GLEN OAKS / PALMETTO RECLAIMED WATER PROJECT - 08-0043-UT - ADMINISTRATIVE CHANGER ORDER #1 & FINALA�MINISTRATNE CHANGE ORDER Change Order 1& Final PROJECT: Glen Oaks/Palmetto Reclaimed Water System CONTRACTOR Volt Information Sciences, Inc 12700 56th Street North Clearwater, F133760 DATE: iune 27,2012 PROJECT NUMBER 08-0043-UT PO REFERENCE NO: ST107265 COUNCIL AWARD: November 4, 2010 DATE OF CONTRACT:November 30, 2010 CODE: 0315-96739-563800-533-000-0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order adjust quantities and adds new items in accordance with field conditions - see attached deta����a�8�� �,'�°'���:. ,�'��"'��'�'_'� �' ; STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ;��� ,,s,�n��� ORIGINAL CONTRACT AMOUNT Admin CO 1& Final - CM NEW CONTRACT AMOUNT ATTEST: k_'L���..lG� �. l. �[.x�. Rosemarie Call, City � Date: C�LC ����-j .�1� �-O/ CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA W1111dII1 B. �1.�.-t� -s-1�. Manager Camilo Soto, Assistant City Attorney $ 2,836,091.85 ($525,118.76} $ 2,310,973.09 .� �, � ��� �� � � �; � .3�,� ,-,�.• Volt Information Science��a', I9h���e � �il,; ...;�'��y �� � � o gy. � a � � . Gary Beilke, ntracts Speci�j`sf'"' '"' ,'�'t = .�� ,. ,�.4 � �/ ,/ a`� {,,� � s�•.e ,.oco°a`•� q*,'�. //!/-�i�/S� �%/ `� �� �'j° ��,�'�i�' Date: ��� � "� , o �.+�. Witnesses: ~ �5f �1�� � Recommended By: Ci�,s� Clearwater �+ 1 �16'��.�,�y�,. tr.�'_.__._._ i'"� ____.._.. _____ _____.._.__.,___ _.--• Lan-Anh Nguyen,PE, Project Manager • ��% � Michael D Quillen, PE, City Engineer � t , P� 2 of 3 contianed: RE: Admi�istntive Change Order 1& F iaal - Glee Oaks/Palm�tto R�laimed Water System ITEM DESCRIPTION Decreases• 3b F&I 6" PVC Pipe by Horiwrnal Directional Drill 3d F&I 12" PVC Pipe by Horiwntal Directional Drill 3f F&I 6" HDPE Pipe by Horizontal Directionat Drill 3g F&I 8" HDPE Pipe by Horizontal Directional Drill 3h FBcI 12" HDPE Pipe by Horizontal Directional Drill 4a F&I 4" PVC Pipe by Qpen Cut 4b F&I 6" PVC Pipe by Open Cut 4c F&I 8" PVC Pipe by Open Cut 4e F&I 4" DI Pipe by Open Cut 4f F&I 6" DI Pipe by Open Cut 4g F&I 8" DI Pipe by Open Cut 4h F&I 12" DI Pipe by Open Cut 4i F&I 4" HDPE Pipe by Open Cut 4j F&I 6" HDPE Pipe by Open Cut 4k F&I 8" HDPE Pipe by Open Cut 41 F&I 12" HDPE Pipe by Open Cut 8b F&I Singie 2" Long Side Service Assembly for Reclaimed Water System (4" Casing) 10 Root Pruning 11 Tree Barricades 13i Connect to Existing 24" RCW Main at Maple Street and Glenwood Avenue (Sheet 45) 14 Sod Restoration as Directed by the Owner or the Owner's Authorized Project Representative 15 Concrete Driveway Restoration as Directed by the Owner or the Owner's Authorized Project Representarive 16 Concrete Sidewalk Restoration as Directed by the Owner or the Owner's Authorized Project Representative 17 Concrete Curb Restoration as Directed by the Owner or the Owner's Authorized Project Representative 18 Asphalt Paving Restoration as Directed by the Owner or the Owner's Authorized Project Representative 19 Underdrain Restoration as Directed by the Owner or the Owner's Authorized Project Representative 20 Cantingency Increases• 2 Maintenance of Traffic (1.5% Maximum) 3a F&I 4" PVC Pipe by Horizontal Directional Drill 3c F&I 8" PVC Pipe by Horiwtrtal Directional Drill 3e F&I 4" HDPE Pipe by Horiwntal Directional Drill 4d F&I 12" PVC Pipe by Open Cut Sa F&I 4" R�ilient VJedge Gate Valve & Valve Box Sb F&I 6" Resiliern Wedge Gate Valve & Valve Box Sc FBtI 8" Resilient Wedge Gate Va1ve & Valve Box Sd F&I 12" Resilient Wedge Gate Valve & Valve Box 6 F&I 4" Blow-off Assembly, Reclaimed Water System 7 F&I 1" Short Side Service Assembly for Reclaimed Water System 8a F&I Single 1" Long Side Service Assembly for Reclaimed Water System (2" Casing) 9 F8cI Combination Air Valve 8c Potyethylene Cover OUANTITY LINIT UN1T COST 569 1;594 42 12 509 2,870 169 661 27 100 111 100 18 77 67 39 187 1,300 1 1 2,000 1,000 1,000 1,000 450 1,000 1 1.29738706 4,926 956 92 1,010 7 1 3 1 1 59 LF LF LF LF LF LF LF LF LF LF LF LP LF LF LF LF EA $18.84 �44.42 $19.12 $23.84 $38.61 $7.20 $10.90 $16.'74 $23.15 $25.86 $36.25 $58.79 $6.27 $9.85 $14.95 $30.60 $1,226.69 LF $4.74 LS $379.30 LS $2,914.36 SY $5.39 SY $39.15 SY $31.89 LF $31.89 SY $28.00 LF $ 7.93 TOTAL COST ($10,719.96) ($70,805.48) ($803.04) ($286.08) ($19,652.49) ($20,664.00) ($1,842.10) ($11,065.14) ($625.05) ($2,586.00) ($4,023.75) ($5,879.00) ($112.86) ($758.45) ($1,001.65) ($1,193.40) ($229,391.03) ($6,162.00) ($3'79.30) ($2,914.36) ($10,780.00) ($39,150.00) ($31,890.00) ($31,890.00) ($12,600.00) ($7,930.00) LS $ 257,826.53 ($257,826.53) Total (Decreases): ($782,931.67) LS LF LF LF LF EA EA EA EA EA EA $3,468.51 $11.62 �25.09 $14.19 �34.49 $652.18 $817.18 �1,108.62 �2,054.05 5956.81 $415.20 159 EA $558.00 $4,500.00 $57,240.12 $23,986.04 �;l,�q�5-48 �3,4a#3�4.90 54,�'i�I.26 $817.18 $3,325.86 �2,054.05 $956.81 �24,496.80 588,722.00 EA 51,849.12 $1,84�i.12 TotAI Increases: ���•�� + '. Pl� 3 of 3 continned: RE: Admini�trative C6ange Order 1& Final - Glen Oak4/Palmetto Reclnimed Wahr System ITEM D�SCRIPTION Additions• 21 8"x4" Tee on Drew St & 2" short side on Betty Lane 22 Addidonal ductile iron fillings @ Hobart & Ridgewood Orangeview 8c Maple and Hillcrest & Maple 23 N Glenwood Ave/Rosemete Rd/Highland Ave Extension OUANTITY UNIT U1vIT COST �OTAL COST 1 LS 51,800.00 51,8(10.00 1 LS 52,323.00 $2,323.00 1 LS �5,036.29 $5,036.29 Total Additions: 59,159.29 Total Net (Decreases)/Increases/Additions: ($525,118.76)