GREENLEA EAST-WEST INTERCONNECT RECLAIMED WATER PROJECT - 10-0038-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINAL�
�L
�
Administrative Change Order 1& Final
PROJECT:
Greenlea East-West Interconnect Reclaimed Water
CONTRACTOR:
Andrew Sitework, LLC
4696 Elevation Way
Fort Myers, F133905
Date: September 5, 2012
PROJECT NUMBER: 10-0038-UT
PO REFERENCE: ST107956
COUNCIL AWARD: October 20. 2011
DATE OF CONTRACT: November 4, 2011
CODE: 0315-96739-563800-533-000-0000
�►A1L'1VIr.1Vf VN (;V1V7KAl,CAMVUIVI
ORIGINAL CONTRACT AMOUNT
Admin CO l& Final - CM
NEW CONTRACT AMOUNT
ATTEST:
�"� n� cz'1 t,�.,
Rosemarie Call,
Date
' ��-
�
/ 7, �L � �i�
CITY OF CLEARWATER, in
PINELLAS COU�F°I?', FLORIDA
Witliam Horne; I[
APPRO ED A
Camilo Soto ,
ACC�P'1'�:U BY: Andrew Sitework, LLC
.>rr:
$1,476,918.69 By: � `', ' �(SEt,1I�' ��`` .
($225 958.92) �` �
, � ,,: �
$1,250,959.77 Date: � � ��
Witnesses: -
DF fyFR` J '
6i �` il il � '
�
i�"�
� /
� -L�._
City Manager
Assistant City Attorney
; ��
,
.� .
�
r � .
..�
Kecomm d By: City of Clearwater
ob t aue, PE, Project Manager
� '�
Michael D Quillen, PE, City Engineer
: �; �
��.,, s�` �_ ` _ �s
`
SEP 7 2012
�: Y£ .. 5. ... ,. � :�i{i,s�+�.
, . 'i . � >,�h; .. .
0
Page 2 of 3
Administrative Change Order 1& Final Greenlea East-West Interconnect RCW
ITEM DESCRIPTION UNIT QUANTITY UNIT COST
Decreases•
3 F&I 4" PVC Pipe by Horizontal LF 94 $� 1,2�
Directional Drill
4 F&I 6" PVC Pipe by Horizontal LF 74 $16.01
Directional Drill
5 F&I 8" PVC Pipe by Horizontal LF 260 $25.57
Directional Drill
6 F&1 12" PVC Pipe by Harizontal LF 730 $53.86
Directional Drill
7 F&I 4" PVC Pipe by Open Cut LF 42 $69.88
8 F&I 6" PVC Pipe by Open Cut LF 50 $46.52
12 F&I 6" Resilient Wedge Gate Valve EA 1 $930.00
& Valve Box
15 F&I 4" Blow-offAssembly, EA 1 $1,300.00
Reclaimed Water System
16 F&I 1" Short Side Service EA 14 $449.00
Assembly for Reclaimed Water
System
17 F&I 2" Short Side Service EA 13 $862.00
Assembly for Reclaimed Water
System
18 F&I 1" Long Side Service EA 15 $'783.00
Assembly for Reclaimed Water
System (2" Casing)
19 F&( 2" Long Side Service EA 14 $1,357.00
Assembly far Reclaimed Water
System (4" Casing)
23 Tree Barricades LS 0.75 $3,200.00
27 Sod Restoration as Directed by the SY 300 $7.90
Owner or the Owner's Authorized
Project Representative
28 Concrete Driveway Restoration as SY 147 $30.82
Directed by the Owner or the
Owner's Authorized Project
Representative
30 Concrete Curb Restoration as LF 44 $22.40
Directed by the Owner or the
Owner's Authorized Project
Representative
31 Underdrain Restoration as Directed LF 100 $29.26
by the Owner or the Owner's
Authorized Project Representative
32 Asphalt Paving Restoration as SY 179 $9.67
Directed by the Owner ar the
Owner's Autharized Project
Representative
TOTAL COST
($1,05938)
($1,184.74)
($6,648.20)
($39,317.80)
($2,934.96)
($2,326.00)
($930.00)
($1,300.00)
($6,286.00)
($11,206.00)
($11,745.00)
($18,998.00)
($2,400.00)
($2,370.00)
($4,530.54)
($985.60)
($2,926.00)
($],730.93)
33 Compact DI Restrained Joint LB 6000 $1.15 ($6,900.00)
Fittings as Directed by the Owner or
the Owner's Authorized Project
Representative
34 Unsuitable Material Excavation CY 50 $6.81 ($340.50)
Below Grade as Directed by the
Owner or the Owner's Authorized
Project Representative
35 Select Backfill Below Grade as CY 50 $23.61 ($1,180.50)
Directed by the Owner ar the
Owner's Authorized Project
Representative
36 Asphalt Overlay as Directed by the SY 100 $17.30 ($1,730.00)
Owner or the Owner's Authorized
Project Representative
37 ]0%Contingency LS t $134,26534 ($134,26534)
($263,295.49)
Increases:
9 F&I 8" PVC Pipe by Open Cut LF 21 123.33 $2,589.93
14 F&I 12" Resilient Wedge Gate EA 3 $2,146.00 $6,438.00
Valve & Valve Box
21 F&I Combination Air Valve Type II EA 1 $2,353.00 $2,353.00
29 Concrete Sidewalk Restoration as SY 4t.71 $25.88 $1,079.45
Directed by the Owner or the
Owner's Authorized Project
Representative
Total Increases: $12,460.38
Additions•
LS 1
38 Pipeline Installation @Fire Station $14,237.44 $14,237.44
LS I
39 Pipeline Installation on Betty Lane $6,610.24 $6,610.24
HDPE Pipe Material Review LS -1
40 Modification $1,032.00 ($1,032.00)
41 Type 1 ARV Modification EA 5 $1,582.55 $7,912.75
Type 1 ARV Modification LS 1
42 Excavation Depth $144.00 $144.00
43 Inspection Overtime Fee Credit HR -57.5 $60.00 ($3,450.00)
LS 1
44 Potable Water for Pressure Testing $453.76 $453.76
Total Additions: $24,876.19
Total Net (Decreases)/Increases/Additions to the Contract: ($225,958.92)