GULF TO BAY / HIGHLAND AVENUE IMPROVEMENTS (GATEWAY) - 08-0051-EN - ADMINISTRATIVE CHANGE ORDER #1; w ADMINISTRATIVE CHANGE ORDER 1 PROJECT: Gulf-to-Bay Blvd./Highland Ave. Improvements Project CONTRACTOR: Gibbs & Register, Inc. 232 S. Dillard Street Winter Garden, FL 34787 Date: Julv 3, 2012 PROJECT NUMBER: 08-0051-EN PO REFERENCE NO.: ST107810 AWARD DATE: September Ol, 2011 CONTRACT DATE: September 23, 2011 CODE: 0315-92270-563700-541-000-0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order adjusts and adds quantities used in the field and adds 30 days to the contract. See attached details. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ��� , ����� :. ORIGINAL CONTRACT AMOUNT $340,265.20 Gibbs & Re ister, Inc. ,�� Admin CO 1 - $12,486.37 � �`��", � �E�� '� <; ° ;� � �_. � , NEW C RAC AMOUNT $352,751.57 ��` 1�,�, ,', 1 . � _ �, � , n�:. t� Camilo Soto, Assistant City Attorney Date: Rosemarie Call, CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA . � William B. Horne, II City Manager Date: ,.��_.�,,, . ison, resi ent ' u "°� 7�� ,, � � , � l� � 2 °' Witnesses: � • � .• - Recommended By: City of Clearwater ��'—�/1d.�� Tara L Kive�tt,Engineering Construction Manager � G� Michael D Quillen, PE , City Engineer � T Continued Page 2 of 2 Administrative Change Order 1- Gulf to Bay/Highland Ave Improvements Project 08-0051-EN ITEM DESCRIPTION Decreases• 2001 Asphalt Milling 2002 Removal of Asphalt & Base 2004 Removal of Concrete Walk 2006 Removal of Unsuitable Material 3001 Asphalt, Surface Course, Type S-3, 1" 4003 6" Double Yellow Paint Center Line 4005 24" White Paint Stop Bar 5004 Concrete Curb, FDOT Type D 6004 Blueberry Flax Lilly, 3 gal. 7002 Conduit 2" Hand Trenched 7004 Conduit 1" Hand Trenched 7006 Contingency Increases• 2003 Removal of Concrete Curb 2005 Material from Planting Areas 4001 6" White Paint Lane Line 4002 6" Yellow Paint Edge Line 4004 12" White Painted Crosswalk 4006 FDOT Standard Arrows (Paint) 5003 24" Wide Concrete Flush Curb at Crosswalks 5005 6" Concrete Sidewalk 6005 Coontie - 7 Gal. 7003 Conduit 2" Directional Bore Additions• 2007 Demo Extra Depth Asphalt 3002 Asphalt Design Mix to 12.5 4007 Striping 4008 18" White at Gore 5008 Sidewalk & Resoration 7006 Repair Conduit QUANTITY UNIT UNIT COST 734 99 109 20 734 112 21 165 172 833 25 0.676722744 SY $2.00 SY $14.00 SY $12.00 CY $76.00 SY $7.00 LF $1.50 LF $3.00 LF $18.00 EA $11.00 LF $5.00 LF $4.00 LS $30,933.20 Total (Decreases): 21 LF $8.00 130 CY $80.00 366 LF $1.00 159 LF $1.00 246 LF $2.00 3 EA $39.00 58 LF $45.00 67 SY $50.00 28 EA $38.00 706 LF $13.00 1 3664 1 48 1 1 Total Increases: LS $4,610.00 SY $2.00 LS $2,431.58 LF $3.00 LS $9,440.00 LS $1,739.99 Total Additions: TOTAL COST ($1,468.00) ($1,386.00) ($1,308.00) ($1,520.00) ($5,138.00) ($168.00) ($63.00) ($2,970.00) ($1,892.00) ($4,165.00) ($100.00) ($20,933.20) ($41,111.20) $168.00 $10,400.00 $366.00 $159.00 $492.00 $117.00 $2,610.00 $3,350.00 $1,064.00 $9,178.00 $27,904.00 $4,610.00 $7,328.00 $2,431.58 $144.00 $9,440.00 $1,739.99 $25,693.57 Total Net (Decreases)/Increases/Additions to the Contract: $12,486.37