Loading...
2011 SIDEWALK CONTRACT - 11-0012-EN - ADMINISTRATIVE CHANGE ORDER #3.� ADMINISTRATIVE CHANGE ORDER #3 PROJECT: 2011 Sidewalk Contract CONTRACTOR: Central Florida Contractors, Inc. P.O. Box 3987 Seminole, Florida 33775 Date: Apri117, 2012 PROJECT NUMBER: 11-0012-EN PO REFERENCE NO.: ST 108005 CONTRACT AWARD: November 3, 2011 CONTRACT DATE: December 13, 2011 CODE: 0315-92339-563700-541-000-0000 A CODE: 0315-92273-563700-541-000-0000 B STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT Adm. CO#1 - CM Approved 2/15/12 Adm. CO#2 - CM Approved 3/20/12 Adm. CO#3 NEW CONTRACT AMOUNT Date: ATTEST: ��"���2 �(.. L")� Rosemarie Call, City Clerk Date: ���L ��i ��/� CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA $568,337.00 $56,832.00 $0.00 ��.Q� ; $625,169.00 ,�4a �.�OF lyE� 1��d��'' p_ � `Ofli, �� � - -- .� t� �" ._ , � � �g �, � , � ----- �� � __ �� � �����°� �� '�'.�iv.�ia�. � � liam B. Horne, II City anager ., y � �- � � �� t` `1� D `� _ _ ,,, r ,� �.;'�' . Central Florida Contractors, I��. J�'� ,� �`� ; c � . sy - ":, � � '�'; , ,,'.;": ,� +ig � ,j By; (SEAL) George Gom , resident Date: � � Witnesses: Lou Gomes 4 �L ��t��/1 t \� S� Alice Eckman Recommended By: City of Clearwater �/ (��/I'.� �� �{r���,r� Tara L. Kivett Engineering ConstrucYion Manager � _� ' � �,� : ..�'° ,,:= !!�--------� . ��.,-�-�'?.._.�.-_._... Michael D. Quillen, PE City Engineer � � . Page 2 of 2 Administrative Change Order 3- 2011 Sidewalk Contract ITEM DESCRIPTION QUANTITYUNIT UNIT COST Remove & Reulace Sidewalks Code: 0315-92273-563700-541-000-0000 "B" Decreases• TOTAL COST 16 Remove & Replace Type I Curb 400 LF $16.00 ($6,400.00) 17 Remove & Replace Modified Curb 400 LF $16.00 ($6,400.00) 18 Remove & Replace Straight Curb 400 LF $16.00 ($6,400.00) 19 Constuct 5 Ft. wide ADA Ramp 60 EA $1,050.00 ($63,000.00) 20 Constuct 4 Ft. wide ADA Ramp 11 EA $1,050.00 ($11,550.00) 23 Root Pruning 510 LF $3.00 ($1,530.00) 24 Gravity Wall (Max Height 24") 99 LF $50.00 ($4,950.00) Total (Decreases): ($100,230.00) Increases• 13 Remove & Replace 4" Concrete Sidewalk 21 Sod 29208 15032 SF $3.20 EA $0.45 Total Increases: $93,465.60 $6,764.40 $100,230.00 Total Net (Decreases)/Increases to the Contract: $0.00