GREENLEA EAST-WEST INTERCONNECT RECLAIMED WATER PROJECT - 10-0038-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINAL� �L � Administrative Change Order 1& Final PROJECT: Greenlea East-West Interconnect Reclaimed Water CONTRACTOR: Andrew Sitework, LLC 4696 Elevation Way Fort Myers, F133905 Date: September 5, 2012 PROJECT NUMBER: 10-0038-UT PO REFERENCE: ST107956 COUNCIL AWARD: October 20. 2011 DATE OF CONTRACT: November 4, 2011 CODE: 0315-96739-563800-533-000-0000 �►A1L'1VIr.1Vf VN (;V1V7KAl,CAMVUIVI ORIGINAL CONTRACT AMOUNT Admin CO l& Final - CM NEW CONTRACT AMOUNT ATTEST: �"� n� cz'1 t,�., Rosemarie Call, Date ' ��- � / 7, �L � �i� CITY OF CLEARWATER, in PINELLAS COU�F°I?', FLORIDA Witliam Horne; I[ APPRO ED A Camilo Soto , ACC�P'1'�:U BY: Andrew Sitework, LLC .>rr: $1,476,918.69 By: � `', ' �(SEt,1I�' ��`` . ($225 958.92) �` � , � ,,: � $1,250,959.77 Date: � � �� Witnesses: - DF fyFR` J ' 6i �` il il � ' � i�"� � / � -L�._ City Manager Assistant City Attorney ; �� , .� . � r � . ..� Kecomm d By: City of Clearwater ob t aue, PE, Project Manager � '� Michael D Quillen, PE, City Engineer : �; � ��.,, s�` �_ ` _ �s ` SEP 7 2012 �: Y£ .. 5. ... ,. � :�i{i,s�+�. , . 'i . � >,�h; .. . 0 Page 2 of 3 Administrative Change Order 1& Final Greenlea East-West Interconnect RCW ITEM DESCRIPTION UNIT QUANTITY UNIT COST Decreases• 3 F&I 4" PVC Pipe by Horizontal LF 94 $� 1,2� Directional Drill 4 F&I 6" PVC Pipe by Horizontal LF 74 $16.01 Directional Drill 5 F&I 8" PVC Pipe by Horizontal LF 260 $25.57 Directional Drill 6 F&1 12" PVC Pipe by Harizontal LF 730 $53.86 Directional Drill 7 F&I 4" PVC Pipe by Open Cut LF 42 $69.88 8 F&I 6" PVC Pipe by Open Cut LF 50 $46.52 12 F&I 6" Resilient Wedge Gate Valve EA 1 $930.00 & Valve Box 15 F&I 4" Blow-offAssembly, EA 1 $1,300.00 Reclaimed Water System 16 F&I 1" Short Side Service EA 14 $449.00 Assembly for Reclaimed Water System 17 F&I 2" Short Side Service EA 13 $862.00 Assembly for Reclaimed Water System 18 F&I 1" Long Side Service EA 15 $'783.00 Assembly for Reclaimed Water System (2" Casing) 19 F&( 2" Long Side Service EA 14 $1,357.00 Assembly far Reclaimed Water System (4" Casing) 23 Tree Barricades LS 0.75 $3,200.00 27 Sod Restoration as Directed by the SY 300 $7.90 Owner or the Owner's Authorized Project Representative 28 Concrete Driveway Restoration as SY 147 $30.82 Directed by the Owner or the Owner's Authorized Project Representative 30 Concrete Curb Restoration as LF 44 $22.40 Directed by the Owner or the Owner's Authorized Project Representative 31 Underdrain Restoration as Directed LF 100 $29.26 by the Owner or the Owner's Authorized Project Representative 32 Asphalt Paving Restoration as SY 179 $9.67 Directed by the Owner ar the Owner's Autharized Project Representative TOTAL COST ($1,05938) ($1,184.74) ($6,648.20) ($39,317.80) ($2,934.96) ($2,326.00) ($930.00) ($1,300.00) ($6,286.00) ($11,206.00) ($11,745.00) ($18,998.00) ($2,400.00) ($2,370.00) ($4,530.54) ($985.60) ($2,926.00) ($],730.93) 33 Compact DI Restrained Joint LB 6000 $1.15 ($6,900.00) Fittings as Directed by the Owner or the Owner's Authorized Project Representative 34 Unsuitable Material Excavation CY 50 $6.81 ($340.50) Below Grade as Directed by the Owner or the Owner's Authorized Project Representative 35 Select Backfill Below Grade as CY 50 $23.61 ($1,180.50) Directed by the Owner ar the Owner's Authorized Project Representative 36 Asphalt Overlay as Directed by the SY 100 $17.30 ($1,730.00) Owner or the Owner's Authorized Project Representative 37 ]0%Contingency LS t $134,26534 ($134,26534) ($263,295.49) Increases: 9 F&I 8" PVC Pipe by Open Cut LF 21 123.33 $2,589.93 14 F&I 12" Resilient Wedge Gate EA 3 $2,146.00 $6,438.00 Valve & Valve Box 21 F&I Combination Air Valve Type II EA 1 $2,353.00 $2,353.00 29 Concrete Sidewalk Restoration as SY 4t.71 $25.88 $1,079.45 Directed by the Owner or the Owner's Authorized Project Representative Total Increases: $12,460.38 Additions• LS 1 38 Pipeline Installation @Fire Station $14,237.44 $14,237.44 LS I 39 Pipeline Installation on Betty Lane $6,610.24 $6,610.24 HDPE Pipe Material Review LS -1 40 Modification $1,032.00 ($1,032.00) 41 Type 1 ARV Modification EA 5 $1,582.55 $7,912.75 Type 1 ARV Modification LS 1 42 Excavation Depth $144.00 $144.00 43 Inspection Overtime Fee Credit HR -57.5 $60.00 ($3,450.00) LS 1 44 Potable Water for Pressure Testing $453.76 $453.76 Total Additions: $24,876.19 Total Net (Decreases)/Increases/Additions to the Contract: ($225,958.92)