Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2009-2010 SANITARY SEWER AND MANHOLD REHABILITATION - SANITARY SEWER EMERGENCY REPAIR PROJECT 09-0047-UT - CHANGE ORDER #1
i C�IANGE ORDER 1 DATE: 9/26/2012 PROJECT: 2009-2010 Sanitary Sewer and Manhole Rehabilitation- PROJECT NUMBER: 09-0047-UT Sanitary Sewer Emergency Repair PO REFERENCE NO.: ST106418 CONTRACTOR: COUNCIL AWARD: Aoril 15,2010 Rowland Incorporated 6855- 102nd Avenue North DATE OF CONTRACT: Mav 18.2010 Pinellas Park,Fl 33782 CODE: 0327-96665-563800-535-000-0000 A CODE: 0315-96664-563800-535-000-0000 B CODE: 0315-96182-563700-539-000-0000 C SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order is to egtend the contract for one year and increase the funding with all unit prices,terms and condition� e�aming the same,and add WPC and Stormwater to cover emergency work within the City Water Reclaimation Facilities and Sto � �es according to the same unit prices and terms and conditions as the sanitary sewer work-see attached for details. ,,,;��. ' �'}"*,�'', ;. � �.:,.,., STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: Row}�[ ' ��0' " 'r'ated� ' . �••�� - .l �� � 'i 4F . l".�: • 4''� ORIGINAL CO CT AMOLJNT $600,000.00 �? : 51 � CO 1 -City C ci 11/15/2012 $ 445,000.00 B : °" ���'AL` � � NEW CON C A UNT $ 1,045,000.00 Ken Rowland, ;`�,�; �+2 �nt*�,•° ,1'' �,�• ... APPRO D . Date: /��2,��/L - f Witnesses: Camilo Soto, Assistant City Attorney � ���,@ �C���F�f � � George N Cretekos, � $v uF ryF ATTEST: I►��S ��.�� , v `���/� � ��� C'� —' � Recommended By: Rosemarie Call, �C�-�erk �� City of Clearwater Date: � � ����.Z. � 1� �, __�___ � ... .. _._ CITY OF CLEARWATER,in Lan-Anh Nguyen,�PE, Project Manager PINELLAS COUNTY, FLORIDA ' � ' ��� Wi liam B.Horne,II City Manager Michael D Quillen,PE, City Engineer �'age 2 of 7 continued: RE: Change Order 1-2009-10 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT TY UNIT COST TOTAL COST Code A:0327-96665-563800-535-000-0000 Increases• C. SEWER PIPE,FORCE MAIN,AND MANHOLE EMERGENCY REPAIR Quantity Unit price Total 1. Mobilization LS 5 $ 200.00 $ 1,000.00 2. Traf�ic Control(per day) PD 60 $ 40.00 $ 2,400.00 3. Labor Hour $ _ Foreman-regular time PH 3000 $ 53.00 $ 159,000.00 Foreman-overtime PH 1000 $ 63.00 $ 63,000.00 Operator-regular time PH 1500 $ 41.00 $ 61,500.00 Operator-overtime PH 1 $ 51.00 $ 51.00 Truck Driver-regular time PH 1 $ 33.00 $ 33.00 Truck Driver-overtime PH 1 $ 43.00 $ 43.00 Pipe Layer-reguar time PH 1 $ 32.00 $ 32.00 Pipe Layer-overtime PH 1 $ 42.00 $ 42.00 Laborer-regular time PH 1 $ 29.00 $ 29.00 Laborer-overtime PH 1 $ 39.00 $ 39.00 4. Eauipment Foreman P/U with hand tools PH 250 $ 18.00 $ 4,500.00 Job truck with tools PH 1 $ 26.00 $ 26.00 Tractor&Trailer(Transport) PH 1 $ 19.00 $ 19.00 Track Hole(to 100 HP) PH 1 $ 73.00 $ 73.00 Track Hole(101 HP to 170 HP) PH 1 $ 116.00 $ 116.00 Track Hole(171 HP and up) PH 1 $ 125.00 $ 125.00 Rubber Tired Backhoe PH 1 $ 50.00 $ 50.00 Wheel Loader(to 150 HP) PH 1 $ 53.00 $ 53.00 Wheel Loader(151 HP and up) PH 1 $ 60.00 $ 60.00 Track Type Tractors(to 100 HP) PH 1 $ 20.00 $ 20.00 Track Type Tractors(101 HP and up) PH 1 $ 25.00 $ 25.00 Dump Truck(Tandem Axle) PH 1 $ 60.00 $ 60.00 Plate Tamp PH 21 $ 5.00 $ 105.00 3" Trash Pump PH 22 $ 5.00 $ 110.00 4"Double Diaphragm PH 2 $ 8.00 $ 16.00 Air Compressor(125 CFM min) PH 1 $ 11.00 $ 11.00 Well Point Pump Per Day 1 $ 90.00 $ 90.00 Well Point LF 1 $ 20.00 $ 20.00 4" Jet Pump Per Day 1 $ 46.00 $ 46.00 Emergency Hauling up to 2500 galllons PH 1 $ 180.00 $ 180.00 Emergency Hauling over 2500 galllons PH 1 $ 180.00 $ 180.00 5. Materials Asphalt-2"Overlay SY 1 $ 9.00 $ 9.00 3000 psi Concrete CY 1 $ 110.00 $ 110.00 Off Site Selected Fill CY 2 $ 3.00 $ 6.00 Limerock Base Material T'N 1 $ 20.00 $ 20.00 #57 Washed Stone TN 1 $ 35.00 $ 35.00 Bahia Sod SF 1 $ 030 $ 0.30 City's standard manhole ring EA 1 $ 121.95 $ 121.95 City's standard manhole cover EA 1 $ 120.15 $ 120.15 Two-way Cleanouts EA 1 $ 50.00 $ 50.00 Page 3 of 7 continued: RE:Change Order 1-2009-10 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT TY UNIT COST TOTAL COST SA.Sewer Piqe Reulacement oer linear foot 8"Diameter PVC LF 1 $ 2.61 $ 2.61 10"Diameter PVC LF 1 $ 4.08 $ 4.08 12"Diameter PVC LF 1 $ 5.86 $ 5.86 15"Diameter PVC LF 1 $ 8.72 $ g,72 18"Diameter PVC LF 1 $ 19.38 $ 19.38 20"Diameter PVC LF 1 $ 0.01 $ 0.01 21"Diameter PVC LF 1 $ 35.90 $ 35.90 24"Diameter PVC LF 1 $ 35.07 $ 35.07 30"Diameter PVC LF 1 $ 0.01 $ 0.01 36"Diameter PVC LF 1 $ 0.01 $ OA1 8"Diameter DI LF 1 $ 27.45 $ 27.45 10"Diameter DI LF 1 $ 33.75 $ 33.75 12"Diameter DI LF 1 $ 39.60 $ 39.60 15"Diameter DI LF 1 $ 0.01 $ 0.01 18"Diameter DI LF 1 $ 55.16 $ 55.16 20"Diameter DI LF 1 $ 61.93 $ 61.93 21"Diameter DI LF 1 $ 0.01 $ 0.01 24"Diameter DI LF 1 $ 81.50 $ 81.50 30"Diameter DI LF 1 $ 91.15 $ 91.15 36"Diameter DI LF 1 $ 122.85 $ 122.85 SB Force Main Reulacement aer linear foot 8"Diameter PVC LF 1 $ 5.82 $ 5.82 10"Diameter PVC LF 1 $ 8.85 $ 8.85 12"Diameter PVC LF 1 $ 12.49 $ 12.49 15"Diameter PVC LF 1 $ 0.01 $ OA1 18"Diameter PVC LF 1 $ 28.44 $ 28.44 20"Diameter PVC LF 1 $ 35.00 $ 35.00 21"Diameter PVC LF 1 $ OA1 $ 0.01 24"Diameter PVC LF 1 $ 50.22 $ 50.22 30"Diameter PVC LF 1 $ 78.16 $ 78.16 36"Diameter PVC LF 1 $ 115.56 $ 115.56 8"Diameter DI LF 1 $ 27.45 $ 27.45 10"Diameter DI LF 1 $ 33.75 $ 33.75 12"Diameter DI LF 1 $ 39.60 $ 39.60 15"Diameter DI LF 59 $ 0.01 $ 0.59 18"Diameter DI LF 1 $ 55.16 $ 55.16 20"Diameter DI LF 1 $ 61.93 $ 61.93 21"Diameter DI LF 1 $ _ 24"Diameter DI LF 1 $ 81.50 $ 81.50 30"Diameter DI LF 1 $ 91.15 $ 91.15 36"Diameter DI LF 1 $ 122.85 $ 122.85 Total increases Code A: $ 295,000.00 �'age 4 of 7 continued: RE: Change Order 1-2009-10 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT (�TY UNTT COST TOTAL COST Code B:0315-96664-563800-535-000-0000 Additions• 1. Mobilization LS 2 $ 200.00 $ 400.00 2. Traffic Control(per day) PD 1 $ 40.00 $ 40.00 3. Labor Hour $ _ Foreman-regular time PH 200 $ 53.00 $ 10,600.00 Foreman-overtime PH 20 $ 63.00 $ 1,260.00 Operator-regular time PH 200 $ 41.00 $ 8,200.00 Operator-overtime PH 20 $ 51.00 $ 1,020.00 Truck Driver-regular time PH 200 $ 33.00 $ 6,600.00 Truck Driver-overtime PH 1 $ 43.00 $ 43.00 Pipe Layer-reguar time PH 1 $ 32.00 $ 32.00 Pipe Layer-overtime PH 100 $ 42.00 $ 4,200.00 Laborer-regular time PH 200 $ 29.00 $ 5,800.00 Laborer-overtime PH 1 $ 39.00 $ 39.00 4. Equipment Foreman P/U with hand tools PH 200 $ 18.00 $ 3,600.00 Job truck with tools PH 200 $ 26.00 $ 5,200.00 Tractor&Trailer(Transport) PH 100 $ 19.00 $ 1,900.00 Track Hole(to 100 HP) PH 100 $ 73.00 $ 7,300.00 Track Hole(101 HP to 170 HP) PH 100 $ 116.00 $ 11,600.00 Track Hole(171 HP and up) PH 1 $ 125.00 $ 125.00 Rubber Tired Backhoe PH 1 $ 50.00 $ 50.00 Wheel Loader(to 150 HP) PH 100 $ 53.00 $ 5,300.00 Wheel Loader(151 HP and up) PH 100 $ 60.00 $ 6,000.00 Track Type Tractors(to 100 HP) PH 99 $ 20.00 $ 1,980.00 Track Type Tractors(101 HP and up) PH 1 $ 25.00 $ 25.00 Dump Truck(Tandem Axle) PH 1 $ 60.00 $ 60.00 Plate Tamp PH 1 $ 5.00 $ 5.00 3" Trash Pump PH 1 $ 5.00 $ 5.00 4"Double Diaphragm PH 1 $ 8.00 $ 8.00 Air Compressor(125 CFM min) PH 35 $ 11.00 $ 385.00 Well Point Pump Per Day 1 $ 90.00 $ 90.00 Well Point LF 200 $ 20.00 $ 4,000.00 4" Jet Pump Per Day 1 $ 46.00 $ 46.00 Emergency Hauling up to 2500 galllons PH 1 $ 180.00 $ 180.00 Emergency Hauling over 2500 galllons PH 1 $ 180.00 $ 180.00 5. Materials Asphalt-2"Overlay SY 100 $ 9.00 $ 900.00 3000 psi Concrete CY 100 $ 110.00 $ 11,000.00 O�Site Selected Fill CY 2 $ 3.00 $ 6.00 Limerock Base Material TN 1 $ 20.00 $ 20.00 #57 Washed Stone TN 1 $ 35.00 $ 35.00 Bahia Sod SF 1 $ 0.30 $ 0.30 City's standard manhole ring EA 1 $ 121.95 $ 121.95 City's standard manhole cover EA 1 $ 120.15 $ 120.15 Two-way Cleanouts EA 1 $ 50.00 $ 50.00 Page 5 of 7 continued: RE: Change Order 1-2009-10 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT TY UNIT COST TOTAL COST SA.Sewer Pine Realacement aer linear foot 8"Diameter PVC LF 1 $ 2.61 $ 2.61 10"Diameter PVC LF 1 $ 4.08 $ 4.08 12"Diameter PVC LF 1 $ 5.86 $ 5.86 15"Diameter PVC LF 1 $ 8.72 $ g.72 18"Diameter PVC LF 1 $ 19.38 $ 1938 20"Diameter PVC LF 1 $ 0.01 $ 0.01 21"Diameter PVC LF 1 $ 35.90 $ 35.90 24"Diameter PVC LF 1 $ 35.07 $ 35.07 30"Diameter PVC LF 59 $ 0.01 $ 0.59 36"Diameter PVC LF 1 $ 0.01 $ 0.01 8"Diameter DI LF 1 $ 27.45 $ 27.45 10"Diameter DI LF 1 $ 33.75 $ 33.75 12"Diameter DI LF 1 $ 39.60 $ 39.60 15"Diameter DI LF 1 $ 0.01 $ 0.01 18"Diameter DI LF 1 $ 55.16 $ 55.16 20"Diameter DI LF 1 $ 61.93 $ 61.93 21"Diameter DI LF 1 $ 0.01 $ 0.01 24"Diameter DI LF 1 $ 81.50 $ 81.50 30"Diameter DI LF 1 $ 91.15 $ 9115 36"Diameter DI LF 1 $ 122.85 $ 122.85 5B Force Main Renlacement aer linear foot 8"Diameter PVC LF 1 $ 5.82 $ 5.82 10"Diameter PVC LF 1 $ 8.85 $ 8.85 12"Diameter , PVC LF 1 $ 12.49 $ 12.49 15"Diameter PVC LF 1 $ OA1 $ 0.01 18"Diameter PVC LF 1 $ 28.44 $ 28.44 20"Diameter PVC LF 1 $ 35.00 $ 35.00 21"Diameter PVC LF 1 $ 0.01 $ 0.01 24"Diameter PVC LF 1 $ 50.22 $ 50.22 30"Diameter PVC LF 1 $ 78.16 $ 78.16 36"Diameter PVC LF 1 $ 115.56 $ 115.56 8"Diameter DI LF 1 $ 27.45 $ 27.45 10"Diameter DI LF 1 $ 33.75 $ 33.75 12"Diameter DI LF 1 $ 39.60 $ 39.60 15"Diameter DI LF 1 $ 0.01 $ 0.01 18"Diameter DI LF 1 $ 5516 $ 55.16 20"Diameter DI LF 1 $ 61.93 $ 61.93 21"Diameter DI LF 1 $ _ 24"Diameter DI LF 1 $ 81.50 $ 81.50 30"Diameter DI LF 1 $ 91.15 $ 91.15 36"Diameter DI LF 1 $ 122.85 $ 122.85 Total Increases Code B: $ 100,000.00 Page 6 of 7 continued: RE:Change Order 1-2009-10 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair TTEM DESCRIPTION UNIT TY UNIT COST TOTAL COST Code C:0315-96182-563700-539-000-0000 Additions• 1. Mobilization LS 2 $ 200.00 $ 400.00 2. Traffic Control(per day) PD 5 $ 40.00 $ 200.00 3. Labor Hour $ _ Foreman-regular time PH 80 $ 53.00 $ 4,240.00 Foreman-overtime PH 10 $ 63.00 $ 630.00 Operator-regular time PH 100 $ 41.00 $ 4,100.00 Operator-overtime PH 10 $ 51.00 $ 510.00 Truck Driver-regular time PH 100 $ 33.00 $ 3,300.00 Truck Driver-overtime PH 10 $ 43.00 $ 430.00 Pipe Layer-reguar time PH 100 $ 32.00 $ 3,200.00 Pipe Layer-overtime PH 10 $ 42.00 $ 420.00 Laborer-regular time PH 100 $ 29.00 $ 2,900.00 Laborer-overtime � PH 10 $ 39.00 $ 390.00 4. Equipment 1 Foreman P/U with hand tools PH 100 $ 18.00 $ 1,800.00 Job truck with tools PH 50 $ 26.00 $ 1,300.00 Tractor&Trailer(Transport) PH 50 $ 19.00 $ 950.00 Track Hole(to 100 HP) PH 10 $ 73.00 $ 730.00 Track Hole(101 HP to 170 HP) PH 10 $ 116.00 $ 1,160.00 Track Hole(171 HP and up) PH 50 $ 125.00 $ 6,250.00 Rubber Tired Backhoe PH 48 $ 50.00 $ 2,400.00 Wheel Loader(to 150 HP) PH 1 $ 53.00 $ 53.00 Wheel Loader(151 HP and up) PH 1 $ 60.00 $ 60.00 Track Type Tractors(to 100 HP) PH 1 $ 20.00 $ 20.00 Track Type Tractors(101 HP and up) PH 1 $ 25.00 $ 25.00 Dump Truck(Tandem Axle) PH 10 $ 60.00 $ 600.00 Plate Tamp PH 1 $ 5.00 $ 5.00 3" Trash Pump PH 1 $ 5.00 $ 5.00 4"Double Diaphragm PH 1 $ 8.00 $ 8.00 Air Compressor(125 CFM min) PH 1 $ 11.00 $ 11.00 Well Point Pump Per Day 1 $ 90.00 $ 90.00 Well Point LF 1 $ 20.00 $ 20.00 4" Jet Pump Per Day 1 $ 46.00 $ 46.00 Emergency Hauling up to 2500 galllons PH 1 $ 180.00 $ 180.00 Emergency Hauling over 2500 galllons PH 1 $ 180.00 $ 180.00 5. Materials Asphalt-2"Overlay SY 50 $ 9.00 $ 450.00 3000 psi Concrete CY 101 $ 110.00 $ 11,110.00 Off Site Selected Fill CY 2 $ 3.00 $ 6.00 Limerock Base Material T'N 1 $ 20.00 $ 20.00 #57 Washed Stone T'N 1 $ 35.00 $ 35.00 Bahia Sod SF 1 $ 030 $ 030 City's standard manhole ring EA 1 $ 121.95 $ 121.95 City's standard manhole cover EA 1 $ 120.15 $ 120.15 Two-way Cleanouts EA 1 $ 50.00 $ 50.00 Page 7 of 7 continued: RE: Change Order 1-2009-10 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT �TY UNIT COST TOTAL COST 5A.Sewer Pine Realacement aer linear foot 8"Diameter PVC LF 1 $ 2.61 $ 2.61 10"Diameter PVC LF 1 $ 4.08 $ 4.08 12"Diameter PVC LF 1 $ 5.86 $ 5.86 15"Diameter PVC LF 1 $ 8,72 $ g,72 18"Diameter PVC LF 1 $ 19.38 $ 19.38 20"Diameter PVC LF 1 $ 0.01 $ OA1 21"Diameter PVC LF 1 $ 35.90 $ 35.90 24"Diameter PVC LF 1 $ 35.07 $ 35.07 30"Diameter PVC LF 59 $ 0.01 $ 0.59 36"Diameter PVC LF 1 $ 0.01 $ OA1 8"Diameter DI LF 1 $ 27.45 $ 27.45 10"Diameter DI LF 1 $ 33.75 $ 33.75 12"Diameter DI LF 1 $ 39.60 $ 39.60 15"Diameter DI LF 1 $ 0.01 $ 0.01 18"Diameter DI LF 1 $ 55.16 $ 55.16 20"Diameter DI LF 1 $ 61.93 $ 61.93 21"Diameter DI LF 1 $ 0.01 $ 0.01 24"Diameter DI LF 1 $ 81.50 $ 81.50 30"Diameter DI LF 1 $ 91.15 $ 91.15 36"Diameter DI LF 1 $ 122.85 $ 122.85 SB Force Main Replacement per linear foot 8"Diameter PVC LF 1 $ 5.82 $ 5.82 10"Diameter PVC LF 1 $ 8.85 $ 8.85 12"Diameter PVC LF 1 $ 12.49 $ 12.49 15"Diameter PVC LF 1 $ 0.01 $ 0.01 18"Diameter PVC LF 1 $ 28.44 $ 28.44 20"Diameter PVC LF 1 $ 35.00 $ 35.00 21"Diameter PVC LF 1 $ 0.01 $ 0.01 24"Diameter PVC LF 1 $ 50.22 $ 50.22 30"Diameter PVC LF 1 $ 78.16 $ 78.16 36"Diameter PVC LF 1 $ 115.56 $ 115.56 8"Diameter DI LF 1 $ 27.45 $ 27.45 10"Diameter DI LF 1 $ 33.75 $ 33.75 12"Diameter DI LF 1 $ 39.60 $ 39.60 15"Diameter DI LF 1 $ 0.01 $ 0.01 18"Diameter DI LF 1 $ 55.16 $ 55.16 20"Diameter DI LF 1 $ 61.93 $ 61.93 21"Diameter DI LF 1 $ _ 24"Diameter DI LF 1 $ 81.50 $ 81.50 30"Diameter DI LF 1 $ 91.15 $ 91.15 36"Diameter DI LF 1 $ 122.85 $ 122.85 Total Additions Code C: $ 50,000.00 Total Increases/Additions Contract: $ 445,000.00