs and roadways each day before leaving the job site. 5. The application of tack and prime coats (either required or placed at the Engineer's discretion) shall be placed per Section 300 of FDOT's Standard Specifications (latest edition). Tack shall also be appiied to the face of all curbs and driveways. The cost (including heating, hauling and applying) shall be included in the per ton bid item for asphalt, unless otherwise noted in the project scope and plans. 6. Leveling course and spot patching shall be applied to sections of the road as noted on the plans, or as directed by the Engineer, per Section 330 of FDOT's 2000 Standard Specifications. The cost shall be included in the per ton unit cost for asphalt, unless otherwise noted in the project scope and plans. 7. If an asphalt rubber binder is required, it shall conform to the requirements of Section 336 of FDOT's 2000 Standard Specifications. 8. On all streets with curb and gutter, the final compacted asphalt shall be '/4" above the lip or face of said curb per City Index l Ol . 23.9 SUPERPAVE ASPHALTIC CONCRETE 1. Unless otherwise noted in this section, all of the asphaltic concrete specifications in Sections 23.1 through 23.8 above shall apply to superpave asphaltic concrete. All asphaltic concrete pavement shall be designed and placed in accardance with the FDOT Standard Specifications for Road and Bridge Construction (latest edition). SectionlV.doc Page 26 of 128 , I�, �� �� ,�i ' ' , , T, �� � � � , � � ' � , � 5/IS/2012 ' ' , � ' � , ' � Section 1V —Technical Specifications 2. All aggregate shall be obtained from an approved FDOT source and shall conform to Sections 901 and 902 of FDOT's Standard Specifications (latest edition). 3. All bituminous materials sha11 conform to Section 916 of FDOT's Standard Specifications (latest edition). Asphaltic binder shall be Grade PG 67-22 unless otherwise specified in the Scope of Work. 4. All superpave mix designs shall conform to Sections 320 and 334 of FDOT's Standard Specifications (latest edition). 5. All general construction requirements shall conform to Section 330 of FDOT's Standard Specifications (latest edition). 23.10 BASIS OF MEASUREMENT Basis of ineasurement will be the number of tons of asphaltic concrete completed, in place and accepted. Truck scale weights will be required for all asphaltic concrete used. 23.11 BASIS OF PAYMENT ' Payment shall be made at the contract unit price for asphaltic concrete surface as specified and measured above. This price shall include all materials, preparation, hauling, placement, tack and/or prime coat either required or placed at Engineer's discretion, leveling, spot patching, � filling of cracks, pothole repair, sweeping, debris removal, labor, equipment, tools, and incidentals necessary to complete the asphalt work in accordance with the plans and specifications. � 24 ADJUSTMENT TO THE UNIT BID PRICE FOR ASPHALT � ' ' � � J i� � ' ' When this Article applies to the contract, the unit bid price for asphalt will be adjusted in accordance with the following provisions: 1. Price adjustment for asphalt shall only be made when the current FDOT Asphalt Price Index varies more than 10% from the bid price at the time of the bid opening. 2. The Bituminous Material Payment Adjustment Index published monthly by the FDOT shall be used for the adjustment of unit prices. This report is available on FDOT's internet site. The address is: http://wwwl 1.myflorida.com. It is under the section "Doing Business with FDOT" in the "Contracts Administration" section under "Asphalt Index". For additional information, call FDOT @ 850-414-4000. 3. The FDOT Payment Adjustment Index in effect at the time of the bid opening will be used far the initial determination of the asphalt price. 4. The FDOT Payment Adjustment Index in effect at the time of placement of the asphalt will be used for payment calculation. 5. The monthly billing period for contract payment will be the same as the monthly period for the FDOT Payment Adjustment Index. 6. No adjustment in bid prices will be made for either tack coat or prime coat. 7. No price adjustment reflecting any further increases in the cost of asphalt will be made for any month after the expiration of the allowable contract time. 8. The City reserves the right to make adjustments for decreases in the cost of asphalt. SectionIV.doc Page 27 of 128 5/15/2012 25 Section IV —Teclmical Specifications GENERAL PLANTING SPECIFICATIONS 25.1 IRRIGATION 25.1.1 DESCRIPTION A. The work specified in this Section consists of the installation of an automatic underground irrigation system as shown or noted in the plans. Provide a11 labor, materials, equipment, services and facilities required to perform all work in connection with the underground sprinkler irrigation system, complete, as indicated on the drawings and/or specified. Work noted as "NIC", "existing", or "by others" is not included in this pay item. B. The irrigation plans are schematic in nature. Valves and pipes shall be located in the turf/landscape areas except at road/paving crossings. All piping under paving shall be sleeved. Changes in the irrigation system layout shall be modified with the approval of the Engineer. 25.1.1.1 QUALITY ASSURANCE A. The irrigation work shall be installed by qualified personnel or a qualified irrigation subcontracting company that has experience in irrigation systems of similar size, scope, mainline, system pressure, controls, etc. B. All applicable ANSI, ASTM, FED.SPEC. Standards and Specifications, and all applicable building codes and other public agencies having jurisdiction upon the work shall apply. C. Workmanship: All work shall be installed in a neat, orderly and responsible manner with the recognized standards of workmanship. The Engineer reserves the right to reject material or work which does not conform to the contract documents. Rejected work shall be removed or corrected at the earliest possible time at the contractor's expense. D. Operation and Maintenance Manuals: The contractor shall prepare and deliver to the Engineer within ten (l0) calendar days prior to completion of construction a minimum of three (3) hard cover binders with three rings containing the following information: 1. Index sheet stating the contractor's address and business telephone number, 24 hour emergency phone number, person to contact, list of equipment with name(s) and address(es) of local manufacturer's representative(s) and local supplier where replacement equipment can be purchased. 2. Catalog and part sheet on every material and equipment installed under this contract. 3. Complete operating and maintenance instructions on all major equipment. 4. Provide the Engineer and the City of Clearwater maintenance staff with written and "hands on" instructions for major equipment and show evidence in writing to the Engineer at the conclusion of the project that this service has been rendered. a. Four-hour instruction (minimum) for the Drip Emitter equipment operation and maintenance. SectionIV.doc b. Two-hour instruction (minimum) for automatic control valve operation and maintenance. Page 28 of 128 , � C � ' � � � � l.� � , ' � � , � 5/15/2012 ' , u 1 � � � � � � � Section IV — Technical Specifications 25.1.1.2 PROJECT CONDITIONS A. The lrrigation Contractor shall coordinate the work with all other trades, all underground improvements, the location and planting of trees and all other planting. Verify planting requiring excavation 24 in. diameter and larger with the Engineer prior to installation of main lines. B. Provide temporary irrigation at all times to maintain plant materials. C. The lrrigation Contractor is responsible to maintain the work area and equipment until final acceptance by the Engineer. Repairs and replacement of equipment broken, stolen, or missing as well as regular maintenance operations shall be the obligation of the contractor. D. The Irrigation Contractor shall submit a traffic control plan (per FDOT specifications) to the Engineer prior to initiating construction on the site. The Contractor shall be responsible for the maintenance of traffic signs, barriers, and any additional equipment to comply with the FDOT standards and to ensure the safety of its employees and the public. 25.1.1.3 WARRANTY A. The Manufacturer(s) shall warrant the irrigation system components to give satisfactory � service for one (l) year period from the date of acceptance by the Engineer and the City of Clearwater. Should any problems develop within the warranty period due to inferior or faulty materials, they shall be corrected at no expense to the City of Clearwater or FDOT. � � � � � � � � 25.1.2 PRODUCTS 25.1.2.1 GENERAL A. All materials throughout the system shall be new and in perfect condition. No deviations from the specifications shall be allowed except as noted. 25.1.2.2 PIPING A. The irrigation system pipe shall be as stated herein and shall be furnished, installed and tested in accordance with these specifications. B. All pipe is herein specified to be Polyvinyl Chloride (PVC) Pipe, 1120, Schedule 40, conforming to ASTM D2665 and D1785. C. All nipples, pipe connections, bushings, swing joints, connecting equipment to the mainline is required to be threaded Polyvinyl Chloride (PVC) Pipe, Schedule 80. 25.1.2.3 PIPE FITTINGS A. All pipe fittings for Schedule 40 PVC pipe shall be as follows: Fittings shall conform to the requirements of ASTM D2466, Standard Specification for Polyvinyl Chloride (PVC) Plastic Pipe Fittings, Schedule 80. All fittings shall bear the manufacturer's name or trademark, material designation, size, applicable IPS schedule and NSF seal of approval. The connection of mainline pipe to the automatic control valve shall be assembled with threaded Schedule 80 fittings and threaded Schedule 80 nipples. ' SectionIV.doc � Page 29 of 128 5/IS/2012 Section IV —Technical Specifications 25.1.2.4 PVC PIPE CEMENT AND PRIMER A. Provide solvent cement and primer for PVC solvent weld pipe and fittings as recommended by the manufacturer. Pipe joints for solvent weld pipe to be belled end. B. Purple primer shall be applied after the pipe and fittings has been cut and cleaned. The Primer shall be of contrasting color and be easily recognizable against PVC pipe. 25.1.2.5 THREADED CONNECTIONS A. Threaded PVC connections shall be made using Teflon tape or Teflon pipe sealant. 25.1.2.6 GATE VALVES 25.1.2.6.1 MANUAL GATE VALVES 2 IN. AND SMALLER A. Provide the following, unless otherwise noted on Drawings: 1. 200-250 psi Ball Valve 2. PVC body - with Teflon Ball Seals 3. Threaded-Dual end Union Connectors 4. Non-Shock Safe-T Shear Stem 5. Safe-T Shear True Union Ball Valve as manufactured by Spears Manufacturing Company , Sylmer, California, or approved equal. 25.1.2.6.2 GATE VALVES 2'/2" IN. AND LARGER A. Provide the following, unless otherwise noted on Drawings: 1. AW WA-G509 2. 200 Ib. O.W.G. 3. Cast Iron body - ASTM A 126 Class B 4. Deep socket joints 5. Rising stem 6. Bolted bonnet 7. Double disc 8. EGuipped with 2" square operating key with tee handle B. Provide two (2) operating keys for gate valve 3" and larger. The "street key" shall be 5' long with a 2" square operating nut. 25.1.2.7 SLEEVES A. Sleeves: (Existing by City of Clearwater) 25.1.2.8 REMOTE CONTROL VALVES A. The remote control valve shall be a solenoid actuated, balance-pressure across-the diaphragm type capable of having a flow rate of 25-30 gallons per minute (GPM) with a SectionIV.doc Page 30 of 128 5/15/2012 � ' � � � � � � � � � � � � ' � � � ' Section IV —Technical Specifications pressure loss not to exceed 6.l pounds per square inch (PSI). The valve pressure rating shall not be less than 150 psi. B. The valve body and bonnent shall be constructed of high impact weather resistant plastic, stainless steel and other chemical/LIV resistant materials. The valve's one-piece diaphragm shal l be of durable santoprene material with a clog resistant metering orifice. C. The valve body shall have a l" inch (FNPT) inlet and outlet or a one inch slip by slip inlet and outlet for solvent weld pipe connections. D. The valve construction shall be as such to provide for all internal parts to be removable from the top of the valve without disturbing the valve installation. E. The valve shall be as manufactured by Rain Bird Sprinkler Mfg. Corp., Glendora, California, or approved equal. F. Identify all control valves using metal I.D. tags numbered to match drawings. 25.1.2.9 VALVE BOXES A. For remote control drip valve assembly and UNIK control timer use a Brooks #36 concrete value box with #36-T cast iron traffic bearing cover, or approved equal. B. For flush valve assembly use an Ametek #181014 (10") circular valve box with #181015 cover comparable to Brooks, or approved equal. C. For air relief assembly use an Ametek #182001 (6") economy turf box with #182002 cover comparable to Brooks, or approved equal. 25.1.2.10 DRIP IRRIGATION 25.1.2.10.1 CONSTRUCTION A. Techline shall consist of nominal sized one-half inch (1/2") low-density linear polyethylene tubing with internal pressure compensating, continuously self-cleaning, integral drippers at a specified spacing, (l2", 18", or 24" centers). The tubing shall be brown in color and conform to an outside diameter (O.D.) of 0.67 inches and an inside diameter (I.D.) of 0.57 inches. Individual pressure compensating drippers shall be welded to the inside wall of the tubing as an integral part of the tubing assembly. These drippers shall be constructed of plastic with a hard plastic diaphragm retainer and a self- flushing/cleaning elastomer diaphragm extending the full length of the dripper. 25.1.2.10.2 OPERATION A. The drippers shall have the ability to independently regulate discharge rates, with an inlet pressure of seven to seventy (7-70) pounds per square inch (PSI), at a constant flow and with a manufacturer's coefficient of variability (Cv) of 0.03. Recommended operating pressure shall be between 15-45 PSI. The dripper discharge rate shall be 0.4, 0.6, or 0.9 gallons per hour (GPH) utilizing a combination turbulent flow/reduced pressure compensation cell mechanism and a diaphragm to maintain uniform discharge rates. The drippers shall continuously clean themselves while in operation. The dripperline shall be available in 12", 18" and 24" spacing between drippers unless otherwise specified. Techline pipe depth shall be under mulch unless otherwise specified on Plans. Maximum system pressure shall be 45 PSC. Filtration shall be 120 mesh or finer. Bending radius shall be 7". SectionlV.doc Page 31 of 128 5/15/2012 Section IV — Technical Specifications B. For on-surface or under mulch installations, 6" metal wire staples (TLS6) shall be installed 3'-5' on center, and two staples installed at every change of direction. 25.1.2.10.3 LINE FLUSHING VALVES A. The sub-surface system shall utilize Automatic Line Flush Valves at the end of each independent zone area. This valve shall be capable of flushing one gallon at the beginning of each irrigation cycle. The valves shall match the dripline manufacturer and connect directly to the dripline. 25.1.2.10.4 AIR/VACUUM RELIEF VALVE A. Each independent irrigation zone shall utilize an AirNacuum Relief Valve at its high point(s). The air and vacuum relief valve shall seal effectively from 2 to l l 0 psi. 25.1.2.10.5 PRESSURE REGULATORS A. The pressure regulator shall be designed to handle steady inlet pressures over I 50 pounds per square inch (psi) and maintain a constant outlet pressures of 25 psi. Regulating accuracy shall be within =/-6%. The pressure regulator shall be manufactured from high- impact engineering grade thermoplastics. Regulation shall be accomplished by a fixed stainless steel compression spring which shall be enclosed in a chamber separate from the water passage. 25.1.2.10.6 FILTERS A. The filter shall be a multiple disc type filter with notation indicating the minimum partial size to travel through or the mesh size of the element being used. The discs shall be constructed of chemical resistant thermoplastic for corrosion resistance. 25.1.2.10.7 FITTINGS A. All connections shall be made with barb or compression type fitting connections. Fittings and dripline shall be as manufactured by the manufacturer of the dripline to ensure the integrity of the subsurface irrigation system. 25.1.2.11 AUTOMATIC CONTROL TIMER A. The irrigation controller (control module) shall be programmable by a separate transmitter device only. The program shall be communicated to the Control Module from the Field Transmitter via an infrared connection. The controller shall be of a module type which may be installed in a valve box underground. The controller shall function normally if submerged in water and the communication from the transmitter shall function if submerged in water. B. The control module shall be housed in an ABS plastic cabinet and shall be potted to insure waterproof operation. The control module shall have two mounting slots for screws allowing the module to be securely mounted inside a valve box. C. The controller shall operate on one nine volt alkaline battery for one full year regardless of the number of stations utilized. The controller shall operate 1, Z, or 4 stations either sequentially or independently. SectionN.doc Page 32 of 128 5/15/2012 � � � � I� � � � � � � r� � ' ' � � � Section IV —Technical Specitications D. The controller shall have three independent programs with eight start times each, station run time capability from one minute to twelve hours in one minute increments, and a seven day calendar. The controller shall turn on stations via latching solenoids installed on the valves. Manual operations shall be initiated by attaching the Field Transmitter to the Control Module and programming a manual start. The controller shall be capable of manual single station or manual program operation. E. The controller shall be as manufactured by Rain Bird Sprinkler Mfg. Corp., Glendora, California USA. 25.1.2.12 FIELD TRANSMITTER � A. The irrigation controller shall be progammable by a separate transmitter device (Field Transmitter) only. The Field Transmitter shall communicate to the Control Module via an infrared connection. The Field Transmitter shall be water resistant and housed in ABS 1 plastic and have a removable, reversible protective sheath. The Field Transmitter shall operate on one 9V alkaline battery. B. The Field Transmitter shall have a large LCD screen and a seven-key programming pad. � A beep sound shall confirm every key stroke. The screen sha11 automatically turn off after one minute when not in use. � � C. The Field Transmitter shall be capable of programming an unlimited number of UNIK Control Modules. D. The Field Transmitter shall be as manufactured by Rain Bird Sprinkler Mfg. Corp., Glendora, California USA. 25.1.2.13 LATCHING SOLENOID � A. The Latching Solenoid shall be supplied with an installed, filtered adapter allowing installation of the solenoid onto any Rain Bird DV, PGA, PEB, PES-B, GB, of EFB series valve. � � � � � � B. The Latching Solenoid shall be as manufactured by Rain Bird Sprinkler Mfg. Corp., Glendora, California USA. 25.1.3 EXECUTION 25.1.3.1 GENERAL INSTALLATION REQUIREMENTS A. Before work is commenced, hold a conference with the Engineer to discuss general details of the work. B. Verify dimensions and grades at job site before work is commenced. C. During the progress of the work, a competent superintendent and any assistants necessary shall be on site, all satisfactory to the Engineer. This superintendent shall not be changed, except with the consent of the Engineer. The superintendent shall represent the Contractor in his absence and all directions given to the superintendent shall be as binding as if given to the Contractor. D. Obtain and pay for all irrigation and plumbing permits and all inspections required by outside authorities. � se�c�oniv.ao� ' Page 33 of 128 5/15/2012 Section IV — Technical Specifications E. All work indicated or notes on the Drawings shall be provided whether or not specifically mentioned in these Technical Special Provisions. F. If there are ambiguities between the Drawings and Specifications, and specific interpretation or clarification is not issued prior to bidding, the interpretation or clarification will be made only by the Engineer, and the Contractor shall comply with the decisions. In event the installation contradicts the directions given, the installation shall be corrected by the Contractor at no additional cost. G. Layout of sprinkler lines shown on the Drawing is diagrammatic only. Location of sprinkler equipment is contingent upon and subject to integration with all other underground utilities. Contractor shall employ all data contained in the contract Documents and shall verify this information at the construction site to confirm the manner by which it relates to the installation. H. Do not proceed with the installation of the sprinkler system when it is apparent that obstructions or grade differences exist or if conflicts in construction details, legend, or specific notes are discovered. All such obstructions, conflicts, or discrepancies shall be brought to the attention of the Engineer. 1. The disturbance of existing paving will not be permitted. Install all required sleeving prior to roadway base. 25.1.3.2 EXCAVATING AND BACKFILLING 25.1.3.2.1 TRENCHING - GENERAL A. Dig sides of trenches straight. Provide continuous support for pipe on bottom of trenches. Lay pipe to uniform grade. Trenching excavation shall follow layout indicated on Drawings. B. Maintain 6 in. horizontal and minimum clearance between sprinkler lines and between all lines of other trades. C. Do not install sprinkler lines directly above another line of any kind. D. Maintain 6 in. vertical minimum between sprinkler lines which cross at angles of 45 degrees to 90 degrees. E. Exercise care when excavating, trenching and working near existing utilities. 25.1.3.2.2 BACKFILLING A. All pressure supply lines (mainline) shall have 18" of fill placed over the pipe. B. Initial backfill on all lines shall be of a fine granular material with no fareign matter larger than '/2 in. C. Compact backfill accarding to Section 125 of FDOT Specification Book, 1996 Edition. D. Do not, under any circumstances, use equipment or vehicle wheels for compacting soil. E. Restore grades and repair damages where settling occurs. F. Compact each layer of fill with approved equipment to achieve a maximum density per AASHTO T 180 - latest edition. Under landscaped area, compaction shall not exceed 95% of maximum density. SectionlV.doc Page 34 of 128 5/15/2012 i � � � � � � � � � � � � � ' � ' � � � � � Section IV —Technical Specifications G. Compaction shall be obtained by the use of inechanical tampers or approved hand tampers. When hand tampers are used, the materials shall be deposited in layers not more than six (6") inches thick. The hand tampers shall be suitable for this purpose and shall have a face area of not more than 100 square inches. Special precautions shall be taken to prevent damage to the irrigation system piping and adjacent utilities. 25.1.3.2.3 ROUTING OF PIPING: A. Routing of pressure and non-pressure piping lines are indicated diagrammatically on Drawings. B. Coordinate specimen trees and shrubs with routing of lines. 1. Planting locations shall take precedence over sprinkler and piping locations. 2. Report to Owner any major deviation from routing indicated. C. Conform to Drawings layout without offsetting the various assemblies from the pressure supply line. D. Layout drip tube and make any minor adjustments required due to differences between � site and Drawings. Any such deviations in layout shall be within the intent of the original Drawings, and without additional cost. � ' L1 � � � � � � r E. Layout all systems using an approved staking method, and maintain the staking of approved layout. 25.1.3.3 INSTALLATION 25.1.3.3.1 WATER SUPPLY A. Connections to the water sources shall be at the approximate locations indicated on the Drawings. Make minor changes caused by actual site conditions without additional cost to the Owner. 25.1.3.3.2 ASSEMBLIES A. Routing or pressure supply lines as indicated on Drawings is diagrammatic only. Install lines and required assemblies in accordance with details on Drawings. B. Do not install multiple assemblies on plastic lines. Provide each assembly with its own outlet. When used, the pressure relief valve shall be the last assembly. C. Install all assemblies in accord with the respective detail Drawings and these Technical Special Provisions. D. Plastic pipe and threaded fittings shall be assembled using Teflon tape, applied to the male threads only. 25.1.3.3.3 SLEEVES: (EXISTING BY CITY OF CLEARWATER) A. The contractor shall verify the location of all existing sleeves as shown on the roadway, utility and/or irrigation plans and notify the Engineer of any discrepancies. 25.1.3.3.4 PLASTIC PIPE A. Install plastic pipe in accord with manufacturer's recommendations. SectionIV.doc Page 35 of 128 5/I S/2012 Section IV-7'echnical Specifications B. Prepare all welded joints with manufacturer's cleaner prior to applying solvent. 1. Allow welded joints as least 15 minutes setup/curing time before moving or handling. 2. Partially center load pipe in trenches to prevent arching and shifting when water pressure is on. 3. Do not permit water in pipe until a period of at least four hours has elapsed for solvent weld setting and curing, unless recommended otherwise by solvent manufacturer. C. Curing l. When the temperature is above 80 degrees F., allow soluble weld joints at least 24 hours curing time before water is introduced under pressure. D. Flushing the system: 1. After all sprinkler pipe lines and risers are in place and connected, open the control valves and flush out the system with a full head of water. E. Installing piping under existing pavement: 1. Piping under existing pavement may be installed by jacking & boring. 2. Secure permission from the Engineer before cutting or breaking any existing pavement. All repairs and replacements shall be approved by Engineer and shall be accomplished at no additional cost. 25.1.3.3.5 CONTROLLERS A. Install al) automatic controllers as shown in the plans. 1. The location of all controllers shall be approved by the Engineers representative prior to installation. 25.1.3.3.6 REMOTE CONTROL VALVES A. Install at sufficient depth to provide not more than 6 in., nor less than 4 in. cover from the top of the valve to finish grade. B. Install valves in a plumb position with 24 in. minimum maintenance clearance from other equipment, 3 feet minimum from edges of sidewalks, buildings, and walls, and no closer than 7 feet from the back of curb or edge of pavement along roadways. C. Contractor shall adjust the valve to provide the proper flow rate or operating pressure for each sprinkler zone. 25.1.3.3.7 GATE VALVES A. Install where indicated and with sufficient clearance from other materials far proper maintenance. B. Check and tighten valve bonnet packing before backfill. SectionIV.doc Page 36 of 128 � � � � � � � � I� � ;� � � � 5/15/2012 � r � �� � � r � �� � � , � � � � L� � Section IV — Technical Specifications 25.2 LANDSCAPE 25.2.1 GENERAL 25.2.1.1 RELATED DOCUMENTS A. The Contract Documents shall include the Plans, Details, Specifications, Bid Proposal, Contract Agreement, including Installation Schedule, all Addenda, and Contractual and Special Conditions when required. 25.2.1.2 REQUIREMENTS OF REGULATORY AGENCIES A. Comply with Federal, State, Local, and other duly constituted authorities and regulatory agencies, without additional cost to the Owner in matters pertaining to codes, safety, and environmental matters. B. Any permits for the installation or construction of any of the work included under the contract, which are required by any of the legally constituted authorities having jurisdiction, shall be arranged for by the Contractor and paid for directly by the Contractor, unless otherwise agreed upon in writing. 25.2.1.3 SCOPE OF WORK A. All provisions of Contract, including General and Special Provisions and Plans, apply to the work specified in this Section. The Scope of Work includes everything for and incidental to executing and completing all landscape work shown on the Plans, Schedules, Notes and as specified herein. B. Furnish and provide all labor, plants and materials tools and equipment necessary to prepare the soil for plantings, to install and care for all plant materials (including finish grading if necessary); to remove and/or transplant existing plants if indicated; to furnish, plant, fertilize, guy and brace, water, mulch and prune all new plant materials; and to execute all other Work as described herein or indicated on the Plans. C. Work under this Section shall include labor and materials for final grading and raking to prepare the site for sodding, sprigging, or seeding, so finished lawn or playing field will appear even and uniform, will drain adequately, and will comply with the intent of the landscape drawings. D. Initial maintenance of landscape materials as specified in this document. 25.2.1.4 QUALITY ASSURANCE A. Landscape work shall be contracted to a single firm specializing in landscape work, who shall in turn subcontract no more than 40% of the work specified. All subcontractors under the control of the Contractor involved in the completion of the landscape work, shall be made known to the Owner and the Landscape Architect prior to their commencement of work on the project. B. All work of this Section shall conform to the highest standard of landscape practices. � C. The Plant Material Schedule included with these Plans is provided only for the Contractor's convenience; it shall not be construed as to conflict or predominate over the � SectionIV.doc Page 37 of 128 5/IS/2012 � Section IV —Technical Specifications Plans. If conflict between the Plans and Specifications exists, the Plan shall predominate and be considered the controlling document. D. During this work, the Contractor shall be responsible for maintaining safety among persons in his employ in accordance with the standards set by The Occupational Safety and Health Act of 1970 (and all subsequent amendments). Owner and Landscape Architect shall be held harmless from any accident, injury or any other incident resulting from compliance or non-compliance with these standards. E. The Contractor shall cooperate with and coordinate with all other trades whose wark is built into or affects the work in this Section. F. All appropriate utility companies and agencies shall be contacted 72 hours prior to excavation. Call "One Call" at 1-800-432-4770. G. The Contractor shall carefully examine the site and all existing conditions affecting the work, such as: soil, obstructions, existing trees, utilities, etc. Report any conditions in conflict with the work to the Landscape Architect. 25.2.1.5 SUBMITTALS A. The Contractor is required to submit prior to the expiration of the required maintenance period, two copies of typewritten instructions recommending procedures to be established by the Owner for maintenance of landscape work for a period of one year. B. Furnish unit prices for all plant materials and inert materials, including labor for all specified wark. 25.2.1.6 ALTERNATES, ADDITIONS, DELETIONS, SUBSTITUTIONS A. If there are additions/alternates included in these Plans and Specifications, the Contractor must propose prices to accomplish the work stated as additions/alternates at the time of bidding. B. The Owner, through his Project Representative, reserves the right to add or deduct any of the work stated herein without rendering the Contract void. C. The Contractor must have written approval by the Project Representative for any substitutions not previously agreed to in the purchase agreement: installation without approval is entirely at the Contractor's risk. D. All material acquired through additions or substitutions shall be subject to all conditions and warranties stated herein. 25.2.1.7 ABBREVIATIONS/DEFINITIONS O.A. or HT.: The over-all height of the plant measured from the ground to the natural, untied state of the majority of the foliage, not including extreme leaves, branches or fronds. C. T.: Clear trunk is measured from the ground to the bottom ofthe first leaf or frond stem with no foliage from ground to specified height. For example, on Canary Island Date Palms or similar, the clear trunk measurement includes the "nut" at the base of the fronds. SectionIV.doc Page 38 of 128 5/]5/2012 � � � � �� � � � , � ' � , � � � � � , � ' � � ' � � � � � ' � , � � � � Section IV —Technical Specifications C. W.: Clear wood is measured from the ground to the bottom of the base of the lowest leaf sheath or boot, trimmed in a natural manner. For example, on Canary Island Date Palms or similar, the clear wood measurement does not include the "nut" at the base ofthe fronds. SPR.: Spread, branches measured in natural untied position to the average crown diameter, not including extreme leaves, branches or fronds. ST. TR. : Straight trunk. MIN.: Minimum. GAL.: Gallon container size, i.e., l gallon, 3 gallon, 7 gallon, etc. O. C.: On center, distance between plant centers. DIA.: Diameter. LVS.: Leaves. D.B.H.: Diameter or caliper of main trunk of tree as measured at breast height at 4-1/2 feet above grade. CAL.: Caliper, the outside diameter of up to a four inch tree is measured six inches above gade, larger trees are measured at 12 inches above grade. B&B: Balled and burlapped in accordance with horticultural standards of the American Association of Nurserymen. PPP: Plants per pot. FG: Field grown. STD.: Standard, single, straight trunk. Owner: To be known as that entity which holds title or control to the premises on which the work is performed. Owner's Representative: Owner's on-site representative shall be responsible for approval of quantity and quality of materials specified and execution of installation. SectionIV.doc Page 39 of ]28 5/15/2012 Section IV —Technical Specifications Contractor: Shall refer to that person or enterprise commonly known as the Landscape Contractor. Landscape Architect: This person or firm is the responsible representative of the Owner who produces the landscape Plans and Specifications. 25.2.1.8 25.2.1.8.1 PRODUCT DELIVERY, STORAGE, AND HANDLING PLANT MATERIALS A. Provide container grown or, if appropriate, freshly dug trees and shrubs. Do not prune prior to delivery. Do not bend or bind trees or shrubs in such a manner as to damage bark, break branches or destroy natural shape. Provide protective covering during delivery. lf plant delivery is made in open vehicles, the entire load shall be suitably covered. B. All plants are to be handled at all times so that roots or root balls are adequately protected from sun, cold, or drying winds. No root balls for trees and container plants that have been cracked or broken shall be planted except upon special approval. Plants shall not be pulled by the tops or stems, nor handled in a rough or careless manner at any time. C. Balled and burlapped plants shall be moved with firm, natural, balls of soil, not less than ] foot diameter of ball to every 1 inch caliper of trunk; root ball depth shall not be less than 2/3 of root ball diameter. B& B plants which cannot be planted upon delivery shall have their root balls covered with moist soil or mulch. D. Trees shall be dug with adequate balls, burlapped, and wire bound if needed. Root pruning to be done a minimum of 4 weeks before removal from the field and planting at the site. Root balls may not be encased in "grow bags" ar other synthetic material, except plastic shrink wrap for transport only. E. Remove all fronds form sabal palms prior to planting, but leave a minimum of l2 inches of new frond growth above the bud. Do not damage bud. On all other palms, only a minimum of palm fronds shall be removed from crown to facilitate moving and handling. Clear trunk shall be determined after minimum fronds have been removed. Boots shall be removed from trunk unless otherwise specified. Palms shall be planted within 24 hours of delivery. F. Deliver trees and shrubs after preparations for planting have been completed and plant immediately. If planting is delayed more than 6 hours after delivery, set trees and shrubs in shade, protect from weather and mechanical damage, and cover to keep the roots moist. G. Label at least one tree and one shrub of each variety with a securely attached waterproof tag bearing legible designation of botanical and common name. H. Sod: Time delivery so that sod will be placed within twenty-four (24) hours after stripping. Protect sod against drying and breaking by covering palettes of sod or placing in a shaded area. � ' �� ' � � ' � � L�J � �� � �� � � SectionlV.doc Page 40 of 128 5/15/2012 � � ' , � ' Section lV —Technical Specifications 25.2.1.9 JOB CONDITIONS 25.2.1.9.1 ACCEPTANCE OF JOB CONDITIONS. A. The Contractor shall examine the sub-grade, verify elevations, observe the conditions under which work is to be performed and notify the Landscape Architect or Project Representative in writing of unsatisfactory conditions prior to beginning work. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the Landscape Architect. Start of work shall indicate acceptance of conditions and full responsibility for the completed work. B. Proceed with and complete the landscape work as rapidly as portions of the site become � available, working within the seasonal limitations for each kind of landscape work and following the approved schedule. If seasonal limitations apply, notify the Landscape Architect for adjustments to the Schedule. ' C. Determine locations of all underground utilities and review for conflicts with planting procedures. � D. When adverse conditions to piant growth are encountered, such as rubble fill, drainage conditions or obstruction, the Contractor shall notify the Landscape Architect in writing prior to planting. � � ' E. Plant trees and shrubs after final grades are established and prior to the planting of lawns, protecting lawn trees and promptly repairing damages from planting operations. 25.2.1.9.2 SCHEDULING OF WORK A. The work shall be carried out to completion with the utmost speed. Immediately upon award of contract, the Contractor shall prepare a construction schedule and furnish a copy to the Owner's Representative and/or the Landscape Architect for approval. The Contractor shall carry out the work in accordance with the approved schedule. B. If the Contractor incurs unforeseen costs, such as overtime hours, holidays, etc. in order � to complete the work within the time stated in the Contract, and/or to maintain the progress schedule, all said costs shall be borne by the Contractor at no additional cost to the Owner. � � C. The Owner's Representative's may request in writing wark stoppage. Upon written request from the Owner's Representative, the Landscape Contractor shall suspend delivery of material and stop all work for such a period as deemed necessary by the Owner, the Owner's Representative, or the General Contractor with respect to any additional costs which may result from work stoppage. 25.2.1.9.3 UTILITIES A. The Contractor shall perform work in a manner which will avoid conflicts with utilities. , Hand excavate, as required, to minimize possibility of damage to underground utilities. Maintain grade stakes set by others until removal is mutually agreed upon by all parties concerned. , � SectionlV.doc Page 4l of 128 5/15/2012 � 25.2.2 PRODUCTS 25.2.2.1 MATERIALS Section 1V — Technical Specifications 25.2.2.1.1 PLANT MATERIALS: NOMENCLATURE A. Plant species, sizes, etc. shall be per Plans and Specifications on Plant Material Scheduled. Nomenclature is per Manual of Cultivated Plant, Standard Encyclopedia of Horticulture, L.H. Bailey, or Standardized Plant Names Dictionary, American Joint Committee on Horticultural Nomenclature (latest editions), or conforms with names accepted in the nursery trade. 25.2.2.1.2 PLANT MATERIALS: QUALITY ASSURANCE A. Provide healthy, vigorous stock grown under climatic conditions similar to conditions in the locality of the project. Plants shall have a habit of growth that is normal for the species and be sound, healthy, vigorous and free from insect pests or their eggs, plant diseases, defects and injuries. Plants shall be well branched and densely foliated when in leaf and shall have healthy, well-developed root systems. B. Trees shall be heavily branched or, in the case of palms, be heavily leafed. Some plant materials may be collected stock with the approval of the Landscape Architect. Provided tree species that have a single main trunk (central leader), unless otherwise stated. Trees that have the main trunk forming a"Y" shape or parallel branching are not acceptable. C. Plant materials shall be specified and shall be Florida #1 or better as to shape and quality for the species as outlined in Grades and Standards for Nursery Plants Part I and II, Florida Department of Agriculture and Consumer Services (latest edition). D. The Owner or Landscape Architect reserves the right to inspect plant materials either at the place of growth or at the project site prior to planting far compliance with requirements for name variety, size quality, or designated area. E. Landscape materials shall be shipped with certificates of inspection as required by governmental authorities. The Contractor shall comply with all governing regulations that are applicable to landscape materials. F. Do not make substitutions. If specified landscape material is not available, submit Landscape Architect proof of it being non-available. In such event, if the Landscape Architect designates an available source, such shall be acquired from designated source. When authorized, a written change order for substitute material will be made by adjustment to Contract amount. G. Height and/or width of trees shall be measured from ground up; width measurement shall be normal crown spread of branches with plants in the normal position. This measurement shall not include immediate terminal growth. All measurements shall be taken after pruning for specified sizes. All trees and shrubs shall conform to measurements specified in the plant material schedule, except that plant material larger than specified may be used with the approval of the Owner or Landscape Architect; with no increase to the Contract price. Plant materials shall not be pruned prior to delivery. H. Plant Material shall be symmetrical, typical for variety and species. Plants used where symmetry is required shall be matched as nearly as possible. SectionIV.doc Page 42 of 128 5/IS/2012 1 ' � � � , � � , � � � �J � , � � ' ' � ' � I� Section 1V —Technical Specifications t. Balled and burlapped plants shall have firm, natural balls of earth of sufficient diameter and depth to encompass the feeding root system necessary for full development of the plant and to conform with the standards of the American Association of Nurserymen. Root balls and tree trunks shall not be damaged by improper binding and B& B procedures. J. Container-grown plants may be substituted for balled and burlapped plants or vice-versa provided the quality is equal or better than specified and the Landscape Architect approves the substitution. K. Container grown stock shall have been grown in containers for at least four months, but not over two years. If requested, samples must be shown to prove no root bound condition exists. 25.2.2.1.3 GRASSES: SOD OR SEED ' A. Sod or seed (as/if specified) shall be a species as stated on the Plan. Solid sod shall be of even thickness and with a good root structure, 95% free of noxious week, freshly mowed before cutting, and in healthy condition when laid. It must not be stacked more than 24 ' hours before laying and it must be grown in soil compatible to that in which it will be installed. Sod must be kept moist prior to and after installation. ' i � � � � � � ' �I u B. Seed shall be delivered to the site in unopened bags with certification tags in place. Purity, germination and weed content shall be as certification requirements. 25.2.2.1.4 MULCH A. Mulch shall be 100% Grade "B" shredded cypress bark mulch, thoroughly mixed with a pre-emergence weed killer according to the label directions as specified on the plan. B. Install mulch to an even depth of 3" before compaction. 25.2.2.1.5 FERTILIZER A. Granular fertilizer shall be uniform in composition; free flowing and suitable for application with approved equipment; received at the site in full, labeled, unopened bags bearing the name, trade name or trademark and warranty of the producer; fully conforming to State of Florida fertilizer laws. B. All fertilizer shall bear the manufacturer's statement of analysis and shall contain the appropriate minimum amounts of elements for the type of use specified herein. C. Agriform 20-10-5 fertilizer tablets or approved equal, shall be placed in planting pit for all plant materials at time of installation and priar to completion of pit backfilling. D. Ground cover and annual areas shall receive fertilization with Osmocote Time Release Fertilizer according to product instructions and rate. E. For sod and seeded areas, fertilize with a complete granular fertilizer on Bahia and St. Augustine grass at the rate of one (1) pound of nitrogen per one thousand (1,000) square feet. Fertilizer shall be commercial grade, mixed granules, with 30% - 50% of the nitrogen being in slow or controlled release form. The ratio of nitrogen to potash will be 1:1 or 2:1 for complete fertilizer formulations. Phosphorus shall be no more than '/4 the nitrogen level. They shall also contain magnesium and micronutrients (i.e. manganese, iron, zinc, copper, etc.). SectionIV.doc Page 43 of 128 5/15/2012 Section IV — Technical Specifications 25.2.2.1.6 STAKES AND GUYS A. For trees, approved plastic or rubber guys shall be used between the stakes and the tree trunk. Galvanized steel guy wire shall not be used. B. Stakes shall be cut from 2" x 4" pressure treated (p.t.) stock for trees over 2" caliper. Stakes shall be 2" x 2" pressure treated (p.t.) stock for trees 2" caliper and under. A minimum of 2 stakes per tree or an optional 3 stakes per tree shall be used. C. For single trunk palms, stakes shall be cut from 2" x 4" pressure treated (p.t.) stock, with a minimum of 3 stakes per palm. Batten consisting of 5 layers of burlap and 5- 2" x 4" by 16" wood connected with two - 3/4" steel bands shall be used around the palm trunk. D. Other tree staking systems may be acceptable if approved. 25.2.2.1.7 PLANTING SOIL A. Unless stated on the plans or in the specifications, install plant material in tilled and loosened native soil backfill. It is the responsibility of the Landscape Contractor to test, prior to planting and at no additional cost to the Contract, any soils which may be unsuitable for the vigorous growth of plants. Unsuitable conditions shall be reported to the Landscape Architect immediately in writing. B. When required, planting soil media shall be provided by the Contractor and shall consist of 1/3 peat and 2/3 sandy loam, with no lumps over 1". C. Backfill and clean fill dirt provided by the Contractor shall be in a loose, friable soil. There must be slight acid reaction to the soil (about 6.0 — 6.5 pH) with no excess of calcium or carbonate, and it shall be free from excess weeds, clay lumps, stones, stumps, roots and toxic substances or any other materials that might be harmful to plant growth or a hindrance to grading, planting, and maintenance procedures and operations. No heavily organic soil, such as muck or peat shall be used as fill dirt. D. Bed preparation for annual beds under l gallon container size shall consist of 3" of Florida peat or other approved organic soil amendment spread over full length and width of planting area. Rototil organic layer 6 inches to 8 inches into native soil. 25.2.2.1.8 SOIL AMENDMENTS A. Terra-Sorb AG or approved equal, soil amendment shall be mixed with native or planting soil for all trees, shrubs, ground cover, and annuals according to manufacturer's recommended application rates and methods, if specified on the Plans. 25.2.2.1.9 TREE PROTECTION A. Wood fencing shall be 2" x 4" pressure treated (p.t.) stock with flagging on horizontal members. Space vertical members 6 feet to 8 feet on center. The barricade shall be placed so as to protect the critical protection zone area, which is the area surrounding a tree within a circle described by a radius of one foot for each inch of the tree's diameter at breast height DBH at 4-'/2 feet above grade. SectionIV.doc Page 44 of 128 i , � ' � � , � � � � � � �� � , 5/15/2012 r � � ' Section IV — Technical Specifications 25.2.2.1.10 ROOT BARRIER SYSTEM � A. Root barrier fabric shall be installed when specified in the plans and/or specifications for protection of adjacent paved surfaces according to specific product name or equal. Install as directed by the manufacturer. , � , � _� , � 25.2.2.1.11 PACKAGED MATERIALS A. Deliver packaged materials in containers showing weight, analysis and name of manufacturer. Protect materials from deterioration during delivery and while stored at the site. 25.2.2.1.12 PESTICIDES A. Pesticides shall be only approved, safe brands applied according to manufacturer's directions. 25.2.3 EXECUTION 25.2.3.1 PREPARATION 25.2.3.1.1 OBSTRUCTIONS BELOW GROUND A. It shall be the responsibility of the Contractor to locate and mark all underground utilities, irrigation lines and wiring prior to commencement of the work. B. If underground construction, utilities or other obstructions are encountered in excavation � of planting areas or pits, the Landscape Architect shall be immediately notified to select a relocated position for any materials necessary. ' �� � � � �� � 25.2.3.1.2 GRADING AND PREPARATION FOR PLANT MATERIALS A. All proposed landscape areas containing existing turf grass or weeds shall be treated with Monsanto's "Round-Up" per manufacturer's specifications. All proposed landscape areas adjacent to water bodies shall be treated with "Rodeo" per the manufacturer's specifications. B. New plant materials will not be installed until a 98% weed/turf eradication has been achieved. More than one application may be required to produce an acceptable planting bed. C. Pre-emergent herbicides are not a substitute for spray treatment of "Round-Up" or "Rodeo", and may be used only with the written approval of the Landscape Architect. D. Should any plant material in the same, or adjacent beds be damaged by these chemicals, the same size, quantity and quality of plants shall be immediately replaced by the Contractor at no cost to the Owner. � E. Any necessary corrections or repairs to the finish grades shall be accomplished by the Contractor. All planting areas shall be carefully graded and raked to smooth, even finish grade, free from depressions, lumps, stones, sticks or other debris and such that they will � conform to the required finish grades and provide uniform and satisfactory surface drainage without puddling. ' SectionN.doc r Page 45 of 128 5/IS/2012 Section 1V — Technical Specifications F. The Contractor shall remove debris (sticks, stones, rubbish) over 1-'/2 inches in any dimension form individual tree, shrub and hedge pits and dispose of the excavated material offthe site. 25.2.3.1.3 PREPARATION FOR ANNUAL BED PLANTING A. Prepare native subgrade by rototilling or loosening by hand methods. Spread 3 inches of Florida peat (1/3), sandy loam (1/3), or other approved organic soil amendment over the full length and width of planting area for annuals. Rototill organic layer 6 inches to 8 inches into the native soil. Grade the planting bed by "crowning' to insure that surface drainage, percolation, and aeration occur at rapid rates. Add Osmocote time release fertilizer according to product instructions and rate. 25.2.3.1.4 PREPARATION FOR SEEDING AND SOD AREAS A. All proposed sod areas containing existing turf grass or weeds shall be treated with Monsanto's "Round-Up" per manufacturer's specifications. All proposed sod areas adjacent to water bodies shall be treated with "Rodeo" per the Manufacturer's Specifications. B. Limit preparation to areas which will be planted promptly after preparation. Loosen sub- grade of seed and sod areas to a minimum depth of 4 inches. C. Immediately prior to any turf work, the Contractor shall finish grade the soil to a smooth, even surface assuring positive drainage away from buildings and the subsequent turf flush to the tops of adjacent curbs and sidewalks. The surface shall be sloped to existing yard drains. D. A complete fertilizer shall be applied to St. Augustine or Bahia grass at a rate of one (l) pound of nitrogen per 1000 square feet. Fertilizer shall be commercial grade, mixed granules, with 30% - 505 of the nitrogen being in slow or controlled release form. Thoroughly work fertilizer into the top 4 inches of soil. E. Moisten prepared seed and sod areas before planting if soil is dry. Water thoroughly and allow surface moisture to dry before planting lawns. Do not create a muddy soil condition. 25.2.3.2 INSTALLATION 25.2.3.2.1 BERM CONSTRUCTION (IF SPECIFIED) A. Install berms at location and design shown on Plans and at the height and slope indicated. Height stated is for finished berm with soil at natural compaction. B. Exact location and configuration of berms may reyuire modification to allow proper drainage; such changes will be coordinated with the Landscape Architect. C. If shown on the Plan, construct berms using clean sandy loam fill dirt which is well- drained, free of rocks, roots, or other debris, with a soil pH of an acid Nature (about 6.0 - 6.5). No heavily organic soil, such as muck or peat shall be used in berm construction. 25.2.3.2.2 LAYOUT OF PLANT MATERIALS A. Unless otherwise stipulated, plant materials shall be approximately located per the plans by scale measurements using established building, columns, curbs, screen walls, etc. as SectionIV.doc Page 46 of 128 5/I S/2012 � �l � � � �� ' ' ' ' , ' � � LJ � � � ,L_I ' ' � ' u u , Section N — Technical Specifications the measuring reference point. Slight shifting may be required to clear wires, prevent blockage of signage, etc. B. Shrubs and ground covers shall be located and spaced as noted on the plant material schedule (if provided), otherwise plants will be placed in the planting beds at the normally accepted spacing for each species. C. Leave an 18 inch (450 millimeters) border of mulched space between outer leaves of installed plant material and the bed line, curb, ar building foundation wall for all plant sizes. D. Any necessary "minor" adjustments in the layout of planting shall be made by the Contractor with the approval of the Landscape Architect in order to conform as nearly as possible to the intent of the plans. 25.2.3.2.3 PLANTING PROCEDURES A. All shrubs, trees and ground covers or vines shall be planted in pits having vertical sides and being circular in outline. Planting pit shall be 3 to 5 times the width of the root ball. � B. Plants shall be set straight or plumb, in the locations shown, at such levei that after settlement normal or natural relationship of the top of the root ball with the ground surface will be established. With regards to proper nursery practices, plants under certain , conditions (i.e. low and wet areas) will benefit from being planted "high" with the root ball about 1 inch higher than the surrounding grade. C. All plant materials shall be fertilized with Agriform 20-10-5 planting tablets, or approved � equal, at time of installation and prior to completion of pit backfilling. Agriform planting tablets shall be placed uniformly around the root mass at a depth that is between the middle and the bottom of the root mass. � � � ' � � � ' ' Application rate: 1 gallon 3 gallon 5 gallon 7 gallon Trees Palms 1 - 21 gram tablet 2 - 2l gram tablet 3 - 21 gram tablet 4 - 2l gram tablet 3 tablets each'/z" (]2 millimeters) caliper 7- 21 gram tablets D. Native soil shall be used in back-filling plant pits or as specified. The Contractor shall be responsible far providing additional soil for building tree saucers. E. When balled and burlapped plants are set, undisturbed native soil shall be left under the base of the root ball to prevent voids. Backfill tilled and loosened native soil around the sides of the root ball. Remove the top 4 inches (100 millimeters) of burlap wire, and all tie-down material from the root ball. Do not remove these materials from the bottom of the root ball. Thoroughly water-in before bringing the back-fill up to the proper grade Roots of bare plants shall be properly spread out, and planting soil carefully worked in among them. Failure to comply is cause for rejection. F. Containerized plants shall be installed with undisturbed native soil left under the base of the root ball to prevent voids. Planting pit shall be 3 to 5 times the width of the root ball. Backfil] tilled and loosened native soil around the sides of the root ball. Thoroughly water-in before bringing the backfill up to the proper grade. SectionlV.doc Page 4'7 of 128 5/15/2012 Section IV —Technical Specifications G. Plant spacing shall be "on center" and varies with the different plant species. Space each variety of plant equally in the planting areas. Shrubs and ground covers adjacent to straight or curved edges shall be triangular - spaced in rows parallel to those edges. Plant a minimum of 18 inches from the back of the curb to the outside edge ofthe plant. H. All azaleas shall be placed into a prepared bed of amended soil containing 50% weed-free Florida peat or approved equivalent. Root balls shall be scarified vertically at 120 degree angles in a triangular pattern. I. Sabal palms may be planted deeper than normal if conditions warrant and if approved. 25.2.3.2.4 SODDING A. During periods of drought, sod shall be watered sufficiently at its origin to moisten the soil adequately to the depth to which it is to be cut. B. An application of 6-6-6, 40% organic, slow or controlled release fertilizer shall be made to all lawn areas just prior to the laying of the sod at a rate of one (1) pound of nitrogen per 1,000 square feet. The ground shall be wet down before the sod is laid in place. C. Solid sod shall be laid tightly with ciosely abutting staggered joints with an even surface edge and sod edge, in a neat and clean manner to the edge of all the paving and shrub areas. Cut down soil level to 1 inch to l-1/2 inches below top of walks prior to laying sod. D. Within 2 hours after installing sod and prior to rolling, irrigate the sod. Sufficient water shall be applied to wet the sod thoroughly and to wet the sod to a depth of 2 inches (50 millimeters). Watering shall be done in a manner that will avoid erosion due to the application of excessive quantities, and the watering equipment shall be a type that will prevent damage to the finished sod surface. Watering shall be repeated as necessary to keep sod moist until rooted to subgrade. E. The sod shall be pressed firmly into contact with the sod bed using a turf roller or other approved equipment so as to eliminate air pockets, provide a true and even surface and insure knitting without any displacement of the sod or deformation of the surfaces of sodded areas. After the sodding operation has been completed, the edges of the area shall be smooth and shall conform to the grades indicated. F. If, in the opinion of the Landscape Architect, top dressing is necessary after rolling, clean silica sand shall be used to fill voids. Evenly apply sand over the entire surface to be leveled, filling-in dips and voids and thoroughly washing into the sod areas. G. On slopes steeper than 2:l and as required, the sod shall be fastened in place with suitable wooden pins or by other approved method. 25.2.3.2.5 SEEDING A. Seed shall be installed per the specifications of the State of Florida Department of Transportation. See plan for type of seed. 25.2.3.2.6 TREE GUYING, BRACING AND STAKING A. Tree guying, staking and bracing shall be the responsibility of the Contractor per sound nursery practices, and shall be done per details shown on the Plans. For trees, a minimum of 2 stakes per tree ar an optional 3 stakes per tree at 120 degree spacing shall be used. SectionlV.doc Page 48 of 128 5/15/2012 , 1 � ' � r , ' LJ , �I � �i , � � � , u , ' � Section IV — Technical Specifications Stakes shall be driven in at an angle, then tightened to vertical supported by approved plastic or rubber guys. Trees shall be staked with a minimum of 4 feet height of stake above grade and a minimum of 30 inches of stake below grade. B. For single trunk palms, a minimum of 3 stakes per palm at 120 degree spacing shall be ' used. Toenail the stakes to batten consisting of 5 layers of burlap and 5- 2 inch x 4 inch x 16 inch wood connected with two 3/4 inch steel bands. Palms shall be staked with a minimum of 5 feet of stake above grade. ' � , , f_� ' C. Contractor shall remove all tree guying, staking, and bracing from trees six (6) months after the date of final acceptance of the landscape work. D. Stake only trees that require support to maintain a plumb position or are in potentially hazardous areas. 25.2.3.2.7 MULCHING A. All planting beds shall be weed-free prior to mulching. B. All curb, roadway, and bed line edges will be "trenched" to help contain the applied mulch. C. All plant beds and tree rings shall be mulched evenly with a 3 inch layer (before compaction) of 100% Grade B recycled cypress bark mulch, or other mulch as specified on the Plans or General Notes. D. Mulch shall not be placed against the trunks of plant materials or foundations of buildings. Maintain a minimum 3 inch clearance for trees and shrub trunks and a minimum 6 inch clearance for the walls of buildings. E. For beds of annual flowers, a 12 inch wide x 3 inch deep band of mulch shall be installed ' in front of the first row of annuals. Maintain a minimum 6 inches of non-mulched clearance from the outside edge of annuals. � � � 25.2.3.2.8 PRUNING A. Pruning shall be done by an experienced certified Arborist to maintain the natural shape and form of the plant. B. Upon acceptance by the Owner, prune any broken branches, remove crossed branches, and branches hanging below the clear trunk of the tree. 25.2.3.2.9 CLEAN-UP A. During landscape work, store materials and equipment where directed by the Owner. ' B. The Contractor shall promptly remove any materials and equipment used on the job, keeping the area neat at all times. Upon completion of all planting, dispose of all excess soil and debris leaving pavements and work areas in safe and orderly condition. ' � ' ' C. The clean-up of the site shall include the removal and proper disposal of the tree guying, staking, and bracing materials as described in specifications. SectionlV.doc Page 49 of 128 5/15{2012 25.2.3.2.10 PROTECTION Section 1V —Technical Specifications A. The Contractor shall provide safeguards for the protection of workmen and others on, about, or adjacent to the work, as required under the parameters of the Occupational Safety and Health Administration (O.S.H.A.) standards. B. The Contractor shall protect the Owner's and adjacent property from damage. C. the Contractor shall protect the landscape work and materials from damage due to landscape operations. Maintain protection during installation and maintenance periods. D. The Contractor shall provide protection (tree barricades) for all existing trees and palms as specified. 25.2.3.2.11 REPAIR OF DAMAGES E. The Contractor shall repair all damage caused by his operations to other materials, property, or trades to a level equal in quality to the existing condition prior to damage. F. The Contractor shall be held responsible for all damage done by his work or employees to other materials or trades' work. Patching and replacement of damaged work may be done by others, at the Owner's direction, but the cost of same shall be paid by the Contractor who is responsible for the damage. 25.2.3.3 MAINTENANCE A. The Contractor shall maintain all plant materials in a first class condition from the beginning of landscape construction until Final Acceptance. B. Operations: l. Maintenance shall include, but not be limited to, watering of turf and planting beds, mowing, fertilizing, cultivation, weeding, pruning, disease and pest control, replacement of dead materials, straightening, turf or planter settlement corrections, replacement of rejected materials, staking and guying repair and tightening, wash-out repairs and regrading, and any other procedures consistent with the good horticultural practice necessary to insure normal, vigorous and healthy growth of all work under the Contract. Mowing shall be consistent with the recommended height per the University of Florida Cooperative Extension Service. 2. Within the warranty period, the Contractor shall notify the Owner of any maintenance practices being followed or omitted which would be detrimental to the healthy, vigorous growth of the landscape. 3. The Contractor shall be responsible for the final watering of not less than one inch of water for all planted materials before leaving the site. 25.2.3.4 INSPECTION, REJECTION, AND ACCEPTANCE 25.2.3.4.1 INSPECTION A. Upon completion of the installation, the Contractor will notify the Owner or the Owner's Representative that the job is ready for inspection. Within 15 days of notifications, the installation will be inspected by the Landscape Architect. A written and/or graphic inspection report will be sent to the Owner and/or Landscape Contractor. SectionIV.doc Page 50 of l28 5/15/2012 ' , � ' ' � , I_ 1 , � C� � �I � , � LJ , ' ' ' Section 1V — Technical Specifications 25.2.3.4.2 REJECTION AND REPLACEMENT ' A. The Landscape Architect shall be final judge as to the suitability and acceptability of any part of the work. Plant material will be rejected if it does not meet the requirements set forth in Plans and Specifications. ' LJ � ' , ' ;LJ L_J � � ' ' ' , B. Replace any rejected materials immediately or within 15 days and notify the Landscape Architect that the correction has been made. 25.2.3.4.3 ACCEPTANCE A. After replacement of rejected plant material (if any) have been made, and completion of all other correction items, the Owner ar Project Representative will accept the project in writing. B. Upon Final Acceptance, the Owner assumes responsibility for maintenance within the terms of the Contract. Acceptance will in no way invalidate the Contractor's warranty period. C. The Contractor's warranty period will begin after final acceptance of the project by the Owner. l. If evidence exists of any lien or claim arising out of or in connection with default in performance of this Contract, the Owner shall have the right to retain any payment sufficient to discharge such claim and all costs in connection with discharging such claim. 2. Where the Specifications call for any stipulated item or an "approved equivalent", or in words to that effect, the Contractor shall indicate the price of the type and species specified in the proposal, giving the price to be added or deducted from his Contract price. The final selection rests with the Owner or his representative. 3. Where plants installed do not meet specifications, the Owner reserves the right to request plant replacement or an appropriate deduction from the Contract amount to compensate for the value not received from the under-specified plant materials. No additional compensation will be made to the Contractor for plants installed that exceed specifications. 25.2.3.5 WARRANTY A. The Contractor shall warranty all palms and trees furnished under this contract for a period of one (l) year and all shrubs for a period of six (6) months. Material which is either dead or in poor health during this period or at completion will be replaced at no charge to the Owner. Should any of the plant materials show 50% or more defoliation during the warranty period, due to the Contractor's use of poor quality or improper materials or workmanship, the Contractor upon notice, shall replace without delay same with no additional cost to the Owner. Should any plant require replacing, the new plant shall be given the equal amount of warranty. ' SectionIV.doc � Page 51 of 128 5/15/2012 Section 1V —Technical Specifications 26 HDPE DEFORMED - REFORMED PIPE LINING 26.1 INTENT It is the intention of this specification to provide for the trenchless restoration of 8" to 12" sanitary sewers by the installation of a high density polyethylene, jointless, continuous, fold and form pipe liner which is watertight and chemically resistant to withstand exposure to domestic sewage including all labor, materials and equipment to provide for a complete, fully restored and functioning installation. 26.2 PRODUCT AND CONTRACTOR/INSTALLER ACCEPTABILITY The City requires that all contractars be prequalified. See General Conditions regarding contractor prequalification. In addition, the City requires a proven extensive tract record for the fold and form liner system to be used in this project. All contractors submitting for prequalification approval for this project must exhibit extensive satisfactory experience in the installation of the proposed liner system and satisfactory evidence that the proposed liner system has been extensively and successfully installed in the Unites States and the State of Florida. The installer must be certified by the liner system manufacturer for installation of the liner system. The City reserves fuli and complete authority to approve the satisfactory nature of the both the liner system and the installer. 26.3 MATERIALS Pipe shall be made from P. E. 3408 polyethylene resins complying with ASTM D 3350, cell classification: P.E. 345434 D for High Density. It shall be Type 3, Grade 4, Class D, according to ASTM D 1248. The Contractor shall provide certified test results for review by the Engineer, from the manufacturer, that the material conforms with the applicable requirements. Material shall have a minimum thickness of SDR 32.5. Pipe specimens shall comply with the minimum property values shown below with the applicable ASTM requirements: Material PropertX ASTM Method Value HDPE Tensile Strength D 638 3,300 psi Elasticity Modulus E=113,000 psi HDPE Impact Strength D 256 A 3.0 ft-lb/in Flexure Modulus E=136,000 psi Expansion Coeff. c=0.009 in/in/deg F At the time of manufacture, each lot of liner shall be reviewed for defects and tested in accordance with ASTM D 2837 and D 1693. At the time of delivery, the liner shall be homogeneous throughout, uniform in color, free of cracks, holes, foreign materials, blisters, or deleterious faults. The Contractor shall provide, as requested, certified test results for review by the Engineer, from the manufacturer, that the material conforms with the applicable requirements. The Engineer may at any time request the Contractor provide test results from field samples to the above requirements. SectionIV.doc Page 52 of 128 5/15/2012 ' , ' ' , � � �� ' ' , ' � , � , � , � ' L_J ' ' ' �� Section IV —Technical Specifications Liner shall be marked at 5-foot intervals or less with a coded number, which identifies the manufacturer, SDR, size, material, date, and shift on which the liner was extruded. Lining manufacturer shall submit to the Engineer for approval as requested, complete design calculations for the liner thickness. The criteria for liner design shall be HS-20 traffic loading, water table to the ground surface, minimum expected lifetime of 50 years, and no structural strength retained from the existing pipe. Liner materials shall meet manufactures specifications of Pipe Liners, Inc. 3421 N. Causeway, Suite 321, New Orleans, LA 70002, 1-800-344-3744 or approved equaL Any approved equal liner system must be approved by the Engineer as an equal system prior to receiving bids. Request for contractor prequalification and/or equal liner system approval must be received by the Engineer no later than l4 days prior to the date for receiving bids. 26.4 CLEANING/SURFACE PREPARATION � It shall be the responsibility of the Contractor to clean and prepare the existing pipes for rehabilitation. The Contractor will thoroughly clean the interior of the sewers to produce a clean interior surface free of all coatings, sand, rock, roots, sludge, or other deleterious materials prior , to lin�r insertion. Bypass pumping will be provided by the Contractor as part of the unit cost of restoration. Bypass operations are to be so arranged as to cause minimum disruptions to local traffic, residents and particularly to commercial facilities. During the cleaning and preparation , operations all necessary precautions shall be taken to protect the public, all property and the sewer from damage. All material removed from the sewers shall be the Contractor's responsibility for prompt disposal ' in accordance with all regulatory agency requirements. The Contractor may be required to control the rate of sewer cleaning in the sanitary system to avoid heavy pollution loads at the City's treatment plants. L� � CJ ' I' ' ' ' ' 26.5 TELEVISION INSPECTION After cleaning, and again after the rehabilitation work on each section of the project is completed, all pipe sections shall be visually inspected by means of closed-circuit color television, and recorded on VHS format tapes provided to the project engineer. The television system used shall be designed for the purpose and suitably lighted to provide a clear picture of the entire periphery of the pipe. 26.6 LINER INSTALLATION Liner shall be sized to field measurements obtained by the Contractor to provide a tight fit to the full interior circumference of the existing sanitary sewer and shall be a continuous, jointless liner product from inside of manhole to inside of manhole. Contractor shall use installation methods approved by the liner manufacturer including liner placement, reforming to fit existing pipe, pressure and heat requirements and reconnection of laterals. The Contractor shall immediately notify the Engineer of any construction delays taking place during the insertion operation. Contractor shall maintain a reasonable backup system for bypass pumping should delays or problems with pumping systems develop. Liner entries at manholes shall be smooth, free of irregularities, and watertight. No pinholes, tears, cracks, thin spots, or other defects in the liner shall be permitted. Such defects shall be removed and replaced by the Contractor at his expense. OSHA requirements for installation procedures, in particular, confined spaces are to be met. SectionlV.doc Page 53 of 128 5/IS/2012 Section 1V—Technical Specifications 26.7 LATERAL RECONNECTION Sanitary laterals shall be reconnected as soon as possible to renew service. Laterals are to be reconnected by means of robotics, by internally cutting out the liner to 100% of the area of the original opening. All lateral reconnections are to be gouted to prevent leakage. Grouting method and material is to be approved by the Engineer. Any reconnections to laterals and connections to manholes which are observed to leak shall be resealed by the Contractor. All laterals discovered during the lining process are to be reconnected unless specifically directed otherwise by the City. The Contractor will be requested to reconnect any laterals discovered to not be reconnected at a later date. Contractor shall notify all local system users when the sanitary system will not be available for normal usage by the delivery of door hangers with appropriate information regarding the construction project. 26.8 TIME OF CONSTRUCTION Construction schedules will be submitted by the Contractor and approved by the Engineer. At no time will any sanitary sewer service connection remain inoperative for more than a eight hour period without a service bypass being operated by the Contractor. In the event that sewage backup occurs and enters buildings, the Contractor shall be responsible for cleanup, repair and property damage costs and claims. 26.9 PAYMENT Payment for sanitary sewer restoration shall be made per lineal foot including all preparation, bypass pumping, equipment, labor, materials, operations, restoration, etc, to provide a fully completed and operational sewer. Payment shall be measured from center of manhole to center of manhole for the sanitary systems and from end of pipe to end of pipe for storm systems. 27 PLANT MIX DRIVEWAYS New driveways or existing black top driveways that must be broken back in widening the pavement (remove only enough to allow adequate grade for access to the street) shall be constructed or replaced in accordance with the specifications for paving the street with the exception that the base shall be six (6) inches. Use Section 23 G Asphaltic Concrete as specified for the street paving. When finished surface of existing drive is gravel, replacement shall be of like material. Payment shall be the same as Plant Mix Driveways. 27.1 BASIS OF MEASUREMENT Measurement shall be the number of square yard of Plant Mix Driveways in place and accepted. 27.2 BASIS OF PAYMENT Payment shall be the unit price per square yard for Plant Mix Driveways as measured above, which price shall be full compensation for all work described in this section of the specifications and shall include all materials, equipment, tools, labor and incidentals necessary to complete the work. SectionlV.doc Page 54 of 128 5/15/2012 ��I � J ' , ' , ' ' �I , LJ � , ' , , , , ' , ' r ' ' ' ' , , ' Section 1V —Technical Specifications 28 REPORTING OF TONNAGE OF RECYCLED MATERIALS This Article deleted. 29 CONCRETE CURBS Concrete Curbs shall be constructed to the line, grade and dimensions as shown on the plans. Unless otherwise noted, all concrete curbs shall have fiber mesh reinforcement and have a minimum strength of 3000 p.s.i. at 28 days. Expansion joints shall be placed at intervals not to exceed ] 00 feet, and scared joints shali be placed at intervals not to exceed 10 feet. In addition, al) the requirements of City Articles 6, 7, and 8 shall also apply. The Contractor shall notify the Project Inspector a minimum of 24 hours in advance of the placement of all concrete curbs. 29.1 BASIS OF MEASUREMENT The basis of ineasurement shall be lineal feet of curb in place and accepted. 29.2 BASIS OF PAYMENT Payment shall be the unit price per lineal foot of curb, which price shall be full compensation for all work described in this and other applicable parts of the specifications and shall include all materials, equipment, tools, labor and incidentals necessary to complete the work. 30 CONCRETE SIDEWALKS AND DRIVEWAYS 30.1 CONCRETE SIDEWALKS ' Concrete sidewalks shall be constructed to the line, grade and dimensions as shown on the plans or herein specified. Unless otherwise noted, all concrete sidewalks shall have fiber mesh reinforcement and have a minimum strength of 3000 p.s.i. at 28 days. Unless otherwise � specified, all concrete sidewalks shall have a minimum width of four feet (4'). Concrete sidewalks shall have a minimum thickness of four inches (4"), except at driveway crossings where a minimum thickness of six inches (6") is required. Also, 6/6 X] 0/l0 welded wire mesh ' reinforcement is required for all sidewalk that crosses driveways. The welded wire mesh shall be positioned in the middle to upper third of the placement. No compensation shall be given if the welded wire mesh is not properly placed. Expansion joints shall be placed at intervals of not � more than l00 hundred feet, and scoring marks shall be made every 5 feet. Concrete shall be poured only on compacted subgrade. In addition, all the requirements of City Articles 6, 7, and 8 shall also apply. ' 30.2 CONCRETE DRIVEWAYS Concrete driveways, whether new construction or replacement, shall be a minimum of six (6) ' inches in thickness with 6/6 x 10/10 welded wire mesh reinforcement and a minimum horizontal distance between expansion joints of no less than four (4) feet measured in any direction. The welded wire mesh shall be positioned in the middle to upper third of the placement. No ' compensation shall be given if the welded wire mesh is not properly placed. Concrete shall be poured only on compacted subgrade. In addition, all the requirements of City Articles 6, 7, and 8 shall also apply. ' SectionIV.doc Page 55 of 128 5/15/2012 r" � Section IV — Technical Specifications The Contractor shall notify the Project Inspector a minimum of 24 hours in advance of the placement of all concrete sidewalks and driveways. 30.3 BASIS OF MEASUREMENT The basis of ineasurement shall be the number of square feet of 4" concrete sidewalk, 6" concrete sidewalk, and 6" concrete driveways in place and accepted. 30.4 BASIS OF PAYMENT Payment shall be the unit price per square foot for each item as measured above, which price shall be full compensation for all work described in this section and other applicable parts of the specifications and shall include all materials, equipment, tools, welded wire mesh where required, labor and incidentals necessary to complete the work. 31 SODDING Unless otherwise noted herein, the contractor shall place all sod, either shown on the plans or at the direction of the Engineer, in conformance with Sections 575, 981, 982 and 983 of FDOT's Standard Specifications (latest edition). The area for sod application shall be loosened and excavated to a suitable depth and finished to a grade compatible with existing grass and structures. Sod shall be placed with edges in close contact and shall be compacted to uniform finished grade with a sod roller immediately after placement. In sloped areas, the sod shall be graded and placed so as to prohibit erosion and undermining of the adjacent sidewalk. No sod that has been cut for more than 72 hours can be used unless authorized by the Engineer in advance. The sod shall be thoroughly watered immediately after placement. The Contractor shall continue to water sod as needed and/or directed by the Engineer as indicated by sun exposure, soil, heat and rain conditions, to establish and assure growth, until termination of the contract. Dead sod, or sod not acceptable to the Engineer, shall be removed and replaced by the Contractor at no additional compensation. Any questions concerning the type of existing sod shall be determined by the Engineer. Unless otherwise noted on the plans, payment for sod (including labor, equipment, materials, placement, rolling, watering, etc.) shall be included in other bid items. Payment for these associated bid items may be withheld until the Contractor provides the City a healthy, properly placed stand of grass. When this work is given as a separate bid item, it shall cover all labor, eyuipment and materials, (including water) required for this work and shall be paid for on the basis of each square foot in place and accepted. No payment for sod shall be made until the Contractor provides the City a healthy, properly placed stand of grass. 32 SEEDING Seed, or seed and mulch, shall only be used when specified for certain demolition projects. The seed and/or mulch shall be placed as called for on the plans in the following manner. The area to be seeded shall be brought to the required line and grade, fertilized and seeded in basic conformance with the latest edition of FDOT's Standard Specifications Sections 570, 981, 982 and 983. However, no wildflower seed shall be used, and Argentine Bahia Seed shall be used instead of Pensacola Bahia. No sprigging will be required. Also, the addition of 20 lb. of Rye Seed (to total 601b. of seed per acre) will be required during the stated periods. It is also required that the Contractor maintain said seed until growth is assured. SectionlV.doc Page 56 of 128 5/15/2012 ' ' ' ' , � ' ' � ' � � ' i ' � ' , ' , ' , ' � � � Section IV—Technical Specifications When this work is given as a bid item, the item shall cover all labor, material, equipment (including water), required far this work, and shall be paid for on the basis of each square yard in place and accepted. If called for on the p}ans, but not shown as a bid item, then the cost of such work as stated above shall be included in the cost of other work. 33 STORM MANHOLES, INLETS, CATCH BASINS OR OTHER STORM STRUCTURES For details on specific design of a type of storm structure refer to Part B Index Numbers 200 to 235. When required, inlets, catch basins or other structures shall be constructed according to the plans and applicable parts of the specifications, Section Numbers 7, 8, & 9, and as approved by the Engineer. Said structures shall be protected and saved from damage by the elements or other causes until acceptance of the work. 33.1 BUILT UP TYPE STRUCTURES � Manholes shall be constructed of brick with cast iron frames and covers as shown on the Index Numbers 201 and 202. Invert channels shall be constructed smooth and semi circular in shape conforming to inside of adjacent sewer section. Changes in direction of flow shall be made in a ' smooth curve of as large a radius as possible. Changes in size and grade of channels shall be made gradually and evenly. lnvert channels shall be built up with brick and mortar on top of concrete base. � � �'I � � ' The storm structure floor outside of channels shall be made smooth and sloped toward channels. Manhole steps shal) not be provided. Joints shall be completely filled and the mortar shall be smoothed from inside of the manholes. The entire exterior of brick manholes shall be plastered with one half inch of mortar. Brick shall be laid radially with every sixth course being a stretcher course. In cases where a storm pipe extends inside a structure, the excess pipe will be cut off with a concrete saw and shall not be removed with a sledge hammer. 33.2 PRECAST TYPE The manhole base shall be set on a pad of dry native sand approximately five inches thick to secure proper seating and bearing. Precast Manholes and Junction Boxes: The Contractor may substitute precast manholes and junction boxes in lieu of cast in place units unless otherwise shown on the plans. Precast Inlets will not be acceptable. When precast units are substituted, the construction of such units must be in accordance with ASTM C 478, or the standard specifications at the manufacturers option. Precast structures must also meet the requirement that on the lateral faces, either inside or , outside, the distance between precast openings for pipe or precast opening and top edge of precast structure be no less than wall thickness. A minimum of four courses of brick will be provided under manhole ring so that future adjustment of manhole lid can be accommodated. ' Manhole steps shall not be provided. Manhole using O ring between precast sections will not be acceptable for storm structures. � Section7V.doc Page 57 of 128 5/15/2012 ' Section IV — Technical Specifications 33.3 BASIS OF PAYMENT Payment for Junction Boxes, Manholes or other structures shall be on a unit basis. 34 MATERIAL USED This article deleted. See SECTION III, ARTICLE 19 — MATERIAL USED. 35 CONFLICT BETWEEN PLANS AND SPECIFICATIONS This article deleted. See SECTION III, ARTICLE 20 — CONFLICT BETWEEN PLANS AND SPECIFICATIONS. 36 STREET SIGNS The removal, covering or relocation of street signs by the Contractor is PROHIBITED. All street signs shall be removed, covered ar relocated by the City's Traffic Engineering Division in accordance with Sections 700, 994, 995, and 996 of FDOT's Standard Specifications (latest edition). The Contractor shall notify the City's Traffic Engineering Division a minimum of 24 hours in advance of the proposed sign relocation, covering or removal. 37 AUDIONIDEO RECORDING OF WORK AREAS 37.1 CONTRACTOR TO PREPARE AUDIONIDEO RECORDING Prior to commencing work, the Contractor shall have a continuous color audio/video recording taken along the entire length of the Project including all affected project areas. Streets, easements, rights-of-way, lots or construction sites within the Project must be recorded to serve as a recard of a pre-construction conditions. 37.2 SCHEDULING OF AUDIONIDEO RECORDING The video recordings shall not be made more than twenty-one (21) days prior to construction in any area. 37.3 PROFESSIONAL VIDEOGRAPHERS The Contractor shall engage the services of a professional videographer. The color audio videotapes shall be prepared by a responsible commercial firm known to be skilled and regularly engaged in the business of pre-construction color audio-video recording documentation. 37.4 EQUIPMENT All equipment, accessories, materials and labor to perform this service shall be furnished by the Contractor. The total audio video system shall reproduce bright, sharp, clear pictures with accurate colors and shall be free from distortion, tearing, rolls or any other form of imperfection. The audio portion of the recording shall reproduce the commentary of the camera operator with proper volume, clarity and be free from distortion and interruptions. In some instances, audio video coverage may be required in areas not accessible by conventional wheeled vehicles. Such coverage shall be obtained by walking. SectionIV.doc Page 58 of I28 5/15/2012 � � �I � � � � � � � � � � � II , , � I�'' � � � � �� Section IV —Technical Specifications 37.5 RECORDED INFORMATION, AUDIO Each recording shall begin with the current date, project name and be followed by the general location, i.e., viewing side and direction of progress. Accompanying the video recording of each video shall be a corresponding and simultaneously recorded audio recording. This audio recording, exclusively containing the commentary of the camera operator or aide, shall assist in viewer ��rientation and in any needed identification, differentiation, clarification, or objective description of the features being shown in the video portion of the recording. The audio recording shall also be free from any conversations. 37.6 RECORDED INFORMATION VIDEO � All vide;o recordings must continuously display transparent digital information to include the date and time of recording. The date information shall contain the month, day and year. The time informa�ion shall contain the hour, minutes and seconds. Additional information shall be � displayed periodically. Such information shall include, but not be limited to, project name, contract number, direction of travel and the viewing side. This transparent information shall appear on the extreme upper left hand third of the screen. Camera pan, tilt, zoom-in and zoom � out rates shall be sufficiently controlled such that recorded objects will be clearly viewed during videotape playback. In addition, all other camera and recording system controls, such as lens focus arid aperture, video level, pedestal, chrome, white balance, and electrical focus shall be � properly controlled or adjusted to maximize picture quality. The construction documentation shall be recorded in SP mode. � � � � � � �I � ' � 37.7 VIEWER ORIENTATION The auc�io and video portions of the recording shall maintain viewer orientation. To this end, overall establishing views of all visible house and business addresses shall be utilized. In areas where the proposed construction location will not be readily apparent to the videotape viewer, highly visible yellow flags shall be placed, by the Contractor, in such a fashion as to clearly indicate the proposed centerline of construction. When conventional wheeled vehicles are used as conveyances for the recording system, the vertical distance between the camera lens and the ground shall not exceed 10 feet. The camera shall be firmly mounted such that transport of the camera �uring the recording process will not cause an unsteady picture. 37.8 LIGHTING All recording shall be done during time of good visibility. No taping shall be done during precipitation, mist or fog. The recording shall only be done when sufficient sunlight is present to properl}� illuminate the subjects of recording and to produce bright, sharp video recordings of those subjects. 37.9 SPEED OF TRAVEL The average rate of travel during a particular segment of coverage shall be directly proportional to the number, size and value of the surface features within that construction areas zone of influence. The rate of speed in the general direction of travel of the vehicle used during taping shall not exceed forty-four (44) feet per minute. SectionIV.doc Page 59 of 128 5/15/2012 Section IV —Technical Specifications 37.10 VIDEO LOG/INDEX All videotapes shall be permanently labeled and shall be properly identified by videotape number and project title. Each videotape shall have a log of that videotape's contents. The log shall describe the various segments of coverage contained on the video tape in terms of the names of the streets or location of easements, coverage beginning and end, directions of coverage, video unit counter numbers, engineering survey or coordinate values (if reasonably available) and the date. 37.11 AREA OF COVERAGE Tape coverage shall include all surface features located within the zone of influence of construction supported by appropriate audio coverage. Such coverage shall include, but not be limited to, existing driveways, sidewalks, curbs, pavements, drainage system features, mailboxes, landscaping, culverts, fences, signs, Contractor staging areas, adjacent structures, etc. within the area covered by the project. Of particular concern shall be the existence of any faults, fractures, or defects. Taped coverage shall be limited to one side of the Site, street, easement or right of way at any one time. 37.12 COSTS OF VIDEO SERVICES The cost to complete the requirements under this section shall be included in the contract items provided in the proposal sheet. There is no separate pay item for this work. 38 EROSION AND SILTATION CONTROL 38.1 STABILIZATION OF DENUDED AREAS No disturbed area may be denuded for more than thirty (30) calendar days unless otherwise authorized by the City Engineer. During construction, denuded areas shall be covered by mulches such as straw, hay, filter fabric, seed and mulch, sod, or some other permanent vegetation. Within sixty (60) calendar days after final grade is established on any portion of a project site, that portion of the site shall be provided with established permanent soil stabilization measures per the original site plan, whether by impervious surface or landscaping. 38.2 PROTECTION AND STABILIZATION OF SOIL STOCKPILES Fill material stockpiles shall be protected at all times by on-site drainage controls which prevent erosion of the stockpiled material. Control of dust from such stockpiles may be required, depending upon their location and the expected length of time the stockpiles will be present. ln no case shall an unstabilized stockpile remain after thirty (30) calendar days. 38.3 PROTECTION OF EXISTING STORM SEWER SYSTEMS During construction, all storm sewer inlets in the vicinity of the project shall be protected by sediment traps such as secured hay bales, sod, stone, etc., which shall be maintained and modified as required by construction progress, and which must be approved by the City Engineer before installation. SectionIV.doc Page 60 of 128 5/15/2012 � � � !N � � � � � � � �� � � L1 � Section IV — Technical Specifications 38.4 SEDIMENT TRAPPING MEASURES � Sediment basins and traps, perimeter berms, filter fences, berms, sediment barriers, vegetative buffers and other measures intended to trap sediment and/or prevent the transport of sediment onto adjacent properties, or into existing water bodies; must be installed, constructed, or, in the ,� case of vegetative buffers, protected from disturbance, as a first step in the land alteration process. Such systems shall be fully operative and inspected by the City before any other disturbance of the site begins. Earthen structures including but not limited to berms, earth filters, � dams ol• dikes shall be stabilized and protected from drainage damage or erosion within one week of installation. 38.5 SEDIMENTATION BASINS � Areas of 3 acres or more shall be required to have temporary sedimentation basins as a positive remedy against downstream siltation and will be shown and detailed on construction plans. � During development, permanent detention areas may be used in place of silt basins, provided they are maintained to the satisfaction of the City. ' ' � r � The Contractor will be required to prohibit discharge of silt through the outfall structure during construction of any detention area and will be required to clean out the detention area before installing any permanent subdrain pipe. In addition, permanent detention areas must be totally cleaned out and operating properly at final inspection and at the end of the one year warranty period. When temporary sedimentation basins are used, they shall be capable at all times of containing at least one (1) cubic foot of sediment for each one hundred (100) square feet of area tributary to the basin. Such capacity shall be maintained throughout the project by regular removal of sediment from the basin. 38.6 WORKING IN OR CROSSING WATERWAYS OR WATERBODIES Land alteration and construction shall be minimized in both permanent and intermittent waterwa.ys and the immediately adjacent buffer of 25 feet from top of bank of the waterways and the buff�;r area whenever possible, and barriers shall be used to prevent access. Where in channel work ca�nnot be avoided, precautions must be taken to stabilize the work area during land alteration, development and/or construction to minimize erosion. If the channel and buffer area are disturbed during land alteration, they must be stabilized within three (3) calendar days after the in channel work is completed. Silt curtains or other filter/siltation reduction devices must be installed on the downstream side of � the in channel alteration activity to eliminate impacts due to increased turbidity. Wherever stream crossings are required, properly sized temporary culverts shall be provided by the contractor and removed when construction is completed. The area of the crossing shall be restored to a � condition as nearly as possible equal to that which existed prior to any construction activity. 38.7 SWALES, DITCHES AND CHANNELS ' All swales, ditches and channels leading from the site shall be sodded within three (3) days of excavation. All other interiar swales, etc., including detention areas will be sodded prior to issuance of a Certificate of Occupancy. � SectionlV.doc ' Page 61 of 128 5/15/2012 � Section 1V —Technical Specifications � 38.8 UNDERGROUND UTILITY CONSTRUCTION The construction of underground utility lines and other structures shall be done in accordance � with the following standards: a. No more than 400 lineal feet of trench shall be open at any one time; b. Wherever consistent with safety and space consideration, excavated material shall be cast � to the uphill side of trenches. Trench material shall not be cast into or onto the slope of any stream, channel, road ditch or waterway. _ 38.9 MAINTENANCE All erosion and siltation control devices shall be checked regularly, especially after each rainfall and will be cleaned out and/or repaired as required. 38.10 COMPLIANCE � Failure to comply with the aforementioned requirements may result in a fine and/or more stringent enforcement procedures such as (but not limited to) issuance of a"Stop Work Order". City of Clearwater Standard Detail Drawings No. 601 and 607 are examples of accepted methods � that may be used or required to control erosion and siltation. � ' , � � � �� � � SectionIV.doc Page 62 of 128 5/15/2012 � � � � � � � � � � � � � f � � � Section IV — Technical Specifications City of Clearwater - Erosion Control This notice is to inform the prime contractor that the City of Clearwater holds them responsible for soil erosion control on their site. The City of Clearwater Engineering Department has the responsibility to minimize the amount of soil erosion into the City's streets, storm sewers and waterways. The construction of a new residence or commercial site and major remodeling of an existing site creates a potential for soil erosion. These instances are usually the result of contractors and subcontractors accessing the property with equipment or construction materials. Then rain storms redistribute the eroded soil into the adjacent streets, storm systems and waterways. When erosion takes place, a City Inspector will place a correction notice at the site. The procedure will be as follows: 1 st occurrence - Warning Znd occurrence - $32 Re-inspection Fee 3rd occurrence - $80 Re-inspection Fee 4th occurrence - Stop Work Order Dependent on the severity of the erosion, the City's Engineering Department may elect to rectify the erosion problem and charge the contractor accordingly. The attached drawings and details are recommendations for the contractor to use as means to support the site from eroding. The contractor may elect to shovel and sweep the street daily or on an as needed basis. However, erosion must be held in check. If the contractor would like to meet with a City inspector on any particular site, please contact Construction Services at 562-4750 or Planning & Development Services at 562-4741. Erosion Control Required - City of Clearwater's Code of Ordinances requires erosion control on all land development projects. Erosion control must be in place and maintained throughout the job. Failure to do so may result in additional costs and time delays to the permit holder. Contact Engineering Department with specific yuestions at 562-4750. � SectionlV.doc � Page 63 of 128 5/15l2012 Section IV —Technical Specifications CITY OF CLEARWATER NOTICE OF EROSION VIOLATION UNDER SECTION 3-701 (DIVISION 7— EROSION AND SILTATION CONTROL) OF THE C1TY OF CLEARWATER CODE OF ORDINANCES, THIS SiTE HAS BEEN FOUND IN VTOLATiON. TH1S SiTE MUST BE RESTORED TO AN EROSION CONTROLLED SiTE PRiOR TO ANY FURTHER DEVELOPMENT TO CONTINUE. Warning $32.00 Re-inspection Fee $80.00 Re-inspection Fee Stop Work Order DATE POSTED: Inspector's Name: Inspector's Signature: SectionTV.doc CITY OF CLEARWATER PLANNING & DEVELOPMENT SERVICES 727 562-4741 & ENGINEERING/CONSTRUCTION 727 562-4750 Received by: (Signature indicates only a copy of this notice has been received and does not in any way indicate admission of guilt or concurrence with findings of the inspector.) IT IS A VIOLATION TO REMOVE THIS NOTICE ANY UNAUTHORIZED PERSON REMOVING THIS SIGN WILL BE PROSECUTED Page 64 of 128 5/ I S/2012 � � � � � � � � � � � � � � � � � � � � �� � � � i � � � � Section IV—Technical Specifications 39 UTILITY TIE IN LOCATION MARKING The tie in locations for utility laterals of water, sanitary sewer, and gas shall be piainly marked on the back of the curb. Marking placed on the curb shall be perpendicular with respect to the curb of the tie in location on the utility lateral. Marks shall not be placed on the curb where laterals cross diagonally under the curb. The tie in location shall be the end of the utility lateral prior to service connection. Markings shall be uniform in size and shape and colors in conformance with the code adopted by the American Public Works Association as follows: SAFETY RED Electric power, distribution & transmission Municipal Electric Systems HIGH VISIBILITY SAFETY YELLOW Gas Distribution and Transmission Oil Distribution and Transmission Dangerou.s Materials, Produce Lines, Steam Lines SAFETY ALERT ORANGE Telephone and Telegraph Systems Police and Fire Communications Cable Television SAFETY PRECAUTION BLUE Water Systems Slurry Pipe Lines SAFETY GREEN Sewer Systems LAVENDER RECLAIMED WATER WHITE PROPOSED EXCAVATION Marks placed on curbs shall be rectangular in shape and placed with the long dimension perpendicular to the flow line of the curb. Marks placed on valley gutter and modified curb shall be 6-inch x 3-inch and placed at the back of the curb. Marks placed on State Road and vertical curb shall be 4-inch X 2-inch and be placed on the curb face. 40 AWARD OF CONTRACT. WORK SCHEDULE AND GUARANTEE This article not used. See SECTION III, ARTICLE 24 — AWARD OF CONTRACT, WORK SCHEDULE AND GUARANTEE. 41 41.1 POTABLE WATERMAINS, RECLAIMED WATERMAINS AND APPURTENANCES SCOPE � The Contractor shall furnish all plant, labor, materials and equipment to perform all operations in connection with the construction of potable water mains, reclaimed water mains and appurtenances including clearing, excavation, trenching, backfilling and clean up. � SectionIV.doc Page 65 of 128 5/15l2012 ' Section N — Technical Specifications 41.2 MATERIALS 41.2.1 GENERAL Materials, equipment and supplies furnished and permanently incorporated into the project shall be of first quality in every respect and shall be constructed and finished to high standards of workmanship. Materials shall be suitable for service intended, shall reflect modern design and engineering and shall be fabricated in a first class workmanlike manner. All materials, equipment and supplies shall be new and shall have not been in service at any time previous to installation, except as required in tests or incident to installation. Machined metal surfaces, exposed bearings and glands shall be protected against grit, dirt, chemical corrosion and other damaging effects during shipment and construction. 41.2.2 PIPE MATERIALS AND FITTINGS 41.2.2.1 DUCTILE iRON PIPE Ductile Iron Pipe shall be in accordance with ANSI/AW WA C 151/A21.51 81 or latest revision. Pipe thickness class, wall thickness and working pressure shall conform to the following table: Size Class Thickness Rated Water Working Pressure (In.) (PSI) 4" Sl 0.26 350 6" 50 0.25 350 8" 50 027 350 12" 50 031 350 The trench laying condition shall be Type 2, Flat bottom trench backfill lightly consolidated to centerline ofpipe. Pipe shall be manufactured in accordance with ANSI/AW WA C 151 /A21.51 8l or latest revision. Pipe shall be asphalt coated on the outside and standard cement lined and sealed coated with approved bituminous seal coat in accardance with ANSUAWWA C104/A21.4 80 or latest revision. 41.2.2.2 POLYVINYL CHLORIDE (PVC) PIPE Polyvinyl Chloride (PVC) Pipe 4-inch through 8-inch shall be in accordance with ANSI/AWWA C900 or latest revision and the American Society far Testing Materials (ASTM) Standard D 2241 and PVC Resin Compound conforming to ASTM Specification D 1784. Polyvinyl Chloride Pipe shall have the same O.D. as Cast and Ductile Iron Pipe and be compatible for use without special adapters with Cast ]ron Fittings. Pipe dimension ratio, working pressure and laying length shall conform to the following table: SectionIV.doc Page 66 of 128 5/15/2012 � � � � � � � � � � ' L� � �J � Section IV —Technical Specifications Size Dimension Ratio Rated Water Working Pressure Laying Length (OD/Thick.) (PSI) (Ft) 4 18 l50 20 6 18 l50 20 8 18 l50 20 Pipe larger than 8-inch shall be ductile iron. The City Engineer reserves the right to require the use of ductile iron in sizes 4-inch through 8-inch when needed due to laying conditions or usage. The bell of 4-inch and larger PVC pipe shall consist of an integral wall section with a solid cross section elastomeric ring which meets the requirements ofASTM D l 869. � Each length of pipe shall bear identification that will remain legible during normal handling, storage and installation and so designate the testing agency that verified the suitability of the pipe material for potable water service. `� All polyvinyl chloride pipe shall be laid with two (2) strands of insulated ]2 gauge A.W.G. solid strand copper wire taped to the top of each joint of pipe with about 18-inches between each piece oftape. It is to be installed at every valve box through a 2-inch PVC pipe to l2-inches minimum � above the top of the concrete slab. The 2-inch PVC pipe shall be the same length as the adjustable valve box, and the 2-inch PVC pipe shall be plugged with a 2-inch removable brass plug with recessed nut. This wire is to be continuous with splices made only by direct bury 3M � brand splice kit approved by the Engineer. This wire is to be secured to all valves, tees and elbows. � � � � � � � � ' 41.2.2.3 FITTINGS AND JOINTS Fitting from 4-inch through 16-inch in size will be compact ductile iron cast in accordance with ANSI/AWWA C153/A 21.53 with mechanicai joint belis. Bolts, nuts and gaskets shall be in accordance with requirements of ANSI/AW WA C 153/A 21.53. The working pressure rating shall be 350 P.S.I. Ductile iron fittings shall be coated and lined in accordance with require requirements of ANSI/AWWA C104/A21.4. Mechanical joint glands shall be ductile iron in accordance with ANSI/AW WA C 11 l/A 21.1 l. When reference is made to ANSI/AW WA Standards, the latest revisions apply. Only those fittings and accessories that are of domestic (USA) manufacture will be acceptable. 41.2.2.4 RESTRAINT Restraint of plugs, caps, tees, bends, etc., shall be accomplished by the use of approved mechanical restraining rings or glands installed per manufacturers recommendations. Hydrants shall be restrained by the use of swivel connecting joints. Restraining mechanical joint glands on hydrants shall be used only where hydrant runout length precludes the use of swivel joint connectors. 41.2.2.5 PIPE WITHIN CASING All pipe placed within casings shall be slip joint ductile iron restrained by the use of restraining gaskets designed for use with the particular joint being installed and have properly sized casing spacers (Cascade Series) installed on the pipe so that the pipe will be centered within the casing. SectionIV.doc Page 67 of 128 5/15/2012 Section IV — Technical Specifications Each end of the casing shall be properly sealed to prevent the intrusion of soil, water, or debris within the casing itself. It shall be sealed by brick and mortar, cement or any approved method by the Engineer. 41.2.3 GATE VALVES Discs of valves shall be operated by methods which will allow operation in any position with respect to the vertical. Gate valves for interior piping or exposed above grade outside structures, shall be handwheel operated with rising stems. Valves 4-inches and larger, buried in earth shall be equipped with 2-inch square operating nuts, valve boxes and covers. Valves shali be fitted with joints suitable for the pipe with which they are to be used. The direction of opening for all valves shall be to the left (counter clockwise). Pressure Rating: Unless otherwise shown or specified, valves for high pressure service shall be rated at not less than l 50 psi cold water, nonshock. The manufacturer's name and pressure rating shall be cast in raised letters on the valve body. lnstallation: Installation shall be in accordance with good standard practice. Exposed pipelines shall be so supported that their weight is not carried through valves. Two Inch Diameter and smaller: Not allowed. These should be approved ball valves. Three Inch Diameter: Not allowed. Four Inch to Sixteen Inch Diameter: Gate Valves, 4 to 16-inch diameter, inclusive, shall be resilient seated gate valves encapsulated with EPDM Rubber in conformance with ANSt/A.W.W.A. Standard Specification C509-515 latest revision. These valves shall include the following features consistent with C509-515, full opening unobstructed waterway, zero leakage at 200 p.s.i. differential pressure, all internal parts removable from bonnet without removing body from pressure main, corrosion resistant bronze or stainless steel nonrising stem with O ring bonnet seal with epoxy coated inside and outside cast iron or ductile iron valve body.. Larger than Sixteen Inch Diameter: Gate valves larger than 16-inch shall be suitable for the service intended and shall be resilient seated gate valves encapsulated with EPDM rubber in conformance with ANSI/AW WA. These valves shall include the following features consistent with C509-80, full opening unobstructed waterway, zero leakage at 200 psi differential pressure. All valves shall be equipped with steel cut bevel gears, extended type gear case and rollers, bronze or babbitt tracks and scrapers and valved by-pass. 41.2.4 VALVE BOXES Valve boxes shall be of standard extension design and manufacture and shall be made of cast iron. No PVC Risers or Derisers are allowed as part of a valve box assembly. They are to be 3- piece valve box assembles. The lower part of the assembly can be ordered in various heights to accommodate different depths. Suitable sizes of valve boxes and extension pieces shall be provided where shown. The valve box cover shall be of cast iron. Valve boxes and their installation shall be included in the bid price for valves. Refer to City Index No. 402; Sheet 1 of 5& Sheet 2 of 5 for potable water valve pad detail, and City Index No. 502; Sheet 1 of 2& Sheet 2 of 2 for reclaimed water valve boxes and pad detail. SectionlV.doc Page 68 of 128 5/l5/2012 � � � � ' � � � � � i � � ' � � � � � � � � � � � Section 1V —Technical Specifications 41.2.5 HYDRANTS No other hydrants, other than those listed below, may be used in extension to or replacement of the City of Clearwater potable water system: • Kennedy Guardian #K 81D Fire Hydrant, • Mueller Super Centurion 25 Fire Hydrant • AVK Nostalgic 2780. • American Darling B-84-B. No substitutions shall be allowed without the approval of the City of Clearwater. Above hydrants shall be in accordance with the latest revision of the AW WA Specification C 502 and include the following modifications: 1. All shipments to be palletized and tailgate delivery. 2. Hydrants shall conform to A.W.W.A. Standard C-502 latest revision and must be UL/FM listed. 3 0 � Hydrants shall be of the compression type, closing with line pressure. The operating threads will be contained in an operating chamber sealed at the top and bottom with an O-ring seal. The chamber will contain a lubricating grease or oil. Hydrants shall be of the traffic model breakaway type, with the barrel made in two sections with the break flange located approximately 2-inch above the ground line. Breakaway bolts not allowed. 6. Operating nut shall be of one-piece bronze or ductile iron construction. 7. A dirt shield shall be provided to protect the operating mechanism from grit buildup and corrosion due to moisture. 8. A thrust washer shall be supplied between the operating nut and stem lock nut to facilitate operation. 9. Operating nut shall be a#7 (1-1/2-inch) pentagon nut. ]0. Nozzles shall be of the tamper resistant, 1/4 turn type with O-ring seals or threaded into upper barrel. Nozzles shall be retained with a stainless steel locking device. 11. The main valve shall be of EPDM solid rubber. l2. The seat shall be of a bronze ring threaded to a bronze insert in the hydrant shoe, with O- rings to seal the barrel from leakage of water in the shoe. 13. The main valve stem will be 304 or higher grade stainless steel and made in two sections with a breakable coupling. l4. Hydrant shall have a 6-inch Mechanical Joint epoxy lined elbow, less accessories. 15. Hydrant shall have a 5-1/4-inch valve opening, and shall be a left hand operation to open. 16. Hydrant shall be without drains. 17. Hydrant shall have two (2) 2-1/2-inch hose nozzles and one (1) 4-1/2-inch pumper nozzle. Threads shall be in accordance with the National Standard Hose Coupling Thread Specifications. � SectionIV.doc � Page 69 of 128 5/IS/2012 Section IV — Technical Specifications 18. Hydrant body shall have a factory finish of yellow paint. All paints shall comply with AW WA standard G502-85 or latest revision. All hydrants will be shop tested in accordance with the latestAWWA Specification C 502. Constrained joint assemblies shall be used which have bolted mechanical and swivel joints from the hydrant tee through to the hydrant. Constrained joints shall absorb all thrust and prevent movement of the hydrant. All hydrants shall be provided with an auxiliary gate valve so that the water to the hydrant may be shut off without the necessity of closing any other valve in the distribution system. No hydrants shall be installed on the reclaimed water system unless approved by the City of Clearwater's Engineering Department. 41.2.6 SERVICE SADDLES Service saddles shall be used on all service taps to 4-inch P.V.C. water main. The largest service connection allowable on 4-inch main shall be l-1 /2-inch. Service saddles shall be used on all 2- inch service connections to 6-inch and larger mains. Service saddles (JCM 406 series or Ford FC 202 series) shall be wide bodied ductile iron with epoxy or nylon coating and shall have stainless steel straps. 41.2.7 TESTS, INSPECTION AND REPAIRS 1. All materials shall be tested in accordance with the applicable Federal, ASTM or AW WA Specification and basis of rejection shall be as specified therein. Certified copies of the tests shall be submitted with each shipment of materials. 2. All materials will be subject to inspection and approved by the Engineer after delivery; and no broken, cracked, misshapen, imperfectly coated or otherwise damaged or unsatisfactory material shall be used. 3. All material found during the progress of the work to have cracks, flaws, or other defects shall be rejected and promptly removed from the site. 4. If damage occurs to any pipe, fittings, valves, hydrants or water main accessories in handling, the damage shall be immediately brought to the Engineer's attention. The Engineer shall prescribe corrective repairs or rejection of the damaged items. 41.2.8 BACKFLOW PREVENTERS The City of Clearwater owns and maintains ali backflow prevention devices that are installed within their system. Therefore, any and all devices must be purchased from the City and installed by City work forces. Backflow prevention devices installed on customer's service lines at the point of delivery (service connection) shall be of a type in accordance with AWWA specification C506 or latest revision. Two (2) different types of backflow prevention devices are allowed. Type of device, when required, is determined by the degree of hazard presented to the municipal water system from possible backflow of water within the customers private system. The types of devices allowed are: SectionIV.doc Page 70 of 128 5/15/2012 � 1 J � � � � � � � u �� � � � � � � � � Section IV —Technical Specifications 1. Double Check Vaive Assembly a device composed of two single, independently acting, approved check valves, including tightly closing shutoff valves located at each end of the assembly and suitable connections for testing the watertightness of each check valve. 2. Reduced pressure principle backflow prevention device a device containing a minimum of two independently acting, approved check valves, together with an automatically operated pressure differential relief valve located between the two check valves. The unit must include tightly closing shutoff valves located at each end of the device, and each device shall be fitted with properly located test cocks. 41.2.9 TAPPING SLEEVES 1 Steel body tapping sleeves shall be JCM Industries Inc., JCM 4l2 ar Smith-Blair 622. All steel body tapping sleeves shall have heavy welded ASTM A 285, Grade C steel body, stainless steel bolts, manufacturer's epoxy coated body, and 3/4-inch bronze test plug. � � � � 41.2.10 BLOW OFF HYDRANTS Blow offs are not allowed. 41.3 CONSTRUCTION 41.3.1 MATERIAL HANDLING Pipe, fittings, valves, hydrants and accessories shall be loaded and unloaded by lifting with hoists or skidding so as to avoid shock or damage. Under no circumstances shall such materials be dropped. Pipe handled on skidways shall not be skidded rolled against pipe already on the ground. � 2. Pipe shall be so handled that the coating and lining will not be damaged. If, however, any part of the coating or lining is damaged, the repair shall be made by the Contractor at his expense in a manner satisfactory to the Engineer. � � � � i � � � 3. In distributing the material at the site of the work, each piece shall be unloaded opposite or near the place where it is to be laid in the trench. 41.3.2 PIPE LAYING 41.3.2.1 ALIGNMENT AND GRADE The pipe shall be laid and maintained to the required lines and grades with fittings, valves and hydrants at the required locations, spigots centered in bells; and all valves and hydrant stems plumb. All pipe installed shall be pigged and properly blown off before any pressure testing and sterilization of the pipe can be completed. The depth of cover over the water main shall be a minimum of 30-inches and a maximum of 42- inches below finished grade, except where approved by the Engineer to avoid conflicts and obstructions. Whenever obstructions not shown on the plans are encountered during the progress of the work and interfere to such an extent that an alteration of the plans is required, the Engineer shall have the authority to change the plans and order a deviation from the line and grade or arrange with the Owners of the structures for the removal, relocation, or reconstruction of the obstructions. SectionlV.doc Page 7l of 128 5/15/2012 Section IV — Technical Specifications 41.3.2.2 INSTALLATION Proper implements, tools, and facilities satisfactory to the Engineer shall be provided and used by the Contractor for the safe and convenient performance of the work. All pipe, fittings, valves and hydrants shall be carefully lowered into the trench piece by piece by means of a derrick, ropes, or other suitable tools or equipment in such a manner as to prevent damage to materials and protective coatings and linings. Under no circumstances shall materials be dropped or dumped in the trench. If damage occurs to any pipe, fittings, valves, hydrants or accessories in handling, the damage shall be immediately brought to the Engineer's attention. The Engineer shall prescribe corrective repairs or rejection of the damaged items. All pipe and fittings shall be carefully examined for cracks and other defects while suspended above the trench immediately before installation in final position. Spigot ends shall be examined with particular care as this area is the most vulnerable to damage from handling. Defective pipe or fittings shall be laid aside for inspection by the Engineer who will prescribe corrective repairs or rejection. All lumps, blisters, and excess coating shall be removed from the bell and spigot end of each pipe, and the outside of the spigot and the inside of the bell shall be wire brushed and wiped clean and dry and free from oil and grease before the pipe is laid. Pipe joints shall be made up in accordance with the manufacturer's recommendations. Every precaution shall be taken to prevent foreign material from entering the pipe while it is being placed in the line. lf the pipe laying crew cannot put the pipe into the trench and in place without getting earth into it, the Engineer may require that, before lowering the pipe into the trench, a heavy, woven canvas bag of suitable size shall be placed over each end and left there until the connection is to be made to the adjacent pipe. During laying operation, no debris, tools, clothing or other materials shall be placed in the pipe. As each length of pipe is placed in the trench, the spigot end shall be centered in the bell and the pipe forced home and brought to correct line and grade. The pipe shall be secured in place with approved backfill material tamped under it except at the bells. Precautions shall be taken to prevent dirt from entering the joint space. At times when pipe laying is not in progress, the open ends of pipe shall be closed by a watertight plug or other means approved by the Engineer. The cutting of pipe for inserting valves, fittings, or closure pieces shall be done in a neat and workmanlike manner without damage to the pipe or cement lining and so as to leave a smooth end at right angles to the axis of the pipe. Pipe shall be laid with bell ends facing in the direction of laying unless directed otherwise by the Engineer. Where pipe is laid on the grade of ] 0 per cent or greater, the laying shall start at bottom and shall proceed upward with the bell ends of the pipe upgrade. Wherever it is necessary to deflect pipe from a straight line, either in the vertical or horizontal plane to avoid obstructions or to plumb stems; or where long radius curves are permitted, the amount of deflection allowed shall not exceed that allowed under the latest edition of ANSI/AWWA C600-82 and C900 81 or latest revisions. No pipe shall be laid when, in the opinion of the Engineer, trench conditions are unsuitable. SectionIV.doc Page 72 of 128 5/15/2012 LJ � � � L� � � � � � � � � � , � 41.3.3 , 41.3.3.1 � Section IV —Technical Specifications SETTING OF VALVES, HYDRANTS AND FITTINGS GENERAL Valves, hydrants, fittings, plugs and caps shal] be set and joined to pipe in the manner specified above for installation of pipe. 41.3.3.2 VALVES � Valves in water mains shall, where possible, be located on the street property lines extended unless shown otherwise on the plans. All valves shall be installed at the tee in all cases, not to exceed l 8-inches from the main line. � The valve box shall not transmit any shock or stress to the valve and shall be centered and plumb over the wrench nut of the valve, with the box cover flush with the surface of the finished pavement or such other level as may be directed. Refer to City Index No. 402; Sheet 1 of 5& � Sheet 2 of 5 for potable water valve pad detail, and City Index No. 502; Sheet 1 of 2& Sheet 2 of 2 for reclaimed water valve box and pad detail. � � 41.3.3.3 HYDRANTS Hydrants shall be located as shown or as directed so as to provide complete accessibility and minimize the possibility of damage from vehicles or injury to pedestrians. All hydrants located 10-feet of more from the main sha11 have a gate valve at the main and another gate valve at the hydrant location. No valve can be located anywhere in the hydrant run to circumvent the use of two valves. Refer to City Index No. 402; Sheet 5 of 5 for potable water hydrants. No hydrants shall be installed on the reclaimed water system unless approved by the City of Clearwater's Engineering Department. � All hydrants shall stand plumb and shall have their nozzles parallel with, or at right angles to, the � curb, with the pumper nozzle facing the curb. Hydrants shall be set to the established grade, with nozzles as shown or as directed by the Engineer. � � u 9' I_� , � � ' Each hydrant shall be connected to the main with a 6-inch ductile iron branch controlled by an independent 6 inch gate valve. 41.3.3.4 ANCHORAGE Movement of all plugs, caps, tees, bends, etc., unless otherwise specified shall be prevented by attaching approved mechanical restraining rings or glands and installed per manufacturers recommendations. Hydrants shall be held in place with restrained swivel joints. Restraining mechanical joint glands on hydrants may be used where hydrant runout length precludes the use of hydrant connecting swivel joints. Where special anchorage is required, such anchorage shall be in accordance with details shown on the plans. 41.3.4 CONNECTIONS TO EXISTING LINES Where shown on the plans or directed by the Engineer, the water lines constructed under this contract shall be connected to the existing lines now in place. No such connection shall be made until all requirements of the specifications as to tests, flushing, and sterilization have been met and the plan of the cut in to the existing line has been approved by the Engineer. SectionlV.doc Page 73 of 128 5/IS/2012 Section 1V —Technical Specifications Where connections are made between new work and existing work, the connections shall be made in a thorough and workmanlike manner using proper materials and fittings to suit the actual conditions. All fittings shall be properly sterilized and pipe will be properly swabbed before connections to existing facilities. All connections to existing facilities will be completed under the supervision of the City of Clearwater Water Division. 41.4 TESTS 41.4.1 HYDROSTATIC TESTS After installation of water mains, complete with all associated appurtenances including service taps, all sections of newly laid main shall be subject to a hydrostatic pressure test of I 50 pounds per square inch for a period of two (2) hours and shall conform to AW WA C600 latest revision. All mains shall be pigged and flushed to remove all sand and other foreign matter before any hydrostatic test can or will be performed. The pressure test shall be applied by means of a pump connected to the pipe in a manner satisfactory to the Engineer. The pump, pipe connection and all necessary apparatus, together with operating personnel, shail be furnished by the Contractor at his expense. The Contractor shall make all necessary taps into the pipe line. The Owner will furnish the water for the test. Before applying the test pressure, all air shall be expelled from the pipe line. 41.4.2 NOTICE OF TEST The Contractor shall give the City of Clearwater's Owner Representative 48-hours advance notice of the time when the installation is ready for hydrostatic testing. 41.5 STERILIZATION Before the system is put into operation, all water mains and appurtenances and any item of new construction with which the water comes in contact, shall be thoroughly sterilized in accordance with AW WA C651. 41.5.1 STERILIZING AGENT The sterilizing agent shall be liquid chlorine, sodium hypochlorite solution conforming to Federal Specification 0 S 602B, Grade D, or dry hypochlorite, commonly known as "HTH" or "Perchloron". 41.5.2 FLUSHING SYSTEM Prior to the application of the sterilization agent, all mains shall be thoroughly flushed. Flushing shall continue until a clean, clear stream of water flows from the hydrants. Where hydrants are not available for flushing, such flushing shall be accomplished at the installed blow off devices generally at the ends of the lines. 41.5.3 STERILIZATION PROCEDURE All piping, valves, fittings and all other appurtenances shall be sterilized with water containing a minimum chlorine concentration of 75 ppm at any point in the system. This solution shall then remain in the distribution system for a minimum contact period of eight (8} hours and never more than 24 hours before it is flushed out. All valves in the lines being sterilized shall be opened and closed several times during the contact period. SectionIV.doc Page 74 of 128 5/15/2012 � , l� � � i � � � � � � , � �J Section IV — Technical Specifications 41.5.4 RESIDUAL CHLORINE TESTS � After the sterilization outlined above has been accomplished, flushing shall continue until free residual chlorine tests not less than 0.2 ppm nor more than 3.0 ppm. Residual chlorine test shall be in accordance with standard methods using a standard DPD test set. � 41.5.5 BACTERIAL TESTS After the water system has been sterilized and thoroughly flushed as specified herein, City of � Clearwater Water Division or the Owner's Representative personnel shall take samples of water from remote points of the distribution system in suitable sterilized containers. The City shall forward the samples to a laboratory certified by the Florida State Board of Health for bacterial 1 examination in accordance with AWWA C651. If tests of such samples indicate the presence of coliform organisms, the sterilization as outlined above shall be repeated until tests indicate the absence of such pollution. The bacterial tests shall be satisfactorily completed before the system � is placed in operation and it shall be the Contractor's responsibility to perform the sterilization as outlined above. If inethods of sterilization differ materially from those outlined above, such methods shall be in ' accordance with directives of the Florida State Board of Health and all methods employed shall have the approval of that agency. Definite instructions as to the collection and shipment of samples sha11 be secured from the laboratory prior to sterilization and shall be followed in all � respects. The City of Clearwater shall secure clearance of the water main from the Florida Department of Environmental Protection before the water distribution system is put into operation. � ' r , , � � ' 41.6 MEASUREMENT AND PAYMENT 41.6.1 GENERAL Bids must include all sections and items as specified herein and as listed on the Bid Form. Payment for the work of constructing the project will be made at the unit price or lump sum payment for the items of work as set forth in the Bid, which payment will constitute full compensation for all labor, equipment, and materials required to complete the work. No separate payment will be made for the following items and the cost of such work shall be included in the applicable pay items of work: • Clearing and grubbing � Excavation, including necessary pavement removal • Shoring and/or dewatering • Structural fill • Backfill � Grading • Tracer wire • Refill materials • Joints materials • Tests and sterilization • Appurtenant work as required for a complete and operable system. � SectionlV.doc ' Page 75 of 128 5/15/2012 Section IV — Technical Specifications 41.6.2 FURNISH AND INSTALL WATER MAINS 41.6.2.1 MEASUREMENT The quantity for payment shall be the actual number of feet of pipe of each size and type satisfactorily furnished and laid, as measured along the centerline of the completed pipe line, including the length of valves and fittings. 41.6.2.2 PAYMENT Payment of the applicable unit price shall be full compensation for furnishing all plant, labor, materials and equipment, and constructing the water mains complete and ready for operation. 41.6.3 FURNISH AND INSTALL FITTINGS 41.6.3.1 MEASUREMENT The quantity for payment will be the number of tons, ar decimal part thereof, of ductile iron fittings satisfactorily furnished and installed. Fitting weights shall be based on weights stamped on the body of the fitting, provided such weights do not exceed the theoretical weights by more than the tolerances permitted in ANSI/AWWA C110/A 21.10 82, latest revision, in which case, the weight will be based upon the theoretical weight plus the maximum tolerance. 41.6.3.2 PAYMENT Payment of the applicable unit price shall be full compensation for furnishing all plant, labor, materials, and equipment required to furnish and install ductile iron fittings. 41.6.4 FURNISH AND INSTALL GATE VALVES COMPLETE WITH BOXES AND COVERS 41.6.4.1 MEASUREMENT The quantity for payment shall be the number of gate vatves of each size satisfactorily furnished and installed. 41.6.4.2 PAYMENT Payment of the applicable unit price for each size shall be full compensation for furnishing all plant, labor, material and equipment and installing the valve complete with box and cover. 41.6.5 FURNISH AND INSTALL FIRE HYDRANTS 41.6.5.1 MEASUREMENT The quantity for payment shall be the number of fire hydrants satisfactorily furnished and installed. The only hydrants allowed to be installed in the City of Clearwater utilities system are listed in Section 41.2.5. No exceptions. 41.6.5.2 PAYMENT Payment of the applicable unit price shall be full compensation for furnishing all plant, labor, material and equipment and installing the fire hydrant complete including necessary thrust SectionIV.doc Page 76 of l28 5/15/2012 i � � � � � � , ' u � � � � , � , , , � � , , � � �I � ' u Section IV —Technical Specifications anchorage, 6-inch pipe between the main and the hydrant and gate valve and valve box on the hydrant lead. 42 GAS SYSTEM SPECIFICATIONS This article not applicable. 43 TENNIS COURTS 43.1 PAVED TENNIS COURTS 43.1.1 SOIL TREATMENTS All soil under courts shall be treated with DSMA l 84 at the rate of 2 pounds active ingredient per 1,000 square foot. Materials shall be brought to the job site in tagged containers. Tags shall be retained and turned into the Engineer's Office. 43.1.2 BASE COURSE Base Course shall be Limerock 6" thick after compaction. Specifications for the base shall be the same as those for Limerock in Section IV - Article 22 of the City of Clearwater Technical Specifications. Subgrade stabilizing will not be required. Surface shall be cut to within 1/2" of true grade in preparation of 1" leveling course. Prior to applying prime coat, surface shall be approved by the Engineer. 43.1.3 PRIME COAT The material used for prime coat shall be cut-back Asphalt Grade RC-70 or RG250 and shall conform to Section 300 of the Florida State Department of Transportation's "Standard Specifications for Road and Bridge Construction". 43.1.4 LEVELING COURSE ' A.Leveling Course shall be a minimum of 1" of Type S-llI Asphaltic Concrete as specified in Section 331 of FDOT's Standard Specification (latest edition). The Leveling Course shall be constructed running East and West. � Finish surface of leveling course shall not vary more than ]/4" when checked with a 10 foot straight edge. if a deficiency of more than '/4" exists, the Engineer will determine if the surface should be leveled or removed and replaced. Such remedial work shall be without compensation. r43.1.5 SURFACE COURSE Surface course shall be a minimum of 1" of Type S-III Asphaltic Concrete as specified in Section � 331 of FDOT's Standard Specification (latest edition). The Surface Course shall be constructed running North and South. ' Finish surfaces shall not vary more than 1/4" in 10 feet. Prior to application of colar coat, surface shall be checked for low areas by flooding the surface with water. Low areas shall be patched as approved by the Engineer prior to application of the color coat. No areas which retain water will , SectionlV.doc Page 77 of 128 5/IS/2012 ' Section IV —Technical Specitications be approved. If a deficiency of more than '/4" exists, the Engineer will determine if the surface should be leveled or removed and replaced. Such remedial work shall be without compensation. 43.1.6 COLOR COAT 43.1.6.1 MATERtALS Materials used in the patching and color coating of Tennis Courts shall be manufactured specifically for Tennis Court Application. All materials must be approved by the Engineer prior to the start of construction. Request for approval of coating materials may be submitted prior to the opening of bids. In requests for approval, the Contractor shall present manufacturer's literature along with the name, address, and date of three previous Tennis Court applications of the proposed material. 43.1.6.2 CONSTRUCTION 43.1.6.2.1 SURFACE PREPARATION The surface to be coated must be sound, smooth, and free from loose dirt or oily materials. Prior to the application of surfacing materials, the entire surface should be checked for minor depressions or irregularities. If it is determined that minor corrections are necessary, the Contractor shall make repairs using approved tack coat and/or patching mix in accordance with manufacturer's recommendations for use. After patching the surface shall not vary more than ]/8" in ten feet in any direction. If a deficiency of more than 1/8" exists, the Engineer will determine if the surface should be leveled or removed and replaced. Such remedial work shall be without compensation. In order to provide a smooth, dense underlayment of the finish course, one or more applications of resurfacer or patch mix shall be applied to the underlaying surface as deemed necessary by the Engineer. Asphaltic concrete Surface Course with a smooth tight mix and no ponding, will not require the resurfacing or patching mix. Asphaltic Concrete Surface Course which is course and rough or is ponding water will require the use of the resurfacer or patch mix. No applications shall be covered by a succeeding application until thoroughly cured. 43.1.6.2.2 FINISH COLOR COURSE The finish course shall be applied to a clean, dry surface in accordance with the manufacturer's directions. A minimum of two applications of color coat will be required. Texture of cured color coat is to be regulated in accordance with manufacturer's recommendations to provide a medium speed surface for tennis play. The color of application shall be dark green for the regulation double's playing area and red for all other others. The finished surface shall have a uniform appearance and be free from ridges and tool marks. 43.1.6.3 PLAYING LINES Forty-eight (48) hours minimum after completion of the resurfacing, 2 inch wide playing lines shall be accurately located, marked and painted with approved marking paint. SectionlV.doc Page 78 of 128 5/15/2012 , � � � , , � � � � � i � r r � ' , � � � Section 1V —Technical Specifications 43.1.6.4 WEATHER LIMITATIONS � No parts of the construction involving Tennis Court surfacing or patching products shall be conducted during rainfall, or when rainfall is imminent or unless the air temperature is at least 50 degrees, Fahrenheit and rising. � 'J � LJ NOTE: The Contractor shall notify the Project Inspector a minimum or 24 hours in advance of all base and asphalt related work. 43.2 CLAY TENNIS COURTS 43.2.1 GENERAL 43.2.1.1 SCOPE The Contractor shall furnish all labor, materials and equipment necessary for the installation of � clay tennis court(s) as set forth in these specifications and /or the construction drawings. The scope of work is indicated on drawings and specified herein. Basis of design for clay courts with sub-surface irrigation system is Hydrogrid Tennis, Inc. or prior approved equal. � � I._ J C� � � , � , �I , � 43.2.1.2 CONTRACTOR QUALIFICATIONS The Owner may make such investigation as he deems necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any Bid if the evidence submitted by, or investigations of such Bidders fail to satisfy the owner that such Bidder is properly qualified to carry out the obligations of the Contract and to complete the work contemplated herein within the time limit agreed upon. Factors to be considered in awarding the Bid shall include the successful completion of similar sub-surface irrigation clay tennis court installations of like value, scope, size and quality as this project, with in the last fve (5) years. The Owner desires to award this contract to firms that have been in business for a minimum of five (5) years. The qualifications and experience of the personnel assigned to the project will be a determining factor in the award of the Bid. 43.2.1.3 STANDARDS The Contractor shall perform all work in a thorough, workmanlike manner and conform to standards for tennis court construction as prescribed or approved by the United States (Lawn) Tennis Association and the United States Tennis Court and Tract Builders Association. The Contractor shall construct the tennis courts with laser guided equipment. 43.2.1.4 BUILDING PERMITS AND TAXES The Contractor shall secure al] construction permits required by law, the City of Clearwater will waive all permit fees. 43.2.1.5 COURT LAYOUT The Owner shall establish two horizontal control points and a construction bench mark. The Contractor shall locate the four corners of each battery and shall layout the courts in conformance with the specifications and drawings. SectionlV.doc Page 79 of 128 5/15/2012 Section tV — Technical Specifications 43.2.1.6 BUILDING REQUIREMENTS The Owner shall provide and maintain reasonable access to the construction site, as well as an area adjacent to the site for storage and preparation of materials. Adequate water outlets within fifty (50) feet of the site shall be provided. 43.2.1.7 SCHEDULE The Owner desires to award the contract to firms who will complete this project in a reasonable time schedule. Consideration in awarding this bid will be given to firms who may commence and complete the project within a reasonable period of time after award of the bid. The Owner, in its sole discretion, will determine the reasonable schedule standard as it relates to the "Notice to Proceed." 43.2.2 SITE PREPARATION 43.2.2.1 SUITABILITY The Contractor shall examine the site to determine its suitability for installation of the courts. 43.2.2.2 DEMOLITION The contractor shall demo the existing tennis courts, remove the existing ten (]0) foot high fence surrounding the tennis courts and all underground utilities within the limits of the construction area. Utilities extending outside the construction limits shall be capped and terminated. The existing tennis courts shall be ground into millings suitable to be mixed into the sub-grade at the proposed location of the new clay tennis courts. Any sub-grade material beneath the existing tennis courts not suitable for planting beds shall be removed and also utilized as sub-grade material beneath the new courts. All demolition materials not utilized in construction of the new courts shall be removed and disposed from the project site. The Contractor shall provide documentation of any recycled materials. 43.2.2.3 SUB-GRADE The sub-grade shall be graded to a tolerance of plus or minus one (1) inch of the final sub-grade elevation. The sub-grade shall be graded level. A compaction to a density not less than 95% of the maximum standard density as determined by AASHTO T-180 is required. The Contractor shall provide documentation of testing to the Owner. 43.2.2.4 FINAL GRADE The final grades outside the tennis court areas and within the construction limits shall be graded to a tolerance of plus or minus one (1) inch of the final grade elevations with positive drainage away from tennis courts and towards drainage swales or outfall structures. A compaction to a density not less than 95% of the maximum standard density as determined by AASHTO T-180 is required. The contractor shall provide documentation of testing to the Owner. 43.2.3 SLOPE 43.2.3.1 SLOPE REQUIREMENTS Rate and direction of slope of the finished surfaces shall be one (1) inch in forty (40) feet, all in one plane, as indicated on the drawings. SectionIV.doc Page 80 of 128 5/15/2012 � � � l� � , � �� � � � � � � � � ' � � � � ' Section IV —Technical Specifications 43.2.4 BASE CONSTRUCTION 43.2.4.1 LINER Two layers of 6 mil construction plastic shall be installed over the sub-grade surface with a minimum overlap of five (5) feet where pieces are joined. Use only materials that are resistant to deterioration when tested in accordance with ASTM E 154, as follows: a. Polyethylene sheet, Construction Grade. 43.2.4.2 BASE COURSE The base course shall consist of six (6) inches of porous base material as supplied by Quality � Aggregate of Sarasota Florida. The surface of the base course shall be smooth and even, and it shall be within one-quarter (1 /4) inch of the established grade. I� � , � � � �J r—� I_� � � � � , , 43.2.4.3 IRRIGATION SYSTEM Perforated pipe shall be installed in trenches in the base course. These trenches shall be in on four (4) foot centers and shall be run perpendicular to the slope of the court. The pipe shall be two and one-quarter (2-1/4) inch diameter with a nylon needle punched sock surrounding the pipe. Six (6) water control canisters shall be installed per court with each canister controlling five (5) grid pipe trenches. Provide all required controls systems time clocks; float switches, control wiring and solenoids, etc. for a complete sub-surface irrigation system. 43.2.5 PERIMETER CURBING 43.2.5.1 CURB Brick curb shall be installed around the entire perimeter of the court area with an elevation of one-quarter (l /4) to one-half (l /2) inch above the finished screening course elevation. 43.2.6 SURFACE COURSE 43.2.6.1 COURT SURFACE A surface course of ISP Type II Aquablend or Lee Hyroblend tennis court material shall be installed over the screening course to a compacted depth of one (l) inch. The Aqua/Hydroblend material shall be watered to its full depth immediately after leveling and then compacted by rolling with a tandem roller weighing 600 to 1000 pounds. The finished surface shall not vary from specified grade by more than one-eighth (l/8) inch. 43.2.7 ROOT BARRIER Root barrier (geo-tech fabric) eighteen (18) inches height shall be placed in a trench on the outside edge of the perimeter curbing eighteen (18} inches in depth with herbicide coating buttons to prevent plant root systems in entering the sub-surface base course of the clay tennis courts. SectionIV.doc Page 81 of 128 5/15/2012 Section N — Technical Specifications 43.2.8 FENCING 43.2.8.1 DESIGN The contractor shall provide a total color coated fencing system as indicated on drawings and described herein. All components: frames, fabric and fittings shall be black. Basis of Design Ameristar HT 25 or prior approved equal subject to strict compliance with Ameristar published specification. 43.2.8.2 POSTS All posts shall be a minimum 2-1/2" Ameristar HT-25 pipe; top rails 1-5/8" Ameristar HT 25 pipe with manufacturers standard "Permacoat" color system. 43.2.8.3 FENCE FABRIC Fence Fabric shall be 1-3/4" #6 gauge mesh throughout, manufactures standard galvanized wire with PVC coating. All fabric to be knuckled on both selvages. 43.2.8.4 GATES Provide gates at locations indicated. At service gates, provide a keeper that automatically engages gate life and holds it in the open position until manually released. Provide gate stops for double gates consisting of a mushroom-type flush plate with anchors, set in concrete, and designed to engage a center drop rod or plunger-bar. Include a locking device and padlock eyes as an integral part of the latch, permitting both gate leaves to be locked with a single padlock. Provide latch, fork type or plunger-bar type to permit operation from either side of gate, with padlock eye as an integral part of the latch. Gate Hinges — Size and material to suit gate size, non-lift-offtype, and offset to permit 180-degree gate opening. Provide one and one-half (1-1/2) pair of hinges for each leaf over six (6) foot nominal height. 43.2.9 WINDSCREENS The contractor shall provide nine (9) foot high windscreens at all ten (10) foot high fencing. Basis of design is Durashade plus by Ball Products, Inc. or equal by Putterman. Black high- density polyethylene, eight (8) oz. per square yard edges hemmed with grommets at twelve (l2) inch on center. Attach to chain link fencing at the top and bottom with 50 LBS plastic ties. 43.2.10 COURT EQUIPMENT 43.2.10.1 POST FOUNDATIONS Post foundations shall be not less than thirty-six (36) inches in length, eighteen (18) inches in width and thirty (30) inches in depth. Foundations shall be placed to provide an exact distance between posts of forty-two (42) feet on a doubles court and thirty-three (33) feet on a singles court. 43.2.10.2 NET POSTS & SLEEVES Net posts shall be galvanized steel having an outside diameter of not less than two and seven- eighths (2 7/8) inches with electrostatically applied enamel finish and shall be equipped with a reel type net tightening device. Post sleeves and posts shall be set plumb and true so as to support SectionlV.doc Page 82 of 128 5/15/2012 � � L' I � � � � l� � � � 1 r � , � � � � � ' ' � � ' Section IV —Technical Specifications the net a height of forty-two (42) inches above the court surface at the posts. Post sleeves shall be Schedule 40 PVC to be set in concrete per net post manufactures recommendation. 43.2.10.3 CENTER STRAP ANCHOR A center strap anchor shall be firmly set in accordance with the rules of the USTA. 43.2.10.4 NET A tennis net conforming to the USTA regulations shall be installed on each court. The net shall have black synthetic netting, a headband of white synthetic material in double thickness with the exterior treated for resistance to mildew and sunlight, and bottom and end tapes of back synthetic material treated to prevent deterioration from the sunlight. A vinyl coated, impregnated steel cable, having a diameter of one quarter (l/4) inch and a length five (5) feet greater than length between the net post shall hold the net in suspension. The net sha(1 have tie strings of a synthetic material at each corner. Basis of Design — Duranet DTS by Ball Products, Inc. 43.2.10.5 CENTER STRAP , Provide a center strap of white heavy duty polyester webbing with black oxide coated brass slide buckles and nickel plated double end snap. Center strap shall be placed on the net and attached to the center strap anchor. � 43.2.10.6 LINE TAPES Line tapes shall be 100% nylon and shall be two (2) inches in width. The tapes shall be -firmly � secured by aluminum nails with aluminum length of two and one-half (2 — 1/2) inches. Positioning shall be in accordance with regulations of the USTA. ' , � � � C� �� U' 43.2.10.7 MISCELLANEOUS EQUIPMENT Deliver the following equipment to the owner: 1. Ride-on Tandem Roller - Brutus AR-I Roller, automatic forward-neutral-reverse transmission; 24 inch wide drum; 3-horse power Briggs and Stratton engine. 2. Hand drag brooms (4 each) - 7' wide aluminum frame with 4-U2" synthetic bristles; Proline. 3. Tow drag brooms (1 each) - 7' wide aluminum frame 4-1/2" synthetic bristles; Proline. 4. Deluxe Proline Line Sweeper (4 each) - friction-driven rubber sleeves; synthetic bristle brush; with fence hook cast aluminum. 5. Scarifier/Lutes (2 each) - 30" wide all aluminum; Proline. 6. Tennis Shoe Cleaners (2 each) - steel frame construction "Scrusher" exact installation location by Owner. 7. Tennis Two Step (2 each) - polyethylene construction with two rubber panels. 8. Court Rake (1 each) — six-foot length aluminum. ' SectionlV.doc ' Page 83 of 128 5/I S/2012 Section IV — Technica] Specifications 43.2.11 SHADE STRUCTURE Provide shade structures as indicted on drawings. Basis of design: Suntrends, Inc. "Cabana Bench 8" — 8'long x 6' wide gable design with standard canvas canopy, direct burial installation. Provide concrete footing, size and reinforcement as required by shade structure manufacture. 43.2.12 WATER SOURCE (Potable) The owner shall supply water line to within fifty (50) feet of the courts with 50 pounds per square inch running pressure at its terminus. This line shall have the capacity to supply 30 gallons of water per minute for each court. 43.2.13 CONCRETE Provide concrete consisting of portland cement per ASTM C I50, aggregates per ASTM C 33, and potable water. Mix materials to obtain concrete with a minimum 28-day compressive strength of 3,500 psi. Use at least four sacks of cement per cu. yd., l-inch maximum size aggregate, 3-inch maximum slump. 43.2.14 EXISTING SPORT TENNIS COURT LIGHTING 43.2.14.1 SHOP DRAWINGS The Contractor shall provide signed and sealed electrical shop drawings by a professional electrical engineer for approval of the relocation and re-aiming of the existing tennis court sport lighting fixtures and electrical service to water coolers. The shop drawings shall include all necessary information according to local electrical codes in providing a complete operating system from the existing electrical panel. The shop drawings shall provide data showing the maximum foot candles the existing fixtures will provide at its new locations for tournament play. Shop drawings shall be submitted to the Parks and Recreation Department for approval. 43.2.14.2 RE-LAMP The Contractor shall re-lamp and clean lens of all existing lighting fixtures after relocating the light pole and fixtures to its new location. The City will provide the new lamps. 43.2.14.3 ELECTRICAL PERMIT The Contractor shall submit electrical drawings to City of Clearwater Planning and Development Services to obtain permits for installation of the electrical works. 43.2.14.4 POLES & FIXTURES The Contractor shal] install three (3) new sixty foot (60') poles and fourteen (14) new fixtures. The City will purchase and provide the new poles and fixtures for the Contractor to install, any other miscellaneous items required to provide a complete operable system shall be provided by the Contractor. Attached with this specification are the photometric lumination charts for the eight-(8) tennis courts. This information is provided by Musco Sport Lighting, 1838 East Chester Drive, Suite #104, High Point, NC 27265, phone (336) 887-0770 fax (336) 887-0771. Contact Douglas A. Stewart. Contractor shall install the poles and fixtures based on the following information: SectionlV.doc Page 84 of 128 5/15/2012 � � , � � � ' � � ' ' � � � � � � , � � � � �_J � � Section 1V —Technical Specifications Pole Tl existing 5 fixture pole, remove one fixture and place on pole TS Pole T2 existing 12 fixture pole, remove six fixtures and place on pole TS Pole T3 existing 5 fixture pole, remove one fixture and place on pole T5 Pole T4 new pole with new seven fixtures and two circuits Pole TS new pole w/existing sixteen fixtures (8 on one side and 8 on the other) and 2 circuits Pole T6 new pole with new seven fixtures and two circuits Pole T7 existing 5 fixture pole, remove two fixtures and place on pole TS Pole T8 existing l2 fiXture pole, remove four fixtures and place on pole TS Pole T9 existing 5 fixture pole, remove two fixtures and place on pole TS Light ]evels ended up at 58+ footcandles. Existing poles have concrete footing approximately one foot wide on all sides Contractor shall plan relocation light poles accordingly. 43.2.14.5 ELECTRICAL CONDUITS Existing electrical conduits are installed individually to the existing light pole, it is suggested the � Contractor place electrical junction boxes at existing pole locations and utilize existing conduits. New conduits will be required for the three (3) new light poles and the Contractor shall include the cost for these electrical conduits in the relocating of the new light poles. � � , , � � ' � � 43.2.15 WATER COOLER 43.2.15.1 SHOP DRAWINGS The Contractor shall provide shop drawings for the installation of water cooler in the cabana area of the tennis courts, electrical, water and drainage submitted to the Parks and Recreation Department for approval. 43.2.15.2 WATER FOUNTAIN Basis for design: Halsey Taylor HOF Series — water cooler with sealed back panels, or equal. 43.2.16 DEMONSTRATION Instruct the Owner's personnel on proper operation and maintenance of court and equipment. 43.2.17 WARRANTY 43.2.17.1 EQUIPMENT The Contractor shall supply warranty cards and operation and maintenance manuals for all equipment to the Owner upon completion of construction of the project. 43.2.17.2 WARRANTY The Contractor shall warranty the courts, fencing, sidewalks and court accessories against defective materials and /or workmanship for a period of one (1) year from the date of completion. � SectionlV.doc u Page 85 of 128 5/15/2012 Section IV —Technical Specifications 43.2.17.3 WARRANTY SUB-SURFACE IRRIGATION SYSTEM The Contractor shall warranty the sub-surface irrigation of the clay tennis courts for a period of two years from the day of completion. 44 44.1 WORK ZONE TRAFFIC CONTROL CONTRACTOR RESPONSIBLE FOR WORK ZONE TRAFFIC CONTROL The Contractor shall be responsible to furnish, operate, maintain and remove all work zone traffic control associated with the Project, including detours, advance warnings, channelization, hazard warnings and any other necessary features, both at the immediate work site and as may be necessary at outlying points. 44.2 WORK ZONE TRAFFIC CONTROL PLAN The Contractor shall prepare a detailed traffic control plan designed to accomplish the level of performance outlined in the Scope of the Work and/or as may be required by construction permits issued by Pinellas County and/or the Florida Department of Transportation for the Project, incorporating the methods and criteria contained in Part VI, Standards and Guides for Traffic Controls for Street and Highway Construction, Maintenance, Utility and lncident Management Operations in the Manual on Uniform Traffic Control Devices published by the U.S. Department of Transportation and adopted as amended by the Florida Department of Transportation, or most recent addition. 44.2.1 WORK ZONE SAFETY The general objectives of a program of work zone safety is to protect workers, pedestrians, bicyclists and motorists during construction and maintenance operations. This general objective may be achieved by meeting the following specific objectives: • Provide adequate advance warning and information regarding upcoming work zones. • Provide the driver clear directions to understanding the situation he will be facing as he proceeds through or around the work zone. • Reduce the consequences of an out of control vehicle. • Provide safe access and storage for equipment and material. • Promote speedy completion of projects (including thorough cleanup of the site). • Promote use of the appropriate traf�ic control and protection devices. • Provide safe passageways for pedestrians through, in, and/ar around construction or maintenance work zones. The 2004 Design Standards (DS), Index 600 "When an existing pedestrian way or bicycle way is located within a trafflc control work zone, accommodation must be maintained and provision for the disabled must be provided. Only approved temporary traffic control devices may be used to delineate a temporary traffic control zone pedestrian walkway. Advanced notification of sidewalk closures and detours marked shall be provided by appropriate signs". 2004 Standard Specifications for Road and Bridge Construction SectionIV.doc Page 86 of 128 � ' � ' � �� � ' ' � ' � � � ' ' � si�si2oi2 � , , ' ' � ' � � , ' �� � � ' ' ' r Section N — Technical Specifications 102-5 Traffic Control: 102-5.1 Standards: FDOT Design Standards (DS) are the minimum standards for the use in the development of all traffic control plans 44.3 ROADWAY CLOSURE GUIDELINES Roadway types: MajorArterials, MinorArterials, Local Collectors, and Local Following are typical requirements to be accomplished prior to closure. The number of requirements increase with traffic volume and the importance of access. Road closures affecting business or sole access routes will increase in process requirements as appropriate. For all but local streets, no road or lane closures are allowed during the Christmas holiday season and the designated "Spring Break" season with prior approval by the City Engineer. 44.3.1 ALL ROADWAYS Obtain permits for Pinellas County and Florida Department of Transportation roadways. Traffic control devises conform to national and state standards. 44.3.1.1 PUBLIC NOTIFICATION Standard property owner notification prior to start of construction for properties directly affected by the construction process. 44.3.2 MAJOR ARTERIALS, MINOR ARTERIALS, LOCAL COLLECTORS Consult with City Traffic staff for preliminary traffic control options. Develop Formal Traffic Control Plan for Permit Submittal to Regulatory Agency as necessary. 44.3.2.1 PUBLIC NOTIFICATION Message Board Display, Minimum of 7-day notice period prior to road closure and maybe longer for larger highway. The message board is to be provided by the Contractor. 44.3.3 MAJOR ARTERIALS, MINOR ARTERIALS 44.3.3.1 PUBLIC NOTIFICATION C-View Release 44.3.4 MAJOR ARTERIALS 44.3.4.1 PUBLIC NOTIFICATION News Release The Message Board may need to be displayed for a period longer than 7 days. 44.4 APPROVAL OF WORK ZONE TRAFFIC CONTROL PLAN The Contractor is invited and encouraged to confer in advance of bidding, and is required, as a , specification of the work, to confer in advance of beginning any work on the Project, with the Traf�ic Operations Division, Municipal Services Building, 100 South Myrtle Avenue, telephone 562-4750, for the purpose of approval of the Contractor's proposed detailed traffic control plan. , SectionIV.doc Page 87 of 128 5/IS/2012 , Section N — Technical Specifications All maintenance of traffic (MOT) plans shall be signed and sealed by a Professional Engineer or an individual who is certified in the preparation of MOT plans in the State of Florida. 44.5 INSPECTION OF WORK ZONE TRAFFIC CONTROL OPERATION The Traffic Operations Division may inspect and monitor the traffic control plan and traf�ic control devices of the Contractor. The City's Construction Inspector assigned to the project, may make known requirements for any alterations or adjustments to the traf�ic control devices. The Contractor shall take direction from the Project Engineer or Project Inspector. 44.6 PAYMENT FOR WORK ZONE TRAFFIC CONTROL Payment for work zone traffic control is a non-specific pay item to be included in the construction costs associated with other specific pay items unless specifically stated otherwise in the Scope of Work in these Technical Specifications and a bid item(s) is included for Work Zone Traffic Control in the proposal form. 44.7 CERTIFICATION OF WORK ZONE TRAFFIC CONTROL SUPERVISOR The City may require that the Supervisar or Foreman controlling the work for the Contractor on the Project have a current International Municipal Signal Association, Work Zone Traffic Control Safety Certification or Worksite Traffic Supervisor Certification from the American Traffic Safety Association with additional current Certification from the Florida Department of Transportation. This requirement for Certification will be noted in the Scope of Work and/or sections of these Technical Specifications. When the certified supervisor is required for the Project, the supervisor will be on the Project site at all times while work is being conducted. The Worksite Traffic Supervisor shall be available on a 24-hour per day basis and shall review the project on a day-to-day basis as well as being involved in all changes to traffic control. The Worksite Traffic Supervisor shall have access to al( equipment and materials needed to maintain traffic control and handle traffic related situations. The Worksite Traffic Supervisor shall ensure that routine deficiencies are corrected within a 24-hour period. The Worksite Traffic Supervisor shall be available on the site within 45 minutes after notification of an emergency situation, prepared to positively respond to repair the work zone traffic control or to provide alternate traf�ic arrangements. Failure of the Worksite Traffic Supervisor to comply with the provisions of this Subarticle may be grounds for decertification or removal from the project or both. Failure to maintain a designated Worksite Traffic Supervisor or failure to comply with these provisions will result in temporary suspension of all activities except traffic and erosion control and such other activities deemed to be necessary for project maintenance and safety. 45 CURED-IN-PLACE PIPE LINING !�•�i�l����►�� It is the intention of this specification to provide for the trenchless restoration of sanitary sewer and storm pipes by the installation if a cured in place jointless, continuous, thermosetting resin impregnated polyester flexible felt liner which is watertight and chemically resistant to withstand SectionIV.doc Page 88 of 128 5l15/2012 ' CJ � � , � r ' '`J i �1 � , , CJ , �� ' r L_ ; , � ' Section IV —Technical Specifications exposure to domestic sewage including all labor, materials and equipment to provide for a complete, fully restored and functioning installation. 45.2 PRODUCT AND CONTRACTOR/INSTALLER ACCEPTABILITY ' The City requires that all contractors be prequalified. See General Conditions regarding contractor prequalification. In addition, the City requires a proven extensive tract record for the liner system to be used in this project. All contractors submitting for prequalification approval ' for this project must exhibit extensive satisfactory experience in the installation of the proposed liner system(s) and satisfactory evidence that the proposed liner system has been extensively and successfully installed in the Unites States and the State of Florida. The installer must be certified � by the liner system manufacturer for installation of the liner system. The City reserves full and complete authority to approve the satisfactory nature of the both the liner system and the installer. � 45.3 MATERIALS The liner shall be polyester fiber felt tubing saturated with a resin prior to insertion. Resin type ' and qualities shall be as specified by the manufacturer to obtain a cured liner with the following properties: , ' �� �i �� ' �� ' � r � Tensile Strength Flexural Strength Flexural Modulus of Elasticity Long Term Modulus of Elasticity (50 Years) ASTM D638 3,000 psi ASTM D790 4,500 psi ASTM D790 300,000 psi ASTM D2290 150,000 psi Liner shall meet strengths as shown in ASTM F1216 unless otherwise submitted and approved by the Engineer. Lining manufacturer shall submit to the Engineer for approval as requested, complete design calculations for the liner thickness. The criteria for liner design shall be HS-20 traffic loading, water table to the ground surface, minimum expected lifetime of 50 years, and no structural strength retained from the existing pipe. Liner materials shall meet manufactures specifications of Insituform of North America, Inc., 3315 Democrat Road, Post Office Box 181071, Memphis, Tennessee 38118; or InLiner USA 1900 N.W. 44th St., Pompano Beach Florida 33064, 305-979-0802, or an approved equal. Any approved equal liner system must be approved by the Engineer as an equal system prior to receiving bids. Request for contractor prequalification and/or equal liner system approval must be received by the Engineer no later than l4 days prior to the date for receiving bids. 45.4 CLEANING/SURFACE PREPARATION It shall be the responsibility of the Contractor to clean and prepare the existing pipes for rehabilitation. The Contractor will thoroughly clean the interior of the sewers to produce a clean interior surface free of all coatings, sand, rock, roots, sludge, or other deleterious materials prior to liner insertion. Bypass pumping will be provided by the Contractor as part of the unit cost of restoration. Bypass operations are to be so arranged as to cause minimum disruptions to local traffic, residents and particularly to commercial facilities. During the cleaning and preparation operations all necessary precautions shall be taken to protect the public, all property and the sewer from damage. All material removed from the sewers shall be the Contractor's responsibility for prompt disposal in accordance with all regulatory agency requirements. The Contractor may be required to control the rate of sewer cleaning in the sanitary system to avoid heavy pollution loads at the City's treatment plants. SectionlV.doc Page 89 of 128 5/15/2012 Section IV — Technical Specifications 45.5 TELEVISION INSPECTION After cleaning, and again after the rehabilitation work on each section of the project is completed, all pipe sections shall be visually inspected by means of closed-circuit color television, and recorded on DVD, CD VHS format tapes provided to the project engineer. The television system used shall be designed for the purpose and suitably lighted to provide a clear picture of the entire periphery of the pipe. 45.6 LINER INSTALLATION Liner shall be sized to field measurements obtained by the Contractor to provide for a tight fit on the interior of the existing pipe to be lined. Contractor shall use installation methods approved by the liner manufacturer including operations for inversion, heat curing and reconnection of laterals. The Contractor shall immediately notify the Engineer of any construction delays taking place during the insertion operation. Contractor shall maintain a reasonable backup system for bypass pumping should delays or problems with pumping systems develop. Liner entries at manholes shall be smooth, free of irregularities, and watertight. No pinholes, tears, cracks, thin spots, excessive wrinkling or other defects in the liner shall be permitted. Such defects shall be removed and replaced by the Contractor at his expense. 45.7 LATERAL RECONNECTION Sanitary laterals shall be reconnected as soon as possible to renew service. Laterals are to be reconnected by means of robotics, by internally cutting out the liner to 95% of the area of the original opening. All lateral reconnections are to be grouted to prevent leakage. Grouting method and material is to be approved by the Engineer. Any reconnections to laterals and connections to manholes which are observed to leak shall be resealed by the Contractor. All laterals discovered during the lining process are to be reconnected unless specifically directed otherwise by the City. The Contractor will be requested to reconnect any laterals discovered to not be reconnected at a later date. Contractor shall notify all local system users when the sanitary system will not be available for normal usage by the delivery of door hangers with appropriate information regarding the construction project. 45.8 TIME OF CONSTRUCTION Construction schedules will be submitted by the Contractor and approved by the Engineer. At no time will any sanitary sewer service connection remain inoperative for more than an eight-hour period without a service bypass being operated by the Contractor. In the event that sewage backup occurs and enters buildings, the Contractor shall be responsible for cleanup, repair and property damage costs and claims. 45.9 PAYMENT Payment for sanitary sewer restoration shall be made per lineal foot including all preparation, bypass pumping, equipment, labor, materials, operations, restoration, lateral reconnection, etc, to provide a fully completed and operational sewer. Payment shall be measured from center of manhole to center of manhole for the sanitary systems and from end of pipe to end of pipe for storm systems. SectionlV.doc Page 90 of 128 5/15/2012 ' u �l r LJI' , � ' ' ' � � , , � , � r � , � ' r ' � 1 ' ' , ' , ' Section 1V —Technical Specifications 46 SPECIFICATIONS FOR POLYETHYLENE SLIPLINING 46.1 MATERIALS 46.1.1 PIPE AND FITTINGS The pipe supplied under this specification shall be high performance, high molecular weight, high density polyethylene pipe (Driscopipe 1000) as manufactured by Phillips Driscopipe, Inc., Dallas, Texas and shall conform to ASTM D 1248 (Type III, Class C, Category 5, Grade P34) or approved equal. Minimum cell classification values shall be 345434C as referenced in ASTM D 3350 ]atest edition. If fittings are required, they will be supplied under this specification and shall be molded or manufactured from a polyethylene compound having a cell classification equal to or exceeding the compound used in the pipe. To insure compatibility of polyethylene resins, all fittings supplied under this specification shall be of the same manufacture as the pipe being supplied. 46.1.2 QUALITY CONTROL The resin used for manufacturer of the pipe shall be manufactured by the pipe manufacturer, thus maintaining complete control of the pipe quality. The pipe shall contain no recycled compound except that generated in the manufacturer's own plant from resin of the same specification from the same raw material. The pipe shall be homogeneous throughout and free of visible cracks, holes, foreign inclusions, or other deleterious defects, and shall be identical in color, density, melt index, and other physical properties. The polyethylene resin used shall have all ingredients pre compound prior to extrusion of pipe, in plant blending is not acceptable. The Engineer may request, as part of the quality control records submittal, certification that the pipe produced is represented by the quality assurance testing. Additionally, test results from manufacturer's testing or random sampling by the Engineer that do not meet appropriate ASTM standards or manufacturer's representation, may be cause for rejection of pipe represented by the testing. These tests may include density and flow rate measurements from samples taken at selected locations within the pipe wall and thermal stability determinations aceording to ASTM D 3350, 10.1.9. 46.1.3 SAMPLES ' The owner or the specifying engineer may request certified lab data to verify the physical properties of the materials supplied under this specification or may take random samples and have them tested by an independent laboratory. , ' !J � ' 46.1.4 REJECTION Polyethylene pipe and fittings may be rejected for failure to meet any of the requirements of this specification. 46.2 PIPE DIMENSIONS Pipe supplied under this specification shall have a nominal IPS (Iron Pipe Size) O.D. unless otherwise specified. The SDR (Standard Dimension Ratio) of the pipe supplied shall be as specified by the Engineer, on the construction plans and/or the scope of work. SectionIV.doc Page 91 of l28 5/15/2012 Section IV — Technical Specifications 46.3 CONSTRUCTION PRACTICES 46.3.1 HANDLING OF PIPE Pipe shall be stored on clean, level ground to prevent undue scratching or gouging of the pipe. If the pipe must be stacked for storage, such stacking should be done in accordance with the pipe manufacturer's recommendations. The handling of the pipe should be done in such a manner that it is not damaged by dragging over sharp objects or cut by chokers or lifting equipment. 46.3.2 REPAIR OF DAMAGED SECTIONS Segments of pipe having cuts or gouges in excess of 10% of the wall thickness of the pipe should be cut out and removed. The undamaged portions of the pipe shall be rejoined using the butt fusion joining method. 46.3.3 PIPE JOINING Sections of polyethylene pipe should be joined into continuous lengths on the job site above ground. The joining method shall be the butt fusion method and shall be performed by the manufacturer's representative and in strict accordance with the pipe manufacturer's recommendations. The butt fusion equipment used in the joining procedures should be capable of meeting all conditions recommended by the pipe manufacturer, including, but not limited to, temperature requirements, alignment, and fusion pressures. 46.3.4 HANDLING OF FUSED PIPE Fused segments of pipe shall be handled so to avoid damage to the pipe. When lifting fused sections of pipe, chains or cable type chokers should be avoided. Nylon slings are preferred. Spreader bars should be used when lifting long fused sections. Care should be exercised to avoid cutting or gouging the pipe. 46.4 SLIPLINING PROCEDURE 46.4.1 PIPE REQUIREMENTS AND DIMENSIONS The liner(s) to be slip lined into the existing storm sewer shall have the following sizes: 12-inch diameter liner (SDR 26) into 15-inch existing sewer. 16-inch diameter liner (SDR 26) into 18-inch existing sewer. 18-inch diameter liner (SDR 26) into 21-inch existing sewer. 21'/z-inch diameter liner (SDR 32.5) into 24-inch existing sewer. 28-inch diameter liner (SDR 32.5) into 30-inch existing sewer. 34-inch diameter liner (SDR 32.5) into 36-inch existing sewer. 42-inch diameter liner (SDR 32.5) into 48-inch existing sewer. 46.4.2 CLEANING AND INSPECTION The existing line shall be cleaned of debris and other obstructions prior to TV inspections or insertion of the polyethylene liner. Cleaning can be accomplished with a high velocity cleaner, a bucket and scrapper, root saws, corkscrews, and rodding or balling units. The method used will be determined by the condition of the existing line. Final cleaning may be required prior to inserting the liner. SectionlV.doc Page 92 of 128 5/15/2012 , ' �_l � , ' 1 , ' � , � �_ 1 ' ' , � � � ' , � � � ' �J ' L� Section N—Technical Specifications 46.4.3 INSERTION SHAFT AND EXCAVATIONS All excavations shall conform to OSHA requirements and any additional requirements as set by the specifying engineer or his representative. Insertion shaft excavations shall coincide with points requiring removal of obstructions or shall be determined by the engineer. An entry slope grade of 2 1/2:1 maximum shall be used to provide a safe bending radius for the polyethylene. The bottom of the entry pit should provide a straight section for ease of entry of the liner into the existing pipe. The length of the level excavation should be at least twelve times the diameter of the liner being inserted. The width of the shaft should be as narrow as possible. The required width will depend on the location, type of soil, depth of the existing sewer line and the water table. 46.4.4 INSERTION OF THE LINER After completion of the access shaft, the top half of the existing sewer shall be broken or cut and removed for the full length of the access shaft. A fabricated pulling head shall be connected to the leading end of the liner pipe. A cable shall be connected to the pulling head so that the liner pipe can be pulled into the existing sewer. Power winches used for pulling in long lengths of polyethylene liner pipe shall be rated equal to the project requirements. Once started, the pulling operation should continue to completion. ' Insertion is normally done at about a slow walking speed. After insertion, a minimum of 12 hours shall be allowed for the liner pipe to reach equilibrium with the sewer temperature and to allow the liner pipe to stress relieve itself. , , ' ' ' � ' � ' The polyethylene liner pipe should protrude at least 6 inches into the manhole where it terminates. After the 12-hour equilibrium period, the annular space between the original pipe and the liner shall be pressure grouted. Said grouting must be from the bottom up to prevent air pockets from forming. Also the grout must be recommended for underwater application and have elastomeric properties. Products used shall be approved by the engineer. The liner shall not be displaced when the annular space is being filled. Spacers, inflatable plugs or other methods approved by the Engineer must be used to prevent displacement. The length of fused pipe that can be pulled wili vary depending on field conditions, the ease of access to the area, and the warking space available. 46.4.5 CONFIRMATION OF PIPE SIZES The Contractor shall be solely responsible to confirm all pipe sizes prior to ordering, fusing and installation of the liner. 46.4.6 UNDERDRAIN CONNECTIONS IF REQUIRED After the liner has been pulled into place, allowed to recover and sealed at the manholes, pipe connections okayed by the engineer shall be reconnected to the liner pipe. SectionlV.doc Page 93 of l28 5/15/2012 Section N — Technical Specifications Pipe connections shall be connected by the use of a pre-fabricated polyethylene saddle. A neoprene gasket shall be installed between the saddle and the liner pipe so that a complete water seal is accomplished when the saddle is placed on the liner pipe and secured with stainless steel bands. 46.4.7 BACKFILLING All excavations shall be backfilled using on site materials or as specified by the engineer. Cost far backfilling of access shafts and underdrain connections shall be including in the unit price bid for sliplining and reconnection of service laterals. Before any excavation is done for any purpose, it will be the responsibility of the contractor to contact the various utility companies and to determine the locations of their facilities. It will be the responsibility of the contractor to provide adequate protection for utility facilities. Any temporary construction right of way and/or storage areas will be arranged for by the contractor. 46.4.8 POINT REPAIR The engineer or his representative will determine if a point repair is necessary only after it has been demonstrated that a liner pipe cannot be pulled through the existing pipe. Payment will be made for each repair. The contractor will be expected to remove the obstruction and clear the pipe. lf removing the top of the existing pipe will accomplish the removal of the obstruction, the bottom of the existing pipe should remain in place to form a cradle for the liner. 46.4.9 CLEAN UP OPERATIONS All materials not used in the backfilling operation shall be disposed of off site by the contractor. Finish grading shall be required. In locations other than street right-of-ways, the surface shall be graded smooth and sodded with the same kind of grass as the existing lawn. Excavation points in street right-of-ways shall be repaired as specified by the engineer. 47 SPECIFICATIONS FOR POLYVINYL CHLORIDE RIBBED PIPE 47.1 SCOPE This specification designates general requirements for unplasticized polyvinyl chloride (PVC) plastic (spiral wound) pipe with integral wall bell and spigot joints for the conveyance of storm water. 47.2 MATERIALS All pipe and fittings shall be manufactured and tested in accordance with specification for "Poly (Vinyl Chloride) (PVC) Large Diameter Ribbed Gravity Storm Sewer Pipe and Fittings Based on Controlled Inside Diameter". The pipe and fittings shall be made of PVC plastic. 47.3 PIPE The bell shall consist of an integral wall section. The solid cross section fiber ring shall be factory assembled on the spigot. Sizes and dimensions shall be as shown in this specification. SectionlV.doc Page 94 of 128 5/15/2012 � ' � u , , �J ' ' ' � �__] , ' ' � , , , , -i i �I � � Section IV — Technical Specifications Standard laying lengths shall be 13 ft. + 1 inch. At manufacturer's option, random lengths of not more than l 5% of total footage may be shipped in lieu of standard lengths. 47.4 JOINING SYSTEM � Joints shall be either an integral bell gasketed joint. When the joint is assembled according to manufactures recommendation it will prevent misalignment of adjacent pipes and form a silt tight joint. � � [_J � � l._ 1 � , 47.5 FITTINGS All fittings and accessories shall be as manufactured and furnished by the pipe supplier or approved equal and have bell and/or spigot configurations compatible with that of the pipe. 48 GUNITE SPECIFICATIONS 48.1 PRESSURE INJECTED GROUT Pressure injected grout shall be of cement and water and shall be proportioned generally in the ratio of l.5 (one and one hal� cubic foot (one and one half bags) of cement to 1(one) cubic foot (7.50 gal.) of water. This mix shall be varied as the grouting proceeds as is necessary to provide penetration in the operator's judgment. Cement shall be Portland Cement conforming to all of the requirements of the American Society for Testing Materials Standard Specifications, latest edition serial designation C] 50 for Portland Cement, Type I. Portland Cement shall weigh not less than 94 pounds per cubic foot. Water used in the grout shall be fresh, clean and free from injurious amounts of oil, alkali, vegetable, sewage and/or organic matter. Water shall be considered as weighing 8.33 pounds per gallon. Grout pump shall be of the positive displacement type and shall be capable of producing adequate pressure to penetrate the area. All pressure grouting will be at the direction of the Engineer. 48.2 REHABILITATION OF CORRUGATED METAL PIPE WITH ' GUNITE Guniting shall conform to all requirements of "Specifications for Materials, Proportioning, and , Application of Shotcrete (ACI 506.2 77)" published by the American Concrete Institute, Detroit, Michigan, except as modified by those specifications. , ' ' ' ' Steel reinforcement shall be incorporated in the Gunite as required and shall be furnished, bent, set and placed in accordance with the provisions ofthese specifications. The purpose of this specification is to obtain a dense and durable concrete having the specified strength. 48.3 COMPOSITION Gunite shall be composed of Portland Cement, aggregate and water so proportioned as to produce a concrete suitable for pneumatic application. SectionIV.doc Page 95 of 128 5/IS/2012 Section 1V —Technical Specifications 48.4 STRENGTH REQUIREMENTS Concrete ingredients shall be selected, proportioned in such a manner as will produce concrete which will be extremely strong, dense and resistant to weathering, and abrasion. Concrete shall have a minimum 28-day strength of 4,000 psi. 48.5 MATERIALS Portland Cement: Cement shall be Portland cement conforming to all of the requirements of the American Society for Testing Materials Standard Specifications, Latest Serial Designation CI50 for Portland Cement, Type l. A bag of cement shall be deemed to weigh not less than 94 pounds per cubic foot. Fine Aggregate: Fine aggregate shall be natural siliceous sand consisting of hard, clean, strong, durable and uncoated particles, conforming to the requirements of American Society for Testing Materials Standard Specifications, Latest Serial Designation C33 for Concrete Aggregates. Fine aggregate shall not contain less than 3% nor more than 6% of moisture. Fine aggregate shall be evenly graded from fine to coarse and shall be within the following limits: Passing No. 3/8 Sieve Passing No. 4 Sieve Passing No. 8 Sieve Passing No. 16 Sieve Passing No. 30 Sieve Passing No. 50 Sieve Passing No. 100 Sieve C�:���i%��X:7 100% 95% to 100% 80% to 100% 50% to 85% 25% to 60% 10% to 30% 2% to 10% Water used in mixing, at the nozzle shall be fresh, clean, and free from injurious amounts of oil, acid, alkali, vegetable, sewage, and/or organic matter. Water shall be considered as weighing 833 pounds per gallon. 48.7 REINFORCEMENT Steel mesh reinforcement shall be electrically welded, cold drawn, mild steel fabric conforming to the latest requirements of ASTM Standard Specifications, Serial Designation A 185 for Welded Steel Wire Fabric for Concrete Reinforcement. Mesh can be fabricated from cold drawn steel wire conforming to the requirements of the latest ASTM Standard Specifications, Serial Designation A 82 and sized as shown on Plans Page 7 of 7. 48.8 STORAGE OF MATERIALS Cement shall be stored with adequate provisions for the prevention of absorption of moisture. It shall be stored in a manner that will permit easy access for inspection and identification of each shipment. Aggregate shall be stockpiled at points selected to provide maximum drainage and to prevent the inclusion of any foreign material during rehandling. SectionIV.doc Page 96 of 128 5/IS/2012 ' �I� � � � ��I � � �J , � ' � � 1 �� � , ' � 1 � Section IV — Technical Specifications 48.9 SURFACE PREPARATION � Unsound materials of construction and all coated, scaly, or unsound concrete in manholes and inlets shall be removed by chipping with pneumatic hammers and chisels to sound surface, all cracks and cavities shall be chipped to such formation that their sides form approximately a 45 � degree angle to the exposed surface for at least one (1) inch in depth. All areas to receive pneumatic concrete shall be cleaned by flushing or scouring with water and compressed air jets to assure removal of all loose particles. All areas of existing surfaces that do not require chipping � shall be given a wet sandblasting with the gunite equipment and the air pressure at the cement gun shall not be less than 50 psi. � ' ' Surface preparation of existing metal surface of a corrugated pipe shall be lightly sandblasted to remove loose material. All sandblasted areas shall then be cleaned by an air/water blast to remove all particles from the cleaning operation. To insure perfect bond, the newly sandblasted surface shall be thoroughly moistened with water prior to application of gunite. In no instance shall gunite be applied in an area where free running water exists. 48.10 PROPORTIONING Prior to start of guniting the Contractor shall submit to the Owner the recommended mix as a � ratio of cement to aggregate. Recommended mix shall be on the basis of test data from prior experience. Provided data submitted is adequate no further testing of recommended mix will be required. � If required, the Contractor shall provide all equipment necessary to control the actual amounts of all materials entering into the concrete. The types of equipment and methods used for measuring materials shall be subject to approval. � � ' � ' � ' � 48.11 MIXING Gunite shall be thoroughly mixed by machine and then passed through a sieve to remove all large particles before placing in hopper of the cement gun. The mixture shall not be permitted to become damp. Each batch should be entirely discharged before recharging is begun. The mixer should be cleaned thoroughly enough to remove all adherent materials from the mixing vanes and from the drum at regular intervals. Water in any amount shall not be added to the mix before it enters the cement gun. Quantities of water shall be controlled by a valve at the nozzle of the gun. Water content shall be adjusted as required for proper placement, but shall in no case exceed four gallons of water per sack of cement, including the water contained in the aggregate. Remixing or tempering shall not be permitted. Mixed material that has stood 45 minutes without being used shall be discarded. Rebound materials shall not be reused. 48.12 APPLICATION Gunite shall not be placed on a frozen surface nor during freezing weather. Gunite shall not be placed when it is anticipated that the temperature during the following 24 hours will drop below 32 degrees, Fahrenheit. Sequence of application may be from bottom to top or vice versa if rebound is properly removed. Corners shall be filled first. "Shooting" shall be from an angle as near perpendicular to the SectionIV.doc Page 97 of 128 5/15/2012 Section IV —Technical Specifications surface as practicable, with the nozzle held approximately 3 feet from the work (except in confined control). If the flow of material at the nozzle is not uniform and slugs, sand spots, or wet sloughs result, the nozzleman shall direct the nozzle away from the work until the faulty conditions are corrected. Such defects shall be replaced as the work progresses. Guniting shall be suspended if: l. Air velocity separates the cement from the sand at the nozzle. 2. Temperature approaches freezing and the newly placed gunite cannot be protected. Gunite shall be applied in one or more layers to such total thickness as required to restore the area as detailed over the original lines of the adjoining surface, unless otherwise specified. All cavities, depressions, washouts and similar failures shall be rebuilt to original lines by use of gunite reinforced with wire mesh. Where the cavity exceeds 4 inches in depth a layer of inesh shall be used for each 3 inches of depth of gunite. In no case shall wire mesh be placed behind existing reinforcement. The time interval between successive layers in sloping vertical or overhanging work must be sufficient to allow initial but not final set to develop. At the time the initia] set is developing, the surface shall be cleaned to remove the thin film of laitance in order to provide a perfect bond with succeeding applications. 48.13 CONSTRUCTION JOINTS Construction joints or day's work joints shall be sloped off to a thin, clean, regular edge, preferably at a 45-degree slope. Before placing the adjoining work, the slope portion and adjacent gunite shall be thoroughly cleaned as necessary, then moistened and scoured with an air jet. 48.14 SURFACE FINISH Nozzleman shall bring the gunite to an even plane and to well formed corners by working up to ground wires or other guides, using lower placing velocity than normal. After the body coat has been placed, the surface shall be trued with a thin edge screed to remove high areas and expose low areas. Low areas shall be properly filled with concrete to insure a true, flat surface. After the concrete surface has been trued, the entire surface shall be given a flashcoat finish except where a special type finish is specified on the drawings. 48.15 CURING Curing shall be in accordance with either paragraph 3.7.](d) or paragraph 3.7.5. ofACI 506.2 77 depending upon atmospheric condition. 48.16 ADJACENT SURFACE PROTECTION During progress of the work, where appearance is important, adjacent areas or grounds which may be permanently discolored, stained, or otherwise damaged by dust and rebound, shall be adequately protected sensitive areas, when contacted, shall be cleaned by early scraping, brushing or washing, as the surroundings permit. SectionIV.doc Page 98 of 128 5/ISl2012 ' � � � � � � ' � � � � � � �J � ' � � � Section IV —Technical Specifications 48.17 INSPECTION � Because of the importance of workmanship affecting the quality of the gunite, continual inspection during placing shall be maintained. Any imperfections discovered shall be cut out and replaced with sound material. � r � � � � � � � � � � � � � 48.18 EQUIPMENT Cement Gun: The mixing and delivering equipment shall be either the vertical double chamber type or rotary type. The upper chamber of the double chamber type shall receive and pressurize the dry mix and deliver it to the lower chamber. The lower chamber shall force the pressurized mix into the delivery hose by means of a feed wheel. The type of feeder utilized should be of suf�icient capacity that the lower chamber may continuously furnish all required material to the delivery hose while the upper chamber receives the recharge. The rotary type cement gun shall have an enlarged hopper to feed material into a rotating multiported cylinder. Material shall fall by gravity into a port which shall then be rotated to a position in which the material is expelled by air into a moving stream of air. All equipment must be kept in good repair. The interior of drums, feed gearing and valves shall be cleaned as often as necessary (at least once every 8 hour shift) to prevent material from caking on critical parts. Nozzle: Nozzle shall be the premixing type with perforated water feed ring inside the nozzle. The maximum length of material hose for the application of gunite shall be approximately 150 feet although it shall be permissible to use as much as 800 feet of material hose if the supply air pressure measured at the cement gun is increased to maintain proper velocity. The following table gives requirements for compressor size, hose size and air pressure using 150 feet of material hose: Comp. Cap Max. Hose Dia. Max. Size Nozzle Min. Air Press. (cfm) (In.) (In.) (psi) 365 1 5/8 1 5/8 60 600 2 2 80 750 2]/2 2 1/2 90 For each 25 feet of material hose used in excess of 150 feet, the required air pressure shall be increased by 5 psi. Air Compressor: Any standard type of compressor shall be satisfactory if it is of sufficient capacity to provide, without interruption, the pressures and volume of air necessary for the longest hose delivery. The air compressor capacity determinations shall include allowances made for the air consumed in blowing rebound, cleaning, reinforcing and for incidental uses. Compressor equipment shall be of such capacity so as to insure air pressures at the special mixer capable of producing the required material velocities. Water Supply: The water pressure at the discharge nozzle should be sufficiently greater than the operating air pressure to assure the water is intimately mixed with the other materials. If the line water pressure is inadequate, a water pump or pressurized tank shall be introduced into the line. The water pressure shall be uniformly steady (nonpulsating). SectionIV.doc Page 99 of 128 5/15/2012 Section 1V — Technical Specifications 49 SANITARY AND STORM MANHOLE LINER RESTORATION 49.1 SCOPE AND INTENT It is the intent of this portion of the specification to provide for the structural rehabilitation of manhole walls and bases with solid preformed liners and made-in-piace ]iner systems used in accordance with the manufacturer's recommendations and these specifications. In addition to these specifications, the Contractor shall comply with manufacturer's instructions and recommendations for work. Purpose of work is to eliminate infiltration, provide corrosion protection, repair voids and to restore the structural integrity of the manhole. For any particular system the Contractor will submit manufacturer's technical data and application instructions. All OSHA regulations shall be met. 49.2 PAYMENT Payment for liners shall be per vertical foot of liner installed from the base to the top of the installed liner. Liners will generally be installed to the top of existing or new corbels. No separate payment will be made for the following items and the cost of such work shall be included in the pay item per linear foot of liner: Bypass pumping; Traffic Control; Debris Disposal; Excavation, including necessary pavement removal; Shoring and/or dewatering; Structural fill; Backfill and compaction; Grout and mortar; Brick; Resetting of the manhole ring and cover; Pipe extensions and connectors necessary to the installation; Replacement of unpaved roadway and grass or shrubbery plot; Replacement of roadway base and asphalt surface; and Appurtenant work as required for a complete and operable system. 49.3 FIBERGLASS LINER PRODUCTS 49.3.1 MATERIALS 49.3.1.1 LINERS Liners shall be fiberglass engineered to meet or exceed AASHTO H 20 loading of 16,000 pound vertical wheel load. Manhole liners are to be of the integral corbel design unless otherwise stipulated. Manhole liners are to be as large in diameter as will fit into the existing manhole. The contractor shall measure the existing manhole immediately prior to ordering materials and is solely responsible for the fitting of the liner. Contractor will be required to submit factory certification for fiberglass liners. The manhole liner shall meet all requirements of ASTM D 3753. 49.3.1.2 MORTAR Mortar shall be composed of one part Portland Cement Type I and between two and three parts clean, well graded sand, 100% of which shall pass a No. 8 sieve. 49.3.1.3 GROUTING Grouting shall be a concrete slurry of four bags of Portland Cement Type IT per cubic yard of clean, well graded sand. SectionlV.doc Page 100 of 128 5/IS/2012 � � � ' � � � � � � � � � � � � ' ' ' � � � �J Section 1V — Technical Specifications 49.3.2 INSTALLATION AND EXECUTION Excavate an area around the top of the existing manhole sufficiently wide and deep for the removal of the manhole ring and corbel section. Remove the frame and cover and corbel section without damaging the existing manhole walls. Care is to be taken not to allow brick or soil to fall into the existing manhole. Remove or reinsert loose brick which protrude more than one inch from the interior wall of the manhole and which could interfere with the insertion ofthe fiberglass liner. If the shelf of the manhole invert is not level around the perimeter, form a flat shelf with mortar. Cut the liner to the proper length. Cutouts in the manhole shall be made to accommodate existing inlet and outlet pipes, drops and cleanouts. Lower the liner into the existing manhole and set the bottom of the liner into quick setting grout. Obtain a good bottom seal to prevent the loss of grout from the annular space between the outside of the liner and the inside wall of the existing manhole. Set the liner as nearly vertically as possible. Pour six inches of quick setting grout above the initial bottom seal in the annular void to insure an adequate bottom seal. Bridge the gap from drops, laterals, force mains, cleanouts and all existing piping between the existing manhole wall and the new manhole liner with P.V.C. pipe. Use quick setting mortar to seal the area around the manhole liner and piping. Fill the annular space between the manhole ]iner and the existing manhole interior walls with grout. Care must be taken not to deflect the manhole liner due to head pressure. Set the existing manhole ring and cover using brick to make elevation adjustments as needed. Observe watertightness and repair any visible leakage. Backfill around the new liner and compact the backfill. Sod the disturbed area. Match existing sod. Where manholes fall in paved areas, disturbed base shall be replaced twice the original thickness and compacted in 8" layers. Asphalt shall be replaced with 1 1/2" of Pinellas County Type II surface. 49.4 STRONG SEAL MS-2 LINER PRODUCT SYSTEM This specification shall govern all work to spray apply a monolithic fiber reinforced cementitious � liner to the wall and bench surfaces of brick, concrete or any other construction material; Strong Seal MS 2 product. �� Described are procedures for manhole preparation, cleaning, application and testing. The applicator must be approved, trained and certified as having successfully completed factory training. The applicator/contractar shall furnish all labor, equipment and materials for applying the Strong Seal MS 2 product directly to the contour of the manhole to form a structural cementitious liner of a minimum 1/2" thickness using a machine specially designed for the application. All aspects of the installation shall be in accordance with the manufacturer's recommendations and with the following specifications which includes: 1. The elimination of active infiltration prior to making the application. 2. The removal of any loose and unsound material. � SectionlV.doc � Page 101 of 128 5/15/2012 Section IV — Technical Specifications 3. The spray application of a pre blended cementitious mix to form a monolithic liner in a 2 coat application. 49.4.1 MATERIALS 49.4.1.1 PATCHING MIX Strong Seal shall be used as a patching mix according to the manufacturer's recommendations and shall have the following minimum requirements: 1. Compressive Strength (ASTM C-]09) l5 min., 200 psi 6 hrs., 1,400 psi 2. Shrinkage (ASTM G596) 28 days, 150 psi 3. Bond (ASTM C-952) 28 days, 150 psi 4. Cement 5. Density, when applied 49.5 INFILTRATION CONTROL Sulfate resistant 105 +/- 5 pcf Strong Plug shall be used to stop minor water infiltration according to the manufacture's recommendations and shall have the following minimum requirements: l. Compressive strength (ASTM C-] 09) - 600 psi, 1 hr.; 1000 psi 24 hrs. 2. Bond (ASTM C-952) - 30 psi, 1 hr.; 80 psi, 24 hrs. 49.6 GROUTING MIX Strong-Seal Grout shall be used for stopping very active infiltration and filling voids according to the manufacture's recommendations. The grout shall be volume stable, and have a minimum 28 day compressive strength of 250 psi and a 1 day strength of 50 psi. 49.7 LINER MIX Strong Seal MS 2 shall be used to form the rr�onolithic liner covering all interior manhole surfaces and shall have the following minimum requirements at 28 days: 1. Compressive strength (ASTM C 109) 3,000 psi 2. Tensile strength (ASTM C 496) 300 psi 3. Flexural strength (ASTM C 78) 600 psi 4. Shrinkage (ASTM C 596) 0% at 90% R.H. 5. Bond (ASTM C 952) 130 psi 6. Density, when applied l OS + pcf Product must be factory blended requiring only the addition of water at the Job site. Bag weight shall be 50 51 pounds and contents shall have dry bulk density of 54 to 56 pounds per cubic foot. Fiberglass rods which are contained in the product shall be alkaline resistant and shall be 1/2" to 5/8" long with a diameter of 635 to 640 microns. Products shall, in the un mixed state, have a lead content not greater than two percent (2%) by weight. SectionlV.doc Page 102 of ]28 5/15/2012 � � � � � �i � � � � � � � � � � � � � , � � ij �' ' Section IV—Technical Specifications Strong Seal MS 2C shall be made with Calcium Aluminate Cement and shall be used according to the manufacturer's recommendations in applications where there is evidence of severe sulfide conditions. Product must be factory blended requiring only the addition of water at job site. Bag weight shall be 50-51 pounds and contents must have a dry bulk density of 50 56 pounds per cubic foot. Cement content must be 65%-75% of total weight of bag. One bag of product when mixed with correct amount of water must have a wet density of 95 108 pounds per cubic foot and must yield a minimum of .67 cubic foot of volume. Fiberglass rods must be alkaline resistant with rod lengths not less than l/2" in length nor greater than 5/8" in height. Product shall not include any basic ingredient that exceeds maximum allowable EPA limit for any heavy metal. Manufacturer must provide MSDS sheets for product(s) to be used in reconstruction process. A two coat application of liner material will be required (no exceptions) with the first coat rough troweled to force materials into cracks and crevices to set the bond. The second coat to be spray applied to assure minimum 1/2" thickness after troweling or brush finishing to a relatively smooth finish. 49.8 WATER Shall be clean and potable. 49.9 OTHER MATERIALS No other material shall be used with the mixes previously described without prior approval or recommendation from the manufacturer. 49.10 EQUIPMENT A specially designed machine consisting of an optimized progressive cavity pump capable of � producing a minimum of 250 psi pumping pressure, contra blend mixer with twin ribbon paddles with discharge, and an air system far spray application of product. Equipment must be complete with water storage and metering system. Mixer and pump is to be hydraulically powered. ' Equipment is to be mounted to heavy duty construction tandem axle road worthy trailer complete with electric brakes and running lights. Internal combustion engine must be included to power the hydraulic system and air compressor. � � � ' , 49.11 INSTALLATION AND EXECUTION 49.11.1 PREPARATION 1. Place boards over inverts to prevent extraneous material from entering the sewer lines and to prevent up stream line from flooding the manhole. 2. All foreign material shall be removed from the manhole wall and bench using a high pressure water spray (minimum 1,200 psi). Loose and protruding brick, mortar and SectionIV.doc Page ]03 of 128 5l15/2012 Section IV — Technical Specifications concrete shall be removed using a mason's hammer and chisel and/or scraper. Fill any large voids with quick setting patching mix. 3. Active leaks sha11 be stopped using quick setting specially formulated mixes according to the manufacturer's recommendations. Some leaks may require weep holes to localize the infiltration during the application after which the weep holes shall be plugged with the quick setting mix prior to the final liner application. When severe infiltration is present, drilling may be required in order to pressure gout using a cementitious grout. Manufacturer's recommendations shall be followed when pressure grouting is required. 4. Any bench, invert or service line repairs shall be made at this time using the quick setting mix and following the manufacturer's recommendations. 5. After all preparation has been completed, remove all loose material. 49.11.2 MIXING For each bag of product, use the amount of water specified by the manufacturer and mix using the Spray Mate Model 35C or 35D equipment for 30 seconds to a minute after all materials have been placed in the mixing hopper. Place the mix into the holding hopper and prepare another batch with timing such that the nozzleman can spray in a continuous manner without interruption until each application is complete. 49.11.3 SPRAYING The surface, prior to spraying; shall be damp without noticeable free water droplets or running water. Materials shall be sprayed, applied to a minimum uniform thickness to insure that all cracks, crevices and voids are filled and a somewhat smooth surface remains after light troweling. The light troweling is performed to compact the material into voids and to set the bond. Not before the first application has begun to take an initial set (disappearance of surface sheen which could be 15 minutes to 1 hour depending upon ambient conditions) is the second application made to assure a minimum total finished thickness of 1/2 inch. The surface is then troweled to a smooth finish being careful not to over trowel so as to bring additional water to the surface and weaken it. A brush finish may be applied to the finished coat to remove trowel marks. Manufacturer's recommendation shall be followed whenever more than 24 hours have elapsed between applications. The wooden bench covers shall be removed and the bench is sprayed such that a gradual slope is produces from the walls to the invert with the thickness at the edge of the invert being no less than 1/2 inch. The wall bench intersection shall be rounded to a uniform radius, the full circumference of the intersection. The final application shall have a minimum of four (4) hours cure time before being subjected to active flow. 49.11.4 PRODUCT TESTING At some point during the application, at least four (4) 2 inch cubes may be prepared each day or from every 50 bags of product used, identified and sent, in accordance with the Owner's or Manufacturer's directions, for compression strength testing as described in ASTM C 109. 49.11.5 CURING Ambient manhole conditions are adequate for curing so long as the manhote is covered. It is imperative that the manhole be covered as soon as possible after the application has been completed. SectionIV.doc Page 104 of l28 5/15l2012 � �� � � � � � � � , � r �I � � , � � � � � � � l� � � ' Section IV — Technical Specifications 49.11.6 MANHOLE TESTING AND ACCEPTANCE Manhole may be vacuum tested from the top of manhole frame to the manhole base. All pipes entering the manhole shall be plugged, taking care to securely place the plug from being drawn into the manhole. The test head shall be placed and the seal inflated in accordance with the manufacturers' recommendations. A vacuum pump of ten (l 0) inches of inercury shall be drawn and the vacuum pump shut off. With the valves closed, the time shall be measured for the vacuum to drop to nine (9) inches. The manhole shall pass if the time is greater than sixty (60) seconds for forty eight (48) inch diameter, seventy five (75) seconds for sixty (60) inches, and ninety (90) seconds for seventy two (72) inch diameter manholes. If the manhole fails the initial test, necessary repairs shall be made. Retesting shall proceed unti] a satisfactory test is obtained. Tests shall be performed by the Contractor under the direction of the Project Engineer. 49.12 INNERLINE ENVIRONMENTAL SERVICES LINER PRODUCT SYSTEM 49.12.1 SCOPE Materials and application procedures for manhole rehabilitation for the purpose of restoring structural integrity, providing corrosion resistance, and stopping infiltration by means of: Hydraulic grouting, where required, as a preliminary measure to stop high volume infiltration 2. Hydrophilic grouting (positive side waterproofing), where required, as follows: a. Hydrophilic foam-injected through wall of manhole to fill voids and/or b. Hydrophilic gel-injected through wall of manhole to stop active leaks 3. Cementitious waterproofing with crystallization (negative side waterproofing) 4. Calcium aluminate cement lining, minimum of l/2 inch 5. Epoxy coating, minimum of 30 dry mils 49.12.2 MATERIALS 49.12.2.1 REPAIRING CEMENT A quick setting hydraulic cement compound shall be used to plug all visible minor leaks and to � instantly stop major leaks, so that further waterproofing processes may proceed unhindered. The repairing cement shall be nonshrinking, nonmetallic, and noncorrosive. The compound shall have the following properties: � �� ' Set Time Tensile Strength ASTM C 307 Compressive Strength ASTM -C l09 � SectionIV.doc , 1-3 minutes ] day 510 psi 3 days 745 psi 28 days 855 psi 1 day 3,125 psi 7 days 7,808 psi 28 days 9,543 psi Page ] OS of 128 5/15/2012 Section IV — Technical Specifications Flexural Strength ASTM C 78 49.12.2.2 HYDROPHILIC GROUTING l day 410 psi 3 days 855 psi 28 days 1,245 psi Based on conditions found in and around the manhole, the applicator shall pressure inject either one or both of the following materials: I. An expansive foam grout shall be used to stop major intrusion of water and fill cracks in and voids behind the structure's surface. Physical properties are as follows: Tensile Strength Elongation Bonding Strength 380 psi ASTM D 3574-86 400% ASTM D 3574-86 250-300 psi � � � � � � 2. A hydrophilic gel grout shall be used for soil stabilization behind the manhole-to prevent seepage, to provide a damming effect, and to place a hydrostatic barrier around exterior � of manhole. Physical properties are as follows: Density Tensile Strength Elongation Shrinkage Toxicity 49.12.2.3 WATERPROOFING 8.75-9.17 lbs/gal ASTM D-3574 150 psi ASTM D- 412 250% ASTM D-3574 Less than 4% ASTM D-1042 Non Toxic A waterproofing component based on the crystallization process shall be applied. The system combines cementitious and silicate based materials that are applied to negative side surfaces to seal and stop leakage caused by hydrostatic pressure. A combination of five coats (using three components-two powders and a special liquid) react with moisture and the constituents of the substrate to form the crystalline structure. It becomes an integral part of the structure and blocks the passage of water. With moisture present, the crystallization process will continue for approximately six months. Upon completion the color will be light grey. Physical properties are as follows: Slant/Shear bond Strength to Calcium Aluminate Cement ASTM (to be given) 1,200 1,800 psi Tensile Strength (7 day cure) ASTM C l90 Permeability (3 day cure) CRD 48 55 49.12.2.4 CEMENT LINING 380 psi (2.62 MPa) 325 psi (2.24 MPa) 8.l x10 llcm/sec to 7.6x10 cm/sec at 100% RH at 50% RH A self bonding calcium aluminate cement shall be applied to restore structural integrity and provide corrosion resistance qualities. The cement (before adding fibers) shall have the following properties: Calcium Aluminate Cement 12 Hrs 24 Hrs 7 Days 28 Days SectionIV.doc Page 106 of 128 5/15/2012 � � � L� �� �� I� � ' � ' ' � � � � � � � u l� � ' � � � u � Section IV — Technical Specifications Astm C 495 Compressive Strength, Psi 7000 11000 12000 13000 Astm C 293 Flexural Strength, Psi 1000 1500 1800 2000 Astm C 596 Shrinkage At 90%Humidiry -- <0.04 <0.06 <0.08 Astm C 666 Freeze-Thaw Aft 300 Cycle No Damage Astm C 990 Pull - Out Strength 200 - 230 Psi Tensile Astm C 457 Air Void Content (7 Days) 3% Astm C 497 Porosity/Adsorption Test 4- 5% Modules of Elasticity: 7.10 X 10 PSI after 24 Hrs moist curing at 68 F. The calcium aluminate cement shall be reinforced with inert fibers which comply with ASTM C 1116 and ASTM C 1018, added at the rate of one pound per cubic yard of concrete. The mixture shall be applied to a thickness of at least one half inch, but no greater than two inches. lt will have a dark grey color. 49.12.2.5 EPDXY COATING A high build, flexible waterproofing epoxy shall be applied to a minimum of 30 dry mils. This epoxy will seal structure from moisture and provide protective qualities to the surface, including excellent resistance to chemical attack and abrasion. The epoxy shall be 100% solids, can be applied to damp surfaces, cures to a tile like finish, is easy to clean, and has no toxic fumes. Its uses include sewage treatment plants and other sewer structures. The epoxy shall have the following properties at 75 degrees F: Mixing Ratio (Parts A:B), by volume 1:1 Color (other colors available on request) Light Gray Pot Life, hrs 1 Tensile Strength, psi, min 2,000 Tensile Elongation, % ] 0 —20 Water Extractable Substances, mg./sq. in., max 5 Bond Strength to Cement (ASTM 882) psi 1,800 49.12.2.6 CHEMICAL RESISTANCE Alcohols, Trichloroethylene, Nitric Acid (3%), Jet Fuels, Water, Sulfuric Acid (3% 10%), MEK, Wine, Butyl Acetate, Beer, Lactic Acid (3%), Gasoline, Corn Oil, Aluminum Sulfate, Paraffin Oil, Vegetable Juice, Sodium Chloride, Motor Oil, Hydrochloric Acid (3%), and many others. 49.12.3 INSTALLATION AND EXECUTION 49.12.3.1 PROCEDURAL OVERVIEW Work shall proceed as follows: l. Remove rungs (steps), if desired by client. 2. Clean manhole and remove debris. � SectionlV.doc ' a. Plug lines and/or screen out displaced debris. b. Apply acid wash, if necessary, to clean and degrease. c. Hydroblast and/or sand blast structure. Page ] 07 of 128 5/15/2012 Section 1V —Technical Specifications d. Remove debris from work area. 3. Repair minor defects in walis, benches, and inverts, as required, with repairing cement. (Note: Major structural repairs, such as rebuilding of benches, will also be made as required by client. 4. Inject hydrophilic grout through all surfaces, as needed, to eliminate infiltration. 5. Apply cementitious/crystallization waterproofing agents to all surfaces, repeating steps as needed. 6. Spray and/or hand apply calcium aluminate cement lining to all surfaces. 7. Spray apply epoxy coating to all surfaces. NOTE: Steps 1-5 shall be executed consecutively with minimal delays; calcium aluminate (Step 6) shall require a cure time of at least twenty-four hours for needed adhesion of epoxy (Step 7) to cement lining. 49.12.3.2 PREPARATION An acid wash shall be used (if needed) to clean and degrease. Then, if the client desires, the rungs shall be removed. Next, the entire structure is thoroughly water and/or sand blasted to remove any loose or deteriorated material. Care shall be taken to prevent any loose material from entering lines and other areas by either plugging the lines ( where feasible) ar inserting protective screens. 49.12.3.3 STRUCTURAL REPAIR Hand place or spray apply hydraulic cement material as necessary to prepared surface to fill cracks and voids in structure. Allow twenty (20) minutes before applying waterproofing/crystal l ization. 49.12.3.4 INFILTRATION CONTROL Pressure injection of hydrophilic gel and hydrophilic foam. l. Drill 5/8" holes through active leaking surface. 2. Install all zert fittings, as recommended by manufacturer. 3. Inject material until water flow stops. 4. Remove fittings (if necessary). 49.12.3.5 WATERPROOFING/CRYSTALLIZATION PROCESS l. Apply a slurry coat of powder #1 to moist wall using a stiff brush, forming an undercoat. 2. Apply dry powder #2 to slurry coat by hand. 3. Brush or spray on sealing liquid during the application to penetrate and initiate the crystal forming process. 4. Repeat steps 2 and 3, until there are no visible leaks. 5. Apply powder #I as an overcoat. 6. Allow one (1) hour to cure before applying cement lining. SectionIV.doc Page 108 of 128 5/15/2012 , � � � L� � � , � � , � � � � , � [1� � ' ' ' � � � � C� ' �� , Section IV—Technical Specifications 49.12.3.6 CEMENT LINING 1. Dampen surface. 2. Mix material in mixer as recommended for spray or hand trowel application. Apply cement until required build up of at least one half inch (and no more than 2 inches) has been achieved. 4. Trowel to smooth finish, restoring contours of manhole. 5. Texture brush surface to prepare for epoxy finish. 6. Allow for a 24-hour cure time prior to epoxy coating. NOTE: If conditions of heavy humidity prevail, a dry air blower shall be used to facilitate curing times. 49.12.3.7 EPDXY COATING Spray apply epoxy coating using airless spraying equipment until surface is visibly covered and a thickness of at least 30 mils has been achieved. Manhole may be safely entered after six (6) hours, as epoxy will be hardened. Full cure strength will be achieved at forty eight (48} hours. 49.12.3.8 CLEAN UP The work crew shall remove all debris and clean work area. 49.12.3.9 MANHOLE TESTING AND ACCEPTANCE Manhole may be vacuum tested from the top of manhole frame to the manhole base. All pipes entering the manhole shall be plugged, taking care to securely place the plug from being drawn into the manhole. The test head shall be placed and the seal inflated in accordance with the manufacturers' recommendations. A vacuum pump of ten (10) inches of inercury shall be drawn and the vacuum pump shut off. With the valves closed, the time shall be measured for the vacuum to drop to nine (9) inches. The manhole shall pass if the time is geater than sixty (60) seconds for forty eight (48) inch diameter, seventy five (75) seconds for sixty (60) inches, and ninety (90) seconds for seventy two (72) inch diameter manholes. If the manhole fails the initial test, necessary repairs shall be made. Retesting shall proceed until a satisfactory test is obtained. Tests shall be performed by the Contractor under the direction of the Project Engineer. 49.12.3.10 WARRANTY All materials and workmanship shall be warranted to the Owner for a period of five (5) years, provided that all the above mentioned repair steps are used. � 50 PROJECT INFORMATION SIGNS � L� � This article deleted. See SECTION III, ARTiCLE 23 — PROJECT INFORMATION SIGNS. 51 IN-LINE SKATING SURFACING SYSTEM 51.1 SCOPE 1. These specifications pertain to the application of the Plexiflor Color Finish System over recreational areas intended for In-Line Skating activities. The materials specified in the SectionN.doc Page ]09of 128 5/IS/2012 '�7 3. Section IV —Technical Specifications site plans shall be of colors indicated and for application over the Plexipave Acrylic Latex System. The work shall consist of suitable cleaning and preparation of the surface to assure a satisfactory bond of the system to the existing surface. All coverage rates are calculated prior to dilution. 4. Plexiflor In-line Skating Surfacing System • 1 Coat ofAcrylic Resurfacer • 2 Coats of Fortified Plexipave • 2 Coats of Plexiflor • Plexicolor Line Paint 51.2 SURFACE PREPARATIONS 51.2.1 ASPHALT Allow new asphalt to cure a minimum of 6 months. The surface must be checked for birdbaths, cracks and other irregularities and repaired with Court Patch Binder according to California Specification Section 10.14. (Surfacing prior to six months may make the asphalt subject to indentation). 51.2.2 CONCRETE Concrete shall have a wood float or broom finish. DO NOT PROVIDE STEEL TROWEL FINISH. DO NOT USE CURING AGENTS OR CONCRETE HARDENERS. Allow the concrete to cure a minimum of 30 days. Acid Etch the entire surface with Concrete Preparer accarding to California Specification Section 10.13. Check surface for birdbaths, cracks and other irregularities and repair with Court Patch Binder according to California Specification Section 10.14. 51.2.3 COURT PATCH BINDER MIX Court Patch Binder Mix: ] 00 Lbs. #80-100 Mesh Silica Sand (dry) 3 gallons Couth Patch Binder 1 to 2 gallons Portland Cement. 51.3 APPLICATION OF ACRYLIC FILLER COAT l. Application of the Acrylic Resurfacer Mix shall be applied to the clean, dry, level surfaces to receive the Plexiflor Surfacing System. The mix shall be applied according to California Specification Section 10.8 using the following mix: Acrylic Resurfacer 55 gallons Water (Clean and Potable) 20-40 gallons Sand(60-80 mesh) 600-900 pounds Liquid Yield l 12-138 gallons 2. Over asphalt surfaces, apply the Acrylic Resurfacer Mix in one or two coats (depending on surface porosity) at a rate of .OS -.07 gallons per square yard per coat. 3. Non-coated concrete surfaces must be neutralized with concrete preparer and primed with California Ti-Coat according to Specification Section 10.17. The Acrylic Resurfacer Mix SectionIV.doc Page 110 of 128 5/15/2012 � �J t , C� � � � , � i� � � � � � � � �r� � � Section IV —Technical Specifications must be applied within 3 hours of the TiCoat application while the primer is dry but still tacky to the touch. Apply the Acrylic Resurfacer Mix in one or two applications at a rate of .OS-.07 gallons per square yard per coat. 51.4 APPLICATION OF FORTIFIED PLEXIPAVE After the filler coat application has dried, apply two coats of Fortified Plexipave at an undiluted rate of .OS-.07 gallons per square yard per coat using the following mix: Plexipave Color Base Plexichrome Water 51.5 PLEXIFLOR APPLICATION 30 gallons 20 gallons 20 gallons 1. Plexiflor is factory premixed and ready to use from the container. The material may be 1 diluted with one (1 ) part water to six (6) parts Plexiflor to improve flowability and provide uniform application. � ' �' ' , , � u � � ' 2. Apply two coats of Plexiflor at a rate of .04-.OS gallons per square yard per coat. 3. Plexiflor is applied (in a similar manner to Plexipave) in windrows on the surface with suf�icient quantity to cover as the squeegee is pulled over the surface. Apply only light pressure to the squeegee. Do not allow ridges to form between passes of the squeegee. Ridges existing after material dries should require corrective action. 4. Plexiflor and its preliminary coatings should be allowed to thoroughly dry prior to application of subsequent coats. 51.6 PLAYING LINES Four hours minimum after compietion of the color resurfacing, playing lines shall be accurately located, marked and painted with Plexicolor Line Paint as specified by The National In-Line Hockey Association. 51.7 GENERAL l. The contractor shall remove all containers, surplus materials and debris upon completion of work leaving the site in a clean, orderly condition that is acceptable to the owner. Gates shall be secured and all containers shall be disposed of in accordance with Local, State and Federal regulations. 2. Materials specified for the Plexiflor System shall tee delivered to the site in sealed, property labeled arums with California Products Corporation labels that are stenciled with the proper batch code numbers. Products packaged or labeled in any other manner will not be accepted. Mixing with clear, fresh water shalt only be done at the job site. Coverage rates are based upon material prior to mixing with water as specified. 51.8 LIMITATIONS 1. Do not apply if surface temperature is less than 50°F or more than 1 40°F. 2. Do not apply when rain or high humidity is imminent. 3. Do not apply when surface is damp or has standing water. SectionlV.doc Page I I 1 of 128 5/I S/2012 Section 1V —Technical Specifications 4. Plexiflor will not hide surface imperfections of previous coatings. 5. Keep from freezing. Do not store in the hot sun. 6. Keep containers tightly closed when not in use. 7. Plexiflor will not prevent substrate cracks from occurring. 8. Plexiflor will mark slightly from normal use of some In-line Skates. 9. Coefficient of friction = 0.78 10. Coating Application Drying Time: 30 minutes to 1 hour at 70°F with 60% relative humidity. 11. Keep court clean. Excess dirt or foreign material can cause the surface to be slippery. In-Line hockey is a physical sport. Always wear NIHA recommended protective gear. 52 RESIDENT NOTIFICATION OF START OF CONSTRUCTION This article deleted. See SECTION III, ARTICLE 22 - RESIDENT NOTIFICATION OF START OF CONSTRUCTION. 53 GABIONS AND MATTRESSES 53.1 MATERIAL 53.1.1 GABION AND RENO MATTRESS MATERIAL 53.1.1.1 PVC COATED WIRE MESH GABIONS & MATTRESSES Gabion & mattress basket units shall be of non-raveling construction and fabricated from a double twist by twisting each pair of wires through three half turns developing the appearance of a triple twist. The galvanized wire core shall have a diameter of 0.1063 inches (approx. US gauge 12). All wire used in the fabrication of the gabion shall comply with or exceed Federal Specifications QQ-W-461 H, possess a maximum tensile strength of 70,000 p.s.i. with a Finish 5, Class 3 zinc coating in accordance with the current ASTM A-641. The weight of zinc coating shall be determined by ASTM A-90. The grade of zinc used far coating shall be High Grade or Special High Grade, as prescribed in ASTM B-6, Table 1. Uniformity of coating shall equal or exceed four l-minute dips by the Preece test, as determined by ASTM A-239. The PVC coating shall be extruded and adhere to the wire core prior to weaving. The PVC coated wire shall be woven into a double twisted hexagonal mesh having uniform openings of 3 l/4 inches by 4'h inches. The overall diameter of the mesh wire (galvanized wire core plus PVC coating) shall be 0.146 inches. Selvedge and reinforcing wire shall be of heavily galvanized wire core, 0.1338 inches in diameter (approx. US gauge 10), coated with PVC and having an overall diameter (galvanized wire core plus PVC coating) of 0.173 inches. Lacing and connecting wire shall be of soft tensile strength (75,000 PSI max), heavily galvanized wire core, 0.087 inches in diameter (approx. US gauge 13 %2), coated with PVC and having an overall diameter (galvanized wire core plus PVC coating) of 0.127 inches. The use of alternate wire fasteners shall be permitted in lieu of tie wire providing the alternate fastener produces a four (4) wire selvedge joint with a strength of 1200 lbs. per linear foot while remaining in a locked and closed condition. Properly formed interlocking fasteners shall be spaced from 4 to 6 inches and have a minimum 3/4 square inch inside area to properly confine the required selvedge wires. Tiger-Tite SectionN.doc Page ll2 of 128 5/15/2012 � � � � � � r � ' , � � �' � � � , , , Section IV — Technical Specifications Interlocking Fasteners are an approved alternate joint material. The Interlocking Wire Fastener shall meet stainless steel material specification ASTM A-313, Type 302, Class l, or equal. � All of the above wire diameters are subject to tolerance limit of 0.004 inches in accordance with ASTM A-641. � � ' � ' i � � �� ' � 53.1.1.2 PVC (POLYVINYL CHLORIDE) COATING The coating shall be gray in color and shall have a nominal thickness of 0.0216 inches but not less than 0.015 inches in thickness. The protective PVC plastic shall be suitable to resist deleterious effects from exposure to light, immersion in salt or polluted water and shall not show any material difference in its initial compound properties. The PVC compound is also resistant to attack from acids and resistant to abrasion. 1. Specific Gravity: a. According to ASTM D-2287 and ASTM D- 792; in the range of 130 to 1.34. 2. Tensile Strength: a. According to ASTM D-142; not less than 2980 psi. 3. Modulus of Elasticity: a. According to ASTM D-412; not less than 2700 psi at ] 00% strain. 4. Resistance to Abrasion: a. According to ASTM 1242; weight loss <12% (Method B). 5. Brittleness Temperature: a. According to ASTM D-746, Procedure A; shall be at least 83 degrees centigrade below the minimum temperature at which the gabions will be handled or placed but not lower than -9.4 degrees centigrade. 6. Hardness: a. According to ASTM D-2240; shall be between 50 and 60 Shore D when tested. 7. Creeping Corrosion: a. Maximum corrosion penetration to the wire core from a square cut end section shall not be more than 25mm when the specimen has been immersed for 2000 hours in a 50% SOLUTION HC1 (hydrochloric acid 12 Be). 53.1.1.3 ACCELERATED AGING TESTS Variation of the initial properties will be allowed, as specified below, when the specimen is � submitted to the following Accelerated Aging Tests: 1. Salt Spray Test: , � � a. According to ASTM B-117 b. Period of test = 3000 hours. 2. Exposure to ultraviolet rays: a. According to ASTM D-1499 and ASTM G-23 (Apparatus Type E). Period of test = 3000 hours at 63 degrees centigrade. SectionlV.doc Page 113 of 128 5/l5/2012 Section IV —Technical Specifications 3. Exposure to high temperature: a. Testing period: 240 hours at l05 degrees centigrade, when tested in accordance with ASTM D- 1203 and ASTM D-2287. 53.1.1.4 PROPERTIES AFTER AGING TESTS After the above Accelerated Aging Tests have been performed, the PVC compound shall exhibit the following properties: 1. Appearance: a. The vinyl coating shall not crack, blister or split and shall not show any remarkable change in colar. 2. Specific Gravity: a. Shall not show change higher than 6% of its initial value. 3. Durometer Hardness: a. Shall not show change higher than l0% of its initial value. 4. Tensile Strength: a. Shall not show change higher than 25% of its initial value. 5. Elongation: a. Shall not show change higher than 25% of its initial value. 6. Modulus of Elasticity: a. Shall not show change higher than 25% of its initial value. 7. Resistance to Abrasion: a. Shall not show change higher than l 0% of its initial value. 8. Brittleness Temperature: a. Cold Bend Temperature - Shall not be lower than -20 degrees centigrade. b. Cold Flex Temperature - Shall not be higher than +18 degrees centigrade. 53.1.2 GABION AND MATTRESS FILLER MATERIAL: The filler stone shall be limestone from a source approved by the Engineer before delivery is started. Representative preliminary samples of the stone shall be submitted by the contractor or supplier for examination and testing by the Engineer. The stone shall have a minimum specific gravity of 2.3 and be of a quality and durability sufficient to insure permanency in the structure. The individual stones shall be free of cracks, seams, and other defects that would tend to promote deterioration from natural causes, or which might reduce the stones to sizes that could not be retained in the gabion or mattress baskets. The stone shall meet the following physical requirements: • Absorption, maximum 5% • Los Angeles Abrasion (FM l OT096), maximum loss 45% • Soundness (Sodium Sulphate), (FM 1-T104), maximum loss 12% SectionlV.doc Page 114 of 128 5/15/2012 , � � �� � r � �� r � � � ' � � � � � ' � C� � ' � � r ' � � , ' � �� Section N —Technical Speciiications • Flat and elongated pieces, materials with least dimension less than one third of greatest dimension shall not exceed 5% by weight. All filler material shall be uniformly graded between 4 inch and 8 inch (equivalent spherical diameter) and shall be angular in form. Rounded stones shall not exceed l0% of the stone, by weight and 70% of the stone, by weight, shall exceed the largest dimension of the mesh opening. 53.1.3 MATTRESS WIRE Mattress wire shall conform to the same specifications as gabions except as follows: The nominal diameter of the wire used in the fabrication of the netting shall be 0.0866 inches minimum, subject to diameter tolerance in accordance with the current ASTM A 641, Table 3. 2. All wire shall be gaivanized according to ASTM A 641, Table l. The minimum weight of the zinc coating shall be 0.70 ozsJsq. ft. for the 0.0866 inch wire used for mesh and lacing and 0.80 ozs./sq. ft. for the 0.106 wire used for selvedge. 3. Adhesion of the zinc coating to the wire shall be capable of being wrapped in a close helix at a rate not exceeding 15 turns per minute around a cylindrical steel mandrel having a diameter 3 times the nominal wire diameter being tested. After the wrap test is completed, the wire shall not exhibit any cracking or flaking of the zinc coating to such an extent that any zinc can be removed by rubbing with bare fingers. 53.1.4 GEOTEXTILE FABRIC Fabric shall conform to FDOT Standard Index ] 99, Type D-2, and FDOT Standard Specifications, 1996 edition, Section 985. 53.2 PERFORMANCE Gabions and Reno Mattresses shall be installed according to the manufacturer's recommendations and as shown on the Drawings. Fabrication of gabion baskets shall be in such a manner that the sides, ends, lid and diaphragms can be assembled at the construction site into rectangular baskets of the sizes specified and shown on the Drawings. Gabions and mattresses shall be of single unit construction; the base, lid ends and sides shall be either woven into a single unit or one edge of these members connected to the base section of the gabion in such a manner that the strength and flexibility at the connecting point is at least equal to that of the mesh. Where the length of the gabion and mattress exceeds one and one-half its horizontal width, they shall be equally divided by diaphragms of the same mesh and gauge as the mattresses shall be furnished with the necessary diaphragms secured in proper position on the base so that no additional tying is required at this juncture. The wire mesh is to be fabricated so that it will not ravel. This is defined as the ability to resist pulling apart at any of the twists or connections forming the mesh when a single wire strand in a section of inesh is cut. � Each gabion or mattress shall be assembled by tying all untied edges with binding wire. The binding wire shall be tightly looped around every other mesh opening along seams so that single and double loops are alternated. , , � A line of empty gabions shall be placed into position according to the contract drawings and binding wire shall be used to securely tie each unit to the adjoining one along the vertica] reinforced edges and the top selvedges. The base of the empty gabions placed on top of a filled line of gabions shall be tightly wire to the latter at front and back. SectionN.doc Page l 15 of 128 5/15/2012 Section ]V —Technical Specifications To achieve better alignment and finish in retaining walls, gabion stretching is recommended. Connecting wires shall be inserted during the filling operation in the following manner: Gabions shall be filled to one third full and one connecting wire in each direction shall be tightly tied to opposite faces of each cell at one third height. The gabion shall then be filled to two thirds full and one connecting wire in each direction shall be tightly tied to opposite face of each cell at one two third height. The cell shall then be filled to the top. Filler stone shall not be dropped more than 12" into the gabions and mattresses. Geotextile fabric shall be installed at locations shown in the Drawings. The surface to receive the cloth shall be prepared to a relatively smooth condition free of obstructions which may tear or cut the cloth. The panel shall be overlapped a minimum of 30 inches and secured against movement. Cloth damaged or displaced during installation, gabion work, or backfill shall be replaced or repaired to the satisfaction of the Engineer at the contractor's expense. The work shall be scheduled so that the fabric is not exposed to ultraviolet light more than the manufacturer's recommendations or five days, whichever is less. 54 LAWN MAINTENANCE SPECIFICATIONS 54.1 SCOPE To remove trash and debris from landscape and paved area; maintenance and fertilization of plant beds and landscape materials; maintenance, repair, and operation of irrigation systems; ornamental pest control; palm pruning; maintenance of traffic; and the cleaning of hard surfaces at designated areas. The Contractor is to work with the City in coordinating maintenance activities and reporting irregularities in the work zone. The Contractor(s) will provide the labor and materials required to maintain the landscaped street medians including: • Traf�ic safety and Maintenance of Traffic; • Trash and debris removal from the job site; • Removal of weeds in landscaped areas and hard surfaces; • Proper trimming and pruning of landscape plants and palms; • Proper fertilization and pest control of landscape and palms (may be subcontracted); • Irrigation service and repair; � • Mulch replacement; • Cleaning of hard surfaces; and the • Reporting of irregularities at the job site. 54.2 SCHEDULING OF WORK The Contractor(s) shall accomplish all landscape maintenance required under the contract between the hours of 6:30 a.m. and 7:00 p.m. Monday through Saturday, excluding observed holidays. The City may grant, on an individual basis, permission to perform contract maintenance at other hours. All work shall be completed in a continuous manner, that is the cleanup, weeding, trimming, etc., be completed before leaving the job site. SectionN.doc Page 116 of 128 5/15/2012 , ' � �I , � � , I� � � � ' � � � � r � ' ' ' , ' ' � ' ' � Section IV —Technical Specifications 54.3 WORK METHODS 54.3.1 MAINTENANCE SCHEDULING The Contractor(s) will adhere to a work schedule provided by the City (see Level of Service). Any variations to that schedule, requested by either party, must be approved, either verbally or in writing by an authorized representative of the other party. 54.3.2 DUTIES PER SERVICE VISIT The contractor(s) shall provide the following service at each scheduled visit to the designated location: 54.4 LITTER Remove trash and debris from the area to be maintained. Proper disposal of collected trash and debr.is is a requirement of the contractor. Extraordinary amounts of debris caused by hurricanes, tornadoes, vandalism, etc., would be the responsibility of the City to clean up. The contractor should report such accumulations of debris when they are encountered. Bids for the extraordinary cleanup from the contractor would be considered. 54.5 VISUAL CHECK The site should be checked for irregularities, such as irrigation leaks, vehicle damage, dead or damaged plant material, vandalism, etc., which should be reported to the City within 24 hours after providing the service. 54.6 PLANT TRIMMING AND PALM PRUNING � All plant material should be trimmed in a manner that promotes the natural shape and mature size of the particular specie. Trimming should be performed at intervals that will maintain plants in a neat appearance. Trimming should be performed to promote fullness of the plants, while ' maintaining height restrictions in Clear Sight Zones as established on the landscape plans. Plants shall be kept trimmed to the back of curb. Brown foliage shall be removed from Liriope. ' � ' � � � ' Palm pruning to be performed at least once per year, preferably in late June or July following flower formation, according to the following specifications: 54.7 PHOENIX SPECIES (CANARY DATE, INDIA DATE, PYGMY DATE, ETC.) Remove all descending fronds, to the base of the frond; all parallel and ascending fronds are to remain in order to leave a full, rounded head; seed heads may remain, but remove old faded heads that are encountered in the pruning process; remove loose frond boots; remove vegetation; such as strangler figs, Brazilian Pepper, Asparagus fern, etc., growing in the frond boots or on the trunk. Provide the rounded, classic cut on all Medjool palm boots. No climbing spikes allowed on palms. 54.8 DEBRIS REMOVAL All debris from pruning process is to be removed from the job site and disposed of by the contractor. Work sites should be left in a clean and neat appearance upon completion. SectionlV.doc Page 117 of 128 5/l5/2012 Section IV —Technical Specifications 54.9 TRAFFIC CONTROL Proper and safe work zones in vehicular traffic areas are to be set up and maintained by the contractor, according to the attached Maintenance ofTraffic specifications. 54.10 PEDESTRIAN SAFETY Contractor is responsible for maintaining safe work zones in areas where pedestrian and park users are present. The City reserves the right to limit the hours of operation in certain high pedestrian use areas. 54.11 PLANT FERTILIZATION All tree and plant material should be fertilized with the appropriate amount of 20-6-12 sulfur coated, slow release, ornamental fertilizer, three times per year. Applications should be made in mid-February, early June, and mid-September, for the first two years. Fertilizer types and amounts will change with requirements of maturing landscape materials. 54.12 WEED REMOVAL IN LANDSCAPED AREA Weeds should be removed on a regular basis in order to keep them from being visibly noticeable. Weed control with the use of appropriate herbicides is allowable, given they are properly applied by a certified applicator. Herbicide damage to landscape material will be remedied by contractor at his/her expense. 54.13 MULCH CONDITION Should be maintained at a thickness that will discourage weed growth as well as help retain soil moisture, usually 3 inches. 54.14 IRRIGATION SERVICE AND REPAIR Should be performed at each visit to assure the systems proper operation and timing. Drip tubing should be kept covered with mulch. Timer should be checked for proper time of day and operating schedule. Leaks or breaks in the system should be repaired before the next scheduled system running time. All repairs which will be charged at $20.00 or more must be approved in advance by the city. Minor repairs, less than $20.00, should be billed to the City in addition to the monthly maintenance fee. 54.15 LAWN AND ORNAMENTAL PEST CONTROL Should be performed by a properly licensed and certified applicator to keep pest populations at a less than damaging level. Landscape materials lost to or extensively damaged by pests will be replaced by the contractor at the contractor's expense. Diazinon products are not to be used on City properties. 54.16 PALM FERTILIZATION Apply three pounds of Magnesium sulfate and one pound of Potassium evenly, per tree, across the root zone (typically within the dripline), annually in early February. SectionIV.doc Page 118 of 128 5/15/2012 f- L_ I 1 �I , ' , lJ � , , ' � ' ' � , � u , 1 ' � ' , ' � � ' ' ' , E� ' , � �, ' Section N — Technical Specifications 54.17 FREEZE PROTECTION The City will provide a freeze/frost protection fabric for the Contractor to install over freeze/frost sensitive plants (Lantana and Pentas). The covering material will be stored at a City facility (yet to be determined). Contractor will remove the covering material from storage and install over the sensitive plants, securely fastening edges of the material to the ground per manufacturer's directions. The City will furnish metal pins needed for securing fabric to the ground. The City will notify the Contractor one (]) day or twenty-four (24) hours minimum prior to the need to protect plant material. After uses, the Contractor will prepare the fabric for storage and return it to the designated City facility. Protective covering shall be removed the following afternoon or remain in place as directed by the City. The City shall notify the Contractor by 11:00 a.m. about removing the cover or keeping it in place due to continued freezing temperatures. The City may cancel the freeze protection event at any time prior to the end of the scheduled installation day (5:00 p.m.) The Contractor will be compensated for the number of hours mobilization or on-site work at the contracted rate per man-hour unit price. The Contractor shall provide a unit price for the installation and removal of the covering fabric on a per event basis, as well as an hourly rate per employee required. The City and contractor will coordinate appropriate irrigation operations with weather conditions. Should freeze/frost damage occur, the Contractor shall perfarm remedial work as per unit basis, as directed by the City. 54.18 LEVEL OF SERVICE This location is to be serviced weekly. Repairs to damage or vandalism to be made within 7 working days of reported irregularity. Weekly visits should occur no closer than six and no further than ten calendar days apart. 54.19 COMPLETION OF WORK Within 24 hours of completing work the contractor shall notify the supervisor assigned to monitor the contract either in person or by phone of said compietion. It is acceptable to leave a phone message. However, to make certain the message is received, it is advisable to call between 6:30 a.m. — 7:30 a.m. or 2:30 p.m. — 3:00 p.m. 54.20 INSPECTION AND APPROVAL Upon receiving notification from the Contractar, the City shall inspect the serviced location the following business day. If, upon inspection, the work specified has not been completed, the City shall contact the Contractor to indicate the necessary corrective measures. The Contractor will be given 48 hours from this notification to make appropriate corrections. If the work has been completed successfully then the City will pay for services billed. 54.21 SPECIAL CONDITIONS This location will be newly installed and under warranty by the installer for a six month period on plants and 12 month warranty on palms. Landscape installer will coordinate irrigation operation with the Maintenance contractor to assure adequate irrigation to the landscape materials. Installer will also be responsible for the untying of palm heads/fronds as he feels appropriate. 2. All listed acreage or square footage figures are estimates. ' SectionIV.doc � Page I 19 of 128 5/15/2012 Section iV — Technical Specifications 3. All maintenance shall be performed in a good and workmanlike manner, consistent with trade practices and standards which prevail in the industry. 4. The Contractor shall be responsible for damage to any plant material or site feature caused by the Contractor or his/her employees. The Contractor shall be notified in writing of the specific nature of the damage and cost of repair. The City shall, at its option, invoice the Contractor for the payment, or reduce by the amount of the repairs the next regular payment to the Contractor. 5. Occasionally circumstances (standing water, prolonged inclement weather, parked vehicles, etc.) may make all or portions of a location unserviceable during the regular schedule. The Contractor shall notify the City Supervisor of such occurrences, and shall schedule to perform the required maintenance to the location as soon as the pertaining circumstances are relieved. 55 MILLING OPERATIONS 55.1 EQUIPMENT, CONSTRUCTION & MILLED SURFACE Unless otherwise noted in the specs, plans or this Article, the milling operation shall be performed in accordance with Section 327 of FDOT's Standard Specifications (latest edition). The Contractor shall notify the Project Inspector a minimum of 24 hours in advance of all milling. 55.2 ADDITIONAL MILLING REQUIREMENTS 1. If the milling machine is equipped with preheating devices, the contractor is responsible to secure any necessary permits, and for complying with all local, state and federal environmental regulations governing operation of this type of equipment. 2. All milled surfaces must be repaved within seven days from the time it was milled, unless otherwise noted in the contract documents. 3. Prior to paving, all milled areas shall be swept with a Municipal type sweeper either of the vacuum or the mechanical type, that picks up and hauls off, dust and dirt. The sweeper must be equipped with its own water supply for pre-wetting to minimize dust. Moreover, the Contractor shall sweep debris off of sidewalks, driveways and curbs in addition to the roadways before leaving the job site. 4. In cases where concrete valley swales are present, the adjoining pavement shall be milled to allow for the new asphalt grade to be flush with the concrete surface. 5. The Contractor shall be responsible for removing any asphalt that remains in the curb line and/or median curbs after the milling operation of a street is complete. The cost of this removal shall be included in the bid item for milling. 6. All radius returns on streets to be milled shall also be milled unless otherwise directed by the Engineer, with payment to be included in the bid item for milling. 7. Any leveling or base replacement required after milling shall be applied to sections ofthe road as noted on the plans, or directed by the Engineer, per Section 330 of FDOT's 2000 Standard Specifications for S-Type resurfacing projects or Section 330 (latest edition) for superpave resurfacing projects. The cost shall be included in the per ton unit cost for asphalt, unless otherwise noted in the project scope and plans. SectionlV.doc Page 120 of 128 5/15/2012 , 1 i ' , � � , , , ' ' , C1 � � , ' ' ' , ' , � 1 �� L � � ' � � Section 1V — Technical Specifications 8. Any roadway base material exposed as a result of the milling operation shall be primed that same day (unless otherwise directed by the Engineer) per Section 300 of FDOT's Standard Specifications (latest edition). Repairs required to said base that result from a failure to place the prime in a timely manner shall be done to the City's satisfaction, and at the Contractor's expense. No paving of the exposed base can commence until the City approves the repaired base. The cost of said prime shall be included in the bid item for milling. 9. Prior to the placement of asphalt, the face of all curbs and driveways shall be tacked after the milling operation is complete. 55.3 SALVAGEABLE MATERIALS All surplus existing materials resulting from milling operations shall remain the property of the City. The transporting and stockpiling of salvageable materials shall be performed by the Contractor. The Contractor shall contact the Public Services Division at (727) 562-4950 to schedule delivery of material. 55.4 DISPOSABLE MATERIALS All surplus materials not claimed by the City shall become the property of the Contractor. The Contractor shall dispose of the material in a timely manner and in accordance with all regulatory requirements in areas provided by the Contractor at no additional expense to the City. 55.5 ADJUSTMENT AND LOCATION OF UNDERGROUND UTILITIES All utilities and related structures requiring adjustment shall be located and adjusted by their owners at the owner's expense. The Contractor shall arrange his schedule to allow utility owners the time required for such adjustments (minimum 48 hours notice per State Statute). All utility adjustments shall be completed prior to the commencement of milling and resurfacing operations. 55.6 ADJUSTMENT OF UTILITY MANHOLES The necessary adjustments of sanitary sewer and stormwater utility manholes and appurtenances ' shall be accomplished by the Contractor in accordance with Section IV, Article 23.7 of the City's Technical Specifications. � 55.7 TYPES OF MILLING There are two types of milling used by the City: � A. Wedge — This will consist of milling a six foot wide strip along the curb line of the pavement adjacent to the curb so the new asphalt will align with the original curb height and pavement cross section. , B. Full Width — This will consist of milling the entire roadway (i.e. curb line/edge of pavement to curb line/edge of pavement). All existing horizontal and vertical geometry shall remain unless otherwise indicated or approved by the Engineer. , ' SectionN.doc ' Page 121 of 128 5l15/2012 Section IV —Technical Specifications 55.8 MILLING OF INTERSECTIONS Intersections, as well as other areas (including radius returns) are to be milled and repaved to restore and/or improve the original drainage characteristics. Said work should extend approximately 50 to ] 00 feet in both directions from the low point of the existing swale. 55.9 BASIS OF MEASUREMENT The quantity to be paid for will be the area milled, in square yards, completed and accepted. 55.10 BASIS OF PAYMENT The unit price for milling shall include: all materials, preparation, hauling, transporting and stockpiling of salvageable materials, disposal of all surplus material, any required milling of radius returns and intersections, prime and/or tack coat either required or placed at Engineer's discretion, removal of asphalt from curbs, sweeping, labor, equipment, and all incidentals necessary to complete the milling in accordance with the plans and specifications. 56 CLEARING AND GRUBBING The work included in this specification includes the removal and disposal of all structures, appurtenances, asphalt, concrete, curbs, walls, trees, roots, vegetation, boulders, conduits, poles, posts, pipes, inlets, brush, stumps, debris and other obstructions resting on or protruding through the ground surface necessary to prepare the area for construction. Clearing and grubbing shall be performed in accordance with Section 110 of FDOT's Standard Specifications (latest edition). Unless otherwise specified in the contract documents, the Contractor shall take ownership of all removed material and dispose of them off-site in accordance with all Local, State and Federal Requirements. 56.1 BASIS OF MEASUREMENT The basis of ineasurement shall be either a lump sum quantity or the number of acres cleared and grubbed as specified on the plans or directed by the Engineer. 56.2 BASIS OF PAYMENT The pay item for clearing and grubbing shall include: all removal and disposal of materials and structures as well as all materials, hauling, equipment, tools, labor, leveling of terrain, landscape trimming and all incidentals necessary to complete the work. 57 RIPRAP The work included in this specification includes the construction of either sand-cement or rubble riprap as shown on the plans. The riprap shall be constructed per Section 530 of FDOT's Standard Specifications (latest edition). 57.1 BASIS OF MEASUREMENT The basis of ineasurement for riprap shall be the volume of sand used in cubic yards for sand- cement, or the dry weight in tons for rubble. ' ' � , L_J , � � � , � � , � LJ , fl u ' SectionlV.doc Page 122 of 128 5/15/2012 ' r ' � Section 1V —Technical Specifications 57.2 BASIS OF PAYMENT � The pay item for sand-cement riprap shall include: all materials, testing, labor, grout, hauling, equipment, excavation, backfill, dressing and shaping for placement of sand-cement and all incidentals necessary to complete the work. � � Li � The pay item for rubble riprap shall include: all materials, required bedding stone, dressing and shaping for placement of bedding stone, filter fabric, testing, hauling, excavating, backfill, dressing and shaping for placement of rubble, and all incidentals necessary to complete the work. No payment will be granted if concrete or stone that exists on-site is used as rubble riprap. 58 TREATMENT PLANT SAFETY This article applies to all City projects located at one of the City's Wastewater Treatment Plants (WWTP) or Potable Water Reservoirs. 58.1 HAZARD POTENTIAL The Contractor shall be aware that hazardous materials are used at the WWTP's and the water ' reservoirs. These may include sodium hypochlorite, gaseous chlorine, sulfur dioxide and ammonia. Potential safety hazards associated with these substances include: r-, I� � � , LJ • An accidental spill or release can impair respiratory functions and result in severe burns to the skin and eyes. At the pre-construction conference, the contractor wiil be provided with a copy of the City of Clearwater Public Utilities Department Emergency Response Plan, and a copy of the applicable Material Safety Data Sheets. All employees of the contractor and sub-contractor assigned to this job shall be familiar with the content of these documents. 58.2 REQUIRED CONTRACTOR TRAINING Prior to issuance of a notice to proceed, the contractor must submit documentation regarding employee safety training relating to the items in Section A above. The documentation must include: • Verification that all employees assigned to this job have received and understood training � in the proper work practices necessary to safely perform the job while warking around gaseous chlorine and sulfur dioxide gas. ' , ' r � r • The date of the training, and • The means used to verify that the employee understood the training. 59 TRAFFIC SIGNAL EQUIPMENT AND MATERIALS All traf�ic signal work shall be performed per the latest edition of FDOT's Standard Specifications (Sections 603 through 699), unless otherwise specified in the contract documents and plans. This specification includes, but is not limited to, the following items: all necessary equipment, materials, guaranties, acceptance procedures, signal timings, field tests, grounding, conduit, signal and interconnect cable, span wire assemblies, pull and junction boxes, electrical power service assemblies, poles, signal assemblies, pedestrian assemblies, inductive loop detectors, SectionlV.doc Page 123 of 128 5/15/2012 Section iV—Technical Specifications pedestrian detectors, traffic controller assemblies, controller cabinets and accessories, removal of existing traffic signal equipment, and internally illuminated signs. All traffic signal installations shall be mast arms and conform to the requirements of FDOT's Mast Arm Assembly standard, and shall be signed and sealed by a professional engineer registered in the state of Florida. All mast arm calculations, as well as the geotechnical report, shall also be signed and sealed by a professional engineer registered in the state of Flarida. All mast arm colors shall be determined and approved by the City prior to ordering from the manufacturer. All traffic signal indicators for vehicles and pedestrians shall be LED's and, approved by both the City and FDOT. In addition to this, all pedestrian signal indicators shall utilize countdown features. Contractor changes to the operation of an existing signal is PROHIBITED unless directed by the City's Traffic Engineering Division. 59.1 BASIS OF MEASUREMENT AND PAYMENT The basis of ineasurement and payment shall be specified in the contract documents and/or plans and shall include all equipment, preparation, materials, testing and incidentals required to complete the work per the plans. 60 SIGNING AND MARKING All signing and marking work shall be performed per the latest edition of FDOT's Standard Specifications, unless otherwise specified in the contract documents and plans. This specification includes the following work: RPM's (Section 706), painted traffic stripes and markings (Section 7l 0), thermoplastic stripes and markings (Section 711) and tubular delineators/flex posts (Sections 705 and 972). The Contractor is responsible to ensure that striping is correctly placed. Errors in striping or markings shall be "blacked-out" with paint, unless otherwise directed by the Engineer. No payment will be made for these incorrect or "blacked-out" areas. Omissions in striping or markings shall be corrected to the City's satisfaction prior to any payment being made. 60.1 BASIS OF MEASUREMENT AND PAYMENT The basis of ineasurement and payment shall be specified in the contract documents and/or plans and shall include all equipment, preparation, materials and incidentals required to complete the work per the plans. 61 ROADWAY LIGHTING All roadway lighting shall be constructed per Sections 715 and 992 of FDOT's Standard Specifications (latest edition), unless otherwise specified in the contract documents and plans. 61.1 BASIS OF MEASUREMENT AND PAYMENT The basis of ineasurement and payment shall be specified in the contract documents and/or plans and shall include all equipment, materials, testing and incidentals required to complete the work per the plans. SectionIV.doc Page 124 of 128 5/15/2012 � � � f� ' ' � , � ' ' r � �l � � ' � r J 1 Section IV — Technical Specifications 62 TREE PROTECTION � 62.1 TREE BARRICADES A. A protective barrier shall be placed around all protected trees and palms prior to land ' preparation or construction activities within or adjacent to the work zone, including all staging and/or lay down areas. Protective barriers shail be installed as follows: , � Ij � � ' l. At or greater than the full dripline of all species of Mangroves and Cabbage Palms. 2. At or greater than the full dripline or all protected native pine trees and other conifer species. 3. At or greater than two-thirds of the dripline of all other protected species 4. At or greater than the full dripline of trees within a specimen tree stand. B. Protective barriers are to be constructed using no less than two-inch lumber for upright posts. Upright posts are to be at least four feet in length with a minimum of one foot anchored in the ground. Upright posts are to be placed at a maximum distance of eight feet apart. Horizontal rails are to be constructed using no less than one inch by four-inch lumber and shall be securely attached to the top of the upright post. The project City's representative must approve any variation from the above requirements. � C. Whenever a protective barrier is required, it shall be in place until all construction activity is terminated. The area within the barrier limits shall remain undisturbed by any activity during construction. Native ground cover and understory vegetation existing within the barriers shall ' remain throughout construction. Exotic plant species may onty be removed by manual labor utilizing hand tools or by other means if authorized in writing by the City's representative. ' � , � ' ' , D. Prior to the erection of any required protective barrier, all surface foreign material, trash or debris shall be removed from the area enclosed by the barrier, and after erection of the barrier no such material or litter shall be permitted to remain within the protected area. No equipment, chemicals, soil deposits or construction materials shal) be placed within such protective barriers. E. No signs, building permits, wires, or other attachments of any kind shall be attached to any protected tree or palm. F. At all times, due care shall be taken to protect the critical root zone of trees protected by this section, and root pruning requirements shall apply to such trees. 62.2 ROOT PRUNING A. Where proposed construction improvements involve excavation and/or impacts to the critical root zone of protected trees, the Contractor shall be required to have an International Society of Arboriculture (ISA) certified arborist perform, or directly supervise root pruning to reduce the impacts of construction. The critical root zone is equivalent to the tree's dripline. Prior to any clearing, grubbing or excavation activities, the affected roots must be severed by clean pruning cuts at the point where grubbing or excavation impacts the root system. Roots can be pruned utilizing specified root pruning equipment designed for that purpose or by hand digging a trench and pruning roots with a pruning saw, chain saw or other equipment designed for tree pruning. Root pruning by trenching equipment or excavation equipment is strictly prohibited. Roots located in the critical root zone that will be impacted by ' se�cionlv.ao� ' Page 125 of 128 5/IS/2012 Section IV —Technical Specifications construction activities shall be pruned to a minimum depth of 18 inches below existing grade or to the depth of the proposed impact if less than 18 inches fram existing grade. Tim Kurtz, Senior Landscape Architect is the City's Representative on Engineering Department projects for root Pruning issues and can be reached at (727) 562-4737, or through the construction inspector assigned to the project. B. Root pruning shail only be performed by or under the direct supervision of an International Society ofArboriculture (ISA) certified arborist. C. Any proposed root pruning trenches shall be identified on site (i.e. staked or painted) inspected and approved by the City's representative prior to actual root pruning. D. Root pruning shall be performed as far in advance of other construction activities as is feasible, but at a minimum shall be performed prior to ANY impacts to the soil. Associated tree protection measures should be implemented upon completion of said root pruning. E. If there is a likelihood of excessive wind and/or rain exceptional care shall be taken on any root pruning activities. F. Root pruning shall be limited to a minimum of ten inches per one inch of the trunk diameter from the tree base. Any exception must be approved by the City's representative prior to said root pruning. G. Roots shall be cut cleanly, as far from the trunk of the tree as possible. Root pruning shall be done to a minimum depth of 18" from existing grade, or to the depth of the disturbance if less than 18". H. Root pruning shall be performed using a Doscocil Root Cutting Machine or equivalent. Alternate equipment or techniques must be approved by the City's representative, prior to any work adjacent to trees to be preserved. I. Root pruning shall be completed, inspected and accepted prior to the commencement of any excavation or other impacts to the critical root zones of trees to be protected. J. Excavations in an area where root are present shall not cause the tearing or ripping of tree roots. Roots must first be cleanly severed prior to continuing with the excavation, or tunneled around to prevent damage to the root. K. Tree roots shall not be exposed to drying out. Root ends shall be covered with native soil or burlap and kept moist until final backfill or final grades has been established. L. When deemed appropriate (e.g., during periods of drought) the City representative may require a temporary irrigation system be utilized in the remaining critical root zones of root pruned trees. M. When underground utility lines are to be installed within the critical root zone, the root pruning requirement may be waived if the lines are installed via tunneling or directional boring as opposed to open trenching. 62.3 PROPER TREE PRUNING A. All tree pruning and/or root pruning on existing trees to remain shall only be performed by or under the direct supervision of an International Society of Arboriculture (ISA) certified arborist. Furthermore, all tree work shall conform to the American National Standards Institute (ANSI) 2001, American National Standard for tree care operations — Tree, Shrub and other Woody Plant Maintenance — Standard practices (pruning) ANSI A-300. SectionlV.doc Page 126 of 128 5/IS/2012 � ' � ' , ' ' ' ' ' , r ' r �__I ' ' f' I� �_, , ' ' � ' Section IV —Technical Specifications B. Proper pruning techniques for all lateral branches of protected trees are required. Flush cuts (pruning cuts that remove the branch collar) and stub cuts (cuts that leave a stub on the tree) are improper techniques. Any protected tree that has been improperly pruned will not be recognized as a tree left on the project in a healthy growing condition, and will require replacement consistent with the current City Codes and Ordinances. C. No protected tree shall have more than 30 percent of its foliage removed. D. No protected tree shall be topped, hat racked or lion-tailed. Any protected tree that has been ' improperly pruned will not be recognized as a tree left on the project in a healthy growing condition, and will require replacement consistent with the current City Codes and Ordinances. � E. Tree Trunks and limbs shall be protected. The use of tree spikes or other devices that damage trunk and bark tissue on protected trees shall be prohibited. Any protected tree that has been damaged in such a manner will not be recognized as a tree left on the project in a healthy � growing condition, and will require replacement consistent with the current City Codes and Ordinances. � 63 PROJECT WEB PAGES I_ � ' 63.1 WEB PAGES DESIGN If requested by the City, Engineer shall design the Project Web Site in accordance with the current City Web Site standards and styles. Project Web Site should include general project information as: Project Name & Number, Scope description, Location, Schedule, and Project Contacts. Note: Occasionally City modifies the general design of the City's Web Site, and the Engineer ' shall consult the City Webmaster for the current requirements, before designing or updating the Project Web Pages. .-� �J 1 I � LJ ' ' r , 63.2 WEB ACCESSIBILITY GUIDELINES Project Web Pages should conform to the W3C Web Accessibility Guidelines and US Section 508 guidelines whenever possible: http://www.w3.org/TR/1999/WAI-WEBCONTENT ] 9990505/ http://www.section508.�ov/ In particular, use of variable-width tables, user-adjustable/relative font sizes, ALT text for images, CSS whenever possible, etc. Accessibility should be a priority over design/aesthetics. 63.3 THE SUN AND WAVES LOGO AND ITS USE The City's Sun and Waves logo should be used for everyday business, on all print and electronic material. It should be used on all internal correspondence, brochures, advertising, vehicles, apparel and signage. It should be used only in the manner presented here, in the proportion shown here, with no alterations. It should not be condensed, lengthened, or otherwise distorted to fit a space. The logo is approved for use by city departments, and is not to be used by outside vendors without the permission of the City Manager, Assistant City Manager or Public Communications of�ice. Electronic versions of the logo should be obtained from the Public Communications. This is for internal use only. SectionIV.doc Page 127 of 128 5/]5/2012 Section IV — Technical Specifications 63.4 MAPS AND GRAPHICS Use of maps and graphics is recommended to illustrate the project; only approved graphics should be posted to the Project Web Pages. 63.5 INTERACTIVE FORMS The site should also include an interactive form ar other options to allow Public's input sent back to the City regarding the Project. 63.6 POSTING The site should be presented to the City's Webmaster for review and posting to the City's Web Server. Posting of the Project Web Pages to a different than City's Web server, if approved, should be coordinated with the City's Webmaster for resolving all accessibility and conformity issues. 63.7 WEB PAGES UPDATES llnless otherwise specified and agreed Engineer is responsible for keeping the posted Web Pages up-to-date, by sending revisions and updates through the City Project Manager to the City's Webmaster for posting. 64 OVERHEAD ELECTRIC LINE CLEARANCE 64.1 CLEARANCE OPTIONS When working in the vicinity of overhead power lines the Contractor shall utilize one of the following options: Option 1- Having the power lines de-energized and visibly grounded. Option 2- Maintaining a minimum distance of 20 feet of clearance for voltages up to 350 kV an 50 feet of clearance for voltages more than 350 kV. Option 3- Determine the line voltage and provide clearance in accordance with the table included in Section 64.2. 64.2 REQUIRED MINIMUM CLEARANCE DISTANCES VOLTAGE MINIMUM CLEARANCE DISTANCE (nominal, kV, alternating current) (feet) Up to 50 10 Over 50 to 200 l 5 Over 20 to 350 20 Over 350 to 500 25 Over 500 to 750 35 ' ' � ' � , ,� ' ' � ' ' ' � I, ' ' L.l C SectionIV.doc Page 128 of 128 5/15/2012 r C_I � � f� IJ r-, ��I ' Section IV —Technical Specifications Over 750 to 1,000 45 Over 1000 (as established by the utility owner/operator or registered professional engineer who is a qualified person with respect to electric power transmission and distribution) ' Note: The value that follows "to" is up to and includes that value. For example, over 50 to 200 means up to and including 200kV. � � ' , � � � � ' , ' � � SectionIV.doc Page 129 of l28 5/15/2012 ' � � � � � � � � � � � � � � � � ' � � SECTION V CONTRACT DOCUMENTS Table of Contents: CONTRACTBOND ..................................................................................................................... 1 CONTRACT.................................................................................................................................. 3 CONTRACTOR'S AFFIDAVIT FOR FINAL PAYMENT ..................................................... 6 PROPOSALBOND ...................................................................................................................... 7 AFFIDAVIT.................................................................................................................................. 8 NON-COLLUSION AFFIDAVIT ............................................................................................... 9 PROPOSAL.................................................................................................................................10 CITY OF CLEARWATER ADDENDUM SHEET .................................................................13 BIDDER'S PROPOSAL .............................................................................................................14 SectionV.doc Page i 7/26l2012 r , ' ' 1 ' t ' ' ' ' 1 1 ' ' 1 ' , ' 1 BOND # CMIFSU0603226 Surety: International Fidelity Insurance Company Address: One Newark Center, ZOth Floor Newark, New Jersey 07102-5207 Phone # 800-333-4167 This is the front page of the performance/payment bond issued in compliance with Florida Statue Chapter 255.05 Contractor: R. A. M. Excavating, Inc. Address: 3349 Hannah Way East Dunedin, Florida 34698 Phone #: 727-463-6428 Obligee: City of Clearwater Address: 100 S. Myrtle Avenue Clearwater, Florida 33758 Phone #: 727-562-4750 Date Issued: January 17, 2013 Amount: $1,239,219.06 One Million Two Hundred Thirty Nine Thousand Two Hundred Nineteen and .06/100 Project Description: Druid Trail Walkway Phase III Praject #: 04-0021-PR Project Address: Legal Description of Property: This is the front page of the bond; all other pages are subsequent regardless of preprinted numbers. c.. , , ' � � ' CJ ' , �' ' L_ � 1 � ' ' ' C�i ' ' ' ' �OND. NUM$ER�FSU0603226 ; CONTI�A�T �QND ST��� Q� P�OiRLDA . CE�U�1Ti' OI" , Iil!��� 1�,LL IYIElY .BY �':I�IE�E; PRESEI�T'I`�': That w� R.A.1VI. E�GA,V;A.�',�1YG, �1�1'C.: as Ccz�i�raetcu �;�1 �F�tNAT _ �,L _ FIDELITY_ INSIJRANCE ODMIPANY � (Suret. . �vl�e5� hame add��SSiS;; ._�e Newark Center, 20th F�r, Nevar , New Jersey 071t72-5�." I�i��T1�I�4F`�'ER CALI;ED TH� "Surety'�, are h�id and firml.y bou�d .inta th� �it,y Q,i �,1��;�ter', Fiorida �er.�ir;�fte� �a,lleci the "fJ�vner") �n the p�nal si�m o% �1KE ,��,I�T:��T ��'�;���D .;. � , .� .�� 'F : � I.. A> :A T � :E ��N ,�4 TS f�1�,�.2.Y�.A�) f4�. t�e paymer�t of w�ich wa b%z�d ourse�ves, ou� f�eir�, ex�cutars, at�trun�st�'ators, suc�essoirs, at�sl assi�MS for th� fait�ifiil p.er%rmance of a certain wrilt�n con`tra+�t, dat�d the d�X;of ,_2��, enter�d i�tcz b�t�ve�n th�'CQ�tractcar and tl�e �ity cii Cl�arw�!ater. %r: �RCTI�i T'�L V�A�ZKWA�Y (P�I,A,�E �) PT��.T�CT #: Q�4-QQ�l�gi� ' a���� of �hi�h s�id c�z�tx��t is inc�r�c��rat�d herein by z�f�x�r�ee a�d is made a p�.t't: h�e�f �s �� fully �i�d= �r�: Nc�� T���OR�, �rx� eo�va��r.oNS o� T�s oB�.�G��ION ,�� �ue�, t��t if che Coni�actor sha�l in all re$pe�tis eomp�y with th� terms and cnnditic�ns t►� sa%c1 contract, incl•uding t�e o�e-y�ar guararttee o� material ancl labor, ancl his obligatians thereunder, ineludi�g the con�aet' do��rne�r�s (w��eh inc�ude t}ae Aclvertisezrient %r $ids, Farm of Proposal, Forrn of Cnn,tr-aet, �c�rm of Stz���ty Bt�n.d, Fnstructians to Bidders, General Conditions and Teehnical Speci�catic��s� a�d the Plaus and �peci�ications therein referred to and made a part thereof, and such alter�tiat�s a� zr�ay be made in said P��ians arid Speei�catio:ns as th�rein provided for, and shall ir�dernnify and save h�t;nles� _ th,e said Q"vu���r ag�inst and from aIl costs, �xpe�n:ses, damagcs, injury or eanduct� want of �are or s�Cill; n�gl.ig�n±�e or default, inoluding patezzt infringements c� the part of the said Cantract�r age�;t� or etnplayees� in the ��cecution or performance of said eontract, ineludimg errors in the �lans furnished ,by t�e Co�tractor, and further, if such "Contractor" or "Contractors" shall prvmptly rnake paym�nts to a�ll persons supplying him, thern or it, labor, maYerial, �d su�plies used direetZ� or in�ir�ctly by said C�ntractdr, Contraetprs, Sub-Contr�.ctop, or Sub-Co�tractoxs, in tl�e pxo�E��"tion af t�ie wvrk pro��ded for in said Contract, tli�s obligation shall be voici, other�ise; the Con�etor anci ��rety jQintly and severally agree to pay to tl�e Ov�n�r any differcnce between the sum to which the said Contracto� would be entitled on the cornp�ction of th� Contract,: aa�d that �vhiel�. the Owt•rer.,rr�a�� b� ol�.�ig,ed t,o �ay for the completian of said wark by coz�traet 4r athervui�e, �Yc any da:r�a���, �i�xe�t or indir,ect, or eo��e.quent�al, vYhich said O�n�r may sustain on account of such w�rlc, or on �ccsaur�t :o�' the f�,lure of t�e said �ontraetor to praper�� and in all things, keep and ex�cute all the pra�zsi:ons of : said� ct��ttra�t, ,,< Cantt?ect fdF Sig�axuce:�iocx , ' . Page: l of !4 ��z�i�at�. �s ,! , ' ' ' ' , ' , ' ' ' ' ' , ' ' � , ' 1 CONTRACT B�ND . �2� And the said Contractor and Surety hereby further bind themselves, their successars, e�€�c�utor,;�, adrninistratars,, and assigns, jointly and s�verally, that they will atnply and fu�1y �axotect th� sai�� Oumer agai�st, and will pay �ny a�.d �1 amounts, damages, costs and judgments which may b�� recovered against or which the Owner may be called upon to pay to any person Qr carporation b;� reason of any da�nages arising from the performance of said w4rk, or af the repair qr maint�nan��� thereaf, or th� rn�nner of do.ing the same or the negleet Qf the said Cantraetor dr his �gez�t� c�r se�rtts ar the i�prop�r perfo�rnance of the �aid work �y the Contra�tor or his agent� s�x se��ts, o�r the �nfringem�ts� oi any patent right� by reasQn of the use of any materia� furnis�ied car t�ork don�;•, • as aforesaid, o� otherwise. �.nd the said Can�actor and Sux'et� hereby fiarther bind themselves, their su�cessar�, k�eir.�; exeaut�rs, ac�n�ainistratoars, and �sssig�s, ,jc�it��ly and scvcrally, to repay the ouvne�` �y �ta� �which th�c; ()wner rnay be compelled fo pay beeause of any lien for labor material fumisk�e�l f�z tl�e work:, em:braccd by said Conttact. And th� said :�`urety, for th� vaYu� rec�ived; hereby stipulates and agrees that no chan�e, ,�xten�ion a:f tirne, al�terati4� or additic�n to the .terms a� the �o�t��ct or ta the warl� to be perfarrned t�ereu�der a�r the speeificatiQns aceompanying the same shall �n any way affect its obli�ations on this bond, and i`k �ia�� her.�t�y �aive norice of a�y such cha�ge, ext�r�sioan of tirne, alteratiQn or addit%on t+� t��; tem�;;�. of tk�e �c�ntra�C or to th;� worl� or to the ��cificatio�ts. , ,' t r � I1�T T`��'T�(�NY ���R��F, witr�ess the hanc�s and seals of the pasti�s here�ta thi� �7ttac �-� °, da y of JanuaYV , 2 0 1 3. °�'—�-�- �� : R.A.M. EXCAVATING, �4 �1 � � � CaNTRACT R �'° ' f � ;�•o .;,; d � ,� ,e _ �y, . , ..., ATTE�T:: � ' C� �'FJ�-� INTERNATIO�iAL FIDII.ITY INSURANC:E aQP�II'AP1Y �URETY f ;` �:, TTNES�: gy; - �, . ,,rr ,�,, �: ' � �4T `EiR1�1�Y��N����"�; �� ; d " Ka een M. Irela�_ 4 ` . . . . . . . . � �+� � � . � . . . � . . - � � - � � , . � . . . . . � . . � . . � � . . . - �. . . „� - ' � . .. � CO S`�GN . . endy _ Hingson, Lice Florida Resident Agent ,8 F,, Co�iract for Signat�are:docx Page 2 of 14 7/26/201:: ��r.��r:�� a��-��uv- 1"'Vl/��K U:1` /1��11 INTERNA7IUNAL FIDELIT� � ALLEGMENY CASU (7N'E NEWA�tK CENiER,'20TH FLf)OR:I�Ei� KNOW ALI� IVIEN �Y THESE PRESEN7S: That- INTERNATIONAL PIDELITY �` the laws of the State of New Jersey, and ALtEGHENY CASUALTY COMPA ro�r� ��r SUt�AN�E C�MPANY TY C+DMPANY ' �G, NE1J1l J�t�SEY 07102-52Q7 URi4NCE COMPANY , a corporation organixed ' and existing under a corpora6on organized' and existing under the laws of the State of v constitute and appoint KATHLEEN M, IRELAN, WENDY L. HINGSON, IAN J. DONALD, R�BERT TROBEC, ALAN P'. CHANDLER, JAY E. WOODY, JEFFREY A. CWANDLER Troy, MI. their true and lawful attomeyl and other writings obligatory and the execufion of such �CQMPANY and ALIEGH�� acknowledged by their regul< This Power of Attorney�,' is � COMPANY and ALLEGHEN 'of IN7ERNATIONAL FIDEL CASUALTY COMPANY at a "RFCf}I \/Gf1 #ha# /41 fha Pi execute, seal and � tllereof, which ai rly'elected officers attF IeEiver for and on'its behaif as surety, any and all bonds and undertakings, co�Vacts o# indemnity < or may be allowed, rec}uired or, peemitted by law, statute rule, regutation, contract or atherwise these presents, shall be as bmding upc�n tfie said IN� ERNATIONAL F4DELITY fPdSURANC� � fully and amply, to all iMents and purposes, as if the same had been duly e:�ecuted and ;ipai offices. , pursuant to and by authority of the 6y-Laws of IN7ERNATIQNAL F4DEL1'FY II�SUF2RNCE Is granted under and by authority of the following resoluUon adoptect by the Board of Directors t a meeting duly held on the 20th day of July, 201� and by the Board of Directors of A,LLEGHENY ay ofAugust, 2000: ;retary af ,the Corporation shatl have the power to appoinf„and to revoke the appointments of, Haom�e�ys-m-rac� or a�en[s wiin pawer d�w a�������� p� U���ned or limited in their respective pawers of attomey, and to execute on behalf of fhe c�orporation and a�fix the Corporat�on's seal fhereto, bonds, unc�ertakings, recognizances, contracts of indemnity and other written obli ations in the naturE� thereof or '' related thereto; and (2j.any sueh'Offrcers of the Corporation may appoint and revoke the appointmenfs of joint-cantrol cust�ians, agenis for acc;eptance o# process, and Attomeys-in-fact with authority to execute waivers a�d consents on behalf of the Corporation; and �3) the signature of any such Olficer of the < Corporatia� and'the Coqporation's seal may be affixed by facsimile to any power of attorney orcertificat�on given or the execution of any bond undertakint�, ', recognizance contract of indemnity or other written obligation in the nature thereof or related thereto, such signahrre and seals when so us�::d whether ' hereiofore or �ereafter, , being hereby adopted by fhe Corporation as the original signature of such officer and the original seal of the Corporation, ta be valid and binding upon the Corporation with the same force artd effect as though manually affixed." IIN WITNESS WHEREOF, INTERNATIaNAL FIaEUTY INSURANCE COMPANY and ALLEGHEI�Y CASl1ALTY COMPANY have eaeh executed and attest�d'these presents'on this 12th day of<March, 2012. ' ��„'V��� 0�+ STATE OF NEW JERSEY .� �'��rr, � t������ Caunry of Essex i ��}' `�� � �� � � 1936 .� ' � � � �� �'�► ROBERT W. MINSTER * � ,� Executive �ce PresidenUChief Operating Officer YLV���`�� '�� �` �" (IntemaUonal Fidelity knsurance Company) � ' and 'Presiden# (AIlegheny Casualty Company) On this 12th day of March 2012, before me came the individual wMo executed the preceding instrument, #o me personally known, and, being by me dufy sworn,'said he is the therein described artrl authorized officer of INTERNATIONAL FIDELI?Y INSURANCE'COMPANY and ALLEGHENY CASUALTY � COMPANY ; that the seals affixed to said instrument are the Corporate Seals of said Companies; that the said Corporate Seals and his signature were duly af#ixad by order af the Boards of Directors of said Gompanies. IN TESTIMONY WHEREOF, I have hereunto set my hand affixed my f.Tfficial Seal, ,��``�`aS���H��+�����fiy at the City of Newarlc, New Jersey the tlay and year first above written. , � �ti��`y����� �� ��,,�' � . .. � +j� * �'. � �� � .. . �� � . . r � w w a • r r: • �r.. � �y1Y4 • ++ . . � • �!�" '91� ♦ " �� , ;'1�'',y„". � `Cl,,' +tu' .� A N07ARY PUBLIC OF NEW JERSEY �'� *'w•., ��;.-� �}.'°� •' My Commission Expires Mar. 27, 2014 ��+s '�` � .�'�' �� iV�W'� J ��� jef�"''+Ee�.�..F.+�'"'``k CERTIFICATION 'I, the undersigned officer of 1NTERNATIOf�AL FIDELITY INSURANCE COMPANY and ALLEGHENY CASUALtY COMPANY do hereby certify that I have ` < compared th� foregoing copy of the Power of Attomey and affidavit, and the copy of the Sections of the By-Laws af said Companies as set foh:h in saitl ' Power of Attorney, wifh the originals on file in the home office of said companies, and that the same are co[rect trarrscripts therE�c�f, �id of the whole ' c3f the said originals, and that the said Power of Attorney has not been revoked and is now in full force and effect. ' IN TESTIMONY WHEREOF, I have hereunta set my hand this 17t11 ' day of J�ilUat'�7, 2013 �-'���_.�_.-.'�/��� IVIARt<4 BRANCO, Assisfant: 5��:,rsfatiy �< � , CONTRACT � This CONTRACT made and entered into this ��`1 da of C�hu�z'��` , 20 � b a1�.d between the City of Clearwater, Florida, a municipal corporati�rein fter designated as tl�e ' "City", and RA.M. EXCAVATING. INC, of the City of DUNEDIN County of PINELLAS an,d State of Florida, hereinafter designated as the "Contractor". � �� .--, �, � ' ' ' WITNESSETH: That the parties to this contract each in cvnsideration of the undertalcings, promises and agreemen�ts on the part of the other herein contained, do hereby undertake, promise and agree as follows: The Contractor, and his or its successors, assigns, executors or administrators, in consideration of tlie sums of money as hcrein after set forth to be paid by the City and to the Contractor, shall and will ,at their own cost and expense perform all labor, furnish all materials, tools and equipment for tkie following: DRUID TRAIL WALKWAY (PHASE 3) PROJECT #: 040021-PR IN THE AMOUNT OF' ONE MILLION TWO HUNDRED THIRTY-NINE THOUSAND TWO HUNDRED NINETEEN DOLLARS AND SIX CENTS (S1,239.219.06) In accordance with such proposal and technical supplemental specifications and such other speci:al provisions and drawings, if any, which will be submitted by the City, together with ariy advertisement, instructions to bidders, general conditions, proposal and bond, which may be here�to attached, and any drawings if any, which may be herein referred to, are hereby made a part of t�iis contract, and all of said work to be performed and completed by the contractor and its successo�rs and assigns shall be fully completed in a good and workmanlike manner to the satisfaction of tlEie City. ' If the Contractor should fail to comply with any of the terms, conditions, provisions or stipulations as contained herein within the time specified for completion of the work to be performed by tif►e Contractor, then the City, may at its option, avail itself of any or all remedies provided on its behsj�lf � and shall have the right to proceed to complete such work as Contractor is obligated to perform in accordance with the provisions as contained herein. � THE CONTRACTOR AND HIS OR ITS SUCCESSORS AND ASSIGNS DOES HEREB�Y AGREE TO ASSUME THE DEFENSE OF ANY LEGAL ACTION WHICH MAY EIE BROUGHT AGAINST THE CITY AS A RESULT OF THE CONTRACTOR'S ACTIVITIi�:S , ARISING OU'T OF THIS CONTRACT AND FURTHERMORE, IN CONSIDERATION CUF THE TERMS, STIPULATIONS AND CONDITIONS AS CONTAINED HEREIN, AGREI?;S TO HOLD THE CITY FREE AND HARMLESS FROM ANY AND ALL CLAIMS FaiR ' DAMAGES, COSTS OF SUITS, JUDGMENTS OR DECREES RESULTING FROM APifY CLAIMS MADF UNDER THIS CONTRACT AGAiNST THE CITY OR TNI:E CONTRACTOR OR THE CONTRACTOR'S SUB-CONTRACTOI2S, AGENTS, SERVAN71'S ' OR EMPLOYEES RESULTING FROM ACTIVITIES BY THE AFOREMENTIONE:D CONTRACTOR, SUB-CONTRACTOR, AGENT SERVANTS OR EMPLOYEES. , Contract for Signature.docx Nage 3 of 14 7/26/21,i12 , � ' ' ' CONTRACT �2) In addition to the foregoing provisions, the Contractor agrees to conform to the following requiremenl:s: ' In connection with the performance of work under this contract, the Contractor agrees not to discriminate against any employee or applicant for employment because of race, sex, religion, color, �r national origin. The aforesaid provision shall include, but not be limited to, the followirig: � employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; lay-off �r termination; rates of pay or other forms of compensation; and selection for training, includiaig apprenticeship. The Contractor agrees to post hereafter in conspicuous places, available for employeaes � or applicants for employment, notices to be provided by the contracting officer setting forth tlie provisions of the non-discrimination clause. ' The Contractor further agrees to insert the foregoing provisions in all contracts hereunder, includurig contracts or agreements with labor unions and/or worker's representatives, except sub-contractors ii�r standard commercial supplies or raw materials. � ' ' �� ' � ' ' � ' ' ' It is mutually agreed between the parties hereto that time is of the essence of this contract, and in tlie event that the work to be performed by the Contractor is not completed within the time stipulat�f;d herein, it is then further agreed that the City may deduct from such sums or compensation as may fae due to the Contractor the sum of $1.000.00 ner dav for each day that the work to be performed by tf�e Contractor remains incomplete beyond the time limit specified herein, which sum of $1,Q00.00 q�r d� shall only and solely represent damages which the City has sustained by reason of the failure of f,he Contractor to complete the work within the time stipulated, it being further agreed that this sum is not to be construed as a penalty but is only to be construed as liquidated damages for fai(ure of the Contract��r to complete and perform all �vork within the time period as specified in this contract. It is further mutually agreed between the City and the Contractor that if, any time after the execution ��f this contract and the surety bond which is attached hereto for the faithful performance of the terms a�nd conditions as contained herein by the Contractor, that the City shall at any time deem the surety ��r sureties upon such performance bond to be unsatisfactory or if, for any reason, the said bond ceases to be adequate in amount to cover the performance of the wark the Contractor shatl, at his or its ov�m expense, within ten (10) days after receipt of written notice from the City to do so, furnish an additionial bond or bonds in such term and amounts and with such surety or sureties as shall be satisfactory to tlfie City. If such an event occurs, no further payment shall be made to the Contractor under the terms a��id provisions of this contract until such new or additional security bond guaranteeing the faithf�ul perfarmance of the work under the terms hereof shall be completed and furnished to the City in a for�m satisfactory to it. Contract for Signature.docx Pagc 4 of 14 7/26/2Q�� 2 ' � ' ' , � , ' , � ' ' ' ' � � ' ' ' CONTRACT (3) IN WITNESS WHEREOF, the parties to the agreement have hereunto set their hands and seals azid have executed this Agreement, in duplicate, the day and year first above written. CITY OF CLEARWATER IN PINELLAS COUNTY, FLORIDA By: �s liam B. Horne, II City Manager Countersigned: By. r' c(epf�Q� C�Q��f George N. Cretekos Mayor (Contractor must indicate whether Corporation, Partnership, Company or Individual.) (The person signing shall, in his own handwriting, sign the Principal's name, his own name, and his title; where the person is signing for a Corporation, he must, by Affidavit, show his authority to bind the Corporation). Contract for Signature.doca Page5ofl4 Attest: City (Seal ) . � �t`Q►��.oF ry�C� (,'t� l_' ����,� �� Call v ; � � �=:=.- � rd'► '"�: =- . � A�pprov� as to`form: � j »_.� `� 1� �� i, �; _ C Assistant City Attorney RA.M. EXCAVATING, INC. (Contracto ) �, � F� � ' � ? �j _ <; •''�;t€:� �' ` � ` ' .,t By: i l�� �� �'�F�p � °' ^ : ' , `c r � s :', . .� •�': .,,. , .,. 7/26/20112 ' , ' ' ' CONTRACTOR'S AFFIDAVIT FOR FINAL PAYMENT (CORPORATION FORl1� STATE OF FLORIDA COUNTY OF On this day personally appeared before me, the undersigned authority, duly authorized �to �rninister oaths and take acknowledgments, , who after being duly sworn, deposes and says: That he is the (TTTLE) ' of R.A.M. EXCAVAT'ING. INC., a Florida Corporation, with its principal place of business located at _ (herein, the "Contractor"). � , �J � That the Contractor was the general contractor under a contract executed on the day +�f 2Q with the CITY OF CLEARWATER, FLORIDA, a municipal corporation, as Owner, and that the Contractor was to perform the construction of DRUID TRAIL WALKWAY (PHASE 3) PROJECT #: 04-0021-PR That said work has now been completed and the Contractor has paid and discharged all sub-contractais, laborers and material men in connection with said work and there are no liens outstanding of any natu�re nor any debts or obligations that might become a lien or encumbrance in connection with said wo:rk against the described property. That he is making this af�idavit pursuant to the requirements of Chapter 713, Florida Statutc,s, , and upon considerarion of the payment of (Final Full Amount of Contract) in full satisfaction ac� discharge of said contract. , � That the Owner is hereby released from any claim which might arise out of said Contract. The word "liens" as used in this affidavit shall mean any and all arising under the operation �f the Florida Mechanic's Lien Law as set forth in Chapter 713, Florida Statutes. Swom and subscribed to before me ' This ' ' ' � ' day of , 20 NOTARY PUBLIC My Commission Expires: Contract for Signature.docx Page 6 of l4 BY: AFFIANT PRESIDENT �rz�n�ai2 ' �-� J � ' , ' � � , I I � , ' PROPOSAL BUND (Not to be fiiled out if a cercitied check is submitted) KNOWT ALL MEN BY THGS� PT2�SENTS: Tht�t we, d�e undersibned, R.A.M. E�ccavatinq, Inc. as Principal, and Mer�hants Hondinq Ca�any (Mutual) as Surety, who's addre,� i, 2100 Fleur Drive Dc� Moines, Iowa 321-1158 , are held and firmly Uound unto the CityofClea��vater, f-'I��riu:z, in the sum of "WC' -i-{ •�.f •' =. 'i'6.,�t;�7`�' �cj��f� ' THCi�isA�v.i) Dollar� ($ ��►-�� uc v }(being a minimum �F l0% oi�Conh•acto�'s tot11 bid Amotint) .for the payment of which, well ai�d truly io be made, we hereby ,jointly aiid scverally bind ourselves, our heirs, executors, administrators, sr�ccessors and assigns. The condition of the above obligation is such that if the attached I'roposal of R.A.M. Excavating. Inc. �s I'rincipal, and � Hrncbng Q��ry (Mutual) as Sui�ety, for work specified �s: ll12UID TR:�1I, �1't�LT���4':��' (PHASE 3) T'ROJECT #• U4-OU21-PR all as stipulated in said Proposal, by doing all wvrk incidcntal thereto, in accordance with the plans and specifications provided herefor, al{ within Pinellas County, is accepled and the eontrACt. awarded to the above numed bidder, and the said bidrler shall within ten days after notice of said awa�•d enter into a contract, in writing, and furnish tl�e required Perf'orn�ance Eiond with surety ur sureties t� he approved by the City Manager, this obligation shall be void, otherwise ehe s�rne shall bc in full force and vii�ie by law and the full Amount of this P,-vpo;al Bond wiU b� paid to the City as stipulated or liqiiic�ated damages. Signed lhis 29th day of �v�nber (Principal inust indicate whether corpor�tion, partnership, company or individual) � The person signing sh111, in his own ' handwriring, sibn the Principal's name, his own naltie a»d his title; the person sianing for a corporation , must, by affidavit, show his authority to bind the corpo��ation. , L_ J SectionV.dac ' ' 2012 Page 7 0l' 14 R.A.M. F.XCAVATING� INC. Principal sy: ' i" �,J � �' J 1`itle --� (u,7� ti' % 1�;RC�IADTrS BQ� Q� ' Suret}� �pI, —�..— y' � �:Wendy L ` �Hingsnn, Att �y e:N'-In-� Fact afid Flor. ida 12esident 13ga�. (239) 275-8220 7126�2Ut 2 ' � ' ' � ' ' � , ' .1V�ERCHANTS BQNDII�TG CQMPANY� POWER OF ATTORNEY KnowAll Persons By These Presents, that MERCMANTS BONDlNG COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations duly organized under ihe laws of the State of lowa (herein collectively called the `Companies'), and that the Companies do hereby make, constltute and appoint, individually, • . Robert Trobec, Wendy L. Hingsoa ot Fort Myeis and State oi Ftorida their true and iawtul Attoiney-In-Fact, with fufi power and authority hereby confened In their name, place and atead, to sign, execute,.acknowledge and deAver jn their behaif as surety any and all bonds, undartakinga, rocognlzances or other written obligatbns In the nature thereof, subJect to the limitetlon that any such instrument shall not exceed the amount of: EIGHT MILLION (58,000,000.00) DOLLARS and to bind the Companiea thereby aa fully and to the same extent as if auch bond or undertaking was signad by the duly authorized officers of the Companles, and all the acts of�aaid Attorney-in-Facl, purauani to the authority herein given, are hereby ratlfied and conflrmed. Thts Power-of-Attomey is made and execuied pursuant to and by authority of the following 8y-Laws adopted by ihe Board of Direclors of the Merchants Bonding Company (Mutual) on April 23, 2011 and adopted by the Board of Directors of Msrchants Nationai Bondinp, inc., on October 24, 2011. ' `The Presldent, SeCretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President aha�l have power and author(ty to appoint Attorneys-in-Fact, and to authorize tham to execute on behalf ot the Corripeny, and ettaCh the seal of the Company thereto, bonds and undertakings, recognizanCes, contracts of indemnity and othar wrltln8s obligatory in the nature thereot. The signature of any authorized oHicer and the seal of the Company may be affixed by facsimile or elecVonlC transmisalon to eny Power of Attomey or Certiflcation thereof authorizing the execuUon and delivery of any bond, undertakfng, recognizance, or olher su�etyshlp oblipat(ons of the Company, and such si8nature and aeal when so used shall have the aame force and effeci as though manually fixed " In Witnass Whereof, the Comp�nles have caused this instrument to be signed and sealed thfa 30th day of July , 2012 . ' STATE OF IOWA COUNTY OF POLK ss. . ��"'�,�10h1,i�� � a• � �s .o� afi��; �p`� a�'� -�- �� � v�, E003 ?.� ���TLt.����r�N �A� y��� � .i ��.. ...� . p\NG Cp,�•• �. • :�0 ORPOq :,°7'. . .•� q�.s�: • y • •��; 'O- m�^• : y 1933 �� c' • ij •��.: • 6, a ' . Jj�„ ,.`;� . •� * ' • • r� �������• MERCHANTS 80NDINCi�COMPANY (MUTUAI) MERCHAtVTS NATIONAL BONDINO, INC. � �� Presldent , On thls 30th day of July 2012 before me appeared Larry Taylor, to me peroonally known, who being by me duly aworn r,tid say that he (a Prestdent of the MERCMANTS BONOING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; anii that the seals alfbced to th� forepoing instrument is the Corporate Seals oi the Companfea; and that the seid instrument was signed and a�led in behalf of the Companies by authority of the(r respective Boarda of Directo�s. , In Testimony Whereof, I have hereunto set my hand and affixed my O�cial Seal at the City of Dea Moines, lowa, the day and year first aboVe written. , ,� MARANDA GREENWALT +�� CommisslonNumber770312 MyCommlasion Expires OctObK 28, 2014 ' ' STATE OF IOWA COUNTY OF POLK ss, E�� ,�? � Notary Public, Pofk County, lowa I, Wflllam Wamer, Jr., Secxetary of the MERCHAfVTS @qNDiNG COMPANY (MUTUAL) and MERCNANTS NATtnVAI �()NDING, INC., do hereby cehKy that the above and focegofng is a true and correct copy of the POWER-OF ATTORNEY executsd hy sa�d L'omp&n�es, which (s stil) in fuU force and effeCt and haa not been amended or revoked. �n 1Mtness Whereot, i have hereunto s�i my hand and affixed ihe seal of the Companies on this�h day of �r lUll ' POA 0014 (11/11) ' ���y�,'�jJ 0�.,.�0*y .�. . � a' -o- `� � u s , �� zoo3 j:�: ���yy.�••..•�'��� �W�1', 1'� -'`►�� �...... .•��N� Cp'•. � o��0�P09�;°;'• • v •%.�ty,�c � `��� -o- c^: : :s'• 1933 �'e; ;y,;d��,,. � � .�� �• • �; • •'�:�'�.• ••...... . �/,��'�...� ��.� Secretary ' , ' PROPOSAL (�) � TO THE CITY OF CLEARWATER, FLORIDA, for DRUID TRAIL WALKWAY (PHASE 3) PROJECT #: 04-0021-PR ' and doing such other work incidental thereto, all in accordance with the contract documents, marked ' DRUID TRAIL WALKWAY (PHASE 3) PROJECT #: 04-0021-PR ' Every bidder must take notice of the fact that even though his proposa! be accepted and the documents signed by the bidder to whom an award is made and by those of�icials authorized to do so on behalf of the City of Clearwater, Florida, that no such award or signing shall be considered a binding contract without a certificate from the Finance Di�ctor that tunds are available to cover the cost of the work to ' be done, or without the approval of the City Attorney as to the form and legality of the contract and all the pertinent documents relating thereto having been approved by said City Attorney; and such bidder is hereby charged with this notice. ' The signer of the Proposal, as bidder, also declares that the only person, persons, company or parties interested in this Proposal, are named in this Propvsal, that he has carefully examined the , Advertisement, Instructions to Bidders, Contract Specifications, Plans, Supplemenlal Specifications, General Conditions, Special Pm��isions, and Contract Bond, that he or his representative has made such investigation as is necessary to determine the character and extent of ihe work and he proposes and ' agrees that if the Proposal be accepted, he will contract with the City of Clearwater, Florida, in the form of contract; hereto annexed, to provide the necessary labor, materials, machinery, equipment, tools or apparatus, do all tfie work required to complete the contract within the time mentioned in the General ' Conditions and according to the requirements of the City of Clearwater, Florida, as herein and hereinafter set forth, and furnish the required surety bonds for the following prices to wit: , , u , ' ' SectionV.doc Pnge 10 of 14 7/26/2012 � LJ , CJ PROPOSAL i2) ' If the foregoin� Proposal shal) be accepted by the City of Clearwater, Florida, and the undersigned st�al I fail to execute a satisfactory contract as stated in the Advertisement herein attached, then the City may, at its option determine that the undersigned has abandoned the contract, and thereupon this Proposal ' shall be null and void, and the certified check or bond accompanying this Proposal, shall be forfeited to become the property of the City of Clearwater, Florida, and the full amount of said check shall be retained by the City, or if thc Proposal Bond be given, the full amount of such bond shall be paid to the City as stipulated or liquidated damagcs; othcrwise, the bond or certified check accompanying this i Proposal, or the amount of said check, shall bc rcturned to the undersigned as specified herein. r Cl ' , ' ' LJ , ' , , Attached hereto is a bond or certified check on :���j�,���, �tr�� S�G�r� v���C ��v Bank, for the sum of c',��' 1-l(: �>n� �� ��rw�: rv rY �G��. �("}�i c�.�S� N,'� ($ i�'-1, C;vc� (being a minimum of 10% of Contractor's tota! bid amount). The full names and residences of all persons and parties interested in the foregoing bid are as follows: (If corporation, give the names and addresses of the President and Secretary. If firm or partnership, the names and addresses of the members or partners. The Bidder shall list not only his name but also the name of any person with whom bidder has any type of agreement whereby such person's improvements, enrichment, employment or possible benefit, whether sub-contractor, materialman, agent, supplier, or employer is contingent upon the award of the contract to the bidder). NAMF,S: ADDRESSES: .-�-� � J S �a.cl�- �:3L{�� �L�,vNqM wA}� � ; � i c� � �L!� — �JUC:"(>� Signature of Bidder: F�._ 3 � i (� � �; (The bidder must indicate wheth Corporation Partnership, Company or Individual). ' SeclivnV.doc � Page 11 of 14 7l26/2012 , ' ' I�� ' ' ' PROPOSAL (3) The person signing shall, in his own handwriting, sign the Principal's name, his own name and his title. Where the person signing for a corporation is other than the President or Vice-President, he must. by affidavit, show his authority, to bind the corporation. '`�J 1 Principal: �_� �--�1�� ; C � �G+.0 � By: � �o�i���./�I��� TiNe: ��(Z.�SIf��� r � Business Address of Bidder: �.3�-j � f--{/�;.�nf l-}�K lni�-�- � C"/-} S'� City and State: l} i1n�� r��I.,�� �C.-. Zip Code 3`� (fl�% �37 � Dated at ( �}�'j , this ,��( day of /V C) li' ' ' ' , � ' ' �J , ' SectionV.doc , Page 12 of 14 A.D., 20 ► ��-- Tl2612012 ' , ' , ' ' ' , ' ' , , � ' ' ' , ' , CITY UF CLEARWATER ADDENDUM SHEET PROJECT: DRUID TRAIL WALKWAY (PHASE 3) PROJECT #: 04-0021-PR Acknowledgment is hereby made of the following addenda received since issuance of Plans and Specifications. Stx;tiunV.duc Addendum No. �_ Date: I I-� �-« Addendum No. �-.�Date: �/ ^,� � M ���- �, Addendum No. _�,� D�ate: " `' •- � � Addendum No. Date: Addendum No. Date: Addendum No. Date: Addendum No. Date: Addendum No. Date: Addendurn No. nate: Addendum No. Date: Addendum No. Date: Page 13 uf 14 '��l�i �= X C�} l�/i�t dti G I,ti`c. (Name of Bidder) � 1� � �� ci+�-vt% ��,c��- (Signature of Of�icer) (�C� � -� � ,� �� .ti--_� (Title of Officer) �Vt� �' �-`j - ;��UI �-,._. (Date) �i2�o�2 ' , ' ' ' � ' ' ' 1 ' ' ' ' ' , ' 1 � DRUID TRAIL PHASE 3 WALKWAY ��r�n�s . �u Cavrw►craR: i Z,��i 21`��(.(;� BIDDER'S TOtAL S 1 � (Numbarsj BIDDER'3 TOTAL S �� 1 ( rn �� 1( i L ��., -��a��. � � ,...L,' r�,- -�.� � � � ( •..; , v�- / �-" lL:l] .�; 1 � � li�iC.: �"1 N 'vt�('f �• /� �'V �C�i�r��i C/V//: �%ir TNE BIDDERB iOTAL ABOYE 18 HIS TOTAL BID BASED ON HK UNIT PR�E8 AND LUMP SUM PRICES /WD THE ESTtMATED QUANTRES REQUIRED. THIS F16URE IS `( h V/ )/ � �" �� • FOR NtFORMATION ONLY AT TME TIME OF OPENMHi 81DE. THE CRY WILL MAKE TME TABULATION Ft�M TME UNR PRICE8/NID LUMP iUM PR�CE 6W. IF THERE � AN ERROII pl THE TOTAL SY TH! �DER IT SNALI s! CNANOEi /1� ONLY THE UNR PRICES ANO LUMP 8UM YRICE 3HALL 80VERN. P:1CM2036W2m�Docs\Tr�uapoAatloniPhaae 3- SpeciRceNons b Bid Documental0ruid TraA PH 3 9id Tab 11-29-12(BID ESTIMATE)