REPLACEMENT OF ANTIQUATED GAS MAIN, SERVICE LINES, GAS METERS AND PIPING CONNECTIONS TO CUSTOMER HOUSE PIPING AND REESTABLISHMENT OF GAS SERVICE AT VARIOUS LOCATIONS - BID 10-12� � i
f I !
s
I
CONTRACT DOCUMENTS
FOR
Clearwater Gas System
Replacement of Antiquated Gas Mains, Service Lines, Gas Meters
and Piping Connections to Customer House Piping and
Reestablishment of Gas Service at Various Locations
B id Number: 10-12
Bid Date: February 17, 2012
Bid Time: 11:OOAM
Prepared by: Mike Deegan & Brian Langille
Clearwater Gas System
400 North Myrtle Avenue
Clearwater, Florida 33758
TABLE OF CONTENTS
SECTION 00020
1
INVITATION TO BID
1
SECTION 00100
2
INSTRUCTIONS TO BIDDERS
00100.01 2
QUALIFICATIONS OF BIDDERS 2
00100.02 BIDDER'S RESPONSIBILITY
00100.03 SITE CONDITIONS 2
00100.04 OMISSIONS AND DISCREPANCIES 3
00100.05 BID ITEMS AND ESTIMATED QUANTITIES 3
00100.06 APPROVED MATERIALS AND EQUIPMENT 3
4
00100.07 SAMPLE OF MATERIALS 4
00100.08 PROPOSAL FORM
00100.09 WITHDRAWAL OF PROPOSALS 4
5
00100.10 BID SECURIIY 5
00100.11 OPENING OF PROPOSALS 5
00100.12 METHOD OF AWARD 5
00100.13 EXECUTION OF CONTRACT 6
00100.14 TIME OF COMPLETION 6
00100.15 LIQUIDATED DAMAGES 6
00100.16 EXTENSIONS OF TIME �
00100.17 CERTIFICATE OF INSURANCE �
00100.18 DETAILED BREAKDOWN SHEET AND SCHEDULE Of PRICES �
00100.19 EXISTING MATERIALS AND EQUIPMENT �
00100.20 QUALIFICATIONS OF BIDDERS �
00100.21 STANDARDS 8
SECT/ON 00140 9
SUMMARY OF INFORMATION TO BIDDERS
00140.01- OBTAINING PLANS AND SPECIFICATIONS
00140.02 - OWNER
00140.03 - CONTRACT
00140.04 - BID SECURITY
00140.05 - TIME OF COMPLETION
00140.06 - INSURANCE REQUIREMENTS
00140.07 - SCOPE OF WORK
9
.9
_9
_9
_9
9
_9
11
SECTION 00310 12
PROPOSAL 12
SECTION 00320 21
BID TABULATION SUMMARY 21
SECT/ON 00330 22
FLORIDA TRENCH SAFETY ACT ACKNOWLEDGMENT 22
SECTION 00340 23
PUBLIC ENTITY CRIMES STATEMENT
23
SECTION 00410 26
CERTIFIED CHECK, CASH OR BID BOND 26
SECTION 00510 27
AGREEMENT 2�
SECTION 00520 30
CONTRACTOR'S AFFIDAVIT 30
SECTION 00530 31
CONTRACTOR'S RELEASE 31
SECTION 00540 32
STATEMENT OF SURETY COMPANY
32
SECTION 00610 33
PERFORMANCE - PAYMENT BOND
33
SECTION 00620 35
CERTIFICATE OF INSURANCE 35
SECTION 00700 36
GENERAL CONDITIONS 36
00700.01 DEFINITIONS 36
00700.02 EXTENT OF CONTRACT 37
00700.03 OBLIGATIONS OF CONTRACTOR 37
00700.04 SUBCONTRACTS 38
00700.05 SEPARATE CONTRACTS 38
38
00700.06 BONDS
00700.07 ADDITIONAL OR SUBSTITUTE BOND 39
39
00700.08 INSURANCE
00700.09 PROOF OF INSURANCE 40
00700.10 ACCIDENTS AND CLAIMS 40
00700.11 MUTUAL RESPONSIBILITY OF CONTRACTORS 41
00700.12 CONTRACTOR'S LIABILITY 41
00700.13 FAMILIARITY WITH CONTRACT REQUIREMENT 41
00700.14 PATENT RIGHTS 4z
00700.15 PERMITS AND LICENSES 42
00700.16 LAWS AND REGULATIONS 43
00700.17 DIMENSIONS AND ELEVATIONS 43
00700.18 PLANS, SPECIFICATIONS AND SHOP DRAWINGS 43
00700.19 DRAWIN65 AND SPECIFICATIONS FURNISHED TO CONTRACTORS 44
00700.20 WORKING SCHEDULES AND PROGRESS CHARTS 44
00700.21 SUPERVISION AND RESPONSIBILITY OF THE CONTRACTOR 45
46
00700.22 SERVING NOTICE
00700.23 AUTHORITY OF ENGINEER 46
00700.24 OBSERVATION OF THE WORK 46
00700.25 EXAMINATION OF THE WORK 47
00700.26
00700.28
00700.29
00700.30
00700.31
00700.32
00700.33
00700.34
00700.35
0070036
00700.37
00700.38
00700.39
00700.40
00700.41
00700.42
00700.43
00700.44
00700.45
00700.46
00700.47
00700.48
00700.49
00700.50
PROTECTION OF WORK AND PROPERTY 48
THE OWNER'S RIGHT TO DO WORK 49
ALTERATION OF PLANS SO
UNAUTHORIZED WORK 50
CLAIMS FOR EXTRA COST 50
CHANGES IN THE WORK SO
EXTRA WORK/INCREASED COMPENSATION 51
SUSPENSION OF WORK 51
DEFECTIVE WORK OR MATERIALS 52
ABANDONMENT OF WORK 52
FORFEITURE OF CONTRACT 53
THE OWNER'S RIGHT TO TERMINATE CONTRACT 53
CONTRACTOR'S RIGHT TO STOP WORK OR TERMINATE CONTRACT 54
NO WAIVER OF CONTRACT 54
NO ESTOPPEL 54
TIME FOR COMPLETION 54
COMPLETION OF WORK DEFINED 54
DELAYS AND EXTENSIONS OF TIME 55
LIQUIDATED DAMAGES 55
PRICES 55
PARTIAL ESTIMATES AND PAYMENTS 56
PAYMENTS WITHHELD 56
LIENS AND FINAL PAYMENTS 5�
FINAL APPROVAL AND ACCEPTANCE OF THE WORK 5�
SECTION 00800 60
SUPPLEMENTARY CONDITIONS 60
00800.01 SUPPLEMENTARY CONDITIONS PREVAIL 60
00800.02 MATERIALS SUPPLIED BY THE OWNER 60
00800.03 PERMITS 60
00800.04 JOINING OF PLASTIC PIPE 60
SECTION 00900 62
ADDENDA 62
SECTION 01000 63
GENERAL REQUIREMENTS 63
01000.01 TRAFFIC CONTROL 63
01000.02 MATERIALS, EQUIPMENT AND LABOR 63
01000.03 PROGRE55 PHOTOGRAPHS 64
01000.04 STANDARDS 64
01000.05 STORAGE OF MATERIALS AND RIGHTS-OF-WAY 64
01000.06 UTILITIES
65
01000.07 SAFETY AND HEALTH REGULATIONS 65
01000.08 USE OF CHEMICALS 65
01000.09 BY-PASSING OF SEWAGE 66
01000.10 DEWATERING AND SEWAGE PUMPS 66
01000.11 LINES, GRADES AND CONSTRUCTION SURVEYING 66
01000.12 TESTS
66
01000.13 WATER AND ELECTRIC POWER 6�
01000.14 MONUMENTS AND LANDMARKS 6�
01000.15 DETOURS
67
01000.16 EXISTING UTILITIES 68
01000.17 SANITARY MEASURES 68
01000.18 CLEANING UP 68
01000.19 FAILURE TO CLEAN UP 69
O1000Z0 RESTORATION OF SURFACE 69
01000.21 PROJECT RECORD DRAWINGS (AS- BUILTS) 69
SECTION 02005 ��
MOBILIZATION ��
SECTION 02221 71
TRENCHING, BACKFILLING AND COMPACTING FOR UTILITY SYSTEMS 71
SECTION 02574 81
PAVEMENT REMOVAL AND REPLACEMENT 81
SECTION 02685 86
NATURAL GAS PIPELINE INSTALLATIONS 86
SECTION 02696 101
DIRECTIONAL DRILL UTILITY PLACEMENT 101
SECTION 02935 107
SODDING 107
SECTION 00020
INVITATION TO BID
Sealed proposals will be received at the City of Clearwater, Purchasing Department, 100 South
Myrtle Avenue, Clearwater, Florida 33756, in Pinellas County, until Februarv 17, 2012 at
11:OOAM, at which time and place they will be publicly opened and read aloud in the
Conference Room, 100 South Myrtle Avenue, Clearwater, Florida 33756, for furnishing all
necessary labor, materials, incidental items, and equipment for the City of Clearwater (d/b/a
Clearwater Gas System): Replacement of Antiquated Gas Mains, Service Lines, Gas Meters
and Piping Connections to Customer House Piping and Reestablishment of Gas Service at
Various Locations.
Specifications and Contract Documents may be obtained from the City of Clearwater, Florida
33756, at no charge and are available on-line @ www.myclearwater.com under the "Services"
link at the top, or go directly to the following link to view all active bids:
http://www.mvclearwater com/apps20/cityprojects/invitationtobid aspx
Questions regarding this bid should be directed to Brian Langille, Operations Manager -
(727) 562-4911. Sealed bids must be submitted on proposal forms as provided (or exact copies
thereo� marked, Replacement of Antiquated Gas Mains, Service Lines, Gas Meters and Piping
Connections to Customer House Piping and Reestablishment of Gas Service at Various
Locations, for the City of Clearwater, Florida.
All proposals must be accompanied by a certified check, bank draft, or bid bond in the amount of
ten percent (10%) of the base bid, made payable to the City of Clearwater. Which check, bank
draft or bid bond shall guarantee that should the proposal be accepted, the bidder will, within ten
(10) days after the acceptance of his proposal, enter into a contract with the City of Clearwater
for the services proposed to be performed and will at that time furnish performance and payment
bonds each in the amount of 30 percent (30%) of the contract, made payable to the City of
Clearwater, Florida, which bonds shall be adequate to guarantee the faithful performance of the
contract.
Proposals may be withdrawn prior to the date of opening, but no proposal may be withdrawn for
a period of ninety (90) days after the date of the opening of bids.
Plans, specifications and bid forms may be obtained from City of Clearwater, Purchasing
Department, located at 100 South Myrtle Avenue, Clearwater, Florida 33756, at no charge.
The City of Clearwater reserves the right to waive any informalities or to accept or reject any or
all bids in part or in total and award the contract in the best interest of the City.
:
Date:
SECTION 00100
INSTRUCTIONS TO BIDDERS
00100.01 QUALIFICATIONS OF BIDDERS
Bidders shall have successfully completed two (2) contracts for similar replacement work in an
amount not less than one hundred per centum (100%) of the amount of the proposal contract
during the past three years.
Bidders shall have received Contract Documents from the Engineer. The Owner may make such
investigations as he deems necessary to determine the ability of the bidder to perform the work,
and the bidder shall furnish to the Owner any additional information and financial data for this
purpose as the Owner may require. The data shall include a detailed and up-to-date list of
equipment the bidder proposes to use, indicating which portions he already possesses and a
detailed description of the method and program of the work he proposes to follow.
If such an investigation fails to satisfy the Engineer or Owner that the bidder is properly qualified
to complete the work described in the drawings and speciiications or to meet the iinancial
obligations of such a contract, the bid may be rejected. In the event the bidder fails, refuses, or
neglects to submit the requested additional information within ten (10) days of the date of any
request for submission, the bidder's proposal guarantee shall be forfeited to the use of the Owner,
not as a penalty, but as liquidated damages.
00100.02 BIDDER'S RESPONSIBILITY
Each bidder shall familiarize himself with all the attached forms, Instructions, General
Provisions, Specifications, Drawings, etc., as he will be held responsible to fully comply
therewith. Each bidder must visit the site of the proposed work and thoroughly acquaint himself
with conditions affecting the work, all utilities in existence to which connections are to be made,
all other requirements of the contract, and obtain all information necessary for completion of the
work on or before the date specified. Each bidder shall also make himself familiar with all
Federal, State, Local and Municipal laws, ordinances, rules and regulations which in any manner
affect the work, those engaged or employed in the work, or the materials or equipment used in or
upon the work. If the bidder or Contractor shall discover any provision in the plan, specification,
or other contract documents which is contrary to, or inconsistent with, any such law, ordinance,
rule, or regulation, he shall immediately report it to the Engineer in writing. The Contractor shall
not at any time after the execution of his contract set up any claims whatever based upon
insufficient data or incorrectly assuming conditions, nor shall he claim any misunderstanding in
regard to the nature, conditions or character of the work to be done under the contract, and he
shall assume all risks resulting from any changes in the conditions which may occur during the
progress of this work.
00100.03 SITE CONDITIONS
Any information on site or soil conditions made available to the prospective bidders through data
collected by test borings and presented on the Engineer's drawings or available in preliminary
reports prepared by the Engineer or obtained verbally from a representative of the Owner or the
Engineer does not guarantee that such site or soil conditions will be as described, and are made
available only upon waiver of all responsibility of the Owner and Engineer. It is the Contractor's
sole risk and responsibility to verify such information in order that he may complete the project
as specified and shown on the contract documents. Under no condition will a variation in the
information obtained by the Engineer on site or soil conditions, including underground soil or
groundwater conditions at the job site, be accepted as a basis in any claim for extra
compensation.
00100.04 OMISSIONS AND DISCREPANCIES
Should a bidder find discrepancies in, or omissions from the drawings or other Contract
Documents, or should he be in doubt as to their meaning, he should at once notify the Engineer.
All notice of omissions or discrepancies or request for clarification must be forwarded to the
Engineer in writing not less than six (6) days before the advertised date of the opening of bids.
Such clarification and corrections as are necessary will be issued in the form of an Addendum to
the Contract Documents and will be forwarded to all prospective bidders. Any Addendum so
prepared and forwarded shall be a part of the Contract Documents. Neither the Engineer nor the
Owner will be responsible for any other explanation or clarification of the Contract Documents.
00100.05 BID ITEMS AND ESTIMATED QUANTITIES
The Owner may increase, decrease or omit the estimated quantity of the work to be done under
any item in the best interests of the project and the unit price as submitted in the proposal shall
be the unit price which the Contractor will receive for any work specifed to be done under that
item.
All work herein specified or implied in any way in the drawings or specifications shall be done
regardless of whether or not the work is specifically defined in any bid item.
The Contractor agrees that the estimated quantities shown in the Bid Schedule are only for the
purpose of comparing bids and that he/she is satisfied with, and will at no time dispute, the said
estimates as means of comparing the aforesaid bids, that he/she will make no claim for loss of
profits or anticipated profits because of any difference between the said estimated quantities and
the quantities of various classes of work actually furnished or performed, that the Owner shall
not be held responsible if any of the said estimated quantities should vary by any amount from
those actually measured during performance of the work.
00100.06 APPROVED MATERIALS AND EQUIPMENT
Whenever a material, article or piece of equipment is identified on the plans or in the
specifications by reference to manufacturers' or vendors' names, trade names, catalog numbers,
etc., it is intended to establish a standard of quality and it will be presumed, unless specifically
excepted by the bidder, that the base bid includes the materials or articles so named, and that the
Contractor's proposal, if accepted, will constitute a contractual obligation to furnish the standard
named materials or articles and no other. To assist the Engineer in making an adequate
evaluation, the bidder shall submit with his proposal, at the time bids are received, detailed
information and data on the items he proposes to furnish as equally acceptable to the named
terms. The data furnished shall include as applicable and needed for evaluation, manufacturer's
name, model identification, descriptive brochures, specifications, performance data, guaranteed
efficiencies, and list of installations in similar service. Such alternate material, article or piece of
equipment shall not be purchased or installed by the Contractor without the Engineer's written
approval. Any revisions to the Drawings as a result of alternate equipment shall be at the
expense of the Contractor.
00100.07 SAMPLE OF MATERIALS
Before any contract is awarded, the bidder may be required to furnish a complete statement of
the origin, composition and manufacture of any or all materials to be used in the work, together
with samples, which samples may be subjected to the tests provided for in these specifications to
determine their quality and conformity to the plans and specifications.
00100.08 PROPOSAL FORM
All bids must be submitted on photocopies of the proposal form bound within these
specifications. No proposal will be considered which is submitted otherwise than on the prepared
proposal form and in the designated manner. The blank spaces in the proposal shall be iilled in
correctly where indicated for each and every item for which a description is given, and the bidder
must state the prices for which he proposes to do each part of the work contemplated, and the
total amount for all the parts included in any or all of the combinations of the work. In case of
discrepancy, the written words or Unit Price , where stated, shall be considered as being the bid
�� ��
price. The bidder shall sign his proposal correctly. If the proposal is made by an individual in
addition to his signature his post office address must be shown; if made by a firm or partnership,
the post office address of each member of the iirm or partnership; if made by a corporation, the
person signing the proposal must be President or Vice-President of the corporation. No proposal
will be considered which is not based upon the complete plans and speciiications, or which
contains any qualifying letter or written memorandum not permitted in these specifications, or
which is not properly made out and signed in writing by the bidder. The proposal shall be
submitted in a sealed envelope bearing the name of the Contractor and describing the project for
which the proposal is being submitted. Proposals will be accepted by registered mail, and then
only if the proposal is enclosed in another sealed envelope contained within the mailing envelope
and is delivered to the Owner prior to the time established for opening bids.
00100.09 WITHDRAWAL OF PROPOSALS
Bidders will be given permission to withdraw any proposal after it has been received by the
Owner, provided the bidder, or his agent duly authorized to act for him, personally appears
before the Owner with a written request prior to the time set for the opening of bids. At the time
set for the opening of proposals the withdrawn proposal will be returned unopened to the bidder.
00100.10 BID SECURITY
Each proposal must be accompanied by the bidder's bid bond or certified check made payable to
the Owner in the amount specified in the proposal form, which sum will serve as bid security and
will be forfeited to the Owner as liquidated damages in the event an award is made and the
contract and bonds are not promptly and properly executed as required in the specifications. All
certified checks, except those accompanying the two lowest bids, will be returned by certifed
mail to the unsuccessful bidders within seven (7) days after the date of the bid opening. (If the
signing of the contract be deferred for a period exceeding two (2) weeks, and the second low
bidder desires to substitute a bid bond for his certified check and the bid bond fully guarantees
his bid, he shall be permitted to do so). The certified checks accompanying the two low bids will
be returned within three (3) days after the Owner and the successful bidder have executed the
contract. In the event no contract award is made within the time limit specified, each certified
check or bid bond will be returned upon the demand of the bidder.
00100.11 OPENING OF PROPOSALS
All proposals will be publicly opened and read, on the date, at the place and commencing at the
time stated in the advertisement. Bidders or their authorized agents should be present. The
Owner reserves the right to reject any or all bids or parts thereof. Proposals may be rejected if
they show any omissions, alterations of form, additions or deductions not called for, conditional
or uninvited alternate bids, or inegularities of any kind. Proposals in which the prices are
unbalanced may be rejected. The Owner reserves the right to accept the bid that will best serve
his interests.
00100.12 METHOD OF AWARD
Bids will be compared on the basis of the total costs of estimated quantities established in the
proposal form, constructed at the unit or lump sum prices bid for the various items listed. The
contract will be awarded to that responsible bidder whose proposal totals the lowest number of
dollars for a complete installation.
The successful bidder will be officially notified in writing by the Owner of the acceptance of his
proposal and award of contract. This notifcation will be made within the time limit set up in the
contract documents.
00100.13 EXECUTION OF CONTRACT
The bidder to whom the contract is awarded must, within ten (10) calendar days following
Notice of Award, present himself to the place designated in the ofiicial Notice of Acceptance, for
signing of the contract, and to substitute for the bid security, a surety performance and payment
bond in the amount of thirty per centum (30%) of the contract price of the work, conditioned that
the Contractor will faithfully perform all work of this contract and promptly pay for all materials
furnished and labor supplied or performed in the execution of all work. All bonds and insurance
shall be issued by companies authorized to transact business in the State of Florida.
If the lowest responsible bidder to whom the contract is awarded fails to give bonds or execute
the contract within the time specified, the amount of the proposal guarantee shall be forfeited to
the Owner, not as a penalty but as liquidated damages.
00100.14 TIME OF COMPLETION
The successful Contractor shall commence work under his contract on a date to be specified in a
written order from the Owner or his authorized representative, which order will also establish the
completion date in accordance with the total number of consecutive calendar days established as
a working period in the proposal. The Contractor shall have at least two (2) weeks notice of this
commencement date and shall fully complete the work described in these plans and
speciiications on, or prior to, the completion date.
If the Contractor fails to commence work within seven (7) days of the announcement of the
official starting date, this shall be just cause for the annulment of the contract.
00100.15 LIQUIDATED DAMAGES
Should the Contractor fail to complete his work on or before the expiration of the date set for
completion or as provided in the Contract Documents covering extension of time, then the
Owner may retain as liquidated damages the amount established in the proposal form, which
amount is agreed upon as the costs which the Owner will sustain per diem by the failure of the
Contractor to complete the work at the time stipulated and the sum is not to be construed as in
any sense a penalty.
00100.16 EXTENSIONS OF TIME
If the Contractor shall be delayed at any time in the progress of the work by any cause beyond
the Contractor's control and without his fault or negligence, including but not restricted to any
act or neglect of the Owner, or of his employees, or by any other contractor employed by the
Owner, or by changes ordered in the work, acts of God or of the public enemy, fires, floods,
epidemics, quarantines, strikes, lockouts, riots, civil commotions or freight embargoes or by
delay authorized by the Owner, or by any cause which the Owner shall decide to justify the
delay, then the time of completion shall be extended for such reasonable time as the Owner shall
decide. No such extensions of time shall be deemed a waiver by the Owner of its right to
terminate the contract for abandonment or delay by the Contractor as herein provided or relieve
the Contractor from full responsibility for performance of his obligations hereunder.
The Owner shall determine the number of calendar days, if any, that the Contractor is in default
in completing the work to be done under this contract. The decision of the Owner shall be final
in the case and shall be binding and conclusive upon all parties to the contract.
00100.17 CERTIFICATE OF INSURANCE
The successful bidder shall submit certificates or other documentary evidence to the Owner for
approval, covering Workmen's Compensation Insurance, Public Liability, Property Damage
Insurance, and Special Hazard Insurance, in the amounts specified on the "Summary of
Information to Bidders."
00100.18 DETAILED BREAKDOWN SHEET AND SCHEDULE OF PRICES
The successful bidder shall submit, in a mutually acceptable form, a detailed breakdown sheet
and schedule of prices of the proposed construction work. Until the Owner approves the
breakdown, the Owner will not be obligated to make any payments to the bidder.
00100.19 EXISTING MATERIALS AND EQUIPMENT
All existing materials and equipment not specified for the complete construction of the project,
or shown on the plans to be retained or reused, shall remain the properry of the Owner and shall
be placed on the project site as the Owner may direct.
00100.20 QUALIFICATIONS OF BIDDERS
In addition to qualifications previously set forth in these specifications, no bid will be considered
unless the bidder, whether resident or non-resident of Florida, is properly qualified to submit a
proposal for this construction in accordance with all applicable laws of the Municipality, County,
and the State of Florida.
00100.21 STANDARDS
This project shall be completed in accordance with these specifications unless noted or otherwise
directed by the Owner or his authorized representative. The decision of the Owner in
interpreting these specifications shall be final.
SECTION 00140
SUMMARY OF INFORMATION TO BIDDERS
00140.01 - OBTAINING PLANS AND SPECIFICATIONS
A complete set of bidding documents may be obtained at the office of City of Clearwater,
Purchasing Department, 100 South Myrtle Avenue, Clearwater, Florida 33756. Also, these
documents may be downloaded off the City of Clearwater website at
http:/lwww.mvclearwater com/apps20/cityprojects/invitationtobid aspx
00140.02 - OWNER
The Owner for this project is the City of Clearwater (d/b/a Clearwater Gas System), 400 North
Myrtle Avenue, Clearwater, Florida 33755
00140.03 - CONTRACT
The contract is entitled "Replacement of Antiquated Gas Mains, Service Lines, Gas Meters and
Piping Connections to Customer House Piping and Reestablishment of Gas Service at Various
Locations"
00140.04 - BID SECURITY
Each Bidder must deposit with his bid a bid bond in the amount of ten percent (10%) of the bid
total, made payable to the City of Clearwater. All bids may be held for a period of 60 days after
receipt.
00140.05 - TIME OF COMPLETION
The time of completion for this contract: 12 months from contract execution
00140.06 - INSURANCE REQUIREMENT5
The insurance requirements for this contract include but are not limited to the following:
Liabilitv Insurance. The following Liability Insurance shall be provided, paid for, and
maintained during the entire contract period:
Comprehensive General Liability and Auto Liability Insurance on an "occurrence" basis
in an amount not less than $1,000,000 combined single limit Bodily Injury and Property
Damage Liability Insurance.
Worker's Compensation Insurance applicable to its employees, if any, for statutory
coverage limits in compliance with Florida Law.
Professional Liability/Malpractice/Errors or Omissions Insurance, as appropriate for the
type of business engaged in by the vendor, shall be purchased and maintained by the
vendor with minimum limits of $500,000 per occurrence.
Additional Insured. The City is to be specifically included as an additional insured on all
Liability Insurance coverage described above.
Notice of Cancellation or Restriction. All Insurance policies must be endorsed and provided to
the City with thirty (30) days notice of cancellation or restriction.
Certiiicates of Insurance/Certified Copies of Policies. The contractar shall provide the City with
a certiiicate or certificates of insurance showing the existence of the coverage described above.
The contractor shall maintain this coverage with a current certificate or certificates of insurance
throughout the term of the contract with the City. When specifically requested by the City in
writing, the contractor will provide the City with certified copies of all policies of insurance as
required above. New certificates and new certified copies of policies shall be provided to the
City whenever any policy is renewed, or obtained from other insurers. The certified copies will
be provided to:
City of Clearwater
Attention: City Clerk
P.O. Box 4748
Clearwater, Florida 34618-4748
The contractor shall defend, indemnify, save and hold the City harmless from any and all claims,
suits, judgments and liability for death, personal injury, bodily injury, or property damage arising
directly or indirectly from any performance under this contract, or a subsequent purchase order
entered into by the City and the contractor, its employees, subcontractors, or assigns, including
legal fees, court costs, or other legal expenses. The contractor acknowledges that it is solely
responsible for complying with the terms of this contract or purchase order. In addition, the
contractor shall, at its expense, secure and provide to the City, when requested all insurance
coverage in this contract.
Any party providing services or products to the City will be expected to enter into a written
agreement, contract, or purchase order that incorporates, either in writing or by reference, all of
the pertinent provisions relating to insurance requirements as contained herein. A failure to do
so may, at the sole option of the City, disqualify any contractor, bidder or provider of services
and/or products to the City.
io
00140.07 - SCOPE OF WORK
In general, the replacement work will consist of approximately sixty (60) miles of antiquated gas
mains located within five (5) distinct geographic areas, which are defined below and shown in
more detail in Appendix A. The term "antiquated" represents all uncoated steel gas mains and
service lines, to include cast iron, that are currently serving customers within the Clearwater Gas
System service territory. The bidder who is awarded the annual contract will perform
replacement work schedule in the order listed below:
1. WEST (12 miles) — Downtown Clearwater
2. GATEWAY (10.4 miles) — Entrance to downtown Clearwater
3. EAST (10.5 miles) — Eastern most sections of Clearwater
4. NORTH (13.7 miles) — All areas located north of Clearwater
5. BELLEAIR (12.4 miles) — Generally located within the Town of Belleair
The bidder is expected to replace approximately 12 miles of gas mains per year, which includes
all associated service line, gas meter and piping connections at each customer location.
However, if bidder projects to complete more than the minimum replacement footage (mileage),
their unit price bid should reflect such costs for the projected mileage and not the minimum
requirement.
The work to be performed under this contract shall consist of the furnishing of all labor and
equipment necessary to satisfactorily complete the City of Clearwater: "Replacement of
Antiquated Gas Mains, Service Lines, Gas Meters and Piping Connections to Customer House
Piping and Reestablishment of Gas Service at Various Locations", including written logs, as-
built drawing of gas main and gas service line piping installations and provide all meter/customer
piping connections and required Integrity testing of customer's piping and reestablishment of gas
service in accordance with these plans and specifications. All workmanship shall be fully
guaranteed for a period of one year after date of acceptance by the Owner. All Testing shall be
paid bv the Contractor. All Professional Survevin� and iob stake out includin� placement
elevations shall be paid bv the Contractor.
11
SECTION 00310
PROPOSAL
TO: City of Clearwater
The following proposal is submitted in accordance with your advertisement inviting proposals to
be received until Februarv 17, 2012 for the construction of "Replacement of Antiquated Gas
Mains, Service Lines, Gas Meters and Piping Connections to Customer House Piping and
Reestablishment of Gas Service at Various Locations"
Having carefully examined the contract documents together with all addenda or bulletins and
being familiar with the various conditions of the work, the undersigned herein agrees to furnish
all materials required and to perform all labor necessary to satisfactorily construct the
"Replacement of Antiquated Gas Mains, Service Lines, Gas Meters and Piping Connections to
Customer House Piping and Reestablishment of Gas Service at Various Locations" in
accordance with the plans and speciiications for the unit prices stated herein.
Accompanying this proposal is a Certified or Cashier's Check or Bid Bond in the amount of ten
percent (10%) of the bid total drawn upon the BANK
and made payable to the City of Clearwater, to serve as bid security.
The undersigned hereby certifies that this proposal is genuine and not sham or collusive, or made
in the interest or in behalf of any person, firm, or corporation not herein named and that the
undersigned has not directly or indirectly induced or solicited any other bidder to submit a sham
bid, or any other person, firm or corporation to refrain from bidding, and that the undersigned
has not in any manner sought by collusion to secure for himself an advantage over any other
bidder.
The undersigned Bidder agrees to accept the unit prices as full compensation for work
performed.
ACKNOWLEDGMENT is hereby made of receipt of the following ADDENDA issued during
the bidding period, if any:
Addendum #1 Dated:
Addendum #2 Dated:
Addendum #3 Dated:
12
ATT`�ST, �
_
, t ;
'- �-�.;:. �w �' � � ��..��rl� ,�.,. ___..
Cc�rporal� 5ecre at ry �
�FFE ;: ; �JF;E'C�i�A'iC SE�AL.
it a ct�rra�r�iion
�
�I�rit3a Gas � Electric �t�rp.
Biddcr's Busin�ss'�Tamcj .�
� � R �Fj J
By: � °'� �' � � �`�. �, f �
�. C}fficer c�r f'rir�al�
`l'itIe J'�cp �resi�ent
�'. �. Bc�x 28�
$usiness �,ddress
i�ade Ci� FI 33�26
Busirress Cit�{/Statel�ip Cc�de
�8i3] 995-Q019
... �
Business Te(ephane �umber
�it�� c�fCl�ar�uater
Clear�vater �a� Sy:7kem
Constructic�n Cantract
E3ase E'riu�.
The ba�� pric:e includes all necLSSary canstructit�rt, including IiL�e tie-in c:anz��;ctic�ns i�l c�rder ta
prc�vide a ct�rnpl�t� main or sen°ice line inst�liatic�n ready for thc; trans�artation �f r�azural �as
ac:cordin� ic� �(earti�vat�r Gas Sy�tem (C�S) standardsic�pc:ratic�n and maintetroanc� mar�ual, It
sha11 alst� it�cludes irtstaliing the c�mplete m�ter �et �nd ccrnnectin� trr the custc�tner'� Yrcru��-
pip�in� at tl�e existin� ar c�ffeet lc��:ation; int��rit}� testin� c�f the customer's pipin� system ar�d
reestablishment ofgas s�rvice °Che Gontractor shall furnish all [abor anci �quipment, f�11 �a�
jc�inin� ec�uipm���t ta be used sha[1 be c��tified �y CUS to 6e in �t�od wc�rkin� cc�nditic�n and
suitable f'�r th� intend purpt�s� prior t�.� b�in�,� utilized; inctudin� all toals, anc� servic.es, it�cluding
pur�in� nitrc���n �as.
r'�il gas relateci rnaterlals will be furnisheci �v� CCiS, and are appiicable tv strin�ent inventc�r},
c:ontr41. h'(�tcrial short��es will require mc�n�tary reimbursement compensatic�n rc� CGS.
T`he �c�ll�l��in� priees are f�r (P�} �I�$ti� mains and service tin�s �vith e�cess fic�w valvcs. T"hey
m�} inc3uc�e installatic�n t�}' PE tapping tces, 3-44�ay tees and �" w�elci tees vr �rnaller tapging te�s,
stap ccack. ris�r, gas met�rs valves. anc3 vatve �c��cs, valve bax ccrncr�te rings, fiCtings, tracer
ti�°ire, iest static�ns, iine marker, p�les, barricad�s, bunrtper poles and a[I si�na�e-maint��tat�ce
rcc�uired p�r F(�t�T' �peci�cation�; fc�r traffc cont�c�l. Alt tii�ch lin�s and I�ell hc�les mi�st b�
n�a�:k�ine ct�m�a�cted tc� appra1�ed �ensit}�. R.equired �nvironmental protecti��n> suclj a� the
instailatie�n c�f'silt fencin� acijaccnt tu ���et lands and ptaeernent of stra�v i�al�s or �itt�ilar apprt�ved
de�ices at storn� �nlets.
Cc�sitrac:tc�r em�Ic�yeGs anti �heir su�rontractors tnust meet th� requirements and int�n� uf t�ae
Cc�de saf �ederal R��ulatic�ns (C�'FR} �R P�rt 192.8t�1. [4�.803. 142.845, 19�.807 anc� 19`?.8U9
retatin� t� "t)geratar Quaii�c�tion" �vith rnandatc�r�• knaw�led�e. skill and abilitiesT tcainin� tc�
be cc��npleted bti• C?etaber i0, 2[1(}5�. The contractor must state in writing that t��ir C}perator
C,�uali�eatic�n plan is in confarmance G�°ith the rntent af Federal t}peratc�r Qualificatit�n
Re�ul�tit�ns and is ,�t ieast �qual to and applicabl� tc� Clear�tater Gas S}�st�n�'s ASME i33I'Q
Qperatc�r Qualiitcation Plan. (7t,� and a11 '1'rainin� Doeumentati€�n shall k�e furr��shed upon
r�ques�. The Gi�ntractor's (Jp�rat�r Quali�ic��tion Plan must also ex�tain �t�w�� their e�mpEoye�s
t�ave the abitity to acie�tify and react to natural �as sela�ed Abn�armal (7�erating Co�ditie���s th�t
n3�v la� �ncc�un�ered r,vhile �irc�rkin� c�n the �as pipeline f�cility. Cnntractor Empla�ee C}�erat�r
Qu�Ii�c;atit�n. Knowl�dge, Skiil and �bility recards will be kept for a 5 y�ar perit�ci. �ailure ta
pro�ridc prc�of of C}perator t�uatificatinn compiia�ncc, and successFut mair�tenance wiit
clssc�ual`rfy the bic�der fram cousicierxcion far tlte award of this bid. Traini�g eecards sha0
b� made av�ilabte ta GGS for auditing.
Th� Gontra�t�r agrees that it f�as in place, c�r �vilt implen�ent a D�ru� and A(cc��at �Traiuing anc�
Testing Pra�ram for their ��ZZplaSre�S that compl}� wit11 the requirements c�f th� �.�nited �t�tes
i�epartmer�t of Transportatian, Titie 49, Pipeline Saf�ry Regulations. Part 1��}. A cc��y af #he
�Icohal ant! Urug Testing Pr�agram ���ill 6c included in tt�e res�onse to this It�quest for Bid.
�1'he c�ntractc�r will also furni�h qua�terl�� sEatistical r�:��arts tc� eG�s' tc� s�vw� acti��� c�a�npli�n�e.
�;
FLORID:1 G:1..5 c4t
"�'� CI��Y C7� C'L.E AR W<�TER.
FL�}F�IUa CAS � ELECTRI� C'CiRPQRA'I"�C}N'S C}I'ER.ATUR QU�LIFtCAT1U�
ALAN IS il�i CC}Tv'FQR1v1,�NGE WITH TH� 1NTE'�fT QF FEDER.�L QPE�ATC}R
(1UALIFICATTC}N RE�ULATIC}NS A'P+lL} I� AT LEAST EQL)�i: �I'4 r1NT)
��PPLIC�BLE TCJ CL�ARWATER GAS �'YSTEM'S �SME B31Q (JI'�RAT�R
QUALIFiCAT1f31v PL�T�d.
#� � _
,
t � ��F
S�CiNE�t� 4 � � ___�_____.__
�.�_ ,' � � ; , �r �
°;Da��id L, Rua�yan'; � �ce-Pr�si t
['. C). E�€�� 2�E) .[)a�ie C.'itE F]_ ?�?�?C-(7?�ti
t)tfi�;�: � 1;.qc}6.(}(}! y. Fax: � i 3��7��(a�L�� ��• I_�-tVl��il. Ir�i ti"u2f�GCCjt-�.cc�m
Sf$ it��h Cst C�tv. 9,t?fM ff.
� ap�n ��c. t�t�-. �,00a �t,
L inch Est. 4�t�°. 1,{�t}� ft.
? inch �st. Qt}'. �7,CiQ0 ft.
� inch Est. Qt��. S,Q00 f#,
fi inch L:st. t:�ty. Q ft.
8 in�h �si. Qtv. 0 ft.
SERVICESIPLA�TIC
4. 2 5 pc:r tt.
�.�� ���e�.
� . 5 f� per f`t.
:�tA I1� SiI'LASTIC
4. 2 5 per f�.
5 . � 0 per ft.
6. 5 a per ft.
5. 5 Q p�r ft.
CASLNG PiISHtMIS�iLE
�i'S inch Cst_ Qty. 2.f}�� ft. 9.�� per fi.
i inch �st_ Qt�,�. 1,0{lOft. �. �0 per ft.
2 irsc;h E�i t�tv. 7,OO�lft. 1 D,{J t� per ft.
E�orin� inrludes insertion �f'the carrier pdpe ��=itk�in the casin�, restc�ratir,n, cleanup, ir��ulat�rs.
�nd seals, anc� vent poles. Foe afl faores, p��=ment 4���11 be fir�r actual distance �fthe bcare. nai tca
'snclude faatage of entrance and exit pits and instaC[ation e�ftracer ��•ire c�r carrier pipe.
�
�t8 inch Est. �ty�. �,4t10 ft.
I inch E�i. Qt�. 2,U(}0 ft.
2 inch Est. Qt!'. ?8,f?OU ft.
� inch E:st. Qt�f. 5,000 ft.
6 in�h Est. {�t�°� {� ft.
� inch E�t. Qty, ?Q(} �t.
12 inch Cst. t,�t��_ El ft.
rr � ,�
11 . � Q per Si.
1�.Q0 ��rft.
11 . 0 fl �er t"t.
14 . � fl per f#.
16 . fl � �er �t,
�. i. G C} per f�.
3 5. t� ti p�r ft.
STE�L•�i%aELU, MECA�YICAL c4� PE TAP�'I^�Ci T�ES
? inch Vv'illiam�on �st. C,�t�=. 75 54. Ci� eacl�
Sf� 'th7eld Punch "I"ees �.st. (�7ty`. 5C1 5 0, 0� ea�h
�t4 Weld ['unch Tees Est. Qty 1 f! 15 .� 0 eac��
I Weld Punch Te�s �st. Qtv. SU 3 S. t? G eac(i
Mechanieai �r F'E i-'used Seruic;� T�� Est. Qt��, 1,1{14 4 C� .�� c;ach
{saddi� e�am�a, sadcilc: tee:. i'� tee, �nd ��rrap arau�ac3) —
SITE PREPAR�TiO� r1N17 R�STt?I2�TIC}1V
EXTRA DEPTH DTTCH
Vv'ill be paid wh�n �.u�aer exceeds 36" and requireci b� stat�:. c��«nt�. city_ cc�n�truciic�n
riquircments, �rr at reque�t i�t CGS.
�7" t� ��" c�eptl� 4, 5 C� extr�� depth per �1:.
��
�#9'° to 60" dep�h
fi 1'' to 7�°, depth
S . � � �xtra c�epth per i��t.
�. 5 ti ��tra ciepth per f�.
�THER F'4Y IT�:?4FIS
Meter F'roie�tion F:st. Cjty�. 7� 25 .�0 per ur�it pole
�Bumper �'ol�s, ��r � in�h pipe, � f� apart and � fi� deep}
Density, if`rec�uired, includes testin� 4. ap �er sq. tt.
Shorin�, it required anci ap�r�aed b;�� CGS 15 .�� p�x it.
�nst�llatic�n a�'well pc�int lteader pi�e 27 .�fi p4r it.
��%�It pQint runnin� tinle 45 t3 . C�C� p�.r �ia��
SOD
Sod n�ateci�l will be supplied. plact�ci, ivatcred and maintaineci f:�r thre� weeks E�r� C�ntra�tc�r antf
acceptable t� the Kight �f'V�a�� �utftority.
f�ahial�lc�ratan �st. QtY. 84,�0� sq. ft. .�� per sq. i�.
�7et�r & Re�uiatt�r Est. C�ty�.
.
�
�GRFAC'E RE�TORATI4N
Cut. rem�ve, and replace. Mat�riai pravided i��r Contractc�r
Aspha�lt Est�r Qtv 30,OOU �q� ft, 2. Sp per ini;f� thick
Limerr�ck Est. C,�ty. 3,04Q sr�. ft. . 25 per inch thic�:
Concr�te Est, t��y. 8,OOd sq, ff. 9. G� _ per s�. (�.
�
5 a . � i} each
Sheil �st. Qt��. l,(�U� sq ft. �. .�� ��r s�. ft.
Sri�k removal �st. �ty. i.000 sq. ft. .�5 �ec sq. fi.
Bri�k r�pCac�n�ent Est. �t�=. 1,�(��} sq. �€. , 75 per s�. f�.
��ed and �nulGh L�st. Qt� . lt��(i00 sq. Ft. .� 5 p�r sy. ft.
2 inch Est. Qt��
� inch �st. C�t}�
� irt�h �st. �t��
PIPE REfVtOVAL
l,5Ci4 f�. 3. o Q per ft,
1,�QQ ft. 4. Q4 per ft.
5�0 it. S. � t� per ft.
P�; 11NDERG�(?ITi�D EXTERIOR HC}L3SE PIPIi�iG
Frttrn �utlet side cafineter set tc� th�: e�t�rit�r appliances t�r h�a�se �ipin� stu6. 4�i11 inclut�e risers
on �ach �nd, sic�p c�ck. �ralves and miscettanecrus fittin�s. Mu�t be nc�te� as Flc�use 1'ipin� un alI
Envoiccs. Air te�t at 15 ��otinc�s per squar� inch (I�SI} fc�r 24 hvurs required f�r final apprc�v�f and
ta�ged with pre$s�re, date and time. Mwst be a �ic�ns�d Plttr�ber or I�P; NaturaE Gas ct�tttr�ctt�r
and qualitieti in this discs�lin�:. C:ontraetar is respt�nsi�te far sli cod� defieicnci�s and must
furnish payment for coc3� cFi�lati�n�, suc� as lc�ss ofpressure test, improp�r d�pCh. nc� tracer wire
etc. Installatic�n also incIud� the placc�ment ar�d in�tai(ati�n c�f si�ht tubes fc�e inspectic�nat
puposes
S18 inch Est. Qty. SUO ft. 4. 25 �er f't.
1 inch Est. Qt��
1 tf� inch Est. (�t��
i inch E�;t, C�ty.
� in�h Est. �t��.
�,oaa �r,
?,0�0 ft.
2,0{}0 ft,
i0Q ft.
f'� Fused S�rv�icc Type T�� Tees F�st. �?ty 1U0,
:�-1�'ay Tee� Est. Qt��. ?j
,�
4 . z � per Ct.
4 . 5 � �er ft.
_4 , 7 5 ___ Per 4't.
5. 5 J per ffi.
4 � . U 0 ea�h.
2 S . � � each
:! � ! ' ! �
The t��t�rk t� b� perform�ti shatl cansist af� the contractor furnishin� all ne��ssaru (abor, tc�ts�s,
equi�m�nt, mat�ri�ls, pipe & fittin�s, supPlies> manutacturec� artic:Ies. pc�w=er, and �ssentiai
custr�mer c�mm�cnieation, labor, and ather op�eratit�ns ne�ess�r� f'or the mc�difi�ation <�f existin�
natural gas house plutnbing to acct�mm�dat� relocatian c�f'[.�a� meters including: obtain�ta�
rec�uired permits if a�plicable, insiallation c��new huuse �a� pipes ��• threading pipe, measurin�i'
tittin� �nd as�emblin� pipe and itCtings, ne4�� �hut off valG��s. �;�s e��eters and re�ulators and
�onnectin� cust�m�r piping from a new t�cation and, subsequ�nt inte�rity pressure fiesting
(I?rop 7`��t- utilizir�� a rr�anon�eter)}ofthe �niir� consurn�r� ���vn�d gas plumbin� s}�sterr�, �nd
�a�ssin� ree�uirec� inspcctions.
�GS will rc:quxre the reestablisl�ing of'the �as �er��ice �nd relightit�� the applicable a�plian��s
that gast thc inte�riry pres�ure tcst. Gontractar shali immecliatel� nc�tify CG5 dispatcher c�fttle
:`�zt �as" anc� cc�mpletc the rec�uired p�per�v��t�rk, ineludin� the: circ��+ test forrt�, and submit, no lat�r
than thc l�ilc��+��ing b�isiness c4avr. "I'he wc�rk sha!! be complete and }�erfc�rmed in stri�t acec�rciance
with the �antract Sgecificatic�ns, and in campliance �ith a�l ap�alicable �;c�des; GGS
rut�uirements. F'Ic�rida Fuel Gas Cade and incfu�Cry standards, f111 �y�ork, materials, and services
n�t expresslv shr���n �r called fQr in the Cc�ntract I7ocuments, ��hich may be necessarv f�r t�e
c�omplete and prc�per construetican t�fthe work in goc�d faitli, shall be performed, furni�h�d, nnd
ins�ailed b�� zhe C�nzr�ctc�r as tht�ugh ori,ginally s� spec's�ed c�r si�o}r°n, at rto increase in cost to
the �it�t. Gas pip� �tt�cr� a�d plurnber� shati �� th�rou�h��� zrained an� experi�ne�d in tt�e sf�ills
requirett, and shafl bc �:crmp(etelv farniliar v�ith th� desi�n and apE�licacian of wc�rk descrii�ed. A�!
��p(icable �lumhin�; �nd gas �itters licensin� shaCl be tiarnished it� CGS
�b�a�e Uround �xtr:ric�r Hous� �'iping and Meter �onn�ct: Qt,� 1,�(?0 25p . 06 each
t �i i ' * ! . ! ' � 1
Tt�e Contractc.�r shal! rsc�tif}� all resid�nts alang the cc�nstru�tiar� r�ut� �vith a printed dc�c�r han��r
nc+tice indic;atir�g t�7e fr�llow�ing information abouE the �rcpcased cc�nstructi�n and the C'orttractt�r
�erformin� the �y°c�rk. GGS lt��fl (pra4ided tc, Contractar c�n disk); the schedul�c� start' date; the.
t��e ofconstruciian; �eneeat sequ�n�e and scheciuling �fec�nstruetion ev�nts; Gc�ntract�r's name;
Contractor'� a�dress; C�?ntractc�r's �hc�n� nurnber; and Superint�nc3�nt's nam�. A s�rr�ple duc�r
t�an�er is aitac�ed tr� Chis� doct�ment and shall b� printed t�n bri�I�tly c;t��ored car�r3 st�ck and a
mirt`rmum of �'�'�„ � 1 i" in size. A sample doar han�cr inclUdin� proposed lan�ua�� shall b�
apprc�ved l��r C:G� �ric�r ts� the �tart afcc�nstructi€�n,
�Iotifi�atic�n (€3c?i,r han�er) sha11 be post�ti tt� residenees and businesses direcity af��c�ed bv th�
�c�ntr�ctar's ��ti��itics no lat�r t}xan t�ua (?} days pric�r to start c�f canstruction, Dir��tly aff�cte�1
�y Cc�ntractor's activities shal[ mean aIl Cuntr��tc�r c�peratic�ns `s��cludin� st��in� are�s,
�uipment aa� material stvra�e, gr[ncipal acc�ss r�utes aeross prirate gr�p�Ry, �tc, Contr�ci�r
cann�at start E��ithout prc�per twa (2) dayr notice period to resitients. Ccantractor i5 a1�o required tt�
rnaintain suffitienT staff tc� ans�rer resident inquiries durin� n�rmal iausiness hour5 an�3 tc�
maint�in messa�e recc�rc3in� �qui�m�nt to receive resident inquiries af2er busin�ss h�urs.
yw
�ontr�ctc�r Supervisor em�rs;ency' pllt�ne numb�r shall k�e prt�vided and upc�ated as ne�essar}� tc�
the CGS Dispatch u>hich operates 24 haurs a day, 36� da}t5 a year.
,, �
s�crra?� oo�zu
�IL1 'I"A13ULATi��T SL�iV���ItY
ITEM
N{,l. AI�'IC►U�T
I Sen�icesiPlastic
� s�,��a.a�
? MainsR'Plastic
� �a�,2s�.��
3 �'asin� PushlMissii� S �.� , � � � . � �
� I)ir�ctic�na[ E3c�r�
� ���,���.�:�
Steel Weld, Nlechanical and PE Tap�in� �I'�es
� �V�l�ldin� b�Y Cc�ntt-actar} � �� , ��� . �� '
6 Sit� Pre�aration and Restoration
� �.�t`
7 C}th�r Pa�° Itetns � � . � �
8 Met�r S�t
� a�,}��.�o
9 Sc�ci
� t�s, ��� . u�
1 � St�r�ace IZ�stc�ration
� zsz, �� ; , c�a
11 F'ipe Itemo�r��
$ 13,��J�.b�
12 PE t.?nd�raround E�terior I-Iausc: Pipin�
�- � ��,��c�,�t�
1 � Abc��°e C"Jrc�und �:xterit�r Hause Pipin� Mc�tc�r Ccanncct � �,� � t � � � . � �.�
�rc��r�,��ns�:���r� ��.,��o,�o�.�a
Tc�tal Sase �3i�i iri Va'ards
�ne *��l�i�;-; �ix ::undr��z Fortv ihousar.d �'h�ee Hunur�u ar.P�� �cfl=J� 1�41iats
f�
��CTi�'�` Qf►33Q
FLC.iI"tIllA TRFNCF[ SAFETY �1CT ACi�`�C;'V4'LEDGI��E'�T
�E2UJECT: Replac�emtnt Qf Antiquated Ga� '4�lains, Ser��ic� C.in�s, Gas Meters and Pipin�
Cc�nnectit�ns tn Ccasit�mer Hause Pipin� and �eestablishment �f Gas Servic� at Various
Lc�catians
BIDllER`S NA�YiF: FIa�-�ca Gas &�lectric Cc����.
Bicid�r acknatiuEed�es tllat inciuded in the varic�us items uf t17e prr�posal in the `E'atal Bid Frice are cc�sts for
�c�mplyirl� �vith thc Florid�a 'Trench Safety tict t:9(i-96, La��:s raf Flnrid�} ef'fective C7ciaber i, i 95?U. T(7e
bic�der furtt��e identi��s the cost� #o be summaria.ed b<:io�v:
'i'rench Safetr
M�asure ,
(t3Lscriptic�n�
L'rrits t�f �v'leasure t�init
(Li�. S�`} {t���antit� 7 td'nit �cast
�F �;� zs.o�
*'I't?i'1�1..;
�Ytenci�:d
Cost
�
* This iutal �rnount is incidental to the c�ntract hici price and is provided t�nl•�� as k�idder
a��nov,�Ied�ment c�f'the Flr�rida Trench �atet} �ct. �
* "1"he C'sty af Clearwat�r ha� enacted addiiiona� shorin� cequirem�nts, within the Citg° Iimii�
adrr�inistcred by� the Cleanv�,ter F`ire I)epartn�ent
Failure tcr cc��n�lete the abc�ve may result in the l�id b�;in� c1ecl�arGd non-respc�nsive,
-i , � ���
�'� ;�� f� ' �:���
Bid �n� Contra or Signatu'
��
�E�Tif)�'�' 003�0
PUBLIC EI�iTITY C'RI:�IE� STATEMENT
SWC7CZ;�! S'I`ATEMENT [�NDEFt S�CTIOTV 2$7,1.i3{3)(a�,
F`LQRIDtI STA'1"GTES. ON At�4BLfC ENTITY` GRI�I�S.
"C'I iIS FQRM �1U�T CiE SIGiv`EI3 !iti° `T`HE Pt2�St�Pt1C:E tJF ,� �tiOTAR.1' PUSLIC C}R t� 1"f-IE:R
O�'F°ICCAi., r'Ii�TH�JRIZ�D Td AD1Vi��TIS"CER t?�T°1{S.
1. 7'hiS �4�'[tT"tl $#ateS]'Setli t5 SttEriiliitec� tc� 4:itp �,t'cicar�+•:,ter
¢�Srint n�mc �af zhc pubti¢ e�tity}
��' �avici L. Rar,yar. Vice Pxesrae;�t
(Print ind�vidu�l`t numc an3 titl�J
fiar _�'lc�r�,da Gas & Elec ri� Ccsr�_
i�ri;ri nama of entit�; submitt�ng sw�m �ta�tamcnt)
wlac�s� busi��ess address is
?. G. B^x 28(t Dafle G;tY FL 33526
and (iiappiicable) its Federai Emplover ldentificaticrn �vurnbcr ��F1N}is
(if the c:t�tittix i�as no FE1N, inclur3e ihe Social Security l�lumt�er cafche in�ividual signin� ti�is
SVVtim 5tat�tri�qt: �9-353€} �G(} _._ ...___)-
?. l un��r�t�nd thai a"publie entit}° crime" as define�i in Para�raph 287.I33�i)(�). FIari�a Statcizes.
rn�ns a itic�latiart �fan�f state or fedcral ia�� �y� a�ersQn �c�ith rLSpect te� and dircct�y r�iated tn t}��
transaction ta1'` �u�►ness rvi2h any �ublic entity c�r with att a�ency c�r �litic:ai suk�ivisic�n t�f an��
oth�r state or �rftt7 the United Statc:s, incltzdin�;. but nc�t Eimifed t�, arsy bid ar ec�ntraci fcsr �aads c�r
senices t� t�� grovid�d t+� any public entit� or an a�ene} c�r �olitical subt�ivision t�f anka otia�r sta?�
c�r c�f� th� United States anci invoi�rin� antitrust. fraud, il�e€t. briberv, collusic�n. rack�teeri���,
cc�nsgiracy, c�r material misrepresentation.
�_ I und�er�tand tbat `"�t�nvict�d"' or "cc�nvicti�n" as defir�ed i�n Para�raph 287.133� i)(�), Flori��
Statuitis. m�a�ts ��nding of �uiit c�r a cc�n�icti�tl c�f� a public �;ntity crime. �v°ith or withraut an
acijudication of �uili, in any fe,derat c�r state trial co�� of° r�cord relaiin� tc� cl�argc� brou�i�t b��
indictment or infQrmation �fter.tultr !, 1989. a� a re��it �fa j�ry verdict, nc�r� ju� tri�l. €�r entry� of
a ple� �i �uiltv �r nalo contendere.
�_ C under4tand that an "affiliate" �s detinecf it� Para�r�ph 287.133(1 }{a}, Flarida Statut�s, means:
1. A prcdc:cess�r c�r successor af a p�rsc�n cs�nviet�d Qf a pub�ic �ntity crim�: or
?. �n � ntitv� under Ehe cc�ntrol af any �iatural peesc�n u°ho �s ae�ive �n the m�rta��mc nt of� tlic erttit�°
a=.id ��ho has be�r� canvi�ted of � pu�ilic �r�tit�� crirr�e. 7'he term °affiliat�"' in�:lude� thc�se
c�ffiee�rs, directt�r�, ex�cutives� �artn�rs, sharel3ald�rs. �rrz�loyee�, mernbers, and a����ts ���t�t� are
active in the rr�ana�em�nt of an affiliate. Ttze a�vn�rship bv one persc�n of sl��res �ar�stiturin� a
�onTrcrllin� inte�rest in anc�ther pers�n, or a pac�ling of �quipment or incorne amon� pe�c�ns 4vl�e��
nc�t it�r t�ir znark�t valu� under an arm's l�n�th a�rc�ment, sh�ll be a prirr�a f�cie case th�t c�ne
�e-rs<>n cr�ntrals anoth�r persQn. A F±e.nan wl3cr kn€awin�ly ent�rs inio a joint venture with a
pers�an ���ho has been c�nvicted Qf a public �ntitv crim� in �3�rida dur�n� ti�� �receding 3t5 months
�hali t�e �orisidered an affidiat�.
:+. i�incierstand L�a# a"persc��" as defin�d in t'ara�raph �87.133(1)�c), Floricia St�tutes, mean� anv
r�atural persc�n or entity or�,aniz�d ut�dc*r t�e Sa�s c�f arE}� state or of �he Unite� Stat�s wit� th�
le�a! pc�w�r to enter into a binding eontract and �r��h2ch �iids c�r a{aplies tc� bici on ct�rttr�cts tor the
�rt�visior� af gocxls ar seruic�s Iet by a pubiie entit��, c�r which �therw�is� transacts ar appiies tp
transact 6usiness wich a public entiC�. The teran "�erson'" includes t}�os� offcers, directors.
�;xecuti�les, Partners, sharehfftders, �m�l€�y�e�, niembers, and a�ents whc� are activ� in
tnanaQement t�f an entity.
G. E3ased an ini'ormatiar� anci bc[ief, the starement ti��hich I h�ve marked b�la�� is true in r�latio� tc+
zl�te entity ;�t�bmitting this swQm statement. {i�l�ase ir�dicate which st�temer�t appli: s.�
•4
?� '��ither the entity submittin� this swcarn st�te�ner�t, nor a:nv Uf#ic�rs. �irecCOrs, executi�{es.
`'�'� �partners. shareholders, �mpl��ce...�, n1em��ts, c�r a�ents w•t�t� are active �sa mana�em�nt of ti�e
er�tit��. nc�r atty afflliate of thc eniitF� haue �ec,n cf�ar�ed witt�s and convicYed caf a�aubl"rc entitw
h w-irr�e subsequent to July t, 1+�$�I,
'z
�`� ��'� 'I'11e entity submitting this s���orn sta�ztnt;nt. r�r t�n�� �r morc� o� the o�ficers, directors,
eYecutives, gartn�rs. sharehoCdcrs, ernployees, memt�ers, ar a�ents �vhu are active in rnana�e;ment
c�f t11e entitv, oc an affliate af tlt� entity� E1as been cttar��d ���ith ar�d conti�icted �f � putalic entit�
, crime subse:qu�ni tes Ju1y 1, 1989.
�. 4� �C�he tntity submitting tl3is s���arn �tatement, or �ne �ar nzore �f its c�fficers, dir�ctors,
;� cxeeutive�;, partner�. sh�rehold�rs. ernployees. rz��mbers or a�,estts �vnc� are aciivz in the
man��4ment oF the entity, ar an af#iliat� c�t the entiiy h�s be�n char��d with and convicied c�f a
`�'"J pu�lie erttzty crime suasequeizt to Julv 1> 1�89. E�ioti�ever, there has been a subseq���nt praceedin�
befvre a}-learing Ufficer af the State c�f Floricia. Divisiort crf ,�dminifitsatiue Hearings and the
x=anai c�rder �ntered by tt�e hearin� U�ficer determined that it was not in the put�lir Interest t�
place the ���tity subtt�i�tit�,� this sw•arn statement c�n the cc�nvicted vendor list (attach a copy ctf the
fina! orderj.
I�.�°I3ERSTA?�D f("�-tA`I' THE SEJBfvI1SS(C?i�i C�F THtS FORIv� `I��? THE �C?Nfift�CTI�tG (:iFF1��Fi
E�OR TH� F'LI�LIC CNi'[�"Y IDENTIEIED 1N P:�R.AGRAPH 1(i:�NE) AB�VE IS FUR "i"l-{�T PL�BLt�
�NTITY C�?tii,Y' A;VI?. THAT THIS FOR.R�I iS l?ALti� T�IEZC?UGH L7EC�Mf3FR 31 C7F THE
CAL�E:NDAR Y�-AR [N WHICH (T IS FI�,EI�. I AL5�7 LNpCRSTANI� THAT I AM R�Qt�tRED Tfl
INFt��,Vl `I'HE f't,`BLIC ENTITY PRICR TO L�N.I`�Rl�'G S'�lT4 � CC1N'�RA�T I�J CXCESS C.)F Z'H�
i"HRE�Ii(JLD :�tMQtlktlT PROVII?EL? IN SE�'7`tC�N ?8?,t}17 FLCIRII7A STATU'1"�S Ft)R
C,�T�GC)RY` 1"V�'G C3F ANY �HANGE 1?�i T'I�IF Ii��G}RMATl�N Ct:�NTA[?�iEt� tN THIS F(�I2�Vi.
1 � ' ,
z� ��;
s
C'Si�naturej
���=e�rn t� a��� �ul�scri�ed l�efcrre me this ;.z�t� d�y c�f F��rua� ,�C�I*�.
..:�
P�rs�r�all�• kncaw�n
C7R Prvduced [�entificatian
(]'tipc �3f icic€�tificati�tnt
.�t
_m y �i fr
�� �1.+. ' i •� � �C��t.t�`,:. �-c``•—.-,
'vc�t�rv P 3ic - Stat� uf F'lorid�
�rtti� Cc?mmission ex�ires � 2/�?12ci1a
1=orrn PIJR ?{}68(12�v.U6/12if92�
N�rv �,. F'atz3.son
#Prinie�i, t}'pet! �.�r scampea�
Cnrnmi�sioned namc �t�natan puhlii}
MARY A. P�RUISt?N
N(3T�lRY Pl.iBt.lC
STATE +0� FLC3Mt1D�5
, Gomml� EE153�6
Expires 12l17/2[3!5
�
THE AMERICAN [i�STITUTE QF ARCH�TECTS
r• .. ,
� +� � • •
KNOW ALL MEN BY THESE PRESENTS, tha! we
Fla�rida Gas & Electric Cc�rp., P C� Box 28Q, Dade Ci#y, FL 3352fi
as Princip�i, hereinafter called the Principal, and
The Gray Insurance Campany, P O Box 6202, NCetairt�, LA 7�049
a corpar�tion du(� ar�anized under the laws of the Stat� of Louisiana as Surety, hereinafter call�d fhe Surety, are held and
firm(y baund untc�
Gify o# CEearwater {dlbfa Clearw�ter Gas SysEemj, 440 North Myrtle Av�nue, Clearwater F� 33755
as Obligee, t�ereinaFter ca!!ed th� dbligee, in the sum af T�N Percent of the azs►aunt hid
C�t�llars i$ 1fs4,03C�.0�} )
for the payment gf wh�ch surn weli and truly tc� !ae rnade, the said Rrinc�pa! and the said Surety, bind ourselves, Qur heirs.
exeeutors, administrators, suecessc�rs and assigns� Ja�nily and severaily, firmly by tit�se presents.
WHEREAS, ihe Principai has submitted a bid for
Bid No. 10-12, Replacement of Arttiquated �as Mafns, Servtce l.ines, Gas Meters and Piping Gonnectit�ns tt�
Cuszomer House Piping and Re-es#ablishmenf �f Gas Service at Vartous Locat%ons
NUW, fiFicREFQRE, �F the C}bfiges shalf accepk tt�e bid r�f the Principal �nd it�e Principat shail enter into � Ce�ntrac� with the�
(�bt�gee #rr acc�rd�nce with the terms of such bid, �nd giva �ueh hond c�r �bands as rnay be speci�ed in ttre baddin� crr
Cc�ntract Qocumenfs with gaad and sufficienf st�r�ty for the faithful p�rfarmanc� a# such Gontract and fc�r the prornpt paymen#
t�f labor and m�terial furnished ir� tha proseGUtitsn ttter�c�f, or in #he euent af tt�� failure of the Principal to enier suc�i CQntract
and grve such t,and or b4nds, if khe Principal sh�!! pa�r fio the (�bfige� the d2fferenc� not #a exceed the perralty hereof belween
the arr�ount specified In said bid and such larger amaunt fnr which the C1bligee may in goad €aikh cantract with ar�other pa�Ey
to per4orm the Wark covered by said bid, ther� tihis obligation shatt be null and void, otherv�ise ta remain i� fui# forc+a ar�d
effeci.
Signed and seal�d this 77th day of Feb____ rua �rv � 2ti1� .
__�� .� � .
� �.�.:.� l ; . �
______� � ���.k ,�,_�.-
��in�s��
v
, , � �°
�j ' �;N�,€ :.�` ��.
(yti+itnes3)
AiFi ClQCUMENT A�?G - 81C7 �St7N(i - AfA - fE&RURRY i�t(i E6 - TNE AMeRkGkN 1N�7i'iJT64F -
ARCHtTECTS i T351�t. Y kVE. N W WASHfMGTQNk A C 2Q[tf5fi
Ftarld�t Gas 8 Eiectric Car�7.
�tP tiC ai) (Seat)
�, ' � ��
� �
G-2�24�-rS
THi� GRAY t1tiSt�RA?Jt�� CC)4iPAi��` �
fiHE C'.aRr�S' C`.AS(�xrli.�`l` e� SIJRETY �OMPAItiY ;
CE;�`ERAL P4WE,t2 {)F ATTC}RitiEY ' �
I{Nt}t� ,1LL E�`�` THESE F�RESE`�7'I`S, TH�T"i'iie Grav Insurance Gc��np�sn4 and The Ge�y Cas��alt�� & Sr�ret} Com�aan}�. cor�oratinns duty �
nr��nixed anci �xisting i�n�ier 4he l�ws of Lt�uisiana, a��d having their principal oflices in ;4�fetairie, Lauis'ra�na, dcr h�reby m$ke, e�nstitutc, and appc?inc �
Eienjamin i{. �rencE�, D�le W�Idor�; Ken�eth ��agne 4Y�[kcr, Paroela �..larma�. Sheree t�'. Lewis, Ctydc D. itare. ar�d Pau! A. Lt�cttseio of �
Ft. '4Y�Iton �each, E`larida jo�nkt� ar severalty on hchalioFcaeh of the �ampanics r�amed abc�ve its tzvc �nd lawfiil Attc�rney{s�-ia-Fact, to mak�, �
e±te�u[e, scal a�td duli�=er, �'ar and o� its behalf and a.� its deed, bonds, ar aiher tvritir�gs tabligaCOry in the r�atu�e af � band, as surcEy, cor�tracts nf �
�uretyshi� a.� src ae may k�c requircd ar p�rmitteci by la�v, regulation, contract ar othcr�vise, provisfed thet na bond ar undcrtakin� ar eontract of �
suretyship exccute�i und�:r this authQriEy shall excced the amaunti c�i�li�,(?OO,QO{�.
`i'his Pt��er af Attornzg� is �rsnted and is sign�l by facsimilc under end t�y the authcsrit+}• ot'the P�ilo�vin� R�sotutiQns ad�pt�d by �he Baards cr�
t�irectors �f bnth 1�he C�ray lnsur�nce Cam{aerry and Tl�e �`rray Casualty ,3: auret� Compan� at me�tings di►1} c�llesi an� held �n the 2&�'tlay csf.3an�.
2(l{}3.
"ftL501.`�Gi�. that thc President. l:xecutivs; Vice Pr�siden4 anu �'sce k'restdent, os thc Seerctan� �e and eacl� c�r �ny aaf thcrn hereb4� is
authorir_eti t� cxccute �s �ors�er ofAttomey qualif}ing the attcarcae> narrtetl in the git=en F�4ver of.�lttc�mero• ta e�ecutc �an hcttatf crf thC Gamp�n}� bvncl5.
undertakings, an�i all cc�ntraet,t ot�suref}�, anQ that each �r an}� c�f rhem is heretry authc�ri�eci tc� attcst ta tize �xecutican ��t" �uc:h }'+at�er �f Attomey, ar�d
4t� attach tbc seai of thc t:an��ann}', and `st is
Fl,;K"t�HF.R RE:S{�IaVEE). that the signature ofsuch afficers and ihc seal nf th� Ct�mpany may be af��+ed to art;.r such F'�1ver ofAttarnc�� c+r
to gnv c�rtifi��ctc relating iFser��z� by f�csimite, aztd �ny such Poc;�er c�� Atcomey t�r eertifieaie be:arin� su�h facsimile si�natuxe ar fsesimite seat �hali
�ie t�inding ugan the C.�+mF�n}� ncaw and in the future when so affixcd �vitis re�ard tc� �ni� ban�, urdertakin� ar eontraci c�f sUret}, t� uhich it is
att�eh�d.
I;� 4ViTNFS� WHI:RI:C)C, The Ciray Insurance Campanpy an�t The Gra}� Ca�ualty & Suret}° Ccamp�ny have �au�ed �heir c�ffi�ial sc�ls t�t t�e her�into
ut`fixeei. an�f these �resents tca he �igned by i3reir aui:horiz�d ofiicers this Sc�tcmbcr i 2, 241 I. %
.
�UR+�,y l��r' �I��'"����iMiM"'�- � Attest: ��%�������� f sk,�...`^'^ya�q
.'� '".� f� ��,���;s',,,F.�,r, �,n. �r#r�'� +�''s�' �"
�,�`"� � F �.� '"
f �°�' �,i�%/� j y� �
a� 5 E,�L �D Michaei T. GrAy ��� �dark 4. 14angirna �E �i�$,L ,�F"e
g-- :� President,'I`fie Gra�� insur�nce Com��ny Secretaryr, ,ar --��
�`.,,,�».»,.r� �d 't`h� Gr�y� In�urarice C���pany, ' �
# Vice Prrs'rc�ent, 'I`h� Gray Gz�ualtw �C 5ur�t�z Gon�pany
The Gra} ��cuatt}� & Sureiv Cx�mpany
4t�tc c�f l�c�ui43,tn�
ss;
Paris�r �rf T�:#�erson
t�n tt�is Sc�ptern�c.r I2. �(}11, before m�. a l�otary' F'uhlic. persondtly appear�d �1iChael 1'. Gra4. Presicitnt af Thc Grav insttranc� Conlpana° �ad Vice
Presict�nt ofThe C;ray Casualtr° � Surety Campany. and Mark S. :Visnguno, Secretary aPThe Gra}° �nsuranc� Cc�mpun� �rsd'I't�e Gray Casualt}� c�.
�urcty C�rnpanv> �ersc�ns�Ily k�otvn to rne, t�eing dttiy swcsrn, aeicr,awledgecS thttt they s��ned the abs�te E�awer oC Attic�rn�y s�d tiSttxed the se�ts csf the
ct�mpani�s sts �,f�ccrs c�f; an�t aeknawtedged said insfrum�nt to be the vatunfary act �nd daes�. t�f their c�rnpanies.
��'°�r"�
...�...,...� �
����� �� �
_�• �*�
�jti+,,, �aFlHttt f"��.r
'i�f "-....«..�`���g'���
aFpp tov„a
,.,�, .�
t.:�+t'����
Lisa �, �diliar, N�tan f�ubli�, P�rish ai �?rleans
Stata of Louisiana
Mv Commission is fitr Lifc
I. h�t�ri: 5. 11�San�unca, SecretarY t�#" Th� Cray tnsurance Comp�r'i3� and The Cray Cas�Ealty cf€ 4urety Compan}, do h�reb} c�tfify that th� abo�e and
C�rgc�ir�n is �t tr�� ara�l ��rre�:t cc�py t�f � Po�ver��rf Attarne� �[ves� L}� the c4mpani��, �4hich is stili in fiill i`crrce ��nil e#�fec[.
13� Wt'i'h�CsaS \�`Ii�aFti:C�E=,
�� ����� c�
�� __ �
�� s�aL �
��r``,.._....�•'�
.
t have set en}# han�! and �ffixed the s�a1s c�f the C:�mpanies this 1lth ��`, �tt .c �k7���y 2�12
��*,�„�.:t«.+ 8r,,� JG''���1GW�"" �G7�� j��':"- +
Y ��� ��
UR�' -- ��
�., �,
�F �iE�L � �.1ark S. nlangun�, Secret:�ry
°�� t: The Gray insurance C'acnp��z}
��'''�.. ..-�'''`'� Thc Gn�ti� Casi;alty � Surety CGmipaa�y
*
_,.�
AC � � oa,r� ���,rc ' jw
c,�.�...-- CERT�FICA7E C�►F C.IABILITY INSlJRANCE
THIS GERTIFICATE IS ISSUED AS A MATTER QF INFORMA7iQN ONLY AND COWFERS hI0 RtGHTS UPON THE GERTiFICATE HOL[!ER THIS
GERT[FIGAT'E dOES NQT AFFIRMATlVELY t}R NE�ATIVEIY AMEN�� EXTENq OF2 AL1`ER fiHE COVERAOE A�FCiRDE17 8Y T'F{E POt,t�IES
EiEi.4W. 7MiS CERFtFtCATE CJF INSUFtAhIGE 0[3ES NOT CON&'(ITUTE A C�NTRACT BETWEEN THE ISSUING INSCIR�R{S}, AUTEit7R12ED
FtLPR�SENTATiVE OR PRf7DUCEF2, AiYD i'NE CER'ftFlGATE Ht3LDER.
114�PO�TA[�T: If the certifi�cate holder is an At}DtTiOIUA� INS�lRED, [he policy�ies} must he endorsed. Ef SUBROLi/�tT1E3N IS WANfEO, subject to
the ter�ns and canditions af tha policy, certain policies may requi�e an endars�rr�eni, A stafement t�n tifis cert(6cate daes not confer rights to the
certfficat� t�oider in Iieu c�f such endarsement s�
�ooucE� Sandra B�zrdick
xTartixeast Vnderwriters Ina. ����
aHCSr�E (727) 521-4253 � �ax
9i�tis.�: �r+ts, r�o): t-t27t sz1-94ss
�'790 lst Street Narth -r'��� �urdick@neu-ins.com _ ___
xtx�a�sss:
Pusro �� �t}0437t36 __ .__ ._ _ _ ._ __ �
st. Pet�rsbuxq FL 33T�3 _ _ ---
. 9NSURER 5 AFFOttD14G C4VERAGE �r
_.m'-..._.- ( �Ih1I^ .M
INS{iREC+ ��._._. _�..._........ ._ ,.�.��.�.��...�.��
Flarida t3as and Elecstric Corp
PO Hc+x 284
oi
�n�rc�xa'nz's,q�€Z1�1C1�C83L2dZtY Ires Co _._._. �335
Dadc Cit Et+su��t�:
---
F FL 33526-02$0 __...._.
COV6FtAGES +
GERTMFlCATE NtlMBER:12-i3 REViSIC}N NUMBER:
THIS tS T4 CERFiF`P TF�A'F TH� POt.iCIES OF INSURANCE IISTEa BELOW HAi/E B�EN ISSUED TGt T'f-� I�tJREQ NAMECi ABQVE FtJFt THE i'OUGY PEF#lOi3
E#�DiGR7EQ. hK�3tlNfTHS7ANDlf� ANY REQt11REMENt, TEF2M OR COND1i'tOtV t7F ANY CANTRAG7 OR OTHER t70CUMENT WITH RE3F�CT T4 WN1GH 7HiS
CEFtTIFiGiTE M.4Y BE iSSUECF bR MAY PERTAIN, THE INSURAN(:€ AFFOROED BY tHE POt.ICiES EIESCR18Ed HEREIN IS SUB,tECT TO ALl THE 7ERtvES.
EX��U5tON5 ANfl CONOITIONS OF Sl€Ch# P4UCIES. LIM#T5 SHOWN MAY HAVE BEEP! REQl1G�[7 $Y PAID CLA�MS,
ivsa
LtK TYP£ 4F iltSURANCE. � � IICY. EFF FtkJGY EICP '.
PqUCY NUk38ER IiitNDLYYVY � . �_.` _....- !,lNN7$
� LiEh`ERA1 LkJs�lC.f7'Y , � .
; X c�r,vva�ci�� c���rzn�, uAa�urr � � I ��ncw oc�uR��t�ce s 2., C/40, 0!
' "��-F'�U"R€I�i"i'°��
A. � GLAIMSM7� � C7tC�ttR � X }[. 1�Ap40�1542tf0�2 fl%1/2012 � ! PRF3d{�SfEaocwcrencQh ...�_�.. 10Qii�.�
�.__ ._. i f 3 �l3t�ar� i..�..., _,..,.. i
�EN't AGGREGA7E l3MiT AFi�L1ES i'�_
� '�i ! PC}LtCy. PRO- i � Lf�
� AiJTf)NKS$IlE LIABiLITY
� � arrv ,auro
� � t.tL f�Wfd�ED Al?'if}S
w
���HE�ULEL+RUTUS
} � NEREfS A VTr�S
� N�N.C3i+�tN'cD AUiQS
X UMBR£E.LA LIA$ �
�_� ocui�
i , �scc�ss uas 3 ca.,va��
� D'cCN.�CTfBi-�
� � � � �Er�wr�;,ta S 10
� �WQRIfERSCDMRENSA790k �
ANd EMPLQX£ft3' LIA�ILt7Y
kN'Y PRCIFR�ECORtAARTriER1EXECUTYVE
E C7FFIC�RIMERt@�R EXCLI3L�ED?
t t�M�+�gcasv �n NN)
Y/N :
�,NJA
acc2sea2aio
69�A455
� PERS'JhAC 8 ROV tNJLzRY -�
� .�'rENERAi A,C;�REv^AT£ E 6
� F�f2�GUC�I"S ,. Ct3Ah#1C5�P RGG � ;..
�
i
coreei.��:� s�nut�uryur
(Ea accioent} S
1�.lza�� sorn�.v �h.i«s�r �a� aer�sr,l s
8f3QlLY f�F3URY �et a,�i�n€� S
� ?R6PcRTr G`RMAC,E
� ipes accxden!} j �'
� `�
— : U��suredr:2stat�ataunGitt�. d j #
; _� _�__±s
%2012 �1/2J?613
� E L EKCN RC,uIGEMT � i
�./¢oia f�/so�.s ���o�s��•�a�nn��a� a
5,f7
1,flQ0,0
2,QOi1r0
2,AOf?,U
•�a
x,t}tiQ,{�{i
,�� .
♦i� �
_—�.�.
� Ii12dLYt� Ms3��rie 1154 2 6930 2 � �7$/31/2Qii jD8/31/2fl22 ��1 +�fS�AS€. r�Gk+CY tIbA1T S ,� OQO Of
; Reriteci/L+�ased. �c�u.i.� E � � ; ���!�� co.�raQe s:a�xi r�e
4ESGRlPT�JN 4F OPER�T{CNS! tOCAT�}NS t VE'HIC4ES (AtCaCYe AG`4RD i 64. ,§ddYqanal AemaAts SGh�Mnlq. If ro4t! apata b requircd)
Zt is agrc�d the Certificate Holder ia named as Additional Znaured`s with res�pecC ta t�enera2 LiaY�ility and CoumMerciai
Auta Coverage.
FICA
Gi.ty af Glearwates
Attn: City Clerk
PO Box 4748
Cl�arwater, F�. 34�29-��48
wc;��p 25 {2p08tb9J
�n�sa2s ���,
S���� ANY OF THE A64VE DESGRF8E0 Ppt,IGIES BE GANGELLEp g�fipRE
TIfiE EXFlRA71ON dATE THEREOF, NOTfCE WI�L 8E DELIV�RED IN
I�CCORDANEE WI7H THE POLfCY PRQY3StK7fd&_
auY��z� z��P�ese�rnt�vE �
�Ken Kija�.rskif SM8 _-,�'-� ��. � ��,.,',.,,�,.�,�'%
� ��ss-aans aco�n cc���o °°'"
The AGORD name and togp are ragtste►ed marks cf AGOftp �#���. ��I Nghts reserved,
SECTION 00410
CERTIFIED CHECK, CASH OR BID BOND
(Attach certified check, cash or bid bond here)
26
SECTION 00510
AGREEMENT
THIS AGREEMENT made and entered this lst day of April, 2012, by and between the CITY
OF CLEARWATER, FL, a municipal corporation, hereinafter called the "OWNER", and
FLORIDA GAS AND ELECTRIC COPORTATION, hereinafter called the
"CONTRACTOR".
WITNESSETH, That for and in consideration of the payments and agreements to be made and
performed by the Owner, the Contractor, at its own cost and expense and with skill and
diligence, will construct and complete all work shown on the Drawings and described in the
Specifications entitled Replacement of Antiquated Gas Mains, Service Lines, Gas Meters and
Piping Connections to Customer House Piping and Reestablishment of Gas Service at Various
Locations. Bid # 10-12
1. The Contractor shall provide and furnish all labor, materials, necessary tools, expendable
equipment, and all utility and transportation service required to complete the work
provided for in this contract. It is understood and agreed that said labor, materials, tools,
equipment and service shall be furnished and said work performed and completed subject
to the satisfaction of the Owner and subject to the final approval of the Owner and its
authorized representatives. The term of this agreement shall begin April 1, 2012 and
terminates March 31, 2013. Any amendment must be in writing and agreed to both
parties.
2. The Contractor agrees to receive the prices stated in the Proposal attached in full
compensation for furnishing material and labor and executing all the work contemplated
in this Contract; the contract amount shall not exceed $1,640,300.00 based on the
estimated quantities in the Bid 10-12. Owner reserves the right to purchase any amount
up to the estimated quantities based on its needs as determined solely by Owner. Owner
and Contractor agree that there are no minimum requirements for purchase in this
Agreement; the Contractor, for such consideration, shall be responsible for all claims,
causes of action, loss or damages arising out of the nature of the work aforesaid or from
any action of the elements; or from any unforeseen obstruction or difficulties which may
be encountered of every description connected with the work, and furnishing the
materials, until their final completion and acceptance.
3. The work on the site is to be commenced when directed by the Owner or his authorized
representative.
4. To prevent disputes, it is agreed by and between the parties to this Contract that the
Owner or his authorized representative shall in all cases determine the quality and
quantity of the several kinds of work and materials which are to be paid for under this
Contract, and he shall determine questions in relation to lines, levels and dimensions of
27
5.
Q
7
work. The Owner shall determine questions in relation to interpretation of the plans and
specifications.
Payment sha11 be made in accordance with provisions as outlined elsewhere in these
Contract Documents.
The Contract Documents shall consist of the following all of which are familiax to the
Contractor and which are incorporated herein by reference:
2.
3.
4.
5.
6.
Invitation to Bid
Instructions to Bidders
Summary of Information to Bidders
Bid Forms
Agreement Forms
Bonds and Certificates
7. General Conditions
8. Supplementary Conditions
9. Addenda
10. General Requirements
11. Specifications
12. Contract Drawings
This agreement, together with these documents, form the contract, and they are as fully a
part of the Contract as if hereto attached or herein repeated.
� 8. Contractor shall at all times furnish adequate tools, testing supplies, appliances,
equipment, a sufficient number of properly OQ skilled workmen, and a sufficient amount
of materials and supplies of proper quality to efficiently and promptly prosecute the work
provided for herein and sha11 promptly pay for a11 material purchased and shall pay all
workmen each week, and if required by the Owner, shall obtain and fiarnish Owner
weekly with signed receipts from all workmen showing the date of payment, the amount
paid, number of hours paid for, the days on which said work was performed, the
classification of the labor so paid, and the rate of wage per hour paid and shall supply
Owner weekly with two (2) copies of the payroll verified by an affidavit. Contractor
shall, as often as requested by the Owner, furnish a sworn statement showing all parties
who furnished labor or materials to the Contractor, with their names and addresses and
the amount due or to become due each. A like statement may be required from any
subcontractor of the Contractor.
9. Should the Contractor default in any of the provisions of this contract and the Owner
employs an attorney to enforce or construe any provision hereof or to collect damages for
breach of the agreement or to recover on any bonds provided for herein, the Contractor
andlor his surety agree to pay the Oumer such reasonable attorney's fees as the Owner
may expend therein. As against the obligations conta.ined herein, the Contractor and his
surety waive a11 rights of exemption.
10. The undersigned Contractor agrees that he has carefully inspected all contract documents
and is familiar with the same, and agrees that he is responsible for having heretofore
examined the site, the location and route of all proposed work, and for having satisfied
himself as to the character of said route, the location of surface and underground
obstructions and nature thereof, the nature of the ground water table conditions and other
physical characteristics of the work and the work site in order that he may include in the
2a
11.
price which he has bid and the price of this contract a11 costs pertaining to the work, and
the contract price is based upon these inspections and examinations.
This contract shall not be construed for or against any party because that party wrote it.
12. The Contractor and the Owner for themselves, their heirs, executors, administrators,
successors, and assigns, hereby agree to the fizll performance of the covenants herein
contained.
IN WITNESS WHEREOF THEY HAVE EXECUTED THIS AGREEMENT.
(CONTRACTOR SEAL}
„��, _ _ .
�a' ,uae,�d.,q�� � .
a ,.�
z�
'y` �.`'' �
:i " � "{a v�m ..
° aA
,o
T� � m
�:; ,� ,.� a ; �,
.�
�; a
• _..� ti 'y w:
� .:;+' e �< Y
:�
� ° r� �:
3''
Countersigned:
-- ��0� �t /� C� LK1�S
George N. Cretekos
Mayor
APPROVED AS TO
FORM:
����
Laura Mahony
Assistant City Attomey
29
FOR THE CONTRACTOR
f
Y� �
Name: Davi L . yan
Title: vice President
' v\ � t.Jl.�/�� ��
Witness fo the Contractor
CITY OF CLEARWATER, FLORIDA
By' .��C� �
William B. Horne, II
City Manager
ATTEST:
By;�°O�.I�%tC�� (,�. ���..
Rosemary Call
City Clerk
V�
1C�
o �
Q
SECTION 00520
CONTRACTOR'S AFFIDAVIT
STATE OF FLORIDA
COUNTY OF
Before me, the undersigned, a Notary Public, duly commissioned, qualified and acting in and for
said County and State personally appeared
(Individual, Partner, or duly authorized representative of Corporate Contractor) who being duly
sworn according to law deposes and says that all labor, material and outstanding claims and
indebtedness of whatever nature arising out of the performance of the contract of the
(Owner) with
(Contractor) have been paid in full.
(Individual, Partner, or duly authorized representative of Corporate Contractor)
Sworn to and subscribed before me this _ day of , 201_.
Notary Public
SEAL
Commission expires:
30
SECTION 00530
CONTRACTOR'S RELEASE
KNOW ALL MEN BY THESE PRESENTS that
a Contractor in the County of and State of , do hereby
acknowledge that (Contractor) this day has had and received of and
from the City of Clearwater, the sum of One Dollar and other valuable consideration in full
satisfaction and payment of all sums of money owing, payable and belonging to
(Contractor) by any means whatsoever, for on account of a certain agreement between the said
City of Clearwater and
(Contractor) dated.
NOW THEREFORE, the said (Contractor)(for myself, my heirs,
executors and administrators)(for itself, its successors and assigns) do by these presents remise,
release, quitclaim and forever discharge the said City of Clearwater, its successors and assigns,
of and from all claims and demands arising from or in connection with the said agreement dated
, and of and from all, and all manner of action and actions, cause
and causes of action and actions, suits, debts, dues, sums and sums of money, accounts,
reckonings, bonds, bills, specialties, covenants, contracts, agreements, promises, variances,
damages, judgments, extents, executions, claims and demand, whatsoever in law or equity, or
otherwise which against the said City of Clearwater, its successors or assigns, the Contractor, its
heirs, successors and assigns ever had, now have, or which (I, my heirs, executors, or
administrators)(it, its successors and assigns) hereafter can, shall or may have, for, upon or by
reason of any matter cause or thing whatsoever, from the beginning of the world to the date of
these presents.
IN WITNESS WHEREOF,
(Contractor) has caused these
presents to be duly executed the _ day of , 201_
Signed, Sealed and Delivered in the presence of:
ATTEST:
(Secretary)
(SEAL)
(Individual Contractor)
(SEAL)
(Partnership Contractor)
By (SEAL)
(Partner)
(Corporation)
AFFIX CORPORATE SEAL,
if a corporation By
(President or Vice President)
31
SECTION 00540
STATEMENT OF SURETY COMPANY
In accordance with the provisions of the contract dated between the City
of Clearwater, Owner of and (Contractor) of
, the (Surety) surety on the bond of
(Contractor) after a careful examination of the books and records of said Contractor or after
receipt of an affidavit from Contractor, which examination or affidavit satisfies this company
that all claims for labor and materials have been satisfactorily settled, hereby approves of fnal
payment of the said (Contractor), Contractor, and by these
presents witnesseth that payment to the Contractor of the final estimates shall not relieve the
Surety Company of any of its obligations to the by the said Surety
Company's Bond.
IN WITNESSETH WHEREOF, the said Surety Company has hereunto set its hand and seal this
day of , 201_.
ATTEST:
SEAL By.
(President, Vice President)
Note: This statement, if executed by any person other than the President or
Vice President of the Company, must be accompanied by a certificate of even
date showing authority conferred upon the person so signing to execute such
instruments on behalf of the Company represented.
32
SECTION 00610
PERFORMANCE - PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: That we , a
Corporation (Corporation-Partnership-Sole Proprietor, Etc.), hereinafter called "Principal" and
(Surety) of , State of Florida, hereinafter
called the "Surety," are held and firmly bound unto the , hereinafter called
"Owner" in the penal sum of Dollars, in lawful money of the United
States for the payment of which sum will and truly be made, we bind ourselves, our heirs,
executors, administrators, and successors, jointly and severally frmly by these presents.
THE CONDITIONS OF THIS OBLIGATION is such that Whereas, the Principal entered into a
certain contract with the Owner, dated the day of , 201_, a copy of
which is attached hereto and made a part hereof for the construction o£
Reptacement of Antiquated Gas Mains, Service Lines, Gas Meters and Piping Connections
to Customer House Piping and Reestablishment of Gas Service at Various Locations
NOW. THEREFORE, if the Principal shall, truly and faithfully perform its duties, all the
undertakings, covenants, terms, conditions and agreements of said contract during the original
term thereof, and any extensions thereof which may be granted by the Owner, with or without
notice to the Surety, and if he shall satisfy all claims and demands incurred under such contract,
and shall fully indemnify and save harmless the Owner from all costs and damages which it may
suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and
expense which the Owner may incur in making good any default, and shall promptly make
payment to all persons, firms, subcontractors, and corporations furnishing materials for or
performing labor in the prosecution of the work provided for in such contract, and any authorized
extension or modification thereof, including all amounts due for materials, lubricants, oil,
gasoline, repairs on machinery, equipment and tools, consumed or used in connection with the
construction of such work, and all insurance premiums on said work, and for all labor, performed
in such work whether by subcontractor or otherwise, then this obligation shall be void; otherwise
to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for the value received hereby stipulates and agrees
that no change, extension of time, alterations or additions to the terms of the contract or to the
work to be performed hereunder or the specifications accompanying the same shall in anyway
affect its obligation on this bond, and it does hereby waive notice of any such change, extension
of time, alteration or addition to the terms of the contract or to the work or to the specifications.
33
_ _
PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall
abridge the right of any beneficiary hereunder, whose claim may be unsatisiied.
IN WITNESS WHEREOF, the said Principal and Surety have duly executed this instrument
under seal in counterparts, each one of which shall be deemed an original, this the day
of _, 201_.
ATTEST:
(Principal) Secretary
(SEAL)
(Witness as to Principal)
(Address)
(City/State/Zip)
ATTEST:
(Surety)
(SEAL)
(Witness as to Surety)
(Address)
(City/State/Zip)
(Principal)
By
(Address)
(City/State/Zip)
(Surety)
:
(Address)
Note: Date of Bond must not be prior to date of Contract.
34
SECTION 00620
CERTIFICATE OF INSURANCE
(Attach insurance certificates here)
35
SECTION 00700
GENERAL CONDITIONS
00700.01 DEFINITIONS
The Contract Documents consist of the Advertisement for Bids, Instructions to Bidders,
Summary of Information to Bidders, Method of Payment, Proposal (as accepted), Contract,
General Conditions, the Technical Specifications and the Drawings, including all modiiications
and addenda thereof incorparated in the documents before their execution. These form the
Contract.
The Owner as used herein shall refer to and designate a public body or authority, corporation,
association, partnership or individual for whom the work is to be performed, or his or their
authorized representative or agent.
The Contractor is the individual, partnership, corporation or other entity undertaking to do the
work herein specified, or his or their heirs, legal representatives, successors or assigns. When
more than one prime contract is awarded for a single project the general contractor shall be so
designated by the Owner.
The Engineer shall be Clearwater Gas System. The word Engineer shall include the officers,
agents, inspectors and employees of Clearwater Gas System.
A Subcontractor shall be an individual, partnership, corporation or other entity having a direct
contract with the Contractor to furnish material, work to a special design according to the plans
and speciiications of this work, or supplying specialized labor and materials for this work. This
does not include one who merely furnishes material or labor not particular to this project.
Written Notice shall be deemed to have been fully served if delivered in person to the individual,
or to a member of the firm, or to an officer of the corporation, for whom it is intended, ar if
delivered at or sent by registered mail to the last business address known to him who gives
notice.
The term "Work" of the Contractor or the Subcontractor includes labor or materials, or both,
equipment, transportation, or other facilities necessary to complete the contract.
All time limits stated in the Contract Documents are the essence of the Contract.
Whenever the word "approved" is used herein, it shall be held, unless otherwise speciiied, to
mean as approved by the Owner. Similar use will be made of the words "directed," "required,"
"permitted," and words of like import.
36
00700A2 EXTENT OF CONTRACT
The Advertisement for Bids, Instructions to Bidders, Summary of Information to Bidders,
Method of Payment, Proposal (as accepted), Contract, General Conditions, the Technical
Specifications, and the Drawings are, and shall be taken to be, parts of this Contract. All work
and materials mentioned in the specifcations and not shown on the drawings and all work and
materials shown on the drawings and not mentioned in the specifications, and all work and
materials necessary for the completion of the work according to the true intent and meaning of
the contract drawings and specifications, and all work and materials required to complete the
entire facility as described in the Advertisement shall be furnished, performed and done, as if the
same were both mentioned in the specifications and shown on the drawings.
The drawings which accompany the specifications are herein designated contract drawings and
are for the purpose of illustrating the general character and extent of the work and are subject to
such modifications and elaboration's by the Owner and Engineer as may be found necessary or
advisable, either before or during the prosecution of the work, and the Contractor shall conform
to and abide by whatever supplementary drawings and explanations that may be furnished by the
Engineer for the purpose of illustrating the work. The Engineer shall decide as to the true
meaning or intention of any portion of the specifications and drawings where the same may be
found unclear or in conflict.
Should anything be omitted from the contract drawings or specifcations which is necessary for a
clear understanding of the work, or should any error appear either in any of the various
instruments furnished or in the work done by other Contractors affecting the work included
under this contract, the Contractor shall promptly notify the Engineer of such omissions or
errors, and in the event of the Contractor's failure to do so, he shall make good any damage to or
defect in his work caused thereby. He will not be allowed to take advantage of any error or
omission on the contract drawings, as full instructions will be furnished by the Engineer, should
such error or omission be discovered, and the Contractor shall carry out such instructions as if
originally specified.
00700.03 OBLIGATIONS OF CONTRACTOR
The Contractor shall, at his own cost and expense unless otherwise specifed, furnish all the
necessary materials, labor, supervision, superintendent, tools and appliances, and shall construct,
finish, test and purge in a safe, substantial and workmanlike manner the work of this contract
within the time and in the manner specified and in accordance with the contract drawings.
The Contractor shall complete the entire work to the satisfaction and approval of the Owner and
shall accept in consideration of, and as full compensation for the work, the sums set opposite the
respective classes of work and materials named in the Contract and proposals herein contained,
the said sums being the amount at which the Contract therefore was awarded to the Contractor.
Acceptance or approval of the work or materials by the Owner does not relieve the Contractor
from liability for poor or defective workmanship and/or materials and any such acceptance or
37
approval is understood to relate to work or materials which can be observed and does in no way
pertain to latent defects or defects ascertainable through testing.
00700.04 SUBCONTRACTS
The Contractor shall not assign or sublet the whole or any part of the work without the written
consent of the Owner and without the written approval by the Owner of the specific party to
whom it is proposed to assign or sublet the same. No such consent and approval, and no approval
of the form of such assignment or subletting, shall release or relieve the Contractor from any of
the obligations and liabilities assumed by him under this Contract, and, as between the parties
hereto, the Contractor shall remain responsible and liable as if no such assignment or subletting
had been made. Nothing contained in the Contract documents shall create any contractual
relationship between any subcontractor and the Owner. The Contractor shall comply with the
ASME B31Q Code, which meets the requirements of Federal CFR 49 Part 192 Subpart N,
particularly the "Span of Control" ratio which requires the supervision of non-qualified
personnel by OQ certified individuals depending on the performance of the covered task
00700.05 SEPARATE CONTRACTS
The owner reserves the right to let other contracts in connection with this work. The Contractor
shall afford other contractors reasonable opportunity for the introduction and storage of their
materials and the execution of their work, and shall properly connect and coordinate his work
with theirs.
If any part of the Contractor's work depends for proper execution or results upon the work of any
other contractor, the Contractor shall inspect and promptly report to the Owner any defects in
such work that render it unsuitable for such proper execution and results. His failure to so inspect
and report shall constitute an acceptance of the other contractor's work as iit and proper for the
reception of his work except as to defects which may develop in the other contractor's work after
the execution of his work.
To insure the proper execution of his subsequent work, the Contractor shall measure work
already in place and shall at once report to the Owner any discrepancy between the executed
work and the drawings.
Wherever work being done by the Owner's forces or by other contractors is contiguous to work
covered by this Contract, the respective rights of the various interests involved shall be
established by the Owner, to secure the completion of the various portions of the work in general
harmony.
00700.06 BONDS
The bidder to whom the Contract is awarded must, within ten (10) calendar days following
notice of award, present himself to the place designated in the official notice of acceptance, for
38
signing of the Contract and the plans, and to substitute for the bid security, a surety
performance-payment bond in the amount of thirty per centrum (30%) of the Contract price,
conditioned that the Contractor will faithfully perform all work of this contract and promptly pay
for all materials furnished and labor supplied or performed in the prosecution of all work. All
bonds and insurance shall be issued by companies authorized to transact business in the State of
Florida and acceptable to the Owner.
00700.07 ADDITIONAL OR SUBSTITUTE BOND
If at any time the Owner shall be or become dissatisfied with any Surety or Sureties then upon
the Performance, Maintenance, Material and Labor Bond, or if for any reason such Bonds shall
cease to be adequate security to the Owner, the Contractor shall, within five (5) days after notice
from the Owner to do so, substitute an acceptable bond or bonds in such form and sum and
signed by such other Sureties as may be satisfactory to the Owner. The premium on such Bond
or Bonds shall be paid for by the Contractor. No further payments shall be deemed due nor shall
be made until the new Sureties have qualified.
00700.08 INSURANCE
A: General
The Contractor shall not commence work under this contract until he has obtained all insurance
required, as specified on the "Summary of Information to Bidders," submitted certificates for this
insurance, and such insurance has been approved by the Owner; nor shall the Contractor allow
any subcontractor to commence work on his subcontract until all similar insurance required of
the subcontractor has been so obtained and approved. The Owner, however, may accept
insurance covering a subcontractor in character and amounts less than the standard requirements
because of the character or the extent of the work to be performed by such subcontractor, such
acceptance by the Owner must be expressly stated in writing.
B: Worker's Compensation
The Contractor shall take out and maintain during the life of this contract adequate Worker's
Compensation Insurance for all his employees employed at the site of the project and in case any
work is sublet, the Contractor shall require the subcontractor similarly to provide Worker's
Compensation Insurance for the latter's employees, unless such employees are covered by the
protection afforded by the Contractor. Coverage shall include Employer's Liability, Voluntary
Compensation and U.S. Longshoremen's and Harbor Workers Act Coverage where applicable.
The Contractor shall, at all times, indemnify and save harmless the Owner and the Engineer, of
and from all claims for Worker's Compensation which may be made by any of the employees of
the Contractor or by any of the employees of any subcontractor to whom the Contractor may
have let the performance of any part of the work embraced by this Contract and the Contractor
will appear for and defend the Owner and Engineer against any and all such claims.
39
C: Public Liability and Property Damage
Each Contractor shall take out and maintain during the life of the Contract such Public Liability
and Property Damage Insurance as shall protect the Owner, the Engineer, the Contractor, and
any subcontractor performing work covered by this Contract from claims for damages for
personal injury, including wrongful death, as well as from claims for property damages, which
may arise from performance related to this contract, whether such performance be by himself or
by any subcontractor or any person directly or indirectly employed on the project.
D: Fire Insurance
The Contractor shall, from commencement of the Contract and until final acceptance by the
Owner upon completion of the entire contract, maintain insurance on all insurable items of the
work included in the Contract against loss or damage by fire or lightning and those periods
covered by the extended coverage endorsement. This insurance shall be listed in the names of the
Owner; Trustee; Contractor; and his subcontractors as their respective interests may appear, in
such amounts as shall fully protect the interests of the Owner; Trustee; Contractor; or any of his
subcontractors.
The risk of loss or damage to the construction work due to the perils covered by the said fire
policy with extended coverage, as well as any other hazards which might result in damage to the
construction work, is that of the Contractor and Surety, and no claims for extra money by the
Contractor for such loss or damage shall be recognized by the Owner nor will such loss or
damage excuse the complete and satisfactory performance of the Contract by the Contractor.
E: Special Hazards
Special hazards, if there is a possibility of such hazards existing in the work contemplated, shall
be covered by rider or riders to the policy or policies. Specific customer appliance or system
damage or two such possible hazards are blasting and environmental damage.
00700.09 PROOF OF INSURANCE
Contractor shall, prior to executing the Contract, deliver to the Owner, proper evidence of
carriage of the insurance required by this Contract. Certificates will be acceptable proof of
public liability, property damage and Worker's Compensation Insurance. An original policy of
fire insurance must be submitted to the Owner as soon as an insurable interest exists.
00700.10 ACCIDENTS AND CLAIMS
The Contractor shall be held responsible for all accidents and shall indemnify and protect the
Owner and Engineer from all suits, claims and actions brought against it, and all cost for liability
to which the Owner or Engineer may be put for any injury or alleged injury to the person or
40
property of another resulting from negligence or carelessness in the performance of the work, or
in protection of the project site, or from any improper or inferior workmanship, or from inferior
materials used in the work.
00700.11 MUTUAL RESPONSIBILITY OF CONTRACTORS
Should a Contractor in the performance of his Contract cause damage to any person, any
property, or work of another Contractor working on this project, he shall, upon due notice to do
so from the Owner or other party to the damage, arrange for an amicable settlement thereon. It is
agreed by all parties herein that such disputes shall not delay completion of the work, nor be
cause for claim against the Owner or Engineer. Work shall be continued by the party claiming
damages at his expense, subject to such damages as may be obtained by due course of law.
00700.12 CONTRACTOR'S LIABILITY
The status of the Contractor in the work to be performed by him under this Contract is that of an
independent Contractor and that as such he shall properly safeguard against any and all injury or
damage to any person, to public and private property, materials and things; and that, as such, he
alone shall be responsible for any and all damage, loss or injury to persons or property that may
rise, or be incurred, in or during the conduct or progress of said work without regard to whether
or not the Contractor, his subcontractors, agents, or employees have been negligent; and that
Contractor shall keep the Owner and Engineer free from, and shall discharge any and all
responsibility and therefore of any sort or kind. The Contractor shall assume all responsibility for
risks or casualties of every description, for any or all damage, loss or injury to persons or
property arising out of the nature of the work, from the action of the elements, or from any
unforeseen or unusual difficulty, the Contractor shall assume and be liable for all blame and loss
of whatsoever nature by reason of neglect or violation of any federal, state, county, or local laws,
regulations or ordinances; that Contractor shall indemnify and save harmless the Owner and
Engineer all their officers, agents, and employees, from all suits or actions at law of any kind
whatsoever in connection with this work and shall, if required by the Owner, produce evidence
of settlement of any such action before final payment shall be made by the Owner. Contractor
acknowledges receipt of one dollar as full and specific consideration for this indemnity
agreement.
00700.13 FAMILIARITY WITH CONTRACT REQUIREMENT
It is the responsibility of, and it is hereby agreed that, the Contractor has, prior to signing of the
Contract, satisfied himself as the nature and location of the work, the conformation of the
ground, the character, quality, and the quantity of the materials which will be required, the
character of equipment and facilities needed preliminary to and during the prosecution of the
work, the general and local conditions, and of all other matters which can in any way affect the
scope of the work under this Contract. Information concerning the general condition of the
project site existing at the time of bidding is presented in the plans and specifications solely for
41
information and convenience in describing the work to be accomplished and the use by the
Contractor of such information cannot in any way relieve the Contractor of his responsibilities as
outlined herein for determining the actual conditions existing at the site and for basing his bid
price upon such conditions. No verbal agreement or conversation with any officer, agent,
employee of the Owner, or the Engineer, either before or after the execution of this Contract,
shall affect or modify any of the terms or obligations herein contained. Failure to comply with
any or all of the requirements will not relieve Contractor from the responsibility of properly
estimating the difficulty or costs of successful completion of the work nor from the responsibility
for the faithful performance of the provisions of this Contract.
00700.14 PATENT RIGHTS
The Contractor shall obtain all necessary consents and shall pay all royalties, licenses, and fees
for the use of any patented invention, articles, composition or process in the work done or the
materials furnished, or any part thereof embraced in this Contract. The Contractor shall be
responsible for any claims made against the Owner, its agents and employees for any actual or
alleged infringement of patents by the use of any patented articles, appliances, etc., in the
construction and completion of the work, and shall save harmless and indemnify the Owner, its
agents and employees from all costs, expenses, and damages, including attorney's fees which the
Owner may be obliged to pay by reason of any actual or alleged infringements of patents used in
the construction and completion of the work herein specified.
00700.15 PERMITS AND LICENSES
Permits and licenses of a temporary nature necessary for the prosecution of the work shall be
secured and paid for by the Contractor unless otherwise specified. Permits, licenses and
easements for CGS gas mains and services classified as CGS permanent structures or permanent
changes in existing facilities will be secured and paid for by the Owner, unless otherwise
speciiied. Contractor will also be responsible for obtaining gas permits related to house piping
connections to gas meter if required, and maintenance of appropriate trade licenses to perform
the specifc scope of work described in this contract, including consumer's underground house
piping and gas meter relocation piping and connections. They also will be noted as contractor of
record on the applicable permits.
The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations
bearing on the conduct of the work as drawn and specified. If the Contractor observes that the
drawings and specifications are at variance therewith, he shall promptly notify the Engineer in
writing, and any necessary changes shall be adjusted as provided in the contract for changes in
the work. If the Contractor performs any work knowing it to be contrary to such laws,
ordinances, rules and regulations, and without such notice to the Engineer, he shall bear all costs
arising there from.
42
00700.16 LAWS AND REGULATIONS
The Contractor at all times shall observe and comply with all Federal, State, Local, and/or
Municipal laws, ordinances, rules, and regulations in any manner and those which may be
enacted later, or bodies or tribunals having jurisdiction or authority over the work and shall
indemnify and save harmless the Owner against any claim or liability arising from, or based on,
the violation of any such law, ordinance, rule, regulation, order, or decree.
The bidder is assumed to have made himself familiar with all Federal, State, Local, and
Municipal laws, ordinances, rules, and regulations which in any manner affect those engaged or
employed in the work, or the materials or equipment used in or upon the work, or in any way
affect the work and no plea of misunderstanding will be considered an excuse for the ignorance
thereof. The Contractor shall be licensed in the required discipline of installing gas mains,
services and underground customer piping systems.
00700.17 DIMENSIONS AND ELEVATIONS
Figured dimensions on drawings shall take precedence over the measurements by scale, and
detailed working drawings are to take precedence over general drawings and shall be considered
as explanatory of them. In case of conflict between dimensions or scales the Engineer shall make
all necessary final clarifications.
00700.18 PLANS, SPECIFICATIONS AND SHOP DRAWINGS
The specifications are intended to supplement and clarify the plans. Work is sometimes called
for in the specifications that is not shown completely on the plans; and the plans sometimes
indicate work that is not mentioned in the specifications. Both plans and specifications must be
complied with completely in order to fulfill the Contract requirements; and whether or not the
work is specifically defined in any bid item, any work called for by either is as binding as if it
were called for by both. The construction drawings, as prepared prior to receiving bids, are
intended to describe the general scope of the work and to form the basis of comparable bids and
may be supplemented after award of the contract with manufacturer's shop drawings, detailed
working drawings and other detailed data necessary to thoroughly describe the requirements of
the finished facility. In no case, however, will such supplemental information form the basis of
claims by the Contractor for increased compensation and in no case will the required work
described by the supplemental information be considered as extra work. In case of conflict
between plans and specifications, the Engineer shall be the sole judge of which shall prevail. The
Engineer shall make all necessary explanations as to the true meaning and intent of the plans and
specifications. Any errors or omissions in the plans and specifications may be corrected by the
Engineer when such corrections are necessary for the proper completion of the work.
The Contractor shall sign and stamp approved all shop or setting drawings for items of
equipment on which he has bid and proposes to install, to verify field dimensions, design criteria,
and materials. After the Contractor has signed and approved the shop drawings, they shall be
43
promptly submitted to the Owner in quadruplicate for review for conformance with the design
concepts of the project. The Contractor shall call Owner's attention to any deviation in the shop
drawings or submittals from the requirements of the plans and speciiications. No deviation from
the plans and specifications shall be approved without a written Change Order. Changes or
corrections may be noted by the Owner and one copy will be returned to the Contractor. The
Contractor shall make any corrections required by the Owner and shall return the required
number of corrected copies of shop drawings until no exception is taken. The Contractor shall
direct specific attention in writing to revisions on resubmitted shop drawings other than the
corrections called for by the Owner on previous submissions. Contractor's stamp of approval on
any shop drawings shall constitute a representation to the Owner that the Contractor has either
verified all quantities, dimensions, field construction criteria, materials, catalog numbers, and
similar data or he assumes full responsibility for doing so and that he has reviewed or
coordinated each shop drawing with the requirements of the work and the Contract documents.
The shop drawings in no way become a part of the Contract documents but are furnished for
informational purposes only. Regardless of corrections made in, review or approval given to
such drawings by the Engineer, the Contractor shall be responsible for the accuracy of such
drawings and for their conformity to the Contract plans and specifications.
00700.19 DRAWINGS AND SPECIFICATIONS FURNISHED TO CONTRACTORS
The successful General Contractor shall be entitled to receive from the Owner six (6) free sets of
Contract drawings and specifications.
00700.20 WORKING SCHEDULES AND PROGRESS CHARTS
The Contractor shall prepare and submit to the Owner for approval prior to initiating
construction activities a working schedule showing the locations and the order in which the
Contractor proposes to undertake the construction. A schedule will include anticipated starting
and completion dates for the various sections and items included in this Contract and will also
indicate scheduled delivery date for all mechanical equipment. All work provided to the
contractor, including service lines shall be scheduled within a 72 hour turn around; emergency
work will have an immediate response. FDOT, County and Municipal permit utilization right of
way and road crossing permit installations shall be prioritized to recover from the delay
associated with obtaining the permit.
Accompanying this schedule shall be a chart sufficiently large to be suitable for recording the
progress of the work. The Contractor will be required to indicate actual progress on this chart
and printed copies shall be made available at the end of each month. These progress charts will
be used in preparing the monthly estimates to the Owner. The contractor shall furnish an
electronic copy of the daily work schedule in advance of the work being done preferably prior to
the beginning of the work day. Copies include Construction Inspection, Gas Sales and Senior
Account.
44
00700.21 SUPERVISION AND RESPONSIBILITY OF THE CONTRACTOR
The Contractor shall give the wark the constant attention necessary to facilitate the progress
thereof and shall cooperate with the Owner and with other contractors in every way possible. The
Contractor shall at all times have an OQ competent superintendent, capable of reading and
thoroughly understanding the drawings and specifications, as his agent on the work, who shall,
as the Contractor's agent, supervise, direct and otherwise conduct the work. Such superintendent
shall be furnished irrespective of the amount of work sublet.
The Contractor shall be solely and wholly responsible for delivering the completed work in a
good, safe and workmanlike condition and for the good condition of the work and materials until
fnal acceptance and his formal release from his obligations. He shall bear all losses resulting on
account of the weather, fire, the elements, or other causes of every kind or nature.
The Contractor shall indemnify and hold harmless (to a limit of $10,000,000) the Owner and the
Engineer and their agents and employees from and against all claims, damages, losses and
expenses, including attorneys' fees arising out of or resulting from the performance of the work,
provided that any such claim, damage, loss or expenses is:
(a) attributable to bodily injury, sickness, disease or death, or to injury to or destruction of
� tangible property (other than the work itsel�, including the loss of use resulting there
from and,
(b) is caused in whole or in part by any negligent act or omission of the Contractor, any
Subcontractor, anyone directly or indirectly employed by any of them or anyone for
whose acts any of them may be liable, regardless of whether or not it is caused in part by
a party indemnified hereunder.
In any and all claims against the Owner or the Engineer or any of their agents or employees by
any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may be liable, the indemnification obligation
shall not be limited in any way by any limitation on the amount or type of damages,
compensation or benefts payable by or for the Contractor or any Subcontractor under Worker's
Compensation Acts, Disability Benefits Acts or other employee benefit acts.
The Contractor shall be held responsible for any violation of laws or ordinances affecting in any
way the conduct of all persons engaged, or the materials or methods used by him, on the work.
The Contractor shall provide and maintain at his own expense, in a sanitary condition, such
accommodations for the use of his employees as are necessary to comply with the requirements
and regulations of the State Department of Health & Rehabilitative Services or the County
Health Department. He shall commit no public nuisance. Sanitary facilities shall be at least
500-feet from the nearest water well. Privies shall have incorporated therein metal containers
which shall be tightly closed and all waste shall be transported away from the site of the work
and disposed of properly.
45
Any instructions, directions, or orders from the Owner shall be given to the Contractor through
his authorized representative. The Owner, except in the absence of the representative, has no
authority to give directions, orders or instructions directly to the Contractor.
00700.22 SERVING NOTICE
Any notice to be given the Contractor under this contract shall be deemed to be served if the
same be delivered to the person in charge of any office used by the Contractor or his
superintendent or agent at or near the work, or deposited in a post office, postpaid, addressed to
the Contractor at his place of business as set forth in this contract.
00700.23 AUTHORITY OF ENGINEER
The supervision of the execution of this contract is vested wholly in the Contractor. In the event
the Owner has engaged the Engineer to represent him during the construction phase the order,
instructions, directions, or requests of the Owner are to be given through the Engineer. The
Engineer shall transmit them promptly to the Contractor as coming from the Owner and
originating in the Owner. The Contractor shall designate a representative to receive such
instructions, directions or requests in his absence, and failing to do so, will be held responsible
for the execution of them.
The Owner shall have the sole authority to suspend the work wholly or in part for such period or
periods as may be deemed necessary due to failure on the part of the Contractor to carry out
orders given to perform any or all provisions of the contract. The Contractor shall not suspend
the work and shall not remove any equipment, tools, lumber or other materials without the
written permission of the Owner. The Engineer has no responsibility regarding the Contractor's
safe prosecution of the work or his compliance with any applicable safety codes or regulations.
00700.24 OBSERVATION OF THE WORK
The Owner or his authorized representative-CGS inspector shall have free access to the materials
and the work at all times for measuring or observing the same, and the Contractor shall afford
him all necessary facilities and assistance for so doing. The contractor shall furnish to CGS a
daily work schedule and list of completed jobs. The notification shall be sent before the start of
the work day and a distribution list shall be provided with necessary updates. After written
authorization to proceed with the work and the Engineer has been engaged to act as the Owners
representative, the Engineer shall:
A. Make visits to the site at intervals appropriate to the various stages of construction to
observe the progress and quality of the executed work and to determine in general if the
work is proceeding in accordance with the Contract Documents; he will not be required
to make exhaustive or continuous on-site observations to check the quality or quantity of
,,
the work, he will not be responsible for the construction means, methods, procedures,
techniques and sequences of construction and he will not be responsible for the
Contractor's failure to perform the construction work in accordance with the Contract
Documents; he will not be responsible for safety precautions and procedures in
connection with the work; and during such visits and on the basis of his on-site
observations as an experienced and qualified design professional he will keep the Owner
informed of the progress of the work, will endeavor to guard the Owner against defects
and deficiencies in the work of Contractors and may disapprove work as failing to
conform to the Contract Documents.
B. Review samples, catalog data, schedules, shop drawings, laboratory, shop and mill tests
of materials and eyuipment and other data which the Contractor is required to submit,
only for conformance with the design concept of the project and compliance with the
information given by the Contract Documents, and assemble written guarantees which
are required by the Contract Documents. Review of shop drawings by Engineer shall not
relieve Contractor from his responsibility to perform his work in accordance with the
plans and specifcations.
C. Consult with and advise the Owner, act as the Owner's representative at the project site,
issue all instructions of the Owner to the Contractor and prepare routine Change Orders
as required.
D. Based on his on-site observations as an experienced and qualifed design professional and
on his review of the Contractor's applications for payment, determine the amount owing
to the Contractor and approve in writing payment to the Contractors in such amounts;
such approvals of payment to constitute a representation to the Owner, based on such
observations and review of the data comprising such applications, that the work has
progressed to the point indicated and that, to the best of his knowledge, information and
belief, the quality of the work is in accordance with the Contract Documents, subject to
the results of any subsequent test called for in the Contract Documents and any
qualifications stated in his approval. Such partial and final payments will be as specifed
elsewhere herein except as modified in this paragraph.
E. Conduct, in company with the Owner, a final site visit of the project for general
conformance with the design concept of the project and general compliance with the
information given by the Contract Documents, and recommend in writing final payment
to the Contractor.
00700.25 EXAMINATION OF THE WORK
The authority and duties of the resident project representatives when provided and authorized as
employees of the Engineer and when the employment thereof is authorized and paid by the
Owner, are limited to examining the material furnished, observing the work done and reporting
their findings to the Engineer. The Engineer does not underwrite, guarantee or insure the work
done by the Contractor. It is the Contractor's responsibility to perform the work in all details in
47
accordance with the Contract Documents, and the Engineer shall never be responsible or liable to
either the Owner or the Contractor or any other party by reason of the Contractor's failure to do
so. Failure by the Engineer or by any project representative or other representative of the Owner
engaged in on-the-site observation to discover defects or deficiencies in the work of the
Contractor shall never, under any circumstances, relieve the Contractor from his responsibility
therefore to the Owner, or subject the Engineer to any liability to the Owner, the Contractor, or
any other party for any such defect or deficiency.
Project representatives shall have no authority to permit deviation from or to modify any of the
provisions of the Drawings or Speciiications without the written permission or instruction of the
Engineer, or to delay the Contractor by failure to observe the materials and work with reasonable
promptness.
The Engineer, his representatives, employees, or any resident project representative in the
employment of the Engineer will not have authority to supervise, direct, expedite or otherwise
control and instruct or order the Contractor or his employees in the fulfillment of the Contractor's
obligation. The Owner's instructions, orders, directions and/or orders to the Contractor shall be
given only through the Engineer, or his employees. The Engineer may only advise the Contractor
when it appears to the Engineer that the work and/or materials do not conform to the
requirements of the Contract Documents, including the Drawings and Specifications.
The payment of any compensation, irrespective of its character or form, or the giving of any
gratuity, or the granting or any valuable favor, directly or indirectly, by the Contractor to any
project representative, is strictly prohibited, and any such act on the part of the Contractor will
constitute a violation of the contract.
If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority
having jurisdiction require any work to speciiically be inspected, tested, or approved by someone
other than the Contractor, the Contractor will give the Engineer timely notice of readiness
therefore. The Contractor will furnish the Engineer the required certificates of inspection, testing
or approval. All such tests will be in accordance with the methods prescribed by the American
Society for Testing and Materials, or such other applicable organization as may be required by
law or the Contract Documents. If any such work required so to be inspected, tested or approved
is covered without written approval of the Engineer, it must, if requested by the Engineer, be
uncovered for observation at the Contractor's expense. The cost of all such inspections, tests and
approvals shall be borne by the Contractor unless otherwise provided.
00700.26 PROTECTION OF WORK AND PROPERTY
The Contractor shall continuously maintain adequate protection of all his work from damage and
shall protect the Owner's property from injury or loss arising in connection with this Contract.
He shall make good any such damage, injury, or loss, except such as maybe directly due to errors
in the Contract Documents, or caused by agents or employees of the Owner. He shall adequately
protect adjacent property as provided by law and the Contract Documents. He shall provide and
48
maintain all passage ways, guard fences, lights, and other facilities for protection required by
public authority or local conditions.
From the start of the work until the completion and acceptance of the work, the Contractor shall
be solely responsible for the work covered by this contract and for the materials delivered at the
site intended to be used in the work and all injury or damage done to the same from whatever
cause as well as any damage done by him, his agents, employees and for subcontractors in the
performance of the work, shall be made good by him at his own expense before the final
payment is made. The Contractor shall be responsible for the preservation of all trees along and
adjacent to the work and shall use every precaution necessary to prevent damage or injury
thereto. The Contractor shall not willfully or maliciously injure or destroy trees or shrubs, and he
shall not remove or cut them without proper authorization from the Owner. Any limbs or
branches of trees broken during such operations, shall be trimmed with a clean cut and painted
with an approved tree healing compound. The Contractor will be liable for all damages or at the
option of the Owner may be required to replace or restore at his own expense, all vegetation not
protected and preserved that may be destroyed or damaged.
The Contractor shall provide suitable means of protection for all materials intended to be used in
the work and for all work in progress, as well as for completed work.
The Contractor shall furnish all the necessary equipment, shall take all necessary precautions and
shall assume the entire cost of handling any sewage, seepage, storm, surface and flood flows
which may be encountered at any time during the construction of the work. The manner
providing for these occurrences shall meet with the approval of the Owner, and the entire cost of
said work shall be considered as having been included in the unit prices submitted for the several
items of the work to be done under this contract.
00700.27 USE OF COMPLETED PORTIONS
The Owner shall have the right to take possession of and use any completed or partially
completed portions of the work, notwithstanding that the time for completing the entire work or
such portions may not have expired but such taking possession and use shall not be deemed an
acceptance of any work not completed in accordance with the Contract Documents. If such prior
use increases the cost of or delays the work, the Contractor shall be entitled to such extra
compensation, or extension of time, or both, as the Owner may determine.
00700.28 THE OWNER'S RIGHT TO DO WORK
If the Contractor should neglect to prosecute the work properly or fail to perform any provision
of this contract, the Owner, after three days' written notice to the Contractor may, without
prejudice to any other remedy he may have, make good such deficiencies and may deduct the
cost thereof from the payment then or thereafter due the Contractor.
49
_
00700.29 ALTERATION OF PLANS
The Engineer reserves the right to make such alterations in the plans or in the character of the
work as may be considered necessary or desirable from time to time to complete fully the
construction of the work, provided such alterations do not change materially the original plans
and specifications, and such alterations shall not be considered as a waiver of any condition of
the contract nor to invalidate any of the provisions thereof.
No alterations in the plans or in the character of the work shall be made without the previous
written approval of the Engineer and/or Inspector.
00700.30 UNAUTHORIZED WORK
Work done without lines and grades being given, and gas pipe installed shallow or contrary to
code requirements, and work done beyond the lines and grades shown on the plans or as given,
except as herein provided, or any extra work done without written authority, will be considered
as unauthorized and at the expense of the Contractor and will not be accepted or paid for by the
Owner. The Owner may order that work so done be removed and replaced at the Contractor's
expense.
00700.31 CLAIMS FOR EXTRA COST
If the Contractor claims that any instructions by drawings or otherwise involves extra cost under
this contract, he shall give the Owner written notice thereof within a reasonable time after the
receipt of such instructions, and in any event before proceeding to execute the work, except in
emergency endangering life or property, and the procedure shall then be as provided for changes
in the work. No such claim shall be valid unless so made.
00700.32 CHANGES IN THE WORK
If for any reason it be deemed necessary in the opinion of the Owner to make any variations in
the scope or nature of the work, which variations increase or decrease the quantities of the work
speciiied, or change the location to an extent not unreasonably affecting the conditions of the
work, and further interpreted by the Owner as involving no classes of work other than those
called for by this contract, the Contractor shall, upon written order from the Owner to that effect,
make such variations. If such variations diminish the quantity of the work to be done, no claim
for damages or for anticipated profits on the work that may be dispensed with shall there by
accrue to the Contractor, and the value of the work dispensed with will not be included in any
payments made to the Contractor. If such variations increase the amount of the work, the value
of such increase shall be determined and fixed by the Owner in accordance with the quantity of
such work actually done, and at the unit prices stipulated in the contract.
�
All major changes will be issued in a standard form which will contain a description of the work
involved in the change, a reference to the proper construction drawings or revised drawings and
will not be effective until signed by the Owner and Contractor.
Such alterations or changes as are mentioned in this section shall not vitiate or annul the
obligations of the contract or the agreement for the work.
Should, in the opinion of the Owner, any contemplated change in the quantities of the work, or
alterations thereof, materially affect the character of the work, or any part thereof, or materially
affect the compensation for the same, then the work shall be classed as extra work.
00700.33 EXTRA WORK/INCREASED COMPENSATION
The Owner may at any time, by a written order, without notice to the Sureties, and without
invalidating the contract, require the performance of such extra work or substantial changes in
the work as it may iind necessary or desirable. The amount of compensation to be paid to the
Contractor for any extra work, as ordered, shall be determined as follows:
(a) By unit prices named in contract and subsequently agreed upon.
(b) By a lump sum mutually agreed upon by the Owner and the Contractor; or
(c) If no such unit prices are set forth and if the parties cannot agree upon a lump sum, then
by the actual net cost in money to the Contractor of the wages of applied labor (including
premiums for Worker's Compensation Insurance, and Social Security taxes); plus twenty
per centum (20%) as compensation for all items of profit, administration, overhead,
superintendence, insurance other than Worker's Compensation Insurance, materials used
in temporary structures, allowances made by the Contractor to subcontractors, additional
premiums upon the performance bond of the Contractor and the use of small tools; plus
the net cost to the Contractor for the materials required in the extra work; plus the cost of
rental for plant equipment (other than small tools) required and approved for the extra
work.
00700.34 SUSPENSION OF WORK
The Owner shall have the right to suspend the whole or any part of the work, when, in the
opinion of the Owner, the Contractor is not doing the work in accordance with the provisions of
the contract and specifications.
If, in the judgment of the representatives of the Owner, the Contractor is taking undue risk of
damage to any part of the construction by proceeding with the work during unfavorable weather
or other conditions, then the Owner shall immediately verbally notify the Contractor or his
representatives on the site confirming the same in writing. The Owner may thereupon suspend
the work temporarily, either wholly or in part for such periods as may be necessary on account of
51
conditions unfavorable for the safe and proper prosecution of the work. In case of such
suspension, a proper extension of time may be required by the Contractor but, regardless whether
it is granted or not, no allowance will be made of the Contractor for any expense resulting there
from. The Owner shall not be liable to the Contractor in any manner for any expenses, damages,
loss of profits, anticipated or otherwise, or any other charges whatsoever arising out of a
suspension in the work of either this Contractor or any Contractor engaged on this project. It
shall be clearly understood that the failure of the Owner to so advise shall not relieve the
Contractor of his responsibility for compliance with the conditions of the contract.
Should the Contractor fail to comply with any orders of the Owner relative to any particular parts
of the work, the Owner shall have the right to suspend the work on any or all parts until its orders
respecting the particular parts are complied with. In case of such suspension, which shall be
considered due to the fault of the Contractor, no extension of time shall be given and no
allowance will be made for the expense of the Contractor on account of idle equipment or forces
during the terms of such suspension.
00700.35 DEFECTIVE WORK OR MATERIALS
If at any time any materials or workmanship should be discovered which do not comply with the
plans, specifications and contract drawings, such defective work and/or material shall
immediately be removed or corrected by the Contractor when notified to do so by the Owner,
and such defects shall be replaced or corrected at the Contractor's expense. Any work or
materials condemned by the Owner as unsuitable or improperly done shall be removed and
repaired or otherwise remedied, as the Owner may require. Any defective work regulated by an
established OQ covered task shall require the individual, responsible for such failure, to be OQ
recertified prior to performing such covered task.
If the Contractor shall neglect or refuse to remove or replace defective wark or materials within
seven (7) days from the date of the notice from the Owner to do so, then the Owner may remove
or cause the same to be removed and satisfactorily replaced by contract or otherwise, as they
may deem expedient, and they may and are empowered, to charge the expense thereof to the
Contractor. The expense so charged will be deducted and paid by the Owner out of such monies
as are or may become due under this agreement, or if such monies are not sufficient to meet said
expense, the additional monies shall be furnished by the Contractor, and if he refuses or neglects
to provide the necessary monies they shall be provided by his Surety.
00700.36 ABANDONMENT OF WORK
Should the Contractor abandon, or in any manner fail to complete the work, the Owner is hereby
authorized and empowered to pay any workmen who may have been employed by the
Contractor, for work done, and to pay any claims against the Contractor for material furnished,
out of any funds that would otherwise be due or become due the Contractor under this Contract,
and in every such case the Owner is hereby authorized and empowered to ascertain the amount
or amounts so due or owning to the workmen, or for materials so furnished; and the amount or
52
amounts so found to be due and payable, shall be final and conclusive against the Contractor, and
may thereafter be paid by the Owner to said labor, or to liquidated claims for materials furnished;
and any partial or final payment may be withheld from the Contractor until all such claims for
labor or material on his Contract have been satisfied.
00700.37 FORFEITURE OF CONTRACT
The Owner, at any time during the continuance of the contract for the work herein provided for,
and prior to the date of acceptance of the work as hereinafter provided, shall have the right and
power to declare the whole or any part of the same forfeited for the violation of any of the
conditions, terms, requirements, or limitations herein contained, or if the performance of the
Contract is unnecessarily or unreasonable delayed, or if the Contractor is not progressing with
the work as fast as is necessary to insure its completion within the time specified and as required
by his Contract, or if the Contractor is showing bad faith in carrying out the Contract, or if the
work not be fully completed within the fixed time in this Contract for its completion, or within
the time to which such completion may be extended as hereinafter provided, or further, if the
Contractor shall fail to or refuse to remedy or repair defective work or materials when so ordered
as herein provided. If the Owner shall declare the said contract forfeited, in whole or in any
particular, such declaration of forfeiture shall in no way relieve or affect the liability of the
Contractor and his Sureties for breach of any of the covenants and conditions of said Contract.
00700.38 THE OWNER'S RIGHT TO TERMINATE CONTRACT
If the Contractor should be adjudged a bankrupt, or if he should make a general assignment for
the beneft of his creditors, or if a receiver should be appointed on account of his insolvency, or
if he should persistently or repeatedly refuse or should fail to supply enough properly skilled
workmen or proper materials, or if he should fail to make prompt payment to subcontractors for
material or labor, or persistently disregard laws, ordinances or the instructions of the Owner, or
otherwise be guilty of a substantial violation of any provision of the Contract, then the Owner,
upon determining that sufficient cause exists to justify such action, may, without prejudice to any
other right or remedy and after giving the Contractor seven (7) days' written notice, terminate the
employment of the Contractor and take possession of the premises and of all materials, tools and
appliances thereon and finish the work by whatever method he may deem expedient. In such case
the Contractor shall not be entitled to receive any further payment until the work is fnished. If
the unpaid balance of the Contract price shall exceed the expense of finishing the work,
including compensation for additional managerial and administrative services, such excess shall
be paid to the Contractor. If such expense shall exceed such unpaid balance, the Contractor or his
Sureties shall pay the difference to the Owner. The expense incurred by the Owner as herein
provided, and the damage incurred through the Contractor's default, shall be certified by the
Engineer.
53
00700.39 CONTRACTOR'S RIGHT TO STOP WORK OR TERMINATE CONTRACT
If the work should be stopped under an order of any court, or other public authority, for a period
of three (3) months, through no act or fault of the Contractor or of anyone employed by him, or if
the Owner fails to make timely payments for completed work, then the Contractor may, upon
seven (7) days' written notice to the Owner, stop work or terminate this Contract and recover
from the Owner payment for all work executed and any loss sustained upon any plant or
materials and reasonable profit and damages.
00700.40 NO WAIVER OF CONTRACT
Neither an extension of time, for any reason, beyond the date iixed herein for the completion of
the Contract, nor the delivery and acceptance of any articles or materials, nor any payment for,
nor acceptance of the whole or any part of the work by the Owner, nor any possession taken by
the Owner or its employees or agents, shall be deemed to be a waiver by the Owner of the right
to abrogate this Contract for abandonment or delay or non- performance in the manner herein
provided, nor shall it operate to void or annul any of the terms of this Contract.
00700.41 NO ESTOPPEL
Neither the Owner, nor any agent or officer thereof shall be precluded or estopped by any return
or certificate made or given by the Owner or other ofiicer, agent or appointee of the Owner under
any provision of this agreement at any time, either before or after final approval and acceptance
of the work and final payment therefore, from showing the true and correct amount and character
of the work done and materials furnished by the Contractor or any other person under this
agreement or that any such return, or certificate, is untrue and incorrect or improperly made in
any particular, or that the work and materials, or any part thereof, do not, in fact, confarm to the
specifcations and Contract Drawings, and the Owner shall not be precluded or estopped
notwithstanding any such return or certificate and payment in accordance therewith, from
demanding and recovering from the Contractor such damages as it may sustain by reason of his
failure to comply with the speciiication and Contract Drawings.
00700.42 TIME FOR COMPLETION
Work on this Contract shall be commenced on a date specified in a written order of the Owner.
The work shall be carried on with such force and in such manner and order and at such points
that within the time limit designated in the Contract, or as may be modified or extended as
hereinafter provided, and as computed from the date stated in the notice to commence work, the
whole work and its parts shall be performed in accordance with the terms of this Contract.
00700.43 COMPLETION OF WORK DEFINED
54
The time for the completion of the herein specified work is defined as that state when, in the
opinion of the Owner or his authorized representative, all the work required to be performed
under the terms of the Contract plans, specifications and extra work orders has been completed
and the entire facility including appurtenances is ready for continuous permanent use for the
purpose intended. After this date there may still remain some cleaning up of Contractor's plant or
minor work and/or adjustments, which do not prevent the permanent use of the project.
00700.44 DELAYS AND EXTENSIONS OF TIME
If the Contractor shall be delayed at any time in the progress of the work by any cause beyond
the Contractor's control and without his fault or negligence, including but not restricted to any
act or neglect of the Owner, or of his agents or employees, or by any other Contractor employed
by the Owner, or by changes ordered in the work, acts of God or of the public enemy, fires,
floods, epidemics, quarantines, strikes, lockouts, riots, civil commotions or freight embargoes or
by delay authorized by the Owner, or by any cause which the Owner shall decide to justify the
delay, then the time of completion shall be extended for such reasonable time as the Owner shall
decide. No claim for increased compensation shall be paid for delays.
No such extension shall be made for delay occurring more than seven (7) days before claim
therefore is made in writing to the Owner. In the case of a continuing cause of delay, only one
claim is necessary.
00700.45 LIQUIDATED DAMAGES
It is mutually agreed by and between the parties hereto that time is an essential part of this
Contract, and that, if the Contractor shall fail to complete the work or any part thereof within the
time fixed in the Contract, the Owner will suffer damages the amount of which cannot
reasonably be determined at this time, and therefore agree that the Owner may retain as
liquidated damages incident to such delay, from the monies that are or which may become due
said Contractor, such sum per day as specified in the Proposal for each and every calendar day
the completion of the work be delayed beyond the time specified herein for such completion. In
addition to liquidated damages indicated herein, the Contractor will be responsible for additional
costs of construction phase engineering services caused by his failure to complete work within
the time specified.
00700.46 PRICES
The Owner will pay, and the Contractor shall receive, the prices stipulated in the proposal herein
contained or hereto annexed, as full compensation for furnishing all the equipment and materials,
and perfortning all the labor which may be necessary in the prosecution of the work required to
provide the complete facility as defined in this Contract.
55
00700.47 PARTIAL ESTIMATES AND PAYMENTS
If the work progresses according to this Contract, the Owner will make partial payments to the
Contractor each month on the basis of a confirmed estimate of the work performed during the
preceding calendar month by the Contractor. Upon such estimate being made and confirmed and
approved by the Owner, the Owner will pay to the Contractor ninety per centum (90%) of the
amount established in such an estimate as the value of the work completed. Such payment shall
be considered, however, only as an advance payment and not as part of the final payment to the
Contractor; and the Owner may at all times reserve and retain out of any or all of the said partial
payments all such sums as it is or may be authorized to reserve or retain.
It is understood and agreed that, should the Owner at any time during the progress of the work
consider the amount withheld on monthly estimates of payment to be in excess of the amount
necessary to complete the work or necessary for the full and ample protection of the Owner, then
the Owner, may reduce the percentage retained to an amount sufiicient for the Owner's proper
protection.
No estimates given, nor payments made, shall be conclusive of the performance of the contract
either wholly or in part, and no estimates, payments or certifcates of final payment shall be
construed to be an acceptance of inferior or defective work or materials.
00700.48 PAYMENTS WITHHELD
The Owner may withhold or, on account of subsequently discovered evidence, nullify the whole
or a part of any certificate to such extent as may be necessary to protect himself from loss on
account of:
Defective work not remedied.
2. Claims filed or reasonable evidence indicating probable filing of claims.
Failure of the Contractor to make payments promptly to subcontractors, or for material,
labor or equipment.
4. A reasonable doubt that the Contract can be completed for the balance, then unpaid.
Damage to another Contractor.
6. Failure of Contractor to clean-up or restore the project site or rights-of-way.
7. Insolvency of Contractor.
Manifest intent of Contractor not to proceed diligently or to complete this contract.
56
When the above grounds are removed, payment shall be made for amounts withheld because of
them.
00700.49 LIENS AND FINAL PAYMENTS
Neither the final payment nor any part of the retained percentage shall become due until the
Contractor, if required, shall deliver to the Owner a complete release of all liens arising out of
this Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that so
far as he has knowledge or information the releases and receipts include all the labor and
material for which a lien could be filed; but the Contractor may, if any subcontractor refuses to
furnish a release or receipt in full, furnish a bond satisfactory to the Owner, to indemnify the
Owner against any lien. If any lien remains unsatisfed after all payments are made, the
Contractor shall refund to the Owner all monies that the latter may be compelled to pay in
discharging such a lien, including all administrative costs and a reasonable attorney's fee.
The final payment shall not become due and payable until the Contractor shall have furnished the
Owner with satisfactory evidence that all labor, materials, outstanding claims and indebtedness
of whatsoever nature arising out of the performance of the Contract have been paid, and until the
Contractor shall have furnished a written statement to such effect executed by Contractor and
Sureties, which will further provide that payment to the Contractor of the fnal estimate shall not
relieve any Surety of its obligation to the Owner as set forth in the Surety Bonds. Where one or
more claims against the Contractor which are in controversy appear unsatisfied, the Owner shall
have the discretion to direct final payment to be made, or a partial payment to be made from the
retained percentage, should it be determined that the withholding of the entire final payment
would work a hardship on the Contractor or delay the final payments of other Contractors or
subcontractors on the project. In such cases, the Contractor and Sureties shall provide the
evidences and statements required under this paragraph, but shall itemize the claims which
remain unsatisfied, giving the reason therefore, and the statements of the Surety Companies shall
provide that the final payment or partial payment, as the case may be, shall not relieve any
Surety of any obligations to the Owner as set forth in the Surety Bonds. If only partial payment
from the retained percentage is permitted under this paragraph, the iinal payment shall not be
made until the Contractor shall have furnished satisfactory evidence and a statement from the
Surety that all claims against the Contractor have been paid and that payment to the Contractor
of the contract balance shall not relieve the Surety of any of its obligations to the Owner as
provided in the Surety's Bond.
00700.50 FINAL APPROVAL AND ACCEPTANCE OF THE WORK
Following the completion of this Contract, as such completion is defined in the Specifications
and as soon thereafter as practicable, the Owner, his representative or the Engineer will review
the work and will make a final estimate of the amount and value of work done by the Contractor.
If the said work appears to be satisfactory and appears to be done in accordance with the
provisions and terms of the Contract Documents, the Owner, upon notice of completion from his
57
representative, and within forty-five (45) days after the final estimate of work is made and
confirmed as correct and unpaid and is approved, will pay to the Contractor the full value of the
work done under this Contract less any amounts previously paid and less any advances
whatsoever, and the Owner will certify the work as completed and will accept it. Said acceptance
will, however, be in all events conditional upon the subsequent remedying by the Contractor of
defects in workmanship or materials which may become apparent within a period of one (1) year
(or a longer period as required elsewhere in the Contract Documents) following the date of
acceptance as herein required. In the event the Owner refuses or declines to certify the work as
completed and accepted and make final payment therefore within forty-five (45) days after
notice and certification, the Owner shall immediately set forth in writing to the Contractor the
reasons for such non-acceptance of the work. After all valid reasons for non-acceptance have
been removed, the Owner shall execute the final certificate of completion and acceptance and
shall make final payment. The certifcation of completion and acceptance of the work will be a
prerequisite to final payment hereunder.
All prior estimates and payments, including those relating to extra work, shall be subject to
correction or adjustment by the iinal cost estimate. Such final payment, however, shall not serve
as a release of the Contractor or of his Sureties from the previously required guarantee against
defects in Contract performance for a period of one (1) year following the date of acceptance of
the work by the Owner.
The acceptance by the Contractor of the final payment, made as aforesaid, shall operate as and
shall be a release to the Owner and to the Engineer and every member and agent of both said
parties from all claims and liabilities to the Contractor for anything done or furnished for, or
relating to the work, or for any act or neglect of the Owner or the Engineer or of any person
relating to or effecting the work, but this final payment shall not relieve the Contractor from his
indemnity, guarantee and/or warranty obligations under the terms of the Contract.
As soon as is practicable after twelve (12) months have elapsed from the date of completion as
herein deiined, the Owner shall make a review and re-inspection of the work and performance of
this contract, or cause the same to be made. If the said performance and work shall be found
satisfactory and work not to have deteriorated through defects in workmanship or materials, then
the Owner shall certify the release of the Surety on the Bond for Performance of Contract. If,
however, the review and re-inspection, or any prior inspection, discloses defects due to the
non-fulfillment of this Contract, or non-compliance with its requirements, the Owner shall so
notify the Contractor in writing, and thereupon the Contractor shall, at his own expense, repair or
replace and shall make good all defects in workmanship, materials, and guarantee, and shall
rectify any non-compliance, and such repairs and fulfillment shall be a prerequisite to the release
of the Surety on the Bond. If, however, the Contractor shall, after due notice, refuse or neglect to
make good the defects to the satisfaction of the Owner, then the Owner may, and is hereby
empowered to, proceed in the manner prescribed in the event of abandonment or forfeiture of the
work by the Contractor, in which case completion by the Owner and the payment of claims for
material and labor and other expense as provided in such procedures, shall be a prerequisite to
the release of the Surety on the Bond for Performance of Contract.
Q3
Within thirteen (13) months after the date of acceptance of the work, or as soon thereafter as
practical, as hereinbefore provided, following a re-inspection, and provided further that any
repairs necessitated by defects in material or workmanship as determined by the Owner in the
re-inspection shall have been made, the Owner will, in writing, finally release the Contractor, his
Sureties and all parties hereunder.
59
SECTION 00800
SUPPLEMENTARY CONDITIONS
00800.01 SUPPLEMENTARY CONDITIONS PREVAIL
The provisions of this section amplify, amend, change and/or add to all other provisions of the
Contract Documents. In the event of a conflict between these Supplementary Conditions and
any other Sections of the Contract Documents, the Supplementary conditions shall apply.
00800.02 MATERIALS SUPPLIED BY THE OWNER
Clearwater Gas System shall supply the following materials: piping (carrier and casing); valves
and valve boxes; concrete valve rings; fittings; tracer wire; marker tape; marker poles; and splice
kits. The contractor shall supply the labor necessary for loading the materials supplied by CGS.
The contractor shall provide all other materials necessary to complete the work. The contractor
shall be responsible for all materials disbursed including accurately inventory of such materials.
Contractor shall provide a trailer capable of transporting 40' or longer lengths of polyethylene
pipe without damaging pipe.
00800.03 PERMITS
The Contractor shall perform all work in strict accordance with the requirements of the following
permits which will be obtained by the Owner: Pinellas County Use Permit, Various City Use
Permits, Florida Department of Transportation Utility Permit, Army Corps of Engineers permit
and the Florida Department of Environmental Protection Dredge and Fill Exemption. The
contractor is responsible for obtaining any necessary permits with gas meter relocations and shall
be listed as the contractor of record for underground gas house piping installations.
00800.04 JOINING OF PLASTIC PIPE
In amplification of Section 02685, Page 02685-4, Article 3.06, the Contractor shall get prior
approval from Clearwater Gas System to use electric fusion couplings. If electric fusion
couplings are used, they shall be supplied by the Contractor at no additional cost to the Owner.
The Contractor shall provide either an Central, Innogaz or Friatec universal electro fusion control
box, capable of storing a minimum of 100 fusion records, pipe alignment clamp, tapping tee
alignment clamp, tapping wrench, pipe scraper, and all other tooling specified by the Electro
Fusion machine manufacturer in their respective installation procedures.
Contractor shall provide the necessary power supply to meet the power requirements as specifed
by the manufacturer of the fusion equipment. Pipe support stands shall be utilized to support
pipe during fusion joining, directional boring pull in, and while lowering of the pipe into the
trench. Pipe support stands shall not be spaced greater than 15' apart for directional boring pull
.�
in. Pipe shall be supported with stands at all time it is placed on pavement to avoid scratching the
pipe surface.
The Contractor shall provide a pyronometer capable of testing the temperature of the heating
iron, while at fusion temperature, to an accuracy of 0.5% (±3°F). The fusion temperature of the
heating iron shall be veriiied each morning in the presence of the CGS Inspector. More frequent
testing may be required at the discretion of CGS Inspector.
Note: All equipment must be in good working order and properly maintained during project
installation. The CGS will inspect the preceding items and reject those not in compliance. The
CGS shall have the right to reject any or all equipment judged inadequate to properly fuse
Polyethylene Pipe and its Fittings.
61
SECTION 00900
ADDENDA
(Insert Addenda here)
62
SECTION 01000
GENERAL REQUIREMENTS
01000.01 TRAFFIC CONTROL
The Contractor shall maintain traffic within the limits of the project for the duration of the
construction period, in accordance with the requirements of FDOT Section 102 of the "Standard
Specifications", as amended herein.
The local streets shall be kept open to two-way traffic for the duration of the construction period,
except that one lane of traffic will be permitted provided that flagmen are used. The Contractor
will not be permitted to isolate access to residences or places of business. Traffic on County
roads and State highways shall be controlled in accordance with the current standards of the
appropriate agency. The contractor shall only utilize Florida certified Maintenance of Traffic
(MOT) personnel when installing and maintaining approved work zone maintenance of traffc
devices. No roadway shall be closed without proper advanced notification to Clearwater Gas
System and the authority having jurisdiction, such as local police and fire.
The Contractor shall furnish, erect and maintain all necessary traffic control and safety devices,
in accordance with the Florida Department of Transportation "ROADWAY AND TRAFFIC
DESIGN STANDARDS", applicable edition, and State of Florida "MANUAL OF TRAFFIC
CONTROL AND SAFE PRACTICES FOR STREET AND HIGHWAY CONSTRUCTION
MAINTENANCE AND UTILITY OPERATIONS", applicable edition, and shall take all
necessary precautions for the protection of the work force personnel and the safety of the
traveling public for the duration of the construction period.
01000.02 MATERIALS, EQUIPMENT AND LABOR
Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labor, water,
tools, equipment, light, power, transportation and any other facilities necessary for the proper
execution and completion of the work.
Unless otherwise specified, all materials shall be new. The Contractor, if required, shall furnish
satisfactory evidence as to the kind of and quality of materials. Before any contract is awarded
the bidder may be required to furnish a complete statement of the origin, composition and
manufacture of any or all materials or equipment to be used in the work, together with samples,
which samples may be subject to tests provided for in these specifications to determine their
quality and fitness for the work. All materials and all workmanship shall be of good quality and
meet specification requirements. Failure of the Owner or Engineer to request material, samples
or conduct tests on the same does not relieve the Contractor of responsibility to furnish the
material as specified. The Contractor shall furnish such equipment as is considered necessary for
the prosecution of the work in an acceptable manner at a satisfactory rate of progress so as to
insure completion by the date set forth in the Contract. The equipment used on any portion of the
63
work shall be used in such a manner so as not to endanger the lives of the operators or others, nor
cause damage to adjacent real property, roadways, structures, or any other property whatsoever.
01000.03 PROGRESS PHOTOGRAPHS
The Contractor shall furnish photographs, 5" x 7", on standard weight paper with negatives, as
directed by the Owner, showing the job, before, during and upon completion of the construction.
Smaller size (not less than 3"x4") photographs shall be furnished to show unusual conditions
encountered during construction.
01000.04 STANDARDS
Wherever in these Contract documents reference is
specifications, codes, standards,
understood that the specifications,
advertisement for bids shall govern,
and requirements,
codes, standards,
made to any of the following, or other,
by abbreviation or name, it shall be
and requirements in effect on the date of
ASTM American Society for Testing Materials
ASME American Society for Mechanical Engineers
ASA American Standards Association
AWWA American Water Works Association
NEMA National Electric and Manufacturers Association
AIEE American Institute of Electrical Engineers
AASHTO American Association of State Highway and Transportation Officials
NBFU National Board Fire Underwriters
NEC National Electric Code
ACI
AGA
AISC
AWPA
Fed. Spec.
SBC
FDOT
NFPA 54
IFGC
FBGFG
American Concrete Institute
American Gas Association
American Institute Steel Construction
American Wood Preservers Association
Federal Speciiications U.S. Government
Southern Building Code
Florida Department of Transportation
National Fuel Gas Code
International Fuel Gas Code
Florida Building Code Fuel Gas
"Standard Specifications" - FDOT Standard Specifications for Road and Bridge Construction,
latest edition, including all supplemental specifications, indices and other directives in effect.
01000.05 STORAGE OF MATERIALS AND RIGHTS-OF-WAY
64
The Owner shall provide the land upon which the work is to be done, with right of access thereto
unless otherwise specified elsewhere in the Contract Documents. The Contractor shall anticipate
requirements of space and land for the erection of temporary construction facilities, office, and
storage of materials. Should the Owner decide that the site of work is insufiicient for such
temporary facilities, the Contractor will be required to arrange for such additional space and land
as may be necessary at his expense.
The Contractor shall make his own arrangements for delivery and handling of equipment and
materials as he may require for the prosecution of his work. In underground utility work all
materials required in the work may be stored on the sides of the roadway or parking area of the
street in which the utilities are to be constructed, as approved by the Owner and/or municipality
having jurisdiction, but all such materials, tools and machinery shall be neatly and compactly
piled in such manner as to cause the least inconvenience to the property owners and the traffic.
Material shall be stored outside of the "Clear Zone" of roadways. All fire hydrants must at all
times be kept free and unobstructed and water and gas shut-off boxes must be kept uncovered.
The materials shall be stored so as to insure the preservation of the quality and fitness for the
work. When considered necessary, they shall be placed on wooden platforms or other hard clean
surfaces and shall be placed under cover as directed. Stored materials shall be located so as to
facilitate prompt inspection. Materials, tools, and machinery shall not be piled or placed against
shade trees unless ample protection is provided for the trees. Lawns, grass plots, or other private
or public property shall not be used for storage purposes without the written permission of the
Owner.
01000.06 UTILITIES
The Contractor shall have the complete responsibility of coordinating his work with the owners
of the various utilities now existing or to be constructed within the limits of this project so that a
minimum delay in the construction shall occur there from.
01000.07 SAFETY AND HEALTH REGULATIONS
The Contractor shall comply with the Department of Labor Safety and Health Regulations for
construction promulgated under the Occupational and Health Act of 1970 (PL596) and under
Sec. 107 of the Contract Work Hours and Safety Standards Act (PL 91-54). The Contractor shall
comply with the State of Florida Trench Safety Act and the City Of Clearwater Trench Safety
Regulations.
01000.08 USE OF CHEMICALS
All chemicals used during project construction or furnished for project operation, whether
herbicide, pesticide, disinfectant, polymer, reactant or of other classification, must show approval
65
of either EPA or USDA. Use of all such chemicals and disposal of residues shall be in strict
conformance with instructions.
01000.09 BY-PASSING OF SEWAGE
The Contractor shall schedule his work so as to either minimize or completely eliminate any by-
pass of raw sewage during construction.
01000.10 DEWATERING AND SEWAGE PUMPS
In general, all pumps utilized by Contractor during construction shall be electric motor driven.
Internal combustion engine driven pumps may be used for a particular application only upon
approval of the Owner.
01000.11 LINES, GRADES AND CONSTRUCTION SURVEYING
The Contractor shall employ a competent surveyor satisfactory to the Owner to lay out the work
from the bench marks, grades, dimensions, points and lines noted on the working drawings,
established at the site, or supplied by the Engineer. Cost of lines, grades and construction
surveying shall be paid for by the contractor.
All work of every description shall be laid out and checked by the Contractor who will be held
solely responsible for its correctness, and all expenses in connection with this work shall be paid
for by the Contractor. In the event batter boards are used the maximum allowable interval for
construction batter boards on sewers and pipe lines will be forty (40) feet for grades under 1.00
percent (1%) and ffty (50) feet for grades of 1.00 percent (1%) and over.
The work may be checked by the Owner and, in the event of discrepancy, his decision shall be
final.
No special compensation will be made to the Contractor to defray costs of any of the work or
delays occasioned by making surveys and measurements, tests or inspections, but such costs
shall be considered as having been included in the price stipulated for the several items of the
work to be done under this contract.
01000.12 TESTS
Tests of material, where required by the specifications, shall be paid for by the Contractor. The
selection of bureaus, laboratories, and/or agencies for the inspection and testing of supplies,
materials or equipment shall be subject to the approval of the Engineer. Satisfactory
.s
documentary evidence that the materials have passed the required inspections and tests must be
furnished to the Owner.
Steel Pipe Inspection Radiography Using X-Ray and Gamma y Ray on Welds - Radiography
is one of the most useful of the non-destructive tests which can be applied for assessing the
quality of the welded joints. Radiograph has been used for the inspection of welds of all types
and thicknesses ranging from minute welds in electronic components to welds up to half ineter
thick employed in heavy fabrications. All potential welder operating on CGS facilities shall be
weld tested by both destructively and non- destructively methods of evaluation. Welding
certification is limited to 6 months before requaliiication is required
Radiography can detect flaws or discontinuities in welds such as:
(i) Cracks.
(ii) Porosity and blow holes.
(iii) Slag, flux or oxide inclusions.
(iv) Lack of fusion between the weld metal and the parent metal
(v) Incomplete penetration
01000.13 WATER AND ELECTRIC POWER
The cost of all water for construction and testing purposes, as well as the expense of having the
water conveyed to and about the work, must be borne by the Contractor and the cost of this work
shall be considered as having been included in the unit or lump sum prices stipulated for the
several items of work to be done under this contract.
Unless otherwise specifically permitted by the Engineer, all water used for construction purposes
shall be obtained from the public water supply main.
The Contractor shall make his own arrangements for electric light and power, as may be required
for his work. Electric light and power and water shall not be utilized from any location without
written consent of the property owner.
01000.14 MONUMENTS AND LANDMARKS
Monuments or landmarks shall not be molested or removed by the Contractor or any of his
employees without written consent of the Owner. Any monument or landmark so removed will
be replaced by the Owner at the expense of the Contractor.
01000.15 DETOURS
The Contractor must so schedule his work that in no case are two adjoining parallel streets closed
for utility construction at any one time. If, in the opinion of the Owner, a traffc hazard or an
unreasonable long detour is caused by the Contractor's plan of work, he shall immediately revise
his working schedule and reopen whatever streets are required for maintenance of traffic. The
67
Contractor will, in no case, be permitted to start work in any new location without permission of
the Owner. If the Contractor shall disregard the instructions of the Owner concerning traffic
control, it will be considered sufficient cause to invoke that section of the specifications entitled
"The Owner's Right to Terminate Contract." The Contractor will be responsible for placing and
maintaining "Detour" signs when required, or when directed by the Owner. The local fire
department and 911 dispatch center shall be notifed of any street closures in advance of such
closure.
01000.16 EXISTING UTILITIES
The Contractor will be required, at his own expense, to do everything necessary to locate,
protect, support, sustain and avoid conflicts with existing water, gas and service pipes, storm and
sanitary sewers, existing structures, electric light and power lines, telephone poles, conduits,
roads and other fixtures on the site of the work. In case any of the said water, gas, and service
pipes, storm and sanitary sewers, existing structures, electric light and power lines, telephone
poles, conduits, roads and other fixtures be damaged, they shall be repaired, but the cost thereof
shall be considered as having been included in the prices stipulated for the various items of work
to be done under contract; per OSHA 1026.651
01000.17 SANITARY MEASURE5
Sanitary conveniences for the use of all persons employed on the work shall be provided and
maintained by the Contractor in sufiicient number, in such manner and in such places as shall be
approved by the Owner. All persons connected with this work shall be obliged to use them, and
any employees found violating these provisions shall be discharged and not again employed
without written consent. All necessary precautions, including the care of employees, and
prevention of any pollution of the existing water supply shall at all times be satisfactory to the
governing authorities. The Contractor shall promptly and fully comply with all orders and
regulations in regard to these matters.
01000.18 CLEANING UP
As the work progresses, the Contractor shall remove from the site and dispose of debris and
waste material. Particular attention shall be given to minimizing any fire hazard from
combustibles as may be used in connection with the work. On or before the date of the iinal
estimate for the work, the Contractor shall tear down and remove all temporary structures built
by him, shall remove all construction plant used by him and shall repair and replace all parts of
existing embankments, fences, sidewalks, shrubbery or structures which were removed or injured
by the Contractor's operations or by employees of the Contractor; shall thoroughly clean out all
sewers, drains, pipes, manholes and miscellaneous structures and shall remove all rubbish and
leave ground, thoroughfares, and rights-of-way in a neat and satisfactory condition.
.:
01000.19 FAILURE TO CLEAN UP
Upon failure of the Contractor to keep the sites of his operations clean, to the satisfaction of the
Owner may upon twenty-four (24) hours' notice to the Contractor, remove any rubbish,
materials, earth, etc., which the Owner may deem necessary, charging the cost thereof to the
Contractor and may deduct the amount from any money that may be due him.
01000.20 RESTORATION OF SURFACE
The Contractor shall replace all surface material, and shall restore paving (unless otherwise
stipulated), curbing, sidewalks, gutters, shrubbery, fences, sod, and other surfaces disturbed to a
condition equal to that before the work began, furnishing all labor and materials incidental
thereto. In restoring paved surfaces, new pavement is required except that granite paving blocks,
sound brick, or asphalt paving blocks may be reused. Restoration work should be expedited.
01000.21 PROJECT RECORD DRAWINGS (AS- BUILTS)
The Contractor shall maintain continuous "record" data for the project, including accurate
records of location, length, and elevation of all pipe lines and piping installed and all
architectural, mechanical, or structural features of the Contract and will provide specific
information to Clearwater Gas System as required. A set of drawings will be provided to the
Contractor to be kept at the job site for this purpose. Promptly after completion of any portion of
the job site, the Contractor shall deliver to the City Engineer or CGS the Owner a professional
type drawings of completed work, with accurate notations recorded thereon as necessary to
revise the drawings for record purposes. Information to be shown for GAS mains and service
lines shall include the location of valves, tees, and offsets dimensions to the nearest permanent
objector monument two road centerline measurements. Information to be shown on a submitted
as built or service line installation card shall include the distance to the nearest cross street center
line, length of service line, measurement from building corner, a north arrow and building
number served. The Contractor will be held responsible for the accuracy of such data and shall
bear any monetary costs incurred in finding gas utilities as a result of incorrect data furnished by
the Contractor.
.•
SECTION 02005
MOBILIZATION
PART 1 - GENERAL
1.01 WORK INCLUDED
A. The work specified under this Section consists of the preparatory work and
operations in mobilizing to begin work on the project, including but not limited to
those operations necessary for the movement of personnel, equipment, supplies
and incidentals to the project site(s), and for the establishment of temporary
offices, buildings, safety equipment and first aid supplies, sanitary and other
facilities as required by these specifications, special provisions and state and local
laws and regulations.
B. The cost of bonds and any required insurance, consideration for indemnification
to the Owner and the Engineer, and any other pre-construction expenses necessary
for the start of the work, excluding the cost of construction materials, shall also be
included in this Section.
PART 2 - PRODUCTS
A. Not Applicable
PART 3 - EXECUTION
A. Not Applicable
PART 4- MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The quantity of Mobilization for which payment will be made shall be the actual
number of units measured in place and accepted. The units measured shall be as
listed in the Bid Schedule. If a payment item for Mobilization is not specifically
included in the Bid Schedule, the quantity for which payment will be made shall
be the quantity required to complete the work.
4.02 PAYMENT
A. Payment for Mobilization shall be made at the prices stated in the Bid Schedule.
If a payment item for Mobilization is not specifically included in the Bid
Schedule, payment for the work specified in this Section shall be included in the
several unit and lump sum prices for all applicable items of work.
�o
SECTION 02221
TRENCHING, BACKFILLING AND COMPACTING FOR UTILITY SYSTEMS
PART 1 - GENERAL
1.01 WORK INCLUDED
A. The work included under this Section consists of clearing, exeavating, grading
and backfilling as required for the construction of the utility systems consisting of
piping and appurtenances as shown on the Drawings and specified herein.
PART 2 - PRODUCTS
2.01 BEDDING MATERIAL
A. Bedding material for use below the water table or in wet trenches shall be pea
rock, drain field lime rock ar similar material as approved by the Owner's
Representative. Pipe bedding material for use in dry trenches shall be lime rock
screenings, sand or other fine inorganic material as approved by the Owner's
Representative.
2.02 ADDITIONAL BACKFILL MATERIAL
A. Additional backfill material shall be a noncohesive, nonplastic granular mixture
of local sand and rock and shall be free from vegetation, organic material, marl,
silt or muck. No stones or rocks shall be larger than 6-inches in diameter, and
when placed within 1-foot of piping and appurtenances stones or rocks shall be no
larger than 2-inches in diameter (1-inch for PVC).
PART 3 - EXECUTION
3.01 CLEARING
A. The Contractor shall perform all clearing necessary for the proper installation of
all piping and appurtenances in the locations shown on the Drawings. Plantings,
shrubbery, trees, utility poles or structures subject to damage resulting from the
excavation shall be transplanted, relocated, braced, shored, or otherwise protected,
preserved and restored unless otherwise directed by the Owner's Representative.
3.02 EXCAVATION
A. The Contractor shall perform all excavation of every description and of whatever
substances encountered, to the dimensions and depth shown on the Drawings, or
as directed. The contractor shall employ an OSHA competent person at each
excavation site to promote safe excavation practices. All excavations shall be
�l
made by open cut. All existing utilities such as pipes, poles and structures shall
be carefully supported and protected from injury, and in case of damage, they
shall be restored at no cost to the Owner's Representative.
B. Trench walls shall be kept to protect the safety of workmen, the general public,
this or other work or structures, or to maintain trench widths within the limits
hereinafter specified, shall be properly sheeted and braced in accordance with the
Florida Trench Safety Act and Occupational Safety & Health Administration
(OSHA) safety standards 29 C.F.R.S.1926.650 Subpart P. Where wood sheeting
or certain designs of steel sheeting are used, the sheeting shall be cut off at a level
2-feet above the top of the installed pipe and that portion below that level shall be
left in place. If interlocking steel sheeting is used, it may be removed providing
removal can be accomplished without disturbing the bedding, pipe or alignment
of the pipe. Any damage to the sheeting shall be cause for rejection of the
affected portion of the work. Not more than 100-feet of trench shall be opened
ahead of pipe laying operations at one time unless the Owner's Representative
approves a greater length of open trench.
C. In areas where trench widths are not limited by right-of-way, and/or easement
widths, property line restrictions, existing adjacent improvements, including
pavements, structures and other utilities, and maintenance of traffic, the trench
sides may be sloped to a stable angle of repose of the excavated material. A
substantially and safely constructed movable trench box shield, "box" or "mole"
may be used in place of sheeting when the trench is opened immediately ahead of
the shield and closed immediately behind the shield as pipe laying proceeds inside
the shield.
D. Ladders or steps shall be provided for and used by workmen to enter and leave
trenches.
E. Pipe trenches for utility lines shall be excavated to a width within the limits of the
top of the pipe and the trench bottom so as to provide a clearance on each side of
the pipe barrel, measured to the face of the excavation or sheeting, if used, of 8-
inches to 12-inches. Where the pipe size exceeds 12-inches, the clearance shall
be from 12-inches to 18-inches. All pipe trenches shall be excavated to a level 8-
inches below the outside bottom of the proposed pipe barrel.
F. Excavation for appurtenances shall be sufficient to provide a clearance between
their outer surfaces and the face of the excavation or sheeting, if used, of not less
than 12-inches. Manhole excavations shall be carried to sufficient depth to permit
their construction on the undisturbed bottom of the excavation.
G. Materials removed from the trenches shall be stored and disposed of in such a
manner that they will not interfere unduly with trafiic on public streets and
sidewalks and they shall not be placed on private property. In congested areas,
72
such materials as cannot be stored adjacent to the trench or used immediately as
backfill shall be removed to convenient places of storage.
H. All materials suitable for use as backfill shall be hauled to and used in areas
where not enough suitable material is available from the excavation.
I. Suitable material in excess of backfll requirements and all unsuitable material
shall become the property of the Contractor and shall be removed from the work
and disposed of by the Contractor at his expense.
Excess suitable material shall remain the property of the Owner and shall be
disposed of within the limits of the project as directed by the Owner's
Representative. The disposal area shall be finish graded upon completion of the
work.
3.03 REMOVAL OF WATER
A. It is a basic requirement of these specifications that excavations shall be free from
water before pipe or structures are installed. However, it is realized that in certain
sections of the work this cannot be accomplished economically and the Contractor
may elect to use the Alternate Method of Construction.
B. The Contractor shall provide all necessary pumps, underdrains, well-point
systems, and other means for removing water from trenches and other parts of the
work. The Contractor shall continue dewatering operations until the backfill has
progressed to a sufficient depth over the pipe to prevent flotation or movement of
the pipe in the trench and so that it is above the natural water table.
C. Water from the trenches and excavation shall be disposed of in such a manner as
will not cause injury to public health, to public or private property, to the work
completed or in progress, to the surface of the streets, or cause any interference
with the use of the same by the public. CGS is not responsible for, or the disposal
of, or any associated costs relating to the disposal of any contaminated ground
water. The Contractor shall submit his proposed methods of handling trench water
and locations at which the water will be disposed of to the Owner's
Representative for approval and shall receive approval before starting the
excavation.
3.04 PIPE BEDDING
A. As described above, all pipe trenches shall be excavated to a level 8-inches below
the outside bottom of the proposed pipe barrel. The resulting excavation shall be
backfilled with approved pipe bedding materials, up to the level of the lower one-
third of the proposed pipe barrel. This backfill shall be tamped and compacted to
provide a proper bedding for the pipe and shall then be shaped to receive the pipe.
Bedding shall be provided under the branch of all fittings to furnish adequate
73
support and bearing under the fitting. Bedding material for piping shall be pea
rock, drainfield lime rock, or similar materials as approved by the Owner's
Representative. Lime rock screenings, sand or other fine inorganic material from
the excavation may be used for bedding material when pipe is installed above the
natural water table.
B. Any excavation below the levels required for installation of the pipe bedding,
except for "Additional Excavation", as hereinafter specifed, shall be backfilled
with approved bedding material, tamped, compacted and shaped to provide proper
support for the proposed pipe, at no additional cost to the Owner's Representative.
3.05 BACKFILL UNDER MANHOLES AND METER VAULTS
A. Any excavation below the levels required for the proper construction of manholes
or meter vaults shall be iilled with Class I concrete. The use of earth, rock, sand
or other materials for this purpose will not be permitted.
3.06 TRENCH STABILIZATION
A. No claim for extras, or additional payment will be considered for cost incurred in
the stabilization of trench bottoms, which are rendered soft or unstable as a result
of construction methods, such as improper or inadequate sheeting, dewatering or
other causes. In no event shall pipe be installed when such conditions exist and
the Contractor shall correct such conditions so as to provide proper bedding or
foundations for the proposed installation at no additional cost to the Owner.
3.07 SPECIAL PIPE FOUNDATION
A. General: When shown on the Drawings or when directed by the Owner, the
Contractor shall provide the special type of pipe foundation in lieu of the pipe
bedding as specifed above and provide the additional excavation required.
B. Type A Pipe Foundation: Type A pipe foundation shall be used when and where
directed by the Owner's Representative. Foundation material shall be crushed,
graded, local limestone suitable for use as concrete aggregate. Gradation shall be
such that 95-100 percent of the material will pass a 1-inch square opening
laboratory sieve. Material shall be placed from 1-foot below the barrel of the pipe
to 6-inches above the pipe and the width of the foundation material as placed
around the pipe shall not be less than the outside diameter of the pipe, plus 12-
inches. Construction of Type A pipe foundation shall be as shown or indicated on
the Drawings. Foundation material shall be placed in the bottom of the trench and
compacted to an elevation, which will provide firm bedding for the full pipe
length, after which material shall be placed and compacted evenly on both sides
of the pipe and above the pipe to an elevation 6-inches above the top of the pipe
barrel. Pipe shall not be displaced or damaged during placement and compaction
of the foundation material.
74
C. Type B Pipe Foundation: Where soft, yielding, unstable or other unsatisfactory
material exists at the bottom of the trench, the Owner's Representative may direct
the use of Type B Pipe Foundation. Only the pipe foundation ordered by the
Owner's Representative will be paid for. Construction shall be in accordance with
the details shown or indicated on the Drawings. Concrete shall be Class I.
3.08 BACKFILL
A. Backflling of utility trenches will not be allowed until the work has been
approved by the Owner's Representative, pressure tested if required, and the
Owner's Representative indicates that backfilling may proceed. Any work which
is covered or concealed without the knowledge and consent of the Owner's
Representative shall be uncovered or exposed for inspection at no cost to the
Owner's Representative. Partial backfill may be made to restrain the pipe during
pressure testing. Sight tubes will be installed on underground house piping
installations as appropriate intervals for inspection.
B. Backfill material shall be noncohesive, nonplastic material free of all debris,
organic material, lumps, clods and broken paving. Backfill material placed within
1-foot of piping and appurtenances shall not contain any stones or rocks larger
than 2-inches in diameter (1-inch for PVC) and no stones or rocks larger than 6-
inches in diameter will be permitted in any backfill.
C. If a sufficient quantity of suitable backfill material is not available from the trench
or other excavations within the site of the work, the Owner's Representative will
order the Contractor to provide additional material suitable for this purpose. The
additional material shall be installed as specified herein. No payment will be
made for additional backfill material used to replace nonplastic material (rock)
over 6-inches in diameter.
D. Selected backfill material containing no stone or rocks larger than 2-inches shall
be placed in 6-inch layers and thoroughly tamped to a depth of 12-inches over the
top of the pipe. Particular attention and care shall be exercised in obtaining
thorough support for the branch of all service connection fittings. Care shall be
taken to preserve the alignment and gradient of the installed pipe.
E. After the backfill has been placed to a level 12-inches over the gasline waterline
or force main pipe, the remainder of the backfill shall be placed in layers, not to
exceed 9-inches, and compacted with mechanical vibrators or other suitable
equipment to obtain a density of the backfilled material of not less than 95 percent
of its maximum density as hereinafter defined, unless otherwise specified on the
plans.
F. After selected backfill has been placed to a depth of 12-inches over the sewer
pipe, backfilling shall proceed to a depth of 30-inches over the pipe by placing the
backf 11 material in 6-inch layers and thoroughly compacting it with mechanical
75
vibrators. Backfill in this portion of the work shall be compacted to 100 percent
of maximum density of the material as hereinafter defined, unless otherwise
specified on the plans.
G. After the backfill has been placed to a level 30-inches over the sewer pipe, the
remainder of the backfill shall be placed in layers, not to exceed 9-inches, and
compacted with mechanical vibrators or other suitable equipment to obtain a
density of the backflled material of not less than 95 percent of its maximum
density as hereinafter defined, unless otherwise specified on the plans.
H. Within paved areas of trench excavation, the base and surfacing shall be
reconstructed as speciiied under Section 02574 Pavement Removal and
Replacement.
I. No more than 800-feet of trench with pipe in place shall be partially backiilled at
any time.
J. Shut Down of Work: When work has shut down for each day, all lines shall be
capped, sealed, and pressured to 90 pounds with air. When a Project is not
immediately tied-in, plug and seal all openings in the pipe and maintain a minimum
of 90 pounds of air pressure. If a pipeline is to be abandoned in place, then
disconnect the gas supply source, purge all of the gas utilizing nitrogen for
all gas lines exceeding 1,000 linear feet or 4" pipe size and larger; any length,
from the abandoned system, and seal all of the ends.
3.09 COMPACTION AND DENSITIES
A. Methods of control and testing of backfill construction to be employed in this
work are:
Maximum density of the material in trenches shall be determined by
AASHTO Designation T-180, unless otherwise noted.
2. Field density of the backfill material in place shall be determined by
AASHTO Designation T-238.
B. Laboratory and field density tests, which, in the opinion of the Owner's
Representative, are necessary to establish compliance with the compaction
requirements of these specifications, will be conducted at the Contractor's
expense. Tests will be made at depths and locations selected by the Owner's
Representative.
C. Trench backfill which does not comply with the specified densities, as indicated
by such tests, shall be reworked and recompacted until the required compaction is
secured, at no additional cost to the Owner. The Costs for retesting such work
shall be paid for the Contractor.
�Z•
3.10 ADDITIONAL EXCAVATION AND BACKFILL
A. Where organic material, such as roots, muck, or other vegetable matter, or other
material which, in the opinion of the Owner's Representative, will result in
unsatisfactory foundation conditions, is encountered below the level of the
proposed pipe bedding material, it shall be wholly or partially removed as
directed by the Owner's Representative and wasted. Sheeting shall be installed if
necessary to maintain pipe trenches within the specified limits. The resulting
excavation shall be backfilled with suitable backfill material, placed in 6-inch
layers, tamped and compacted up to the level of the bottom of the proposed pipe
bedding material. Sufficient compaction of this material shall be performed to
protect the proposed pipe against settlement. Construction shall then proceed in
accordance with the provisions of Article 3.04 Pipe Bedding.
B. Additional excavation shall be performed only when ordered by the Owner's
Representative. Where organic or other unsuitable material is encountered in the
excavation, the Contractor shall bring the condition to the attention of the
Owner's Representative and obtain his determination as to whether or not the
material will require removal, prior to preparing the pipe bedding.
C. Additional backfill material, if required, shall be furnished in accordance with the
provisions therefore in Article 3.08 Backf Il.
3.11 ALTERNATE METHOD OF CONSTRUCTION
A. General:
1. A combination of conditions in the substrata, water table, or method of
disposal may be encountered during the course of the work, which make
dewatering impossible, or only possible through the use of unusual
methods, the cost of which is excessive. When such conditions are
encountered, but only after all reasonable means to dewater the excavation
have been employed without success, the Contractor, with the concurrence
of the Owner's Representative, may elect to employ the following alternate
method of construction. The concurrence of the Owner's Representative
shall be obtained in writing and shall limit the use of the alternate
method of construction to such specific portions of the work as the
Owner's Representatives shall determine.
2. The construction specifications contained in the preceding parts of this
section shall establish the required standards of construction quality for
this work. Use of the alternate method of construction described
hereinafter shall in no way be construed as relieving the Contractor of
his basic responsibility for satisfactory completion of the work. No
additional payment will be made to the Contractor for excavation, backfill,
��
sheeting or any costs incurred for work or materials, or any other costs
incurred as a result of the use of this alternate method of construction.
The unit and lump sum prices established in the Proposal shall be full
payment for the various items of work.
3. Subject to all of the requirements stated hereinabove, including written
approval of the Owner, construction will be permitted in accordance with
the following specifications. All requirements of Article 3.01 through
Article 3.09, inclusive, of these specifications shall apply to this
construction unless otherwise specifically modified herein.
B. Removal of Water: The installation of pipe, manholes and appurtenances under
water will be permitted and the requirements of Article 3.03 Removal of water
will be waived.
C. Excavation:
Excavation of pipe trenches to the level of the bottom of the proposed pipe
bedding shall be performed in accordance with Article 3.02 Excavation. if
rock, such as lime rock or other similar hard, cemented material providing
firm, unyielding trench bottoms is encountered at the level of the bottom
of the proposed pipe bedding, no additional excavation will be required. If
material such as sand, marl, or other material which cannot be classified as
rock, as hereinabove defined, is encountered at the level of the bottom of
the proposed pipe bedding, the pipe trench shall be excavated to an
additional depth of 10-inches minimum, below that level. This additional
excavation, and the additional back filling made necessary thereby, is an
essential part of this alternate construction method and no additional
payment will be made for this work, regardless of the type of material
encountered.
2. Excavation for manholes to be installed under water shall be continued to
a depth, below the outside bottom of the proposed structure, which will
provide a minimum space of 12-inches in rock, or 24-inches in sand, as
the same are deiined hereinabove, for the placement of drainfield lime
rock as hereinafter specified.
3. The excavation of pipe trenches at their junction with excavations for
manholes shall be modified in the following manner: A longitudinally
sloping, plane bottom surface, for the placement of pipe bedding material,
shall be provided from the bottom of the manhole excavation, at its
extremity, to a line of intersection with the bottom of typical excavation of
10-feet measured horizontally, from the vertical plane of the manhole
excavation.
78
D. Pipe and Manhole Bedding: The pipe trench or manhole excavation shall be
backfilled to receive the pipe or manhole with drainfield lime rock as the same is
commonly referred to in this area, up to the level of the lower one-third of the
proposed pipe barrel, or to the outside bottom of the proposed manhole as
applicable. This backfill shall be tamped and compacted to provide proper
bedding for the pipe or manhole, as also specified herein. Under no
circumstances will material other than drainfield lime rock be considered
satisfactory for use as bedding material for underwater construction.
E. Backfill:
1. After the pipe is installed, backfilling shall proceed in accordance
with the provisions of Article 3.08 Backfill, except that drainfield
lime rock shall be used to back fill around the pipe and to a level
even with the top of the pipe be1L Under no circumstances will
material other than drainfield limerock be considered satisfactory
for this purpose.
2. If the Alternate Method of Construction is used, all backfill
material, including drainiield lime rock, shall be carefully lifted
into the trench and released to fall freely therein when the bucket
or container is at or just above water level. Under no
circumstances shall backfill material be dumped or pushed into
trenches containing water. Below the existing water level,
backfill material shall be carefully rammed into place in uniform
layers. Above the water level, backfill material shall be placed
and compacted as specified in Article 3.08 Backfill and Article
3.09 Compaction and Densities.
3.12 RESTORATION OF EXISTING SURFACES
A. Paved and grassed areas disturbed by the operations required under this Section
shall be restored as indicated on the Drawings and/or specified herein. All
materials required for temporary and permanent street repairs shall include base
materials.
PART 4- MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The quantity of Trenching, Backfilling and Compacting for Utility Systems for
which payment will be made shall be the actual number of units measured in
place and accepted. The units measured shall be as listed in the Bid Schedule. If
a payment item for Trenching, Backfilling and Compacting for Utility Systems is
not specifcally included in the Bid Schedule, the quantity for which payment will
be made shall be the quantity required to complete the work.
79
4.02 PAYMENT
A. Payment for Trenching, Backfilling and Compacting for Utility Systems shall be
made at the prices stated in the Bid Schedule. If a payment item for Trenching,
Backf lling and Compacting for Utility Systems is not specifically included in the
Bid Schedule, payment for the work speciiied in this Section shall be included in
the several unit and lump sum prices for all applicable items of work.
END OF SECTION
80
SECTION 02574
PAVEMENT REMOVAL AND REPLACEMENT
PART 1 - GENERAL
1.01 WORK INCLUDED
A. Work includes all labor and materials under this Section for cutting, removing,
protecting and replacing existing pavements of the various types encountered
including roadways, driveways and sidewalks.
B. Permits: The Contractor shall obtain the necessary permits prior to any
roadway work. Additionally, the Contractor shall provide advance notice to the
appropriate authority, as required, prior to construction operations.
C. Protection of Existing Improvements: The Contractor shall be responsible for
the protection of all types of pavements, sidewalks and other improvements
within the work area. All damage to such improvements, as a result of the
Contractor's operations, beyond the limits of the work of pavement replacement
as described herein, shall be repaired by the Contractor at his expense.
PART2-PRODUCTS
2.01 MATERIALS
A. Materials, including lime rock, bituminous prime and tack coat, and asphaltic
concrete for the above work shall meet the requirements established therefore by
the FDOT Specifications.
Lime rock shall be Miami or Ocala Lime rock.
2. Bituminous prime coat material shall be cutback asphalt Grade RC-70.
3. Bituminous tack coat material shall be emulsified asphalt Grade RS-2.
4. Asphaltic concrete shall be Type S-I or S-III.
5. Concrete material shall be Class I or II, and/or as otherwise required to
meet FDOT specifications.
6. Welded wire fabric, joint reinforcing welded wire fabric shall conform
to ASTM-A185 and ASTM-A615.
E�
PART 3 - EXECUTION
3.01 PREPARATION
A. Pedestrian or school crossings: Where the work crosses or interferes with school
or pedestrian crossings, extreme care shall be taken by the Contractor to insure the
safety of school children or other pedestrians. Contractor shall also make
necessary accommodations to provide a safe path for handicap individuals
traveling through the work zone, compliant to ADA.
3.02 PERFORMANCE
A. Removals:
1. Pavement Removal:
a. Where existing pavement is to be removed, the surfacing shall be
mechanical saw cut prior to trench excavation, leaving a uniform
and straight edge, with minimum disturbance to the remaining
adjacent surfacing. The width of cut for this phase of existing
pavement removal shall be minimal.
b. Immediately following the specified backfilling and compaction,
a temporary sand seal coat surface shall be applied to the cut
areas. This temporary surfacing shall provide a smooth traffic
surface with the existing roadway and shall be maintained until
iinal restoration. Said surfacing shall remain for 10 days in order
to assure the stability of the backfill under normal traffic
conditions. Following this period and prior to 15 days after
application, the temporary surfacing shall be removed and final
roadway surface restoration accomplished.
c. In advance of iinal restoration, the temporary surfacing shall be
removed and the existing pavement mechanically sawed straight
and clean to the stipulated dimensions. Following the above
operation, the Contractor shall proceed immediately with final
pavement restoration in accordance with these requirements.
2. Sidewalk, Drive, & Curb Removal: Concrete sidewalks, curbs,
combination curb and gutter, walks, drive ribbons, or driveways shall be
removed by initially sawing the structure, with a suitable power saw, as
specified above for pavement. When a formed joint in the concrete is
within 3-feet of the proposed saw cut and parallels the proposed saw cut,
the removal line shall be extended to the formed joint. After sawing, the
material shall be removed.
82
- .
B. Restorations:
General: Cut and removed driveway or roadway pavement in
connection with trench excavation shall be replaced or restored in equal
or better condition than the original and as may be shown on the
Drawings. The Drawings indicate minimum requirements. Backfill
shall comply with the other sections of these Specifications or FDOT
Standards, whichever are more stringent.
2. Pavement Restoration - Asphalt:
a. Lime rock base course shall be compacted for its full thickness to
not less than 98 percent of maximum density as determined by
AASHTO Designation T 180. field density of lime rock base in
place shall be determined by AASHTO Designation T 238.
b. Construction methods and equipment shall generally meet the
requirements therefore as established in the FDOT Specifications.
c. After the application of the prime coat on the base, the prime
coat shall be allowed to cure without sanding for a period of 24-
hours. The Contractor shall take all necessary precautions to
protect the primed surface against damage during this interval.
If, at the end of 24-hours, it is not proposed to proceed at once
with the application of the surface course, primed surface shall be
given a light application of clean sand and opened to traffic.
d. Joints with existing surface and base shall be sawed cut straight
and neat. If necessary to obtain a straight net joint, the
contractor shall cut out sufficient existing material and replace it
with new material.
e. The upper surface of the completed base course shall be
compacted to an elevation to permit the full depth of the surface
course to be constructed without deviating from the grade of the
pavement surface. The completed surface shall match the line
and grade of the existing surface. When pavement is removed to
the edge of the roadway, the replaced base course shall extend
not less than 6-inches beyond the edge of the surfacing.
f. After the base course construction in the trench area has been
completed and primed, the surface shall be tack coated and the
thickness of Type S-I asphaltic concrete shall be constructed in
:Pc.
accordance with the plans or requirements specified above for
pavement restoration.
Driveway Restoration - Asphalt: Driveway pavement with lime rock base
cut and removed in connection with trench excavation shall be replaced or
restored as speciiied above for street or roadway pavement, except the
new lime rock base course shall be equivalent the existing base course in
thickness, except that in no case shall new driveway base course be less
than 6-inches in thickness. Muck or unsuitable material found under
existing driveway construction will not be removed and replaced.
4. Concrete, Sidewalk, Walkway, Driveway Ribbon and Curb Restoration:
a. Concrete sidewalks, walkways, driveways, driveway ribbons and
curbs required to be removed for the installation of facilities
under this Contract shall be restored. Class I concrete shall be
used in all cases.
b. Replaced portions of these items shall conform to the lines, grades
and cross sections of the removed portions. Concrete
sidewalks and walkways shall be of 4-inch minimum thickness;
concrete driveways and driveway ribbons shall be 6-inch
minimum thickness. Replaced concrete curb and/or gutter shall
join neatly to the remaining section.
Pavement Restoration - Concrete: Rigid pavement shall be replaced in
kind with Class I concrete, using high early strength cement. The
subgrade course for rigid pavement shall be replaced with stabilized
subgrade or cleaniill material and compacted to a thickness to match the
existing base.
a. The Contractor shall saw cut and remove the existing concrete to
the nearest joint as directed in the field by the Owner's
Representative. Provision for expansion joints (minimum %2"
preformed joint filler) and saw cut joints shall be a part of the
restoration work for the driveway and roadway.
6. Asphaltic Concrete Surface Course Overlay:
a. The work under this section includes asphaltic concrete surface
course overlay paving as and where directed by the Owner or his
authorized representative. Where this paving is directed it shall
take the place of asphaltic concrete pavement restoration as
specified herein above. This surface course overlay shall extend
over the reconstructed base course and the existing pavement to the
[�!
limits directed by the Owner or his authorized representative,
which generally shall be full width of the roadway.
b. After the base course construction in the trench area has been
completed and primed, the surface shall be tack coated and the
thickness of Type S-III asphaltic concrete shall be constructed in
accordance with the plans or requirements specified above for
pavement restoration.
7. Nonsurfaced streets, alleys and driveways shall be restored with 6-inches
of compacted lime rock base material placed in the top of the trench.
PART 4- MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The quantity of Pavement Removal and Replacement for which payment will be
made shall be the actual number of units measured in place and accepted. The
units measured shall be as listed in the Bid Schedule. If a payment item for
Pavement Removal and Replacement is not specifically included in the Bid
Schedule, the quantity for which payment will be made shall be the quantity
required to complete the work.
4.02 PAYMENT
A. Payment for Pavement Removal and Replacement shall be made at the prices
stated in the Bid Schedule. If a payment item for Pavement Removal and
Replacement is not specifcally included in the Bid Schedule, payment for the
work specifed in this Section shall be included in the several unit and lump sum
prices for all applicable items of work.
END OF SECTION
m
SECTION 02685
NATURAL GAS PIPELINE INSTALLATIONS
PART 1 - GENERAL
1.01 WORK INCLUDED
A. The work speciiied under this Section consists of all labor, services, equipment,
materials, labor, testing and purging required to complete the construction of the
gas mains and services; including meter sets and connection to the consumer's
piping system with integrity testing performed of the customer' system and
reinitiating of gas service; consisting of, but not limited to, piping, appurtenances
and other accessories as shown on the Drawings and or specifcations.
PART2-PRODUCTS
2.01 MATERIALS
A. Clearwater Gas System will furnish all gas related material in connection with the
installation of gas mains and service lines. Materials will be available for pick-up
by the Contractor at 400 North Myrtle Avenue, Clearwater, Florida, 33755.
Warehouse hours are 7:00 AM until 9:30 AM and 2:30 PM until 3:30 PM. The
contractor may pick up materials during these hours only. The contractor shall
supply the labor and equipment necessary far loading the materials supplied by
the City of Clearwater. The CGS will not provide any items, unless specifically
stated in the contract. The contractor is responsible for all materials obtained and
must adhere to the requirements of contractor vehicle and warehouse audits.
Contractor will be responsible for all shortages and monetary reimbursement is
required.
PART 3 - EXECUTION
3.01 LOADING, STORING AND STRINGING
A. When loading or unloading lengths of plastic pipe, a nylon sling will be used so as
not to damage the pipe itself. When unloading lengths of plastic pipe, it shall be
done by hand in such a manner as not to damage the pipe itself, nor to endanger
the safety of the main.
B. When storing, plastic material and fittings shall be placed on skids and covered
with a sheet of polyethylene or like material to protect it from sunlight.
C. When stringing pipe on the job site, the area will be cleared of all sharp objects,
and pipe will be placed in the ground in the same manner as unloading, so as not
to damage the pipe itsel£ While stringing lengths of pipe, a nylon sling shall be
EZ'7
used in such a manner so as not to damage the pipe itself. Pipe shall not be
dragged along the ground surfaces.
3.02 INSTALLATION
A. Installation shall include excavation whether by trenching machine, backhoe,
directional drilling, by hand or other methods which may be necessary to prepare
a trench in which the pipe will be laid. The word "ditching" is used here and shall
mean the maintenance of ditch, including temporary damming, pumping, bailing
and draining and dewatering, wherever required, and the furnishing and placing of
any temporary shoring used to maintain the ditch. When the gas line parallels
other lines, not less than one foot clearance will be permitted from other lines, but
the required clearance from parallel lines shall be obtained from moving the ditch
lines laterally rather than through reduction of normal minimum cover of the gas
line. The foregoing clearances shall be minimum clearances allowable unless
owners of the interfering lines require greater clearances from gas lines. Then
their requirements shall be met if at all possible.
1. Trench shall be free of debris, sharp rocks, etc., before adding the sand
bed for the new gas main. Sand bed shall have a minimum thickness of 4"
below and 12" above the gas main
2. Before each section of pipe is installed in the line, internal surface shall be
suitably clean.
3. The pipeline shall be pigged_and safely purged prior to fnal acceptance.
4. The open ends of all sections of joined and/or installed pipe (not in
service) shall be closed at night to prevent animals or foreign material
from entering the pipe line or pipe section. Extreme care must be
exercised when moving plastic pipe, support stands and rollers shall be
used when fusing and lowering pipe into the trench or bore hole.
POLYETHYLENE PIPE SHALL NOT BE DRAGGED ON THE
GROLIND OR ON PAVED SURFACES. Support/Stands must be used at
all time that pipe is placed on paved surfaces.
Waterproof nightcaps of approved design may be used but they will be so
constructed that they will prevent the entrance of any type of natural
precipitation into the pipe and will be fastened to the pipe in such a
manner that the wind cannot blow them loose.
6. The practice of stuffing cloth or paper in the open ends of the pipe will not
be tolerated.
m
7. Where possible, the pipe will be raised and supported at a suitable distance
from the open end such that the open end will be below the level of the
pipe at the point of support.
8. Plastic pipe must be installed below ground level and shall have a
minimum 36-inch depth of cover unless shown otherwise. No gas line
shall be installed at a depth of less than 36 inches or greater than 48"
inches below finish grade without written approval of the owner.
Unless otherwise specified a minimum of 12 inches vertically and 24
inches horizontally shall be maintained between the pipe surface and other
utility lines or adjacent foreign structures. In the event that it is not
possible to maintain required vertical clearance from other structures, the
Contractor shall case the gas main in steel pipe or plastic sheeting topped
with concrete at the discretion of the CGS's inspector.
9. Width of ditch shall be no less than twice the pipe diameter.
10. Plastic pipe is not to be installed in a vault or any other below-grade
enclosure.
11. Plastic pipe must be installed so as to minimize shear or tensile stresses.
12. Pipe that has scratches, notches, cuts or any other abrasions that exceed
10% of the pipe wall thickness shall be disposed o£ The Contractor shall
use pipe stands, rollers, spooling devices, or other means to avoid
damaging the pipe during installation. Observe pipe during installation for
scratches, gouges or other defects. If defects are present, remove and
discard defective section of pipe. The CGS Inspector must be notified of
all defects and subsequent repairs.
13. Thermoplastic pipe that is not encased must have a minimum wall
thickness of 0.090 inches and labeled D 2513.
14. Any fittings, valves, crosses or laterals shall be accomplished with fusion
welds and the installation shall be included in the unit cost of the pipe
installation.
B. All lines shall be marked by # 12 insulated copper tracer wire installed 12 inches
above the pipe. Gas mains, valves and locating stations shall also be marked by
adhesive identification disk affixed to the permanent curb or pavement. In
addition, all mains 4-inches or larger shall be marked by 4-inch wide non-metallic
marking tape installed 18 inches above the pipe. Tracer wire shall be looped-up,
uncut, into every valve box including main valves and service valves.
Installations where 500 feet of pipe is laid between valves, empty test station
valve boxes shall be installed over the gas main with tracer wire looped up every
500 feet. In commercially zoned areas, plastic marker poles with tracer wire
E:Z3
looped up and attached may be substituted for gas test station type valve boxes
with the inspector's approval. All tracer wire splices shall be made by the use of a
direct bury splice kit, electric and duct tape connections are prohibited. Upon
completion of the project, and before fnal payment, the contractor will perform
the continuity check of the tracer wire to ensure and demonstrate to the CGS
inspector that there are no separations, and the tracer wire can be used for locating
purposes. The Contractor shall be responsible for repairing any damaged, broken
or otherwise separated tracer wire. All tracer wire, gas marking tape, valve boxes,
valve box concrete rings, marker poles and splice kits will be supplied by
Clearwater Gas System and the installation cost shall be included in the unit cost
of pipe installation.
C. Each plastic main must be installed with sufficient clearance, or must be insulated
from any source of heat, so as to prevent the heat from impairing the
serviceability of pipe. Locating wire is to be considered a source of heat, with the
exception of directional drilling placement.
D. Valves shall be maintained and protected from outside damage throughout the
length of the project and shall be kept accessible. The Contractor shall be
responsible for repairing valves, valve boxes, marker poles and test stations that
are damaged by construction activities. The Contractor shall also make any
adjustments to valve boxes that may be required to be flush with final grade.
Valves and Valve Boxes: Install valves and valve boxes plumb. All boxes shall be
installed flush with the finished grade. Support valve box with prefabricated
valve box rings or other approved formed and poured concrete material. Adequate
backfill shall be placed around the valve boxes and valve extension boxes to
prevent any damage or settlement to the pipeline that may be transferred to the
pipe through the valve box. Protective sleeves shall be installed over fusion joints
and extend through the valve boxes on the polyethylene valve installations. Plastic
valves shall be restrained from torque with approved restraints. Gas valves shall
be marked by adhesive identification disks affxed to the permanent curb or the
permanent pavement and marker poles installed if warranted for visibility. Valves
shall be installed at the design marked locations. Valve supports are required for
2" valves and larger. Valves shall be installed with the operating nut on top,
facing vertically up. CGS will not accept valves that are cocked or oriented in any
direction except up.
E. Prior to joining, all individual gas main lengths shall be swabbed. All gas mains
shall be double pigged prior to initiation of gas service, but after joining has been
complete. The pigs used shall be suitable for different size pipes and be designed
for polyethylene pipe use. Any pig that could damage the pipe, such as wire brush
type pigs suitable for steel pipe shall not be acceptable for use inside plastic
mains. Only use of compressed air to drive the pig through the pipe shall be
permitted.
m
F. Marker Poles: As the pipeline installation has progressed and before completion,
the Contractor shall install marker poles and posts at the locations designated by
the CGS construction standard of not to exceed 500 linear foot intervals and
prominent locations such as offsets and valve locations Bury the anchor end of all
5- foot posts approximately one- foot deep to attain a uniform height of 4- feet
above ground exposure as recommended by the manufacturer and to promote
safety in the line of sight.
3.03 QUALIFICATION OF JOINING PROCEDURES
A. Joining procedures shall be in accordance with Section 192.283 of the US
Department of Transportation, Title 49, Pipeline Safety Regulations, Part 192.
B. Procedures for making joints in plastic pipe may be tested by the pipe and fitting
manufacturers, and these tests may be accepted by the operator for qualification
of the procedure used by the contractor.
C. A copy of each written procedure being used for joining plastic pipe must be
available to the persons making and inspecting joints at the site where joining is
accomplished.
D. The Operations Coordinator will furnish a copy of the manufacturers
recommended Heat Fusion Joining Procedures Manual at the time of certification.
Butt Fusions
1. All butt fusions must be performed by the person(s) qualified by CGS to butt fuse, as certified
by testing pipe size category. Contractor's supervisor shall be present during all pipe fusions to
insure that all required procedures are adhered to and to witness the quality of each joint.
2. Pipe fusion shall be conducted in accordance with the "Clearwater Gas System Polyethylene
Gas Pipe Training Procedures", Ambient temperature shall be between 55° F and 90° F prior to
pipe fusion; otherwise pipe shall be protected from direct sunlight and cooled down until the
ambient temperature falls within the above temperature range.
3.04 QUALIFICATIONS OF PERSONNEL
A. Any person joining polyethylene gas pipe must receive training in accordance
with Section 192.285 of the US Department of Transportation, Title 49, Pipeline
Safety Regulations, Part 192.
B. No person shall make a joint in a plastic pipe unless that person has been certified
through knowledge, skills and ability evaluation. The Gas Construction Inspector will conduct
such evaluation initially and on an annual basis. Records shall be maintained of personnel
qualified to make joints. NON-QUALIFIED CONTRACTOR EMPLOYEES SHALL NOT BE
.�
ALLOWED TO PERFORM POLYETHYLENE JOINING. CGS fusion certifications shall
remain in effect for up to one calendar year.
C. Contractor employees and their sub contractors must meet the requirements and
intent of CFR 49 Part 192.801, 192.803, 192.805, 192.807, and 192.809 relating
to Operator Qualification issued on August 27, 1999 and effective with mandatory
training to be completed by October 27, 2002 and continued knowledge, skills
and ability training, hands on task assessments, to comply with the current OQ
requirements. The Contractor shall furnish for review to the Operations
Coordinator their current plan, so it can be reviewed for compliance. The
Contractor must state in writing that their qualification plan is in conformance
with the intent of Federal Operator Qualification Regulations and is at least equal
to and applicable to Clearwater Gas System's Operator Qualification Plan. The
Contractor's Operator Qualification Plan must also explain how their employees
have the ability to identify and safely react to natural gas related Abnormal
Operating Conditions that may be encountered.
3.05 INSPECTION OF PLASTIC JOINTS
A. Each joint must be inspected to ensure that it is acceptable. The person who inspects
joints in plastic pipes must be qualified by appropriate training and experience in
evaluating the acceptability of plastic pipe joints made under the applicable joining
method. The inspector must be approved by the Operations Coordinator with
concurrence of the Operations Manager.
1. CGS will have OQ certified; polyethylene qualified construction
inspector r at the various gas construction job sites. The Inspector
has the right to reject any fusions not meeting CGS requirements.
The Contractor shall replace all fusions not meeting CGS
requirements at his own expense.
2. The Contractor shall also designate a polyethylene qualified
supervisor who will be present on site at all times to observe pipe
fuser(s).
3. The CGS's Inspector will employ non-destructive testing methods
on polyethylene fusions and reject all deficient fusions. The CGS
inspector can request any amount of random fusion samples, cut
away from a joined pipeline for destructive testing
JOINING PLASTIC PIPE
A. In general, all plastic joining shall be in accordance with American Standards
Code for Pressure Piping, as outlined.
B. A plastic pipe joint that is joined by heat fusion may not be disturbed until it has
been properly set. Plastic pipe may not be joined by a threaded joint. Miter joints
are prohibited.
91
C. Each heat fusion joint on plastic pipe must comply with the following:
1. A heat fusion joint must be joined by a device that holds the heater
element square to the ends of the piping, compresses the heated ends
together, and holds the pipe in proper alignment while the plastic hardens.
2. Heat may not be applied with a torch or other open flame.
3.07 TESTING
A. Each segment of a plastic pipeline must be pressure tested. The test procedure
must insure discovery of all potentially hazardous leaks in the segment being
tested. The plastic pipeline installation shall be pressure tested to 90 pounds per
square inch for MD PE 2406, 150 lbs per square inch for HDPE 3408, or no less
than the Maximum Allowable Operating Pressure of the Distribution System.
The temperature of thermoplastic material must not be more than 100 degrees
Fahrenheit during the test. These tests shall be recorded on a chart-type pressure
instrument, initially starting at the "0" increment mark and progressing to the
testing increment, as testing medium is introduced. Test duration shall be a
minimum of 24 hours and longer as required, depending on the complexity and
developed length. A 24-hour test shall be placed on the entire system of mains
prior to initiation of gas service. If a portion of the gas service has met the
requirements of the leak test and it is possible for the other sections to be tested
independently, then the CGS inspector or the designated representative of CGS
may approve initiation of gas service for that portion.
B. Each day's work shall be tied into the preceding day's work and tested overnight.
A pressure-time clock gauge with a range no greater than 0— 200 psig. and in
good working order shall be furnished by the Contractor. All testing shall comply
with D.O.T. Title 49, Part 192, Transportation of Natural and Other Gas by
Pipeline: Minimum Federal Safety Standards." The location of the project along
with the temperature at the time the test pressure is placed upon the pipe shall be
recorded on the pressure chart. The pressure charts shall be given to the CGS
inspector or the designated representative. In order to facilitate daily testing,
appropriate testing apparatus shall be used. Leaks shall be repaired in a manner
approved by the CGS or the designated representative of CGS before additional
lengths of pipe that need to be tested are added to the main.
C. Fusion joints shall be a one-half inch molten bead of uniform appearance after
completion. This bead shall be visible and examined for penetration 360 degrees
around the pipe diameter.
D. Purging Pipes and Fittings: A combustible gas indicator shall be used when
purging mains, services and house piping. When purging gas from abandoned
lines, the air and the gas must be discharged aboveground at a minimum height of
8' above grade, and directed away from electric power lines or structures. When
'%
purging air from new lines, installation of a 5/8 service saddle and a grounded
metallic riser is required at the end or within four (4) feet from each dead end
on all new installations of pipe in order to purge air from all dead ends
simultaneously. Release gas into new lines at a rate that will prevent formation
of a hazardous mixture of gas and air or precede natural gas with a slug of inert
gas, such as nitrogen provided by the contractor at no additional cost to CGS.
E. If service lines are installed at the same time as the mains, then service lines shall
be included in the testing of the mains. If service lines are installed after gas
service has been initiated, then the Contractor shall test each service line
individually to stand up to an air test of 90- psig. for thirty (30) minutes. If a leak
is discovered, then the Contractor shall immediately make the appropriate repairs,
in a method approved by the CGS inspector or the designated representative of
CGS. All existing service lines that are disconnected from the main temporarily
shall be tested as if they are new lines before being placed back into service. The
pressure shall not decrease during the test period. Air pressure shall be held until
after soap testing. Soap test the service connection by brushing/ spraying an
approved liquid leak detection solution around the tapping tee base at the main,
both ends of the outlet coupling, the outlet connection of the excess flow valve,
and the pipe to riser connection in the customer's yard or business location, and at
the meter valve inlet and outlet. If any leaks appear, the CGS's Inspector will
direct appropriate repair procedures.
INSTALLATION - SERVICES
Service Lines Connected to a Polyethylene Main. All hot taps shall be made by
qualifed fusers using self-tapping tees Contractor shall install tapping tees at the
locations marked by CGS. Bell holes shall be excavated, if installing the gas
mains by boring methods, at each tapping tee installation site to provide an
adequate work area for installation and inspection of tapping tees. The tapping
tees shall be installed in accordance with the CGS Procedures by the person(s)
qualified by CGS to install tapping tees. All tapping tee fusions must be left open
to be inspected by the CGS Inspector. TAPPING TEES SHALL ONLY BE
INSTALLED ON THE TOP OF MAIN
2. The main shall be tapped after the tapping tee fitting and final connections has
cooled for the time period specified by the manufacturer and the service line has
been soaped and pressure tested. The manufacturer supplied tapping wrench or
fitting shall be the only tool used for turning the tapping tee cutter to avoid
tapping the backside of the main or loss of the cutter into the main, allen wrenches
shall not be used.
3. Mechanical Joints. Compression type mechanical joints to connect polyethylene
pipe to steel pipe shall be designed for natural gas use and the gasket material in
the coupling must be compatible with the polyethylene pipe. The coupling must
93
be used in combination with an internal tubular rigid stiffener. The preferred
method is the utilization of a transition fitting to allow a steel to steel connection
using a compression dresser style coupling that can be readily restrained from pull
out by a mechanical or welding a rod type clamping device. Joints shall be
designed and installed to effectively sustain the longitudinal pull-out forces
caused by contraction of the piping or by external loading. Compression
couplings shall not be used in above ground installations. All mechanical joint
connections shall be noted on the submitted asbuilt drawing, including the
coupling manufacturer's pertinent information
3.08 ANTI-DRUG AND ALCOHOL PROGRAM
A. The contractor agrees that it has in place, or will implement a drug and alcohol
training and testing program for its employees that comply with the requirements
of the US Department of Transportation, Title 49, Pipeline Safety Regulations,
Part 199, Drug Testing Program for Pipeline Personnel. The Contractor further
agrees to allow access to its property and records by the Human Resources
Director, or appointed designee, of the City of Clearwater. The Contractor will
permit representatives of state or federal agencies who monitor the compliance of
Drug and Alcohol rules/regulations access to its property and records. The
contractor shall furnish quarterly statistical reports to the Operations Coordinator.
B. Said program shall provide pre-employment, random, for cause and post accident
drug training and testing (alcohol for cause testing) for all of its employees as
required by Federal regulations and who are assigned to perform services for
Clearwater Gas System.
C. The contractor shall attest in writing, under oath, the following:
1. That the contracting firm has an agreement with a drug testing laboratory
certified by HHS/NIDA and an alcohol testing facility;
2. The name and address of the Medical Review Officer retained by the
contractor for the drug and alcohol testing program;
That all employees of the contractor have been drug tested pre-
employment; and
4. That all employees covered by the US Department of Transportation
Regulation 199 receive random, for cause and post accident drug testing
and alcohol testing for cause pursuant to such regulation.
D. Prior to doing any work for the Clearwater Gas System, the contractor will submit
a copy of their current Alcohol Testing Policy and Drug Testing Policy. This
policy will be included in a response to the Request for Bid.
94
PART 4- MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The quantity of Natural Gas Pipeline Installation for which payment will be made
shall be the actual number of units measured in place and accepted. The units
measured shall be as listed in the Bid Schedule. If a payment item for Natural
Gas Pipeline Installation is not specifcally included in the Bid Schedule, the
quantity for which payment will be made shall be the quantity required to
complete the work.
4.02 PAYMENT
A. Payment for Natural Gas Pipeline Installation shall be made at the prices stated in
the Bid Schedule. If a payment item for Natural Gas Pipeline Installation is not
specifcally included in the Bid Schedule, payment for the work specified in this
Section shall be included in the several unit and lump sum prices for all applicable
items of work.
NATURAL GAS HOUSE (PIPING) PLUMBING
DESCRIPTION
It is a mandatory requirement of the Natural Gas House (Piping) Plumbing Section that the
contractor possesses either a Master Plumbers certified or registered with the State of Florida and
locally or a Gas Contractor license registered locally with either PCCLB or Pasco County
Building Department, depending where jurisdictionally the work will be performed.
The work to be performed shall consist of furnishing all necessary labor, tools, equipment,
materials, pipe & fittings, supplies, manufactured articles, power, and essential customer
communication, labor, and other operations necessary for the modification of existing natural gas
house plumbing to accommodate relocation of gas meters including: obtaining required permits
if applicable; installation of new house gas pipes by threading pipe, measuring/ fitting and
assembling pipe and fittings, new shut off valves, gas meters and regulators and connecting
customer piping from a new location and, subsequent pressure testing — leak check (Drop Test-
utilizing a manometer))of the entire house gas plumbing system, and passing required
inspections. CGS will reserve the right to mandate the turning on the gas and relighting the
applicable appliances. Contractor shall immediately notify CGS dispatch of the "on gas" and
complete the required paperwork, including the drop test form, and submit, no later than the
following business day. The work shall be complete and performed in strict accordance with the
Contract specifications, and in compliance with all applicable codes, CGS requirements, Florida
Fuel Gas Code and industry standards. All work, materials, and services not expressly shown or
called for in the Contract Documents, which may be necessary for the complete and proper
�
construction of the work in good faith, shall be performed, furnished, and installed by the
Contractor as though originally so specified or shown, at no increase in cost to CGS. Gas pipe
ftters and plumbers shall be licensed quali�ed and thoroughly trained and experienced in the
skills required, and shall be completely familiar with the design and application of work
described.
EXISTING GAS HOUSE PIPING (PLUMBING)
The modification of the existing gas house piping plumbing shall be performed by the contractor
only after receiving written approval from the CGS construction inspector. With the inspector's
authorization the Contractor shall perform all modifications required for gas meter set clearance
code compliance of existing natural gas plumbing.
The Contractor shall remove and dispose of all abandoned existing gas plumbing piping. The
Contractor shall not cut into the existing gas plumbing until the CGS inspector verifies the new
meter stub-out location.
TESTING
Contractor shall pay for all testing and retesting required to show compliance with the Contract
Specifications, Codes, Regulations, and all other applicable laws.
A. CUSTOMER SYSTEM PRESSURE TEST
The Contractor will conduct leakage tests at one and half times the gas delivery pressure for
minimum time of 15 minutes on the new completed gas plumbing or as required by the City-
County Building Inspector. The pressure shall not decrease or increase during the test period.
B. CODE COMPLIANCE TESTING:
Before turning gas on
Before gas is introduced into a system of gas piping, the entire system shall be inspected to
determine that there are no open fittings or ends and that all valves at unused outlets are closed
and plugged or capped.
C. LEAK DETECTION METHODS
The leakage shall be located by means of an approved gas detector, a noncorrosive detection
fluid or other approved leak detection methods
..
The following is an approved procedure for leak testing customer piping systems:
Leak tests are required any time there is an interruption of service meaning the flow of gas was
stopped for any reason. Florida Fuel Gas Code 406.6.3 (NFPA 54 -8.2.3) states that
"Immediately after the gas is turned on into a new system or into a system that has been initially
restored after an interruption of service, the piping system shall be tested for leakage. If leakage
is indicated, the gas supply shall be shut off until the necessary repairs have been made".
The leak test will indicate any leaks within the propane piping system due to interruption of
service or out of gas situation. The leakage test is simply testing the integrity of the system
plumbing joints and the seal of the pipe joint compound, piping fittings, pipe, gas equipment &
appliances, valves etc. This is the safety reasoning behind leak testing. The purpose a leak test is
performed is the life-safety factor "Protect Life and Then Property and because it is required by
Federal Pipeline Safety Laws of CFR 49.192, Florida Building Code adopted law/ ordinance and
the gas industry.
The leak check tests for leakage throughout the system of piping and appliances. It is used for
new and existing gas systems. It is conducted after a system has been successfully pressure
tested, inspected and approved.
Normally, the leak check is conducted when one of the following occurs:
• A system of new gas or modified gas piping is placed into service for the first time (drop test)
• A gas leakage is suspected (investigation of an odor complaint)
• A gas meter is replaced
• An appliance or appliance connector is replaced
• An out of gas condition occurs (interruption of service)
The pressure test and leak check are often confused. A pressure test is required for new piping
installations, while a leak check is required whenever the gas system is initially placed into
service or when the gas is turned back on after it has been turned off. Leak checks differ from the
pressure test in that it requires no special preparations. The medium used for a leak check is fuel
gas at normal supply pressure. The gas is applied to the total system
LEAK CHECK PROCEDURE
The procedure for the leak check is not specified in the NFPA 54- National Fuel Gas Code or the
ICC Fuel Gas Code- Florida Fuel Gas Code. Any CGS accepted method can be used, as long as
it finds leaks. It is recommended that a written procedure for the method be developed and the
steps be taken to ensure that all employees follow the method established, consequently every
system is tested identically
97
TESTING FOR LEAKAGE
This test can be done by one of the following methods:
For Any Gas System- To an appropriate checkpoint attach a manometer or an appropriate
pressure gauge between the inlet to the piping system and the first regulator in the piping system,
momentarily turn on the gas supply and observe the gauging device for pressure drop with the
gas supply shut off. No evident drop in pressure should occur during a period of 3 minutes.
For Gas Systems Using Undiluted Liquefied Petroleum Gas System- Preparation for propane. A
leak check performed on an LP Gas System being placed back into service should include all
regulators, including appliance regulators, and control valves in the system. Accordingly, each
individual equipment shutoff valve should be supplying pressure to its appliance for the leak
check. This check will prove the integrity of the 100 percent pilot shut off of each gas valve in
the on position. Pilot not incorporating a 100 percent pilot shut off valve and all manual gas
valves not incorporating safety shutoff systems are to be placed in the off position prior to leak
checking, by using the following methods:
By inserting a pressure gauge between the container gas shutoff valve and the frst regulator in
the system, admitting full container gas pressure to the system and closing the container shutoff
valve. Enough gas should be released from the system to lower the pressure gauge reading by
lOpsi. The system should then be allowed to stand for 3 minutes without showing an increase or
decrease in the pressure gauge reading.
For systems serving appliances that receive gas at a pressure of'/2 psi or less, by inserting a water
manometer or appropriate pressure gauge into the system downstream of the final regulator,
pressurizing the system with either fuel gas or air to test pressure of 9 in. water column and
observing the device for a pressure change. If fuel gas is used as a pressure source, it is necessary
to pressurize the system to full operating pressure, close the container service valve, and then
release enough gas from the system through a range burner valve or other suitable means to drop
the system pressure to 9 in water column. This ensures that all regulators in the system are
unlocked and that a leak anywhere in the system is communicated to the gauging device. The
gauging device should indicate no lose or gain of pressure for a period of 3 minutes.
WHEN LEAKAGE IS DETECTED
When pressure drops on the gauge or manometer is noted, all equipment or outlets supplied
through the system should be examined to see whether they are shut off and do not leak. If they
are found tight, there is a leak in the piping system.
Where leakage is indicated, the gas supply at the meter shall be shut off, locked and slugged until
the necessary repairs have been made. CGS dispatch shall be notified ASAP
Where leakage or other defects are located, the affected portion of the piping system shall be
repaired or replaced and retested
Matches, candles, open flames or other methods that could provide a source of ignition shall not
be used
�'Z]
PLACING GAS EQUIPMENT IN OPERATION
Gas utilization equipmend appliances shall be permitted to be placed in operation after the piping
system has been tested and determined to be free of leakage and purged in accordance with
Section 406.7.2. of the Florida Fuel Gas Code
The Contractor will conduct leakage tests at one and a half times the gas delivery pressure for
minimum time of 15 minutes on the existing gas house plumbing or as required by the City-
County Building Inspector. The pressure shall not decrease or increase during the test period.
Other inspections and tests required by the City — County Building Inspector, codes, ordinances,
or other legally constituted authority shall be the responsibility of and shall be paid for by the
Contractor.
Testing of the existing gas house piping plumbing shall be performed prior to connecting the
new supply line.
TESTING:
Testing will be in accordance with the Florida Building Code and the CGS leakage testing
requirements.
CONTRACTOR'S CONVENIENCE TESTING:
Inspection and testing performed exclusively for the Contractor's convenience by CGS shall be at
the convenience of CGS if available and normal labor rates may be applicable .
SCHEDULE FOR TESTING:
1. If applicable, testing shall be scheduled with the Building Department in advance.
2. At least 48 hours notice shall be provided to the Building Department, when permits and
testing is required.
COOPERATION WITH THE BUILDING DEPARTMENT:
Building Inspectors shall have access to the work at all times and all locations where the work is
in progress. Contractor shall provide such access to enable the Building Department to perform
its functions properly.
A. Revising schedule: When changes of construction schedule are necessary during
construction, Contractor shall coordinate all such changes with the Building Department as
required.
B. Adherence to Schedule: When the Building Department is ready to inspect, but is prevented,
correction notices fees will be paid for by the contractor
Natural Gas Distribution System
Any incompleteness of the work, all extra charges for testing attributable to the delay will
be back-charged to the Contractor and shall not be borne by the CGS.
..
COORDINATION WITH CUSTOMERS
The Contractor is responsible for coordinating access to private property with the homeowners.
The Contractor shall notify the property owner/ resident at least 14 days in advance of
performing work. Prior to starting work at a specific location the Contractor shall schedule the
work with the homeowner or resident, as the customer's presence during the meter upgrades/
change out work is required.
The Contractor shall relight all pilot lights the same day after they install the new gas meter and
regulator. Contractor will confirm the regulator settings for the specific flow
No residence shall be shall be left out of gas service overnight. Each residence shall be
reconnected and all pilot lights re-lit before the end of the daily work day.
END OF SECTION
100
SECTION 02696
DIRECTIONAL DRILL UTILITY PLACEMENT
PART 1 - GENERAL
1.01 WORK INCLUDED
A. The work specified under this Section consists of furnishing and installing
underground gas utilities by directional drill methods. This work shall include all
services, equipment, materials, labor and testing required completing the gas
utility installation and restoring any disturbed areas to their existing or better
conditions. The maximum depth of installed gas facilities shall not exceed four
feet unless prior approval is received, since CGS must readily access the facility
for maintenance in the future. All underground utilities shall be located and
potholed prior to the start of boring.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Plastic pipe must meet or exceed the following strength and composition
standards:
PE (Polyethylene) ASTM D 2513
For all gas pipes over 1" diameter
a. Plastic Pipe
1. Couplings: Plastic pipe couplings shall meet or exceed all
applicable ASTM strength and composition standards for
the particular type pipe being used.
2. Joints: Plastic pipe joints shall be made in accordance with
applicable ASTM standards. In all cases, the joints shall be
made sufficiently strong to withstand the stresses of
installation, with joints completely set and cured prior to
placement of the pipe.
B. Drilling Fluids shall consist of a mixture of potable water and gel-forming
colloidal material such as bentonite, or a polymersurfactant mixture producing a
slurry of custard-like consistency.
iol
2.02 EQUIPMENT
A. All equipment used in the execution of work shall have the built-in capacity,
stability and necessary safety features required to fully comply with these
speciiications without showing evidence of undue stress or failure.
It shall be the responsibility of the Contractor to assure that the equipment to be
used in the crossing operation is in sound operating condition. Backup equipment
may be required where job site conditions indicate that severe damage to the
roadway or a hazardous condition may result in the event of an equipment
breakdown and where the condition of the equipment to be used indicates that
routine component replacement or repair will likely be necessary during the
crossmg.
General Arrangement of Tunnel Boring System: The tunnel boring
equipment shall consist of truck-mounted iield power unit and a trailer or
dolly mounter drill unit. A minimum crew of three people is required to
operate the units.
a. Field Power Unit: The field power unit shall be a self-contained
truck-mounted system designed to provide a supply of high
pressure bentonite cutting fluid to the drill unit. It shall contain a
1,000 gallon (3,800 liter) fluid storage tank and a complete
bentonite mixing system. The cutting fluid is to be mixed on site
without the need for an external water supply. It shall permit
changes to be made to the bentonite concentration during tunneling
in response to changing soil conditions. The iield power unit shall
contain the power-takeoff-driven high pressure bentonite pumping
system.
b. Directional Drill System: A dolly mounted version of the drill
system shall include a thrust frame. Both the trailer mounted and
dolly mounted drill system shall be designed to rotate and push
10-foot (3-meter) minimum hollow drill sections into the tunnel
being created by the boring head. The drill sections shall be made
of a high strength steel which permits them to bend to a 30-foot
(9-meter) radius without yielding. Drill end fittings shall permit
rapid make-up of the drill sections while meeting the torque,
pressure and lineal load requirements of the system. The boring
head itself shall house a watertight battery-operated electronic
system used to determine tool depth and location from surface and
to orient the head for steering.
All tunneling systems shall be in sound operating condition with
no broken welds, excessively worn parts, badly bent or otherwise
misaligned components. All ropes, cables, clamps and other non-
l02
mechanical but essential items shall be in sound condition and
replaced immediately when need is apparent.
Other: Devices or utility placement systems for providing
horizontal thrust other than those previously defned in the
preceding sections shall not be used unless approved by the
Engineer prior to commencement of the work. Consideration for
approval will be made on an individual basis for each specified
location. The proposed device or system will be evaluated prior to
approval or rejection on its potential ability to complete the utility
placement satisfactorily without undue stoppage and to maintain
line and grade within the tolerances prescribed by the particular
conditions of the project.
Water sluicing methods, jetting with compressed air, or boring or
tunneling devices with vibrating type heads that do not provide
positive control of the line and grade shall not be allowed.
2. Spoils Equipment: Vacuum truck shall be a self-contained truck which
has sufficient vacuum and capacity to remove excess bentonite mixture
from the project site as required or directed by the Owner's
Representative.
PART 3 - EXECUTION
3.01 PERSONNEL REQUIREMENTS
A. Responsible representatives of the Contractor and Subcontractor(s) shall be
present at all times during the actual crossing operations. A responsible
representative as specified herein is defined as a person experienced in the type of
work being performed and who has the authority to represent the Contractor in a
routine decision making capacity concerning the manner and method of carrying
out the work specified herein.
B. The Contractor and Subcontractor(s) shall have sufficient number of competent
workers on the project at all times to ensure the utility placement is made in a
timely and otherwise satisfactory manner. Adequate personnel for carrying out all
phases of the actual crossing operation (where applicable: tunneling system
operators, operator for removing spoil material, and laborers as necessary for
various related tasks) must be on the job site at the beginning of work. A
competent and experienced supervisor representing the Contractor or
Subcontractor that is thoroughly familiar with the equipment and type of work to
be performed, must be in direct charge and control of the operation at all times.
In all cases the supervisor must be continually present at the project site during
the actual crossing operation.
103
3.02 COORDINATION OF THE WORK
A. The Contractor shall notify the Owner and Engineer at least 24 hours in advance
of starting work. In addition, the actual crossing operation shall not begin until
the Engineer or his representative is present at the project site and agrees that
proper preparations for the crossing have been made. The Engineer's approval for
beginning the crossing shall in no way relieve the Contractor from the ultimate
responsibility for the satisfactory completion of the work.
B. The Contractor and the Engineer shall select a mutually convenient time for
crossing operation to begin in order to avoid schedule conflicts.
3.03 PROCEDURE
A. Erection or installation of appropriate safety and warning devices in accordance
with the Florida Department of Transportation (FDOT) Manual on Trafiic Control
and Safe Practices shall be completed prior to beginning work.
B. Subsurface Soil and Drainage Investigation: To correctly plan individual crossing
procedures such as dewatering, use of cutting heads, positioning of auger within
the casing and to accurately locate potential problem areas, an adequate
subsurface investigation shall be made by the Contractor.
C. Equipment Set-Up:
1. The general operating sequence of the tunneling system shall be as
follows:
a. The trailer or dolly is positioned at the starting location.
b. The tool head and first drill pipe are loaded onto the thrust frame.
c. The proper cutting fluid pressure is set on the iield power unit.
d. The tool is advanced and steered level at the proper depth using the
locator to sense tool position.
e. More drill pipe is added as the tool is advanced.
f. After each new drill pipe is advanced into the ground, the tool is
located and a computer generates the steering command for the
next length of drill pipe to keep the tool on course.
g. Steps "e" and "f' are repeated until the tool advances to the end of
the run.
104
h. At the end of the run the drilling head is removed and a reamer is
attached to enlarge (if necessary) the hole for the utility.
i. The utility is attached to the reamer.
j. The drill pipe is withdrawn from the hole pulling the utility.
k. Utility connections are made.
The area is restored.
D. Crossing Operation: The actual crossing operation shall be accomplished during
daylight hours and shall not begin after the hour pre-established as the latest
starting time that will allow completion during daylight hours except as noted
below:
In emergency situations, or where delay would increase the likelihood of a
failure, nighttime work will only be allowed to complete a delayed
crossing. In addition, where the obvious hazards of nighttime work are
carefully considered and determined to be insignificant, nighttime work
will be allowed to complete a properly planned crossing if the Engineer
agrees that the delay was caused by reasonably unavoidable
circumstances, when such nighttime work is necessary to avoid placing an
undue hardship on the Contractor.
Planned nighttime work is expressly prohibited and will not be allowed
except for extenuating circumstances. Any nighttime work shall be in
strict conformance with the Florida Department of Transportation (FDOT)
Manual on Traffic Control and Safe Practices.
E. Equipment Breakdowns or Other Unforeseen Stoppages: If forward motion of the
tunneling tool has halted at any time other than for reasons planned for in advance
and prevention of voids under paved areas cannot be assured, the tunnel must be
filled with bentonite by injection as soon as possible and abandoned.
When an obstruction is encountered that cannot be passed or an existing utility is
damaged, open cutting for inspection may be allowed if approved by the Engineer
when consideration of all pertinent facts indicate such action is warranted. Any
such authorized excavation shall be repaired according to the appropriate
specifications herein or otherwise directed.
105
3.04 WAIVER OF REQUIREMENTS
A. These specifications are appropriate for most common crossing situations. Under
unusual conditions, not adequately covered herein, these requirements may be
altered or waived when their strict adherence would increase the likelihood of
crossing failure. Any such alteration or waiver shall be based on sound
engineering judgment and must be fully documented as further speciiied herein.
Any alteration or waiver must be approved by the Engineer.
3.05 REPORTING PROCEDURES
A. An accurate log shall be kept by the Contractor on all crossings. The purpose of
this log is to record and report the data necessary to isolate and identify all
common factors associated with underground crossing failures. The log shall also
be for the inspector's use as a checklist of essential items pertaining to the
crossing. The data shall be recorded on the job site during the actual crossing
operation. The log shall include elevation readings of the utility every 10 feet
along the crossing.
PART 4- MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The quantity of Directional Drill Utility Placement for which payment will be
made shall be the actual number of units measured in place and accepted. The
units measured shall be as listed in the Bid Schedule. If a payment item for
Directional Drill Utility Placement is not specifically included in the Bid
Schedule, the quantity for which payment will be made shall be the quantity
required to complete the work.
4.02 PAYMENT
A. Payment for Directional Drill Utility Placement shall be made at the prices stated
in the Bid Schedule. If a payment item for Directional Drill Utility Placement is
not speciiically included in the Bid Schedule, payment for the work specified in
this Section shall be included in the several unit and lump sum prices for all
applicable items of work.
END OF SECTION
�s
SECTION 02935
SODDING
PART 1 - GENERAL
lAl WORK INCLUDED
A. The work specified in this section consists of the establishing of a stand of grass,
within the areas indicated on the Drawings and/or areas disturbed by construction
activities, by the furnishing and placing of grass sod, fertilizing, watering and
maintaining the sodded areas to assure a healthy stand of grass, until rooted.
PART 2 - PRODUCTS
2.01 GRASS SOD
A. Grass sod shall match existing grass type and shall be well matted with grass
roots. The sod shall be taken up in rectangles, preferably 12-inch by 24-inch,
shall be a minimum of 2-inches in thickness and shall be live, fresh and uninjured
at the time of planting. It shall be reasonably free of weeds and other grasses and
shall have a soil mat of sufficient thickness adhering firmly to the roots to
withstand all necessary handling. The sod shall be planted as soon as possible
after being dug and shall be shaded and kept moist until it is planted. After sod is
installed it shall be maintained until it is rooted, which will necessitate watering
frequently
2.02 WATER FOR GRASSING
A. The water used in the sodding operations may be obtained from any approved
spring, pond, lake, stream or municipal water system. The water shall be free of
excess and harmful chemicals, acids, alkalies, or any substance which might be
harmful to plant growth or obnoxious to traffic. Salt water shall not be used.
PART 3 - EXECUTION
3.01 PREPARATION OF GROUND
A. The area over which the sod is to be placed shall be scarified or loosened to a
suitable depth and then raked smooth and free from rocks or stones. Where the
soil is sufficiently loose, the Owner's Representative, at his discretion, may
authorize the elimination of ground preparation.
lo�
3.03 PLACING SOD
A. The sod shall be placed on the prepared surface, with edges in close contact and
shall be firmly and smoothly embedded by light tamping with appropriate tools.
B. Where sodding is used in drainage ditches, the setting of the pieces shall be
staggered so as to avoid a continuous seam along the line of flow. Along the
edges of such staggered areas, the offsets of individual strips shall not exceed 6-
inches. In order to prevent erosion caused by vertical edges at the outer limits, the
outer pieces of sod shall be tamped so as to produce a featheredge effect.
C. On steep slopes, the Contractor shall, if so directed by the Owner's
Representative, prevent the sod from sliding by means of wooden pegs driven
through the sod blocks into firm earth, at suitable intervals.
D. Sod which has been cut for more than 72 hours shall not be used unless
specifically authorized by the Owner's Representative after his inspection thereof.
Sod which is not planted within 24 hours after cutting shall be stacked in an
approved manner and maintained and properly moistened. Any pieces of sod
which, after placing, show an appearance of extreme dryness shall be removed
and replaced by fresh, uninjured pieces.
E. Sodding shall not be performed when weather and soil conditions are, in the
Owner's Representative opinion, unsuitable for proper results.
3.04 WATERING
A. The areas on which the sod is to be placed shall contain sufficient moisture, as
determined by the Owner's Representative, for optimum results. After being
placed, the sod shall be kept in a moist condition to the full depth of the rooting
zone for at least 2 weeks. Thereafter, the Contractor shall apply water as needed
until the sod roots and starts to grow for a minimum of 60 days (or until final
acceptance, whichever is latest).
3.05 MAINTENANCE
A. The Contractor shall, at his expense, maintain the sodded areas in a satisfactory
condition until final acceptance of the project. Such maintenance shall include
repairing of any damaged areas and replacing areas in which the establishment of
the grass stand does not appear to be developing satisfactorily.
B. Replanting or repair necessary due to the Contractor's negligence, carelessness or
failure to provide routine maintenance shall be at the Contractor's expense.
Replanting necessary due to factors determined to be beyond the control of the
Contractor shall be paid for under the appropriate contract pay items.
i�
PART 4- MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The quantity of Sodding for which payment will be made shall be the actual
number of units measured in place and accepted. The units measured shall be as
listed in the Bid Schedule. If a payment item for Sodding is not specifically
included in the Bid Schedule, the quantity for which payment will be made shall
be the quantity required to complete the work.
4.02 PAYMENT
A. Payment for Sodding shall be made at the prices stated in the Bid Schedule. If a
payment item for Sodding is not specifcally included in the Bid Schedule,
payment for the work specified in this Section shall be included in the several unit
and lump sum prices for all applicable items of work.
END OF SECTION
109
m
SECTION 00510
AGREEMENT
THIS AGREEMENT made and entered this 1 St day of April, 2012, by and between the CITY
OF CLEARWATER, FL, a municipal corporation, hereinafter called the "OWNER", and
FLORIDA GAS AND ELECTRIC COPORTATION, hereinafter called the
"CONTRACTOR".
WITNESSETH, That for and in consideration of the payments and agreements to be made and
performed by the Owner, the Contractor, at its own cost and expense and with skill and
diligence, will construct and complete all work shown on the Drawings and described in the
Specifications entitled Replacement of Antiquated Gas Mains, Service Lines, Gas Meters and
Piping Connections to Customer House Piping and Reestablishment of Gas Service at Various
Locations. Bid # 10-12
1: The Contractor shall provide and furnish all labor, materials, necessary tools, expendable
equipment, and all utility and transportation service required to complete the work
provided for in this contract. It is understood and agreed that said labor, materials, tools,
equipment and service shall be furnished and said work performed and completed subject
to the satisfaction of the Owner and subject to the final approval of the Owner and its
authorized representatives. The term of this agreement shall begin April 1, 2012 and
terminates March 31, 2013. Any amendment must be in writing and agreed to both
parties.
2. The Contractor agrees to receive the prices stated in the Proposal attached in full
compensation for furnishing material and labor and executing all the work contemplated
in this Contract; the contract amount shall not exceed $1,640,300.00 based on the
estimated quantities in the Bid 10-12. Owner reserves the right to purchase any amount
up to the estimated quantities based on its needs as determined solely by Owner. Owner
and Contractor agree that there are no minimum requirements for purchase in this
Agreement; the Contractor, for such consideration, shall be responsible for all claims,
causes of action, loss or damages arising out of the nature of the work aforesaid or from
any action of the elements; or from any unforeseen obstruction or difficulties which may
be encountered of every description connected with the work, and furnishing the
materials, until their final completion and acceptance.
3. The work on the site is to be commenced when directed by the Owner or his authorized
representative.
4. To prevent disputes, it is agreed by and between the parties to this Contract that the
Owner or his authorized representative shall in all cases determine the quality and
quantity of the several kinds of work and materials which are to be paid for under this
Contract, and he shall determine questions in relation to lines, levels and dimensions of
27
�
7
work. The Owner shall determine questions in relation to interpretation of the plans and
specifications.
Payment shall be made in accordance with provisions as outlined elsewhere in these
Contract Documents.
The Contract Documents shall consist of the following all of which are familiar to the
Contractor and which are incorporated herein by reference:
2.
3.
4.
5.
6.
Invitation to Bid
Instructions to Bidders
Summary of Information to Bidders
Bid Forms
Agreement Forms
Bonds and Certificates
7. General Conditions
8. Supplementary Conditions
9. Addenda
10. General Requirements
11. Specifications
12. Contract Drawings
This agreement, together with these documents, form the contract, and they are as fully a
part of the Contract as if hereto attached or herein repeated.
� 8. Contractor shall at all times furnish adequate tools, testing supplies1 appliances,
equipment, a sufficient number of properly OQ skilled workmen, and a sufficient amount
of materials and supplies of proper quality to efficiently and promptly prosecute the work
provided for herein and shall promptly pay for all material purchased and shall pay all
workmen each week, and if required by the Owner, shall obtain and furnish Owner
weekly with signed receipts from all workmen showing the date of payment, the amount
paid, number of hours paid for, the days on which said work was performed, the
classification of the labor so paid, and the rate of wage per hour paid and shall supply
Owner weekly with two (2) copies of the payroll verified by an affidavit. Contractor
shall, as often as requested by the Owner, furnish a sworn statement showing all parties
who furnished labor or materials to the Contractor, with their names and addresses and
the amount due or to become due each. A like statement may be required from any
subcontractor of the Contractor.
9. Should the Contractor default in any of the provisions of this contract and the Owner
employs an attorney to enforce or construe any provision hereof or to collect damages for
breach of the agreement or to recover on any bonds provided for herein, the Contractor
and/or his surety agree to pay the Owner such reasonable attorney's fees as the Owner
may expend therein. As against the obligations contained herein, the Contractor and his
surety waive all rights of exemption.
10. The undersigned Contractor agrees that he has carefully inspected all contract documents
and is familiar with the same, and agrees that he is responsible for having heretofore
examined the site, the location and route of all proposed work, and for having satisfied
himself as to the character of said route, the location of surface and underground
obstructions and nature thereof, the nature of the ground water table conditions and other
physical characteristics of the work and the work site in order that he may include in the
aa
11
price which he has bid and the price of this contract all costs pertaining to the work, and
the contract price is based upon these inspections and examinations.
This contract shall not be construed for or against any party because that party wrote it.
12. The Contractor and the Owner for themselves, their heirs, executors, administrators,
successors, and assigns, hereby agree to the full performance of the covenants herein
contained.
1N WITNESS WHEREOF THEY HAVE EXECUTED THIS AGREEMENT.
(CONTRACTOR SEAL)
4.a ,
,.�
r4`�', '�<,
., ,V , '. .
R , �'g "` �c �� `` ' -
:.^Y � s =`'; � :
*�., �'] ` , , `
. � ^P� 7 ��� �"b'""' v" � �..
. � � � v�� ..� pl �� ..
� �°'eomr.c�•- �^��.
�
. ,,,
Countersigned:
— �,P�'���c�1C�t��l
George N. Cretekos
Mayor
APPROVED AS TO
FORM:
Laura Mahony
Assistant City Attorney
29
FOR THE CONTRACTOR
�
B :
ame: Dav L . Runyan
Title: Vice President
�� ��
Witness f the Contractor
CITY OF CLEARWATER, FLORIDA
sy: ,��?��.- `�
William B. Horne, II
City Manager
ATTEST:
� �
By: %" �.1ta�c �- c�
Rosemary Call �
City Clerk �
�
�l�ofryFC/�
.� f �
�
� A�