Loading...
HIGHLAND-JEFFORDS DRAINAGE REPLACEMENT - 09-0001-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINAL� ADMIlVISTRATIVE CHANGE ORDER 1& Final PROJECT: Highland Ave./Jeffords St. Drainage Improvements Project CONTRACTOR: Caladesi Construction Co. 1390 Donegan Rd. Largo, Florida 33771 Date: December 10. 20� 12 PROJECT NUMBER: 09-0001-I::N PO REFERENCE NO: ST 108�:29 AWARD DATE: Februarv 16, 2012 CONTRACT DATE: Februarv 29, 2(�12 CODE: 0315-96169-563700-539-000-000�0 A CODE: 0327-96634-563800-535-000-0000 B CODE: 0327-96742-563800-533-000-OOO�J C SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT ; This change order decreases, increases, and adds items to provide for nnforseen Seld conditions,-,se��tt�h�,�d:;� � <�, . STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT $900,274.10 Admin Change Order 1& Final - CM ($156,606.58) NEW CONTRACT AMOUNT $743,667.52 Camilo Soto, Assistant City Attorney Date: ATTEST: Rosemarie Call, Date: �-e � � -�� � � ' `\��� �� �- f r. .�S�lL1 �: �� ._ a��� � CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA � � r,• illiam B. Horne, II City Manager ACCEPTED BY: � r�.;;�,• . ' �• . � Date: I �d'� ( �o'-v � li' Witnesses: � � � •-=*� y��. �,r ,' � � ' 4 � � C� i U i�^ '� k �. � � l President � �i � Recommended By: City of Clearwater ��,L f ` L�1'L(�l.:� , Tara L Kivett, Eng Construction Manag��;r �i�i�` � �� % Michael D. Quillen, PE , City Engine�; r � f'age 2 of 2 Administrative Change Order 1& Final - Highland /Jeffords S� Drainage Improvements Project (09-0001-E1� ITEM DESCRIPTION QTY UNIT iTNIT COST TOTAL C05T Stormwater Code A: 0315-96169-563700-539-000-0000 Decreases• 2.4 Unsuitable Material Removal & 2,500 CY $24.00 ($60,Or�0.00) Replacement (Structure Foundation & Pipe/Culvert Bedding Only) 3.2 60" Reinforced Concrete Pipe (Class IV) 1 LF $186.00 ($1,6G.00) 3.3 18" Reinforced Concrete Pipe 11 LF $75.00 ($&?5.00) 3.5 17' X 8' Drainage Structure (2 Accesses) 0.6 EA $11,700.00 {$7,02Q.00} # 1,2,3 4.2 Curb Replacement (Straight) 6.5 10% Contingency Increases• 4.1 Parking Lot.Reconstruction 5.1 Sod (Match Existing) 6.2 Sidewalk Restoration Additions• 3.12 12" PVC Connection DS-4 43 6" Concrete Wall Curb 6.6 Concrete Entry Drive 100 LF $14.50 ($l,�t�0.00) 1 LS $72,542.60 {$72,542.60) Total (Decreases): ($142,U23.50) 566.2326 SY $ 23.26 $13,1'10.57 1494 SF $0.34 $51)7.96 572.5 LS $6.70 $3,835.75 Total Increases: $17,5:14.28 1 LS $7,684.00 $7,684.00 1 LS $650.00 $650.00 1 LS $9,159.15 $9,159.15 Total Additions: $17,4!�3.15 Total Net (Decreases)/Increases/Additions Code A: {$107,O.16.1'n Sewer Code B: 0327-96634-563800-535-000-0000 Decreases• 7.1 12" PVC Sanitary Sewer Removal & 90 LF $ 83.70 ($7,5:33.00) Replacement 7.2 8" PVC Sanitary Sewer Lateral Removal 20 LF $ 45.10 ($9Q2.00) & Replacement 7.3 Sanitary Sewer Lateral Removal & 100 LF $ 18.20 {$1,8?0.00) Replacement 7.6 10% Contingency 1 LS $5,854.90 ($5,8:i�1.90} Total {Decreases): $ (16,109.90) Additions• 7.7 6" DIP Service @ 60" RCP 1 LS $4,421.09 $4,4.Z 1.09 Total Additions: $4,421.09 Total Net (Decreases)/Additions Code B: ($11,6�38.81) Water Code C: 0327-96742-563800-533-000.0000 Decreases: 8.1 10"Pressure Utility Main Removal & 45 LF $ 132.00 ($5,940.00) Replacement (Potable Water) 8.2 12" Pressure Utility Main Removal & 180 LF $ 152.50 ($27,4:i0.00) Replacement (Potable Water) 8.3 Potable Water Service Removal & 100 LF $ 10.66 ($l,0ti6.00) Replacement 8.4 10% Contingency 1 LS $ 3,445.60 ($3,44�.60) Total (Decreases): ($37,9�D1.60) � - Total Net (Decreases)llncreases/Additions: ($156,6D6.58)