GLEN OAKS / PALMETTO RECLAIMED WATER PROJECT - 08-0043-UT - ADMINISTRATIVE CHANGER ORDER #1 & FINALA�MINISTRATNE CHANGE ORDER Change Order 1& Final
PROJECT: Glen Oaks/Palmetto Reclaimed Water System
CONTRACTOR
Volt Information Sciences, Inc
12700 56th Street North
Clearwater, F133760
DATE: iune 27,2012
PROJECT NUMBER 08-0043-UT
PO REFERENCE NO: ST107265
COUNCIL AWARD: November 4, 2010
DATE OF CONTRACT:November 30, 2010
CODE: 0315-96739-563800-533-000-0000
SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT
This change order adjust quantities and adds new items in accordance with field conditions - see attached deta����a�8�� �,'�°'���:.
,�'��"'��'�'_'� �' ;
STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ;��� ,,s,�n���
ORIGINAL CONTRACT AMOUNT
Admin CO 1& Final - CM
NEW CONTRACT AMOUNT
ATTEST:
k_'L���..lG� �. l. �[.x�.
Rosemarie Call, City �
Date:
C�LC ����-j .�1� �-O/
CITY OF CLEARWATER, in
PINELLAS COUNTY, FLORIDA
W1111dII1 B.
�1.�.-t� -s-1�.
Manager
Camilo Soto, Assistant City Attorney
$ 2,836,091.85
($525,118.76}
$ 2,310,973.09
.�
�,
�
��� �� �
�
�; � .3�,� ,-,�.•
Volt Information Science��a', I9h���e � �il,;
...;�'��y �� � � o
gy. � a
� �
.
Gary Beilke, ntracts Speci�j`sf'"' '"' ,'�'t =
.�� ,. ,�.4 �
�/ ,/ a`� {,,� � s�•.e ,.oco°a`•� q*,'�.
//!/-�i�/S� �%/ `� �� �'j° ��,�'�i�'
Date: ��� � "� , o
�.+�.
Witnesses:
~ �5f �1��
�
Recommended By: Ci�,s� Clearwater
�+ 1
�16'��.�,�y�,. tr.�'_.__._._
i'"� ____.._.. _____ _____.._.__.,___ _.--•
Lan-Anh Nguyen,PE, Project Manager
• ��% �
Michael D Quillen, PE, City Engineer
�
t ,
P� 2 of 3 contianed:
RE: Admi�istntive Change Order 1& F iaal - Glee Oaks/Palm�tto R�laimed Water System
ITEM DESCRIPTION
Decreases•
3b F&I 6" PVC Pipe by Horiwrnal Directional Drill
3d F&I 12" PVC Pipe by Horiwntal Directional Drill
3f F&I 6" HDPE Pipe by Horizontal Directionat Drill
3g F&I 8" HDPE Pipe by Horizontal Directional Drill
3h FBcI 12" HDPE Pipe by Horizontal Directional Drill
4a F&I 4" PVC Pipe by Qpen Cut
4b F&I 6" PVC Pipe by Open Cut
4c F&I 8" PVC Pipe by Open Cut
4e F&I 4" DI Pipe by Open Cut
4f F&I 6" DI Pipe by Open Cut
4g F&I 8" DI Pipe by Open Cut
4h F&I 12" DI Pipe by Open Cut
4i F&I 4" HDPE Pipe by Open Cut
4j F&I 6" HDPE Pipe by Open Cut
4k F&I 8" HDPE Pipe by Open Cut
41 F&I 12" HDPE Pipe by Open Cut
8b F&I Singie 2" Long Side Service Assembly for
Reclaimed Water System (4" Casing)
10 Root Pruning
11 Tree Barricades
13i Connect to Existing 24" RCW Main at Maple Street
and Glenwood Avenue (Sheet 45)
14 Sod Restoration as Directed by the Owner or the
Owner's Authorized Project Representative
15 Concrete Driveway Restoration as Directed by the
Owner or the Owner's Authorized Project
Representarive
16 Concrete Sidewalk Restoration as Directed by the
Owner or the Owner's Authorized Project
Representative
17 Concrete Curb Restoration as Directed by the Owner or
the Owner's Authorized Project Representative
18 Asphalt Paving Restoration as Directed by the Owner
or the Owner's Authorized Project Representative
19 Underdrain Restoration as Directed by the Owner or
the Owner's Authorized Project Representative
20 Cantingency
Increases•
2 Maintenance of Traffic (1.5% Maximum)
3a F&I 4" PVC Pipe by Horizontal Directional Drill
3c F&I 8" PVC Pipe by Horiwtrtal Directional Drill
3e F&I 4" HDPE Pipe by Horiwntal Directional Drill
4d F&I 12" PVC Pipe by Open Cut
Sa F&I 4" R�ilient VJedge Gate Valve & Valve Box
Sb F&I 6" Resiliern Wedge Gate Valve & Valve Box
Sc FBtI 8" Resilient Wedge Gate Va1ve & Valve Box
Sd F&I 12" Resilient Wedge Gate Valve & Valve Box
6 F&I 4" Blow-off Assembly, Reclaimed Water System
7 F&I 1" Short Side Service Assembly for Reclaimed
Water System
8a F&I Single 1" Long Side Service Assembly for
Reclaimed Water System (2" Casing)
9 F8cI Combination Air Valve 8c Potyethylene Cover
OUANTITY LINIT UN1T COST
569
1;594
42
12
509
2,870
169
661
27
100
111
100
18
77
67
39
187
1,300
1
1
2,000
1,000
1,000
1,000
450
1,000
1
1.29738706
4,926
956
92
1,010
7
1
3
1
1
59
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LP
LF
LF
LF
LF
EA
$18.84
�44.42
$19.12
$23.84
$38.61
$7.20
$10.90
$16.'74
$23.15
$25.86
$36.25
$58.79
$6.27
$9.85
$14.95
$30.60
$1,226.69
LF $4.74
LS $379.30
LS $2,914.36
SY $5.39
SY $39.15
SY $31.89
LF $31.89
SY $28.00
LF $ 7.93
TOTAL COST
($10,719.96)
($70,805.48)
($803.04)
($286.08)
($19,652.49)
($20,664.00)
($1,842.10)
($11,065.14)
($625.05)
($2,586.00)
($4,023.75)
($5,879.00)
($112.86)
($758.45)
($1,001.65)
($1,193.40)
($229,391.03)
($6,162.00)
($3'79.30)
($2,914.36)
($10,780.00)
($39,150.00)
($31,890.00)
($31,890.00)
($12,600.00)
($7,930.00)
LS $ 257,826.53 ($257,826.53)
Total (Decreases): ($782,931.67)
LS
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
$3,468.51
$11.62
�25.09
$14.19
�34.49
$652.18
$817.18
�1,108.62
�2,054.05
5956.81
$415.20
159 EA $558.00
$4,500.00
$57,240.12
$23,986.04
�;l,�q�5-48
�3,4a#3�4.90
54,�'i�I.26
$817.18
$3,325.86
�2,054.05
$956.81
�24,496.80
588,722.00
EA 51,849.12 $1,84�i.12
TotAI Increases: ���•��
+ '.
Pl� 3 of 3 continned:
RE: Admini�trative C6ange Order 1& Final - Glen Oak4/Palmetto Reclnimed Wahr System
ITEM D�SCRIPTION
Additions•
21 8"x4" Tee on Drew St & 2" short side on Betty Lane
22 Addidonal ductile iron fillings @ Hobart & Ridgewood
Orangeview 8c Maple and Hillcrest & Maple
23 N Glenwood Ave/Rosemete Rd/Highland Ave
Extension
OUANTITY UNIT U1vIT COST �OTAL COST
1 LS 51,800.00 51,8(10.00
1 LS 52,323.00 $2,323.00
1 LS �5,036.29 $5,036.29
Total Additions: 59,159.29
Total Net (Decreases)/Increases/Additions: ($525,118.76)