FOR AND IN CONSIDERATION of the sum of One Dollar ($1. 00) cash in hand
paid to them , the receipt of which is hereby acknowledged, and the benefits
to be derived therefrom, Genevieve Thornton Parker, joined by FRANK PARKER,
her husband,
do , het-eby grant and conVey to the CiTY OF CLEAR WATER, FLORIDA, an
easement over, under and across the following described land, lying and being
situate in the County of Pinellas, State of Florida, to-wit:
Begin at the NE cor. of Lot 10 of Wm. Brown's Subdivision of Bay
View, Florida as recorded in Plat Book 1 Page 13 of the public
records of Hillsborough County, Florida of which Pinellas County
o
was formerly a part; run thence S 0 37I03"W, along the easterly
line of said Lot 10, 663.66 ft., thence S 56027125"W 121. 32 feet
for a point of beginning of a 15.0 foot permanent easement for
construction and maintenance of a sanitary sewer line with a
temporary one year construction easement of 7.5 feet on both sides
of the permanent easement; thence S5602712511W, along said center-line,
0.86 feet, thence S70027'18"W, along said center-line, 88. 15 feet,
thence N89022t5711W, along said center-line, 26.0 feet to end of
center-line. Said point lying S 0037I03"W, along the westerly
line and its southerly extension, 759.53 feet from the NW cor. of
said Lot 10.
Restoratlon shall be made as set forth in the Addendum to Easement attached
hereto and made a part hereof by reference.
This easement being for sanitary sewer installation and maintenance. Gre.ntor shall,
upon this property becoming a part of the Cl~l of Clearwater, have full right to
conneot to ~\dcMr~oP'cL8fXlw l~~\te8'ltiD~~e sRHiUW.rJe 'fIe ~iifi'nJ1~nf:;> u~~ge.
the above described premises and to construct, install and maintain thereon any
sanita.ry sewer line and to inspect and alter such sanitary sewer line from time
to time.
IN WITNESS WHEREOF, the part iea
hand S and seal S this 26th day of
hereto ha ve
Maroh,
A.
set
D.
their
, 196
3
Signed, sealed and delivered
in the presence of:
~U~~ J~ P~SEAL)
Genevieve Thornton Parker
~ a L (SEAL)
Frank p~r~./l/
OF~FLORIDA
)
COUNTY OF k'~~nllYAG{) PINELLAS
Before 'me .pers"i:>nal.ly"'appear ea.-OeneVieve-Thornfon Parker
Fnmk parker, her husband,
and
...::0
<m
",0
::00
-<r::;
.:"'"
.0
-.-.---- F:~
;:0:2:
rnf'i";
::01=
V>:J:o-
~<n
- '"
nt:,
r~
~;1'
~p-
:x-
~
:::u
CoAJ
N
to me well known
and known to me to be the individual S described in and who executed the
fori;lgoing instrument and acknowledged before me that they executed
tbe:,~,~me for the purposes therein expressed.
w
s::
-u
3:
..
c:::n
~
::~, _, '-', _~ .r'~:.::..
_:>.,,,->---"WI.'l:N~SS my hand and official seal this 26th
. 1\.':D.,19'9 3
day of
Maroh
.......: --
" ;:My'-C~fui s sion Expi res
/7 rJ5/-0!J ~_Z'
ot '71
.... '_......
.
I
Clearwater Eat- South Interceptor
CLEI-54 . 1nj9 -643
Q,R O't PAGE
ADDENDUM TO EASEMENT
The following requirements will govern clearing, excavation and restoration of
property and public rights of way for construction of the interceptor sewer and are
an explicit part of the construction contract:
Final Cleaning Up
Before the work is considered complete, all rubbish and unused material due to
or connected with the construction must be removed and the premises left in a con-
dition satisfactory to the Owner. All property, both public and private, disturbed
or damaged during the prosecution of the work shall be restored to its former
condition. Final payment will be withheld until such work is accomplished.
Safety, Protection and Sanitation
a. Safety
The Contractor shall furnish and install all necessary temporary works for
the protection of the work and the safety of the public and shall carryon his work in
the manner best calculated to avoid injury to the public or to the workmen.
b. Protedtion of Adjacent Property and Utilities
The Contractor shall conduct his work in such manner as to avoid damage to
adjacent private or public property and shall immediately repair or pay for any
damage incurred through his operations.
Construction Procedure
Portions of the work are along the water front of Tampa Bay. It shall be the
Contractor's responsibility to preserve, protect and/ or replace existing water
front structures, bulkheads, piers, and docks without additional compensation.
Earthwork for Pipe Line Construction
1. Clearing
(a) Clearing operations in areas of wild growth (brush, mangrove, et c.)
shall be confined to the actual easement or right of way provided. Clearing
parallel to the provided easement for construction purposes will be allowed if the
permission of the property owner is obtained by the Contractor for such clearing.
The cleared area shall be of adequate width for purposes of sewer construc-
tion, access of equipment, layout and stockpiling of excavated material.
Brush and trees cleared from the work site shall be removed from the site
and satisfactorily disposed of by the Contractor. Disposal by burning may be allowed
if, in the opinion of the Engineer, adequate precaution has been taken to prevent
spreading of the fire and nuisance to adjacent properties. The Contractor shall,
.-', ----.--'--.---.- - -
. .... . however... be fully. responsibleforancohsequerices~ofsucli1)urning:
(b) Clearing operations in cultivated 'areas (groves, shrubbery and plant-
ings) will be limited to the easement or right of way required and within such
right of way to trees and shrubs which must be removed for construction purposes,
In public rights of way and in easements on private property all lawns,
plantings and shrubs will be restored either by removal and replacement of
existing plantings or by replanting with plants equal to that existing prior to
construction. The Contractor is expected to cooperato '-Vith invnlved property
owners in protecting existing plantings.
Sprinkler systems, cables and/ or other privately owned buried improve-
ments shall be protected, preserved and/ or replaced without additional com-
pensation.