POLLUTION PREVENTION PROJECT AT TWO LOCATIONS - 10-0029-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINAL � •, ADMINISTRATIVE CHANGE ORDER 1 &Final Date: July 16,2012 PROJECT: Pollution Prevention @ Two(Z)Locations PROJECT NUMBER: 10-0029-EN PO REFERENCE NO.: ST 108228 AWARD DATE: Februarv 16,2012 CONTRACTOR: Kamminga&Roodvoets,Inc. CONTRACT DATE: March 7,2012 5219 Cone Road Tampa,Florida 33610 CODE: 0315-96137-563700-537-000-0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order is necessary to adjust quantities and add new items according to field conditions -details attached. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT $210,412.40 Kamminga&Roodvoets,Inc. Admim CO 1 &Final-CM {$22,874.64) NEW CONT T AMOUNT $187,537.76 - By: (SEAL) Y ne Harrison, Senior Project Manager APP VED AS T F RM: Date: 7 2 2°(Z- Camilo Soto, Assistant City Attorney Witnesses: Date: ATTEST: G' "`� � ---�..,�, ,�:""��� f j' ���f rtte�,►y'+� �...�-�1 c_./�L L�,� �t. �` ��._., ;� � �r,��s�``� . x Rosemarie Call, � ' e��ry r� � �,, � � , -� f �- `�+.'"'°��,�4 y{ Date: C.Lu / �i �� '� '�`--�� .��,:� Recommended By: y of Clearwater �g -- ����' ����� � V.�,�,� - � CITY OF CLEARWATER,in �%�� , �,.� PINELLAS COUNTY, FLORIDA Tara L. Kivett Engineering Construction Mana� � . �I:1�:�-�- —�- , � William B. Horne, II City Manager Michael D. Quillen, PE, City Enginee: � Page 2 of 2 • Administrative Change Order 1 & Final-Pollution Prevention @ Two(2) Locations ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST Decreases• 8 42"RCP (Class III) Storm Pipe 1 LF $134.00 ($134.00) 9 34"x 53"ERCP (Class III) Storm Pipe 2 LF $171.00 ($342.00) 10 18"PVC Storm Pipe (Contech A-2000 � or equal) � 3 LF $84.00 ($252.00) 13 Roadway Restoration 11.5 SY $52.00 ($598.00) 14 4" Sidewalk Restoration 382.4988235 SF $4.25 � ($1,625.62) 16 2'Curb&Gutter Restoration 9.5 LF $23.00 ($218.50) 17 6" Concrete Driveway Restoration 15.50095238 �SF $5.25 ($81.38) 19 RoadwayUnderdrainRestoration 50 LF $16.00 ($800.00) �� Remove and Replace unsuitable Material 100 CY $30.00 ($3,000.00) 24 6"PVC Water Main Adjustment 14 LF � $74.00 ($1,036.00) 25 10%Contingency � 1.00 LS $19,128.40 ($19,128.40) Total(Decreases): ($27,215.90) Increases• 15 6" Sidewalk Restoration 43.8 SF $2.25 $98.55 21 Sod(in-kind) 1,953.5 SF $0.80 $1,562.80 Total Increases: $1,661.35 Additions: Valve Replacement 1 LS $435.02 $435.02 DIP in lieu of PVC Water Main 36 LF $9.76 $351.36 Additional depth roadbase&asphalt 57.8 SY $32.76 � $1,893.53 Total Additions: $2,679.91 Total Net(Decreases)/Increases and Additional items: ($22,874.64)