Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
FLD2002-07021A; SGN2003-01002
FLD2002-07021A; SGN2003-01002 601 OLD COACHMAN RD CLEARWATER COMMUNITY SPORTS COMPLEX & PHILLIES SPRING TRAINING FACILITY SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION iA SUBMIT 12 COPIES OF THE ORIGINAL APPLICATION including 1) collated, 2) stapled and 3) folded sets of site plans SUBMIT APPLICATION FEE $_ CASE DATE RECEIVED: RECEIVED BY (staff init alE ATLAS PAGE 4:. 2- 1 ZONING DISTRICT: C t LAND USE CLASSIFICAA It SURROUNDING USES OF PROPERTIES: NORTH: SOUTH: WEST: EAST: 5 ee adi s NOTE: 13 TOTAL SETS OF INFORMATION REQUIRED (APPLICATIONS PLUS SITE PLANS SETS) �0707- ___ 6 -SC71q Lo 0 3. 0 10 02- FLEXIBLE DEVELOPMENT APPLICATION Comprehensive Infill Redevelopment Project (Revised 11/05/02) ^- PLEASE TYPE OR PRINT- use additional sheets as necessary A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Section 4- 202.A) City of Clearwater c/o Kevin Dunbar, Director APPLICANT NAME: .Parks and Recreation Department MAILING ADDRESS: 100 S. Myrtle Avenue, Clearwater, FL 33756 -5520 E -MAIL ADDRESS: kdunbar@clearwater-fl.com CELL NUMBER: 727 -224 -7144 PROPERTY OWNER(S): AGENT NAME(S): _ MAILING ADDRESS: E -MAIL ADDRESS: CELL NUMBER: City of Clearwater (Must include ALL owners) Not applicable B. PROPOSED DEVELOPMENT INFORMATION: PHONE NUMBER: 727- 562 -4823 FAX NUMBER: 727-562 -4825 PHONE NUMBER: FAX NUMBER: STREET ADDRESS of subject site: 601 Old Coachman Road, Clearwater, Florida 2-an n I i LEGAL DESCRIPTION: Please refer to the attached legal description for the three parcels. (if not listed here, please note the location of this document in the submittal) (Exhibit A) PARCEL NUMBER: 7- 29 -16- 00000 -410 -0100 (Carpenter) 7- 29 -16- 16442 - 000 -0010 (Home Depot) 7- 29 -16- 00000 - 430 -0100 (Joe D.) PARCEL SIZE: Approx.. 17.4 acres (See location map — Exhibit B) (acres, square feet) PROPOSED USE AND SIZE: Please refer to attached Project Narrative (Exhibit C) (number of dwelling units, hotel rooms or square footage of nonresidential use) DESCRIPTION OF REQUEST(S): Please refer to the attached Exhibit C. (include all requested code deviations; e.g. reduction in required number of parking spaces, specific use, etc.) Page 1 of 7 — Flexible Development Application - Comprehensive Inf ill Redevelopment Project— City of I at f vi a t�r Planning Department N 1 00 South Myrtle Avenue U. Clearwater, Florida 33756 Telephone: 727 - 562 -4567 Fax: 727 - 562 -4865 SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION iA SUBMIT 12 COPIES OF THE ORIGINAL APPLICATION including 1) collated, 2) stapled and 3) folded sets of site plans SUBMIT APPLICATION FEE $_ CASE DATE RECEIVED: RECEIVED BY (staff init alE ATLAS PAGE 4:. 2- 1 ZONING DISTRICT: C t LAND USE CLASSIFICAA It SURROUNDING USES OF PROPERTIES: NORTH: SOUTH: WEST: EAST: 5 ee adi s NOTE: 13 TOTAL SETS OF INFORMATION REQUIRED (APPLICATIONS PLUS SITE PLANS SETS) �0707- ___ 6 -SC71q Lo 0 3. 0 10 02- FLEXIBLE DEVELOPMENT APPLICATION Comprehensive Infill Redevelopment Project (Revised 11/05/02) ^- PLEASE TYPE OR PRINT- use additional sheets as necessary A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Section 4- 202.A) City of Clearwater c/o Kevin Dunbar, Director APPLICANT NAME: .Parks and Recreation Department MAILING ADDRESS: 100 S. Myrtle Avenue, Clearwater, FL 33756 -5520 E -MAIL ADDRESS: kdunbar@clearwater-fl.com CELL NUMBER: 727 -224 -7144 PROPERTY OWNER(S): AGENT NAME(S): _ MAILING ADDRESS: E -MAIL ADDRESS: CELL NUMBER: City of Clearwater (Must include ALL owners) Not applicable B. PROPOSED DEVELOPMENT INFORMATION: PHONE NUMBER: 727- 562 -4823 FAX NUMBER: 727-562 -4825 PHONE NUMBER: FAX NUMBER: STREET ADDRESS of subject site: 601 Old Coachman Road, Clearwater, Florida 2-an n I i LEGAL DESCRIPTION: Please refer to the attached legal description for the three parcels. (if not listed here, please note the location of this document in the submittal) (Exhibit A) PARCEL NUMBER: 7- 29 -16- 00000 -410 -0100 (Carpenter) 7- 29 -16- 16442 - 000 -0010 (Home Depot) 7- 29 -16- 00000 - 430 -0100 (Joe D.) PARCEL SIZE: Approx.. 17.4 acres (See location map — Exhibit B) (acres, square feet) PROPOSED USE AND SIZE: Please refer to attached Project Narrative (Exhibit C) (number of dwelling units, hotel rooms or square footage of nonresidential use) DESCRIPTION OF REQUEST(S): Please refer to the attached Exhibit C. (include all requested code deviations; e.g. reduction in required number of parking spaces, specific use, etc.) Page 1 of 7 — Flexible Development Application - Comprehensive Inf ill Redevelopment Project— City of I at f vi C. PROOF OF OWNERSHIP: (Section 4- 202.A) ❑ SUBMIT A COPY OF THE TITLE INSURANCE POLICY, DEED TO THE PROPERTY OR SIGN AFFIDAVIT ATTESTING. OWNERSHIP (see page 6) D. 1. WRITTEN SUBMITTAL REQUIREMENTS: (Section 3- 913.A) Provide complete responses to the six (6) GENERAL APPLICABILITY CRITERIA: The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is located. Refer to Exhibit D 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. Refer to Exhibit D 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. Refer to Exhibit D 4. The proposed development is designed to minimize traffic congestion. Refer to Exhibit D 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. Refer to Exhibit D 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. Refer to Exhibit D AProvide complete responses to the ten (10) COMPREHENSIVE INFILL REDEVELOPMENT PROJECTCRITERIA (as applicable): 1. The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards. Refer to Exhibit E 2. The development of the parcel proposed for development as a comprehensive infill redevelopment project or residential infill project will not reduce the fair market value of abutting properties. (Include the existing value of the site and the proposed value of the site with the improvements.) Refer to Exhibit E Page 2 of 6 — Flexible Development Application - Comprehensive Inf ill Redevelopment Project— City of Clearwater '3. The uses within the comprehensive infill redevelopment project are otherwise permitted in the City of Clearwater. Refer to Exhibit E 4. The uses or mix of use within the comprehensive infill redevelopment project are compatible with adjacent land uses. Refer to Exhibit E 5. Suitable sites for development or redevelopment of the uses or mix of uses within the comprehensive infill redevelopment project are not otherwise available in the City of Clearwater. Refer to Exhibit E 6. The development of the parcel proposed for development as a comprehensive infill redevelopment project will upgrade the immediate vicinity of the parcel proposed for development. Refer to Exhibit E 7. The design of the proposed comprehensive infill redevelopment project creates a form and function that enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. Refer to Exhibit E 8. Flexibility in regard to lot width, required setbacks, height and off - street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. Refer to Exhibit E 9. Adequate off - street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on- street parking in the immediate vicinity of parcel proposed for development. Refer to Exhibit E 10. The design of all buildings complies with the Tourist District or Downtown District design guidelines in Division 5 of Article 3 (as applicable). Use separate sheets as necessary. Refer to Exhibit E L E,, Page 3 of 6 — Flexible Development Application - Comprehensive Infill Redevelopment Project— City of Clearwater E. SUPPLEMENTAL SUBMITTAL IUIREMENTS: (Section 4- 202.A) 3 SIGNED AND SEALED SURVEY (including dimensions of property) —One original and 12 copies; • COPY OF RECORDED PLAT, as applicable; N/A • PRELIMINARY PLAT, as required; N/A IN LOCATION MAP OF THE PROPERTY; ! TREE SURVEY (including existing trees on site and within 25' of the adjacent site, by species, size (DBH 4" or greater), and location, including drip lines and indicating trees to be removed); IN GRADING PLAN, as applicable F. SITE PLAN SUBMITTAL REQUIREMENTS: (Section 4- 202.A) If SITE PLAN with the following information (not to exceed 24"x 36 "): X All dimensions; X North arrow; X Engineering bar scale (minimum scale one inch equals 50 feet), and date prepared; X Location map; X Index sheet referencing individual sheets included in package; X Footprint and size of all EXISTING buildings and structures; X Footprint and size of all PROPOSED buildings and structures; X All required setbacks; X All existing and proposed points of access; All required sight triangles; N /A— existing drives Identification of environmentally unique areas, such as watercourses, wetlands, tree masses, and specimen N/A —None trees, including description and location of understory, ground cover vegetation and wildlife habitats, etc; X Location of all public and private easements; X Location of all street rights -of -way within and adjacent to the site; X Location of existing public and private utilities, including fire hydrants, storm and sanitary sewer lines, manholes and lift stations, gas and water lines; X All parking spaces, driveways, loading areas and vehicular use areas, including handicapped spaces; X Depiction by shading or crosshatching of all required parking lot interior landscaped areas; X Location of all refuse collection facilities and enclosures (minimum 12'x10' clear space); Location of all landscape material; N/A -refer to Landscape Plan _ Location of all jurisdictional lines adjacent to wetlands; N/A -none X Location of all onsite and offsite storm -water management facilities; X Location of all outdoor lighting fixtures; and X Location of all existing and proposed sidewalks X SITE DATA TABLE for existing, required, and proposed development, in written /tabular form: X Land area in square feet and acres; _ Number of EXISTING dwelling units and PROPOSED dwelling unit /A —not residential project X Gross floor area devoted to each use; X Parking spaces: total number, presented in tabular form with the number of required spaces; X Total paved area, including all paved parking _spaces and driveways, expressed in square feet and percentage of the paved vehicular area; _ Size and species of all landscape material; N/A -refer to Landscape Plan _ Official records book and page numbers of all existing utility epsement;NO fer to Survey Building and structure heights; N /-g �e�er .,to 4chj.; gctural �evatlons X Impermeable surface ratio (I.S.R.); and X Floor area ratio (F.A.R.) for all nonresidential uses 9 REDUCED SITE PLAN to scale (8'/2 X 11) and color rendering if possible FOR DEVELOPMENTS OVER ONE ACRE, provide the following additional information on site plan: X One -foot contours or spot elevations on site; X Offsite elevations if required to evaluate the proposed stormwater management for the parcel; X_ All open space areas; X Location of all earth or water retaining walls and earth berms; X Lot lines and building lines (dimensioned); X Streets and drives (dimensioned); X Building and structural setbacks (dimensioned); X Structural overhangs; X Tree Inventory; prepared by a "certified arborist ", of all trees 8" DBH or greater, reflecting size, canopy (drip lines) and condition of such trees Page 4 of 6 — Flexible Development Application - Comprehensive Infill Redevelopment Project— City of Clearwater G. LANDSCAPING PLAN SUBMIT "i . REQUIREMENTS: (Section 4- 1102.A) Y3 LANDSCAPE PLAN: X_ All existing and proposed structures; X_ Names of abutting streets; _ Drainage and retention areas including swales, side slopes and bottom elevationsxefer to Site Plan X_ Delineation and dimensions of all required perimeter landscape buffers; _ Sight visibility triangles;N /A- existing drives X Delineation and dimensions of all parking areas including landscaping islands and curbing; Proposed and required parking spaces; refer to Site Plan X Existing trees on -site and immediately adjacent to the site, by species, size and locations, including dripline (as indicated on required tree survey); X_ Location, size, description, specifications and quantities of all existing and proposed landscape materials, including botanical and common names; X Typical planting details for trees, palms, shrubs and ground cover plants including instructions, soil mixes, backfilling, mulching and protective measures; Interior landscaping areas hatched and /or shaded and labeled and interior landscape coverage, expressing in both square feet and percentage covered; Conditions of a previous development approval (e.g. conditions imposed by the Community Development Board); N/A X Irrigation notes REDUCED LANDSCAPE PLAN to scale (8' /z X 11) (color rendering if possible) J IRRIGATION PLAN (required for Level Two and Three applications) N/A ❑ COMPREHENSIVE LANDSCAPE PROGRAM application, as applicable N/A H. STORMWATER PLAN SUBMITTAL REQUIREMENTS: (City of Clearwater Design Criteria Manual and 4- 202.A.21) :] STORMWATER PLAN including the following requirements: X Existing topography extending 50 feet beyond all property lines; X_ Proposed grading including finished floor elevations of all structures; X All adjacent streets and municipal storm systems; X— Proposed stormwater detention /retention area including top of bank, toe of slope and outlet control structure; X Stormwater calculations for attenuation and water quality; X Signature of Florida registered Professional Engineer on all plans and calculations ffi COPY OF PERMIT INQUIRY LETTER OR SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT (SWFWMD) PERMIT SUBMITTAL (SWFWMD approval is required prior to issuance of City Building Permit), if applicable ❑ COPY OF STATE AND COUNTY STORMWATER SYSTEM TIE -IN PERMIT APPLICATIONS, if applicable N/A I. BUILDING ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Section 4- 202.A.23) Required in the event the application includes a development where design standards are in issue (e.g. Tourist and Downtown Districts) or as part of a Comprehensive Infill Redevelopment Project or a Residential Infill Project. N BUILDING ELEVATION DRAWINGS – all sides of all buildings including height dimensions, colors and materials �I REDUCED BUILDING FAEVAII and –four nave nor, noLs and m�een to scale to 11) (black and white and color rendering, if possible) as required Y ain J. SIGNAGE: (Section 4- 202.A.16) M Comprehensive Sign Program application, as applicable (separate application and fee required)TO` -ire filed at a later date ❑ Reduced signage proposal (8 % X 11) (color), if submitting Comprehensive Sign Program application N/A K. TRAFFIC IMPACT STUDY: (Section 4- 202.A.13 and 4- 801.C) 2S Include as required if proposed development will degrade the acceptable level of service for any roadway as adopted in the Comprehensive Plan. Trip generation shall be based on the most recent edition of the Institute of Transportation Engineer's Trip General Manual. Refer to Section 4 -801 C of the Community Development Code for exceptions to this requirement. Page 5 of 6 – Flexible Development Application - Comprehensive Infill Redevelopment Project– City of Clearwater FILE COPY. L. SIGNATURE: I, the undersigned, acknowledge that all representations made in this application are true and accurate to the best of my knowledge and authorize City representatives to visit and photograph the property described in this application. nature of property owner or represe M. AFFIDAVIT TO AUTHORIZE AGENT: (Names of all property owners) STATE OF FLORIDA, COUNTY OF PINELLAS Sworn to and subscribed before me this '•�day of A. D. 2004 to me and /or by E�. !� � [.j ,f' y __.. who is personally known has produced �;., as identification. 19 ' My; p Mary p. t:r essmon MMISslom SpnDEDTHRU "ry9, 2005 j btu 27 f%fpl "0yFA1NINS0P Notary publigj, INS My commission expires: 1. That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location): 2. That this property constitutes the property for which a request for a: (describe request) 3. That the undersigned (has /have) appointed and (does /do) appoint: as (his /their) agent(s) to execute any petitions or other documents necessary to affect such petition; 3. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 4. That the applicant acknowledges that all impact fees (parks and recreation, traffic, etc.) will be paid PRIOR to the issuance of a building permit, certificate of occupancy, or other mechanism, whichever occurs first; 5. That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City representatives to visit and photograph the property described in this application; 6. That (1 /we), the undersigned authority, hereby certify that the foregoing is true and correct. Property Owner Property Owner STATE OF FLORIDA, COUNTY OF PINELLAS Before me the undersigned, an officer duly commissioned by the laws of the State of Florida, on this day of personally appeared who having been first duly sworn Deposes and says that he /she fully understands the contents of the affidavit that he /she signed. My Commission Expires: Notary Public SARanning DepartmentlApplication Formsldevelopment review lcomprehensive infill applicationZdoc F IL E V 0 r Page 6 of 6 — Flexible Development Application - Comprehensive Infill Redevelopment Project— City of Clearwater EXHIBIT A Home Depot Site: Lot 1, THE CLEARWATER COLLECTION SECOND REPLAT, according to the plat thereof recorded in Plat Book 107, pages 24 and 25, Public_ Records of Pinellas County, Florida. TOGETHER WITH rights of ingress and egress as reserved in Warranty Deed recorded in Official Records Book 1479, page 95, Public Records of Pinellas County, Florida. TOGETHER WITH non - exclusive easements. for ingress and egress, the passage and parking of vehicles, the passage and accommodation of pedestrians, separate and common utility lines, construction, reconstruction, development, erection, removal and maintenance of building components and other matters over, on and under the land described in, and all as more particularly created, defined, located and limited in: (1) that certain Operation and Reciprocal Easement Agreement recorded in Official Records book 6440, page 2013; (2) Amendment to and Ratification of Operation and Reciprocal Easement agreement recorded in Official Records Book 6735, page 217; (3) Third Amendment to an Operation and Reciprocal Easement agreement recorded in Official Records Book 6921, page 129; (4) unrecorded Third Amendment dated July 17, 1990, as referred to in the Fourth Amendment to an Operation and Reciprocal Easement Agreement recorded in Official Records. Book 7541, page 849 which was re- recorded in Official Records Book 7561, page 2125; 1 (5) Fourth Amendment to an Operation and Reciprocal Easement Agreement recorded in Official Records Book 7541, page 849 which was re- recorded in Official Records Book 7561, page 2125; and (6) Fifth Amendment to Operation and Reciprocal Easement Agreement recorded in Official Records Book 9664, page 451, Public Records'-of Pinellas County, Florida; TOGETHER WITH non - exclusive easement rights as granted by Parking and Driveway Easement recorded in Official Records Book 6440, page 2002, as amended by Amended Parking and Driveway Easement recorded in Official Records Book 6735, page 212, Public Records of Pinellas County, Florida. TOGETHER WITH a non - exclusive easement as Drainage Easement Agreement recorded in Official 2190, Public Records of Pinellas County, Florida. A -1 described in that certain Records Book 6618, page f �, i LESS AND EXCEPT those portions of the above easement properties which lie within the properties taken, in fee simple, designated as Parcels 111 and 123 by Eminent Domain Suit No. 99- 4965 -CI, as evidenced by that Lis Pendens recorded in Official Records Book 10598, page 2406; Stipulated Order of Taking & Final Judgment recorded in Official Records Book 10714, page 617; and stipulated Order of Taking and final Judgment recorded in Official Records Book 10714, page 620; Stipulated Order of Taking and Partial Final Judgment recorded in Official Records Book 10714, page 624; Stipulated Order of Taking and Final Judgment recorded in Official Records Book 10714, page 628; Order of Taking recorded in Official Records Book 10741, page 2041; Stipulated Final Judgment recorded in Official Records Book 11611, page 1495 and Amended Order of Taking and Stipulated Final Judgment recorded in Official Records Book 11704, page 1408, Public Records of Pinellas County, Florida. LESS AND EXCEPT those portions of the above easement properties which lie within the properties taken, in fee simple, designated as Parcel 119 by Eminent Domain Suit No. 99- 5089 -CI, as evidenced by that Lis Pendens recorded in Official Records Book 10604, page 2207; Stipulated Order of Taking and Final Judgment recorded in Official Records Book 10662, page 353 and Stipulated Order of Taking and Final Judgment recorded in Official Records Book 10874, page 2276, Public Records of Pinellas County, Florida. LESS AND EXCEPT that portion of said Lot 1 taken, in fee simple, designated as PARCEL 120 by Eminent Domain Suit No. 99- 4965 -CI, as evidenced by that Lis Pendens recorded in Official Records Book 10598, page 2406; Stipulated Order of Taking & Final Judgment recorded in Official Records Book 10714, page 617 ;. and Stipulated Order of Taking and Final Judgment recorded in Official. Records Book 10714, page 620; Stipulated Order of Taking and Partial Final Judgment recorded in Official Records Book 10714, page. 624; Stipulated Order of Taking and Final Judgment recorded in Official Records Book 10714, page 628; Order of Taking recorded in Official Records Book 10741, page 2041; Stipulated Final Judgment recorded in Official Records Book 11611, page 1495 and Amended Order of Taking and Stipulated Final Judgment recorded in Official Records Book 11704, page 1408, Public Records of Pinellas County. A -2 Bomber Field: That portion of the northeast 1/4 of the southeast 1/4 of Section 7, Township 29 South, Range 16 East, Pinellas County, Florida, being further described as follows: BEGIN at the northwest corner of Lot 1, THE CLEARWATER COLLECTION SECOND REPLAT according to the plat thereof as recorded in Plat Book 107, Pages 24 and 25 of the Public Records of Pinellas County, Florida; thence along the north line of said plat, also being the south line of the northeast 1/4 of the southeast 1/4 of Section 7, Township 29 South, Range 16 East, N 89 °47'45 "W., 247.55 feet to the northwest corner of THE CLEARWATER COLLECTION SECOND REPLAT; thence leaving said line, N 00 046'44 "E., 436.73 feet along a line 175.00 feet east of and parallel with the center line of Florida Power Corporation's HIGGINS - DISSTON 110 KV transmission line; thence leaving said line, S 89 °47'45 "E, 102.60 feet; thence S 67 002'37 "E., 116.88 feet; thence S.89 04745 "E., 790.19 feet to the west right of way line of U.S. HIGHWAY 19 (STATE ROAD 55, right of way width varies); thence along said right of way line the following two (2) courses, S.00 °57'56 "W., 311.95 feet; thence S.05 027'56 "W., 79.92 feet to the north line of the aforesaid THE CLEARWATER COLLECTION SECOND REPLAT; thence along said line S.89 047'45 "W., 745.73 feet to the POINT OF BEGINNING. Containing 9.148 Acres, more or less. A -3 Joe DIMaggio Sports Complex — Legal Description A parcel of land within the Southwest '/ of the Southeast '/4 of Section 7, Township 29 South, Range 16 East, Pinellas County, Florida and being further described as follows: Commence at the Southwest corner of the Southeast'/ of said Section 7; thence along the West line of said Southeast '/4 North 00 141'47" East, for 50.00 feet to the North right -of -way line of Drew Street; thence along said right -of -way line South 89 140'19 "East for 542.36 feet to the Point of Beginning; thence leaving said line North 00 141'47" East, for 435.00 feet; thence South 89 040'19" East, for 761.22 feet to the West right -of -way line of Old Coachman. Road; thence along said right -of -way line South 00 °47'54" West, for 435.00 feet to the intersection with said North right -of -way line of Drew Street; thence along said right -of -way line North 89 140'19" West for 760.45 feet to the Point of Beginning. Containing 330,959 square feet or 7.60 acres, more or less •MI Commence at the Southwest corner of the Southeast'/ of said Section 7; thence along the West line of said Southeast % North 00 041'47" East, for 485.00 feet to the Point of Beginning; thence continue along said line North 00 041'47" East, for 823.27 feet to the South right-of-way line of Sharkey Road (CR 289); thence along said right -of -way line South 89 153'02" East, for 1,305.10 feet to the intersection, with the West right -of -way line of Old Coachman Road; thence along said right -of -way line South 00 04754" West, for 828.12 feet; thence .leaving said line North 89 °40'19" West, for 1,303.58 feet to the Point of Beginning. 7- 23 -02; 3:16PM;PARK= and REC:REA.110H EXHIBIT B Location Neap E C- U O U ON t Gdrpe- er aefes 3a .30 e.f V'\ e'\ d 50rnb dcfes 9 Drew Street �4 3 ae� es g•2 , tGrJOC'toGV ++ v, v ...,fIIIIII �� iIIIIIi,... This Is Not A Survey Not To Scale r U) CITY OF CLEARWATER, FLORIDA PUBLIC WORKS ADMINISTRATION ENGINEERING OdaNO Bem�ec I'ras cwc «co e• PROPOSED to r,c.re. PHILLIES STADIUM t cv t 07/22/2002 EXHIBIT C Project Narrative Section B — Proposed Development Information: Proposed Use and Size The Community Sports Complex will include: (1) an open air, natural grass ballpark stadium, meeting first class Major League Baseball spring training standards, with approximately 7,000 fixed seats (including premium seating and group areas), and an outfield berm seating area accommodating approximately 1,000 fans. Also included in the project scope are home and visitor clubhouse facilities, batting tunnels, team office space (for both Major League and Florida operations), kids' play area, concessions and food court, security office, first aid facility, novelties store /stands, press box and broadcasting facilities; (2) one full -size lighted practice field; (3) one practice infield; and (4) approximately 100 VIP /Player /Staff parking spaces near the clubhouse and 280 reserved spaces (south of Home Depot). Description of Requests: '0: :110* 391120- This parcel of land has been classified as a Comprehensive Infill Project, where setbacks are not specified. Following is an explanation of setbacks provided: Primarily because of a large existing retention pond that runs parallel with US 19, the west side of this parcel is provided with almost 200 feet of setback from US 19. The south side of the site adjoins an existing parking lot, retention pond, and service drive. New construction adjacent to these elements (within 10 feet of the property line) is a parking lot, landscaped areas and sidewalks — an extension of already existing site elements. The west side of the site adjoins the Florida Power right -of -way. A practice field, including fence and netting, must be constructed all the way up to this property line because of the limited land area of this parcel. However, because no other building can be constructed in this right -of -way and the property line on the west side of the site is 250' from the centerline of Coachman Road, fencing and netting will be over 200' from the edge of pavement of this road. The north side of the site is adjacent to the existing Carpenter Complex practice fields. A portion of this property line will be nearly abutted by an access driveway, sidewalk, and batting tunnels. However, this should not be considered detrimental as both are City -owned properties and because of the close functional relationship and interaction between the Carpenter Complex and this new facility. BUILDING HEIGHT The building height of this complex is being driven by a number of issues: • Required Functional / Program Relationships — Clubhouse / Locker Room spaces for this type of facility are typically located on the lowest level, close to the field level and dugouts. Many of these spaces also require a minimum of 10 -feet clear ceiling height. r ` Fan amenities, such as toilets, concessions, novelty and tickets, are located on a main concourse level, ideally overlooking the field and convenient to all parts of the seating bowl and entries. Press, TV /radio, suites, and team office spaces require location well above the field and bowl to ensure the best views of the entire field. • Land Area — Because of the area of this parcel of land, the program relationships. defined above dictate the building will be on three levels. • Flood Zone / Seasonal High Groundwater Table — Because the seasonal high ground - ater table is only one to two feet below grade and the 100 -year flood elevation is at elevation 24, the lowest finished floor of the sports complex must be set above elevation 24. Existing grades on the site vary between 20 and 27. Due to the factors noted above, compounded by additional space required for structure, mechanical systems, site lines, slab and roof slopes, the bulk of the building will be +/- 40 feet above existing grade. Tower elements have been designed to highlight elevators, stairs and main entries — making them easily identified and located. These vary in height up to 49 feet above existing grade. The proposed scoreboard building will have two catwalk/interior levels of approximately 284 sq. ft. each that provide access to the video board and scoreboard equipment, and an air conditioning equipment mezzanine above. In order to be visible above the heads of berm patrons and legible across the ballpark, the uppermost point of the scoreboard building will be +/- 70 feet above the playing field. Other tall elements specific to baseball are also provided on site: • The batter's eye is required to be 40 -feet high by the PBA (Professional Baseball Association). • Backstops, netting and fencing to keep baseballs in play and to protect pedestrians and vehicles in the area may be as much as 50 feet high. Field lights will be as high as 156 feet above the field in order to meet PBA requirements for lighting criteria on the field, to be comparable with other similar facilities, and to satisfy requirements of local media for televised games. Spill light shall be controlled by a combination of the fixtures being installed with internal glare /spill light control louvers and aiming. Initial spill light readings, taken at 200 feet behind the field lighting poles, shall not exceed the following values for vertical and horizontal measurement: 2 Foot - candles — Vertical; 1 Foot - candle — Horizontal. :0al =311x91 WRITTEN SUBMITTAL REQUIREMENTS: (Section 3- 913.A) Provide complete responses to the six (6) GENERAL APPLICABILITY CRITERIA: 1. The proposed development of land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is located. The existing site is located near the busy intersection of US 19 and Drew. South of the site is a dense commercial district including shopping centers, restaurants, and multi -story office buildings. North of the site is the existing Carpenter Complex (Phillies Spring Training practice fields). Although the actual footprint of this facility will be larger than many individual commercial establishments in the existing area, the varying building heights of the stadium will integrate well with the high profile intersection and multi -story buildings in the area. In addition, an attractive visual and functional link will be opened up between the commercial area and the Carpenter Complex by combining multi -story built space with expansive amounts of green space provided by the stadium field, the practice field, and the outfield earth berm. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. This project brings to the City the ability to enhance the existing urban setting to provide more opportunities for and the better facilitation of major public gatherings. It will expand upon the tourism and family- oriented activity generated by the existing spring training venue at the Carpenter Complex. The ballpark will be integrated with new public open space, plans for future bike trails /pedestrian ways and mixed -use development, and serve as a component to further growth in the area. We anticipate that this project will enhance the Carpenter Complex and the adjacent shopping center by consolidating the practice fields and stadium in one convenient location, increasing revenues and creating a lively atmosphere in the area. 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. The stadium and its site will be organized as a single, comprehensive system. Careful facilitation of the design will include understanding and responding to diverse community goals and needs. We feel that this facility can only enhance, not deter, the health of area residents by introducing an inviting pedestrian- oriented environment and through the creation of bike trails, sidewalks and traffic improvements planned for associated City properties (including Joe DiMaggio) and Florida Power right -of -way. 4. The proposed development is designed to minimize traffic congestion. The need to provide convenient, easily understandable and non - threatening traffic solutions is of great importance for projects of this nature. By taking into'consideration all the required site elements; i.e., parking, traffic circulation, concessionaire's services, trash, and pedestrian access, the plan allows for simple drop -off zones, park and walk areas and pedestrian circulation — all aimed at reducing and facilitating movement of traffic in the stadium vicinity. In addition, a study of the potential impact of the proposed ballpark on the adjacent trafficways has been performed by the City, and plans for implementing improvements in the area are already underway as part of another project. See attached Traffic Study prepared by Florida Design Consultants, Inc. 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. Careful consideration has been given to the parameters of this site, its interface with the adjacent community and physical setting. The interior and exterior environments are integrated into a single functional system. The hip roofs reflect elements found in the neighborhood to the west and the massing, stucco, and character of the exterior fagade have been inspired by the special characteristics of existing Clearwater architecture. See attached architectural exterior elevations 6. The design of the proposed development minimizes adverse effects, including visual acoustic and olfactory and hours of operation impacts, on adjacent properties. Shields are utilized on ballpark lights to minimize light overflow into adjacent areas, and. the sound system is designed to direct acoustic activity within the stadium. As a result, affects on adjacent properties are minimal. The sports complex is distanced from Coachman, thus reducing the noise in surrounding neighborhoods. The ballpark will be cleaned up and maintained after each event, and no offensive odors are associated with this type of facility. V � L E IC col P V EXHIBIT E Provide complete responses to the ten (10) COMPREHENSIVE INFILL REDEVELOPMENT PROJECT CRITERIA (as applicable): 1. The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards. Because of this site's location behind the existing shopping center and large setback from Coachman, it does not have frontage or access to make it an especially desirable commercial location. The mixed district classifications across the parcel (commercial/ preservation /and outdoor recreation) also make the site difficult to develop. However, the development of a stadium /ballpark is well suited for the location, enhancing the functionality of the Carpenter Complex and bridging the gap between the Carpenter Complex and the adjacent commercial establishments. This development is not possible, however, without some deviations from the existing development standards of the various districts on the site. 2. The development or redevelopment of the parcel proposed for development as a comprehensive infill redevelopment project or residential infill project will not reduce the fair market value of abutting properties (include the existing value of the site and the proposed value of the site with the improvements). We believe this development will increase the value of the shopping center, commercial properties and vacant properties in the vicinity by bringing more people and more revenue - generating opportunities into the area. The existing value of the site is estimated to be $4,951,500. After the proposed community sports complex is constructed, the estimated value is projected to be $21,602,000 - $23,602,000. 3. The uses within the comprehensive infill redevelopment project are otherwise permitted in the City of-Clearwater. Jack Russell Stadium and multiple ballparks already exist throughout the City of Clearwater. 4. The uses or mix of use within the comprehensive infill redevelopment project are compatible with adjacent land uses. Our proposed use for the land blends well with existing retail, sports and educational facilities in the area. 5. Suitable sites for development or redevelopment of the uses or mix of uses within the comprehensive infill redevelopment project are not otherwise available in the City of Clearwater. Although other sites were explored, this site is the most desirable because of its proximity to the Carpenter Complex, size, accessibility and high - profile location. The location and HLE CG`R� orientation of the stadium will have a significant impact on the project's success. We have taken into consideration broad site - planning issues such as: quality of pedestrian experience, relationship to adjacent existing buildings, efficient infrastructure strategies, organization of parking, roadways and transit features, integration of stadium within the neighborhood, security, access for services and media, availability of development parcels and impact of sequential demolition /relocation of existing features. 6. The development of the parcel proposed for development as a comprehensive infill redevelopment project will upgrade the immediate vicinity of the parcel proposed for development. This project will improve the aesthetics of the area, increase the value of adjacent commercial property, and upgrade amenities associated with the Carpenter Complex. 7. The design of the proposed comprehensive infill redevelopment project creates a form and function that enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. This project brings to the City the ability to enhance the existing urban setting to provide more opportunities for, and the better facilitation of, major public gatherings. It will expand upon the tourism and family- oriented activity generated by the existing spring training venue at the Carpenter Complex. The ballpark will be integrated with new public open space, plans for future bike trails /pedestrian ways and mixed -use development, and serve as a component to further growth in the area. This project will enhance the Carpenter Complex and the adjacent shopping center by consolidating the practice fields and stadium in one convenient location, increasing revenues and creating a lively atmosphere in the area. 8. Flexibility in regard to lot width, required setbacks, height and off - street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. Because of the advantages noted in item 7 above, the development of this parcel into a community sports complex will provide great benefit both to the immediate vicinity and to the City of Clearwater. Required setbacks must be waived in order to physically fit this complex on the site. However, since the parcel is bounded on all sides by a parking lot, shopping center, Carpenter Complex and retention ponds, the impact will be negligible. Height restrictions for commercial and outdoor recreation districts of 25 to 30' would simply not allow a stadium to be constructed on this parcel given the available land area, the seasonal high groundwater elevation, and the 100 -year Flood Zone elevation. See item 9 below for parking commentary. V E C [� �,� 9. Adequate off - street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on- street parking in the immediate vicinity of parcel proposed for development. An off - street parking formula is not available for a facility of this type in Clearwater. The City has, therefore, requested that information on comparable facilities be provided for comparison. Roger Dean Stadium in Jupiter, Florida, is a spring training facility with a 7,000 -seat stadium. 1,500 patron parking spaces are provided on site (4.6:1 ratio). Another new spring training facility currently under construction in Surprise, Arizona, has a 10,500 - seat stadium, with 1,800 patron parking spaces provided on site (5.8:1 ratio). The plans for the proposed sports complex in Clearwater include a 142 space VIP patron parking area on site, with an additional +/- 406 spaces immediately adjacent in the Florida Power right -of- way, and +/- 1,100 St. Petersburg College spaces identified on the northwest side of the intersection of Coachman and Drew Street. (Total of +/- 1,652 spaces, 4.8:1 ratio). 10. The design of buildings complies with the Tourist District or Downtown District design guidelines in Division 5 of Article 3 (as applicable). Use separate sheets as necessary. Not applicable. 11 LL Planning Department o 100 South Myrtle Avenue _o Crwater a Clearwater, Florida 33756 Telephone: 727-562-4567 Fax: 727-562-4865 G/ SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION [� SUBMIT ONE (1) COPY OF THE FOLDED PLANS (see C and D below) SUBMIT APPLICATION FEE $ 300.00 / L 9 SVy C� Supplement to CASE #: SGN ! t? O .� - 0 10 DATE RECEIVED: ( 'J -f� RECEIVED BY (staff initials): W.W ATLAS PAGE #: ?_- 5 6 0 ZONING DISTRICT: C LAND USE p CLASSIFICATION: Cc o ids COMPREHENSIVE SIGN PROGRAM APPLICATION (Revised 05130/02) -PLEASE TYPE OR PRINT GENERAL PRINCIPLES: The intent of the Comprehensive Sign Program is to provide private property owners and businesses with flexibility to develop innovative, creative and effective signage and to improve the aesthetics of the City of Clearwater. This program provides an alternative to minimum standard signage subject to flexibility criteria which ensure that signage will not have an adverse impact on the aesthetics, community character and quality of life of the City of Clearwater. A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Code Section 4 -1001) PROJECT ADDRESS: 601 Old Coachman Road, Clearwater, FL 33765 APPLICANT NAME: City of Clearwater MAILING ADDRESS: 100 S. Myrtle Avenue, Clearwater, FL 33756 PHONE NUMBER: 727 - 562 -4823 711+ FAX NUMBER: 727 -562 -4825 PROPERTY OWNER(S): City of Clearwater (Must include ALL owners) AGENT NAME: (Contact Person) N/A MAILING ADDRESS: PHONE NUMBER: FAX NUMBER: Check if AGENT is Contractor ❑ Sign Contractor Name: State License Number: B. PROOF OF OWNERSHIP: (Code Section 4- 202.A.5) ❑ SUBMIT A COPY OF THE TITLE INSURANCE POLICY, DEED OR AFFIDAVIT ATTESTING TO THE OWNERSHIP OF THE PROPERTY (included herein in subsection F) C. SIGN PLAN AND ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Code Sections 4 -1001 and 4- 202.A.23) ❑ SIGN PLAN with the following information (not to exceed 24" x 36 "): xx All dimensions; xx Bar scale and date prepared; xx Detailed, colored drawing(s) of all proposed signs including: height, area, text/copy, materials and colors; xX Calculations used to determine area and height of all signs; j�qZA Details of all existing signs on parcel (indicate if existing signs are to remain with this proposal) including height, dimensions and area; * Illumination details including type, placement, intensity and hours of illumination, and area of signs to be illuminated. *See attached documentation. BUILDING ELEVATION DRAWINGS - all sides of buildings with proposed and existing attached signage including facade direction, height dimensions, colors and materials. Page 1 of 4 - Comprehensive Sign Program Application - City of Clearwater D. SITE PLAN SUBMITTAL. ..:QUIREMENTS: (Code Section 4 -1001 & .section 202) ❑ SITE PLAN with the following information. (not to exceed 24"x 36 "): XX- All dimensions; XX North arrow; XX Engineering bar scale (minimum scale one inch equals 50 feet), and date prepared; XX Location map; XX Footprint and size of all buildings and structures; *_%_ All required five foot setbacks as measured from property line; * *See attached documentation. XX All existing and proposed points of.access; XX All required sight triangles; XX Location of all public and private easements; XX Location of all street rights -of -way within and adjacent to the site; XX Location of all existing and proposed sidewalks; XX Lot frontage on all street rights -of -way; XX Location of all freestanding (including directional) signs proposed and existing (indicate whether to be removed); XX Location of all attached signs, proposed and existing (indicate whether to be removed). ❑ DATA TABLE for existing, permitted, and proposed signs and development, in written /tabular form:' XX Land area in square feet and acres; XX' Lot frontage on all street rights -of -way; Square- footage of building facades facing adjacent street rights -of -way; Number and area of attached signs on parcel; XX Number and area of freestanding signs on parcel. E. WRITTEN SUBMITTAL REQUIREMENTS: (Code Section 3- 1807.C) , Signage proposed as pan` of a Comprehensive Sign Program may deviate,from the minimum sign standards in terms of numbers of signs per business or parcel of land, maximum area of sign face per parcel of land and the total area of sign faces per business or parcel of land, subject to compliance with the flexibility criteria outlined below. Monument signs, pursuant to Sections 3- 1806.13.1.8 and 3- 18068.2 shall not be eligible for this program. As part of the program, all sign types (freestanding, attached, windows, interior site directional, etc.) shall be reviewed for the business and/or the development parcel to achieve compliance in so far as possible with these current regulations. A master sign program for shopping centers, including all out parcels, and office complexes shall include all types of signs for all tenants/uses within the development parcel. These will be reviewed as a Comprehensive Sign Program application. All existing and proposed signs must be architecturally integrated into the. design of the building and/or site using similar and coordinated design and style features, materials and colors, etc. Attached signs shall be horizontally and vertically proportionately located on each facade with no protrusions above roof lines, over windows, trim, cornices or other building features. ❑ Provide complete responses to the COMPREHENSIVE SIGN PROGRAM CRITERIA including how the criteria are met: 1. Architectural Theme. The design, character, location and /or materials of all freestanding and attached ' signs proposed in .a comprehensive sign program shall be demonstrably more attractive than signs otherwise permitted on the parcel proposed for development under the minimum signs standards. All signs must be architecturally integrated into /with the design of the building and /or site using similar and coordinated design features, materials and colors, etc. 00 -7-2111111 ME Z OST21 Mr. 10�1 =1 2. Height. The height of all freestanding signs proposed through the Comprehensive Sign Program shall relate to the design of the sign and shall not exceed 14 feet in height. See attached documentation. 3. Lighting. Any lighting proposed as a part of a Comprehensive Sign Program is automatically controlled so that the lighting is turned off when the business is closed. See attached documentation. Page 2 of 4 - Comprehensive Sign Program Application - City of Clearwater M 4. Total Area of Sign Faces. Height, 1+rea, Number and Location of Signs. The he,ynt, area, number and location of signs permitted through the Comprehensive Sign Program shall be determined by the Community Development Coordinator based on the following criteria: overall size of site, relationship between the building setback and sign location, frontage, access and visibility to the site, intended traffic circulation pattern, hierarchy of signage, scale and use of the project, and submittal of a master sign plan for the development parcel /project. Additionally, the maximum permitted sign area shall be based on the following formula when evaluated against the above criteria: Attached signs — The maximum area permitted for attached signage shall range from one percent up to a maximum of six percent of the building fagade to which the sign is to be attached. ii. Freestanding signs — The maximum permitted area of all freestanding signs on a site shall not exceed the range of sign area permitted by the street frontage or building fagade calculation methods set forth in Section 1806.B.1.c.i. and ii. See attached documentation. 5. Community Character. The signage proposed in the Comprehensive Sign Program shall not have an adverse impact on the community character of the City of Clearwater. See attached documentation. 6. Property Values. The signage proposed in the Comprehensive Sign Program will not have an adverse impact on the value of the property in the immediate vicinity of the parcel proposed for development. See attached documentation. 7. Elimination of Unattractive Signage. The signage proposed in a Comprehensive Sign Program will result in the elimination of existing unattractive signage or will result in an improvement to the appearance of the parcel proposed for See atetpgCr nhincfom&gns na c signs otherwise permitted under the minimum sign standards, 8. Special Area or Scenic Corridor Plan. The signage proposed in the Comprehensive Sign Program is consistent with any special area or scenic corridor plan which the City of Clearwater has prepared and adopted for the area in which the parcel proposed for development is located. N/A Page 3 of 4 —Comprehensive Sign Program Application —City of Clearwater HLE C F. AFFIDAVIT TO AUTHORIZE AGENT /ATTESTING TO OWNERSHIP: (Code Section 4- 202.1) City of Clearwater (Names of all property owners) the city is 1. That ?;ya?fiYvY&W the owner(K) and record title holder(s) of the following described property (address or general location): 601 Old Coachman Road, Clearwater, FL.33765 2. That this property constitutes the property for which a request for a: (describe request) Comprehensive Sign Program 1 That the undersigned (has/have) appointed and (does /do) appoint: N/A as (his /their) agent(s) to execute any petitions or other documents necessary to affect such petition; 4. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 5_ That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City representatives to visit and photograph the property ,described in this application; 6. That (I/AZ, the undersigned authority; herebycertify.that the foregoing is true and acc ztg to the best of my /ourknowledge. By: Propeffy Owner Kevin E. Dunbar, Director. Property Owner Parks &. Recreation Department STATE OF FLORIDA, COUNTY OF PINE -LAS Before me the undersigns an officer duly commissioned by the laws of the State of Florida, on this 30 h day of J � Personally appeared K P y I n � V n RA 0 who having been first duly swam Deposes and says that he /she fully understands the contents of the affidavit that he /she signed. Notary Public My Commission Expires: Mary P. Cressman *; r MY COMMISSION # CC993927 . EXPIRES February 9, 2005 A' the BONDED THRU TROY FAIN INSURANCE, INC S:1Planning DepartmentlApplication Form sldevelopment review lComprehensive Sign Program 2002 .doc Page 4 of 4 —Comprehensive Sign Program Application —City of Clearwater HLE C Or" V COMPREHENSIVE SIGN PROGRAM APPLICATION Additional Documentation March 19, 2003 C. SIGN PLAN AND ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Code Sections 4 -1001 and 4- 202.A.23) Illumination details including type, placement, and intensity have not yet been included in this application, other than whether sign shall be internally or externally illuminated. Internal illumination shall likely either be fluorescent or neon. External illumination shall be via ground- mounted lamp. Illumination details shall be developed by the sign fabricator and coordinated with the architect and City of Clearwater prior to installation. E. WRITTEN SUBMITTAL REQUIREMENTS: (Section 3- 1807.C) . Architectural Theme. The exterior design of the new sports complex itself has been inspired by the special characteristics of existing Clearwater architecture and the curving, free flowing lines of Florida vegetation and palm trees. In like manner, the freestanding and attached signs proposed have been designed to compliment and reflect the architectural character of the new sports complex as well as the tradition of baseball. The use of stucco, masonry, custom metal details, colors, curving lines and leaf motif which are integral parts of the building design are repeated in the signage /graphics proposed for the complex, actually enhancing and becoming a part of the exterior design of the complex. 2. Height. Per telephone conversation with Lynn Isaak, P.E. with the Florida Department of Transportation, the future overpass at the intersection of Drew and US 19 will be approximately at elevation 60 (compared to a current elevation of +/ -34). From this point it will slope back down to intersect the existing road elevation ( +/ -29) approximately 1300' north. Interpolating between these two numbers the highest point of the roadway within the property lines of the sports complex would be + /- elevation 45. The height of the freestanding sign proposed on the east side of the sports complex, based upon the roadway elevations, will be 14' above this highest point of the proposed roadway. 3. Lighting. Lighting will comply with Code requirements. 4. Total Area of Sign Faces. a. Per attached Data Table, the area of all attached signs are well under the allowable 6 percent of the building facade to which the signs are attached, including the attached sign on the north side of the scoreboard building (2.2% of the overall stadium northern building fagade). b. Based on section 3 -1806 B.1c.i, the maximum area of a freestanding sign face on the east facade shall not exceed 779 s.f. The area of the proposed Type X8 freestanding sign is 143 s.f. c. Because there are two major entries to the new sports complex (one on US 19 and one on Coachman) a variance is requested to allow a monument sign at the west If T s entry in addition to the freestanding sign at the east entry off US 19. The area of the proposed Type X9 monument sign is 34.5 s.f. - substantially less than the 181 s.f. sign that would be permitted based on the lot frontage on the west elevation. d. There are a total of 24 banners proposed on light poles along the south and west sides of the stadium. These banners count as freestanding signage, totaling 264 s.f. e. Also, note that the total area of the X8 and X9 signs and the 24 banners is only 441.5 s.f. — even less than the allowable sign area for the west side alone! 5.Community Character. As described in item 1 above, the signage proposed for the new sport complex has been designed to integrate tastefully with the existing architectural character of Clearwater. The attached Data Table indicates there are only 4 signs, which can be read from the adjacent public thoroughfares, and these serve as needed building identification enabling visitors to easily locate the sports complex or be made aware of upcoming events. The remaining signage is pedestrian and wayfinding oriented and only becomes legible as the sports complex is approached from the parking lot on the south and the long entry drive on the west. 6. Property Values. There is nothing distractive or offensive about the aesthetics, size, lighting, etc. of the proposed signage that will have an adverse impact on the value of the property in the immediate vicinity of the sports complex, particularly since the adjacent areas are commercial in nature. 7. Elimination of Unattractive Signage. There is currently no existing signage on the site of the sports complex following the demolition of the existing Home Depot. Because the proposed signage is integrated with the design of the new complex, it is necessarily an improvement over signage that would have been permitted under the minimum sign standards. 8. Special Area or Scenic Corridor Plan. N/A Phillies Clearwater Community Sorts Complex T TWI project Ia. Comprehensive Sign Program Data Table i i59rOr15ts f.,,(�17�42 acres) WEST ELEVATION I I jArea (s.f. Streetlfrrontb& ( COachman) 650 I f + (Carpenter Center) 907 f f� r1557 €!r# �{ € gllowable li�eestapdmg s€gnlar�ea 1 s f per�2 t f of�streefmntagelt;�� �,� _ � �`,R' 778 ,� Bu€Iding €fagadetotalFi s a f& ,s €•` 196b0 f .it.itlul(� Allowable attacheds€gnage6% ofrarea, f fii76 S€gle sided allowableifreestantlings€gnage 1 sf,per t00�s faf bui tlingH 19�6�_' v) u�f ,392 S ;,,,. S Si nGate o " " " F Fronts eLe ib€lit` €,. Sign type I Sign description Notes Area A Attached I I Freestanding M Monument L Legible from Coachman Road X10 P Phillies logo q qty. 1, internally 5 57.5 5 57.5 illuminated F6 P Phillies door logo ' c clty. 2 0 0 0 0 Not Calculated in total.; F7 A Admin. door logo g gH. 1 . 0 0 0 0 Not Calculated in total. F7 Phillies door logo g gtY 2 0 0 0 0 Not Calculated in total. X10 Phillies logo /team store I.D. q qty:, Iinternally 1 18.5 1 18.5 (Sim.) i illuminated X3 Tickets sign q qty 1 1 11.67 1 11.67 1 15 X6 Phillies admin. I.D. c clty. 1 8 8.4 8 8.4 X9 Building I.D. monument q qb'• 1, double- sided, 3 34.5 3 34.5. 3 34.5 externally illuminated Banners 1 14 Banners 1 154 1 154 double-sided X1 lWest entry building I.D. s sty. 1.., :- 1 10.2 1 102 1 102 X5 Rules and regulations g gty.3 0 0 0 0 Not Calculated in total TOTAL ARE' F $St NAPE THIS EI VATION I`� € .. _, 3 3,86 57 r r ,s, g g 1 151 5 SOUTH ELEVATION ( A Area (s. f.) J J Butl TPA rT 14998 Allowabledattachedsignage 6% of S n ngle- sided allo�wableifreestanding s€gnage 1 S f er�100 S f; of bwltl€ng �`�` ' �k '`3��4..'EV.. r re €k uS:.n.,..: ... . ...s� ; FiontagefiLeg€bility Double�s€de� allow ° Sign type Sign description N Notes A Area A Attached I I Freestanding I M Monument . .'No adjacent public roadway Banners 1 10 Banners 1 110 1 110 double -sided X2 South entry building I.D. I Igty 1 4 46 4 46 TMI14ARE"F0, ETH %ELE�,,e.a,.Si , ,- . . , 16, " " . . 11Q � � 1i 4N iA u EAST ELEVATION - - l lArea (s.f.) Street,frbnta a US 19850clifr+ Ca )T858 0 Itf# 1'508 -0Irf ' , a; g { ) �{ reenter Ceoter, G q i'. V. iL'�a Viz. L Allowable freestandingas€gn area 1 s f Fper +2sl f Hof street fronttage Z54 �a�1 Bulld€n '.fa Odetota �g� Allowable attached signage ti Single sided allowable freestanding s€gnage 1 s:f;per 100 sf..of building a� ,� �� Y1 Dou` ble �sidetlalloviabie fr "eestandlns t €na "f r 00 s fofbu tl n R . Si'g'n Category _ _ � .1... j �FtageLeg�bdity Sign type Sign descri tioo lNotes I Area I I Attached I I Freestanding M Monument L Legible from US 19 X8 US 19 marquee qty. 1, double- sided,. 1 143 1 143 1 143 internally illuminated, reader board TOTAL AREA�t,OFSIGNAGETHIS ELEVATIOPI� „ar�� 3 „ „ „�_, , , 0 0Z I " NORTH ELEVATION Area Bwldmg,fagade total �1g� Allowable attached sI na a }}pp8 'r—,= h o area gynie� ' 'A'.�s,'?d9a€ CIt�W,Sf� Single sided allowable freestanding signage 1 s taper 100 s,f. of building€ 182 ' " s „- S S�� 0 _ _ F Frontage�Leg�bll Double s ded allowabl jfreestanding s€gni 2gs f iler 00 S.T. f bwlding 324 „ Sign t e Sign description Notes Area A Attached F Freestanding M Monument " "No adjacent public roadway F3 IScoreboard I.D. lqty. 1, double -sided 360 3 360 TOTAL Af2EA OF S1GfVAGE TH,I,SjELEVAaT10N,,,,. , � ffil`l ��� �� 360 I I t" INTO, M3 1 11 =1,,0 FILE C -Y April 15,2003 �. Fora. 11111 yd..:iJr WAIi.ItAt DECD l�:.i• %1.��_.1 +`..) 'v 1: r•r -;, rr J'rn:r,J 4.;rv: :.: •...: :.:::. u' rh" 1` � 1 n. D. l i1 �1 . A,- ! � 4� OTarnrr card A� in, fha Inrm ^„nr /y" aAnll indrufe fha Alin, rl—al rgrrr,enlnlirra, ....say, and /er —if., o/ fhe reaptcfire Onrliea Mrero; 11 — n( the ain pufnr number ah.0 X1 t, 1h, pLara , and the plural Ihn ain putnr; thr uar, nj nnrt J-d- ,h.11 inefade _- .11 frenderr; nnd, (/ r <red, the Iran Wore" shall - i"d..11 the nine, herein dea..ihed if m - than one - - - Made this 11th day of January .4. D. 19 63 Between John D. Miller and Marjorie L. Miller, his wife, Of the County o f P i n e l l a s and State of Florida party/ of the first part, and CITY OF CLEARWATER, a municipal corporation, of the County of Pine I I as and State of Florida party of the second part. WftnIlessetlg that the said party of the first part,, for and in consideration of thesumof One el .00) Doi lar and other valuable- considerationQallars, to him in hand paid, the receipt whereof is hereby acknowledged, has granted, bargain- ed, sold and transferred, and by these presents does grant, bargain, sell and transfer unto the said party of the second part all that certain parcel of land lying and being in the County of P i ne l I a s and State of Florida, more particularly described as follows: The Northeast Quarter (NE- of the Southeast Quarter (SE4) of Sec- tion 7, Township 29 South, Range 16 East, LESS AND EXCEPT the right - of -way of U. S. Highway 19; also, LESS AND. EXCEPT the following de- scribed parcel of land to -wit: Beginning at the Southwest corner of the NE4 of SEX of Section 7, Township 29 South, Range 16 East; thence North 89 degrees �52 minutes 03 seconds East, along the South boundary of said NE-Z' of SE4, 239.10 feet to a point that is 175.00 feet East- erly of and at right angle to the center line of Florida Power Cor- poration's existing Higgins- Disston 110 KY transmission line; thence North 0 degrees 23 minutes 18 seconds East, parallel to said ekisti.ng center I i ne,-- 1 153.54 feet; the ce North 0 degrees 24 minutes 38 seconds East, parallel to said existing center line, 193.08 feet to a point on the North boundary of said NE4 of SE-1; thence South 89 degrees 41 minutes 38 seconds West, along said North boundary, 236.29 feet to the Northwest corner of said NEX of SE4, thence South 0 degrees 30 minutes 40 seconds (lest along the West boundary of said NE4 of SEX, 1345.95 feet to the Point of Beginning: situate, lying and being in the County of Pinellas, State of Florida. including rights of ingress and egress in accordance with Deed recorded in OR Book 1472; page 385. Together with all the tenements, hereditaments an '-d appurtenances, with every privilege ) ridht, title, interest and estate, dower and right of dower, reversion, remainder and easement thereto beloneine or in anywise appertaining: To Have and to Hold the same in fee simple forever. land the said party of the fay•,st part does covenant with the said party of the .second part that he is lawfully seized of the said premises, that they are free from all incu, ?n- brances and that he has good right and lawficl authority to ,sell the same; and the said party of the first part does hereby fully warrant the title to said land, and will defend the same against the lawful claims of all persons whOM'soever. In Witness Whereof. the said, party of the first part has hereunto, set his hand and seal the day and year above written. Signed, Sealed and Delivered in Our Presence: H L c elt" 1 I L n c0 V �cc .d V ��1'CP1 State of Florida, u.R. a5�6 t'1,ci.651 County of Pinellas . I HEREBY CEItTIFY, That on this 17th day of January .4. D. 19 63 before one personally appeared John D. Miller, joined. by his wife, Marjorie L. Miller, to me well known and known to me to be the person described in and who executed the foregoing 0072.veyance to CITY OF CLEARWATER, and they acknowledged the execution thereof to be the i r free act and deed for the uses and purposes therein mentioned. WITNIESS my signature and official seal at Clearwater, in the County of Pinellas and State of Florida,' the day and year last aforesaid. my Commission Expires Notary Public 'J Notary Pubtle, State of Florida at Large My Commission Expires Oct. 22, 1966 C.:` ' Bonded by American Surety Co. of N. Y. y' 485602. 485601 i ►. 485679 L Tr Od M 0 ' d t� CA h �D Cqd 0rM �V3 0rA %0 YM p 0 ,}aemvx+e• '�sruae+�w �A � Q HLE COH ~ D_OCUMENTA1? _5TAh1f TAY. GOCU, LNT�,P � TAM � TAY. w CD = JA ?!10'SJ JdNl (_ UP c11:;1rPnLLEH, _ = 1 <B.190124 - 1 0 ,}aemvx+e• '�sruae+�w �A � Q HLE COH �- a *U.ow.e:,xas >�e w.ur 972616 1q.V.,�.....rA.�........ 'J .. Made this L day of c� L l�� J. D.19 62 Between JOHN D. MILLER and MARJORIE L. MILLER, his wife, of the County of Pinellas and State of Florida parties of the first part, and FLORIDA POWER CORPORATION 101 Fifth Street South, St. Petersburg, Florida a corporation existing under the laws of the State of Florida , having its principal place of business in the County of Pinellas and State of Florida party of the second part, Witneeeed4 that the said parties of the first part, for and in consideration of the sum of TEN DOLLARS ($10.00) AND 07M VALUABLE CONSIDERATIONS Dcaaxzx to them in hand paid, the receipt whereof is hereby acknowledged, have ftranted,.barpained, sold, aliened, remised, released, enfeoffad, conveyed and con - rmed and by these presents do grant, bargain, sail, alien, remise, release, enfeoff, convey and confirm unto the said party of the second part and its succes- sors and assigns forever, all that captain parcel of land lying and being in the County of Pinellas and State of Florida, more particularly described as follows: Beginning at the.Southwest corner of the NL of SE,,,, of Section 7; Township 29 South, Range 16 East; thence North 89' 52' 03" East, along the South boundary of said NE}, of 0„1, 239.10 feet to a point that is 175.00 feet Easterly of and at right angle to #e center line of Florida Power Corporation's existing Higgins - Disston 110 KV transmission line; thence North 0' 23' 18" Fast, parallel to said existing center line, 1153.54 feet; thence North 0' 24' 38" East, parallel to said existing center line, 193.08 feet to a point on the North boundary of said N vaL of SE-4; thence South 890 41' 38" West {i along said North boundary, 236.29 feet to the Northwest corner of said NEy of ;4; thence South 0' 30' 40" West along the q - West boundary of said N-4 of SLR, 1345.95 feet to the Point of Beginning, LESS that �o <, portion..thereof which is subject to road right -of -way for Coachmen Road.(County o c x Road No. 32) . Tae conveyance. herein is subject to the Grantors, their heirs and assigns reserv- ^� °es ing the following rights in and to the hereinabove described parcel of land: The Grantors hereby expressly reserve unto themselves, their heirs and assigns, the right, at their own risk, to cross, at approximately right angles thereto, the parcel of land herein conveyed at such points as may be agreed upon by the parties hereto, their heirs, successors or assigns, for the purpose of having access:to such part or portion of the land and premises of the Grantors as may, by the conveyance of the herein described parcel or tract of land, be cut off from the rest of the land and premises of the Grantors, their heirs or assigns. Together_ with all the tenements, hereditaments and appurtenances, with every prcc 1lega light, title, interest and estate, dower and right of dower, reversion, remoindar and• casement thereto belonging or in anywise appertaining: To Have and to Held the same in fee simple forever. .Ind -the said. part iesof the first part do covenant with the said. party of the see oriil.pait` that they —, lawfully seized of the. said promises, that they are free of 'all incumbraned, aad that they have ¢oqa right and lawful authority to sdi'th0 same; and�.that said parties of the jlt.A' fort doth hereby fully warrant the U46 -to said laddi and will defend Ehp as 'a¢ainaE the lawful claims of oil persons whomsaevar r,•. jr. W1tne8s Whereo& the said part ies of the first part have hereunto set their hand s and seal: s the day and year above written. $Jped, 9eded and Delivered in Our 'Presenee: er 71 Gt-� CST ✓ � , r% MUJQr1e U. er �r A.. �J v �. .o FILE COPY State Of Boric* 0.8.1472 PACE 386 comfy of PnELLAS I HBRM cEATIFY; That on this G'4 dal/ a /�� r1. D. 1962 , before me personally appeared JOHN D. MILLER and MARJORIE L. MILLER, his wife, to me known to be the persons described in and who executed the forejoinj conveyance to FLORIDA POWER CORPORATION and severally acknowledged the execution thereof to be their free act and deed for the uses and purposes therein mentioned. tore and official seal at Clearwater WITNB3S my atjna and State o Florida, the day and in the County of Pinellas f year last aforesaid. J� FILE COPY �B ✓�mr rlfy comnuasion Expires Notgr{��ub�kc " Notary Pubko. State;ttior" at•tarn• a•, 61y commissioo aspires Oct. 15. 1964'• OWdaad by W,a. as�uigi 1- 414aAa� . a` ,.Y • u ' ice._ to _ J� FILE COPY MAY - 6 1994 CITY OF CLEARWATER, FLORIDA DEED OF CONVEYANCE WPI NO. :7117045 PROJECT NUMBER :15150 -2566 COUNTY :Pinellas STATE ROAD :55 PARCEL NO. :121 THIS INDENTURE made this 2Z __XA_ day of 1 1994 by and between the City of Clearwater. F1 1 a, a Florida Municipal Corporation, party of the first part, and the Florida Department of Transportation, of the State of Florida, party of. the second part, whose mailing address is 11201 North McKinley Drive, Tampa, Florida 33612 -6403. WITNESSETH: That the party of the first part, for and in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations, including, but not limited to, -'any required right-of-way clearing and utility relocations, to it in hand paid by said party of the second part, at or before the ensealing and delivery of these presents, the receipt whereof is hereby acknowledged, has granted, bargained, sold, conveyed and confirmed unto the said party of the second part, and to its heirs and assigns forever, all the following piece, parcel, lot or tract of land, situate, lying and being in the County of Pinellas and State of Florida, and described as follows, to wit: PARCEL 121 RIGHT -OF -WAY That part of: The Northeast Quarter (NE1 /4) of the Southeast Quarter (SE1 /4) of Section 7, Township 29 South, Range 16 East, LESS AND EXCEPT the following right -of -way of U. S. Highway 19; also LESS AND EXCEPT the following described parcel of land to -wit: Beginning at the Southwest corner of the NE1 /4 of the SE1/4 of Section 7, Township 29. South, Range 16 East; thence North: 890521,03" East; along the South boundary of said NE1 /4 of SE1 /4, 2.39.10 feet to a point that is 175.00 feet Easterly of and at right angle to the centerline of Florida Power Corporation's existing Higgins - Disston 110 RV transmission line; thence North 0 °23118" East, parallel to said existing center line, 1153.54 feet; thence North 0°24138" East, parallel to said existing center line, 193.68 feet to a point on the North boundary of said NE1 /4 of SE1 /4; thence South 89 °41138" West, along said North boundary, 236.29 feet to the Northwest corner of said NE1 /4 of SE1 /4, thence South 0 °30'40" West along the West boundary of said NE1 /4 of SE1 /4, 1345.95 feet to the POINT OF BEGINNING: situate, lying and being in the County of Pinellas, State of Florida. Lying within the following described boundary, to -wit: Commence at a 5/8" iron rod no. LB -33 marking the Southwest corner of the Southeast 1/4 of Section 7, Township 29 South, Range 16 East, Pinellas County, Florida, run thence South 89 °39146" East, a distance of 2,671.71 feet along the South boundary of the Southwest 1/4 of said Section 7 to. the Southeast corner thereof; thence North 00 °54150" East, a distance of 1,350.60 feet along the East boundary of the Southeast 1/4 of +.-.id Section 7; thence North 89 °50151" West, a distance of 100.01. feet. to the existing West right - of -way line of U. S. #19 and the POINT OF BEGINNING; thence North 89 °50151" West, a distance of 6.27 feet- along the North boundary of THE CLEARWATER COLLECTION - SECOND REPLAT, according to the map or plat thereof, recorded in Plat Book 107, Page 24 of the Public Records of Pinellas County, Florida; thence North 05 °24150" East, a distance of 79.90 feet to said West right -of- way line of U.S. $19; thence along said West right -of -way line, south 00 °54150" West, a distance of 79.57 feet to the POINT OF BEGINNING. Containing 249 square feet, more or less. n� %i e k VU I HLE Cgrlq TOGETHER TH all and singular tene s, hereditaments and appurtenances reunto belong or appertaining; every right, title or interest, legal _.,z equitable, of the said party of Life first part, of, in and to the same. TO HAVE AND TO HOLD the same unto the said party of the second part, its heirs and assigns, to its own property use, benefit and behoof forever. IN WITNESS WHEREOF, the said party of the first part has caused these presents to be executed in its name by its City Manager, City Clerk, countersigned by its Mayor - Commissioner, and approved as to form and correctness by its Office of City Attorney, and its corporate seal to be hereunto attached, the day and year first above written. Countersigned: CITY OF CLEARWATER, FLORIDA P. O. BOX 4748 CLEARWATER, FLORIDA 34618 -4748 i� By:_ �.�5• ,sf�_' Rita Garvey, Mayor -Co ssioner 4, Elizabeth M. Deptula City Manager Attest: / 1 Cy this . E. :Goudeau,. City Clerk �1 STATE OF FLORIDA } COUNTY OF PINELLAS } BEFORE ME, the undersigned, personally appeared Rita Garvey, the Mayor- Commissioner of the City of Clearwater, Florida, who executed the foregoing instrument and acknowledged the execution thereof to be her free act and deed for the use and purposes herein set forth, and who is personally known to me. WITNESS ') P my hand and official seal this day of 1994- DENISE A.WIISON Notary Pu 1 i c ., My COMMSSION ) CC 201408 EXPIRES Print /type name: s °= eoNDCDn mar' AADauIANIX.W P '�.. STATE OF FLORIDA } COUNTY OF PINELLAS } BEFORE ME, the undersigned, personally appeared Elizabeth M. Deptula, the City Manager of the City of Clearwater, Florida, who executed the foregoing instrument and acknowledged the execution thereof to be her free act and deed for the use and purposes herein set forth, and who is personally known to me. Q WITNESS my hand and official seal this i�Y6 day of / , 1994. I_ DENISE A. WILSON Not a ry P ll b I 1 C _ My COMMISSION / CC 201408 EXPIRES June 18.19%, Print /type name: ('i ':�•. .:C�e WNDED nft 1e0Y FAIN MUPMCE. INC. Approved as to-form and correctness: By: Office of the City Attorney SRSSdeed.ewb F � L E C'0 p V COMPREHENSIVE SIGN PROGRAM APPLICATION Additional Documentation March 19, 2003 OBSOLETE C. SIGN PLAN AND ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Code Sections 4 -1001 and 4- 202.A.23) Illumination details including type, placement, and intensity have not yet been included in this application, other than whether sign shall be internally or externally illuminated. Internal illumination shall likely either be fluorescent or neon. External illumination shall be via ground- mounted lamp. Illumination details shall be developed by the sign fabricator and coordinated with the architect and City of Clearwater prior to installation. E. WRITTEN SUBMITTAL REQUIREMENTS: (Section 3- 1807.C) 1. Architectural Theme. The exterior design of the new sports complex itself has been inspired by the special characteristics of existing Clearwater architecture and the curving, free flowing lines of Florida vegetation and palm trees. In like manner, the freestanding and attached signs proposed have been designed to compliment and reflect the architectural character of the new sports complex as well as the tradition of baseball. The use of stucco, masonry, custom metal details, colors, curving lines and leaf motif which are integral parts of the building design are repeated in the signage /graphics proposed for the complex, actually enhancing and becoming a part of the exterior design of the complex. 2. Height. Per telephone conversation with Lynn Isaak, P.E. with the Florida Department of Transportation, the future overpass at the intersection of Drew and US 19 will be approximately at elevation 60 (compared to a current elevation of +/ -34). From this point it will slope back down to intersect the existing road elevation ( +/ -29) approximately 1300' north. Interpolating between these two numbers the highest point of the roadway within the property lines of the sports complex would be + /- elevation 45. The height of the freestanding sign proposed near the south entry of the sports complex at the bridge off of US 19 is 14' above this highest point of the proposed roadway. 3. Lighting. Because part of the purpose of the freestanding sign along US 19 is to advise passers -by of upcoming events, a variance is requested to allow this sign to be lit during non -game and non- event times as well as during the events themselves. Hours of illumination during non -game and non -event times to be negotiated with the City of Clearwater. Also, a variance is requested to allow the monument sign on Coachman to be externally lit during non -game and non -event times. Any other lighted signs indicated in the sign package will meet the requirements of the Clearwater Sign Ordinance. 4. Total Area of Sign Faces. i. Per attached Data Table, the area of all attached signs are well under the allowable 6 percent of the building facade to which the signs are attached, except the attached sign on the north side of the scoreboard building that will be 6% of the building facade. Based on section 3 -1806 B.1c.i, the maximum area of a freestanding sign face on the east facade shall not exceed 779 s.f.. The area of the proposed Type X8 freestanding sign is 143 s.f. Because there are two major entries to the new sports complex (one on US 19 and one on Coachman) a variance is requested to allow a monument sign at the west entry in addition to the freestanding sign at the east entry off US 19. The area of the proposed Type X9 monument sign is 34.5 s.f. - substantially less than the 181 s.f. sign that would be permitted based on the lot frontage on the west elevation. There are a total of 24 banners proposed on light poles along the south and west sides of the stadium. These banners count as freestanding signage, totaling 264 s.f. Also, note that the total area of the X8 and X9 signs and the 24 banners is only 441.5 s.f. — even less than the allowable sign area for the west side alone! 5. Community Character. As described in item 1 above, the signage proposed for the new sport complex has been designed to integrate tastefully with the existing architectural character of Clearwater. The attached Data Table indicates there are only 4 signs, which can be read from the adjacent public thoroughfares, and these serve as needed building identification enabling visitors to easily locate the sports complex or be made aware of upcoming events. The remaining signage is pedestrian and wayfinding oriented and only becomes legible as the sports complex is approached from the parking lot on the south and the long entry drive on the west. 6. Property Values. There is nothing distractive or offensive about the aesthetics, size, lighting, etc. of the proposed signage that will have an adverse impact on the value of the property in the immediate vicinity of the sports complex, particularly since the adjacent areas are commercial in nature. 7. Elimination of Unattractive Signage. There is currently no existing signage on the site of the sports complex following the demolition of the existing Home Depot. Because the proposed signage is integrated with the design of the new complex, it is necessarily an improvement over signage that would have been permitted under the minimum sign standards. 8. Special Area or Scenic Corridor Plan. N/A Phillies Clearwater Community Sports Complex Comprehensive Sign Program Data Table WEST ELEVATION Area (s.f.) Street ffontage• (Coachman} B50 I�f i *"`(Garp�enter�C.e,�nt��907�1 f� �i 557s1pf ,r, �,��:� � Allowable�fr�ee�standutg��gn ar�eakls f �ert2 t f ofEstreetfftontage i � � �� ��� ��� �€ �x e ��"-'• � E� � l � � w �� �, 1176 , Allowable attached €sEgnage 6 /o of area�� 1st er�tOD s f bf buddmg��� �, 196 Single sided allowable freestandmg�sEgnage � � , jef�ree a ng s tgna e2 sfir100 s f. of bwld�ng Double sidedallowabstndEg Sign description Notes Area X10 Phillies logo qty. 1, intemally . 57.5 illuminated qty. 2 0 F6 !✓ Phillies door logo Not Calculated in total. F7 J Admin. door logo qty. 1 Not Calculated in total. 0 F7 Phillies door logo 2 Not Calculated in total. 0 X10 Phillies logo /team store I.D. qty., 1intemally 18.5 Slm. ) � illuminated X3 ickets sign qty. 1. 11.67 X6 __ Phillies admin. I.D. , qty. 1 qty. 1, double- sided, 8.4 34.5 X9 Building I.D. monument externally illuminated Banners 1a Banners 154 double -sided X1 West entry building I.D. qty. 1 102 X5 Rules and regulations gty.3 Not Calculated in total 0 TO7ALAttEA ,OSIGNAG,ETHIStEUATION`€�3865T l SOUTH ELEVATION Area (s.f.) Altowable.�a�ttachedsignage S 'd all owable isi na s f 10b s�f f4t)Uda1 cx� ngle sid freestandin` r g g 9g c n Csg Doutite sided alio�v�able keestan, ". sE�na 2 t r�t00 s f df b ddm � �1 3q0 _n 9 Notes Area Sign t p Sign description Banners 10 Banners 110 4 building I.D. double -sided qty 1 46 X2 South entry 7OTALAR,EA�"®F� SIGN'AGE�THI8ELE1/ATIQN"��.��� „x, '�'���;36 EAST ELEVATION Area (s.f.) Stteet frontage (US�`19)�550 I f � (Ca(penter Center} 8580 �Itf "�i'$08 �0�'hf,� ����"����a�,� "5r� r Alloywable freestanding�gnar�ea�l�s fperh f f oitstetfron�ageEG �th� Building +fa,ade Allo�v�able attachetl�sig��nage Si�y s�id�al�l�o�wFable�fr�s��andEng s�jgn�ag�e,,�1s�� per �O��fr�o�f blltling e €� 0fflwddmM Doub esuiedallowabli Sign t e I Sign description Notes'Area X8 SUS 19 marquee qty. 1, ouble- sided, 143 i internally illuminated, I reader board T(? aTALAF2EA ,OFSIGNAGTHISELEUATI,OP1, ", •, NORTH ELEVATION Area Buddingrfagadetatalgu M01, d fz �'f '1224; X973' pllowableattached srgnage }� f area E�En� ��� � °; je sided o�i�alf�e frame 5tandin��si na e�lrstf pent 0 S fof bwldittg" 1 a � � f 18�� Sirr� Doubles�Cedsallowabje�f�ee�stantling�s�gnage�2�s f�per100 s fo�bu ding �, �;'�,�� „�?_�,t324. Sign t pe Sign descri tion Notes Area F3 Scoreboard I D qty 1 double sided 360 HOK SPORT +VENUE +EVENT M�OLETIE 15 203 Phillies Clearwater Community Spor omplex Tat����ject land area: Comprehensive Sign Program Data Table _ _ _ 7�9,�'�:��f�17.42 acres WEST ELEVATION Area s.f. Street'frontage(Coachman)650'I.f.+(Carpenter Center)907 Lf.=1557 I.f. Allowable freestanding sign area 1 s:f:'per 2 I.f.of street frontage 779 - Building faqade total 19600 Allowab�e attached'signage 6�o ot area 11J6 Single-sided atlowa6le treesfandiog signage 1 s.f."per 100 s f.of building 196 Double-sided allowabie freestanding signage 2 s_f,per 1�0 s.f.of building' 392 5ig�,�gc7Yj��+� w �_,, u� u��i�„ �,�g������! Si n t e Si n descri tion Notes A�ed Attached Freestanding Monument Legible irom Coachman Road v' F4 Phillies logo qry.�,imemairy 57.5 57.5 � � illuminated F6 Phillies door logo 4tY z 0 0 Not Calculated in total. F7 Admin.door logo 4tv � 0 0 Not Caiculated in total. F7 Phillies door logo 9tY 2 0 0 Not Calculated in total. --. X10 Phillies logo/team store I.D. qty.,linternallyilluminated �g.5 18.5 (_ �Y�� G�r��y (vse r r �r•a�. '- X3 Tickets sign q�v�� t(•�7 f(fi� �'�' �/••��' ,• ( l. 76� 15 �" X6 Phillies admin.I.D. qtv � `$.�J 1.2 `( #� " " . y� � X9 Building I.D.monument qty.i,doub�e-sided,,,�, 34.5 34.5 A� / 34.5 :,�`�#''y}'•�' escternally i�luminatelF';; �9 rJ:�ar �5►' � Banners 14 Banners 154 154 (�� `D�, � _ double-sided ,/ X1 West entry building I.D. q�v�� 102 102 �� 102 - __ X5 Rules and regulations qtv 3 0 0 Not Calculated in total T{,)T�1:� �EA i}F SM�}�IAGE THIS�1,�:f�AT1�3N.:m.�'�.� .� �;:W` i�_ _ :: ... '� . � ��-�.'. 2 .; ; ~.'�54-�:. =.' �;_:: SOUTH ELEVATION Area s.f. 8udding fa�ade total 14996 Allowable attacfied signage 6%of a�ea 900 Single-sided aibwable freestanding signage 1 s.f.per 100 s.f.ofbuilding 150 Doubie=sided allowabie fre�standing signage 2 s.f.;��per 100 s.f.of buildi�g � � � 3� � " ������e9o�' .�" �` .. �-` ������� ,. .x ��� .::�: Si n t e Si n dESCri tio� Notes ArBa Attached Freestanding Monument 'NO adjacent public roadway Banners 10 Banners 11 p 110 � � double-sided �'��+� �� -- X2 South ent buildin I.D. q�v� V� "' ` • L TOTALAR � `t�FSI+�NAGETHISELEYATION ; 160 ' �a ' titl .= A_�:x, �fl=� EAST ELEVATION Area s.f. Street frontage(US 19)650J.f.+(Carpenter Center)858'-0"I.f.=1,508'-0"I.f. Altowable freestarMmg sign area 1 s:f:per 2 I f.bf street frontage 754 Building fa�ade total 17060 Allowabie attached signage,6/of area ' 1024 Single-sided allowable freestantling signage 1 s.f.per 100 s.f.of l�uilding, 171 Double-sidetl allovsrable�reestanding signage 2s.f.�per 100 s.f.of building�'�� �� �� � � ��341 �n;��y��f�����nCateg�- ���Fr _ ` Lsg�I ,� _�: __.,. SI n t B Si n desCll t/on NoteS A�ea Attached Freestanding Monument Legible from US 19 X8 US 19 marquee q�y.�,double-sided, `�� - ���� `yy^'� I �,,�3�Of155 :'�+c intemally illuminated, �7 ra reader board �y � �kTAL:"AREA CfF SI�NAGE THIS ELEY�t770��-:.��"'._ .-, ,;, ,m���"���� . ���� " = ` � ��a�'.��'�: �. ,��:�.� . , NORTH ELEVATION Area Budding fa�ade total 16224 Aliowabte attached signage 6%of area- 973 Single-sided ailowabie fteesianding signage 1 s f.per 10p s.f.pf building 1fi2 Double-sided ailowable freestanding signage 2 s.f.per 100 s.f of building, 324 �.:_ , ,,,_.�tgnG������' �.�� ' .:Fro�I.eg�: : _. , SI Il t e ''Si n descri tion Notes rea A hed Freestanding Monumenf 'No adjacent public roadway , — F3 Scoreboard I.D. qty.i,double-sided / �,� , . 4 �c��� �€��r�[[isk � °a�ac��v ' m� -., a. ����s� � .h����� �t���� � � �#a '`` '� �y6 3�° ��° 3 S �r Y ..�____,--� ������e„� ��jd . � �.,, �� z z. � Z t . � � ��1, ,e� ' La- �''` s,�~ ��'( • ( 7 y v �,D� HOKSPORT+VENUE+EVENT pA ��0���� March11,2003 a Vwrwate Planning Department ea r water 1 100 South Myrtle Avenue 0 Clearwater, Florida 33756 Telephone: 727 - 562 -4567 Fax: 727 - 562 -4865 I� SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION SUBMIT 12 COPIES OF THE ORIGINAL APPLICATION including / 1) collated, 2) stapled and 3) folded sets of site plans LI SUBMIT APPLICATION FEE $ (�/P,_ CASL R.D ?.®0 Z- 0 70 2.1 A DATE RECEIVED: RECEIVED BY (staff initials): 6`'1 ATLAS PAGE M. -2- a 1 ZONING DISTRICT: S LAND USE CLASSIFICATION: OS SURROUNDING USES OF ADJACENT PROPERTIES: NORTH: SOUTH: WEST: EAST: 5e- 4 3o 5(�N2 -oo3- 01002_ * NOTE: 13 TOTAL SETS OF INFORMATION REQUIRED (APPLICATIONS PLUS SITE PLANS SETS) FLEXIBLE DEVELOPMENT APPLICA'T'ION Comprehensive Infll Redevelopment Project (Revised 11/05/02) - PLEASE TYPE OR PRINT— use additional sheets as necessary A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Section 4- 202.A) City of Clearwater c/o Kevin Dunbar, Director APPLICANT NAME: .Parks and Recreation Department MAILING ADDRESS: 100 S. Myrtle Avenue, Clearwater, FL 33756 -5520 E -MAIL ADDRESS: kdunbar@clearwater-fl.com PHONE NUMBER: 727- 562 -4823 CELL NUMBER: 727 -224 -7144 FAX NUMBER: 727 -562 -4825 PROPERTY OWNER(S): City of Clearwater (Must include ALL owners) AGENT NAME(S): Not applicable MAILING ADDRESS: E -MAIL ADDRESS: PHONE NUMBER: CELL NUMBER: FAX NUMBER: B. PROPOSED DEVELOPMENT INFORMATION: STREET ADDRESS of subject site: 601 Old Coachman Road, Clearwater, Florida LEGAL DESCRIPTION: Please refer to the attached legal description for the three parcels. (if not listed here, please note the location of this document in the submittal) (Exhibit A) PARCEL NUMBER: 7- 29 -16- 00000 - 410 -0100 (Carpenter) 7- 29 -16- 16442 -000 -0010 (Home Depot) 7- 29 -16- 00000 - 430 -0100 (Joe D.) PARCELSIZE: Approx. 17.4 acres (See location map — Exhibit B) (acres, square feet) PROPOSED USE AND SIZE: Please refer to attached Project Narrative (Exhibit C) (number of dwelling units, hotel rooms or square footage of nonresidential use) DESCRIPTION OF REQUEST(S): Please refer to the attached Exhibit C. (include all requested code deviations; e.g. reduction in required number of parking spaces, specific use, etc.) ` k �J') Page 1 of 7 — Flexible Development Application - Comprehensive Infill Redevelopment Project— City of Clearwater �'�'� OBSOLETE C. PROOF OF OWNERSHIP: (Section 4- 202.A) ❑ SUBMIT A COPY OF THE TITLE INSURANCE POLICY, DEED TO THE PROPERTY OR SIGN AFFIDAVIT ATTESTING OWNERSHIP (see page 6) D. 1. WRITTEN SUBMITTAL REQUIREMENTS: (Section 3- 913.A) Provide complete responses to the six (6) GENERAL APPLICABILITY CRITERIA: The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is located. Refer to Exhibit D Refer to Exhibit E UU 0 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. Refer to Exhibit D 3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use. Refer to Exhibit D 4. The proposed development is designed to minimize traffic congestion. Refer to Exhibit D 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. Refer to Exhibit D 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. Refer to Exhibit D Provide complete responses to the ten (10) COMPREHENSIVE INFILL REDEVELOPMENT PROJECTCRITERIA (as applicable): 1. The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards. Refer to Exhibit E 2. The development of the parcel proposed for development as a comprehensive infill redevelopment project or residential infill project will not reduce the fair market value of abutting properties. (Include the existing value of the site and the proposed value of the site with the improvements.) Refer to Exhibit E UU 0 Page 2 of 6 — Flexible Development Application - Comprehensive Inf ill Redevelopment Project— City of Clearwater 3. The uses within the comprehensive infill redevelopment project are otherwise permitted in the City of Clearwater. Refer to Exhibit E 4. The uses or mix of use within the comprehensive infill redevelopment project are compatible with adjacent land uses. Refer to Exhibit E 5. Suitable sites for development or redevelopment of the uses or mix of uses within the comprehensive infill redevelopment project are not otherwise available in the City of Clearwater. Refer to Exhibit E 6. The development of the parcel proposed for development as a comprehensive infill redevelopment project will upgrade the immediate vicinity of the parcel proposed for development. Refer to Exhibit E 7. The design of the proposed comprehensive infill redevelopment project creates a form and function that enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. Refer to Exhibit E 8. Flexibility in regard to lot width, required setbacks, height and off - street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. Refer to Exhibit E 9. Adequate off - street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on- street parking in the immediate vicinity of parcel proposed for development. Refer to Exhibit E 10. The design of all buildings complies with the Tourist District or Downtown District design guidelines in Division 5 of Article 3 (as applicable). Use separate sheets as necessary. Refer to Exhibit E ��LETE Page 3 of 6 — Flexible Development Application - Comprehensive Inf ill Redevelopment Project— City of Clearwater E. SUPPLEMENTAL SUBMITTAL IUIREMENTS: (Section 4- 202.A) 21 SIGNED AND SEALED SURVEY (including dimensions of property) —One original and 12 copies: ❑ COPY OF RECORDED PLAT, as applicable; N/A ❑ PRELIMINARY PLAT, as required; N/A 3 LOCATION MAP OF THE PROPERTY; IN TREE SURVEY (including existing trees on site and within 25' of the adjacent site, by species, size (DBH 4" or greater), and location, including drip lines and indicating trees to be removed); 3 GRADING PLAN, as applicable F. SITE PLAN SUBMITTAL REQUIREMENTS: (Section 4- 202.A) IN SITE PLAN with the following information (not to exceed 24"x 36 "): X All dimensions; X North arrow; 5F Engineering bar scale (minimum scale one inch equals 50 feet), and date prepared; X Location map: X Index sheet referencing individual sheets included in package; X Footprint and size of all EXISTING buildings and structures; X Footprint and size of all PROPOSED buildings and structures; R All required setbacks; X All existing and proposed points of access; All required sight triangles; N /A- existing drives Identification of environmentally unique areas, such as watercourses, wetlands, tree masses, and specimen N/A —None trees, including description and location of understory, ground cover vegetation and wildlife habitats, etc; X Location of all public and private easements; X Location of all street rights -of -way within and adjacent to the site; X Location of existing public and private utilities, including fire hydrants, storm and sanitary sewer lines, manholes and lift stations, gas and water lines; X All parking spaces, driveways, loading areas and vehicular use areas, including handicapped spaces; X Depiction by shading or crosshatching of all required parking lot interior landscaped areas; X Location of all refuse collection facilities and enclosures (minimum 12'x10' clear space); Location of all landscape material; N/A —refer to Landscape Plan _ Location of all jurisdictional lines adjacent to wetlands; N/A —none X Location of all onsite and offsite storm -water management facilities; X Location of all outdoor lighting fixtures; and X Location of all existing and proposed sidewalks IX SITE DATA TABLE for existing, required, and proposed development, in written /tabular form: X Land area in square feet and acres; _ Number of EXISTING dwelling units and PROPOSED dwelling units, /A —not residential proj ect X Gross floor area devoted to each use; X Parking spaces: total number, presented in tabular form with the number of required spaces; X Total paved area, including all paved parking spaces and driveways, expressed in square feet and percentage of the paved vehicular area; Size and species of ali landscape material; N/A —refer to Landscape Plan Official records book and page numbers of all existing utility easement; N /p, —Qfer to Survey Building and structure heights; N %g Xee>i ,ta Azch� t�ectura1l levations X Impermeable surface ratio (I.S.R.); and X Floor area ratio (F.A.R.) for all nonresidential uses REDUCED SITE PLAN to scale (8 %X 11) and color rendering if possible 9 FOR DEVELOPMENTS OVER ONE ACRE, provide the following additional information on site plan: X One -foot contours or spot elevations on site; X Offsite elevations if required to evaluate the proposed stormwater management for the parcel; X_ All open space areas; X Location of all earth or water retaining walls and earth berms; X Lot lines and building lines (dimensioned); . X Streets and drives (dimensioned); X Building and structural setbacks (dimensioned); R Structural overhangs; X Tree Inventory; prepared by a "certified arborist ", of all trees 8" DBH or greater, reflecting size, canopy (drip lines) and condition of such trees Page 4 of 6 — Flexible Development Application - Comprehensive Infill Redevelopment Project— City of Clearwater G. LANDSCAPING PLAN SUBMITI ,REQUIREMENTS: (Section 4- 1102.A) N7 LANDSCAPE PLAN: X_ All existing and proposed structures; X_ Names of abutting streets; _ Drainage and retention areas including swales, side slopes and bottom elevations;refer to Site Plan X_ Delineation and dimensions of all required perimeter landscape buffers; _ Sight visibility triangles;N /A- existing drives X Delineation and dimensions of all parking areas including landscaping islands and curbing; Proposed and required parking spaces; refer to Site Plan X Existing trees on -site and immediately adjacent to the site, by species, size and locations, including dripline (as indicated on required tree survey); X_ Location, size, description, specifications and quantities of all existing and proposed landscape materials, including botanical and common names; X Typical planting details for trees, palms, shrubs and ground cover plants including instructions, soil mixes, backfilling, mulching and protective measures; X Interior landscaping areas hatched and /or shaded and labeled and interior landscape coverage, expressing in both square feet and percentage covered; Conditions of a previous development approval (e.g. conditions imposed by the Community Development Board); N/A X Irrigation notes Yl REDUCED LANDSCAPE PLAN to scale (8'/2 X 11) (color rendering if possible) .J IRRIGATION PLAN (required for Level Two and Three applications) N/A ❑ COMPREHENSIVE LANDSCAPE PROGRAM application, as applicable N/A H. STORMWATER PLAN SUBMITTAL REQUIREMENTS: (City of Clearwater Design Criteria Manual and 4- 202.A.21) :] STORMWATER PLAN including the following requirements X Existing topography extending 50 feet beyond all property lines; X_ Proposed grading including finished floor elevations of all structures; X All adjacent streets and municipal storm systems; Proposed stormwater detention /retention area including top of bank, toe of slope and outlet control structure; X_ Stormwater calculations for attenuation and water quality; X Signature of Florida registered Professional Engineer on all plans and calculations gl COPY OF PERMIT INQUIRY LETTER OR SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT (SWFWMD) PERMIT SUBMITTAL (SWFWMD approval is required prior to issuance of City Building Permit), if applicable ❑ COPY OF STATE AND COUNTY STORMWATER SYSTEM TIE -IN PERMIT APPLICATIONS, if applicable N/A I. BUILDING ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Section 4- 202.A.23) Required in the event the application includes a development where design standards are in issue (e.g. Tourist and Downtown Districts) or as part of a Comprehensive Infill Redevelopment Project or a Residential Infill Project. N BUILDING ELEVATION DRAWINGS— all sides of all buildings including height dimensions, colors and materials N REDUCED BUILDING F1aElt I and fmaterialsldiidveh Hots and materials to scale 2d 11) (black and white and color rendering, if possible) as required Y J. SIGNAGE: (Section 4- 202.A.16) M Comprehensive Sign Program application, as applicable (separate application and fee required)TO -be filed at a later date ❑ Reduced signage proposal (8'/2 X 11) (color), if submitting Comprehensive Sign Program application N/A K. TRAFFIC IMPACT STUDY: (Section 4- 202.A.13 and 4- 801.C) �9 Include as required if proposed development will degrade the acceptable level of service for any roadway as adopted in the Comprehensive Plan. Trip generation shall be based on the most recent edition of the Institute of Transportation Engineer's Trip General Manual. Refer to Section 4 -801 C of the Community Development Code for exceptions to this requirement. Page 5 of 6 — Flexible Development Application - Comprehensive Infill Redevelopment Project— City of Clearwater Or"SOLETE L. SIGNATURE: I, the undersigned, acknowledge that all representations made in this application are true and accurate to the best of my knowledge and authorize City representatives to visit and photograph the property described in this application. nature of property owner or represe M. AFFIDAVIT TO AUTHORIZE AGENT: (Names of all property owners) STATE OF FLORIDA, COUNTY OF PINELLAS / Sworn to and subscribed before me this �j��(day 1. That (I am /we are) the owner(s) and record title holder(s) of the following described property (address or general location): 2. That this property constitutes the property for which a request for a: (describe request) 3. That the undersigned (has /have) appointed and (does /do) appoint: as (his /their) agent(s) to execute any petitions or other documents necessary to affect such petition; 3. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 4. That the applicant acknowledges that all impact fees (parks and recreation, traffic, etc.) will be paid PRIOR to the issuance of a building permit, certificate of occupancy, or other mechanism, whichever occurs first; 5. That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City representatives to visit and photograph the property described in this application; 6. That (1 /we), the undersigned authority, hereby certify that the foregoing is true and correct. Property Owner Property Owner STATE OF FLORIDA, COUNTY OF PINELLAS Before me the undersigned, an officer duly commissioned by the laws of the State of Florida, on this , personally appeared Deposes and says that he /she fully understands the contents of the affidavit that he /she signed. My Commission Expires: SAFfanning Departmenft4pplication Formsldevelopment reviewlcomprehensive infill applicationZdoc day of who having been first duly sworn Notary Public Page 6 of 6 — Flexible Development Application - Comprehensive Inf ill Redevelopment Project— City of Clearwater of A.D. 2004 to me and /or by who is rpersonaliy —k on w has produced ;,fig -,, __.. -._ —. __._.__ as identification. = M � *: MYC'Om A4 ry P. Cressma ION # CC993927 F BG .Ll"A& Fe l HDEO rHR SOY 9 l200S l Notary publiq,, My commission expires: 1. That (I am /we are) the owner(s) and record title holder(s) of the following described property (address or general location): 2. That this property constitutes the property for which a request for a: (describe request) 3. That the undersigned (has /have) appointed and (does /do) appoint: as (his /their) agent(s) to execute any petitions or other documents necessary to affect such petition; 3. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property; 4. That the applicant acknowledges that all impact fees (parks and recreation, traffic, etc.) will be paid PRIOR to the issuance of a building permit, certificate of occupancy, or other mechanism, whichever occurs first; 5. That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City representatives to visit and photograph the property described in this application; 6. That (1 /we), the undersigned authority, hereby certify that the foregoing is true and correct. Property Owner Property Owner STATE OF FLORIDA, COUNTY OF PINELLAS Before me the undersigned, an officer duly commissioned by the laws of the State of Florida, on this , personally appeared Deposes and says that he /she fully understands the contents of the affidavit that he /she signed. My Commission Expires: SAFfanning Departmenft4pplication Formsldevelopment reviewlcomprehensive infill applicationZdoc day of who having been first duly sworn Notary Public Page 6 of 6 — Flexible Development Application - Comprehensive Inf ill Redevelopment Project— City of Clearwater EXHIBIT A Home Depot Site: Lot 1, THE CLEARWATER COLLECTION SECOND REPLAT, according to the plat thereof recorded in Plat Book 107, pages 24 and 25, Public Records of Pinellas County, Florida. TOGETHER WITH rights of ingress and egress as reserved in Warranty Deed recorded in Official Records Book 1479, page 95, Public Records of Pinellas County, Florida. TOGETHER WITH non- exclusive easements for ingress and egress, the passage and parking of vehicles, the passage and accommodation of pedestrians, separate and common utility lines, construction, reconstruction, development, erection, removal and maintenance of building components and other matters over, on and under the land described in, and all as more particularly created, defined, located and limited in: (1) that certain Operation and Reciprocal Easement Agreement recorded in Official Records book 6440, page 2013; (2) Amendment to and Ratification of Operation and Reciprocal Easement agreement recorded in Official Records Book 6735, page 217; (3) Third Amendment to an Operation and Reciprocal Easement agreement recorded in Official Records Book 6921, page 129; (4) unrecorded Third Amendment dated July 17, 1990, as referred to in the Fourth Amendment to an Operation and Reciprocal Easement Agreement recorded in Official Records Book 7541, page 849 which was re- recorded in Official Records Book 7561, page 2125; (5) Fourth Amendment to an Operation and Reciprocal Easement Agreement recorded in Official Records Book 7541, page 849 which was re- recorded in Official Records Book 7561, page 2125; and (6) Fifth Amendment to Operation and Reciprocal Easement Agreement recorded in Official Records Book 9664, page 451, Public Records.'of Pinellas County, Florida, TOGETHER WITH non - exclusive easement rights as granted by Parking and Driveway Easement recorded in Official Records Book 6440, page 2002, as amended by Amended Parking and Driveway. Easement recorded in Official Records Book 6735, page 212, Public Records of Pinellas County, Florida. TOGETHER WITH a non- exclusive easement as described in that certain Drainage Easement Agreement recorded in Official Records Book 6618, page 2190, Public Records of Pinellas County, Florida. S 1M L } A -1 02""SOLETE V0 LESS AND EXCEPT those portions of the above easement properties which lie within the properties taken, in fee simple, designated as Parcels 111 and 123 by Eminent Domain Suit No. 99- 4965 -CI, as evidenced by that Lis Pendens recorded in Official Records Book 10598, page 2406; Stipulated Order of Taking & Final Judgment recorded in Official Records Book 10714, page 617; and stipulated Order of Taking and final Judgment recorded in Official Records Book 10714, page 620; Stipulated Order of Taking and Partial Final Judgment recorded in Official Records Book 10714, page 624; Stipulated Order of Taking and Final Judgment recorded in Official Records Book 10714, page 628; Order of Taking recorded in Official Records Book 10741, page 2041; Stipulated Final Judgment recorded in Official Records Book 11611, page 1495 and Amended Order of Taking and Stipulated Final Judgment recorded in Official Records Book 11704, page 1408, Public Records of Pinellas County, Florida. LESS AND EXCEPT those portions of the above easement properties which lie within the properties taken, in fee simple, designated as Parcel 119 by Eminent Domain Suit No. 99- 5089 -CI, as evidenced by that Lis Pendens recorded in Official Records Book 10604, page 2207; Stipulated Order of Taking and Final Judgment recorded in Official Records Book 10662, page 353 and Stipulated Order of Taking and Final Judgment recorded in Official Records Book 10874, page 2276, Public Records of Pinellas County, Florida. LESS AND EXCEPT that portion of said Lot 1 taken, in fee simple, designated as PARCEL 120 by Eminent Domain Suit No. 99- 4965 -CI, as evidenced by that Lis Pendens recorded in Official Records Book 10598, page 2406; Stipulated Order of Taking & Final Judgment recorded in Official Records Book 10714, page 617; and Stipulated Order of Taking and Final Judgment recorded in Official Records Book 10714, page 620; Stipulated Order of Taking and Partial Final Judgment recorded in Official Records. Book 10714, page 624; Stipulated Order of Taking and Final Judgment recorded in Official Records Book 10714, page 628; Order of Taking recorded in Official Records Book 10741, page 2041; Stipulated Final Judgment recorded in Official Records Book 11611, page 1495 and Amended Order of Taking and Stipulated Final Judgment recorded in Official Records Book 11704, page 1408, Public Records of Pinellas County. A -2 Bomber Field: That portion of the northeast 1/4 of the southeast 1/4 of Section 7, Township 29 South, Range 16 East, Pinellas County, Florida, being further described as follows: BEGIN at the northwest corner of Lot 1, THE CLEARWATER COLLECTION SECOND REPLAT according to the plat thereof as recorded in Plat Book 107, Pages 24 and 25 of the Public Records of Pinellas County, Florida; thence along the north line of said plat, also being the south line of the northeast 1/4 of the southeast 114 of Section 7, Township 29 South, Range 16 East, N 89047'45W., 247.55 feet to the northwest corner of THE CLEARWATER COLLECTION SECOND REPLAT; thence leaving said line, N 00 °46'44 "E., 436.73 feet along a line 175.00 feet east of and parallel with the center line of .Florida Power Corporation's HIGGINS - DISSTON 110 KV transmission line; thence leaving said line, S 89 °47'45 "E, 102.60 feet; thence S 67 002'37 "E., 116.88 feet; thence S.89 047'45 "E., 790.19 feet to the west right of way line of U.S. HIGHWAY 19 (STATE ROAD 55, right of way width varies); thence along said right of way line the following two (2) courses, S.00 057'56 "W., 311.95 feet; thence S.05 °27'56 "W., 79.92 feet to the north line of the aforesaid THE CLEARWATER COLLECTION SECOND REPLAT; thence along said line S.89 °47'45 "W., 745.73 feet to the POINT OF BEGINNING. Containing 9.148 Acres, more or less. A -3 I 7) r 1 I r / Form 1101 f1�: id, WAKKAN1 ')FGU l''.' :l. %;_I ;.) i „x:::•cuw /f:a {l i.:n : :..: :... .... .. ... AeMy r 97.er used Ao d.. the lean "party” xhnit (nclrule the Ali,,. prm.nnl rcprcxen/nlirrx, ,vecrxxon n.nd /.r n. «i qnx o/ LAe runrcL(re pn.rliex nrreM; lAn rue n/ the a(n gnlnr nrrrnner ,hall inrludr lhr pGunl, and Lhe plural the sintruMr, thr axe of nn. grader rhnll inrhrde _ - aLl render ±; rtnd, i /axed, LAe lrrm Hole" shall inelrede afl [Im nolex Aerein denrihcd i/ morn m r_r than one - '• .Made this 17th day of January ✓1. D. 1963 ' Betweell John D. Miller and Marjorie L. Miller, his wife, o f the County o f P i n e l l a s and State of Florida party of the first part, and CITY OF CLEARWATER, a municipal corporation, of the County of P i ne I I as and State of r Florida party of the second part. Witnesseth that the said party of the first part,, for and in consideration of the sum of One CI.00) Do Iar and other valuable cons iderationQeKars, to him in hand paid, the receipt whereof is hereby acknowledged, has granted, bargain- ed, sold and transferred, and by these presents does grant, bargain, sell and transfer unto the said party of the second part all that certain parcel of land lying and being in the County of Pine I I as and State of . tlorida, more particularly described as follows: The Northeast Quarter (NE-0 of the Southeast Quarter (SE4) of Sec- tion 7, Township 29 South, Range 16 East, LESS AND EXCEPT the right - of -way .of U. S. Highway 19_; also, LESS AND- EXCEPT the following de- scribed parcel of land to -wit: Beginning at the Southwest corner of the NE1 of SE4 of Section 7, Township 29 South, Range 16 East; thence North A9 degrees 52 minutes 03 1 seconds East, along the South boundary of said NE4 of SE4, 239.10 feet to a point that is 175.00 feet East- erly of and at right angle to the center line of Florida Power Cor- poration's existing Higgins - Disston 110 KV transmission line; thence North 0 degrees 23 minutes 18 seconds East, parallel to said existing center line, 1153.54 feet; thence North 0 degrees 24 minutes 38 seconds East, parallel to said existing center line, 193.08 feet to a point on the North boundary of said NE; of SE'; thence South 89 degrees 41 minutes 38 seconds West, along said North boundary, 236.29 feet to the Northwest corner of said NE4 of SE4, thence South 0 degrees 30 minutes 40 seconds West along the West boundary of said NE4 of SE4r 1345.95 feet to the Point of Beginning: situate. lying and being in the County of Pinellas, State of Florida, including rights of ingress and egress in accordance with Deed recorded in OR Book 1472; page 385. T6fretllelr with all the tenements, hereditaments an:d appurtenances, with every pra nlege, right, title, interest and estate, dower and right of dower, reversion, remainder and easement thereto belonsing or in anywise appertaining: To Have and t® Hold the same in fee simple forever. .4nd the said party of the first part does covenant with the said party of the second part that he is lawfully seized of the said premises, that they are free from all inctan- brances and that he has good right and lawful authority to sell the same; and the said party of the first part does hereby fft•lly warrant the title to said kind, and will defend the same against the lawful claims of all persons wltanz.soever. In witness Whereof, the ,said, party of the first part has hereunto, set his hand and seal the day and year above written. o Signed, Scaled and Delivered in Our Presence: N C... C7 c0 t• us V O.- c F� 1 7�,� it7 :3 o 't� d d c'-1 � � 5 3 ti y LL) c 0.0 'L3 30,158B d'•''' ,� r, ,t,`A�, 4C •t�CRLE�,R P�E� O X L; M O Date 3 U \ ABSTRACT OF DESCRIPTION +� rn m�> i „ I11I 1 Ln ro ib q) o a o o C-4 140 3: G.7 M na v a U (y] a N d E co rp 'U v n Z v •1J a V v �rr1 -'• �1 ij`'; •,a N U Z21 O H r y U .vf� ^'r VV- COD a —mil I Jl lim O n� < >4I,IIIIIIIII'!Ilj o iO �QI C.O U _ 11 'OI�!lil!;!ilu 1 1!W11103 SVI13NId o Ip� o I�cI m II �. J ...- .••, W � `; H J N c :n U ' `o Iv�Gllillllllll0 AiNn03.- S�ll3NId o ra. oa rod& WAYMA rr 9"i2616�i � uw ...................N i `�li��ltflii�g Made this day of J. D. 1962 Between JOHN D. MILLER and MARJORIE L. MILLER, his wife, N 1r< .O y o�w o � O ZaWC o° 9 of the County of Pinellas and State of Florida parties of the first part, and FLORIDA POWER CORPORATION 101 Fifth Street South, St. Petersburg, Florida a corporation existing under the laws of the State of Florida having its principal place of business in the County of Pinellas and State of Florida party of the second part, WitileSSeth, that the said parties of the fzret part, for and in consideration of the sum of TEN DOLLARS 010.00) AND OTHER VALUABLE CONSIDERATIONS Buffi-4 to them in hand paid, the receipt whereof is hereby acknowledged, have granted, bargained, sold, aliened, remised, released, enfeofJed, conveyed and con - ftrmed and by these presents do grant, bargain, sell, alien, remise, release, enfeoff, convey and confirm unto the said party of the second part and its succes- sors and assigns forever, all that certain parcel of land lying and being in the County of Pinellas and State of Florida, more particularly described as follows: Beginning at the Southwest corner of the NE{- of SE.1 of section 7, Township 29 South, Range 16 East; thence North 89° 52' 03" East, along the South boundary of said i* of SE4, 239.10 feet to a point that is 175.00 feet Easterly of and at right angle to the center line of Florida Power Corporation's existing Higgins - Disston 110 KV transmission line; thence North 0° 23' 18" East, parallel to said existing center line, 1153.54 feet; thence North 0° 24' 38" East, parallel to said existing center line, 193.08 feet to a point on the North boundary of said NEL of SE-L 4; thence South 89° 41' 38" West along said North boundary, 236.29 feet to the Northwest corner of said NEy of SEi; thence South 0° 3D' 40" West along the West boundary of said NE,' of S*,-1345.95 feet to the Point of Beginning, LESS that portion thereof which is subject to road rigbt -of -way for Coachman Road (county Road No. 32). The conveyance herein is subject to the Grantors, their heirs and assigns reserv- ing the following rights in and to the hereinabove described parcel of land: The Grantors hereby expressly reserve unto themselves, their heirs and assigns, the right, at their own risk, to cross, at approximately right angles thereto, the parcel of land herein conveyed at such points as may be agreed upon by the parties hereto, their heirs, successors or assigns, for the purpose of having access.to such part or portion of the land and premises of the Grantors as may, by the conveyance of the herein described parcel or tract of land, be cut off from the rest of the land and premises of the Grantors, their heirs or assigns. Together with all the tenements, hereditaments and appurtenances, with every pnivege, right, title, interest and estate, dower and right of dower, reversion, remainder and.'easement thereto belonging or in anywise appertaining: To Have and to Hold the same in fee simple forever. ,and the said part iesof the first part do covenant with the said party of the second part that they are lawfully seized of the" said premises, that they are free of all ineumbrance, and that they have _ • .'good right and law/W authority to sell the same, and,that said parties of the ftraA ;" doth hereby fully warrant the title to said land, and will defend the ,iarne#�'agoinat the lawful claims of all persons whomsoever. Ir. Witness Whereof, the said part ies of the ftrst part have hereunto set their hand a and seal s the day and year above written. .sl.�.. D. i Miller v' e ICJ A.� V . O V C.. OBSOLETE 0 G r State of Florida, oj.1472 PACE386 Comt7 of PECUAS ZZ I RUM CBRTM, That on this '-'Id - day of A. D. 1,962 , before me personally appeared JOHN D. MILLER and MAAJORIE L. MILLER, hie wife, to me known to be the persons described in and who executed the foregoing conveyance to FLORIDA POWER CORPORATION and severally acknowledged the execution thereof to be their free act and deed for the uses and purposes therein mentioned. Clearwater WrPNEW my signature and of)datal seal at a S t of Florida. the day and in the County of Pinellas year last aforesaid. L .My Commission Expires Nc Publxe Notary K.W. State 1;001it11 al Larp= : •, my commission expires Oct. 15, 1%4:'- Bsnase 0y rus. bosWnya InaWyilaal�0� . d 1d iiE i 'o e Z x y., ,.l r t -= OBSOLETE MpY - 6 1994 MY OF CLEARWATER, FLORIDA DEED OF CONVEYANCE WPI NO., :7117045 PROJECT NUMBER :15150 -2566 COUNTY :Pinellas STATE ROAD :55 PARCEL NO. :121 THIS INDENTURE made this day of , 1994, by and between the City of Clearwater, F1 i a, a Florida Municipal Corporation, party of the first part, and the Florida Department of Transportation, of the State of Florida, party of the second part, whose mailing address is 11201 North McKinley Drive, Tampa, Florida 33612 -6403. WITNESSETH: That the party of the first part, for and in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations, including, but not limited to,- any required right -of -way clearing and utility relocations, to it in hand paid by said party of the second part, at or before the ensealing and delivery of these presents, the receipt whereof is hereby acknowledged, has granted, bargained, sold, conveyed and confirmed unto the said party of the second part, and to its heirs and assigns forever, all the following piece, parcel, lot or tract of land, situate, lying and being in the County of Pinellas and State of Florida, and described as follows, to wit: PARCEL 121 RIGHT -OF -WAY That part of: The Northeast Quarter (NE1 /4) of the Southeast Quarter (SE1 /4) of Section 7, ?� Township 29 South, Range 16 East, LESS AND EXCEPT the following right -of -way ` of U. S. Highway 19; also LESS AND EXCEPT the following described parcel of land to -wit: Beginning at the Southwest corner of the NE1 /9 of the SE-1/4 of Section 7, Township 29 South, Range 16 East; thence North 89 °52'03" East, along the South boundary of said NE1 /4 of SE1 /4, 239.10 feet to a point that is 175.00 feet Easterly of and at right angle to the centerline of Florida Power Corporation's existing Higgins - Disston 110 RV transmission line; thence North 0 °23118" East, parallel to said existing center line, 1153.54 feet; thence North 0 °24138" East, parallel to said existing center line, 193.08 feet to a point on the North boundary of said NE1 /4 of SE1 /4; thence South 89 °41138" West, along said North boundary, 236.29 feet to the Northwest corner of said NE1 /4 of SE1 /4, thence South 0 °30140" West along the West boundary of said NE1 /4 of SE1 /4, 1345.95 feet to the POINT OF BEGINNING: situate, lying and being in the County of Pinellas, State of Florida. Lying within the following described boundary, to -wit: Commence at a 5/8" iron rod no. LB -33 marking the Southwest corner of the Southeast 1/4 of Section 7, Township 29 South, Range 16 East, Pinellas County, Florida, run thence South 89 °39146" East, a distance of 2,671.71 feet along the South boundary of the Southwest 1/4 of said Section 7 to the Southeast corner thereof; thence North 00 °54150" East, a distance of 1,350.60 feet along the East boundary of the Southeast 1/4 of =aiu Section 7; thence North 89 °50151" West, a distance of 100.01 feet to the existing West right - of -way line of U. S. #'19 and the POINT OF BEGINNING; thence North 89 °50'51" West, a distance of 6.27 feet along the North boundary of THE CLEARWATER COLLECTION - SECOND REPLAT, according to the map or plat thereof, recorded in Plat Book 107, Page 24 of the Public Records of Pinellas County, Florida; thence North 05 °24150" East, a distance of 79.90 feet to said West right -of- way line of U.S. $19; thence along said West right -of -way line, South 00 °54150" West, a distance of 79.57 feet to the POINT OF BEGINNING. Containing 249 square feet, more or less. (7d 0 t9 CC��C Ii; C TOGETHER 'LTH all and singular teneir s, hereditaments and appurtenances reunto belong or appertaining; 1 1 every right, title or interest, legal _r equitable, of the said party of 1.,1e first part, of, in and to the same. TO HAVE AND TO HOLD the same unto the said party of the second part, its heirs and assigns, to its own property use, benefit and behoof forever. IN WITNESS WHEREOF, the said party of the first part has caused these presents to be executed in its name by its City Manager, City Clerk, countersigned by its Mayor- Commissioner, and approved as to form and correctness by its Office of City Attorney, and its corporate seal to be hereunto attached, the day and year first above written. Countersigned: CITY OF CLEARWATER, FLORIDA P. O. BOX 4748 CLEARWATER, FLORIDA 34618 -4748 A'4'A_'.fv �v w By :. ` Al Rita Garvey, Mayor -Col ssioner Elizakfeth M. Deptula City Manager Attest: Cy thia .E. .Goudeau,. City Clerk STATE OF FLORIDA.} COUNTY OF PINELLAS } BEFORE ME, the undersigned, personally appeared Rita Garvey, the Mayor - Commissioner of the City of Clearwater, Florida, who executed the foregoing instrument and acknowledged the execution thereof to be her free act and deed ' for the use and ur oses herein set forth and who is p p , personally known to me. WITNESS my hand and official seal this C'2�() day of / 1994. ILaw "v. DENISE A. WILSON Notary Pu lic .j MY COMMISSION I CC 201408 EXPIRES Print/type name: ! •s >me18,1NSI p „ ^d, eoxut0 rwm mor raw nawuNCE, xc. STATE OF FLORIDA } COUNTY OF PINELLAS } BEFORE ME, the undersigned, personally appeared Elizabeth M. Deptula, the City Manager of the City of Clearwater, Florida, who executed the foregoing instrument and acknowledged the execution thereof to be her free act and deed for the use and purposes herein set forth, and who is personally known to me. Q WITNESS my hand and official seal this e day of / , 1994. I_ :v •. DENISE A. WILSON Notary Public — uyCOMMISSIO ie �408IXP!RES Print /type name: �j Vii;, eouaonRUTRDYFAIHIHs~CE.IK. Approved as to form and correctness: By: Office of the City Attorney SR55deed.ewb Joe DiMaggio Sports Complex — Legal Description A parcel of land within the Southwest '/4 of the Southeast '/4 of Section 7, Township 29 South, Range 16 East, Pinellas County, Florida and being further described as follows: Commence at the Southwest corner of the Southeast'/ of said Section 7; thence along the West line of said Southeast '/4 North 00 041147" East, for 50.00 feet to the North right -of -way line of Drew Street; thence along said right -of -way line South 89 140'19 "East for 542.36 feet to the Point of Beginning; thence leaving said line North 00 °41'47" East, for 435.00 feet; thence South 89 040'19" East, for 761.22 feet to the West right -of -way line of Old Coachman Road; thence along said right -of -way line South 00 047'54" West, for 435.00 feet to the intersection with said North right -of -way line of Drew Street; thence along said right -of -way line North 89 °40'19" West for 760.45 feet to the Point of Beginning. Containing 330,959 square feet or 7.60 acres, more or less _ i' Commence at the Southwest corner of the Southeast' /4 of said Section 7; thence along the West line of said Southeast' /4 North 00 041'47" East, for 485.00 feet to the Point of Beginning; thence continue along said line North 00 041'47" East, for 823.27 feet to the South right -of -way line of Sharkey Road (CR 289); thence along said right -of -way line South 89 153'02" East, for 1,305.10 feet to the intersection with the West right -of -way line of Old Coachman Road; thence along said right -of -way line South 00 147'54" West, for 828.12 feet; thence leaving said line North 89 140'19" West, for 1,303.58 feet to the Point of Beginning. -d � . `. rah } • � ° k � ,<4 . - 3 N L t(7 •5.�� ( 6 77 -7 '77? S� 0(- tip' !`r ✓w G��� "1 � L l i N 0 r1/ ! CY Z �� •I _ • e JAR t t 0 Sve ZSo r8Y V Z I-Ijol 4mAr5- _ -rs°-Giv -?.- 1 6 t 1 .F. . _• �:�_ lt., "��7r :'J. -. ! � 7. i' ./`tea:.: tW.'- "�Ll�'�' !. ^' �: "� • / ,' . }` ti's .. - w � s` � i .�fi,,� .� -r �. r.,� _ R «. t �.l 1. r, � . ='i � � ey" -Y .�.. �_��• .` }` • � ,ti`s , 05 :►.-w��.•, I�a� fi �;.[y`� � � }' a �: • z7 you 33.5 X,s rIzc) fj 40 zs reso o cx cl f�c c2SSd �l__Y i o` %• b V. QAQ r l' - arw SC4AI _ � V i� �7 l 1 1�."iC � � _ 'D E�i� . d $. � � N0s-•� e�1_ 4� Si 1 pp� f / ZS ?;� i � L 2 G�._0�..,. 3 —.iC.V S �oJ'� � Tim, �. S � � • �' S�___...�._ ID 40 e- S JJ_ A � {�r.� e 7 - g_.rc. ei• WV.5 S ..c�..,. ��._�s r�x o.6•,a.�. Y_ ! BSOLETE---- fj SC Or 1 I� � D1 i ZU -qA � OBSOLETE V a Phillies Clearwater Community Spor,zi Complex Total project land area: Comprehensive Sign Program Data Table 759,015 s.f. 17.42 acres WEST ELEVATION Area s.f. Street frontage (Coachman) 650 Lt. + (Carpenter Center) 907 Lf. =1557 Lf. Allowable freestanding sign area 1 s.f. per 2 Lt. of street frontage 779 Building fagade total 19600 Allowable attached signage 6% of area 1176 Single -sided allowable freestanding signage 1 s.f. per 100 s.f. of building 196 Double -sided allowable freestanding signage 2 s.f, per 100 s.f. of building 392 Sign Category Frontage Legibility Si n 5TrSkqn description Notes Area Attached Freestanding Monument Legible from Coachman Road F4 - PF illie5 logo - qty. 1, internally illuminated. 57.5 57.5 17 F6 Phillies door logo qty. 2 Not Calculated in total. 0 0 F7 Admin. door logo qty. 1 Not Calculated in total. 0 0 F7 Phillies door logo city. 2 Not Calculated in total. 0 0 X10 PFiillies logo /team store I.D_ gti . infemallyinum'matea" --q-8- X3 • Tickets sin _ . ,.,, C y 1, f f 4& �/ }� r%•�� i 1. rG� 15 -, Phillies:adrxlin l.R_. _ „ >- ._ qty-1 yjr Y 12 .. •• _ y i>• X9 � Building I.D. monument � `; ' > . °,' qty; 1doub £ . xt @reially111rifiinated ` `4.5 - 34.5 A 1 34.5 � rJ:,AeQ�'b'a Banners — -- -- - __ - - - 14 Banners double-sided 154 154 X11 _ est ent buildin 1.D. 4!Y,1 - _ _ - 102 _ 102 102 X5 Rules and reg_u atios gty.3 Not Calculated in total 0 0 TOTAL AREA OF.SIGNAGE THIS ELEVATION 393.5 205 154 34.5 151.5 SOUTH ELEVATION Area s.f. Building fagade total . 14996 Allowable attached signage 6 % of area 900 Single—sided—allowable freestanding signage 1 s.f. per 100 s.f- of building. 150 Double - sided allowable freestanding signage 2 s.f. per 100 s.f. of builcHing _ 300 Sign Category Fronts e Legibility 9 Sin a Si n description _ -� Notes__ _ _Ared r Attached Freestanding Monument 'NO adjacent public roadway r Banners �` - _ 10.Banners double sided, 110 110 9 `: - SoUth ent buildin I.D. city 1 s~ ,e TOTAL AR AGE THIS ELEVATION 160 50 110 0 N/A EAST ELEVATION Area s.f. Street frontage (US 19) 650 Lf. + (Carpenter Center) 658'- 0 ".l.f. = :1,508' -0" 1.f. Allowable freestanding sign area 1 s.f; per 2 Lf. of street.frontage 754 Buihiing,fagade total .. 17060 Allowable attached signage 6 % of area; r 1024 Single -shied allowable freestanding signage 1 s.f. per 100 s.f. of building 171 Double -sided allowable freestanding signage 2 s.f. per 100 s.f. of building 341 '- Sign Category Frontage Legibility Sin a Si n descri tion Notes Area- _A-tfached Freestanding �� Monument Legible from US 19 X8 US 19 marquee —.. qty. 1, double - sided, internally illuminated, reader - board - `� 14 3- LL = - - = / 155 ��3� TOTAL AREA OF SIGNAGE THIS ELEVATION 0 0 155 NORTH ELEVATION Area Building fagade total 16224 Allowable attached signage 6% of area 973 Single -sided allowable freestand'mg signage 1 sJ., per 100 s.f. of building, 162 Double•sided allowable freestanding signage 2 s.f, per 100 s,f- of building 324 Sign Category Frontage Legibility Sin a Si n descri tion Notes Area Attached Freestanding Monument 'No adjacent public roadway F..3 Scoreboard f.D.,_ v� iershied j _ _/ w.t TOTAL AREA OF SIGNAGE THIS'ELEVATION 197. 197 0 0 N/A 1`/6 3 aZ.�Z Y� . -7c( •f HOK SPORT + VENUE + EVENT GFC300L � !�rch 11,2003 COMPREHENSIVE SIGN PROGRAM APPLICATION Additional Documentation December 20, 2002 C. SIGN PLAN AND ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Code Sections 4 -1001 and 4- 202.A.23) Illumination details including type, placement, and intensity have not yet been included in this application, other than whether sign shall be internally or externally illuminated. Internal illumination shall likely either be fluorescent or neon. External illumination shall be via ground- mounted lamp. Illumination details shall be developed by the sign fabricator and coordinated with the architect and City of Clearwater prior to installation. D. SITE PLAN SUBMITTAL REQUIREMENTS: (Code Section 41001 & Section 202) Because the property lines of the sports complex site are so far from the adjacent roadways, a variance is requested to allow the freestanding and monument signs. along US 19 and Coachman to be outside of the property limits of the sports complex itself, and inside the road right -of- ways /Florida Power right -of -way: E. WRITTEN SUBMITTAL REQUIREMENTS: (Section 3- 1807.C) 1. Architectural Theme. The exterior design of the new sports complex itself has been inspired by the special characteristics of existing Clearwater architecture and the curving, free flowing lines of Florida vegetation and palm trees. In like manner, the freestanding and attached signs proposed have been designed to compliment and reflect the architectural character of the new sports complex as, well as the tradition of baseball. The use of stucco, masonry, custom metal details, colors, curving lines and leaf motif which are integral parts of the building design are repeated in the s.ignage /graphics proposed for the complex, actually enhancing and becoming a part of the exterior design of the complex. 2. Height. Per telephone conversation with Lynn Isaak, P.E. with the Florida Department of Transportation, the future overpass at the intersection of Drew and US 19 will be approximately at elevation 60 (compared to a current elevation of +/ -34). From this point it will slope back down to intersect the existing road elevation ( +/ -29) approximately 1300' north. Interpolating between these two - numbers the highest point of the roadway within the property lines of the sports complex would be + /- elevation 45. The height of the freestanding sign proposed near the south entry of the sports complex at the bridge off of US 19 is 14' above this highest point of the proposed roadway. 3. Lighting. Because part of the purpose of the freestanding sign along US 19 is to advise passers -by of upcoming events, a variance is requested to allow this sign to be lit during non -game and non- event times as well as during the events themselves. Hours of illumination during non -game and non -event times to be negotiated with the City of Clearwater. Also, a variance is requested to allow the monument sign on Coachman to be lit during non -game and non -event times. Any other lighted signs indicated in the sign package will meet the requirements of the Clearwater Sign Ordinance. OLEO`) 6 0 L I E TE 4. Total Area of Sign Faces. L Per attached Data Table, the area of all attached signs are well under the allowable 6 percent of the building fagade to which the signs are attached. ii. 'Based on section 3 -1806 B.1c.i, the maximum area of afreestanding sign face on the east fagade shall not exceed 779 s.f.. The area of the proposed Type X8 freestanding sign is 516 s.f. Because there are two major entries to the new sports complex (one on US 19 and one on Coachman) a variance is requested to allow a monument sign at the west entry in addition to the freestanding sign at the east entry off US 19. The area of the proposed Type X9 monument sign is 150 s.f. - substantially less than the 754 s.f. sign that would be.permitted based on the building frontage on the west elevation. Also, note that the total area of the X8 and X9 signs is only 666 s.f._— even less than the allowable sign area for the west side alone! 5. Community Character. As described in item.1 above, the signage proposed for the new sport complex has been designed to integrate tastefully with the existing architectural character of Clearwater. The attached Data Table indicates there are only 4 signs, which can be read from the adjacent public thoroughfares; and these serve as needed building identification enabling visitors to easily locate the sports complex or be made aware of upcoming events. The remaining signage is pedestrian and wayfinding oriented and only becomes legible as the sports complex is approached from the parking lot on the south and the long entry drive on the west. 6. Property Values. There is nothing distractive or offensive about the aesthetics, size, lighting, etc. of the proposed signage that will have an adverse impact on the value of the property in the immediate vicinity of the sports complex, particularly since the adjacent areas are commercial in nature. 7. Elimination of Unattractive Signage. There is currently no existing signage on the site of the sports complex following the demolition of the existing Home Depot. Because the proposed signage is integrated with the design of the new complex, it is necessarily an improvement.over signage that would have been permitted under the minimum sign standards. N/A 8. Special Area or Scenic Corridor Plan. rn- � mo XETE 3 rn Ir F Phi(lies Clearwater Community Spon* Complex Total project land area: Comprehensive Sign Program Data Table 759,015 s.f. 17.42 acres WEST ELEVATION Area s.f. Street frontage (Coachman) 650 Lf. + (Carpenter Center) 907 Lf. = 1557 Lf. Allowable freestanding sign area 1 s.f, per 2 Lf. of street frontage 779 Building facade total 19600 Allowable attached signage 6% of area 1176 Single -sided allowable ffeestanding signage 1 s.f. per 100 s.f. of building 196 Double -sided allowable freestanding signage 2 s.f, per 100 s.f. of building 392 Sign Category Frontage Legibility Sin type I Sign description Notes Area Attached Freestanding Monument Legible from Coachman Road F4 Phillies logo gty�,1 lntemaily illuminated 55 55 F6 Phillies door loo Sty. 2 2 "� 2 F7 Admin. door logo qty. 1 2.5 2.5 F7 Phillies door logo i 9ty• 2 • 2 'i 2 X10 Phillies logo /team store I.D. qty., 1internallyilluminated 10.5 10.5 X3 Tickets sin Sty. 1 ' 15 15 15 X6 Phillies admin. I.D. —__ -- - - -- --8.5 8.5 X9 Building I.D. monument ty.1,dy. ble- sided, mat illuminated 150 5� 150 Banners I option 1 qty. 7, opfiong b_.6- '�? 4 220 _ 220 �J� lOVA,— 1� I. X1 West entry building I.D. ,qty. 1 100 y 100 100 X5 I Rules and regulations c 4ty.3 22.5 ; 22.5 TOTAL AREA OF SIGNAGE THIS ELEVATION - 588 218 220 150 265 SOUTH ELEVATION I Area s.f. Building facade total 14996 Allowable attached signage 6% of area 900 Single -sided allowable freestanding signage 1 s.f. per 100 s.f. of building 150. Double -sided allowable freestanding signage 2 s.f. per 100 s.f. of building 300 Sign Category Frontage Legibility Sl n type I Si n description Notes Area Attached Freestanding Monument wo adjacent public roadway Banners or -gM.3-Wien-2 qty. 7- 174 p� X2 South entry building I.D. q`ly 1; this igure includes qty. 3 X5 signs on this 61 61 TOTAL AREA OF SIGNAGE THIS ELEVATION 235 61 174 0 N/A EAST ELEVATION Area s.f. Street frontage (US 19) 650 Lf. + (Carpenter Center) 858' -0" Lf. = 1,508' -0" Lf. Allowable freestanding sign area 1 s.f, per 2 Lf. of street frontage 754 Building facade total 17060 Allowable attached signage 6% of area 1024 Single -sided allowable freestanding signage 1 s.f. per 100 s.f. of building 171 Double -sided allowable freestanding signage 2 s.f. per 100 s.f. of building 341 Sign Category Frontage Legibility Sin type Si n description I Notes Area Attached Freestanding Monument Legible from US 19 X8 US 19 marquee q , double- sided, nternaly illuminated, reader board 516 _ 1 S9� 516 TOTAL AREA OF SIGNAGE THIS ELEVATION 516 0 516 0 516 NORTH ELEVATION Area Building facade total 16224 Allowable attached signage 6% of area 973 Single -sided allowable freestanding signage 1 s.f. per 100 s.f. of building 162 Double -sided allowable freestanding signage 2 s.f. per 100 s.f. of building 324 Sign Category Frontage Legibility Sin a I Si n description Notes Area Attached Freestanding Monument -No adjacent public roadway F3 IScoreboard I.D. qty. 1,double -sided 8001 800 TOTAL AREA OF SIGNAGE THIS ELEVATION 8001 0 800 0 N/A "'S0L T [�Zz HOK SPORT +VENUE +EVENT / � � �� � &ce 2 SIGN TYPE X9 SIGHT TRIANGLE PLAN D SITE VERIFY ALL DIMENSIO S TO AVOID POND zQ I� LANDSCAPED AREA w 24' MONUMENT SIGN X8 SIGHT TRIANGLE - � I o � I I M � I -- ---- -- - - ---� 30' -0° SIGN TYPE X8 SIGHT TRIANGLE PLAN WAL B ,/Y =,,-o.- 0 0 'OLET100ight Line Studies DETAIL A Phillies Clearwater Community Sports Complex Comprehensive Sign Program .S OBSOLETE Phillies Clearwater Community Sports %;omplex Total project land area: Comprehensive Sign Program Data Table 759,015 s.f. 17.42 acres WEST ELEVATION Area s.f. Street frontage (Coachman) 650 I.f. + (Carpenter Center) 907 I.f. = 1557 I.f. Allowable freestanding sign area 1 s.f. per 2 I.f. of street frontage 779 Building fagade total 19600 Allowable attached signage 6% of area 1176 Single -sided allowable freestanding signage 1 s.f. per 100 s.f. of building 196 Double -sided allowable freestanding signage 2 s.f. per 100 s.f. of building 392 Sign Category Frontage Legibility Sin type Si n description I Notes Area Attached Freestanding Monument Legible from Coachman Road F4 Phillies logo qty. 1, internally illuminated 55 55 F6 Phillies door logo qty. 2 2 2 F7 Admin. door logo qty. 1 2.5 2.5 F7 Phillies door logo qty. 2 2 2 X10 Phillies logo /team store I.D. qty., 1internally illuminated 10.5 10.5 X3 Tickets sign qty. 1 15 15 15 X6 Phillies admin. I.D. qty. 1 8.5 8.5 X9 Building I.D. monument qty. 1, double- sided, externally illuminated 150 150 150 Banners option 1 qty. 7, option 2 qty. 6 220 220 X1 West entry uilding I.D. qty. 1 100 100 100 X5 I Rules and regulations qty-3 22.5 22.5 TOTAL AREA OF SIGNAGE THIS ELEVATION 588 218 220 1501 265 SOUTH ELEVATION Area s.f. Building fagade total 14996 Allowable attached signage 6% of area 900 Single -sided allowable freestanding signage 1 s.f. per 100 s.f. of building 150 Double -sided allowable freestanding signage 2 s.f. per 100 s.f. of building 300 Sign Category Frontage Legibility S! n type I Si n description I Notes Area Attached Freestanding Monument Wo adjacent public roadway Banners option 1 qty. 3, option 2 qty. 7 174 174 X2 South entry building I.D. qty 1, this figure includes qty. 3 X5 signs on this elev. 61 61 TOTAL AREA OF SIGNAGE THIS ELEVATION 235 61 174 0 N/A EAST ELEVATION Area s.f. Street frontage (US 19) 650 I.f. + (Carpenter Center) 858' -0" 11 = 1,508' -0' I.f. Allowable freestanding sign area 1 s.f. per 2 t.f. of street frontage 754 Building fagade total 17060 Allowable attached signage 6% of area 1024 Single -sided allowable freestanding signage 1 s.f. per 100 s.f. of building 171 Double -sided allowable freestanding signage 2 s.f. per 100 s.f. of building 341 Sign Category Frontage Legibility Sign type SI n description Notes Area Attached Freestanding I Monument Legible from US 19 X8 US 19 marquee JqY 1, double- sided, intematy illuminated, reader board 516 516 516 TOTAL AREA OF SIGNAGE THIS ELEVATION 516 0 516 0 516 NORTH ELEVATION Area Building fagade total 16224 Allowable attached signage 6% of area 973 Single -sided allowable freestanding signage 1 s.f. per 100 s.f. of building 162 Double -sided allowable freestanding signage 2 s.f. per 100 s.f. of building 324 -Sign Category Frontage Legibility Sin type I Sign description I Notes Area Attached Freestanding F Monument -No adjacent public roadway F3 I Scoreboard I.D. Jqty. 1, double -sided 800 800 TOTAL AREA OF SIGNAGE THIS ELEVATION 8001 0 800 0 N/A 44 *46 HOK SPORT + VENUE + EVENT December 20, 2002 SIGN TYPE X9 SIGHT TRIANGLE PLAN SITE VERIFY ALL DIMENSIONS TO AVOID POND <C a LANDSCAPED AREA w 24' MONUMENT SIGN X8 SIGHT TRIANGLE L -- - - - -i I o M I ------- - - - - -� I 30$ -on t� SITE REFERENCE PLAN SIGN TYPE X8 SIGHT TRIANGLE PLAN DETAIL B t/z• =P -0•. DETAIL A bUL "' TE Sight Line Studies Phillies Clearwater Community Sports Complex Comprehensive Sign Program �ri►�o . �AOA -v)o 54Avs. A F-I �l i L OBSOLETE Wells, Wayne From: Wells, Wayne Sent: Thursday, April 21, 2005 5:27 PM To: Delk, Michael Subject: Councilmember request re Bright House Networks Field sign Michael - Section 3- 1804.H of the General Standards of the Sign Code states that "Notwithstanding any other provision of this Code, no sign shall be subject to any limitation based on the content of the message contained on such sign." Section 3- 1805.W of the Signs Permitted Without a Permit of the Sign Code states for signs on publicly owned property "...Consistent with the general standards in Section 3 -1804, the approval or disapproval shall not be based on the content of the message contained (i.e., the viewpoint expressed) on such sign..." You may also want to talk to Kevin Dunbar, Parks and Recreation Director, regarding the contract with Bright House Networks and the amount and type of advertising by Bright House Networks on the electronic message sign oriented toward US 19. Wayne s LONG RANGE PLANNING DEVELOPMENT REVIEW CITY OF CLEARWATER PLANNING DEPARTMENT POST OFFICE BOX 4748, CLEARWATER, FLORIDA 33758 -4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLoRIDA 33756 TELEPHONE (727) 562-4567 FAx (727) 562 -4576 May 7, 2003 Mr. Kevin Dunbar, Director Parks and Recreation Department City of Clearwater 100 South Myrtle Avenue Clearwater, FL 33756 -5520 RE: Development Order regarding Case FLD2002- 07021A/SGN2003 -01002 at 601 Old Coachman Road (Clearwater Community Sports Complex and Phillies Spring Training Facility) Dear Mr. Dunbar: This letter constitutes a Development Order pursuant to Section 4- 206.D.6 of the Community Development Code. On April 15, 2003, the Community Development Board reviewed your application for Flexible Development approval, as a revision to a previously approved Comprehensive Infill Redevelopment Project (FLD2002- 07021), to increase the permitted height of a building (scoreboard) from 30 feet to 70 feet, under the provisions of Sections 2 -7043 and 2- 1404.A and a Comprehensive Sign Program to increase the number and area of freestanding signage from one sign of 64 square feet to 26 signs totaling 441.5 square feet and to increase the number and area of attached signage from one sign of 24 square feet to seven signs totaling 604.07 square feet, under the provisions of Section 3 -1807. This revision was for the scoreboard building and signage for the Clearwater Community Sports Complex and Phillies Spring Training Facility. The Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for for A�roval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Sections 2 -704.B and 2- 1404.A. 2. The proposal is in compliance with the criteria as a Comprehensive Sign Program per Section 3 -1807. 3. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3 -913. BRIAN J. AUNGST, MAYOR- COMMISSIONER HOYT HAMILTON, VICE MAYOR— COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HIBBARD, COMMISSIONER BILL JONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" .l May 7, 2003 Dunbar — Page 2 Conditions of Approval: ( *Conditions 1 -9 were included with the prior approval by the CDB on September 17, 2002, and were included with this amendment): 1. That the City upgrade site D (Joe DiMaggio) prior to the 2006 spring training season. The City shall provide at least 1,200 spaces at this location, with at least 550 spaces to be upgraded with paved drive aisles and a minimum 15 -foot wide landscape area along Drew Street and Old Coachman Road. The balance of the spaces may be on grass spaces (on playing fields); 2. That the City upgrade, with Florida Power's approval, site C with paved drive aisles and a minimum landscape area along Old Coachman Road of 15 feet, as part of a continuous, consistent streetscape; 3. That the player parking area be enhanced with a column and ornamental fence, acceptable to the Planning Department; 4. That a landscape plan for each parking lot be submitted to approved by Staff, prior to the issuance of permits for construction; 5. That should the Pinellas Trail extension within the Florida Power right -of -way be constructed prior to the 2004 spring training season, the sidewalk along the east side of Old Coachman Road may be eliminated and the sidewalk along the west side of Old Coachman Road shall be increased to a minimum width of 10 feet. If the Pinellas Trail extension is not constructed within this timeframe, but is substantially designed with funding assured (within fiscal year 03/04), then its construction may be deferred and a temporary surface should be installed for an interim period. If the trail is neither substantially designed nor funded, five -foot sidewalks should be installed prior to the 2004 spring training season; 6. That the signature landscape display at the intersection of Drew Street and Old Coachman Road be approved by the Planning Department, prior to construction, and installed prior to the 2006 spring training season; 7. That all proposed signage (scoreboard, directionals, temporary, etc.) be approved through a Comprehensive Sign Program by the Community Development Board; 8. That the design of the buildings be consistent with the conceptual elevations submitted to, or as modified by the CDB; 9. That a revised Master Parking Plan be submitted to staff within 14 days, with corrected parking tabulations and identifying site E (plaza parking); 10. That the scoreboard building be attached to, and made a part of, the north wall of the berm seating portion of the stadium; and 11. That the changeable message sign may be relocated, under Staff approval, by a maximum of 25 feet in any direction to accommodate unforeseen construction issues. Pursuant to Section 4 -407, an application for a building permit shall be made within one year of Flexible Development approval (April 15, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. May 7, 2003 Dunbar — Page 3 Please be aware that the issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4 -502.13 by the applicant or by any person granted party status within 14 days of the date of this Development Order. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on May 21, 2003 (14 days from the date of this Development Order). If you have any questions, please do not hesitate to call Wayne Wells, AICP, Senior Planner, at 727- 562 -4504. Sincerely, Cynthia H. Tarapani, AICP Planning Director IIMS5clPDSIPlanning DepartmentlCD BIFLEXIInactive or Finished Applications l Old Coachman 601 Stadium Scoreboard and Signage - Approved101d Coachman 601 Development Order.doc SPORT +VENUE +EVENT TRANSMITTAL 323 West 8th Street, Suite 700 Kansas City, Missouri 64105 USA T: 816 2211500 F: 816 2211578 Project Name: CLEARWATER COMMUNITY SPORTS COMPLEX & PHILLIES STF Project No.: 02- 0259 -00 ❑ CLEARWATER PHILLIES 727 - 441 -8638 JACK RUSSELL MEMORIAL STADIUM, 800 PHILLIES DR, CLEARWATER, FL 33755 _ ❑ PHILADELPHIA PHILLIES 215 - 952 -8218 _ VET_ ERANS STADIUM, 3501 S. BROAD ST., PHILADELPHIA, PA 19148 _❑ --- - - - - -- --------- - - -- PHILLIES- WASHINGTON SPORTS 215 - 952 -8359 3300 S. 7TH ST., PHILADELPHIA, PA 19148 ❑ BREDSON & ASSOCIATES 816- 356 -6569 9503 E. 63RD ST., #_214, RAYTOWN, MO 64133 _ ❑ CHARLOTTE ENGINEERING (PT. CHARLOTTE) 941- 329 -2552 1700 EL JOBEAN RD., PT. CHARLOTTE, FL 33948 ❑ CHARLOTTE ENGINEERING (TAMPA) 813 - 289 -2599 110 S. HOOVER BLVD., # 206, TAMPA, FL 33609 ❑ ECCB 215 - 923 -2020 FEDERAL RESERVE BANK BLDG, INDEP. MALL WEST, 100 N. 6T" ST., PHILADELPHIA_, PA 19106 ❑ HUNT CONSTRUCTION (TAMPA) 813 - 287 -6301 _.._ 7650 COURTNEY CAMPBELL CAUSEWAY, #1150, TAMPA, FL 33607 ❑ HUNT JOB SITE 727 - 724 -5941 21870 U.S. HIGHWAY 19 NORTH, CLEARWATER, FL 33765 ❑ SHUMAKER, LOOP & KENDRICK 813 - 229 -7600 101 E. KENNEDY BLVD, #2800, TAMPA, FL 33602 -5151 ❑ WJHW 972 - 934 -3700 4801 SPRING VALLEY RD, #11313, DALLAS, TX 75244 ®' CITY OF CLEARWATER, PARKS & REC. 100 S. MYRTLE AVE., CLEARWATER, FL 33756 From: Jenny Wilmot Date: April 3, 2003 Kevin, John Timberlake Joe Giles — Bill Webb John Stranix -Bob Beriinsky (FPM) Dan Koehly Ken Doherty Dan Vickstrom Pradeep Patel — Bob McConnell - John Gerbner — Kris Kearns Jim Downing — Brent Leiter — Denise Hand — Rick Lentz Mark McCaskey Jessica Kayser— Bob Berlinsky (FPM) Kent Ihrig Gary White Kevin Dunbar VIA: ❑ US Mail ❑ Courier Per Bob Berlinsky's requested, please find 15 sets of the Clearwater Environmental Graphics Comprehensive Sign Program dated April 15, 2003. This set includes the color 11 x 17 sign type book and related plan documents for use during your April 15, 2003 CDB Signage review meeting. These documents contain all client requested revisions. Please feel free to contact me if you require any additional information or clarification. Regards, Jenny Wilmot ® UPS Overnight HOK Distribution: Dave Bower x Ed Coon x C.Ostmeyer Brian Smith Steve Boyd Kelley Alie J. Templeton x File -DMC s �3 September 23, 2002 Mr. Kevin Dunbar, Director Parks and Recreation Department City of Clearwater 100 South Myrtle Avenue Clearwater, FL 33756 -5520 RE: Development Order regarding Case FLD2002 -07021 at 601 Old Coachman Road (Clearwater Community Sports Complex and Phillies Spring Training Facility) Dear Mr. Dunbar: This letter constitutes a Development Order pursuant to Section 4- 206.D.6 of the Community Development Code. On September 17, 2002, the Community Development Board reviewed your application for Flexible Development request, as part of a Comprehensive Infill Redevelopment Project, to: (1) reduce the required side (south and west) setbacks from 10 feet to zero feet (to parking/pavement) within the Commercial District; (2) reduce the required side (south and west) setback from 20 feet to zero feet (to parking/pavement) within the OS/R District; (3) increase the permitted height of a building (stadium) from 25 feet to 49 feet within the Commercial District; and (4) increase the permitted height of a building (stadium) from 30 feet to 49 feet within the OS/R District, under the provisions of Sections 2 -704B and 2- 1404A. The proposal is to develop the overall site with the Clearwater Community Sports Complex and Phillies Spring Training Facility of 8000 total seats. The Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Sections 2 -704.B and 2- 1404.A. 2. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3 -913. 3. The development will enhance other redevelopment efforts, will likely function as a "spark plug" to initiate development in the area and expand upon the tourism and family- oriented activity generated by the existing spring training venue at the Carpenter Complex. v f September 23, 2002 Dunbar — Page 2 Conditions of Approval: 1. That the City upgrade site D (Joe DiMaggio) prior to the 2006 spring training season. The City shall provide at least 1,200 spaces at this location, with at least 550 spaces to be upgraded with paved drive aisles and a minimum 15 -foot wide landscape area along Drew Street and Old Coachman Road. The balance of the spaces may be on grass spaces (on playing fields); 2. That the City upgrade, with Florida Power's approval, site C with paved drive aisles and a minimum landscape area along Old Coachman Road of 15 feet, as part of a continuous, consistent streetscape; 3. That the player parking area be enhanced with a column and ornamental fence, acceptable to the Planning Department; 4. That a landscape plan for each parking lot be submitted to approved by Staff, prior to the issuance of permits for construction; 5. That should the Pinellas Trail extension within the Florida Power right -of- way be constructed prior to the 2004 spring training season, the sidewalk along the east side of Old Coachman Road may be eliminated and the sidewalk along the west side of Old Coachman Road shall be increased to a minimum width of 10 feet. If the Pinellas Trail extension is not constructed within this timeframe, but is substantially designed with funding assured (within fiscal year 03/04), then its construction may be deferred and a temporary surface should be installed for an interim period. If the trail is neither substantially designed nor funded, five -foot sidewalks should be installed prior to the 2004 spring training season; 6. That the signature landscape display at the intersection of Drew Street and Old Coachman Road be approved by the Planning Department, prior to construction, and installed prior to the 2006 spring training season; 7. That all proposed signage (scoreboard, directionals, temporary, etc.) be approved through a Comprehensive Sign Program by the Community Development Board; 8. That the design of the buildings be consistent with the conceptual elevations submitted to, or as modified by the CDB; and 9. That a revised Master Parking Plan be submitted to staff within 14 days, with corrected parking tabulations and identifying site E (plaza parking). Pursuant to Section 4 -407, an application for a building permit shall be made within one year of Flexible Development approval (September 17, 2003). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. Please be aware that the issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. September 23, 2002 Dunbar — Page 3 In addition, please be aware that an appeal of a Level Two approval (Flexible Development) may be initiated by a property owner abutting the property (which is the subject of the approval) within 14 days of the date of the CDB decision. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expired on October 1, 2002. If you have any questions, please do not hesitate to call Wayne Wells, AICP, Senior Planner, at 727- 562 -4504. Sincerely, Cynthia H. Tarapani, AICP Planning Director S:IPlanning DepartmentlC D BIComp Sign Prog101d Coachman 601 Community Sports Complex101d Coachman 601 Development Order - FLD.doc k I, CDB Meeting Date: April 15, 2003 Case Number: FLD2002- 07021A/SGN2003 -01002 Agenda Item: B8 CITY OF CLEARWATER PLANNING DEPARTMENT STAFF REPORT OWNERS: City of Clearwater and Florida Power Corporation APPLICANT: City of Clearwater REPRESENTATIVE: Kevin Dunbar, Director, Parks and Recreation Department LOCATION: 601 Old Coachman Road REQUEST: Flexible Development approval, as a revision to a previously approved Comprehensive Infill Redevelopment Project (FLD2002- 07021), to increase the permitted height of a building (scoreboard) from 30 feet to 70 feet, under the provisions of Sections 2 -704.B and 2- 1404.A and a Comprehensive Sign Program to increase the num- ber and area of freestanding signage from one sign of 64 square feet to 26 signs totaling 441.5 square feet and to increase the number and area of attached signage from one sign of 24 square feet to seven signs totaling 604.07 square feet, under the provisions of Section 3- 1807. PLANS REVIEWED: Site plan submitted by City of Clearwater Public Works Administra- tion and Charlotte Engineering and Surveying, Inc. SITE INFORMATION: PROPERTY SIZE: Total site: 37.393 acres Sites A & B: 17.42 acres of paved parking and the stadium on the northeast corner of Sharkey Road and Old Coachman Road; Site C: 2.712 acres of unpaved parking at the Carpenter Complex approximately 450 feet north of the intersection of Sharkey Road and Old Coachman Road; and Site D: 17.261 acres at the Joe DiMaggio complex on the northwest corner of Drew Street and Old Coachman Road PROPERTY USE: Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 1 a Current Use: Community Sports Complex and Phillies Spring Training Facility (under construction), Carpenter Complex parking and Joe DiMaggio parking and ball field Proposed Use: Clearwater Community Sports Complex and Phillies Spring Training Facility PLAN CATEGORIES: CG, Commercial General; R/OS, Recreation/Open Space; P, Preservation; and T/U, Transportation/Utility Classifications ZONING DISTRICTS: C, Commercial District; OS/R, Open Space/Recreation District; P, Preservation District; and I, Institutional District ADJACENT LAND USES: North: Carpenter Complex, attached dwellings, detached dwellings West: Retail sales and services, attached dwellings, detached dwellings, Florida Power right -of -way, Joe DiMaggio Field House East: Automobile dealerships, Clearwater Commerce Park, Florida Power right -of -way, Time Warner offices South: Retail sales and services, Florida Power right -of -way, St. Petersburg College CHARACTER OF THE IMMEDIATE VICINITY: Nonresidential uses dominate the U.S. Highway 19 corridor east of Old Coachman Road/Florida Power right -of -way. The St. Petersburg College is to the south across Drew Street. Residential uses are on the west side of Old Coachman Road and north of Sharkey Road. ANALYSIS: The overall site consists of several parcels. The main parcel (site A and B) of 17.42 acres is actually three parcels or portions of parcels: (1) the former Home Depot commercial property, now owned by the City; (2) Bomber Field, owned by the City; and (3) a portion of the Florida Power right -of -way, on which the City has a License Agreement for parking. Also included is the grass parking area of 2.712 acres (site C) within the Florida Power right -of -way between Old Coachman Road and the Carpenter Complex. The parking area, soccer fields and baseball field at the Joe DiMaggio complex of 17.261 acres (site D) is also included. The main parcel is located near the busy intersection of US Highway 19 North and Drew Street and is zoned C, Commercial District and OS/R, Open Space/Recreation District. South of the site is a dense commercial area including shopping centers, restaurants, hotels and multi -story office buildings. Other portions of the shopping center, including Target, abut to the south. The Carpenter Complex is adjacent to the north, also zoned OS/R Districts. St. Petersburg College is to the south of the Joe DiMaggio parking area on the south side of Drew Street. Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 2 The City is developing the main parcel with the Clearwater Community Sports Complex and Phillies Spring Training Facility as a replacement of the existing Jack Russell Memorial Stadium (located on Greenwood/Martin Luther King, Jr. Avenue North and Seminole Street). This project, as an "outdoor recreation/entertainment" use, was previously approved by the Community Development Board on September 17, 2002, and is being presently processed as a Comprehensive Infill Redevelopment Project due to the new deviations necessary and the zoning districts involved. This site was chosen over other sites within the City as being the most desirable due to its proximity to the Carpenter Complex, size of available property, accessibility and its high - profile location. As part of the site selection process, consideration was given to the quality of the pedestrian experience, relationship to adjacent existing buildings, efficient infrastructure strategies, organization of parking, roadways and transit features, integration of the stadium within the neighborhood, security, access for services and media, availability of development parcels and the impact of sequential demolition/relocation of existing features. This stadium project brings to the City the ability to enhance this location to provide greater opportunity for, and the better facilitation of, major public gatherings. Construction of the stadium will expand upon the tourism and family- oriented activity generated by the existing spring training venue at the Carpenter Complex. The Community Sports Complex is planned to be used for various activities: Phillies spring training games, Clearwater Phillies games, concerts, baseball and softball tournaments, and other special events. These activities will occur both during daylight and nighttime hours. The stadium will be integrated with new public open spaces; plans for future bike trails /pedestrian ways and mixed -use development and can serve as a component for redevelopment of this area. By consolidating the practice fields and stadium in one convenient location, the Carpenter Complex and the adjacent shopping center will be enhanced through increased revenues and by creating a lively atmosphere in the area. The stadium's Mediterranean architecture will set a new standard for this area, with its hip roofs, earth tone stucco, arches, medallions, decorative metal railings and trellised sunshades. The .Community Development Board (CDB) approved the stadium request, with conditions, on September 17, 2002, The stadium is presently under construction. Staff has been working with the Parks and Recreation Department and the City's consultant on the sign application It was determined that the scoreboard will be a building by definition and use, and integrally part of the overall building. The prior approval did not include the increased height for this scoreboard building. The scoreboard will be an elevated portion of, and attached to, the outfield seating structure as part of the overall stadium. The request is to increase the permitted height from 30 feet to 70 feet. The stadium building was previously approved for only a height increase from 30 feet to 49 feet. Scoreboards are an integral component of major league ballparks, a unique structure and will be oriented toward the ballpark. The requested height of 70 feet is based on the functional requirements of an outdoor stadium, which are typical of most major league baseball facilities. Signage for this facility was not submitted as part of the prior FLD application approved by the CDB on September 17, 2002. The stadium approval included a condition that signage, including the scoreboard, be submitted as a Comprehensive Sign Program to be processed as a revision to this prior CDB approval. Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 3 The principal building is the Community Sports Complex and Phillies Spring Training Facility, which has frontages on both U.S. Highway 19 and Old Coachman Road. The Comprehensive Sign Program application includes a total of 26 freestanding signs totaling 441.5 square feet (less than the maximum of 779 square feet or one half the lot width as measured along the widest street frontage, Old Coachman Road), where only one sign is permitted. A monument sign 5' -4" in height is proposed adjacent to Old Coachman Road at the Complex's main entrance, designed to match the materials and colors of the stadium and will contain the site address. A freestanding, changeable message sign (electronic reader board) is proposed oriented toward U.S. Highway 19, at a maximum height of 14 feet above the elevated roadway. This portion of U.S. Highway 19 is presently being reconstructed with an elevated roadbed. The overall height from grade of this freestanding sign is proposed at 32.5 feet. The changeable message sign's steel supports will be painted with colors to match stadium colors. The changeable message sign will not have the site address located on it, since its orientation is toward U.S. Highway 19 and the 601 Old Coachman Road address would be confusing to passing motorists. Twenty -four of the freestanding signs will actually be banners on light poles at the front of the stadium and along the sidewalk adjoining the south side of the stadium. The overall height of the light poles is 12 feet. The sign package also includes an increase from one to seven attached signs located on the south and west fagades of the stadium and on the scoreboard building as part of the northern stadium facade. Most of the attached signage lettering will be channel letters pinned off the wall faces, except for the Phillies logo signage that will be cabinet -style signs. The proposed signs will complement and be integrated with the architecture of the stadium. The attached signage proposed for the south side of the stadium will be 46 square feet (0.5 percent or roughly less than one percent of the facade to which it will be attached), where one sign, 20 square feet in area is permitted. The sign will read "Phillies Clearwater Community Sports Complex" in channel letters pinned off the building facade. The attached signage proposed for the west side of the stadium will be 198.07 square feet (1.7 percent of the facade to which it will be attached). These signs will read "tickets," "team store" and "Phillies administration offices" in channel letters pinned off the building facade and will include sign cabinets for Phillies logos. The proposal includes attached signage on the scoreboard building that will be 360 square feet (2.2 percent of the north stadium facade to which it will be attached). This sign will read "Phillies Clearwater Community Sports Complex" and will be directly attached to the north facade of the scoreboard building. This sign face may change as part of the naming rights of the stadium. CODE ENFORCEMENT ANALYSIS: There are no outstanding Code violations associated with the overall site. Staff Report — Community Development Board —April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 4 A. COMPLIANCE WITH MAXIMUM DEVELOPMENT POTENTIAL STANDARD IN THE C, COMMERCIAL DISTRICT (Section 2- 701.1) AND THE OS/R, OPEN SPACE/RECREATION DISTRICT (Section 2- 1401.1): STANDARD REQUIRED/ PERMITTED EXISTING PROPOSED IN COMPLIANCE? FLOOR AREA 0.55 (C) 0.438 (C) * ** 0.17 (C) * ** Yes RATIO (FAR)* 0.25 OS/R 0.002 OS/R 0.17 OS/R) IMPERVIOUS 0.95 (C) 0.96 (C) * ** 0.68 (C) * ** Yes SURFACE 0.60 (OS/R) 0.138 (OS/R) 0.39 (OS/R) RATIO SR ** * The numbers provided include the former Home Depot parcel and the Bomber Field area only. ** The numbers provided include the former Home Depot parcel, the former Bomber Field area and that portion of the Florida Power right -of -way adjacent to the former Bomber Field area only. * ** The numbers provided are for the area zoned Commercial District only and does not include the retention pond adjacent to US Hwy 19 zoned Preservation District. Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 5 B. FLEXIBLE DEVELOPMENT STANDARDS FOR COMPREHENSIVE INFILL REDEVELOPMENT PROJECTS IN THE COMMERCIAL AND OPEN SPACE/RECREATION DISTRICTS (Sections 2 -704 and 2- 1404): (Home Depot parcel, the Bomber Field area and the adjacent Florida Power r.o.w. only — Sites A, B, C and E) STANDARD PERMITTED/ EXISTING PROPOSED IN REQUIRED COMPLIANCE? LOT AREA N/A 17.42 acres 17.42 acres Yes minimum LOT WIDTH N/A 913 feet (along 913 feet (along Yes (minimum) US Hwy 19 US Hwy 19 FRONT N/A East US 19): 200 East (US 19): Yes SETBACK feet to pavement; 200 feet to 255 feet to pavement; 235 building; feet to building; West Old West Old Coachman): 232 Coachman): 32 feet to pavement; feet to 460 feet to pavement; 427 building feet to building REAR N/A N/A N/A N/A SETBACK SIDE N/A South: zero feet South: zero feet Yes SETBACK to pavement; zero to pavement; 10 feet to building; building; North: zero feet to North: 10 feet pavement; 24 feet to pavement; 15 to building feet to building HEIGHT N/A 24 feet 49 feet Yes maximum (stadium); 70 feet (scoreboard) PARKING 0.025 -5 per 366 spaces 1,841 spaces Yes SPACES 10,000 SF land total minimum area or as (287 paved determined by spaces; 1,554 the Community unpaved spaces) Development Coordinator based on ITE Manual standards Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 6 C. FLEXIBILITY CRITERIA FOR COMPREHENSIVE INFILL REDEVELOPMENT PROJECTS IN THE COMMERCIAL DISTRICT AND THE OPEN SPACE/RECREATION DISTRICT (Sections 2 -704.B and 2- 1404.A): 1. The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards. The City is redeveloping the overall subject property for the Clearwater Community Sports Complex and Phillies Spring Training Facility, which is an "outdoor recreation/entertainment" use and permitted within the C, Commercial, OS/R, Open Space/Recreation, I, Institutional and P, Preservation Districts. The previous request was processed and reviewed as a Comprehensive Infill Redevelopment Project because the overall site could not be developed for the stadium with associated parking without deviations from some of the development standards and the criteria. Prior approval included an increase in height for the stadium from 25 feet or 30 feet (depending on the Zoning District involved) to 49 feet. Detailed review of the construction plans during the preparation of the signage application, determined that the scoreboard is a building and was not previously approved for its intended height. The scoreboard will be an elevated building and attached to, the outfield seating structure as part of the overall stadium. The proposal includes increasing the height of the scoreboard building from 30 feet to 70 feet. The requested height of 70 feet is based on the functional requirements of an outdoor stadium, which are typical of most major league baseball facilities. 2. The development of the parcel proposed for development as a Comprehensive Infill Redevelopment Project will not reduce the fair market value of abutting properties. The Clearwater Community Sports Complex replaces a closed Home Depot store and the Bomber Field. The Home Depot building was valued at more than $4.6 million. The City purchased the Home Depot site for $3.925 million. The cost of construction of the stadium and associated improvements is expected to be between $20.5 and $22.5 million. The proposed construction is anticipated to help stabilize and enhance property values in the area by providing a redeveloped site and new, modern building. With the redevelopment proposal, the assessed valuation of nonresidential property within the US Highway 19 corridor is expected to increase. 3. The uses within the Comprehensive Infill Redevelopment Project are otherwise permitted in the City of Clearwater. The City of Clearwater permits "outdoor recreation/entertainment" in the C, Commercial, OS/R, Open Space/Recreation, I, Institutional and P, Preservation Districts as Flexible Standard or Flexible Development uses. Jack Russell Memorial Stadium and other ballparks already exist throughout the City. Staff Report —Community Development Board —April 15, 2003— Case FLD2002- 07021A/SGN2003 -01002 Page 7 4. The use or mix of uses within the Comprehensive Infill Redevelopment Project is compatible with adjacent land uses. Compatibility of the Sports Complex was determined by the CDB with the initial proposal (FLD2002- 07021). The increased height of the scoreboard building is in keeping with the proposed stadium and its approved height of 49 feet. The existing power line towers adjacent to the west are taller than the proposed scoreboard. The proposed stadium lights could be as tall as 156 feet. 5. Suitable sites for development or redevelopment of the uses of mix of uses within the Comprehensive Infill Redevelopment Project are not otherwise available in the City of Clearwater. This site was determined suitable under the prior approval on September 17, 2002 (FLD 2002 - 07021). This site was selected as most desirable due to its proximity to the Carpenter Complex, the size of the property, the accessibility of the site and its high - profile location. Other considerations included the quality of the pedestrian experience, the relationship to other buildings, efficient infrastructure strategies, organization of parking, roadways and transit features, the ability to integrate the stadium into the neighborhood, security of the stadium and patrons, access for services and the media, the availability of parcels for development and the impact of sequential demolition/relocation of existing site improvements. 6. The development of the parcel proposed for development as a Comprehensive Infill Redevelopment Project will upgrade the immediate vicinity of the parcel proposed for development. The construction of the Community Sports Complex adjacent to the Carpenter Complex will be an amenity for this area by concentrating all Phillies operations to one location. The scoreboard is an integral part of the Community Sports Complex. 7. The design of the proposed Comprehensive Infill Redevelopment Project creates a form and function which enhances the community character of. the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. This stadium project, with its proposed scoreboard, will enhance the property with new development, including a well - designed building and landscaping. The use will provide greater opportunity for, and the better facilitation of, major public gatherings. Construction of the stadium at this location will expand upon the tourism and family - oriented activity generated by the existing spring training venue at the Carpenter Complex. The stadium will be integrated with new public open spaces; plans for future bike trails /pedestrian ways and mixed -use development and can serve as a component for redevelopment of this area. By consolidating the practice fields and stadium in one Staff Report — Community Development Board —April 15, 2003 —Case FLD2002- 07021A/SGN2003 -01002 Page 8 convenient location, the Carpenter Complex and the adjacent shopping center will be enhanced through increased revenues and by creating a lively atmosphere in the area. 8. Flexibility in regard to lot width, required setbacks, height and off - street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. The increase in height for the scoreboard building is requested to permit the development of this overall site for the Community Sports Complex. The increase is necessary to serve the proposed stadium use. 9. Adequate off - street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on- street parking in the immediate vicinity of the parcel proposed for development. The determination of adequate parking was decided with the approval of the prior request on September 17, 2002 (FLD 2002 - 07021). The increase in height for the scoreboard building will not affect the requirement or provision of required parking. D. COMPREHENSIVE SIGN PROGRAM (Section 3- 1807): 1. Architectural theme; The signs proposed in a comprehensive sign program shall be designed as a part of the architectural theme of the principal buildings proposed or developed on the parcel proposed for development and shall be constructed of materials and colors which reflect an integrated architectural vocabulary for the parcel proposed for development or the design, character, location and /or materials of all freestanding and attached signs proposed in a comprehensive sign program shall be demonstrably more attractive than signs otherwise permitted on the parcel proposed for development under the minimum signs standards. All signs must be architecturally integrated into /with the design of the building and /or site using similar and coordinated design features, materials and colors, etc.; The principal building is the Community Sports Complex and Phillies Spring Training Facility, with site frontages on both U.S. Highway 19 and Old Coachman Road. The request includes a total of 26 freestanding signs, where only one sign is permitted. A monument sign 5' -4" in height is proposed adjacent to Old Coachman Road at the Complex's main entrance, designed to match the materials and colors of the stadium. A freestanding, changeable message sign (electronic message sign) is proposed oriented toward U.S. Highway 19, at a maximum height of 14 feet above the elevated roadway. This portion of U.S. Highway 19 is presently being reconstructed with an elevated roadbed. The overall height from grade of this freestanding sign is proposed at 32.5 feet. The changeable message sign will be painted steel supports with colors to match stadium colors. Twenty -four of these freestanding signs will be banners on light poles at the front of the stadium and along the sidewalk adjoining the south side of the stadium. The sign Staff Report —Community Development Board —April 15, 2003 —Case FLD2002- 07021A/SGN2003 -01002 Page 9 package also includes an increase from one to seven attached signs located on the south and west fagades of the stadium and on the scoreboard building. Most of the attached signage lettering will be channel letters pinned off the wall faces, except for Phillies logo signage that will be cabinet -style signs. The proposed signs will complement and be integrated with the architecture of the stadium. 2. The height of all freestanding signs proposed through the comprehensive sign program shall relate to the design of the sign and shall not exceed 14 feet in height, except in the D and T Districts, the height shall not exceed 6 feet in height; The proposed monument sign along Old Coachman Road will be 5' -4" in height. The changeable message sign oriented to U.S. Highway 19 will be located west of an existing drainage retention pond and will be 14 feet in height above the highest point of the roadway crown adjacent to the property, in accordance with Code provisions. 3. Lighting. Any lighting proposed as a part of a comprehensive sign program is automatically controlled so that the lighting is turned off at 12 midnight or when the business is closed, whichever is later; Lighting will be turned off at 12 a.m. (midnight), or when the complex is closed, whichever is later. 4. Height, Area, Number and Location of Signs. The height, area, number and location of signs permitted through the Comprehensive Sign Program shall be determined by the Community Development Coordinator based on the following criteria: overall size of site, relationship between the building setback and sign location, frontage, access and visibility to the site, intended traffic circulation pattern, hierarchy of signage, scale and use of the project, consistency with Beach by Design, Clearwater Downtown Redevelopment Plan or any other applicable special area plan and submittal of a master sign plan for the development parcel/project. Additionally, the maximum permitted sign area shall be based on the following formula when evaluated against the above criteria: a) Attached signs — The maximum area permitted for attached signage shall range from one percent up to a maximum of six percent of the building facade to which the sign is to be attached; The attached signage proposed for the south side of the stadium will be 46 square feet (0.5 or roughly less than one percent of the fagade to which it will be attached), where one sign, 20 square feet in area is permitted. The sign will read "Phillies Clearwater Community Sports Complex" in channel letters pinned off the building fagade. The attached signage proposed for the west side of the stadium will be 198.07 square feet (1.7 percent of the fagade to which it will be attached). These signs will read "tickets," "team store" and "Phillies administration offices" in channel letters pinned off the building fagade and will include sign cabinets for Phillies logos. The proposal includes Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 10 attached signage on the scoreboard building that is shown at 360 square feet (2.2 percent of the overall northern fagade of the stadium to which it will be attached). This sign will read "Phillies Clearwater Community Sports Complex" and be directly attached to the building fagade. This sign face may change as part of the naming rights of the stadium. b) Freestanding signs — The maximum permitted area of all freestanding signs on a site shall not exceed the range of sign area permitted by the street frontage or building fagade calculation methods set forth in Section 1806.B.l.c.i.and ii; The Comprehensive Sign Program application includes 26 signs totaling 441.5 square feet (less than the maximum of 779 square feet or one half the lot width as measured along the widest street frontage, Old Coachman Road). The height of the monument sign along Old Coachman Road will be 5' -4." The changeable message sign oriented toward U.S. Highway 19 will be 14 feet in height above the highest point of the roadway crown adjacent to the property (or 32.5 feet). In order to accommodate unforeseen construction issues, the changeable message sign may be relocated, under Staff approval, by a maximum of 25 feet in any direction. The light poles for the banners will be 12 feet in height. 5. Community character. The signage proposed in a comprehensive sign program shall not have an adverse impact on the community character of the City of Clearwater; The redevelopment of the former Home Depot and Bomber Stadium site for the Community Sports Complex constitutes a dramatic change and improvement for the site, general vicinity and the City as a whole. The signs will be architecturally integrated with the proposed stadium (currently under construction) and scoreboard buildings with regards to color, finish and materials and should result in a positive impact on the community character of the City of Clearwater. 6. Property values. The signage proposed in a comprehensive sign program will not have an adverse impact on the value of property in the immediate vicinity of the parcel proposed for development; The redevelopment of the parcel constitutes an improvement to the site and surrounding neighborhood. The proposed, architecturally integrated signs, in conjunction with the stadium, will result in a positive impact on surrounding property values. 7. Elimination of unattractive signage. The signage proposed in a comprehensive sign program will result in the elimination of existing unattractive signage or will result in an improvement to the appearance of the parcel proposed for development in comparison to signs otherwise permitted under the minimum sign standards; Signage originally associated with the former Home Depot has been removed. The site has two frontages freestanding signage is being oriented toward, Old Coachman Road and U.S. Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 11 Highway 19. The sign along Old Coachman Road is a monument sign, designed to emulate the lower intensity of this roadway and be compatible with the residential character along the west side of Old Coachman Road north of Sharkey Road. The changeable message sign oriented toward U.S. Highway 19 is consistent with the commercial character of this roadway. The banners on the light poles will contribute to the festive atmosphere of persons walking to access the stadium. The proposal will result in an improvement to the site over what would be otherwise permitted under the Minimum Development Standards. 8. Special area or scenic corridor plan. The signage proposed in a comprehensive sign program is consistent with any special area or scenic corridor plan which the City of Clearwater has prepared and adopted, for the area in which the parcel proposed for development is located; The City has not adopted a special area, or scenic corridor plan along U.S. Highway 19 or Old Coachman Road. The signs will be architecturally integrated with the proposed stadium and scoreboard buildings with regards to color, finish and materials and should result in a positive impact on the community character of the City of Clearwater. D. GENERAL APPLICABILITY (Section 3 -913): Conditions which are imposed by the Community Development Coordinator and the Community Development Board pursuant to a Level One or a Level Two Approval shall ensure that: 1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density, and character of adjacent properties in which it is located. The stadium project was previously found to be in harmony with the scale, bulk, coverage and character of adjacent properties when the Community Development Board approved the project on September 17, 2002 (FLD 2002 - 07021). The varying building heights of the stadium will integrate it well with the high profile intersection and the multi -story buildings within the area. The scoreboard building is a unique structure to major league ballparks and its height will be in harmony with the light poles for the stadium and the power line towers immediately west of the stadium. The proposal includes a Comprehensive Sign Program with a total of 26 freestanding signs where one is permitted and an increase in the area and number of attached signs. All of the proposed signs will be architecturally coordinated with the building and the overall site with regards to color, materials and finish. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. The Community Development Board approved the development of this site as a sports complex on September 17, 2002 (FLD 2002 - 07021). The addition of the scoreboard Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 12 building and signage will complement the stadium and should enhance the existing urban setting and provide more opportunities for public gatherings. The proposed signs will be architecturally integrated with the buildings through the consistent use of similar color, materials and finish. The proposed development should not discourage appropriate development and use of adjacent land or buildings. 3. The proposed development will not adversely affect the health or safety of persons residing or working in the neighborhood of the proposed use. The construction of the scoreboard building and the proposed signage will not adversely affect the health or safety or persons residing or working in the neighborhood. 4. The proposed development is designed to minimize traffic congestion. The proposal includes the scoreboard building (which is part of the overall stadium building) and signage exclusively and is expected to have little or no increased effect on parking demands or traffic congestion. 5. The proposed development is consistent with the community character of the . immediate vicinity of the parcel proposed for development. The City has given careful consideration to the design of the site, its interface with the adjacent community and its physical setting. The massing of the building, use of stucco and hip roofs on the stadium towers, and character of the exterior fagade has been inspired by the special characteristics of existing Clearwater Mediterranean architecture. The proposed development will blend well with the commercial character of the immediate vicinity and will establish new design standards for this area. The proposed signs will be aesthetically more attractive than other signs in the area. 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. The Community Sports Complex is planned to be used for various activities: Phillies spring training games, Clearwater Phillies games, concerts, baseball and softball tournaments, and other special events. These activities will occur both during daylight and nighttime hours. The light poles to provide for nighttime activities may be as high as 156 feet to meet Major League Baseball standards. The request includes a mix of freestanding, monument -style signs and attached signs. The colors and materials of all signs are consistent with those used for the building and reflect an integrated architectural vocabulary for the parcel as a whole. The proposed signs are more attractive than signs otherwise permitted within the Commercial District. There should be no adverse effects generated by the proposed development. Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 13 SUMMARY AND RECOMMENDATION: The Development Review Committee reviewed the application and supporting materials on February 13, 2003. The Planning Department recommends APPROVAL of the Flexible Development approval, as a revision to a previously approved Comprehensive Infill Redevelop- ment Project (FLD2002- 07021), to increase the permitted height of a building (scoreboard) from 30 feet to 70 feet, under the provisions of Sections 2 -704.B and 2- 1404.A and a Comprehensive Sign Program to increase the number and area of freestanding signage from one sign of 64 square feet to 26 signs totaling 441.5 square feet and to increase the number and area of attached signage from one sign of 24 square feet to seven signs totaling 604.07 square feet, under the provisions of Section 3 -1807, for the site generally located at 601 Old Coachman Road, with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Sections 2 -7043 and 2- 1404.A. 2. The proposal is in compliance with the criteria as a Comprehensive Sign Program per Section 3 -1807. 3. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3 -913. Conditions of Approval ( *Conditions 1 -9 were included with the prior approval by the CDB on September 17, 2002, and should be included with this amendment): 1. That the City upgrade site D (Joe DiMaggio) prior to the 2006 spring training season. The City shall provide at least 1,200 spaces at this location, with at least 550 spaces to be upgraded with paved drive aisles and a minimum 15 -foot wide landscape area along Drew Street and Old Coachman Road. The balance of the spaces may be on grass spaces (on playing fields); 2. That the City upgrade, with Florida Power's approval, site C with paved drive aisles and a minimum landscape area along Old Coachman Road of 15 feet, as part of a continuous, consistent streetscape; 3. That the player parking area be enhanced with a column and ornamental fence, acceptable to the Planning Department; 4. That a landscape plan for each parking lot be submitted to approved by Staff, prior to the issuance of permits for construction; 5. That should the Pinellas Trail extension within the Florida Power right -of -way be constructed prior to the 2004 spring training season, the sidewalk . along the east side of Old Coachman Road may be eliminated and the sidewalk along the west side of Old Coachman Road shall be increased to a minimum width of 10 feet. If the Pinellas Trail extension is not constructed within this timeframe, but is substantially designed with funding assured (within fiscal year 03/04), then its construction may be deferred and a temporary surface should be installed for an interim period. If the trail is neither substantially designed nor funded, five -foot sidewalks should be installed prior to the 2004 spring training season; 6. That the signature landscape display at the intersection of Drew Street and Old Coachman Road be approved by the Planning Department, prior to construction, and installed prior to the 2006 spring training season; Staff Report — Community Development Board — April 15, 2003 — Case FLD2002-0702 1 A/SGN2003-01002 Page 14 7. That all proposed signage (scoreboard, directionals, temporary, etc.) be approved through a Comprehensive Sign Program by the Community Development Board; 8. That the design of the buildings be consistent with the conceptual elevations submitted to, or as modified by the CDB; 9. That a revised Master Parking Plan be submitted to staff within 14 days, with corrected parking tabulations and identifying site E (plaza parking); 10. That the scoreboard building be attached to, and made a part of, the north wall of the berm seating portion of the stadium; and 11. That the changeable message sign may be relocated, under Staff approval, by a maximum of 25 feet in any direction to accommodate unforeseen construction issues. Prepared by Planning Department Staff: "Ag- IL(. Wayne P. Wells, AICP, Senior Planner ATTACHMENTS: Aerial Photograph of Site and Vicinity Location Map Zoning Atlas Map Application S: IPlanning DepartmentlCD BIFlexlPending caseslReviewed and Pending0d Coachman 601 Community Sports Complex101d Coachman 601 Staff Report. doc Staff Report — Community Development Board — April 15, 2003 — Case FLD2002-0702 1 A/SGN2003-01002 Page 15 C:\La and Pro'ects 31 on ro'ectslvariences FL \VAR02 1.dw 09/05/200210:40:55 A Mcrell n OP, CR,50t gE4CH� .."77 _ . - yt $ W MANOR - A rn c z q o _ �❑ c A n OAKM NT cOq ti o CANDLE D D _ ,0.� - CIy A� i o RACLAND o kVE T, N p ry /y Z W Log- o s 0� A o a BERKIEV PL o�¢ m = ACO N � i E o �� 0 AYWOOD AVE VERDE DR m TERRACE DR i D Yr'' O C. R. 535 OL nI I LANORV MAYWOOD AVE IIIJI A o MAPLEWOOD AVE o y °� Z 0� ^ LEE Q 00on m z N� ANNAr AVE FOREST ClE RD r N n > y LAKE FORL- \ n � RD y PINEW000 AVE F �� � q r D ---- -J RR�fR `� Z o COLLEGE oaz COLLEGE N HILL DR -Zi Q N BAYWOOD AVE DA D ^5 ❑ /� RUSKIN RD FERNWOOD AVEo o FERNWOOD AVE A � a07 Ol0 � .L� CO'gCy N EVELYN pVE z A OBERLIN OR MAKERS .O o �H,• m AVE rrri� T9q �O nV31VId ALS1 < KILMER AVE o 81V y1 T3 (, O v` •`fir '� - O y y I-� O s90d�y�TO° WAY Z :,a�,�j 11`.�� {(�� \d ✓r In y �C*'S'j--- PASSSS WAAYY9� C.R. 08 NVNHOtl00 Ol0 n pp DR c 2 Z � no A O° BYPASS Cb U.S, }9 S. R. 5 5 o tz CI COACHMAN PLAZA v n CARDINAL 4A DR 1 1j1rlir!�7 Da U AUDREV v OR PARK Grond Ar, OWEN DR OWEN o000M?lptl3 WEST VIRGINIA LA EVANS CF R agRK BLVD FAIRWOOD p A 7 PINEAPPLE LA I LUCAS DR y D ]c-_ q � BEACHWOOD AVE O THOMAS Q °o i o R GROVE R t.j O n a O HAMPTON RD o CALAMONDIN LANE D 1 EL TRINIDAD o v �`�i Z yp 1 ) COUNTRY D a I:= X-3 DAVID AVE ST cROl FAIWOOD AVE o � LANE GRANTWOOD AV ANT ONI8dS .� 0 Z CROSS ELIZABETH AVE m = BR�Cq p JADEWOOD AVE 3 t+ p p y HOLLYWo OOD AVE E. �RApfFP ° y a �� A KNOS MOO LORI DR' ARROWEAD CIR Z > M O003 N�1 MELONWOOD NOISSIW In SUE A D U ,1D '° . MR TR ,W 42/02?42/1A9 oro TIMR [bNST. TR T +[, ___________ 41/01 a746 O S / R suRM � S � 41102 aoa � 33' 34 45 i N Carpenter Field �32 35 f4 MDR '3 7' 3 � m 42/+6 vesm,'n 4 ,m 'm 2/09 30' 37'1° i s L 29` 397M 3 .. 42/10 ________ eso "7R i am t PN. R 28 39gro 4 - eao 27 4� n °° sb�, o ♦ 42 / O a B az M /07 a x2/R 08 4Y/+8 .. 42/11 a / D 26 4+ g - a 42/15 S S x IB ^I-40 puroMr - - _21 I�j _e am 200 0 ' f! THE C TER T[ON yrs 43/01 n cz I S,— 0 Hasa 2 V Ham r�DS e�,ae' OND REPLAT C o ' ■ ■ rma. I I P � o 1077 -25 I YT b0 I 4 43/OD 3 ce I I 44/020 DaE7r STREET CA 528 Nf - _% <eb— i N' O' LL 41 U C m ID 0 'm v m .a v J FLEXIBLE DEVELOPMENT REQUEST OWNERS-City of Clearwarter, Home Depot U.S.A., and A 'Florida Power Corporation CASE: FLD 2002 -07021 SITE: 601 Old Coachman Road PROPERTY SIZE (ACRES): 37.393 PIN: 07- 29 -16- 00000 - 410 -0100 PIN: 07-29-16-16442-000-0010 PIN: 07-29-16-00000-430-0100 ATLAS 2816 PAGE: -' T'. Q J LL U C m m 0 0 m 2 CL a J 0 EXISTING SURROUNDING USES --TCASE: Depot U.S.A., and OWNERS: NCo Florida Power Corporation FLD 2002 -07021 SITE: 601 Old Coachman Road PROPERTY SIZE (ACRES): 37.393 PIN: 07- 29 -16- 00000 - 410 -0100 PIN: 07- 29- 1e- 16442- 00 0- 0 010 PIN: 07- 29 -1e- 00000-430-0100 ATLAS 2818 PAGE: 0 View looking north along US Hwy 19 View looking northeast near south side of View looking north along west side of stadium 601 Old Coachman Road FLD2002 -07021 A/S GN2003 -01002 View looking northwest at east side of stadium View looking east along south side of stadium View looking west near south side of stadium o �� �� F -I G LEp��'�EiZ �M'MuN�1`r s;ic J�..2�j. o2 Nod 'G> Sc q�• � 47 7o �ja ,f).6 w T R / = G ! am 7�;?7t � � - ��v✓iP��/Z f EOFnr� U SU�Ir� 7oc ou 74f V� M"— OAe 6) LI(7_7 72) M ��3 �8D � fW A-dd5gE1' ��c�r,✓6 (s-, W�J /4r 0&0 ��L&� /WO XA214�� 41.. 1AL6 Lac&660- -,20U = Ly a -�- s� LID J�r/ �u 4f- 4 MAI i vY �+ CDB Meeting Date: Case Number: Agenda Item: OWNERS: APPLICANT: April 15, 2003 FLD2002 -07021 A/SGN2003 -01002 B8 REPRESENTATIVE: LOCATION: CITY OF CLEARWATER PLANNING DEPARTMENT STAFF REPORT City of Clearwater and Florida Power Corporation City of Clearwater Kevin Dunbar, Director, Parks and Recreation Department 601 Old Coachman Road REQUEST: Flexible Development approval, as a revision to a previously approved Comprehensive Infill Redevelopment Project (FLD2002- 07021), to increase the permitted height of a building (scoreboard) from 30 feet to 70 feet, under the provisions of Sections 2 -704.B and 2- 1404.A and a Comprehensive Sign Program to increase the num- ber and area of freestanding signage from one sign of 64 square feet to 26 signs totaling 441.5 square feet and to increase the number and area of attached signage from one sign of 24 square feet to seven signs totaling 604.07 square feet, under the provisions of Section 3- 1807. PLANS REVIEWED: Site plan submitted by City of Clearwater Public Works Administra- tion and Charlotte Engineering and Surveying, Inc. SITE INFORMATION: PROPERTY SIZE: Total site: 37.393 acres Sites A & B: 17.42 acres of paved parking and the stadium on the northeast corner of Sharkey Road and Old Coachman Road; Site C: 2.712 acres of unpaved parking at the Carpenter Complex approximately 450 feet north of the intersection of Sharkey Road and Old Coachman Road; and Site D: 17.261 acres at the Joe DiMaggio complex on the northwest corner of Drew Street and Old Coachman Road PROPERTY USE: Staff Report — Community Development Board — April 15, 2003 — Case FLD2002 -07021 A/SGN2003 -01002 Page 1 � - * i I N OR@ �r Current Use: Community Sports Complex and Phillies Spring Training Facility' (under construction), Carpenter Complex parking and Joe DiMaggio parking and ball field Proposed Use: Clearwater Community Sports Complex and Phillies Spring Training Facility PLAN CATEGORIES: CG, Commercial General; R/OS, Recreation/Open Space; P, Preservation; and T/U, Transportation/Utility Classifications ZONING DISTRICTS: C, Commercial District; OS/R, Open Space/Recreation District; P, Preservation District; and I, Institutional District ADJACENT LAND USES: North: Carpenter Complex, attached dwellings, detached dwellings West: Retail sales and services, attached dwellings, detached dwellings, Florida Power right -of -way, Joe DiMaggio Field House East: Automobile dealerships, Clearwater Commerce Park, Florida Power right -of -way, Time Warner offices South: Retail sales and services, Florida Power right -of -way, St. Petersburg College CHARACTER OF THE IMMEDIATE VICINITY: Nonresidential uses dominate the U.S. Highway 19 corridor east of Old Coachman Road/Florida Power right -of -way. The St. Petersburg College is to the south across Drew Street. Residential uses are on the west side of Old Coachman Road and north of Sharkey Road. ANALYSIS: The overall site consists of various parcels. The main parcel (site A and B) of 17.42 acres is actually three parcels or portions of parcels: (1) the former Home Depot commercial property; (2) Bomber Field, owned by the City; and (3) a portion of the Florida Power right -of -way, on which the City has a License Agreement for parking. Also included is the grass parking area of 2.712 acres (site C) within the Florida Power right -of -way between Old Coachman Road and the Carpenter Complex. The parking area, soccer fields and baseball field at the Joe DiMaggio complex of 17.261 acres (site D) is also included. The main parcel is located near the busy intersection of US Highway 19 North and Drew Street and is zoned C, Commercial District and OS/R, Open Space/Recreation District. South of the site is a dense commercial area including shopping centers, restaurants, hotels and multi -story office buildings. Other portions of the shopping center, including Target, abut to the south. The Carpenter Complex is adjacent to the north, also zoned OS/R Districts. St. Petersburg College is to the south of the Joe DiMaggio parking area on the south side of Drew Street. Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A /SGN2003 -01002 Page 2 Onp SOL E L00 The City seeks is developing the main parcel with the Clearwater Community Sports Complex and Phillies Spring Training Facility as a replacement of the existing Jack Russell Memorial Stadium (located on Greenwood/Martin Luther King, Jr. Avenue North and Seminole Street). This project, as an "outdoor recreation/entertainment" use, was previously approved by the Community Development Board on September 17, 2002, and is being presently processed as a Comprehensive Infill Redevelopment Project due to the deviations necessary and the zoning districts involved. This site was chosen over other sites within the City as being the most desirable due to its proximity to the Carpenter Complex, size of available property, accessibility and its high - profile location. As part of the site selection process, consideration was given to the quality of the pedestrian experience, relationship to adjacent existing buildings, efficient infrastructure strategies, organization of parking, roadways and transit features, integration of the stadium within the neighborhood, security, access for services, and media, availability of development parcels and the impact of sequential demolition/relocation of existing features. This stadium project brings to the City the ability to enhance this location to provide greater opportunity for, and the better facilitation of, major public gatherings. Construction of the stadium will expand upon the tourism and family- oriented activity generated by the existing spring training venue at the Carpenter Complex. The Community Sports Complex is planned to be used for various activities: Phillies spring training games, Clearwater Phillies games, concerts, baseball and softball tournaments, and other special events. These activities will occur both during daylight and nighttime hours. The stadium will be integrated with new public open spaces, plans for future bike trails /pedestrian ways and mixed use development and can serve as a component for redevelopment of this area. By consolidating the practice fields and stadium in one convenient location, the Carpenter Complex and the adjacent shopping center will be enhanced through increased revenues and by creating a lively atmosphere in the area. The stadium's Mediterranean architecture will set a new standard for this area, with its hip roofs, earth tone stucco, arches, medallions, decorative metal railings and trellised sunshades. The stadium request was approved by the Community Development Board (CDB) on September 17, 2002, with conditions. The stadium is now under construction. Staff has been working with the Parks and Recreation Department and the City's consultant on the sign package. It came to our attention during discussions that the scoreboard will actually be a building and that the prior approval did not include the increased height for this scoreboard building. The request is to increase the permitted height from 30 feet to 70 feet. The stadium building was previously approved for a height increase from 30 feet to 49 feet. Scoreboards are an integral component of major league ballparks and a unique structure, oriented toward the ballpark, which will not be visible to adjacent properties or U.S. Highway 19. The requested height of 70 feet is based on the functional and programmatical requirements of an outdoor stadium, which is typical of most major league baseball facilities. Signage for this facility was not submitted as part of the prior package approved by the CDB on September 17, 2002. The stadium approval included ` a condition that signage, including the scoreboard, be submitted as a Comprehensive Sign Program to be processed as a revision to this prior CDB approval. Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 3 0 o �OLETE The principal uilding is the mmunity Sp Complex and Phillies Spring Train* g Facility, which has fr ntage/de h S. Highwa 19 and Old Coachman Road prehensive Sign Progra appliludes a tot of 26 freestanding signs totali 441.5 quare f t (less than the m imum quare fee r one half the lot width as measure o est street frontage, L wher my one sign is permitted. A monument s' n '-4" n height is proposed adjacent toac an Park at the Complex's main entrance, desi to match the materials and coloradium and will contain the site address. A freestanding, electronic changeable messagarquee) is proposed oriented toward U.S. Highway 19, at a maximum height of 14 feet abelevated roadway. This portion of U.S. Highway 19 is presently being reconstructed with ed roadbed. The overall height from grade of this freestanding sign is proposed at - ' feet. The marquee sign will be painted steel supports with colors to match stadium colors. The marquee sign will not have the site address located on it, since its orientation is toward U.S. Highway 19 and the 601 Old Coachman address would be confusing to passing motorists. Twenty -four of these freestanding signs will actually be banners on light poles at the front of the stadium and along the sidewalk adjoining the south side of the stadium. The overall height of the light poles is 12 feet. The light poles will also not contain the site address (for obvious reasons). O, S I Z s 3 A� I °� a -4 7 The sign package also includ an increas from one to sev attached si located on the south and west fagades of the st ium and o the scoreboard ilding. Mo of the attached signage lettering w ll be channel tters pinne off the wall face , except for P allies logo signage that will be cabin -style sign The pro osed signs wil complement and be integrated with the arc ' re of the st dium. The ached signage roposed for e south .side of the stadium will b uare feet percent of facade to w ich it will be attached), where one sign, 20 square fe in area is permitted. e sign will ad "Phillies Clearwater Community Sports Complex" in channel letters pinned f the buildin fagade. The attached signage proposed for the west side of the stadium will be square feet ercent of the fagade to which it will be attached). These signs will read "tickets," "team store" and "Phillies administration offices" in channel letters pinned off the building fagade and will include sign cabinets for Phillies logos. The roposal includes attached signage on the scoreboard building that will be NN square feet percent of the fagade to which it will be attached). These signs will read "Phillies Clearwater Community Sports Complex" and be directly attached to the building fagade. CODE ENFORCEMENT ANALYSIS: There are no outstanding Code violations associated with the overall site. Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 4 A. COMPLIANCE WITH MAXIMUM DEVELOPMENT POTENTIAL STANDARD IN THE C, COMMERCIAL DISTRICT (Section 2- 701.1) AND THE OS/R, OPEN SPACE /RECREATION DISTRICT (Section 2- 1401.1): STANDARD REQUIRED/ PERMITTED EXISTING PROPOSED IN COMPLIANCE? FLOOR AREA 0.55 (C) 0.438 (C) * ** 0.17 (C) * ** Yes RATIO (FAR)* 0.25 OS/R) 0.002 (OS/R) 0.17 (OS/R IMPERVIOUS 0.95 (C) 0.96 (C) * ** 0.68 (C) * ** Yes SURFACE 0.60 (OS/R) 0.138 (OS/R) 0.39 (OS/R) RATIO (ISR)** * The numbers provided include the former Home Depot parcel and the Bomber Field area only. ** The numbers provided include the former Home Depot parcel, the former Bomber Field area and that portion of the Florida Power right -of -way adjacent to the former Bomber Field area only. * ** The numbers provided are for the area zoned Commercial District only and does not include the retention pond adjacent to US Hwy 19 zoned Preservation District. Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 5 0 SS®L L B. FLEXIBLE DEVELOPMENT STANDARDS FOR COMPREHENSIVE INFILL REDEVELOPMENT PROJECTS IN THE COMMERCIAL AND OPEN SPACE/RECREATION DISTRICTS (Sections 2 -704 and 2- 1404): (Home Depot parcel, the Bomber Field area and the adjacent Florida Power r.o.w. only — Sites A, B, C and E) STANDARD PERMITTED/ EXISTING PROPOSED IN REQUIRED COMPLIANCE? LOT AREA N/A 17.42 acres 17.42 acres Yes minimum LOT WIDTH N/A 913 feet (along 913 feet (along Yes (minimum) US Hwy 19 N) US Hwy 19 N) FRONT N/A East (US 19): 200 East S 19): Yes SETBACK feet to pavement; 200 feet to 255 feet to pavement; 235 building; feet to building; West Old West Old Coachman): 232 Coachman): 32 feet to pavement; feet to 460 feet to pavement; 427 building feet to building REAR N/A N/A N/A N/A SETBACK SIDE N/A South: zero feet South: zero feet Yes SETBACK to pavement; zero to pavement; 10 feet to building; building; North: zero feet to North: 10 feet pavement; 24 feet to pavement; 15 to building feet to building HEIGHT N/A 24 feet 49 feet Yes maximum (stadium); 70 feet (scoreboard) PARKING 0.025 -5 per 366 spaces 1,841 spaces Yes SPACES 10,000 SF land total minimum area or as (287 paved determined by spaces; 1,554 the Community unpaved spaces) Development Coordinator based on ITE Manual standards Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A /SGN2003 -01002 Page 6 OBSOLETE C. FLEXIBILITY CRITERIA FOR COMPREHENSIVE INFILL REDEVELOPMENT PROJECTS IN THE COMMERCIAL DISTRICT AND THE OPEN SPACE /RECREATION DISTRICT (Sections 2 -704.11 and 2- 1404.A): 1. The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards. The City is redeveloping the overall subject property for the Clearwater Community Sports Complex and Phillies Spring Training Facility, which is an "outdoor recreation/entertainment" use and permitted within the C, Commercial, OS/R, Open Space/Recreation, I, Institutional and P, Preservation Districts. The previous request was processed and reviewed as a Comprehensive Infill Redevelopment Project because the overall site could not be developed for the stadium with associated parking without deviations from some of the development standards and the criteria. Prior approval included an increase in height for the stadium from 30 feet to 49 feet. Further refinement of construction plans and preparation of the signage package revealed that the scoreboard is a building and was not previously approved for its intended height. The proposal includes increasing the height of the scoreboard building from 30 feet to 70 feet. The requested height of 70 feet is based on the functional and programmatical requirements of an outdoor stadium, which is typical of most major league baseball facilities. 2. The development of the parcel proposed for development as a Comprehensive Infill Redevelopment Project will not reduce the fair market value of abutting properties. The Clearwater Community Sports Complex replaces a closed Home Depot store and the Bomber Field. The Home Depot building was valued at more than $4.6 million. The City purchased the Home Depot site for $3.925 million. The cost of construction of the stadium and associated improvements is expected to be between $20.5 and $22.5 million. The proposed construction is anticipated to help stabilize and enhance property values in the area by providing a redeveloped site and new, modern building. With the redevelopment proposal, the assessed valuation of nonresidential property within the US Highway 19 corridor is expected to increase. 3. The uses within the Comprehensive Infill Redevelopment Project are otherwise permitted in the City of Clearwater. The City of Clearwater permits "outdoor recreation/entertainment" in the C, Commercial, OS/R, Open Space/Recreation, I, Institutional and P, Preservation Districts as Flexible Standard or Flexible Development uses. Jack Russell Memorial Stadium and other ball parks already exist throughout the City. Staff Report — Community Development Board — April 15, 2003 — Case FLD2002 -07021 A/SGN2003 -01002 Page 7 0 BS"rQ) L E T E 4. The use or mix of uses within the Comprehensive Infill Redevelopment Project is compatible with adjacent land uses. The type of activity and peak use time will change with the development of the subject area for the Community Sports Complex, different than the former Home Depot and Bomber Field uses. Compatibility of the Sports Complex was determined in xxx, 2002, with the initial stadium proposal. The increased height of the scoreboard building is in keeping with the proposed stadium and its approved height of 49 feet. The Florida Power power line towers are taller than the proposed scoreboard. 5. Suitable sites for development or redevelopment of the uses of mix of uses within the Comprehensive Infill Redevelopment Project are not otherwise available in the City of Clearwater. This site was determined suitable under the prior approval on September 17, 2002. This site was selected as most desirable due to its proximity to the Carpenter Complex, the size of the property, the accessibility of the site and its high - profile location. Other considerations included the quality of the pedestrian experience, the relationship to other buildings, efficient infrastructure strategies, organization of parking, roadways and transit features, the ability to integrate the stadium into the neighborhood, security of the stadium and patrons, access for services and the media, the availability of parcels for development and the impact of sequential demolition/relocation of existing site improvements. 6. The development of the parcel proposed for development as a Comprehensive Infill Redevelopment Project will upgrade the immediate vicinity of the parcel proposed for development. The construction of the Community Sports Complex adjacent to the Carpenter Complex will be an amenity for this area by concentrating all Phillies operations to one location. The scoreboard is an integral part of the Community Sports Complex. 7. The design of the proposed Comprehensive Infill Redevelopment Project creates a form and function which enhances the community character of the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. This stadium project, with its proposed scoreboard, will enhance the property with new development, including a well - designed building and landscaping. The use will provide greater opportunity for, and the better facilitation of, major public gatherings. Construction of the stadium at this location will expand upon the tourism and family - oriented activity generated by the existing spring training venue at the Carpenter Complex. The stadium will be integrated with new public open spaces, plans for future bike trails /pedestrian ways and mixed use development and can serve as a component for redevelopment of this area. By consolidating the practice fields and stadium in one convenient location, the Carpenter Complex and the adjacent shopping center will be Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 8 _ (aji enhanced through increased revenues and by creating a lively atmosphere in the area. 8. Flexibility in regard to lot width, required setbacks, height and off - street parking are justified by the benefits to community character and the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole. The increase in height for the scoreboard building is requested to permit the development of this overall site for the Community Sports Complex. The increase is necessary to serve the proposed stadium use. 9. Adequate off - street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on- street parking in the immediate vicinity of the parcel proposed for development. The determination of adequate parking was decided with the approval of the prior request on September 17, 2002. The increase in height for the scoreboard building will not affect the requirement or provision of required parking. D. COMPREHENSIVE SIGN PROGRAM (Section 3- 1807): 1. Architectural theme; The signs proposed in a comprehensive sign program shall be designed as a part of the architectural theme of the principal buildings proposed or developed on the parcel proposed for development and shall be constructed of materials and colors which reflect an integrated architectural vocabulary for the parcel proposed for development or the design, character, location and /or materials of all freestanding and attached signs proposed in a comprehensive sign program shall be demonstrably more attractive than signs otherwise permitted on the parcel proposed for development under the minimum signs standards. All signs must be architecturally integrated into /with the design of the building and /or site using 1 similar and coordinated design features, materials and colors, etc.; *1�. The principal buildin.X is the Community Sports Complex and Phillies Spring Tr ' ing Facility, which has ontages on both U.S. Highway 19 and Zha man Ro The request include al of 26 freestanding signs, where only is p fitted. A monument sig ' -4' in height is proposed adjacent to Oa Park at the Complex's mai rance, designed to match the materials and the stadium. A freestanding, electronic changeable mess age sign (marquee) is oriented toward U.S. Highway 19, at a maximum height of 14 feet above th roadway. This portion of U.S. Highway 19 is presently being reconstructed witted roadbed. The overall height from grade of this freestanding sign is proposed a eet. The marquee sign will be painted steel supports with colors to match stadium colors. Twenty -four of these freestanding signs will be banners -on light poles at the front of the stadium and along the sidewalk adjoining the south side of the stadium. The sign package also includes an increase from one to seven attached signs located on the south and west fagades of the Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 9 stadium and on the scoreboard building. Most of the attached signage lettering will be channel letters pinned off the wall faces, except for Phillies logo signage that will be cabinet -style signs. The proposed signs will complement and be integrated with the architecture of the stadium. 2. The height of all freestanding signs proposed through the comprehensive sign program shall relate to the design of the sign and shall not exceed 14 feet in height, except in the D and T Districts, the height shall not exceed 6 feet in heig t; The proposed monument sign along Old Coachman Road will b -4" in height. The marquee sign oriented to U.S. Highway 19 will be located west of an existing drainage retention pond and will be 14 feet in height above the highest point of the roadway crown adjacent to the property, in accordance with Code provisions. 3. Lighting. Any lighting proposed as a part- of a comprehensive sign program is automatically controlled so that the lighting is turned off at 12 midnight or when the business is closed, whichever is later; Lighting will be turned off at 12 midnight or when the business is closed, whichever is later. 4. Height, Area, Number and Location of Signs. The height, area, number and location of signs permitted through the Comprehensive Sign Program shall be determined by the Community Development Coordinator based on the following criteria: overall size of site, relationship between the building setback and sign location, frontage, access and visibility to the site, intended traffic circulation pattern, hierarchy of signage, scale and use of the project, consistency with Beach by Design, Clearwater Downtown Redevelopment Plan or any other applicable special area plan and submittal of a master sign plan for the development parcel/project. Additionally, the maximum permitted sign area shall be based on the following formula when evaluated against the above criteria: a) Attached signs — The maximum area permitted for attached signage shall range from one percent up to a maximum of six percent of the building fagade to which the sign z be aJ Aihe � �A� f T /attached gnage proposed for the south side of the st dium will be quare et ( percent of the fagade to which it will be tached), where one si , 20 square feet in area is permitted. The sign will read "Ph' lies Clearwater Co unity Sports Complex" in channel letters pinned off the bu lding fagade. T attached signage proposed for the west side of the stadium will be square feet ercent of the fagade to which it will be attached). These signs will read "tickets," eam store" and "Phillies administration offices" in channel letters pinned off the building fagade and will include sign cabinets for Phillies logos. The proposal includes attached signage on the scoreboard building that will be M square feet AN MI percent of Staff Report —Community Development Board —April 15, 2003 —Case FLD2002 -07021 A/SGN2003 -01002 Page 10 0 13 ZfE5�)LIR the facade to which it will be attached). These signs will read "Phillies Clearwater Community Sports Complex" and be directly attached to the building facade. b) Freestanding signs — The maximum permitted area of all freestanding signs on a site shall not exceed the range of sign area permitted by the street frontage or building facade calculation methods set forth in Section 1806.B.l.c.i.and ii; The Comprehensive Sign Program a lication includes signs totaling 441. �quare feet (less than the maxim of square feet or one half the lot width as measured along the widest street frontag , 9). The height of the monument sign along Old Coachman Road will be ' -4' he marquee sign oriented toward U.S. Highway 19 will be 14 feet in height a ove the highest point of the roadway crown adjacent to the property (or - " feet) and the light poles for the banners will be 12 feet in height. 3 2 -Y, 5. Community character. The signage proposed in a comprehensive sign program shall not have an adverse impact on the community character of the City of Clearwater; The redevelopment of the former Home Depot and Bomber Stadium site for the Community Sports Complex constitutes a dramatic change and improvement for the site, general vicinity and the City as a whole. The signs will be architecturally integrated with the proposed stadium (currently under construction) and scoreboard buildings with regards to color, finish and materials and should result in a positive impact on the community character of the City of Clearwater. 6. Property values. The signage proposed in a comprehensive sign program will not have an adverse impact on the value of property in the immediate vicinity of the parcel proposed for development; The redevelopment of the parcel constitutes an improvement to the site and surrounding neighborhood. The proposed, architecturally integrated signs, in conjunction with the stadium, will result in a positive impact on surrounding property values. 7. Elimination of unattractive signage. The signage proposed in a comprehensive sign program will result in the elimination of existing unattractive signage or will result in an improvement to the appearance of the parcel proposed for development in comparison to signs otherwise permitted under the minimum sign standards; Signage originally associated with the former Home Depot has been removed. The site has two. frontages freestanding signage is being oriented toward, Old Coachman Road and U.S. Highway 19. The sign along Old Coachman Road is a monument sign, designed to emulate the lower intensity of this roadway . and be compatible with the residential character along the west side of Old Coachman Road north of Sharkey Road. The marquee sign oriented toward U.S. Highway 19 is consistent with the commercial character of this roadway. The banners on the light poles will contribute to the festive atmosphere of Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 11 cC�oC G i persons walking to access the stadium. The proposal will result in an improvement to the site over what would be otherwise permitted under the Minimum Development Standards. 8. Special area or scenic corridor plan. The signage proposed in a comprehensive sign program is consistent with any special area or scenic corridor plan which the City of Clearwater has prepared and adopted for the area in which the parcel proposed for development is located; The City has not adopted a special area or scenic corridor plan along U.S. Highway 19 or Old Coachman Road. The signs will be architecturally integrated with the proposed stadium and scoreboard buildings with regards to color, finish and materials and should result in a positive impact on the community character of the City of Clearwater. D. GENERAL APPLICABILITY (Section 3 -913): Conditions which are imposed by the Community Development Coordinator and the Community Development Board pursuant to a Level One or a Level Two Approval shall ensure that: 1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density, and character of adjacent properties in which it is located. The stadium project was previously found to be in harmony with the scale, bulk, coverage and character of adjacent properties when the Community Development Board approved the project on September 17, 2002. The varying building heights of the stadium will integrate it well with the high profile intersection and the multi -story buildings within the area. The scoreboard building is a unique structure to major league ballparks and its height will be in harmony with the light poles for the stadium and the power line towers immediately west of the stadium. The proposal includes a Comprehensive Sign Program with a total of 26 freestanding signs where one is permitted and an increase in the area and number of attached signs. All of the proposed signs will be architecturally coordinated with the building and the overall site with regards to color, materials and finish. 2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly impair the value thereof. The development of this site as a sports complex was approved by the Community Development Board on September 17, 2002. The addition of the scoreboard building and signage will complement the stadium and should enhance the existing urban setting and provide more opportunities for public gatherings. The proposed signs will be architecturally integrated with the buildings through the consistent use of similar color, materials and finish. The proposed development should not discourage appropriate development and use of adjacent land or buildings. Staff Report — Community Development Board — April 15, 2003 — Case FLD2002- 07021A/SGN2003 -01002 Page 12 5, 0 U��7F 3. The proposed development will not adversely affect the health or safety of persons residing or working in the neighborhood of the proposed use. The construction of the scoreboard building and the proposed signage will not adversely affect the health or safety or persons residing or working in the neighborhood. 4. The proposed development is designed to minimize traffic congestion. The proposal includes signage exclusively and is expected to have little or no increased effect on parking demands or traffic congestion. 5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development. The City has given careful consideration to the design of the site, its interface with the adjacent community and the physical setting. The massing of the building, use of stucco and hip roofs on the stadium towers, and character of the exterior fagade has been inspired by the special characteristics of existing Clearwater Mediterranean architecture. The proposed development will blend well with the commercial character of the immediate vicinity and will establish new design standards for this area. The proposed signs will be aesthetically more attractive than other signs in the area. 6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. The Community Sports Complex is planned to be used for various activities: Phillies spring training games, Clearwater Phillies games, concerts, baseball and softball tournaments, and other special events. These activities will occur both during daylight and nighttime hours. The light poles to provide for nighttime activities may be as high as 156 feet to meet Major League Baseball standards. The request includes a mix of freestanding, monument -style signs and attached signs. The colors and materials of all signs are consistent with those used for the building and reflect an' integrated architectural vocabulary for the parcel as a whole. The proposed signs are more attractive than signs otherwise permitted within the Commercial District. There should be no adverse effects generated by the proposed development. SUMMARY AND RECOMMENDATION: The application and supporting materials were reviewed by the Development Review Committee on February 13, 2003. The Planning Department recommends APPROVAL of the Flexible Development approval, as a revision to a previously approved Comprehensive Infill Redevelop- ment Project (FLD2002- 07021), to increase the permitted height of a building (scoreboard) from 30 feet to 70 feet, under the provisions of Sections 2 -704.B and 2- 1404.A and a Comprehensive Sign Program to increase the number and area of freestanding signage from one sign of 64 square feet to 26 signs totaling 441.5 square feet and to increase the number and area of attached signage Staff Report — Community Development Board — April 15, 2003 — Case FLD2002-0702 1 A/SGN2003-01002 Page 13 MOONOR TE from one sign of 24 square feet to seven signs totaling 604.07 square feet, under the provisions of Section 3 -1807, for the site generally located at 601 Old Coachman Road, with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Sections 2 -704.B and 2- 1404.A. 2. The proposal is in compliance with the criteria as a Comprehensive Sign Program per Section 3 -1807. 3. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3 -913. 4. The development will enhance other redevelopment efforts, will likely function as a "spark plug" to initiate development in the area and expand upon the tourism and family- oriented activity generated by the existing spring training venue at the Carpenter Complex. Conditions of Approval ( *All of the following conditions were included with the prior approval by the CDB on September 17, 2002, and should be included with this amendment): 1. That the City upgrade site D (Joe DiMaggio) prior to the 2006 spring training season. The City shall provide at least 1,200 spaces at this location, with at least 550 spaces to be upgraded with paved drive aisles and a minimum 15 -foot wide landscape area along Drew Street and Old Coachman Road. The balance of the spaces may be on grass spaces (on playing fields); 2. That the City upgrade, with Florida Power's approval, site C with paved drive aisles and a minimum landscape area along Old Coachman Road .of 15 feet, as part of a continuous, consistent streetscape; 3. That the player parking area be enhanced with a column and ornamental fence, acceptable to the Planning Department; 4. That a landscape plan for each parking lot be submitted to approved by Staff, prior to the issuance of permits for construction; 5. That should the Pinellas Trail extension within the Florida Power right -of -way be constructed prior to the 2004 spring training season, the sidewalk along the east side of Old Coachman Road may be eliminated and the sidewalk along the west side of Old Coachman Road shall be increased to a minimum width of 10 feet. If the Pinellas Trail extension is not constructed within this timeframe, but is substantially designed with funding assured (within fiscal year 03/04), then its construction may be deferred and a temporary surface should be installed for an interim period. If the trail is neither substantially designed nor funded, five -foot sidewalks should be installed prior to the 2004 spring training season; 6. That the signature landscape display at the intersection of Drew Street and Old Coachman Road be approved by the Planning Department, prior to construction, and installed prior to the 2006 spring training season; 7. That all proposed signage (scoreboard, directionals, temporary, etc.) be approved through a Comprehensive Sign Program by the Community Development Board; 8. That the design of the buildings be consistent with the conceptual elevations submitted to, or as modified by the CDB; and 9. That a revised Master Parking Plan be submitted to staff within 14 days, with corrected ei parking tabulations and identifying site E (plaza parking). Staff Report — Community Development Board — April 15, 2003 — Case FLD2002-0702 1 A/SGN2003-01002 Page 14 Q��LETE. s. Prepared by Planning Department Staff. Wayne M. Wells, AICP, Senior Planner ATTACHMENTS: Aerial Photograph of Site and Vicinity Location Map Zoning Atlas Map Application S:IPlanning DepartmentlCD BTlexlPending casesiReviewed and Pending101d Coachman 601 Community Sports ComplexDld Coachman 601 Staff Report. doc Staff Report —Community Development Board —April 15, 2003 —Case FLD2002- 07021A/SGN2003 -01002 Page 15 ®� �O LE �E �n �1 ro CL 1� O 3 158 ir ' y+e r m ne, w 1U 0 nn 11 re 73 nn g 7i 'ys i 0f_.._.» .... .. r J n1i I , 129 a g 30 80 ' , 'I I /.... .� _- -_i . ua nts Bt a, 7 a R . 8 ., J aQ ' I y 15 6A lIlaetN N N �9 , Hneor r 92 nn u os n.r10Ya1a 5 roro y °r , V'- 1et'\ ' •-• Ii ..... 57 nn 126 157 154 19 nn tilt 36 22 St nn - 18 ------- 62 68 S j7 S b n . ?I .. .. .,.2-.s5 11 /06 i76B to 17 it /04 res ; 3 / •� V,� OS 19� rNa 38 tiP 6 Ba -� 11 05 •;... i_.. I' i , Oi ` 6 $ gi tees IP Q . lk �y .1221 (...ZS... ad: 7 G te61 . 6 01 a 18 39 2 5 a +NO z o�11 41 1 i aGyO ''ii" B � ° "s 112 `� t ` t° Il R IES 91 O 90 d 6t9so P ♦ d D s d EI. F S 8 /6 . L a �+ II "� '4v i t . �- 10`� ' C : i.,,� �• Q ,� I _-e- a - �.•'' » s _.3 I5 -11 118 U rc� ._-..5.'- _—•..--....'..-111 ' ,i . .. ..1]..i9.._ .t. : e._ .• i . . '1' :. i;i(_� .. ^1 " 1 : 2. _ 7 40 -------- L117 _Z ..... 11 11/07 20 . : . 28 " 0 %lt9 to �a. +�a, �q, I es -BI E ,...1 1t � - 3 ; 1 i B I V i i r' •� 0 1 3 115 '�D,I ,d1i1. tn0 ` t0 ` 09�1t8 I 7 I 301 199 0 105 ,elf 88 ,Pa (T37' {11I; i '�^r 1t /081 7d0o n I ; ' i 7 X1.108 91 L.. ...(� , ! �_'• so i 6 x.109 toe " =r ».. ». 411. 0 1d 'r F2 .t �- ^•--Yi I 1e9- 6 4E 19S 110 �'4 ` 9Q g9• E P ' 9S er ,�,' i I , 1I r •- ''i'! % I 11/08 201 71s1a/e•0r0 195 102 p o 'i 1 31 3 I I I - Q 11102 ------ -oi - 1�- - tL-5l-St i- -.r.'.' , = 9I /n -t- -o•i , 187 101 97 H a 9 s y M D i g 99 MAN 1107 -,e1 rw 190 .� too GapCN CROSSING 1 i° (ias -192 TR r r to ....I ` a , I 191 192 193 191 -___ j' 13/01 a13r- rif:,y^ -------- -- ;'s €.> s t : s:...:� \+s'• ..._1 Ir ". '•._ - 98 X09- fe i5 221 P-LAQE PARK p; ;'rf� '�,41 � i..'4as ? »;f yv3.:'; �' "<�,. stf r. 4p��„ 1 - •?, ' ' 3 �i,uj - I �:3. '• ,.. ' �• .y,, fi•AY�'",1y3'.v Y 3%� I •<t;, >si.����'k��s` '�<f°�a%^:iy';s�4� � ^'"�'.?J,a2� .f �� ' , 1/011 1 p :. X4`4: #E+ �`'i�.4 .���'vx, %3.n ,yC.f.• ,f' ,L. ck `�'^'S."., i, IMC ,ID Mari:, u::.r:�: `'� ' v: ?a 4g?&9i.�,`�:' Yk'tis •'�(�'�' � 3. `L Z � .f '.:.s>�' -bk„ >z,<�iz "r €kk `I%�.�'.E •':t'�''xIr,,�� '�hf�,t' ��� `. ..:,:':<:`>�c.. ..w.,. .. I' a�' ��Nv'�" ^w^`?:�,. '`�. .1,�, ts�7Q^ ,.:F' ^i�zv:' '� •k`.i�'ai, Z''p; rwf<i... I ':,� Q: rw ri> `��'"�'� • ' fir.! . • NORTHEAST COACHMAN PARK O. S / /w 13/02 / ft stilt. 13/02 WSs;;:• 13 I 11:7 =ll 1 S 8 OOIyFCE � 7 "'"d ^ "'oiy^.:'�s.' >`',�:i'at! <: �"' /,� rro , w . g; . '� ..,..... ' <�:%4«zr,r'e'' > < ✓c z,;':wa� ..,Rkk�'3v : :f:F <<: - -- -- --- .,.�... -__ —•� � . ---..- - 4 rao scsr �`,,,,SA✓a«: aw•» / S -..., :, :... a' ^.: :, '� •>nx.. t^ %• y. .,.: s. r4. x r> fr.. ...;;,n...,: ✓:..„, .,»y:3yh�j:2kvjS; ^,,;. 9 ..�''. ,si: ,r .:3 <?? ,3;k;. . <s.< 4,�s2:.•1:;;?F'c<, /I t.YSt:. �H. N K' "' .4::i4 6>^:H :ir� ' �''ti »f Gi44','�'. .::yY:L ° €:Y2�#G. .�.3 >.SS.a. fr«.. ✓4>5 >..:...< Q not 130 130 V r xE .r e W < ?fs 4f' •;Sf .G %:',a kY?»'rrkiax x., :> k.>.... x s L.. 4„ »�%�uwy � ,s .w:;�bk:yy k; Lj: <.. ..tiFL";?"• �p t:('' °^ r10 1 .,C rSl <r: r <y "< Mi!Y.d�x•, IS 01, m � .(• >., k. ty ' 2, : > ✓ � . 77e% YA ,2 z � 1 Sts B :.SY.•. 4 I. :hsf3^, R:�S2.: S..vn », f $ vii y •.�# < rid .<��^'na,,. / '9 . <`! ;' ` � r3: #:• of <£'::: `^. <r. ^:,.�: r o DRIVE . VAR91Y 'wr. "•isgw' 11 /OZ TK ' O 9�C J / i` in ':.r.F`< roe .r,: .,J ? "�,'." >A. ✓:,:� 'fzi?:, .. eDI 7 ~ �4:iN4:• Y.Y.: ".c : ^;7:ii.. 2 r r :i:h::. .k.3n Carpenter Field '„ 19 I .xr2a'<`n r'i . y •�<i f 1 ^ Qr. JJ '�' Ty "� tap Ile R .i'> +.F. ro, .. -- �. .... ..... .. .. .. I: I >tr Ypr 11 21 i 0 77. i,..'- ri �.'•j € {Y fk sH`i„aE ✓.$ ''` ±`..7 •' _>.1 12/09 �N? lao - ..,. -.._i 1� .............. .. _- ...- _......__.in p . c- e .t`r rpo 29 38 12/03 •.fi'4b.2Y>s':>.. :(z': ` "i<x `s�,. nlm. j rsf ra ygx <yrs. `�38 z 3i 3.3pkt. r .:n f _ ........ : 23,p 28 yqr „'ih3l` € xiassfsf� eu E`r� - ------------ LEARWATER "19., ¢�' 3<� a� 21an r/e7 trlq,y. M 13/07 42/108f }fiR 'ua D N , q 12/ 8 M g a ,�;� o: a II /If 12 2 Ig/l3 I1n1 ..I3 /IS �� ndrr� , J �g N` _ _ ttF• �' Q -N eao ro, rot evr tee eoi 10 ] i tea k�.:. i 28 272 ff3£�•;:f ror21m 9 1- E CLEARII'ATE C LECT[ON y ' ,fF I 3/023 1 3 Ot _� t r ! .c o{}" , a' � ¢x: � #r : c.•i.:ifi i:k d %dr";: #�' ..i`;r ,.::;{�Q%�` � � pr1 � y ',,CC�a;;>»5yy,, �:k� A s §�� •��rw , ;t� ° `7 ,, � a en _._.._ �•. .�C _ $3.:,'`i'SSY.Gk (RiV�`6:' ,w,•: ?',"Srx:< r 'Y.<`.4: p mMV 1 '"` --- ir� "3 U p rlam 1 1.16 1602 a!ro 19:1 ' Q2 COND REPEAT fy '� sh7 �».kY %: �E��'YkY'✓+k 1 QB yp �, S�;C ��;<✓� �` , ' ,�j, I•- _..- ....... �J �^,,� it3.F ;��'`.��, t;<�... Y m z �' a•sY'? F� tt •'' -_.. rn.e sF ' ___ 107 -26 snu ! \ 11w tnN 10 _ / 0 1>,.er7 3 � ;rlavr �^ 1-� ..._....... X � "Aa+ DREt. Is o /01 i Ob �'"�'. .:.rt38.�>sd >ma.�#' " -y �•. CONDO -. / < `fi I I '' • f 0 Me ` 3x N sq _ _ a i Ka t e >... - - - - - __ - - C.R..S28 OREiI ea � •aa �u`Yaz• •. �., 3S�o7 y 11.____ -- z[areAia 8 - DREW - - - - rq,18♦3<.t;. R -7" q _ DREW ti' �. CR. 32Q N ._ STREET .. - - R s ` »r -,el - te 3 I --.- -_ ea tae ' • nY _. ', 1 1�1q -f. ; -- -° - -- 11 Renm<reale tt -_. 29... 73 .� 3`.,. - --- -1, e: r_.0 S II /Ot 1i 8 11 .... ... 2Q 12/0 i ^y. _ - _ ._ I ` , u, !7'r.".IrtYnrnar %. w' I tae 1 `. _ i t -- -__- -- ' I vr-an coat i 1 - IN 5 : r 1 i - L.- _ _ •• »... _ r ... a :rc .. c emanlmuen ii I s. tae tar ,........' sy'"I7 ....!.._.I ' r _.." A 8 and used ey me , d°ienl nn me ae..lDn. _.185 i rn.{1!! ! i i ;: .- 5:- .._.!- __,,, - -'••, - - -� A> M received ref cdlecled ter the owoose or ee. $ ,m - -- - 1 "frostrvctvre In rcntarY. As SUM, the City of IM7 1 , , ^�.......... ......... _ _ - .... —. meMef ne ,rgronllta.'ey /effM'or hnplled, c . Y . 1 1 , 1 > ` 1 a«ure<r• cwneleltneff. rdloDpll Y• ar fuilob,a 2r '-, ,J j ! rl ._1' 1 01"! o^ olnn erli<vlDr use Furinermwe. the Ci( ' ' Y effDirm III -------- - - - --- , 9 •.� I ; Nberp - ' / it vw.jt N no at.. Y rnalfoevb o »od, i i r ' ..� of su<h dole. i rel i 98 __i .. —..—. . . 11/06 22 ;' _ I Hoff: g pR . Inu ._ nom' - _ rI .r "" "" " ST. PETERSBURG nmol < Ior Mrarmallon DD lelefl e"flonf Dleere , _____ «'vial! our Web file. l ....... r......._ � This AllDS DD w „ I .. JUNIOR COLLEGE '. _ - _ -- -- - I � 1 1 im...e, t i • ' i ,s a 2 . 1 1....:..1 # .................... _ ........ _.:- M cj QQ 1 l................. . :� X �+ 1 i +Dnrww L., •? aa/Og.__ ................ it F, d m-f l ! i • i ;'( r - - 0 100 200 4 A t...tN�? 11 /07 tli trrro�; s7 00 I U ' 3 N a l........... -_! � ....... ......... ........ , I S1 EA57WOOp OR 18 � f `•: rrd --- ------------------------ I I I ;I 9 __________11 J/........ji 11., ., 11 . r , I 1_F 777 1 f a D 2 t5 . u U , . Not 14 fsl 53 154F $ ". " I I , %s' 6 .......... 29 20 60 V, ------ um r------- 153 1 /061 -------------- 57 1 2 ........ . . . g nn 154 36 51 lots 27 It" 16 ep [.141 62 71 156A If" 37 4 ------ .......... 30 MIS 11/05 2 . : I i- : ::_ Oi25; . . . ....... S 11 83 4 fut /04 30 5 q A 25-44 55 46 39 1140 47 47 65 40 90 •2 121 8 t17 11 It q: go iF 42 .0p 11/07 . ......... .. 4 .......... it 1 92 120 1 ,b I too 2; 1 CIO t' to 114 107 202 199 94 11/081 17: II 20 •109 115 201 95 11/08 11/00 : i I : : r 19 --------------j- L < ----------------- 197 101. N z 125 93 0 go q cc 1841 B9 MDg ISO cc VtOS%t4G [185-192 Ij ) I - 0 I IS, (L TR M • 191 192 193 194 O3z: too 7 5 CD ------------ 0 -- — -- ---- 13/01 00 )ARK k4 17-224 IL s /011 IS to NORTHEAST COACHMAN PARK TV 13/02 13/02 .4 0S 11 0 40 5 N It 130 Ll ti -Q�d 0 R rwmp. COW. N. st S:x 47 ... . ..... 41101 P'l to 00 41/02' O:S/R 'a do 2 Curpen t r Field M. is .......... .................... 42/09 ......................... >d0 Into p 01 LEARWATER'"W" PN. R b.0.% 6H s2,D0 ........... to "'14 D ................ foe M 42/13 CLEARWATE C A.EC 33/023 43/01 0 MV-11tt § W COND fa CL REPLAT Ut F'i7 ....... ........ .. . . . ..... 0! PH . . ......... . ... jl 33 0. gbpg INA too XcTur ewA DREW F1 OREN STRMT 528 L — — 3572-103 '*4-338 st 29 12/0 1/0 i ............. S 20 -1 as 4 11 ------ --- -- 21 5 and Used 6y the rcepi,nt .1th 2;11 `••••-••• -•% the 1--ei-d --- I.11-ted fc, the P.,p.,e of d,, `n(nG2t ctuft Lt". As sUch. the City of _XM . . .......... ........ LccwOCY• �Ple ones& rellW111y. w wijoj,4�1 P`ws�t .J, F . . .... y Othff PO(timl Use. FU1.thbn. the Cit ------------ c, '. of oto. - sw'�Ddftbfti y hot... 23 to, 10, : " 11/06 r 22 NOTE This Atios page is Wblecl to P�Iodlc ................... . ..... It Fo, '4 ST. PETERSBURG 11SOn cbmt f0ttst '.�Ilonl ple.,e j ; -Wt oU, Web site. c JUNIOR COLLEGE =."Moon i 12/01 I ..... ...... .................... . . . C" R2 41.,A . . ............... eq cj q) 200 400 z 1Z 11 /07 be ;j a 0 �z -0 L) .......... . . to -- T1 ------------- I ----- rZ ....... .. ........ . ...... ---------- ASTWOOD DR < 30 31 2 ------------------------ 0) _F 14 ------------------ . 19 18 17 r — -------------- --------- LONG RANGE PLANNING DEVELOPMENT REVIEW CITY OF C LEARWATE R PUNNIING DEPARTMENT POST OFFICE Box 4748, CLEARWATER, FLORIDA 33758 -4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAx (727) 562 -4576 May 7, 2003 Mr. Kevin Dunbar, Director Parks and Recreation Department City of Clearwater 100 South Myrtle Avenue Clearwater, FL 33756 -5520 RE: Development Order regarding Case FLD2002- 07021A/SGN2003 -01002 at 601. Old Coachman Road (Clearwater Community Sports Complex and Phillies Spring Training Facility) Dear Mr. Dunbar: This letter constitutes a Development Order pursuant to Section 4- 206.D.6 of the Community Development Code. On April 15, 2003, the Community Development Board reviewed your application for Flexible Development approval, as a revision to a previously approved Comprehensive Infill Redevelopment Project (FLD2002- 07021), to increase the permitted height of a building (scoreboard) from 30 feet to 70 feet, under the provisions of Sections 2 -704.B and 2- 1404.A and a Comprehensive Sign Program to increase the number and area of freestanding signage from one sign of 64 square feet to 26 signs totaling 441.5 square feet and to increase the number and area of attached signage from one sign of 24 square feet to seven signs totaling 604.07 square feet, under the provisions of Section 3 -1807. This revision was for the scoreboard building and signage for the Clearwater Community Sports Complex and Phillies Spring Training Facility. The Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Sections 2 -704.B and 2- 1404.A. 2. The proposal is in compliance with the criteria as a Comprehensive Sign Program per Section 3 -1807. 3. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3 -913. BRIAN J. AUNGST, MAYOR- COMMISSIONER HOYr HAMILTON, VICE MAYOR- COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HIBBARD, COMMISSIONER BILL JONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" May 7, 2003 Dunbar — Page 2 Conditions of Approval: ( *Conditions 1 -9 were included with the prior approval by the CDB on September 17, 2002, and were included with this amendment): 1. That the City upgrade site D (Joe DiMaggio) prior to the 2006 spring training season. The City shall provide at least 1,200 spaces at this location, with at least 550 spaces to be upgraded with paved drive aisles and a minimum 15 -foot wide landscape area along Drew Street and Old Coachman Road. The balance of the spaces may be on grass spaces (on playing fields); 2. That the City upgrade, with Florida Power's approval, site C with paved drive aisles and a minimum landscape area along Old Coachman Road of 15 feet, as part of a continuous, consistent streetscape; 3. That the player parking area be enhanced with a column and ornamental fence, acceptable to the Planning Department; 4. That a landscape plan for each parking lot be submitted to approved by Staff, prior to the issuance of permits for construction; 5. That should the Pinellas Trail extension within the Florida Power right -of -way be constructed prior to the 2004 spring training season, the sidewalk along the east side of Old Coachman Road may be eliminated and the sidewalk along the west side of Old Coachman Road shall be increased to a minimum width of 10 feet. If the Pinellas Trail extension is not constructed within this timeframe, but is substantially designed with funding assured (within fiscal year 03/04), then its construction may be deferred and a temporary surface should be installed for an interim period. If the trail is neither substantially designed nor funded, five -foot sidewalks should be installed prior to the 2004 spring training season; 6. That the signature landscape display at the intersection of Drew Street and Old Coachman Road be approved by the Planning Department, prior to construction, and installed prior to the 2006 spring training season; 7. That all proposed signage (scoreboard, directionals, temporary, etc.) be approved through a Comprehensive Sign Program by the Community Development Board; 8. That the design of the buildings be consistent with the conceptual elevations submitted to, or as modified by the CDB; 9. That a revised Master Parking Plan be submitted to staff within 14 days, with corrected parking tabulations and identifying site E (plaza parking); 10. That the scoreboard building be attached to, and made a part of, the north wall of the berm seating portion of the stadium; and 11. That the changeable message sign may be relocated, under Staff approval, by a maximum of 25 feet in any direction to accommodate unforeseen construction issues. Pursuant to Section 4 -407, an application for a building permit shall be made within one year of Flexible Development approval (April 15,, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. May 7, 2003 Dunbar — Page 3 Please be aware that the issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4 -502.13 by the applicant or by any person granted party status within 14 days of the date of this Development Order. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on May 21, 2003 (14 days from the date of this Development Order). If you have any questions, please do not hesitate to call Wayne Wells, AICP, Senior Planner, at 727- 562 -4504. Sincerely, Cynthia H. Tarapani, AICP Planning Director IIMS5cIPDSIPlanning DepartmentlCD BIFLEXIInactive or Finished Applications l Old Coachman 601 Stadium Scoreboard and Signage - Approve&Old Coachman 601 Development Order.doc n� Zea oy..� A Z U N � T d� J I 9t O C� V r -� r fJ 1 o, V � d Q B 2 37' -10" *Window decals are not calculated in total signage area Sign type F7: Vinyl logo and text to be surface applied to glass door SCALE: 1 " =1' -0" 10 FILE Copy 83' -7 5/8" 5' -10 5/8" APR 4 4 2003 FG-1 FM �'�A�e1�liVC &DEVt"LOLIM SVC:i CQ71(D� C� Ai 0 18' -5 7/8" DMIMOI HE H'T -------- Hill 1111111111111111111111 I�--- - - - -�� I I - - -- — - - - -- i 11'EAM STORES ' — � 1 -3 /8 FE ' 11►'�, ' 10' -3" I F WEST ELEVATION SCALE: 1/8 " =1' -0" �,op� T I C K E T!k Sign type X3: 2 "thick formed metal reverse channel letters mounted to canopy. SCALE: 3/8 " =1' -0" TOTAL AREA: 11.67 s.f. 5' -7/8" 1' -0" 2' -5 3/8" 7 6 /8" o� *Window decals are not 8 1/8" calculated total T E A M STORE __ signage area 8' -0" Sign type F6: Sign type X10: Vinyl logo to be surface Logo to be internally illuminated sign cabinet and letters to applied to glass door be metal plate letters pinned -off face of building. SCALE: V=V-0" SCALE: 3/8 " =1' -0" TOTAL AREA: 1' SQUARE FOOTAGE CALCULATIONS Square footage calculations Total facade: 2,094 s.f ATTACHED SIGN -AGE or signage: s.f. — - - Available 6 %fi125 aP0�4aD� ©.DQoQ0QD4 ...... .. .. Total attached signage area this facade, sign types X3 and X10 = 30.17 sq. ft. - 1�_= MM COMIMM- COIvIl'R �I` ;.1\'SiUr SIGN IKOO GRAM W 42' -5 5/8" 3/4" i n i i i7 i i i i PARTIAL WEST ELEVATION @ CLUBHOUSE ENTRY SCALE: 1/16"=1'-0" - 10' -0" �� PHILLIE Sign type X10 (SIM): Logo to be internally illuminated sign cabinet SCALE: 1/4 " =1' -0" TOTAL AREA: 57.5 s.f. I In Mtee W UI 17' -6" S ADMINISTRATION OFFICE Sign type X6: 2 "thick formed metal reverse channel letters mounted to canopy. SCALE: 1 /2 " =1' -0" SQUARE FOOTAGE CALCULATIONS ice© Square footage calculations _ATTACHED S I G N AG E Total facade: 4,660 s.f. Available 6% for signage:280 s.f. 4voo�aoa ©vaaQO © ©a Total attached signage area this facade, sign types X6 and X10 (SIM)= 65.9sq.ft. r.: (1 6 1/2" 47' -2" ir7/8" e IC4 1/2" I *Window decals are not calculated in total signage area Sign type I'T Vinyl logo to be surface applied to glass door TOTAL AREA: 8.4 s.0 SCALE: 3/4 " =1' -0" FILE up INELL91ES CLEARWATMR 11 COM0901M fimm C�coo� r r o � o Sign type X1 1 -1/2" deep painted reverse channel letters pinned -off building Sign type XS Rules and regulations sign Metal panel sign with frame and plate letters rm_yYYfr � rllllTi Ir. 33]IZ L rrlllTTT CO]II ]]LUJJII LUJJJII 441- IdJail 1L i4 r r C 1t rrmTTTrTr Tr E8 LCN]�I� I� 1 Lrr 1 iii 14 ## rrmTTTr :ECC033III Tr rrm rE ii iT WEST ENTRY GATE ELEVATION (THIRD BASE SIDE) SCALE: 1 /8 " =11 -0" SQUARE FOOTAGE CALCULATIONS - Y 0� Total facade: 1,900 s.f. Available 6% for signage:114 s.f. ATTACHED S I G N AG E 1 ©pOD ©OOQ ©D[ QQ ©Q ©Q Total attached signage area this facade, sign type X1:107 s.f.' ° rrMY rrmi CN] LWj YYT iii ]1I 1 rrFTYYYri �miii 1:C677�I1: LLLUJ 11 4, 141 r r C 4=14 ### T M �rCN�7+� LLW T ii Jl CCC77��I `L"IJ ` 44W 4444fyY' rrrYYyyY , 1 iii _ iimii ii rrHYYYYt t mYYYf �Trr rm33TTr CN7]]II r r C TITTT m TT CO�1II: LWJJJll W�JJ11 L L WJ111 WJJLL W yJ## rrl-r1Y Y1f 4 Y1-4 :11 441JJ1# mYYtr 111 m1Trr rrmTTTr :ECC033III C m31rr N]III LLWJ�1` L L WJJll WJ111 44441♦♦ rrrrl I'll I'll fr 4 4x44 r 44iJ1 ## Y1i♦ mYYYr mini T -0° AREA TYPE X1 SIGN: 102 s.f. TOTAL AREA OF SIGNS THIS ELEVATION: 102 s.f. LT OMMUINITY S +Pt�1Z�TS COMIPLI >X 1'ACIE Ti1'PlE X 1 SOUTH ENTRY GATE ELEVATION (FIRST BASE SIDE) SCALE: 1 /8 " =1' -0" L. ■ ■ ■ ■ ■ ■ .3.5 -A 3 -to S ASCOREBOARD BUILDING STREET SIDE ELEVATION SCALE: 3/32 " =1' -0" ) 5 Ti. 75 V' x. bto Z6, X S• b Clock Metal sign panel with pinned -off painted etal letters and logos Video board Ad panel Matrix scoreboard RE: d rawi ng A5 -1 -2 /D additional information e: cage on scoreboard /fielc is not viewable from perty line or public righl ray, therefore not include rea calculation. FILE COPY No m a RE: 5/B CATWALK 94 SQ. FT. I I I I I I Lu I - - - -- -------- - - a RE: 5/B AD PANELS U --- ------------ — — — — — — — — — 1 — -- — — — — — — — — — — — — — - - - - - -- I I I� I METAL GRATE I SCOREBOARD PLAN 1 ST LEVEL ACCESS HATCH METAL GRATE I CATWALK FLOOR 94 SQ. FT. NETTING I I CATWALK FLOOR I 94 SO. FT. 1 I- X - - - -- -- - -- - ---- - - - --- I - -- - - - - -- - - - - - - -- -- - - - - -- 'I--- li i ii i � I I i — --- - - - - -- - - -- - -- — — -- - - - - -- I I GUARDRAIL j SHIP'S LADDER - INTERIOR FLOOR j j 96 SO. FT. COORDINATE O LOCATION W/ EQUIPMENT j SCOREBOARD PLAN 2N6 LEVEL RE: 5/A m a w m - -,i --------------- _ _ - i CROSS BRACING X---- ----- - - - - -' -- I i VERTICAL LADDER I W/ LOCKABLE CAGE I I RE: 5/A m a RE: 5/B I� I � -_ - ---------------------- - ___ =_= SQUARE FOOTAGE CALCULATIONS [VMS Total attached signage this facade 360 s.f. 9) IM91RopQgi)QoQpQ ©I CATWALK 94 SQ. FT. -- -- - - - - - -- SCOREBOARD PLAN GR1 DE LEVEL ASCOREBOARD FLOOR P SCALE: 3/32 " =1' -0" ATTACHED SIGNAGE CLOCK GRAPHICS OPEN FRAME AIR CONDITIONING EQUIP. AS REQ'D ROOFING ON METAL DECK VIDEO BOARD — METAL PANEL ENCLOSURE METAL GRATE w CATWALK m SCOREBOARD — SHIP'S LADDER — CONCRETE FLOOR - SLAB ON DECK METAL LADDER W/ LOCKABLE FRONT CAGE FOR LIMITED ACCESS X ) ( X ROOF 86'-6" ELEV. ! POSS. MECH. MEZZANINE 77' -0" ELEV. a 2' -4" ill SECOND LEVEL SCOREBOARD 61'- 101/2" ELEV. I , I I I PROTECTIVE NETTING APPROX. 2' -0" FROM FACE OF I SCOREBOARD & VIDEO BOARD !FIRST LEVEL SCOREBOARD 50'- 101/2" ELEV. FIN. GRADE m Ln Li_i m BSECTION AT OUTFIELD SCOREBOARD SCALE: 3 /32 " =1' -0" H R nm fu"BULL )JETS ClLlE&JIM's NIG IF, SA RE: 5/B CATWALK 94 SQ. FT. I I I I I I I X- -- I - - - -- -------- - - a I I - - --tI - - - - - -- - - - -- - -- X— — ----- I U --- ------------ — — — — — — — — — 1 — -- — — — — — — — — — — — — — - - - - - -- I I I SCOREBOARD PLAN 1 ST LEVEL ACCESS HATCH j I I FOR LADDER BELOW j I INTERIOR FLOOR AREA 96 SO. FT. I I I I RE: 5/A - -,i --------------- _ _ - i CROSS BRACING X---- ----- - - - - -' -- I i VERTICAL LADDER I W/ LOCKABLE CAGE I I RE: 5/A m a RE: 5/B I� I � -_ - ---------------------- - ___ =_= SQUARE FOOTAGE CALCULATIONS [VMS Total attached signage this facade 360 s.f. 9) IM91RopQgi)QoQpQ ©I CATWALK 94 SQ. FT. -- -- - - - - - -- SCOREBOARD PLAN GR1 DE LEVEL ASCOREBOARD FLOOR P SCALE: 3/32 " =1' -0" ATTACHED SIGNAGE CLOCK GRAPHICS OPEN FRAME AIR CONDITIONING EQUIP. AS REQ'D ROOFING ON METAL DECK VIDEO BOARD — METAL PANEL ENCLOSURE METAL GRATE w CATWALK m SCOREBOARD — SHIP'S LADDER — CONCRETE FLOOR - SLAB ON DECK METAL LADDER W/ LOCKABLE FRONT CAGE FOR LIMITED ACCESS X ) ( X ROOF 86'-6" ELEV. ! POSS. MECH. MEZZANINE 77' -0" ELEV. a 2' -4" ill SECOND LEVEL SCOREBOARD 61'- 101/2" ELEV. I , I I I PROTECTIVE NETTING APPROX. 2' -0" FROM FACE OF I SCOREBOARD & VIDEO BOARD !FIRST LEVEL SCOREBOARD 50'- 101/2" ELEV. FIN. GRADE m Ln Li_i m BSECTION AT OUTFIELD SCOREBOARD SCALE: 3 /32 " =1' -0" H R nm fu"BULL )JETS ClLlE&JIM's NIG IF, SA MARQUEE SIDE ELEVATION SCALE: 3/16 " =1' -0" sign to be shut off i stadium is closed rix message board age change rate to every two minutes steel sign support Concrete base pad MARQUEE FRONT ELEVATION @US 19 SCALE: 3/16 " =1' -0" 17' -10" +59' -0" Note: RE: sheet 10, drawing A, for sight triange plan. +45' -0" highest elevation of US19 bridge RE: GSD 1 -00 for sign location I O - Right -of -way or property line 9 Y NOTE: sign to be double -sided RE: sheet 10, drawing A, for sight triange plan. Property line or right -of -way Dryvit system on metal studs to match stadium dryvit Architectural pre -case top Cast stone medallion to match stadium medallions i? Pinned -off painted metal letters CMU base to match CMU used on stadium 6" high pinned off metal letters Sign to have landscaping at base of sign MARQUEE SIDE ELEVATION SCALE: 1 /2 " =1' -0" 13' -4" S CLEARWATER ,� 'f1Ri1 COMPLEX MARQUEE ELEVATION @ COACHMAN TOTAL AREA: 34.5 s.f. SCALE: 1 /2 " =1 ' -0" iL L 6U. Site light pole by others Double -sided vinyl banners SCALE: 3/4 " =1' -0" TOTAL AREA: 11 s.f. 11 x 24 poles = 264 s.f. aw i Ir V-6" '1 �9 1/2" 4' -6" 4' -7 12' -0" 850' -0" from property line to Carpenter Center Road nox I � N Nr 0 I Carpenter Center access road III 5 , 4 1� n 1 � n � srs CLEARWATER COMMUNITY SPORTS COMPLEX SITE PLAN WITH CARPENTER CENTER COMPLEX SCALE: N.T.S. 907' -0" from property line to Carpenter Center Road i +1�; Sight triangle I I C L 50' UTILITY EASEMENT I OR —2---5 1 Landscaped Area I I _ I I —21'6" I -- Monument Sign X9 I 20' -0" I \ 20' -0" I I 0 SIGN TYPE X9 SIGHTTRIANGLE PLAN 20'-0" SCALE: N.T.S. SITE REFERENCE PLAN Detail A OMEN MMMM ME ON ■ moommoommmom ■ MEN by I N N O M M E M E ■ ■ m o n o ■ ■ ■ o ■ ■ ■ ■ ■ ■ o ■ ■ ■ m Igo, v ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ r n, O M E N ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ N o w satl 9 17` ■ ■ v ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ m ■ ■ ■ ■ ■ ■ ■ ■ ■ 9 M i � w Vl ' I' � l +r m {n z. c. .m m m. z 1 I R ° �rn e 1 iL .1 ■M .3■W i Elio Iir I . J oil ism �j 1 �a rl ■ +� oil ,I ~d o � � 7 y n �r 7 O> n n O r rTI ° �rn e 1 iL .1 ■M .3■W i Elio Iir I . J oil ism �j 1 �a rl ■ +� oil ,I i y I O t MI. z. c'. m m m z JIM plow-0 fl r 1 i = ire — S rTl IMF- I= ire � ►� AMal 1S n � I o� x S rTl ■ aa� 1Nil I, ■ oil r �t e ii _ EL ._MEE. 11Th__ is �INIIII�; er 11 ■ll ®le - - -- �- E_ � N O t m, c m m m z 1 �r z� �n �rT1 0 oy r M x �M I I I, III ICI ,I III I� I� I� I.I . 01 11=H �I �I'�CIII L H u =i INN �• 1 �m _, ��r�r rrr N O G m z c' m m m z r ar rTl CIA ~n �r �r 0 7t �y rTl J. 4 Mil 'ai d 1111i jl! .III -.rommi■ t rl, til � ti I. I ' . go r' CITY OF CLEARWATER NOTICE OF COMMUNITY DEVELOPMENT BOARD PUBLIC HEARINGS The Community Development Board of the City of Clearwater, Florida, will hold public hearings on Tuesday, April 15, 2003, beginning at 2:00 p.m., in the City Commission Chambers, in City Hall, 3rd floor, 112 South Osceola Avenue, Clearwater, Florida, to consider the following requests: NOTE: All persons wishing to address an item need to be present at the BEGINNING of the meeting. Those cases that are not contested by the applicant, staff, neighboring property owners, etc. will be placed on a consent agenda and approved by a single vote at the beginning of the meeting. 1. City of Clearwater and Florida Power Corp. are requesting a flexible development approval, as a revision to a previously approved Comprehensive Infill Redevelopment Project (FLD2002- 07021), to increase the permitted height of a building (scoreboard) from 30 ft to 70 ft, under the provisions of Section 2 -704.13 and 2- 1404.A, and a Comprehensive Sign Program to increase the number and area of freestanding signage from one sign of 64 sq ft to 26 signs totaling 441.5 sq ft and to increase the number and area of attached signage from one sign of 24 sq ft to 7 signs totaling 604.07 sq ft, under the provisions of Section 3- 1202.G (Proposed Use: A new building to house a scoreboard . and a sign program for the Community Sports Complex and Phillies Spring Training Facility) at 601 Old LCoachman -Rdl, Sec. 07- 29 -16, M &B's 41.01 & 43.01 and Clearwater Collection 2nd Replat, Lot 1 less rd right of way on E! FLD 2002- 07021A_& SGN 2002 - 01002) 2. Menna — Pinellas, LLC are requesting a flexible development approval for an overnight accommodation establishment with a reduction of the front (east) setback from 25 ft to 12 ft (to pavement), a reduction of the front (south) setback from 25 ft to 15 ft (to pavement), a reduction of the side (west) setback from 10 ft to 5 ft (to pavement), and a reduction of side (north) setback from 10 ft to zero ft (to pavement), an increase in building height from 25 ft to 59 ft and to allow direct access to a major arterial street, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2 -704.0 (Proposed Use: The demolition of an existing restaurant and the construction of a 78 -room hotel) at 20780 U.S. 19 N., Sec. 18- 29 -16, M &B 14.122. FLD 2003 -02009 3. Happy -Go- Luckv, Inc. are requesting a flexible development approval for an existing overnight accommodation use with a reduction of the required lot width along U.S. 19 from 200 ft to 100 ft, reductions of the side (south) setback from 10 ft to zero ft (to existing and proposed pavement), a reduction of the rear (west) setback from 20 ft to 6.3 ft (to existing pavement) and to allow direct access (existing) to a major arterial street, as part of a Comprehensive Infill Redevelopment Project, under the provisions of Section 2 -704.K (Proposed Use: An existing, 86 -room overnight accommodation use on a reconfigured lot [related to FLD2003- 020091) at 20788 U.S. 19 N., Sec. 18- 29 -16, M &B 14.121. FLD 2003 -02008 4. Clearwater Homeless Intervention Proiect, Inc. are requesting a flexible development approval for a residential shelter for 10 residents in 8 dwelling units with a reduction of the front (north) setback from 25 ft to 21 ft (to building), a reduction of the side (west) setback from 10 ft to 5 ft (to pavement), reductions of the rear (south) setback from 20 ft to 5 ft (to building) and from 20 ft to zero ft (to pavement) and a reduction of required parking from 5 spaces to 4 spaces, as part of a Comprehensive Infill Redevelopment Project, under the provisions of Section 2- 704.C, and a Comprehensive Landscape Program, with reductions of landscape buffer widths along the west property line from 10 ft to 5 ft and along the south property line from 10 ft to zero ft, under the provisions of Section 3- 1202.G (Proposed Use: An 8 dwelling unit (10 residents) transitional housing project) at 1353 & 1357 Park St., Overbrook Sub., Blk 6, Lots 3 -6. FLD 2003 -02010 5. McDowell Holdings, Inc. are requesting a flexible development approval to permit offices with a reduction in the front (north) setback from 25 ft to 17 ft (to pavement and building), a reduction in the side (east) setback from 20 ft to 10 ft (to building), a reduction in the side (west) setback from 20 ft to 7 ft (to pavement) and a reduction in the rear (south) setback from 20 ft to 11 ft (to building) and from 20 ft to 3 ft (to dumpster enclosure), as part of a Comprehensive Infill Redevelopment Project, under the provisions of Section 2- 1004.13, and a reduction in the landscape buffer along the rear (south) property line from 12 ft to 3 ft, as part of a Comprehensive Landscape Program, under the provisions of Section 3- 1202.G (Proposed Use: A 2,789 sq ft office building) at 1459 Court St., Breeze Hill, Blk A, Lots 5 & 6. FLD 2003 -01002 6. Clearwater Retail Group, Ltd. are requesting a flexible development approval modifying a portion of the Development Order (condition 6) approving the flexible development application (case FLD 02- 02 -06) which requires that freestanding signs be limited to a single, unified monument -style sign along South Missouri Ave. and a single, unified monument -style sign along Druid Rd., as part of a Comprehensive Sign Program, under the provisions of Section 3 -1807 (Proposed Use: a Comprehensive Sign Program with 5 freestanding, monument signs and 8 attached signs) at 810 S. Missouri Ave., Clearwater Retail, Lots 7 -10. FLD 02- 02 -06A & SGN 2003 -02009 7. Brightwater Cove Townhomes, LLC are requesting a flexible development approval for attached dwellings within the Tourist District with reductions of the side (east and west) setbacks from 10 ft to 7 ft and 6 ft, respectively, (to building), reduction in the rear (north) setback from 20 ft to zero ft (to pavement) and 13 ft (to pool) and to permit parking that is designed to back into the public right-of-way, as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2 -803.0 and Preliminary Plat approval for nine townhomes lots at 130 Brightwater Dr., Bayside Sub. No. 2, Lots 50 -52. FLD 2003 -02007 8. Religious Community Services, Inc. are requesting a flexible development approval to permit a social/public service agency (food pantry) within the Commercial District adjacent to property designated as residential in the Zoning Atlas with a reduction in the front (south) setback along Hart St. from 25 ft to 15 ft (to building), side (east and north) setbacks from 10 ft to 5 ft (to pavement) and a reduction in the required number of parking spaces from 58 spaces (4 spaces per 1,000 sq ft of gross floor area) to 31 spaces (2.15 spaces per 1,000 sq ft of gross floor area), as a Comprehensive Infill Redevelopment Project, under the provisions of Section 2 -704.0 and to permit the reduction in the side (east) landscape buffer from 12 ft to 5 ft, as part of a Comprehensive Landscape Program, under the provisions of Section 3- 1202.G (Proposed Use: a 2 story, 12,592 sq ft social/public service agency [food pantry]) at 405 N. Myrtle Ave., Bon Air, Blk A, Lots 1 -4 less rd and Drew Park, Lots 36 -40 & 3 ft of vac Drew Court on W, less N 7.5 ft of the W 40 ft. FLD 2003 -02011 9. Florida Middle Properties, Inc. (Michael Hughley, President) are requesting an appeal of an administrative interpretation of the Community Development Code and decision by an administrative official (Community Development Coordinator) that: the use of the site as an automobile service station, has been out of business for more that 6 months, requiring approval through the Flexible Standard Development Process, under the appeal provisions of Section 4 -501 of the Community Development Code at 1445 S. Missouri Ave., Sall's 2nd Addition, Blk A, Lots 1 & 2 less rd. APP 2003 -00001 Interested parties may appear and be heard at the hearings or file written notice of approval or objection with the Planning Director -or City Clerk prior to the hearings. Any person who decides to appeal any decision made by the Board, with respect to any matter considered at such hearings, will need a record of the proceedings and, for such purpose, may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based per Florida Statute 286.0105. All individuals speaking on public hearing items will be sworn in. Five days prior to the meeting, staff reports and recommendations on the above requests will be available for review by interested parties between the hours of 8:30 a.m. and 4:30 p.m., weekdays, at the City of Clearwater, Planning Department, 100 S. Myrtle Ave., Clearwater, FL 33756, or call 562 -4567. Lisa Fierce Planning Department City of Clearwater P.O. Box 4748, Clearwater, FL 33758 -4748 NOTE: Applicant or representative must be present at the hearing. Cynthia E. Goudeau, CMC City Clerk I• `e YOU ARE BEING SENT THIS NOTICE IF YOU ARE THE APPLICANT OR OWN PROPERTY WITHIN 500 FT. OF THE SUBJECT PROPERTY. A COPY OF THIS AD IN LARGE PRINT IS AVAILABLE IN THE OFFICIAL RECORDS AND LEGISLATIVE SERVICES DEPT. ANY PERSON WITH A DISABILITY REQUIRING REASONABLE ACCOMMODATION IN ORDER TO PARTICIPATE IN THIS MEETING SHOULD CALL THE OFFICIAL RECORDS AND LEGISLATIVE SERVICES DEPT WITH THEIR REQUEST AT (727) 562- 4090. Ad: 03/30/03 7 LONG RANGE PLANNING DEVELOPMENT REVIEW CITY OF CLEARWATER PLANNING DEPARTMENT POST OFFICE BOX 4748, C'.EARWATER, FLORIDA 33758 -4748 MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE, CLEARWATER, FLORIDA 33756 TELEPHONE (727) 562-4567 FAX (727) 562 -4576 May 7, 2003 Mr. Kevin Dunbar, Director Parks and Recreation Department City of Clearwater 100 South Myrtle Avenue Clearwater, FL 33756 -5520 RE: Development Order regarding Case FLD2002- 07021A/SGN2003 -01002 at 601 Old Coachman Road (Clearwater Community Sports Complex and Phillies Spring Training Facility) Dear Mr. Dunbar: This letter constitutes a Development Order pursuant to Section 4- 206.D.6 of the Community Development Code. On April 15, 2003, the Community Development Board reviewed your application for Flexible Development approval, as a revision to a previously approved Comprehensive Infill Redevelopment Project (FLD2002- 07021), to increase the permitted height of a building (scoreboard) from 30 feet to 70 feet, under the provisions of Sections 2 -704.13 and 2- 1404.A and a Comprehensive Sign Program to increase the number and area of freestanding signage from one sign of 64 square feet to 26 signs totaling 441.5 square feet and to increase the number and area of attached signage from one sign of 24 square feet to seven signs totaling 604.07 square feet, under the provisions of Section 3 -1807. This revision was for the scoreboard building and signage for the Clearwater Community Sports Complex and Phillies Spring Training Facility. The Community Development Board (CDB) APPROVED the application with the following bases and conditions: Bases for Approval: 1. The proposal complies with the Flexible Development criteria as a Comprehensive Infill Redevelopment Project per Sections 2 -704.13 and 2- 1404.A. 2. The proposal is in compliance with the criteria as a Comprehensive Sign Program per Section 3 -1807. 3. The proposal is in compliance with other standards in the Code including the General Applicability Criteria per Section 3 -913. BRIAN J. AUNGST, MAYOR- COMMISSIONER HOYT HAMILTON, VICE MAYOR- COMMISSIONER WHITNEY GRAY, COMMISSIONER FRANK HIBBARD, COMMISSIONER BILL JONSON, COMMISSIONER "EQUAL EMPLOYMENT AND AFFIRMATIVE ACTION EMPLOYER" 1 May 7, 2003 Dunbar — Page 2 Conditions of Approval: ( *Conditions 1 -9 were included with the prior approval by the CDB on September 17, 2002, and were included with this amendment): 1. That the City upgrade site D (Joe DiMaggio) prior to the 2006 spring training season. The City shall provide at least 1,200 spaces at this location, with at least 550 spaces to be upgraded with paved drive aisles and a minimum 15 -foot wide landscape area along Drew Street and Old Coachman Road. The balance of the spaces may be on grass spaces (on playing fields); 2. That the City upgrade, with Florida Power's approval, site C with paved drive aisles and a minimum landscape area along Old Coachman Road of 15 feet, as part of a continuous, consistent streetscape; 3. That the player parking area be enhanced with a column and ornamental fence, acceptable to the Planning Department; 4. That a landscape plan for each parking lot be submitted to approved by Staff, prior to the issuance of permits for construction; 5. That should the Pinellas Trail extension within the Florida Power right -of -way be constructed prior to the 2004 spring training season, the sidewalk along the east side of Old Coachman Road may be eliminated and the sidewalk along the west side of Old Coachman Road shall be increased to a minimum width of 10 feet. If the Pinellas Trail extension is not constructed within this timeframe, but is substantially designed with funding assured (within fiscal year 03/04), then its construction may be deferred and a temporary surface should be installed for an interim period. If the trail is neither substantially designed nor funded, five -foot sidewalks should be installed prior to the 2004 spring training season; 6. That the signature landscape display at the intersection of Drew Street and Old Coachman Road be approved by the Planning Department, prior to construction, and installed prior to the 2006 spring training season; 7. That all proposed signage (scoreboard, directionals, temporary, etc.) be approved through a Comprehensive Sign Program by the Community Development Board; 8. That the design of the buildings be consistent with the conceptual elevations submitted to, or as modified by the CDB; 9. That a revised Master Parking Plan be submitted to staff within 14 days, with corrected parking tabulations and identifying site E (plaza parking); 10. That the scoreboard building be attached to, and made a part of, the north wall of the berm seating portion of the stadium; and 11. That the changeable message sign may be relocated, under Staff approval, by a maximum of 25 feet in any direction to accommodate unforeseen construction issues. Pursuant to Section 4 -407, an application for a building permit shall be made within one year of Flexible Development approval (April 15, 2004). All required certificates of occupancy shall be obtained within one year of the date of issuance of the building permit. Time frames do not change with successive owners. The Community Development Board may grant an extension of time for a period not to exceed one year and only within the original period of validity. May 7, 2003 Dunbar — Page 3 Please be aware that the issuance of this Development Order does not relieve you of the necessity to obtain any building permits or pay any impact fees that may be required. In order to facilitate the issuance of any permit or license affected by this approval, please bring a copy of this letter with you when applying for any permits or licenses that require this prior development approval. Additionally, an appeal of a Level Two approval (Flexible Development) may be initiated pursuant to Section 4 -502.B by the applicant or by any person granted party status within 14 days of the date of this Development Order. The filing of an application/notice of appeal shall stay the effect of the decision pending the final determination of the case. The appeal period for your case expires on May 21, 2003 (14 days from the date of this Development Order). If you have any questions, please do not hesitate to call Wayne Wells, AICP, Senior Planner, at 727- 562 -4504. Sincerely, Cynthia H. Tarapani, AICP Planning Director IIMS5clPDSIPlanning DepartmentlC D BIFLEXIInactive or Finished Applications 101d Coachman 601 Stadium Scoreboard and Signage - Approved101d Coachman 601 Development Order.doc 2 25 + SPORT +VENUE +EVENT HOK SPORT. INC. AM Itee of Record ArchBeature, Engimaring, Pianrgng, Inleriom, Facility Programming 323 W 6th Street, Sulfa 700 Kansas City, Missouri 64105 EwJn9qq1e EWNG COLE Cu@RY BROTT Assoekda ArchHect, Sintcturol Engmear Federal Reserve Bank Bulling tndependenee mall West 100 mom 6th Street Philadelphia, pennsytvanlo 19106 -1590 Eredson & Assocloles meehanlcoi Englneer 9503 E 63rd Street, Sulfa 214 Raytown, m0 64133 Charlotte Enaineormg Sports Group Cia Engineer 110 South Hooror Blvd., /206 Tampa, FL 33609 WJHW Audto/Video ConsuHont 13714 Comma Rd., SuNe. 110 Dallas, Texas 75244 i • ,.: r. r Y NOTES ®�° w�4 1. DM IT OF r Via` '.-�- ,.: r. r NOTES ®�° 1. DM IT OF ,.. '.-�- ��- U J Z (n00 -j ®�° U J Z (n00 -j ZZ� QW � 0. � nw Z ° W o Z . < it: Qo0.' �q L' s W 0 Z r, V W_ °. a W Y KEYPLAN U U NO. 9 -00 ISSUED BY: HOK S +V +E M o W ce Q BY: REVIEWED BY: QQm1-0. Z ,- - fMOXCT ATE: =aoo< TrnE: I LF16- COPY ffMIX-aw 0 PROEff NORTHr - -` SUITE LEVEL REFERENCE PLAN e is 32 '` 01 11- Copyright NON Sport, INC 2002 25 FILE COPY ROOF LEVEL REFERENCE PLAN SPORT +VENUE+EVENT KOK SPORT. INC. kchited of Retard Archffecture,.Engtneering. Planning. Interiors. FatOHy Programming 323 W 8th Street" Sub 700 Kansas City, Missouri 64105 SWING COLE CHERRY BROTT Associate Archliecl. Stnuctural Engineer Federal Reserve Bank Building Independence Mail West 100 North 6th Sinai ph0adeiphto, Pennsytranio 19106 -1590 Bredson 8 Associates Mechanical Engineer 9503 E 63r6 Street, Suite 214 Raytown, UO 64133 Chado"a Enalneerina Sports Grow ChB E glneer 110 South Hoover Md., #206 Tampa" FL 33609 WJHW Audla/ eo ConsuRont 13714 Gamma Rd., Suite. 110 Dallas, Texas 75244 J V) J � F Q H Z Z1=/tUG1 —QF-n UlO U Q Z • • 4s W�3 Qw N o Z = z Z t] Lea O Cr.0 ?� 4 °w =0° Uwoz0 Q O U 7 Q = Q O O t aZU:5 e PROJECrNORTH J V) J � F Q H Z Z1=/tUG1 —QF-n UlO U Q Z J Z Z Z LLJ -00 W�3 Qw N o Z = z Z t] Lea O Cr.0 ?� 4 °w =0° Uwoz0 Q O U 7 Q = Q O O t aZU:5 e PROJECrNORTH PRO.ECT -NO: (ISSUED BY: 02- 0259 —OD HOK S +Y +E Copyrfght HOK Sport. INC 2002 its] 2- • k1W/-,1V soul XXM= ------------------------------ 9 R sic 0 is PROPOSED ':HALF PRACTICE FIELD POM .. .... I V l ima . . . . . . . . . . . . SMACK FLORIDA F POWER R ROW 5�- 1 .... ....... ......... bs/R 0am 20' 44.41 J. ............ If NIA lone 225' FPC RICHT-07-V"Ay N/A C 15' -25' OR 1472 n MS .......... NT/A 0.25'. 20' SETBACK NO S R • r-1 F -P25' its] 2- • k1W/-,1V soul XXM= ------------------------------ 9 R sic 0 is PROPOSED ':HALF PRACTICE FIELD 20' SIDE YARD SETBACK LmIsm. -.1 00610 ....... .... POM .. .... I V l ima . . . . . . . . . . . . SMACK FLORIDA 20' SIDE YARD SETBACK LmIsm. -.1 00610 ....... .... POM .. .... t:j . . . . . . . . . . . . SMACK FLORIDA F POWER R ROW 5�- 1 .... ....... ......... bs/R 0am 20' 44.41 J. ............ 1,60' NIA lone 0 N/A C 15' -25' —7 cow BUILD G os/R PROPOSED PLAYING FIELD AP."e 1V SIDE YAW`j REQUIRED SETBACKS PROVIDED SETBACKS VARIANCE REQUESTED . . . . . . . . . . . . SMACK R F o R m t_'> 5�- 1 .... ....... ......... bs/R 0am 20' 44.41 ............ 1,60' NIA lone 0 N/A C 15' -25' —7 .......... NT/A 0.25'. It NO S R • r-1 F -P25' 10, 15, 251 to, 60 30 0 60 120 > rr u C. SCALE: 1-=w, PROPOSED DEIENTION' Lu - BOND uj - c' :p :E A, o 0 Ln a I=- o E E! Vf 25* FRONT YARD sp- '* -- Lli z El SETBACK LLI ............. ... POND 79-92• 2' E co 9; 7 cow BUILD G os/R PROPOSED PLAYING FIELD AP."e 1V SIDE YAW`j REQUIRED SETBACKS PROVIDED SETBACKS VARIANCE REQUESTED . . . . . . . . . . . . SMACK R F o R m t_'> 5�- 1 .... ....... ......... bs/R 0am 20' 44.41 1:33' 1,60' NIA lone 0 N/A C 15' -25' —7 m— NT/A 0.25'. It NO S R • r-1 F -P25' 10, 15, 251 to, 60 30 0 60 120 > rr u C. SCALE: 1-=w, til 10' SIDE YARD SETBACK PROJECT BOUNDARY I 'Ma". MT ZONING REQUIRED SETBACKS PROVIDED SETBACKS VARIANCE REQUESTED . . . . . . . . . . . . S R F o R m t_'> 5�- 1 .... ....... ......... bs/R 8 C, m a 20' NIA 1:33' 1,60' NIA C) z 0 N/A C 15' -25' 10' 10' -20' NT/A 0.25'. N/A NO S R • r-1 F -P25' 10, 15, 251 to, 60 30 0 60 120 > rr u C. SCALE: 1-=w, Lu - E EFE ;3 c5 t7 0 uj - c' :p :E A, 0 Ln a I=- o E E! z E5 8 sp- '* -- Lli z El LLI 79-92• 2' E co 9; 7 a g =�� a o �. .2 C3 0 z BZ A. U "N 0 ■ ■ vv: -"A: ■ ED EASTING POND 25° FRONT YARD SETBACK I 'Ma". MT ZONING REQUIRED SETBACKS PROVIDED SETBACKS VARIANCE REQUESTED • 10- SIDE YARD ■ SETBACK S R F o R m t_'> 5�- 1 R bs/R 8 C, m a 20' NIA 1:33' 1,60' NIA I 'Ma". MT ZONING REQUIRED SETBACKS PROVIDED SETBACKS VARIANCE REQUESTED F S R F o R m t_'> 5�- 1 R bs/R 8 C, m a 20' NIA 1:33' 1,60' NIA C) z 0 N/A C 15' -25' 10' 10' -20' NT/A 0.25'. N/A NO Z r-1 F -P25' 10, 15, 251 to, 60 30 0 60 120 > rr u C. SCALE: 1-=w, Lu - E EFE ;3 c5 t7 0 uj - c' :p :E A, 0 Ln a I=- o E E! z E5 8 sp- '* -- Lli z El LLI pap rr < 2' E co 9; 7 a g =�� a o �. .2 C3 0 z U I 'Ma". MT ZONING REQUIRED SETBACKS PROVIDED SETBACKS VARIANCE REQUESTED F S R F S R F S R bs/R 25' 20' NIA 1:33' 1,60' NIA YES YES N/A C 15' -25' 10' 10' -20' NT/A 0.25'. N/A NO YES NIA F -P25' 10, 15, 251 to, 15' NO NO NO N/A - THROUGH LOT- FRONT YARD SETBACK APPLIES TO EAST & WEST FRONTAGES +/11; -Daniel M. Vickstrom, P.E. P.E. No. 46090 State of Florida DATE: 07.24.02 SCALE: 1"=60' DRN. BY: KES CHRD. BY: DMV 0-1 00 SO 00 PROD. 9 11711-1 L- CLq Ise w CLq +/11; -Daniel M. Vickstrom, P.E. P.E. No. 46090 State of Florida DATE: 07.24.02 SCALE: 1"=60' DRN. BY: KES CHRD. BY: DMV PROD. 9 11711-1 _ rl / o 2 CONCRETE �A / i I I lK. U. Z� k� -- x OOD WOOD ,1'/ 2 41 FLA' Poi IN C. iNV / / NV ,2 H WOOD '24" PVC PIPE 24" PVC P|PIIE F PiPE , ` �R0�N� 24 PIPE . 24- TqPE ----� TOP El 24�94 SAN 'R! � O0 !NV � G |NV � ," �.�p / -- GENE.RATOR '01N 7 1 =t4 CONCRETF SLAB OF PIPE 6.25 48"Rl- / v / 0- RWH REVIEM BY. SAT RIM 26�1 / / NV ,2 H WOOD '24" PVC PIPE 24" PVC P|PIIE F PiPE , ` �R0�N� 24 PIPE . 24- TqPE ----� TOP El 24�94 SAN 'R! � O0 !NV � G |NV � ," �.�p / -- GENE.RATOR '01N 7 1 =t4 CONCRETF SLAB OF PIPE 6.25 48"Rl- / v / 0- RWH REVIEM BY. c opt," I NORTH PL4 PLAN Top OF PARAPET T EL 76!-7' Ak TOP-OF PARAPET T EL 70-10 172— .41 SUITE LEVEL T EL 52 -10 IT2— NAIN CONCOURSE `OPEN TO COMOURSE'--\ BEYOND (m) 16 17 18 .H.—H ...... MUM, um= R. ATION @ ADMIN. /NOVELTY STORE n19 wi LIGHT pFIMRE, A '\ TO? OF PARAPET 1,7 EL 56-10 t127 'SURE IEVE! 1!k WAIN CONCOURSE EL 38-10 112 SERVICE LEVEL EL 24'27 2 WEST ELEVATION 14 T.O. PARAPET -3 i We -Ems .............. ........... I M-1110—Mi, IN ON Mw"-=MM9TMw — DECEMBER 22, 2002 M= MOVE a 10 srextIM M= SC rr SPORT+VEMUE+EVENT PACKAGE O= CVA= Twn" 1`0011ER CNICOM KOK SPORT. INC. 14M � arvJaz REVISIONS ft DATE DESCRIPTION! Archlied of Record ArchileauTe, Engtreering, Pfwnlng. 1C7;MW4-UA30W .Inladors-Facirdy Provamm'ing CU20 cul ME 523 W 8th Street, Suite 700 0010 .47 MuMirf Kansas CRY, Wssauri 64105 Evvzms-l�.Vn T.O. Pomm ft "n901-9 p 051" sroicr= SIM 4 11 05210 sm l06T =a MMMM rMS COM MERRY MOIT AssoeM I Arcltlled, FILIE C Ou P V *531s kmStIMROOF Structural EhgTrwr 05,00 o7j-Tta�a mtu Federal Reserva'Bark Suildhig' a= MM T�Trn 05511 WIX sun IndaperIdertet Vag Wasi z2jw assrl — — TMFJAAx.S 100 ,North fill, Street ; 00ITT aMsIGUMS csna a anAacaT PhIladelpma, Perm yfeaffla, T.O. PARAPET N =10 HJ7JASg1 JIM COM Ash 9 910 6 -9 590 ... ... .... i ..................... ............... .......... - ...... ................ .... .......... ... ...... ........... . .. . .. Bredsorr & As=!afn ....... . . . . . . . . .. . Wocharlcol Engineer Z' 0 z .. 9503 E 453rd Street, Sulfa 214 owo 'Mmn" waoa<Q Rayfwn, MD 64133 CtArfolle Engineering sports GrOMR —CIA Engineer 110 South Hoover BW., f206 OTIS; SSW MWAIC WOMM Tamp., FL 33609 MIS CA'!O®E wupIlOOMIC 071" — Jvaums WJHW M;O lx�-� wz s $Mm:`*M NSLLUM Audlo/VIdeo Corisuffant Imuo AaormmmL mw nE 13714 Gamma Rd., Sulle. 110 Ulm wm'aWA IWIS ami App-mra ffrM= klam" DOOM Dafts, Texas 75244 07,16 iawmttat supog s[All M am vac '.i81E-TTx OW rMUMASIX (M) SKXE-KY+ a= sw wu rumw M TRU Onto M AM -CMISPUIVI-M Tg56TiYE WEI= 07M nnymmw 07910 JOOM SMM ow$ PEW SDM jw SIXuas OHIO Snn DXM NO MQ0 =I FILM v= DOORS OMM J=IS DM am cn;Kw COOMC woes. O OTTDfAp cOiuw COM =404. qAMM VQ0Os OM am D= FOADIsm am O.-M =14 1,0707 am wMwv-7MKM 0220 POCUM 0 r"M MM GITSLM 9YAD am 0MMSM 1w= W07 PtUI. SYS= 0310 CELM TAE 0%11 AM== TAn MLM awo ¢Tlilti AUUM no ac QMI = vtO CM SPIT FLOOM QXRU IT WAUL USE M AOCCW= 0 COM STIMO:nc TL,RF 09M � RM MrM wM FA ,RMD ?=S A! sr=M Floc SrJm61 Mw"-=MM9TMw — DECEMBER 22, 2002 PACKAGE 14M � arvJaz REVISIONS ft DATE DESCRIPTION! WEST ELEVATION @ ENTRY GATES T.O. Pomm p 4 11 FILIE C Ou P V ci z2jw ; 00ITT T.O. PARAPET N ... ........ ....... ... ... .... i ..................... ............... .......... - ...... ................ .... .......... ... ...... ........... . .. . .. W-10 t 2 SUITE LEVEL ....... . . . . . . . . .. . ........ .......... -11.......-........"' ...... . . . . . . . . . . . .......... Z' 0 z .. 4 11