SKYCREST EXPANSION & CHAUTAUQUA LAKE ESTATES RCW PROJECT - 09-0044-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALG �ADMINISTRATIVE CHANGE ORDER Change Order 1& Final PROJECT: Skycrest Expansion & Chautauqua Lake Estates RCW Project CONTRACTOR: Young's Communication 424 West Drive Melbourne, F132904 DATE: August 31, 2012 PROJECT NUMBER: 09-0044-UT PO REFERENCE NO: ST107604 COUNCIL AWARD: June 14. 2011 DATE OF CONTRACT: June 29 .2011 CODE: 0315-96739-563800-533-000-0000 A CODE: 0315-96739-563800-533-000-0000 B SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order adjusts quantities and adds new items according to fieid conditions and adds 59 calendar days to th�; .. contract - see details attached . � ��,� STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin CO 1& Final - CM NEW CONTRACT AMOUNT ATTEST: �°��.� �c., Rosemarie Call, Date: �i �%���vilc City Clerk 17� .:J—�%i�� �'= CITY OF CLEARWATER, in PINE�,.LAS COUNTY, FLORIDA 0 W111i8Iri - ' 1/�l�" � � . orng II ,�City Manager Camilo Soto, Assistant City Attorney $ 1,160,489.00 ($149,016.35) $ 1,011,472.65 TNE � � ,, 1. � '�� , ` �: ++�: � �: ACCEPTED B . Young's Co mm ' a1 B: �'�— Date: � ' y' �� Wimesses: O � � y� i `' � � �� : }�> y, y.l �,, . ,) , � �• � _ � �� Recommended By: City of Cle ater ..__.. _........ ��:;. Lan—Anh Nguyen, Project Manager t. �. Michael D Quillen, PE, City Engineer � � Page 2 of 4 continued: RE: Administrative Change Order 1& Final - Skycrest Expansion & Chautauqua Lake Estates RCW Project ITEM DESCRIPTION UNIT QUANTITY UNIT COST Skvcrest Exaansion Code: A 0315-96739-563800-533-000-0000 Decreases• AS F&I 4" PVC Pipe by Open Cut LF 998 $12.00 A6 F&I 6" PVC Pipe by Open Cut LF 533 $18.00 A8 F&I 6" Resilient Wedge Gate Valve & EA 5 $790.00 Valve Box A10 F&I 1" Short Side Service Assembly for EA 47 $450.00 Reclaimed Water System Al l F&I Single 1" Long Side Service EA 14 $725.00 Assembly for Reclaimed Water System (2" Casing) Al2 F&I Single 2" Long Side Service Assemb EA 7 $1,110.00 A13 Root Pruning LF 986 $3.00 A18 Connect to Existing 6" RCW Main at LS 1 $1,475.00 Plaza Street and Pennsylvania Avenue A19 Sod Restoration as Directed by the SY 400 $4.00 Owner or the Owner's Authorized Project Representative A24 Underdrain Restoration as Directed by LF 171 $ 9.00 the Owner or the Owner's Authorized Project Representative TOTAL COST ($11,976.00) ($9,594.00) ($3,950.00) ($21,150.00) ($10,150.00) ($7,770.00) ($2,958.00) ($1,475.00) ($1,600.00) ($1,539.00) A25 10% Contingency LS 1 $80,723.50 ($80,723.50) Total (Decreases) Code A: ($152,885.50) Increases• A1 Mobilization (3.5% Maximum) A2 Maintenance of Traffic (1.5% A3 F&I 4" PVC Pipe by Horizontal Directional Drill A4 F&I 6" PVC Pipe by Horizontal Directional Drill A7 F&I 4" Resilient Wedge Gate Valve & Valve Box A9 F&I 4" Blow-off Assembly, Reclaimed Water System A21 Concrete Sidewalk Restoration as Directed by the Owner or the Owner's Authorized Project Representative Addirions• A26 Video A27 LayoudAs-builts A28 Connect to Existing 4" RCW Main at Palmetto St and Holt Ave. A29 F&I 4" HDPE Pipe by Horizontal Directional Drill A30 Dewatering 100 Pierce St. LS LS LF LF EA EA SY LS LS LS LF LS 0.54195 $20,000.00 0.763333333 $1,500.00 1359 $15.50 329 $23.00 5 $665.00 1 $1,100.00 18 $45.00 Total Increases Code A: 1 $ 2,825.00 1 $ 9,889.50 1 $1,500.00 1,430 $ 17.00 1 $1,852.00 $10,839.00 $1,145.00 $21,064.50 $7,567.00 $3,325.00 $1,100.00 $810.00 $45,850.50 $2,825.00 $9,889.50 $1,500.00 $24,310.00 $1,852.00 , Page 3 of 4 continued: RE: Administrative Change Order 1& Final - Skycrest Expansion & Chautauqua Lake Estates RCW Project ITEM DESCRIPTION UNIT OUANTITY UNIT COST TOTAL COST A31 Restoration 100 Pierce St. LS 1 $570.00 $570.00 A32 Remove Existing BlowoffAssembly EA 1 $563.00 $563.00 Catalina Dr. A33 Remove Existing 4" Tee Maple St. EA 1 $775.00 $775.00 A34 Remove Existing 90deg bend Maple St EA 1 $800.00 $800.00 A35 Relocate Blowoff Assemblly Catalina EA 1 $715.00 $715.00 A36 16"X4" Tapping Sleeve EA 1 $3,688.00 $3,688.00 A37 Druid St. & Hercules Skycrest LS 1 $2,133.40 $2,133.40 A38 6" Tee & 6X4 Reducer Maple St. EA 1 $1,000.00 $1,000.00 A39 4" MJ Cross EA 1 $1,500.00 $1,500.00 A40 4" 22deg Fitting Glen Oaks Park EA 1 $241.00 $241.00 A41 4" 45deg bend Maple St. EA 2 $241.00 $482.00 A42 4" 90deg Fitting Glen Oaks Park EA 1 $241.00 $241.00 Total Additions Code A: $53,084.90 Total Net (Decreases)/Increases/Additions Code A: ($53,950.10) Chautauaua Lake Estates RCW Code B: 0315-96739-563800-533-000-0000 Decreases• B3 F&I 4" PVC Pipe by Horizontal Directior LF 121 $15.75 ($1,905.75) B4 F&I 6" PVC Pipe by Horizontal Directior LF 98 $23.00 ($2,254.00) BS F&I 4" HDPE Pipe by Horizontal LF 446 $17.00 ($7,582.00) Directional Drill B6 F&I 4" PVC Pipe by Open Cut LF 533 $14.00 ($7,462.00) B7 F&16" PVC Pipe by Open Cut LF 104 $16.75 ($1,742.00) B8 F&I 4" HDPE Pipe byOpen Cut LF 400 $19.00 ($7,600.00) B10 F&I 6" Resilient Wedge Gate Valve & EA 1 $790.00 ($790.00) Valve Box B 11 F&I 4" Blow-off Assembly, Reclaimed EA 1 $1,100.00 ($1,100.00) Water System B 12 F&I 1" Short Side Service Assembly for EA 20 $450.00 ($9,000.00) Reclaimed Water System B13 F&I Single 1" Long Side Service EA 1 $725.00 ($725.00) Assembly for Reclaimed Water System (2" Casing) B 14 F&I Single 2" Long Side Service EA 1 $1,110.00 ($1,110.00) Assembly for Reclaimed Water System (4" Casing) B15 Root Pruning LF 295 $3.00 ($885.00) B18 Sod Restoration as D'uected by the SY 200 $4.00 ($800.00) Owner or the Owner's Authorized Project Representative B19 Concrete Driveway Restoration as SY 100 $55.00 ($5,500.00) Directed by the Owner or the Owner's Authorized Project Representative B20 Concrete Sidewalk Restoration as SY 100 $45.00 ($4,500.00) Directed by the Owner or the Owner's Authorized Project Representative B21 Concrete Curb Restoration as Directed LF 100 $45.00 ($4,500.00) by the Owner or the Owner's Authorized Project Representative .� � Page 4 of 4 continued: RE: Administrative Change Order 1& Final - Skycrest Expansion & Chautauqua Lake Estates RCW Project ITEM DESCRIPTION B22 Asphalt Paving Restoration as Directed by the Owner or the Owner's Authorized Project Representative B23 Underdrain Restoration as Directed by the Owner or the Owner's Authorized Project Representative B24 Owner's Contingency Increases• „ UNIT SY LF LS OUANTITY UNIT COST 200 $45.00 500 $9.00 TOTAL COST ($9,000.00) ($4,500.00) 1 $24,775.50 ($24,775.50) Total (Decreases) Code B: ($95,731.25) B9 F&I 4 Resihent Wedge Gate Valve & V� EA 1 $ 665.00 $665.00 Total IncreasesCode B: $665.00 Total Net (Decreases)/Increases CodeB: ($95,066.25) Total Net (Decreases)/Increases/Additions to Contract: ($149,016.35)