2011 SIDEWALK CONTRACT - 11-0012-EN - ADMINISTRATIVE CHANGE ORDER #4,- ° CHANGE ORDER 4 PROJECT: 2011 Sidewalk Contract CONTRACTOR: Central Florida Contractors, Inc. PO Boz 3987 Date: August 17, 2012 PROJECT NUMBER: 11-0012-EN PO REFERENCE NO: ST108005 CONTRACT AWARD: November 03, 2011 CONTRACT DATE: December 13. 2011 Seminole, Florida 33775 CODE: 0315-92339-563700-541-000-0000 A CODE: 0315-92273-563700-541-000-0000 B SCOPE OF CHANGE: TffiS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT E�ctends the contract for 180 days and increases the funding on a unit price basis only for a not to exceed amount, with all other terms and conditions remairung the same, see attached for details. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY• ORIGINAL CONTRACT AMOUNT Admin CO 1- CM - 2/15/2012 Admin CO 2- CM - 3/20/2012 Admin CO 3- CM - 4/25/2012 C04-CC-09/0� 12 NEW CONTR�CT WMnillv AS TO Camilo Sd Ass' fiy , — G��r�t'�C't�� George N. Cretekos, Mayor ATTEST: �-�- �`� Rosemarie Call, City Clerk �� v Date: y�{,�a-�"n G�-t�i ���� - � $ $ 568,337.00 56,832.00 $ 400,000.00 $ 1,025,169.00 SHE C`����\� j �� � �� � CITY OF CLEARWATER, in � PINELLAS COUNTY, FLORIDA �_ � Witliam B. Horne, II City Manager -�; U� _ , ., ` � ' �, Central Flori ntractors, �c,;; :.� � � �": .' t ? g�i ,�_. �' «� By: �� (��" � q : George Gom , Presiden� `.-, � ``��'".� �r � =� � '� �, ��'�i . � � �v . , f .^ Date: S 3/ /� °.f�1,,j;., Witnesses: �I � 9 �j� Recommended By: City of Clearwater Tara L Kivett, Eng Construction Manager �� � Michael D Quillen, PE, City Engineer Page 2 of 3 Change Order #4 - 2011 Sidewalk Contract ITEM DESCRIPTION Estimated uanti New Sidewalks Code A: 0315-92339-563700-541-000-0000 Addition• 28 Construct New 4" Concrete 6000 Sidewalk (3000 PSI w/Fiber Mesh) 29 Construct New 6" Concrete 2000 Sidewalk (3000 PSI w/Fiber Mesh and 6"x6" /# 10 x# 10 Welded Wire Mesh) 30 Root Pruning 230 31 Install Detectable Warning Mat on 163 Existing Sidewalk 32 Preparation, installation and 1 maintenance of Project Sign UNIT UNIT COST SF $2.45 SF $3.80 LF $3.00 EA $250.00 EA $500.00 TOTAL COST $14,700.00 $7,600.00 $690.00 $40,750.00 $500.00 33 Construct 4 ft. Wide ADA Ramp 7 EA $500.00 $3,500.00 34 Construct 5 ft Wide ADA Ramp 7 EA $500.00 $3,500.00 35 Upgrade 4 ft. wide ADA Ramp 16 EA $1,050.00 $16,800.00 36 Upgrade 5 ft. wide ADA Ramp 16 EA $1,050.00 $16,800.00 37 Remove Concrete Dumpster Pad 1 EA $500.00 $500.00 38 Adjust Sanitary Sewer Manhole 2 EA $500.00 $1,000.00 39 Contingency 1 LS $3,561.46 $3,561.46 Total Net Increases Code A: $109,901.46 Remove and Renlace Sidewalks Code B: 0315-92273-563700-541-000-0000 Additions 40 Install Detectable Warning Mat on 1 EA Existing Sidewalk 41 Preparation, installation and 1 EA maintenance of Project Sign 42 Remove & Replace 4" Concrete 27775 SF Sidewalk (3000 PSI w/Fiber Mesh Reinforcing) 43 Remove & Replace 6" Concrete 700 SF Sidewalk (3000 PSI w/Fiber Mesh Reinforcing) 44 Remove & Replace Valley Gutter 312.5 LF Curb 45 Remove & Replace Type I Curb 20 LF 46 Remove & Replace Modified 20 LF 47 Remove & Replace Straight Curb 50 LF 48 Construct 4 ft. wide ADA Ramp 59 EA 49 Construct 5 ft. wide ADA Ramp 59 EA 50 Sod 30000 SF 51 Adjust Sanitary Sewer Manhole 5 EA 52 Root Pruning 500 LF 53 Install Gravity Wall (Maximum 5 LF Height 24 Inches) 54 Install Straight Curb 137.5 LF $250.00 $500.00 $3.20 $3.80 $16.00 $16.00 $16.00 $16.00 $1,050.00 $1,050.00 $0.45 $500.00 $3.00 $50.00 $16.00 $250.00 $500.00 $88,880.00 $2,660.00 $5,000.00 $320.00 $320.00 $800.00 $61,950.00 $61,950.00 $13, 500.00 $2,500.00 $1,500.00 $250.00 $2,200.00 . .r . . 54 Install Straight Curb 137.5 LF $16.00 $2,200.00 Page 2 of 3 Change Order #4 - 2011 Sidewalk Contract 55 Removal of 4" sidewalk 100 LF $2.00 $200.00 56 Grinding (across the sidewalk) 108 LF $10.00 $1,080.00 57 Clearing & Grubbing 1 LS $5,007.00 $5,007.00 58 6-18" Wall 100 LF $30.00 $3,000.00 59 19 - 30" Wall 100 LF $55.00 $5,500.00 60 Contingency 1 LS $32,731.54 $32,731.54 Total Net Increases Code B: $290,098.54 Total Net Increases to the Coutract: $400,000.00